PLANT
Remove the debris and allow for traffic. Due to continue of rain it is not
advisable to travel by vehicles. Further road improvement work in progress.
1|P a g e
Power House and Tailrace
There is no any damage due to heavy rain.
Surface area of tail race and no any damage due to heavy rain. Tail race is under this surface.
Outlet of tailrace . Accumulated gravel not affected to operational work but this should be
remove before start the operational work
Penstock Path
Minor Land slide between anchor block A4 and A5 . Access road washed out
at A5 due to heavy flow in the stream closed to anchor block 5 .There is no
physical damage to penstock supports but some of foundation not stable.
Soil collapse on penstock line and this was expecting during design stage and
this is not very critical for operational work. This area is very unstable and
penstock path design based on that situation.
Embankment erosion
3|P a g e
Forebay Tank
Headrace Channel
4|P a g e
New water path created due to heavy rain and need to introduce several Box
culverts across Channel path .
Land slide can happen in future but there is no visible very thick overburden in
that area,
5|P a g e
Debris above weir
Land slide area just above the weir and right side of weir
6|P a g e