Sei sulla pagina 1di 10

ENGINEERINGREVDELIVERABLE

18 APR16
LIST KAMBITIN 2
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
DOCUMENT
No NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
ENGINEERING DOCUMENT 29 #DIV/0! 0.00% #DIV/0! 0.00%
B ENGINEERING DESIGN 29
B.1 PROCESS ENGINEERING 8
Process Simulation

CALCULATION
Calculation for LP Test Separator
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Direct Heater Test Separator
Calculation Direct Heater LP Production Separator
Calculation Test Tank Cap 200 BBLS
Calculation Storage Tank Cap 500 BBLS
Calculation Pig Launcher (Kambitin II) & Pig Receiver (BS III)
Line Sizing (Flowline , Manifold & Block Station)

DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
8 ----008 Process Flow Diagram (PFD) Flowline Kambitin II 1
9 ----009 Process Flow Diagram (PFD) Block Sation Kambitin II 1
10 ----010 Heat and Material Balance Kambitin II 1

11 ----011 Process Flow Diagram (PFD) Gas Trunkline Kambitin II - Block Station III 1
Tanjung

Piping & Instrumentation Diagram


7 ----007 P&ID Flowline Kambitin II 1
8 ----008 P&ID Block Station System Kambitin II 1
9 ----009 P&ID Flowline Gas Trunkline Kambitin II - Block Station III Tanjung

SAFE Chart
3 ----003 Safe Chart Drawing Warukin Kambitin II 1
LIST
3 ----003 Line List Kambitin II 1
B.2 MECHANICAL 5
CALCULATION
6 ----006 Mechanical Calculation - Wall Thickness Pressure Vessel Kambitin II 1 100.00% 0.00% 0.00%
7 ----007 Mechanical Calculation - Atmospheric Tank Kambitin II 1

8 ----008 Mechanical Calculation - Wall Thickness for Pig Launcher and Pig Receiver 1

DATA SHEET
6 ----006 Datasheet LP Test Separator 1
Datasheet LP Production Separator
Datasheet LP LP Gas Scrubber
Datasheet Direct Heater Test Separator
Datasheet Direct Heater LP Production Separator
Datasheet Test Tank Cap 200 BBLS
Datasheet Storage Tank Cap 500 BBLS
Datasheet Pig Launcher (Kambitin II) & Pig Receiver (BS III)
LIST
3 ----003 Equipment List Kambitin II 1
B.3 PIPING 6
LIST
3 ----003 Tie-In List Kambitin II 1
CALCULATION

DRAWING
9 ----009 Piping Drawing Index Kambitin II 1
Key Plan Block Station Kambitin II
10 ----010 General Plot Plan Kambitin II 1
11 ----011 Piping Plan Kambitin II 1
12 ----012 Isometric Drawing Kambitin II 1
MATERIAL TAKE OFF
ENGINEERINGREVDELIVERABLE
18 APR16
LIST KAMBITIN 2
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
DOCUMENT
No NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
3 ----003 Piping MTO Kambitin II 1 100.00% 0.00% 0.00%
B.4 INSTRUMENT 10
CALCULATION
3 Control Valve Calculation 1
PSV Calculation
Flow Element Calculation
DATA SHEET
Datasheet for Pressure Gauge Warukin Kambitin II
7 ----007 Datasheet Level Gauge Kambitin II 1
10 ----010 Datasheet for Level Indicating Controller Kambitin II 1
13 ----013 Datasheet for Temperature Gauge c/w Tehrmowell Kambitin 1
16 ----016 Datasheet for Control Valve Kambitin II 1
19 ----019 Datasheet for Pressure Safety Valve Kambitin II 1
Datasheet for Flow Element & Indicator
DRAWING
5 ----005 Instrument Location Plan Drawing Kambitin II 1
6 ----006 Instrument Process Hook-Up Drawing Kambitin II 1

LIST
3 ----003 Instrument Index Kambitin II 1
MATERIAL TAKE OFF
3 ----003 MTO for Instrument Kambitin II 1

B.5 ELECTRICAL
1 CALCULATION 1
Electrical Load Schedule Kambitin II
2 ----002 Cable Sizing Calculation Kambitin II 1
DATA SHEET
1 ----001 Datasheet for LV Distribution Panel Kambitin II 1 100.00% 0.00% 0.00%
2 ----002 Datasheet for Generator Kambitin II 1 100.00% 0.00% 0.00%
DRAWING

1 ----001 Typical Installation Detail Drawing for Lighting & Small Power Kambitin II 1

2 ----002 Typical Installation Detail Drawing for Grounding and Bonding Kambitin II 1

3 ----003 Typical Installation Detail Drawing for Ladder/Tray Support Kambitin II 1

4 ----004 Typical Installation for Cable & Duct Bank Kambitin II 1


Typical Installation Detail Drawing for Electrical Equipment Wiring System
Kambitin II
5 ----005 Overall Singel Line Diagram Kambitin II 1
6 ----006 Electrical Equipment Plan Drawing Kambitin II 1
7 ----007 Grounding System Layout Kambitin II 1
8 ----008 Power Cable Routing Layout Kambitin II 1
LIST
1 ----001 Cable Schedule Kambitin II 1
MATERIAL TAKE OFF
1 MTO Electrical Kambitin II 1
B.6 CIVIL/STRUCTURE
1 CALCULATION Foundation Scrubber
Foundation Production Separator
Foundation Test Separator
Foundation Pig Launcher/Receiver
Foundation Genset (2 unit)
Foundation Direct Heater (2 unit)
Foundation Crude Oil Tank (2 unit)
2 DRAWING
Foundation Lay Out Plan
Equipment (Vessel) Foundation Plan, View & Section
Genset Foundation Plan, View & Section
Direct Heater Foundation Plan, View & Section
Crude Oil Tank Foundation Plan, View & Section
ENGINEERINGREVDELIVERABLE
18 APR16
LIST KAMBITIN 2
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
DOCUMENT
No NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
3 MTO
MTO Civil & Structure Kambitin II

1
ENGINEERING DELIVERABLE LIST WARUKIN TENGAH
REV 18 APR16
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
ENGINEERING DOCUMENT 26 #DIV/0! 0.00% #DIV/0! 0.00%
B ENGINEERING DESIGN 26
B.1 PROCESS ENGINEERING 7
Process Simulation

CALCULATION
Calculation for LP Test Separator
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Crude Oil Storage Tank Cap 200 BBLS
Line Sizing (Flowline , Manifold & Block Station)

DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
5 ----005 Process Flow Diagram (PFD) Flowline Warukin Tengah 1
6 ----006 Process Flow Diagram (PFD) Block Sation Warukin Tengah 1
7 ----007 Heat and Material Balance Warukin Tengah 1

Piping & Instrumentation Diagram


5 ----005 P&ID Flowline Warukin Tengah 1
6 ----006 P&ID Block Station System Warukin Tengah 1

SAFE Chart
2 ----002 Safe Chart Drawing Warukin Tengah 1
LIST
2 ----002 Line List Warukin Tengah 1
B.2 MECHANICAL 3
CALCULATION
Mechanical Calculation - Wall Thickness Pressure Vessel Warukin Tengah
5 ----005 Mechanical Calculation - Atmospheric Tank Warukin Tengah 1 100.00% 0.00% 0.00%

DATA SHEET
4 Datasheet for LP Test Separator 1 100.00% 0.00% 0.00%
Datasheet for LP Production Separator
Datasheet for LP Gas Scrubber
Datasheet Crude Oil Storage Tank Cap 200 BBLS
LIST
2 ----002 Equipment List Warukin Tengah 1
B.3 PIPING 6
LIST
2 ----002 Tie-In List Warukin Tengah 1
CALCULATION

DRAWING
5 ----005 Piping Drawing Index Warukin Tengah 1
Key Plan Block Station Warukin Tengah
6 ----006 General Plot Plan Warukin Tengah 1
7 ----007 Piping Plan Warukin Tengah 1
8 ----008 Isometric Drawing Warukin Tengah 1
MATERIAL TAKE OFF
2 ----002 Piping MTO Warukin Tengah 1
B.4 INSTRUMENT 10
CALCULATION
2 ----002 Control Valve Calculation 1
PSV Calculation
Flow Element Calculation
DATA SHEET
Datasheet for Pressure Gauge Warukin Tengah
6 ----006 Datasheet Level Gauge Warukin Tengah 1
9 ----009 Datasheet for Level Indicating Controller Warukin Tengah 1
12 ----012 Datasheet for Temperature Gauge c/w Tehrmowell Warukin Tengah 1
15 ----015 Datasheet for Control Valve Warukin Tengah 1
18 ----018 Datasheet for Pressure Safety Valve Warukin Tengah 1
ENGINEERING DELIVERABLE LIST WARUKIN TENGAH
REV 18 APR16
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
Datasheet for Flow Element & Indicator
DRAWING
3 ----003 Instrument Location Plan Drawing Warukin Tengah 1
4 ----004 Instrument Process Hook-Up Drawing Warukin Tengah 1

LIST
2 ----002 Instrument Index Warukin Tengah 1
MATERIAL TAKE OFF
2 ----002 MTO for Instrument Warukin Tengah 1
ENGINEERING DELIVERABLE
REV 18 APR16
WARUKIN SELATAN
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
ENGINEERING DOCUMENT 27 #DIV/0! 0.00% #DIV/0! 0.00%
B ENGINEERING DESIGN 27
B.1 PROCESS ENGINEERING 7
Process Simulation

CALCULATION
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Storage Tank Cap 1000 BBLS
Calculation Crude Oil Pump Cap 700 BPD
Line Sizing (Flowline , Manifold & Block Station)

DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
2 ----002 Process Flow Diagram (PFD Flowline Warukin Selatan 1 100.00% 0.00% 0.00%
3 ----003 Process Flow Diagram (PFD) Block Station Warukin Selatan 1
4 ----004 Heat and Material Balance Warukin Selatan 1

Piping & Instrumentation Diagram


3 ----003 P&ID Flowline Warukin Selatan 1
4 ----004 P&ID Block Station System Warukin Selatan 1

SAFE Chart
1 ----001 Safe Chart Drawing Warukin Selatan 1
LIST
1 ----001 Line List Warukin Selatan 1 100.00% 0.00% 0.00%
B.2 MECHANICAL 4
CALCULATION
1 ----001 Mechanical Calculation - Wall Thickness Pressure Vessel Warukin Selatan 1 100.00% 0.00% 0.00%
2 ----002 Mechanical Calculation - Atmospheric Tank Warukin Selatan 1 100.00% 0.00% 0.00%

DATA SHEET
1 ----001 Datasheet for LP Production Separator 1 100.00% 0.00% 0.00%
Datasheet for LP Gas Scrubber
Datasheet Storage Tank Cap 1000 BBLS
Datasheet Crude Oil Pump Cap 700 BPD
LIST
1 ----001 Equipment List Warukin Selatan 1
B.3 PIPING 6
LIST
1 ----001 Tie-In List Warukin Selatan 1 100.00% 0.00% 0.00%
CALCULATION
1 1
DRAWING
Piping Drawing Index Warukin Selatan
Key Plan Block Station Warukin Selatan
2 ----002 General Plot Plan Warukin Selatan 1
3 ----003 Piping Plan Warukin Selatan 1
4 ----004 Isometric Drawing Warukin Selatan 1
MATERIAL TAKE OFF
1 ----001 Piping MTO Warukin Selatan 1
B.4 INSTRUMENT 10
CALCULATION
1 Control Valve Calculation 1
PSV Calculation
Flow Element Calculation
DATA SHEET
Datasheet for Pressure Gauge Warukin Selatan
5 ----005 Datasheet Level Gauge Warukin Selatan 1
8 ----008 Datasheet for Level Indicating Controller Warukin Selatan 1
11 ----011 Datasheet for Temperature Gauge c/w Tehrmowell Warukin Selatan 1
14 ----014 Datasheet for Control Valve Warukin Selatan 1
17 ----017 Datasheet for Pressure Safety Valve Warukin Selatan 1
ENGINEERING DELIVERABLE
REV 18 APR16
WARUKIN SELATAN
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
Datasheet for Flow Element & Indicator
DRAWING
1 ----001 Instrument Location Plan Drawing Warukin Selatan 1
2 ----002 Instrument Process Hook-Up Drawing Warukin Selatan 1

LIST
1 ----001 Instrument Index Warukin Selatan 1
MATERIAL TAKE OFF
1 ----001 MTO for Instrument Warukin Selatan 1
ENGINEERINGREVDELIVERABLE
18 APR16 LIST GENERAL
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
ENGINEERING DOCUMENT #REF! #DIV/0! 0.00% #DIV/0! 0.00%
A PROJECT MANAGEMENT & CONTROL 2
1 ----001 Deliverable List for Upgrading Facility 1 100.00% 0.00% 0.00%
2 ----002 Document Control Procedure 1 100.00% 0.00% 0.00%
D QUALITY ASSURANCE AND QUALITY CONTROL 2 100.00% 0.00% 0.00%
1 ----001 QA/QC Plan 1 100.00% 0.00% 0.00%
2 ----002 Inspection and Test Plan 1 100.00% 0.00% 0.00%
3 Prosedur WPS & PQR
Prosedur Pengelasan (Welding)
NDE Prosedur
Hydrotest Prosedur
ITP Plan
E HSE
Safety Design Basis, Safety and Environment
HSE Plan
Safety Loss Prevention
Environmental Management and Monitoring System
Equipment Noise
B ENGINEERING DESIGN #REF!
B.1 PROCESS ENGINEERING 4
DESIGN BASIS
Process Design Basis
1 ----001 Process Design Basis 1 100.00% 0.00% 0.00%
Philosophy
1 ----001 Operation and Control Philosophy 1 100.00% 0.00% 0.00%
Process Simulation
Process Simulation Report (WS, WT, Kambitin)
PROCEDURE
Pre-Commissioning , Commissioning and Start -Up Procedure
DRAWING
Process & Uitility Flow Diagram and Heat & Material Balance
1 ----001 PFD Drawing Index 1 100.00% 0.00% 0.00%
Piping & Instrumentation Diagram
1 ----001 P&ID Drawing Index 1
P&ID Standard Legend and Symbols
REPORT
HAZID Study
HAZID Close Out Report
HAZOP Study
HAZOD Close Out Report
B.2 MECHANICAL 7
SPECIFICATION
1 ----001 General Rquirement for Mechanical Package Equipment 1 100.00% 0.00% 0.00%
2 ----002 Surface Preparation & Painting 1 100.00% 0.00% 0.00%
3 ----003 Specification for Reciprocating Pump 1 100.00% 0.00% 0.00%
4 ----004 Specification for Pressure Vessel 1 100.00% 0.00% 0.00%
5 ----005 Specification for Atmospheric Tank 1 100.00% 0.00% 0.00%
6 ----006 Specification for Diesel Engine 1 100.00% 0.00% 0.00%
7 ----007 Specification for Direct Heater 1
B.3 PIPING 2
SPECIFICATION
1 ----001 Valve Specification 1 100.00% 0.00% 0.00%
2 ----002 Piping Material Specification 1 100.00% 0.00% 0.00%
B.4 INSTRUMENT 2
1 SPECIFICATION
1 ----001 Specification fo General Instrumentation 1 100.00% 0.00% 0.00%
2 ----002 Specification for Control Valve 1 100.00% 0.00% 0.00%
B.5 ELECTRICAL 11
(Kambitin-II)
SPECIFICATION
1 ----001 Specification for Electrical Installation 1 100.00% 0.00% 0.00%
2 ----002 Specification for Low Voltage Distribution Panel 1 100.00% 0.00% 0.00%
ENGINEERINGREVDELIVERABLE
18 APR16 LIST GENERAL
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
3 ----003 Specification for Transformer 1 100.00% 0.00% 0.00%
4 ----004 Specification for Diesel Generator 1 100.00% 0.00% 0.00%
5 ----005 Specification for Medium Voltage Distribution Panel 1 100.00% 0.00% 0.00%
6 ----006 Specification for DOL Panel 1 100.00% 0.00% 0.00%
REPORT
1 ----001 ETAP Simulation 1 100.00% 0.00% 0.00%
DATASHEET
Datasheet for LV Switchgear
Datasheet for MV Switchgear
3 ----003 Datasheet for Distribution Trafo 1 100.00% 0.00% 0.00%
4 ----004 Datasheet Well Trafo-1 1
5 ----005 Datasheet Well Trafo-2 1
6 ----006 Datasheet for LV Cable 1
Datasheet for MV Cable
C CIVIL/STRUCTURE 15
DESIGN BASIS
1 ----001 Civil Structure Design Basis 1 100.00% 0.00% 0.00%
SPECIFICATION
1 ----001 Specification for Steel Structure Works 1 100.00% 0.00% 0.00%
2 ----002 Spcification for Pilling Works 1 100.00% 0.00% 0.00%
3 ----003 Specification for Sewer and Drainage Works 1 100.00% 0.00% 0.00%
4 ----004 Specification for Concrete Works 1 100.00% 0.00% 0.00%
Earth Work Specification
REPORT
1 ----001 Topography Report 1 100.00% 0.00% 0.00%
Site Survey Report
Soil Test Report
CALCULATION
1 1 100.00% 0.00% 0.00%
DRAWING
1 ----001 Standard Drawing List 1 100.00% 0.00% 0.00%
2 ----002 Standard Drawing Generla Notes for Civil and Structure 1 100.00% 0.00% 0.00%
3 ----003 Standard Drawing for Detail of Stairway 1 100.00% 0.00% 0.00%
4 ----004 Standard Drawing for Guard Post Hose Box & Lightning Pole 1 100.00% 0.00% 0.00%
5 ----005 Standard Drawing Foundation for Detail Ladder 1 100.00% 0.00% 0.00%
6 ----006 Standard Drawing Pile Head Treatment 1 100.00% 0.00% 0.00%
7 ----007 Standard Drawing for Concrete Reinforcement 1 100.00% 0.00% 0.00%
MATERIAL TAKE OFF
1 1 100.00% 0.00% 0.00%
PIPELINE/TRUNKLINE 13
SPECIFICATION
1 ----001 Auger Boring Specification 1 100.00% 0.00% 0.00%
2 ----002 Pipeline Onshore Specification 1 100.00% 0.00% 0.00%
3 ----003 Join Coating Specification 1 100.00% 0.00% 0.00%
4 ----004 Insulation Joint Specification 1
5 ----005 Pipeline Welding Specification 1 100.00% 0.00% 0.00%
6 ----006 Pipeline Valve Specification 1 100.00% 0.00% 0.00%
DRAWING
1 ----001 General Plot Plan 1 100.00% 0.00% 0.00%
2 ----002 Alignment Sheet 1 100.00% 0.00% 0.00%
3 ----003 Detail Pipeline Marker and Warning Sign 1 100.00% 0.00% 0.00%
Typical Pipe Support
4 ----004 Typical Road Crossing 1 100.00% 0.00% 0.00%
CALCULATION
Pipeline Wall Thickness Calculation
DATASHEET
Datasheet Pipeline Valve
Datasheet Barred Tee
Datasheet Insulation Joint
MATERIAL TAKE OFF
1 ----001 Pipe and Fitting MTO 1 100.00% 0.00% 0.00%
2 ----002 Flange, Gasket, Bolt and Nut MTO 1 100.00% 0.00% 0.00%
ENGINEERINGREVDELIVERABLE
18 APR16 LIST GENERAL
30% 30%
85% 85%
100% 100%

IFR IFA AFC ASBUILT


Planed Actual
No DOCUMENT NUMBER Document Title TOTAL WF SIZE
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL Progress Progress Weight
(%) Weight (%) (%) (%)
3 ----003 Valve MTO 1 100.00% 0.00% 0.00%
#REF!
B CONSTRUCTION (Construction Manual/Procedure/Plans) 20
PIPELINE 12
1 ----001 ROW survey Procedure 1 100.00% 0.00% 0.00%
2 ----002 Clearing and Grading Procedure 1 100.00% 0.00% 0.00%
3 ----003 Material Handling, Hauling, Storage and Stringging Procedure 1 100.00% 0.00% 0.00%
4 ----004 Field Bending Procedure 1 100.00% 0.00% 0.00%
5 ----005 Pipeline Welding Procedure 1 100.00% 0.00% 0.00%
6 ----006 Trenching, Lowering, Holiday Test and Backfilling Procedure 1 100.00% 0.00% 0.00%
7 ----007 Field Joint Coating Procedure 1 100.00% 0.00% 0.00%
8 ----008 Pipe Crossing Procedure 1 100.00% 0.00% 0.00%
9 ----009 Pipeline Cleaning, Filling & Hydrostatic Procedure 1 100.00% 0.00% 0.00%
10 ----010 Pipeline Swabbing, Draying and Nitrogen Purging Procedure 1 100.00% 0.00% 0.00%
11 ----011 Reinstatement Procedure 1 100.00% 0.00% 0.00%
12 ----012 Auger Boring Procedure 1 100.00% 0.00% 0.00%
PIPING 1
1 ----001 Piping Fabrication and Testing Procedure 1 100.00% 0.00% 0.00%
MECHANICAL 1
1 ----001 Painting Procedure 1 100.00% 0.00% 0.00%
Prosedur Pelaksanaan Konstruksi Tangki
PEMBONGKARAN 6
1 ----001 Prosedur Pembongkaran Flowline 1 100.00% 0.00% 0.00%
2 ----002 Prosedur Pembongaran Block Station 1 100.00% 0.00% 0.00%
3 ----003 Prosedur Pembongkaran Trunkline 1 100.00% 0.00% 0.00%
4 ----004 Process Hazard Analysis 1 100.00% 0.00% 0.00%
5 ----005 Prosedur Pembongkaran Tanki Penimbun 1 100.00% 0.00% 0.00%
6 ----006 Prosedur Pengangkatan 1 100.00% 0.00% 0.00%