Design Footing on 2 Pile - USD Method ACI 318-99 , EIT 1008 - 38 [ Metric Unit ]

A. Material Properties : ACI318-8.5.2


Concrete Steel
Comp. Strength (fc') 250 ksc. Yeild Strength (fy) 3000 ksc.
Unit Weigth ,(wc) 2400 kg/m3
B. Design Parameters : ACI318-10.2.7
b1 : 0.85 ; fb : 0.90 ; fv 0.85 ; Covering 7.5 cm.
C. Footing and Piles Configuration
Pile Driven Pile Footing
PC. Pile Section Dia 22 cms. Colume Size a2 = 0.20 m.
Safety Load 30 Tons. a1 = 0.20 m.
factor load 2.00 Footing size B = 0.60 m.
Ultimate Load 60 Tons. L = 1.50 m.
Group of Pile ,N 2 Pile
D. Loading ACI318-15.2.1 and 15.2.2
Dead Load = 30 Tons.
Live Load = 25 Tons.
Total Load = 84.5 Tons. OK
E. Check Bending moment ACI318-15.4.1
Mu = 21 Tons-m.
Assume. rr=min = 14/fy = 0.0047
Ru.=rfy(1-0.59r(fy/fc')) Ru = 13.63 ksc.
Mu=fRubd^2 d.eff. = 53.40 cm.
d = 55.00 cm. Thickness = 0.63 m.
F. Check Shearing at Critical section ACI318-15.4.2
Beam Shear
No. of Pile A (cm ) X (cm.) Y (cm.) X1 Y1 P'x P'y
1 30 45 0 0 0 0 0
2 30 45 0 0 0 0 0
Vu=Pnet*N Vu = 0.000
Vc=0.53f(fc')^0.5bd Vc = 23506.0004 kg. OK
G. Check Punching Shear ACI R 318-15.4.2 and 15.5.2
Punching Shear
No. of Pile a (cm ) X (cms.) Y (cms.)
X2 Y2 Area P'
1 30 45 0 -7.50 0.00 165 39.54545455
2 30 45 0 -7.50 0.00 165 39.54545455
Vu=Pnet*N Vu = 79090.909 kg.
Vc=0.27f(2+(4/Bc))(fc')^0.5bod = 359242.65 kg.
or Vc=1.06f(fc')^0.5bod = 235060.00 kg.
Vc = 235060.00 kg. OK

a x x a1
d
Y
x
a

1 2
a2

X
B
a

a1
d/2

H. Punching shear at conner pile ACI318-11.12.1.2


Vu=Pu = 60000 kg.
Vc=0.27f(2+(4/Bc))(fc')^0.5bod = 120945.02 kg.
or Vc=1.06f(fc')^0.5bod = 245196.62 kg.
Vc = 120945.02 kg. OK
Mahanakorn University of Technology Project : Standard Calculation Sheet for R.C. Design
Civil Eng. Department Des. By : ENG 1 Chk. By : ENG 2 Sheet
Sheet : 1/2
Bangkok Thailand Title : Footing on Pile File : RC_FOO01.xl 10/03/2004
Date :
Design Footing on 2 Pile - USD Method ACI 318-99 , EIT 1008 - 38 [ Metric Unit ]
I. Reinforcement Design ACI318-10.3 and 10.5
About X-X Axis
Mu = 21 Tons-m.
m = fy/(0.85*fc') = 14.1176
Ru = Mu/fbd^2 = 12.86 cm2.
rreq'd = (1/m)[1-(1-(2m*Rn/fy))0.5] = 0.0086
rb = 0.85b1*(fc'/fy)[6120/(6120+fy)] = 0.0404
Asreq'd=(0.85fc'/fy).b.d.(1-(1-(2/0.85fc') Mu/(fbbd2))0.50)) 14.60 cm2
Check r max = 0.75rb = 0.0303
r min = max(14/fy,(fc')0.5/(4*fy)) 0.00467
USE r = 0.0057 OK
Select Layer Reinf. Bar As (cm2)
No. 6 DB20mm 18.85 OK

J. Reinforcement Design ACI318-10.3 and 10.5


About Y-Y Axis
r min = max(14/fy,(fc')0.5/(4*fy)) 0.00467
USE r = 0.0047
As = r*b*d = 38.5000
Select Layer Reinf. Bar As (cm2)
No. 8 DB25mm DB20mm 39.27 OK
K. Check Bonding ACI318-15.6.2
B
ldb of DB20mm = (0.06*Ab*fy)/(fc')0.5 = 35.76 cm. OK

1.50 m.
0.60 m.

No. 6 DB20mm

No. 8 DB25mm
0.63 m.

LEANCONCRETE 0.05 m.
COMPACTED SAND 0.10 m.

2 Pile 22 cm. * 22 cm.


Safety Load 30 Ton / Pile ( FS. 2.00 )


2
2




1. Parameter
2. Factor Load 2
2.0
3. 3D

4. load

5. Beam Shear, punching shear d
) Shear
6. Bonding

Potrebbero piacerti anche