TABLE OF CONTENTS

TAB SAMPLE FORMS

Report Title ........................................................................................................... 1

Certification........................................................................................................... 2

Instrument Calibration Report............................................................................... 3

Air Handling Unit (Central Station)........................................................................ 4

Air Handling Unit (Packaged/Unitary Belt Drive)................................................... 5

Air Handling Unit (Packaged/Unitary Direct Drive) ............................................... 6

Fan Test Report (Belt Drive)................................................................................. 7

Fan Test Report (Direct Drive >1/8 hp)................................................................. 8

Fan Test Report (Direct Drive <1/6 hp)................................................................. 9

Air Outlet Test Report......................................................................................... 10

VAV Terminal Unit Test Report PD .................................................................... 11

VAV Terminal Unit Test Report PI ...................................................................... 12

Fan Terminal Unit Test Report PD ..................................................................... 13

Fan Terminal Unit Test Report PI ....................................................................... 14

Duct Traverse Report (Rectangular)................................................................... 15

Duct Traverse Report (Round) ........................................................................... 16

Hydronic Pump Test Report ............................................................................... 17

Balancing Valve Test Report (Fixed or Adjustable Orifice)................................. 18

Balancing Valve Test Report (Self Adjusting) ..................................................... 19

Ultrasonic Flow Measurement Test Data............................................................ 20


Cooling Coil Test Data (Hydronic) ...................................................................... 21

Cooling Coil Test Data (DX) ............................................................................... 22

Heating Coil Test Data (Hydronic) ...................................................................... 23

Heating Coil Test Data (Steam).......................................................................... 24

Heating Coil Test Data (Electric) ........................................................................ 25

Chiller Test Report (Water Cooled) .................................................................... 26

Chiller Test Report (Air Cooled).......................................................................... 27

Cooling Tower Test Report................................................................................. 28

Hot Water Boiler Test Report.............................................................................. 29

Heat Exchanger Test Report (Water to Water)................................................... 30

Heat Exchanger Test Report (Steam to Water) .................................................. 31

Energy Recovery Wheels Test Data................................................................... 32

Duct Air Leakage Test Data (Optional)............................................................... 33


CERTIFIED TEST, ADJUST, AND
BALANCE REPORT

DATE:_____________

PROJECT:
NAME ________________________________________________________________
ADDRESS______________________________________________________________
______________________________________________________________

DESIGN ENGINEER:
NAME ________________________________________________________________

HVAC CONTRACTOR:
NAME ________________________________________________________________

NEBB TAB FIRM:


NAME ________________________________________________________________
ADDRESS_____________________________________________________________
______________________________________________________________

TAB CERTIFICATION NUMBER: _______________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
1
CERTIFICATION

PROJECT____________________________________________________________________

THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND


FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT
EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND
BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES,
WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST- ADJUST- BALANCE REPORT
PROJECT SUMMARY.

SUBMITTED & CERTIFIED BY:

NEBB CERTIFIED TAB FIRM NAME _____________________________________________

CERTIFICATION NO. ____________ CERTIFICATION EXPIRATION DATE___________

REPORT DATE __________________________

SEAL

NEBB QUALIFIED TAB SUPERVISOR NAME _____________________________________


NEBB QUALIFIED TAB SUPERVISOR SIGNATURE________________________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
2
INSTRUMENT CALIBRATION REPORT

PROJECT ____________________________________________________________________

INSTRUMENT MANUFACTURER MODEL SERIAL DATES OF USE INSTRUMENT


TYPE NUMBER NUMBER CALIBRATION
DATE

NEBB TAB FIRM

TAB SUPERVISOR

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
3
AIR HANDLING UNIT TEST REPORT
(Central Station)

PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA MOTOR DATA DESIGN ACTUAL
Unit Designation HP (Kw)
Manufacturer RPM
Model Number Rated Volts
Serial Number Rated Amps
Phase
Operating Hz
Service Factor

Operating Volts
Operating Amps

FAN DATA DESIGN ACTUAL


Supply Air CFM (L/s)
OTHER DATA DESIGN ACTUAL
Outside Air CFM (L/s)
Motor Sheave OD
Return Air CFM (L/s)
Motor Sheave Bore
Total Outlet Air CFM (L/s)
Fan Sheave OD
Fan Sheave Bore
Fan Discharge S.P. in.
(Pa)
Sheave Center Distance
Fan Suction S.P. in. (Pa)
Number of Belts
Fan Total S.P in. (Pa)
Belt Size
External S.P. in. (Pa)

Fan RPM

REMARKS:

TEST DATE:
READINGS BY:

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
4
AIR HANDLING UNIT TEST REPORT
(Packaged/Unitary Belt Drive)

PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA MOTOR DATA DESIGN ACTUAL
Unit Designation HP (Kw)
Manufacturer RPM
Model Number Rated Volts
Serial Number Rated Amps
Phase
Operating Hz
Service Factor

Operating Volts
Operating Amps

FAN DATA DESIGN ACTUAL


Supply Air CFM (L/s)
Outside Air CFM (L/s) OTHER DATA DESIGN ACTUAL
Return Air CFM (L/s) Motor Sheave OD
Motor Sheave Bore
Total Outlet Air CFM (L/s)
Fan Sheave OD
External Discharge S.P. Fan Sheave Bore
in. (Pa)
External Suction S.P. in. Sheave Center Distance
(Pa) Number of Belts
External S.P. in. (Pa) Belt Size

Fan RPM

REMARKS:

TEST DATE:
READINGS BY:

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
5
AIR HANDLING UNIT TEST REPORT
(Packaged/Unitary Direct Drive)

PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA MOTOR DATA DESIGN ACTUAL
Unit Designation HP (Kw)
Manufacturer RPM
Model Number Rated Volts
Serial Number Rated Amps
r Phase
Operating Hz
Service Factor

Operating Volts
Operating Amps

FAN DATA DESIGN ACTUAL


Supply Air CFM (L/s)
Outside Air CFM (L/s) OTHER DATA DESIGN ACTUAL
Return Air CFM (L/s)

Total Outlet Air CFM (L/s)

External Discharge S.P.


in. (Pa)
External Suction S.P. in.
(Pa)

Fan RPM

REMARKS:

TEST DATE:
READINGS BY:

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
6
FAN TEST REPORT
(Belt Drive)

PROJECT __________________________________________________________________

FAN DATA FAN NO. FAN NO. FAN NO.


Unit Designation
Type of Service
Manufacturer
Model Number
Serial Number
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
Total Airflow CFM (L/s)
Total Outlet Airflow CFM(L/s)
Fan Suction SP in. (Pa)
Fan Discharge SP in. (Pa)
Total SP or ESP in. (Pa)

Motor HP (Kw)
Motor RPM
Motor Rated Volts
Motor Rated Amps
Motor Phase
Motor Operating Hz
Motor Service Factor

Motor Sheave OD
Motor Sheave Bore
Fan Sheave OD
Fan Sheave Bore
Sheave Center Distance
Number of Belts
Belt Size
Fan RPM
Operating Voltage
Operating Amps T1/T2/T3

REMARKS:
TEST DATE _________________________
READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
7
FAN TEST REPORT
(Direct Drive) >1/8 hp

PROJECT __________________________________________________________________

FAN DATA FAN NO. FAN NO. FAN NO.


Unit Designation
Type of Service
Manufacturer
Model Number
Serial Number

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL


Total Airflow CFM (L/s)
Total Outlet Airflow CFM(L/s)

Fan Suction SP in. (Pa)


Fan Discharge SP in. (Pa)
Total SP or ESP in. (Pa)
Motor HP (Kw)

Motor RPM
Motor Rated Volts
Motor Rated Amps
Motor Phase
Motor Operating Hz
Motor Service Factor

Operating Voltages
Operating Amperages

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
8
FAN TEST REPORT
(Direct Drive) < 1/6 hp

PROJECT __________________________________________________________________

FAN DATA FAN NO. FAN NO. FAN NO.


Unit Designation
Type of Service
Manufacturer
Model Number

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL


Total Airflow CFM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
9
AIR OUTLET TEST REPORT

PROJECT ______________________________ SYSTEM DESIGNATION_____________


OUTLET MANUFACTURER __________________ TEST APPARATUS________________

AREA OUTLET DESIGN FINAL


SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

* NOTE: If AK = 1.00, velocity information and measurements are not required.

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
10
VAV TERMINAL UNIT TEST REPORT
(Pressure Dependent)

PROJECT ______________________________ SYSTEM DESIGNATION_____________


OUTLET MANUFACTURER _________________ OUTLET TEST APPARATUS________

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

* NOTE: If AK = 1.00, velocity information and measurements are not required.

REMARKS:
TEST DATE _________________________
READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
11
VAV TERMINAL UNIT TEST REPORT
(Pressure Independent)

PROJECT _______________________________ SYSTEM DESIGNATION____________


OUTLET MANUFACTURER ______________ OUTLET TEST APPARATUS__________

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
DDC CF HEATING AIRFLOW CFM (L/S)
DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
DDC CF HEATING AIRFLOW CFM (L/S)
DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

* NOTE: If AK = 1.00, velocity information and measurements are not required.

REMARKS:
TEST DATE _________________________ READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
12
FAN TERMINAL UNIT TEST REPORT
(Pressure Dependent)

PROJECT ___________________________________ SYSTEM DESIGNATION_______________


OUTLET MANUFACTURER ____________________ OUTLET TEST APPARATUS_____________

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
FAN AIRFLOW CFM (L/S)
DDC CF FAN SPEED (Hi,med,low,variable,etc) --------
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

* NOTE: If AK = 1.00, velocity information and measurements are not required.

