Sei sulla pagina 1di 5

Construction Works for B+G+3 Residential Apartment at Old Airport, Doha, Qatar Bill of Quantities

#REF!

Item Qty Unit Rate Amount


Description
(QR) (QR)

Fire Pumps General description


Split case horizontal type pumps as specified,
mounted on a steel base; complete with suction
and delivery manifolds, OS&Y valves, non-return
valves, strainers, gauges, flexible connections
and factory wired control panel; connections to
cold water suction including puddle flanges,
vortex steel plates, etc. and fire protection
delivery pipework, pumps test line with flow
meters and gate valves, and electrical
connections to local outlets/control panel;
complete as shown on drawings and as specified.

13.0.0 Electrical Fire Pump


Supply, install, connect, test and commissioning
an automatic, factory assembled wired and tested electric
driven fire pumps system consisting of the pump, motor, and
controller, (pump & motor) to be mounted on a common base
prior to shipment. Fire pumps shall be horizontal split case
bronze fitted, double suction, centrifugal . The pump complete
package shall be UL listed and FM approved including all
accessories and conteroller conforming to all requirements of
NFPA #20 and as shown on drawings.

13.0.1 Ref. EFP-02 - 500 gpm, 110 psi 1.0 No. -


-
13.1.0 Jockey Fire Pump -
Supply, install, connect, test and commissioning -
an automatic packaged End Suction jockey pump, complete
including but not limited to the ULlisted controller and all other
accessories as specified and as shown on drawings.

13.1.0 Ref. FJP - 20 gpm, 120 psi 1.0 No. -


-
13.2.0 Diesel Fire Pump -
Supply, install, connect, test and commissioning -
an automatic, factory assembled wired and
tested Diesel driven fire pumps system
consisting of the pump, motor, diesel tank, and
controller, ( pump & motor) to be mounted on a
common base prior to shipment. Fire pumps shall
be horizontal split case bronze fitted, double
suction, centrifugal The pump complete package
shall beconforming to all requirements of NFPA
#20 and as shown on drawings.

13.2.1 Ref. DFP-02 - 500 gpm, 110 psi 1.0 No. -


-
-
-
-

CARRIED TO COLLECTION 0.00

MR. SHAHEEN BIN MUTTAR AL KAWARI


BQ/13/1 May, 2016
Tender Ref.: APG/328
Construction Works for B+G+3 Residential Apartment at Old Airport, Doha, Qatar Bill of Quantities

#REF!

Item Qty Unit Rate Amount


Description
(QR) (QR)
FIRE FIGHTING WORKS (Cont'd)

13.3.0 Fire Water Tanks


Supplying, fixing,testing and commissioning of
Noncombustible & QCDD approved reinforced concrete
underground tanks, complete with supports, all pipe
connections, floating valve, access door, level indecator,
overflow and drain connections, ladder, anti vortix plate, and
all accessories, as specified and shown on drawings and as
per QCDD requirements.

13.3.1 Fire Water Tanks - 72 m3 2.0 No. -


-
13.4.0 Siamese Connection -
Supply, install and comissioning of 2x65mm, ,Dia. 150mm -
Siamese Connectios, works includes all needed connections
and valves to finish the work in best way according layouts,
specifications, QCDD requirements and under engineer
supervision.

13.4.1 Siamese connection (Dry) 1.0 No. -


-
13.5.0 Alarm Check Valve -
Supply, install and comissioning of Fire Alarm Check Valves -
Assembly with OS&Y control valve, alarm check valve, water
flow detector, drain valve, pressure gauges, alarm gong,
complete as shown on drawings and as specified; jointing to
pipework.

15.5.1 Ref. ACV 1.0 No. -


-
13.6.0 Firefighting Pipes -
Supplying, fixing,testing and commissioning of Steel SCH40 -
pipes.in accordance to ASTM A53, and fittings including all
necessary accessories, automatic air vents with gate valves,
supports, blanking plates, painting or coating in accordance
with the NFPA requirements; joints shall either be flanged,
welded or by mechanical coupling complete as shown on
drawing and as specified above & under ground.

13.6.1 Dia. 25 mm 230 m -


13.6.2 Dia. 32 mm 60 m -
13.6.3 Dia. 40 mm 140 m -
13.6.4 Dia. 50 mm 60 m -
13.6.5 Dia. 65 mm 65 m -
13.6.6 Dia. 80 mm 35 m -
13.6.7 Dia. 100 mm 130 m -
13.6.8 Dia. 150 mm 50 m -
-
13.7.0 Fire Sprinklers -
13.7.1 Supply , install , connect and test of 15 mm brass Upright
sprinkler heads (K-5.6) to be installed at all areas above false
ceiling. all as specified, as shown on drawings and as per 130 No. -
QCDD requirements. The work shall be according NFPA 13

CARRIED TO COLLECTION 0.00

MR. SHAHEEN BIN MUTTAR AL KAWARI


BQ/13/2 May, 2016
Tender Ref.: APG/328
Construction Works for B+G+3 Residential Apartment at Old Airport, Doha, Qatar Bill of Quantities

#REF!

