Sei sulla pagina 1di 22

AID120091-02

Sheraton Hotel Banani | Dhaka, Bangladesh

L1: Material & Finishes Specifications


AID120091-02_SC_TC_PS11_FM_101_C

Rev Date Description By Checked

A 14 October 2016 For Tender PB PB

B 10 February 2017 For Tender PB PB

C 24 February 2017 For Tender PB PB


REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 24 February 2017
DATE:

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT
ACRYLIC
Resin panel@ light cove
AC-101 Resin Panel Dama
diffusers

GLASS
Pyrex Fire Safety Glass Clear AGC Asia Pacific Pte Ltd
GL-101 General Clear Glass
Glass, 10mm

MIRROR

Clear Mirror, Copper & Lead


MR-101 General Clear Mirror AGC Asia Pacific Pte Ltd
Free, 6mm thk

METAL
Stainless Steel Hairline Finish,
MT-101 Stainless Steel Polaris Archimetal Pte Ltd
Anti Fingerprint

MT-102 Mirror Black Metal Black Mirror Metal Polaris Archimetal Pte Ltd

Patterned Metal for Lift 1D- 092, Ant Fingerprint, Black


MT-103 Tiking Pte Ltd
Doors Colour
Black Metal Hairline Finish,
MT-104 Stainless Steel Polaris Archimetal Pte Ltd
Anti Fingerprint

PAINT

Interior Emulsion paint, Dulux Akzonobel Paints (S) Pte


PT-101 Ceiling Paint
Winter Hills 50RB 83/005 Ltd

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02_SC_TC _PS11_FM_101_C
Page 1 of 3
REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 24 February 2017
DATE:

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT
Interior Emulsion paint, Dulux
Akzonobel Paints (S) Pte
PT-101 Ceiling Paint at Wet Area Winter Hills 50RB 83/005,
Ltd
Mouldgaurd Finish

STONE

Preselected
Tilottoma Bangla Group
in Dhaka
ST-101 Polished Grey Granite Polished Granite (Green Granite & marble
Ltd)

Preselected
ST-102 Flamed Textured Granite Flamed Textured Tilottoma Bangla Group
in Dhaka

Preselected
ST-103 Honed Granite Tilottoma Bangla Group
Honed Grey Granite in Dhaka

TILES

Mosaic at Wall Behind


TL-101 Shading Blend 20 Begonia GF+A Global Pte Ltd
Reception Counter

WALLCOVERING

.Xessex Pte Ltd


WC-101 Wallcovering at Toilet Manakin Belize 89000-89005

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02_SC_TC _PS11_FM_101_C
Page 2 of 3
REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 24 February 2017
DATE:

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT

WOOD

Tilottoma Bangla Group


Veneer Panels at Lobby
WD-101 Walnut 3711Q, JQC-1113 (Jiangsu Qiancheng Wood
Wall
Technology )

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02_SC_TC _PS11_FM_101_C
Page 3 of 3
Sheraton Hotel, REV. 24 February
PROJECT : PROJECT NO. : AID120091-02
Dhaka DATE : 2017

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

AC-101 GL-101 MR-101


Resin panel@ light cove diffusers General Clear Glass General Clear Mirror

MT-101 MT-102 MT-103


Stainless Steel Mirror Black Metal Patterned Metal for Lift Doors

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TC _PS11_FM_101_C

Page 1 of 3
Sheraton Hotel, REV. 24 February
PROJECT : PROJECT NO. : AID120091-02
Dhaka DATE : 2017

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

MT-104 PT-101 PT-102


Black Metal at Door Handles Ceiling Paint Ceiling Paint at Wet Areas

ST-101 ST-102 ST-103


Polished Grey Granite Flamed Textured Granite Honed Grey Granite

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TC _PS11_FM_101_C

Page 2 of 3
Sheraton Hotel, REV. 24 February
PROJECT : PROJECT NO. : AID120091-02
Dhaka DATE : 2017

LOCATION : Arrival Lobby ISSUE DATE : 14 October 2016 REV # : C

FINISHES & MATERIALS SCHEDULE

TL-101 WC-101 WD-101


Mosaic at Wall Behind Reception Wallcovering at Toilet Veneer Panels at Lobby
Counter

