Sei sulla pagina 1di 231

From.

M/s . Om Shakthi Buildcon Pvt., Ltd


No.13, 3rd Floor, 6th Main, Kodigehalli
Main Road, Balaji Layout, Near Tatanagar
Circle, Bangalore - 560 094.

To,
JSW Steel Limited
Vijayanagar Works
P.O.: Vidyanagar, Village: Toranagallu,
Vidyanagar - 583275.
Bellary - Karnataka ( India )

Sl
SAC Code
No
Scaffolding out
E.1 side Cooling 995457
tower

Scaffolding
E.2 inside Cooling 995457
tower
Temporary
E.3 995429
Partition:

working
E.4 995457
platform
E.5 Safety net 995429

Removal &
refixing of
existing SS
F 995429
Mesh, fixtures,
supports &
wooden fills
Dismentling of
existing
temporory steel
G 995457
support given to
bottom most
louer support

Removal &
refixing of
H existing fan, 995429
motor, shaft &
Gear box
Sl
SAC Code
No

Providing Micro Cocrete Encasement for


I
RC Columns and Beams
1 995432

2 995429
3 995429

4 995429
5 995429

6 995429
Providing Screed
J Concrete on Top
Terrace Slab

7 995432
8 995429
9 995429
Sl
SAC Code
No

10
10
995429

K Treatment for minor Corrossion damaged r


11 995432

12 995429
13 995429

Pressure grouting of cracks in RC walls

14 995429
15 995429

L Pre-cast Concrete Louvers

16 995429
17 995429
18 995429
Sl
No
19 995429

M Shotcreteing for top fan enclosure circular wa


20 995429

21 995429
22 995429

23 995429

24 995429
25 995429

N Anticorrosion coating for steel member

26 995429

Storage &
P 995429
Disposal
Q House Keeping 995429

Amount in Rupees: Twenty Six L


Amount in Rupees: Twenty Six L

##
Certified that the particulars given are true and correct

Certified that the particulars given above are true and


Will be received from the buyer on account of
Prepared By
., Ltd
digehalli
r Tatanagar
nagallu,

Service Code / Ite


Providing scaffolding using MS Pipes & couplers and
arrive a suitable grid of scaffolding for accessing all th
outside. Also toe guard and ladder has to be provided.
medium (B-class) the measurement will be given on th
scaffolding.

Providing scaffolding using MS Pipes & couplers and/


arrive a suitable grid of scaffolding for accessing all th
soffits from inside. The pipe size should not be less tha
be done based on plan area x height covered by scaffol
Providing and fixing GI Sheet temporary partition to p
from water, sludge, dust,debris and other repair activiti

:Providing and fixing a covering platform made of stru


firm base for further repair activities Steel will be sup
Providing /erecting / maintaining temporary protective
fixing and arrangements to ensure that it remains in po
net shall be made with 12 mm nylon rope all around , w
both ways at 100 mm distance apart, providing HDPE
nylon rope firmly etc.measurements as per area covere

existing equipments to be removed for repair of seating


back and alighnement to be carried out .
Remove tempory support given to the lower louver lip

existing equipments to be removed for repair of seating


back and alighnement to be carried out (fan, shaft & m
Service Code / Ite

ement for
Removal of Waste particles/plastering/loose concrete w
including cleaning with wire brush & water, shifting
Engineer-in-charge.

Providing two coats of anticorrosive chemical (Nitozi


equivalent) the exposed reinforcing bars in columns af
to remove corrosion scale / rust followed by water jet a
Drilling of 12mm. Dia. 75mm depth hole in concrete f
hammering drilling machine with concrete drill bits. T
water & air jet. etc., complete as per directions of Engi

Providing and fixing shear connectors of 8 mm of stee


specific and size of shear connectors and fixing in exis
fix S from M/s. Fosroc Chemicals or equivalent) of ap
as scaffolding, shape for shear connectors as per appro
fixing and cost of steel for shear connectors and labour
Engineer-in-charge. ( Note: Steel Clients Scope )
Supplying and Fabrication of HYSD/Torsteel reinforce
hooking,lapping and or welding wherever required, pla
approved quality and gauge including the cost of bindi
wherever necessary etc complete as per design, specifi
Charge ( Note: Steel Clients Scope )

