SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN

Centrifugal Fan SATIP-K-001-01 30-Apr-13 HVAC

PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Not Applicable

2.0 MATERIAL RECEIVING

The intent of this SATIP is to cover Fans used as


Exhaust and Supply Fan SAIC SAIC Exhaust and Supply Fans (Wall Mounted, Roof
2.1
Receiving Inspection K-4001 K-4001 H w Mounted, Ceiling Mounted, Inline and any other type of
mounting as specified in the Construction Drawings)

HVAC System Electrical, See See


2.2 See SATIP-P-104-08 HVAC Equipment
Instrumentation and Control Remarks Remarks
See See
2.3 Low Voltage Motor See SATIP-P-113-01 LV Induction Motors
Remarks Remarks

Handling , Storage and Preservation SAIC SAIC


2.4
Inspection K-4001 K-4001 w S Contractor QA/QC to perform Weekly Inspection

3.0 INSTALLATION

Exhaust and Supply Fan SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.1
Inspection K-4002 K-4002 H w each location by type or manufacturer

SAIC SAIC
3.2 Battery Room HVAC Requirements
K-4046 K-4046 H w

Essential Operating Facilities HVAC SAIC SAIC


3.3
requirements K-4006 K-4006 H w
Pressurized Building HVAC SAIC SAIC
3.4
Requirements K-4044 K-4044 H w
Communication Facilities HVAC SAIC SAIC
3.5
Requirements K-4045 K-4045 H w
Air Moving/Cooling Equipment
SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.6 Duct/Pipe Connection
K-4003 K-4003 H w each location by type or manufacturer
Inspection

Page 1 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN

Centrifugal Fan SATIP-K-001-01 30-Apr-13 HVAC

PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

See See
3.7 Low Voltage Motor See SATIP-P-113-01 LV Induction Motors
Remarks Remarks

Page 2 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 6 COS 03/31/2012
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN

Centrifugal Fan SATIP-K-001-01 30-Apr-13 HVAC

PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

HVAC System Electrical, See See


3.8 See SATIP-P-104-08 HVAC Equipment
Instrumentation and Control Remarks Remarks
4.0 PRE-COMMISSIONING

4.1 Not applicable

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractors performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents

Page 3 of 3