OSHIMANOKI MYANMAR CO.,LTD.

NEW FACTORY
SCHEMATIC DESIGN )
14 JULY 2017
ARCHITECTURIAL
MACHANICAL
00 DRAWING LIST ME-01 M&E SCOPE OF WORK-1

P-01 PERSPECTIVE - 1 ME-02 M&E SCOPE OF WORK-2

P-02 PERSPECTIVE - 2 ME-03 M&E SCOPE OF WORK-3

P-03 PERSPECTIVE - 3 ME-04 ELECTRICAL OUTLINE CONDITION (1)

A-01 GENERAL & BUILDING SCOPE OF WORKS ME-05 ELECTRICAL OUTLINE CONDITION (2)

A-02 EXTERIOR FINISHING SCHEDULE-1 ME-06 ELECTRICAL ROOM CONDITION

A-03 EXTERIOR FINISHING SCHEDULE-2 ME-07 MECHANICAL SYSTEM OUTLINE

A-04 INTERIOR FINISHING SCHEDULE-1


M-01 EQUIPMENT LIST-01
A-05 SITE PLAN
M-02 EQUIPMENT LIST-02
A-06 ENLARGE OFFICE PLAN
M-03 PLUMBING SYSTEM SCHEMATIC DIAGRAM
A-07 ROOF PLAN
M-04 VENTILATION SYSTEM SCHEMATIC DIAGRAM
A-08 SECTION A, B
M-05 AIR CONDITION PIPING SYSTEM SCHEMATIC DIAGRAM
A-09 SECTION C
M-06 COMPRESSED AIR, LPG, STEAM SYSTEM SCHEMATIC DIAGRAM
A-10 ELEVATION 1, 2
M-07 PLUMBING SYSTEM SITE PLAN
A-11 ELEVATION 3, 4
M-08 UTILITY SYSTEM (COMPRESSED AIR, LPG, STEAM) SITE PLAN
A-12 DOOR & WINDOW SCHEDULE-1
M-09 VENTILATION SYSTEM SITE PLAN
A-13 DOOR & WINDOW SCHEDULE-2
M-10 VENTILATION SYSTEM OFFICE PLAN
A-14 GUARD HOUSE & BIKE PARK
M-11 AIR CONDITION PIPING SYSTEM OFFICE PLAN
A-15 CIVIL, EXTERNAL WORK & LANDSCAPE PLAN

ELECTICAL
STRUCTURE
E-01 SINGLE LINE DIAGRAM
S-01 STRUCTURAL DESIGN CONDITION
E-02 LAYOUT OF PANEL & MAIN FEEDER

E-03 LAYOUT OF LIGHTING SYSTEM (FACTORY)

E-04 LAYOUT OF LIGHTING SYSTEM (OFFICE)

E-05 LAYOUT OF EMERGENCY & EXIT LIGHT

E-06 LAYOUT OF RECEPTACLE (FACTORY & OFFICE)

E-07 SCHEMATIC DIAGRAM FOR TELEPHONE, LAN & MATV

E-08 SCHEMATIC DIAGRAM FOR FIRE ALARM & PUBLIC ADDRESS SYSTEM

E-09 LAYOUT OF TELEPHONE, LAN & MATV OUTLET (FACTORY & OFFICE)

E-10 LAYOUT OF PUBLIC ADDRESS SYSTEM

E-11 LAYOUT OF FIRE ALARM SYSTEM

DRAWING LIST
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY 00
PERSPECTIVE - 1
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-01
PERSPECTIVE - 2
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-02
PERSPECTIVE - 3
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-03

/ Description /Works Works / Remarks / Description /Works Works / Remarks


Included Excluded
Included Excluded
5) /BUILDING WORKS
1) / DESIGN SERVICE

B. / Building Works
A. / Schematic Design

B. / Building Permit Drawings / Piling


a)
C. / Working Drawings Works
b) / Sub Structure Works
D. / Perspective Drawings
/ Super Structure
c)
E. / Scale Models Works
d) / Finishing Works
F. / As-Built Drawings / Company Sign on External
e) 2 nos.
Wall
G. / As-Built Photos
f) / Fire Proof for Steel Structure Not required by law.

