Sei sulla pagina 1di 22

Special Report

Cracks and Crack Control


in Concrete Structures

Fritz Leonhardt
Professor Emeritus
Dr.-Ing. Dr.-Ing. h.c. mull.
Consulting Engineer
Stuttgart, FRG

he material presented in this paper is ing in concrete structures. In this paper,


T based on more than 30 years of re-
search, observations and experience
causes of concrete cracking are dis-
cussed, including tensile strength of
concerning causes, control, and conse- concrete, temperature, shrinkage and
quences of cracking in concrete struc- creep effects. Recommended crack
tures. This extensive background was widths are presented along with design
helpful in the preparation of this paper methods for sizing reinforcement to
which deals with questions of concrete control crack widths.
cracking.
The presence of cracking does not
necessarily indicate deficiency in CAUSES OF CRACKING
strength or serviceability of concrete Concrete can crack due to a number of
structures. While currently available de- causes. Some of the most significant
sign code provisions lead to reasonable causes are discussed in detail.
control of cracking, additional control
can be achieved by understanding the
basic causes and mechanisms of crack- Tensile Strength of Concrete
The tensile strength of concrete is a
widely scattering quantity. Cracking oc-
Note: This paper is a revised and updated version of curs when tensile stresses exceed the
an article originally published in the Proceedings of
the International Association for Bridge and Struc-
tensile strength of concrete. Therefore,
tural Engineering (1ABSE), Zurich, Switzerland, to control concrete cracking, the tensile
1987, p. 109. strength of concrete is of primary im-

124
portance. Laboratory test data con-
ducted by H. Busch were analyzed
statistically. As presented in Ref. 1, this Synopsis
analysis furnished the following re-
Simple design rules are presented
lationships for the mean direct tensile to control cracking in concrete struc-
strength, f tm , related to the 28-day
tures. Causes of cracking and its ef-
compressive cylinder strength f,' of con-
fect on serviceability and durability are
crete:
discussed. The paper is primarily ap-
plicable to large structures such as
fcm = 2.1 (fc)z (psi)
/3

bridges. However, general concepts


fi 'm = 0.34 (ff)2"'(N/mm2) presented are applicable to any con-
crete structure. Prestressing forces
The statistical analysis indicated that are considered. A numerical example
the coefficient in this equation can be showing application of the method
modified to 1.4 (0.22) and 2.7 (0.45) to and use of simple design charts is in-
obtain the 5 and the 95 percentiles, re- cluded.
spectively, of the tensile strength, fI.
The tensile strength of concrete is
slightly higher in flexure. However, it is
recommended that values for direct ten-
sion be used in practice. Concrete cement during concrete hardening. This
cracks when the tensile strain, t, ex- effect is usually neglected except in
ceeds 0.010 to 0.012 percent. This massive structures as indicated in Ref. 2.
limiting tensile strain is essentially in- However, depending on cement content
dependent of concrete strength. and type of cement, the temperature
The 5 percentile of the tensile within concrete members with dimen-
strength, f, should be used in design to sions of 12 to 36 in. (30 to 91 cm) can
locate areas in the structure that are increase approximately 36F to 108F
likely to crack by comparing calculated (20C to 60C) during the first 2 days
stresses with the expected concrete after casting.
strength. The 95 percentile, f 5 , should If concrete members are allowed to
be used to obtain conservative values for cool quickly, tensile stresses may reach
restraint forces that might occur before values higher than the developing ten-
the concrete cracks. These restraint sile strength of the concrete. Even if this
forces are used to calculate the amount process results only in microcracking,
of reinforcement needed for crack width the effective tensile strength of the
control. hardened concrete is reduced. How-
ever, very often wide cracks appear
even when reinforcement is provided.
Causes of Cracking During
In addition, the reinforcement may not
Concrete Hardening be fully effective since bond strength is
Concrete cracking can develop during also developing and is yet too low. It is
the first days after placing and before necessary to minimize such early cracks
any loads are applied to the structure. by keeping temperature differentials
Stresses develop due to differential within the concrete as low as possible.
temperatures within the concrete. This can be done by one or more of the
Cracking occurs when these stresses ex- following measures:
ceed the developing tensile strength, f;, 1. Choice of cement A cement with
of the concrete as indicated in Figs. 1 low initial heat of hydration should be
and 2. Differential temperatures are selected. Table 1 shows that there is a
mainly due to the heat of hydration of significant variation in heat develop-

PCI JOURNAUJuly-August 1988 125


b concrete

compression

+ +G = OT a T Ec

GT
tension

Internal stresses
in equilibrium

Fig. 1. Temperature distribution due to heat of hydration and


internal stresses caused by outside cooling in a free standing
concrete block.

