Sei sulla pagina 1di 5

CURRICULUM VITAE

ADNAN GULZAR
RADIO NETWORK ENGINEER

OBJECTIVE: Continuous advancement of technical and interpersonal skills, be a lead


contributor to my role, aim for the next level while staying focused on the current

MEMBERSHIP: Professional Engineer of Pakistan Engineering Council.


EXPERIENCE:
Location KSA & Pakistan

Organization NOKIA

RADIO NETWORK PLANNING : MOBILY KSA PROJECT


January To December 2016

4G Planning including PCI, Neighbor planning, Antenna


Physical Parameters
3G Planning including Iu links, RNC HW and NodeB
dimensioning
2G Planning including Cell-level, BSC-level, Links-level
(ATERMUX-CS and PS, Abis), MFS(Packet Server)
dimensioning
ATOLL: Simulations studies including
2G: Signal level per cell, Best Server
3G: Pilot Quality, CQI, RSCP
4G: SINR, RSPR, RSRQ, Overlapping Studies
RNP datafills
Site Surveys Evaluation

ALCATEL-LUCENT

RADIO NETWORK PLANNING : MOBILY KSA PROJECT


Tenure 2012 To December 2015

2G RNP datafills preparation for new sites/expansions


planning frequencies, HSN, MAIO, Neighbour Relations,
MAL
3G RNP datafills: PSC planning, Neighbor Relations for
new nodeBs
3G Expansions: CE, Carrier, Power expansions tracking
and data preparation /coordination with customer and
optimization
RNC Planning: Traffic based Rehoming, RNC CPU
loads, Interfaces monitoring, New RNCs
dimensioning(with main help of Capacity BO team)
BSS Planning: MFS(Multi-BSS Fast packet Server) PS
traffic dimensioning based on projection of current traffic
using dimensioning guidelines.

RADIO NETWORK PLANNING : CM PAK GSM PROJECT


Tenure 2009 To 2012

Cell Planning based on the nominal plan of customer:


coordination with our cell planner and transmission, civil, site
acquisition teams, also providing support role to pre-sales team
for future dimensioning/coverage calculations.
Expansions Dimensioning, BSS equipment dimensioning based on existing
network stats like TCH blocking, TA stats and coverage holes /complaints as well as
projected traffic: based on RF utilization, HR penetration, Blocking, traffic growth
scenarios criteria of customer.
RNP datafills preparation for new sites/expansions planning frequencies, HSN,
MAIO, Neighbour Relations, MAL
Automatic Frequency Planning on 9955 RNP tool.
RMS based frequency Planning using 9955 RNP tool.
Site Integration reporting and drive test teams management.
Antenna Redesign activities for coverage optimization based on 9955 tool
simulations and drive test results.
Weekly Report preparation for project CTO taking input from Rollout, Site
Integration, Optimization, BSS planning teams highlighting the planned activities
and issues.
BSS Planning: BSC Loading Calculations, Ater and N7 Utilization Calculations,
BSC Cutover Planning, LAC planning, PS dimensioning such as GP cards, Ater PS,
Extra TS calculations, New BSCs integration in the network and required resource
calculations such as ATER-CS/PS, N7 taking help of software tools like AMT and
Smart CARO
RADIO NETWORK OPTIMIZATION and PLANNING :
MOBILINK GSM PROJECT

Tenure 2008 To 2009

BSCs Optimization, Operational issues reporting, parameter tuning to improve CS


traffic KPIs, performing neighbor audits, optimization based on NPO/customer
traffic stats as well as
global drive test results of major cities.
RMS based frequency Planning using 9955 RNP tool.

PREVIOUS
EXPERIENCE:

Organization HUAWEI TECHNOLOGIES LTD.


Location Pakistan
Tenure 2007 To 2008
Description Product Manager Mobile Networks for CDMA and WiMAX radio
access product line

Preparing BoQ in line with customer RFP and providing a


proposal taking into consideration the technical aspects and cost
of the project.
Coordination with Network Planning, Microwave, Engineering
Services and other departments for completing their BoQ in line
with technical requirements of concerned departments of
customer.
Gathering customer requirements before submitting the proposal
and once submitted clarifying queries related to the proposal.
In a running project, keeping in touch with customer and own
technical teams to know any problems in the network and giving
timely proposals for coming capacity/coverage expansions.

Organization Zhongxing Telecom Equipment (ZTE) Corp.


Location Pakistan
Tenure 2004 to 2007
Description Radio Network Engineer: CDMA Wirless Local Loop Projects of V-
PTCL Wireless and GO CDMA (Telecard).

RF surveys of CDMA cell sites for proposing antenna height, azimuth, taking into
account any blocking factors and adjacent cell sites, terrain and population clutter.
Good familiarity with model tuning parameters and link budget formulae as well as
propagation models.
Using Global Mapper, Mapinfo Professional V7.5 for planning and optimization
activities.
Analyzing drive tests of cell sites using testing and analysis ZTE Netscope Solution
software CNT and CNA (for RF rollout as well as cluster optimization).
KPI Analysis of PTCL-WLL network using ZTE CNO software and through
monitoring daily and weekly statistics of the BSC(Cell and Global Statistics) and
suggesting any expansion in capacity or changes in radio parameters.
Spectrum Analysis of Instaphone and PTCL-WLL using
Tektronix NETtek Spectrum Analyzer.

EDUCATION:
Bachelor of Engineering(Computer Systems Engineering) -2004
College of E&ME, National University of Sciences and Technology, Rawalpindi,
Pakistan
Fellow of Science (Pre-Engineering) -2000 F.G Sir Syed College, The Mall,
Rawalpindi, Pakistan
Matriculation (Science) -1998 Army Public School & College,
Rawalpindi, Pakistan
Initial Schooling: Presentation Convent (Murree, Pakistan)
Army Public School and College (Rawalpindi, Pakistan)
ACTIVITIES AND ACHIEVEMENTS:
Received MOST (Ministry of Science and Technology) scholarship for B.E.
(Computer Systems) degree at NUST after qualifying in an all Pakistan competitive
exam. My merit position was 36 out of the 250 candidates who qualified for
scholarship.
Remained class prefect almost throughout school life.
Participated in speech and Naat competitions at school.
Actively participated in famous Pakistan cricket captain Imran Khans campaign for
Shaukat Khanum Memorial Cancer Hospital.
ENGINEERING DEGREE PROJECTS:
Iris Based Recognition System (Final Year Project).The system is able to
recognize people based on the uniqueness of iris patterns of their eyes.
Segmentation, normalization and Gabor Wavelet filters were applied on images of
human eye to do the task. The system has been implemented by simulation on
Matlab.
Infrared Remote Control (Transceiver)
Designed and implemented an offline database of an Internet Service Provider in
Oracle.
Implemented p-n junction level Layout of a 4-bit Adder in design tool LASI.
Morphing: This computer graphics project was implemented using MS VISUAL
C++6.
Designed and implemented Power Supply .
Designed and implemented a Micro Coded Machine in Verilog which performs
addition, subtraction, multiplication (reduction done by Wallace tree) using a loop
machine.
Digital Clock: A clock displaying hours, minutes, seconds on seven segment
displays.
Wrote a research report on International Trade with emphasis on WTO.

SOFTWARE SKILLS :
9955 RNP tool
TEMS
ALU Network Performance Optimization (NPO) Platform
Mapinfo Professional
Google Earth
ZTE Netscope Solution for Radio Optimization
Tektronix NETtek Spectrum Analyzer
MS EXCEL, WORD, POWER POINT

REFERENCES: Available on request.


PERSONAL INFORMATION:
Adnan Gulzar
DOB Oct 20,1982
Whatsapp: +923335687437
Personal email: adnan.gulzar@gmail.com

Contact Adnan on LinkedIn : www.linkedin.com/in/adnan-gulzar-a669745

Potrebbero piacerti anche