(ii) Foundation
(Pile cap, stump)
2 Formwork:
3 Reinforcement:
Pad footing:
T20 60 /2 / 10
2.2m
2.47kg/m
6520.8 kg 24192.17
Stump:
T16 60/6/1.67m
1.58kg/m
949.9 kg 3419.64
R6 60 / 6
1.2m
0.22kg/m
95 kg 352.45
4 Concrete work:
(iii) Column :
Formwork:
2 Reinforcement:
T16 40/8/1.6m
1.58kg/m
809 kg 2912.40
T20 20/4/1.6m
2.47kg/m
316.2 kg 1173.10
R6 60/6/0.6m
0.22kg/m
47.52 kg 176.30
3 Concrete work:
Mass concrete of column 60 / 3.79
227.4 m3 50043.92
Formwork:
2 Reinforcement:
T16 60/10/2.57m
1.58kg/m
2436.36 kg 8770.90
R6 60/8/0.5m
0.22kg/m
52.8 kg 195.90
3 Concrete work:
Formwork:
T16 60/2/2.57m
1.58kg/m
487.27 kg 1754.17
R6 60/8/2.5m
0.22kg/m
264 kg 979.44
3 Concrete work:
Formwork:
2 Reinforcement:
T16 60/12/2.2m
1.58kg/m
2502.72 kg 9009.79
R6 60/2/2.7m
0.22kg/m
71.28 kg 264.45
3 Concrete work:
Formwork:
2 Reinforcement:
T16 60/8/2.57m
1.58kg/m
2047.68 kg 7371.65
R6 60/8/0.5m
0.22kg/m
52.8 kg 195.89
3 Concrete work:
Ground beam:
Formwork:
Reinforcement:
Concrete work:
Formwork:
1
Rough surface of beam 355.894 m2 18008.24
Reinforcement:
T12 343.48 1236.53
2 T16 680.98 kg 2451.53
T20 722.57 2680.73
R6 315.1 1169.02
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Roof beam:
Formwork:
Reinforcement:
Concrete work:
Ground slab:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
Formwork:
Reinforcement:
Concrete work:
(vii) Staircase
1 Formwork:
2 Reinforcement:
3 Concrete work:
2. Finishes
-wall finishes(plastering & painting) 5894.64 m2 104335.13
-floor finishes(cement rendering) 2538.75 m2 128460.75
-ceiling(gypsum plaster board 382.73 m2 6774.32
-
DESCRIPTION AMOUNT(RM)
1. Site Clearing 1,039.50
2. Foundation 349,325.23
3. Column 342,170.14
4. Beam 161,649.36
5. Slab 1,462,861.35
6. Brickwall 283162.54
7. Staircase 116,228.81
8. Others 239,570.20
Subtotal 1 2,956,007.13
Subtotal 2 3,192,487.70
TOTAL 3,288,262.33
Price Index
2 excavation m3 16.50
3
Concrete :
(Foundation, walls , beams and columns)
Grade 25 m3 220.07
4
Reinforcement :
6 mm dia. Mild steel bar (R6) 3.71
20 mm dia. high tensile bar (T20) 3.71
16 mm dia. high tensile bar (T16) kg 3.60
12 mm dia. high tensile bar (T12) 3.60
10 mm dia. high tensile bar (T10) 3.71
BRC A8 T8 m2 12.72
6 Brickwall m2 38.30
7 12mm thk plasterboard in ceiling m2 49.00
9 Finishes
-wall finishes(plastering & painting) m2 17.70
-floor finishes(cement rendering) m2 10.60
-ceiling(gypsum plaster board m2 17.70