Sei sulla pagina 1di 7

firstpointgroup.

com
Head Office +44 (0) 20 7758 4190

Personal Details
Name: Samphas Mao

Date of Birth: 13 October 1978

Nationality: Cambodian

Languages: Khmer, Vietnamese, English, French


Email: maosamphas@gmail.com
Tel: +855-888420000

Employment History
01 Jan, 2012 Present
Xinwei (Cambodia) Telecom Co., ltd
Core Network FO and BO Team Leader
Reporting to: O&M Manager

Responsibility for Core Network BO:

Data configuration for Voice and SMS interconnect to the other operators through voice and SMS
gateway, ISUP over E1, and MAP over E1.
SMS interconnect with sysbase365 via SMPP protocol.
Data configuration for Xinwei 4G products such as SAG3000, SAC, iM3000 server, CB3000
server, iMC2000 Server testing and commissioning, troubleshooting etc. Those interconnect
bases on SIP trunk
Database server installation and configuration, HLR3000, Oracle 9g, Linux CentOS 5.5.
BTS data configuration and OMC (EMS Server)
Bridge between Core Network resources and R&D, to test debugs and upgrading issue, capture
package with Wireshark tools for analyze and Xinwei signaling monitoring tool.
Configuration management of network elements and assigned nodes
Backup system by scheduling and autodump
IP networks (routing protocols, MPLS)
TDM (Multiplexers, DSP, PDH, voice and data)
ATM (PVC, SVC, MPLS) would be an added advantage
Sysbase365 interface interconnect, and SMPP link configuration.
Involved for new staffs recruitment and interview them
Responsibility for Core Network FO:
Ensuring accurate and timely 1st level support.
Ensuring Surveillance Management & Performance Monitoring for Core, Transmission, IP, RAN &
VAS
Helpdesk Management in terms of customer complaint handling, coordination and escalation.
Fault management in terms of TT (escalation, update, follow up and closure)
Supervising and managing entire Front Office team.
Performance evaluation of Front Office Engineers.

Page 1 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

Coordination with customer and MS internal departments.


Maintaining updated network topology information.
Front Office reports are accurately, and timely generated and distribution.

01 January 2008 30 December 2011


Cambodia Advance Communication Co., Ltd
3G NOC Engineer

Responsibility for 3G Network of Ericsson Products

Monitoring UMTS network, e.g. RNC, NODE B, ( MSC, HLR,MGW, GGSN, SGSN), VAS Nodes
(ADC, EDCS, MIEP, MMS, MOIP, MSDP DS)
Monitoring Ericsson Core Network alarm events from the alarm Panel, Winfio 7.5, OSS-RC.
Restart STSMAIN Resource in APG node A or B
Short code implementation, B-number analysis
MSC/HLR CP backup and site alteration increment (SAE)
IMSIs loading to HLR
MGW E1 checking and testing (block and interconnect)
Involved:
Do the integration of MGW R4.1, MSC APZ 212 50, HLR APZ212 33C
To do the acceptance test with ERICSSON Engineer MSC, MGW, HLR
To interface for Multi Vendor Integration between IN, VAS REDKNEE and ERICSSON Core
Network
Moshel health check and alarm viewing over MGW,RNC's and NodeB's
Do the integration between CADCOMMS core and other operators via Telecom Cambodia (TC
HUAWEI SWITCH and ERICSSON MGW as SCCP Relay)
To help O&M team to check the interconnection with SCCP and the other operators.
To help O&M team to check E1 connection at RNC to RBS.
To do SAE increment (HLR, MSC), and Loading the new IMSIs to HLR.
To assist Core Network specialist to analyze the B-Table, health check MSC, HLR
To involve some Core Network Upgrading activities such as (APG, MSC R12, HLR R12 )
Sometimes to assist the core network specialist to Create CSR to get support from Ericsson
Support team when the problem cannot be solved by Managed Service via CSR online system.
Know clearly about the work flow of Ericsson team from the implementation period till O&M period
Node B Troubleshooting and viewing the alarm at initial level while PAT
Performing the first line maintenance, testing and diagnosis of faults. Identification of alarms and
alarm handling. Site access management (Security).
Ensuring escalation of faults and maintaining records into logbook. Follow up the engineering
works orders to be approved.
24/7 Shift Schedule
Report to line manager, customer care, customer services and the other department during the
network out off service or maintenance.

