NAKAWA VOCATIONAL TRAINING INSTITUTE

DEPARTMENT OF BUILDING CONSTRUCTION

OF NATIONAL CERTIFICATE IN BUILDING CONSTRUCTION

INDUSTRIAL TRAINING REPORT

NAME OF TRAINEE: OTIRA ALEX

REG NO: UBT104/2016/TC: 310

SUBMISSIONUGANDA BUSINESS AND TECHNICAL EXAMINATIONS BOARDS


(UBTEB)

YEAR OF SUMISSION: 15/02/2016

DECLARATION

I OTIRA ALEX declare that this report was written by me without any assistance from either my
course mates or any other person.
OFIRA ALEX

Date: 15/2/2017

APPROVAL BY THE SUPERVISOR

This project was approved by the supervisor/ Head of Department Mr. Keeya Francis

@mail.com and it was done very and need


2
Date:..

Name:

Signature:..

This project was also approved by the site supervisor/

Site Engineer

Name :..

Signature:

Date: .

This project was also approved by the UBTEB supervisor/

Name :..

Signature:

Date: .

3
DEDICATION

I hereby dedicate this study with great honour to my father who is fighting hard to see that I
achieve a bright future and the most things thanking God for making me able to go through all
the process to come with this design study.

4
TABLE OF CONTENTS
DECLARATION..............................................................................................................................i
APPROVAL BY THE SUPERVISOR............................................................................................ii
DEDICATION................................................................................................................................iii
BACKGROUND.............................................................................................................................1
1.1 Back ground of the project...................................................................................................1
1.2 Problem statement...............................................................................................................1
1.3 Purpose of the project study................................................................................................1
1.4 Objective of the design project Study...................................................................................1
1.4 Importance of the study.......................................................................................................1
1.5 Delimitations.........................................................................................................................2
1.5 Objectives............................................................................................................................2
1.6 Work plan..............................................................................................................................2
1.7 Limitations............................................................................................................................2
2.1 Design specifications...........................................................................................................3
2.2 Actualization of the product.................................................................................................3
1.5 Work Plan for the project study............................................................................................4
2.3 Working drawing.................................................................................................................6
2.1 Design specification..............................................................................................................8
2.1.2 The leveling of the ground to receive...................................................................................8
2.1.3 Quantity of design................................................................................................................8
BLOCK PLAN................................................................................................................................9

5
BACKGROUND

The reason why I come out with this project is to have skill in setting out a building.

1.1 Back ground of the project


The reason why I come out with this project to have knowledge in building/setting out in
the building construction and have skills in building a retaining wall were by a retain is
the wall building to protect lose soil from fall

1.2 Problem statement


The soil around the working place/sited is always collapsing due to the nature of the
ground. Much as there are a number of different types of retaining wall types available in
the construction industry, their design is relatively expensive that the poor people/
trainees in my community may not be able to afford. Meaning that there is a need to
design a simple retaining wall which is easy to construct and using local materials

1.3 Purpose of the project study


The purpose of the design is to enable low income earners to be able to use the local
available material to construct walls, retaining walls.

1.4 Objective of the design project Study


In order to realise the purpose/end results of this design study project, the following
objective may be fulfilled.

1.4 Importance of the study


To a trainer to get skills of leveling
Space for workshop practice
Adding into reference bank at library
Cost of labour

6
1.5 Delimitations
i. Share the available tools
ii. Efficient use of material
iii. Reporting early

1.5 Objectives
Leveling skills

At the end of the project, to have leveled ground will be formed which construction of
solid ground fallen.

1.6 Work plan


Activities
Site clearance
Cutting and filling
Compaction
Retaining wall
Placing of hardcore
Blinding
Batching
Mixing
Transport
Over site concrete
Compaction
Coating

1.7 Limitations
Weather condition
Material shortage
Time for project work
Shortage of tool and equipment

CHAPTER TWO

2.0 METHODOLOGY

7
2.1 Design specifications
This specifies the shape, size, finisher and material for the study designed

2.2 Actualization of the product


This is the removal of unwanted objects like grass, trees, and larking in order for the
workmen and working tool work get lost.

