Sei sulla pagina 1di 33

Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT
AMA

AMA

AMJ AHS
MAH
MAH

RE-ISSUED FOR APPROVAL


ISSUED FOR APPROVAL

KAPSARC & COMMUNITY PROJECTS DEPARTMENTS


DESCRIPTION

DHAHRAN COMMUNITY HOUSING PROJECTS DIVISION


AS-BUILT

BI-10-01382

EXPAND DHAHRAN RESIDENTIAL COMMUNITY


UTILITIES INFRASTRUCTURES AND NETWORKS
JO/EWO

10-01382

PACKAGE - 2
25/06/15

07/09/15
DATE

07/27/17
NO.
REV

01
A

DISCIPLINE
ENGINEER

PROTECTION RELAY SETTING REPORT FOR


AHS
07/27/17
DATE:
PROJECT
ENGINEER
JZM
S/S #46A, S/S #46B AND RESIDENTIAL PAD-MOUNTED
DATE:
CERTIFIED
07/27/17
SF6 LOOPS
AMJ
07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS
07/27/17
DATE:
Prepared by
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

JULY 2017
(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 1
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
TABLE OF CONTENTS
ENGG CERT
AMA

AMA

AMJ AHS
MAH
MAH

1. OBJECTIVES .................................................................................................................... 3
2. REFERENCE STANDARDS .............................................................................................. 3
3. ELECTRICAL SYSTEM DESCRIPTION ............................................................................ 3
4. VENDOR INFORMATION .................................................................................................. 4
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

5. CALCULATION BASIS ..................................................................................................... 4


DESCRIPTION

AS-BUILT

6. DATA FOR CALCULATION .............................................................................................. 5


7. PROTECTION AND CO-ORDINATION PHILOSOPHY ..................................................... 6
8. LIST OF PROTECTIVE RELAY ......................................................................................... 9
9. SETTING CALCULATION ............................................................................................... 11
10. ATTACHMENT ................................................................................................................ 33
JO/EWO

10-01382
25/06/15

07/09/15
DATE

07/27/17
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS
07/27/17
DATE:
PROJECT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED
AMJ
07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 2
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
1. OBJECTIVES
AMJ
ENGG CERT

The objective of the study is to determine the protection relay settings for the new 115kV
AMA

AMA

AMJ

gas insulated switchgear (GIS) substation 46A, new double-ended 13.8kV substations 46B
AHS
MAH
MAH

which will feed the residential pad-mounted SF6 loops and 13.8kV distribution system such
as SWCC pump station, and the existing substation No. 16. at Dhahran residential
community. The selected settings will maximize the protection system discrimination and
provide adequate protection against short circuits and overloads.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

2. REFERENCE STANDARDS

2.01 Saudi Aramco Engineering standards

SAES-P-100 Basic Power System Design Criteria


SAES-P-114 Power System Protection and Control
SAES-P-121 Transformer and Reactors
JO/EWO

10-01382

2.02 IEEE standards


25/06/15

07/09/15
DATE

07/27/17

IEEE STD 242-2001 Recommended Practice for Protection and Coordination of


Industrial and Commercial Power Systems
NO.
REV

01
A

DISCIPLINE
ANSI C37.91 Guide for Protective Relay Applications to Power
ENGINEER
AHS
IEEE C37.108 Guide for the Protection of Network Transformers
DATE:
07/27/17 IEEE Std C57.91-1995 IEEE Guide for Loading Mineral-Oil-Immersed Power
PROJECT
ENGINEER
Transformers
JZM IEEE C37.113-1999 Guide for Protective Relay Applications to Transmission
07/27/17
DATE: Lines
CERTIFIED
AMJ
IEEE C37.101 Guide for Generator Ground Protection
07/27/17 NFPA 70 National Electric Codes
DATE:
CONSTRUCTION
AGENCY
AMJ 3. ELECTRICAL SYSTEM DESCRIPTION
DATE:
07/27/17
It is proposed to expand Dhahran residential community in order to support company
OPERATIONS
mission and accommodate manpower projected in the future. Under this BI, it is required to
AFS

DATE:
07/27/17 construct new residential villas, apartment buildings, schools, community facilities, and
CONTROL NUMBER
VERIFICATION

support facilities to achieve Saudi Aramco residential program.In addition, it is compulsory


EDSD

to design new electrical power distribution system. It is planned to design a new 115kV gas
DATE:

insulated switchgear (GIS) substation that will interface with National Grid 115kV substation
BY:
REVISIONCERTIFICATION

located at Half-moon bay via 2 underground cables.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________

Moreover, the residential primary distribution system will operate at 13.8kV through looped
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 3
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
pad-mounted SF6 switchgears, underground cables, and looped package substations. As a
AMJ
result, new double-ended 13.8kV substations will be constructed to feed the residential
ENGG CERT
AMA

AMA

AMJ

pad-mounted SF6 loops and all other facilities requires a 13.8kV distribution system such
AHS
MAH

as SWCC pump station, and the existing substation No. 16.


MAH

4. VENDOR INFORMATION
4.01 ABB, 115kV switchgear documents APEP
RE-ISSUED FOR APPROVAL

4.02 EEIC-13.8kV, 480V switchgear,


ISSUED FOR APPROVAL
DESCRIPTION

4.03 EEIC-package substation


AS-BUILT

4.04 EEIC-13.8kVpad mounted switchgear documents


4.05 ALFANAR- 480V switchgear
4.06 SPTC and WESCOSA, power transformer documents
4.07 SEL, MERLIN GERIN, ABB protective relay documents
5. CALCULATION BASIS
JO/EWO

The calculation bases adopted in this document are summarized as shown below.
10-01382

5.3 Load data in this calculation is based on following Electrical Load List& Load
25/06/15

07/09/15
DATE

07/27/17

Summary for Substation 46A & 46B as a result of detail design.


NO.
REV

01
A

DISCIPLINE
HE-361186 (Rev.B)
ENGINEER
AHS
5.4 Simplified one line diagram for calculation is based on following one line diagram
07/27/17
DATE:
PROJECT
ENGINEER
as a result of detail design.
JZM

DATE:
07/27/17
HA-361005-sht 1 to 2 (REV.0F1) Electrical key one line diagram SUB 46A & 46
CERTIFIED
AMJ HA-361006- sht 1 to 5(REV.0) One line diagram PMSG at PKG 3,4,5,6.
07/27/17
DATE:
CONSTRUCTION
HA-361007-sht 01 (REV 0) 208-046-SG-301 Protection & Metering
AGENCY
AMJ HA-361008-sht 01 (REV 0) 208-046-SG-001 Protection & Metering
07/27/17
DATE:
OPERATIONS HA-361009-sht01 (REV0) 208-046-MCC-001 one line diagram
AFS
07/27/17
HA-361010-sht01 (REV0) 208-046-MCC-002 one line diagram
DATE:
CONTROL NUMBER

HA-361119-sht 1 to 07(REV 0F1) 208-46-SG-601 Protection and metering


VERIFICATION
EDSD

HA-361118 208-046-XFR-601/602 one line diagram


DATE:

HA-106978 SS 16 Single Line Diagram


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

5.5 Electrical power study-short-circuit parameters at network interface locations


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

are based on information from Saudi Electricity Company through contractor.


(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 4
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
6. DATA FOR CALCULATION
AMJ Input data to the calculation software is as listed below
ENGG CERT
AMA

AMA

AMJ

6.1 SYSTEM SHORT CIRCUIT CAPACITY AT THE INTERFACE POINTS.


Table 1: Utility short circuit parameters
AHS
MAH
MAH

LOCATION 3-Phase Single-Line-Ground


115kV GIS kV
I sym (kA) X/R I asym (kA) I sym (kA) X/R I asym (kA)

- MAX 115 15.5 20 - 17.5 6.2 -


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

- MIN 115 14.2 19.7 - 15.9 6.3 -


DESCRIPTION

AS-BUILT

The above Maximum and Minimum short circuit fault level are consider on the 115kv GIS
substation as received from national grid .

6.2 SWITCHGEAR AND CONTROLGEAR

The switchgears and control gears under Package-2 Contractor scope of work are
included in this report as per substation #SS46A & 46B one line diagrams and
JO/EWO

information from selected manufacturer (ABB, EEIC, ALFANAR).


10-01382

Data for each transformer is based on vendor (SPTC, WESCOSA) information and
25/06/15

07/09/15
DATE

07/27/17

project specification requirements.


