Material received without certification shall not be used in fabrication and kept in quarantine until
material certificates are received and controlled against the requirements described in Chapter 2.0 of this
specification and the Contractors Structural Material Specification.
Structural steel shall be delivered with following types of certificates:
Type X, XI, I, Ia, II, IIa, III, IV : EN 10204 / 3.1 applies if materials are supplied by West European,
2.5 Welding Consumables
2.4 Traceability
The Subcontractor shall ensure that transfer of marking to the materials is strictly controlled so that any
material can be easily identified and kept traceable to the material certificates. Marking shall be done by
North American, Japanese and recognized Certifying Authority-approved steel mill. In other cases a 3.2
certification is to be supplied.
Type V, VI : EN 10204 / 3.1.
Steel for non-load bearing structures such as angle bars, cable ladders, cable strips, etc. shall be at least
supplied with EN 10204 / 2.2 certification.
Verified true copies of original stamped certifications shall be supplied for all materials.
All consumables shall comply with one of the following codes, or an approved
The welding consumables used in fabrication shall be approved by classification standards and selected to
produce welds with mechanical properties equivalent to those required for the base metal and shall be
subject to approval by Contractor prior to use.
Welding consumables for the work shall be supplied with an EN 10204 2.2 certificate as a minimum.
Except for solid wires, all consumables shall be classified as low hydrogen type. Low hydrogen
consumables are defined as those that produce deposit weld metal with no more than 5ml/100g diffusible
hydrogen. For self-shielded flux cored wire, hydrogen content of no more than 8ml/100g weld metal may
be accepted.
Subcontractor shall designate a competent representative familiar with all phases of fabrication and
administration to which Contractor may communicate at all times.
Subcontractor shall designate during the work, at all times, competent supervision (e.g. foreman,
construction manager) experienced in structural steelwork.
Subcontractor shall employ only skilled and qualified craftsmen to perform all aspects of the work
including NDT and inspection.