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
13
FAN TERMINAL UNIT TEST REPORT
(Pressure Independent)

PROJECT _________________________________________ SYSTEM DESIGNATION_______________


OUTLET MANUFACTURER ___________________________ OUTLET TEST APPARATUS____________

VAV TERMINAL DATA


NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
FAN AIRFLOW CFM (L/S)
DDC ADDR FAN SPEED (Hi,med,low,variable,etc) --------
DDC CF DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW

* NOTE: If AK = 1.00, velocity information and measurements are not required.

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
14
DUCT TRAVERSE TEST REPORT
(Rectangular)

PROJECT_______________________________ SYSTEM DESIGNATION____________________


LOCATION ______________________________ TRAVERSE DESIGNATION_________________
INSTRUMENTATION_______________________

DUCT DESIGN AIRFLOW ACTUAL AIRFLOW


Size I.D. ____________ SCFM (sL/s) _______________ SCFM (sL/s) _______________
Area ft (m)____________ CFM (L/s) _________________ FPM (m/s) _________________
S.P. in. w.g. (Pa)________ CFM (L/s) _________________

POSITION 1 2 3 4 5 6 7 8 9 10 11 12 13
1
2
3
4
5
6
7
8
9
10
11
12
13

VELOCITY
SUBTOTALS
.

REMARKS:

TEST DATE _________________________

READINGS BY ________________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
15
DUCT TRAVERSE TEST REPORT
(Round)

PROJECT_______________________________ SYSTEM DESIGNATION____________________


LOCATION ______________________________ TRAVERSE DESIGNATION_________________
INSTRUMENTATION_______________________
DUCT DESIGN AIRFLOW ACTUAL AIRFLOW
Size Diameter__________ SCFM (s/Ls) _______________ SCFM (s/Ls) _______________
Area ft (m)____________ CFM (L/s) _________________ FPM (m/s) _________________
S.P. in. w.g. (Pa)________ CFM (L/s) _________________

REMARKS:
TEST DATE _________ READINGS BY _______________________
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
16
HYDRONIC PUMP TEST REPORT

PROJECT _________________________________________________________________________

UNIT DATA UNIT NO. UNIT NO. UNIT NO.


Unit Designation
Type of Service
Manufacturer
Model Number
Design Flow GPM (L/s)
Design Head Ft (kPa)
Impeller Size Inches (mm)
Serial Number
Motor Manufacturer

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL


Motor Hp (Kw)
Pump/Motor Speed RPM

No Flow Suction Pressure ft (kPa)


No Flow Discharge Pressure ft (kPa)
No Flow Differential Pressure ft (kPa)
Actual Impeller Size
Final Suction Pressure ft (kPa)
Final Discharge Pressure ft (kPa)
Total Dynamic Head ft (kPa)
Final Flow GPM (L/s)

Motor Rated Amperage


Final Operating Voltages
Final Operating Amperages T1/T2/T3
Final Operating HZ

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
17
BALANCING VALVE TEST REPORT
(Fixed or Adjustable Orifice)

PROJECT

Unit Service Manufacturer Model Size Design Flow Valve P Final Flow
Designation Number GPM Setting/ GPM
(L/s) Position (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ________________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
18
BALANCING VALVE TEST REPORT
(Self Adjusting)

PROJECT

Unit Service Manufacturer Model Size Design Operating P Final Flow


Designation No. Flow Pressure GPM (L/s)
GPM (L/s) Range

REMARKS:

TEST DATE _________________________

READINGS BY ________________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
19
ULTRASONIC FLOW
MEASUREMENT TEST DATA

PROJECT

Reading Reading Reading Reading Reading Reading Reading


No. ___ No. ___ No. ___ No. ___ No. ___ No. ___ No. ___
DESIGN
Reading Designation
Service
Location
Design Flow GPM (L/s)

ACTUAL
Pipe Size
Pipe Material
Pipe Wall Thickness

Transducer Size
Spacing Distance
Application

Final Flow GPM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ________________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
20
COOLING COIL TEST DATA
(Hydronic)

PROJECT _________________________________________________________________________

Coil System Coil Design Air Design Water Actual Airflow Actual Water
Designation Served Location Flow Flow GPM (L/s) CFM (L/s) Flow GPM (L/s)
CFM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
21
COOLING COIL TEST DATA
(DX)

PROJECT _________________________________________________________________________

Coil System Coil Design Airflow Final Actual


Designation Served Location CFM (L/s) Airflow
CFM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
22
HEATING COIL TEST DATA
(Hydronic)

PROJECT _________________________________________________________________________

Coil System Coil Design Air Flow Design Water Actual Airflow Actual Water
Designation Served Location CFM (L/s) Flow GPM (L/s) CFM (L/s) Flow GPM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
23
HEATING COIL TEST DATA
(Steam)

PROJECT ________________________________________________________________

Coil System Coil Design Air Flow Actual Airflow


Designation Served Location CFM (L/s) CFM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
24
HEATING COIL TEST DATA
(Electric)

PROJECT _________________________________________________________________________

Coil System Coil Design Design Design Phase Actual Actual Actual
Designation Served Location Airflow Kw Voltage Airflow Voltage Amperage
CFM (L/s) CFM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
25
CHILLER TEST REPORT
(Water Cooled)

PROJECT

UNIT DATA DESIGN ACTUAL UNIT DATA DESIGN ACTUAL


Unit Designation Unit Designation
Manufacturer Manufacturer
Model Number Model Number
Serial Number Serial Number

EVAPORATOR DATA DESIGN ACTUAL EVAPORATOR DATA DESIGN ACTUAL


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

CONDENSER DATA CONDENSER DATA


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

UNIT DATA DESIGN ACTUAL UNIT DATA DESIGN ACTUAL


Unit Designation Unit Designation
Manufacturer Manufacturer
Model Number Model Number
Serial Number Serial Number

EVAPORATOR DATA DESIGN ACTUAL EVAPORATOR DATA DESIGN ACTUAL


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

CONDENSER DATA CONDENSER DATA


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

REMARKS:

TEST DATE:
READINGS BY:

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
26
CHILLER TEST REPORT
(Air Cooled)

PROJECT

UNIT DATA DESIGN ACTUAL UNIT DATA DESIGN ACTUAL


Unit Designation Unit Designation
Manufacturer Manufacturer
Model Number Model Number
Serial Number Serial Number

EVAPORATOR DATA DESIGN ACTUAL EVAPORATOR DATA DESIGN ACTUAL


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

UNIT DATA DESIGN ACTUAL UNIT DATA DESIGN ACTUAL


Unit Designation Unit Designation
Manufacturer Manufacturer
Model Number Model Number
Serial Number Serial Number

EVAPORATOR DATA DESIGN ACTUAL EVAPORATOR DATA DESIGN ACTUAL


Flow GPM (L/s) Flow GPM (L/s)
Pressure Drop Pressure Drop

REMARKS:

TEST DATE:
READINGS BY:

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
27
COOLING TOWER TEST REPORT

PROJECT _________________________________________________________________________

Unit Manufacturer Model No. Serial No. Design Water Actual Water
Designation Flow GPM (L/s) Flow GPM (L/s)

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
28
HOT WATER BOILER TEST REPORT

PROJECT _________________________________________________________________________

UNIT DATA UNIT NO. UNIT NO. UNIT NO.


Unit Designation
Manufacturer
Model Number
Serial Number

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL

Water Flow GPM (L/s)


Water Pressure Drop

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
29
HEAT EXCHANGER TEST REPORT
(Water to Water)

PROJECT ___________________________

UNIT DATA UNIT NO. UNIT NO. UNIT NO.


Unit Designation
Location
Service
Manufacturer
Model No.
Serial No.

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL


PRIMARY WATER
Water Flow GPM (L/s)
Water Pressure Drop

SECONDARY WATER
Water Flow GPM (L/s)
Water Pressure Drop

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
30
HEAT EXCHANGER TEST REPORT
(Steam to Water)

PROJECT _________________________________________________________________

UNIT DATA UNIT NO. UNIT NO. UNIT NO.


Unit Designation
Location
Service
Manufacturer
Model No.
Serial No.

TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL


Water Flow GPM (L/s)
Water Pressure Drop

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
31
ENERGY RECOVERY WHEELS TEST DATA

PROJECT ___________________________________________________________________

DESIGN DATA
Unit System Designation
Service
Location
Manufacturer
Model Number
Serial Number

Primary Air Flow CFM (L/s)


Primary Air P
Secondary Air Flow CFM (L/s)
Secondary Air P

ACTUAL DATA

Primary Air Flow CFM (L/s)


Primary Air P
Secondary Air Flow CFM (L/s)
Secondary Air P

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
32
DUCT AIR LEAKAGE TEST DATA
(Optional)

PROJECT ______________________________________________________________________

Section Section Section Section Section Section


DESIGN DATA No. No. No. No. No. No.

System Designation
Type of Service
Location
Zone
Altitude
Density
Leakage Class
Design Static Pressure
Pressure Class
Seal Class

Airflow CFM (L/s)

Surface Area
Airflow per Surface Factor
Percent Allowable Leakage

ACTUAL DATA
Actual Static Pressure
Test Section Air Leakage
Test Section % Air Leakage
Test Witness

REMARKS:

TEST DATE _________________________

READINGS BY ______________________

COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____