For details of each transformer rating, please refer to the following table. The transformer
NO.
REV

01
A

DISCIPLINE tap setting is selected to achieve close to 100% of nominal voltage as much as possible.
ENGINEER
AHS
The tapping position was applied for all studies.
07/27/17
DATE:
PROJECT
ENGINEER Transformer MVA NOM Open circuit Widing Neutral Selecte Re
JZM %Z voltage (kV) connec Earth d tap mar
07/27/17
DATE: tion Resistor k
CERTIFIED ONA ON prim SEC
AMJ valve[A]
N AF
07/27/17
DATE:
CONSTRUCTION 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC
AGENCY
AMJ 601
07/27/17
DATE:
OPERATIONS 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC

AFS 602
07/27/17
DATE: 208-46-XFR- 1.5 5.75 13.8 0.48 Dyn11 Solidly
CONTROL NUMBER
VERIFICATION

301 grounded
EDSD

208-46-XFR- 1.5 5.75 13.8 0.48 Dyn11 Solidly


DATE:

302 grounded
BY:
REVISIONCERTIFICATION

Loop XFR 1.5 5.75 13.8 0.40 Dyn1 Solidly -2.5%


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Typ-1 grounded
(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 5
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
Loop XFR 1.0 5.75 13.8 0.40 Dyn1 Solidly -2.5%
Typ-2 grounded
ENGG CERT
AMA

AMA

AMJ

Loop XFR 0.5 5.75 13.8 0.40 Dyn1 Solidly -2.5%


AHS

Typ-3 grounded
MAH
MAH

Loop XFR 0.3 5.75 13.8 0.40 Dyn1 Solidly -2.5%


Typ-4 grounded
RE-ISSUED FOR APPROVAL

6.3 CABLE SIZE AND IMPEDANCE DATA


ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

Cable technical data is based from Riyadh Cable information as selected cable
manufacturer.
Followings are used for cable modeling:
- Cable cross sectional area space.
- Cable allowable ampere rating.
- Cable resistance value.
JO/EWO

10-01382

- Cable reactance value.


- Cable installation length for each load.
25/06/15

07/09/15
DATE

07/27/17

6.4 ELECTRICAL LOAD


NO.
REV

01
A

DISCIPLINE
ENGINEER Electrical load is based on Electrical load list &Load Summary .The load are modeled as
AHS

DATE:
07/27/17 lumped under each package substation by considering 70% constant KVA and 30%
PROJECT
ENGINEER constant Z load.
JZM

DATE:
07/27/17 The operating conditions were been regarded as:
CERTIFIED
AMJ C - Continuous Loads (Loads that may continuously be required for normal operation)
07/27/17
DATE: I - Intermittent Loads (Loads that are required for intermediate operation)
CONSTRUCTION
AGENCY
AMJ
S - Standby Loads (Loads that are not required for normal operation and/or for standby
07/27/17
DATE: duty)
OPERATIONS
AFS
7. PROTECTION AND CO-ORDINATION PHILOSOPHY
07/27/17
DATE:
This section provides details of protection system, protection grading philosophy,
CONTROL NUMBER
VERIFICATION

basis and recommended relay setting.


EDSD

DATE:

7.1 PROTECTION GRADING PHILOSOPHY


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

The following grading philosophy was implemented in determination of


(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 6
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
recommended setting:
AMJ
ENGG CERT
AMA

AMA

AMJ

Protections are selected to prevent harm or injury to personnel and


AHS
MAH
MAH

damage to the equipments thus minimizing loss to the plant.

Relay setting philosophy divides the system into zones covering bus-bars,
transformers, motors and feeders. These shall be adequately protected
with the minimum time of system disconnection in the event of the fault.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

A graded and properly coordinated system of protective devices shall be


installed as far as practicable to provide selective fault clearing system
which allows the circuit switching devices nearest to a fault operating first.
The protective system shall be based on the philosophy of overlapped.
JO/EWO

10-01382

7.2 BASIS OF EVALUATION

7.2.1 GENERAL
25/06/15

07/09/15
DATE

07/27/17

The co-ordination curves were produced using the Star Module of the ETAP software
package version 12.5.0. The time grading margin of 0.3s is recommended between
NO.
REV

01
A

relays. The following formula is used for grading of protections, where td is the
DISCIPLINE
ENGINEER downstream relay operating time:
AHS
07/27/17
= +
DATE:
PROJECT Where:
ENGINEER
JZM
CTI: coordination time interval
DATE:
07/27/17 Margin required between definite time/instantaneous relays: tm= 0.25
CERTIFIED Margin required between inverse time relays (numerical type): tm = 0.25
AMJ
07/27/17
Margin required between inverse time relays (electromechanical): tm = 0.35
DATE:
CONSTRUCTION
Margin required between relay and fuse downstream: tm = 0.25
AGENCY
AMJ
Margin required between LV breaker trip units clear space
07/27/17
DATE:
OPERATIONS 7.2.2 CABLES PROTECTION
AFS
Inverse time pickup setting to be set at the cable de-rated ampacity. In the absence of
DATE:
07/27/17 cable de-rated ampacity it should not be set more than the full load current of the
equipment that it is connected to.
CONTROL NUMBER
VERIFICATION
EDSD

7.2.3 DISTRIBUTION EQUIPMENT


Inverse time pickup setting to be set at the bus continuous rating.
DATE:
BY:
REVISIONCERTIFICATION

7.2.4 TRANSFORMER PROTECTION RELAY SETTINGS


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

a) PRIMARY SIDE
Inverse time setting: is preferred to be set at 100% of transformer maximum
(DCC) NO. _____________________
10-01382-0004

site rating. However, settings between 100 to 600% of the transformer


RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 7
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
maximum site rating is allowed by IEEE recommendations and considered
AMJ acceptable

ENGG CERT
AMA

AMA

Instantaneous
AMJ

Numerical relays: Instantaneous setting is set above the transformer


AHS
MAH
MAH

inrush current and 125% above the transformer through fault current at
the secondary side
Instantaneous setting is disabled for Incomer main
Feeder sensitive ground fault is set to 10% of the transformer forced cooling
rating
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

Ratio differential current pick-up value shall be operated to minimum


AS-BUILT

differential fault current. Ratio differential element shall not be operated to


measurement errors between transformer primary and secondary side.
Instantaneous element shall be greater than transformer inrush current.
b) SECONDARY SIDE
Inverse time setting is set at 100% of the transformer maximum site rating
Ground protection is achieved via residual CT with pickup set at 50% of the
JO/EWO

10-01382

neutral grounding resistor with time delay to coordinate with upstream and
downstream relays
25/06/15

07/09/15
DATE

07/27/17

c) TRANSFORMER NEUTRAL
Inverse time setting is set at 50% of the neutral grounding resistor rating with
NO.
REV

01
A

DISCIPLINE
time delay to coordinate with downstream relays
ENGINEER
AHS
07/27/17 7.2.5 MV OR LV FEEDER PROTECTION
DATE:
PROJECT
ENGINEER
JZM Instantaneous over-current element on MV Main switchgear at the TR
07/27/17
DATE: secondary side shall be disabled for unwanted operation and Feeder
CERTIFIED
AMJ switchgear Instantaneous over-current protection shall be set at about 80% of
07/27/17
DATE:
CONSTRUCTION
symmetrical short circuit current.
AGENCY
AMJ
07/27/17
DATE:
Overload protection setting shall be at 125% of maximum load.
OPERATIONS
AFS
07/27/17
Earth fault protection for MV or LV feeder are fed via core balance CT and
DATE:
CONTROL NUMBER
VERIFICATION

setting shall be at 10% through 40% of fault level .


EDSD

DATE:
BY:

Time multiplier selected to provide acceptable grading.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

7.2.6 THE UNDERVOLTAGE RELAY SETTINGS


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________

The under voltage relays pickup is generally set at 85% of nominal voltage with time
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 8
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
delay of 2 seconds to account for drop associated with motor starting.
AMJ
7.2.7 THE OVERVOLTAGE RELAY SETTINGS
ENGG CERT
AMA

AMA

AMJ

The over voltage relays pickup set at 105% of nominal voltage with time delay of 2
AHS

seconds.
MAH
MAH

8. LIST OF PROTECTIVE RELAY

Protective relays for this Project are as following table, further more data refer to vendors
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

data sheet.
AS-BUILT

SWGR FEEDER NAME DESCRIPTION CT & PT


PROTECTIVE RELAY

FUNC- TYPE
TION / MAKER
115kV Incomer from SEC 115kV Incomer -
Switchgear CB 601 01 CT-3 2000/1 50BF 7VK61/SIEMEN
S
JO/EWO

