Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
400 IN
LAV LAVATORY
WC IN
KS KITCHEN SINK LAV SH
up
SS SERVICE SINK
500
600
700
LAV
600
600
SH
WC
KS
WC WATER CLOSET
FD FLOOR DRAIN
500
OUT
CO CLEAN OUT P L A N
KS
P L A N
2.71
VSTR VENT STACK THRU ROOF dn
up
GATE VALVE
CONCRETE COVER CONCRETE COVER
2" 2"
CHECK VALVE up 2" 2"
4" CHB 4" CHB
100
75
SS
1"
1"
M WATER METER NGL NGL
dn
150
150
F FAUCET
OUT IN IN
525
600
700
800
SH SHOWER HEAD RISER
100
100
600 700
JB JUNCTION BOX WC
SH LAV
SECTION @200MM SPACING, SECTION @200MM SPACING,
COLD WATER LINE BOTHWAYS BOTHWAYS
SH LAV
SOIL PIPE WC
WASTE PIPE
P-TRAP
dn
03
CATCH BASIN DETAILS 04
JUNCTION BOX DETAILS
P 01 P 01
SCALE 1:100 MTS. SCALE 1:100 MTS.
M M
3.00 M MANHOLE
400MM
1.00 M 1.00 M 1.00 M 3.00 M
F WAY
1.00 M 1.00 M 1.00 M
GENERAL NOTES
ROAD RIGHT O
0.15 M
400MM
MH MH MH
1. ALL PLUMBING WORKS INDICATED HEREIN SHALL
0.35 M
MEET THE PROVISIONS OF THE PLUMBING CODE NGL CO
NGL
AIR SPACE AIR SPACE CO
CO CO CO
OF THE PHILIPPINES, THE NATIONAL PLUMBING DC DC LC
GF WATERLINE LAYOUT 2F WATERLINE LAYOUT
WATER WATER
LINE LINE
CODE, LOCAL CITY ORDINANCE RULES AND
1.00 M
REGULATIONS. 01 02
LOWER
LOWER
LOWER
(TYPICAL)
2. PLUMBING CONTRACTOR TO COORDINATE WITH P 01 P 01 INLET PIPE MANHOLE MANHOLE MANHOLE
SCALE 1:100 MTS. SCALE 1:100 MTS. (TYPICAL)
OTHER RELATED DRAWINGS AND SPECIFICATIONS,
2.00 M
1.83
2.20
AND NOTIFY THE CONSULTING ENGINEER OF ANY VERT. BARS AT 0.60M
DISCREPANCY FOUND THEREIN.
BARS EVERY 3 LAYERS PIPE
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON
DIGESTION DIGESTION LEACHING (TO PUBLIC
PLANS. ANY RELOCATION REQUIRED FOR PROPER CHAMBER CHAMBER WELL SEWER)
EXECUTION OF OTHER TRADE SHALL BE WITH 6" DRAINAGE PIPE 6" DRAINAGE PIPE
LC
CB CB CB
PRIOR APPROVAL OF THE ARCHITECT OR
DS DS 3" PVC DP
ENGINEER. DS DS
2" PVC WASTE PIPE
0.20
DC
08
SEPTIC TANK DETAILS
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING P 01
P I P E
OTHERWISE SPECIFIED. dn
2" PVC WASTE PIPE
up
MILLIMETERS, UNLESS OTHERWISE SPECIFIED.
P V C D RA IN A G E P I P E
3 "
DS SS
3" PVC DS
dn 3" PVC DP
6"
3" WASTE
STACK
GD
WC
3" SOIL FD
STACK LAV
CO
3" WASTE
STACK
FD LAV 3" PVC DP
WC
FD
GD dn
SINK
3" PVC DP
JB
6" PVC DRAINAGE PIPE
TO MAIN SEWER
TO MAIN SEWER
06
GF SANITARY LINE LAYOUT 07
2F SANITARY LINE LAYOUT 09
WATERLINE ISOMETRIC @ REAR VIEW 10
SANITARY LINE ISOMETRIC @ REAR VIEW
P 01 P 01 P 01 P 01
SCALE 1:100 MTS. SCALE 1:100 MTS. SCALE 1:200 MTS. SCALE 1:200 MTS.
MASTER PLUMBER/ SANITARY ENGINEER: REG. NO. PROJECT TITLE / LOCATION : OWNER / ADDRESS : SHEET CONTENT: DRAWN BY : SHEET NO :
T. I. N. DESIGNED BY :