ment among different types of cements. concrete, as it was done years ago, is not
The cement content of concrete should recommended.
be kept as low as possible by good 4. Precooling This is a necessity for
grading of the aggregates. Heat de- large massive concrete structures such
velopment can also be reduced by ad- as dams. For more usual structures, in
ding fly ash or using slag furnace ce- which shortening after cooling can take
ment. place without creating significant re-
2. Curing Evaporation of water straint forces, precooling is expensive
must be prevented by using curing and unnecessary. In this case, thermal
compounds or by covering the concrete insulation is preferable and it also has
with a membrane. Rapid evaporation the benefit of accelerating concrete
can lead to plastic shrinkage cracking. strength development. An exception
3. Curing by thermal insulation - may be made in very hot climates since
Rapid cooling of the surface must be precooling can keep concrete workable
prevented. The degree of thermal insu- for a longer period of time.
lation depends not only on the climate, Often shrinkage is considered as a
but also on the thickness of the concrete cause of early cracking. However, this is
member and on the type of cement used. not true under normal climatic condi-
Spraying cold water on warm young tions. Shrinkage needs time to produce a

126
Table 1: Heat of hydration of various types of
cements.*

Heat of hydration (Btu/1b)

Type of
cementt 1 day 3 days 7 days 28 days

I 92 144 157 167

II 76 115 135 148

III 139 184 194 205

IV 50 81 94 117

V 58 88 101 124

*Data obtained from Concrete Manual, U.S. Bureau of


Reclamation, 1975, pp. 45-46.
t Federal Specifications SS-C-192G, including Interim
Amendment 2, classified the live types according to usage as
follows: Type I for use in general concrete construction when
Types 11, 111, 1V, and V are not required; Type 11 for use in
construction exposed to moderate sulfate attack; Type III for use
when high early strength is required; Type IV for use when low
heat of hydration is required; and Type V for use when high sulfate
resistance is required.
Note: 1.0 Btu/Ib = 2.32 J/g.

shortening as high as the tensile rupture Causes of Cracking After


strain. Only in very hot and dry air Concrete Hardening
shrinkage can cause early cracks in
young concrete, if measures against Tensile stresses due to dead and live
evaporation are not applied. loads cause cracking. Normal rein-

cracking due to restraint

tensile strength fit

Internal Stress

5 10 15 20 h
Concrete hardening time, hours

Fig. 2. Development of the tensile strength and stresses due to nonlinear


temperature distribution within the concrete.

PCI JOURNAL/July-August 1988 127


Deformed Shape considering Upper Face
of Beam Warmer Than Bottom Face and
assuming beam freed from interior Supports^

I I I

I MDT
Moment Diagram

VAT

Shear Diagram

Fig. 3. Forces in a concrete beam due to a temperature rise OT at


the upper face of the beam and external restraint provided by
interior supports.

forcement or prestressing should be de- treme temperatures that occur at 20 to


signed to provide required strength and 50-year intervals must be considered. As
keep crack widths within permissible indicated in Refs. 3, 4, 5 and 6, temper-
limits. Tensile stresses due to service atures in bridge structures were mea-
loads can be controlled by prestressing. sured in several countries. Recently, the
The degree of prestressing can be cho- U.S. Transportation Research Board
sen based on structural or economic published in Ref. 7 temperature data for
considerations. Normally, partial pre- bridge design.
stressing leads to better serviceability Temperature differentials should be
than full prestressing. considered along with recommended
Cracks can also be initiated by ten- mean temperatures, Tm , used for cal-
sile stresses due to restrained defor- culating maximum and minimum
mations from temperature variations or changes in the lengths of structural
from shrinkage and creep of concrete. members. In Central Europe values for
Imposed deformations such as differ- T. are specified for concrete bridges as
ential settlement between foundations varying from +68F to 22 (+20C to
can also cause cracks. 30C).
There are two types of restraint which The temperature distribution over a
cause stress in concrete members, beam cross section can be subdivided
namely, internal restraint as shown in into three parts as shown in Fig. 4. The
Fig. 1, and external restraint in indeter- constant part, 0 T,, causes axial forces if
minate structures, as shown in Fig. 3. overall length changes are restrained.
Restrained deformations caused crack- The linear part, AT,, causes restraint
ing in concrete bridges and it was forces, M AT and V AT, in indeterminate
primarily due to temperature differ- structures as shown in Fig. 3 for a three
ences produced by heating under the span continuous beam. The nonlinear
sun and cooling during the night. Ex- part, AT3i causes stresses, which are in

128
Table 2. Recommended cross section temperature
differentials for bridge design in Europe.

Box girder T-beams


Type of
cross section Mari- Conti- Mari- Conti-
and exposure time nental time nental

