Sei sulla pagina 1di 4

JOB HAZARD ANALYSIS

Team composition: 09 th August .2016

1) Ifejika celestine
TASK: CLEANING OF RMU 2) Ogbonnaya Martins (CSR)
3) Alozie Sunday (HSE-Adviser)
LOCATION: WATER FACILITIES YARD, I.A PHC 4) Agama David (Technician)
5) Raymond Ini (Technician)

Task step Hazard-Source Threats Top-Event Consequence Who/what Inher Barrier/ Control Recovery Action Party
ent Measure
May be Measure
harmed Risk

1)-Carry-out H1- Dust T1- -Contact to -Injury to Personnel (L) C1-Ensure R1.1- Apply R1.1 1.2
RMU cleaning particles Inadequate sharp-edges worker adequate use of first-Aid
use of PPE P1A PPE Alozie S
H2-Sharpedges -Inhalation of -Nasal
T2-Horse-play dust disorder. C1.2-No horse-
H3-Tripping play R1.2-
Hazard T3- -Cut / wound to MEDIVAC C1.1 C1.6
Carelessness personnel C1.3-Proper Agama
H4-Prolonged concentration
bending T4-The -Waist-pain David
needed
weather Uche N
H5.Use of hand- condition - C1.4-Proper
tools Raymond
observation of
T-5.Fatigue weather and do
not work under
rain

Prepared by . Agreed

Sign Sign..
C1.5-Rest a while

C1.6-Use nose
mask

C1.7-Use shoc-
card

2)-Carry-Out H1-Shape Edges T1-Body Cut / Wound Injury to Personnel ( L) C2.1-Provide R4.1 Apply R4.1 R4.2
Hipot Test contact personnel sanction for test First Aid. Alozie
H2-Wrong sharp-edge Trip & Fall & P2.B Certificate
reading C4.1- C4.7
-Damage to Assets A2.B
T3-Poor C2.2-Use of PPE, Agama
H3-Use of hand supervision Assets Equipment R4.2 David
tools Damage C2.3-mind your
-Skeletal- MEDIVAC
T3-Wrong steps Uche N
H4-Tripping procedure musculo-
hazard Disorder C2.4-. Follow Raymond
T4- procedures.
Carelessness
C2.5-Ensure
/ Fatigue
proper
T5-Use of supervision
incompetent
personnel C2.6-Use a
trained
T6-Use of personnel.
uncertified
C2.7-Use a
Equipments
certified
equipments

Prepared by . Agreed

Sign Sign..
WORK METHOD STATEMENT / PROCEDURESINTRODUCTION

This document present the methodology involved in CLEANING OF RMU.

Task: CLEANING OF RMU.


S/N TASK STEPS STEPS DESCRIPTION
1 Raise Permit to work Raise permit to work and other applicable permit to enable
asset owner to be aware of the job to be done.
2 Conduct tool box meeting Tool meeting to be done before commencing work and
highlighting some of the hazard involved in the job
3 Carry-out Cleaning of RMU This involved the cleaning of RMU with the use of sandpapers
and liquid detergent for proper cleaning.
4 Carry-Out Hipot Test This refers to the confirmation of the leaking current on the
Ring Main Unit (RMU). DEP 63.10.08.91-Gen.

Prepared by . Agreed

Sign Sign..
MATERIALS / EQUIPMENT
1. Simple Hand Tools
2. Sandpapers
3. Detergent
4. Hi Pot tester.
5. Wire brush

Prepared by . Agreed

Sign Sign..