Page 2 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

Responsibility for Transmission Network:

24/7/365 monitoring of all alarms generated by Ericsson MW nodes such (TN's, HC's, OMS,
MRD's, MSR, AXX).
Daily and monthly Report of active alarms& Follow up
1st&2nd line trouble shooting of generated alarms and problems.
Reporting of all transmission problems and network performance.
Faults escalation, follow up with field maintenance and ELS when needed.
Coordination of Fault origins with other Vendors.
Management Escalation and Updates of Major Network Problems through Front Office
Surveillance.
Monitoring and maintaining the DCN connectivity for Transmission Network.
Creation and Configuration of network elements on SOM and ensure that all NE's should be
visible through SOM.
Provide support to Field Operations and Project team as required.
Provide the necessary operation maintenance support such as software upgrading for operational
software on Microwave equipments
Keep & Provide the backup configuration for all live microwave nodes.
Control and supervise the maintenance downtime MDT& TCN for all activities on live elements
related to transmission and keep a copy of configuration backup before& after each activity.
Control the access for all transmission network nodes.
Report to line manager, customer care, customer services and the other department during the
network out off service or maintenance.

01 February 2007 31 December 2007


ZTE HK Cambodia Co, Ltd.
Sr. NSS Engineer

Involved ZTE Turnkey Project Phase 6.1 with TMIC


Cell Planning.
SA (Site Acquisition) works.
CME (Civil Work Management Engineering)
ZXG10 BTS, ZXG10 BSC, and WCDMA Core Network Self Learning.
Drive Test

05 August 2002 31 January 2007


Huawei Tech Investment Co., Ltd.
Fixed Network and Transmission Engineer

Huawei C&C08 Switching Phase 1 and 2 Project with CAMINTEL

Page 3 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

Software and Hardware Commissioning, Configuration and Installation of (C&C08 32, SM, ONU,
RSM, RIM) and Trunk data, CSS7, R2, PRI, ISDN (2B+D), and B Number Analysis.
Huawei Optical Transmission SDH 155/622 Phase 1 Project with CAMINTEL
Software and Hardware Commissioning, Configuration and Installation of Metro 1000 SDH
155/622 iManager T2000 Tool Software Service E1 Configuration (4 Nodes as ring 1+1
configuration STM-4)
Huawei Optical Transmission SDH 155/622 Phase 2 Project with CAMSHIN
Software and Hardware Commissioning, Configuration and Installation of Metro 1000 SDH
155/622 iManager T2000 Tool Software Service E1 Configuration (10 Nodes as ring 1+1
configuration STM-1, STM-4)
Huawei Optical Transmission SDH 155/622 Phase 2 Project with MobiTel
Software and Hardware Commissioning, Configuration and Installation of Metro 1000 SDH
155/622 iManager T2000 Tool Software Service E1 Configuration (3 Nodes as chain 1+1
configuration STM-1, STM-4)
Huawei Optical Transmission SDH 155/622H Phase 1 Project in Laos with LTC Operator
Software and Hardware Commissioning, Configuration and Installation of Metro 1000 SDH
155/622H iManager T2000 Tool Software Service E1 Configuration (25 Nodes as ring 1+1
configuration STM-1)
Subcontractor Management, and training to customer
Huawei Access Network Project in Thailand with TOT and TA DLC Operators
Participate in PAT of Huawei Access Network Products MD5500, UA5000.
Huawei Access Network Project in Vietnam with Viettel Operator
Subcontractor Management, and training to customer
Software and Hardware Commissioning, Configuration and Installation of Huawei Access
Network ONU, OLT
PAT and Training to customer
Huawei Broadband Project phase 1 with Citylink (Local ISP)
Software and Hardware Commissioning, Configuration and Installation of Huawei Broadband
Products (MA5200G+, iManager N2000+, MA5100, MA5300, MA5600).
PAT and Training to customer
Services (ADSL, HDSL, SDSL, VDSL, ADSL++) and Hardware Maintenance for 1 year

Education and Qualifications


2006 - 2008
CWF NGO (Conversations with Foreigners), Phnom Penh, Cambodia
Conversational English Advanced Communication

2006 - 2007
National Information Communications Technology Development Authority
CCNA1 to CCNA4

