ER356QP-QP(S) Monthly Report No: 20 (June 2012)

C & V ENGINEERING PTE LTD


Contract ER356QP
Qualified Person (Supervision) for Contract No: ER356QP
For Proposed Access Road To Changi North Industrial Park
QP(S) Monthly Report No: 20 (Ending June 2012)

Client Land Transport Authority

Reference ER356-120630-6043-CV-Monthly Report No: 20 (Ending 30 th June 2012)

Submitted by C & V Engineering Pte Ltd

00 30th June 20th issue Mr. Yap Yuen Chua Cheng Kim Hua
2012

Rev Date Notes /Description Prepared by Reviewed/Approved by

Contents
Contents................................................................................................................................................2

1.0 Summary.........................................................................................................................................4

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 1


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

1.1 Introduction ..............................................................................................................................4

1.2 Status of Main Contractor works................................................................................................4

1.3 QP(S) Works.................................................................................................................................4

2.0 Scope of Main Contract and QP(S) Works......................................................................................5

2.1 Main Contract Works...................................................................................................................5

2.2 QP(S) Works.................................................................................................................................6

3.0 Transmittals.....................................................................................................................................6

3.1 Letters to LTA on Main contractors matter..................................................................................6

3.1.1 Statistics on Letter Review Time...........................................................................................6

Table 3.1.1a Statistics on Submission Review times (month of May)..............................................6

Table 3.1.1b Cumulative Statistics on Submission Review times (since Nov 09).............................7

3.2 Letters to LTA on matters other than Main Contractors issue.....................................................7

3.3 Letters received from LTA /other Authorities...............................................................................7

4.0 Construction Drawings.....................................................................................................................7

5.0 Meetings, inspections and coordination..........................................................................................7

5.1 Meetings and coordination..........................................................................................................7

5.2 Inspections carried out................................................................................................................7

6.0 Main contractor construction works, safety and monitoring and areas of concern.........................8

6.1 Main contractor construction works............................................................................................8

6.2 Safety and monitoring work.........................................................................................................8

6.3 Area of concern...........................................................................................................................8

7.0 Contractors Programme and Method Statements..........................................................................8

8.0 QP(S) matters QP(S) Manpower Deployment...............................................................................8

8.1 QP(S) Manpower Deployment.....................................................................................................8

Table 8.1 - Summary of staff mobilised (as at 30 th November 2010)..................................................9

9.0 QP(S) Progress Photographs for the month of May 2012.............................................................9

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 2


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

List of Appendixes
Ref Title

1A QP(S) Scope of works

2A Letter to LTA - Review of Main Contractors submission

3A Letter to LTA and Authorities except on Contractors submission/issues

3B Letter from LTA/other Authorities

3C BCA Authority Submission Monitoring Table

4A List of Construction Drawings

5A List of Meetings Held/Attended

5B List of Inspections

7A Status of review of Method Statements as at 30 June 2012

8A QP(S) Staffing

9A Monthly Progress Photographs (Month of June 2012)

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 3


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

Summary
1.1 Introduction
The Contract ER356QP is for the provision of Qualified Person(Supervision)Services
for the main contract ER356 - which was awarded to Koon Construction & Transport
Co. Pte. Ltd. in July 10 . ER356QP services commenced on 26 th October 2010 and due
to complete by 30th June 2012, to be followed by a 12 months servicing of the
contractors defect liability period.

The ER356QP Contract reference is as follows:

Main contract Duration 24 calendar Months + 12 months defect liability


period

Main contract commencement 26th July 2010


date

Main contract completion date 26th July 2012 (24 months)

ER356QP Commencement date 26th October 2010

ER356QP Completion date 26th July 2012 (22 months)

% of time lapsed (ER356QP) 86.36% ( 19 out of 22 month)

1.2 Status of Main Contractor works


a) The Contractor has carried out the following works in June 2012:--

i. Casting for Diaphragm Beam & slab, parapet wall


ii. The Contractor carried out Deck Slab.
iii. The Contractor Carried out Road Pavement & Base Slab Retaining wall.