10-01382

CB602 115kV Incomer -


CT-6 2000/1 87B1 SEL487B/
02 Schweitzer
CT-7 2000/1 87B2
25/06/15

07/09/15
DATE

07/27/17
NO.
REV

115kVBus
01
A

CB 603
DISCIPLINE section & 115kV CT-3 2000/1 50BF 7VK61/SIEMEN
ENGINEER
CB 604
AHS
S
CB 605 Bus Coupler
07/27/17
CT-1,5 87B1 SEL487B/
DATE:
PROJECT
2000/1 Schweitzer
ENGINEER CT-2,6 87B2
JZM
2000/1
07/27/17
DATE:
CERTIFIED
AMJ Transformer 50/67MVA TR CT1:600/1 50/51/50G P643/ALSTHO
07/27/17 208-046xfr(T)-601 FEEDER /51G M
DATE: CT2:600/1 87T,87N
CONSTRUCTION 208-046xfr(T)-602 (115kV/13.8kV , SEL 487E/
AGENCY Schweitzer
AMJ %Z : 9% @
07/27/17
DATE: 50MVA) CT3:1000/1 50BF 7VK61/SIEMEN
OPERATIONS
S
AFS CT5:2000/1 87B1
07/27/17 SEL487B/
DATE:
CT6:2000/1 87B2
CONTROL NUMBER

Schweitzer
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 9
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
13.8kV 208-46-SG-301-A 13.8kV INCOMER A CT1:3000/5A 51P-1 SEL 451/
AMJ Switchgear
( From : 208-46-XFR-
/51NB/27p Schweitzer
1
ENGG CERT
AMA

AMA

0-601 )
AMJ

CT2:3000/5A 87B1 SEL 587Z/


Schweitzer
AHS
MAH
MAH

CT3:3000/5A 87T SEL 487E/


Schweitzer
NCT:3000/5A 51NT/51N SEL 751A/
L Schweitzer
PT:13.8kV/12
0v
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

13.8kV INCOMER B CT1:3000/5A 51P-2 SEL 451/


DESCRIPTION

/51NB/27p Schweitzer
AS-BUILT

( From : 208-46-XFR-
2
0-602 )
CT2:3000/5A 87B2 SEL 587Z/
Schweitzer
CT3:3000/5A 87T2 SEL 487E/
Schweitzer
NCT:3000/5A 51NT/51N SEL 751A/
L Schweitzer
PT:13.8kV/12
0V
JO/EWO

10-01382

208-46-SG-301-A BUS Protection CT: 3000/5A 87B1 SEL 587Z


208-46-SG-301-B / Schweitzer
PT13.8kV/120 87B2
25/06/15

07/09/15
DATE

07/27/17

51/51G/25 SEL 451/


NO.
REV

CT:3000/5A
01
A

/27 Schweitzer
DISCIPLINE
ENGINEER
AHS
208-46-XFR-301 1.5MVA TR FEEDER CT:100/5A 51/50/50G SEL 751A/
07/27/17
DATE:
(13.8kV/0.48kV %Z: /27 Schweitzer
PROJECT 208-46-XFR-302
ENGINEER CT:50/5A
JZM
07/27/17 Feeder CB B309 to Feeders to 13.8kv CT:600/5A 51/50/50G SEL 751A/
DATE:
CERTIFIED CB B318 & CB B 321 pad mounted /27 Schweitzer
AMJ to CB B330 switchgear at CT:50/5A
07/27/17
PKG,3,4,5,6,7 , sub
DATE: 16 and SWCC
CONSTRUCTION
AGENCY 480V 208-046-SG-001A 480V Incomer A ACB 2000A LSIG GE entelligaurd
AMJ switchgear 208- (From 208-46-XFR- With RELT
07/27/17
DATE: 046-SG-001 301)
OPERATIONS
AFS ACB 2000A LSIG GE entelligaurd
208-046-SG-001B 480V Incomer B
DATE:
07/27/17 With RELT
(From 208-46-XFR-
CONTROL NUMBER

302)
VERIFICATION
EDSD

208-046-SG-001-T 480VTIE CB ACB 2000A LSIG GE entelligaurd


With RELT
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 10
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
480V OUTGOING
AMJ FEEDER
208-046-SG-001CB TO :208-26-MCC-001 ACB 800A LSIG GE entelligaurd
ENGG CERT
AMA

AMA

AMJ

005 With RELT


208-046-SG-001CB ACB 800A
AHS

TO :208-26-MCC-002
MAH
MAH

006

Pad mounted S60-046-PMSG-305 To LOOP 5A CT 1250/1A VIP 300 Merlin Gerin


switchgear S60-046-PMSG-306 To LOOP 5B
CT 1250/1A
S60-046-PMSG-305A To LOOP 4A CT 1250/1A VIP 300 Merlin Gerin
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

S60-046-PMSG-306A To LOOP 4B
DESCRIPTION

CT 1250/1A
AS-BUILT

S60-046-PMSG-301 To LOOP 1 CT 1250/1A VIP 300 Merlin Gerin


S60-046-PMSG-302 To LOOP 2
CT 1250/1A
S60-046-PMSG-333 To LOOP 34 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-334 To LOOP 33
CT 1250/1A
S60-046-PMSG-331 To LOOP 31 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-332 To LOOP 32
JO/EWO

10-01382

CT 1250/1A
S60-046-PMSG-320 To LOOP 11A CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-321 To LOOP 11B
25/06/15

07/09/15
DATE

07/27/17

CT 1250/1A
S60-046-PMSG-322 To LOOP 12A CT 1250/1A VIP 300 Merlin Gerin
NO.
REV

S60-046-PMSG-323 To LOOP 12B


01
A

DISCIPLINE CT 1250/1A
ENGINEER
AHS S60-046-PMSG-319 To LOOP 58 CT 1250/1A VIP 300 Merlin Gerin
DATE:
07/27/17 S60-046-PMSG-318
PROJECT Sub 16 switchgear CT 1250/1A
ENGINEER
JZM

DATE:
07/27/17 S60-046-PMSG-317 To Zone -3 CT 1250/1A VIP 300 Merlin Gerin
CERTIFIED SG#049-016-301 To existing loads CT 1250/1A VIP 300 Merlin Gerin
AMJ
07/27/17
DATE:
CONSTRUCTION LOOP-1,2 Transformer 13.8kV
AGENCY Package
AMJ
substation 5A,5B,4A,4B /400v
07/27/17 Primary CT 200 /1A VIP 35
DATE:
OPERATIONS
AFS Outgoing feeder MCCB MF1 MEMF
07/27/17
DATE:
9. SETTING CALCULATION
CONTROL NUMBER
VERIFICATION
EDSD

9.1 115/13.8KV TRANSFORMER - DIFFERENTIAL CURRENT


DATE:
BY:
REVISIONCERTIFICATION

9.1.01 Applied relay


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Relay type : SEL 487


(DCC) NO. _____________________
10-01382-0004

Maker : Schweitzer

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 11
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
Relay function : 87T
AMJ
ENGG CERT
AMA

AMA

AMJ

9.1.02 TRANSFORMER DATA


AHS
MAH


MAH

TR. No : 208-46-XFR-601, 602


Capacity : 50/67 MVA
Rated voltage : 115 / 13.8 kV
FLC(Primary Current) : 50 MVA / (3 x 115kV) =251 A
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

FLC(Secondary Current) : 50 MVA / (3 x 13.8kV) =2091.91 A


DESCRIPTION

AS-BUILT

9.1.03 CT / PT DATA
1st CT ratio : 600 / 1 A
2nd CT ratio : 3000 / 5 A

9.1.04 CALCULATION (87T)


JO/EWO

10-01382

TAP 1 (WDG1 Current TAP)-1st

: 251 x 1/ 600 = 0.376 TAP 1 = 0.418 [A]


25/06/15

07/09/15
DATE

07/27/17

TAP 2 (WDG2 Current TAP)-2nd


NO.
REV

01
A

DISCIPLINE
ENGINEER
: 2091 x 5 / 3000 = 3.48 TAP 2 = 3.48 [A]
AHS
07/27/17
DATE:
PROJECT O87P (Operate current Level O87P = 0.20 [TAP]
ENGINEER
JZM

DATE:
07/27/17 87AP (Differential current Alarm Level O87P = 0.20 [TAP]
CERTIFIED
AMJ
07/27/17
87AD (Differential current Alarm Delay)
DATE:
87AD = 5.00 [s]
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
SLP 1 (Restraint Slope 1)
OPERATIONS
SLP 1 = 25.00 [%]
AFS
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION

SLP 2 (Restraint Slope 2) SLP 2 = 70.00 [%]


EDSD

DATE:


BY:

IRS 1 (Restraint Slope 1 Limit)


IRS 1 = 3.00 [TAP]
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________

U87P = 10.00 [TAP]


10-01382-0004

U87P (Unrestraint current Level)

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 12
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
PCT 2 (2ND Harmonic Block) PCT 2 = 15.00 [%]
ENGG CERT
AMA