Providing 75 mm thick micro concrete encasement for


per directions of Engineer-in- charge.( Shuttering add
of 50 % aggregates , 10 mm down as per manufactu
preparing the existing surface by removing all loose pa
air and water jet as per the directions of the Engineer-i
tackles and labours.
Drilling 12 dia holes 50 mm deep with rotary cum ham
machine including cleaning with compressed air and fi
per manufacturer's specification and as per the directio
labours.
( Note: Steel Clients Scope )
Supplying and Fabrication of HYSD/Torsteel reinforce
hooking,lapping and or welding wherever required, pla
approved quality and gauge including the cost of bindi
wherever necessary etc complete as per design, specifi
Charge. ( Note: Steel Clients Scope )
Service Code / Item Description

Providing and laying 75 mm thick, M30 grade concret


graded aggregates or ready mix concrete of grade M30
IS:456-2000) with integral water proofing compound a
area including vibrating, tamping, including all lead an
with plaster of 12 mm thick in CM 1:4 with integral w
thread indentations at 450 mm x
450 mm, rounding of all corners wherever smooth rend
graded aggregates or ready mix concrete of grade M30
IS:456-2000) with integral water proofing compound a
area including vibrating, tamping, including all lead an
with plaster of 12 mm thick in CM 1:4 with integral w
thread indentations at 450 mm x
450 mm, rounding of all corners wherever smooth rend
and as per the directions of Engineer- in-Charge.
.( Shuttering additional, to be measured as per It
( Not
Scope )

ion damaged regions for RC Members


The loose plaster / concrete shall be removed by gentle
exposed surface shall be cleaned thoroughly with air /
materials, transportation, labour, equipments hire charg
directed by the Engineer-in-charge.

The exposed reinforcing bars shall be thoroughly clean


cloth, followed by applying two coats of anti-corrosive
Fosroc Chemicals or equivalent) to the bars, etc. comp
Engineer-in- charge. Cost inclusive of consumables lik
corrosive chemical, brushes etc., complete
Providing 20 mm thick structural grade polymer / latex
Fosroc Chemicals or equivalent) for RC members after
corrosive chemical as per manufacturers specification

RC walls

Providing and making V grooves over the crack., comp


inclusive of material, labour, scaffolding & staging etc
Pressure grouting of cracks in RC members with neat c
drilling 12 mm dia, 75 mm deep holes, including clean
10 mm dia pvc nozzle in drilled holes with anchor grou
cement slurry under a pressure of 3 to 4 Kgs / sq.cm sh
inclusive of cement, nozzle,PVC Nozzle, Drilling Hole
scaffolding.grouting equipment hire charges.

Lifting and placing of precast louvers as per standard s


In - charge. Old louvers to be taken out by using crane
Supplying, mixing & placing controlled grade concrete
aggregate in columns at plinth level of required thickn
as directed by the engineer - in - charge .
( Shuttering additional, to be measured as per Item
Note: Cement & Aggregate - Clients Scope )
Supplying and Fabrication of HYSD/Torsteel reinforce
hooking,lapping and or welding wherever required, pla
approved quality and gauge including the cost of bindi
wherever necessary etc complete as per design, specifi
Charge. ( Note: Steel Clients Scope )
Service Code / Item Description
Providing and fixing formwork to side of concrete incl
centreing sheets with steel props, acrotubes etc. mainta
all s played edges, notching,batten, strutting, bolting, n
support the farmwork bolts, wires, ties, clamps etc. wa
as required to obtain next finish, including careful rem
lift all as per specification and as directed by the engin
junctions etc.
ure circular walls
Exposed concrete surface of RC wall shall be sand bla
exposed rebars, spalled cover concrete etc., as per spec
charge.Cost inclusive of scaffolding / staging, all mate
complete

The exposed reinforcing bars shall be thoroughly clean


cloth, followed by applying two coats of anti-corrosive
Fosroc Chemicals or equivalent) to the bars, etc. comp
Engineer-in- charge. Cost inclusive of consumables lik
corrosive chemical, brushes etc., complete
Drilling 12 dia holes 50 mm deep with rotary cum ham
machine including cleaning with compressed air and fi
per manufacturer's specification and as per the directio
labours, material and equipment hire charges including

Providing and placing proposed weld mesh of size 100


connector with binding wire or tack welded as per sket
cost is inclusive of all materials, welding, equipment, e
Providing 40 mm thick shotcrete for RC wall including
and directions of engineer-in- charge.
Providing applying a coat of corrosion inhibitor on rein
specification and directions of engineer in charge.