QP(S) Works
a) QP(S) -C&V Engineering PTE. LTD. Commence QP service on 26 th October 2010.

b) QP(S) supervised /observed/reported on the following : --

i. Inspection for: - Casting of Crash Cushion Concrete Pad.


ii. Casting of Parapet Wall.
iii. Review Method of statements/Test Reports submitted by Contractor.

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 4


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

2.0 Scope of Main Contract and QP(S) Works


2.1 Main Contract Works
The Main Contract ER356 had been awarded to Koon Construction & Transport Co. Pte Ltd
in July 10.

The works comprised works such as:

Design and construction of a elevated vehicular RC deck structure over


open drain for the ingress from TPE to Changi North Industrial Park

Design & construction of a Structure over canal, a signalized traffic junction, an


acceleration lane & at grade roads for egress from Changi North Industrial Park into
PIE.

Modification & Recambering of existing carriageway to tie in with the levels of the
adjacent connecting roads.

Widening / recambering / raising / milling down and overlaying of existing


carriageways, construction of rigid pavement at at-grade road
intersections and accesses to adjoining developments as shown in the
Drawings.

Design, construction & modification of earth retaining structures including


Retaining walls, slopes & embankments, etc.

All drainage works (roadside drains, culverts, sumps, etc) including all ancillary
works but not limited to the complete design, obtaining necessary approval from
relevant authorities including but not limited to PUB(Drainage), supply of materials
and equipment, construction and handing over to relevant authorities;

All sewer diversion works including but not limited to the complete design, obtaining
necessary approval from relevant authorities including but not limited PUB
(Sewerage), supply of materials, construction and handing over to relevant
authorities;

Resiting / reconstruction of existing signage, guardrails, railings, bollards and all


others affected by the Works

Site clearance, earth works, turfing, and construction of footpath, trench


works and trees planting.

Miscellaneous works.

All temporary and monitoring works related to the projects.

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 5


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

2.2 QP(S) Works


The Contract ER356QP is for the provision of Qualified Person(Supervision) Services for
the main contract ER356 - The scope of works is shown in Appendix 1A - QP(S) scope
of works.

QP(S) services include the provision of professional engineering supervision services as


required under the Authoritys requirements and /or the requirements of other authorities
and agencies and to comprise:

Provide qualified site supervision staff as required under the Building Control Act to
support the QP(S);

Ensure that the construction works are carried out in a safe manner in
accordance with best construction practices; and

Any other professional engineering services as set out in the scope of Services.

3.0 Transmittals

3.1 Letters to LTA on Main contractors matter


The list of letters to LTA related to Main contractor is as shown in Appendix 2A (Review of
Main Contractors submissions).

3.1.1 Statistics on Letter Review Time


According to the Quality Performance Evaluation Criteria as stated in C&V`s Project Quality
Plan (PQP section 2.5) 50% of all letters must be reviewed within 7 days and 55% after 1 years. It
also states that 90% of all letters must be reviewed within 14 days and 96% after 1 year. Table 3.1.1a
shows the letters reviewed statistics for the month of August 2011 whereas Table 3.1.1b shows the
cumulative statistics of all letters received and reviewed since the beginning of the project. As can
be seen, all targets set had been achieved.

Table 3.1.1a Statistics on Submission Review times (month of June 2012)


Letters received June Letters reviewed in June Within 7 days (%) Within 14 days (%)
2012 2012

2 2 75 % 25%

Table 3.1.1b Cumulative Statistics on Submission Review times (since Nov 10)
Letters received since Letters reviewed since Within 7 days Within 14 days (%)
project commenced project commenced. (%)

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 6


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

101 100 98% 2%

3.2 Letters to LTA on matters other than Main Contractors issue

The list of letters to LTA on issues other than those linked to Main contractor s
submission are as shown in Appendix 3A (Letters to LTA , except on Main Contractors
submission/ issues ).

3.3 Letters received from LTA /other Authorities


The list of letters from LTA is as shown in Appendix 3B (Letters from LTA/other Authorities).

4.0 Construction Drawings


The construction drawings list is as shown in Appendix 4A (List of Construction Drawings).

5.0 Meetings, inspections and coordination

5.1 Meetings and coordination


The list of meetings held in this month is as shown in Appendix 5A (list of Meetings held
/attended).

