Sei sulla pagina 1di 618

2

1 Congresso portugus de
Building Information Modelling

Universidade do Minho, Guimares


24 e 25 de novembro de 2016

Editores:
Miguel Azenha
Joo Poas Martins
Jos Granja

Coorganizado por:

3
Texto 2016 Editores
Design Jos Granja
ISBN: 978-989-8793-04-1
DOI: https://doi.org/10.5281/zenodo.166758
Departamento de Engenharia Civil, Escola de Engenharia, Universidade do Minho
Campus de Azurm, 4800-058, Guimares, Portugal
http://www.civil.uminho.pt/
Universidade do Minho. 2016
Autores. 2016
Editores. 2016

Crditos para a foto de capa: Boutik Marketing


Todos os direitos reservados. Nenhuma parte desta publicao pode ser reproduzida,
armazenada ou transmitida total ou parcialmente, por nenhuma forma e nenhum meio, seja
mecnico, eletrnico, ou qualquer outro, sem autorizao prvia escrita dos autores e editores.
Os textos, bem como os esquemas e imagens do seu contedo so da inteira responsabilidade
dos seus autores.
Os autores e os editores fizeram todos os esforos para assegurar a exatido da informao
apresentada.

4
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

COMISSO ORGANIZADORA LOCAL


Miguel Azenha Universidade do Minho (EEUM)
Jos Granja Universidade do Minho (EEUM)
Bruno Figueiredo Universidade do Minho (EAUM)

COMISSO ORGANIZADORA NACIONAL


Joo Poas Martins Universidade do Porto (FEUP)
Antnio Aguiar Costa Universidade de Lisboa (IST)
Nuno Lacerda Universidade do Porto (FAUP)
Francisco Teixeira Bastos Universidade de Lisboa (IST)

COMISSO CIENTFICA
Joo Poas Martins Universidade do Porto (FEUP) (Presidente)
Alfredo Soeiro Universidade do Porto (FEUP)
Antnio Aguiar Costa Universidade de Lisboa (IST)
Bruno Figueiredo Universidade do Minho (EAUM)
Diogo Ribeiro Instituto Superior de Engenharia do Porto (ISEP)
Fernanda Rodrigues Universidade de Aveiro (UA)
Fernando Pinho Universidade Nova de Lisboa (UNL)
Francisco Teixeira Bastos Universidade de Lisboa (IST)
Hugo Rodrigues Instituto Politcnico de Leiria (IPL)
Joo Pedro Couto Universidade do Minho (EEUM)
Jos Carlos Lino Newton-C - Consultores de Engenharia
Jos Pedro Sousa Universidade do Porto (FAUP)
Jos Pinto Duarte Penn State University (PSU)
Levi da Costa Universidade Lusada (UL)
Lus Costa Neves Universidade de Coimbra (FCTUC)
Miguel Azenha Universidade do Minho (EEUM)
Nuno Lacerda Universidade do Porto (FAUP)
Paula Couto laboratrio Nacional de Engenharia Civil (LNEC)
Sara Eloy Inst. Universidade de Lisboa (ISCTE)
Zita Sampaio Universidade de Lisboa (IST)

COMISSO DE HONRA
Paulo Loureno Universidade do Minho (EEUM)
Hiplito Sousa Universidade do Porto (FEUP)
Fernando Branco Universidade de Lisboa (IST)
Carlos Guimares Universidade do Porto (FAUP)
Teresa Heitor Universidade de Lisboa (IST)

5
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

PATROCINADORES

A400 - Projetistas e Consultores de Engenharia

Telhas Cobert - Part of BRAAS MONIER BUILDING GROUP

BIMMS - Building Information Modeling and Management Solutions

INFOR - Sociedade Portuguesa de Estudos e bimTEC - Building Information


Informtica Modeling Consultants

CONSTRUSOFT Software BIM para a ARCHIBUS


Indstria de Construo

6
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

dstgroup building culture Leica when it has to be right

Newton-C - Consultores de Engenharia


nossoBIM - Pioneiros em formao
avanada e divulgao BIM online

CYPE - Software para Engenharia e Construo


EDP - Energias de Portugal

7
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

8
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

PREFCIO

A crescente importncia da representao digital de elementos de construo, tornada possvel


pelas metodologias Building Information Modelling (BIM), est a introduzir alteraes muito
relevantes no projeto, na construo e gesto de operaes. Estes processos digitais introduzem
novos paradigmas de relacionamento entre os vrios atores envolvidos, com grande impacto
nas formas de desenvolver o trabalho.

O objetivo do Congresso PTBIM promover um frum de discusso tcnico-cientfica em


lngua Portuguesa, envolvendo a participao ativa das comunidades profissional e acadmica
das reas de Arquitetura e Engenharia. Pretende-se enfatizar os problemas e esforos de
implementao na Indstria da Construo e reforar as redes de profissionais que incorporam
prticas BIM nas suas atividades.

Esta primeira edio do PTBIM, com lugar no Campus de Azurm da Universidade do Minho
(24 e 25 de novembro de 2016) contou com 52 artigos reportados neste livro de atas, e cerca de
200 inscritos, em correspondncia com o limite mximo preconizado pela organizao. Os
artigos contemplam autores de diversas instituies de ensino/investigao nacionais, bem
como profissionais da Indstria da Arquitetura, Engenharia e Construo.

Apesar da realizao do evento ter decorrido na Universidade do Minho, em sinergia entre as


Escolas de Engenharia e de Arquitetura, importante assinalar o cariz integrador ao nvel
organizativo com participao e apoio de vrias instituies de ensino: Faculdade de
Engenharia da Universidade do Porto, Faculdade de Arquitetura da Universidade do Porto e
Instituto Superior Tcnico. tambm especialmente relevante assinalar o envolvimento das
Ordens dos Engenheiros e dos Arquitetos nesta organizao, demonstrando a forte relevncia
da temtica para a prtica profissional e a louvvel atitude proactiva das Ordens Profissionais
a este respeito.

No contexto desta publicao assinala-se um agradecimento especial ao trabalho voluntrio dos


membros da Comisso Cientfica na reviso dos trabalhos submetidos.

Os Editores:

Miguel Azenha
Joo Poas Martins
Jos Granja

9
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

10
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

NDICE

Prefcio ...................................................................................................................................... 9

ndice ....................................................................................................................................... 11

Parte I Implementao, interoperabilidade e colaborao


BIM A400: Implementao, Resilincia, Rentabilidade
Andr Silva, Diogo Drumond, Joo Oliveira ...................................................................... 19

Solues para a coordenao, implementao e gesto BIM - Uma perspetiva global


Jos Carlos Lino, Nuno Lacerda, Francisco Reis, Bruno Caires ......................................... 33

Desenvolvimento de interfaces de realidade virtual a partir de BIM e avaliao da sua


aplicabilidade
Fbio Alexandre Matoseiro Dinis, Joo Pedro da Silva Poas Martins .............................. 45

Implementao do conceito BIM na COBA


Pedro Serra, Carlos Canelhas, Antnio Raposo, Jos Cidades ........................................... 57

Implementao BIM na CASAIS S.A


Miguel Pires, Andr Monteiro ............................................................................................. 69

Implementao BIM numa empresa de estudos e projetos de Engenharia (CENOR)


Andr Monteiro, Joo Lima, Sofia Henriques, Lus Rodrigues, Lus Ribeirinho ............... 77

O que h de BIM em NOZ


Ana Silva, Daniela Silva, Flvio Silva, Rui Dias ................................................................ 87

Implementao do Modelo de Informao Integrado no BIM em obra ferroviria


Martim Bernardo Ribeiro, Miguel Chichorro Gonalves, Pedro Mda Magalhes ............ 99

Fluxos de informao BIM - recolha e partilha automatizada de dados a partir de um


modelo BIM
Joaquim Danado ................................................................................................................ 109

A utilizao de ferramentas digitais como suporte idealizao, anlise e construo de


malhas estruturais de madeira
Joo M. Barroso, Jorge G. Fernandes, Jorge M. Branco ................................................... 121

Explorao dos benefcios mtuos entre BIM e jogos de simulao


Vtor Mineiro, Rosaldo Rossetti, Miguel Azenha ............................................................. 131

11
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Proposta de sistema de classificao nacional orientado para objetos BIM


Henrique Nunes, Paula Couto, Maria Joo Falco Silva, Fernando F.S. Pinho ................ 143

Classificao e organizao de objetos BIM e sua aplicao em modelos 4D & 5D


Ana Quintela, Joo Pedro Couto, Francisco Reis ............................................................. 153

BIM no projeto de estruturas de obras hidroeltricas


Alexandre Marques, Miguel Azenha, Andr Ferreira ....................................................... 163

Implementao da metodologia BIM na direo de engenharia de barragens da EDP


produo caso de estudo do projeto de estruturas da central e circuito hidrulico do
A.H. de Frido
Andr Ferreira, Alexandre Marques, Celso Lima ............................................................. 173

Guia de implementao da metodologia BIM


Claudio Gomes, Jos Carlos Lino, Ricardo Pereira Santos .............................................. 185

Implementao BIM nos projetos de ensino do Departamento de Engenharia Civil da


UMinho
Miguel Azenha, Jos Carlos Lino, Joo Pedro Couto ....................................................... 195

Parte II BIM em projeto de arquitetura e engenharia


O BIM aplicado a estaes de metro
Lus Ribeirinho, Andr Monteiro, Miguel Conceio ....................................................... 209

BIM em projeto de obras hidrulicas o caso de uma estao elevatria


Sofia Henriques, Lus M. P. Rodrigues, Jorge de Mello Vieira ........................................ 219

Engineering projects support based on BIM technology


Taisiia Mitina, Jos Carlos Lino, Lusa Maria da Silva Gonalves .................................. 227

Aplicao do design generativo nas tecnologias BIM


Ins Caetano, Antnio Leito e Francisco Teixeira Bastos ............................................... 239

Design generativo para Building Information Modelling


Bruno Ferreira, Antnio Leito ......................................................................................... 251

Uma arquitetura de objetos


Rafael Vieira ...................................................................................................................... 263

Otimizao evolutiva de forma para sustentabilidade, cruzando o BIM e a modelao


algortmica
Pedro Santiago ................................................................................................................... 275

12
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A-BIM: Algorithmic-based Building Information Modelling


Sofia Feist, Antnio Leito ................................................................................................ 285

Da linha ao varo: caso de estudo do projeto de estabilidade, tendo o conceito BIM como
base
Gabriel Lopes .................................................................................................................... 297

Energy analysis using cooperation between BIM tools (Revit and Green Building Studio)
and Energy Plus
Kamar Aljundi, Armando Pinto, Fernanda Rodrigues ...................................................... 309

Contributo dos modelos BIM para a exposio, representao e documentao da


arquitetura
Rita Rebelo Pvoas, Francisco Teixeira Bastos ................................................................ 321

Modelo integrado para a simulao do faseamento construtivo de barragens


Lus Pedro Bidarra, Miguel Azenha, Joo Pedro Couto, Jos Carlos Lino ....................... 333

Modelao BIM de armaduras em estruturas de beto armado: possibilidades, desafios e


interoperabilidade
Joo Fernandes, Jos Carlos Lino, Ricardo Santos ........................................................... 343

Caso de estudo da utilizao do BIM no apoio ao projeto de redes urbanas de


abastecimento de gua em frica
Gabriel Lopes .................................................................................................................... 359

Implementao BIM de um projeto de instalaes hidrulicas de um edifcio unifamiliar


Miguel Chichorro Gonalves, Pedro Rocha, Martim Bernardo Ribeiro ........................... 371

Ferramenta BIM para o dimensionamento de poos de fundao


Cludio Gomes, Diogo Ribeiro, Rui Gavina, Bruno Costa e Andr Santos .................... 381

Desenvolvimento de um software para a determinao e mitigao do escoamento


superficial
Lus Sanhudo, Joo Poas Martins .................................................................................... 395

Parte III BIM na construo


Integrao de ferramentas BIM aplicadas a um caso de estudo coordenao e
quantificao
Tiago Gouveia, Jos Carlos Lino, Joo Pedro Couto ........................................................ 409

Aplicaes recentes no uso de BIM na Segurana na Construo


Alfredo Soeiro, Joo Pedro Poas Martins ........................................................................ 419

13
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Utilizao do BIM na gesto de segurana do estaleiro da construo do tnel do Maro


Juliana Fernandes, Joo Pedro Couto, Manuel Tender .................................................... 427

Utilizao do BIM 4D e 5D enquanto metodologia avanada para o planeamento,


preparao e monitorizao de obras
Diogo Coelho, Joo Pedro Couto, Dinis Leito, Joo Morgado ....................................... 437

Reabilitao de um edifcio pblico: contributo para a interoperabilidade entre BIM e


PRONIC
Rodrigo Giollo, Maria Joo Falco Silva, Paula Couto .................................................... 451

BIM no apoio gesto da construo


Anne-Marie Mushamalirwa, Andr Reis Antunes, Antnio Aguiar Costa ....................... 463

Ferramentas BIM de apoio gesto de obra


Joana Arajo, Jos Carlos Lino, Joo Pedro Couto .......................................................... 475

Do modelo obra caso internacional de prtica colaborativa


Jos Carlos Lino, Nuno Pires ............................................................................................ 489

Parte IV BIM na gesto de operaes e manuteno


Plataforma Web-BIM para gesto de instalaes de um Campus Universitrio
Ricardo Resende, Lus Coroado, Antnio Lopes, Rodrigo Sacadura, Maria Helena Teixeira,
Sara Eloy, Miguel Sales Dias ............................................................................................ 501

O uso da tecnologia BIM em Patrimnio Histrico. Um caso de estudo: O Convento dos


Capuchos da Caparica
Joo Frescata Pereira, Ana Tom ...................................................................................... 513

Building Life Cycle Management na reabilitao de edifcios


Raquel Matos, Fernanda Rodrigues, Hugo Rodrigues, Ana Alves, Paulo Ribeirinho ...... 527

Modelao BIM do patrimnio existente. O caso de uma ETAR


Lus M. P. Rodrigues, Sofia Henriques, Jorge de Mello Vieira ........................................ 537

Interface BIM para a gesto de instalaes


Andr Reis Antunes, Ruben Santos, Antnio Aguiar Costa ............................................. 547

Implementao da metodologia BIM-FM a uma unidade desportiva piscina olmpica


Diana Bastos Silva, Jos Pinto-Faria, Jos Carlos Lino .................................................... 559

14
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A metodologia BIM Building Information Modeling na gesto da manuteno dos


edifcios: estudo de caso do campus 2 do IPLeiria
Cludio Carvalho, Antnio Aguiar Costa, Lusa M. S. Gonalves ................................... 567

Rentabilizao da gesto de ativos de infraestruturas atravs do BIM


Hugo Pina, Pedro Mota da Silva, Hugo Rodrigues e Fernanda Rodrigues ...................... 579

Contributo do BIM como suporte das fases de manuteno e operao dos edifcios
Wilson Dias, Jos Carlos Lino, Joo Pedro Couto ............................................................ 589

O BIM na certificao energtica de edifcios de servios


Raul Lana Miguel, Daniel Marcelo Ferreira ..................................................................... 601

ndice de autores................................................................................................................... 615

15
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

16
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Parte I
Implementao, interoperabilidade e colaborao

17
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

18
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM A400: IMPLEMENTAO, RESILINCIA, RENTABILIDADE

Andr Silva (1), Diogo Drumond (1), Joo Oliveira (1)

(1) A400 Projectistas e Consultores de Engenharia Lda, Porto

Resumo
Existem vrios exemplos de implementao de tecnologias BIM na produo de projetos, no
entanto o xtase do primeiro projeto bem-sucedido rapidamente d lugar a uma inquietao
perante um problema de grande importncia Como controlar os custos de produo de
projetos em BIM?

O processo de implementao de tecnologias BIM num gabinete de projetos por si s rduo,


sendo que aplicado a uma empresa multidisciplinar a complexidade do processo incrementada
em vrias ordens de grandeza. Este artigo descreve a abordagem da A400 a esta problemtica
percorrendo as fases criticas e as opes tomadas.

Todo este processo obrigou a uma profunda reformulao na forma como abordamos os
projetos, desde a alterao dos campos de ao dos intervenientes, passando pela aquisio de
meios, pela formao e qualificao dos recursos e at o desenvolvimento de software. No
artigo sero descritas as alteraes ao modus operandi dos departamentos e a forma como o
BIM permitiu difundir e controlar a informao de forma simples, inequvoca e eficaz.

A interligao dos vrios softwares que utilizam os modelos BIM em interao revelou-se uma
vantagem importante. Os softwares de modelao Revit e Tekla Sutructures permitiram
transmitir informao com ferramentas de clculo e simulao como o Robot (Estruturas) e
Design Builder (AVAC), assim como vrios softwares desenvolvidos internamente otimizando
os tempos de desenvolvimento de projeto de uma forma significativa.

Sero apresentados os custos de implementao assim como as rentabilidades obtidas aps a


introduo do novo sistema produtivo, referindo o balano positivo com retornos importantes
em 3 anos.

19
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

A gnese e fora motriz do processo BIM no seio da A400 ambicionou a melhoria do processo
produtivo, segundo uma tica de aumento da rentabilidade. Esse objetivo conseguiu-se atravs
da identificao e resoluo de problemas, incompatibilidades e incongruncias em fases a
montante do processo construtivo.

A experincia adquirida ao longo dos 20 anos de existncia demonstrou que os principais


desperdcios no mbito do processo produtivo de projetos surgiam na troca de informaes e
na compatibilidade entre as especialidades. O aparecimento do BIM possibilitou a criao de
uma metodologia focada na reduo destas ineficincias aumentando a qualidade e a
rentabilidade dos processos.

A empresa possui um organograma dividido em 7 departamentos Estruturas, Estruturas


Metlicas, Instalaes Hidrulicas, Instalaes Eltricas, Instalaes Mecnicas, Coordenao
e I&D contando no total com cerca de 60 colaboradores. Internamente so desenvolvidos
projetos de engenharia de edifcios, sendo a arquitetura desenvolvida por parceiros.

2. O Problema/Oportunidade BIM

Recentemente, apesar da tecnologia BIM ser encarada pelos diversos atores como uma
inevitabilidade para a indstria AEC (Architecture, Engineering, Construction), os avanos
neste processo tm decorrido de forma lenta. A crise do sector em Portugal restringe os
investimentos e consequentemente os processos de implementao nas empresas possuem
recursos escassos e atrasos significativos.

No entanto a maior restrio utilizao da tecnologia BIM personaliza-se nos prprios


clientes, que no esto dispostos a despender honorrios superiores na obteno de um produto
final concordante com essa metodologia. Dada a concorrncia no mercado de projeto qualquer
empresa que pretenda aumentar os seus honorrios de forma a compensar o investimento em
BIM assistir a uma diminuio da sua carteira de clientes. Constata-se assim a existncia de
uma externalidade no negcio dos projetos, dado que as vantagens de um projeto em BIM
beneficiam principalmente os promotores, contudo assiste-se a uma no valorizao desta
tecnologia no momento de comparao de propostas.

A coordenao de especialidades sempre foi uma prioridade para a A400, identificando-se na


tecnologia BIM uma mais-valia. No entanto, desde a gnese do processo de implementao que
se definiu o objetivo de tornar o processo produtivo mais rentvel e no somente incrementar a
qualidade final do projeto. Esta abordagem permitiu justificar um investimento srio e libertar
os recursos necessrios, mas tambm aumentar o grau de dificuldade associado. Grande parte
das decises foram condicionadas por esta mxima, o que obrigou a um olhar mais atento ao
tipo de solues encontradas, permitindo em simultneo assegurar o foco na otimizao que
qualquer mudana de paradigma impe.

20
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Processo de Implementao

O facto das vrias especialidades serem produzidas e desenvolvidas internamente facilita os


fluxos de informao, os quais, no entanto, assentavam sobre desenhos produzidos em Autocad
2D e em comunicaes atravs de emails. As limitaes impostas pela fragmentao da
informao conduziam a erros que originavam desperdcios elevados, obrigando as equipas a
consumirem horas em reformulaes sucessivas de trabalho.

Edifcios cada vez mais complexos e exigentes a nvel tcnico agravam a ineficincia deste
modelo de produo. A metodologia BIM surge como ferramenta de melhoria dos processos
produtivos aumentando a facilidade com que a informao flui entre os vrios intervenientes.

A aplicao direta de um software BIM no processo produtivo seria relativamente simples e at


poderia produzir benefcios mais imediatos, no entanto em comparao com os benefcios
largamente superiores de uma alterao substancial do processo produtivo atravs de uma
implementao estruturada a longo prazo, delineou-se um plano com objetivos mais alargados.

Em traos gerais o plano consistiu nas seguintes fases:


Reformulao/aquisio de software e hardware a pequena escala (Testes);
Criao de um grupo de trabalho multidisciplinar para liderar o processo;
Produo de aplicativos gerais de apoio com departamento de I&D;
Produo de metodologias e procedimentos gerais;
Elaborao de projetos reais pelos elementos do grupo de trabalho;
Reviso de procedimentos e metodologias;
Formao a todos os colaboradores dos departamentos produtivos;
Implementao alargada do novo processo;
Desenvolvimento de aplicativos especficos pelo departamento de I&D;
Implementao do programa de melhoria contnua;

4. Comparativo de Modelo Inicial e Modelo Atual

O processo de implementao enfrentou vrios obstculos e dificuldades, como alis referido


ao longo do presente artigo. Para caracterizao desta evoluo so apresentados na figura
abaixo dois modelos, um pertencente ao grupo de projetos piloto e um modelo atual.

21
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Comparativo Modelo Piloto vs Modelo Atual.

Aparentemente, e em termos estritamente visuais os modelos exibem diferenas grficas pouco


significativas. Mas o que de facto apresentado so dois modelos conceptualmente distintos,
nomeadamente na transio entre uma representao inerte de massas e elementos 3D, para um
modelo realmente interativo, e de fluxo de informao integrado, demonstrando do real
propsito de um projeto BIM.

O percurso foi, sem dvida sinuoso, repleto de dificuldades e de decises complexas, mas foram
os resultados que transmitiram o incentivo para o desenvolvimento metodolgico e de melhoria
contnua, particularmente na motivao e envolvimento dos recursos humanos, os quais, de
forma natural sentiram o abalo associado significativa alterao de paradigma vigente.

Destacam-se as principais alteraes conceptuais e organizacionais do Plano de


Implementao/Execuo BIM, as quais sero devidamente detalhadas ao longo do presente
artigo:
Processamento e parametrizao das famlias previamente sua introduo, partindo-
se de um sistema de classificao interno em aplicativo prprio, uniformizando
parmetros gerais internos, mas tambm parmetros particulares de cada especialidade.
Esse sistema de classificao recorreu caracterizao de cada famlia atravs de
parmetros internos gerais e intrnsecos a cada especialidade.

Exemplo: IME- 01_Air Terminals- 01_Grelhas 01_Insuflao.

22
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tipo de Famlia Parametros Configurao

Parameter Type Name Discipline Type Parameter (TP) / InstanceGroup


(I) Parameter Under
Model Modelo - -
Pr-definidos inicialmente Manufacturer Marca - -
Identity Data
Description Descrio - -
Shared Parameter REF. Referncia TP - Text Identity Data

Largura
Comprimento
Dimensions Family Parameter Espaamento Alhetas Common Lenght Dimensions
Extrao, Insuflao, Exteriores,
Altura
Lineares, Intumescentes,
Outras necessrias
Desenfumagem

Other Shared Parameter Piso Common I - Text Text


Other Shared Parameter Espao Common I - Text Text
Other Shared Parameter Zona Common I - Text Text

Mechanical Shared Parameter Perda de Carga HVAC Pressure Mechanical

Mechanical Flow Shared Parameter Caudal de Ar HVAC Air Flow Mechanical - Flow

Figura 2: Exemplo de sistema de classificao e de parametrizao.

Homogeneizao de templates internos preparados com requisitos especficos de cada


especialidade, bem como visualizaes do prprio modelo e entre modelos interligados.
Importa referir que foram tambm aproveitadas mais potencialidades do software que
permitiram trocas de informao mais fludas entre especialidades e sem interveno
manual anteriormente necessria.
Definies especficas para a interoperabilidade entre o modelo Revit e outros
softwares, concretamente softwares de clculo estrutural e simulao trmica,
energtica e luminotcnica.

5. Recursos humanos

Uma problemtica central em qualquer processo de implementao a metodologia de


distribuio de recursos humanos.

Aps a elaborao do plano de implementao, criou-se uma equipa interdisciplinar


responsvel pelo processo. Selecionaram-se elementos de 4 departamentos (Estruturas, Inst.
Hidrulicas, Inst. Eltricas e Inst. Mecnicas) com atuao na criao de contedos e
procedimentos, com coordenao atravs de reunies peridicas, lideradas pelo BIM Manager.
Por duas vezes foi necessrio realocar recursos devido fraca produtividade deste grupo de
trabalho:
Numa primeira abordagem selecionaram-se tcnicos desenhadores. Os elementos
escolhidos possuam uma experincia elevada e estavam enquadrados na empresa h
vrios anos. No entanto esta opo revelou-se pouco eficaz, dado que a alterao
pretendida no poderia incidir apenas na rea de ao especfica destes colaboradores.
Era necessrio envolver elementos que tivessem uma abordagem mais generalista a
todas as fases do projeto e no s parte de produo dedicada de elementos grficos e
escritos;
Atravs da identificao das falhas da equipa inicial, selecionaram-se engenheiros de
cada departamento com 3 a 6 anos de experincia. Esta equipa apesar de sensvel ao

23
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

processo na sua globalidade, dedicava demasiada ateno aos seus projetos em curso,
penalizando o tempo despendido com o processo de implementao;
A equipa que melhor efeito surtiu foi composta por engenheiros estagirios, com 0 a 1
ano de experincia: A juventude desta equipa, aliada a uma maior frescura mental,
estabeleceu caminho motivao para um universo novo, exibindo perseverana nas
dificuldades e abertura para discutir e aplicar as diretrizes.

6. Formao

A necessidade de um plano de formao exaustivo tambm originou algumas dificuldades. A


opo de contratar uma empresa externa para ministrar as formaes foi tomada em alternativa
a formaes preparadas internamente. Estas ultimas seriam certamente mais produtivas no
sentido de divulgar os procedimentos e metodologias desenvolvidas, no entanto, os custos de
preparao dessas formaes e a sua ministrao excediam largamente os custos da formao
externa.

Recorreu-se ento a um plano de formao com o intuito de uniformizar generalizadamente os


conhecimentos BIM entre os colaboradores. Esta formao teve a durao total de 32 horas,
cujo contedo programtico incidiu principalmente nas funes macro do Revit. Pese embora
a formao tenha atingido os objetivos propostos salienta-se a dificuldade em encontrar
programas adequadas para a parte MEP (Mechanical, Electrical, Plumbing) do Revit. A
utilizao de sistemas com equipamentos interligados que transportam fluidos ou energia,
contm particularidades importantes cujos os formadores no esto suficientemente
familiarizados.

7. Software e Hardware

A seleo do software outra das etapas inerentes implementao da tecnologia BIM. No


caso particular da A400 a escolha recaiu sobre o Autodesk Revit, alicerado nos seguintes
motivos:
data de 2012 seria o software que melhor asseguraria a multidisciplinaridade,
nomeadamente para modelao em MEP;
Exibia uma quota de mercado considervel;
Existiam j cerca de 6 licenas Revit na empresa.

A distribuio das diferentes verses do Revit efetuada segundo as necessidades de modelao


de cada departamento, sendo que as especialidades MEP trabalham com o Revit Completo, j
que apenas esta verso permite a modelao deste tipo de sistemas. Por sua vez, o departamento
de Estruturas utiliza licenas Revit LT em fases iniciais dos projetos transitando para a verso
completa nas fases finais e em projetos de maiores dimenses. Esta opo permitiu poupanas
significativas nos custos de licenciamento sem grandes alteraes produtivas, sendo que as
funcionalidades da verso LT so suficientes para todo o processo de modelao estrutural se
no forem includas as armaduras. O departamento de Estruturas Metlicas utiliza softwares

24
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM, nomeadamente o Tekla Structures, h cerca de 10 anos, com elevado grau de sucesso e
enraizamento.

Na especialidade de estruturas a utilizao de armaduras modeladas em Revit foi adiada. Esta


opo deveu-se escassez de recursos disponveis para o processo de implementao e ao facto
da A400 ter feito investimentos substanciais no desenvolvimento de aplicativos de desenho de
armaduras em Autocad, que poderiam ser mantidos em produo por mais tempo.

Os custos anuais de licenciamento para Revit Completo, Revit LT e Tekla Structures rondam
os 30 000 . Dadas as alteraes do licenciamento Autodesk estima-se que uma licena de Revit
em regime de aluguer poder atingir cerca de 15% do custo direto de um posto de trabalho,
representando assim um encargo elevado.

Como se compreende pelo atrs exposto, as licenas de software so onerosas, e necessrio


um trabalho de racionalizao de recursos, pois no financeiramente senesato disponibilizar
licenas para todos os colaboradores. Assim sendo, sentiu-se necessidade de monitorizar os
acessos a licenas, para progressivamente adequar o nmero disponvel s reais necessidades
de trabalho. Tal foi conseguido atravs do desenvolvimento interno por parte do departamento
de I&D de um aplicativo que permite:
Controlo do nmero de denials (executar o software sem licena disponvel);
Visualizao por parte de todos os colaboradores da utilizao das licenas,
flexibilizando a partilha de recursos;

Figura 3: Aplicativo para gesto de licenas.

Em termos de hardware foram adotadas as especificaes gerais descritas nas recomendaes


da Autodesk. De momento a empresa adquire workstations Supermicro i7 6700K, 32 GB
RAM Non ECC, NVIDIA Quadro M2000, SSD 256GB.

A infraestrutura de rede suportada por dois cluster cada um deles composto por 2 nodos de
computao redundantes, com armazenamento de dados redundante multi-camada interligados
por switches instalados em cascata com um backbone a 40Gbps.

8. Implementao Metodologia BIM

Na atualidade o desenvolvimento de projetos em BIM a nvel nacional no permitiu em diversas


situaes avanar com uma soluo totalmente integrada entre arquitetura e especialidades.
Ainda mais longe encontra-se a perspetiva de expandir a utilizao dos modelos oramentao

25
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ou gesto de obra. Essa dificuldade, nomeadamente com gabinetes de arquitetura, originou o


desenvolvimento de uma metodologia de trabalho que integrasse a processos BIM com a
metodologia anterior. Foram desenvolvidas ferramentas, manuais e procedimentos que
abordassem o processamento da informao quando esta fosse fornecida em Autocad ou outros
meios no integrados.

8.1 Gesto de Modelos


De particular relevncia no desenvolvimento de projetos de engenharia a preparao do
modelo base que contm a arquitetura. Particularmente em especialidades MEP torna-se difcil
produzir um modelo BIM sem existir uma base arquitetnica na mesma tecnologia.

Esta questo minimizou-se com a produo de um modelo simplificado de arquitetura, ficando


a cargo do departamento de Instalaes Mecnicas para otimizar fluxos de trabalho, dado este
modelo ser reutilizado nos softwares de simulao energtica HAP e Design Builder. Em
casos particulares, este modelo tambm usado para iniciar o modelo de clculo estrutural.

O processo produtivo da A400 assenta na criao distinta de modelos por especialidade que se
interligam com os restantes segundo o esquema da figura abaixo. ainda gerado um modelo
de coordenao com o intuito de detetar incompatibilidades e exportar elementos coordenados
a enviar para entidades externas (clientes, arquitetos, outros projetistas de especialidades).

Figura 4: Esquema interligaes entre modelos.

Outro dado com relevncia ser o facto do trabalho segundo a metodologia BIM obrigar a uma
reformulao interna de organizao da informao na infraestrutura (Fileserver). Esse trabalho
desenvolveu-se baseado numa metodologia que permita trabalho colaborativo.

Destaque ainda para a relevncia da implementao BIM como catalisador de possveis


melhorias anteriormente identificadas no sistema de qualidade da empresa, ainda que sem
ligao direta prpria metodologia. Nesta categoria insere-se, por exemplo, a reorganizao
da distribuio de informao num servidor central. Dado que num projeto geral comum
existirem mais de 10 especialidades distintas, a organizao da informao assume um papel
preponderante na gesto dos processos. Uma das vantagens da adoo de tecnologias BIM o
poder reformular todo o processo produtivo produzindo alteraes estruturais cujo investimento
no agrupado com esta implementao no justificaria a sua realizao.

26
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

8.2 Elaborao de procedimentos e manuais


Dada a dimenso da empresa e a extenso das alteraes que a implementao produziria, foi
necessrio desenvolver um mecanismo que permitisse a divulgao dos contedos e
procedimentos associados implementao BIM.

A utilizao da equipa de implementao para divulgar os procedimentos seria morosa e


ineficiente. Optou-se pela criao de plataforma de partilha de conhecimento associada ao
processo BIM.

Foi desenvolvido um aplicativo - Repository que armazena artigos de conhecimento, bem


como ficheiros e documentos de apoio que permitem a utilizao por parte de qualquer
colaborador de um contedo desenvolvido pela equipa de implementao.

A opo de criar um aplicativo prprio permitiu introduzir funcionalidades que os aplicativos


de mercado no contm. A ttulo de exemplo os artigos carregados no Repository que contm
ficheiros anexos so importados diretamente para os programas sem necessidade de interfaces
Exportao/Importao nativas. Esta facilidade expansvel maioria dos softwares utilizados.

8.3 Gesto de objetos


Uma dificuldade recorrente na gesto diria de projetos BIM a manuteno da qualidade dos
objetos criados. Comportamentos nocivos como a cpia de outros projetos, alteraes ad
libitum, utilizao sem conhecimento prvio do modo de parametrizao e utilizao direta de
famlias de fabricantes dificultavam a concretizao do projeto BIM, reduzindo a qualidade do
produto final.

Para evitar este tipo de problemtica criou-se um procedimento de criao de famlias, apoiado
por um aplicativo derivado do Repository (Knowledge Base), que permite gerir e atualizar
qualquer elemento. Cada um dos objetos acompanhado por um manual que relata o seu
propsito e descreve o seu processo de criao e parametrizao. Este aplicativo permite a
introduo direta no modelo em curso a partir da sua interface.

Note-se que no seio da empresa o processo de criao de famlias totalmente livre e


encorajado, sendo a sua aprovao restrita Equipa de Implementao.

Figura 5: Aplicativo Gesto Famlias

27
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Novamente pelas razes descritas no ponto anterior a falta no mercado de um aplicativo


associado gesto de contedos produzidos tornou o investimento neste software bastante
rentvel.

8.4 Deliverables e comunicao intermdia


Dada a fase transitria em que a indstria AEC se encontra, surgiu a necessidade de garantir
que os elementos a entregar (deliverables) poderiam ser utilizados e contemplados na
metodologia anterior. Com efeito a maioria dos clientes e parceiros da A400 no possui
softwares BIM e muitas vezes no reconhece valor acrescentado na sua utilizao. De forma a
no excluir esse mercado criaram-se procedimentos que minimizassem as dificuldades de
exportao de BIM para CAD 2D.

De uma forma geral as peas de projeto so entregues em formatos editveis e no editveis.


Na metodologia anterior as entregas consistiam em ficheiros DWG, DOC, XLS e PDF,
aos quais se adicionaram com a implementao BIM as extenses RVT e IFC.

A opo pela divulgao dos modelos em base editvel pretende mobilizar os parceiros da A400
a aderir a esta tecnologia, sendo que na preparao de modelo em Revit procura-se fomentar a
utilizao dos objetos criados pela A400 e ao mesmo tempo familiarizar os parceiros com os
processos de modelao internos.

Contudo, grande parte dos elementos processados por parceiros e clientes so ainda os ficheiros
DWG. Com a implementao da tecnologia BIM procurou-se manter em larga medida os
elementos produzidos anteriormente, sendo estes exportados diretamente do modelo Revit. Para
o efeito criou-se um aplicativo que permite a exportao para Autocad a partir do Revit.

A incorporao deste aplicativo obrigou criao de perfis de exportao prprios a cada


departamento. Dada a facilidade da sua utilizao e as melhorias versus a ferramenta de
exportao base do Revit houve uma aceitao generalizada deste aplicativo. Esta opo
permite ainda uma difuso automtica de alteraes aos perfis de exportao, garantindo que a
aparncia dos desenhos em Autocad idntica independentemente do colaborador que os
preparou.

Embora este esforo pela garantia da compatibilidade entre processos produtivos seja til
apenas no futuro prximo, considerou-se que o incremento de investimento desta opo seria
justificado pela durao do processo de massificao das tecnologias BIM. Dado que com os
recursos designados no era possvel implementar o processo em todos os departamentos em
simultneo, seria em todo o caso necessrio haver procedimentos e ferramentas que
permitissem ambos os processos produtivos coexistir.

8.5 Investimento e expectativa de retorno


Os custos seguintes indicam o investimento feito desde o incio de 2014.

28
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Quadro Resumo Investimento.


Mapa de investimento
Licenas de software Unidades
Building Design Suite Premium 14
Revit LT 15
Tekla Structures 2
Total Rubrica 197 512
Formaes Custo
Custo de formaes 6 400
Custos produtivos 38 400
Total Rubrica 44 800
Recursos internos Custo
Fase 1 - Formao de equipa e primeiros contactos
20 993
com tecnologia BIM
Fase 2 - Preparao de contedos base 28 101
Fase 3 - Projetos teste 21 322
Fase 4 - Divulgao e massificao 39 688
Custo de produo de aplicativos 88 988
Total Rubrica 199 092
Total 441 403

Algumas das licenas de Revit foram adquiridas anteriormente, no entanto a sua utilizao em
pleno iniciou-se com este processo. As licenas de Tekla Structures tambm foram adquiridas
anteriormente e j eram utilizadas antes do processo de implementao do BIM.

Os custos apresentados para formao incluem no s os valores contratados externamente,


mas tambm os custos de paragem de produo durante as horas de formao. Como se pode
constatar este custo consideravelmente superior ao custo do formador.

A utilizao de recursos internos reflete os custos da equipa de desenvolvimento durante as


fases decorridas.

As projees de retorno para este investimento basearam-se na reduo dos rcios de horas em
projetos. As seguintes notas mostram as projees por especialidade:
No departamento de Coordenao os custos de projeto ascendiam a 10-20% do valor
total. Com a introduo da tecnologia BIM estimou-se uma reduo de 30% neste valor,
concretamente ao nvel dos tcnicos de desenho dado o elevado nmero de horas
necessrio para efetuar sobreposies dos desenhos.
No departamento de Estruturas otimizaram-se tempos de produo dos modelos de
clculo e de preparao de plantas estruturais, utilizando o modelo BIM para ambas as
funes. Na prtica a opo permitiu dispensar as horas de desenhador em fases iniciais
e reduzir o tempo de preparao de modelos. Estimou-se uma reduo de 30% do tempo
necessrio para estas tarefas, o que representa uma reduo de 9% no custo total de
estruturas.

29
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

No departamento de Instalaes Hidrulicas prev-se uma reduo de cerca de 10%


devido principalmente reduo de horas de tcnico de desenho nas fases iniciais e
atravs da reduo de tempo necessrio para representar traados bifilares e facilidade
em preparao de medies utilizando as metodologias BIM.
No departamento de Instalaes Eltricas no se perspetivam redues significativas
enquanto os melhoramentos futuros descritos no captulo seguinte no forem
implementados.
No departamento de Instalaes Mecnicas almeja-se uma reduo global de 15% dada
a facilidade de detetar atravancamentos e na leitura da arquitetura e estruturas. Prev-se
anular os problemas de incompatibilidades que prejudicavam as fases finais dos projetos
e obrigavam na maioria dos casos a desperdcios importantes.

Apesar de serem esperados retornos a longo prazo, foi evidente que os primeiros projetos
produzidos atravs de tecnologia e metodologia BIM tiveram um sobrecusto. Os resultados
mostraram um aumento superior a 50%. Dado o lote de projetos ser reduzido em nmero, no
possvel retirar significado dos resultados. Destaque-se que o desempenho dos departamentos
nestes projetos iniciais foi heterogneo, dada a variabilidade dos perfis dos recursos humanos.

9. Desenvolvimentos Futuros

A implementao efetuada permite o desenvolvimento massificado de projetos em tecnologia


BIM. No entanto, existem reas de projeto onde a possibilidade de otimizao do processo de
clculo, desenho e comunicao evidente.

Com o desenvolvimento de novos aplicativos a A400 procurar utilizar os modelos em Revit


como plataforma de clculo e simulao. Os seguintes pontos resumem os principais
aplicativos:
RVT.Circuits A A400 est neste momento a adaptar de Autocad para Revit um
software que a partir da posio dos equipamentos com consumo energtico e do traado
dos caminhos de cabo, permite o dimensionamento. O software adquire a posio e as
caractersticas dos equipamentos, tomadas, quadros, geradores e outros elementos
ligados rede eltrica e efetua os clculos de dimensionamento da cablagem necessria.
RVT.Pipes Este aplicativo funcionar de forma anloga ao Circuits, atuando sobre as
redes hidrulicas. Novamente o modelo de Revit ser utilizado para recolher os dados
dos equipamentos e seus consumos, sendo processados no aplicativo e posteriormente
representados novamente no software BIM;
RVT.EEE Um outro aplicativo previsto incide sobre o processo de certificao
energtica de acordo com o REH e RECS em vigor em Portugal. Novamente os modelos
Revit sero utilizados para efetuar as verificaes e simulaes necessrias pela
regulamentao otimizando o tempo gasto nestas anlises.

Apesar do custo necessrio para produzir estas aplicaes ser substancial, os retornos esperados
garantem a viabilidade deste investimento em perodos relativamente curtos (3-5 anos).

30
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

10. Concluses

data deste artigo a empresa comea a retirar dividendos dos investimentos realizados, no
sendo, no entanto, possvel afirmar de forma perentria quais as redues de alocao
atualmente. Mantendo o nvel de encomendas mdio dos ltimos 3 anos a empresa prev
amortizar o investimento no prximo trinio. Esta expectativa exclui os investimentos futuros
descritos no captulo anterior.
Ser inegvel que existem outras vantagens e benefcios de todo este processo, no entanto desde
o incio manteve-se o foco no retorno do investimento atravs do aumento da eficincia do
processo produtivo. Convm, ainda assim, listar outros benefcios diretos ou indiretos que se
obtiveram com esta implementao:
Melhorias do processo produtivo, que de outra forma seriam infundados;
A qualidade dos projetos aumentou substancialmente com a reduo de erros por
incompatibilidades. Este ganho traduz-se num aumento generalizado de encomendas;
Preparao com a devida adequao tecnolgica para uma mudana de paradigma no
setor que se antev inevitvel;
A modelao BIM agilizou a interao com aplicativos que facilitam os processos de
dimensionamento e simulao que fazem parte de qualquer projeto de engenharia;
A utilizao de modelos BIM permitiu um novo patamar de interoperabilidade entre os
softwares de clculo e simulao j adquiridos. Deu-se uma reduo dos erros
associados a estas modelaes dada a facilidade atingida no processamento de dados.
O processo e as perspetivas futuras mostram ainda algumas desvantagens que penalizam o
desempenho da abordagem seguida pela empresa:
Grande parte do investimento deve-se falta de formao dos tcnicos envolvidos. Com
a difuso destas tecnologias as empresas que prologarem o processo no precisaro de
investimentos to avultados nesta rbrica;
O mercado ainda no produz contedos BIM de uma forma generalizada, para assim
permitirem s empresas dispensar a produo prpria de objetos. Grande parte da base
de dados da A400 foi produzida internamente, com custos de investimento assinalveis.
Este problema tender a desaparecer com a massificao da utilizao da tecnologia
BIM, particularmente por parte dos fabricantes;
Alguns dos aplicativos desenvolvidos foram elaborados por falta de solues comerciais
com as mesmas capacidades. Com a evoluo dos softwares julga-se que estes
programas cairo em desuso face a produtos mais generalizados e com maiores
potencialidades.

Em suma as orientaes e objetivos definidos inicialmente permitiram que hoje seja possvel
identificar os indcios de sucesso perspetivados. Sem dvida que a via da rentabilidade do
investimento o melhor caminho para justificar os custos de implementao. Dada a crise que
se faz sentir no sector no expectvel que o mercado reconhea os benefcios desta
metodologia de forma imediata. Note-se ainda que as iniciativas governamentais nesta rea tm
sido diminutas e no se antev uma mudana de poltica capaz de prosperar uma mudana mais
radical. Caber aos profissionais do setor, e mais particularmente s empresas de projeto,
encontrar uma forma de rentabilizar o investimento orientando-se principalmente no seu
mercado sem esperar contrapartidas de clientes ou de outros intervenientes no processo.

31
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

32
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

SOLUES PARA A COORDENAO, IMPLEMENTAO E


GESTO BIM - UMA PERSPETIVA GLOBAL
Jos Carlos Lino(1), Nuno Lacerda(1), Francisco Reis(1), Bruno Caires(1)

(1) BIMMS BIM Management Solutions, Porto

Resumo
O BIM aparece, hoje, como necessidade e obrigatoriedade, levando as pessoas e organizaes
a adaptarem-se cada vez mais rapidamente a esta nova realidade e mudana que a mesma
implica.

De uma situao de aplicaes pontuais e errticas, passou-se para uma generalizao do


conceito e para a sua globalizao. Atualmente, uma grande percentagem dos atores na indstria
da Arquitetura, Engenharia, Construo e Operao (AECO) j sabem identificar os seus
princpios bsicos, as aplicaes e os usos que mais lhes proveem.

Tal como muitas outras inovaes tecnolgicas, somos amide surpreendidos por uma mirade
de casos, de aplicao local, isolados, mas que denotam que a disseminao e difuso do BIM,
entre outros, veiculadas pelas comunicaes web, tm sido muito eficazes. De qualquer modo,
a muitos surge, porm, a necessidade de descodificar um novo lxico, de se apreenderem novas
ferramentas e de se implementarem novos procedimentos. Enfim, de se aplicarem novas
solues aos velhos problemas da indstria da construo, suportada pelos profissionais de
arquitetura e engenharia.

Procurando responder a essa necessidade, a BIMMS constituiu-se assim como uma associao
de profissionais, multifacetados em aplicaes especficas nas vrias reas de Arquitetura e
Engenharia com o intuito de apoiar organizaes e indivduos na transio dos seus projetos e
processos para BIM. Com esse esprito de servio ao BIM aplicado, neste artigo, procuram-se
ilustrar vrias solues que surgiram como respostas aos desafios colocados, pela natureza e
localizao dos diversos projetos, desde a coordenao e modelao, implementao e
gesto, todos representando oportunidades concretas de inovao e evoluo.

33
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

A BIMMS - Management Solutions constituiu-se em 2014, com a misso de apoiar parceiros


da indstria AECO a integrar o BIM nos seus processos, atravs da disponibilizao das suas
competncias tcnicas e profissionais, ao servio dos projetos globais de arquitetura, engenharia
e construo.

A consultoria em BIM uma atividade ainda muito recente, carente de ser mais estudada do
ponto de vista cientfico, pelo que ainda difcil encontrar estudos especficos sobre este tema.
Baseia-se, essencialmente, no conhecimento e experincia dos consultores, que perante uma
nova abordagem aos tradicionais mtodos de projetar, construir e operar, optam pelas solues
e implementaes que lhes parecem mais eficientes e adequadas. Apesar de j muita teoria se
poder encontrar sobre BIM e sobre os seus usos e aplicaes, j no to fcil encontrar a sua
aplicao prtica, pelo que neste artigo, procurou-se partilhar a experincia adquirida nesta rea.

Para tal, recolheram-se junto dos diversos consultores da BIMMS, os diversos usos e aplicaes
adotadas em vrios casos prticos internacionais, apresentando alguns resultados e concluses
desta sua experincia.

A dificuldade em ultrapassar as condicionantes de confidencialidade inerentes aos projetos,


muitos deles ainda em andamento, impediram a referenciao nominal dos mesmos, apesar de
se apresentarem vrias ilustraes e menes aos referidos trabalhos. Das mltiplas abordagens
recolhidas, percebe-se uma lgica holstica, que percorre todo o processo desde a modelao,
coordenao, implementao, formao e at inovao.

Com o relato dessas experincias de consultoria, pretende-se contribuir para a divulgao e o


conhecimento nesta rea da consultoria em BIM, principalmente em Portugal.

2. Mudana para BIM Enquadramento

Atualmente, a indstria AECO encontra-se perante novos desafios de grande relevncia, tais
como, a crescente complexidade dos projetos a executar, a necessidade de praticar opes
sustentveis, as preocupaes energticas globais, a reduo dos custos e a melhoria da
produtividade, entre outros. Como forma de resposta necessidade de melhoria dos processos
atuais de trabalho em projeto, surgiu o conceito BIM, que essencialmente assenta numa
metodologia de construo virtual que, entre muitas outras capacidades, permite a partilha de
informao entre todos os intervenientes e fases do projeto. Num modelo BIM a informao
encontra-se interligada por relaes paramtricas o que significa que as alteraes so
processadas em tempo real em todo o modelo, evitando a propagao de erros e dinamizando
os processos de atualizao [1].

Com vista implementao total do processo BIM, baseada em mapas de processos claramente
identificados, detalhados e compreensivos a definir o fluxo de informao, a tecnologia permite
vrios melhoramentos em cada fase do ciclo de vida de uma construo [2]. O BIM
proporciona, cada vez mais cedo, visualizaes mais realistas, colaborao efetiva das mltiplas

34
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

disciplinas de projeto, extrao de estimativas de custo, deteo de erros e omisses antes da


construo, que melhoram a pr-construo e o projeto [1].

O BIM foi avaliado como benfico para a construo, fabrico e ps-construo [3],
principalmente devido ao uso do modelo de projeto como base para o Fabrico de Componentes
[4], Sincronizao de projeto e Planeamento da construo [5] e integrao com Sistemas de
Operao e Gesto de instalaes. O BIM, entre muitos outros benefcios deu aos consultores
MEP e construtores a oportunidade de levarem a cabo a requerida coordenao com um maior
grau de preciso e colaborao [6, 7]. A implementao prtica desta metodologia comea a ser
evidente, tendo ainda que lidar com dificuldades, nomeadamente, as inerentes ao investimento
e curva de aprendizagem. Comea a sentir-se a necessidade de adquirir competncias a nvel
profissional, quer nos cursos de arquitetura, engenharia civil e cursos especiais bem como no
ambiente empresarial [8].

Esta transio para o BIM trouxe diversas alteraes ao modo de fazer e de pensar as diversas
disciplinas. A Arquitetura tem ao seu dispor auxiliares conceo, produo e comunicao
da sua proposta que antes no existiam. A Engenharia comea a integrar-se com processos de
fabrico e automatizao para otimizar as suas solues. A construo adapta-se a novos
modelos de negcio e de contratao, ao trabalho colaborativo e integrao de diversos
sistemas de gesto. A operao e manuteno integram o conhecimento das fases anteriores
visando um ciclo de vida mais sustentvel.

Da recolha dos vrios casos prticos em que a BIMMS tem participado desde o seu incio de
atividade, identificaram-se usos principais que integram este ciclo de vida, optando-se por os
agrupar em Modelao, Coordenao, Implementao, Formao e Inovao, conforme se
apresentam nos captulos seguintes.

3. Modelao e Coordenao

A modelao trata-se do elemento base a partir do qual se pode iniciar a interao e integrao
da informao. Esse processo de Modelao, tal como a Construo, tem sido desenvolvido
como um agrupamento de Peas, Materiais e Equipamentos, que concentra a ateno do
Projetista na soluo e no no desenho ou representao. Nos trabalhos analisados, a
preocupao que os elementos modelados tenham propriedades geomtricas e no
geomtricas, constituindo estas propriedades no seu conjunto uma Base de Dados automtica
de informao inerente ao Projeto que possa ser usada por qualquer interveniente durante o
ciclo de vida do Edifcio/Instalao em qualquer fase desde o Projeto Operao e Manuteno.
Os principais modelos requeridos so os de arquitetura, de estruturas, de hidrulicas
(abastecimento, drenagem, pluviais, rede de incndio), de mecnicas e de eltricas (ver Figuras
1 e 2).

35
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Modelo BIM de Estruturas. Figura 2: Detalhe do Modelo BIM de


Estruturas e Arquitetura.

A criao e uso de objetos paramtricos tem sido uma condicionante quase permanente em
todas as modelaes efetuadas. Se j vo existindo algumas bibliotecas a disponibilizar estes
componentes, principalmente quando se trata das principais marcas, muito est ainda por
desenvolver, sendo necessrio programar esses blocos de classes e famlias (ver Figura 3).
Igualmente muito recorrente, encontra-se a solicitao de modelos que sejam desenvolvidos a
partir do levantamento do existente, seja a partir de peas desenhadas, seja a partir de
levantamentos topogrficos ou por aquisio de nuvens de pontos. Nestes modelos de registo,
admite-se normalmente um nvel de informao menor, correspondente ao desconhecimento
das caractersticas dos materiais e processos construtivos usados inicialmente.

Figura 3: Objetos BIM.

Inerente produo do modelo o seu aproveitamento para simulao de formas, processos e


anlises bem como a respetiva comunicao.

Os desafios lanados Arquitetura e Engenharia com a conceo e adoo de formas e ideias


menos convencionais, tornam-se mais fceis de superar atravs da sua visualizao. Desde a
fase de conceito da execuo, o alinhamento entre a equipa de projeto reforado com a

36
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

visualizao tridimensional, O desenvolvimento desse processo evolutivo, acrescentando


valor a cada fase do projeto, atravs da simulao da realidade. A produo de renders e
trabalhos de ps-produo arquitetnica, mais no visam que contribuir quer para a
comunicao das ideias, quer para a simulao do ambiente a construir (ver Figura 4).

Figura 4: Imagem renderizada a partir de Modelo BIM.

Neste processo de simulao, um dos usos mais importantes e mais requeridos a extrao de
peas desenhadas diretamente do modelo. A necessidade de criar peas desenhadas com uma
linguagem visual percetvel e compatvel com a normalizao das empresas, obriga a um
esforo de configurao e ajuste nos diversos softwares e plataformas, que no dever ser
negligenciado.

Igualmente a extrao de quantidades, obriga a uma verificao cuidada da qualidade do


modelo, de modo a no incorrer em erros. Em fases conceptuais, esta extrao pode revelar-se
muito til, mas por vezes, tem insuficiente informao para atingir o objetivo pretendido.

O conceito BIM comea, realmente, a fazer sentido quando se inclui a componente colaborativa
entre os diversos intervenientes, logo entre os diversos modelos, acarretando uma cuidada
coordenao dos mesmos.

Esta coordenao tem diferentes nveis e graus de interveno, no entanto, em casos mais
avanados, comea logo por uma gesto de informao. O domnio dos dados, com a
organizao da criao, anlise e controlo de documentos, essencial para que a estrutura de
informao seja gervel.

Em todos os casos analisados, sempre que existe mais que um modelo, a deteo de conflitos
e verificao de incompatibilidades foi um uso requerido (ver Figuras 5 e 6). Aparentemente
sendo algo simples, a sua aplicao prtica, dados os milhares de conflitos que por vezes
existem, bem como a necessidade de encontrar solues concretas para cada um desses
problemas, faz desta uma atividade de elevado grau de especializao e exigindo experincia.

37
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Modelo BIM das especialidades MEP. Figura 6: Anlise de Conflitos entre
especialidade com recurso a Software.

Outro aspeto muito comum em quase todos os casos analisados, em que a coordenao se torna
mais eficaz, passa pela adoo de um ambiente comum colaborativo. A possibilidade de usar
plataformas de partilha de ficheiros na cloud ou servidores locais em tempo real torna possvel
que durante a modelao, todas as especialidades estejam visveis, detetando antecipadamente
os possveis problemas de organizao, espao ou conflitos.

Associada a esta questo da coordenao muito frequente colocarem-se problemas de


interoperabilidade. A existncia de diferentes plataformas e softwares, bem como trocas de
informao em diferentes formatos, leva necessidade de controlar estes problemas, sempre
com vista a obter um modelo federado coordenado. Para a verificao e validao final da
qualidade deste modelo podero ser usados softwares que quando programadas conseguem
apoiar a verificao da soluo preconizada quer para conflitos quer verificar a soluo no
mbito de condies regulamentares, conforto ou at de construtibilidade. Nestas trocas de
informaes e protocolos, apareceram j duas vezes a necessidade de incorporar formatos de
gesto de operaes e manuteno, nomeadamente o COBIE.

4. Implementao e Formao

O processo de implementao e formao BIM sempre muito mais dispendioso do que a


aquisio da Tecnologia. Os processos tradicionais so os mesmo h muitos anos, esto
enraizados e muitas vezes otimizados ao mximo, no entanto limitados para os dias de hoje.
Aps o reconhecimento interno, o passo para a mudana muitas vezes dificultado por anos e
anos de conhecimento adquirido em processos mecanizados pelos utilizadores sendo esta a
barreira mais difcil de ultrapassar. O apoio de uma empresa especializada na implementao
torna-se fundamental no s para que a curva de motivao/aprendizagem da equipa no desa
para nveis que coloquem em causa o sucesso da implementao assim como beneficiar de um
apoio num conjunto necessrio de conhecimentos tcnicos e experincia de uma equipa
especializada que orientar no melhor caminho, para que os processos fiquem rapidamente
estabilizados. Dentro da BIMMS, as competncias e perfis dos colaboradores afetos a estas

38
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

reas de implementao e formao, diferem substancialmente das necessrias para modelao


e coordenao. A obrigatoriedade do contacto pessoal com o cliente e a disponibilidade para
apreender a cultura das organizaes exige perfis de consultor com slidos conhecimentos
tcnicos, mas com experincia e soft-skills de relacionamento bem desenvolvidos. O uso da
metodologia BIM tem sido iniciado na fase de projeto, permitindo assim que durante a fase de
construo exista uma transmisso do conhecimento adquirido nas fases passadas e uma
evoluo na Base de Dados contida no Modelo BIM.

Em algumas aplicaes mais avanadas, o apoio contratao em BIM, bem como a


consequente verificao da conformidade com Normas BIM e o BIM Execution Planning
assumem uma importncia crucial. Sem estas ferramentas de controlo e fiscalizao, o processo
no desenvolvido.

Uma das principais mais valias que a BIMMS tem proporcionado aos seus parceiros, tem sido
um apoio tcnico in situ, seja numa obra ou num gabinete. Desde logo na preparao da obra
e verificao/adaptao do projeto s condicionantes prprias da empreitada, mtodos de
trabalho e planeamento. Durante este o modelo BIM serve de base de trabalho para a
Construo permitindo a extrao de Peas Desenhadas, elementos que tero de ser pr-
fabricados, assim como preparao de cofragens e simulao da construo (ver Figuras 7 e 8).
Todos os intervenientes trabalham sobre a mesma referncia permitindo a facilidade no
entendimento da soluo preconizada e possveis alternativas. A Construo Virtual potencia
novos processos de trabalho como por exemplo a preparao dos trabalhos em visualizaes
3D, a validao dos autos de medio pelo modelo ou mesmo as reunies de trabalho/obra em
que o Modelo visualizado evitando assim deslocaes e movimentos de pessoas ao local. A
georreferenciao de todos os elementos permite uma monitorizao constante do processo de
construo podendo ser usadas ferramentas de laser scanning para o acompanhamento da fase
de construo ou mesmo validao da construo a nvel geomtrico.

Os pedidos de esclarecimento apoiados nos modelos e plataformas BIM, so um dos usos mais
requeridos quando a BIMMS presta apoio tcnico in situ. A facilidade com que estas dvidas
so complementadas com ilustraes extradas do modelo, vem trazer uma nova abordagem ao
modo como as fiscalizaes estavam habituadas a dar resposta a essas solicitaes por parte
dos construtores.

Igualmente importante, mas mais difcil de obter, so os desenhos tcnicos de preparao,


extrados diretamente do modelo. A dificuldade em detalhar o modelo, tem correspondncia
direta com o grau de pormenor que se consegue obter desses desenhos (ver Figuras 9 a 12).

39
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Modelo BIM da Cofragem e Simulao da Figura 8: Detalhe 3D do


Construo. Modelo BIM de Estruturas.

A gesto da obra, implica uma grande conivncia com o BIM Manager, com vista a poder
efetivamente controlar quer os tempos quer os custos inerentes mesma.

Figura 9: Modelo BIM de um Edifcio com todas as Especialidades (Visualizao adequada


anlise durante uma Reunio de Obra).

No processo de planeamento o modelo BIM 4D usado para representar graficamente,


simultaneamente, elementos permanentes e temporrios com a calendarizao das atividades
de construo (ver Figura 13). Pode incluir recursos de mo-de-obra, materiais e associadas
entregas e a localizao do equipamento. Como os componentes do modelo 3D esto
diretamente ligados calendarizao, a visualizao do planeamento e dos recursos podem ser
analisados ao longo de diferentes espaos temporais e fsicos.

40
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 10: Modelo BIM das Estruturas de um Figura 11: Modelo BIM - Auto Estrada.
tabuleiro de uma Ponte.

Figura 12: Modelo BIM de uma Ponte.

Figura 13: Modelo BIM 5D (anlise e simulao do Planeamento Construtivo).

O modelo BIM 4D pode ser tambm usado para planear efetivamente as fases de construo,
controlar os trabalhos executados diariamente monitorizando-os relativamente ao planeamento
inicial, assim como gerir os espaos ocupados, caminhos de acesso e apoiando tambm
implementao de planos de monitorizao e preveno de segurana e ambiente em obra. O
usos de ferramentas de Gesto e Planeamento apoiadas em modelos BIM est a tonar-se um
procedimento essencial nas empresas de Construo pois o seu uso potencia uma diminuio

41
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de risco na empreitada assim como de uma forma fcil permite criar cenrios de simulao do
Planeamento da Construo.

A anlise do Custo (BIM 5D) ou controlo oramental pode ser usada desde a fase inicial at
concluso da empreitada, servido como elemento de gesto apoiada em quantidades retiradas
diretamente do modelo. Associando custos ao planeamento consegue-se sem grande dificuldade
retirar os cronogramas financeiros, grficos de cash-flow, autos de medio e outros, elementos
esses fundamentais para qualquer empresa de Construo.

Inerente a estes processos de implementao, tm-se desenvolvido aes de Formao, com


vista a melhorar competncias consoante os papis e perfis de cada envolvido. Percebe-se dos
diversos processos, que se caminha para sistemas de certificao de profissionais e de empresas,
que sero condicionantes das participaes nos concursos e obras.

Dos diversos tipos de formaes que a BIMMS tem sido solicitada a coordenar, a formao
genrica para quadros-topo de alinhamento e envolvimento na causa BIM, surge como a
inicial e normalmente condicionante de todo o seguimento. Seguem-se formaes e sesses
gerais e departamentais de alinhamento de organizao em BIM. Muitas vezes so requeridas
sesses tcnicas de aquisio de competncias em softwares e ferramentas BIM bsicas e
avanadas. As formaes prticas de verificao so normalmente in situ e servem de controlo
e acompanhamento dos processes BIM. A BIMMS, face da sua experincia, tem sido tambm
convidada a apresentar casos em cursos para organizaes profissionais, e escolas do ensino
superior.

5. Inovao

Por ltimo, mas com forte repercusso na sua sustentabilidade, surge a inovao, em que
qualquer consultor deve investir fortemente. Da passagem do seu conhecimento aos seus
parceiros, dever resultar o reconhecimento por parte destes de um constante processo de
inovao e valorizao do conhecimento dos seus especialistas. A BIMMS no s possui
quadros especializados nas diversas reas da indstria da Arquitetura, Indstria, Construo e
Operao (AECO) como tambm na rea da informtica e programao. Com grande
experincia no apoio ao Projeto, Construo e j muito desenvolvimento na rea de Operao
e Manuteno e com o sempre presente objetivo da inovao a empresa tem apostado em reas
especificas de desenvolvimento inovador, como a realidade aumentada a programao de Plug-
ins para Softwares existentes de reas especficas que colmatam as necessidades dos
utilizadores, apoio a teses de mestrado e doutoramento assim como a participao em formaes
BIM a nvel Nacional e Internacional e tambm com a participao em grupos de trabalho
nacionais e europeus de normalizao BIM.

A aposta na inovao representa uma forte parcela dos custos operacionais da empresa
traduzindo-se isso em confiana uma vais valia nos servios oferecidos que so diferenciadores
relativamente oferta normal de mercado.

42
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 14: Simulao Virtual (Modelo BIM e Realidade Virtual).

6. Concluses

Da apresentao deste quadro de usos e aplicaes prticas em que a BIMMS tem participado,
percebe-se o seu carter holstico e integrador. A individualizao tem sido preterida ao
coletivo, e os clientes tendem a alterar os usos e a amplitude dos requisitos, de trabalho para
trabalho.

O BIM global. O conceito e a sua aplicao esto distribudos, o que permite a uma consultora
deslocalizada em relao aos habituais centros de deciso, tambm competir e integrar esses
modos novos de realizar projeto, porventura at com maior eficincia.

A carncia pelo conhecimento prtico desta metodologia, com vista sua aplicao
profissional, leva os Arquitetos e Engenheiros a procurarem ofertas formativas e educacionais,
quer nas instituies acadmicas, nos organismos profissionais, nas empresas especializadas e
mesmo junto das software houses.

