Material Labour rate

Sand (filling) 39.00 Hish Skilled


Sand (Mortor) 44.00 Skilled
Chips 12mm Semi-skilled
Chips 6mm Un-skilled
Metal 40mm
Cement 640.00
Sand for filling 42.00 Nut Bolt
Rod Fire Wood
Brick(25x12x8cm)
Brick Khoa
R.R. Stone
Tranportation 1092.00
bour rate
205.00
190.00
170.00
150.00

70.00
415.00
Earth work portion

SL Description of items Qnty Rate


No.
1 2 3 4
1 Supplying all labour, T&P and Earthwork in
excavation in Ordinary Soil including
dressing, breaking clods & laying in layers
not exceeding 30cum in depth leveling the
bed & depositing the soil with in initial lead
of50m. & initial lift of 1.50m. , including
sundries, supervision charges etc & as per
the direction of engineer- in-charge.

Data for 100 cum


a) Man Mulia (Un-skilled) 16 nos
b) Women Mulia (Un-skilled) 16 nos
32 nos Each 150.00
c) Add O.H.C. @ 7.5 %
d) Add Contractor Profit@ 7.5 %

e) Add foundation@ 20 %

Add Labour Cess 1%


Total for 100 cum

2 Supplying all labour, T&P and Earthwork in


excavation in Hard Soil or Gravelly Soil with
in 50 m. initial lead & 1.50m. initial lift
including Rough dressing, breaking clods, &
laying in layers not exceeding 0.30m in
depth, leveling the bed & including sundries
, supervision charges etc, & as per the
direction of engineer- in-charge.

Data for 100 cum


a) Man Mulia (Un-skilled) 21.5 nos
b) Women Mulia (Un-skilled) 21.5 nos
43 nos Each 150.00
c) Add O.H.C. @ 7.5 %
d) Add Contractor Profit@ 7.5 %

e) Add foundation@ 20 %

Add Labour Cess 1%


Total for 100 cum
SL Description of items Qnty Rate
No.
1 2 3 4

3 Supplying all labour, T&P and Earthwork in


excavation in Stony earth and gravels
mixed with stone & boulders not exceeding
0.014 cum in volume with in 50mtr. Initial
lead & 1.50m. initial lift including rough
dressing, breaking clods & laying in layers
not exceeding 0.30m In depth, leveling the
bed & including sundries , supervision
charges etc, & as per the direction of
Engineer- in-charge.

Data for 100 cum


a) Man Mulia (Un-skilled) 33.53 nos
b) Women Mulia (Un-skilled) 33.53 nos
67.06 nos Each 150.00
c) Add O.H.C. @ 7.5 %
d) Add Contractor Profit@ 7.5 %

e) Add foundation@ 20 %

Add Labour Cess 1%


Total for 100 cum

3 Supplying all labour, T&P and Earthwork in


excavation in Slushy Soil (in water up to
0.6m depth requiring the aids of pans
&Vassals) with in 50m. initials lift including
leveling the bed ,rough dressing, including
sundries , supervision charges etc, & as per
the direction of engineer- in-charge.

Data for 100 cum


a) Man Mulia (Un-skilled) 21 nos
b) Women Mulia (Un-skilled) 23 nos
44 nos Each 150.00
c) Add O.H.C. @ 7.5 %
d) Add contractor profit 7.5 %

e) Add 20% for foundation

Add 1 % Labour Cess


Total for 100 cum
SL Description of items Qnty Rate
No.
1 2 3 4

5 Supplying all labour, T&P and earth work in


excavation in all kinds of soil within initial
lead of 50m lead & initial lift of 1.50m.
including rough dressing breaking clods &
laying in layers not exceeding 0.30m. In
depth, leveling the bed, using pans, vessels
for slushy soil & including sundries
supervision charges & labour cess etc, as
per the direction of Engineer-in-charge.

Data for 100 cum


In Ordinary Soil 6624.00
In Hard Soil /Gravelly Soil 8901.00
In Stoney Earth &Gravel 13881.42
In Slushy Soil 9108.00
38514.42 / 4
Add 1% Labour Cess
Say 9724.90
6 Cutting in disintegrated rock not requiring
blasting to be removed by pick axes and
crow bars and depositing materials within
50m initial lead and 1.5m initial lift including
rough dressing as per direction and
specification of the department including
stacking the useful materials separately as
ordered.

Data for 100 cum


Data for 100 cum
a) Man Mulia (Un-skilled) 55 nos
b) Women Mulia (Un-skilled) 54 nos
109 nos Each 150.00
c) Add O.H.C. @ 7.5 %
d) Add contractor Profit@ 7.5 %

e) Add for foundation 20.00 % 18802.50


SL Description of items Qnty Rate
No.
1 2 3 4
Add Labour Cess 1.00 %
Total for 100 cum

7 Supplying all labour, T&P and Blasting hard


and compacted sheet rock excluding sand
stone measured in solid including jumping
holes cost of explosive fuse, detonator, etc
and stacking the blasted debris clear of
work within 50m lead.

Data for 2.83 cum


i) Blaster 1 no Each 205.00
Man Mulia 2 nos Each 150.00
Stone cutter 2 nos Each 190.00
Sangi Mulia 2 nos Each 170.00

ii) cost of explosive fuse, detonator L.S.

III) Overhead Charges @ 7.50 % on(i+ii) 1305.60


IV) Add Contractor Profit @ 7.50 % on(i+ii) 1305.60
v) Total (i + ii+ iii+iv)
For 1 cum = 1501.44 / 2.83 cum
Add Labour Cess @ 1.00 %

8 Supplying all labour, T&P and Excavation of


founation in hard rock (granite) removed by
chiselling including dressing and levelling
the bed not exceeding 1.5m in depth and
depositing the soil within initial lead of 50m
and as per specification approved by the
Department

Data for 1 Cum


Labour
i) Man Mulia (Un-skilled) 5.68 nos Each 150.00

ii) Overhead Charges @ 7.50 % on (i+ii) 852.00


iii) Add Contractor fit. @ 7.50 % on (i+ii) 852.00
Total (i + ii+ iii)
Add Labour cess 1.00
SL Description of items Qnty Rate
No.
1 2 3 4
9 Supplying all labour, T&P and Excavation of
founation in laterite rock or any hard rock
(other than granite or disintigrated rock)
removed by chiselling including dressing
and levelling the bed not exceeding 1.5m in
depth and depositing the soil within initial
lead of 50m and as per specification
approved by the Department

Data for 1 Cum


Labour
i) Man Mulia (Un-skilled) 3.74 nos Each 150.00

ii) Overhead Charges @ 7.50 % on (i+ii) 561.00


iii) Add Contractor Profit@ 7.50 % on (i+ii) 561.00
Total (i + ii+ iii)
Add Labour cess@ 1.00

10 Supplying all labour, T&P and Shoring and


shuttering foundation trenches, pits etc.with
close wooden planks or sheets shuttering
etc.excluding cost of planks and sheets
(labour only)

Data for 1 Sqm


Labour
i) Carpenter ( 2nd class) 0.50 nos Each 190.00

ii) Overhead Charges @ 7.50 % on(i+ii) 95.00


iii) Add Contractor Profit@ 7.50 % on(i+ii) 95.00
Total (i + ii+ iii)
Add 1% Labour Cess

11 Supplying all labour, T&P and Filling in


foundation and plinth with excavated
materials including watering and ramming
as directed by the Engineer-in-charge
Data for 100 cum
a) In Ordinary Sail 6624.00 x 2 / 3
Add Labour Cess @ 1.00 %
SL Description of items Qnty Rate
No.
1 2 3 4

b) In Hard Soil /Gravelly Soil 7417.50 x 2 / 3


Add Labour cess@ 1.00 %

c) In Stoney Earth &Gravel 11567.85 x 2 / 3


Add Labour cess@ 1.00 %

d) In Slushy Soil 7590.00 x 2 / 3


Add Labour cess@ 1.00 %

e) In all kinds of soil


In Ordinary soil 4416.00
In Hard Soil /Gravelly Soil 4945.00
In Stoney Earth &Gravel 7711.90
In Slushy Soil 5060.00
22132.90 / 4
Add Labour Cess @ 1%

Say

12 Extra lift of 1.5m or part there of over the


initial lift of 1.5m in all kinds of
embankments and road works and ordinary
earth work in general.
1st Extra lift of 1.5m (upto 7.5m)

Data for 100 cum


Labour
i) Man Mulia (Unskilled) 4.10 nos Each 150.00

ii) Overhead Charges @ 7.50 % on(i+ii) 615.00


iii) Add Contractor Profit@ 7.50 % on(i+ii) 615.00
SL Description of items Qnty Rate
No.
1 2 3 4
Total (i + ii+ iii)
Add Labour Cess @ 1 %
Amount in Remarks
Rs.
5 6

4800.00
360.00
360.00
5520.00 5520.00
1104.00
6624.00
66.24
6690.24
Say 6690.20

6450.00
483.75
483.75
7417.50 7417.50
1483.50
8901.00
89.01
8990.01
Say 8990.00
Amount in Remarks
Rs.
5 6

10059.00
754.43
754.43
11567.85 11567.85
2313.57
13881.42 13881.42
138.81 707.25
14020.23 14588.67
Say 14020.20 145.8867
14734.56

6600.00
495.00
495.00
7590.00 7590.00
1518.00
9108.00
91.08
9199.08
Amount in Remarks
Rs.
5 6
Say 9199.10