g) /
2) / SURVEY AND SITE RELATED WORKS Foundations for Bldg. Services

Equipment

A. / Site Survey

B. ) / Soil Investigation C. / Furniture, Fitting and Equipment

C. / Land Reclamation / Built in


a)
Furniture
D. / Grading
b) / Loose Furniture
/ Removal of existing obstructions on
E. c) / Blind Box For Windows in Office Area
site
d) / Blind, Curtain
F. / Demolition underground obstructions / Lighting Box for
e)
Toilet
f) / Hand Wash Sink
3) / PERMITS AND SERVICES APPLICATIONS / Pantry Sink w/Cup
g)
Board
A. / Building Permit h) / Kitchen Counter

Fee shall be paid by the owner. The contractor i) / Guard Post for SHUTTER DOORS
B. / Connection of Services such as Water shall provide the necessary assistances for the /Column Corner
Supply, Waste Water, Storm Water, Electricity, etc. owner in obtaining the building permit. j)
Guard
/ Steel Ladder For
k)
C. / Environmental Application (ECPP) The contractor shall assist preparation of drawings and
Roof
documents. l) / Room name plate
m) / Column Numnber Paint
D. /Other Relevant Government Permit / Reception
n)
Counter
/ Kitchen
o)
Equipment
4) / CEREMONY
p)
/ Entrance Lobby Company Sign
A. / Ground Breaking Ceremony numbers of guests to be around 20 people
B. / Topping Up Ceremony
D. / Others
C. / Completion or Opening Ceremony
/ Production Machine
a)
Foundation
b) / Steel Plates for Prod. Machine
5) / CIVIL AND EXTERNAL WORKS
A. Site Works c) / Overhead Crane
a) / Main Entrance Gate d) / Dock Leveler
b) / Company Sign at Entrance Gate / Dock
e)
SHELTER
c) / Flag Pole w/Foundation
f) / Roof Ventilation Natural ventilation monitor
d) / Lawn
/ Water
e) / Trees g)
Tank
f) / Internal Road Paving h) / Transformer Yard Transformer to be installed in Electrical Room

i) / Truck Scale
g) / Traffic Signs Road Marking only.
j) / Gas Governor Room
h) / Car Park Roof k) / Lift
I) / Bike Park Roof 10 nos l) / Dumbwaiter
j) / Boundary Fences m) / Conveyer System
k) / Storm Water Drainage / Waste Water
n)
Treatment
l) / Spirit House o) / Master Key
m) / Guard House p) / Termite Control on Ground
n) / Drivers' Room
o) / Billboard
p) / Pipe Rack
q) / Sub station building

GENERAL & BUILDING SCOPE OF WORKS


14 JULY 2017 A-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY
EXTERIOR FINISHING SCHEDULE-1 S=N/A
14 JUL 2017
A-02
EXTERIOR FINISHING SCHEDULE-2 S=N/A
14 JUL 2017
A-03
INTERIOR FINISHING SCHEDULE-1 S=N/A
14 JUL 2017
A-04



4


20m

1
150mm
4K3010kg/cm3


1


200mmHeavy Duty Area150mmLight Duty Area

CBR6
CBR2000

0.57kN/()0.35kN/()

1
1,2
1,2

STRUCTURAL DESIGN CONDITION


14 JULY 2017 S-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE

A) / ELECTRICAL SYSTEM
1 115kV / 115kV HV. INCOMING N/A 23 / ALARM MONITORING SYSTEM N/A
2 115KV / 115kV SUB-STATION SYSTEM N/A 24 / LIGHTNING PROTECTION SYSTEM
3 33KV / 33kV HV. INCOMING SYSTEM 25 AV / AV SYSTEM
4 33KV / HIGH VOLTAGE SWITCH GEAR Conpact type 27 115KV / 115KV APPLICATION FEE DRAWING SUPPORT ONLY

5 / TRANSFORMER 28 33KV / 33KV APPLICATION FEE DRAWING SUPPORT ONLY


6 (MDB) / MAIN DISTRIBUTION BOARD(MDB) 29 TEL / TELEPHONE SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY
7 (MDB -> PANEL) / MAIN FEEDER FOR GENERAL(MDB -> PANEL) 30 LAN / LAN SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY
PANEL FOR LIGHTING, RECEPTACLE, GENERAL VENT,
8 /
PUMP 31 CATV / CATV SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY

9 (PANEL -> EQUIPMENT) / SECONDARY POWER SUPPLY(PANEL -> EQUIPMENT)


10 / EMERGENCY POWER SUPPLY SYSTEM (GENERATOR)
11 (UPS, CVCF) / SPECIAL POWER SUPPLY SYSTEM(UPS, CVCF) N/A
12 / LIGHTING
13 / EXTERNAL LIGHTING
14 / RECEPTACLE
15 / TELPHONE SYSTEM B) / ELECTRICAL SYSTEM FOR PROCESS