Referncias

[1] Eastman, C., et al., BIM Handbook, in A Guide to Building Information Modeling for
Owners, Managers, Designers, Engineers, and Contractors 2011.
[2] Beauregard, M., S. Alsafouri, and S.K. Ayer, Development of a peer review-based
activity to improve students BIM process mapping understanding. 2016: Orlando.
[3] Azhar, S., M. Khalfan, and T. Maqsood, Building information modeling (BIM): now and
beyond. Australasian Journal of Construction Economics and Building 2012.
[4] Cao, D., et al., Identifying and contextualising the motivations for BIM implementation
in construction projects: An empirical study in China 2016.
[5] Chen Ke, et al., Bridging BIM and building: From a literature review to an integrated
conceptual framework. Int. J. Proj. Manag., 2015.
[6] Quigley, D.E., Achieving Spatial Coordination Through BIM. 2013, MCAA, NECA,
and SMACNA.
[7] Neil, J., How has Building Information Modelling changed the MEP Coordination
process? . 2014: University of Salford, Manchester.
[8] Lino , J.C., M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, in Encontro Nacional BETO ESTRUTURAL - BE2012 FEUP. 2012.

43
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

44
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

DESENVOLVIMENTO DE INTERFACES DE REALIDADE VIRTUAL


A PARTIR DE BIM E AVALIAO DA SUA APLICABILIDADE
Fbio Alexandre Matoseiro Dinis (1), Joo Pedro da Silva Poas Martins(1)

(1) Faculdade de Engenharia da Universidade do Porto, Porto

Resumo
Os programas comerciais associados tecnologia BIM (Building Information Modeling),
apesar da sua constante atualizao, so por vezes rivalizados por outro tipo de solues
informticas tecnologicamente menos evoludas e com mais anos de mercado. O know-how e
o processo de familiarizao com o software BIM, o custo da atualizao do equipamento das
empresas e da formao ao nvel do pessoal so dos principais obstculos no percurso pela
implementao desta tecnologia. O desenvolvimento de novos processos de interao entre
Realidade Virtual (RV) e software BIM poder desempenhar um papel relevante na relao
entre mquina e utilizador.

Foi desenvolvida uma soluo original que permite uma troca de dados bidirecional entre o
software de modelao e a interface virtual. A soluo explorada recorreu a equipamento de
RV como o Oculus Rift DK2 (Development Kit 2) e o sensor de deteo de comandos gestuais
Leap Motion.

Realizou-se tambm um teste de utilizao atravs de um caso de estudo e preenchimento de


um inqurito onde 30 participantes avaliaram o grau e adequabilidade/naturalidade de cada um
dos comandos programados. Entre outras concluses, destacou-se a avaliao da globalidade
dos comandos com 126 (60%) de um total de 210 votos (30 participantes, 7 comandos), com a
classificao mxima (Natural, no necessita de treino) dos 4 graus da escala fornecida.

1. Introduo

A utilizao de BIM no se identifica como um fator transversal indstria AEC (Arquitetura,


Engenharia e Construo). A preferncia por solues informticas como o CAD (Computer
Aided Design), ou seja, que no exigem conhecimentos na rea do BIM, uma realidade para
muitos intervenientes do setor. Seja pela aparente simplicidade do CAD na execuo de

45
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

determinadas tarefas, seja pela falta de familiarizao com os procedimentos BIM, a


implementao desta metodologia junto das empresas enfrenta ainda algumas barreiras.

As solues BIM requerem maior detalhe e quantidade de informao pelo que, necessitam de
maior dispndio de tempo para o desenvolvimento das vrias fases do projeto. Neste ponto as
solues como o CAD podem ser preferveis para utilizadores que ainda no fizeram a transio
para o BIM, sendo que, muitas das vezes implicam menor detalhe ou mais tempo gasto na
realizao de tarefas que, de outra forma, seriam automticas no caso de um modelo BIM. [1]

O know-how e o processo de familiarizao com os programas informticos comerciais


dedicados ao BIM representam alguns dos principais obstculos no percurso pela sua
implementao. No menos relevante, o desempenho das mquinas, responsveis pelo
processamento da informao, podero determinar a morosidade de execuo de tarefas,
dependendo da dimenso do projeto BIM.

A atualizao das empresas ao nvel do pessoal e do equipamento informtico acarreta custos


muitas vezes incomportveis com a capacidade financeira das mesmas. Neste sentido, a falta
de capacidade monetria para comportar este ponto gera uma barreira para a generalizao do
BIM entre os intervenientes na indstria da construo. [2]

Neste trabalho prope-se a avaliao do uso da realidade virtual (RV) como complemento
interao com software comercial BIM. Deste modo, ser avaliada a sua viabilidade em
operaes como visualizao, edio de modelos 3D, diminuio do tempo de familiarizao
do utilizador com a mecnica do trabalho, o potencial do seu uso como ferramenta facilitadora
do dilogo entre os diferentes intervenientes num projeto, entre outros.

O desenvolvimento de uma interface capaz de mobilizar sinergias entre BIM e RV pretende dar
resposta aos seguintes desafios:
Falta de experincia e incentivo por parte do pessoal ativo nas empresas relativamente
transio para a implementao da metodologia BIM e sua operabilidade;
Diminuio do tempo de adaptao e familiarizao com uma nova ferramenta
informtica;
Acessibilidade da tecnologia a novos pblicos, desde utilizadores de nvel profissional
com vasta experincia em modelao, a estudantes, docentes, utilizadores de um BIM
mais terico, a trabalhadores da indstria da construo sem qualquer contato anterior
com este tipo de tecnologia, etc.;
Alternativa s restries associadas visualizao limitada pelo confinamento de ecrs
2D;
Explorar novos mtodos de trabalho entre mquina e o utilizador.

2. Aplicaes da RV em Engenharia Civil, Arquitetura e na Indstria da Construo

Como tecnologia catalisadora de novos mtodos de trabalho, a RV no se encontra circunscrita


a um nmero limitado de aplicaes. A oferta de sensores, software e capacidade dos

46
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

equipamentos atuais suficiente para afirmar que a RV se poderia aplicar a todo o tipo de
objetivos. Quer isto dizer que a RV no se encontra prescrita para determinado uso numa nica
rea do conhecimento. De modo evidente, a razoabilidade dessa mesma aplicao ter que ser
sempre avaliada. No entanto, recai sobre a imaginao o potencial que a RV poder exercer
sobre novas metodologias e renovao de processos de trabalho.

2.1 Ferramenta de Comunicao


Na comunicao de ideias e melhoria da perceo espacial, a RV poder assumir um papel
determinante, atuando como mediador na transmisso de informao entre diferentes
intervenientes do processo construtivo, eliminando dvidas ou dificuldades. Esta tecnologia
poder auxiliar os projetistas em processos de deciso em fases muito iniciais do projeto.

Rendering, consiste no processo de produo de uma imagem a partir de dados armazenados


num computador e atualmente uma ferramenta de comunicao visual de utilizao comum.
Um render, termo correspondente imagem processada, poder induzir o observador em erros
por se encontrar confinado ao espao bidimensional de um ecr ou projeo. De facto, a
interpretao de uma imagem plana, imprimida ou projetada, sempre recriada pela capacidade
de quem a est a visualizar e a interpretar a 3D. Ainda que simulada a terceira dimenso do
espao (imagem plana, recorrendo perspetiva ou ao 3D), a imerso espacial inexistente,
comprometendo a perceo do espao [3].

Recorrendo RV atravs de HMDs (Head Mounted Display) conectados a um software de


modelao, possvel imergir o observador no projeto modelado. Desta forma, a perceo da
informao assemelha-se ao que aconteceria no local de construo. O ponto de vista passa de
um observador externo cena (caso do equipamento de visualizao plana como ecrs,
projetores, etc.), para um participante do prprio modelo. Neste sentido, determinadas questes
que s se levantariam em obra surgem a montante, onde as alteraes acarretam menores custos.

2.2 Investigao e Ensino


A RV aplicada ao ensino, na rea da Engenharia Civil e Arquitetura, por exemplo, poder atuar
como complemento, influenciando positivamente a apreenso de conhecimentos a partir da
imerso e interatividade proporcionadas por este tipo de tecnologia.

Um modelo tridimensional imersivo poder desempenhar um papel relevante na evoluo da


perceo visual dos espaos e/ou elementos, existentes ou no. A sensao de imerso num
ambiente virtual distingue-se claramente da realidade transmitida por um ecr ou vrios em
associao. A apresentao de contedos que outrora seriam de difcil interpretao em formato
2D podero ganhar, no que concerne a inteligibilidade, se apresentados recorrendo a tecnologia
de RV.

Exemplos com alguma complexidade visual e apresentao contida numa s imagem so raros
e difceis de concretizar. Na generalidade dos casos so precisos conjuntos de plantas, cortes e
pormenores construtivos para possibilitar a plena compreenso de alguns elementos
construtivos. Uma visualizao mais interativa e representativa dos elementos, da sua
configurao no real, poder auxiliar o processo de compreenso da escala e caractersticas dos
mesmos.

47
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O modelo virtual poder ser til no s em lies presenciais, mas tambm para aprendizagem
distncia. Deste modo, a RV proporciona novas alternativas para um ensino tcnico, de uma
forma impraticvel recorrendo a metodologias tradicionais [4].

Importa salientar a componente motivacional associada interao com uma tecnologia


dinmica como a RV. A integrao desta tecnologia em ambiente letivo contar certamente
com o fator motivacional por parte da audincia, o que poder influenciar positivamente a
eficcia da transmisso da informao.

A introduo de RV nas instituies de ensino possibilita aos estudantes considerar este tipo de
tecnologia na sua vida profissional.

3. Criao de uma plataforma de interao

No desenvolvimento da interface foi utilizado o motor de jogo Unity (verso 5.3.4f1). Este
motor de jogo surge como intermedirio para que os modelos BIM, importados para este em
formato prprio, possam ser manuseados em ambiente virtual.

Dada a forma expedita com que o Unity interage com equipamentos de RV possvel, atravs
de pequenos passos, conectar o modo de visualizao da cena a um HMD.

Neste programa criado um cenrio destinado produo de um ambiente de jogo. Dentro do


cenrio disponibilizado podem ser importados vrios objetos vindos do software BIM desde
que respeitem determinados tipos de formato de ficheiro como o FBX (Filmbox) e o OBJ
(Object file). Estes formatos de ficheiro asseguram a interoperabilidade, permitindo que a
geometria dos objetos a transportar seja preservada. Fatores como texturas e cores no so
comportadas neste tipo de formato e caso sejam relevantes para um determinado projeto devem
ser adicionadas recorrendo a programas dedicados como 3ds Max, Autodesk Maya ou atravs
de aplicaes como o Universal Material Converter.

Para alm do HMD Oculus Rift DK2 foi ainda utilizado um sensor de leitura de movimentos
gestuais. O Leap Motion deteta os movimentos das mos do utilizador atravs de duas cmaras
e trs LEDs de infravermelhos at uma distncia de 80 cm, afastamento limitado pela
propagao da luz LED no espao. O aparelho recebe a informao captada pelos sensores
sendo esta enviada via USB para o Leap Motion tracking software.

48
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Utilizao do sensor Leap Motion na manipulao de objetos BIM no ambiente


virtual.

Para alcanar uma interao distinta daquela que tradicionalmente feita atravs de um
computador, a relao obtida entre estas duas peas de hardware, Oculus Rift e Leap Motion,
foi testada e consecutivamente sujeita a ajustes. O objetivo seria criar, ou reutilizar comandos
para que, de forma natural, permitissem manusear a geometria de objetos de um projeto.

Como representado na Figura 1, basta ao utilizador erguer as mos at que estas estejam no seu
campo de viso para que possam surgir no cenrio virtual e interagir com o projeto a decorrer.
A interao poder ser feita adicionalmente recorrendo a um joystick, nomeadamente para
operaes de movimento do observador e rotao, cpia e translao de objetos.

4. Elaborao de um plugin para o Autodesk Revit 2016

Foi desenvolvido um plugin, usando a linguagem de programao C#, para estabelecer a


comunicao entre o modelo BIM no Autodesk Revit 2016 e os correspondentes objetos no
ambiente virtual criado atravs do Unity. Todas as operaes reconhecidas pelo plugin e
reproduzidas no Revit correspondem a gravaes feitas em linhas de um ficheiro de texto,
enviadas pelo Unity em tempo real a partir de um script.

Os comandos de translao e rotao recorreram API (Application Programming Interface)


do Revit na sua programao. Assim, o comando translao estabelece que caso seja lida no
ficheiro de texto uma operao de translao associada a um objeto, esta ser representada no
Revit atravs do vetor deslocamento entre a posio original e a final do objeto em causa.

O comando rotao executado sempre que se introduzam alteraes na orientao de um


objeto no espao virtual. A nova orientao registada no ficheiro de texto e atualizada
imediatamente no modelo do Revit. A identificao de cada objeto no espao virtual e no
ambiente de modelao requer que os respetivos IDs sejam mapeados devidamente. O ficheiro
FBX permite incluir os IDs de cada objeto na respetiva designao que visvel no Unity pelo
que, para objetos definidos no Revit esse mapeamento efetuado corretamente. J para os novos

49
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

objetos criados no ambiente virtual foi necessrio desenvolver um expediente para garantir a
sua correta identificao no software de modelao. Assim, ao reproduzir o comando cpia no
ambiente virtual, um objeto com ID original igual a [4000] registado como [-4000] no ficheiro
de texto. De imediato o Revit ir criar uma cpia deste objeto, sendo reconhecido (plugin) que
o ID [-4000] ser interpretado pelo Revit como um novo ID de valor igual a [-1]. Desta forma,
o resultado visvel no Revit uma cpia de um objeto j existente cujo ID corresponde a [-1].
Foi programado um contador para que caso se fizesse uma nova cpia, o ID da mesma seria [-
2] e assim sucessivamente de forma cumulativa por cada nova cpia de um objeto j existente.

Recorreu-se ainda funo Idling da API do Revit que permite que o cdigo do plugin seja
executado praticamente de forma contnua, desde que nenhum outro comando do Revit esteja
a ser invocado [5]. Desta forma, caso sejam escritas novas linhas no ficheiro de texto, ou seja,
operaes de cpia, translao ou rotao no Unity, ir ocorrer uma resposta no Revit. Da
perspetiva do utilizador o projeto ser atualizado, comunicando entre os dois programas, Unity
e Revit, de um modo prximo a uma comunicao em tempo real, embora ambos processem
modelos separados.

5. Caso de estudo

5.1 Descrio
Com o objetivo de obter uma resposta do utilizador final realizou-se uma prova de conceito
transposta no formato de caso de estudo. Assim, e embora se reconhea que a dimenso da
amostra no permita obter resultados estatisticamente significativos para a populao alvo,
depreenderam-se cuidadosamente algumas concluses acerca da recetividade dos inquiridos
face interao proporcionada pelos comandos desenvolvidos.

A importao do modelo integral seria incompatvel com o intuito deste estudo pelo que, a cada
participante no caso de estudo apresentou-se um modelo BIM do edifcio O, cafetaria da FEUP
(Faculdade de Engenharia da Universidade do Porto). Por forma a realar a componente
sequencial do teste o modelo encontrou-se dividido em dois espaos (Figura 2). Nestes
decorreram os testes para avaliao do grau de interao/adequabilidade dos comandos
programados.

O modelo foi importado para o motor de jogo Unity a partir do Autodesk Revit 2016, via FBX.

A fase prtica do teste inicia-se na zona 1 (Figura 2, esquerda) cuja inteno consiste na
familiarizao do utilizador com o ambiente em RV. Nesta zona decorram testes em dois
momentos. Primeiramente o domnio de dois comandos bsicos de interao: comando de
movimento e comando de seleo, ambos com auxlio do joystick. O domnio do movimento
pela cena e a capacidade de selecionar individualmente um objeto, representam duas funes
fundamentais para a primeira experincia com a interface. O comando de movimento ativado
atravs do deslocamento do boto analgico esquerdo (Figura 3). O utilizador movimenta-se
pelo cenrio mudando de direo mediante a orientao da cabea. O comando de seleo
ativado ao premir o boto A, e desativado caso o boto B seja pressionado (Figura 3). Um objeto

50
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ao ser selecionado no ambiente virtual ter a sua cor original modificada para amarelo
(decretada por cdigo RGB) auxiliando o utilizador na identificao.

Num segundo momento decorreu o teste dos comandos de translao, rotao e cpia dos perfis
H indicados na Figura 2 esquerda. A translao destes objetos pode ser executada por dois
processos. O primeiro consiste em selecionar um objeto e atravs do boto analgico esquerdo
(Figura 3) arrast-lo at posio desejada. Como alternativa possvel selecionar um objeto
pretendido e executar um pinch. O Leap Motion, caso se coloque uma das mos em frente do
sensor, unindo o polegar ao indicador, deteta a execuo do comando gestual pinch. De seguida,
basta mobilizar a mo numa direo e o objeto selecionado acompanhar o movimento de
translao.

O comando de rotao, semelhante ao de movimento, poder ser ativado por dois meios. Ambos
requerem que um objeto seja selecionado atravs do boto do joystick que executa o comando
de seleo. Aps a escolha do objeto a manusear, o utilizador poder optar por uma das teclas
destinadas ao comando de rotao atravs do joystick (Figura 3) gerando uma rotao do objeto
selecionado segundo o seu prprio eixo vertical.

Um segundo processo para ativar o comando de rotao executado atravs do sensor Leap
Motion. Estabelecendo gestualmente dois pinchs, o Unity deteta o ponto mdio entre a posio
das duas mos. Em rigor, esta posio calculada como o ponto mdio entre a unio de um
polegar com um indicador de uma mo (pinch da mo esquerda, por exemplo) e o seu
correspondente na mo direita (pinch detetado com a mo direita). O objeto selecionado ir
rodar, para esquerda ou direita, atendendo ao deslocamento de uma mo em relao outra.

Para copiar um elemento previamente selecionado, ser necessrio recorrer ao comando cpia.
Esta funcionalidade permite que o utilizador crie um nmero ilimitado de cpias de um objeto.
O comando ativado atravs do boto X do joystick, ou seja, um objeto selecionado e poder
produzir-se uma cpia do mesmo pressionando o boto X.

Figura 2: Cenrio correspondente zona 1 (esquerda) e zona 2 (direita).

A zona 2 (Figura 2 direita) foi concebida tendo como finalidade um teste integral da interface
e das suas funcionalidades. O utilizador tendo sua disposio todos os comandos programados
teria que executar cada um dos tpicos indicados:
1. Criar uma cpia do lavatrio existente;

51
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2. Alterar a posio da cpia, colocando-a sobre uma nova parede, para alm da que
suporta o lavatrio original.

Rotao de Rotao de um
um objeto objeto selecionado
selecionado no sentido horrio.
no sentido
anti-horrio.
Desativa o
comando de
seleo de um
objeto.

Ativa o comando
de seleo de um
Ativa o comando Ativa o comando
objeto.
de movimento. de cpia.
Figura 3: Comandos associados a cada boto do joystick. [6]

5.2 Aplicao da interface desenvolvida Engenharia de Instalaes- Revit MEP


A interface de RV poder ser utilizada em conjugao com variados tipos de software. A sua
arquitetura flexvel, podendo ser ajustada para interagir adequadamente com a API especfica
de cada programa BIM.

No trabalho desenvolvido optou-se por explorar o software Revit 2016 da Autodesk. Representa
um dos programas BIM mais utilizados a nvel mundial e disponibiliza uma licena de estudante
gratuita. O Revit tambm a ferramenta BIM mais utilizada para a produo de desenhos
segundo o National BIM Report de 2016 no setor da construo do Reino Unido, seguindo o
ArchiCAD e o Vectorworks [7].

Um aspeto relevante do MEP (Mechanical, Electrical and Plumbing) reside na particularidade


de os objetos poderem estar ligados entre si, seja por tubagens, peas especficas de ligao
como ts, cotovelos, etc. Essas ligaes surgem quando dois elementos se fixam entre si
ativando uma conexo. Esta dependncia gera um movimento conjunto entre os objetos
conectados. A agregao entre os elementos permite ao mover um s objeto, fazer com que
todos os outros ligados ao primeiro se movimentem em conjunto. Na Figura 4 pode-se constatar
o smbolo , referente ao ponto de conexo entre dois objetos. Importa referir que para alm
do movimento em simultneo, as tubagens podero modificar o seu comprimento adequando-
se nova localizao do objeto a que se encontram conectadas.

52
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Pormenor da conexo entre bacia de retrete e tubagem.

5.3 Anlise de resultados


Depois de realizarem as operaes descritas no ponto 5.1, os participantes preencheram um
questionrio com o intuito de avaliarem a usabilidade do hardware e das ferramentas
informticas desenvolvidas.

Dos equipamentos de RV utilizados, o comando Rotao (joystick) obteve a maioria das


preferncias dos participantes do caso de estudo, seguindo o comando Translao ativado a
partir do sensor Leap Motion. O comando classificado com menor grau de
naturalidade/adequabilidade foi o de Translao de objetos atravs do joystick (consultar Figura
5).

Como nota final, pode salientar-se o fato de a grande maioria das classificaes se ter feito
atravs das opes Requer pouco treino e Natural, no necessita de treino. A globalidade
dos comandos do caso de estudo foi classificada com 126 (60%) de um total de 210 votos (30
participantes, 7 comandos), com a classificao mxima dos 4 graus da escala (Figura 6).

53
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

30
28
26
24
22
20
Nmero de respostas

18
16
14
12
10
8
6
4
2
0
Movimento Seleo Rotao Rotao Criao de Translao Translao
(joystick) (joystick) (joystick) (Leap cpia (joystick) (Leap
Motion) (joystick) Motion)
Pouco intuitivo Requer muito pouco treino Natural, no necessita de treino

Figura 5: Classificao geral da adequabilidade/naturalidade de cada um dos comandos


desenvolvidos para RV.

140
126
120
Nmero de respostas

100
77
80

60

40

20
7
0
0
Nada intuitivo Pouco intuitivo Requer muito Natural, no
pouco treino necessita de treino

Figura 6: Classificao acumulada da interface produzida em RV.

54
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

6. Concluso

Atravs do recurso a hardware de realidade virtual (Oculus Rift e sensor Leap Motion) foi
possvel observar que utilizadores de diferentes ramos do conhecimento e de diferentes idades
conseguiram operar com software BIM sem conscincia de que o estavam a realizar. Dado as
alteraes no modelo em Unity reproduzirem-se automaticamente no projeto em Revit,
possvel sem conhecimento prvio de trabalho com esta ferramenta BIM, executar
modificaes simples em projetos. A interface no detm o rigor geomtrico da ferramenta
Autodesk Revit, nem faria sentido dentro dos objetivos do presente trabalho. O rigor do projeto
conferido atravs de software dedicado como o Revit, ArchiCAD, AECOsim, Vectorworks,
entre outros. Um dos principais objetivos alcanados passou pela evidncia de uma modificao
no projeto exercida atravs de RV e visualizada paralelamente num programa BIM.

Importa referir que durante o caso de estudo apresentado detetou-se entre os 30 participantes
um caso de nusea e enjoo provocado pelo chamado motion sickness. Pausas regulares, a
habituao tecnologia e a qualidade do computador onde a interface de RV est a ser utilizada
exercem influncia sobre esta reao.

Em suma, o mercado para a RV est em expanso e a Engenharia Civil poder usufruir de


muitas das vantagens deste tipo de tecnologia. Este trabalho poder contribuir para o
desenvolvimento de interfaces mais complexas onde o leque de possibilidades ser uma tarefa
difcil de antever.

Referncias

[1] Ireland, B. "Growing Pains Despite an increase in the softwares adoption, the electrical
industry is still experiencing barriers with BIM". EC&M Electrical Construction &
Maintenance. http://www.ecmweb.com/design/growing-pains. (Maro 2016).
[2] Clemente, J., Cachadinha N., "Building Information Modeling como ferramenta de
visualizao de realidade aumentada em obras de reabilitao Um Caso de Estudo"
(2012), Congresso Construo 2012, 4 Congresso Nacional, Coimbra 2012.
[3] Hampton, V., Rubenstone, J., Sawyer, T. "How Video Games Became Design and
Construction Tools A new generation is hacking into its childhood toysand driving
better project decisions". ENR Engineering News-Record
http://www.enr.com/articles/38932-how-video-games-became-design-and-
construction-tools. (Maro 2016).
[4] Sampaio, Alcnia Z., Ferreira, Miguel M., Rosrio, Daniel P., Martins, Octvio P, "3D
and VR models in Civil Engineering education: Construction, rehabilitation and
maintenance", Automation in Construction, vol. 19, pp. 819 - 828, Novembro 2010. doi.:
10.1016/j.autcon.2010.05.006.
[5] Tammik, J. "Idling Event". The Building Coder Blogging about the Revit API.
http://thebuildingcoder.typepad.com/blog/2010/04/idling-event.html. (Junho 2016).
[6] http://ecx.images-amazon.com/images/I/91RsGVBf1IL._SL1500_.jpg (Junho 2016).
[7] National BIM Library. " The National BIM Report is the most comprehensive analysis
of the state of BIM within the UK construction sector", National BIM Report 2016.
https://www.thenbs.com/knowledge/national-bim-report-2016. (Junho 2016).

55
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

56
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO DO CONCEITO BIM NA COBA

Pedro Serra (1), Carlos Canelhas (1), Antnio Raposo (1), Jos Cidades (1)

(1) COBA Consultores de Engenharia e Ambiente S.A., Lisboa

Resumo
O grupo COBA, pelos vrios campos de atividade e o elevado nmero de valncias que agrega,
apresenta um interesse particular relativamente s metodologias BIM, sobretudo no que respeita
gesto centralizada da informao do projeto. O presente artigo pretende apresentar os
trabalhos prticos de implementao BIM desenvolvidos at ao momento.

Inicialmente foi recolhida e analisada informao sobre BIM, de forma a identificar as mais-
valias desta metodologia, definindo-se de seguida um conjunto de objetivos a alcanar atravs
de uma estratgia de implementao gradual na empresa.

No primeiro projeto piloto foi desenvolvido o modelo estrutural de uma ETA, o que permitiu
formar uma equipa na utilizao do software e estabelecer processos de extrao da informao
do modelo. De seguida foram desenvolvidas a arquitetura e as estruturas de um edifcio, tendo
sido criados vrios objetos paramtricos e explorada a interoperabilidade entre os formatos
DGN e DWG. No ltimo projeto piloto foi modelada uma central hidroeltrica, recorrendo a
modeladores em localizao remota, na qual foram includas especialidades adicionais. Este
projeto serviu para aproximar os projetistas do modelo BIM, o qual foi j utilizado na
visualizao e no apoio tomada de deciso.

Espera-se num futuro prximo continuar o desenvolvimento das restantes especialidades,


aproximando os projetistas do modelo BIM atravs da utilizao de plataformas de
visualizao, formao interna e da introduo da modelao na fase de conceo das obras.

1. Introduo

O Building Information Modeling (BIM) um processo de gesto da informao inerente s


diferentes fases do ciclo de vida da construo, suportado por um ambiente tecnolgico comum,
o modelo 3D paramtrico. So j conhecidos os desenvolvimentos BIM a nvel internacional,

57
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

rea em que o Reino Unido se encontra claramente destacado, com um roadmap BIM imposto
pelo governo e com um plano de longo prazo que impe a utilizao BIM na indstria da
construo. convico da COBA que, em breve, esta imposio legal ir ser alargada a outros
pases e que as exigncias dos donos de obra iro evoluir no sentido de aumentar o rigor nos
processos de partilha de informao digital e de gesto do ciclo de vida dos empreendimentos.
Foi esta espectativa que levou introduo do conceito BIM na COBA, tendo sido identificada
a necessidade de criar conhecimentos sobre o tema que contribussem para incrementar a
competitividade da empresa.

Apesar dos fatores identificados, necessrio ter em conta que, nos mercados onde a empresa
atua, o BIM no se apresenta como uma necessidade imediata. No entanto, o contacto com a
tecnologia BIM permitiu reconhecer algumas vantagens que esta metodologia pode trazer,
nomeadamente: o aumento do nvel de conformidade entre documentos que tm como origem
o modelo BIM, a deteo de problemas e incompatibilidades mais cedo durante o projeto, a
coordenao entre especialidades atravs do modelo 3D e a comunicao com o cliente.

O reconhecimento destas vantagens levou ao desenvolvimento de esforos no sentido de


implementar metodologias BIM na empresa que permitam sobretudo facilitar a coordenao
entre as vrias especialidades e gerir a informao digital produzida.

2. Implementao

A implementao BIM implica sempre um investimento em aquisio de software, melhoria de


hardware, formao de pessoal e quebras de produtividade iniciais. Com vista a minimizar os
custos associados a esta fase, em especial na formao e nas quebras de produtividade, foi
constituda uma pequena equipa que tinha como principais objetivos:

Adquirir competncias de modelao que permitissem garantir a autonomia na


produo de modelos BIM paramtricos nas especialidades mais relevantes empresa
(estruturas, arquitetura e equipamentos);
Estudar a regulamentao internacional de modo a incorporar as boas prticas
atualmente reconhecidas na indstria para organizao da informao digital associada
ao BIM;
Estabelecer processos de trabalho associados produo de informao a partir do
modelo paramtrico, conforme os usos a definir;

O carcter disruptivo da alterao de metodologia de trabalho na empresa torna essencial


encontrar um conjunto alargado de usos a dar aos modelos paramtricos, to imediatos quanto
possvel, sem colocar demasiadas exigncias modelao e ao grau de desenvolvimento dos
objetos. Foram ento considerados trs usos essenciais produo de modelos BIM:

A produo de peas desenhadas atravs da elaborao de cortes dinmicos no modelo;


A obteno de quantidades automaticamente a partir do modelo;
A elaborao de imagens renderizadas a partir do modelo.

58
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Identificados os usos a dar ao modelo foi realizada uma anlise aos recursos humanos
disponveis e verificou-se existir um conjunto de colaboradores com alguns conhecimentos de
modelao 3D em Microstation e com capacidade para, de forma autnoma, desenvolverem
modelos BIM na plataforma escolhida o AECOsim Building Designer. Estes recursos estavam
afetos na sua maioria ao Ncleo de Recursos Naturais da empresa, departamento com uma das
componentes de produo mais importantes da COBA. Procurou-se ento criar as condies
para o desenvolvimento mais ou menos autnomo de modelos BIM por parte da equipa, numa
abordagem de experimentao com apoio de recursos on-line e guias de modelao da Bentley.
Esperava-se com esta abordagem reduzir os custos de implementao atravs de um
investimento reduzido na formao, mas garantindo uma transio gradual e orgnica, em
primeiro lugar dentro do prprio ncleo, e mais tarde transversal a toda a empresa.

Com base nesta estratgia deu-se incio ao desenvolvimento de um conjunto de projetos piloto,
mais representativos do trabalho realizado habitualmente pela empresa.

3. Projetos Piloto

Devido elevada componente de trabalho autnomo a que a estratgia idealizada obriga, estes
projetos iniciais serviram sobretudo para desenvolver os conhecimentos sobre os programas
utilizados, e compreender exatamente o alcance dos objetivos definidos para a implementao
BIM na empresa.

O primeiro projeto piloto centrou-se na modelao da especialidade de Estruturas da Estao


de Tratamento de guas apresentada na Figura 1. O objetivo principal para o projeto era o
desenvolvimento dos processos associados ao sistema de produo (desenvolvimento do
modelo por parte do modelador e obteno automatizada dos desenhos e das quantidades).

Figura 1: Modelo estrutural da Estao de Tratamento de gua.

59
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Ao nvel da modelao verificou-se que o conjunto de ferramentas paramtricas, apesar de


limitado, permite modelar uma parte importante da estrutura (vigas, lajes, pilares, paredes, etc.).
Existe contudo uma srie de objetos que no so habituais nos projetos de edificao e cuja
parametrizao geomtrica no imediata (nem a sua classificao nos vrios sistemas de
classificao da indstria AEC). , por exemplo, o caso do beto de enchimento dos
decantadores (Figura 2), que foram construdos recorrendo s ferramentas de modelao 3D
no paramtricas. Estas questes e as respetivas solues foram sendo registadas num manual
de modelao interno para posterior consulta.

Figura 2: Modelo e desenho parcial de um decantador com beto de enchimento.

Com o objetivo de reduzir as perdas de produtividade na implementao de metodologias BIM,


procurou-se minimizar as alteraes aos processos de trabalho j existentes na empresa. Ao
nvel do desenho, isto significa exportar os desenhos obtidos do modelo do formato DGN para
DWG. Este processo permite por um lado manter os processos de edio e montagem de
desenhos j existentes (e assim reduzir as necessidades de formao e perdas de produtividade
associadas), mas obriga a um cuidado maior na etapa de edio de desenho, devido perda de
interatividade que se verifica entre o modelo BIM e o desenho exportado (Figura 3).

Figura 3: Desenho obtido do modelo paramtrico, exportado para DWG.

