Sei sulla pagina 1di 1

NOTES:

1. All dimensions are in millimeters


2. Use class class 25 for bases &beams ,
class 30 for columns and 20 for the slab
4Y10-55-200T2 7Y12-52-150T1 3.Read this drawing in conjunction
5Y10-53-200T2 with relevant Architectural drawings.
7Y12-46-150T1 7Y12-54-150T1 4. Minimum cover for concrete is:
4Y10-49-200T2 5Y10-51-200B2 a. Foundation = 50mm
b. Columns = 30mm
7Y12-45-150T1 7Y12-50-150B1
4Y10-47-200T2 c. Beams = 25mm
7Y12-48-150T1 d. Slabs = 25mm
7Y12-44-150T1 2 5. All reinforcement to be twisted bars
0B
6Y10-43-200T2
Y1
0 -35
-2 0
3rd floor B.S 4449.
6. All steel reinforcement must be
approved by the Structural Engineer
5Y10-42-200B2 14
4Y10-64-200T2
7Y12-41-150B1 7Y12-60-150T1
13
Y1 7Y12-58-150T1
0-6 4Y10-61-200T2
3-2 7Y12-56-150B1

2850
7Y12-62-150B1 00
B2 6Y10-59-200T2
4Y10-55-200T2 7Y10-57-200B2
7Y12-52-150T1
7Y12-54-150T1 5Y10-53-200T2
7Y12-46-150T1
4Y10-49-200T2 5Y10-51-200B2
7Y12-45-150T1 7Y12-50-150B1
4Y10-47-200T2
7Y12-44-150T1 2 7Y12-48-150T1
0B
6Y10-43-200T2
Y 10
- 3 5-2
0
2nd floor
5Y10-42-200B2 14
4Y10-64-200T2
7Y12-41-150B1 7Y12-60-150T1
13
Y1 7Y12-58-150T1
0-6 4Y10-61-200T2
3-2 7Y12-56-150B1

2850
7Y12-62-150B1 00
B2 6Y10-59-200T2
4Y10-55-200T2 7Y10-57-200B2
7Y12-52-150T1
7Y12-54-150T1 5Y10-53-200T2
7Y12-46-150T1
4Y10-49-200T2 5Y10-51-200B2
7Y12-45-150T1 7Y12-50-150B1
4Y10-47-200T2
7Y12-44-150T1 2 7Y12-48-150T1
0B
6Y10-43-200T2
Y1 0 -35
-2 0
1st floor
5Y10-42-200B2 14
3Y10-26-200T2
7Y12-41-150B1 3Y10-23-200T2
13
Y1
0-2 7Y12-22-150T1
7Y12-24-150B1 5-2
0 7Y12-19-150T1
0B

3,000
2 10Y10-21-200T2
7Y12-37-150T1
10Y10-20-200B2
4Y10-39-200T2
7Y12-18-150B1
4Y10-38-200B2
7Y12-33-150T1 7Y12-36-150B1
4Y10-40-200T2

7Y12-31-150T1 7Y12-32-150T1
4Y10-34-200T2
7Y12-27-150T1
0 B2
6Y10-29-200T2
10
-3
5 -2
0
ground floor
6 Y
6Y10-30-200B2 1
3Y10-26-200T2
7Y12-28-150B1 3Y10-23-200T2
13
Y1 7Y12-17-150T2
0-2 7Y12-22-150T1
7Y12-24-150B1 5-2
0 7Y12-19-150T1
0B
3,000

2 10Y10-21-200T2
7Y12-37-150T1
10Y10-20-200B2
4Y10-39-200T2
7Y12-18-150B1
6Y10-14-200T2 0T1
4Y10-38-200B2
- 20
7Y12-33-150T1 7Y12-36-150B1
4Y10-40-200T2 Y 1 0-18 9Y10-16-200B1
7
7Y12-31-150T1 5Y12-13-150T1
4Y10-34-200T2 7Y12-32-150T1 7Y12-15-150B2
7Y12-27-150T1 2
0B
6Y10-29-200T2
10
- 35
-2
0
basement i 5Y12-12-150B1
Y
6Y10-30-200B2 16
3Y10-26-200T2
6Y10-11-200B2
7Y12-28-150B1 3Y10-23-200T2
13
Y1
0-2 7Y12-22-150T1
X
7Y12-24-150B1 5-2
0 7Y12-19-150T1 BOSKO ENGINEERING LTD
0B
SECTION X-X
3,000

2 10Y10-21-200T2 P.O BOX 25371-00100, NAIROBI


10Y10-20-200B2 7Y12-08-150T1 TEL: 254 735190997
4Y10-09-200T2 Boskoengineers@gmail.com
7Y12-18-150B1
4Y10-07-200B2
4Y10-10-200T2
X EDWIN KOLA
7Y12-06-150B1
B2
7Y12-01-150T1
2 00
05-
0-
Y1
15
6Y10-03-200T2 7Y12-04-150B1
basement II
7Y12-02-150B1

SECTION THROUGH STAIRCASE OF BLOCK A D.O.O


D.O.O
B.O.O
D.O.O

AS INDICATED ON THE DRAWING


December 2014

Potrebbero piacerti anche