Top of
cross section
warmer than
bottom (F) 18 27 14.4 21.6

Bottom of
cross section
warmer than
top(F) 9 14.4 7.2 10.8
Note: 1.0 A N' _ (9/5) AC.

equilibrium over the cross section and pansion for concrete. Cooling causes
produce no action forces. These tensile stresses in areas near extremities
stresses, which also exist in statically of the section.
determinate structures, can be calcu- For bridges in Europe, the AT values
lated by imposing equilibrium condi- given in Table 2 are recommended. In
tions and considering that: addition to temperature, restrained con-
crete creep and shrinkage can cause
JcT = AT3aTEc stresses. Shrinkage often leads to cracks
between connected members of signifi-
where a T is equal to 6 x 10 -6 / 0 F cantly different sizes. Stress due to re-
(10-5 / C), the coefficient of thermal ex- strained creep and shrinkage can be cal-

rig. 4. uivision of temperature aiagram into its constant, unear ana noniinear parts.

PCI JOURNAL/July-August 1988 129


G
iihii

compressive G
due to DL+w LL+ P
plan A-A
H
'_'-- cracks due to
AT, AS and ACr

Fig. 5. Transverse cracks in thin bottom slab of box girder due to


differential temperature, creep and shrinkage despite prestressing.

culated in the same way as stresses due the linear theory of elasticity, consider-
to temperature. ing the structure initially uncracked. In
Transverse cracks due to temperature, these calculations, f,s should be taken as
creep and shrinkage effects are fre- the tensile strength of the concrete. In
quently found in the relatively thin the tension side of a beam, cracking will
bottom slabs of box girders despite the occur in areas where bending moments
fact that calculations show considerable due to service loads and restraint cause
longitudinal compressive stresses due to stresses in the extreme tensile fiber
prestressing. Compressive stresses tend above f15 . As bending increases, the
to shift towards the thick webs which depth of cracking can be calculated by
undergo less creep and shrinkage strains considering a maximum concrete tensile
as illustrated in Fig. 5. strain of 0.015 percent as shown in Fig.
Box sections are indeterminate struc- 7.
tures. Therefore, restraint moments are Calculation of possible maximum
developed when the section is heated bending moments due to restraint
on one side by the sun. This leads to should be based on f 5 . As shown in Fig.
vertical cracking in bridge piers and 8, consideration of such moments in-
tower shafts as shown in Fig. 6. Ref. 8 creases the areas in which cracking may
shows examples of temperature cracks be expected to occur.
in prestressed concrete structures. Bending moments due to restraint
define only the location and quantity of
reinforcement or prestressing necessary
Determination of Areas
to limit the crack width for serviceability
Likely to Crack purposes. As proven long ago by
Cracking occurs whenever the princi- Priestley, and illustrated in Fig. 9,
pal stresses due to service loads or due these moments do not decrease the ul-
to restraint forces or due to a combina- timate strength of the structure because
tion of service loads and restraints ex- they are reduced and finally disappear
ceed the tensile strength of concrete. due to cracking and plastic deformation
These stresses can be calculated using as service loads are increased until the

130
deflection line

vertical cracks

-MAT
II
+ +MOT

+ MAT

Fig. 6. Bridge pier cross section and moments due


to temperature rise on one side of the pier.

-EG
XII

-O,015/.
cracked
Zone of web

rLE 7,5db
+ill
flange Zone S

Fig. 7. Cracked zones in webs of beams under combined moment due


to dead load, live load and restraint.

limit state is reached. However, the ments due to service loads in sizing of
structure must be checked for possible main reinforcement. It must, however,
brittle failure of the compression zone if be observed that restraint due to pre-
a relatively high degree of prestressing stressing does not decrease on the way
is used, especially for continuous T- up to limit state.
beains. Therefore, to satisfy strength re- Restraint forces decrease beginning
quirements, bending moments due to with the first crack since the stiffness of
restraint should not be added to mo- the structure is progressively reduced

PCI JOURNAL/July-August 1988 131


Fig. 8. Increased cracked area due to restraint moment.

with each crack that occurs. Steel Evaluation of Cracks


stresses due to restraint are highest As indicated in Fig. 10, crack widths
when the first crack occurs and decrease are greater at the surface and decrease
with each further crack. This tends to re- towards the reinforcement. Long years
duce crack widths. Fig. 9 shows the effect of research reported in Refs. 9 and 10,
on moment due to reduction of restraint. and experience indicate that crack

service loads ultimate lim. state


M due to load and
restraint forces brittle failure
by too high prestress

1,75M DL+LL ductile failure

M AT 1,75 MDL
effect of AT effect of 1,5T
M DL+ LL
MDL

0 Curvature 4 D Curvature
OT OT

Fig. 9. Illustration of reduction of restraint forces as the limit state is approached.