member
providing and applying of anticorrosive inhibitor on st
equilvent as per manufacturer stanadard( rate conside

Necessary arrangements for loading ,unloading ,storag

Disposal of unwanted & scraps generated during erctio

s: Twenty Six Lakh Sixty Three Thousand Two Hundred


true and correct and the amount indicated represents the

ve are true and correct and the amount indicated is prov


count of ..
Approved B
ABSTRACT
Work
Unit Rate
Order Qty
hese to
as well as
B Sq.m 7358 60.00

ese to
d slab
Cu.m 24348 60.00
ent will
ing area
Sq.m 576 517.00

rovide
Sq.m 1030 385.00
ary
safety
n rope Sq.m 1800 330.00
mm

fixed
lot 8 450.00
Nos. 15 350.00

fixed
set 8 25,000.00
Work
Unit Rate
Order Qty
crete
ns of Sqm 1356 160.00

r
ery cloth Rmt 12756 50.00
ary-cum-
y by Nos 9576 50.00

uring of
(Lock
ion such
Nos 9576 85.00
ut for
of
nding,
of
embers Kgs 16907 16.00
er-in-

tering as
addition Cum 133 49,084.00
pressed
s, Sqm 619 160.00
g
grout as
ve of Nos 1020 120.00
nding,
of
embers Kgs 1138 16.00
er-in-
Work
Unit Rate
Order Qty

Cum 32 7,230.00
Cum 32 7,230.00
ed. The
ing,
Sqm 330 190.00
d as

mery
/s.
Rmt 1320 50.00
anti-
M/s.
anti- Sqm 330 2,000.00

ge. Cost
Rmt 1000 50.00
fter

at
Nos 2000 112.00
t is

ngineer -
Nos 240 995.00
e
omplete
Cum 84 5,330.00
(
nding,
of
embers Kgs 6692 16.00
er-in-
Work
Unit Rate
Order Qty
steel
including
nts to
position Sqm 896 340.00
ad and
m
es of
Sqm 360 550.00
s etc.,

mery
/s.
Rmt 3636 50.00
anti-
g
grout as
Nos 440 71.00
ve of

hear
ge. The Sqm 280 332.00

ication
Sqm 280 2,137.00
ers
Sqm. 5000 150.00

ny
Kgs 2000 75.00

Lot 2 110,000.00

Lot 2 150,000.00
Total
SGST 9%
CGST 9%
Round Off
Total
no flow of additional consideration directly from the buy
Authorised Signatory
RA 01, RA
Total 02, RA 03,
RA 04
441,480.00### 2345

1,460,880.00### 4308.36
297,792.00### 531.11

396,550.00### 660
594,000.00### 1016

3,600.00### 4
5,250.00### 15

200,000.00### 4
RA 01, RA
Total R02, RA 03,
A RA 04

0
1
216,960.00### 731.744

637,800.00### 1632
478,800.00### 5048

813,960.00### 5048
270,512.00###9234.8786

6,528,172.00### 76.2424
99,040.00### 0
122,400.00### 0
18,208.00### 0
RA 01, RA
Total 02, RA 03,
RA 04

231,360.00### 0
231,360.00### 0
62,700.00### 359.7

66,000.00### 398
660,000.00### 147.06

50,000.00### 435
224,000.00### 855

238,800.00### 100
447,720.00### 34.305
107,072.00###2234.6466
RA 01, RA
Total 02, RA 03,
RA 04
304,640.00### 945.265
198,000.00### 360

181,800.00### 250
31,240.00### 440

92,960.00### 280

598,360.00### 280
750,000.00### 2112.84

150,000.00### 2000

220,000.00### 1

300,000.00### 1
17,500,056.00
e buyer
Amt RA 01, RA 02, Previous Qty - RA
RA 03, RA 04 05
140,700.00 1,232.00

258,501.60 1,081.92
274,582.11

254,100.00 270.00
335,280.00 400.00

1,800.00 1.00
5,250.00 5.00

100,000.00 1.00
Amt RA 01, RA 02, Previous Qty - RA
RA 03, RA 04 05
117,079.04 448.18

