Sei sulla pagina 1di 12

Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

Pile Geotechnical Design using S


Site:
Round Pile f = 1000 mm Skin Area per m, As= 3.142 Base Area, Ab =
Factor of Safety (FoS) =

End Bear at Pile Ultimate


Unit Skin Cumulative depth, End Bear at
Depth Avg SPT Skin Fric, Capacity, Qult =
Fric, fs = Skin Fric, Fs qb=min(400N/3, depth, Qb (kN)
Interval (m) Value, N Fs (kN)
2N (kN/m2) (kN) Fs+Qb (kN)
10000) (kN/m2)

1 11 22 69.1 69.1 1466.7 1151.9 1221.0


2 11 22 69.1 138.2 1466.7 1151.9 1290.1
3 2 4 12.6 150.8 266.7 209.4 360.2
4 2 4 12.6 163.4 266.7 209.4 372.8
5 2 4 12.6 175.9 266.7 209.4 385.4
6 13 26 81.7 257.6 1733.3 1361.4 1619.0
7 26 52 163.4 421.0 3466.7 2722.7 3143.7
8 21 42 131.9 552.9 2800.0 2199.1 2752.0
9 21 42 131.9 684.9 2800.0 2199.1 2884.0
10 1 2 6.3 691.2 133.3 104.7 795.9
11 12 24 75.4 766.5 1600.0 1256.6 2023.2

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

12 5 10 31.4 798.0 666.7 523.6 1321.6


13.5 6 12 56.5 854.5 800.0 628.3 1482.8
15 6 12 56.5 911.1 800.0 628.3 1539.4
16.5 1 2 9.4 920.5 133.3 104.7 1025.2
18 3 6 28.3 948.8 400.0 314.2 1262.9
19.5 1 2 9.4 958.2 133.3 104.7 1062.9
21 2 4 17.0 975.2 240.0 188.5 1163.6
23 2 4 22.6 997.8 240.0 188.5 1186.3
24 2 2464.8 7743.2 8741.0 10000.0 7854.0 16595.0

Specified Working Load = 8000 kN Depth required =

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

(Based on given BH/MKT Report & above FoS)

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

n using SPT Values


0.785 m2
2.000

Pile Allowable Pile Capacity (kN)


Capacity, Qall =
Qult/FoS (kN) 0 1000 2000 3000 4000 5000
0
610.5
645.1
180.1
186.4 5
192.7
809.5
1571.8
Depth (m)

1376.0
10
1442.0
397.9
1011.6

15
07/26/2017
Depth (m
10
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

660.8
741.4 15
769.7
512.6
631.5
531.5 20
581.8
593.1
8297.5

25

13 m

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD

Report & above FoS)

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

Micropile Structural Capacity Calculation

Pile Diameter, f = 1000 mm


Grade, fcu 35 cement grout (w/c ratio = 0.45)
Use API Pipe, f 88.9 mm 6.45 mm thk
fy = 500 N/mm2 (min)

Area of Steel & Concrete


As (provided) = 2prt
As = 1670.7068 mm2
Ac = p*d2/4
Ac = 785500 mm2

Ultimate Axial Load,


fu = 0.4fcu*Ac + 0.75fy*As
fu = 11623515 N
fu = 11623.51506 kN

Taking Factor of Safety (FoS) = 2


fall = fu/FoS
fall = 5811.8 kN
Based on the structural capacity above, the micropile is able to take the given working load
of 5811.8 kN

Micropile Details

Micropile, Dia 1000 mm

API Pipe inside


f 88.9
6.45 mm thk

Clear spacing/Cover = 455.6 mm

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

Cement grout, G 35 N
W/C Ratio 0.45 min

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

working load

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

Micropile Structural Capacity Calculation

Pile Diameter, f = 1000 mm


Grade, fcu 35 cement grout (w/c ratio = 0.45)
Use Rebar, f 32 mm 25 Nos
fy = 460 N/mm2 (min)

Area of Steel & Concrete


As (provided) = Sprbars2
As = 20106.193 mm2
Ac = p*d2/4
Ac = 785500 mm2

Ultimate Axial Load,


fu = 0.4fcu*Ac + 0.75fy*As
fu = 17933637 N
fu = 17933.63658 kN

Taking Factor of Safety (FoS) = 2


fall = fu/FoS
fall = 8966.8 kN
Based on the structural capacity above, the micropile is able to take the given working load
of 8966.8 kN

Micropile Details

Micropile, Dia 1000 mm

R6 Spiral Link

Rebar 4Y12

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

Cement grout, G 35 N
W/C Ratio 0.45 min

07/26/2017
Design of Micropile GEOPROFOUND ENGINEERING SDN BHD (707134-T)

working load