60
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Relativamente s quantidades de materiais, o AECOsim permite exportar tabelas em Excel com


os vrios objetos que compem o modelo e os respetivos materiais, mas com uma capacidade
de edio da tabela limitada. Por este motivo optou-se por realizar um passo intermdio,
utilizando uma template de exportao simplificada, ligada lista de quantidades de trabalho
com a formatao utilizada habitualmente. Todas estas transferncias de informao foram
sendo registadas e organizadas num fluxograma apresentado no final (Figura 10).

O projeto seguinte envolveu um edifcio de apoio do aproveitamento hidroeltrico, tendo sido


desenvolvidos os modelos de arquitetura, de estruturas e de arranjos exteriores (Figura 4).

Esperava-se nesta etapa melhorar os processos de trabalho explorados no projeto anterior e criar
uma base de trabalho alargada para a especialidade de arquitetura. Durante este projeto a equipa
adquiriu os conhecimentos necessrios para a criao de objetos paramtricos nativos do
AECOsim recorrendo ao Parametric Cell Studio, o que representou um avano importante para
a criao e manuteno de uma biblioteca paramtrica prpria.

Figura 4: Modelos Estrutural e de Arquitetura do edifcio de apoio.

Este projeto serviu ainda para estabelecer um processo de trabalho para a obteno de imagens
renderizadas (Figuras 5 e 6). Tal como ficou estabelecido para os desenhos tcnicos, procurou-
se encontrar uma soluo que minimizasse qualquer quebra de produtividade relativamente aos
mecanismos j implementados na empresa. Por este motivo foram testadas as opes de
exportao do modelo BIM para DWG, para posterior importao em 3dStudio Max. Apesar
de mais uma vez esta soluo quebrar a interatividade entre os modelos, ela permite aumentar
o grau de detalhe dos objetos para o nvel necessrio renderizao (mas irrelevante para a
produo de desenhos e extrao de quantidades) sem sobrecarregar o modelo BIM.

61
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Modelo

BIM

Modelo

Render

Figura 5 Em cima: modelo BIM original do edifcio em DGN. Em baixo: modelo para
renderizao em DWG.

Figura 6: Esquema simplificada do fluxo de informao nos usos a dar ao modelo BIM [2].

O projeto piloto seguinte permitiu aumentar as rotinas de trabalho 3D, melhorar os processos e
aproximar o modelo das equipas de projeto. Iniciaram-se ento os trabalhos de modelao da
Central Hidroeltrica apresentada na Figura 7.

62
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Modelos de Estruturas, Arquitetura e Equipamentos da central hidroeltrica.

Este trabalho foi substancialmente diferente dos restantes, uma vez que o modelo foi realizado
em 3D por vrios modeladores, um dos quais localizado externamente COBA. Os modelos
BIM foram criados em paralelo, utilizados para coordenao entre especialidades (Figura 8) e
como veculo de comunicao entre modeladores internos e externos.

Figura 8: Utilizao do modelo para visualizao e apoio tomada de deciso.

Esta necessidade de partilha de informao colocou uma srie de novos desafios. A necessidade
de transmitir alteraes em diferentes modelos, e o facto de no existir uma regra clara sobre o
processo e os momentos de partilha de informao, provocaram problemas na interpretao dos
modelos por parte de cada um dos envolvidos. Surgiu assim a necessidade de definir um
documento orientador dos processos e regras na partilha de informao digital um Project
BIM Execution Plan (BEP).

63
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os projetos apresentados permitiram criar uma base de trabalho slida (biblioteca paramtrica
e conhecimentos de modelao) para os prximos desenvolvimentos, onde se espera aplicar as
vrias ferramentas utilizadas em projetos reais.

4. Desenvolvimentos futuros

importante referir uma vez mais que o trabalho apresentado foi desenvolvido com uma
componente autnoma que no pode ser ignorada, o que limitou a possibilidade de quantificar
os reais ganhos em termos de produtividade na utilizao de metodologias de trabalho BIM.
Mesmo sem uma quantificao exata, ficou j claro que a utilizao de ferramentas BIM
representa enormes ganhos nos tempos de produo, nomeadamente nas alteraes necessrias
numa fase de projeto base. Estes ganhos so obtidos nas fases de produo de desenhos e de
quantificao de trabalhos. Esta situao ser seguramente apurada quando forem definidos os
objetivos para os projetos a desenvolver de seguida. A estratgia de implementao BIM na
empresa tem alis de ser constantemente revista, em conformidade com as dificuldades e as
oportunidades que vo sendo identificados em cada projeto.

Para alm da necessidade de definir o BEP, importante extender o processo BIM ao projeto,
e aumentar a capacidade de modelao na empresa. Foi ento elaborado um plano de formao,
que se divide em trs mdulos distintos: produo, projeto e manuteno da biblioteca BIM.
(Figura 9).

Figura 9: Diviso do plano de formao BIM.

64
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Para alm da reviso dos objetivos definidos inicialmente, os projetos desenvolvidos revelaram
um conjunto de oportunidades de melhoria nos processos de trabalho internos, que merecem
ser exploradas. Todos os processos expostos esto sujeitos a serem revistos, melhorados ou at
descartados na eventualidade de se encontrarem alternativas mais produtivas ou que permitam
enfrentar novos desafios sem comprometer a integridade dos resultados j estabelecidos.

Das vrias etapas documentadas relativamente extrao de informao dos modelos (Figura
10), ser interessante eliminar por completo a necessidade de exportar os desenhos para
Autocad. Utilizando o modelo BIM como origem da informao 2D, a criao e manuteno
de um desenho base parece desnecessria, sendo possvel fazer a transio diretamente dos
cortes dinmicos para os layouts, sempre em ambiente AECOsim. Este processo resulta num
menor nmero de ficheiros a gerir, permite manter a interatividade total entre modelos e layouts,
e possibilita a utilizao da meta-informao existente no modelo para anotao dos desenhos
(pelo menos de forma mais eficaz). Esta alterao permite ainda utilizar processos de gesto de
documentao com recurso s ferramentas existentes no software.

Figura 10: Esquema simplificada do fluxo de informao nos usos a dar ao modelo BIM [3].

Sendo o BIM uma metodologia de trabalho que tem por base a partilha de informao digital
iremos continuar a desenvolver o BEP, pondo em prtica algumas das regras que foram
identificadas como fundamentais no ltimo projeto piloto. Esta etapa pode at ser estendida a
outros programas como o Revit, utilizando o IFC ou o i-model como formatos de transferncia

65
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de informao. Parece-nos tambm relevante diminuir a distncia entre as entidades, pondo em


prtica sistemas informticos de partilha de informao digital como o ProjectWise.

Com uma base de trabalho slida para as estruturas e a arquitetura, necessrio desenvolver os
objetos e as tcnicas de modelao para os equipamentos mecnicos, hidrulicos e eltricos.
Este trabalho j foi iniciado, estando a ser abordadas as questes do nvel de detalhe geomtrico
dos elementos e a sua incluso nos processos apresentados. Contribui tambm para este desafio
as definies criadas no plano de formao.

Cada especialidade tem as suas especificidades no que diz respeito modelao paramtrica.
A modelao de estradas, acessos e topografia, exige ferramentas de modelao especficas,
encontradas em softwares como o InRoads ou o Civil 3D, programas que j so utilizados na
empresa. Ser importante incorporar estes programas nos fluxos de informao alcanados.

Com a incluso de mais especialidades nos vrios modelos e com o aumento da complexidade
dos projetos, ser importante utilizar, de maneira formal, as ferramentas de Clash-Detection, e
encontrar rotinas e metodologias de trabalho que facilitem a coordenao do projeto.

necessrio aproximar as equipas de projeto do modelo BIM, usando-o como ferramenta, tanto
para coordenar as vrias especialidades, como para projetar. Para o efeito necessrio
identificar uma ferramenta que d acesso informao digital (o AECOsim, um i-model
acessvel atravs do Microstation ou do Navigator, ou pdfs 3D). ainda necessrio munir os
projetistas das ferramentas para realizarem parte do seu trabalho em BIM, atravs da aplicao
do plano de formao e da modelao de nveis de detalhe baixos, utilizando objetos
paramtricos mais evoludos construdos, por exemplo, com o Generative Components (Figura
11).

Figura 11: Objeto paramtrico criado em Generative Components, do macio de


envolvimento do circuito hidrulico de uma central hidroeltrica.

A utilizao do modelo paramtrico como forma de documentao do projeto permite aumentar


a produtividade e a qualidade dos entregveis obtidos, desde que exista uma base de trabalho
prvia de preparao da biblioteca paramtrica e de edio de templates. Reconhecendo que
este trabalho nunca est concludo, acreditamos ter ultrapassado esta etapa no que diz respeito
s estruturas e arquitetura, existindo agora uma biblioteca paramtrica e rotinas de trabalho

66
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

que permitem avanar na produo de modelos BIM. No entanto, esta apenas uma das
vantagens da utilizao deste tipo de tecnologias, sendo necessrio evoluir a aplicao do BIM
ao projeto. necessrio aproximar as equipas de trabalho ao modelo para coordenao, utilizar
a modelao como ferramenta para projetar, e construir um processo de gesto da informao
de uma forma mais eficaz.

Referncias

[1] Bentley, GenerativeComponents V8i Essentials 08.11.08 Bentley Institute Course


Guide, Bentley Systems Inc, 2010.
[2] N. Davies, Practical Architectural Modelling with AECOsim Building Designer, 1st ed.
Pennsylvania: Bentley Institute Press, 2008.
[3] C. Eastman, BIM Handbook, a guide to Building Information Modeling for Owners,
Managers, Designers, Engineers, and Contractors, John Wiley & Sons Inc., 2011
[4] PAS 1192-2:2013, Specification for information management of the capital/delivery
phase of construction projects using building information modelling, The British
Standard Institution (BSI), 2013.

67
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

68
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO BIM NA CASAIS S.A

Miguel Pires (1), Andr Monteiro (2)

(1) CASAIS Engenharia e Construo S.A, Braga


(2) bimTEC, Porto

Resumo
O Departamento Tcnico da CASAIS deu incio ao processo de implementao da metodologia
BIM de modo a capacitar os seus tcnicos com a necessria formao e conhecimentos
especializados permitindo introduzir nos projetos de conceo interna a abordagem de acordo
com o conceito BIM. Em conjunto com a bimTEC, empresa consultora especialista na
integrao de metodologias e processos BIM, foi desenvolvido um plano de ao para
introduo da nova metodologia de trabalho, contemplando uma estratgia faseada, com
objetivos definidos para curto, mdio e longo prazo.

Os principais objetivos da primeira fase da implementao BIM foram criar o ncleo CASAIS
BIM, desenvolver e integrar "workflows", e desenvolver e potenciar os servios BIM no mbito
dos trabalhos do Grupo CASAIS. O objetivo final a atingir o incremento do ROI e
concomitantemente providenciar um melhor servio aos clientes, interna e externamente, de
modo a exceder as suas expectativas.

O projeto de conceo-construo desenvolvido em Gibraltar denominado "Edifcio West One"


foi selecionado como projeto-piloto BIM. Tendo como principal objetivo a capacitao e
consolidao de competncias BIM, a modelao do projeto-piloto permitiu ainda avaliar a
adequabilidade das opes tomadas. Modelao 3D, extrao automtica de quantidades,
planeamento 4D e deteo de colises foram funcionalidades BIM exploradas no mbito do
projeto-piloto e exerceram um importante contributo para a equipa de execuo da obra da
CASAIS.

No presente artigo descrita a motivao e estratgia relacionadas com a implementao BIM


na CASAIS, bem como os primeiros resultados da utilizao do BIM no seguimento da
metodologia adotada.

69
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

A implementao BIM na indstria da construo, pelo facto de se realizar em contexto


multidisciplinar, apresenta desafios acrescidos.

No desenvolvimento da sua atividade, a CASAIS atua na totalidade dos diversos estgios do


ciclo da construo: desde a conceo de projeto de raiz, percorrendo a fase comercial de
apresentao das propostas de oramento, atravs da produo e construo dos edifcios, fase
de assistncia ps-venda e incluindo por vezes a prpria gesto e manuteno de edifcios.

Motivada pelo forte impulso de internacionalizao, a atividade da CASAIS desenvolve-se


muito para alm do mercado portugus, encontrando-se atualmente a laborar em 14 pases. A
forte internacionalizao da CASAIS induz igualmente diversas variveis a ter em conta no
processo de implementao.

A multidisciplinaridade dos processos e a presena em diversas geografias obrigou,


previamente implementao BIM na empresa, reflexo ponderada acerca da estratgia e
plano de ao a realizar na CASAIS.

Como ncora de desenvolvimento da implementao BIM, foi deciso orientadora a


constituio de ncleo BIM na sede da CASAIS, ao nvel do Departamento Tcnico da
construtora. Enquanto rea privilegiada de interao com os diversos ramos da empresa, bem
como com as diferentes geografias, revelou ser o local mais apropriado para desenvolvimento
de competncias e especializao BIM. Por outro lado, no Departamento Tcnico que os
benefcios mais diretos da aplicao das ferramentas BIM tendem a surgir de forma mais
imediata, na medida em que possvel desde logo tirar partido de funcionalidades como a
extrao automtica de vistas e quantidades do modelo, ou a deteo de incompatibilidades [1].
Este tipo de funcionalidade permite, por um lado, agilizar vrias das tarefas associadas ao
desenvolvimento de projetos, e por outro, facilitar a comunicao entre cliente, equipas
projetistas e equipas de produo (fabrico e construo), ambos aspetos muito importantes para
a maioria das construtoras [2], incluindo a CASAIS.

No sentido de comear a estabelecer dinmicas de interao com outras reas da empresa, em


particular, com as equipas de fabrico e de construo, foram desde o incio exploradas
funcionalidades adicionais como a integrao do faseamento construtivo nos modelos e a
simulao animada do processo de construo.

2. Estratgia BIM na CASAIS

2.1 Introduo
Qualquer alterao de metodologias, em especial numa indstria como da Arquitetura,
Engenharia e Construo (AEC), caracterizada pela rigidez dos seus processos, em
concomitncia com a elevada maturidade da CASAIS (cerca de 6 dcadas de atividade),
implicam mudanas profundas, resultando em processos delicados.

70
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Foram assim desenvolvidas reunies estratgicas de discusso com os diversos intervenientes


que ocorreram de forma informal, mas essenciais para a correta caracterizao dos objetivos.
Posteriormente foram realizadas entrevistas mais personalizadas com os responsveis da equipa
tcnica bem como o Administrador da tutela e o responsvel de sistemas informticos da
CASAIS.

2.2 Objetivos do Plano Estratgico


Previamente implementao foi realizado um Plano Estratgico que permitisse a avaliao
das caractersticas prprias da organizao, bem como a definio de um plano de formao e
de operacionalizao personalizados. Os objetivos principais adotados foram os seguintes:
Definio de objetivos a alcanar com a implementao BIM na CASAIS,
compreendendo a formalizao de uma viso integrada de adoo de processos BIM na
empresa a curto, mdio e longo prazo;
Definio de uma estratgia de implementao BIM que permita uma transio eficiente
dos atuais processos 2D centrados na produo de documentos, para processos 3D
suportados por modelos BIM paramtricos e enriquecidos de informao;
Apresentao das metodologias preconizadas e dos processos a implementar no mbito
da implementao operacional do BIM, tendo por base o nvel de maturidade
tecnolgica aferido para a empresa no contexto atual.

2.3 Objetivos da Implementao BIM


Foram definidos 3 objetivos ambiciosos no mbito da Implementao BIM:
Curto Prazo - Criar e consolidar o Ncleo BIM CASAIS ancorado no Departamento
Tcnico da empresa;
Mdio Prazo - Integrar workflows e processos de trabalho suportados em modelos BIM
nas diferentes reas de atividade do Grupo CASAIS;
Longo Prazo - Desenvolver e integrar novas reas de negcio suportadas por processos
BIM no portflio de servios do Grupo CASAIS.

2.4 Motivao da Implementao BIM


A motivao para a implementao BIM na CASAIS ocorreu predominantemente pelos fatores
seguintes:
Acompanhar as exigncias do mercado: O contacto com clientes internacionais que num
contexto de mercado globalizado e numa industria cada vez mais qualificada e
especializada. A CASAIS enquanto empresa que pretende estar posicionada neste tipo
de mercados de criao de Valor, pretende adotar e incorporar a metodologia BIM;
Conscincia da necessidade de evoluo: O contacto da equipa tcnica com aplicaes
BIM e a perceo das suas vantagens e potencialidades criou uma conscincia da
necessidade de mudana de paradigma na realizao da atividade de projeto;
Veiculo para potenciar sinergias internas: Beneficiar do potencial da metodologia BIM
nas diversas fases do ciclo de vida do projeto.

71
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Analise SWOT

Como forma prtica de sistematizar as diversas perspetivas e variveis foi realizada uma anlise
SWOT (Figura 1) enquanto metodologia apropriada na cenarizao para apoio deciso.

Figura 1: Anlise SWOT.

4. Implementao

4.1 Integrao por Fases da Implementao


Foi prevista a criao por fases do processo de implementao, definidas conforme o esquema
da Figura 2. A primeira fase corresponde ao definido no Plano Estratgico ao estgio temporal
de Curto Prazo, sendo o mais importante para constituir a base de fundao da implementao
BIM.

Figura 2: Fases de implementao.

72
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.2 Vetores Principais da Implementao


Na primeira fase da implementao foram definidos os 4 vetores principais:
Formalizao do Ncleo BIM da CASAIS: Constitudo por 2 arquitetos, 3 engenheiros
de estruturas, 1 engenheiro de mecnicas, 1 engenheiro eletrotcnico e 1 desenhador;
Desenvolvimento de competncias de modelao BIM: Desenvolvimento de aulas de
formao terica e prtica para aprendizagem do software;
Integrao da infraestrutura de suporte: Criao do Template de representao,
realizao de manual de boas prticas BIM;
Integrao de processos e operacionalizao da equipa BIM.

5. Projeto-piloto

5.1 Introduo
A CASAIS Gibraltar, motivada pelo impulso anglo-saxnico atualmente presente na adoo e
obrigatoriedade de projetar de acordo com metodologia BIM [3], apadrinhou enquanto
patrocinador a iniciativa de implementao. A escolha do projeto-piloto recaiu pelo edifcio
West One cuja conceo construo foi totalmente desenvolvida pelos tcnicos da CASAIS
e que o Dep. Tcnico coordenou. um edifcio de 12 andares destinado a habitao com os
dois pisos iniciais aptos para comrcio e a presena de uma penthouse no ltimo piso.

5.2 Sistema de Classificao


No mbito da especialidade de Estabilidade foi desenvolvido um sistema de classificao dos
diversos elementos baseado no sistema definido no NRM2 RICS new rules of measurement
Detailed measurements for building works [4]. Este sistema permitiu classificar os elementos
de modo a obter de forma automtica as medies em tabelas criadas dinamicamente e que so
atualizadas automaticamente sempre que o modelo sofre alteraes. O sistema de classificao
implementado no Revit por via dos Keynotes (Figura 3).

Figura 3: Utilizao do Keynote para classificao dos elementos.

5.3 Modelao e Deteo de Incompatibilidades


O software utilizado para a modelao do edifcio foi o Revit da Autodesk. Foram realizados
modelos distintos das diversas especialidades (Figura 4): Arquitetura, Estrutura e MEP.

73
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Modelos BIM (Arquitetura, Estruturas e MEP).

A realizao dos modelos permitiu a visualizao de diversas incompatibilidades durante os


estudos de projeto bem como apresentar diversas verses da fachada para aprovao do cliente,
revelando-se de enorme interesse e utilidade a sua utilizao no decurso dos trabalhos de
projeto.

5.4 Extrao de Quantidades


A utilizao da metodologia BIM permitiu atingir a extrao automtica de quantidades
diretamente do modelo sendo importante a adoo de rigorosos critrios de modelao para
garantir a qualidade e fiabilidade da informao obtida. O resultado final traduz-se na forma de
tabelas onde a informao organizada segundo os critrios definidos (Figura 5).

Figura 5: Exemplo de extrao automtica de quantidades para as Estruturas.

5.5 Planeamento da Construo


Ao nvel da especialidade de Estrutura foi possvel realizar a simulao do planeamento
construtivo alicerado no plano de trabalhos da execuo da obra. O software utilizado foi o
Navisworks.

5.6 Resultados do projeto-piloto


O objetivo do projeto-piloto passava pela criao do modelo do projeto West-One evoludo
at um nvel em que o modelo pudesse ser utilizado como complemento ao projeto, permitindo

74
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

uma inspeo visual da geometria e da informao associados aos elementos. Testar a utilizao
das funcionalidades descritas anteriormente eram aspetos valorizadores do projeto-piloto, numa
tica de antecipar o tipo de utilizao que se pretende dar aos modelos a curto prazo.
Os resultados do projeto-piloto foram particularmente encorajadores para as Estruturas,
especialidade cujo modelo foi criado mais rapidamente, inclusivamente, com uma demora
inferior ao esperado. A falta dos objetos especficos para o modelo de instalaes foi um fator
condicionante, no entanto, foi possvel desenvolver o modelo recorrendo a objetos semelhantes
da biblioteca do software. A abordagem ao desenvolvimento do modelo de arquitetura foi
ambiciosa, tendo-se optado pela modelao a um nvel de detalhe elevado, o que por sua vez
tambm resultou no aumento do tempo necessrio para concluir o modelo.

6. Projetos Adicionais

Decorrente da implementao BIM e da experincia alcanada foram realizadas outros projetos


pelo Ncleo BIM nomeadamente (Figura 6):

Projeto de Conteno Perifrica da obra Ocean Spa Plaza em Gibraltar;


Projeto de Estabilidade do edifcio Consulado de Angola no Porto;
Projeto de Conteno de Fachada e de Estabilidade do Edifcio Estrela 24 em Lisboa;

Figura 6: Exemplo de modelos adicionais. Da esquerda para a direita, Ocean Spa Plaza,
Consulado de Angola, Edifcio Estrela 24.

7. Concluso

A implementao BIM na CASAIS tem-se revelado um desafio interessante, possibilitando a


interao profunda entre as diversas especialidades ao nvel da conceo de projeto. Em
complemento permite de forma muito competente e clarificadora expor e apresentar o
faseamento construtivo em obras de especial complexidade s equipas de Direo de Obra.
A apresentao de solues alternativas bem como o controlo automtico das medies so
uma garantia de apoio deciso e cruciais na fase comercial da apresentao de propostas.

75
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Na relao com os Clientes e com os demais intervenientes (tcnicos de licenciamento


camarrio, Fiscalizaes, Subempreiteiros, etc.) uma mais-valia ao melhorar a comunicao,
deteo de incompatibilidades e a deteo de colises entre especialidades.

A implementao BIM uma evoluo positiva e a criao do Ncleo BIM permite no s


atuar no presente, ao nvel da realizao de projetos, mas garantir a incorporao do
conhecimento e sua difuso para o futuro, alicerando as bases de evoluo numa metodologia
de grande potencial e na aplicao aos diversos estgios do ciclo da construo.

Referncias

[1] C. Eastman, P. Teicholz, R. Sacks e K. Liston, BIM handbook : a guide to building


information modeling for owners, managers, designers, engineers, and contractors,
Hoboken, N.J: Wiley, 2008.
[2] SmartMarket Report, The Business Value of BIM for Construction in Major Global
Markets, McGraw Hill Construction, USA, 2014.
[3] NBS, International BIM Report 2016, England: NBS, 2016.
[4] RICS, RICS new rules of measurements 2: Detailed measurement for building works,
UK: Royal Institution of Chartered Surveyors (RICS), 2013.

76
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO BIM NUMA EMPRESA DE ESTUDOS E


PROJETOS DE ENGENHARIA (CENOR)
Andr Monteiro (1), Joo Lima(1), Sofia Henriques(2), Lus Rodrigues(2), Lus Ribeirinho(2)

(1) bimTEC, Porto


(2) CENOR Consultores, S.A., Lisboa

Resumo
O Departamento de Estudos e Projetos da CENOR deu incio implementao da metodologia
BIM nos seus processos de trabalho, tendo como principais objetivos, por um lado, integrar
novos processos que permitam aumentar o nvel de automao e sistematizao, e por outro,
dar resposta a solicitaes especficas do mercado nacional e internacional. Para tal, foi
desenvolvido em conjunto com a bimTEC, empresa consultora especialista na integrao de
metodologias e processos BIM, um plano de ao para introduo da nova metodologia de
trabalho de forma faseada, definindo objetivos a curto, mdio e longo prazo.

Em termos operacionais, a estratgia de implementao desenvolveu-se segundo quatro


vertentes principais: 1) Planeamento estratgico; 2) Formao; 3) Desenvolvimento do Projeto-
piloto; 4) Formalizao dos processos e ferramentas de apoio aplicao da metodologia BIM.

O presente artigo descreve com algum detalhe o processo de implementao BIM na CENOR,
dando especial nfase evoluo processual observada nos projetos BIM, entretanto
desenvolvidos na CENOR, salientando-se os principais resultados operacionais alcanados,
dificuldades e benefcios encontrados, assim como a aferio e anlise dos indicadores chave
de desempenho estabelecidos para este processo.

1. Introduo

Uma das tendncias de maior relevo na indstria da Arquitetura, Engenharia, Construo e


Operao (AECO) durante os ltimos anos a ascenso do Building Information Modeling
(BIM) enquanto processo de abordagem ao desenvolvimento e gesto de projetos [1], [2]. Em
Portugal esta tendncia no to evidente [3], no entanto, empresas com forte atividade no
mercado internacional, nas quais se incluem a CENOR, comeam a procurar formas de integrar

77
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

a metodologia BIM nos seus processos de trabalho, fruto no s das solicitaes de clientes
como do prprio reconhecimento do potencial da metodologia nos processos internos.
O processo de implementao BIM no obedece a uma frmula rigorosa e inflexvel, no
entanto, existem aspetos que podem ser generalizados. Simplificadamente, um processo de
implementao exige, no mnimo, a criao de uma equipa e a disponibilizao de uma
infraestrutura que lhe permita desenvolver projetos BIM de forma expedita e consistente [4]. A
nfase na equipa decisiva na medida em que ser a equipa a pr em prtica a metodologia
BIM. Por outro lado, e assumindo que a primeira equipa BIM se resume a um pequeno ncleo,
ser esta a responsvel por suportar a disseminao da metodologia BIM dentro da empresa em
fases futuras.

A transio de uma abordagem CAD para uma abordagem BIM implica alteraes estruturantes
da forma de trabalhar, pelo que sero sempre esperados desafios em qualquer processo de
implementao BIM [5].

2. Enquadramento do BIM na CENOR previamente implementao

Enquanto mtodo de abordagem ao desenvolvimento de atividades relacionadas com os


projetos da indstria da AEC, o BIM enquadra-se na rea/campo de pesquisa/explorao da
Comisso para a Modernizao Informtica da CENOR (CMIC), um grupo constitudo por um
representante de cada servio, cujo objetivo principal a otimizao e automatizao de
processos, seja por via da programao, seja por integrao de novas aplicaes informticas
ou metodologias nos mtodos de trabalho internos. A identificao do BIM como um dos
principais vetores a explorar surge no mbito do trabalho desenvolvido pela CMIC e consolida-
se com o aparecimento da primeira oportunidade para o desenvolvimento de um modelo BIM.
Este primeiro contacto com o BIM consistiu na modelao de uma ETAR, infraestrutura
existente, com vista criao de um repositrio digital da informao do respetivo projeto
(Figura 1).

Figura 1: Sobreposio do modelo da ETAR e da respetiva nuvem de pontos.

No sentido de acompanhar uma tendncia cada vez mais presente e de dar resposta a
solicitaes concretas como o caso da ETAR, foi contratado um colaborador com vrios anos

78
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de experincia no desenvolvimento de projetos em BIM. Paralelamente, alguns membros da


equipa frequentaram aes de formao nesta rea.

Com o desenvolvimento do primeiro projeto BIM, ficou claro que uma implementao
estruturada e transversal a vrios departamentos da CENOR s seria possvel mediante um
esforo organizativo alicerado num conhecimento profundo da metodologia BIM. Para tal
seria necessrio mobilizar colaboradores cuja dispensa dos projetos aos quais se encontravam
alocados no era possvel. Assim, a CENOR decidiu recorrer a uma empresa consultora
especializada para desenvolver e pr em prtica uma estratgia de implementao da
metodologia BIM. A bimTEC foi a empresa escolhida para o efeito.

3. Descrio do processo de implementao

A estratgia de implementao (Figura 2) desenvolveu-se segundo as seguintes quatro vertentes


principais:
1. Planeamento estratgico: Que consistiu na realizao de um diagnstico empresa para
identificar o nvel BIM e definir os principais vetores de desenvolvimento da estratgia
de implementao;
2. Formao: Modular por especialidade e por nvel de complexidade;
3. Projeto-piloto: No qual foram aplicados os conceitos adquiridos por via da formao;
4. Integrao da infraestrutura: Onde foram formalizados processos e ferramentas de apoio
aplicao da metodologia BIM.

bimTEC

Plano
Entrevistas Define requisitos para desenvolver Formao Suporte
Estratgico

Administrao
Administrao Entregue a Diretores de Equipa BIM Equipa BIM
Servio

Mdulo 1 Projeto 1
Perfil da Objetivos da
empresa implementao
Mdulo 2 Projeto 2
Recursos Planeamento das
informticos atividades Mdulo n Projeto n

Perfil do Processos de Elementos


Realizadas a cliente-tipo modelao personalizados a
Define entregar
Processos Procedimentos
produtivos operativos

Organizao Armazm de
Objetivos e Processos do bimSPOT contedos
expectativas colaborativos

Perfil do
Plano de formao Estrutura da
colaborador
equipa BIM
Organizao da
Equipa Tcnica equipa BIM

Plano de
Recursos
investimento
informticos
Nvel de
Define
Maturidade BIM
Legenda
CENOR Atividades Tpicos Documentos Desenvolvimento

Figura 2: Diagrama do processo de implementao proposto.

79
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.1 Planeamento estratgico


A primeira etapa do processo de implementao, o planeamento estratgico, desenvolve-se com
base num diagnstico realizado internamente com o objetivo principal de identificar o nvel
BIM da CENOR e os processos em que a metodologia BIM seria mais facilmente implementada
e/ou que retornaria maiores benefcios. No relatrio do planeamento estratgico foram
identificadas as concluses do diagnstico realizado e foi formalizada a estratgia a adotar na
implementao, incluindo a composio e caracterizao da equipa que veio a liderar a
integrao do BIM na empresa. O esboo da equipa BIM teve em conta aspetos como o perfil
tecnolgico dos membros e as dinmicas de trabalho expectveis em regime de produo [6].
Esta equipa foi o foco das atividades contempladas no processo de implementao.

A discusso do relatrio estratgico foi uma das etapas mais importantes do incio da
implementao na medida em que foi quando o plano de ao foi formalizado com base na
calendarizao das atividades e nos recursos disponveis. Alguns aspetos como a constituio
da equipa BIM ou os objetivos traados para a implementao foram ligeiramente alterados em
virtude dos recursos mobilizveis internamente. Manter os nveis de produo num patamar
aceitvel um dos principais requisitos da implementao de processos transformativos na
maioria das empresas. A CENOR no foi exceo pelo que, a flexibilizao da estratgia foi
um aspeto essencial na abordagem implementao do BIM.

3.2 Formao
A segunda etapa do processo de implementao passa pela formao dos membros da equipa
BIM.

A formao foi desenvolvida de forma modular, por especialidade e por nvel de complexidade.
As primeiras aes de formao tiveram como objetivo o desenvolvimento de competncias
bsicas de modelao em colaboradores sem contacto prvio com aplicaes BIM. A
consolidao das competncias foi concretizada, numa primeira fase, com o desenvolvimento
do projeto-piloto e, posteriormente, com uma segunda vaga de aes de formao focadas em
cada uma das especialidades de projeto existentes na CENOR, incluindo ainda formao de
carcter geral, focada na definio de processos e de metodologias aplicveis ao
desenvolvimento de projeto BIM.

O incio do projeto-piloto aps os mdulos de introduo modelao BIM resultou da vontade


testar as metodologias BIM e CAD em paralelo num mesmo projeto, o que obrigou a uma
reestruturao do plano de formao inicialmente previsto. Alguns dos mtodos e processos
abordados nos mdulos de modelao avanada ministrados aps o projeto-piloto teriam sido
teis durante a criao do modelo, no entanto, a antecipao do projeto-piloto teve a vantagem
de permitir que a equipa frequentasse os mdulos avanados j com os conhecimentos bsicos
bastante consolidados.

3.3 Projeto-piloto
A escolha do projeto-piloto recaiu sobre o projeto de uma estao de metro. A generalidade das
aplicaes de modelao BIM encontra-se otimizada para a modelao de edifcios regulares e
no de edifcios de infraestruturas enterradas como uma estao de metro, pelo que uma
estrutura mais regular no implicaria desafios da mesma ordem. A opo por um projeto desta

80
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

envergadura e complexidade justifica-se pelo facto de se tratar de um projeto tpico da CENOR


tornando-se, por este motivo, de primordial importncia a identificao dos desafios associados
ao desenvolvimento deste tipo de projeto o mais cedo possvel. O facto de a componente
geotcnica ser preponderante no projeto da estao foi outro fator que contribuiu para a sua
escolha enquanto projeto-piloto, na medida em que o servio de geotecnia da CENOR, e apesar
das ferramentas BIM no estarem ainda muito desenvolvidas nesta rea, era um dos sectores
que maior interesse mostrou na implementao.

O projeto contemplou, essencialmente, duas especialidades (Figura 3): geotecnia e estruturas.


A primeira incluiu a modelao do terreno e o faseamento construtivo associado ao movimento
de terras, e a modelao das paredes moldadas e a respetiva estrutura temporria de
escoramento. A segunda incluiu a modelao de toda a estrutura de beto armado, com exceo
da modelao de armaduras. A modelao das redes e instalaes no foi contemplada para este
projeto.

Inicialmente, os objetivos do projeto-piloto passavam pela mobilizao formal da equipa BIM,


pela consolidao dos conhecimentos adquiridos na formao, pelo teste de diversas
metodologias de modelao e pelo suporte criao e validao do template Revit (um dos
softwares adotados). Com o evoluir do projeto, a preparao do modelo numa perspetiva 4D
com vista criao de uma simulao animada do faseamento construtivo da obra foi tambm
estabelecida como um dos principais objetivos do projeto-piloto. Sendo o processo de
implementao focado essencialmente no desenvolvimento e produo de projetos utilizando
metodologias BIM, a componente 4D assume uma grande relevncia na promoo interna e
externa do projeto BIM. Em empresas da dimenso da CENOR com estruturas organizadas por
ncleos/reas de atividade, a promoo interna particularmente importante na disseminao
de novos mtodos de trabalho.

Figura 3: Modelos desenvolvidos no mbito do projeto-piloto. Da esquerda para a direita:


modelo de coordenao, modelo da geotecnia, modelo de estruturas.

3.4 Integrao da infraestrutura BIM


A utilizao eficaz de uma metodologia BIM obriga preparao de uma infraestrutura que
suporte o desenvolvimento, utilizao e gesto dos modelos. A infraestrutura abrange aspetos
concretos como a preparao de toda a componente informtica, a nvel de software e hardware,

81
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

a preparao de templates e de normas de classificao e codificao de elementos; por outro


lado, enquadram-se igualmente no domnio da preparao da infraestrutura a definio de
processos de trabalho colaborativos. Com a concluso do projeto-piloto e a identificao dos
workflows mais relevantes e passveis de serem utilizados na generalidade dos projetos a
desenvolver futuramente, foram formalizados os vrios aspetos processuais da infraestrutura
BIM em conformidade.

Uma das mais importantes ferramentas da infraestrutura a plataforma para consulta e partilha
de conhecimento que agrega os vrios documentos e workflows que compem a metodologia
BIM, tendo uma plataforma tipo Wiki sido escolhida para o efeito.

4. Anlise de resultados

4.1 Benefcios diretos


Do processo de implementao e em particular da experincia retirada do desenvolvimento do
projeto-piloto, foi possvel confirmar vrios dos benefcios diretos expectveis com a utilizao
da metodologia BIM, nomeadamente:
Deteo de erros e incompatibilidades de projeto em fase adiantada do processo de
modelao, sendo frequente a sua identificao como consequncia do prprio processo
de modelao que, por obrigar a uma caracterizao geomtrica mais completa do
edifcio, resulta habitualmente num maior rigor de representao que faz sobressair
erros e incompatibilidades;
Criao de desenhos coerentes de forma sistemtica e capacidade de complementar as
peas desenhadas tradicionais com vistas tridimensionais do modelo que ajudam
consideravelmente na comunicao do projeto;
Extrao automtica de quantidades do modelo de forma expedita, permitindo reduzir
o tempo de medio do projeto e obter valores sempre consistentes com a geometria
modelada;
Introduzir alteraes ao projeto e retirar quantidades e desenhos atualizados sem grande
esforo adicional;
Aproveitar o modelo de projeto para explorar funcionalidades complementares como a
produo de renders ou a simulao animada do faseamento construtivo;
Utilizar o modelo como ferramenta de comunicao e promoo, interna e
externamente, dos projetos desenvolvidos.

4.2 Desafios
Apesar de expectveis, os desafios sentidos ao longo do processo de implementao e em
particular do desenvolvimento do projeto-piloto acabaram por se revelar incontornveis, sendo
os seguintes os mais relevantes:
Conciliar a formao (participao nas aes de formao e no desenvolvimento do
projeto-piloto) com a necessidade de dar resposta aos projetos em curso; a produo no
pode ser completamente interrompida, o que obriga a um compromisso entre as duas
atividades;

82
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Consolidar competncias de modelao algo moroso e que apenas evolui com a


utilizao contnua de ferramentas e processos;
Os workflows BIM encontram-se em constante atualizao por fora da evoluo das
ferramentas de modelao e do tipo de solicitao, o que obriga a um acompanhamento
constante das alteraes aos mtodos e processos por parte dos utilizadores.

4.3 Ps projeto-piloto
Imediatamente aps o desenvolvimento do projeto-piloto a CENOR deu incio a dois outros
projetos BIM, designadamente: o projeto de uma estao elevatria de gua e de uma segunda
estao de metro. Relativamente ao primeiro, o objetivo principal passava pela produo de
desenhos para fabrico apoiados em isometrias com elevado nvel de detalhe (geomtrico e
informativo). Neste projeto foi possvel integrar duas vertentes menos exploradas no projeto-
piloto, nomeadamente, a componente do desenvolvimento de modelos de redes (MEP) e a
componente de trabalho em simultneo no mesmo modelo (Worksharing). O projeto da
segunda estao permitiu a aplicao dos princpios do projeto-piloto, mas de forma mais linear
e consistente, bem como o desenvolvimento de novas metodologias e workflows.

Existem alguns indicadores que permitem analisar a evoluo da implementao da


metodologia BIM sob diferentes perspetivas. Relativamente comparao entre tempo de
produo do projeto segundo a abordagem tradicional baseada em desenhos isolados,
frequentemente denominada de metodologia CAD, e a abordagem a implementar, metodologia
BIM, houve uma diferena muito ligeira de 2% a favor da ltima. Note-se contudo, que a
bimTEC acompanhou o trabalho, colmatando a inexperincia da equipa. expectvel que a
equipa BIM da CENOR venha a necessitar de cada vez menos apoio e tempo para desenvolver
o projeto BIM.

Aps a implementao, foi possvel constatar, a nvel de recursos dedicados ao BIM, uma
consolidao da equipa BIM e um fluxo constante de novos projetos BIM. O nvel de
complexidade e de pormenorizao dos projetos tem tambm vindo a aumentar como
consequncia da maior destreza adquirida por parte dos modeladores e da diminuio de receios
sobre a metodologia BIM, em virtude das provas dadas.

A nvel de funcionamento da equipa de modelao, tem-se registado um decrscimo gradual de


necessidade de apoio modelao corrente por parte do BIM Manager da CENOR, que se vem
dedicando mais superviso e gesto dos modelos. expectvel que a tendncia se mantenha
medida que a equipa ganhe experincia, destreza e autonomia de modelao.

Alm dos workflows bsicos formalizados, existem j novos processos avanados de trabalho
em desenvolvimento pela equipa BIM, pelo que a estrutura atual j permite a formalizao e
integrao de novos workflows avanados.

83
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5. Generalizao das prticas

As caractersticas prprias de cada empresa no permitem que um processo de implementao


seja completamente replicado em diferentes organizaes, no entanto, existe um conjunto de
procedimentos que podem ser generalizados e aplicados transversalmente com apenas
pequenos ajustes.

5.1 Planeamento estratgico


Existem dois aspetos estratgicos fundamentais a considerar: a definio do principal objetivo
da implementao e a definio da equipa BIM.

Estabelecer corretamente o objetivo para a implementao o que permitir desenvolver uma


metodologia e uma infraestrutura BIM medida da empresa/organizao/equipa. A definio
da equipa, por outro lado, condicionar decisivamente a otimizao dos recursos necessrios a
mobilizar para a implementao e posteriormente para a operacionalizao da metodologia
BIM.

O objetivo da implementao deriva da identificao da motivao para a implementao e da


definio do principal domnio de reestruturao de workflows. A definio da equipa BIM
resulta da identificao dos colaboradores mais compatveis com a forma de trabalhar segundo
a metodologia BIM, seja por experincia, vocao ou ambos, e da disponibilidade de alocao
s atividades de formao.

5.2 Formao
Abordar a formao de forma intensiva e contnua tem a vantagem de permitir expor as equipas
a uma gama alargada de funcionalidades e tcnicas de modelao desde o incio do processo de
aprendizagem, o que tende a estimular o interesse e o entusiasmo pelos novos mtodos de
trabalho, no entanto, a consolidao dos princpios bsicos muito importante para garantir
destreza na utilizao das funcionalidades mais avanadas das ferramentas; este tipo de
conhecimento habitualmente obtido por via da utilizao repetida, isto , com a experincia e
utilizao diria. Por norma, o fator decisivo para intercalar ou no os mdulos de formao
reside na articulao com o restante calendrio de atividades relacionadas com a implementao
e com a produo.

5.3 Projeto-piloto
O grande objetivo do projeto-piloto passa pela aquisio de competncias de modelao,
especialmente em equipas cujos colaboradores se encontrem a dar os primeiros passos na
modelao BIM. Dominar a capacidade de modelar significa ganhar um nvel de destreza e
autonomia que permita abordar qualquer tipo de projeto. S com as competncias de modelao
consolidadas se poder passar para a aplicao de workflows mais avanados.

5.4 Metodologia BIM


A metodologia BIM define um conjunto de mtodos, processos e regras para abordar o
desenvolvimento de projetos BIM de forma clere, consistente e uniforme. As regras de
nomenclatura transversais aos vrios projetos, independentemente da especialidade, so
particularmente importantes para minimizar a entropia que se gera ao trabalhar com modelos

84
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

cada vez mais complexos. Os workflows que surgem no mbito de determinado projeto devem
sempre ser formalizados de modo a poderem ser reutilizados ou evoludos em projetos futuros.

6. Concluses

A CENOR deu incio implementao formal da metodologia BIM no seu Departamento de


Estudos e Projetos. Os primeiros resultados mostram, por um lado, os benefcios de utilizar a
metodologia, quer a nvel de tempo de desenvolvimento de projeto como do tipo de informao
e esquemas adicionais que possvel obter sem grande esforo adicional.

A definio da estratgia de implementao deve obrigatoriamente ter em conta a mobilizao


dos recursos internos alocados s atividades de produo de modo a conciliar com as atividades
da implementao. A formao BIM, incluindo as atividades de formao e o desenvolvimento
do projeto-piloto, deve ter como objetivo principal desenvolver na equipa nveis de destreza e
autonomia que lhes permita fazer face generalidade dos desafios bsicos de produo de
qualquer tipo de projeto BIM.

A proliferao interna do BIM e a sua utilizao em diferentes reas do projeto so os objetivos


mais prementes estabelecidos pela CENOR para o desenvolvimento interno da implementao
do BIM a curto-prazo.

Referncias

[1] NBS, International BIM Report 2016, England: NBS, 2016.


[2] SmartMarket Report, Measuring the Impact of BIM on Complex Buildings, USA: Dodge
Data & Analytics, 2015.
[3] P. Carvalho, Avaliao do estado de implementao da tecnologia BIM no setor da
construo em Portugal, Porto: FEUP, 2016.
[4] David Miller, BIM Mobilisation to Implementation - an SME Perspective, England: BIM
Task Group, 2013.
[5] G. Lea, Investigating the 'triple bottom line': CAD vs BIM, Preston, UK: Department of
the Built and Natural Environment, University of Central Lancashire, 2011.
[6] J. Joseph, BIM Titles and Job Descriptions: How Do They Fit in Your Organizational
Structure?, BIM/CAD/Technologies: Autodesk University 2011, 2011.
[7] C. Eastman, P. Teicholz, R. Sacks e K. Liston, BIM handbook: a guide to building
information modeling for owners, managers, designers, engineers, and contractors,
Hoboken, N.J: Wiley, 2008.

85
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

86
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O QUE H DE BIM EM NOZ

Ana Silva (1), Daniela Silva (1), Flvio Silva (1), Rui Dias (1)

(1) NOZ Arquitectura, Lisboa

Resumo
A NOZ um estdio de arquitetura sediado em Lisboa desenvolvendo projetos para Portugal e
Reino Unido.

O BIM parte integrante de todos os projetos desenvolvidos na NOZ, desde o conceito at


construo.

S atravs da implementao de modelos BIM possvel responder de forma rpida, eficaz e


assertiva, atendendo s necessidades de colaborao e interao distncia, e grande
exigncia e complexidade dos projetos que desenvolvemos.

Para a conferncia PT BIM, a NOZ prope-se a partilhar a sua experincia, utilizando como
exemplo o desenvolvimento dos projetos Dylon Site Redevelopment, para 250 apartamentos,
em Londres, e a obra de reconverso do The Courtyard Theatre, em Stratford-upon-Avon.

Ambos os projetos foram inteiramente desenvolvidos em ambiente BIM, desde a sua fase inicial
com a elaborao de diversos estudos de massas e reas at fase final de execuo e
construo, sempre tirando partido dos diversos recursos que as ferramentas proporcionam no
desenvolvimento do processo criativo, nomeadamente ao nvel de 'scheduling', 'design options',
faseamento, 'report', 'clash detection' e visualizao.

This is how we BIM. How do you BIM?

87
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

"Deus quer, O Homem sonha, a Obra nasce." Em Mensagem Mar Portugus de Fernando
Pessoa.

A necessidade de cumprimento de um objetivo implica sempre a determinao de um conjunto


de passos necessrios sua concretizao. A existncia de um plano, contribui antecipadamente
para o sucesso de uma determinada tarefa ou conjunto de tarefas, tentando antecipar os
eventuais riscos ou identificar oportunidades na sua prossecuo. Define uma estratgia. Um
projeto.

Na construo, bem como nas cincias ou negcios, um plano ou estratgia, tm um carcter


de projeto, do latim projectum ou 'antes da ao'.

Ao longo da histria, e medida que os objetivos se tornaram mais complexos e ambiciosos, a


necessidade de planificar, antevendo potenciais riscos e reduzindo o erro, implicaram tambm
projetos cada vez mais complexos e completos, envolvendo estudos adicionais e pesquisa de
solues. A industria da construo ilustra de forma clara a evoluo do projeto, bastando para
tal comparar um projeto atual, com um projeto de 100 anos.

Durante este tempo, a forma de produo de projeto foi tambm sofrendo alteraes, fruto da
evoluo tecnolgica e da introduo dos computadores, com enormes ganhos de
produtividade.

2. Modelling. Information. Building.

2.1 Modelling
A introduo do computador, e no caso o desenho assistido por computador (CAD), no se
traduziu numa efetiva mudana de paradigma. O desenhador deixou de desenhar num estirador,
passando a desenhar num monitor. Evidentemente que os ganhos de produtividade foram
vrios, abrindo-se novas oportunidades, criando-se e explorando novas ferramentas. Tornou-se
banal ilustrar um edifcio por meio de representaes tridimensionais, e efeitos foto-realistas.
No obstante, e apesar da evoluo, o paradigma manteve-se, e a sua origem continua a ser
traada ao estirador. Uma linha mantm-se uma linha. Mesmo tratando-se de uma representao
tridimensional, mesmo sendo possvel a parametrizao das linhas e das superfcies geradas
pelo conjunto de linhas, a informao contida num determinado desenho ou modelo baseia-se
ainda na linha.

O conceito BIM altera este paradigma de uma forma que a introduo do CAD no permitia.
Deixmos de tratar de representaes geomtricas, e passmos a lidar com bases de dados. Uma
linha no mais apenas uma linha. um objeto especfico, com caractersticas fsicas precisas.
Uma linha, passa a ser, por exemplo, uma parede, com uma determinada espessura, altura,
material, cor. E porque uma 'linha' agora um objeto que reside num espao e tem uma relao
tridimensional, e no apenas bidimensional, a ao base de projeto consiste na modelao.

88
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Habilidade que aprendemos com o CAD, e que ser provavelmente uma das ltimas evolues
desse paradigma.

Num ambiente BIM, um desenho, apenas uma das formas de inquirir a base de dados em que
o projeto agora se transforma.

As ferramentas BIM acrescentam um novo nvel de caracterizao das superfcies geradas,


sendo estas apenas um suporte aos vrios elementos construtivos. Elementos estes que
correspondem na realidade a elementos de construo existentes, com determinadas
caractersticas fsicas especficas. Sendo assim, a modelao de uma determinada superfcie,
permite gerar uma pea de mobilirio, ou uma parede, ou toda a envolvente de um edifcio.
Porm, tratando-se de uma base de dados, possvel adicionar parmetros aos elementos
obtidos atravs das superfcies modeladas, permitindo a alterao destes a partir da introduo
de dados numricos, sem necessidade de desenho adicional, ou obter do modelo dados que
sejam pertinentes produo de relatrios, nomeadamente reas, volumetrias, quantidades,
entre outros.

A mudana de um paradigma de representao para um paradigma de modelao, torna o


projeto mais prximo da realidade, algo efetivamente tambm possvel num ambiente CAD,
mas que o paradigma BIM permite expandir para outras possibilidades. Tendo desde logo uma
visualizao tridimensional do modelo, possvel antever a obra, no processo normal de
desenvolvimento do trabalho, sem necessidade de ferramentas ou processos adicionais.

A Figura 1 mostra a modelao de uma pea de mobilirio, de forma no dissimilar da


modelao em CAD. No entanto, em BIM, possvel definir as funes desse objeto,
nomeadamente que, ao ser colocado num modelo, apenas ser possvel coloc-lo sobre um
pavimento (cho) e passar a constar do mapa de quantidades, especificamente como pea de
mobilirio com indicao automtica do compartimento em que foi colocado.

Figura 1: Fases de modelao de uma pea de mobilirio para PUMP FITNESS SPIRIT.
NOZ Arquitetura.

89
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Foto do balco de atendimento no ginsio PUMP FITNESS SPIRIT em Alvalade,


Lisboa. Foto por FG+SG. NOZ Arquitetura.

As figuras 3 e 4 mostram a modelao de um edifcio de escritrios no centro de Londres. Os


estudos iniciais envolveram a modelao de um conjunto de superfcies geratrizes de diferentes
elementos das fachadas em cortina, extenso das varandas e inclinao das guardas. A
alterao das superfcies geratrizes atualiza automaticamente os diferentes elementos
construtivos associados, com possibilidade de atualizar tambm, tabelas de rea, estimativas de
custos, entre outros.

Figuras 3 e 4: Modelao de superfcies e aplicao de fachada de cortina para um estudo de


uma torre em Londres, Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.

A figura 5 mostra o modelo completo do projeto de Remodelao e Ampliao da Escola da


Murteira. Porquanto o modelo de arquitetura esteja totalmente modelado, esto ainda omissos
elementos de especialidade e outras informaes referentes s caratersticas fsicas dos

90
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

materiais e o seu comportamento. No obstante, o modelo permite j um elevado grau de


coordenao e verificao, reduzindo a possibilidade de erros e omisses em fase de projeto.

Figura 5: Modelo bsico do projeto para a Remodelao e Ampliao da Escola da Murteira.


NOZ Arquitetura.

2.2 Information
No entanto, e porque se trata de uma base de dados, relativamente aberta, com uma capacidade
de compilao e agregao de informao virtualmente infinita, uma linha, alm de ter um
registo tridimensional, pode agregar ainda mais informao. A linha anteriormente traada num
estirador, e mais tarde traada num ecr, tem agora determinadas caractersticas espaciais e
tambm, caractersticas fsicas. Se for uma parede, uma linha ser composta por vrias
camadas, com indicao de materiais com caractersticas fsicas especficas como de resistncia
trmica, transparncia, refletncia, acstica, entre outros. Similarmente, a informao contida
em determinada linha, ser distinta se for um cabo de telecomunicaes ou uma conduta de
ventilao, ou seja, as linhas traadas no ecr podem agora corresponder de forma muito
especfica e completa a elementos e componentes de construo que existem na realidade, que
esto modelados espacialmente, e contextualizados num determinado espao ou modelo. Se um
objeto est modelado e informado que s pode ser colocado numa parede, apenas ser
permitida a sua colocao numa parede, ficando na dependncia desta. Se a parede mover, o
objeto mover com a parede. Se porventura a parede desaparecer, o objeto tambm desaparece.
O nvel de antecipao e capacidade de coordenao e eliminao de erro de manuseamento de
um projeto aumentou significativamente. A consequncia que alguns erros de manuseamento
tm a possibilidade de propagao catastrfica num modelo se no estiverem devidamente
implementados mecanismos de controlo.

As ferramentas BIM apresentam um conjunto de famlias e objetos que contm inicialmente


um conjunto bsico de informao. com estes objetos paredes, portas, janelas que se
iniciam os primeiros passos dum ambiente BIM.

91
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Porque se trata de uma base de dados, possvel complementar e adicionar aos elementos do
modelo informaes como custo, funo, acabamento, designao, entre outros, enriquecendo
o modelo de uma forma que permite um cruzamento de dados cada vez mais completo e
complexo.

Por outros lado, a colocao num espao tridimensional gera uma relao espacial entre estes,
permitindo a extrao de um conjunto de informaes adicionais. Extrair quantidades, reas,
filtrando por funo, cor, ocupao ou qualquer outro parmetro que tenha sido introduzido no
modelo, estabelecendo relaes e rcios, por exemplo, a relao de reas teis por reas brutas,
a relao entre ocupantes e nmero de lugares de estacionamento necessrios, o pr-
dimensionamento de percursos de fuga baseado em nveis de ocupao, etc., passam a ser
ferramentas importantes de deciso e comunicao do projeto com as vrias partes interessadas,
em particular com os clientes.

A inquirio do modelo a base de dados - permite agora a extrao de informao cada vez
mais completa e complexa, muito para alm da extrao de desenhos necessrios sua
construo.

As figuras 6 e 7 mostram um corte de fachada com indicao dos vrios elementos constituintes
de uma parede ou de uma laje. A legendagem do desenho obtida automaticamente com a
introduo prvia da informao no modelo. Desta forma garante-se um elevado nvel de
consistncia entre as vrias peas do projeto.

Figuras 6 e 7: Cortes de fachada axonomtrico e planificado de uma moradia.


NOZ Arquitetura.

As figuras 8 a 11 mostram um conjunto de informao extrada de um modelo para um edifcio


habitacional, como n de unidades, relao de tipologias, e respetivas ocupaes. Estas
informaes base permitem estimar requisitos paralelos para um edifcio do gnero como o n
de lugares de estacionamento necessrios (automveis e bicicletas), rea para armazenamento
de resduos ou reas tcnicas. Estas informaes podem ser extradas ainda antes de existir uma
ideia de arquitetura, permitindo influenciar e informar o prprio processo de desenho,

92
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

contribuindo para que os objetivos iniciais so cumpridos com menores margens de tolerncia
e consequentemente com menores custos.

Figura 8: Mapa de unidades tipo, e requisitos para a definio do n de estacionamento e rea


para armazenamento de lixos. Zig-Zag House em Londres. Ian Ritchie Architects Ltd.
Ian Ritchie Architects Ltd.

Figura 9: Extrato da figura 8, referente aos requisitos para o dimensionamento da rea para
armazenamento de lixo. Zig-Zag House em Londres. Ian Ritchie Architects Ltd.
Ian Ritchie Architects Ltd.

Figura 10: Mapa Unidades tipo, com tabela de reas interiores brutas, ocupao e desvio ao
padro de reas mnimas estipuladas no London Housing Design Guide. Zig-Zag House em
Londres. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.

93
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 11: Extrato da figura 10 referente tabela de reas interiores brutas, ocupao e desvio
ao padro de reas mnimas estipuladas no London Housing Design Guide. Zig-Zag House
em Londres. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.

2.3 Building
Uma maior densidade de modelao, e a introduo de cada vez maiores quantidades de
informao, permitem a inquirio sobre muitos aspetos do edifcio, e sobre aspetos muito
especficos. A integrao de modelos de diferentes especialidades permite uma coordenao
cada vez mais fina, minimizando riscos e erros.

O modelo fica apto para um conjunto de simulaes ao nvel do comportamento fsico


estrutural, trmico, acstico e consoante o nvel de detalhe, pode ser possvel a exportao
direta de elementos para fabricao. O nvel adequado de informao, ao nvel de
especificaes tcnicas e informao comercial de determinados materiais, possibilita a
extrao e compilao de cadernos de encargos atravs do cruzamento de bases tipificadas de
cadernos de encargos como o National Building Standards britnicos.

Evidentemente, que h um custo-benefcio a considerar, sendo que a modelao exausto


deixar, em certo ponto, de corresponder a um ganho prtico de eficincia, pelo que dever ser
analisado caso-a-caso, consoante a complexidade do projeto e acompanhamento pretendido
durante o perodo de vida ps-obra.

As figuras 12 e 13 mostram modelos de trabalho do teatro The Other Place, com definio das
vrias camadas constituintes dos diferentes elementos construtivos e integrao dos modelos
de estruturas e instalaes mecnicas. A execuo integrada dos modelos de arquitetura e
especialidades permite, com os procedimentos de controlo adequados, prever possveis
situaes de conflito, com uma margem de erro reduzida. A execuo do modelo de servios
sobre o modelo de arquitetura, com informao de funo e ocupao dos diversos
compartimentos, ou a existncia de equipamentos especiais, como portas assistidas (figura 14),
permite informar, no modelo, as premissas e requisitos base para o desenvolvimento dos
projetos de especialidades.

94
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 12: Visualizao seccionada do teatro The Other Place, com integrao do modelo de
estruturas. Em Stratford-upon-Avon, Reino Unido. Ian Ritchie Architects Ltd. Ian Ritchie
Architects Ltd.

Figura 13: Visualizao integrada dos modelos de especialidades de estruturas, instalaes


mecnicas do teatro The Other Place, em Stratford-upon-Avon, Reino Unido. Ian Ritchie
Architects Ltd. Ian Ritchie Architects Ltd.

Figura 14: Extrato do mapa de portas do teatro The Other Place, em Stratford-upon-Avon,
Reino Unido. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.

95
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 15: Foto do auditrio do teatro The Other Place, em Stratford-upon-Avon, Reino
Unido. Ian Ritchie Architects Ltd. Rui Dias.

3. Building Information Modelling. And Management.

Da mesma forma que o aparecimento do CAD permitiu a evoluo da representao planificada


para uma situao de modelao, tambm o BIM evoluir permitindo o surgimento de novas
solues aliceradas nas ferramentas BIM. A gesto de patrimnio e instalaes o passo
natural para a evoluo do BIM. Um modelo devidamente estruturado e suficientemente
completo, incluir informao relevante em quantidade suficiente para a gesto e manuteno
de instalaes.

A existncia do modelo como o reflexo de uma base de dados, que agora o nosso projeto de
edifcio, abre a possibilidade de cruzamento ou exportao para outras bases de dados,
especficas gesto de instalaes na sua vertente tcnica e econmica.

Com a progressiva implementao da 'internet das coisas', possvel conceber um sistema de


'report' base de dados do edifcio, indicando com preciso os equipamentos que carecem de
ateno.

O advento de equipamentos de Realidade Virtual permitir a navegao em fase de projeto, e


Realidade Aumentada permitir a navegao em obra, sobrepondo sobre esta, o modelo que se
encontra em projeto, permitindo verificar se a construo est a seguir os planos iniciais, e
registando, no prprio modelo, o andamento dos trabalhos.

Aps a concluso, a existncia de um 'modelo final' as built por analogia s telas finais,
permitir navegar num determinado espao construdo, sobrepondo sobre este todos os servios
e infraestruturas que se encontram ocultos, facilitando a despistagem de incidentes e o
planeamento de alteraes.

96
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Esta uma realidade que comea a dar os primeiros passos, de que se prev um enorme
crescimento. O prprio acrnimo tender a evoluir de BIM, para BIMM. Building Information
Modelling and Management.

Referncias

[1] I. Ritchie, Being: an Architect. Royal Academy of Arts, London, 2014.


[2] I. Ritchie, RSC Courtyard Theatre. Categorical Books, London, 2006.
[3] I. Ritchie, (Well) Connected Architecture. Academy Editions, London, 1994.
[4] P. Cook, K. Oosterhuis. Architecture Goes Wild: Manifest Writings. 010 Publishers,
Rotterdam, 2002.
[5] K. Oosterhuis. Hyperbodies. Birkhauser, Basel, 2003.
[6] K. Oosterhuis, WEB of North Holland, A+U:Architecture and Urbanismo, no.10,
pp.46- 49, October 2002.
[7] HM Government, Industrial strategy: government and industry in partnership, 2012.
[8] HM Government, Digital Built Britain. Level 3 Building Information Modelling
Strategic Plan, Fevereiro 2015.
[9] Cabinet Office, Government Construction Strategy, Maio 2011.

97
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

98
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO DO MODELO DE INFORMAO INTEGRADO


NO BIM EM OBRA FERROVIRIA
Martim Bernardo Ribeiro (1), Miguel Chichorro Gonalves (1), Pedro Mda Magalhes (1)

(1) Faculdade de Engenharia da Universidade do Porto, Porto

Resumo
O presente artigo aborda um caso de estudo de uma obra ferroviria existente. A obra em causa
uma passagem superior de pees. Elementos de diferentes especialidades foram modelados
no Revit para posteriormente se proceder anlise da sua implementao.

Foi modelada parte da obra, aps o que se procedeu a uma anlise comparativa entre os
elementos de projeto, no ProNIC e no Revit para averiguar a qualidade dos objetos nativos do
Revit. Foi feita uma anlise ao nvel do detalhe grfico entre elementos desenhados do projeto
e do modelo, e uma anlise ao nvel da informao de cada famlia de objetos abordada.

Concluiu-se que apesar dos softwares como o Revit apresentarem vantagens imediatas s
empresas que os adotem, tambm apresentam desvantagens. Ao nvel grfico verificou-se que
h de facto vantagens imediatas quando comparado com softwares CAD. Ao nvel da
informao, no entanto, ainda h um longo caminho a percorrer visto que ser necessrio que a
quase totalidade das empresas envolvidas na indstria da construo tomem parte no processo.
O grande obstculo prende-se com a falta de objetos para utilizar em modelos. Verificou-se
ainda que economicamente invivel em muitos dos casos s empresas criarem os seus prprios
objetos.

1. Introduo

Um dos grandes desafios da indstria da construo nos dias de hoje procurar novos mtodos
e formas de dar resposta ineficincia que est muitas vezes, e de um modo negativo, associada
construo civil. Felizmente, o desenvolvimento e progresso tecnolgico acompanham e
influenciam o mundo empresarial diretamente. O BIM, e todas as teorias associadas, aparece na
vanguarda tecnolgica atual e promete revolucionar todo o mercado da construo. De acordo
com a NBS (National Building Specification UK), BIM um acrnimo para Building

99
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Information Modelling em que so descritos os meios atravs dos quais todas as entidades
conseguem compreender um edifcio atravs do uso de um modelo digital [1]. Apesar de j ser
utilizado em alguns pases, sendo que noutros j mesmo obrigatrio o seu uso [2], ainda
existem muitos problemas por resolver. Os desafios da indstria ao nvel do BIM passam no
s pela sua implementao, mas tambm por problemas que transcendem o uso de softwares
[3].

O BIM possibilita a utilizao de softwares de modelao por objetos permitindo realizar


projetos de uma forma mais eficiente e menos dispendiosa a longo prazo. Alm disso, e esse
um dos desafios atuais, as entidades associadas ao BIM pretendem criar fluxos de informao
unvocos entre as vrias entidades da indstria da construo civil. O expoente mximo do BIM
permitir que uma equipa de projetistas desenvolva um projeto, num determinado software e
ao mesmo tempo, com objetos que contenham toda a informao (detalhe grfico e informao
intrnseca) necessria durante aquela fase, e consigam fazer chegar essa mesma informao a
todas as entidades que necessitem da mesma nas fases seguintes. Isto pressupe que no haja
perdas de informao entre softwares distintos [3].

De acordo com a parceria Portugal 2020, que consagra a poltica de desenvolvimento


econmico, social, ambiental e territorial em Portugal, definindo as intervenes, os
investimentos e as prioridades de financiamento necessrias para promover o crescimento
inteligente, sustentvel e inclusivo do pas, esto planeadas intervenes significativas na rede
ferroviria nacional. Exemplifica-se na tabela 1 as extenses previstas [4].

Tabela 1: Intervenes na rede ferroviria nacional.