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TC _PS11_FM_101_C

Page 3 of 3
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : AC-101

ISSUE 14 October REV


LOCATION : Arrival Lobby - REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Resin panel@ light cove diffusers

Dimensions Refer To Exhibit For Pattern

Finishes & Content -


Order Ref Resin panel

Manufacturer Dama

Supplier Dama

Address 3029A Ubi Road 3,


#01-98/99 Singapore 408661

Contact Tel/Fax T: +65 6743 6100


F : +65 6395 9100 IMAGE FOR DESIGN INTENT ONLY

E: biz@dama.com.sg
Notes :

1. All items shall be read in conjunction with AID091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.


3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 1 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : GL-101

ISSUE 14 October REV


LOCATION : Arrival Lobby REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description General Clear Glass

Dimensions 10mm Thick

Finishes & Content Clear


Order Ref Pyrex fire safety Glass Clear Glass,

Manufacturer AGC Asia Pacific Pte Ltd

Supplier AGC Asia Pacific Pte Ltd

Address AGC Asia Pacific Pte Ltd


460 Alexandra Road
#32-01 PSA Building
Singapore (119963)
Contact Tel/Fax Christine Wong
E: christine.wong@agc.com IMAGE FOR DESIGN INTENT ONLY
DID : (65) 6277 4274
Office main phone line : (65) 6273 5656
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 2 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : MR-101

ISSUE 14 October REV


LOCATION : Arrival Lobby REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Clear Mirror


Dimensions 6mm Thick
Finishes & Content Clear Mirror
Order Ref Clear Mirror, Copper & Lead Free

Manufacturer AGC Asia Pacific Pte Ltd

Supplier AGC Asia Pacific Pte Ltd

Address AGC Asia Pacific Pte Ltd


460 Alexandra Road
#32-01 PSA Building
Singapore (119963)
Contact Tel/Fax Christine Wong
E: christine.wong@agc.com IMAGE FOR DESIGN INTENT ONLY

DID : (65) 6277 4274

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and

installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of

similar appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 3 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : MT-101

ISSUE 14 October REV


LOCATION : Arrival Lobby REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Stainless Steel

Dimensions Verify With Drawings

Finishes & Content Hairline Finish, Ant Fingerprint

Order Ref Stainless Steel Hairline Finish

Manufacturer Polaris Archimetal Pte Ltd

Supplier Polaris Archimetal Pte Ltd

Address 7 Soon Lee St #05-33 Ispace,


Singapore 627608

Contact Tel/Fax Catherine Chang


IMAGE FOR DESIGN INTENT ONLY
T : +65 6261 9751
F : +65 6261 7528
M : +65 93853815
Email : catherine25@polarisam.com
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and

installation.
4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of

similar appearance and performance to the satisfaction of the Consultant.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 4 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka, NO. : 2 CODE : MT-102

ISSUE 14 October REV 24 Feb


LOCATION : Arrival Lobby REV. # : C
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Mirror Black Metal

Dimensions Verify With Drawings

Finishes & Content Mirror Finish, Ant Fingerprint

Order Ref Black Mirror Metal

Manufacturer Polaris Archimetal Pte Ltd

Supplier Polaris Archimetal Pte Ltd

Address 7 Soon Lee St #05-33 Ispace,


Singapore 627608

Contact Tel/Fax Catherine Chang


T : +65 6261 9751
F : +65 6261 7528
IMAGE FOR DESIGN INTENT ONLY
M : +65 93853815
Email : catherine25@polarisam.com
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and
installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of
similar appearance and performance to the satisfaction of the Consultant.
AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 5 of 15
ITEM
Sheraton Hotel PROJECT AID120091-0
PROJECT :
Dhaka, NO. : 2
CODE MT-103
:
ISSUE 14 October REV 24 February
LOCATION : Arrival Lobby REV. # : C
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Patterned Metal for Lift Doors

Dimensions 0.8mm-2mm Thk (To be Verified by lift consultant)

Finishes & Content Anti Fingerprint Black Colour

Order Ref 1D- 092

Manufacturer Tiking Pte Ltd

Supplier Tiking Pte Ltd

Address 10 Kaki Bukit Road, 2 #01-06 First East Centre


Singapore 417868

Contact Tel/Fax T : +65 66361826


F : +65 66361829
M : +65 93853815
IMAGE FOR DESIGN INTENT ONLY
E: tiking@singnet.com.sg

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and

installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of

similar appearance and performance to the satisfaction of the Consultant.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 6 of 15
ITEM
Sheraton Hotel PROJECT AID120091-0
PROJECT :
Dhaka, NO. : 2
CODE MT-104
:
ISSUE 14 October REV 24 February
LOCATION : Arrival Lobby REV. # : C
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Black Metal at Door Handles

Dimensions -

Finishes & Content Anti Fingerprint Black Colour

Order Ref Black Metal, Hairline Finish

Manufacturer Polaris Archimetal Pte Ltd

Supplier Polaris Archimetal Pte Ltd

Address 7 Soon Lee St #05-33 Ispace,


Singapore 627608

Contact Tel/Fax Catherine Chang


T : +65 6261 9751
F : +65 6261 7528
IMAGE FOR DESIGN INTENT ONLY
M : +65 93853815
Email : catherine25@polarisam.com
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and

installation.
4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of

similar appearance and performance to the satisfaction of the Consultant.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 7 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : PT-101

ISSUE 14 October REV


LOCATION : Arrival Lobby - REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Ceiling Paint

Dimensions To Be Verified, Refer To Corresponding Drawings

Finishes & Content Low Sheen


Order Ref Interior Emulsion paint, Dulux Winter Hills 50RB
83/005
Manufacturer Akzonobel Paints (S) Pte Ltd

Supplier Akzonobel Paints (S) Pte Ltd

Address 22 Soon Lee Road ,Singapore 628082


IMAGE FOR DESIGN INTENT ONLY
Contact Tel/Fax Caroline Chia
E: caroline.chia@akzonobel.com
M: +65 8188 5191
T: +65 6267 6116 F: +65 6268 4696/ 6265 4775
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 8 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : PT-102

ISSUE 14 October REV


LOCATION : Arrival Lobby - REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Ceiling Paint at Wet Areas

Dimensions To Be Verified, Refer To Corresponding Drawings

Finishes & Content Low Sheen


Order Ref Interior Emulsion paint, Dulux Winter Hills 50RB
83/005 Mould guard
Manufacturer Akzonobel Paints (S) Pte Ltd

Supplier Akzonobel Paints (S) Pte Ltd

Address 22 Soon Lee Road ,Singapore 628082


IMAGE FOR DESIGN INTENT ONLY
Contact Tel/Fax Caroline Chia
E: caroline.chia@akzonobel.com
M: +65 8188 5191
T: +65 6267 6116 F: +65 6268 4696/ 6265 4775
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 9 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : ST-101

ISSUE 14 October REV 10th Feb


LOCATION : Arrival Lobby REV. # : B
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Polished Grey Granite

Dimensions 1200(L)x1200 (W) x 8 (THK) mm

Finishes & Content Polished

Order Ref Polished Grey Granite (Preselected in Dhaka)

Manufacturer Green Granite & marble Ltd

Supplier Tilottoma Bangla Group


Address 67 Bir-Uttom C.R. Dutt Road, Hatirpool Dhaka-1205
Banladesh IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Shahriar Sajjad


T: 880-9668808
F:880-2-9663184
E:sajjad@tilottoma.com, info@tilottoma.com
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and

installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient

requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of

similar appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 10 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : ST-102

ISSUE 14 October REV 10th Feb


LOCATION : Arrival Lobby REV. # : B
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Flamed Grey Granite

Dimensions 1200(L)x1200 (W) x 8 (THK) mm


Finishes & Content Flamed texturerd

Order Ref Flamed Texturered Grey Granite (Preselected in


Dhaka)
Manufacturer Green Granite & marble Ltd

Supplier Tilottoma Bangla Group


Address 67 Bir-Uttom C.R. Dutt Road, Hatirpool
Dhaka-1205 Banladesh
Contact Tel/Fax Shahriar Sajjad
T: 880-9668808
F:880-2-9663184 IMAGE FOR DESIGN INTENT ONLY