132
Ag. 10. Crack width at the surface is used as a measure of
the effect of cracking on concrete members.

Table 3. Allowable crack widths.


Ambient
condition of w90t Maximum w Crack
exposuret (in.) permitted (in.) appearance

Mild 0.012 0.020 Easily


visible

Moderate 0.008 0.016 Difficult to see


with the naked
Severe 0.004 0.0012 eye

* w90 denotes the 90 percentile of the crack width, w.


t Defined as indicated in the CEB-FIP Model Code:
Mild exposure
The interiors of buildings for normal habitation or offices.
Conditions where a high level of relative humidity is reached
for a short period only in any one year (for example 60 percent
relative humidity for less than 3 months per year).
Moderate exposure
The interior of buildings where the humidity is high and
where there is a risk for the temporary presence of corrosive
vapors.
Running water.
Inclement weather in rural or urban atmospheric conditions,
without heavy condensation of aggressive gases.
Ordinary soils.
Severe exposure
Liquids containing slight amounts of acids, saline or strongly
oxygenated waters.
Corrosive gases or particularly corrosive soils.
Corrosive industrial or maritime atmospheric conditions.
Note: 1 in. = 2.54 cm.

PCI JOURNALJJuly-August 1988 133


widths up to 0.016 in. (0.4 mm) do not sensitivity to corrosion of various types
significantly harm the corrosion protec- of reinforcement led to different re-
tion of the reinforcement furnished by quirements for concrete cover. It is
the concrete, provided the cover is suffi- prudent to vary crack width limita-
ciently thick and dense. However, to tions depending on environmental con-
avoid undue concern by casual observ- ditions.
ers, crack widths should be limited to For the environmental criteria of CEB
0.008 in. (0.2 mm) at surfaces which are and Eurocode No. 2, crack widths can be
often seen from a short distance. defined as presented in Table 3. These
Polluted air containing CO 2 (which values are valid for a concrete cover, c,
causes carbonation), and SO 2 (which of 1.18 in. (30 mm) and for bar diame-
forms acids), or chlorides from deicing ters, db , smaller than c/1.2 but not greater
salts, can cause damage to concrete than 1 in. (25 mm). For larger cover, the
structures. Having cracks or not, con- allowable crack width should be in-
crete structures must be protected creased to c130 (c in mm). For cover
against such attacks. greater than 2 3/s in. (60 mm) and bar di-
Despite the evidence that crack ameters of main reinforcement greater
widths up to 0.016 in. (0.4 mm) do not or equal to No. 10 (32 mm), small diam-
significantly affect the corrosion protec- eter and closely spaced reinforcement
tion of reinforcement, different levels of should be provided within the cover to
environmental exposure and different control crack widths.

Fig. 11. Stress-strain diagram of a reintorced concrete member under direct tension.

134
DESIGN OF tension between cracks, re-
ferred to as tension stiffening
REINFORCEMENT effect (see Fig. 11)
Reinforcement can be designed to As indicated in Ref. 9, AE S can be ex-
control crack widths using information pressed as:
presented in the following sections.
AE 8 = (1/E 3 ) ( o2scr / a ) (3)
Basic Analysis where
The following presentation follows = reinforcement stress immedi-
(T ,.

the 1978 CEB-FIP Model Code and the ately after cracking
1983 CEB Manual. The material is mss' = steel stress in cracked state
based on theoretical considerations and E s = Young's modulus for the rein-
experimental results. forcement
Fig. 11 shows a plot of steel stress ver-
sus longitudinal strain over a given The strains E and A E S are significantly
length, 1, of a reinforced concrete ele- affected by concrete strength and rein-
ment in direct tension. As the load in- forcement ratio.
creases, cracks are assumed to occur The mean crack spacing can be ex-
within this length. The crack spacing pressed as:
and the longitudinal mean strain define
s c ,.m =2(c+s/10) +k,kzd b /p e(4)
the mean crack width:
where
Wm = S can E m (1) c = concrete cover in mm
s = bar spacing in mm
where
w m = mean crack width k l = 0.4 for deformed reinforcement,
= mean crack spacing considering bond strength
Em = mean strain = Al/l k2 = 0.125 for bending members,
considering shape of E diagram
As the load increases, reinforcement = 0.25 for members under direct
stress at a potential crack location varies tension,
linearly. When the crack occurs, rein- < 0.125 for combined bending and
forcement stress at the crack, o- $ , in- compression
creases suddenly without a significant db = bar diameter
change in the mean strain. As the load P e = effective reinforcement ratio,
continues to increase and more cracks A s /A Cei where A, is the effective
appear, the relationship between the concrete area around the bar
mean strain, E m , and reinforcement defined as indicated in Fig. 13.
stress at the crack, a-8 , approaches that of
Using the equations presented, the
the reinforcement alone, as indicated in
mean crack width, Wm, can be calcu-
Fig. 11. Conditions before cracking will
lated. The 90 percentile of w can be as-
be referred to as State I and conditions
sumed to be:
assuming the reinforcement working in
a cracked section will be referred to as
w so = k4 W m (5)
State II:
where k 4 is given in the Eurocode as 1.3
E,n= ES' AEg (2) and 1.7 for restraint forces and service
loads, respectively. The author recom-
where
mends k 4 = 1.5 for all cases. The effect of
E'',' = steel strain in State II repeated loads can be considered by re-
AE s = strain reduction by concrete in ducing the value of A E g in Eq. (2):

