Sei sulla pagina 1di 5

Check list for Substation/ Switch-yard

Na Details: 400KV lndravati s ? (-( I


Sl No Protection Scheme Stat u s Rema rks
1, Local Breaker Backup (LBB) Yes CTIG, EE Make

2 Event Logger (EL) Yes PERM 2OO

3 Synchronizlng Facillty Yes Relay Type:SKD,EE Make


Are Synchro Check Relay provided with requisite
4 Yes
setti ngs ?

DC supply:
Yes 220V DC : 02 sets
5 i) 48V 48V DC:02 sets
Yes
ii)220v
6 DG set Yes 35OKVA (02 Nos.)
7 Auxiliary Supply Yes Availed from SOUTHCO
8 Special Protection Scheme (SPS) No
Under Frequency Relay(UFR):
i) Stage I

9 ii) Stage ll No
iii) Stage lll

Has the Fault level lncreased since connected to No


10
grid?

lf status at Sl.No 1 isYes, then whether


11 Sectionalisation of the bus/ Series Reactor on the No
line or bus provided to limit the fault level?

Has the size and number of ICT in the S/S been


planned in a way that the outage of any single unit
t2 NA
does not overload the remaining lCTs or the
underlying transmission system
SCADA:
i) Voice Voice: PLCC
13 No
ii) Data Data: RTU

L4 Switching Schemes No One & half Circuit Breaker Scheme


Are Circuit Breakers suitable for single-phase and
15 Yes Single phase auto recloser VARM
three-phase auto reclosing?

t6 Are Circuit Breakers provided with two trip coils?


Yes
Are Circuit Breakers provideb with Pre lnsertion Not available in PG-UIHEP Line and
t7 Yes available in all other Lines
Resistors?

Are Earthing Switches provided at appropriate


18 locations to facilitate earthing of outgoing Yes

transmission lines to enable maintenance?

Are all main protection relays of numerical type?


19 No
Are protection functions subdivided into two
independent groups & capable of providing
20 Yes
uninterrupted protection even in the event of one
protection groups failing?
2L Are two sets of DC sources available? Yes

(u^^on*
M,, 6l 1

ol I tj
3s \ \9 b lr lr)
lf status to Sl.No 21 is Yes, then whether relays are
electrically and physically segregated into two
22 groups to obtain redundancy and to take protection Yes

systems out for maintenance while the equipment


remains in service?

lf status to Sl.No 2L is No, then whether relays are


electrically and physically segregated into two
groups by giving DC supplies through separate
23 fuses ?
Main & Check zone for 400KV BUS
24 Bus Bar Protection Yes
(SBNH161,EE Make)

Bus Bar Protection scheme has provision for future


Yes
25 expansion
26 Emulsifier System Yes

I a, D) 1,c D
\9,
ffi,y, 3c \
lndravati-Rengali Line lndravati-Jevoore Line lndravati'ulHEP Line
Protection Srheme Status Remarks Status Remarks 5tatus Remarks
5l No I

MICOM P442 (AISTOM MAKE) MICOM P442 (AISTOM MAKE) MICOM P442 (ALSTOM MAKE)
Yes Yes
1 Main l-Distance Yes

Main ll-Distance Protection of directional


MICRO MHO
2 comparison protection or phase Yes Yes SEL 421 (SEL Make) Yes MICRO MHO (English Electric Make)
(English Electric Make)
segregated line differential protection

Directional instantaneous def inite


3 mlnimum time (IDMT)type earth fault No No No
relay

Directional IDMT over current and earth lnburlt in MICOM P442 (Main'l) lnb!ilt rn MlcoM P442 {Matn t)
4 No lnbualt in MICOM P442 (Maint) No No
fault back up protectron

!lO%lot 0.5sec (for Stage-l) and 110% for 0.5 sec (for StaSe-l) and 170% tot o. 5 Sec (for Stage-l ) and
Two stage over voltage protection Yes Yes Yes
5
150% for 100 msec (for stage-ll) 150% for 100 msec (for stage-ll) 150% for 100 msec (for stage-ll)

6 Auto Reclosing Yes VARM 1 11,EE Yes VARM 1 1 1,EE Yes VARM 1 11.EE

carrier aided intetrtripping/blocking PUPZ2, TRIP MODE:1 pole Zl,Z2 &


7 Yes Yes PUPZ2, TRIP MODE:1 pole 21.22 & CR Yes PUPZ2, TRIP MODE:1 pole z1 & CR
feature CR

Are Power Line Carrier Communication


(PLCc) equipment with Protection
ABB Make,Model:ETL42 (Not
8 coupler complete for speech YeS BPL Make,Model:6515 Yes BPL Make,Model16515 Yes
comrssroned,OPTCL property)
transmission, line protection and data
channels provided?

Are 100% back up Communication


Yes
9 Channels provided for transmission line Yes Yes

& line compensating equipment?