9628.61
96.29
9724.89 /100cum

16350.00
1226.25
1226.25
18802.50 18802.50
3760.50
22563.00
Amount in Remarks
Rs.
5 6
225.63
22788.63
Say 22788.60

205.00
300.00
380.00
340.00
1225.00
80.60
1305.60 1305.60
97.92
97.92
1501.44
530.54
5.31
535.85
535.80 /Cum

852.00
852.00 852.00
63.90
63.90
979.80
% 9.80
989.60
Say 989.60 /cum
Amount in Remarks
Rs.
5 6

561.00
561.00 561.00
42.08
42.08
645.15
% 6.45
651.60 /cum

95.00
95.00 95.00
7.13
7.13
109.25
Cess 1.09
110.34 /Sqm
Say 110.30 /Sqm

4416.00
44.16
4460.16 4460.20 /100cum
Amount in Remarks
Rs.
5 6

4945.00
49.45
4994.45 4994.45 /100cum

7711.90
77.12
7789.02 7789.00 /100cum

5060.00
50.60
5110.60 5110.60 /100cum

5533.23
55.33
5588.56
5588.60 /100cum

615.00
615.00 615.00
46.13
46.13
Amount in Remarks
Rs.
5 6
707.25 10335.86
7.07 103.35855
714.32 10439.21
Say 714.30
100cum 10185.52
10287.378
Sand filling

SL Description of items Qnty Unit Rate Amount in


No. Rs.
1 2 3 4 5.00

1 Supplying all materials, labour, T&P and


filling in foundation and plinth with sand
well watered and rammed including
conveyance of all materials to work site,
payment of royalty , taxes & labour cess
etc all complete as per specification and
direction of Engineer-in-charge.

Data for Per Cum

a) Materials
Sand ffor filling 100 cum cum 42.00 4200.00
4200.00

a) Labour charges
i) Man Mulia (Unskilled) 12.36 nos Each 150.00 1854.00
1854.00

O.H.C. @ 7.50 % 6054.00


Add Contractor Profit@ 7.50 % 6054.00
Cost of 100 cum
Cost for 1 cum = 6962.10 / 100 cum
C) Lead & Royalty of Sand 356.00
Total (A+B+C)
Add 1 % Labour Cess

Say
Crusher Dust filling

SL Description of items Qnty Unit Rate Amount in


No. Rs.
1 2 3 4 5.00
1 Supplying all materials, labour, T&P and
filling with Granite stone screening
(Passing through 2.36mm sieve &
retained on 180 micron sieve) watered
and rammed including conveyance of all
materials to work site, payment of royalty
, taxes ,contractor profit & labour cess
etc all complete as per specification and
direction of Engineer-in-charge.
Data for Per Cum

a) Labour charges
i) Man Mulia (Unskilled) 12.36 nos Each 150.00 1854.00
1854.00
O.H.C. @ 7.50 %
Add Contractor Profit@ 7.50 %
Cost of 100 cum
Cost for 1 cum = 2132.10 / 100 cum
(B) Material Cost & carriage & Royalty
Cost of Granite stone screening (Passing
through 2.36mm sieve & retained on 180
micron sieve)(one cum)
C) Lead & Royalty of Granite stone
Total (A+B+C)
Add 1 % Labour Cess

Say
Remarks

6.00

4200.00

1854.00
6054.00
454.05
454.05
6962.10
69.62 69.62
356.00
425.62
4.26
429.88 42.98772
429.90
Remarks

6.00

1854.00
139.05
139.05
2132.10
21.32 21.32

578.00

311.80 21.32 21.53


911.12
9.11
920.23
920.20
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6

1 Supplying all labour, T&P and laying in


trenches centrifugally cost ( spun) Iron
Pressure pipes S/S and specials class-LA
conforming to IS- 1536 of following
nominal diameter as per specification all
complete excluding joints ( Earth work to
be measured separately )

Vide- AR- 2.2.1 (a) ( Page-43)


Taking an average of 10m of 200mm dia CL- A
Data for 2 x 257 kg - = 514 kg.
a) Plumber ( Fitter ) (S) 0.17 nos Each 190.00 32.30
b) Helper to Plumber/Filter 0.17 nos Each 170.00 28.90
c) Male Worker ( Unskilled 1.33 nos Each 150.00 199.50
260.70
d) O.H. charges @ 12 %
e) Watering charges @ 1%
f) Sundries @ 8%

Rate for 100 kg = 316.75 / 5.14 61.62


Say

a) 90mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr
( 0.75Q/ 3.66 m) x 10 = 2.05 QH
Laying of C.I. pipe 1.61 Qntl Per Qntl 61.62 99.22
cost for 10 mtr 99.22
Cost for 1 Mtr 99.22 / 10 9.92
Add Labour cess@ 1 % 0.10
10.02
Say

b) 100 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr
( 0.75Q/ 3.66 m) x 10 = 2.05 QH
Laying of C.I. pipe 2.05 Qntl Per Qntl 61.62 126.33
cost for 10 mtr 126.33
Cost for 1 Mtr 126.33 / 10 12.63
Add carriage of C.I. pipe from store to 6.67
work site within 5.00 KM Lead.
19.30
Add Labour cess 1% 0.19
19.49
Say 19.50
c) 150 mm dia C.I. pipe
Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =3.33 qntl
Laying of C.I. pipe 3.33 Qntl Per Qntl 61.62 205.21
cost for 10 mtr 205.21
Cost for 1 Mtr 205.21 / 10 20.52
Add carriage of C.I. pipe from store to 10.91
work site within 5.00 KM Lead.
31.43
Add Labour cess@ 1% 0.31
31.74

d) 200 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =4.86 qntl
Laying of C.I. pipe 4.86 Qntl Per Qntl 61.62 299.50
cost for 10 mtr 299.50
Cost for 1 Mtr 299.50 / 10 29.95
Add carriage of C.I. pipe from store to 17.14
work site within 5.00 KM Lead.
47.09
Add Labour cess@ 1% 0.47
47.56
Say 47.60

e) 250 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =6.56 qntl
Laying of C.I. pipe 6.56 Qntl Per Qntl 61.62 404.26
cost for 10 mtr 404.26
Cost for 1 Mtr 404.26 / 10 40.43
Add carriage of C.I. pipe from store to 24.00
work site within 5.00 KM Lead.
64.43
Add Labour cess@ 1% 0.64
65.07

f) 300 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =8.47 qntl
Laying of C.I. pipe 8.47 Qntl Per Qntl 61.62 521.96
cost for 10 mtr 521.96
Cost for 1 Mtr 521.96 / 10 52.20
Add carriage of C.I. pipe from store to 30.00
work site within 5.00 KM Lead.
82.20
Add Labour cess@ 1% 0.82
83.02

g) 350 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =10.66 qntl
Laying of C.I. pipe 10.66 Qntl Per Qntl 61.62 656.92
cost for 10 mtr 656.92
Cost for 1 Mtr 656.92 / 10 65.69
Add carriage of C.I. pipe from store to 40.00
work site within 5.00 KM Lead.
105.69
Add Labour cess@ 1% 1.06
106.75

h) 400 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.00mtr =12.95 qntl
Laying of C.I. pipe 12.95 Qntl Per Qntl 61.62 798.04
cost for 10 mtr 798.04
Cost for 1 Mtr 798.04 / 10 79.80
Add carriage of C.I. pipe from store to 40.00
work site within 5.00 KM Lead.
119.80
Add Labour cess@ 1% 1.20
121.00

h) 450 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =15.63 qntl
Laying of C.I. pipe 15.63 Qntl Per Qntl 61.62 963.19
cost for 10 mtr 963.19
Cost for 1 Mtr 963.19 / 10 96.32
Add carriage of C.I. pipe from store to 60.00
work site within 5.00 KM Lead.
156.32
Add Labour cess@ 1% 1.56
157.88
i) 500 mm dia C.I. pipe
Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =18.33 qntl
Laying of C.I. pipe 18.33 Qntl Per Qntl 61.62 1129.58
cost for 10 mtr 1129.58
Cost for 1 Mtr 1129.58 / 10 112.96
Add carriage of C.I. pipe from store to 60.00
work site with 5.00 KM Lead.
172.96
Add Labour cess@ 1% 1.73
174.69

j) 600 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =24.43 qntl
Laying of C.I. pipe 24.43 Qntl Per Qntl 61.62 1505.49
cost for 10 mtr 1505.49
Cost for 1 Mtr 1505.49 / 10 150.55
Add carriage of C.I. pipe from store to 80.00
work site with 5.00 KM Lead.
230.55
Add Labour cess@ 1% 2.31
232.85

j) 700 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =31.50 qntl
Laying of C.I. pipe 31.5 Qntl Per Qntl 61.62 1941.18
cost for 10 mtr 1941.18
Cost for 1 Mtr 1941.18 / 10 194.12
Add carriage of C.I. pipe from store to
work site with 5.00 KM Lead.
194.12
Add 1 % Labour Ces 1.94
196.06
225.90
Remarks

260.70
32.59
2.61
20.86
316.75
/Qntl

/ Mtr
/ Mtr

/ Mtr
/ Mtr
/ Mtr

/ Mtr

/ Mtr
/ Mtr

/ Mtr

/ Mtr

/ Mtr
/ Mtr

/ Mtr

/ Mtr
/ Mtr
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6

1 Supplying all labour,T&P and making the


transportation of following materials M.S.
pipes, specials including hoisting, loading
and stacking etc.from the departmental
store to work site, all complete as per the
direction of Engineer-in-charge.

