Sei sulla pagina 1di 1

Eaves line

100mm 150mm
Gas Meter (open)
Dimension Exchangeable Gas Bottle In-Situ Gas Cylinder

A 500mm 1500mm

B 1500mm 3500mm

C 500mm 500mm

Table 1 - Gas Cylinder/Bottle Clearances


The horizontal distances are measured from the centre line of the Gas Cylinder or Bottle
The vertical distances are measured from the top of any Gas Cylinder/Bottle valve

Gas Meter (Enclosure)

250mm 150mm
255mm

Obstacles and door clearances

Madison PCD
70 900min 260
Clear access space
(Indicated by shaded area)
MAD
250

255min
Wall PCD
MADISON
PCD
250
1800max

100min

100mm 100mm
400min

Ground

Side View Front View

PCD Fed Underground

Roof 260mm
100

MAD 900min 260


PCD Clear access space
(Indicated by shaded area)
100

255min
Wall MADISON
PCD
250
4000max

100min
400min

Obstruction/Utility Clearance
Working clearances 2000mm H x 900mm W x 900mm D
Fixed Services: Pipes, Taps, Water Meters 150mm
Ground Power source: Including the point where the 150mm
premises power supply cable connects to the
Side View Front View property electrical board
Corner of wall and exterior structure such as
window or balcony
100mm
150mm
PCD Fed Aerially Left of PCD for the door to open
Space under eaves from aerially fed PCD
255mm
100mm

Wall line Wall line