Sei sulla pagina 1di 71

n N 2 Z 2 (( N 1)e2 2 Z 2 )

10%
Contractor
8% 8% Awareness of the
Management stakeholder
Designer Architecture Price sensitivity
Public office

Accounting 31%
Economics Norms and laws
Civil Eng.
Evaluator Professional experience
18%
25%
Recommendation
Formulator probability
Image/Reputation

0 2 4 6 8 10 12 14 16 18 20 22 24
(a) (b)
Quantity of respondants
C

A
120
Calibrated model
Validated model
100
Actual projects

80
No. of projects

60

40

20

0
2009 2010 2011 2012 2013 2014 2015
Year
Formulator' option awareness Formulator' option awareness
0.00 1.00
0.15 0.20
0.10 0.15
1.0 0.10 1.0
0.05 0.7 0.05 0.7
0.00 0.3 Designer' 0.00 0.3 Designer'
0.0 option 0.0 option
0.3 0.0 awareness 0.3 0.0 awareness
0.7 0.7
(a) Evaluator' option awareness 1.0 (b) Evaluator' option awareness 1.0
0.40

0.38

fraction of RC applied
Maximum limit
0.36

0.34

0.32

0.30
Minimum limit
0.28
10% 15% 20% 25% 30% 35% 40% 45% 50%
Difference in price of RC with regard to CC

0.50
fraction of RC applied

0.40

0.30

0.20

0.10

0.00
SC.01 SC.02 SC.03 SC.04

Combined scenarios
100%
Bolsas recolectadas (%)

80%

60% Bolsas no
reciclables
Bolsas
40%
reciclables

20%

0%
0.0 0.2 0.4 0.6 0.8 1.0
Tasa de segregacin


t2

42
P(t ) 1 e ( )

100%

80% =7
Departured residents (%)

Fast
60% Evacuation
boundary
= 12 min
40%
Slow Evacuation
boundary
20%

0%
0 5 10 15 20 25 30
Time (min)
CDI Demand / Capacity ( )

Potrebbero piacerti anche