AMA

AMJ AHS
MAH
MAH

PCT 4 (4TH Harmonic Block) PCT 4 = 15.00 [%]

PCT 5 (5TH Harmonic Block) PCT 5 = 35.00 [%]


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

TH5P (5TH Harmonic Alarm Level) TH5P = OFF [TAP]


AS-BUILT

TH5D (5TH Harmonic Alarm Delay) TH5D = 1.00 [s]

E87HR (Harmonic Restraint) E87HR = Y

9.2 115/13.8KV TRANSFORMER RESTRICTED EARTH FAULT PROTECTION


EREF (Enable Restricted earth fault element) EREF = 1
JO/EWO

10-01382

REFRFa
Combo
25/06/15

07/09/15
DATE

07/27/17

REF50Ga(residual current sensitivity pickup)


0.25
NO.
REV

01

TCREFa (torque control REF element) 1


DISCIPLINE
ENGINEER
AHS
REF50Da(REF inst O/C a pick up) OFF
07/27/17
DATE:
PROJECT
ENGINEER
JZM
REF50Da(REF inst O/C a pick up) OFF
07/27/17
DATE:
CERTIFIED
AMJ 9.3 CALCULATION (51/50/50G/51G)- TRANSFORMER PRIMARY
DATE:
07/27/17 OVERCURRENT(601/602)
CONSTRUCTION
AGENCY 9.3.01 CT / PT data
AMJ

DATE:
07/27/17
CT ratio :600 / 1 A
OPERATIONS
AFS
07/27/17
DATE: 9.3.02 APPLIED RELAY
CONTROL NUMBER
VERIFICATION

Relay type : MICOM P643


EDSD

Maker : ALSTHOM
DATE:


BY:

Relay function : 51/50/51G/50G


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

9.3.03 CALCULATION
(DCC) NO. _____________________
10-01382-0004

PHASE PICKUP 51P : 0.7 x CT sec

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 13
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
(125% OF FLC AT 67MVA RATING 420A)
ENGG CERT
AMA

AMA

AMJ

CURVE TYPE : IEC STANDARD INVERSE

TIME DAIL 51TD : 0.425


AHS
MAH
MAH

INSTANTANEOUS PICKUP 50P : 8.7 x CT sec


(110% of through fault current(Asymm)
at transformer secondary )

DELAY in sec 50TD : 0.01s


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

GROUND PICKUP 51G : 0.2 x CT sec


AS-BUILT

(20% OF CT RATING: 120A)

CURVE TYPE : IEC STANDARD INVERSE

TIME DAIL 51TD : 0.175

INSTANTANEOUS PICKUP 50G 10 x CT sec


(110% of through fault current(Asymm)
at transformer secondary )
JO/EWO

10-01382

DELAY in sec 50TD : 0.01s


25/06/15

07/09/15
DATE

07/27/17

9.4 EARTH FAULT PROTECTION TRANSFORMER LINE AND BUS (13.8KV)


NO.
REV

01

9.4.01 TRANSFORMER DATA


A

DISCIPLINE
ENGINEER
AHS
TR. No : 208-46-XFR-601, 602

DATE:
07/27/17
Capacity : 50/67 MVA
PROJECT
ENGINEER
Rated voltage : 115 / 13.8 kV
JZM

DATE:
07/27/17 FLC(Primary Current) : 50 MVA / (3 x 13.8kV) =2091.91 A
CERTIFIED
AMJ Earth Faults Current : 1000 A
07/27/17
DATE:
Relay type : SEL 751A(51NT & 51NL)
CONSTRUCTION
AGENCY
AMJ : SEL 451(51NB)
07/27/17
DATE: Make : Schweitzer
OPERATIONS
AFS
9.4.02 CT / PT DATA
07/27/17
DATE:
CT ratio : 500 / 5 A (neutral CT)
CONTROL NUMBER
VERIFICATION
EDSD

9.4.03 CALCULATION (51NT)


DATE:
BY:

TOC TRIP LVL 51G1P : 2.5A


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

: Maximum Earth Faults Current 25% setting


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

1000x 0.25 x 5 / 500 =2.25


(DCC) NO. _____________________
10-01382-0004

TOC CURVE SEL 51G1C :C1-IEC STANDARD INVERSE

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 14
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
TOC TIME DIAL 51G1TD :0.27
ENGG CERT
AMA

AMA

AMJ

TOC TRQ CONTROL 51G1TC :1


AHS
MAH
MAH

9.4.04 CALCULATION (51NB PART OF 13.8KV SWITCHGEAR INCOMER IED)

TOC TRIP LVL 51G1P : 2.5A


: Maximum Earth Faults Current 25% setting
1000x 0.25 x 5 / 500 =2.5
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

TOC CURVE SEL 51G1C :C1-IEC STANDARD INVERSE


AS-BUILT

TOC TIME DIAL 51G1TD :0.22

TOC TRQ CONTROL 51G1TC :1

9.4.05 CALCULATION (51NL)

TOC TRIP LVL 51G1P : 2.5A


: Maximum Earth Faults Current 25% setting
1000x 0.25x 5 / 500 =2.5
JO/EWO

10-01382

TOC CURVE SEL 51G1C :C1-IEC STANDARD INVERSE


25/06/15

07/09/15
DATE

07/27/17

TOC TIME DIAL 51G1TD :0.17

TOC TRQ CONTROL 51G1TC :1


NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS
9.5 CALCULATION (51/27)- 13.8KV SWITCHGEAR INCOMER PROTECTION (CB (B)-301
07/27/17 & 302)
DATE:
PROJECT
ENGINEER
JZM
07/27/17
9.5.01 APPLIED RELAY
DATE:
CERTIFIED Relay type : SEL 451-5
AMJ
07/27/17 Make : Schweitzer
DATE:
CONSTRUCTION
AGENCY Relay function : 51/27 (13.8kV switchgear incomer A & B)
AMJ

DATE:
07/27/17
9.5.02 TRANSFORMER DATA
OPERATIONS
TR. No : 208-046-XFR-601, 602
AFS

DATE:
07/27/17 Capacity : 50/67MVA
CONTROL NUMBER


VERIFICATION

Rated voltage : 115 / 13.8 kV


EDSD

FLC (Secondary Current) :67 MVA / (3 x 13.8kV) =2803 A


DATE:

Earth Faults Current : 1000 A


BY:

9.5.03 CT / PT DATA
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

CT ratio :3000 / 5 A
(DCC) NO. _____________________


10-01382-0004

PT ratio :13.8kV/120V

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 15
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT
AMA

AMA

AMJ AHS

9.5.04 CALCULATION (50/51) - INVERSE TIME-OVERCURRENT ELEMENT SETTING


MAH
MAH

51S10 (Operating Quantity Element 1)


: Maximum Phase 51S10 = IMAXL
RE-ISSUED FOR APPROVAL


ISSUED FOR APPROVAL

51S1P (Inverse Time-Overcurrent pickup)


DESCRIPTION

AS-BUILT

: Full Load Current 110% setting


2803 x 1.10 x 5 / 3000 = 5.14 51S1P = 5.14 [A]

51S1C ( Inverse Time-Overcurrent Curve)


: U1 ~ U5 & C1 ~ C5 51S1C =C1

51S1TD ( Inverse Time-Overcurrent Time Dial)


: Time Dial 51S1TD = 0.36
JO/EWO

10-01382

50P1P (Phase Instantaneous Overcorrect pickup)


: Not used 50P1P = OFF
25/06/15

07/09/15
DATE

07/27/17

9.5.05 CALCULATION (27) UNDER VOLTAGE SETTING


NO.
REV

01
A

DISCIPLINE
27O1 (Operating Quantity Element 1)
ENGINEER
AHS : Positive Sequence Voltage Magnitude 27O1 = V1FIM
07/27/17
DATE:
PROJECT
27P1P1 (Under Voltage pickup)
ENGINEER
: V = 80% of Rated voltage
JZM

DATE:
07/27/17 120 x 0.8 = 96 27P1P1 = 96.00 [V]
CERTIFIED
AMJ 27P1D1 (Under Voltage Time Delay)

DATE:
07/27/17 : Time Delay 27P1D1 = 120.00 [Cy]
CONSTRUCTION
AGENCY
AMJ
07/27/17
9.6 CALCULATION (51/25)- 13.8KV SWITCHGEAR BUS TIE PROTECTION (CB (B)-303)
DATE:
OPERATIONS
9.6.01 APPLIED RELAY
AFS
07/27/17 Relay type : SEL 451-5
DATE:


CONTROL NUMBER

Make : Schweitzer
VERIFICATION


EDSD

Relay function : 51/25 (13.8kV switchgear bustie)


DATE:

9.6.02 TRANSFORMER DATA


BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

TR. No : 208-046-XFR-601, 602


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Capacity : 50/67MVA
(DCC) NO. _____________________
10-01382-0004

Rated voltage : 115 / 13.8 kV

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 16
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
FLC (Secondary Current) :67 MVA / (3 x 13.8kV) =2803 A
AMJ
Earth Faults Current : 1000 A
ENGG CERT
AMA

AMA

AMJ

9.6.03 CT / PT DATA

AHS

CT ratio :3000 / 5 A (51G/51)


MAH
MAH

PT ratio :13.8kV/120v

9.6.04 CALCULATION (50/51) - INVERSE TIME-OVERCURRENT ELEMENT SETTING


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

51S10 (Operating Quantity Element 1)


DESCRIPTION

AS-BUILT

: Maximum Phase 51S10 = IMAXL

51S1P (Inverse Time-Overcurrent pickup)


: Full Load Current 102% setting
2803 x 1.02x 5 / 3000 = 4.77 51S1P = 4.77 [A]

51S1C ( Inverse Time-Overcurrent Curve)


: U1 ~ U5 & C1 ~ C5 51S1C =C1
JO/EWO

10-01382

51S1TD ( Inverse Time-Overcurrent Time Dial)


25/06/15

07/09/15
DATE

07/27/17

: Time Dial 51S1TD = 0.29

50P1P (Phase Instantaneous Overcurrent pickup)


NO.
REV

01
A

DISCIPLINE
: Not used 50P1P = OFF
ENGINEER
AHS

DATE:
07/27/17 9.6.05 CALCULATION (25) - SYNCHRONISM CHECK FOR BREAKER
PROJECT
ENGINEER
JZM 25VL (Voltage Window Low Threshold) 25VL = 108.00 [V]
07/27/17
DATE:
CERTIFIED
AMJ
07/27/17 25VH (Voltage Window High Threshold) 25VH = 130.00 [V]
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17 SYNCS2 (Synchronism Source 2) SYNCS2 = VBZ
DATE:
OPERATIONS
AFS

DATE:
07/27/17 KS2M (Synchronism Source 2 Ratio Factor) KS2M = 1.00
CONTROL NUMBER
VERIFICATION


EDSD

KS2A (Synchronism Source 2 Angle Shift) KS2A = 0.00


DATE:
BY:

ALTS2 (Alternative Synchronism Source 2) ALTS2 = NA


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

25SFBK2 (Maximum Slip Frequency) 25SFBK2 = 0.05

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 17
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT
AMA

AMA


AMJ

ANG1BK2 (Maximum Angle Difference 1)


ANG1BK2 = 15.00
AHS
MAH
MAH

ANG2BK2 (Maximum Angle Difference 2)


ANG2BK2 = 15.00

TCLSBK2 (Breaker 2 Close Time) TCLSBK2 = 8.00


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

BSYNBK2 (Block Synchronism Check) BSYNBK2 = 52AA2


AS-BUILT

9.7 CALCULATION (87B)- 13.8KV SWITCHGEAR BUSBAR DIFFERENTIAL


PROTECTION

9.7.01 CT / PT DATA
2nd CT ratio : 3000 / 5 A

CT Type : C200
JO/EWO

10-01382

Knee-point voltage : 185 V

IF (Max. external fault current) : 40 kA(Asymm)


25/06/15

07/09/15
DATE

07/27/17

RCT (CT secondary resistance) : 1.105


NO.
REV

: 0.105
01
A

RLEAD
DISCIPLINE
ENGINEER P : 1 (three-phase faults)
AHS

DATE:
07/27/17 Safety Factor : 120 %
PROJECT
ENGINEER N(# of CTs) : 18
JZM

DATE:
07/27/17 Ie(CT excitiation current at operating V) :0.019
CERTIFIED
AMJ Ir(is the current through the relay at Vr) :0.0605

DATE:
07/27/17
N(CT ratio) :600
CONSTRUCTION
AGENCY
AMJ 9.7.02 Calculation (87B) - Differential Element Setting
07/27/17
DATE:
OPERATIONS
87A1P (A- Phase first high-impedance pickup)
AFS
: IF / CT ratio x (RCT + RLEAD x P ) x Safety Factor
07/27/17
DATE:
40000 / (3000/5) x (1.105 + 0.105 x 1) x 1.2 = 121 V 87A1P = 121 [V]
CONTROL NUMBER
VERIFICATION
EDSD

87A2P (A- Phase second high-impedance pickup) - Alarm


DATE:

: IF / CT ratio x (RCT + RLEAD x P )


BY:

87A2P = 81.00 [V]


REVISIONCERTIFICATION

40000 / (3000/5) x (1.105 + 0.105 x 1) = 80.66 V


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

87B1P (B- Phase first high-impedance pickup 87B1P = 121.00 [V

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 18
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ 87B2P (B- Phase second high-impedance pickup) Alarm 87B2P = 81.00 [V]
ENGG CERT
AMA

AMA

AMJ

87C1P (B- Phase first high-impedance pickup) 87C1P = 121.00 [V]


AHS
MAH
MAH

87C2P (B- Phase second high-impedance pickup) 87C2P =81.00 [V]

9.7.01 MINIMUM OPERATING CURRENT

Imin= (n Ie+ Ir Im) N


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

= (18 *.019+120/2000+0)*600
AS-BUILT

=241.2A

9.8 CALCULATION (51/50/50G/51G)- 13.8KV SWITCHGEAR OUTGOING FEEDER


PROTECTION

9.8.01 Applied relay

Relay type : SEL 751A


JO/EWO

10-01382

Maker : Schweitzer


25/06/15

07/09/15

Relay function : 51/50/51G/50G


DATE

07/27/17

Location : 13.8kV outgoing Feeder CB B317 & CB B 322 (FEEDERS TO s16


NO.
REV

01
A

PAD MOUNTED SWICTHGEARS)


DISCIPLINE
ENGINEER
AHS
07/27/17 9.8.02 CT / PT data
DATE:
PROJECT
ENGINEER
CT ratio : 600 / 5 A
JZM

DATE:
07/27/17 CBT ratio : 50 / 5 A
CERTIFIED
AMJ 9.8.03 Calculation (50/51) - Maximum Phase Time-Overcorrect Element Setting


07/27/17
DATE: 51P1P (Maximum Phase Time-Overcurrent Pickup)
CONSTRUCTION
AGENCY 800 x 1.05 x 5 / 600 = 10.39 51P1P = 7 [A]
AMJ

DATE:
07/27/17 51P1C (Maximum Phase Time-Overcurrent Curve)
OPERATIONS : U1 ~ U5 & C1 ~ C5 51P1C = U2
AFS
07/27/17 51P1TD (Maximum Phase Time-Overcurrent Time Dial)
DATE:
51P1TD = 3.28
CONTROL NUMBER

: Time Dial
VERIFICATION
EDSD

9.8.04 Calculation (51GS) Ground Time-Overcurrent Element Setting


DATE:
BY:


REVISIONCERTIFICATION

51G1P (Neutral Time-Overcorrect Pickup) 51N1P = 13


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

130 x 5 / 50 = 13
(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 19
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
51G1C (Neutral Time-Overcurrent Curve) C1-IEC standard inverse
AMJ
ENGG CERT
AMA

AMA

AMJ AHS
MAH
MAH

51G1TD (Neutral Time-Overcurrent Time Dial) 51N1D =0.17

9.9 Calculation (51/50/50G/51G)- 13.8kV switchgear feeder protection to XFR 301 &XFR302
9.9.01 Applied relay
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

Relay type : SEL 751A


DESCRIPTION

AS-BUILT

Maker : Schweitzer

Relay function : 51/50/51G/50G

Location : 208-46-XFR-301.,208-46-XFR-302

Transformer data

TR. No : 208-046-XFR-301, 302

Capacity : 1.5MVA
JO/EWO

10-01382

Rated voltage : 13.8 kV/480v


:1.5MVA / (3 x 13.8kV) =62.75 A
25/06/15

07/09/15

FLC (Secondary Current)


DATE

07/27/17

9.9.02 CT / PT data
NO.
REV

01
A

DISCIPLINE 2nd CT ratio : 100 / 5 A


ENGINEER
AHS CBT ratio : 50 / 5 A
07/27/17
DATE:
PROJECT
ENGINEER 9.9.03 Calculation (50/51) - Maximum Phase Time-Overcorrect Element Setting
JZM
07/27/17 51P1P (Maximum Phase Time-Overcurrent Pickup)
DATE:
CERTIFIED 62.75 x 2.1x 5 / 100 = 6.5 51P1P = 6.5 [A]
AMJ