/ MAIN EQUIPMENT PABX, MDF 1 / POWER SUPPLY FOR PROCESS MACHINE

/ WIRING (MDB -> PANEL) / MAIN FEEDER FOR PROCESS(MDB -> PANEL)
& / PIPING & OUTLET BOX / PANEL FOR PROCESS MACHINE
/ TELEPHONE HANDSET (PANEL -> EQUIPMENT) / SECONDARY POWER SUPPLY(PANEL -> EQUIPMENT)
16 LAN / LAN SYSTEM 2 / MACHINE GROUNDING

/ MAIN EQUIPMENT SERVER, HUB, ROUTER / GROUNDING ROD N/A


/ WIRING (->) / PIPING & WIRING(ROD->TERMINAL BOARD) N/A
& / PIPING & OUTLET BOX (->) / PIPING & WIRING(TERMINAL BOARD->ROD) N/A
17 / INTERCOM SYSTEM
/ MAIN EQUIPMENT Entrance to 2FL office

/ WIRING
/ PIPING
18 / FIRE ALARM SYSTEM
19 / PUBLIC ADDRESS SYSTEM
/ MAIN EQUIPMENT
, , / PIPING, WIRING & SPEAKER
20 / MATV/CATV SYSTEM
/ MAIN EQUIPMENT ANTENA,

/ WIRING
& / PIPING & OUTLET BOX Canteen, office

/ TV
21 / CCTV SYSTEM
, , , / MAIN EQUIPMENT, CAMERA, WIRING, MONITOR N/A
/ PIPING N/A
22 / ACCESS CONTROL SYSTEM
, / EQUIPMENT & WIRING N/A
/ PIPING N/A
IC / IC CARD N/A

M&E SCOPE OF WORK-1


14 JULY 2017 ME-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE
C)/PLUMBING SYSTEM D)/HVAC SYSTEM
1 / DOMESTIC WATER SUPPLY SYSTEM 1 / CHILLED WATER SYSTEM(FOR AIR CON)
/ INCOMING METER
/ WATER COOLED CHILLER N/A
/ INCOMING PIPE
, / COOLING TOWER, COOLING WATER PUMP N/A
/ WATER TANK
() / CHEMICAL FEEDER N/A
/ BOOSTER PUMP
/ SUPPLY PIPE TO EACH EQUIPMENT
() / SOFTENER N/A
2 () /
DOMESTIC HOT WATER SUPPLY SYSTEM(CENTRAL / AIR COOLED CHILLER N/A
SYSTEM)
/ HOT WATER TANK N/A
/ CHILLED WATER PUMP N/A
/ HOT WATER PUMP N/A / CUSHION TANK N/A
/ SUPPLY PIPE TO EACH EQUIPMENT N/A / EXPANSION TANK N/A
3 () /
DOMESTIC HOT WATER SUPPLY SYSTEM(INDIVIDUAL
2F shower booth 2 / HOT WATER SYSTEM(FOR AIR CON)
SYSTEM)
4 / SEWAGE DRAINAGE SYSTEM / AIR COOLED HEAT PUMP CHILLER N/A
/ PIPE / HEAT EXHANCHANGER N/A
/ SUBMERGIBLE PUMP FOR SEWAGE / HOT WATER PUMP N/A
/ SUMP PIT / CUSHION TANK N/A
/ SEPTIC TANK FOR SEWAGE N/A / EXPANSION TANK N/A
/ INSPECTION PIT 3 () / AIR CONDITIONING SYSTEM(WATER COOLED)
5 / SANITARY FIXTURES wash-let(2F only)
/ AHU N/A
6 / GUARDEN FAUCET
/ FAN COIL UNIT N/A
7 / FIRE PROTECTION SYSTEM
4 () / AIR CONDITIONING SYSTEM(AIR COOLED)
/ PORTABLE FIRE EXTINGUISHER
/ INDOOR HYDRANT SYSTEM 150L/min set (, / CDU & FCU
/ OUTOOR HYDRANT SYSTEM 300L/min set 5 / PIPE FOR AIR CON SYSTEM

/ SPRINKLER SYSTEM N/A / CHILLED WATER N/A


/ FOAM FIRE EXTINGUISHING SYSTEM N/A / HOT WATER N/A
/ GAS FIRE EXTINGUISHING SYSTEM N/A / REFREGERANT
/ DRY CHEMICAL EXTINGUISHING SYSTEM N/A / AC DRAIN
ANN () / ANN N/A
5 / VENTILATION SYSTEM
(ANN) / WIRING(SUPERVISORY SWITCH->ANN) N/A
6 / SMOKE EXHAUST SYSTEM N/A
(ANN) / WIRING(FLOW SWITCH->ANN) N/A
7 / BUILDING MONITORING SYSTEM N/A

