Sei sulla pagina 1di 7

K.L.E.

Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

L e s s o n D e l ive r y P l an , E xe c u t i o n S t a t u s an d P ro g re s s M o n i to r in g
A c a d e m i c Ye a r : 2 0 1 5 - 1 6 Semester: VIII
Name of the Staff Member: Prakash S Kerur Subject: Flexible AC Transmission systems Subject code: 10EE832
Hrs required as per Syllabus: 52 hrs Hrs available as per COE: 52 Additional Classes required: 00

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 1&2 FACTS, Concept And General System Configuration
Planned Start Date : 28/01/16 Planned Completion Date: 12/02/16 Planned Hrs : 1 0 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Introduction to the FACTS
2 Facts, concept and general system
configuration
3 Transmission, interconnection
4 Flow of power in AC systems in parallel system
5 Flow of power in AC systems in mesh system
6 Power flow and dynamic stability consideration
of a transmission line inter connection
7 Relative importance of controllable parameters
8 Basic types of FACTs controllers shunt, series,
9 Combined shunt and series connected
controllers.
10 Benefits of FACTS controllers
K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 3. Power Semiconductor Devices
Planned Start Date : 15/02/16 Planned Completion Date: 01/03/16 Planned Hrs : 10 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Introduction to power semiconductor devices
2 Types of high power devices
3 Characteristics and requirement ,power device
4 Principle of high power devices material

5 Continued

6 Structure of power Diode

7 Structure of MOSFET

8 Structure of MOS turn off thyristors

9 Structure of GCT

10 Structure of integrated gate commutated


thyristors ( IGCT).
K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 4. Voltage Source Converters
Planned Start Date : 03/03/16 Planned Completion Date: 17/03/16 Planned Hrs : 06 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Introduction and basic concepts ,
2 Single phase full wave bridge converter
3 Single phase one leg operation
4 Square wave voltage harmonics for single
phase bridge
5 3 phase full wave converter

6 Derivation of output voltge.


K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 5. Self And Line Commutated Current Source Converters
Planned Start Date : 18/03/16 Planned Completion Date: 29/03/16 Planned Hrs : 6 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Introduction and concept of CSC ,

2 3 phase full wave rectifier with and without


commutation angle
3 Thyristors based converter
4 Thyristors based converter with commutation
angle
5 Current source converter with turnoff
devices,
6 Current sourced versus voltage source
converter
K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 6. Static shunt compensator SVC and STATCOM
Planned Start Date : 31/3/16 Planned Completion Date: 25/04/16 Planned Hrs : 10 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Objectives of shunt compensation
2 Continued
3 Methods of controllable VAR generation
4 Continued

5 Static VAR compensator

6 Continued

7 Working of SVC

8 Continued

9 Working of STATCOM

10 Comparison between SVC and STATCOM.


K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Lesson Delivery Plan Execution Status Progress Monitoring


Unit No : 7 & 8. Static series compensators
Planned Start Date : 26/04/16 Planned Completion Date: 16/05/16 Planned Hrs : 10 Engaged Hrs:
Class Engaged HOD
Portion to be covered per hour Extra Experiences worth noting
No Date Sign.
1 Working of GCSC

2 Working of TSSC

3 Controlling of TCSC

4 Working of SSSC

5 objectives of series compensation,

6 variable impendence type of series


compensation
7 Continued

8 switching converter type series compensation

9 Controlling of switching converter

10 External control for series reactive


compensators.
K.L.E. Societys
FORM
K.L.E. INSTITUTE OF TECHNOLOGY, HUBBALLI
ISO 9001: 2008 - KLEIT
Dept of Information Science & Engg.
K.L.E.S.

Document#:
Title: Lesson Delivery Plan, Execution Status and Progress Monitoring Rev: 1.0
FMTC0304

Remarks:
Whether the schedule for the subject was satisfactory?
Whether the content was correlated with exam pattern?
Whether any new practices were adopted?

Note: Missed classes should be rescheduled within 15 days from the actual date.

No. of classes planned No. of classes engaged


52

Signature of the faculty

Potrebbero piacerti anche