STATUS OF COMPONENT INSPECTION RECORD

HALL : 2

DATE DATE PENDING PENDING PASSING RATE


No QTY CAST ACCEPTED NCR REJECT
CASTING INSPECTION INSPECTION (REPAIR) (%)

1 8.8.2017 9.8.2017 35 0 0 34 1 0 0%

2 9.8.2017 10.8.2017 35 0 0 35 35 0 0%

REMARKS : Major defect


STATUS OF COMPONENT INSPECTION RECORD
HALL : 3

DATE DATE PENDING PENDING PASSING RATE


No QTY CAST ACCEPTED NCR REJECT
CASTING INSPECTION INSPECTION (REPAIR) (%)

1 8.8..2017 10.8.2017 31 0 0 31 0 0 0%

REMARKS : Major defect


STATUS OF COMPONENT INSPECTION RECORD
HALL : 4

DATE DATE PENDING PENDING PASSING RATE


No QTY CAST ACCEPTED NCR REJECT
CASTING INSPECTION INSPECTION (REPAIR) (%)

1 7.8.2017 8.8.2017 8 4 0 4 0 0 50%

2 8.8.2017 9.8.2017 11 7 0 4 0 0 64%

3 9.8.2017 10.8.2017 11 7 1 3 0 0 64%

4 11.8.2017 12.8.2017 12 5 3 4 0 0 42%

REMARKS : Improvement reduce defect panel

Panel : Partition wall & shear wall


Defect : No Opening; honeycomb
Improvement:
STATUS OF COMPONENT INSPECTION RECORD
HALL : 5

DATE DATE PENDING PENDING PASSING RATE


No QTY CAST ACCEPTED NCR REJECT
CASTING INSPECTION INSPECTION (REPAIR) (%)

1 8.8.2017 9.8.207 13 0 0 13 0 0 0%

2 9.8.2017 10.8.2017 7 1 1 7 0 0 14.28%

3 10.8.2017 11.8.2017 8 5 0 8 0 0 62.50%

4 11.8.2017 12.8.2017 8 1 0 8 0 0 12.50%

REMARKS : Defect panel;

Panel : Shear Wall & Partition Wall


Defect: honeycomb, rebar link position, starter bar position, missing lifting item deha
STATUS OF COMPONENT INSPECTION RECORD
HALL : 7

DATE DATE PENDING PENDING


No QTY CAST ACCEPTED NCR REJECT PASSING RATE (%)
CASTING INSPECTION INSPECTION (REPAIR)

1 7.8.2017 8.8.2017 24 21 0 3 2 0 88%

2 8.8.2017 9.8.2017 15 14 0 1 1 0 93%

3 9.8.2017 10.8.2017 9 5 0 4 4 0 56%

4 10.8.2017 11.8.2017 14 14 0 0 0 0 100%

5 11.8.2017 12.8.2017 12 10 0 2 1 0 83%

REMARKS : Improvement reduce the defect

Panel : Lift Wall


Defect: Honeycomb, concrete leakage
Improvement: