Sei sulla pagina 1di 17
PRBS FRM BRUT I") JIANGHAN PETROLEUM PROSPECTING & DESIGN INSTITUTE OF SINOPEC § lone JPPDI SUDAN BRANCH DATA TRANSMITTAL To : PETRO-ENERGY E&P CO. LTD. FROM ; — JPPDI Khartoum Sudan Date: 29,11, 2016 ‘Transmittal Nos: GEN-P-T-012 PROJECT: Provision of Hadida Export Pumps and Power FOR INFORMATION Forsicnature — [_| Plant Upgrading FORAPPROVAL [| __ FOR QUOTATION PROJECTNo. Petro-Energy/11/2016-881 1046 FORCONSTRUCTION [| FORREVIEW Z No. DESCRIPTION DWG./DOC. NO. REVSHEETCOPIES 1. _| Data Sheet For Ball Valve HD4-DST-PIP-1603-4001 | A| 6 2. __| Data Sheet For Globe Valve HD4-DST-PIP-1603-002 | A| 3 3. _ | Data Sheet For Strainer HD4-DsT-PIP-1603-4003 | al 2 4. __ | MTO For Bulk Valves HD4-MTO-PIP-t608-4001 | A| 2 5, _ | Hedida FPF Phase Il Stage | Plot Plan HD4-LAY-PIP-1603-4007-01 | B| 1 «, _ | Hadida FPF Phase Stage! Plot Plan Power | HD4-LAY-PIP-1603-400%-02 | 5 | Plant 7, | Hadide FPF Phase Stage Plot Plan Export | HO4LAY-PIP-1603-400%-03 | |] Pumps Area Electronic copy handed over to PETRO-ENERGY's DCC. gh pet Project Manager INTERNAL DSTRIBUTION ofPle|x| 1] wera osrmamon [oe [e[x|t DOE mm Zeakcal Process Inston | Ping I om 1 ‘Mechanical I (= Original P = Ai/ Adi E = Bacon copy X= AST = Transit PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THIS TRANSMITTAL, Received: Date: PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING on een eer Petro-Energy E&P Co., Ltd. PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING DATA SHEET FOR BALL VALVE CONTRACT NO.: Petro-Energy/11/2015-8811 WORK ORDER NO.: 044 A | sssveprorrevew | crue | mew | spe | THe PREPARED| CHECKED | APPROVED| REV DESCRIPTION DATE BY i By CLIENT PROTEST: PROVISION OF FADION EXPORT PUPS AND POMER PLANT UPGRAGING [ouENT: PeTHO-ENEROYEEPCOLTO [rk order no: 044 [bce nor HOLOST APE OT SEIS ev Wo & GENERAL DATA [VENDOR COMFIRTATIONNOTES) [ANE SZERANGE FOE, [VALVE Awe CLASS ‘ [vatve SERVICE ‘SWEET HYDROCARBON UTIOTES [VALVE TYPE: SPLIT BODY [VALVE ENO CONFIGURATION RAISED FACE FLANGED. tener ASME 10__LOWG PATTER FLINGE FACE FSH SMOOTH FINS (RA=3.2 106A NORD [VALVE BORE REDUCEDFULID REDUCED BORE [CORRISION ALLOWANCE: ern Es TaivE OPERATION EVER OPERATED GEAR OPERATIONS BABOVE bait SUPPORT FLOATING BALL TRUNNON MOUNTED FOR" & ABOVE LOoKNG FACULTY, "ASPER REQUISITION poor Gavi BLEED REQUIRED (Ci PWG] FOR 6 ABOVE eau SUD pwr STATIC REQURED [wwriexow oursveTeM REQUIRED. FLOW DRECTON 8 DRECTONA, [GREASEIGEALANT HUECTION FTTNG REQUIRED FOR A ABOVE. waTERALS B07 ‘AST ATOGN ATU ADT WO, NA OSE, pau ASTM AT82-FSIGASTIA3SI GR CFE sien ASTIN 182 GRFSTS PR NRT SEATS PTFE, ANTI STATIC RENEWABLE SEATS ‘SSH6 SEAS “Tow scan PACKS FLEXBLE GRPHO oct. ASTM A10-87 AND ASTHATOU ZA SEATSPRING ‘SSH6 [CODES AND STANORROS pesieuco0e SHG ETE FLANGE DIVENSONS ASMESTES [DERTIFCATION AS EN 1020 TTPERIS Re Test AP. 07165 655 PART AS APPLIOABLE [evoROSTATCTEST A598 OTHER APPLCAELE PROM SPEC, PIPING MATERNAL SPECPCATION —— GENSPCDR-ImT VALVE SPECICATION (GEN-SPCPPENSS 1 ‘Sot pale aves we nel coe ‘ales shal have postion near stovng agen and cate poss “The requrener of Ful brant pack cy sabe separa enledn Pe Vave Reston. ‘Vendor al he data wih eee maeral agate sec rate ‘ahs be inpede yi ary Far ctl npeconrogrerant er VAL STF ATOR ERT PO PORE ROTS—A EET POR Scent peTaDeRERGTERP COLT BALM A Aleem PaSnDIBRETID e oo [Doc. No: HO4DST-PIP. 1603-4001 SHEET 2 ofS § lon fen Para See SER OTTER hae arER Far Ine eve cuss ro fave ee SHEET ORO ai SET BOnY fuse eo COMMON — We To NED exer HENAN SD fie ame REDO — enue eomisen tomes — Tem lesa {ae oer REN ERTS TOE SURO HONOR OUNTED poomeFicuTy TS PERTEGUSTEN pu sou jose ERED famiston oor SST —— recur PLOMDRECTEN SDRECTOR arenas SBT STENTS EWE MTA pu AST GR [rar AST GUT PTS EE AMIS RENEVGLE SEATS cS ss Wot [son ros EOL OLIN STANT ND STUTT co5es me SaaS SeROTOSSE SESE PLA OUEST ASETES etrcrren oe pers 10 SST RT 1S LETTE [ones Ter AAS SHER AUT ROSA — Arcee ASIAN —— GSACR iE SEOFEATEN ceSsC Pra Leama ea Hl So pa a 2 Vie hl ae por es ox opm opal 4 Tseng bt al pty a Va Ra “ Te Sa aaa Sab Pe acta wad 3 ‘ale be pected by Hie ary, Fuga pen regrarent er VORL [PROUECT PROVISON OF FAOIDA EXPORT PUPS AND POWER PLANT UPGRADING [DATA SHEET FOR, [cLeNT: PeTRO-ENERGYEUPCOLTO BALL VALVE as [vrk or No-048 FAGNO.BAETS = [boe. No: HOOST Papa) ——eHEET Sots Cony pPESREC AT [GeneRAL oATA "VENDOR CONFRUATIONNOTE [aLve SERANGE TOU fvaLve swe cass 008 [vacve semvice “ULES fvacve TE SPL BOO [vacve ENO CONFIGURATION SCREWED (FTE) fisusra VANUFACTURER'S SD, [vALve BORE (REDUCED REDUCED [ooRRISIONALLONAACE 16m [oesicw [acre OmERATON, TEVEROPERATED, fant suPpoRT. FLOATING ALL [tock FACT AS PERREQUSTTION fou SOLID fowri stan REQUIRED. [avristow curSverem REQUIRED. [FLowoRECTION BLDIRECTIONAL [aaTeRATS poor ‘STA ATOGNT STH ATE WO, WAL OSH feat ASTA 182 GR 16 sre ASTM 182 GRE Pr SEATS PIFE, ANTI STATIC RENEWABLE