Subcontractor shall designate during the work, at all times, competent supervision (e.g. foreman,
with related requirements (but not limited to) inspections, acceptance criteria, responsibilities and
verifying documents. For each relevant activity Subcontractor shall incorporate the kind of verification by
construction manager) experienced in structural steelwork.
Subcontractor shall employ only skilled and qualified craftsmen to perform all aspects of the work
including NDT and inspection.
Subcontractor shall submit an ITP which chronologically lists all relevant aspects covering the full scope
1.5 Performance
Subcontractor shall designate a competent representative familiar with all phases of fabrication and
administration to which Contractor may communicate at all times.