Caracterizao da RFN Extenso (KM) 2013 Extenso (KM) 2020/2022
Rede ferroviria nacional 2.432 2.585
Rede eletrificada 1.630 2.371
Rede com sistema de
sinalizao eletrnica e 1.652 2.200
eltrica
Rede com sistema de
780 385
sinalizao mecnica
Rede com sistema de controlo
1.513 1.215
de velocidade (Convel)
Rede com sistema ETCS - em
funcionamento ou emulado
136 985
com sistema nacional
(Convel)
Rede com sistema de
telecomunicaes rdio solo- 1.509 1.509
comboio
Rede com sistema GSM-R 0 916

100
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Partindo desta realidade, foi selecionada uma passagem superior de pees j existente num troo
ferrovirio em funcionamento em Portugal como objeto de estudo. A obra em causa denomina-
se: PSP ao KM 6+600 guas Santas / Palmilheira, e tal como o nome indica, trata-se de uma
passagem no apeadeiro de guas Santas / Palmilheira pertencente linha ferroviria do Minho.
O motivo para esta escolha deve-se ao facto de estas passagens se tratarem de objetos de
moderada complexidade e de se tratarem de construes que vo ser executadas dezenas de
vezes no mbito do plano estratgico nacional. Alm disso, estas construes fogem norma
daquilo que podem ser consideradas construes correntes (estruturas porticadas de beto
armado), visto tratarem-se de estruturas metlicas. Estes fatores foram decisivos para dar
resposta aos objetivos propostos; Figura 1.

Figura 1: Passagem superior de pees guas Santas / Palmilheira.

Dos dois principais objetivos propostos o primeiro consiste em tentar compreender em que
pontos que os softwares de modelao por objetos (mais precisamente o Revit) so
superiores a softwares CAD na realizao das mesmas tarefas. Espera-se que atravs da
modelao parcial da infraestrutura em Revit, se consiga comprovar as vantagens entre os
dois tipos de software. O segundo objetivo o de tentar compreender se as famlias de objetos
nativas do Revit esto aptas para dar resposta s especificaes tcnicas exigidas pelo Protocolo
para a Normalizao da Tcnica na Construo (ProNIC). Este protocolo uma iniciativa do
Estado Portugus aprovado em dezembro de 2005, no mbito do Programa Operacional
Sociedade do Conhecimento (POSC) que permite a criao de documentao tcnica
normalizada, nomeadamente mapas de quantidades e trabalhos [5]. Atravs de uma anlise

101
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

qualitativa entre famlias de objetos concretas representados no ProNIC e no Revit espera-


se obter uma ideia geral de como que os objetos em Revit conseguem de um modo geral dar
resposta s exigncias tcnicas Nacionais.

2. Metodologia

Foi modelada e analisada parte desta estrutura com dois objetivos em mente. O primeiro era
compreender se havia de facto vantagens em usar softwares de modelao por objetos que
seguem a metodologia BIM, nomeadamente o Revit. A existncia, ou no, destas vantagens
passou por analisar e comparar o projeto original ao projeto em Revit. Posteriormente
verificou-se se estas metodologias foram mais eficientes do que as prticas atuais.

O segundo grande objetivo era o de analisar o nvel de informao dos objetos no Revit e
compar-los com o mapa de quantidades e trabalhos do projeto original. Ainda dentro deste
objetivo, pretendeu-se fazer outra comparao entre os elementos descritos anteriormente e um
mapa de quantidades e trabalhos normalizado realizado em ProNIC. Atravs destes passos,
compreendeu-se at que ponto a informao presente em softwares de modelao por objetos
correspondem s exigncias nacionais feitas para descrever elementos em obra.

A metodologia adotada passou essencialmente por analisar os elementos tradicionais de


projeto e verificar que transposies podem ser realizadas no mbito de softwares de modelao
grfica por objetos que se enquadrem na metodologia BIM.

Aquilo que se entendem por elementos tradicionais de projeto, compreendem todos os


documentos compostos pelas peas escritas e desenhadas que so as utilizadas na realizao de
projetos e obras em Portugal. Estes documentos representam a quase globalidade de informao
relativa a uma empreitada. Partindo desse pressuposto, foram realizados paralelismos entre
esses documentos e novas formas de realizar projeto utilizando softwares de metodologia BIM
em conjunto com o ProNIC. Para este efeito, parte da obra existente (infraestrutura metlica,
sinalticas e luminrias) foi replicada no Revit, em conjunto com a elaborao de um mapa
de quantidades e trabalhos normalizado utilizando o ProNIC.

O objetivo consistiu em compreender de que modo que os projetos tradicionais em Portugal


podem evoluir no sentido da implementao de metodologias BIM, acompanhados pelo uso do
ProNIC como um meio de normalizao para a qualidade da informao. Tentou-se
compreender do mesmo modo, se estas metodologias trazem vantagens ou no ao mercado da
construo civil.

Partindo das peas escritas, nomeadamente o mapa de quantidades e trabalhos e as condies


tcnicas, Portugal ter que encontrar um processo de normalizao idntico ao Omniclass e ao
Uniclass de modo a conseguir criar fluxos de informao unvocos ao longo de toda a cadeia
produtiva na indstria da construo. Foi neste ponto que se olhou para o ProNIC como uma
ferramenta fundamental para dar resposta a esta questo. tambm sem margem para dvidas
atravs do ProNIC que se far a ponte entre os processos de normalizao associados s peas
escritas. No que toca s peas desenhadas, ser atravs da digitalizao das mesmas,

102
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

nomeadamente em softwares de modelao grfica por objetos como o caso do Revit, que
se evitaro erros de projeto comuns.

Exemplifica-se atravs da figura 2 um diagrama de como que o conjunto de peas escritas e


peas desenhadas foram abordados. A criao do modelo em Revit associada ao LOD (level
of detail) e a elaborao dos documentos do ProNIC associadas ao LOI (level of information)
[6].

Figura 2: Esquema da Metodologia [6].

Foi detalhado o processo de modelao em Revit da obra, utilizando as peas desenhadas


como elemento base. Foi feita uma descrio exaustiva daquilo que o Revit oferece enquanto
software. Posteriormente, foi feita uma anlise ao projeto na medida em que se pretendeu
verificar quais eram os pontos fortes do Revit contrastados com as peas escritas na sua forma
tradicional. Exemplifica-se na figura 3 um exemplo grfico de uma das incompatibilidades
presentes no projeto quando se procedeu modelao do mesmo em Revit. Como se percebe,
a incompatibilidade representa dois perfis metlicos que se intersectam. Por muito pequenas
que estas situaes sejam, podem poupar recursos importantes a todas as entidades
responsveis.

103
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Incompatibilidade encontrada no projeto [7].

Ao nvel da informao foi analisado o grau de informao (LOI) presente no modelo em


Revit atravs de uma anlise comparativa. A ideia foi tentar perceber de que modo que esta
informao se conjuga com a j existente no projeto da passagem superior de pees e com o
mapa de quantidades e trabalhos que foi realizado no ProNIC, analisando assim o estado atual
do Revit relativamente a Portugal e verificar quais so as mais valias relativamente
informao contida nos elementos tradicionais de projeto.

3. Anlise e discusso

Atravs do uso do Revit e da explorao do ProNIC foi possvel dar uma resposta bastante
concreta aos dois objetivos inicialmente propostos.

O primeiro, que pretendia verificar as possveis vantagens da utilizao de suportes de


modelao grfica por objetos (neste caso em particular o Revit) quando comparado com
projetos em CAD, mostrou que h de facto vantagens substanciais no seu uso. A primeira mais
valia prende-se com o facto de haver uma poupana notvel de tempo quando se usa o Revit
devido natureza deste software. O mtodo de modelar por objetos permitiu colocar objetos
tridimensionais com dimenses pr-definidas no modelo de acordo com o projeto original. Isso
permitiu criar cortes, alados e plantas automticas unvocas do modelo sem erros. A diferena
que quando se trabalha em CAD, necessrio criar um conjunto de linhas para criar estes
elementos. O problema deste mtodo, como se verificou, que alm de se perder bastante tempo
a criar um nico corte, planta ou alado, tambm se d aso possibilidade de existirem

104
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

incompatibilidades entre cada um destes elementos. Esta concluso assenta essencialmente nos
objetos da estrutura metlica, visto que estes representam o grosso da infraestrutura.
Exemplifica-se na figura 4 a modelao da caixa de elevadores em Revit existente na
passagem superior de pees. Com as famlias de objetos nativas do Revit de estruturas
metlicas foi possvel criar um modelo 3D com a preciso necessria para execuo em obra.
Como se pode verificar, possvel criar virtualmente qualquer tipo de corte e alado
representativo, permitindo assim uma poupana considervel de tempo como foi anteriormente
descrito.

Figura 4: Alados e modelo 3D da caixa de elevadores existente no projeto [7].

O segundo objetivo nasceu da necessidade de realizar uma verificao ao nvel da informao,


exemplificado na figura 6, dos objetos do Revit. Partindo de dois elementos de projeto
originais para este caso em concreto, peas escritas e condies tcnicas e sempre que
necessrio as peas desenhadas, foi possvel fazer uma comparao concreta e individual entre
estes elementos e o ProNIC. Ao realizar um mapa de quantidades e trabalhos normalizado no
ProNIC para elementos metlicos, sinalticas e luminrias, foi possvel verificar que tipo de
elementos so propcios de apresentarem maiores disparidades nos diferentes mapas de
quantidades e trabalhos. Aps esta anlise, foi realizada uma outra mais extensiva que compara
os mapas de quantidades e trabalhos do ProNIC com o Revit. A concluso a que se chegou
foi a de que apesar dos elementos metlicos e as sinalticas nativas do Revit apresentarem

105
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

graus de informao bastante aceitveis, as luminrias no seguem este pressuposto. De um


modo geral os objetos de especialidade mais complexos na indstria da construo no tm
uma representao que respeite as exigncias de especificao ao nvel da informao. No
entanto, existem objetos fornecidos por fabricantes que do uma resposta muito superior s
exigncias de informao previstas nos mapas de quantidades e trabalhos. Estes objetos provam
a necessidade de o BIM no poder funcionar isoladamente e que todas as entidades da indstria
devem tomar um papel ativo na adoo e uso desta metodologia.

Exemplifica-se na figura 5 o mapa de trabalhos de dois tipos de luminrias realizado no


ProNIC para o projeto em causa. Assumiu-se que este mapa contm tendencialmente toda a
informao necessria para fazer uma descrio unvoca que leve escolha de uma marca em
particular pelas entidades construtoras. Existem ainda outros parmetros que no esto descritos
por no constarem no projeto original.

Figura 5: Excerto do ProNIC relativo s luminrias exteriores existentes [7].

Ao comparar a informao que consta na figura 5 com a figura 6 conclui-se que apesar de
alguns dos parmetros essenciais estarem presentes na luminria do Revit, como o caso da
voltagem ou do tipo de materiais presentes, outros como os graus de proteo e tipos de classe

106
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

no se encontram presentes. Esta comparao, ainda que genrica, mostra que de acordo com
as especificaes tcnicas em Portugal, h ainda algum dfice no grau de informao de
famlias de objetos nativas de softwares como o Revit. Isto pode criar dificuldades iniciais a
gabinetes de projeto que adotem metodologias BIM, pois sero forados a criar os seus prprios
objetos.

Figura 6: Parmetros de tipo de uma famlia de luminrias [7]

107
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Concluso

Concluiu-se que apesar de as metodologias BIM apresentarem srias vantagens, ainda h um


longo caminho a percorrer que transcende os desenvolvimentos tecnolgicos. necessrio
dinamizar e implementar medidas concretas para que haja uma adoo generalizada do BIM na
indstria. As respostas aos dois objetivos propostos podem proporcionar diversos temas para
novas dissertaes partindo de cada objetivo individualmente.

Deste modo importante compreender at que ponto possvel criar uma biblioteca limitada
de objetos em softwares como o Revit. O objetivo, neste caso, entender se possvel
parametrizar esses objetos de acordo com o ProNIC, garantindo assim a existncia de uma
biblioteca pronta a utilizar de modo a criar uma normalizao idntica j existente noutros
pases que utilizam o Omniclass e o Uniclass. No menos importante compreender de que
modo que todas estas questes se podem enquadrar no COBie, assim como fazer uma anlise
aos IFC e questo imperativa da interoperabilidade.

Referncias

[1] NBS, What is Building Information Modelling (BIM)?,


https://www.thenbs.com/knowledge/what-is-building-information-modelling-bim
(Outubro de 2016).
[2] P. MacLeamy Industrial strategy: government and industry in partnership Building
Information Modelling. 2012.
[3] R. Owen, R. Amor, J. Dickinson, M. Prins, and A. Kiviniemi, Research Roadmap
Report Integrated Design & Delivery Solutions (IDDS) CIB Publication 370 / ISBN
978-90-6363-072-0.
[4] A. Pires de Lima, S. S. Monteiro Plano Estratgico dos Transportes e Infraestruturas
Horizonte 2014-2020. Abril de 2014.
[5] InCI, ProNIC DOCUMENTO InCI/ProNIC. 2 de Julho de 2012.
[6] A. Kell, S.Mordue, 2015, Levels of Definitions,
https://toolkit.thenbs.com/articles/levels-of-definition/ (setembro de 2016).
[7] M. B. Ribeiro Implementao do modelo de informao integrado no bim caso de
estudo: obra ferroviria, Tese de Mestrado, Porto, FEUP, 2016.

108
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

FLUXOS DE INFORMAO BIM - RECOLHA E PARTILHA


AUTOMATIZADA DE DADOS A PARTIR DE UM MODELO BIM
Joaquim Danado (1)

(1) Arquiteto, gueda

Resumo
Na elaborao de um modelo BIM de arquitetura, um dos seus principais fundamentos a
criao e gesto de informao. Neste sentido, o trabalho apresentado tem por base a
necessidade de extrair a informao de um modelo BIM, de acordo com as exigncias legais
para o licenciamento de um projeto de arquitetura, consistindo no preenchimento automatizado
do quadro sinptico.
No enquadramento descrito, apresenta-se um fluxo de trabalho entre Revit - Dynamo - Excel.
Este assenta sobre regras taxonmicas definidas previamente, de modo a facilitar a
interoperabilidade entre plataformas, que podero estar descritas em sede de protocolo BIM.
Deste modo, utiliza-se o Dynamo que, enquanto ferramenta de programao visual, permite a
recolha de dados criados no Revit, transpondo-os para Excel onde so calculados, compilados
e tornados acessveis a todos os intervenientes, sem necessidade de recorrer ao modelo nativo.
Porm, uma vez que parte dessa informao gerada em Revit de forma isolada, a restante no
Excel calculada, havendo a necessidade de devolver essa informao ao Revit, mais uma vez
recorrendo ao Dynamo.
Desta forma, cria-se um fluxo de trabalho automtico, explcito e baseado num modelo BIM,
mitigando riscos no que se refere qualidade da informao e acelerando todo o processo.

1. Introduo

Na elaborao de um projeto de arquitetura em Portugal, para licenciamento do mesmo junto


de cmaras municipais, um dos vrios requisitos a que se tem de responder, prende-se com a
recolha de informao necessria sua anlise e que deve estar compilada num Quadro
Sinptico, previsto pela Portaria n113/2015 de 22 de abril [1].

A fim de eliminar tarefas repetitivas de recolha de informao durante a elaborao de um


projeto de arquitetura, o presente trabalho tem como objetivo o preenchimento automtico do

109
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

quadro sinptico numa folha de clculo em Excel, a partir de um modelo BIM elaborado em
Revit. A escolha do Revit, recaiu no s pela experincia do autor com esta plataforma de
modelao, mas sobretudo pela grande adeso nos ltimos anos por parte de tcnicos no
contexto portugus, no que escolha de plataformas de modelao paramtrica diz respeito,
alargando o nmero de possveis interessados neste trabalho. J a escolha da plataforma Excel,
incide essencialmente pela sua utilizao generalizada no contexto digital atual. Para
automatizao do processo, utilizou-se a plataforma de programao visual Dynamo para trocas
de informao entre o Revit e o Excel. A utilizao do Dynamo neste fluxo, surge como veculo
de troca de dados entre plataformas de forma automatizada, instantnea, simples e direta. Neste
contexto, uma vez que o Revit produz apenas informao isolada e h necessidade de efetuar
clculos utilizando a informao recolhida, optou-se por efetu-los atravs de rotinas
elaboradas em Dynamo bem como entre clulas de uma folha de clculo em Excel.

No que respeita a trabalhos j realizados que tentem resolver situaes similares ao trabalho
apresentado, da pesquisa prvia efetuada para elaborao do mesmo, no foi encontrado algo
que se assemelhe. Trabalhos desenvolvidos at ento, que compreendam a utilizao de
programao visual, centram-se essencialmente no seu potencial enquanto software [7]. Por
outro lado, exemplos prticos, ainda que muito focado na modelao de estruturas complexas,
encontram-se acessveis apenas em fruns online ou stios da internet da especialidade, tais
como, por exemplo, em www.dynamobim.org ou em http://.au.autodesk.com.

2. Fluxo de Informao associada ao Modelo BIM

2.1 Recolha de informao


A informao necessria a recolher para preenchimento do quadro sinptico, encontra-se
redigida na Portaria 113/2015 [1], sendo que a descrio de cada dado solicitado, bem como a
sua frmula de clculo, encontra-se noutros diplomas legais, nomeadamente no RJUE [4], no
RGEU [2] e no decreto-regulamentar 9/2009 [3].

A recolha da informao foi efetuada com recurso a trs plataformas digitais, sendo elas:
Autodesk Revit 2017: para criao do modelo BIM de arquitetura;
Microsoft Office Excel 2016: para armazenamento e clculo de dados;
Dynamo 0.9.2: para clculo de dados e trocas de informao entre Revit e Excel.

Estas plataformas garantiram data da elaborao do trabalho, um funcionamento estvel.


Por forma a facilitar a comunicao entre plataformas, no que se refere aos dados a recolher,
foi criado um cdigo alfanumrico "D00" para cada um deles, sendo D de "dado" e respetivo
nmero de dois algarismos.

Os dados a recolher, necessrios elaborao do quadro sinptico, encontram-se descritos na


Tabela 1, bem como o seu cdigo correspondente e a plataforma digital a utilizar para a sua
criao.

110
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: informao a recolher para preenchimento do quadro sinptico


Dado Designao Plataforma Diploma legal unidade
a utilizar
D01 rea do terreno Revit DR 9/2009 ficha n11 m2
D02 rea total de implantao Revit DR 9/2009 ficha n9 m2
D03 rea total de construo Excel DR 9/2009 ficha n12 m2
D04 rea de construo em Revit DR 9/2009 ficha n12 m2
habitao/comrcio/Servios/
D05 rea de construo em Revit DR 9/2009 ficha n12 m2
estacionamento
D06 rea de construo em alpendres Revit DR 9/2009 ficha n12 m2
D07 rea de construo em anexos Revit DR 9/2009 ficha n12 m2
D08 rea til Revit n2 art.67 cap.III RGEU m2
D09 rea habitvel Revit n2 art.67 cap.III RGEU m2
D10 rea de logradouro Excel DR 9/2009 ficha n40 m2
D11 N total de pisos Dynamo - Un.
D12 Altura mxima do edifcio (crcea) Dynamo DR 9/2009 ficha n5 m
D13 Cota de soleira Dynamo DR 9/2009 ficha n16 m
D14 rea impermevel Revit - m2
D15 rea permevel Excel - m2
D16 Volume de construo Dynamo DR 9/2009 ficha n74 m3
D17 ndice de ocupao Excel DR 9/2009 ficha n35 %
D18 ndice de impermeabilizao do Excel DR 9/2009 ficha n34 %
solo
D19 ndice de utilizao Excel DR 9/2009 ficha n36 %

2.2 Preparao do modelo BIM de arquitetura - Revit


Os dados a recolher a partir do modelo de Revit, encontram-se armazenados em trs tipos
diferentes de objetos que pertencem a categorias especficas, conforme apresentado na Tabela
2. Cada um desses objetos, possui parmetros onde a informao relativa aos mesmos
armazenada, sendo ainda possvel criar novos parmetros, onde informao necessria a uma
determinada categoria de objetos pode ser adicionada. Assim, para que tal informao possa
ser gerada e por sua vez recolhida, necessrio criar os respetivos objetos.

De forma a entender que objetos foram necessrios criar no Revit, elaborou-se uma tabela que
os relaciona com os dados necessrios ao quadro sinptico - Tabela 2.

111
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 2: objetos necessrios em Revit para criao de dados


Objetos a criar (Revit) Categorias dos objetos Dados a gerar
(Revit)
Property Line Site / Property Lines D01
Area Areas D02; D04; D05; D06; D07; D14
Room Rooms D08; D09

Cada objeto gerado de forma diferente, pelo que necessrio ter em conta as caractersticas
de cada um, nomeadamente a sua categoria bem como os seus parmetros associados, que
armazenam a informao pretendida para cada dado.

O objeto Property Line, definido por um polgono fechado. A informao quanto sua rea,
relativa ao dado D01, armazenada no seu parmetro "area".

Os objetos Area, so tambm definidos por um polgono fechado. Para fornecer a informao
relativa aos dados D02, D04, D05, D06, D07 e D14, cada objeto designado pelo nome do
dado a gerar, de modo a se poder calcular o resultado da soma das reas dos objetos com
nomenclatura igual.

Os objetos Room, so delimitados por objetos com caractersticas de definio de reas (e.g.:
paredes, lajes de piso, tetos falsos, etc.). Para clculo dos dados D08 (rea til) e D09 (rea
habitvel), houve a necessidade de criar dois parmetros do tipo booleano (Yes/No) especfico
para a categoria Rooms, com o nome "rea habitvel" e "rea til", visto que o Revit no os
possui por defeito. Desta maneira, adiciona-se essa informao a cada espao, i.e., a cada objeto
Room. Uma vez que a rea correspondente a cada objeto armazenada no seu parmetro de
tipo "area", os parmetros rea til e rea habitvel funcionam como filtro para o clculo
total das respetivas reas.

No sentido do acima descrito, aps modelao integral do modelo de arquitetura, foram criados
todos os elementos necessrios correta leitura da informao no modelo. Foi criado o objeto
Property Line no modelo BIM de Revit, a fim de gerar a rea da propriedade (D01) a intervir.
Foram tambm criados todos os objetos Area, correspondentes aos vrios tipos de reas brutas
de construo (D04; D05; D06; D07), bem como as reas de implantao e impermeabilizao
(D02; D14). Os objetos Room foram igualmente criados, correspondendo exclusivamente a
reas interiores do edifcio e com os parmetros "rea til" (D08) e "rea habitvel" (D09)
adicionados sua categoria de objetos.

2.3 Preparao da folha de clculo - Excel


A folha de clculo tem no fluxo apresentado uma dupla funo: o clculo de alguns dos dados
e o armazenamento de toda a informao necessria criao do quadro sinptico. intuito
desta folha de clculo armazenar toda a informao recolhida, de modo a estar acessvel a
qualquer elemento da equipa de trabalho.

112
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Foi assim criada uma folha de clculo em formato XLS, especificamente formatada para receber
a informao contida no modelo BIM, conforme apresentado a Figura 1. Alguns dos dados,
aps a sua recolha, foram calculados automaticamente dentro da folha de clculo,
nomeadamente os dados D03, D10, D15, D17, D18 e D19. As suas frmulas, dentro da folha
de clculo, encontram-se descritas na Tabela 3.

Figura 1: Folha de clculo utilizada para armazenamento da informao.

Tabela 3: frmulas dos dados a calcular na tabela de clculo.


Dados Informao a calcular Frmula na tabela de
clculo
D03 rea total de construo =SOMA(C5:C8)
D10 rea de logradouro =C2-C3
D15 rea permevel =C2-C15
D17 ndice de ocupao =C3/C2
D18 ndice de impermeabilizao do solo =(C15/C2)*100
D19 ndice de utilizao =C4/C2

No que respeita aos ndices D17, D18 e D19, estes encontram-se em conformidade com as
frmulas descritas no Decreto-Regulamentar 9/2009 [3] e apresentadas de seguida:


D17: IO = 100 (1)


D18: Iimp = 100 (2)


D19: Iu = (3)

113
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A localizao da folha de clculo na estrutura de pastas do projeto, deve manter-se no decurso


do mesmo e esta deve ser do conhecimento de toda a equipa de trabalho, evitando trabalho
redundante durante o fluxo de informao apresentado.

3.4 Troca automatizada de informao - do Modelo BIM para a Folha de clculo - Dynamo
As trocas de informao entre o modelo BIM e a folha de clculo, foram realizadas por meio
da plataforma de programao visual Dynamo. Para que tal seja possvel, foi necessrio
programar rotinas em Dynamo capazes de recolher no modelo BIM a informao desejada e
transmiti-la folha de clculo em Excel previamente formatada.

A plataforma Dynamo, trata-se de uma aplicao de cdigo aberto que utiliza programao
visual, i.e., pequenas linhas de cdigo de programao condensadas em "caixas" designadas de
"ns", que ligados a outros ns criam uma linha completa de cdigo. A linha de cdigo
completa, guardada num ficheiro externo na extenso DYN e comumente designada de rotina
(ou script em ingls). A grande vantagem na utilizao de programao visual, prende-se com
o facto de no ser necessrio possuir aprofundados conhecimentos de programao para poder
programar (embora seja uma vantagem em rotinas mais complexas). Atravs do Dynamo,
possvel aceder interface de programao do Revit (API - Application Programming
Interface), que de outra forma, na sua estrutura base, no seria possvel.

No trabalho elaborado, foi criado um conjunto de rotinas, que recolhessem toda a informao
existente no modelo de arquitetura elaborado em Revit. Para tal, foi preciso ter em conta a
categoria de cada objeto e respetivo parmetro de onde se pretende extrair informao.

Para a recolha do dado D01 no modelo BIM, foi utilizada a rotina para Dynamo conforme
apresentado na Figura 2. A rotina procura o objeto Property Line no modelo, do qual filtrado
o parmetro com o nome "Area" que contm o valor relativo rea da propriedade.

Figura 2: rotina em Dynamo para extrao da rea de objetos da categoria "Property Lines".

Para recolha dos valores baseados em objetos da categoria "Areas", aos quais correspondem os
dados D02, D03, D04, D05, D06, D07 e D14, foi utilizada uma rotina para Dynamo, conforme
apresentado na Figura 3. Utilizou-se um n do pacote de ns "LunchBox" para recolha de
objetos "Area" no modelo BIM em Revit. No n aplicado um filtro na caixa de cdigo (code
block) onde ser colocado o cdigo do dado a obter. A rotina procura todos os elementos com
esse nome e efetua a sua soma, revelando o seu valor total.

114
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: rotina em Dynamo para obteno da rea total de objetos da categoria "Areas" com
o mesmo cdigo de dado.

Para clculo da rea til e habitvel do edifcio, correspondentes aos dados D08 e D09, a rotina,
tal como apresentada na Figura 4, procura todos os objetos Room aos quais aplicado um
filtro por parmetro com o nome "rea til" ou "rea Habitvel", de acordo com os nomes
dos parmetros criados anteriormente no modelo em Revit. Isolados os objetos pelo parmetro
com valor YES em Revit (a que corresponde True na rotina em Dynamo), feito o somatrio
das suas reas, obtendo-se o valor total de reas teis ou de reas habitveis.

Figura 4: rotina em Dynamo para clculo de rea teis ou habitveis de objetos "Room".

Outros dados, dos quais no existem objetos no modelo BIM que possuam esses valores, podem
ser obtidos atravs de rotinas em Dynamo, com o intuito de estas calcularem esses valores em
falta. Enquadram-se nesta lgica, o nmero total de pisos acessveis (D11), a altura mxima do
edifcio (D12), a cota de soleira (D13) e a volumetria do edifcio (D16).

Para clculo do dado D11, relativo ao nmero total de pisos, conforme apresentado na Figura
5, solicita-se ao Dynamo que procure todos os nveis existentes no modelo em Revit em que o
parmetro Name contm o texto "Piso". Uma vez que este dado se refere ao nmero de pisos
acessveis, arbitrou-se durante a modelao que somente estes podem conter no seu nome a
palavra Piso, excluindo-se desta lgica nveis relativos a coberturas e outros que no sejam
acessveis. O Dynamo gera de seguida uma lista com todos os pisos que correspondem
procura, qual se solicita que a plataforma faa a contagem dos mesmos.

115
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Rotina em Dynamo para clculo do nmero total de pisos acessveis.

No que diz respeito altura mxima do edifcio, relativo ao dado D12, a rotina apresentada na
Figura 6, parte de uma lista com todos os nveis existentes no modelo em Revit, de onde se isola
o primeiro e o ltimo nvel. Aps isolados, efetuada a diferena entre os valores armazenados
no parmetro Elevation de cada um deles, obtendo-se o valor correspondente altura do
edifcio.

Figura 6: Rotina em Dynamo para clculo da altura do edifcio.

Para clculo da cota de soleira, referente ao dado D13, conforme apresentado na Figura 7, na
rotina em Dynamo isolado do modelo Revit o objeto da categoria Level com o nome "Piso 0",
arbitrado como o correspondente ao nvel de entrada no edifcio. Deste nvel extrado a sua
cota altimtrica atravs do parmetro Elevation. necessrio que os elementos da categoria
Level se encontrem associados ao zero geodsico do projeto (Survey Point) e no associados ao
ponto base do modelo (Base Point).

Figura 7: Rotina em Dynamo para clculo da cota de soleira do edifcio.

Para clculo do volume do edifcio relativo ao dado D16, conforme apresentado na Figura 8,
na rotina efetuado a diviso entre o nmero total de pisos acessveis e a crcea mxima, a fim
de obter o valor mdio entre nveis acessveis, que ser multiplicado pela rea total de
construo, dando um valor aproximado da volumetria total do edifcio.

116
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Rotina em Dynamo para clculo aproximado da volumetria do edifcio.

As rotinas desenvolvidas, foram complementadas com a restante linha de cdigo apresentada


na Figura 9, de modo a indicar ao Dynamo para que ficheiro em Excel os valores de todos os
dados recolhidos tm de ser transpostos. A rotina compreende: o caminho at ao ficheiro XLS,
o nome da folha onde se encontra a tabela a preencher, a localizao da clula a preencher e o
respetivo dado. De salientar que as coordenadas de uma lista em programao comeam em 0
(zero), pelo que a clula com coordenadas A:1 em Excel, no Dynamo ser entendido como 0:0.

Figura 9: Parte da rotina em Dynamo que transportar os valores dos dados recolhidos no
modelo em Revit para a folha de clculo em Excel.

Toda as rotinas apresentadas para recolha dos dados necessrios a partir do modelo BIM em
Revit, foram criadas num nico ficheiro em formato DYN, pelo que com uma s ordem, toda a
tabela em Excel foi preenchida automaticamente. Estas seguem ainda uma lgica que foi ao
encontro das necessidades do trabalho apresentado, sendo que podero ser desenvolvidas outras
rotinas para obter a mesma informao.

3.5 Troca automatizada de informao - da Folha de clculo para o Modelo BIM - Dynamo
No que diz respeito informao contida na folha de Excel, parte dela foi gerada atravs do
clculo entre clulas. Como tal, essa informao no consta no modelo BIM. Assim, sendo que
toda a informao, relativa ao quadro sinptico, dever constar numa das peas desenhadas do
projeto de arquitetura, automatizou-se a transposio de toda a informao presente na folha de
clculo em Excel para o Modelo em Revit, com recurso a uma rotina em Dynamo, de modo a
preservar a integridade da informao j gerada. Essa informao transposta enquanto
parmetro da categoria Project Information. Uma vez no ser possvel no Revit criar uma tabela
com informao relativa a esta categoria, optou-se por utilizar uma famlia da categoria

117
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

TitleBlock, onde constam todos os parmetros adicionados famlia e ao projeto como Shared
Parameters, relativos a cada dado gerado e que sero preenchidos automaticamente aps
corrida a rotina. O Dynamo encarrega-se de recolher a informao existente em cada clula da
folha de clculo e pass-la aos parmetros associados, tal como apresentado na Figura 10.

Figura 10: Rotina em Dynamo para transposio de uma clula em Excel para Revit.

O fluxo foi concludo neste ponto, encontrando-se a tabela em Excel preenchida, bem como o
modelo BIM com toda a informao gerada.

4. Concluso

No trabalho desenvolvido, procurou-se automatizar a recolha de informao a partir do modelo


BIM em Revit, com recurso ao Dynamo e extraindo toda a informao para uma folha de
clculo, que ento utilizada como retorno de informao nela calculada ao modelo BIM. O
fluxo utilizado atravs do Dynamo, acabou por ser separado em duas rotinas. Uma que faz a
transposio dos dados de Revit para Excel e outra que transporta os dados de Excel para Revit.
Foi possvel automatizar todo o processo respondendo necessidade inicial, acelerando o
processo de recolha de informao, que de outra forma seria tedioso, moroso e exposto ao erro
humano. um processo que dever ser repetido, sempre que haja uma alterao ao projeto de
arquitetura que influencie os valores dos dados necessrios ao quadro sinptico, de forma a
manter toda a informao atualizada.