SEATS S516. sears “UTON fsLaNoPRORNS FLEXLE CRIPHOL ours. ASTM AIS367 AND ASTHATORZH [GoOES AND STANDARDS pesiGN CODE ae ESTEE [SCREWED OWENSONS ASME 81.201 IceRTmcATION BSN (0200 TWREATS re Tes ‘1607/65 6755 PART DRS APPLICABLE -voRosTaTICTEST 1598 [OTHER APPLICABLE PROD SPEC PPNG WATER SPECIATION EXSPCPPSI, {VALVE SPEOIFICATION CGENSPO-PIPSDSS tC RESRERENTSTES 7 ‘So poten ales we we ‘aves Stal Fave poston nica showing open ad cose postions The requterent of Ful br ant padlock ly sabe septal ented ne Va Reqs. onder shal i edt wh hs cflered mail ayant he sected mae Toes npete yi party. Far eal npacn rgreront ef VOR [PROTECT PROVISGN OF FADIDA EXPORT PUNPS AND POWER PLANT UPGRAGING [DATA SEETFOR [GLinT: PeTRO-ENERGY EEPCOLTO [BALL VALVE [Work orderNo: ea [TAGNO:DAFTT Doc. ne: Hoe DsTIRTeonaooT SET eat ev Nok PreweCeT [GENERAL DATA [VENDOR CONFARATONNOTEA] [WALVE SERINE F, [vaLve ASE CLASS ce Jvacve Sewvice SWEET HYDROCARBON, JaLve TPE SPUT BODY VALVE ENO CONFIGURATION. RING JOINT FUNCE lensri ADIDFRCTURERS STO vaLve BORE (REDUCEDIFUUT. REDUCED, [CORRISON ALLOMANCE: ‘am joes ALE ORERATION TEVEROPERATED, faa suPPoRT TRUNNION VOUNTED, [Locka FACLTy 1A PER REQUISTION. ea SOU Dun. STATIC REQUIRED fawn. Low OUT SYSTEM REQUIRED. FLOW DRECTION BLOIRECTIONAL IwaTERDALS lscor AST ATOSNT AST ADTOWOD, HA OO eae AST 182 GREST stew AST 182GRFSTG RNR SEATS PIE ANTISTANC [ReNenaBt= SEATS ‘S60 seus VITON [Guo PACKER. FLX CAO Bout. AST ALS. AND ASTAIATOA [CODES AND STANDARDS loesaw CODE si EES FLANGE DINENSIONS ASE BIBS [ceRTFICATION 2 EN OZOTYPES TD pre Test API BIT BS 6755 PART DAS PPLABLE IHvoROsTaTE TEST P1598 [OTHER APPLCAaL= PRON SPEC PING MATERIAL SPECICATION CERSPCP RST VALVE SPECIFICATION (GENSPCPPSDES I ROOREAENTETIOTES ‘Sa palo was ae lw ‘Vaves shat fave postin mcr s 5 ad cepa Taegan a Fu bee and park act shale separa ere ne Ve Reus Verde shel fe dl ih he oferes marl aga he pecid mati. ‘aves tbe nape by Ui pay, Fc di nspecten egrenerteer& ORL {OJECT “PROVISION OF WADIDR EXPORT PONDS AND POWER PLANT UPGRADING [DATA SHEET FOR [GLENT: PeTRO-ENERGYEEPCOLTO BALL VALVE Work order no: 008 Fras no.BArTS si a Doc. Ne: x DST-APTSOSOo| SHEET S75 lone vn a [PRE SPEER [SEVERAL DATA [PERDOR CONFIRMATONNOTES) ave BERNE TETOU Lv ASNE CLASS 13008 VALVE SERVICE SWEET HYDROCARBON [VALve TYPE PUT BODY [VALVE ENO CONFIGURATION NBT, SCREWED, tener MANUFACTURERS STD [VALve BORE (REDUSEDULT REDUCED [SORRIION ALLOWANCE. ‘om [pewN [ane OREN THER OPERATED, AL suPPoRT FLOATING BALL Locka FACT AS PER REGUSTION os SOuD Ti STATC REQURED, [wri stow oursveTE REQUIRED. FLOWOIRECTION BLORECTONL aaTERALS poo ASTM ATOGNT AST RPTO NOS AR OSEE ea ASTI 2 GRESTE STEN ASTATEZ GRIST Rey SEATS PIFE,ANTESTATIC RENEWABLE SEATS S16. seas ‘TON [ocano PACH FLENOLE GREPHOL Jsoxs ASTIN ALS-07 AND ASTH ATE [CODES AND STANDARDS Dewan oooe: SRST AEST [SCREWED DNERSOWS ASHE 81201 [CERTFICATION BS EN 0204 NPE STB me test A107 BS 6755 PART 2 AS APPLICABLE HYDROSTATIC TEST P1538 [OTHER APPLICABLE PRON. SPEC PPING HATER SPECTFEATION CESPOPI TED TALVE SPECIFICATION (GEN-SPO-PI S055 [mea RESORENENTS TOTES 7 ‘Shed palon waves oe 00 ae 2, \Vaves sal hve poston ier showy pen and Goce ponans 3, Tha requremen Ful bere and pack aly stale separa erin Vave Regu, 4 Vevicrsa he dita wh fered rata agin he pecid mata. 5, "Yves be nsec ty pay, For dad npeconraterent ft VORL PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING DOCUMENT NO : HD4-DST-PIP-1603-4002 DATE : 29.11.16 COVER SHEET Petro-Energy E&P Co., Ltd. PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING DATA SHEET FOR GLOBE VALVES CONTRACT NO.: Petro-Energy/11/2015-8811 WORK ORDER NO.: 044 A ISSUED FOR REVIEW 29.11.16 aw) $70. TME PREPARED | CHECKED | APPROVED BY BY BY REV DESCRIPTION DATE CLIENT Reno [Pa SrEETFOR Jovose vaLve [AG No: c1-t09.6 pir sec: ant [GeweRac cara EROOR CONF RVATIONNOTET) VALVE SIZE RANGE. Poe VALVE ASNE CLASS, 1508 TALVE SERVICE "SWEET HYDROCARBON IWaLVE TYPE ‘SOLID WEDGE VALVE END CONFIGURATION RAISED FACE FLANGED. PATTERN ASME B16.10_ STRAIGHT Stent RISING STEM, JDONNET BOLTED [FLANGE FAGE FINSH ‘3.2 106.3 um Ra (195-250 AAR) [GORRISTON ALLOWANCE, “Lémm DESIGN. VALVE OPERATION, HAND WHEEL OPERATED [GEAR OPERATION FOR 127 & LARGER] LOCKING FACILITY ‘AS PER REQUISITION MATERIALS BODY ‘ASTM ATOSNT ASTIN ADT WOB, MAK 025% © [COVERIEONNET ‘ASTM ATOSN [ASTM A2T@ WCB, MAK_0-25% C [weDGe ‘ASTM AZI7 CANS [SEATS (BOOYIWEDGE) ‘ASTM ATOBN + STECLITE NOS. [BOD YIGONNET GASKETS ‘SPIRAL WOUND SS-904 WITH SOFT STEEL CENTERNG RNG [sTew 720 [SLND FLANGE, ‘ASTI ATOSN [etaND BUSH Tate [GLAND PACKING GRAPHOT BOLTING ‘ASTM A907 AND ASTM ATOZ [CODES AND STANDARDS: [DESIGNTCODE: APT BOCES 5352 [FLANGE OIMENSIONS ‘ASHE 165 [GeRTIFICATION BSEN 10206375, [HYOROSTATIC TEST API 598 [OTHER APPLICABLE PROJ. SPEC. - PIPING MATERIAL SPECIFIGATION GEN-SPCPIP-505D 'VALVE SPECIFICATION (GEN-SPC-PIP-50S5 [ADDITIONAL REGUIREWENTS / NOTES 1] Vaves shall have postion inieslor Showing open and cose postions 2) Vaives_shall have faciiies for provision of padlock at ste '3) Vendor shall he offered material agains! he specified material PROTECT“ PROVISON OF HADIDN EXPORT PUMPS AND POWER PLANT UPGRADING, A [SUeWT- PETRO-CNERGYEEPCOLTD = Doc. no HoOST-AP-To0sa002 SHEET 7AT or: Orde No: 08 [GENERAL DATA [VEXDOR CONFRMATONNOTES) NALVE SIZE RANGE Sow VALVE ASME CLASS, 2008 IWALVE SERVICE ‘SWEET RYDROCAREON VALVE TYPE ‘SOLO WEDGE [VALVE END CONFIGURATION RING JOINT FLANGE [PATTERN ASME B16.10,_ STRAIGHT [stem RISING STEM JEONNET ‘BOLTED FLANGE FACE FINSH 3.2106 Sum Ra (126-250 ARH [CORRISION ALLOWANGE, “Lémm DESIGN. VALVE OPERATION HAND WHEEL OPERATED (GEAR OPERATION FOR & & LARGER] LOCKING FACILITY AS PER REQUISITION MATERIALS BOOT. ‘STH AVON ASTM AZTS WOE, WAK OSHC [COvERIBONNET ‘ASTM ATOSN [ASTM AZTS WS, MAK. 0.25% 6 lWeDGe ‘ASTIMAZTT AIS [SEATS (BODYWVEDGE) ‘ASTI ATUSN + STELLITE WO JBODYIBONNET GASKETS ‘SPIRAL WOUND SS 304 WITH SOFT STEEL CENTERING RNG) isrem 126 [GLAND FLANGE, ASTIC ATOON [SCAND BUSH Tar ISLAND PACKING (GRAPHOT. fBOLTING ‘ASTI ATGS-BY AND ASTIN ATGE2H [CODES AND STANDARDS: IDESTGNCODE: PT BOOTES 5D [FLANGE DIMENSIONS. ASHE 8 185 [CERTIFICATION BSEN 10208318 IYDROSTATIC TEST APL S98. [OTHER APPLICABLE PROJ, SPEC. PIPING MATERIAL SPECIFICATION GEN'SPCPIP-S050 VALVE SPECIFICATION ‘GEN-SPCPIP-5055. [ADDITIONAL REGUIREWENTS [NOTES “Valves shall have positon indealor showing open and cose postions 2) Valves shall have facities for provision of padock at sl. 3) Vendor shal fl the offered miteil against he specified material PROVISION OF HADIDA EXPORT PUMPS, AND POWER PLANT UPGRADING DOCUMENT NO : HD4-DST-PIP-1603-4003 REV. Petro-Energy E&P Co., Ltd. COVER SHEET DATE : 29.11.16 PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING DATA SHEET FOR STRAINER CONTRACT NO.: Petro-Energy/11/2015-8811 WORK ORDER NO.: 044 20.11.16 A ISSUED FOR REVIEW Haw SPO TM PREPARED] CHECKED | APPROVED) DESCRIPTION DATE BY BY BY CLIENT OWNER PRC CONTRACTOR Joocuwent no. 46 ee ee TADS DSTPIPABDI A005 : PETRO-ENERGY ESP CO.LTD STRAINER DATA SHEET PROVISION OF HADIDA EXPORT PUMPS ANO POWER PLANT UPGRADING SUDAN HADIOA FPF ODEL No ‘CONTRACT NO. TOTAL ary: TANG. [seanionenioe DENSITY viscosrT¥ ‘quanriry P&IONO, | OPER PRESSURE (OPER. TEMPERATURE (CORROSIVE CONTAMINANTS (CORROSION ALLOWANCE mm IRE 215 °c] ka/males0 Phs4@ 8 (ou. wareR 2 \woxpio-PRO-te03-0211 ‘OPERATING CONDITIONS (eat ch wit) AUD lewocon Hee ‘SWEET or SOUR SERVICE [sweeT tuwxagum Low ca 0 nian e.oW [ oma FLOW TRE 0 IGN TEMPER ‘SE | FACE TO FACE: WEIGHT -AINTING SIEVE MATERIA ESIGN PRESEL “Wi DESIGN METAL TEMP /ENDOR FIG. NO. ~ODY MATERIAL FLANGE NATERIAL BOLTING MATERIAL DESIGN CONDITIONS: BASKET SURE Eee ee ATURE DIMENSIONS mn] L TTNOTE =(NOTE (NOTE 1) [AS PER VENDOR PROCEDURE M AZNB WC ‘A105 AST A99-877 ATOAZH ASI316 MESH SIZE ALLOWASL= PRESSURE OROF! Kali __(GeanVDitynote2) PIPE SCHEDULEIMATERIAL [SCH STO/ASTW A 106 6-8 SHOP HYDRO Test ‘YES (in, {U5 Times Design Pressure) NODE Inuer jouer Ivenr lORAIN “NOTES ‘CONNECTIONS "0" S00HRF FLGAS ASHE BTES 0" SCHARF FLGASASMEBTES 3° 16008SCRD_1500# BALL VALVE ‘3° 15008SCRO 15008 BALL VALVE. | 1. VENDOR TO SPECIFY — 2. VENOER TO SPECIFY AND i SHOULD BE AS WINUM AS POSSELE [size RATING [REMARK [Size RATING REMARK Petro-Energy E&P Co., Ltd. PROVISION OF HADIDA EXPORT PUMPS AND POWER PLANT UPGRADING MATERIAL TAKE OFF FOR BULK VALVES. CONTRACT NO.: Petro-Energy/11/2015-8811 WORK ORDER NO.: 044 MATERIAL TAKE OFF FOR [ia zzanie | sssugnronscuew | raw | ii_{ Sak HD4.MTO.PIP-1603-4001 a QD T | ate enero —— en ape Ta Sears | lo {no POWER MLA UPSRAON ew] ary. | set MATERIAL DESCRIPTON TAONO. REMARKS Rev. lea vAve + [2 | a | Baltvaiveso,ssoon [SA IEREORNTES SEARS] suraa ros m 2 [1 | | eALvanvescr. coor | SPEYAVESTECRENTONS GENSPCSPNST | eneua a 3 | 2 | | BAlLvaive son, soo | PPR YUrEomeonenrmaceesrer=S | rears a «| 8 | 2 | sat vanenr sor | SPRAUEREORATOS SRECOPEST|renaoo a @ [1 | & | eALvalvens, soo | SPYLYEsreoresnONS coesrerr=sT | pearit a © | 1 | © | aAtvauvere sso | SPRYAVERREOREATINS SSCS) erenaoo a 7 | 2 | © | sAtvavers oo | SPRESEENDS Serres! eeAeiiS a © | 2 | tor | aaLvarvers ooo | SPeRYMVESPEORCATONS CoRSrC PES! iorBKETLG [a | locos vaLve + [2 [© | SOs valves. soon | SERENE SE SETROS] wat eni a 2 | 1 | © | ctome waivene son | SAUTE SreorcrTENS SSROARES | ag. non a lores Above MTrOs are based on BASC DESIGN "esued For Apgroval” PID REV.S ORAWINGS, Jz. Peinawitin ks / Vendor packages are exces fom this MTO scope. 2 I 3 4 i 5 6 1 z \ 8 I aaa aoe? i eS eon Pa ee, ae ee oe eee sypren [eas SE ere a | ee eee ee | fame cdiegeanaeeal ay foe pe ee a esses a : Ea See et ee ee = So eer tee 2 pe a a aaa pe peeeee eee eee ee ; ; 3 dao = i Re i fF I | rt LH! i i KEY PLAN

Potrebbero piacerti anche