Sei sulla pagina 1di 7

VALORIZACIN N 01

Del 02. AL 31. De MAYO... del 20

OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:

ITEM DESCRIPCIN UND. CANT. P. UNIT. PARCIAL ANTERIOR


CANT.
1.00 CONCRETEO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO FC= 175 KG/CM2 M3 12.00 333.94 4,007.28
1.01.02 ENCOFRA. - DESENCOF. M2 60.00 42.00 2,520.00
1.01.03 ACERO CORRUGADO KG 800.00 4.94 3,952.00 10,479.28
1.02 VIGA
1.02.01 CONCRETO FC= 175 KG/CM2 M3 8.00 305.15 2,441.20
1.02.02 ENCOFRA. - DESENCOF. M2 40.00 46.53 1,861.20
1.02.03 ACERO CORRUGADO KG 500.00 4.94 2,470.00 6,772.40
1.03 LOSA ALIGERADA
1.03.01 CONCRETO FC= 175 KG/CM2 M3 9.00 279.22 2,512.98
1.03.02 ENCOFRA. - DESENCOF. M2 120.00 33.07 3,968.40
1.03.03 ACERO CORRUGADO KG 700.00 4.94 3,458.00
1.03.04 LADRILLO O.15x0.30x0.30 UND 1020.00 2.67 2,723.40 12,662.78
2.00 MUROS
2.01 LADRILLO KK 18 HCO. SOGA M2 30.00 48.84 1,465.20
2.02 LADRILLO KK 18 HCO. CABEZA M2 48.00 76.09 3,652.32 5,117.52
COSTO DIRECTO 35,031.98
GASTOS GENERALES ( 15% ) 5,254.80
UTILIDAD ( 10 % ) 3,503.20
SUBTOTAL 43,789.98
IGV 7,882.20
TOTAL 51,672.18
ACUMILADO
% AVANCE
YO... del 20

UBICACIN:

ANTERIOR ACTUAL ACUMULADO SALDO %


IMPORTE CANT. IMPORTE CANT. IMPORTE CANT. IMPORTE AVANCE
DATOS

Pb= 43,789.98
Fpb= FEBRERO

INICIO DE OBRA: ABRIL


TIEMPO: 90 DAS

MARZO ABRIL
VALORIZACIN N 02
Del 01. AL 30. De JUNIO... del 20

OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:

ITEM DESCRIPCIN UND. CANT. P. UNIT. PARCIAL ANTERIOR


CANT. IMPORTE
1.00 CONCRETEO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO FC= 175 KG/CM2 M3 12.00 333.94 4,007.28
1.01.02 ENCOFRA. - DESENCOF. M2 60.00 42.00 2,520.00
1.01.03 ACERO CORRUGADO KG 800.00 4.94 3,952.00 10,479.28
1.02 VIGA
1.02.01 CONCRETO FC= 175 KG/CM2 M3 8.00 305.15 2,441.20
1.02.02 ENCOFRA. - DESENCOF. M2 40.00 46.53 1,861.20
1.02.03 ACERO CORRUGADO KG 500.00 4.94 2,470.00 6,772.40
1.03 LOSA ALIGERADA
1.03.01 CONCRETO FC= 175 KG/CM2 M3 9.00 279.22 2,512.98
1.03.02 ENCOFRA. - DESENCOF. M2 120.00 33.07 3,968.40
1.03.03 ACERO CORRUGADO KG 700.00 4.94 3,458.00
1.03.04 LADRILLO O.15x0.30x0.30 UND 1020.00 2.67 2,723.40 12,662.78
2.00 MUROS
2.01 LADRILLO KK 18 HCO. SOGA M2 30.00 48.84 1,465.20
2.02 LADRILLO KK 18 HCO. CABEZA M2 48.00 76.09 3,652.32 5,117.52
COSTO DIRECTO 35,031.98
GASTOS GENERALES ( 15% ) 5,254.80
UTILIDAD ( 10 % ) 3,503.20
SUBTOTAL 43,789.98
IGV 7,882.20
TOTAL 51,672.18
% AVANCE
ACTUAL ACUMULADO SALDO %
CANT. IMPORTE CANT. IMPORTE CANT. IMPORTE AVANCE
VALORIZACIN N 03
Del 01. AL 30. De JULIO... del 20

OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:

ITEM DESCRIPCIN UND. CANT. P. UNIT. PARCIAL ANTERIOR


CANT. IMPORTE
1.00 CONCRETEO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO FC= 175 KG/CM2 M3 12.00 333.94 4,007.28
1.01.02 ENCOFRA. - DESENCOF. M2 60.00 42.00 2,520.00
1.01.03 ACERO CORRUGADO KG 800.00 4.94 3,952.00 10,479.28
1.02 VIGA
1.02.01 CONCRETO FC= 175 KG/CM2 M3 8.00 305.15 2,441.20
1.02.02 ENCOFRA. - DESENCOF. M2 40.00 46.53 1,861.20
1.02.03 ACERO CORRUGADO KG 500.00 4.94 2,470.00 6,772.40
1.03 LOSA ALIGERADA
1.03.01 CONCRETO FC= 175 KG/CM2 M3 9.00 279.22 2,512.98
1.03.02 ENCOFRA. - DESENCOF. M2 120.00 33.07 3,968.40
1.03.03 ACERO CORRUGADO KG 700.00 4.94 3,458.00
1.03.04 LADRILLO O.15x0.30x0.30 UND 1020.00 2.67 2,723.40 12,662.78
2.00 MUROS
2.01 LADRILLO KK 18 HCO. SOGA M2 30.00 48.84 1,465.20
2.02 LADRILLO KK 18 HCO. CABEZA M2 48.00 76.09 3,652.32 5,117.52
COSTO DIRECTO 35,031.98
GASTOS GENERALES ( 15% ) 5,254.80
UTILIDAD ( 10 % ) 3,503.20
SUBTOTAL 43,789.98
IGV 7,882.20
TOTAL 51,672.18
% AVANCE
ACTUAL ACUMULADO SALDO %
CANT. IMPORTE CANT. IMPORTE CANT. IMPORTE AVANCE