Strength Required (m) Pre Pour Checklist F = Fail = Non-compliance with approved plans & documentation P = Pass = Compliance with approved plans & documentation. N/A = Not Applicable for the job task P F N/A Remarks Approval granted to pour on Excavation Date: Blinding Setting Out Time: Reinforcement For HAL Joints Print Name: Formwork Signature: Bracing Date: Anchor Bolts Plates Drains For Client Pipe Penetration Print Name: U/G Pipe Signature: Electrical Date: Plumbing Temporary Works Pour Details Date of Pour: Air Temperature: Pour Commenced (time): Weather: Pour Completed (time): Test Samples Reference ID: Actual Volume Poured (m): Comments:
Post Poured Inspection completed and
Post Pour P F Comments defects rectified Concrete Curing For HALL Concrete Finish Print Name: Line and Level Signature: Concrete Honeycombing For Client Cracks and Air Bubbles Print Name: Any Defects Signature: Any Non-Conformity Date: