2
Executive summary
3
Brakes India Private Limited
Employees 7646
Products Braking Systems, Castings, Machine Building, Polymer Compounding
Engineering Capability Design, Develop, Test and Validate
4
Manufacturing Locations
Jamshedpur
Customer Centricity
Waki (Pune) Proximity to Customers
Sholinghur (3)
Flexible Packing
Sholinghur(foundry)
Quick Response
Satellite Plant Polambakkam
Mother Plant Support Plant
5
Light Vehicle Product Portfolio
3 million p.a.
12 million p.a.
Master Cylinder Booster
.
Drum Brakes
Lining
Calipers
0.05 million p.a. Pads 1.7 million p.a.
4.5 million p.a.
TPM Advance
TPM Milestones Special Award
TPM Special
Award
Goal
TPM Excellence in :
Consistent Award
2005
2003
TPM Awards by JIPm, Japan.
7
Our Vision
8
Need for Innovation in QMS
9
Why Innovation ?
Multi Process
10
What are the Innovative approaches ?
Innovations in
4) PFMEA GYR coding
5) Integration of Six Sigma with 1) Innovation in
other Management Systems System Audit plan
- Planetary system
Act Plan
How to improve What to do?
next time ? How to do it ?
Check Do
Did things happen Do what was
according to plan? planned ?
11
1. Innovative Approach in QMS Audit plan
1) Innovation in
System Audit plan
- Planetary system
Act Plan
How to improve What to do?
Check Do
Did things happen Do what was
according to plan? planned ?
12
What is the Innovation in QMS Audit plan ?
Earlier Methodology
Assembly
Stand alone system Plants
Warehouse
Dedicated
Sub Assy
Satellite
Plants
Plants
Corporate Mother
Depts plants
13
Innovation in QMS Audit plan is ..
Warehouse
Sub assy plants
Dedicated
Satellite plants
Mother
c Corp
plants Departments
Team
15
2. Innovative approach in QMS audit scoring
Act Plan
How to improve What to do?
next time ?
How to do it ?
Check Do
Did things happen Do what was
according to plan? planned ?
2. QMS Audit scoring
- Color coded Dashboards
16
What is the Innovation in Audit scoring ?
17
What is the Innovation in Audit scoring ?
Various
Self Domain QMSA
ISO / TS VDA6.3 Brakes Customer/
Audit Function Score
ISO / TS 16949 Standard India QMS ZF TRW
Check Wise GYR
Standard Scoring Procedure Audit
16949 List checklist Status
Forms
VDA6.3
BI
QMS
Procedure
ISO/TS
VDA 6.3 Earlier BI
16949 New Methodology
Methodology
Methodology Methodology
Evaluation Criteria
Final
Element Element Final
Final Report Scor Report
Score Score Score
e
Opportunity 80 89
for
Requirements mainly satisfied;
8 B Improvement 4
Minor deviation 70 79
(OFI)/
Observations
Requirements partially satisfied; 60 69
6 3
significant deviation Non 50 59
Conformance Minor NCR
Requirements Inadequately 40 49
4 2
satisfied; major deviation 30 39
C
20 29
Requirement not satisfied 0 Major NCR 1
10 19
NA-Not Applicable /NV-Not
NA/NV NA / NV NA / NV 09
Valuated
19
Sample scoring sheet
20
Sample scoring sheet
TS Element
Element
Score Details
Look for
TS Clause Brakes India Objective
Procedure evidence
Element
Score
21
Elemental Scoring Methodology
Requirements mainly 80 89
satisfied; 4
Minor deviation 70 79
Requirements partially 60 69
satisfied; significant 3
deviation 50 59
Requirements 40 49
Inadequately satisfied; 2
major deviation 30 39
Requirement not 20 29
1
satisfied 10 19
22
Final Scoring Methodology
Proposed Brakes
India
Evaluation Criteria Methodology
Final Score
Requirements partially 60 69
satisfied; significant
deviation 50 59
Requirements Inadequately 40 49
satisfied; major deviation 30 39
20 29
Requirement not satisfied
10 19
User friendly
24
3. Innovative approach in New Product audits ..
Act Plan
How to improve What to do?
next time ? How to do it ?
Check Do
Did things happen Do what was
according to plan? planned ?
25
What is the Innovation ?
Product Launch
Phase 3
26
How New Product audit being Done ?
Focus Elements:
Supplier Readiness
27
How New Product audit being Done ?
Check Points
Supplier Readiness
Readiness to meet Customer requirements
New supplier evaluation
Customer special Requirement
BOM Readiness
Response to customer concern
PCM (Product Characteristics Matrix) & SLP
(Safe Launch Plan) Readiness and / or
Product / Process Design Readiness Review implementation
Product / Process Design Change management Supplier PPAP readiness (including Supplier
packaging readiness)
Review of CV / DV / PV testing results
Supplier Run @ rate results
Process design / application readiness
Incoming control readiness
Packaging readiness
28
How New Product audit being Done ?
Plant Readiness
Mistake Proofing
Line walk audit
Plant PPAP Readiness
Safe Launch Plan
People Readiness
Engineer / supervisor skill / training levels
Line operator skill / training levels
31
Plant Readiness: Audit Sample Sheet
32
Over all Readiness : Audit Sample Sheet
33
Improvement & Review Process
Pending as off
proposed target
Verification of High Risk, Escalate
Proposed Action Team member and review
status Action for completion with
revised target
Completed as per
target date
Successful action
by Program Manager Graduation
Phase I / II > or equal to 70 % Phase III > Or equal to 90%
Phase III > or equal to 75%
34
Sample NP Audit score - Dashboard
1 Design readiness 33 67 67 .
Friction TD to be released
3 Supplier readiness 50 60 75
TOTAL 43 57 71
TOTAL
July 2015
Supplier readiness April 2015
Feb 2015
Design readiness
0 10 20 30 40 50 60 70 80 90 100
Sample NP Audit score - Dashboard
1 Design readiness 33 56 78
3 Supplier readiness 50 50 75
4 Plant Readiness - 211- Mistake Proofing 17 17 83
5 Plant Readiness - E212 - Documents 25 25 100
6 Plant Readiness - G54 - Line Sign Off 0 0 75
8 Plant Readiness - E213 - Safe Launch 33 33 100
TOTAL 27 33 83
TOTAL
Plant Readiness - E213 - Safe Launch
Plant Readiness - G54 - Line Sign Off July 2015
Plant Readiness - E212 - Documents April 2015
Plant Readiness - 211- Mistake Proofing Feb 2015
Supplier readiness
Design readiness
0 10 20 30 40 50 60 70 80 90 100
36
Sample NP Audit score - Dashboard
TOTAL
GDPIM Process Compliance
People Readiness
Plant Readiness - E213 - Safe Launch
Plant Readiness - PPAP July 2015
Plant Readiness - G54 - Line Sign Off April 2015
Plant Readiness - E212 - Documents Feb 2015
Plant Readiness - 211- Mistake Proofing
Supplier Readiness
Customer Readiness
Design readiness
37 0 10 20 30 40 50 60 70 80 90 100
Benefits
Able to Identify , Monitor & Review effectively on New product Systemic gaps
Function wise / APQP gate wise
38
4. Innovative approach in PFMEA
Act Plan
How to improve What to do?
next time ?
How to do it ?
Check Do
Do what was
Did things happen
according to plan? planned ?
39
What is the Innovation ?
40
What is the Innovation ?
PFMEA
Final /Sub
Other Mfg .Process
Assembly
All Types of Assemblies &
Other Mfg Process
Category-1 Category-2 Category-3 Category-4
SC / CC Non SC/CC SC / CC Non SC/CC
S x O x D = RPN
S vs O S vs D S vs O S vs D S vs O S vs D S vs O S vs D
High High - PPM Low DETECTION LEVELS Error Proofing, Poka Yoke, 100% Testing Investments are
RED
prioritized
YELLOW Medium Medium - PPM Medium DETECTION LEVELS Controls are medium like First off, Last off
GREEN Low Low - PPM High DETECTION LEVELS Controls are relaxed
41
How ?
Severity &
Table 1 Table 3 Table 5 Table 7
Occurrence
Severity &
Table 2 Table 4 Table 6 Table 8
Detection
How ?
PFMEA Tables
Table 8
Table 7
Table 6
Table 5
Table 3 Table 4
Table 1 Table 2
43
Benefits
44
5. Innovative approach in Integration
of Six Sigma
Act Plan
How to improve What to do?
next time ? How to do it ?
Check Do
Did things happen Do what was
according to plan? planned ?
45
How we integrate ?
New
Regular Monitor the Trends against the
Products/
Products Targets & Benchmarks
Process
46
How we integrate ?
47
Six Sigma Deployment
Site Heads
Leader/
Champion
48
Result : Six Sigma Skill set ( Plant wise )
BI - Padi - 10 22 53 46
BD- Sholingur - 6 9 29 21
BI- Polambakkam - 9 15 18 18
BI Foundry - 6 28 - 34
BI Nanjangud &
- 6 12 14 18
Sundaram Polymer
BI SEZ, Rolltec,Waki,
Sitarganj, MRC1, MRC2 - - 15 27 21
Gurgaon Plants
Corporate
Departments (ER&D,
Marketing, Corp QA, 3 8 33 48 47
SDI, Corp MSE, QHSE,
Padi Finance)
TOTAL 3 45 107 189 205
49
Six Sigma Project focus
Project Themes
Energy Recovery
Effluent Reduction
Water/fuel conservation
Safety Improvement
SHE Focus
50
Over All Summary
Benefits
Innovative Approaches
Qualitative Quantitative
1. QMS Audit Planning Audit plan and execution Reduced mandays CAR
Planetary audits easier reply time less
2. QMS Audit Report - Audit is objective & colour Audit is Quantified with
Score card / dashboard coded Score - GYR Status
5. Six sigma integration with - Improving analytical skill Cost benefits, No. of
Management systems of employees GB, BB, YB
- Production / Product
variation reduction
51
Conclusion :
52
BI Plants - Location Matrix
Top
Core
Management
54
Processes in Brakes India
55
Brakes India Customer / Product scope
52 OEM expectations
28 Product catalogs
CUSTOMER
Higher product Mix
56
Red Zone
area is more
57
Red Zone
area is less
58