Durante o desenvolvimento das rotinas, concluiu-se que a necessidade de estabelecer regras,


quanto s nomenclaturas a usar no modelo BIM, de extrema importncia. Estas devero
encontrar-se descritas em protocolo que estabelea regras taxonmicas, de modo a que a rotina
elaborada funcione sem problemas.

Todo o trabalho desenvolvido, poder ser aplicado em qualquer projeto de arquitetura seja qual
for a sua escala ou tipologia, para fins de licenciamento junto de cmaras municipais. A
metodologia por trs do mesmo, poder ser adaptada a outros contextos inerentes prtica da
arquitetura ou de outras disciplinas que necessitem de uma anlise e avaliao de condies
espaciais de um edifcio.

De futuro e no seguimento deste trabalho, tenciona-se efetuar um aperfeioamento do fluxo


apresentado, simplificando o seu processo. ainda inteno do mesmo, o desenvolvimento de
uma API nativa de Revit, capaz de dispensar a utilizao de outras plataformas digitais, para
atingir os objetivos propostos.

118
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Referncias

[1] Portaria 113/2015 de 22 de Abril, Elementos Instrutrios dos procedimentos previstos


no Regime Jurdico de Urbanizao e Edificao (RJUE) ,2013.
[2] Decreto-Lei n 38382 de 7 de Agosto de 1951, Regulamento Geral das Edificaes
Urbanas (RGEU) e respetivas alteraes subsequentes.
[3] Decreto-Regulamentar n9/2009, Conceitos Tcnicos nos domnios do ordenamento do
territrio e do urbanismo a utilizar nos instrumentos de gesto territorial, 2009.
[4] Decreto-Lei 136/14 de 9 de Setembro, Dcima alterao ao Regime Jurdico de
Urbanizao e Edificao (RJUE), 2014.
[5] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook: a guide to building
information modeling for owners, managers, designers, engineers, and contractors.
Hoboken, N.J.: Wiley, 2008.
[6] D. Holzer, The BIM Manager Handbook: guidance for professionals in architecture,
engineering, and construction. Chichester, W.S.:Wiley, 2016.
[7] T. Vogt, "Current Application of graphical programming in the design phase of a BIM
project: development opportunities and future scenarios with 'Dynamo'", Tese de
Mestrado, Newcastle, University of Northumbria, Tyne and Wear, UK, 2016.

119
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

120
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A UTILIZAO DE FERRAMENTAS DIGITAIS COMO SUPORTE


IDEALIZAO, ANLISE E CONSTRUO DE MALHAS
ESTRUTURAIS DE MADEIRA
Joo M. Barroso (1), Jorge G. Fernandes (1), Jorge M. Branco (1)

(1) ISISE, Universidade do Minho, Guimares

Resumo
As malhas estruturais de madeira so um tipo especial de estruturas que estabelecem um novo
marco para a construo leve. Partindo de uma estrutura simples e ligeira, possvel criar uma
grande variedade de formas e geometrias garantindo assim uma enorme liberdade arquitetnica.

Contudo, tendo em conta a variedade de formas e a complexidade que estas podem apresentar,
necessria a criao de modelos atravs dos quais se possam desenvolver tcnicas de form-
finding, de otimizao e de simplificao dos processos de construo.

Neste trabalho ser apresentado um caso de estudo, construdo, com 46m2 (6mx6m), no qual
foram usadas ferramentas digitais para a sua idealizao, softwares de clculos e plug-ins
(Rhinoceros 5, Grasshopper, GeometryGym, Kangaroo Live Physics, Karamba, Autodesk
Robot Structura Analysis) que possibilitaram o processo de form-finding e a interoperabilidade
entre os diferentes softwares. Pretende-se apresentar o processo de desenho, anlise e a
construo da malha, a partir da utilizao destas ferramentas. Por fim, comparam-se os
modelos com as diferentes etapas da construo da malha de madeira.

1. Introduo

O caso de estudo que ser apresentado consiste numa malha estrutural elstica de madeira. Este
sistema estrutural tem por base a deformao de uma grelha de madeira plana a partir da qual
possvel obter formas tridimensionais simples ou mais complexas, garantindo uma excelente
relao geometria-eficincia. Estas malhas so tambm caracterizadas pela rapidez do processo
de construo e a otimizao dos recursos materiais. Com tudo isto, seria de esperar que as
malhas elsticas de madeira fossem mais comuns hoje em dia, no entanto, apenas um punhado
de exemplos foram construdos at agora. Por outro lado, a sua liberdade formal, que faz delas
estruturas interessantes para qualquer projetista, um grande desafio j que a definio da sua

121
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

geometria um processo complexo que dificulta a anlise estrutural e o processo de conceo


das mesmas.

Para dar resposta a estes desafios so necessrias novas ferramentas, j que os convencionais
processos/mtodos de idealizao no so capazes de o fazer. Para este tipo de soluo
estrutural necessrio recorrer a ferramentas que permitam controlar a modelao
tridimensional paramtrica, e a implementao de metodologias BIM certamente a resposta.

2. As malhas estruturais

Desde as primeiras construes de cpulas e abbadas que os elementos estruturais de casca


tm vindo a ser cones na arquitetura e engenharia. No incio do sculo XX, devido ao crescente
interesse na sua facilidade em cobrir grandes vos, foram utilizadas na construo de fbricas,
armazns e hangares de avies, estendendo-se mais tarde a edifcios como pavilhes
desportivos, escolas, etc. [1]. Ao longo do tempo, com a evoluo das estruturas de casca surgiu
a necessidade de otimizar esta soluo, tornando-as mais leves e, em certos casos, procurando
reduzir o seu custo. desta necessidade de otimizao que surgem as malhas estruturais, pois
tm a capacidade de conseguir formas muito semelhantes s das cascas utilizando uma menor
quantidade de material [1].

Estas malhas estruturais podem ser construdas com diversos tipos de materiais, metal (ao ou
alumnio), madeira, carto ou fibra de vidro, e so diversos os exemplos j construdos que
podemos encontrar, como pode ser visto na Tabela 1 [1].

Tabela 1: Exemplos de malhas estruturais construdas com diversos tipos de material [1].
Exemplo Material Local
Mannheim Multihalle Madeira Mannheim, Alemanha
Japan Pavilion Carto Hannover, Alemanha
British Museum Great Court Ao Londres, Reino Unido
Roof
Experimental pavilion Fibra de vidro Institute Navier, ENPC,
Frana
Pods Sports Complex Madeira Scunthorpe, Reino Unido

A malha depende muito do material que a compe, e a madeira oferece a este tipo de estrutura
inmeras vantagens. Uma das caractersticas das malhas estruturais a sua leveza, que no caso
da madeira, pode ainda ser potenciada, dada a baixa densidade deste material. Por outro lado,
o baixo mdulo de elasticidade da madeira favorece a sua deformao, permitindo a construo
de malhas estruturais elsticas. Este tipo de malhas caracteriza-se principalmente pelo seu
processo construtivo, em que a partir de uma malha montada num plano bidimensional so
aplicadas foras deformando a malha at forma desejada [2]. Apesar de todas as suas
qualidades, somente em 1975 foi concluda, na Alemanha, a primeira malha estrutural de

122
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

madeira [3]. O edifcio denominado de Manheim Multihalle (Figura 1a), e o projeto foi
conduzido pelo arquiteto Frei Otto, vencedor do prmio Pritzker em 2015. J no sculo XXI,
possvel registar o aparecimento de novos exemplos (Figura 1b), sempre projetados caso a caso
devido falta de conhecimento que permitisse criar uma base de informao consolidada no
que diz respeito idealizao e construo destas estruturas.

Figura 1: Mannheim Multihalle (a), Alida Woodome (b) e Ostuni Pergola (c) [4].

3. Modelao

Focando agora no trabalho desenvolvido, e tal como j foi referido, o que se propunha era a
projeo e a construo de uma malha estrutural elstica de madeira, quadrada, de
aproximadamente 9m de lado e com os cantos cortados, como possvel visualizar na
Figura 2a. Aps a construo da malha plana, seria ps-tensionada at obter a geometria final
de cerca de 6m de lado (Figura 2b).

Figura 2: Malha plana (a) e malha tensionada (b).

Sendo esta uma malha elstica, o processo de deformao foi a preocupao principal de todo
o processo de construo, e naturalmente, condicionou os processos de conceo e de
modelao. Assim sendo, foi necessrio encontrar um processo que permitisse simular a
transformao da malha no processo construtivo e que apresentasse a sua forma ps-tensionada.
Este processo, denominado form-finding [2], podia ser abordado de diversas formas: com base

123
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

em modelos fsicos (Figura 3a), com base em modelos computacionais (Figura 3b) e
combinaes entre modelos fsicos e computacionais.

Figura 3: Modelo fsico (a) e modelo computacional (b).

Evidenciando a abordagem computacional, de notar que os softwares atuais possuem


ferramentas que nos permitem desenhar facilmente estruturas complexas, neste caso especfico,
os softwares usados foram o Rhinoceros 5 [5] e o Grasshopper [6]. Esta conjugao de
programas consistiu na utilizao da programao visual do Grasshopper para conceber os
modelos e na utilizao do Rhinoceros como visualizador dos mesmos. Contudo, o Grasshopper
no tinha a capacidade de simular o processo construtivo da malha, o que fez com que fosse
usado complementarmente o plug-in Kangaroo Live Physics [7]. Esta ferramenta
computacional baseia-se num mtodo denominado Dynamic Relaxation (mtodo que permite
obter uma geometria em que todas as foras estejam em equilbrio) [8], e permitiu simular o
processo construtivo da seguinte forma (Figura 4):

Figura 4: Processo de obteno da nova forma da malha estrutural elstica de madeira


simulando o processo construtivo [2].

Iniciou-se com a definio de uma geometria base (malha plana), qual foram associados
elementos com as propriedades do material a ser utilizado. Em seguida foram impostas as
condies fronteira e definidas as foras de deformao da malha. Foi ento realizada uma
simulao at a malha atingir o equilbrio, obtendo assim a nova geometria (Figura 5). O
processo descrito foi repetido, alterando as foras aplicadas, at se ter atingido a geometria
desejada, com base em requisitos previamente impostos: determinadas dimenses, mxima
encurvadura dos elementos, etc.

124
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Sequncia de obteno da forma; A: Forma plana inicial com representao das
foras de deformao; B: Forma intermdia; C: Forma final [2].

Apesar do modelo obtido apresentar bons resultados, decidiu-se criar um novo modelo
recorrendo a outra ferramenta, com vista a mais tarde comparar os modelos e selecionar o mais
favorvel. Este segundo modelo foi concebido com o Grasshopper mas desta vez
complementado com o plug-in Karamba. Esta ferramenta mostrou-se bastante mais completa
do que o Kangaroo, pois oferecia a possibilidade de analisar a estrutura, obter valores de
reaes, deformaes e outros valores relativos ao comportamento estrutural da malha. Apesar
de tudo isto, o Karamba foi utilizado apenas no processo de obteno da forma, tal como o
Kangaroo. Este mtodo de conceo do modelo apenas apresentou pequenas diferenas
relativamente ao descrito anteriormente. No processo da definio da forma da malha no
Karamba foram aplicados deslocamentos nos apoios da estrutura, enquanto no Kangaroo a
deformao foi imposta atravs de foras aplicadas na malha.

3.1 Comparao entre modelos


Concludos os dois modelos foi necessrio analisar os prs e contras de cada um. Os resultados
de ambos os modelos foram considerados satisfatrios pois apresentaram geometrias muito
idnticas obtida pelo modelo fsico (ver Figura 2), apresentando valores finais para as
principais dimenses muito prximos entre si.

Apesar de tudo, o modelo concebido atravs do Kangaroo apresentou um problema, pois devido
forma como a malha foi criada, os pontos de interseco entre os elementos de madeira no
eram fixos, o que lhes oferecia liberdade total, e tal no correspondia realidade. Para alm de
no ser realista, esta liberdade total permitia ainda que, aps a deformao, os quadrados da
malha variassem de dimenso. Embora na estrutura real isso fosse acontecer, devido liberdade
limitada das ligaes, essa variao nunca ultrapassaria os 25mm (Figura 6), j no modelo
atingiu em certos pontos variaes de 120mm.

Figura 6: Exemplo da ligao dos elementos de madeira [2].

No caso do modelo criado atravs do Karamba, foi possvel utilizar uma ferramenta do
Grasshopper denominada Galapagos. O Galapagos um comando que permite a
implementao de um algoritmo evolutivo de uma forma simplificada. Nesta situao o

125
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Galapagos permitiu calcular o deslocamento necessrio a aplicar nos apoios do modelo em


funo da altura mnima definida nas zonas de entrada da estrutura (Figura 7), 2.10m. Com a
utilizao deste componente foi possvel criar um modelo mais preciso e com uma geometria
mais prxima da pretendida.

Figura 7: Utilizao do Galapagos na obteno do deslocamento dos apoios.

Com esta comparao entre os modelos facilmente se concluiu que o modelo desenvolvido com
o Karamba, que possibilitou a utilizao do Galapagos, era vantajoso relativamente ao
desenvolvido com o Kangaroo, que apresentava o problema das ligaes.

4. Interoperabilidade

Para a anlise estrutural do caso de estudo foi utilizado o software Autodesk Robot Structural
Analysis [9]. Tal como a maioria dos softwares comerciais de clculo estrutural, o Robot
demonstrou limitaes na definio de geometria complexas. Assim sendo, foi necessrio
utilizar um modelo tridimensional concebido noutro programa. Surgiu com isto um tema muito
presente no universo BIM, a interoperabilidade entre softwares. O objetivo foi utilizar o modelo
concebido anteriormente (Rhinoceros 5 + Grasshopper + Karamba) no Robot. Apesar do
Rhinoceros 5 potenciar uma exportao direta para mais de 30 tipos de ficheiros diferentes, o
ficheiro RSA (.rtd) no era uma das opes, com isto, excluindo a exportao direta, foi
necessrio procurar outras alternativas. Uma destas alternativas foi a utilizao de um plug-in
do Grasshopper denominado GeometryGym [10]. Este plug-in mostrou-se bastante completo,
oferecendo diversos comandos utilizveis no Grasshopper que permitiam a aplicao de cargas,
a criao de seces de elementos estruturais, a atribuio de propriedades a estas seces e at
criar malhas de elementos finitos, entre outras funes. Para alm das funes associadas
anlise estrutural, o GeometryGym providenciava tambm outros conjuntos de componentes
dedicados ao Autodesk Revit [11] e aos ficheiros IFC [12]. Apesar de tudo, a utilizao deste
plug-in neste trabalho no apresentou bons resultados, pois para alm da sua complexidade no
processo de exportao, em que existiram algumas dificuldades, o resultado obtido no RSA
nunca foi o desejado, apresentando sempre falta de elementos.

Posto isto partiu-se para uma segunda alternativa, que consistia na exportao do modelo do
Rhinoceros para um ficheiro AutoCAD [13] (.dwg), e consequentemente a importao deste
novo ficheiro para o Robot (Figura 8). Com a exportao para ficheiro AutoCAD (.dwg) todos
os elementos da malha foram transformados em linhas, e aps a importao para o Robot estas
linhas apresentaram-se como barras unidas por ns, s quais foi possvel associar as
propriedades da madeira.

126
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Processo de exportao e importao do ficheiro .dwg.

5. Modelos numricos

Estando definido o processo de exportao e importao do modelo, iniciou-se a anlise do


modelo numrico. Nesta fase surgiu um novo desafio, devido ao facto de a estrutura ser
constituda por 2 layers, ou seja, 2 malhas sobrepostas, de forma a aumentar a resistncia e
rigidez da estrutura (Figura 9). Era necessrio definir a forma de representao destes layers no
modelo e para tal houve a necessidade de retroceder ao Karamba e criar novos modelos. Assim
sendo, foram criados dois novos modelos, um deles possua os 2 layers devidamente
representados e outro consistia num modelo simplificado em que os 2 layers eram representados
apenas num nico. Esta representao nica consistiu na alterao da seco dos elementos de
madeira para uma seco com a mesma rea e inrcia que duas seces originais.

Figura 9: Representao da malha estrutural de madeira com um e dois layers [2].

Quando importado para o Robot, o modelo simplificado apresentou apenas um layer constitudo
por barras distribudas em 2 direes (perpendiculares) ligadas por ns. No caso do modelo
mais complexo, apareceram os 2 layers representados a diferentes cotas, constitudos por barras
em 2 direes (perpendiculares), tambm estas ligadas por ns, mas nas quais os ns das duas
camadas se interligavam por elementos de barra que representavam os ligadores reais
(parafusos de ao) (Figura 10).

Figura 10: Modelo simplificado com apenas um layer (a) e modelo com dois layers (b).

127
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Observando os dois modelos, apesar das suas diferenas, apresentaram resultados muito
prximos entre si, sendo apenas marcados por duas diferenas: o peso prprio da estrutura,
devido ao acrscimo dos ligadores, e a quantidade de elementos (barras, ns e apoios)
necessrios sua modelao (Tabela 2).

Tabela 2: Comparao entre o modelo simplificado e o modelo com dois layers.


Tipo de elemento Modelo simplificado Modelo com dois layers
Barras 340 896
Ns 184 400
Apoios 12 24

6. Construo

Aps um intenso processo de conceo e de definio da forma da malha, acima sumariamente


apresentado, iniciou-se a construo escala real da malha estrutural de madeira. Mantendo
como foco os processos BIM e as ferramentas digitais, aqui so comparados os modelos
concebidos e os resultados deles obtidos com o processo de construo e o produto final
conseguido.

A primeira fase da construo consistiu em montar uma grelha plana, constituda por 2 layers
de elementos de madeira interligados por parafusos de ao, de igual geometria e propriedades
modelada no Grasshopper (Figura 11).

Figura 11: Construo da malha plana.

Devido sua leveza (206kg), a malha foi facilmente transportada para a sua localizao final
sem o auxlio de qualquer equipamento mecnico (Figura 12).

Figura 12: Transporte da malha pelos participantes da construo.

128
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Foram aplicadas cargas estrutura atravs de um mecanismo de cabos e alavancas, idnticas s


aplicadas nos modelos computacionais para gerar a deformao da malha. Tentou-se que as
cargas fossem aplicadas em simultneo para que a estrutura se deformasse o mais
homogeneamente possvel (Figura 13a). Aps ter atingido a sua forma final (6x6m2), o sistema
de cabos foi retirado e substitudo por blocos de beto, com a funo de apoios da estrutura
(Figura 13b).

Figura 13: Aplicao de cargas com o sistema de cabos e alavancas (a) e aplicao de blocos
de beto como apoios da estrutura (b).

O comportamento da malha durante a sua fase de construo e como produto final foi
extremamente satisfatrio, e tal como a estrutura, foram tambm satisfatrios os modelos
computacionais desenvolvidos (Figura 14). Todas as dimenses da estrutura so idnticas s
dimenses dos modelos digitais, tendo variaes mximas de apenas 100mm na zona central
da malha. O seu comportamento ps construo foi o esperado, deformando-se ligeiramente no
topo devido ao do peso prprio, tal com previsto no modelo numrico.

Figura 14: Modelo computacional e malha estrutural de madeira, jardim da Escola de


Arquitetura da Universidade do Minho, em Guimares.

7. Concluso

Em sumula, relativamente ao processo de concepo dos modelos tridimensionais no


Grasshopper, a utilizao do Karamba mostrou-se vantajosa relativamente ao Kangaroo,
potenciando resultados muito satisfatrios. Por outro lado, os 2 layers deveriam ter sido
representadas no modelo inicial, de forma a optimizar o processo.

129
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

No que toca interoperabilidade entre softwares, apesar dos bons resultados, a utilizao do
GeometryGym tende a ser vantajosa relativamente ao mtodo utilizado. O GeometryGym
possui um vasto leque de componentes que podem tornar mais completa a transio de modelos,
no s para o Robot, mas para outros softwares que podero vir a ser teis na concepo de
malhas estruturais de madeira.

Conseguindo contornar o problema da definio da geometria no Robot, atravs da utilizao


de modelos criados no Grasshopper, foi tambm bem-sucedida a anlise estrutural da malha.

Para concluir, a conceo e anlise da malha estrutural foram conseguidas com sucesso, e
atravs delas foi possvel construir a primeira malha estrutural de madeira de que h registo em
Portugal. Este sucesso s se tornou possvel graas utilizao de ferramentas digitais, e
possibilidade de transio de informao entre elas. Neste sentido, a utilizao de metodologias
BIM ser o futuro das malhas estruturais de madeira, com a implementao das ideias de
processo colaborativo atravs de um modelo central.

Referncias

[1] D. Naicu, Geometry and Performance of Timber Gridshells, Tese de Mestrado, The
University of Bath, Bath, Reino Unido, 2012.
[2] D. Naicu, R. Harris, and C. Williams, Timber Gridshells:Design methods and their
application to a temporary pavilion, in World Conference on Timber Engineering
(2014), Quebec City, Canada, 2014.
[3] C. Paoli, Past and Future of Grid Shell Structures, Tese de Mestrado, Massachusetts
Institute of Technology, Massachusetts, EUA, 2007.
[4] Gridshell.it, Gridshell.It, 2016. [Online]. Available: http://www.gridshell.it/.
[5] R. McNeel and Associates, Rhinoceros, 2016. [Online]. Available:
https://www.rhino3d.com/.
[6] S. Davidson, Grasshopper, 2016. [Online]. Available:
http://www.grasshopper3d.com/.
[7] D. Piker, Kangaroo. [Online]. Available: http://kangaroo3d.com/.
[8] D. Silva, B. Jacob, and M. Rodrigues, Implicit and Explicit Implementation of the
Dynamic Relaxation Method for the Definition of Initial Equilibrium Configurations of
Flexible, in 25th International Conference on Offshore Mechanics and Arctic
Engineering, at Hamburg, Germany, 2006.
[9] Autodesk Inc., Autodesk Robot Structural Analysis, 2016. [Online]. Available:
http://www.autodesk.com/products/robot-structural-analysis/overview.
[10] J. Mirtschin, GeometryGym. [Online]. Available:
https://geometrygym.wordpress.com/.
[11] Autodesk Inc., Autodesk Revit, 2016. [Online]. Available:
http://www.autodesk.pt/products/revit-family/overview.
[12] BuildingSMART International Ltd, BuildingSMART IFC, 2016. [Online]. Available:
http://www.buildingsmart-tech.org/.
[13] Autodesk Inc., Autodesk AutoCAD, 2016. [Online]. Available:
http://www.autodesk.com/products/autocad/overview.

130
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

EXPLORAO DOS BENEFCIOS MTUOS ENTRE BIM E JOGOS


DE SIMULAO
Vtor Mineiro (1), Rosaldo Rossetti (1), Miguel Azenha (2)

(1) Faculdade de Engenharia da Universidade do Porto, Porto


(2) Universidade do Minho, Guimares

Resumo
Nos ltimos anos tem-se verificado um crescimento de jogos srios e de simulao. Este tipo
de jogos tem como principais objetivos apoiar o treino de pessoas ou equipas, estudar os
comportamentos dos jogadores perante determinadas situaes ou simulao de vrios cenrios
de forma a prever resultados finais de solues adotadas.

O envolvimento do jogador no jogo torna-se um fator de grande relevncia para a eficcia do


uso de jogos srios e jogos de simulao na anlise comportamental de pessoas em situaes
de emergncia ou risco, como por exemplo evacuao de um edifcio em chamas.

No desenvolvimento de jogos, a modelao do cenrio de jogo realizada normalmente de raiz


pelos programadores. Esta tarefa tanto mais custosa quanto maior for o detalhe do cenrio.
Contudo, ao replicar um edifcio real de raiz, os programadores esto a repetir uma tarefa que
j foi executada por arquitetos e engenheiros aquando da sua conceo. Esta duplicao de
esforos, para alm de desnecessria, por vezes fica aqum do expectvel. A dificuldade dos
programadores em obterem a informao necessria para a criao do cenrio leva a que os
cenrios se afastem da realidade.

Com a crescente aplicao do conceito BIM nos projetos de edifcios, a representao


geomtrica do edifcio, o mobilirio, os materiais aplicados (propriedades fsicas e visuais)
passam a estar agrupados digitalmente no projeto do edifcio. Desta forma, os projetos BIM
tornam-se elementos ricos para o desenvolvimento de jogos srios e de simulao.

Este trabalho resulta de dissertao de mestrado [1] na qual foi explorada a integrao do
conceito BIM e jogos de simulao, no sentido de aproveitar as potencialidades do BIM para a
criao de cenrios de jogos de simulao, e ao mesmo tempo, melhorar a navegao e interao
dos modelos BIM atravs dos motores de jogos. Assim o resultado deste trabalho uma

131
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

soluo, baseada numa arquitetura Cliente-Servidor, que permite a interoperabilidade de


pacotes de software. A soluo engloba o protocolo de mensagens para viabilizar a troca de
informao entre os pacotes de software e inclui o processo de criao de cenrios de jogo a
partir de modelos BIM.

1. Introduo

Em 1970, Clark C. Abt [2] introduz o conceito jogos Srios com uma simples definio que
ainda e utilizada nos dias de hoje e que resume os jogos srios como sendo os jogos cujo
principal objetivo no o entretenimento (em oposio aos tradicionais videojogos). Jogos
srios tem como principal objetivo o treino e formao. No entanto, apesar da diferena do
objetivo fundamental do jogo, os videojogos normalmente contm tambm uma componente
de aprendizagem, pelo menos numa fase inicial do jogo. Assim o jogador executa um
determinado conjunto de aes, as quais devem concluir com sucesso, semelhana do mtodo
de ensino tradicional [3].

Joo Ribeiro usa os exerccios de simulao de emergncia realizados em edifcios pblicos


como objeto de estudo [4], onde reala a dificuldade das pessoas muitas vezes no levarem
estes exerccios a srio. Como alternativa, apresenta o uso de sistemas de simulao virtual
como fonte de informao til para os exerccios de evacuao de emergncia. Neste sentido
explora o conceito de jogos srios [5]. Para tal, apresenta um simulador de evacuao de
emergncia, desenvolvido no mbito do seu estudo, como ferramenta valiosa para o apoio e
melhoria dos exerccios reais, dado que os jogos podem ser bastante atrativos e educativos [4].
Uwe Rppel [6] apresenta um projeto de investigao para desenvolver uma soluo de resposta
e recuperao para ajudar as equipas de salvamento em encontrar o caminho mais curto em
edifcios pblicos e disponibilizar-lhes informao importante. A soluo consiste em recorrer
informao BIM para mostrar as plantas do edifcio em dispositivos mveis e gerar os
percursos a seguir pela equipa de salvamento. Sara Freitas [7] reala um conjunto de
caractersticas que esto presentes nos videojogos e que os tornam um recurso til no ensino e
treino de pessoas e equipas. So realadas caractersticas como uma maior motivao das
pessoas que esto a aprender, taxas de concluso superiores, possibilidade de aceitar novos
alunos ou formandos, criao de atividade colaborativas e a aprendizagem e o ganho de
experincia direta.

O processamento computacional de hoje em dia torna possvel a anlise de vrios cenrios


suportados por simulaes. Tratando-se de um edifcio, as simulaes em fase de utilizao do
edifcio podem resultar em elevados custos de correo de falhas/erros de projeto do edifcio.
Assim, Uwe Rppel [8-9] prope o desenvolvimento de uma plataforma que combine o BIM e
diferentes simuladores. Atravs da integrao de simuladores de fogo e fumo, simuladores de
evacuaes e o BIM, esperado que a plataforma obtenha um ambiente imersivo com
resultados mais realistas. Desta forma, Rppel procura realizar avaliaes mais assertivas do
modelo BIM e ter uma visualizao nica de varias simulaes.

132
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O presente artigo estar focado numa proposta de fluxo de trabalho para garantia de adequada
interoperabilidade entre plataformas BIM e motores de jogo, garantindo a possibilidade do uso
de representaes fidedignas dos edifcios no processo de conceo de jogos srios.

2. Integrao de BIM e Jogos de Simulao

A figura 1 ilustra a viso geral da soluo idealizada neste trabalho. Como se pode verificar
existem trs partes fundamentais. Uma parte definida por um conjunto de servios de
armazenamento de dados BIM, Data Providers, e que podero ser utilizados pelos pacotes de
software BIM, BIM Providers e pelos designados Consumers. Os BIM Providers representam
o conjunto de pacotes de software BIM que permitem a manipulao de informao nos objetos,
materiais e modelos dos edifcios. Os Consumers representam o conjunto pacotes de software
que utilizam a informao BIM na sua aplicao, mas que no tem capacidade de manipular
essa informao. Neste conjunto fazem parte pacotes de software como motores de jogo,
simuladores, ou plataformas para simulao social utilizando inteligncia artificial distribuda
a partir de entidades autnomas, conhecidas como agentes, que permitem desenvolver
aplicaes com o objetivo de enriquecer os modelos BIM atravs da sua anlise.

Figura 1: Vista geral da soluo.

2.1 Arquitetura e implementao


A arquitetura de alto nvel da soluo idealizada neste trabalho est ilustrada na figura 2. A
arquitetura baseia-se numa soluo Cliente-Servidor assente em quatro camadas principais e
duas camadas de abstrao.

A camada de Cliente caracterizada pelo bloco Consumers. Este bloco representa as aplicaes
clientes que pretendem utilizar os servios disponibilizados pelos servidores.
A camada Servidor, por sua vez apresenta um conjunto de subcamadas mais complexo que
integra o BIM. Nesta camada, o processo de implementao foi dividido em duas fases.

133
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Arquitetura de alto nvel.

A primeira fase, que objeto deste trabalho, consiste no desenvolvimento e implementao da


camada Consumers das subcamadas BIM Providers e Service Interfaces (figura 3). Da
subcamada BIM Providers fazem parte o conjunto de pacotes de software de modelao BIM,
como Autodesk Revit ou ArchiCAD, onde so implementados servios que os Consumers
utilizaro. Estes servios so definidos atravs da linguagem de definio de web-services
(WSDL) e tem como principal objetivo abstrair o cliente do servidor e o servidor do cliente.

Figura 3: Arquitetura de alto nvel (Fase 1).

A fase posterior consiste no desenvolvimento e implementao de uma plataforma Open Data,


representada pelos blocos Data Providers, Data Server Interfaces e Open Data Platform.

2.2 Problemas inerentes integrao de tecnologias e solues propostas


Ao longo do desenvolvimento deste trabalho surgiram vrias dificuldades. Este ponto apresenta
um resumo das principais dificuldades apresentadas em [1]. Assim so apresentadas
dificuldades na utilizao do modelo de dados, bem como no desenvolvimento de add-in do
Autodesk Revit (plataforma BIM) e no Unity 3D (motor de jogo).

Modelo IFC (2x3)


O formato mais utilizado na AEC para partilha de informao BIM obedece ao modelo de dados
Industry Foundation Classes (IFC) que tem sido desenvolvido e mantido pela buildingSMART.

134
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Contudo, a perda de informao frequente no processo de exportao e importao do modelo.


Existe um conjunto de informao do modelo BIM que no convertida em entidades IFC
quando este exportado para IFC.

A informao relativa textura usada num material um exemplo de informao que se perde
quando um modelo exportado para o formato IFC. Um cenrio de jogo onde os objetos
apresentam formas e aparncias prximas da realidade ter um maior impacto na imerso do
jogador, pelo que as informaes relacionadas com a aparncia dos materiais e elementos so
muito importantes para a criao de um cenrio de jogo.

O formato adotado foi o formato proprietrio FBX (.fbx), desenvolvido pela Kaydara e detido
pela Autodesk. O utilizador precisa apenas de exportar o modelo para este formato. Ao exportar
o modelo a partir do Revit, possvel selecionar a opo de exportar o modelo considerando o
nvel de detalhe geomtrico. O modelo pode assim ser importado no motor de jogo com
facilidade e ser adicionado cena de jogo como um objeto de jogo. Por sua vez, o objeto de
jogo contem os vrios elementos do modelo. Cada elemento do modelo contm no seu nome o
nmero de ID usado como referncia na plataforma BIM. Assim a informao geomtrica do
modelo transferida para o motor de jogo recorrendo ao formato FBX e a informao adicional
passada atravs de uma arquitetura cliente-servidor, onde o motor de jogo (cliente) efetua
pedidos ao software BIM (servidor) para recolher a informao pretendida.

Autodesk Revit
A Autodesk disponibiliza uma API (Application Programming Interface) para que os seus
utilizadores possam desenvolver add-ins para implementar e automatizar algumas das suas
rotinas de modelao. Apesar da API suportar a framework .NET 4.5 existem muitas
funcionalidades que no esto exploradas. O uso de tarefas assncronas um desses casos.

