BASE PLATE

(VERIFY SIZE &


1 2 3 THICKNESS)
6,000
3,000 3,000

ANCHOR BOLT
(VERIFY SIZE)

150mm THK SLAB A3 ANCHOR BOLT A4 BASE PLATE DETAIL


S-02 SCALE 1:50 S-02 SCALE 1:50
F.F.L.

ANCHOR BOLT
(VERIFY SIZE)
A B C D
13,240
4,600 3,500 3,500 1,640
3,570 9,670

A2
S-02
EXISTING BUILDING
2 COLUMN

1,480

BASE PLATE

2,200
(VERIFY SIZE &
THICKNESS)

150

150

150

150

150
150 150 150 150 150
PART OF BLDG. 2
PART OF BLDG. 1 FFL. +4.845
CUSTOMER/ VISITORS LOUNGE

3,000
BRIDGEWAY
FFL. +4.945
0.76% SLOPE

6,000
6,000
(TRANVERSE SECTION) 3,000

A2 BRIDGEWAY ROOF FRAME 150 150 150 150 150

150

150

150

150

150
1
S-02 SCALE 1:100
EQ. EQ. EQ. EQ.
100 100
4 EQ. PARTS
@ 2866.25 EACH= 11465
EXISTING
WALL BELOW

A1 GROUND FLOOR
S-02 SCALE 1:150

PROJECT TITLE PROJECT OWNER DESIGNED BY SHEET CONTENTS: SHEET NO.


BRIDGEWAY
S-02
DRAWN BY JBB
CONTINENTAL TEMIC BRIDGEWAY CONTINENTAL TEMIC CHECKED BY
STRUCTURAL
16 Ring Road, Light Industry & Science Park II Bargy. La Mesa Calamba Laguna
ELECTRONIC PHILS. INC. APPROVED BY

DATE 17 JULY 2017

Potrebbero piacerti anche