81,600.00 425.00
252,400.00 1,510.00

429,080.00 1,510.00
147,758.06 1,810.89

3,742,281.96 21.45
-
-
-
Amt RA 01, RA 02, Previous Qty - RA
RA 03, RA 04 05

-
-

-
68,343.00 19.50

19,900.00 169.00
294,120.00 42.62

21,750.00 160.00
95,760.00 255.00

99,500.00 30.00
182,845.65 10.29
35,754.35 558.67
Amt RA 01, RA 02, Previous Qty - RA
RA 03, RA 04 05
321,390.10 225.47

-
198,000.00

12,500.00
31,240.00

92,960.00

598,360.00
316,926.00 909.41

150,000.00 250.00

110,000.00 0.25

150,000.00 0.25
8,939,761.87
PAN No : AABCO7889F
STC No : AABCO7889FSD001
TIN No : 29201124035
Invoice No : 38
Date : 01.08.2017
P.O. No : VJNR/111014//C/4700041291
Vendor Code. 20026506
RA No. : RA 06
Ref Person : Nr. Laxman
Previous Amt - Current Bill
RA 05 Qty
73,920.00 1,317.00

64,915.20 1,081.92
18.00

103,950.00 270.00
132,000.00 400.00

450.00 1.00
1,750.00 3.00

25,000.00 1.00
Previous Amt - Current Bill
RA 05 Qty
71,708.80 451.38

21,250.00 390.00
75,500.00 1,510.00

128,350.00 1,510.00
28,974.24 1,769.73

1,052,851.80 21.62
-
-
-
Previous Amt - Current Bill
RA 05 Qty

-
-
3,705.00 22.50

8,450.00 124.00
85,240.00 42.62

8,000.00 160.00
28,560.00 160.00

29,850.00 30.00
54,845.70 10.29
8,938.72 2,300.67
Previous Amt - Current Bill
RA 05 Qty
76,659.80 225.47
136,411.50 784.41

18,750.00 250.00

27,500.00

37,500.00
2,305,030.76
F
FSD001

4//C/4700041291
Current Bill Amt
79,020.00

64,915.20
9,306.00

103,950.00
132,000.00

450.00
1,050.00

25,000.00
Current Bill Amt
72,220.80

19,500.00
75,500.00

128,350.00
28,315.68

1,061,196.08
-
-
-
Current Bill Amt
4,275.00

6,200.00
85,240.00

8,000.00
17,920.00

29,850.00
54,845.70
36,810.72
Current Bill Amt
76,659.80
-

-
-

-
117,661.50

18,750.00

-
2,256,986.48
203,128.78
203,128.78
-0.05
2,663,244.00
Measurement sheet ( Corex II - Cell 3 )
Site : Jindal Steel Works _ Toranagallu Bellary

SL No Description
E1 Scaffodling outside cooling tower
South Side
East Side
North Side

E2 Scaffolding Inside cooling tower


Grid AB4 to AB7

E3 Temporary partition

E4 Working platform

E5 Safety Net

F Removal & refixing of existing SS mesh

G Dismantling of existing temporary steel support given to


bottom most louver support

H Removal & refixing of existing fan

I Provinding micro concrete encasement for column &


Beam:
1) Removal of waste particles
For column: EL 6.2m to EL 17.4m Grid A5,A6, A7 and
B5, B6, B7

For Beam: EL 9.55m to EL 17.4m , Grid A4, A5, A6 and


B4, B5, B6

For Louver beams


For extra beam fan down beam
For inner wall cleaning for coating

For inner beam cleaning for coating


For Top ceiling cleaning for coating

2) Providing 2 coats of anti corrosive treatment


For column EL 6.2m to EL 17.4m - Grid A11 + A13
For Louvers beam
For beam
Door side wall

3) Drilling for the shear connector


For column: A5, A6, A7 & B5, B6, B7 ht 11.2m - Spacing
0.6m per column shear 75 Nos X 6

For beam : A4 to A6 & B4 to B6 EL 9.55 to 19.8m Length


8.1m spacing 0.6m per beam shear 56

For Louver Beams: EL - 6.2m to EL 17.4m length 1.5m


Spacing 0.6m per louver 12 Nos X 14
Extra beam EL 17.4m Length 5.8m Spacing 0.6m per
beam 40 Nos

Top beam EL 17.4m Grid A4 to A6 distributor for lokfix in


both sides 42 X 2 per beam

Drilling for B4 to B6 - Distributor in both sides

4) Drilling for the shear connector


For column: A5, A6, A7 & B5, B6, B7 ht 11.2m - Spacing
0.6m per column shear 75 Nos X 6

For beam : A4 to A6 & B4 to B6 EL 9.55 to 19.8m Length


8.1m spacing 0.6m per beam shear 56

For Louver Beams: EL - 6.2m to EL 17.4m length 1.5m


Spacing 0.6m per louver 12 Nos X 14

Extra beam EL 17.4m Length 5.8m Spacing 0.6m per


beam 40 Nos

Top beam EL 17.4m Grid A4 to A6 distributor for lokfix in


both sides 42 X 2 per beam

Drilling for B4 to B6 - Distributor in both sides

SL No Description
5) Fabrication for steel reinforcement:
For column:
12mm bar
12mm bar
12mm bar
8mm bar

For Beam:
12mm bar
12mm bar

8mm bar
8mm bar

For louver beam


12mm bar
12mm bar
12mm bar
12mm bar
8mm bar

Extra Beam ( Fan Side )


12mm bar
8mm bar

Shear connector
For column ( 8mm dia )
For beam ( 8mm dia )
For louver beam ( 8mm dia )
For extra beam ( 8mm dia )

6) 75mm thick microconcrete

For column: grid A5 t0 A7 & B5 to B7 , EL 6.2m to 17.4m

For beams:
A4 to A6 & B4 to B6
For Louver Beams
Deduction Qty

Fan motor plate grouting


Fan gear box plate grouting
For extra beam
Fan down beam

K Treatment for Minor Corrosion damaged regions for RC


Members
11) The loose plaster remove
iii) Louver Beams

12) Exposed reinforcement anti corrosive treatment


i) North side wall & column
ii) East side wall
Louver beams

13) 20mm thick PMM plaster


North side inner wall

East side inner wall

Door side

Pressure grouting
14) V Groove over the cracks ( North side wall )
Outside walls

15) Pressure grouting at cracks


North side walls
Outside walls

L Precast Concrete slab ( Louvers )


16) Lifting & placing of precast louvers slab

17) Mixing & placing controlled grade concrete M30

SL No Description
18) Fabrication for steel reinforcement
For slab
12mm dia bar
10mm dia bar

RA 02
Total slabs - 30
Alaready claimed - 20
Balance - 10
12mm dia bar
10mm dia bar

RA 03
Total slabs - 30
Alaready claimed - 20
Balance - 10
12mm dia bar
10mm dia bar

RA 04
Total slabs - 30
Alaready claimed - 20
Balance - 10
12mm dia bar
10mm dia bar
RA 05
Total slabs - 30
Alaready claimed - 20
Balance - 10
12mm dia bar
10mm dia bar

19) Fixing form work to side of concrete shuttering

Form work ( Shuttering work for the microconcrete work )


For column

For Louver beam

For beam

25) Providing and applying a coat of corrosion inhibitor


i) Inside top ceiling
ii) Column
iii) Beam
iv ) Cantiliver beam
v ) Precast slab
vi ) Inside walls
a) North side
b) East side
Extra Work:
Fan side down beam
N Anticorrosion coating for steel member

26) Providing & applying of anticorrosion on steel member

P Storage & Disposal

Q House Keeping
Unit Nos Length Width

Sqm 2.00 13.50


Sqm 2.00 11.00
Sqm 2.00 5.00
1.00 17.00

Cum 1.00 10.500 9.20

Sqm 20.00 1.000 0.90

Sqm 120.00 2.000 0.50


Sqm 50.00 3.000 1.00

Sqm 4.00 10.000 10.00

Lot 1.00

Nos 3.00

Nos 1.00
Sqm 6.00 1.200 11.20

Sqm 4.00 8.100 1.20

Sqm 2.00 8.100 0.90


Sqm 4.00 5.800 1.00

Sqm 14.00 1.500 1.00


Sqm 2.00 5.480 1.02
Sqm 1.00 9.150
Sqm 2.00 5.000
Sqm 12.00 3.200 1.00
Sqm 1.00 10.000 3.20

Rmt 1.00 50.000


Rmt 1.00 300.000
Rmt 1.00 10.000
Rmt 1.00 30.000

No. 450.00

Nos 336.00

Nos 168.00
Nos 80.00

Nos 252.00

Nos 224.00

No. 450.00

Nos 336.00

Nos 168.00

Nos 80.00

Nos 252.00

Nos 224.00

Unit Nos Length Qty in RMT

Rmt 24.00 11.200 268.80


Rmt 18.00 4.000 72.00
Rmt 24.00 2.250 504.00
Rmt 112.00 0.875 98.00

Rmt 12.00 8.100 194.40


Rmt 12.00 5.800 69.90
Rmt 12.00 2.900 34.80
Rmt 164.00 2.250 369.00
Rmt 82.00 0.875 71.75

Rmt 30.00 2.675 80.25


Rmt 15.00 1.975 29.63
Rmt 30.00 2.475 74.25
Rmt 15.00 1.975 29.63
Rmt 120.00 2.250 270.00

Rmt 16.00 6.550 104.80


Rmt 58.00 2.550 147.90

Rmt 450.00 0.225 101.25


Rmt 336.00 0.225 75.60
Rmt 168.00 0.225 37.80
Rmt 80.00 0.225 18.00

Cum 6.00 11.200 1.60

Cum 4.00 8.100 1.60


Cum 2.00 8.100 1.20
Cum 15.00 1.650 0.40
Cum 15.00 1.400 0.20

Cum 1.00 1.200 1.20


Cum 1.00 1.200 0.90

Cum 2.00 5.800 1.80

Sqm 15.00 1.000 1.50

Rmt 1.00 20.000


Rmt 1.00 20.000
Rmt 14.00 6.000

Sqm 1.00 5.000 0.50


2.00 2.800 3.20
Sqm 3.00 7.000 0.40
2.00 3.000 0.30
Sqm 12.00 1.000 1.00

Rmt 1.00 80.000


Rmt 1.00 80.000

Nos 100.00
Nos 60.00

Nos 30.00

Cum 30.00 3.050 0.90

Unit Nos Length Qty in RMT

Rmt 210.00 3.050 640.50


Rmt 750.00 0.900 675.00

Rmt 70.00 3.050 213.50


Rmt 250.00 0.900 225.00

Rmt 70.00 3.050 213.50


Rmt 250.00 0.900 225.00

Rmt 70.00 3.050 213.50


Rmt 250.00 0.900 225.00
Rmt 70.00 3.050 213.50
Rmt 250.00 0.900 225.00

Sqm 40.00 3.050 0.20


Sqm 40.00 0.900 0.20

Sqm 4.00 11.200 1.60


Sqm 2.00 11.200 0.90
Sqm 10.00 1.500 1.60
Sqm 5.00 1.500 0.90
Sqm 4.00 8.100 1.60
Sqm 2.00 8.100 1.20

Sqm 1.00 10.000 10.00


Sqm 6.00 1.300 12.00
Sqm 6.00 1.300 10.00
Sqm 15.00 1.300 1.70
Sqm 30.00 2.050 3.05

Sqm 1.00 11.000 12.00


Sqm 2.00 5.800 12.00

Sqm 2.00 5.800 1.80


Kgs

Lot

Lot
Depth Quantity

18.000 486.00
18.000 396.00
18.000 180.00
15.000 255.00

1,317.00

11.200 1,081.92
1,081.92

18.00

120.00
150.00
270.00

400.00

1.00

3.00

1.00
80.64

38.88

14.58
23.20

21.00
11.18
10.000 91.50
10.000 100.00
38.40
32.00
Total 451.38

50.00
300.00
10.00
30.00

Total 390.00

450.00

336.00

168.00
80.00

252.00

224.00

1,510.00

450.00

336.00

168.00

80.00

252.00

224.00

1,510.00

Weight per KG Total Weight in KG

0.889 238.93
0.889 64.00
0.889 448.00
0.395 38.71

0.889 172.80
0.889 62.13
0.889 30.93
0.395 145.76
0.395 28.34

0.889 71.33
0.889 26.33
0.889 66.00
0.889 26.33
0.395 106.65

0.889 93.16
0.395 58.42

0.395 39.99
0.395 29.86
0.395 14.93
0.395 7.11

1,769.73

0.090 9.68

0.085 4.41
0.085 1.65
0.400 3.96
0.200 0.84

0.075 0.11
0.075 0.08

0.075 1.57
21.62

22.50

22.50

20.00
20.00
84.00
#REF!

