ABDUL BASIT

S/o FARZAND ALI


Date of Birth: JAN 27, 1990
Postal Address: House#24, Street#2, KHADIJA PARK OPP ZANBIA HOSPITAL NEAR MANSOORAH MULTAN
ROAD LAHORE.
CNIC: 35202-4559721-3
Phone No: (+92) 321 6613023 / 0307 7510072 E-mail: abdul_basit_19@hotmail.com / basitgill19@gmail.com

Objective:
To pursue a career in a dynamic and growing organization with a progressive, receptive and learning work environment where I
can explore my technical and managerial skills.
Qualification: (First division holder throughout the educational career)

Examination Year Institute Grade


B.Sc Electrical Engineering. 2008-2012 University of Engineering & Technology, Lahore 3.371/4.0
F.Sc. 2006-2008 Mansoorah Degree College, Lahore A Grade
Matriculation 2004-2006 AL Dawah Model High School, Lahore A Grade

Professional Profile
Interloop Group (PVT) Limited, Lahore 25-oct-2012 to present

Working as Team Leader/Assistant Manager have 4 year of design, systems development and project planning experience. Lead the
Project teams in different project with successfully completing and delivering production on time. Establish & Developed Energy
Management system (EMS) and successfully completed energy efficiency projects. Improving maintenance system from failure mode
maintenance to reliability maintenance by using RCA techniques and condition monitoring

Description of major tasks:


Supervise the electrical section in maintenance related jobs, provide assistance with troubleshooting, issue reports on
major failures and recommend suitable actions to minimize or eliminate the recurrence of problems. Planning, and
executing preventative routine maintenance, and troubleshooting electrical problems as they occur and taking the
relevant actions to rectify them.
Designing & Planning of project and future Extension.
Execution of the project engineering involving Installation, commissioning & testing of electrical equipments.
Creating project specifications and outlining the scope required to meet goals.
Ensuring a tight control over costs.
Designed Power Transmission & Distribution system, control system, Electrical sites plans and control panels.
Implement 5S in different departments with help of Industrial Engineering team.
Make Maintenance Plan and Operational SOP.
Record & analysis of all utility data and evaluate the performance.
Maintain significant Inventory stock.
Clear all Internal and External Audit in our Area related to EHS.
Reporting progress on jobs and shutdowns to senior management.
Providing regular direction, mentorship, and coaching to team members.
Projects:
Collect the quotation from different Companies.
Make Technical and commercial Comparison statements.
Create complete layout and drawings (civil, Mechanical and Electrical).
Make P & Ids of Project
Make Bill of Quantity (BOQ) of project
Make and implement complete Project plan (civil, Mechanical and Electrical)
Calculate size and Order placement of Piping and Cabling Equipment, pumps, control panel, Auxiliary panel, VCB,
overhead crane, Fans for Ventilation system, vales, tanks etc.
Testing of Different Equipment like Relays, Alternator, H.T cables, Tanks and piping.
Installed synchronization system.
Projects done as team leader
Erection & commissioning of HFO Engine Wartsila 12V32 LN.
Operations and Maintenance of Diesel Engines. Cummins Generators QSK-60 (2200 KVA)
Erection & commissioning of Waste Heat Recovery boiler.
Conductor replacement of overhead transmission line.
Extension of knitting Machine Hall. Erection & commissioning of steam boarding machine.
Developed a new L.T Room.
Reliability maintenance
Working in Engineering Department as Management Trainee Officer (MTO), In 15 month training period we worked on
different projects to improve the present maintenance system to Reliable maintenance system to decrease the down time of
machine. During that period we developed different excel sheet, maintenance format and practices to improve the present
maintenance system under the supervision of Manager Engineering.

Root Cause Analysis


Root Cause Analysis is a technique to find the actual cause of problem. We developed the excel sheet under
consideration of Fish Bone Diagram and Failure Mode Effective Analysis to find the Root Cause of the Machine
Failure.
Critical Equipment Categorization
Study the all existing equipment in the plant and categorized the critical equipment on the base of EHS, Plant
availability, dependent department and Process.
Condition Monitoring
Change the existing Maintenance system with condition monitoring. Strategic planning to start condition monitoring
Improved maintenance system
Study all existing maintenance system of equipment, remove deficiencies, unnecessary practices and make the new
maintenance plan of equipment.
Internship Experience
WAPDA Engineering Academy Faisalabad. 4 week Internship
Generation, Transmission, Distribution.
Perform different Experiment in workshop and power simulator.
Visited different grid station, Steam power station, Gas power station.

Professional & Technical Workshops


Attend one week EnMS LAC Energy management system Lead Auditor course in Interloop Limited organized by
SGS Pakistan.
Attend 3 day workshop on Basic MS Excel in Interloop Limited
Attend one day workshop on Improving Energy Efficiency in Electrical System organized by National Energy
Conservation Center (ENERCON)
Attend one day workshop on Improving Boiler Operating Efficiency organized by National Energy Conservation
Center (ENERCON)
Attend one day workshop on Emotional Intelligence organized by Training Solution at Interloop Limited

Computer Skills
Microsoft Office MS Project
Microsoft Excel MS Power Point

AWERDS & ACHIEVMENTS


Head of Seminar Committee of Society of Electrical Engineering Department (SEED-RCET)
Won 2nd Position in Technical Crisis Management in UET Tehno-Fest11
Won 2nd Position in Circuit Design Competition held in REECE11 by SEED
Chief organizer of various workshops, seminars and competitions at university

INTRESTS & ACTIVITES


Member of Rachna blood donating society (RBDS)
Public Relationship, Book reading, E-gamming
Play volleyball, cricket and cards.
Member of sponsorship committee for REECE12 by SEED
LANGUAGES
English (Intermediate) Urdu (Native) Punjabi (Native)

Potrebbero piacerti anche