PCI JOURNAL/July-August 1988 135


b= 13ocm
(5(.2 in.)
(0.6in,) (#4)
c=1,5cm db=l4mm

L i E v
o 1
r ( ^
l I c=2 cm
(0.8 in.)

i ) Ec
/
O M 18cm 3

(a2)db=4.2mm
d b 6mm
J1 ( (7 y / 1 \ ` f I s= 15 cm db=26mm
J ` l 1 I1 `l (6in.) (it8)

Fig. 12. Crack pattern on T-beam with large bars near extreme tension fiber and light
reinforcement in the stem.

De s = k5 (1/E 3 ) (crgcr/(Tg') Sizing Reinforcement for


Direct Tension
where k5 varies from 0.4 to 0.8 depend-
ing on frequency of load repetition as The diagram in Fig. 14 can be used to
indicated in Ref. 11. obtain the required reinfor( ement area
If the direction of the reinforcement is for a given bar diameter, specified crack
not normal to the crack, as in the case of width limit, and given concrete
shear or torsion, the crack width can be strength. The diagram applies for the
multiplied by a factor k. which can be case of axial tension under service loads
taken as 1.0 for angles up to 15 degrees or restraint forces. The full lines in Fig.
from the normal with the crack direction 14 refer to a characteristic strength of the
and 2.0 for a 45 degree angle. This factor concrete C 20, the dotted lines to C 40.
can be interpolated for angles between For other strengths, the factor k, must be
15 and 45 degrees. used.
Fig. 12 shows that the reinforcement For crack control one should always
controls crack width only within a small choose the concrete class above the one
area around the bars. This. area is de- specified for ultimate strength of the
fined in the CEB-FIP Model Code as structure. Bar diameter should be cho-
the effective area, A Ce , shown in Fig. 13. sen for obtaining small bar spacings as
indicated in Section 5.5. Fig. 14 also
shows steel stress at first crack and
Sizing Reinforcement for minimum reinforcement percentage re-
Crack Control quired to avoid reinforcement yielding
when first crack occurs. Steel stress at
For practical design, the use of simple
first crack is given by:
charts is recommended to obtain the
necessary crack control reinforcement
08CT = .f rm/ Pe = 2.1 (.{x) 2 3/Pe
area. Design charts are presented in
Section 2.42 of the 1983 CEB Manual. For reinforcement with a yield
Use of these charts will be explained in strength of 60,000 psi (413 N/mm 2 ) and
the following sections. 3000 and 5000 psi (21 and 34 N/mml)

136
ii

16 in. (40cm)
Direct
7.5 d bi5ldp dA Tension

S
16 in.

Fig. 13. Definition of the effective concrete area according to CEB-FIP 1978 Model Code.

concrete strength, the minimum rein- the reinforcement area obtained to


forcement percentage can be calculated satisfy strength requirements will be
as 0.57 and 0.81 percent, respectively. sufficient for crack control requirements
Steel stresses at cracking can be in the effective area.
higher than allowable stress under If the load is high, then the steel
working stress provisions of design stresses can rise above 0 cr and cause an
codes. This is acceptable for restraint additional crack width Aw. This A w
forces because additional cracking will can be estimated using Eqs. (1) and (2)
decrease stresses. For loads however, and obtaining the mean crack spacing
such high stresses will not occur if the for given d b and Pe from Fig. 15. The A w
structure meets the strength require- must then be subtracted from the
ments of applicable codes. Normally, specified w 90 to read the higher Pe from

PCI JOURNAL/July-August 1988 137


II
32
10
9 E 28
^8 a
N 7
. 6 0 20
-
y
.0
5 16

4 a` 12
3
a8
v
4
U,4 1,2 1,4 1,6 1,8 2.0
percentage of reinforcement pe _As (ova)

for C 20 (2900psi 1 (6Oksi)(50) I (40) I (30) I I I)2Oksii ACe


420 300 201 150 125
Gs cr min 9 i{
for C40 (5800psi) ( ksi) (50) (40) (3Oksi)
420 300 200
min p
Steel stress at first crack Gs cr [N/mm 2 ] for fctm -2,3 N/mm 2at C 20
3,4 N/mm 2 at C 40
(334 psi of 2900psi )
(493psi at 5800psi)

Fig. 14. Design chart ( Ps db diagram) for determining direct tension.

