Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
70.00
415.00
Earth work portion
e) Add foundation@ 20 %
e) Add foundation@ 20 %
e) Add foundation@ 20 %
Say
4800.00
360.00
360.00
5520.00 5520.00
1104.00
6624.00
66.24
6690.24
Say 6690.20
6450.00
483.75
483.75
7417.50 7417.50
1483.50
8901.00
89.01
8990.01
Say 8990.00
Amount in Remarks
Rs.
5 6
10059.00
754.43
754.43
11567.85 11567.85
2313.57
13881.42 13881.42
138.81 707.25
14020.23 14588.67
Say 14020.20 145.8867
14734.56
6600.00
495.00
495.00
7590.00 7590.00
1518.00
9108.00
91.08
9199.08
Amount in Remarks
Rs.
5 6
Say 9199.10
9628.61
96.29
9724.89 /100cum
16350.00
1226.25
1226.25
18802.50 18802.50
3760.50
22563.00
Amount in Remarks
Rs.
5 6
225.63
22788.63
Say 22788.60
205.00
300.00
380.00
340.00
1225.00
80.60
1305.60 1305.60
97.92
97.92
1501.44
530.54
5.31
535.85
535.80 /Cum
852.00
852.00 852.00
63.90
63.90
979.80
% 9.80
989.60
Say 989.60 /cum
Amount in Remarks
Rs.
5 6
561.00
561.00 561.00
42.08
42.08
645.15
% 6.45
651.60 /cum
95.00
95.00 95.00
7.13
7.13
109.25
Cess 1.09
110.34 /Sqm
Say 110.30 /Sqm
4416.00
44.16
4460.16 4460.20 /100cum
Amount in Remarks
Rs.
5 6
4945.00
49.45
4994.45 4994.45 /100cum
7711.90
77.12
7789.02 7789.00 /100cum
5060.00
50.60
5110.60 5110.60 /100cum
5533.23
55.33
5588.56
5588.60 /100cum
615.00
615.00 615.00
46.13
46.13
Amount in Remarks
Rs.
5 6
707.25 10335.86
7.07 103.35855
714.32 10439.21
Say 714.30
100cum 10185.52
10287.378
Sand filling
a) Materials
Sand ffor filling 100 cum cum 42.00 4200.00
4200.00
a) Labour charges
i) Man Mulia (Unskilled) 12.36 nos Each 150.00 1854.00
1854.00
Say
Crusher Dust filling
a) Labour charges
i) Man Mulia (Unskilled) 12.36 nos Each 150.00 1854.00
1854.00
O.H.C. @ 7.50 %
Add Contractor Profit@ 7.50 %
Cost of 100 cum
Cost for 1 cum = 2132.10 / 100 cum
(B) Material Cost & carriage & Royalty
Cost of Granite stone screening (Passing
through 2.36mm sieve & retained on 180
micron sieve)(one cum)
C) Lead & Royalty of Granite stone
Total (A+B+C)
Add 1 % Labour Cess
Say
Remarks
6.00
4200.00
1854.00
6054.00
454.05
454.05
6962.10
69.62 69.62
356.00
425.62
4.26
429.88 42.98772
429.90
Remarks
6.00
1854.00
139.05
139.05
2132.10
21.32 21.32
578.00
260.70
32.59
2.61
20.86
316.75
/Qntl
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
/ Mtr
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6
mtr
mtr
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6
mtr
mtr
mtr
mtr
mtr
mtr
mtr
mtr
mtr
mtr
mtr
Laying of UPVC (CLASS-II) pipe
Add cost of Class-II pipe (110mm ) 1.00 mtr Mtr 121.75 121.75
Add cost of labour 1.00 mtr Mtr 51.31
173.06
Add Labour Cess 1% 1.73
174.79
51.31
Add Labour Cess 1% 0.51
51.83 51.80
270.76
2.71
273.47
a) 160mm O.D.UPVC pipe
(DATA FOR 10 MTR)
Labour of laying
a) Plumber (Fitter) (S) 0.25 nos Each 190.00 47.50
b) Male worker (Unskilled) 0.5 nos Each 150.00 75.00
Labour for jointing & Testing
c) Plumber (Fitter) (S) 0.46 nos Each 190.00 87.40
d) Helper to plumber or fitter 1.92 nos Each 170.00 326.40
e) Male worker (Unskilled) 0.25 nos Each 150.00 37.50
573.80
O.H.C. 12.50 % 71.73
645.53 645.53
Jointing materials
g) Cost of solvent cement =30 grammes or 0.133 kg Per kg 200.00 26.60
0.03 kg.
h) Watering Charges 1% 5.74
i) Sundries 8% 45.90
78.24 78.24
Data for 10 Mtr 723.77
For 1.00 mtr 723.77 / 10 72.38
Add Carriage of PVC pipe from Store to 1.00 mtr 3.70
Work site within 5 km
76.08
Add Labour Cess 1% 0.76
76.84
Say 76.80 / Mtr
51.31
Add Labour Cess 1% 0.51
51.83 51.80
104.36
Add Labour Cess @ 1% 1.04
105.41
7.00
521.67
65.21
5.22
31.30
623.39
Labour Ch 0.63
63.63
108.40
729.17
91.15
7.29
43.75
871.35
/Each
143.60
873.33
109.17
8.73
52.40
1043.63
105.40
873.33
109.17
8.73
52.40
1043.63
105.41
922.83
115.35
9.23
55.37
1102.79
111.38 63
1300.00
162.50
13.00
78.00
1553.50
156.90
1300.00
162.50
13.00
78.00
1553.50
156.90
1470.00
183.75
14.70
88.20
1756.65
177.42
1470.00
183.75
14.70
88.20
1756.65
177.42
Lead Joint
127.60
801.90
929.50
88 92.8295 93.8795
/Each
197.10
1202.85
1399.95
255.20
1603.80
1859.00
303.95
2004.75
2308.70
356.85
2405.70
2762.55
436.95
2405.70
2842.65
515.80
3207.60
3723.40
570.25
3608.55
4178.80
611.75
3809.03
4420.78
446.498
782.40
5212.35
5994.75
990.40
6174.63
7165.03
1031.90
6495.39
7527.29
1069.25
6816.15
7885.40
1298.50
8019.00
9317.50
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5.00 6.00
1 Supplying all materials, labour,T&P and
cutting M.S. pipe & welding two laying to
inner& outer including packet cutting & joint
and testing the joint leak proof etc all complete
as per the direction of Engineer-in-charge.
7.00
5056.63
50.57
5107.20
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5 6
1 Fixing Ferrule of the following
nominal bore including drilling the
water main( cast iron pipes or pipes
with the metal strap) As per
specification complete
( excluding cost of ferrule)
Labour Charges
a) Plumber ( Fitter) 0.33 nos Each 190.00 62.70
b) male worker (U/S)- 0.33 nos Each 150.00 49.50
112.20
c) Add O.H.C. @ 12.50 % on 112.20 14.03
d) Watering charges @ 1% on 112.20 1.12
e) sundries @ 8% on 112.20 8.98
136.32
Add Labour Cess 1% 1.36
137.69
3 Making connection of galvanized mild
steel distribution branch with
galvanized mild steel main 50mm to
80mm nominal bore by providing and
fixing tee including cutting and
threading the Pipes completes( cost
of G.I. fitting to be measured and
paid Separately)
Labour Charges
a) Plumber ( Fitter) 0.45 nos Each 190.00 85.50
b) male worker (U/S)- 0.45 nos Each 150.00 67.50
153.00
c) Add O.H.C. @ 12.50 % on 153.00 19.13
d) Watering charges @ 1% on 153.00 1.53
e) sundries @ 8% on 153.00 12.24
185.90
Add Labour Cess 1% 1.86
187.75
287.39
350.00
637.39
6.37
643.76
159.66
94.40
254.06
2.54
256.60
Sluice Valves Fixing
SL Description of items Qnty Unit Rate in Rs Amount
No. in Rs.
1 2 3 4 5 6
1 Supplying all labour, T & P Fixing the cast
Iron sluice valve with double flanged ends
for water works purposes for the following
rating and nominal diameters ( but
excluding the cost of cast Iron, sluice
valves, bolts, nuts, and rubber insertion )as
per specification, complete. as per the
direction of the Engineer -in charge.
475.76
578.40
1054.16
4025.00
5079.16
513.00
120.8
765.73
657.93
1423.66
11.2
1.6 11.2
6487.60
7911.26
241.22
1304.86
657.93
1962.79 746.83
74.6829
76
2.32
7187.60 16.24
9150.39 0.812
924.20 313.87
1899.84
816.99
2716.83 1500.86
150.086
0.00
2716.83
-335.92
2603.28
816.99
3420.27 2204.31
220.431
0.00
3420.27
-264.87
3498.97
976.05
4475.02 3259.05
325.905
0.00
4475.02
-158.34
4523.53
976.05
5499.58 4283.61
428.361
0.00
5499.58
-54.86
0.00
976.05
976.05 -239.91
-23.991
0.00
976.05
-511.74
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 Providing flanged joints (Full-faced
flanges) for jointing PVC pipes and other
conventional pipes and fittings of the
following nominal diameters including
testing of the joints & cost of nut bolt and
rubber insertion as per specification
complete & direction of Engineer-in-
charge.
b) 100mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.25 nos Each 190.00 47.50
b) Helper to Plumber or fitter 0.25 nos Each 170.00 42.50
c) Male worker(un-skilled) 1.00 nos Each 150.00 150.00
240.00
d) O.H.C @ 12.50 % on 240.00 30.00
e) Watering charges @ 1% on 240.00 2.40
Sundries including Tool & Plant @ 7% on 240.00 16.80
289.20
Materials
Rubber Insertion 3mm thick x 10nos
0.05 sqm/e =0.50 sqm @ 7.00 kg/sqm 3.50 Kg Kg 115.00 402.50
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 80nos = 23.00 Kg 23.00 Kg Kg 66.00 1518.00
1920.50
For 10 nos joints
For 1 joint 2209.70 / 10 220.97
Add Labour cess 1% 2.21
223.18
Say 223.20
c) 150mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm 5.60 Kg Kg 115.00 644.00
20mm x 65mm long nut bolt @ 0.4643 kg
Per each = 80nos = 37.14 Kg 37.14 Kg Kg 66.00 2451.24
3095.24
For 10 nos joints
For 1 joint 3424.21 / 10 342.42
Add Labour cess 1% 3.42
345.84
Say 345.80
d) 200mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm 8.12 Kg Kg 115.00 933.80
20mm x 70mm long nut bolt @ 0.4750 kg
Per each = 80nos = 38.00 Kg 38.00 Kg Kg 66.00 2508.00
3441.80
For 10 nos joints
For 1 joint 3770.77 / 10 377.08
Add Labour cess 1% 3.77
380.85
Say 380.80
d) 250mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm 10.92 Kg Kg 115.00 1255.80
20mm x75mm long nut bolt @ 0.4892 kg
Per each = 80nos = 38.00 Kg 39.14 Kg Kg 66.00 2583.24
3839.04
For 10 nos joints
For 1 joint 4247.54 / 10 424.75
Add Labour cess 1% 4.25
429.00
Say 429.00
d) 300mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm 14.00 Kg Kg 115.00 1610.00
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 120nos = 58.70 Kg 58.70 Kg Kg 66.00 3874.20
5484.20
For 10 nos joints
For 1 joint 5892.70 / 10 589.27
Add Labour cess 1% 5.89
595.16
Say 595.20
A) 75mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.15 nos Each 190.00 28.50
b) Helper to Plumber or fitter 0.15 nos Each 170.00 25.50
c) Male worker(un-skilled) 0.80 nos Each 150.00 120.00
174.00
d) O.H.C @ 12.50 % on 174.00 21.75
e) Watering charges @ 1% on 174.00 1.74
Sundries including Tool & Plant @ 7% on 174.00 12.18
209.67
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm 2.80 Kg Kg 115.00 322.00
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 40nos = 11.50 Kg 11.50 Kg Kg 66.00 759.00
1081.00
For 10 nos joints
For 1 joint 1290.67 / 10 129.07
Add Labour cess 1% 1.29
130.36
Say 130.40
b) 90mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.15 nos Each 190.00 28.50
b) Helper to Plumber or fitter 0.15 nos Each 170.00 25.50
c) Male worker(un-skilled) 0.80 nos Each 150.00 120.00
174.00
d) O.H.C @ 12.50 % on 174.00 21.75
e) Watering charges @ 1% on 174.00 1.74
Sundries including Tool & Plant @ 7% on 174.00 12.18
209.67
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm 2.80 Kg Kg 115.00 322.00
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 40nos = 11.50 Kg 11.50 Kg Kg 66.00 759.00
1081.00
For 10 nos joints
For 1 joint 1290.67 / 10 129.07
Add Labour cess 1% 1.29
130.36
Say 130.40
C) 110mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.25 nos Each 190.00 47.50
b) Helper to Plumber or fitter 0.25 nos Each 170.00 42.50
c) Male worker(un-skilled) 1.00 nos Each 150.00 150.00
240.00
d) O.H.C @ 12.50 % on 240.00 30.00
e) Watering charges @ 1% on 240.00 2.40
Sundries including Tool & Plant @ 7% on 240.00 16.80
289.20
Materials
Rubber Insertion 3mm thick x 10nos
(0.050 sqm /E = 0.50 sqm@ 7.00 kg/sqm 3.50 Kg Kg 115.00 402.50
16mm x 60mm long nut bolt @ 0.2874 kg
Per each = 80nos = 23.00Kg 23.00 Kg Kg 66.00 1518.00
1920.50
For 10 nos joints
For 1 joint 2209.70 / 10 220.97
Add Labour cess 1% 2.21
223.18
Say 223.20
c) 160mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm 5.60 Kg Kg 115.00 644.00
20mm x 65mm long nut bolt @ 0.4643 kg
Per each = 80nos = 37.14 Kg 37.14 Kg Kg 66.00 2451.24
3095.24
For 10 nos joints
For 1 joint 3424.21 / 10 342.42
Add Labour cess 1% 3.42
345.84
Say 345.80
d) 200mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.30 nos Each 190.00 57.00
b) Helper to Plumber or fitter 0.30 nos Each 170.00 51.00
c) Male worker(un-skilled) 1.10 nos Each 150.00 165.00
273.00
d) O.H.C @ 12.50 % on 273.00 34.13
e) Watering charges @ 1% on 273.00 2.73
Sundries including Tool & Plant @ 7% on 273.00 19.11
328.97
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm 8.12 Kg Kg 115.00 933.80
20mm x 70mm long nut bolt @ 0.4750 kg
Per each = 80nos = 38.00 Kg 38.00 Kg Kg 66.00 2508.00
3441.80
For 10 nos joints
For 1 joint 3770.77 / 10 377.08
Add Labour cess 1% 3.77
380.85
Say 380.80
d) 250mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm 10.92 Kg Kg 115.00 1255.80
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 80nos = 38.00 Kg 39.14 Kg Kg 66.00 2583.24
3839.04
For 10 nos joints
For 1 joint 4247.54 / 10 424.75
Add Labour cess 1% 4.25
429.00
Say 429.00
d) 315mm dia
(Data for 10 joints)
Labour charges
a) Plumber (Fitter) 0.40 nos Each 190.00 76.00
b) Helper to Plumber or fitter 0.40 nos Each 170.00 68.00
c) Male worker(un-skilled) 1.30 nos Each 150.00 195.00
339.00
d) O.H.C @ 12.50 % on 339.00 42.38
e) Watering charges @ 1% on 339.00 3.39
Sundries including Tool & Plant @ 7% on 339.00 23.73
408.50
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm 14.00 Kg Kg 115.00 1610.00
20mm x 75mm long nut bolt @ 0.4892 kg
Per each = 120nos = 58.70 Kg 58.70 Kg Kg 66.00 3874.20
5484.20
For 10 nos joints
For 1 joint 5892.70 / 10 589.27
Add Labour cess 1% 5.89
595.16
Say 595.20
Remarks
209.67
0.4
2.8
1081.00
1290.67
/Each
Joint
289.20
0.5
3.5
1920.50
2209.70
/Each
Joint
328.97
0.8
5.6
3095.24
3424.21
/Each
Joint
328.97
1.16
8.12
3441.80 38
3770.77
/Each
Joint
408.50
1.16
10.92
3839.04 39.136
4247.54
/Each
Joint
408.50
1.16
14
5484.20 58.704
5892.70
/Each
Joint
209.67
0.4
2.8
1081.00
1290.67
/Each
Joint
209.67
0.4
2.8
1081.00
1290.67
/Each
Joint
289.20
0.4
2.8
1920.50
2209.70
/Each
Joint
328.97
0.8
5.6
3095.24
3424.21
/Each
Joint
328.97
1.16
8.12
3441.80 38
3770.77
/Each
Joint
408.50
1.16
10.92
3839.04 39.136
4247.54
/Each
Joint
408.50
1.16
14
5484.20 58.704
5892.70
/Each
Joint
SL Description of items Qnty Unit Rate in Amount
No. Rs in Rs.
1 2 3 4 5.00 6.00
1 Supplying all labour, T&P and fixing
Single Air valves for Water Works
purposes for the following
dismeter,including drilling the water
main (Cast Iron or pipe with metal
straps) But excluding cost of Air Valve
and metal straps as per specification
complete and direction of Engineer-in-
charge.
7.00