Item Qty Unit Rate Amount


Description
(QR) (QR)
FIRE FIGHTING WORKS (Cont'd)

13.7.2 Supply , install , connect and test of 15 mm brass Sidewall


sprinkler heads (K-5.6) to be installed at all areas above false
ceiling. all as specified, as shown on drawings and as per 4 No. -
QCDD requirements. The work shall be according NFPA 13

-
13.8.0 Zone Control Valve -
Supplying, installing, testing, and commissioning, firefighting
zoon control valve complete with all valves, pressure gauge,
flow switches, connections with fire alarm system, etc, and -
all accessories according to the specifications and as shown
on the drawings and finalize the work as conformity with
regulations.
13.8.1 Ref. ZCV - 50 mm 1 No. -
13.8.2 Ref. ZCV - 100 mm 4 No. -
13.8.3 Ref. ZCV - 150 mm 2 No. -
13.8.4 Ref. ZCV - 200 mm 2 No. -
-
13.9.0 Automatic Air Vent -
13.9.1 Supplying, installing, testing and commissioning 25 mm
diameter automatic air vent valve at the highest point of the
fire risers, complete with gate valve, pressure gauge 2 No. -
connections, and finalize the work as conformity with
regulations.
-
13.10.0 Fire Hose Cabinet -
13.10.1 Fire hose cabinet single cabient, hose reel , 25mm diameter
x 30m long fire hose with 25mm discharge nozzle and Gate
valve, as shown on drawings and as specified. All FHC must 12 No. -
have pressure reducing valve and all necessary accessories.

-
13.11.0 Fire Extinguisher -
Supply , install , connect and test of Fire extinguisher. All as
specified, as shown on drawings, and as per QCDD -
requirements.
13.11.1 Ref. PFE 6 KG 3 No. -
13.11.2 Ref. PFE 6 KG K-Type 31 No. -
13.11.3 Ref. CFE 5 KG 9 No. -
13.11.4 Ref. FFE 6 KG 1 No. -
13.11.5 Ref. FB 31 No. -
-
13.12.0 Landing Valve 12 No. -
-
-
-
-
-

CARRIED TO COLLECTION 0.00

MR. SHAHEEN BIN MUTTAR AL KAWARI


BQ/13/3 May, 2016
Tender Ref.: APG/328
Construction Works for B+G+3 Residential Apartment at Old Airport, Doha, Qatar Bill of Quantities

#REF!

Item Qty Unit Rate Amount


Description
(QR) (QR)
FIRE FIGHTING WORKS (Cont'd)

13.13.0 Flow Switch 4 No. -


General Requirements -
Allow for producing all shop and as built drawings for approval -
and as required by the engineer
Allow for sterilization and cleaning out of all Pipe work system -
(Contractor shall submit complete set of sterilization methods
and specifications from specialist contractor for revision and
approval)

Allow for providing all painting and plates, discs, labels etc. for -
identification of system equipments
Allow for any other necessary items required for the -
completion of the work as described in the relevant sections of
the drawings and / or specifications and not mentioned herein
or suggested from the contractor and approved from the
consultant office

-
13.14.0 Handover Process -
Overall Individual and integrated System Testing and -
Commissioning and Handover Process to the approval of the
Engineer including Maintenance activities during
warranty period in a strict compliance to Contract
Documents and to QCS 2014.
-
-
-
-
-
-
-
-
-
-
-

CARRIED TO COLLECTION 0.00

MR. SHAHEEN BIN MUTTAR AL KAWARI


BQ/13/4 May, 2016
Tender Ref.: APG/328
Construction Works for B+G+3 Residential Apartment at Old Airport, Doha, Qatar Bill of Quantities

#REF!

Item Qty Unit Rate Amount


Description
(QR) (QR)

COLLECTION
From Page BQ/13/1 -

From Page BQ/13/2 -

From Page BQ/13/3 -

From Page BQ/13/4 -

#REF! 0.00

MR. SHAHEEN BIN MUTTAR AL KAWARI


BQ/13/5 May, 2016
Tender Ref.: APG/328

Potrebbero piacerti anche