Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
18 APR16
LIST KAMBITIN 2
30% 30%
85% 85%
100% 100%
CALCULATION
Calculation for LP Test Separator
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Direct Heater Test Separator
Calculation Direct Heater LP Production Separator
Calculation Test Tank Cap 200 BBLS
Calculation Storage Tank Cap 500 BBLS
Calculation Pig Launcher (Kambitin II) & Pig Receiver (BS III)
Line Sizing (Flowline , Manifold & Block Station)
DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
8 ----008 Process Flow Diagram (PFD) Flowline Kambitin II 1
9 ----009 Process Flow Diagram (PFD) Block Sation Kambitin II 1
10 ----010 Heat and Material Balance Kambitin II 1
11 ----011 Process Flow Diagram (PFD) Gas Trunkline Kambitin II - Block Station III 1
Tanjung
SAFE Chart
3 ----003 Safe Chart Drawing Warukin Kambitin II 1
LIST
3 ----003 Line List Kambitin II 1
B.2 MECHANICAL 5
CALCULATION
6 ----006 Mechanical Calculation - Wall Thickness Pressure Vessel Kambitin II 1 100.00% 0.00% 0.00%
7 ----007 Mechanical Calculation - Atmospheric Tank Kambitin II 1
8 ----008 Mechanical Calculation - Wall Thickness for Pig Launcher and Pig Receiver 1
DATA SHEET
6 ----006 Datasheet LP Test Separator 1
Datasheet LP Production Separator
Datasheet LP LP Gas Scrubber
Datasheet Direct Heater Test Separator
Datasheet Direct Heater LP Production Separator
Datasheet Test Tank Cap 200 BBLS
Datasheet Storage Tank Cap 500 BBLS
Datasheet Pig Launcher (Kambitin II) & Pig Receiver (BS III)
LIST
3 ----003 Equipment List Kambitin II 1
B.3 PIPING 6
LIST
3 ----003 Tie-In List Kambitin II 1
CALCULATION
DRAWING
9 ----009 Piping Drawing Index Kambitin II 1
Key Plan Block Station Kambitin II
10 ----010 General Plot Plan Kambitin II 1
11 ----011 Piping Plan Kambitin II 1
12 ----012 Isometric Drawing Kambitin II 1
MATERIAL TAKE OFF
ENGINEERINGREVDELIVERABLE
18 APR16
LIST KAMBITIN 2
30% 30%
85% 85%
100% 100%
LIST
3 ----003 Instrument Index Kambitin II 1
MATERIAL TAKE OFF
3 ----003 MTO for Instrument Kambitin II 1
B.5 ELECTRICAL
1 CALCULATION 1
Electrical Load Schedule Kambitin II
2 ----002 Cable Sizing Calculation Kambitin II 1
DATA SHEET
1 ----001 Datasheet for LV Distribution Panel Kambitin II 1 100.00% 0.00% 0.00%
2 ----002 Datasheet for Generator Kambitin II 1 100.00% 0.00% 0.00%
DRAWING
1 ----001 Typical Installation Detail Drawing for Lighting & Small Power Kambitin II 1
2 ----002 Typical Installation Detail Drawing for Grounding and Bonding Kambitin II 1
1
ENGINEERING DELIVERABLE LIST WARUKIN TENGAH
REV 18 APR16
30% 30%
85% 85%
100% 100%
CALCULATION
Calculation for LP Test Separator
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Crude Oil Storage Tank Cap 200 BBLS
Line Sizing (Flowline , Manifold & Block Station)
DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
5 ----005 Process Flow Diagram (PFD) Flowline Warukin Tengah 1
6 ----006 Process Flow Diagram (PFD) Block Sation Warukin Tengah 1
7 ----007 Heat and Material Balance Warukin Tengah 1
SAFE Chart
2 ----002 Safe Chart Drawing Warukin Tengah 1
LIST
2 ----002 Line List Warukin Tengah 1
B.2 MECHANICAL 3
CALCULATION
Mechanical Calculation - Wall Thickness Pressure Vessel Warukin Tengah
5 ----005 Mechanical Calculation - Atmospheric Tank Warukin Tengah 1 100.00% 0.00% 0.00%
DATA SHEET
4 Datasheet for LP Test Separator 1 100.00% 0.00% 0.00%
Datasheet for LP Production Separator