10 Disturbance Recorder Yes Inbuilt rn MICOM P442 (Marn-l) Yes tnbuilt in MlcoM P442 (Main-l) Yes tnbuilt in MlcoM P442 (Marn-l)

RANZA (ABB)/lnbuilt in MICOM RANZA (ABB)/lnbuilt in MICOM P442 RANZA {ABB}/lnbuilt rn MICOM P442
11 Distance to Fault Locator P442 (Main-l) (Main-l) (Mainl)
Yes Yes Yes

Event LogSer:
Stand alone PERM200 (EE Make) Yes stand alone PERM200 {EE Make) Yes stand alone PERM200 (EE Make)
12 i) Stand Alone Yes

ii) Pan of S/5 or Switchyard automation

Are Time Synchronizing Equipment (TSE)


complete with antenna, all cables,
processing equipments etc. provided to Time Synchronising Unit, Model: Time Synchronisins Unit, Model: MC-l Time Synchronising unrt, Model: MC-l
MC-l (MASIBUS Make) (MASIBUS Make) {N,IASIBUS Make)
receive svnchronizing pulse through Yes Yes
13 Yes Time Display Unrt : TDU-64
Global Positioning Svstenl (GPS) Time Display Unit : TDU-64 Time Display Unit: TOU-64
Make: MASIBUS Make: MASIBUS Make: MASIEUS
compatible for synchrgnization of event
logger, disturbance recorder and
SCADA/automation sYstem ?

Are all protection employed Numerical No NO


14 No
type?

Are two protection channels in addition ABB Make,Model:ETL42 (Not


BPL Make,Model:6515 Yes
15 to one sPeech Plus data channel Yes 8PL Make,Model:6515 Yes
comissioned,OPTCL ProPeft Y)
provided for each direction?

YeS CTIG39,EE Yes CTIG39,EE


Local Breaker Backup Protection (LBB) Yes CTIG39,EE
16

\7 Any other Protection No No


No

trip for 21 Yes Block ot 22.23,24 and trip for 21 Yes Blockfo(Z2,Z3,Z4and triP for 21
18 PSB Scheme Yes Block for 22,23,24 and I

g*,',
@u1,,1,,
Q,tl*i*
ErXutuuu, Pe,a,
{
3'1, Ir>
G, Ir,**Su\rq--
eerk-
ba l, l'>
V- l^1'^"^'*

Ol
t
ee |<./c M
r\^^$D r \ila*t s/t
R.M.
CHECK LIST FOR LINE REACTOR
NAME/DETAILS 400KV/s0 MVAR LINE REACTOR
Sl No Protection Scheme Status Remarks
1 Diffe rentia I Yes 87R,CAG 34,EE

2 Restricted Earth Fault (REF) Yes 64R,CAG 14,EE

Reactor backup protection (impedance type


3 or definite time over current (O/C) and Yes 21R,YTG 33,EE
earth fault (E/F) protection)
4 Buch ho lz Yes

5 Winding Temperature lndicator (WTl) Yes Ala rm-100"C,Tri p- 1. 10"C

6 Magnetic Oil Gauge (MOG) Yes


7 Oil Temperature lndicator (OTl) Yes Ala rm-95"C,Tri p- 105"C
390KV on HV side & 120KV on
8 Surge Arrestor (SA) Yes
Neutral side
9 Cooling Yes Fan( ONAN, ONAF)
Fire Protection Sysrem available (
10 Any other Protection No
Emulsifire)

@kp,),,
! 19.
),o l, ['r
$,. 6\
r'''
CHECK LIST FOR TRANSFORMER
NAME/DETAILS 4OO / 220 I 33 KV,3X105 MVA,B H EL AUTO TRANSFORM ER

Sl No Protection Scheme Status Remarks


1 Differential Protection Yes MrcoM P633
GTTM22(99) ALSTOM
2 Over Fluxing Yes (V/f)inv: 2.53
(V/f)inst : 3.036
3 Restricted Earth Fault Yes CAGl4,ALSTOM
Backup directional over current and earth
4 fault protection (HV & LV side) or Yes CDD3l,ALSTOM
impedance protection
5 Buch holz Yes

6 Winding Temperature lndicator (WTl) Yes Alarm-95"C,Trip-105"C


7 Oil Temperature Indicator (OTl) Yes Alarm-85'C,Trip-95'C
Magnetic Oil Gauge (MOG) with low oil level
8 Yes
alarm provided?
Oil Surge Relay (OSR) for On Load Tap
9 Yes
Changer (OLTC)
10 Pressure Relieve Device (PRD) Yes

Surge Arrester (SA) on both primary and


390KV on primary side and 21.6KV on
L1 secondary sides of transformers located
secondary side
outdoors and connected to over head lines
Yes
Tertiary winding protection Not Used (Solidly grounded)
12 No

CDD 12,EE Current Setting: I]-O%for I


13 Over load alarm Yes
Sec

1,4 Cooling No
Both Fan & Pump( ONAN, ONAF, OFAF)
Fire Protection System available(
15 Any other protection Yes
Emulsifire & Hydrant)

fu^v'