DATE:
07/27/17 51P1C (Maximum Phase Time-Overcurrent Curve)
CONSTRUCTION : U1 ~ U5 & C1 ~ C5 51P1C = C2
AGENCY
AMJ
07/27/17 51P1TD (Maximum Phase Time- Overcurrent Time Dial)
DATE:
OPERATIONS : Time Dial 51P1TD = 0.45
AFS
07/27/17
DATE: 50P1P (Phase Instantaneous Overcurrent pickup
CONTROL NUMBER
VERIFICATION

Through Current(42.14KA) 110% setting 50P1P=80


EDSD

50P1D (Definite Time Phase Overcurrent Time Delay)


DATE:
BY:

: Time Delay 50P1D = 0.01 [s]


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

9.9.04 Calculation (51GS) -Ground Element Setting


(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 20
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
51G1P (Neutral Time-Overcorrect Pickup) 51N1P = 5
AMJ
50x 5 / 50 = 5
ENGG CERT
AMA

AMA

AMJ AHS


MAH
MAH

51G1C (Neutral Time-Overcurrent Curve) C1-IEC standard inverse

51G1TD (Neutral Time-Overcurrent Time Dial)


51N1D =0.05
RE-ISSUED FOR APPROVAL

9.10 Calculation (51/50/50G/51G)- 13.8kV switchgear feeder protection (Pad mounted


ISSUED FOR APPROVAL
DESCRIPTION

SWGR feeder)
AS-BUILT

9.10.01 Applied relay

Relay type : SEL 751A

Maker : Schweitzer

Relay function : 51/50/51G/50G

Location : Feeder CB B310 to CB B318 & CB B 321,CB B 323 to CB B330


JO/EWO

10-01382

9.10.02 CT / PT data

2nd CT ratio : 600 / 5 A


25/06/15

07/09/15
DATE

07/27/17

CBT ratio : 50 / 5 A
NO.
REV

01
A

9.10.03 Calculation (50/51) - Maximum Phase Time-Overcorrect Element Setting


DISCIPLINE
ENGINEER
AHS
51P1P (Maximum Phase Time-Over current Pickup)

DATE:
07/27/17 600 x 5 / 600 = 5 51P1P = 5 [A]
PROJECT
ENGINEER 51P1C (Maximum Phase Time-Over current Curve)
JZM
07/27/17 : U1 ~ U5 & C1 ~ C5 51P1C = C2
DATE:
CERTIFIED
AMJ
51P1TD (Maximum Phase Time-Over current Time Dial)
07/27/17 : Time Dial 51P1TD = 1
DATE:
CONSTRUCTION
AGENCY
AMJ 9.10.04 Calculation (51GS) - Ground-Over current Element Setting
07/27/17
DATE:
OPERATIONS
AFS
51G1P (Neutral Time-Overcorrect Pickup) 51N1P = 4.5

DATE:
07/27/17 45 x 5 / 50 = 4.5
CONTROL NUMBER
VERIFICATION
EDSD

51G1C (Neutral Time-Over current Curve) C1-IEC standard inverse


DATE:
BY:


REVISIONCERTIFICATION

51G1TD (Neutral Time-Over current Time Dial)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

51N1D =0.25
(DCC) NO. _____________________
10-01382-0004

9.11 Calculation (51/50/50G/51G)- 13.8kV pad mounted switchgear feeder protection (

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 21
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
Feeder to package substations)
AMJ 9.11.01 Applied relay
ENGG CERT
AMA

AMA

AMJ

Relay type : VIP 300


AHS


MAH
MAH

Maker : Schneider (Merlin gerin in ETAP)

Relay function : 51/50/51G/50G

Location : Padmounted switchgear at PKG 3,4,5,6, AREA


RE-ISSUED FOR APPROVAL

9.11.02 CT / PT data
ISSUED FOR APPROVAL
DESCRIPTION

CT ratio : 1250 / 1 A
AS-BUILT

9.11.03 Calculation (50/51) - Maximum Phase Time-Over current Element Setting

51P1P (Maximum Phase Time-Over current Pickup) 51P = 400 [A]


(100% of switchgear continuous bus rating)

Curve type Standard inverse (X1)

Time dial 0.3


JO/EWO

10-01382

9.11.04 Calculation (50/51) - Ground - Overcurrent Element Setting


25/06/15

07/09/15
DATE

07/27/17

51N1P (Maximum Phase Time-Over current Pickup) 51N = 32 [A]

Curve type Standard inverse (X1)


NO.
REV

01
A

DISCIPLINE Time dail 0.4


ENGINEER
AHS
07/27/17
DATE: 9.12 Calculation (51/50/50G/51G)- 13.8kV pad mounted switchgear feeder protection (
PROJECT
ENGINEER Feeder to substations#16 SWGR)
JZM
9.12.01 Applied relay
07/27/17
DATE:
CERTIFIED
AMJ Relay type : VIP 300
07/27/17
DATE: Maker : Schneider (Merlin gerin in ETAP)
CONSTRUCTION


AGENCY
AMJ Relay function : 51/50/51G/50G
07/27/17
DATE: Location : Pad mounted switchgear (PMSG 318 & 319)feeder to
OPERATIONS
AFS
Substation 16

DATE:
07/27/17 9.12.02 CT / PT data
CONTROL NUMBER


VERIFICATION

CT ratio : 1250 / 1 A
EDSD

9.12.03 Calculation (50/51) - Maximum Phase Time-Over current Element Setting


DATE:
BY:

51P1P (Maximum Phase Time-Over current Pickup) 51P = 800 [A]


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

(Pick up chosen to have current co-ordination with downstream relay)


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Curve type Standard inverse (X10)


(DCC) NO. _____________________
10-01382-0004

Time dial 0.05

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 22
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
(Above Time dial and curve type is considered to maintain the same time setting with downstream)
AMJ
ENGG CERT
AMA

AMA

AMJ

9.12.04 Calculation (50G/51G) - Maximum ground Over current Element Setting


AHS

51N1P (Maximum Phase Time-Over current Pickup) 51N = 120 [A]


MAH
MAH

(Pick up chosen to have current co-ordination with downstream relay)

Curve type Standard inverse (X1)

Time dial 0.3


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

9.13 Calculation (51/50/50G/51G)- 13.8kV pad mounted switchgear 049-016-SG-301 feeder


DESCRIPTION

protection ( Feeder to existing load)


AS-BUILT

9.13.01 Applied relay

Relay type : VIP 300

Maker : Schneider (Merlin gerin in ETAP)

Relay function : 51/50/51G/50G

Location : Pad mounted switchgear (049-016-SG-301)feeder to


JO/EWO

10-01382

Substation 16
9.13.02 CT / PT data
25/06/15

07/09/15
DATE

07/27/17

CT ratio : 1250 / 1 A
NO.
REV

01
A

9.13.03 Calculation (50/51) - Maximum Phase Time-Over current Element Setting


DISCIPLINE
ENGINEER
AHS
51P1P (Maximum Phase Time-Over current Pickup) 51P = 400 [A]
07/27/17
DATE:
PROJECT
ENGINEER Curve type Standard inverse (X1)
JZM

DATE:
07/27/17 Time dial 0.3
CERTIFIED
(Above Time dial and curve type is considered to have the coordination with the incomer feeder to substation
AMJ
#16(B301))
07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ 9.13.04 Calculation (50G/51G) - Maximum ground Over current Element Setting
07/27/17
DATE: 51N1P (Maximum Phase Time-Over current Pickup) 51N = 32 [A]
OPERATIONS
(Pick up chosen to have current co-ordination with downstream relay)
AFS

DATE:
07/27/17
Curve type Standard inverse (X1)
CONTROL NUMBER


VERIFICATION

Time dial 0.4


EDSD

(Above Time dial and curve type is considered to have the coordination with the incomer feeder to substation #16(B301))
DATE:
BY:


REVISIONCERTIFICATION

50N1P (Phase Instantaneous Overcurrent Pickup) 50N = 640 [A]


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(Pick up chosen to have current co-ordination with downstream relay)


(DCC) NO. _____________________


10-01382-0004

Time dial 0.03

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 23
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
9.14 Calculation (51/50/50G/51G)- 13.8kV package substation feeder protection ( XFR
AMJ primary)
ENGG CERT
AMA

AMA

AMJ

9.14.01 Applied relay


AHS


MAH
MAH

Relay type : VIP 35

Maker : Schneider (Merlin gerin in ETAP)

Relay function : 51/50/51G/50G

Location : Package substation XFR primary


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

9.14.02 CT / PT data
DESCRIPTION


AS-BUILT

CT ratio : 200 / 1 A

9.14.03 Calculation (50/51) - Phase Time-Overcurrent Element Setting

51P1P (Maximum Phase Time-Over current Pickup) 51P = 55 [A]


(Pick up chosen to have current co-ordination with downstream relay)

Curve type TYP

Time dial 0.00


JO/EWO

10-01382

9.14.04 Calculation (50G/51G) - Ground -Over current Element Setting


25/06/15

07/09/15
DATE

07/27/17

51N1P (Maximum Phase Time-Over current Pickup) 51N = 25 [A]


NO.
REV

Curve type Definite time


01
A

DISCIPLINE
ENGINEER
AHS Time dial 0.1
07/27/17
DATE:
PROJECT
ENGINEER
JZM 9.15 Modified setting over current protection settings for substation#16 Switchgear
07/27/17
DATE:
CERTIFIED
9.15.01 Phase Over current setting for incomer (B301 & B302)
AMJ
Relay type : CO
07/27/17
DATE:
CONSTRUCTION Maker : WESTING HOUSE
AGENCY
AMJ Relay function : 51/50
07/27/17
DATE:
OPERATIONS CT ratio : 1200 / 5 A
AFS Location : Incomer feeder (CB B 301 & CB B 302 )
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION

Phase Actual Modified


EDSD

Protection setting setting


DATE:

51-PKP 3.00 3.00


BY:

CO9-very CO2-short
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Curve inverse inverse


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

TD 3.5 10.5
(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 24
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
OC1 50-PKP N/A N/A
AMJ TD N/A N/A
ENGG CERT
AMA

AMA

AMJ

OC2 50-PKP N/A N/A


AHS
MAH
MAH

TD N/A N/A
9.15.02 Ground Over current setting for incomer (B301 & B302)

Relay type : CO

Maker : WESTING HOUSE


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL


DESCRIPTION

Relay function : 51G/50G


AS-BUILT

CT ratio : 1200 / 5A

Location : Incomer feeder (CB B 301 & CB B 302 )

Ground Modified setting


Protection Actual setting
51-PKP 0.50 0.5
CO2-short inverse
JO/EWO

Curve CO-8-inverse
10-01382

TD 3.5 6.5
25/06/15

07/09/15
DATE

07/27/17

50-PKP N/A N/A


TD N/A N/A
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS
07/27/17
DATE:
PROJECT
ENGINEER
JZM
9.15.03 Phase Over current setting for outgoing (unit 6, B311 & B312)
07/27/17
DATE:
CERTIFIED Relay type : CO
AMJ
07/27/17 Maker : WESTING HOUSE
DATE:
CONSTRUCTION
AGENCY Relay function : 51/50
AMJ
07/27/17 CT ratio : 600 / 5 A
DATE:
OPERATIONS Location : CB B31, B322 & unit 6
AFS
07/27/17
DATE:
B311& B322 B311& B322 UNIT 6 UNIT 6
CONTROL NUMBER
VERIFICATION

Phase Actual Modified ACTUAL Modified


EDSD

Protection setting setting SETTING setting


DATE:

51-PKP 5.00 5 5.00 5


BY:

CO9-very CO9-very CO9-very CO2- short


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Curve inverse inverse inverse inverse


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

TD 1.5 1.5 1.5 4


(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 25
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
OC1 50-PKP N/A 44.00 N/A N/A
AMJ TD N/A N/A N/A N/A
ENGG CERT
AMA

AMA

AMJ

OC2 50-PKP N/A N/A N/A N/A


AHS
MAH
MAH

TD N/A N/A N/A N/A

9.15.04 Ground Over current setting for outgoing (Unit 6,B311 & B312)

Relay type : CO
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

Maker : WESTING HOUSE


DESCRIPTION

AS-BUILT

Relay function : 51G/50G

CT ratio : 600 / 5 A

Location : CB B31, B322 & unit 6

B311& B322 B311& B322 UNIT 6 UNIT 6


Ground Actual Modified ACTUAL Modified
Protection setting setting SETTING setting
JO/EWO

10-01382

51-PKP 0.50 0.5 0.50 0.50


Curve CO-8-inverse CO-8-inverse CO-8-inverse CO-8-inverse
25/06/15

07/09/15
DATE

07/27/17

TD 1.5 0.5 1.5 .5


NO.
REV

01

50-PKP N/A N/A N/A N/A


A

DISCIPLINE
ENGINEER TD N/A N/A N/A N/A
AHS
07/27/17
DATE:
PROJECT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED
AMJ 9.16 Calculation overcurrent protection for incomer at 480V switchgear 208-46-SG001
07/27/17
DATE:
CONSTRUCTION 9.16.01 Details
AGENCY
AMJ Breaker type : AKD
07/27/17


DATE:
OPERATIONS Rated Current : 2000 A
AFS Trip unit : Entelligaurd
07/27/17

DATE:
Maker : GE
CONTROL NUMBER
VERIFICATION

function : LSIG
EDSD

Location : Incomer (208-046-SG-001)


DATE:
BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________

Panel No : 208-46-XFR-0-301~ 302


CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Capacity : 1500 kVA


(DCC) NO. _____________________
10-01382-0004

Rated voltage : 0.48 kV

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 26
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
FLC (Full Load Current) : 1500 kVA / (3 x 0.48kV) =1804.27 A
AMJ
ENGG CERT

9.16.02 Calculation (PHASE)


AMA

AMA

AMJ

LT (Long Time Pick Up)


AHS
MAH
MAH

: Full Load Current 100% setting


1800 x 1 / 2000 = 0.9 LT = 0.9
LT Band LT Band = 2.00
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

ST(Short Time Pick Up)


DESCRIPTION

AS-BUILT

: Full Load Current 150 ~ 400% setting

1800 x 2 / (2000 x 0.9) = 2.00 ST = 2.0

: ST Band ST Band = 7.00

: I2t OUT

9.16.03 Calculation (GROUND)


JO/EWO

10-01382

GROUND Pick Up
25/06/15

07/09/15
DATE

07/27/17

460 / (2000 ) = 0.2 GP = 0.23


NO.
REV

01
A

DISCIPLINE
ENGINEER : Ground Band GN Band = 5.00
AHS
07/27/17
DATE:
PROJECT
: I2t OUT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED 9.17 Calculation over current protection for Bustie at 480V switchgear 208-46-SG-001
AMJ
07/27/17
DATE:
9.17.01 Details
CONSTRUCTION


AGENCY
AMJ Breaker type : AKD
07/27/17
DATE: Rated Current : 2000 A
OPERATIONS
AFS Trip unit : Entelligaurd


07/27/17
DATE: Maker : GE
CONTROL NUMBER
VERIFICATION

function : LSIG
EDSD

Location : Bus tie (208-046-SG-001)


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

XFR detials : 208-46-XFR-0-301~ 302


(DCC) NO. _____________________

Capacity : 1500 kVA


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 27
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
Rated voltage : 0.48 kV
AMJ
FLC (Full Load Current) : 1500 kVA / (3 x 0.48kV) =1804.27 A
ENGG CERT
AMA

AMA

AMJ

9.17.02 Calculation (PHASE)


AHS
MAH
MAH

LT (Long Time Pick Up)


: Full Load Current 100% setting
1800 x 0.72 / 2000 = 0.65 LT =0.65
LT Band LT Band = 1.00
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

ST(Short Time Pick Up)


: Full Load Current 150 ~ 400% setting

1800 x 1.44/ 2000x0.95= 2.00 ST =2

: ST Band ST Band =5.00


JO/EWO

10-01382

: I2t OUT
9.17.03 Calculation (GROUND)
25/06/15

07/09/15
DATE

07/27/17

GROUND Pick Up
400/ (2000) = 0.2 GP = 0.2
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS
: Ground Band GN Band = 3.00
07/27/17
DATE:
PROJECT
ENGINEER
: I2t out
JZM
07/27/17
DATE:
CERTIFIED
AMJ
9.18 Calculation overcurrent protection for outgoing feeders(to MCCs) at 480V
07/27/17
DATE: switchgear 208-46-SG001
CONSTRUCTION
AGENCY
AMJ 9.18.01 Details


07/27/17
DATE: Breaker type : AKD
OPERATIONS
AFS Rated Current : 800 A

DATE:
07/27/17
Trip unit : Entelligaurd
CONTROL NUMBER
VERIFICATION

Maker : GE
EDSD

function : LSIG
DATE:


BY:

Location : outgoing feeders to MCC01 &02


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 28
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ 9.18.02 Calculation (PHASE)
ENGG CERT
AMA

AMA

AMJ

LT (Long Time Pick Up)


AHS

: Full Load Current 100% setting


MAH
MAH

800 x 1 / 800 = 1 LT =1
LT Band LT Band = 1.00

ST(Short Time Pick Up)


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

: Full Load Current 150 ~ 400% setting


AS-BUILT

800 x 2 / 800 = 2.00 ST =2

: ST Band ST Band = 2.00

: I2t OUT

9.18.03 Calculation (GROUND)


JO/EWO

10-01382

GROUND Pick Up
25/06/15

07/09/15
DATE

07/27/17

160/ (800 ) = 0.2 GP = 0.2


NO.
REV

01
A

DISCIPLINE : Ground Band GN Band = 1.00


ENGINEER
AHS
07/27/17
DATE: : I2t out
PROJECT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED 9.19 Calculation protection for outgoing feeders to ACCU at 208-46-MCC01, 208-46-
AMJ MCC02
07/27/17
DATE:
CONSTRUCTION
AGENCY 9.19.01 Details
AMJ

DATE:
07/27/17 Breaker type : SGLB
OPERATIONS
Rated Current : 400 A
AFS

DATE:
07/27/17 Trip unit :LSI
CONTROL NUMBER


VERIFICATION

Maker : GE
EDSD

function : LSIG

DATE:

Location : ACCU feeders in MCC 01 & 02


BY:

Load rating : 125KVA


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 29
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
9.19.02 Calculation (PHASE)
AMJ LT (Long Time Pick Up)
ENGG CERT
AMA

AMA

AMJ

: Full Load Current 100% setting


150 x 1.33 / 400 = 0.5 LT =0.5
AHS
MAH
MAH

LT Band LT Band = 1.00

ST(Short Time Pick Up)


: Full Load Current 150 ~ 400% setting
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

150 x 8 / (400*0.5) = 2.00 ST =6


AS-BUILT

: ST Band ST Band = 2.00

: I2t OUT

INSTANTANEOUS (INST Time Pick Up)


3 times the rating 3
JO/EWO

10-01382

9.19.03 Calculation (GROUND)


25/06/15

07/09/15
DATE

07/27/17

GROUND Pick Up
80/ (400 ) = 0.2 GP = 0.2
NO.
REV

01
A

DISCIPLINE
ENGINEER : Ground Band GN Band = 1.00
AHS
07/27/17
DATE:
PROJECT : I2t out
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED
AMJ
07/27/17
DATE: 9.20 Calculation protection for outgoing feeders to AHU at 208-46-MCC01, 208-46-MCC02
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
9.20.01 Details
OPERATIONS
AFS Breaker type : SGLB
07/27/17
DATE:
Rated Current : 400 A
CONTROL NUMBER
VERIFICATION

Trip unit :LSI


EDSD

Maker : GE
DATE:
BY:

function : LSIG
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Location : AHU feeders in MCC 01 & 02


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Load rating : 17.7KVA


(DCC) NO. _____________________
10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 30
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT

9.20.02 Calculation (PHASE)


AMA

AMA

AMJ

LT (Long Time Pick Up)


AHS
MAH
MAH

: Full Load Current 100% setting


21.29 x 1.40 / 60 = 0.5 LT =0.5
LT Band LT Band = 1.00
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

ST(Short Time Pick Up)


DESCRIPTION

AS-BUILT

: Full Load Current 150 ~ 400% setting

21.29 x2 / (60*0.5) = 1.5 ST =1.5

: ST Band ST Band = 1.00

: I2t OUT
JO/EWO

10-01382

INSTANTANEOUS (INST Time Pick Up)


1.5 times the rating 1.5
25/06/15

07/09/15
DATE

07/27/17

9.20.03 Calculation (GROUND)


NO.
REV

01

GROUND Pick Up
A

DISCIPLINE
ENGINEER
30/ (60 ) = 0.2 GP = 0.2
AHS
07/27/17
DATE:
PROJECT
ENGINEER : Ground Band GN Band = 1.00
JZM
07/27/17
DATE: : I2t out
CERTIFIED
AMJ
07/27/17
DATE:
CONSTRUCTION 9.21 CALCULATION OF NEUTRAL OVER CURRENT PROTECTION AT XFR 208-046-
AGENCY
AMJ XFR-301, 208-046-XFR-302
07/27/17
DATE:
OPERATIONS 9.21.01 Transformer data
AFS
TR. No : 208-46-XFR-301, 302
07/27/17
DATE:
Capacity : 1.5 MVA
CONTROL NUMBER
VERIFICATION

Rated voltage : 13.8 kV/480V


EDSD

FLC(Primary Current) : 1.5 MVA / (3 x 0.48kV) =1804 A


DATE:
BY:

Earth Faults Current : 47.8 KA


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

9.21.02 CT / PT data
(DCC) NO. _____________________


10-01382-0004

CT ratio :2000 / 5 A

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 31
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT
AMA

AMA

AMJ

9.21.03 Calculation (51NT)


AHS
MAH
MAH

TOC TRIP LVL 51G1P : 1.25A


: Maximum Earth Faults Current 22.5% setting
500 x 5 / 2000 =1.25

TOC CURVE SEL 51G1C :C1-IEC STANDARD INVERSE


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

TOC TIME DIAL 51G1TD :0.29


DESCRIPTION

AS-BUILT

TOC TRQ CONTROL 51G1TC :1

9.22 CALCULATION OF BREAKER FAILURE PROTECTION AT 115KV LINE


FEEDER, BUS COUPLER AND BUS SECTION

Applicable Circuit Breaker CB 603, CB605, CB 607, CB 606, CB 602, CB601, CB 604, CB
608,CB 609

System voltage: 115 KV


JO/EWO

10-01382

System Frequency 60 Hz Relay Ordering


Relay
Details 7VK610, 1A, 60Hz, 125V
25/06/15

07/09/15
DATE

07/27/17

9.22.01 Configuration of the scope of functions


NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS Addr Parameter Setting Comments
07/27/17
DATE:
PROJECT 103 Grp Charge OPTION Disabled Setting Group change option
ENGINEER
JZM 106 VT CONNECTION NO Voltage transformer connection
07/27/17
DATE:
CERTIFIED 107 CT CONNECTION YES Current transformer connection
AMJ

DATE:
07/27/17 110 Trip mode 3Pole only Trip mode
CONSTRUCTION
AGENCY 126 Back-Up O/C Disabled Backup overcurrent
AMJ

DATE:
07/27/17 133 Auto Reclose Disabled Auto-Reclose function
OPERATIONS
AFS
134 AR control mode Invisible Auto-Reclose control mode

DATE:
07/27/17
135 Synchro-Check Disabled Synchronism & voltage check
CONTROL NUMBER
VERIFICATION

137 U/O VOLTAGE Disabled under/over voltage protection


EDSD

BREAKER
139 Breaker failure protection
DATE:

FAILURE Enabled
BY:

140 Trip Cir. Sup. Disabled Trip circuit supervision


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 32
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AMJ
ENGG CERT
AMA

AMA

AMJ AHS

Breaker failure
MAH
MAH

9.22.02
protection setting

Addr Parameter Setting Comments


3901 FCT BreakerFail ON Breaker Failure Protection
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

3902 I> BF 0.25 A Pick-up threshold I>


DESCRIPTION

AS-BUILT

1pole retrip with stage T1


3903 1p-RETRIP (T1) NO (local trip)
T1, Delay after 1pole start
3904 T1-1pole (local trip)
T1, Delay after 3pole start
3905 T1-3pole 0.1 sec (local trip)
T2, Delay of 2nd stage
3906 T2 0.2 sec (busbar trip)
T3, Delay for start with de-
3907 T3-BkrDefective fective bkr.
Trip output selection with
3908
JO/EWO

10-01382

Trip BkrDefect. NO defective bkr

3909 Chk BRK CONTACT NO Check Breaker contacts


25/06/15

07/09/15
DATE

07/27/17

3912 3I0> BF 0.1 A Pick-up threshold 3I0>

3913 T2StartCriteria Parallel with T1 T2 Start Criteria


NO.
REV

01
A

DISCIPLINE
ENGINEER
3921 End Flt. stage OFF End fault protection
AHS
Trip delay of end fault
DATE:
07/27/17 3922 T-EndFault protection
PROJECT
ENGINEER 3931 PoleDiscrepancy OFF Pole Discrepancy supervision
JZM
Trip delay with pole dis-
DATE:
07/27/17 3932 T-PoleDiscrepancy crepancy
CERTIFIED
AMJ
07/27/17
DATE:
CONSTRUCTION
AGENCY 10. ATTACHMENT
AMJ
07/27/17
DATE:
OPERATIONS
AFS Attachment #1 Time current characteristic curves index
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

Attachment #2 Time current characteristic curves


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

(DCC) NO. _____________________


10-01382-0004

RELAY SETTING REPORT DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-361264 33
UTILITIES INFRASTRUCTURES AND NETWORKS OF 01
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 48
A1 EDSD/2616-0399.doc

Potrebbero piacerti anche