2.50
17.92
8.40
1.80
12.00

42.62

80.00
80.00
160.00

100.00
60.00
160.00

30.00

0.125 10.29

Weight per KG Total Weight in KG

0.889 569.33
0.617 416.67

0.889 189.78
0.617 138.89

0.889 189.78
0.617 138.89

0.889 189.78
0.617 138.89
0.889 189.78
0.617 138.89
2,300.67

24.40
7.20

71.68
20.16
24.00
6.75
51.84
19.44
225.47

100.00
93.60
78.00
33.15
187.58

132.00
139.20

20.88

784.41
250.00

0.25

0.25
Service Tax Invoice

Name of the Service Provider : Conatact Details


M/s Om Shakthi Builcon Pvt Ltd Mr. Elumalai
Address: Mob: 7022983065
#13, 3rd Floor, H M Towers, Email ID: omshakthi8305@gmail.com
Kodigehalli Road, Near Tatanagar Circle,
Bangalore - 560 094
Service Tax Registration No.:
AABCO7889FSD001
IT PAN No.: AABCO7889F
TIN NO.: 29201124035

NAME OF THE SERVICE RECEIVER : JSW STEEL LTD


ADDRESS: TORANAGALLU, SANDUR ( TQ ) BELLARY (DIST )
SERVICE TAX REGISTRATION No.: AAACJ4323NST001

TIN NO.: 29630016301

SL No. Description UOM

3000093741
1.1 REPAIRING,CLNG TWR,VENDOR,JSW,0- INR
30MTR
Subtotal
SGST 9%
CGST 9%
Round Off
Grand Total

( Rs in words: Twenty Six Lakh Sixty Three Thousand Two Hundred and Fourty Four Rupees Only )

Certified that the particulars give above are true and correct and tehe amount indicated the price actually
flow of additional consideration directly from the byyer.
(OR)
Certified that the particulars give above are true and correct and the amount indicated is provisional as as
received from the buyer on account of .
Remarks

Prepared by
ax Invoice

Conatact Details Invoice No. 38


Mr. Elumalai Invoice No. RA 06
Mob: 7022983065 Bill Invoice Date: 01.08.2017
Email ID: omshakthi8305@gmail.com Service Reddered Period

P .O No.: VJNR/111014//C/4700041291
PO DATE: 23.03.2016

Qty Amount

1 2,256,986.48

2,256,986.48
203,128.78
203,128.78
(0.05)
2,663,244.00

red and Fourty Four Rupees Only )

d tehe amount indicated the price actually charged and that there is no
(OR)
d the amount indicated is provisional as assitional consideration will be
For Name of the service Provider

Signatory Authorised Agent


Item SL as Budget Rate as per
per WO Description of the work as per WO Ref. No. Qty WO

1.1 (3000093741) REPAIRING,CLNG,TWR,VENDOR,JSW,0- 1.000 1,75,00,056


30MTR

Total

Add:-Service Tax 14% on 40% of Basic Value


SB Cess@0.5% on 40% of Basic Value
KK Cess@0.5% on 40% of Basic Value
VAT @ 14.5% on 70%
ROUND OFF

SUB Total in Rupees

Subtotal
SGST 9%
CGST 9%
Round Off
Grand Total
1 GROSS AMOUNT UPTO DATE :

2 DEDUCT GROSS AMOUNT SINCE PREVIOUS BILL

3 GROSS AMOUNT OF THIS BILL

( Rupees in words : Twenty Six Lakh Sixty Three Thousand Two Hundred

Prepared By: Checked By: Approved By:

Name Name Name

Designation Designation Designation

Signature & Date Signature & Date Signature & Date


RA 01, RA Amount - RA 01, RA
02, RA 03, 02, RA 03, RA 04, RA RA 06 Amount - RA 06 Cummulative Cummulative Amt
Qty
RA 04, RA 05 05

5.00 11,244,792.66 1.00 2,256,986.48 6.00 13,501,779.14

11,244,792.66 2,256,986.48 13,501,779.14

629,708.39
22,489.59
22,489.59
1,141,346.45
(0.01)

13,060,826.67

2,256,986.48
203,128.78
203,128.78
(0.05)
2,663,244.00 15,724,070.67
15,724,070.67

13,060,826.67

2,663,244.00

ee Thousand Two Hundred and Fourty Four Rupees Only. )