8

/ COLD WATER APPLICATION FEE



9 / WASTE WATER APPLICATION FEE N/A

E) /KITCHEN SYSTEM


() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A No kitchen
10 / GAS APPLICATION FEE N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A No kitchen

() / DRAINAGE PIPE (IN CYNDER CONCRETE) N/A No kitchen

() / DRAINAGE PIPE (AFTER GUTTER) N/A No kitchen

/ GREASE TRAP N/A No kitchen

/ SEPTIC TANK FOR KITCHEN N/A No kitchen

LPG / LPG GAS CYLINDER N/A No kitchen

/ KITCHEN EQUIPMENT N/A No kitchen

/ DRINKING WATER SUPPLY SYSTEM


/ SUPPLY & EXHAUST FAN N/A No kitchen

/ SUPPLY & EXHAUST DUCT N/A No kitchen

/ EXHAUST HOOD N/A No kitchen

/ POWER SUPPLY TO KITCHEN EQUIPMENT N/A No kitchen

M&E SCOPE OF WORK-2


14 JULY 2017 ME-02
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE
F) / UTILITY SYSTEM(PROCESS)
F) / UTILITY SYSTEM
1 () / COMPRESSED AIR SYSTEM(LOW PRESSURE)
9 / SPECIAL GAS SUPPLY SYSTEM
/ MAIN EQUIPMENT 37kw, INV, oil free
/ MAIN EQUIPMENT N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE)
() / PIPE(MAIN PIPING ->BRANCH VALVE) N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE)
,() / COOLING TOWER, COOLING WATER PUMP N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
/ CHEMICAL FEEDER N/A 10 / PROCESS EXHAUST SYSTEM

/ SOFTENER N/A / EXHAUST FAN N/A


2 () / COMPRESSED AIR SYSTEM(LOW PRESSURE) (->) / DUCT(MAIN DUCT ->BRANCH DAMPER) N/A
/ MAIN EQUIPMENT N/A (->) / DUCT(BRANCH DAMPER->PROCESS MACHINE) N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A / EXHAUST AIR TREATMENT Scraber
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A 11 / DUST COLLECTOR SYSTEM
,() / COOLING TOWER, COOLING WATER PUMP N/A
(, ) / DUST COLLECTOR , FAN N/A
/ CHEMICAL FEEDER N/A
(->) / DUCT(MAIN DUCT ->BRANCH DAMPER) N/A
/ SOFTENER N/A

(->) / DUCT(BRANCH DAMPER->PROCESS MACHINE) N/A
12 / HVAC SYSTEM FOR PROCESS
3 / COOLING WATER SUPPLY SYSTEM FOR PROCESS

/ MAIN EQUIPMENT N/A
/ MAIN EQUIPMENT N/A
/ AUTOMATIC CONTROL N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A
13 / REFREGERATOR SYSTEM N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
/ CHEMICAL FEEDER N/A
/ SOFTENER N/A


4 / PROCESS CHILLED WATER SUPPLY SYSTEM


/ MAIN EQUIPMENT N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
5 RO / RO WATER SUPPLY SYSTEM
/ MAIN EQUIPMENT N/A G) /OTHERS

() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A 1 / AIR CURTAIN


() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A 2 , , / AIR SHOWER, PATHBOX, CLEAN BENCH
6 / STEAM SUPPLY SYSTEM
/ MAIN EQUIPMENT Future
() / PIPE(MAIN PIPE ->BRANCH VALVE) Future
() / PIPE(BRANCH VALVE->PROCESS MACHINE) Future

/ STEAM DRAIN PIPE Future

/ STEAM TRAP Future

7 / WASTE WATER TREATMENT SYSTEM FOR PROCESS

/ MAIN EQUIPMENT Future
() / PIPE(MAIN PIPE ->BRANCH VALVE) Future
() / PIPE(BRANCH VALVE->PROCESS MACHINE) Future
8 / FUEL SUPPLY SYSTEM LPG
/ MAIN EQUIPMENT 3t bulk tank
() / PIPE(MAIN PIPE ->BRANCH VALVE)
() / PIPE(BRANCH VALVE->PROCESS MACHINE)

M&E SCOPE OF WORK-3


14 JULY 2017 ME-03
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY