Form BCA-BE-PERMIT-A1

DECLARATION ON THE PLANNING APPROVAL STATUS OF THE BUILDING PROJECT


AT THE TIME OF SUBMISSION OF THE JOINT APPLICATION FOR PERMIT
TO COMMENCE *DEMOLITION/SITE FORMATION/PILING/STRUCTURAL/BUILDING WORKS

Commissioner of Building Control INSTRUCTION


Building and Construction Authority 1 * Delete accordingly
5 Maxwell Road #02-00 2 Tick the appropriate box of items 1 to 3 and if item 3 is
Tower Block, MND Complex applicable, also tick items 3.1 or 3.2 with 3.2.1 and/or 3.2.2.
Singapore 069110 Item 3.1 & 3.2 do not apply to piling / demolition works.
3 Indicate "NA" in boxes not applicable
4 Please use BLACK INK to complete the form
DECLARATION (To be completed by the Qualified Person who prepared the building plans or the structural plans where building plan
submission is inapplicable)

Project Title: PROPOSED INTERIM BUS DEPOT WITH SINGLE STOREY WORKSHOP AND TWO STOREY ANCILLARY
FACILITIES _____________________________________________________________________________________________

___________________________________________________________________________________________________________

___________________________________________________________________________________________________________

*Lot/Plot: 04150M PT & 04238V ____________ *TS/MK 31____________________

House No.: _______________________ Road: ____ LOYANG AVENUE _______________________

I declare that the planning approval status of the above building project is as ticked below:-

1 Written Permission was issued by the Competent Authority under the Planning Act (Cap 232)
on ___________________ as per copy attached.

2 Planning approval is not required.

2.1 under URA exemption list.

2.2 as Lodgement Form has been submitted as per receipt attached.

3 Provisional Permission was issued by the Competent Authority under the Planning Act (Cap 232)
on ___________________ as per copy attached and the proposal

3.1 DOES NOT involve an alteration to the Master Plan, i.e Rezoning and/or increase
in Plot Ratio and is not subject to payment of Development Charge.

3.2 involves an alteration to the Master Plan, i.e. Rezoning and/or increase in Plot
Ratio and/or is subject to payment of Development Charge and

3.2.1 Rezoning has been approved by the Minister as per copy of


correspondence attached.

3.2.2 payment of Development Charge has been made to or secured


by the Competent Authority as per copy of documentary proof attached.

Name & Signature of Qualified Person Name & Address of Professional Firm

BEV/B1_APPENDIX 1_Jan 2009 Page 1 of 2


Form BCA-BE-PERMIT-A1
Registration No.: Date: UEN: Tel no.:

BEV/B1_APPENDIX 1_Jan 2009 Page 2 of 2