Tools used:
Hoe
Slasher
Panga
Wheel barrow
Pit axe
Rake

This is also protect the works tools from wildlife habitats like snakes and others

Cutting and filling


This is the leveling of the ground excavating soil from the high level and filling the
excavated soil in the lower part of the site in order

1.4.1 Carry out need

1.4.2 Write product design specification

1.4.3 Generate candidate product solutions

1.4.4 Make the detailed design scheme for the chosen product

1.4.5 Process the product according to the detailed schemes

1.5 Work Plan for the project study

No Objective DEC JAN FB

8
1 Over site concrete
2 Product design specification
3 Realization of product

To make it leveled

Tools used
Hoe
Spade
Wheel barrow

Compaction is the process of removing air avoid with concrete to achieve maximum.

Tools used
Romper
Wheel Barrow
Spade
Machine
1. Placing of hardcore. Is the process of spreading concrete on the site. This is done because
some part of the site is made of ground and hardcore is placed to hold the concrete and to
avoid depression and shrinkage of the soil. This is done by hands and string to get an equal
level.
2. Blinding
This is a layer of sand placed to fill t packets of the hardcore and to cover the shaper hardcore
to avoid it from piercing the over site concrete.

Tools used

i. Spade
ii. Hoe
iii. Wheel barrow

3. Batching

9
This is the process of measuring the consistency of concrete.

Batching may be carried out in two ways;

By weight: i s defined as the quantity of matter in the body.

By volume: Is defined as a space occupied by object.

Tools used.

Spade
Hoe
Wheel Barrow

4. Mixing.

Is addition of different substance of material to from one body

The requirement needed for mixing can be hand or by machine.

Material used.

Cement
Sand
Aggregate
With sufficient amount of water.

5. Transportation

After mixing the concrete or motor is transported from the mixture to the formed work
concrete. Can be transported in various ways as follow.

i. Through wheel barrow


ii. Through damper
iii. Through pipeline.

Over sites concrete

This is laying of concrete to get a firm floor.

10
i. Tools used
ii. Spirit level
iii. Trovel
iv. Spade

2.3 Working drawing

Proposed workshop

Curing

Is the treatment given to a newly laid concrete slab

Recommendation

Since the concrete laid as 1:3:6 i.e. part of the cement, 3 part of sand and 6 part of a coarse
aggregator should be made 1:2:4 for a strong mix and easy compaction for the solid flour to last
for a long time.

11
Calculation

Volume of hardcore

LXWXh

14.15 X 10.15 X 0.15

Volume of hardcore

21.54 cm

I forward = 3m3

50 wheel Barrow of aggregate/sand

NO. of trip = Volume H/C Fill


Volume of Truck
21.7
3
= 7.18 trip of truck

2.1 Design specification

2.1.2 The leveling of the ground to receive


Solid ground floor

12
Form ground
Level ground

2.1.3 Quantity of design


Site clearance
Scope of work

SECTION PLAN
Over site concrete

Plenth wall 100 mm

75b mm
Hard core
ZZZZZZZZZ
150 mm

Back fill

Found Concrete

Site plan 6.75 MM

Existing plate form


Retaining wall build with stones

pavers

13

Water channel
BLOCK PLAN

NAKAWA MARKET

MAIN ROAD
Security house at the gate
Administration Block
D.H

KLA TO JINJA
Main ground for NVTI

JINJA ROAD
Security office T
Machine
Dept Campus
MUTI Wook Electric
graze
Tree
work ity Dept
Bore Hall
Walk way

School
Toilet Existing Propose site
Platform of Levee Store BCP BCP Contain Class
class Offices room

Conclusion: I Alex Otira conclude this report b y saying it is true. Thanks.


APPENDICIES
Appendix 1: work shop procedure

Appendix 2: retaining wall built with stones

Appendix 3: working drawing


Appendix 1 work shop procedure
Appendix 2 retaining wall built with stones
Appendix three working drawing