E:sajjad@tilottoma.com, info@tilottoma.com

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 11 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : ST-103

ISSUE 14 October REV 10th Feb


LOCATION : Arrival Lobby REV. # : B
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Honed Grey Granite


Dimensions 1200(L)x1200 (W) x 8 (THK) mm

Finishes & Content Honed Finish

Order Ref Honed Grey Granite (Preselected in Dhaka)

Manufacturer Green Granite & marble Ltd

Supplier Tilottoma Bangla Group


Address 67 Bir-Uttom C.R. Dutt Road, Hatirpool
Dhaka-1205 Banladesh

Contact Tel/Fax Shahriar Sajjad


T: 880-9668808
IMAGE FOR DESIGN INTENT ONLY
F:880-2-9663184
E:sajjad@tilottoma.com, info@tilottoma.com
Flamed Grey Granite
Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 12 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka, NO. : 2 CODE : TL-101

ISSUE 14 October REV


LOCATION : Arrival Lobby - REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Mosaic at Wall Behind Reception Counter


Dimensions 20 x 20

Finishes & Content Polished

Order Ref Shading Blend 20 Begonia

Manufacturer Bisazza

Supplier GF+A Global Pte Ltd


Address 24 Mohamed Sultan Rd. Singapore 239012.

Contact Tel/Fax T: +65 6222-2112


F: +65 6223-2112
E: andrew.lim@gfaglobal.com
IMAGE FOR DESIGN INTENT ONLY

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 13 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka NO. : 2 CODE : WC-101

ISSUE 14 October REV


LOCATION : Arrival Lobby - REV. # : A
DATE : 2016 DATE :

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Wallcovering at Toilet


Dimensions -

Finishes & Content Non Woven Fabric Back

Order Ref Manakin Belize 89000-89005

Manufacturer Arte

Supplier Xessex Pte Ltd


Address
9 Penang Road Park Mall #06-01 Singapore
238459
Contact Tel/Fax Jianing
T: +65 6333 1833
F: +65 6333 1815 IMAGE FOR DESIGN INTENT ONLY
E: jianing@xessex.com.sg

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 14 of 15
Sheraton Hotel PROJECT AID120091-0 ITEM
PROJECT :
Dhaka, NO. : 2 CODE : WD-101

ISSUE 14 October REV 10th Feb


LOCATION : Arrival Lobby REV. # : B
DATE : 2016 DATE : 2017

FINISHES & MATERIALS SPECIFICATION SHEET

Item Description Veneer Panels at Lobby Wall and Doors

Dimensions -

Finishes & Content Matt Finish

Order Ref Walnut 3711Q JQC-1113

Manufacturer Jiangsu Qiancheng Wood Technology Co Ltd

Supplier Tilottoma Bangla Group


67 Bir-Uttom C.R. Dutt Road, Hatirpool
Dhaka-1205 Banladesh
Address Shahriar Sajjad
Contact Tel/Fax T: 880-9668808
IMAGE FOR DESIGN INTENT ONLY
F:880-2-9663184
E:sajjad@tilottoma.com, info@tilottoma.com

Notes :

1. All items shall be read in conjunction with AID120091-02_DD_PRM_01.

2. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

3. Supplier/Manufacturer to confirm all details, requirements and specifications with contractor prior to manufacture and installation.

4. Supplier/Manufacturer to confirm with contractor on all site measurements.

5. All materials must be soil resistant, flame proofed to meet local fire codes and durable to fit for intended use.

6. Contractor must provide appropriate sealers to resist stains & water absorption and meet all country slip coefficient requirements

7. Must be contract quality & suitable for commercial installation.

8. All items are equal and approved. The proposed material is indicative, alternatives may be proposed providing they are of similar

appearance and performance to the satisfaction of the Consultant.

9. Manufacturer to submit actual samples mounted on board for Client/Designers approval.

AID120091-02_SC_TC _PS11_FM_301_B
PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS
Page 15 of 15

Potrebbero piacerti anche