5.2 Inspections carried out


Inspections carried out for this month are summarised in Appendix 5B (List of Inspections).

6.0 Main contractor construction works, safety and monitoring and


areas of concern

6.1 Main contractor construction works


a) Casting of Deckslab, Beams, Diaphragm wall, Top Slab & Paraphet Wall

6.2 Safety and monitoring work


a) All safety issues were closely monitored. Any potential safety problems that were
noted on site were immediately conveyed to KCTC for rectification. Items noted so far
were of relatively minor in nature & was rectified by Contractor within the given time
frame.

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 7


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

b) No SQNs were issued for the month of June 2012.


c) The Contractor conducted their 18th monthly safety committee meeting on 29th March
2012 in our presence, regarding the safety precautions & awareness of workers. Safety
Toolbox meetings were held on a daily basis.

6.3 Area of concern


a) SAFETY REVIEW - We have frequently reminded KCTC that safety matters are always
top of concerns. So far 1 minor work related accident was reported.

b) INTERNAL PROCEDURES - The Contractor has been reminded to ensure that Method
Statements are submitted at least 28 days before commencement of construction
activities to give sufficient time for the Method Statement to be reviewed. This is
because there are always comments from the LTA and QP(S) which needs to be
addressed before the Contractor is allowed to commence works.

c) UNAUTHORISED WORKS None to report for the month of June 2012.

7.0 Contractors Submission : Method Statements


For the Complete List of Method of Statement please refer to Appendix 7A .

8.0 QP(S) matters QP(S) Manpower Deployment


8.1 QP(S) Manpower Deployment
The manpower deployment is shown in Appendix 8A -List of Staf

So far the full force of 2 RTOS have been deployed (since 14 th Feb 11), please see Table 8.1

Table 8.1 - Summary of staff mobilised (as at 30th November 2010)


Ref Position Contract Mobilised Mobilised number
required number from from 14th February
number 8th November 2011
10

Part time

QP(S) Qualified Person 1 1 1


(Supervision)

Full time

RTO Resident technical 1 1 1


Officer

Total full RTOs 1 1 1


time staf

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 8


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

Note : * The Duties of RTO 1 has been Resumed from 10 th April 2012.

9.0 QP(S) Progress Photographs for the month of June


2012.
Please see Appendix 9A attached.

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 9


ER356QP-QP(S) Monthly Report No: 20 (June 2012)

APPENDIX 1A - QP(S) Scope of Works


QP(S) is to provide the required Qualified Person (Supervision) [QP(S)] to

a) provide professional engineering supervision services as required under the Authoritys


requirements and /or the requirements of other authorities and agencies;

b) provide qualified site supervision staff as required under the Building Control Act to
support the QP(S);

c) ensure that the construction works is carried out in a safe manner in accordance with
best construction practices; and

d) Any other professional engineering services as set out in the scope of Services.

QP(S)s primarily role is to ensure safety and quality construction by the main contractor and
serve as the technical advisor to LTA on the matter of supervision . As no formal contract exists
between The Main contractor and QP(S) , all dealing are through LTA and no changes in the design
is to be accepted during the supervision stage , unless the QP(Design ) and LTA have approved it.

As the main contract is a Design and Build contract , the main contractor has engaged the design
firm (Fong Consult Pte. Ltd) to undertake the full design based on LTAs tender development
drawings and also based on further data/information collected by the main contractor.

The main contractor had also engaged Er. Dr. Goh Sew Khee as PE for temporary works as well as
PE (TERS) for temporary earth retaining structures .

At the same time , LTA has also engaged Accredited Checker ( AC) namely Mr. Chitaldroog
Keshava Murthy to provide the required check on permanent design of the works, as well as for
the checking of the AIP documents. Where necessary, an AC will also be engaged by LTA.

QP(S) role is mainly to carry out supervision duties and checking services for method statements
and other proposals submitted by KCTC. The temporary works which are not deemed to be checked
by an AC are also to be checked by QP(S). However, the permanent design check , obtainment of
the permit to carry out structural works from the BCA, and modifications, if any, at construction
stage are to be handled by the QP(D) .

The full scope of works for QP(S) is as described in the contract document for ER356QP

ER356-120630-6043-CV-Monthly Report No.20(June 2012) 10