138
Gs,cr
small p
0
largep
AGscr
l
} I_-nGc
Q)

N Ncr,Mcr N,M Fig. 16. Illustration of jump in steel


applied load stress at cracking for different
reinforcement ratios.

500
(70)-
+N MandM,-N

(60)- ^^ M
400
N \ASI
E
I I As
E (50)- 1 _ As
z
\ p bd e/d =M/Nd
1 \
300 axial
1
(40), tension N,

Ln
a, pure cS
(30) bending
20C \ s;
a,

(20) ^o C2p

a a^^ 900PS!)
E 00
.' 10 C
M
^^50 (^2s
^ --
20 (2

0 0,5 1,0 1,5 2,0


percentage of reinforcement p = bd /

Fig. 17. Diagram to obtain increase of steel stress at cracking under tension, bending or
bending with compression for varying eccentricity elh of resultant forf;,n = 1.2 (f,1 )2/3.

PCI JOURNAL/July-August 1988 139


Fig. 14 along a line for (w 90 Ow).
Rough estimates are sufficient in prac-
tice.

_ X
LJ T
L
Sizing Reinforcement for Bending
and Combined Bending and
T Compression
L
a, Members subjected to bending plus
compression require much less rein-
pO forcement for crack control than mem-
C
bers under direct tension. This can be
U O understood considering the sharp in-
N
crease in steel stress that occurs at
cracking. As indicated in Figs. 16 and
L V Z
3 W
17, the increase in steel stress depends
o on concrete tensile strength, f,, rein-
x AA forcement percentage, p, and type of
J)
a, stress distribution such as produced by
direct tension, or combined bending
(D C^ X and compression. It should be noted
x I
a that in Fig. 17 the reinforcement ratio
refers to the concrete area A, = bh.
L W V As can be seen from Fig. 17, there is a
significant difference between the stress
0
increase for tension compared to the in-
Ii)
crease for bending. For prestressed con-
crete structures, the stress increase is
w significantly reduced depending on the
}f L degree of prestressing. In Fig. 17 the
values of e/h = 1.0 and 0.4 corre-
spond to moderate and limited pre-
stressing levels, respectively, e/h =
0.17tofulprest ing.Evenmoderat
prestressing leads to low steel stresses at
cracking and, therefore, small per-
centages are sufficient for crack control.
For bending, and combined bending
Cn and compression, the diagram given in
Fig. 14 can be used to obtain Pe applying
the correction factor:

k5 = (h x ")lh
c
where x" is the depth of the neutral axis
U
for State II and under the cracking mo-
ment considering axial loads from re-
straint and prestressing, and including
reinforcement to satisfy strength re-
Fig. 18. Illustration of effective areas and quirements.
associated strain distributions under For sizing longitudinal crack control
cracking moment. web reinforcement, the correction factor

140
stresses before cracking
crack pattern due to loads to A T
Gc

neutr. axis
state II-

to i i 5

F 3tcr G'ct

crack width
E ct _ 0,4 to
fe w90 ~ 1000

Fig. 19. Cracks and stresses in members without reinforcement.

becomes: pends on the possible depth to of the


crack and can be calculated from the
kB = (ha x)Ih,, maximum tensile strain of concrete ect,,,
0.012 percent with k4 = 1.6. Thus:
where h,, is the depth to the reinforce-
ment as shown in Fig. 18. w 90 = 1.6' 2 tcr' E ct,u 0.4 (10 -3 ) to
For crack control of members sub- In a dry climate, shrinkage of the
jected to shearing or torsional stress, the cracked zone should be taken as A E8h
equations given in Ref. 11 should be 0.01 percent. Thus:
used.
w90 = 1.62tcr(Ect,u+ A Esh)
0.6 (10 -3 ) to
Crack Control Without
Reinforcement Forw 90 = 0.004 in. (0.1 mm), the depth
In massive concrete structures or in of the cracks can be as large as 10 in. (25
moderately prestressed concrete struc- cm). For restrained bending (e.g., un-
tures subjected to tensile stresses due to reinforced but moderately prestressed
temperature, as shown in Figs. 1 and 4, slabs or beams), the depth should re-
cracks that occur often remain as fine main below t cr -- h/5.
cracks having widths below w 90 even
without reinforcement. Larger cracks do
Recommendations for Size and
not occur because the tensile strain in
Spacing of Reinforcement
the concrete, E ct, is restrained by the
adjoining zone under compression as Optimal crack control is obtained by
shown in Fig. 19. choosing small bar diameters and a
The width, w 90 , of such cracks de- small spacing. Table 4 shows recom-

PCI JOURNAL/July-August 1988 141


Table 4. Recommended upper limits for reinforcing bar spacing.

Allowable crack width, w 90 (in.) 0.004 0 .008 0.012


Direct tension 4 6 8
Bending (o = 36,000 psi)* 4 6 8
B en ding (&j= 18,000 psi) 6 8 12
Shear (v0 = 290 psi) Stirrups rectangular to axis of member 4 6 8
Shear (v0 = 435 psi) Stirrups rectangular to axis of member 2 4 6
Shear (v0 = 435 psi) Stirrups at 45 to 60 deg with axis of member 4 8 10
Torsion (t0>290 psi) Ties rectangular to axis of member 2 3 5
Torsion (t 0 > 290 psi) Ties at 45 deg with axis of member 4 8 10

*The steel stress Q'; and the nominal vertical shear and nominal torsional stresses v 0 and t o , respectively,
refer to the load specified for the serviceability limit state of crack control.
Note: 1.0 in. = 2.54 cm; 1.0 psi = 6.89 x 10 N/mm2.

mended upper limits for the spacing of a. Direct tension:


reinforcing bars. p,,,i = fps / ff = 2.7 (f) 2 3/f5

b. Bending:
Minimum Reinforcement I',,i iii 0.5 J [95 /J
Minimum reinforcement should meet
where Pmin refers to the full cross-sec-
the following conditions:
tional area, A, = bh and f, is the yield
(a) Satisfy strength requirements It
strength of the reinforcement. If crack-
is noted in passing that in most Euro-
ing is caused by restraint forces due to
pean codes not only a maximum con-
temperature, creep, shrinkage or differ-
crete strain but also a maximum steel
ential settlement, then the A, can be
strain is specified for strength design.
limited to two to three times the effec-
(b) Prevent sudden failure when
tive area as indicated in Fig. 13. Table 5
cracking occurs This can occur when
presents minimum reinforcement re-
the force transferred from the concrete
quirements.
to the reinforcement is greater than the
(c) Satisfy serviceability requirements
strength of the reinforcement. Cracking
by controlling crack widths Minimum
can be due to applied loads or restraint
reinforcement should be used in all
forces. The minimum amount of rein-
areas where in the cracked state con-
forcement can be calculated as follows:
crete tensile stresses due to loads or re-
straint forces exceed ft5 . In these areas,
Table 5. Minimum reinforcement the minimum reinforcement can be ob-
percentage for f,, = 60,000 psi. tained from Fig. 14 using the k B factor
according to Fig. 18.
Concrete
strength Related
f, (psi) 3000 5000 area ACKNOWLEDGMENT
Direct tension 0.76 1.08 A, = b h The author wishes to express his ap-
preciation to Dr. Walter Dilger and
Bending 0.15 0.22 A,= b h
Eduardo A. B. Salse for reviewing the
Note: 1.0 psi = 6.8 x 10 - 3 N/mm2. paper and for their helpful suggestions.

142
REFERENCES
1. Riisch, H., "Die Ableitung der charak- Transportation Research Board, Report
teristischen Werte der Beton-zugfestig- 276, September 1985.
keit," Beton, Heft, February 1975. 8. Leonhardt, F., "Ri/3schaden an Beton-
2. Widmann, R., "Massenbetonprobleme brucken, Ursachen and Abhilfe,"
beim Ban der Gewolbemauer Ko1n- Beton-und Stahlbetonbau, Heft, Feb-
brein," Lectures of Betontag, 1977, ruary 1979.
Deutscher Beton-Verein. 9. Schiessl, P., "Admissible Crack Width in
3. Kehlheck, F., "Einfluss der Son- Reinforced Concrete Structures," Pre-
nenstrahlung bei Bruckenbauwerken," liminary Report, V. 2 of IABSE-FIP-
Werner Verlag, Dusseldorf, 1975. CEB-RILEM-IASS, Colloquium, Liege,
4. Priestley, M. J. N., "Design of Concrete June 1975.
Bridges for Temperature Gradients," 10. Beeby, A. W., "Design Considerations,
ACI Journal, Proceedings, V. 75, May In Debate: Crack Width Cover and Cor-
1978, pp. 209-217. rosion," Concrete International, V. 7,
5. Thurston, S. J., Priestley, M. J. N., and No. 5, May 1985, pp. 24-25.
Cooke, N., "Influence of Cracking for 11. Leonhardt, F., Vorlesungen fiber Mas-
Thermal Response of Reinforced Con- sivbau, 4, Teil, Springer Verlag, 1977.
crete Bridges," Concrete International, 12. Falkner, H., "Zur Frage der Ri/3bildung
V. 6, No. 8, August 1984, pp. 36-48. durch Eigen-und Zwangs-spannungen
6. Dilger, W., and Ghali, A., "Temperature infolge Temperatur in Stahlbeton-
Stresses in Composite Box Girder bauteilen," Deutscher Ausschu,6 fur
Bridges," Journal of Structural En- Stahlbeton, Heft, 208.
gineering, ASCE, V. 109, ST6, June 1983, 13. Schlaich, J., and Dieterle, H., "Versuche
p. 1460. mit Ferrozement," 15, Forschungskol-
7. Imbsen, et al., "Thermal Effects in Con- loquium des DAfStB in Stuttgart, April
crete Bridge Superstructures," U.S. 1984.

PCI JOURNAL/July-August 1988 143


APPENDIX A - NOTATION
Ae = gross area of concrete cross h = total depth of member
section k,...k 5 = coefficients in crack width
Ace = effective area of concrete ten- equations
sile zone surrounding rein- M = bending moment
forcing bar Mc, = cracking moment
AP, = area of prestressed reinforce- MDL = moment due to dead load
ment MLL = moment due to live load
A, = area of nonprestressed rein- N = normal force (positive if ten-
forcement sion)
b = width of member n = modular ratio = E8/Ee
C = thickness of concrete cover s = bar spacing
d = effective depth of member S Cr = crack spacing
dp = bar diameter B erm = mean crack spacing
Ec = Young's modulus of concrete T = temperature
ES = Young's modulus of steel AT = temperature change
e = eccentricity w = crack width
= tensile stress in concrete Wm = mean crack width
ft, = percentile, p, of direct tensile w90 = 90 percentile of crack width
strength of concrete (per- x = depth of neutral axis in cracked
centile is that value of the sections
quantity below or equal to aT = coefficient of thermal expansion
which p percent of all mea- e et = tensile strain in concrete
surements may be expected to e m= mean strain over an average
fall) length of cracked concrete
.f; = strength of concrete in direct e = steel strain in cracked stage
tension (neglecting tension stiffening)
lm = mean strength of concrete in A e g = reduction of steel strain by
direct tension tension stiffening
0'8 = steel stress in cracked state p = reinforcement ratio
0scr = steel stress at first crack im- Pc = A 8/A Ce = inforcement ratio in

f.
mediately after cracking effective .2nsion zone of con-
= yield strength of steel rein- crete
forcement P to = minimum reinforcement ratio

NOTE: Discussion of this article is invited. Please submit


your comments to PCI Headquarters by April 1, 1989.

144
APPENDIX B - DESIGN EXAMPLE
Given: A 12 in. (30.5 cm) square rein- 12'
forced concrete section in direct ten-
sion.
2.5"
f = 5800 psi (40 N/mmz)
f,= 60,000 psi (413 N/mmz)
14
12 7
N = 100 kips (445 N)
Cover, c = 2 in. (5 cm)
db = 0.875 in. (22 mm)

Required: Check the bar diameter to


limit crack width at crack formation to
0.012 in. (0.305 mm).

Solution: Fig. 14 provides a chart relat- (0.178 mm) is obtained. Since this value
ing bar diameter and effective rein- is less than the 0.012 in. (0.305 mm) re-
forcement ratio for various limiting quired crack width limit in this example,
crack widths and concrete strengths. the No. 7 bars provided are considered
Calculate effective area, Ace: adequate for crack width control in this
ACe = 6 x 6 = 36 in. 2 (232 cm2) case. Use of the chart is illustrated
c= 0.6/36 = 0.0167 or 1.67 percent below.
Entering the chart in Fig. 14 with A= From Fig. 14, a designer can also deter-
1.67 percent and No. 7 bar size, a crack mine that the steel stress at cracking is
width, w90 , of approximately 0.007 in. approximately 30 ksi (207 N/mm2).

6 in. 3.5" <7.5db=7.5x7/8=6.6in.(ok)


<8 in.
(ok) 2.5"
J- Qy.
6'
00

00

*Obtained by
interpolation
N

v
m

Pe = 1.6 7 % .Qe

PCI JOURNAL/July-August 1988 145