Sei sulla pagina 1di 2

SHORING DESIGN REVIEW CHECKLIST

PLOT NO. DATE


LOCATION
CONSULTANT SPECIALIZED CONTRACTOR

Section S/N Elements to be checked Consultant Contractor


NOT NOT
GENERAL OK N/A OK N/A
OK OK
1 NOC from Infrastructure department
2 NOC from neighbors
3 NOC from other Authority (if required)
4 Copy of Valid Site plan
5 Approved Soil report by Creative Clusters Authority
6 Shoring design calculation (hard & soft)
7 Consultant & contractor stamp and logo on drawing
8 Third party approval (if necessary)
SOIL REPORT PARAMETERS
9 Coefficient of Pressure at rest Ko
10 Coefficient of Active Pressure at rest Ka
11 Coefficient of Passive Pressure Kp
12 Cohesion (c)
13 Angles of friction ()
14 Wall friction
15 Water table
RUN THE PROGRAM AND CHECK OUTPUT FILES
16 Moment
17 Shear
18 Anchor Force
19 Embedment length
20 Deflection (maximum 30mm road side, 50mm neighbor side)
21 Stresses
DESIGN OF SHORING REINFORCEMENT
22 Maximum Percentage of Reinforcement 4%
23 Minimum Percentage of Reinforcement 0.4%
24 Minimum of 6 No. bars spaced evenly around
25 Minimum bar size shall be 12mm
26 Maximum spacing 300mm
DESIGN OF ANCHORS
27 Maximum grout length (10m)
28 Minimum grout length (3m)
29 Anchor Spacing vertical and horizontal (min 1.2m)
30 Safety factor
31 Standard diameter for pre stressing tendon
32 Specified characteristic strength / ultimate tendon capacity
Anchors force near the water bodies (special safety factor to be
33
added)
34 Ultimate bond strength

Page 1 of 2 ZD-DC-F-77 Issue 5, Rev 0, Dated 14/06/2015

dcca.gov.ae
Section S/N Elements to be checked Consultant Contractor
NOT NOT
DESIGN OF CAPPING BEAM OK N/A OK N/A
OK OK
37 Moment and Shear
38 Stresses
DESIGN OF I BEAM
39 Moment and Shear
40 Stresses
DESIGN OF CONCRETE PANEL
41 Moment and Shear
42 Stresses
SURCHARGE
2
43 Surcharge 20kN/m
44 Existing building (calculation)
MATERIAL PROPERTIES
45 Concrete
46 Steel
WALLER BEAM
47 Compulsory for contiguous piles and Secant piles
48 Design of Waller beam

REVIEWERS COMMENT(S)

SPECIALIZED CONTRACTOR CONSULTANT

Reviewed by Contractor Reviewed by Consultant


Name Stamp Name Stamp
Designation Designation

Signature Signature

Date Date

Page 2 of 2 ZD-DC-F-77 Issue 5, Rev 0, Dated 14/06/2015