Datasheet for LP Gas Scrubber
Datasheet Crude Oil Storage Tank Cap 200 BBLS
LIST
2 ----002 Equipment List Warukin Tengah 1
B.3 PIPING 6
LIST
2 ----002 Tie-In List Warukin Tengah 1
CALCULATION
DRAWING
5 ----005 Piping Drawing Index Warukin Tengah 1
Key Plan Block Station Warukin Tengah
6 ----006 General Plot Plan Warukin Tengah 1
7 ----007 Piping Plan Warukin Tengah 1
8 ----008 Isometric Drawing Warukin Tengah 1
MATERIAL TAKE OFF
2 ----002 Piping MTO Warukin Tengah 1
B.4 INSTRUMENT 10
CALCULATION
2 ----002 Control Valve Calculation 1
PSV Calculation
Flow Element Calculation
DATA SHEET
Datasheet for Pressure Gauge Warukin Tengah
6 ----006 Datasheet Level Gauge Warukin Tengah 1
9 ----009 Datasheet for Level Indicating Controller Warukin Tengah 1
12 ----012 Datasheet for Temperature Gauge c/w Tehrmowell Warukin Tengah 1
15 ----015 Datasheet for Control Valve Warukin Tengah 1
18 ----018 Datasheet for Pressure Safety Valve Warukin Tengah 1
ENGINEERING DELIVERABLE LIST WARUKIN TENGAH
REV 18 APR16
30% 30%
85% 85%
100% 100%
LIST
2 ----002 Instrument Index Warukin Tengah 1
MATERIAL TAKE OFF
2 ----002 MTO for Instrument Warukin Tengah 1
ENGINEERING DELIVERABLE
REV 18 APR16
WARUKIN SELATAN
30% 30%
85% 85%
100% 100%
CALCULATION
Calculation for LP Production Separator
Calculation for LP Gas Scrubber
Calculation Storage Tank Cap 1000 BBLS
Calculation Crude Oil Pump Cap 700 BPD
Line Sizing (Flowline , Manifold & Block Station)
DRAWING Process & Uitility Flow Diagram and Heat & Material Balance
2 ----002 Process Flow Diagram (PFD Flowline Warukin Selatan 1 100.00% 0.00% 0.00%
3 ----003 Process Flow Diagram (PFD) Block Station Warukin Selatan 1
4 ----004 Heat and Material Balance Warukin Selatan 1
SAFE Chart
1 ----001 Safe Chart Drawing Warukin Selatan 1
LIST
1 ----001 Line List Warukin Selatan 1 100.00% 0.00% 0.00%
B.2 MECHANICAL 4
CALCULATION
1 ----001 Mechanical Calculation - Wall Thickness Pressure Vessel Warukin Selatan 1 100.00% 0.00% 0.00%
2 ----002 Mechanical Calculation - Atmospheric Tank Warukin Selatan 1 100.00% 0.00% 0.00%
DATA SHEET
1 ----001 Datasheet for LP Production Separator 1 100.00% 0.00% 0.00%
Datasheet for LP Gas Scrubber
Datasheet Storage Tank Cap 1000 BBLS
Datasheet Crude Oil Pump Cap 700 BPD
LIST
1 ----001 Equipment List Warukin Selatan 1
B.3 PIPING 6
LIST
1 ----001 Tie-In List Warukin Selatan 1 100.00% 0.00% 0.00%
CALCULATION
1 1
DRAWING
Piping Drawing Index Warukin Selatan
Key Plan Block Station Warukin Selatan
2 ----002 General Plot Plan Warukin Selatan 1
3 ----003 Piping Plan Warukin Selatan 1
4 ----004 Isometric Drawing Warukin Selatan 1
MATERIAL TAKE OFF
1 ----001 Piping MTO Warukin Selatan 1
B.4 INSTRUMENT 10
CALCULATION
1 Control Valve Calculation 1
PSV Calculation
Flow Element Calculation
DATA SHEET
Datasheet for Pressure Gauge Warukin Selatan
5 ----005 Datasheet Level Gauge Warukin Selatan 1
8 ----008 Datasheet for Level Indicating Controller Warukin Selatan 1
11 ----011 Datasheet for Temperature Gauge c/w Tehrmowell Warukin Selatan 1
14 ----014 Datasheet for Control Valve Warukin Selatan 1
17 ----017 Datasheet for Pressure Safety Valve Warukin Selatan 1
ENGINEERING DELIVERABLE
REV 18 APR16
WARUKIN SELATAN
30% 30%
85% 85%
100% 100%
LIST
1 ----001 Instrument Index Warukin Selatan 1
MATERIAL TAKE OFF
1 ----001 MTO for Instrument Warukin Selatan 1
ENGINEERINGREVDELIVERABLE
18 APR16 LIST GENERAL
30% 30%
85% 85%
100% 100%