2004 - 2005
Build Bright University, Phnom Penh, Cambodia

Page 4 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

Pre-MBA

1996 - 2002
Bach Khoa University of Technologies, Ha Noi, Viet Nam
Bachelor Degree of Electronics and Telecommunications

July 13, 1995


Graduated in High School

Professional Training

Dec 2008 to 5 Dec 2008


Cambodia SKT (System Knowledge Transfer), Ericsson Education Malaysia on SGSN R7 Operation and
Maintenance

24 Nov 2008 to 28 Nov 2008


Cambodia SKT (System Knowledge Transfer), Ericsson Education Malaysia on GGSN R4 Operation and
Maintenance

20 Oct 2008 to 31 Oct 2008


Cambodia SKT (System Knowledge Transfer), Ericsson Education Malaysia on CN/MSS for
MSC/HLR/AUC Operation and Maintenance

6 Oct 2008 to 17 Oct 2008


Cambodia SKT (System Knowledge Transfer), Ericsson Education Malaysia on CN/MSS for M-MGw
Operation and Maintenance

16 June 2008 to 19 June 2008


Malaysia, Ericsson Education Malaysia on GGSN R4 Network Engineer

12 June 2008 to 13 June 2008


Malaysia, Ericsson Education Malaysia on GSNM/WCDMA SGSN R7.0 System Administration

10 June 2008 to 11 June 2008


Malaysia, Ericsson Education Malaysia on GSNM/WCDMA Operation and Handling in SGSN R7

30 May 2008 to 04 June 2008


Malaysia, Ericsson Education Malaysia on GSNM/WCDMA M-MGW R4 Operation and Configuration

16 May 2008 to 23 May 2008


Malaysia, Ericsson Education Malaysia on WCDMA MSC/MSC-S R12 Configuration

12 May 2008 to 15 May 2008


Malaysia, Ericsson Education Malaysia on WCDMA AXE Maintenance

09 May 2008 to 09 May 2008


Malaysia, Ericsson Education Malaysia on GSM/WCDMA AUC R12 Operation

06 May 2008 to 08 May 2008


Malaysia, Ericsson Education Malaysia on GSM/WCDMA HLR R12 Operation

Page 5 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

23 Apr 2008 to 05 May 2008


Malaysia, Ericsson Education Malaysia on WCDMA AXE Operation

21 Apr 2008 to 22 Apr 2008


Malaysia, Ericsson Education Malaysia on WCDMA MSS R4 Introduction

3 Apr 2008 to 7 Apr 2008


Malaysia, Ericsson Education Malaysia on ATM & IP over ATM

2 Apr 2008 to 2 Apr 2008


Malaysia, Ericsson Education Malaysia on CPP Nodes Features & Functions

31 Mar 2008 to 1 Apr 2008


Malaysia, Ericsson Education Malaysia on Ericsson WCDMA System Overview

2006
Cambodia with the Association for Oversea Technical Scholarship (AOTS) on the Application of
Information and Communication Technology (the main subject is IT Project Management)

2005
Shenzhen, Huawei HQ on Data Communication Products Engineer Training

2003
Malaysia, Huawei Regional Office on Switching System and Access Network Engineer Training

Software Tools
Microsoft Office Suite
Microsoft Word
Microsoft Excel
Microsoft PowerPoint
Microsoft Publisher
Internet / Email / Other
Outlook: Diary/Email
Internet Research
Lotus Notes

Page 6 of 7
firstpointgroup.com
Head Office +44 (0) 20 7758 4190

References

1 Mr. Derek Voigt

-Head of Head of Operations at Ericsson Myanmar Co. Ltd


-E-mail: derek.voigt@ericsson.com
www.ericsson.com

2 Mr. Him Phirom:


-NSS Technical Support Expert, Asiacell Company for
Telecommunications, Iraq
-Mobile: +964-7701105717
-E-mail: himphirom@asiacell.com or himphirom@yahoo.com
www.asiacell.com

3 Mr. Mey Thirith

-VAS & Billing Team Leader at Cambodia Advance Communications Co.Ltd


(www.qbmore.com.kh)
-Mobile: +855 13240930/+855 12944330
-E-mail: thirith.mey@qbmore.com

Available on request

Page 7 of 7

Potrebbero piacerti anche