2 TRANSPORTATION OF PVC PIPES FROM STORE TO WORK SITE MIN.5 KM

Conveyance of pipe including loading and


unloading ( Bulky materials)
Within 5.00 Km 1200.00 / Per Truck
A) 110mm O.D.PVC pipe 685.00 mtr / Per Truck
Rate for Mtr 1200.00 / 685.00 = 1.75

A) 160mm O.D.PVC pipe 325.00 mtr / Per Truck


Rate for Mtr 1200.00 / 325.00 = 3.69
Say 3.70
Remarks

mtr

mtr
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6

1 Supplying all labour,T&P and making the


transportation of following materials M.S.
pipes, specials including hoisting, loading
and stacking etc.from the departmental
store to work site, all complete as per the
direction of Engineer-in-charge.

1 TRANSPORTATION OF C.I.PIPES FROM STORE TO WORK SITE MIN.5 KM

Conveyance of pipe including loading and


unloading ( Bulky materials)
Within 5.00 Km 1200.00 / Per Truck

a) 100mm dia C.I. (0.206 qntl/mtr) 180.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 180.00 = 6.67

b) 150mm dia C.I. (0.338 qntl/mtr) 110.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 110.00 = 10.91

c) 200mm dia C.I. (0.486 qntl/mtr) 70.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 70.00 = 17.14

d) 250mm dia C.I. (0.656 qntl/mtr) 50.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 50.00 = 24.00

e) 300mm dia C.I. (0.847 qntl/mtr) 40.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 40.00 = 30.00

f) 350mm dia C.I. (1.065 qntl/mtr) 30.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 30.00 = 40.00

g) 450mm dia C.I. (1.563 qntl/mtr) 20.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 20.00 = 60.00

h) 500mm dia C.I. (1.833 qntl/mtr) 20.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 20.00 = 60.00

i) 600mm dia 15.00 Mtr / Per Truck


Rate for Mtr 1200.00 / 15.00 = 80.00

2 TRANSPORTATION OF PVC PIPES FROM STORE TO WORK SITE MIN.5 KM


Conveyance of pipe including loading and
unloading ( Bulky materials)
Within 5.00 Km 1200.00 / Per Truck
A) 110mm O.D.PVC pipe 685.00 mtr / Per Truck
Rate for Mtr 1200.00 / 685.00 = 1.75

A) 160mm O.D.PVC pipe 325.00 mtr / Per Truck


Rate for Mtr 1200.00 / 325.00 = 3.69
Say 3.70
Remarks

mtr

mtr

mtr

mtr

mtr

mtr

mtr

mtr

mtr
mtr

mtr
Laying of UPVC (CLASS-II) pipe

SL Description of items Qnty Unit Rate in Rs Amount in Remarks


No. Rs.
1 2 3 4 5 6 7
1 Supplying all materials,labour,T&P and
laying in trenches unplastised PVC
pipes and specials (class-II) of the
following outer diameter (4kg/cm2)
including jointing with supply of
approved solvent cement by non-heat
application method including testing as
per specification, all complete (earth
work in trenches, cost of PVC pipe &
specials fittings to be measured
separately) as per the direction of
Engineer-in-charge.

a) 75mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.12 nos Each 190.00 22.80
b) Male worker (Unskilled) 0.24 nos Each 150.00 36.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.22 nos Each 190.00 41.80
d) Helper to plumber or fitter 0.83 nos Each 170.00 141.10
e) Male worker (Unskilled) 0.12 nos Each 150.00 18.00
259.70
O.H.C. 12.50 % 32.46
292.16 292.16
Jointing materials
g) Cost of solvent cement =30 grammes 0.03 kg Per kg 200.00 6.00
or 0.03 kg.
h) Watering Charges 1% 2.60
i) Sundries 8% 20.78
29.37 29.37
Data for 10 Mtr 321.54
For 1.00 mtr 321.54 / 10 Labour cost 32.15
Add Carriage of PVC pipe from 1.00 mtr 1.75
Store to Work site within 5 km
33.91
Add Labour Cess 1% 0.34
34.24 /mtr(Labour)

Add Cost of PVC Class-II pipe 1 mtr mtr 84.96 84.96


Add Cost of Labour 1 mtr mtr 33.91
118.87
Add Labour cess 1 % 1.19
120.05
Say 119.90 /mtr
a) 110mm O.D.UPVC pipe
(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.18 nos Each 190.00 34.20
b) Male worker (Unskilled) 0.35 nos Each 150.00 52.50
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.31 nos Each 190.00 58.90
d) Helper to plumber or fitter 1.33 nos Each 170.00 226.10
e) Male worker (Unskilled) 0.18 nos Each 150.00 27.00
398.70
O.H.C. 12.50 % 49.84
448.54 448.54
Jointing materials
g) Cost of solvent cement =30 grammes 0.056 kg Per kg 200.00 11.20
or 0.03 kg.
h) Watering Charges 1% 3.99
i) Sundries 8% 31.90
47.08 47.08
Data for 10 Mtr 495.62
For 1.00 mtr 495.62 / 10 49.56
Add Carriage of PVC pipe from 1.00 mtr 1.75
Store to Work site within 5 km
51.31
Add Labour Cess 1% 0.51
51.83

Add cost of Class-II pipe (110mm ) 1.00 mtr Mtr 121.75 121.75
Add cost of labour 1.00 mtr Mtr 51.31
173.06
Add Labour Cess 1% 1.73
174.79

a) 160mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.25 nos Each 190.00 47.50
b) Male worker (Unskilled) 0.50 nos Each 150.00 75.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.46 nos Each 190.00 87.40
d) Helper to plumber or fitter 1.92 nos Each 170.00 326.40
e) Male worker (Unskilled) 0.25 nos Each 150.00 37.50
573.80
O.H.C. 12.50 % 71.73
645.53 645.53
Jointing materials
g) Cost of solvent cement =30 grammes 0.133 kg Per kg 200.00 26.60
or 0.03 kg.
h) Watering Charges 1% 5.74
i) Sundries 8% 45.90
78.24 78.24
Data for 10 Mtr 723.77
For 1.00 mtr 723.77 / 10 72.38
Add Carriage of PVC pipe from 1.00 mtr 3.69
Store to Work site within 5 km
76.07
Add Labour cess @ 1% 0.76
76.83 76.50
Labour Charg
Add cost PVC (Class-II) 1.00 mtr 257.42 257.42
Add cost labour 1.00 mtr 76.07
333.49
Add Labour Cess 1% 3.33
336.82
Say 336.50 / Mtr
abour)
/mtr
our Charge
Laying of UPVC (CLASS-III) pipe

SL Description of items Qnty Unit Rate in Rs Amount in Remarks


No. Rs.
1 2 3 4 5 6 7
1 Supplying all labour,T&P and laying in
trenches unplastised PVC pipes and
specials (class-III) of the following outer
diameter (6kg/cm2) including jointing with
supply of approved solvent cement by non-
heat application method including testing
as per specification, all complete (earth
work in trenches, cost of PVC pipe &
specials fittings to be measured separately)
as per the direction of Engineer-in-charge.

a) 110mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.18 nos Each 190.00 34.20
b) Male worker (Unskilled) 0.35 nos Each 150.00 52.50
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.31 nos Each 190.00 58.90
d) Helper to plumber or fitter 1.33 nos Each 170.00 226.10
e) Male worker (Unskilled) 0.18 nos Each 150.00 27.00
398.70
O.H.C. 12.50 % 49.84
448.54 448.54
Jointing materials
g) Cost of solvent cement =30 grammes or 0.056 kg Per kg 200.00 11.20
0.03 kg.
h) Watering Charges 1% 3.99
i) Sundries 8% 31.90
47.08 47.08
Data for 10 Mtr 495.62
For 1.00 mtr 495.62 / 10 49.56
Add Carriage of PVC pipe from Store to 1.00 mtr 1.75
Work site within 5 km

51.31
Add Labour Cess 1% 0.51
51.83 51.80

270.76
2.71
273.47
a) 160mm O.D.UPVC pipe
(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.25 nos Each 190.00 47.50
b) Male worker (Unskilled) 0.5 nos Each 150.00 75.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.46 nos Each 190.00 87.40
d) Helper to plumber or fitter 1.92 nos Each 170.00 326.40
e) Male worker (Unskilled) 0.25 nos Each 150.00 37.50
573.80
O.H.C. 12.50 % 71.73
645.53 645.53
Jointing materials
g) Cost of solvent cement =30 grammes or 0.133 kg Per kg 200.00 26.60
0.03 kg.
h) Watering Charges 1% 5.74
i) Sundries 8% 45.90
78.24 78.24
Data for 10 Mtr 723.77
For 1.00 mtr 723.77 / 10 72.38
Add Carriage of PVC pipe from Store to 1.00 mtr 3.70
Work site within 5 km
76.08
Add Labour Cess 1% 0.76
76.84
Say 76.80 / Mtr

a) 200mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.32 nos Each 190.00 60.80
b) Male worker (Unskilled) 0.64 nos Each 150.00 96.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.74 nos Each 190.00 140.60
d) Helper to plumber or fitter 2.58 nos Each 170.00 438.60
e) Male worker (Unskilled) 0.32 nos Each 150.00 48.00
784.00
O.H.C. 12.50 % 98.00
882.00 882.00
Jointing materials
g) Cost of solvent cement =30 grammes or 0.133 kg Per kg 200.00 26.60
0.03 kg.
h) Watering Charges 1% 7.84
i) Sundries 8% 62.72
97.16 97.16
Data for 10 Mtr 979.16
For 1.00 mtr 979.16 / 10 97.92
Add Carriage of PVC pipe from Store to Work 1.00 mtr 0.00
site within 5 km
97.92
Add Labour Cess 1% 0.98
98.90
Say 84.80 / Mtr
Laying of UPVC (CLASS-III) pipe

SL Description of items Qnty Unit Rate in Rs Amount in Remarks


No. Rs.
1 2 3 4 5 6 7
1 Supplying all labour,T&P and laying in
trenches unplastised PVC pipes and
specials (class-III) of the following outer
diameter (6kg/cm2) including jointing with
supply of approved solvent cement by non-
heat application method including testing
as per specification, all complete (earth
work in trenches, cost of PVC pipe &
specials fittings to be measured separately)
as per the direction of Engineer-in-charge.

a) 75mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.12 nos Each 190.00 22.80
b) Male worker (Unskilled) 0.24 nos Each 150.00 36.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.22 nos Each 190.00 41.80
d) Helper to plumber or fitter 0.83 nos Each 170.00 141.10
e) Male worker (Unskilled) 0.12 nos Each 150.00 18.00
259.70
O.H.C. 12.50 % 32.46
292.16 292.16
Jointing materials
g) Cost of solvent cement =30 grammes or 0.03 kg Per kg 200.00 6.00
0.03 kg.
h) Watering Charges 1% 2.60
i) Sundries 8% 20.78
29.37 29.37
Data for 10 Mtr 321.54
For 1.00 mtr 321.54 / 10 32.15
Add Labour Cess 1% 0.32
32.48
Say 27.80 / Mtr
a) 90mm O.D.UPVC pipe
(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.14 nos Each 190.00 26.60
b) Male worker (Unskilled) 0.28 nos Each 150.00 42.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.29 nos Each 190.00 55.10
d) Helper to plumber or fitter 1.00 nos Each 170.00 170.00
e) Male worker (Unskilled) 0.14 nos Each 150.00 21.00
314.70
O.H.C. 12.50 % 39.34
354.04 354.04
Jointing materials
g) Cost of solvent cement =30 grammes or 0.04 kg Per kg 200.00 8.00
0.03 kg.
h) Watering Charges 1% 3.15
i) Sundries 8% 25.18
36.32 36.32
Data for 10 Mtr 390.36
For 1.00 mtr 390.36 / 10 39.04
Add Carriage of PVC pipe from Store to Work 1.00 mtr 1.30
site within 5 km
40.34
Add Labour Cess 1% 0.40
40.74
Say 35.10 / Mtr
a) 110mm O.D.UPVC pipe
(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.18 nos Each 190.00 34.20
b) Male worker (Unskilled) 0.35 nos Each 150.00 52.50
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.31 nos Each 190.00 58.90
d) Helper to plumber or fitter 1.33 nos Each 170.00 226.10
e) Male worker (Unskilled) 0.18 nos Each 150.00 27.00
398.70
O.H.C. 12.50 % 49.84
448.54 448.54
Jointing materials
g) Cost of solvent cement =30 grammes or 0.056 kg Per kg 200.00 11.20
0.03 kg.
h) Watering Charges 1% 3.99
i) Sundries 8% 31.90
47.08 47.08
Data for 10 Mtr 495.62
For 1.00 mtr 495.62 / 10 49.56
Add Carriage of PVC pipe from Store to 1.00 mtr 1.75
Work site within 5 km

51.31
Add Labour Cess 1% 0.51
51.83 51.80

a) 160mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.25 nos Each 190.00 47.50
b) Male worker (Unskilled) 0.5 nos Each 150.00 75.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.46 nos Each 190.00 87.40
d) Helper to plumber or fitter 1.92 nos Each 170.00 326.40
e) Male worker (Unskilled) 0.25 nos Each 150.00 37.50
573.80
O.H.C. 12.50 % 71.73
645.53 645.53
Jointing materials
g) Cost of solvent cement =30 grammes or 0.133 kg Per kg 200.00 26.60
0.03 kg.
h) Watering Charges 1% 5.74
i) Sundries 8% 45.90
78.24 78.24
Data for 10 Mtr 723.77
For 1.00 mtr 723.77 / 10 72.38
Add Carriage of PVC pipe from Store to 1.00 mtr 3.70
Work site within 5 km
76.08
160mm OD PVC (Class-III) pipes 1.00 mtr 370.00
446.08
Add Labour Cess 1% 4.46
450.54
Say 450.50 / Mtr

a) 200mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.32 nos Each 190.00 60.80
b) Male worker (Unskilled) 0.64 nos Each 150.00 96.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.74 nos Each 190.00 140.60
d) Helper to plumber or fitter 2.58 nos Each 170.00 438.60
e) Male worker (Unskilled) 0.32 nos Each 150.00 48.00
784.00
O.H.C. 12.50 % 98.00
882.00 882.00
Jointing materials
g) Cost of solvent cement =30 grammes or 0.133 kg Per kg 200.00 26.60
0.03 kg.
h) Watering Charges 1% 7.84
i) Sundries 8% 62.72
97.16 97.16
Data for 10 Mtr 979.16
For 1.00 mtr 979.16 / 10 97.92
Add Carriage of PVC pipe from Store to Work 1.00 mtr 0.00
site within 5 km
97.92
Add Labour Cess 1% 0.98
98.90
Say 84.80 / Mtr
Tyton Rubber Joint

SL Description of items Qnty Unit Rate in Amount


No. Rs in Rs.
1 2 3 4 5 6.00
1 Supplying all labour T & P and making
tyton joints using SBR rubber rings to
spun Iron cast Iron pipes and fittings of
the following nominal diameter including
testing of the joints but excluding the cost
of rubber rings as per specification all
complete as per the direction of the
Engineer in charge

(i) 100mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 5/ 6 nos Each 190.00 158.33
Helper to Plumber (F) 2/ 3 nos Each 170.00 113.33
Male worker(Unskilled) 1 2 / 3 nos Each 150.00 250.00
521.67
O.H. charge @ 12.50 % on 521.67
Watering charges @ 1 % on 521.67
Sundries @ 6 % on 521.67
For 10 nos Joints
For 1no joint 623.39 / 10 62.34
Add Labour Cess @ 1 % 0.62
62.96
Say 63.00
Add Tyton Rubber Ring 1 No Each 45 45.00
107.34
Add Labour cess 1% 1.07
108.41

(ii) 150mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1 / 3 nos Each 190.00 253.33
Helper to Plumber (F) 2 / 3 nos Each 170.00 113.33
Male worker(Unskilled) 2 5 / 12 nos Each 150.00 362.50
729.17
O.H. charge @ 12.50 % on 729.17
Watering charges @ 1 % on 729.17
Sundries 6 % on 729.17
For 10 nos joints
For 1no joint 871.35 / 10 87.14
Add Labour Cess @ 1 % 0.87
88.01
Say 88.00
Add Tyton Rubber Ring 1 no Each 55 55.00
142.14
Add Labour cess 1% 1.42
143.56

(ii) 200mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1 / 3 nos Each 190.00 253.33
Helper to Plumber (F) 1 nos Each 170.00 170.00
Male worker(Unskilled) 3 nos Each 150.00 450.00
873.33
O.H. charge @ 12.50 % on 873.33
Watering charges @ 1 % on 873.33
Sundries 6 % on 873.33
For 10 nos joints
For 1no joint 1043.63 / 10 104.36
Add Labour Cess @ 1 % 1.04
105.41

(ii) 250mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1 / 3 nos Each 190.00 253.33
Helper to Plumber (F) 1 nos Each 170.00 170.00
Male worker(Unskilled) 3 nos Each 150.00 450.00
873.33
O.H. charge @ 12.50 % on 873.33
Watering charges @ 1 % on 873.33
Sundries 6 % on 873.33
For 10 nos joints
For 1no joint 1043.63 / 10 104.36

104.36
Add Labour Cess @ 1% 1.04
105.41

(ii) 300mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1 / 3 nos Each 190.00 253.33
Helper to Plumber (F) 1 nos Each 170.00 170.00
Male worker(Unskilled) 3.33 nos Each 150.00 499.50
922.83
O.H. charge @ 12.50 % on 922.83
Watering charges @ 1 % on 922.83
Sundries 6 % on 922.83
For 10 nos joints
For 1no joint 1102.79 / 10 110.28
Add Labour Cess @ 1 % 1.10
111.38

(ii) 350mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1/ 2 nos Each 190.00 285.00
Helper to Plumber (F) 2 nos Each 170.00 340.00
Male worker(Unskilled) 4 1/ 2 nos Each 150.00 675.00
1300.00
O.H. charge @ 12.50 % on 1300.00
Watering charges @ 1 % on 1300.00
Sundries 6 % on 1300.00
For 10 nos joints
For 1no joint 1553.50 / 10 155.35
Add Labour Cess @ 1 % 1.55
156.90

(ii) 400mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 1 1 / 2 nos Each 190.00 285.00
Helper to Plumber (F) 2 nos Each 170.00 340.00
Male worker(Unskilled) 4 1 / 2 nos Each 150.00 675.00
1300.00
O.H. charge @ 12.50 % on 1300.00
Watering charges @ 1 % on 1300.00
Sundries 6 % on 1300.00
For 10 nos joints
For 1no joint 1553.50 / 10 155.35
Add Labour Cess @ 1 % 1.55
156.90

