Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)
1 SUMP A To RL -55 RL - 55 To Rl 55 1,000,000 2,396 Rl -30 (Series) 19,676 25 300 1.20 3.60 28.60 MF 385 1 120 432 6,480
2 SUMP B To RL -35 RL -35 To Rl 55 56,000 134 Rl 55 17,414 90 1,400 1.33 18.62 108.62 MF 385 1 130 468 7,020
3 SUMP C To RL -10 RL - 10 To Rl 55 46,000 110 Rl 55 17,390 65 2,000 1.33 26.60 91.60 MF 385 1 130 468 7,020
Total Days
2,640 54,480 20,520
Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)
1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288
Rl -30 (Series)
- - -
- - -
- - -
Total Days
2,396 3,260 36,288
-
- 5 10 15 20 25
Day
PUMP CALCULATION OPTION 01
BY USING 2 UNITS MF 390
Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line Pipeline (m)
(m3) (m2) ( m3 / hour ) ( m 3 / hour ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/hour)
1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288 1,200
Rl -30 (Series)
- #N/A #N/A #N/A - - -
Total Days
2,396 3,260 36,288
-
- 5 10 15 20 25
Day
PUMP CALCULATION OPTION 02
BY USING 3 UNITS MF 390
Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)
1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.52 4.56 29.56 MF 390 4 140 504 36,288
Rl -30 (Series)
- - -
- - -
- - -
Total Days
2,396 3,260 36,288
-
- 2 4 6 8 10 12 14 16 18
Day
PUMP CALCULATION OPTION 03
BY USING 1 UNITS MF 420
Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)
1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 1.95 5.85 30.85 MF 420 3 220 792 42,768
Rl -30 (Series)
- #N/A #N/A #N/A - -
Total Days
2,396 3,260 42,768
-
- 2 4 6 8 10 12 14 16 18
Day
PUMP CALCULATION OPTION 03
BY USING 1 UNIT 140, 1 UNIT 340, 1 UNIT MF 390 and 1 UNIT MF 420
Volume Catchment Inflow Cumm. Inflow Static Pipeline Head Loss Friction Total Head Pump Flowrate
No Pond Alarm level (RL) Outlet Highest Line
(m3) (m2) ( m 3 / day ) ( m 3 / day ) Head (m) ( meter ) (m / 100m) Head (m) Type Number (ltr/s) (m3/hr) (m3/day)
1 SUMP A To RL -55 - RL - 55 To Rl 55 1,000,000 2,396 Err:509 3,260 25 300 0.33 0.99 25.99 MF 140 1 60 216 3,888
Rl -30 (Series)
- 25 300 0.82 2.46 27.46 MF 340 1 100 360 6,480
Total Days
2,396 3,260 33,696
Day
Sump Dimension Calculation
COAL FROM INDONESIA
SUMP A
Catchment Area 1,000,000.00 meter2
1 30 25 4 3,000
2 30 20 4 2,400
3 40 15 4 2,400
SUMP B
Catchment Area 56,000.00 meter2
1 30 15 4 1,800
2 30 20 4 2,400
3 25 25 4 2,500
Sump Dimension Calculation
COAL FROM INDONESIA
SUMP C
Catchment Area 46,000.00 meter2
1 30 15 4 1,800
2 25 20 4 2,000
3 25 25 4 2,500
DYNAMIC HEAD VS FLOWRATE
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL
1995 275.1 205.0 219.8 194.5 231.5 206.5 83.2 251.7 96.5 123.3 133.0 183.0 2,203.10
1996 231.5 300.3 141.5 133.3 218.5 116.5 181.5 48.8 55.8 177.0 57.0 145.5 1,807.20
1997 118.0 206.3 132.8 155.0 119.8 121.8 92.3 130.8 1.0 73.8 208.0 321.3 1,680.90
1998 222.4 277.2 341.7 119.7 158.5 116.9 221.6 302.4 191.3 225.4 176.4 255.1 2,608.60
1999 237.5 147.9 157.9 209.3 169.3 190.7 183.5 100.5 119.9 181.2 238.7 257.2 2,193.60
DIKETAHUI
JAN FEB MAR APR MAY JUN JUL AUG SEP mm / day
OCT NOV DEC Luas Cachment area =100ha
2.971 3.114 2.722 2.224 2.459 2.061 2.088 2.285 1.273 2.139 2.228 3.1838 2.395753 Debit Air Tanah=20.0 l/Jam
Luas Sump = 300.0 m2
Tinggi Permukaan Air =50.0 mdpl
Tinggi permukaan Tambang = 75.0 mdpl
Panjang pipa =300.0 m
Head Losse =1.2 m/100
Maximum In A 275.1 300.3 341.7 209.3 231.5 206.5 221.6 302.4 191.3 225.4 238.7 321.3 2608.6
Average In A M 9.2 10.0 11.4 7.0 7.7 6.9 7.4 10.1 6.4 7.5 8.0 10.7
Rain Plan / Qua 10.19 7.19 7.95 8.73
20.434
Water Volume Vs Actual Elevation
In Payau Pond
Water Volume (meter3)
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
-
50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94
Actual elevation