Sei sulla pagina 1di 1

Resume of Key Personnel in Substation Projects

Position Assistant Manager - PED


Personal information Name : Marimuthu Pandian.K Date of birth :20.05.1984

Professional qualifications : Diploma in Civil Engineering

Experience Summary:
From To Company/ Project Experience

01.03.2014 Till now M/s.KSA Powerinfra Pvt.Ltd.,/ Assistant Manager/Mytrah -


220/33KV Substation, Aspiri Village, Kurnool

15.10.2008 February 2014 M/s.G.E.T. Power Ltd./ Civil Engineer


Project Name:
1. 400KV Substation (PGCIL) at Thiruvalam, Vellore
Dist.
2. 400KV Substation (TNEB) in Sunguvar Chatram
3. 400/220KV Substation (PGCIL) in Sohawal,
Faizabad, U.P.,
4. 33/11KV Substation (RGVVY), Mayurbhanj Dist,
Orissa
5.

13.10.2006 14.10.2008 M/s.Voltech Pvt. Ltd. / Engineer


Project Name:
6. 220/66KV K.R.Pet Substation Projects (KPTCL) and
220kV Transmission Line
7.

12.11.2004 13.10.2006 M/s.Zen Project Pvt.Ltd / Engineer


Project Name:
220/110KV Kudchi Substation Projects (KPTCL)

Key Responsibilities:-
To look after all civil activities like Control room
building, equipment foundations, tower foundations,
power transformer foundation, cable ducts, slab
casting, road and Drainages.
Site supervision of all types of culverts, hume pipe
laying such as raft, footing, abutment, retain wall,
kerb, deck slab stone pitching etc.,.
Conducting & preparation of test reports such as
cube test, slump cone test, bricks, aggregate etc.,.
Preparation of bar bending schedules.
Preparation BOM
Handling of dumpy level and Thedolite instruments.
Verification of Site leveling, earth work cutting and
filling.