(ii) 450mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 2 nos Each 190.00 380.00
Helper to Plumber (F) 2 nos Each 170.00 340.00
Male worker(Unskilled) 5 nos Each 150.00 750.00
1470.00
O.H. charge @ 12.50 % on 1470.00
Watering charges @ 1 % on 1470.00
Sundries 6 % on 1470.00
For 10 nos joints
For 1no joint 1756.65 / 10 175.67
Add Labour Cess @ 1 % 1.76
177.42

(ii) 500mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S) 2 nos Each 190.00 380.00
Helper to Plumber (F) 2 nos Each 170.00 340.00
Male worker(Unskilled) 5 nos Each 150.00 750.00
1470.00
O.H. charge @ 12.50 % on 1470.00
Watering charges @ 1 % on 1470.00
Sundries 6 % on 1470.00
For 10 nos joints
For 1no joint 1756.65 / 10 175.67
Add Labour Cess @ 1 % 1.76
177.42
Remarks

7.00

521.67
65.21
5.22
31.30
623.39

Labour Ch 0.63
63.63

108.40

729.17
91.15
7.29
43.75
871.35

/Each
143.60

873.33
109.17
8.73
52.40
1043.63

105.40

873.33
109.17
8.73
52.40
1043.63

105.41

922.83
115.35
9.23
55.37
1102.79

111.38 63
1300.00
162.50
13.00
78.00
1553.50

156.90

1300.00
162.50
13.00
78.00
1553.50

156.90

1470.00
183.75
14.70
88.20
1756.65

177.42

1470.00
183.75
14.70
88.20
1756.65

177.42
Lead Joint

SL Description of items Qnty Unit Rate in Amount


No. Rs in Rs.
1 2 3 4 5 6
1) Supplying all labour , T&P and making
the lead caulked joint with molten lead
to spun iron or cast iron pipes and
fittings of following nominal dia meter
including testing of joints but excluding
the cost of lead and gasket as per the
following specification, all complete as
per the P.H.specification and direction of
Engineer-in-charge.

a) 100mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 0.28 qntl Qntl 415.00 116.20
Kerosene Oil 0.38 ltrs Lits 30.00 11.40
127.60

ii) Labour Charge.


Plumber ( Fitter ) (S) 1 nos Each 190.00 190.00
Helper to Plumber 1 nos Each 170.00 170.00
Male Worker (Unskilled) 2 nos Each 150.00 300.00
660.00
O.H. charge @ 12.5 % on 660.00 82.50
Watering charges @ 1 % on 660.00 6.60
Sundries @ 8 % on 660.00 52.80
801.90
Rate for 10 nos joints
Cost for each joint 929.50 / 10 92.95
Add cost Pig Lead 2.20 kg kg 170.00 374.00
Gasket 0.18 kg kg 60.00 10.80
477.75
Add Labour Cess @ 1% 4.78
482.53
Say 482.50
b) 150mm dia C.I. (Data for 10 Joints)
Material
I) Fire wood 0.42 qntl Qntl 415.00 174.30
Kerosene Oil 0.76 ltrs Lits 30.00 22.80
197.10

ii) Labour Charge.


Plumber ( Fitter ) (S) 1.5 nos Each 190.00 285.00
Helper to Plumber 1.5 nos Each 170.00 255.00
Male Worker (Unskilled) 3 nos Each 150.00 450.00
990.00
O.H. charge @ 12.5 % on 990.00 123.75
Watering charges @ 1 % on 990.00 9.90
Sundries @ 8 % on 990.00 79.20
1202.85
Rate for 10 nos joints
Cost for each joint 1399.95 / 10 140.00
Add cost Pig Lead 3.40 kg kg 170.00 578.00
Gasket 0.23 kg kg 60.00 13.80
731.80
Add Labour Cess @ 1% 7.32
739.11
Say 739.10

c) 200mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 0.56 qntl Qntl 415.00 232.40
Kerosene Oil 0.76 ltrs Lits 30.00 22.80
255.20

ii) Labour Charge.


Plumber ( Fitter ) (S) 2 nos Each 190.00 380.00
Helper to Plumber 2 nos Each 170.00 340.00
Male Worker (Unskilled) 4 nos Each 150.00 600.00
1320.00
O.H. charge @ 12.5 % on 1320.00 165.00
Watering charges @ 1 % on 1320.00 13.20
Sundries @ 8 % on 1320.00 105.60
1603.80
Rate for 10 nos joints
Cost for each joint 1859.00 / 10 185.90
Add cost Pig Lead 5.00 kg kg 170.00 850.00
Gasket 0.30 kg kg 60.00 18.00
1053.90
Add Labour Cess @ 1% 10.54
1064.44

d) 250mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 0.65 qntl Qntl 415.00 269.75
Kerosene Oil 1.14 ltrs Lits 30.00 34.20
303.95

ii) Labour Charge.


Plumber ( Fitter ) (S) 2.5 nos Each 190.00 475.00
Helper to Plumber 2.5 nos Each 170.00 425.00
Male Worker (Unskilled) 5 nos Each 150.00 750.00
1650.00
O.H. charge @ 12.5 % on 1650.00 206.25
Watering charges @ 1 % on 1650.00 16.50
Sundries @ 8 % on 1650.00 132.00
2004.75
Rate for 10 nos joints
Cost for each joint 2308.70 / 10 230.87
Add cost Pig Lead 6.10 kg kg 170.00 1037.00
Gasket 0.35 kg kg 60.00 21.00
1288.87
Add Labour Cess @ 1% 12.89
1301.76
Say 1301.80

e) 300mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 0.75 qntl Qntl 415.00 311.25
Kerosene Oil 1.52 ltrs Lits 30.00 45.60
356.85

ii) Labour Charge.


Plumber ( Fitter ) (S) 3 nos Each 190.00 570.00
Helper to Plumber 3 nos Each 170.00 510.00
Male Worker (Unskilled) 6 nos Each 150.00 900.00
1980.00
O.H. charge @ 12.5 % on 1980.00 247.50
Watering charges @ 1 % on 1980.00 19.80
Sundries @ 8 % on 1980.00 158.40
2405.70
Rate for 10 nos joints
Cost for each joint 2762.55 / 10 276.26
Add cost Pig Lead 7.20 kg kg 170.00 1224.00
Gasket 0.48 kg kg 60.00 28.80
1529.06
Add Labour Cess @ 1% 15.29
1544.35

f) 350mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 0.93 qntl Qntl 415.00 385.95
Kerosene Oil 1.7 ltrs Lits 30.00 51.00
436.95

ii) Labour Charge.


Plumber ( Fitter ) (S) 3 nos Each 190.00 570.00
Helper to Plumber 3 nos Each 170.00 510.00
Male Worker (Unskilled) 6 nos Each 150.00 900.00
1980.00
O.H. charge @ 12.5 % on 1980.00 247.50
Watering charges @ 1 % on 1980.00 19.80
Sundries @ 8 % on 1980.00 158.40
2405.70
Rate for 10 nos joints
Cost for each joint 2842.65 / 10 284.27
Add cost Pig Lead 8.40 kg kg 170.00 1428.00
Gasket 0.60 kg kg 60.00 36.00
1748.27
Add Labour Cess @ 1% 17.48
1765.75

g) 400mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 1.12 qntl Qntl 415.00 464.80
Kerosene Oil 1.7 ltrs Lits 30.00 51.00
515.80

ii) Labour Charge.


Plumber ( Fitter ) (S) 4 nos Each 190.00 760.00
Helper to Plumber 4 nos Each 170.00 680.00
Male Worker (Unskilled) 8 nos Each 150.00 1200.00
2640.00
O.H. charge @ 12.5 % on 2640.00 330.00
Watering charges @ 1 % on 2640.00 26.40
Sundries @ 8 % on 2640.00 211.20
3207.60
Rate for 10 nos joints
Cost for each joint 3723.40 / 10 372.34
Add cost Pig Lead 9.50 kg kg 170.00 1615.00
Gasket 0.75 kg kg 60.00 45.00
2032.34
Add Labour Cess @ 1% 20.32
2052.66

h) 450mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 1.21 qntl Qntl 415.00 502.15
Kerosene Oil 2.27 ltrs Lits 30.00 68.10
570.25

ii) Labour Charge.


Plumber ( Fitter ) (S) 4.5 nos Each 190.00 855.00
Helper to Plumber 4.5 nos Each 170.00 765.00
Male Worker (Unskilled) 9 nos Each 150.00 1350.00
2970.00
O.H. charge @ 12.5 % on 2970.00 371.25
Watering charges @ 1 % on 2970.00 29.70
Sundries @ 8 % on 2970.00 237.60
3608.55
Rate for 10 nos joints
Cost for each joint 4178.80 / 10 417.88
Add cost Pig Lead 14.00 kg kg 170.00 2380.00
Gasket 0.95 kg kg 60.00 57.00
2854.88
Add Labour Cess @ 1% 28.55
2883.43
Say 2883.40

i) 500mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 1.31 qntl Qntl 415.00 543.65
Kerosene Oil 2.27 ltrs Lits 30.00 68.10
611.75

ii) Labour Charge.


Plumber ( Fitter ) (S) 4.75 nos Each 190.00 902.50
Helper to Plumber 4.75 nos Each 170.00 807.50
Male Worker (Unskilled) 9.5 nos Each 150.00 1425.00
3135.00
O.H. charge @ 12.5 % on 3135.00 391.88
Watering charges @ 1 % on 3135.00 31.35
Sundries @ 8 % on 3135.00 250.80
3809.03
Rate for 10 nos joints
Cost for each joint 4420.78 / 10 442.08
Add cost Pig Lead 15.00 kg kg 170.00 2550.00
Gasket 1.00 kg kg 60.00 60.00
3052.08
Add Labour Cess @ 1% 30.52
3082.60
Say 3082.60

J) 600mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 1.68 qntl Qntl 415.00 697.20
Kerosene Oil 2.84 ltrs Lits 30.00 85.20
782.40

ii) Labour Charge.


Plumber ( Fitter ) (S) 6.5 nos Each 190.00 1235.00
Helper to Plumber 6.5 nos Each 170.00 1105.00
Male Worker (Unskilled) 13 nos Each 150.00 1950.00
4290.00
O.H. charge @ 12.5 % on 4290.00 536.25
Watering charges @ 1 % on 4290.00 42.90
Sundries @ 8 % on 4290.00 343.20
5212.35
Rate for 10 nos joints
Cost for each joint 5994.75 / 10 599.48
Add cost Pig Lead kg kg 170.00 0.00
Gasket kg kg 60.00 0.00
599.48
Add Labour Cess @ 1% 5.99
605.47

K) 700mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 2.14 qntl Qntl 415.00 888.10
Kerosene Oil 3.41 ltrs Lits 30.00 102.30
990.40

ii) Labour Charge.


Plumber ( Fitter ) (S) 7.7 nos Each 190.00 1463.00
Helper to Plumber 7.7 nos Each 170.00 1309.00
Male Worker (Unskilled) 15.4 nos Each 150.00 2310.00
5082.00
O.H. charge @ 12.5 % on 5082.00 635.25
Watering charges @ 1 % on 5082.00 50.82
Sundries @ 8 % on 5082.00 406.56
6174.63
Rate for 10 nos joints
Cost for each joint 7165.03 / 10 716.50
Add cost Pig Lead kg kg 170.00 0.00
Gasket kg kg 60.00 0.00
716.50
Add Labour Cess @ 1% 7.17
723.67

L) 750mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 2.24 qntl Qntl 415.00 929.60
Kerosene Oil 3.41 ltrs Lits 30.00 102.30
1031.90

ii) Labour Charge.


Plumber ( Fitter ) (S) 8.1 nos Each 190.00 1539.00
Helper to Plumber 8.1 nos Each 170.00 1377.00
Male Worker (Unskilled) 16.2 nos Each 150.00 2430.00
5346.00
O.H. charge @ 12.5 % on 5346.00 668.25
Watering charges @ 1 % on 5346.00 53.46
Sundries @ 8 % on 5346.00 427.68
6495.39
Rate for 10 nos joints
Cost for each joint 7527.29 / 10 752.73
Add cost Pig Lead kg kg 170.00 0.00
Gasket kg kg 60.00 0.00
752.73
Add Labour Cess @ 1% 7.53
760.26

L) 800mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 2.33 qntl Qntl 415.00 966.95
Kerosene Oil 3.41 ltrs Lits 30.00 102.30
1069.25

ii) Labour Charge.


Plumber ( Fitter ) (S) 8.5 nos Each 190.00 1615.00
Helper to Plumber 8.5 nos Each 170.00 1445.00
Male Worker (Unskilled) 17 nos Each 150.00 2550.00
5610.00
O.H. charge @ 12.5 % on 5610.00 701.25
Watering charges @ 1 % on 5610.00 56.10
Sundries @ 8 % on 5610.00 448.80
6816.15
Rate for 10 nos joints
Cost for each joint 7885.40 / 10 788.54
Add cost Pig Lead kg kg 170.00 0.00
Gasket kg kg 60.00 0.00
788.54
Add Labour Cess @ 1% 7.89
796.43

L) 900mm dia C.I. (Data for 10 Joints)


Material
I) Fire wood 2.80 qntl Qntl 415.00 1162.00
Kerosene Oil 4.55 ltrs Lits 30.00 136.50
1298.50

ii) Labour Charge.


Plumber ( Fitter ) (S) 10 nos Each 190.00 1900.00
Helper to Plumber 10 nos Each 170.00 1700.00
Male Worker (Unskilled) 20 nos Each 150.00 3000.00
6600.00
O.H. charge @ 12.5 % on 6600.00 825.00
Watering charges @ 1 % on 6600.00 66.00
Sundries @ 8 % on 6600.00 528.00
8019.00
Rate for 10 nos joints
Cost for each joint 9317.50 / 10 931.75
Add cost Pig Lead kg kg 170.00 0.00
Gasket kg kg 60.00 0.00
931.75
Add Labour Cess @ 1% 9.32
941.07
Remarks

127.60

801.90
929.50
88 92.8295 93.8795

/Each

197.10
1202.85
1399.95

255.20

1603.80
1859.00

303.95
2004.75
2308.70

356.85

2405.70
2762.55

436.95
2405.70
2842.65

515.80

3207.60
3723.40
570.25

3608.55
4178.80

611.75

3809.03
4420.78
446.498
782.40

5212.35
5994.75

990.40
6174.63
7165.03

1031.90

6495.39
7527.29
1069.25

6816.15
7885.40

1298.50

8019.00
9317.50
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5.00 6.00
1 Supplying all materials, labour,T&P and
cutting M.S. pipe & welding two laying to
inner& outer including packet cutting & joint
and testing the joint leak proof etc all complete
as per the direction of Engineer-in-charge.

(Data for 1 Joint)


(i) Cutting of 450mm dia M.S.pipe 8mm thick 146.32 cm Per cm 7.00 1024.24

ii) Welding Two Layers to 450mm dia


M.S.pipe
Inside length 141.30 cm
Outside length 146.32 cm
Pocket welding 60.00 cm
347.62 cm Per cm 11.60 4032.39
5056.63
Add Labour Cess @ 1%
Remarks

7.00

5056.63
50.57
5107.20
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6
1 Fixing Ferrule of the following
nominal bore including drilling the
water main( cast iron pipes or pipes
with the metal strap) As per
specification complete
( excluding cost of ferrule)

10mm to 25mm bore


Labour for laying
a Plumber ( fitter) 0.25 nos Each 190.00 47.50
b Helper to plumber or Helper 0.50 nos Each 170.00 85.00
c Male worker (U/S)- 0.50 nos Each 150.00 75.00
207.50
d Add O.H.C.@ 12.5 % 207.50 25.94
e jointing materials etc @ 17 % on 207.50 35.28
f Watering charges @ 1% on 207.50 2.08
g sundries @ 8% on 207.50 16.60
287.39
ADD 15mm dia Brass Ferrule cock 1 no Each 350.00 350.00

Add Labour Cess 1%

2 Making connection of galvanized mild


steel distribution branch with
galvanized mild steel main 25mm to
40mm nominal bore by providing and
fixing tee including cutting and
threading the pipes completes( cost
of G.I. fitting to be measured and
paid Separately)

Detailed of cost laying of one


connection take 32mm dia
as an average size)

Labour Charges
a) Plumber ( Fitter) 0.33 nos Each 190.00 62.70
b) male worker (U/S)- 0.33 nos Each 150.00 49.50
112.20
c) Add O.H.C. @ 12.50 % on 112.20 14.03
d) Watering charges @ 1% on 112.20 1.12
e) sundries @ 8% on 112.20 8.98
136.32
Add Labour Cess 1% 1.36
137.69
3 Making connection of galvanized mild
steel distribution branch with
galvanized mild steel main 50mm to
80mm nominal bore by providing and
fixing tee including cutting and
threading the Pipes completes( cost
of G.I. fitting to be measured and
paid Separately)

Detailed of cost laying of one


connection take 65mm dia
as an average size)

Labour Charges
a) Plumber ( Fitter) 0.45 nos Each 190.00 85.50
b) male worker (U/S)- 0.45 nos Each 150.00 67.50
153.00
c) Add O.H.C. @ 12.50 % on 153.00 19.13
d) Watering charges @ 1% on 153.00 1.53
e) sundries @ 8% on 153.00 12.24
185.90
Add Labour Cess 1% 1.86
187.75

4 Supplying all labour, T&P and fixing


metal or PVC Fabricated Saddle
Pieces using suitable rubber O
rings , bolts and nuts etc, to PVC
Pipes of suitable diameter 80mm to
315mm as per specification complete.

80mm to 315mm dia


( DATA FOR ONE PIECE OF RUBBER O RING)
Labour Charges
a) Plumber/ fitter 0.25 nos Each 190.00 47.50
b) Helper to plumber or fitter 0.50 nos Each 170.00 85.00
132.50
c) Add O.H.C. @ 12.50 % on 132.50 16.56
d) Watering charges @ 1.00 % on 132.50 1.33
e) Sundries @ 7.00 % on 132.50 9.28
159.66
(i) Add 110mm dia Service Saddle 1 set Set 94.40 94.40
Add Labour Cess 1%

(ii) Cost of Labour Charges 159.66


Add cost 160mm dia Service saddle 1 no Each 179.30 179.30
338.96
Add Labour Cess 1% 3.39
342.35
Remarks

287.39
350.00
637.39
6.37
643.76
159.66
94.40
254.06
2.54
256.60
Sluice Valves Fixing
SL Description of items Qnty Unit Rate in Rs Amount
No. in Rs.
1 2 3 4 5 6
1 Supplying all labour, T & P Fixing the cast
Iron sluice valve with double flanged ends
for water works purposes for the following
rating and nominal diameters ( but
excluding the cost of cast Iron, sluice
valves, bolts, nuts, and rubber insertion )as
per specification, complete. as per the
direction of the Engineer -in charge.

(Data for 10 Joints)


100mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 100mm dia C.I.

a) D/F sluice valve =10 nos


@ 0.443/each = 4.43 qntl 4.43 Qntl Qntl 107.40 475.76
475.76
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.25 nos Each 190.00 47.50
Helper to plumber 0.25 nos Each 170.00 42.50
Male worker 1.00 nos Each 150.00 150.00
240.00
Add O.H. charges. @ 12.5 % on 240.00 30.00
Watering @ 1 % on 240.00 2.40
Sundries @ 7 % on 240.00 16.80
Rate for 10 nos 289.20
Rate for One no 289.20 / 10 28.92

b) Rate for 20 nos flanged joints 20 nos Each 28.92 578.40

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00


Nut Bolt 16mm x 60mm long 46 kg Kg 70.00 3220.00
3mm thick Rubber Insertion =20nos
= 0.05 sqm=1.00 Sqm
@7.00kg/sqm 7.00 kg Kg 115.00 805.00
. Rate for 10 nos Valves 4025.00

Rate for one no 5079.16 / 10 507.92


Add Labour Cess 1% 5.08
513.00 Say

(Data for 10 Joints)


150mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 150mm dia C.I.

a) D/F sluice valve =10 nos


= 7.13 qntl 7.13 Qntl Qntl 107.40 765.73
765.73
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.30 nos Each 190.00 57.00
Helper to plumber 0.30 nos Each 170.00 51.00
Male worker 1.10 nos Each 150.00 165.00
273.00
Add O.H. charges. @ 12.5 % on 273.00 34.13
Watering @ 1 % on 273.00 2.73
Sundries @ 7 % on 273.00 19.11
Rate for 10 nos 328.97
Rate for One no 328.97 / 10 32.90

b) Rate for 20 nos flanged joints 20 nos Each 32.90 657.93

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


Nut Bolt 20mm x 65mm long 74.28 kg Kg 70.00 5199.60
3mm thick Rubber Insertion =20nos
= 0.08 sqm =1.60 sqm
Sqm@7.00kg/sqm 11.20 kg Kg 115.00 1288.00
Rate for 10 nos Valves 6487.60

Rate for one no 7911.26 / 10 791.13


Add Labour Cess 1% 7.91
799.04
Say 799.00

(Data for 10 Joints)


200mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 200mm dia C.I.

a) D/F sluice valve =10 nos


= 12.15 qntl 12.15 Qntl Qntl 107.40 1304.86
1304.86
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.30 nos Each 190.00 57.00
Helper to plumber 0.30 nos Each 170.00 51.00
Male worker 1.10 nos Each 150.00 165.00
273.00
Add O.H. charges. @ 12.5 % on 273.00 34.13
Watering @ 1 % on 273.00 2.73
Sundries @ 7 % on 273.00 19.11
Rate for 10 nos 328.97
Rate for One no 328.97 / 10 32.90

b) Rate for 20 nos flanged joints 20 nos Each 32.90 657.93


Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00
Nut Bolt 20mm x 70mm long 76.00 kg Kg 70.00 5320.00
-160nos @ 0.4750kg /Each =76.00
Kg
3mm thick Rubber Insertion =20nos 16.24 kg Kg 115.00 1867.60
=0.116 sqm =2.32 sqm
@7.00kg/sqm =

Rate for 10 nos Valves 7187.60

Rate for one no 9150.39 / 10 915.04


Add Labour Cess 1% 9.15
924.19 Say

(Data for 10 Joints)


250mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 250mm dia C.I.

a) D/F sluice valve =10 nos


= 17.69 qntl 17.69 Qntl Qntl 107.40 1899.84
1899.84
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.40 nos Each 190.00 76.00
Helper to plumber 0.40 nos Each 170.00 68.00
Male worker 1.30 nos Each 150.00 195.00
339.00
Add O.H. charges. @ 12.5 % on 339.00 42.38
Watering @ 1 % on 339.00 3.39
Sundries @ 7 % on 339.00 23.73
Rate for 10 nos 408.50
Rate for One no 408.50 / 10 40.85

b) Rate for 20 nos flanged joints 20 nos Each 40.85 816.99

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


kg Kg 0.00 0.00
sqm sqm 0.00 0.00
Rate for 10 nos Valves 0.00

Rate for one no 2716.83 / 10 271.68


Add Labour Cess 1% 2.72
274.40

(Data for 10 Joints)


300mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40
Rate of laying of 300mm dia C.I.
a) D/F sluice valve =10 nos
= 24.24 qntl 24.24 Qntl Qntl 107.40 2603.28
2603.28
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.40 nos Each 190.00 76.00
Helper to plumber 0.40 nos Each 170.00 68.00
Male worker 1.30 nos Each 150.00 195.00
339.00
Add O.H. charges. @ 12.5 % on 339.00 42.38
Watering @ 1 % on 339.00 3.39
Sundries @ 7 % on 339.00 23.73
Rate for 10 nos 408.50
Rate for One no 408.50 / 10 40.85

b) Rate for 20 nos flanged joints 20 nos Each 40.85 816.99

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


kg Kg 0.00 0.00
sqm sqm 0.00 0.00
Rate for 10 nos Valves 0.00

Rate for one no 3420.27 / 10 342.03


Add Labour Cess 1% 3.42
345.45

(Data for 10 Joints)


350mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 350mm dia C.I.


a) D/F sluice valve =10 nos
= 32.58 qntl 32.58 Qntl Qntl 107.40 3498.97
3498.97
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.50 nos Each 190.00 95.00
Helper to plumber 0.50 nos Each 170.00 85.00
Male worker 1.50 nos Each 150.00 225.00
405.00
Add O.H. charges. @ 12.5 % on 405.00 50.63
Watering @ 1 % on 405.00 4.05
Sundries @ 7 % on 405.00 28.35
Rate for 10 nos 488.03
Rate for One no 488.03 / 10 48.80

b) Rate for 20 nos flanged joints 20 nos Each 48.80 976.05

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


kg Kg 0.00 0.00
sqm sqm 0.00 0.00
Rate for 10 nos Valves 0.00

Rate for one no 4475.02 / 10 447.50


Add Labour Cess 1% 4.48
451.98
(Data for 10 Joints)
400mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 400mm dia C.I.


a) D/F sluice valve =10 nos
= 42.12 qntl 42.12 Qntl Qntl 107.40 4523.53
4523.53
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.50 nos Each 190.00 95.00
Helper to plumber 0.50 nos Each 170.00 85.00
Male worker 1.50 nos Each 150.00 225.00
405.00
Add O.H. charges. @ 12.5 % on 405.00 50.63
Watering @ 1 % on 405.00 4.05
Sundries @ 7 % on 405.00 28.35
Rate for 10 nos 488.03
Rate for One no 488.03 / 10 48.80

b) Rate for 20 nos flanged joints 20 nos Each 48.80 976.05

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


kg Kg 0.00 0.00
sqm sqm 0.00 0.00
Rate for 10 nos Valves 0.00

Rate for one no 5499.58 / 10 549.96


Add Labour Cess 1% 5.50
555.46
(Data for 10 Joints)
450mm dia C.I.
Data for laying 7.40 QH C.I. specials
vide A/R- 2.2.14
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8% on 654.10 52.33
794.73
For 7.40 Qntl
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of 450mm dia C.I.


a) D/F sluice valve =10 nos
= 42.12 qntl Qntl Qntl 107.40 0.00
0.00
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S) 0.50 nos Each 190.00 95.00
Helper to plumber 0.50 nos Each 170.00 85.00
Male worker 1.50 nos Each 150.00 225.00
405.00
Add O.H. charges. @ 12.5 % on 405.00 50.63
Watering @ 1 % on 405.00 4.05
Sundries @ 7 % on 405.00 28.35
Rate for 10 nos 488.03
Rate for One no 488.03 / 10 48.80

b) Rate for 20 nos flanged joints 20 nos Each 48.80 976.05

Add cost sluice valve (P.N.1.0) 10 nos Each 0.00 0.00


kg Kg 0.00 0.00
sqm sqm 0.00 0.00
Rate for 10 nos Valves 0.00

Rate for one no 976.05 / 10 97.61


Add Labour Cess 1% 0.98
98.58
Remarks

475.76

578.40
1054.16
4025.00
5079.16

513.00

120.8
765.73

657.93
1423.66

11.2

1.6 11.2
6487.60
7911.26

241.22

1304.86

657.93
1962.79 746.83
74.6829
76

2.32

7187.60 16.24
9150.39 0.812

924.20 313.87

1899.84
816.99
2716.83 1500.86
150.086

0.00
2716.83

-335.92
2603.28

816.99
3420.27 2204.31
220.431

0.00
3420.27

-264.87
3498.97

976.05
4475.02 3259.05
325.905

0.00
4475.02

-158.34
4523.53

976.05
5499.58 4283.61
428.361

0.00
5499.58

-54.86
0.00

976.05
976.05 -239.91
-23.991

0.00
976.05
-511.74
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 Providing flanged joints (Full-faced
flanges) for jointing PVC pipes and other
conventional pipes and fittings of the
following nominal diameters including
testing of the joints & cost of nut bolt and
rubber insertion as per specification
complete & direction of Engineer-in-
charge.

A) 80mm dia (Range-75mm to90mm)


(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.15 nos Each 190.00 28.50
b) Helper to Plumber or fitter 0.15 nos Each 170.00 25.50
c) Male worker(un-skilled) 0.80 nos Each 150.00 120.00
174.00
d) O.H.C @ 12.50 % on 174.00 21.75
e) Watering charges @ 1% on 174.00 1.74
Sundries including Tool & Plant @ 7% on 174.00 12.18
209.67
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm 2.80 Kg Kg 115.00 322.00
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 40nos = 11.50 Kg 11.50 Kg Kg 66.00 759.00
1081.00
For 10 nos joints
For 1 joint 1290.67 / 10 129.07
Add Labour cess 1% 1.29
130.36
Say 130.40

b) 100mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.25 nos Each 190.00 47.50
b) Helper to Plumber or fitter 0.25 nos Each 170.00 42.50
c) Male worker(un-skilled) 1.00 nos Each 150.00 150.00
240.00
d) O.H.C @ 12.50 % on 240.00 30.00
e) Watering charges @ 1% on 240.00 2.40
Sundries including Tool & Plant @ 7% on 240.00 16.80
289.20
Materials
Rubber Insertion 3mm thick x 10nos
0.05 sqm/e =0.50 sqm @ 7.00 kg/sqm 3.50 Kg Kg 115.00 402.50
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 80nos = 23.00 Kg 23.00 Kg Kg 66.00 1518.00
1920.50
For 10 nos joints
For 1 joint 2209.70 / 10 220.97
Add Labour cess 1% 2.21
223.18
Say 223.20

c) 150mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm 5.60 Kg Kg 115.00 644.00
20mm x 65mm long nut bolt @ 0.4643 kg
Per each = 80nos = 37.14 Kg 37.14 Kg Kg 66.00 2451.24
3095.24
For 10 nos joints
For 1 joint 3424.21 / 10 342.42
Add Labour cess 1% 3.42
345.84
Say 345.80

d) 200mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm 8.12 Kg Kg 115.00 933.80
20mm x 70mm long nut bolt @ 0.4750 kg
Per each = 80nos = 38.00 Kg 38.00 Kg Kg 66.00 2508.00
3441.80
For 10 nos joints
For 1 joint 3770.77 / 10 377.08
Add Labour cess 1% 3.77
380.85
Say 380.80

d) 250mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm 10.92 Kg Kg 115.00 1255.80
20mm x75mm long nut bolt @ 0.4892 kg
Per each = 80nos = 38.00 Kg 39.14 Kg Kg 66.00 2583.24
3839.04
For 10 nos joints
For 1 joint 4247.54 / 10 424.75
Add Labour cess 1% 4.25
429.00
Say 429.00

d) 300mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm 14.00 Kg Kg 115.00 1610.00
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 120nos = 58.70 Kg 58.70 Kg Kg 66.00 3874.20
5484.20
For 10 nos joints
For 1 joint 5892.70 / 10 589.27
Add Labour cess 1% 5.89
595.16
Say 595.20

1 Providing flanged joints (Stub flanges) for


jointing PVC pipes and other fittings of
the following nominal diameters
including testing of the joints & cost of
nut bolt and rubber insertion & labour
cess as per specification complete &
direction of Engineer-in-charge.

A) 75mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.15 nos Each 190.00 28.50
b) Helper to Plumber or fitter 0.15 nos Each 170.00 25.50
c) Male worker(un-skilled) 0.80 nos Each 150.00 120.00
174.00
d) O.H.C @ 12.50 % on 174.00 21.75
e) Watering charges @ 1% on 174.00 1.74
Sundries including Tool & Plant @ 7% on 174.00 12.18
209.67
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm 2.80 Kg Kg 115.00 322.00
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 40nos = 11.50 Kg 11.50 Kg Kg 66.00 759.00
1081.00
For 10 nos joints
For 1 joint 1290.67 / 10 129.07
Add Labour cess 1% 1.29
130.36
Say 130.40

b) 90mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.15 nos Each 190.00 28.50
b) Helper to Plumber or fitter 0.15 nos Each 170.00 25.50
c) Male worker(un-skilled) 0.80 nos Each 150.00 120.00
174.00
d) O.H.C @ 12.50 % on 174.00 21.75
e) Watering charges @ 1% on 174.00 1.74
Sundries including Tool & Plant @ 7% on 174.00 12.18
209.67
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm 2.80 Kg Kg 115.00 322.00
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 40nos = 11.50 Kg 11.50 Kg Kg 66.00 759.00
1081.00
For 10 nos joints
For 1 joint 1290.67 / 10 129.07
Add Labour cess 1% 1.29
130.36
Say 130.40

C) 110mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.25 nos Each 190.00 47.50
b) Helper to Plumber or fitter 0.25 nos Each 170.00 42.50
c) Male worker(un-skilled) 1.00 nos Each 150.00 150.00
240.00
d) O.H.C @ 12.50 % on 240.00 30.00
e) Watering charges @ 1% on 240.00 2.40
Sundries including Tool & Plant @ 7% on 240.00 16.80
289.20
Materials
Rubber Insertion 3mm thick x 10nos
(0.050 sqm /E = 0.50 sqm@ 7.00 kg/sqm 3.50 Kg Kg 115.00 402.50
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 80nos = 23.00Kg 23.00 Kg Kg 66.00 1518.00
1920.50
For 10 nos joints
For 1 joint 2209.70 / 10 220.97
Add Labour cess 1% 2.21
223.18
Say 223.20

c) 160mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm 5.60 Kg Kg 115.00 644.00
20mm x 65mm long nut bolt @ 0.4643 kg
Per each = 80nos = 37.14 Kg 37.14 Kg Kg 66.00 2451.24
3095.24
For 10 nos joints
For 1 joint 3424.21 / 10 342.42
Add Labour cess 1% 3.42
345.84
Say 345.80

d) 200mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm 8.12 Kg Kg 115.00 933.80
20mm x 70mm long nut bolt @ 0.4750 kg
Per each = 80nos = 38.00 Kg 38.00 Kg Kg 66.00 2508.00
3441.80
For 10 nos joints
For 1 joint 3770.77 / 10 377.08
Add Labour cess 1% 3.77
380.85
Say 380.80

d) 250mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm 10.92 Kg Kg 115.00 1255.80
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 80nos = 38.00 Kg 39.14 Kg Kg 66.00 2583.24
3839.04
For 10 nos joints
For 1 joint 4247.54 / 10 424.75
Add Labour cess 1% 4.25
429.00
Say 429.00

d) 315mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm 14.00 Kg Kg 115.00 1610.00
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 120nos = 58.70 Kg 58.70 Kg Kg 66.00 3874.20
5484.20
For 10 nos joints
For 1 joint 5892.70 / 10 589.27
Add Labour cess 1% 5.89
595.16
Say 595.20
Remarks

209.67

0.4
2.8

1081.00
1290.67

/Each
Joint

289.20

0.5
3.5
1920.50
2209.70

/Each
Joint

328.97

0.8
5.6

3095.24
3424.21

/Each
Joint

328.97

1.16
8.12

3441.80 38
3770.77

/Each
Joint

408.50

1.16
10.92

3839.04 39.136
4247.54

/Each
Joint
408.50

1.16
14

5484.20 58.704
5892.70

/Each
Joint

209.67

0.4
2.8

1081.00
1290.67

/Each
Joint

209.67

0.4
2.8

1081.00
1290.67

/Each
Joint

289.20

0.4
2.8

1920.50
2209.70

/Each
Joint

328.97

0.8
5.6

3095.24
3424.21

/Each
Joint
328.97

1.16
8.12

3441.80 38
3770.77

/Each
Joint

408.50

1.16
10.92

3839.04 39.136
4247.54

/Each
Joint
408.50

1.16
14

5484.20 58.704
5892.70

/Each
Joint
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5.00 6.00
1 Supplying all labour, T&P and fixing
Single Air valves for Water Works
purposes for the following
dismeter,including drilling the water
main (Cast Iron or pipe with metal
straps) But excluding cost of Air Valve
and metal straps as per specification
complete and direction of Engineer-in-
charge.

Ref:- A/R-1999 P-No.296 Sl No.2.6.4

(A) SINGLE AIR VALVES


(I) 15mm to 25mm diameter.
Data for one Air Valve.
Labour for drilling and fixing the Air
Valve.
(a) Plumber (Fitter) (S) 0.25 nos Each 190.00 47.50
(b) Helper to Plumber or Fitter 0.50 nos Each 170.00 85.00
c) Male Worker(Unskilled) 0.50 nos Each 150.00 75.00
207.50
d) O.H. Charges @ 12.5 % on 207.50 25.94
e) Jointing materials etc @ 17 % on 207.50 35.28
f) Water Charges @ 1 % on 207.50 2.08
g) Sundries @ 8 % on 207.50 16.60
Cost of One No 287.39
Add Labour Cess 1% 2.87
290.26

2 Supplying all labour, T&P and Fixing


Double Air Valve for Water Works
Purposes of the following diameter (But
Excluding cost of Double Air
Valve,Rubber insertion,Bolts and nus)
as per specification ,complete and
direction of Engineer-in-charge.

(A) DOUBLE AIR VALVES


Up to 80mm dia
a) Labour Charges for fixing
Labour
Pl. Fitter (S) 0.93 nos Each 190.00 176.70
Helper to plumber 0.62 nos Each 170.00 105.40
Male worker 2.48 nos Each 150.00 372.00
654.10
Add O.H. charges. @ 12.5 % on 654.10 81.76
Watering @ 1% on 654.10 6.54
Sundries @ 8 % on 654.10 52.33
Rate for 7.40 Qntl 794.73
Rate for 1 Qntl 794.73 / 7.40 107.40

Rate of laying of C.I. D/F Air valve


=10 nos =0.713 qntl 0.713 Qntl Qntl 107.40 76.57

Data for flange jointing vide A/R 0 2-2-


30
Remarks

7.00