A complexidade da estrutura de dados do proprietrio utilizada no Revit revelou ser uma das
maiores dificuldades deste trabalho. A quantidade de entidades e o facto de no haver uma
documentao clara sobre a estrutura e relacionamento dessas entidades, tornou-se num
obstculo difcil de contornar.

As atualizaes anuais do Revit e das respetivas APIs mostraram incompatibilidades entre


verses. Estas incompatibilidades levaram a que rotinas implementadas em verses anteriores
no pudessem ser implementadas de igual forma na verso atual. Por exemplo, na verso do
Revit 2012, as informaes sobre a textura de um determinado material estavam acessveis
atravs de mtodos disponibilizados na API. A partir da verso do Revit 2014, a API sofreu
alteraes de tal forma que estas informaes deixaram de estar acessvel pela API.

Unity 3D
No sentido de ultrapassar estas dificuldades na conexo dos dois sistemas via web-services a
soluo foi implementada de acordo com o protocolo TCP (Transmission Control Protocol).
Assim, esta soluo permite desenvolver aplicaes de servidor e cliente de forma independente
do protocolo de comunicao. Desta forma evita-se a necessidade de alterar os servios j
implementados caso novos protocolos de comunicao sejam implementados.

135
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Para alm das dificuldades relacionadas com os materiais j mencionadas, a aplicao dos
materiais no modelo importado apresentou tambm algumas falhas. O modelo pode ser
exportado utilizando o nvel de detalhe grfico dos elementos. Um elemento composto por mais
do que um componente, por exemplo uma porta, ao ser exportado sem ser considerado o seu
nvel de detalhe grfico, transforma as meshs de cada componente numa nica mesh. Desta
forma, quando o elemento importado para o cenrio de jogo ter uma nica mesh. Se o mesmo
elemento for exportado considerando o nvel de detalhe grfico, as meshs de cada elemento
ficam agrupadas no mesmo elemento, mas de forma independente.

Para contornar este problema foi implementado o servio "GetMaterials" para adquirir os
materiais de um dado elemento. Assim o Unity efetua um pedido ao Revit para saber quais so
os materiais aplicados num dado elemento. Posteriormente o Unity cria os materiais no seu
editor de forma a replicar a biblioteca de materiais do Revit no Unity.

Outro aspeto relacionado com os problemas na importao dos materiais a ausncia de


padronizao na estrutura e propriedades dos materiais nos diferentes pacotes de software. O
uso de diferentes propriedades para caracterizar as caratersticas dos materiais origina
ambiguidade na interpretao das propriedades correspondentes entre as duas plataformas. As
propriedades de shininess e smothness dos materiais so um dos exemplos onde o Revit e Unity
apresentam designaes diferentes para a caracterizao destas propriedades. Por sua vez, estas
propriedades tm uma enorme importncia na caracterizao e renderizao do cenrio. A
incorreta definio destas propriedades pode causar um resultado completamente diferente do
esperado.

2.3 Processo de Integrao


A soluo desenvolvida segue uma lgica Cliente-Servidor, o que originou a necessidade de
processo de integrao separado em etapas e atividades quer no lado do Cliente quer no lado
do Servidor.

Servidor
A primeira etapa do processo de integrao definida pela exportao do modelo do edifcio
para o formato FBX, tendo o cuidado de exportar o modelo com o nvel de detalhe grfico
selecionado. Uma vez exportado o modelo necessrio iniciar o servidor para que o cliente
possa aceder informao dos elementos do modelo.

Cliente
A figura 4 apresenta a sequncia de atividades a seguir para criao do cenrio de jogo no lado
do cliente. As atividades foram agrupadas em quatro fases distintas. Assim temos as trs
primeiras fases para preparao do cenrio e a ltima fase para o desenvolvimento do jogo.

A primeira fase, designada "Model Geometry", inicia-se com a importao do modelo do


edifcio em formato FBX para o projeto, seguido da sua adio cena de jogo. Com estes passos
adicionado um objeto de jogo que de agora em diante ser designado de cenrio. Este objeto
de jogo contem todos os elementos do edifcio que por sua vez so tambm objetos de jogo.
Contudo, necessrio estender a informao destes elementos de forma a integrar a informao
BIM do edifcio. Para tal executado o passo, "Parse Elements". Neste passo, os objetos de

136
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

jogo contidos no cenrio so estendidos com um componente "ModelObject" que permitir


guardar a informao BIM do objeto. So adicionados o nmero de identificao e o nome do
objeto, de forma a poder ser referenciado no servidor.

A segunda fase, "BIM Model Info", consiste na atualizao da informao BIM dos objetos do
cenrio. Nesta fase esperado que o cliente complete a informao dos objetos de jogo
includos do cenrio. Assim, atravs da atividade "Gather Elements Info", o cliente solicita a
informao de cada objeto includo no cenrio e atualiza os dados do objeto com a informao
BIM recebida. Aps os objetos de jogo estarem atualizados, so atualizados os materiais
aplicados nos objetos. Para tal so executadas as atividades "Gather Materials" e "Update
Materials Library and Game Object Materials". A primeira consiste no pedido dos materiais (e
suas propriedades) de um determinado elemento. A segunda consiste no processamento e
tratamento da resposta do servidor. Assim se algum dos materiais recebidos ainda no estiver
replicado na biblioteca de materiais do cliente, este criado. Se o material existir, cabe ao
utilizador decidir se atualiza ou no a informao do material. Desta forma possvel manter
no motor de jogo uma biblioteca de materiais que o reflexo da biblioteca do software BIM.
Uma vez atualizados os elementos e os materiais do modelo, a conexo ao servidor pode ser
terminada, uma vez que no esto implementados outros servios.

A terceira fase, "Model Improvement", consiste no refinamento do modelo de forma a corrigir


erros oriundos do formato FBX. A primeira atividade desta fase consiste em corrigir os
materiais aplicados em elementos simples. Posteriormente preciso aplicar manualmente os
materiais a cada submesh de elementos compostos. Assim, o utilizador deve corrigir os
materiais dos elementos compostos para cada tipo de elemento composto. Para agilizar o
processo, foi implementada uma rotina que permite replicar a aplicao dos materiais de um
objeto aos restantes objetos desse mesmo tipo.

Por fim, vem a fase de desenvolvimento do jogo em si, "Game Development". Nesta fase o
utilizador deve implementar os scripts com as interaes pretendidas de acordo com o objetivo
do jogo. Na figura 4 foram destacados os scritps associados abertura e fecho de portas, ao
acender e apagar luzes, ao jogador e lgica de jogo, uma vez que so as interaes que
permitem esta soluo destacar-se das solues existentes no mercado.

137
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Diagrama de atividades da soluo.

3. Casos de Estudo

No sentido de avaliar a soluo desenvolvida neste trabalho foram realizados quatro casos de
estudo. Os casos de estudo consistem em executar um conjunto de aes para alcanar um fim
comum, que neste caso ser um ambiente virtual de um edifcio onde o utilizador possa navegar
livremente pelo edifcio segundo uma vista de primeira pessoa. Cada caso de estudo usar um
conjunto de ferramentas diferentes e ser avaliado num conjunto de parmetros. Posteriormente
feita uma comparao entre os resultados obtidos em cada caso de estudo no sentido de obter
uma avaliao relativa entre os vrios conjuntos.

Cada caso de estudo foi avaliado de acordo com um conjunto de mtricas de forma a avaliar a
soluo individualmente e posteriormente comparar com as restantes solues. As mtricas
definidas para avaliao das solues so: (i) nvel de esforo necessrio; (ii) necessidade de
tarefas manuais; (iii) quantidade de ferramentas necessrias; (iv) dependncia de software; (v)
experincia do utilizador; (vi) nvel de realismo do cenrio (renderizao); (vii) interaes do
utilizador com o modelo; (viii) expanso e integrao com outros sistemas.

Nos casos de estudo deste trabalho utilizaram-se ferramentas utilizadas atualmente na AEC para
a explorao do modelo e por fim a soluo desenvolvida. Assim, o primeiro consiste em
utilizar a ferramenta de visualizao avanada disponvel com o Autodesk Revit. No segundo

138
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

caso utilizado o software BIMx, da empresa Graphisoft. O caso trs consiste em utilizar o
motor de jogo Stingray, da Autodesk. O Stingray foi aquirido pela Autodesk para promover a
explorao em tempo real, animao e interao do modelo do edifcio. Assim este caso o
caso de estudo que mais se aproxima da soluo desenvolvida neste trabalho. Por fim, o ltimo
caso consiste em avaliar a soluo desenvolvida usando os pacotes de software Autodesk
Revit e Unity3D.

Nos casos de estudo um, trs e quatro foi utilizado o modelo avanado Revit disponibilizado
pela Autodesk no seu stio Web. A escolha deste modelo resultou da necessidade de utilizar um
modelo com complexidade geomtrica elevada de forma abranger o maior nmero de situaes
possveis. Ao mesmo tempo era necessrio que os elementos tivessem um nvel de
desenvolvimento tal que permitisse extrair informaes sobre a composio dos elementos e
materiais aplicados. No caso de estudo 2, dada a dependncia do formato da ferramenta, foi
utilizado outro edifcio.

4. Anlise de Resultado

No ponto anterior cada caso de estudo foi analisado individualmente. Os resultados obtidos
para cada critrio analisado, em cada uma das solues, encontram-se resumidos na Tabela 1.

A soluo do Revit torna-se uma soluo vlida quando se pretende realizar simples
visualizaes e exploraes do modelo. Nestas situaes o utilizador procura realizar aes
rpidas de visualizao sem precisar de realizar interaes com o modelo. Como se pretende
que estas aes sejam rpidas, o facto de o utilizador ter de utilizar mais do que um software
para obter um ambiente virtual torna-se uma desvantagem. Contudo, a navegao do utilizador
disponvel nesta soluo pouco prtica para o utilizador, pelo que neste aspeto as restantes
solues so uma melhor opo. Se o utilizador pretender navegar pelo modelo com um nvel
de renderizao aceitvel as restantes solues conseguem melhores resultados, uma vez que
para obter nvel de renderizao elevados a navegao pelo modelo fica impraticvel.

J o BIMx consegue um nvel de renderizao aceitvel ao mesmo tempo que permite uma
navegao na perspetiva de primeira pessoa bastante fluida. No entanto tem o inconveniente de
obrigar a que o modelo seja exportado a partir do ArchiCAD, limitando a escolha dos pacotes
de software de modelao da equipa projetista do modelo. As interaes do utilizador com o
modelo so tambm limitadas. O utilizador pode atravessar portas sem que haja colises e
impedimentos entre a porta e o utilizador o que torne o ambiente menos realista do desejvel.

A soluo do Stingray por sua vez apresenta um bom resultado na renderizao do ambiente e
permite a implementao de diversas interaes entre o modelo e o utilizador. No entanto a
necessidade de o modelo passar por quatro ferramentas (ver [1]) para gerar o ambiente virtual
navegvel por qualquer utilizador torna a soluo dissuasora dos utilizadores menos
experientes.

139
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Anlise comparativa das solues.


Autodesk Revit BIMx Stingray Unity 3D
Esforo Baixo Baixo Elevado Mdio
Correes no modelo No No Sim Sim
N. de ferramentas 1 1 4 2
Dependncias de software Sim Sim Sim No
Conhecimento de utilizao Sim No No No
Renderizao Baixo Aceitvel Bom Aceitvel
Luzes No No Sim Sim
Interaes Portas No No Sim Sim
Info Sim Limitada Sim Limitada
Integrao de outros No No Sim Sim
sistemas (simuladores,
sistemas multi-agentes, ...)

Por sua vez, a soluo proposta neste trabalho e que foi implementada no caso de estudo do
Unity 3D, permite que a equipa projetista do modelo escolha as suas prprias ferramentas de
modelao BIM, desde que estas implementem a soluo proposta. O software de edio do
ambiente virtual fica tambm ao critrio dos utilizadores. Desta forma a soluo promove a
interoperabilidade entre pacotes de software. O resultado da renderizao do ambiente no
to bom como a renderizao da soluo do Stingray mas aceitvel. Contudo, o esforo
necessrio para gerar o ambiente virtual bastante inferior ao esforo requerido pela soluo
do Stingray, pelo que torna a soluo mais apelativa para os utilizadores. J a nvel de
expansibilidade a soluo proporciona a possibilidade de integrar com sistemas simuladores e
multiagentes semelhana do Stingray. As figuras 5.a) e 5.b) apresentam o ambiente virtual
resultante do processo definido na soluo. Conforme possvel verificar o resultado obtido
um ambiente virtual bastante aceitvel mesmo sem despender grandes esforos no Unity a
configurar as propriedades de iluminao, fator que tem grande influncia no realismo do
cenrio.

a) Vista exterior b) Vista interior


Figura 5: Ambiente virtual final em Unity 3D.

140
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5. Concluses e trabalho futuro

A soluo resultante deste trabalho comprova que a integrao do BIM nos jogos de simulao
contribui para um desenvolvimento de ambientes virtuais realistas. Os criadores vem reduzido
o esforo de criao de ambientes virtuais realistas, que por sua vez incluem significativas
quantidades de informao sobre materiais e outras propriedades. Como resultado possvel
definir comportamentos tambm mais realistas. Por sua vez, a integrao de jogos de simulao
no BIM contribui para uma melhor a navegao e explorao do edifcio, ao mesmo tempo que
se tira proveito do potencial dos jogos de simulao para apoiar as tomadas de deciso da equipa
projetista do edifcio e dos restantes intervenientes, atravs de simulaes e anlises efetuadas
nos jogos de simulao. Confirmou-se, portanto, que existe benefcio mtuo na integrao do
BIM nos jogos de simulao e os jogos de simulao no BIM.

Com este trabalho foi possvel identificar diversas dificuldades que, embora tenham sido
ultrapassadas, merecem ainda um aprofundamento no sentido de melhorar os resultados
obtidos. Assim, rene-se os trabalhos futuros em trs grupos: Interoperabilidade, Plataforma
Open Data e Jogos BIM. A na implementao da arquitetura Cliente-Servidor SOAP atravs de
Web Services da WCF reflete-se numa maior adoo da soluo por parte da industria. O
desenvolvimento e implementao de uma plataforma Open Data dever ser capaz de dissociar
o modelo do edifcio dos pacotes de software BIM, integrando numa base de dados relacional
o modelo de dados IFC. Neste sentido a plataforma funcionaria como repositrio de elementos
BIM ao mesmo tempo que poderia ser utilizada como uma plataforma colaborativa durante a
conceo do projeto do edifcio. Por sua vez, a plataforma serviria tambm de biblioteca de
materiais com as suas propriedades fsicas e aparncia. Outra rea que pode servir de base para
futuros trabalho consiste no desenvolvimento de jogos de simulao que se adequem s diversas
fases de conceo do projeto, incluindo as fases operacionais do edifcio.

Referncias

[1] V. Mineiro, Exploracao dos benefic ios mutuos entre BIM e jogos de simulacao .
Dissertao de Mestrado. Porto, Faculdade de Engenharia da Universidade do Porto,
Portugal, 2016.
[2] C. A. Clark, Serious Game, 1970.
[3] D. R. Michael e S. L. Chen, Serious games: Games that educate, train, and inform,
2005.
[4] J. Ribeiro, J. E. Almeida, R. J. F. Rossetti, A. Coelho e A. L. Coelho, Using serious
games to train evacuation behaviour, em 7th Iberian Conference on Information
Systems and Technologies (CISTI), 2012.
[5] E. Cordeiro, A. L. Coelho, R. J. F. Rossetti e J. E. Almeida, Human behavior under fire
situationsportuguese population, em Fire and Evacuation Modeling Technical
Conference, 2011.
[6] U. Rppel e K. M. Stuebbe, BIM-based indoor-emergency-navigation-system for
complex buildings, Tsinghua Science & Technology, vol. 13, p. 362367, October
2008.
[7] S. Freitas, Using games and simulations for supporting learning, em Learning, media

141
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

and technology, 2006.


[8] U. Rppel e P. Abolghasemzadeh, Bim-based immersive evacuation simulations, em
18th International Conference on the Application of Computer Science and Mathematics
in Architecture and Civil Engineering, 2009.
[9] U. Rppel e K. Schatz, Designing a bim-based serious game for fire safety evacuation
simulations, Advanced Engineering Informatics, vol. 25, p. 600611, 2011.

142
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

PROPOSTA DE SISTEMA DE CLASSIFICAO NACIONAL


ORIENTADO PARA OBJETOS BIM
Henrique Nunes (1), Paula Couto (2), Maria Joo Falco Silva (3), Fernando F.S. Pinho (4)

(1) FCT, Universidade NOVA de Lisboa, Lisboa


(2) Laboratrio Nacional de Engenharia Civil, Lisboa
(3) Laboratrio Nacional de Engenharia Civil, Lisboa
(4) CEris, ICIST, FCT, Universidade NOVA de Lisboa, Lisboa

Resumo
O setor de atividades de Arquitetura, Engenharia, Construo e Operao (AECO) portugus
evidencia a crise socioeconmica que tem afetado o pas nos ltimos anos. Considerando que
este setor uma das bases da economia do pas, necessrio estabelecer metas para o seu
desenvolvimento e modernizao. O desenvolvimento e divulgao do uso de tecnologias da
informao, aliados implementao de processos Building Information Modelling (BIM) e
adoo de sistemas de classificao para a construo, em harmonia com os sistemas e normas
internacionalmente aceites, apresentam-se como objetivos relevantes na evoluo do setor.

A crescente difuso dos processos BIM tem sensibilizado os diferentes intervenientes da AECO
para a importncia das Tecnologias de Informao e Comunicao (TIC) e da sua
uniformizao. Reconhecendo a relevncia desta questo, a International Organization for
Standardization (ISO), atravs do Comit Tcnico 59 (TC59) desenvolve normas com o intuito
de uniformizar a forma de classificao da informao, com publicaes orientadas para o
desenvolvimento de Sistemas de Classificao de Informao para a Construo (CICS).

A comunicao tem por base a dissertao de mestrado do primeiro autor, e apresenta a


metodologia proposta para o desenvolvimento e implementao de um CICS nacional, baseada
na anlise de sistemas internacionais de classificao, orientada para objetos BIM e com uma
abrangncia que permita representar a complexidade dos processos do setor.

143
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

O setor de atividades de Arquitetura, Engenharia, Construo e Operao (AECO) portugus


evidencia as consequncias da crise socioeconmica que tem afetado o pas nos ltimos anos,
a qual provocou um atraso no desenvolvimento deste setor, pelo que o mesmo se apresenta
desatualizado face a outros, no tendo acompanhado plenamente os avanos internacionais
relacionados com metodologias, materiais e tecnologias de informao e de construo [1].
Considerando que o setor AECO uma das bases da economia de qualquer nao, necessrio
estabelecer metas para o seu desenvolvimento e modernizao.

O desenvolvimento, divulgao e intensificao do uso de tecnologias da informao, aliados


implementao de processos BIM e adoo de Sistemas de Classificao de Informao da
Construo (CICS, sigla inglesa para Construction Information Classification System), em
harmonia com os sistemas e normas internacionalmente aceites, apresentam-se como objetivos
importantes na evoluo do setor AECO nacional, cuja relevncia na atividade econmica
portuguesa e no desenvolvimento do pas, se encontra patente na responsabilidade e capacidade
de absorver grande parte da mo-de-obra no qualificada ou no empregada por outros setores
[2].

Nos ltimos anos tem-se observado o aparecimento de ferramentas informticas cada vez mais
eficientes, capazes de modelar e representar de modo mais realista variados projetos de
engenharia civil, com diferentes graus de complexidade. A utilizao destas ferramentas, aliada
necessidade e procura de agrupar e reunir informao sobre todo o ciclo de vida de
determinado empreendimento, est no mote do desenvolvimento do processo Building
Information Modelling (BIM). Atualmente existem diversos softwares e variadas abordagens
ao modo como se insere, se guarda e se apresenta a informao disponibilizada, pelo que, torna-
se fundamental que todos os intervenientes recorram mesma linguagem para partilhar
informao e tambm que esta esteja organizada e classificada de acordo com os mesmos
princpios [3].

A crescente divulgao e implementao dos processos BIM tem sensibilizado os diferentes


intervenientes do setor para a importncia das Tecnologias de Informao e Comunicao (TIC)
e da sua uniformizao, tendo alguns pases desenvolvido CICS adaptados sua realidade
nacional. Reconhecendo a dimenso e a relevncia desta questo, a International Organization
for Standardization (ISO), atravs do Comit Tcnico 53 (TC53) tem desenvolvido normas com
o intuito de uniformizar a forma como a informao classificada. o caso da ISO12006-
2:2015 [4] e ISO12006-3:2006 [5], cujo principal objetivo orientar o desenvolvimento de
CICS. Apesar de existirem diversos sistemas internacionais de classificao de informao [6]
[8], no existe at ao momento nenhum sistema de classificao de referncia que seja aplicado
de uma forma consistente ao contexto portugus.

No contexto nacional, foi criado o Comit Tcnico 197 (CT197) com o objetivo acompanhar
os desenvolvimentos do Comit Tcnico Europeu para a normalizao BIM (CEN/TC 442) e
contribuir no desenvolvimento de normalizao no mbito dos sistemas de classificao,
modelao da informao e processos ao longo do ciclo de vida dos empreendimentos [9].

144
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2. Importncia de classificar

O conceito de Classificao pode ser decomposto em trs propsitos principais: i) o de agrupar


objetos em classes, facilitando a compreenso desses objetos enquanto parte de um mundo
extremamente completo e complexo; ii) o de permitir a criao de taxonomias, isto ,
classificaes e descries cientficas baseadas em terminologias consistentes, o que possibilita
a comunicao clara e assertiva entre intervenientes; por ltimo, iii) o de classificar potenciando
a eficincia na recolha, tratamento e distribuio de informao sobre diversos, distintos ou
semelhantes, objetos, j que oferece um mtodo sistemtico, hierarquicamente organizado e
codificado. Neste contexto, os objetos podem representar conceitos concretos (materiais de
construo, edifcios, etc.), ou conceitos abstratos (p.e. propriedades de materiais) [10].

Classifica-se quando se realiza uma distribuio de objetos em classes, sendo que, uma classe
composta por um conjunto de objetos com determinadas particularidades em comum, relao
lgica ou afinidade, que possibilita a sua distino de outros objetos [11]. As classes podem ser
decompostas em subclasses, e assim sucessivamente, aumentando a particularidade do conjunto
de caractersticas da classe anterior. Apresenta-se na Figura 1 a ilustrao da hierarquia
caracterstica de um sistema de classificao de informao.

Nvel 1 Nvel 2 Nvel 3

Classe A1 Classe A11

Classe A Classe A2 Classe A12

Classe A3 Classe A31

Figura 1: Estrutura de classificao hierrquica com trs nveis de detalhe.

De acordo com o nvel de detalhe de cada classe, estas so designadas de modo distinto. Classes
do mesmo nvel de subdiviso so denominadas Coordenadas (Classes A1, A2 e A3), classes
mais abrangentes, e portanto, com nvel de detalhe inferior, so designadas por Subordinantes
(Classe A). De modo idntico, classes com nvel de detalhe superior so designadas por
Subordinadas, j que existe uma classe superior a esta, associada a um conjunto de
caractersticas menos particulares (A11 e A12 so classes subordinadas de A1) [10].

Um sistema de classificao pode ser definido de forma simplista como sendo um conjunto de
termos ou classes organizado [11] e tal definio pode ser aplicada de diferentes formas a um
infindvel conjunto de objetos, oriundos de diferentes reas ou temas (Biologia, Engenharia,
Literatura, etc.). Apresentam-se na Figura 2 os principais tipos de classificao que se
consideram como da maior relevncia no estudo e anlise de sistemas de classificao de
informao para a construo [10].

145
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Gerais
Especializadas Analticas
Tipos de
Classificao
Enumerativas Documentais
Por Facetas

Figura 2: Tipos de classificao relevantes para a Construo.

Uma classificao que tenha por objetivo um assunto particular, bem delimitado, denominada
por Especializada, uma vez que a sua abrangncia est bem definida, inversamente, se o seu
objetivo for abranger todo um universo de informao, denomina-se Geral.

Quando uma classificao pretende sistematizar informao, com o intuito de facilitar a sua
explicao e compreenso, ento constitui uma classificao Analtica (tambm conhecida por
classificao Cientfica ou Taxonomia). Por oposio, uma classificao designada como
Documental pressupe a classificao de documentos ou de diferentes tipos de informao com
o intuito de facilitar a sua organizao, armazenagem e localizao [10].

Relativamente s classificaes Enumerativas, estas assumem esta designao quando o seu


objetivo listar exaustivamente todas as subclasses, incluindo as compostas, diretamente
relacionadas com a classe principal, enquanto que nas classificaes por facetas, as subclasses
so criadas atravs da decomposio da classe principal de acordo com determinado princpio,
simples e particular, de diviso, o que permite a criao de classes compostas baseadas no
consrcio de princpios de diviso. Esta particularidade tem como consequncia a necessidade
de definir a ordem como as facetas so agrupadas. So exemplos de facetas a funo, forma ou
material de determinado objeto [10]. Refere-se ainda, que as tipologias apresentadas no se
excluem mutuamente, sendo possvel encontrar em vrias classificaes, utilizaes
simultneas destes sistemas.

3. Sistemas de classificao de informao da construo

O estudo de alguns dos sistemas de classificao para a construo internacionais mais


difundidos e utilizados atualmente, constitui uma importante referncia para a criao de uma
proposta de um CICS nacional. Os princpios base, de estruturao e de codificao, validados
pela aplicao e evoluo desses sistemas, apresentam-se como importantes referncias na
elaborao de um sistema de classificao portugus.

A inexistncia de um CICS completo faz com que se torne necessrio analisar sistemas de
classificao nacionais que abranjam o setor AECO mas cujo foco no seja exclusivo neste
setor. A principal vantagem de analisar estes sistemas prende-se com a terminologia e conceitos

146
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

utilizados, e ainda, com os complementos com que estes so publicados, nomeadamente, as


bases de dados de descries.

3.1 Sistemas internacionais de classificao


O desenvolvimento de uma metodologia para a criao de um CICS nacional poder beneficiar
com a adoo de caractersticas semelhantes s de alguns sistemas de classificao de
informao internacionais existentes [6][8], [12], [13]. Na Tabela 1 expe-se os sistemas
analisados, as regies geogrficas onde so publicados e os seus possveis contributos para um
sistema nacional.

Tabela 1: Possveis contribuies dos sistemas de classificao de informao internacionais.


Sistema de Classificao Possveis contributos
Nvel de abrangncia;
Estrutura hierrquica;
UniClass 2015 Relao entre tabelas;
(Reino Unido) Complemento de base de dados de terminologias;
Codificao flexvel, possibilidade de introduzir novos
elementos.
Nvel de abrangncia;
OmniClass Desenvolvimento colaborativo com o setor AECO;
(Estados Unidos da Foco nas convenes e prticas nacionais no descurando a
Amrica) compatibilidade com outros sistemas;
Relao entre tabelas.
Codificao intuitiva;
UniFormat
Nvel de detalhe capaz de classificar edifcios especiais;
(Estados Unidos da
Segregao dos elementos e consequente incremento no
Amrica e Canad)
nvel de detalhe.
Capacidade de complementar informao internamente (pela
MasterFormat
entidade ou utilizador);
(Estados Unidos da
Codificao flexvel, possibilidade de introduzir novos
Amrica e Canad)
elementos.
eCl@ss 9.0 Desenvolvimento colaborativo com o setor;
(Europa) Terminologia adotada facilita a traduo de conceitos.

3.2 Sistemas nacionais de classificao


A inexistncia de um CICS nacional completo faz com que apenas seja possvel analisar
sistemas de classificao de informao, relacionados com a indstria da construo, com o
objetivo de identificar os seus possveis contributos no desenvolvimento de uma metodologia
para a criao de um sistema de classificao de informao da construo completo. Na Tabela
2 expe-se os sistemas analisados [14][17], as entidades responsveis pela sua publicao e
os seus possveis contributos.

147
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 2: Sistemas nacionais de classificao de informao e suas entidades responsveis.


Sistema de Classificao Possveis contributos
Classificao Portuguesa das Lista de definies de conceitos e termos como
Atividades Econmicas CAE-Rev.3 ferramenta facilitadora da aplicao e
(Instituto Nacional de Estatstica) interpretao do sistema.
Vocabulrio Comum dos Contratos Vocabulrio suplementar que permite associar
Pblicos CPV determinado cdigo a respetiva descrio,
(Comisso Europeia) facilitando aplicao e interpretao do sistema.
Separao entre diferentes tipos e tamanhos de
Classificao Portuguesa das empreendimentos (edifcios e obras de
Construes CC-PT engenharia civil);
(Instituto Nacional de Estatstica) Conceo do sistema para que o nvel de detalhe
seja adequado s necessidades atuais do setor.
Protocolo para a Normalizao da Listagem e estruturao dos captulos dos
Informao Tcnica na Construo trabalhos de construo;
ProNIC Classificao de materiais de acordo com funo,
(Instituto dos Mercados Pblicos, do forma e material;
Imobilirio e da Construo) Terminologia e conceitos utilizados.

3.3 Sntese comparativa


A anlise dos sistemas de classificao referidos anteriormente, no permite por si s,
identificar um sistema, cujas caractersticas e particularidades, favoream a sua adoo como
sistema de referncia para o desenvolvimento de um CICS portugus. Os sistemas estudados
apresentam diversas e diferentes vantagens e desvantagens, pelo que se torna relevante
identificar os principais atributos que o sistema a desenvolver dever possuir e escolher ento,
como base orientadora, aquele que apresentar o maior nmero de atributos favorveis. A
escolha dos principais atributos a comparar prende-se com o objeto do sistema a conceber. Com
efeito, pretende-se desenvolver um sistema padronizado, abrangente e flexvel, dotado de uma
codificao intuitiva, que seja aplicvel s metodologias BIM e promova a interoperabilidade
entre sistemas.

Dado que os sistemas de classificao portugueses no foram concebidos com um grau de


abrangncia suficiente para contemplar todo o setor da Construo portuguesa e, apesar de
constiturem boas ferramentas de classificao de informao da sua rea de foco, o seu nvel
de detalhe tal que, no lhes permite constituir uma base de referncia que oriente a conceo
do CICS nacional. Neste sentido, estes sistemas no so integrados na Tabela 3, muito embora
a sua anlise sugira, que alguns dos seus atributos podero favorecer a adaptao do sistema a
desenvolver, ao contexto portugus.

Relativamente aos sistemas internacionais, OmniClass incorpora o UniFormat e o


MasterFormat, sendo de facto um sistema de classificao para a Construo mais abrangente
e completo do que os mencionados. Neste sentido, apresenta-se na Tabela 3 a comparao entre
os atributos dos Uniclass 2015, OmniClass e eCl@ss 9.0.

148
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 3: Comparao entre os sistemas UniClass 2015, OmniClass e eCl@ss 9.0.


Principais Atributos UniClass 2015 OmniClass eCl@ss 9.0
Adaptao com metodologias BIM
Nvel de detalhe idntico em todas as tabelas
Focados na Indstria da Construo
Tabelas Inter-Relacionveis
Concebido em concordncia com a ISO12006-

2
Compatibilidade com outros sistemas de

classificao
Codificao Intuitiva
Disponvel em diferentes lnguas
Estrutura hierrquica
Classificao Especializada

Ponderando os principais princpios, atributos e vantagens dos diferentes sistemas de


classificao analisados, internacionais e nacionais, surge que o desenvolvimento de um
Sistema Nacional de Classificao de Informao da Construo dever basear-se no sistema
internacional UniClass 2015 e integrar vantagens de outros sistemas.

Sendo o UniClass 2015 a principal referncia, tal implicar que o sistema a conceber esteja em
conformidade com as normas internacionalmente aceites, e portanto seja um sistema
padronizado. Assim, o CICS nacional dever contemplar os seguintes princpios gerais: i) Estar
em conformidade com a norma ISO12006-2:2015; ii) Incluir uma classificao composta por
tabelas hierarquicamente organizadas; iii) Abranger a complexidade e dimenso dos trabalhos
do setor AECO nacional; iv) Ser dotado de uma codificao simples, intuitiva e flexvel para
acomodar novas entradas; v) Permitir a aplicao isolada das tabelas ou de tabelas relacionadas
entre si; vi) Integrar uma base de dados de terminologias, conceitos e descries;

4. Proposta de um modelo de classificao

A metodologia de classificao proposta resulta da anlise de diferentes sistemas de


classificao de informao, nacionais e internacionais, da reviso de outra proposta de
metodologia [10], da aprendizagem de conceitos base sobre organizao de conhecimento [11],
da considerao atenta dos princpios orientadores do sistema de classificao UniClass 2015
[17] [18] e ainda, baseia-se no padro proposto pela ISO12006-2 [4].

O CICS nacional dever ser composto por diferentes tabelas classificativas. Estas tabelas
permitem organizar a informao em diferentes classes e a sua estrutura dever seguir o

149
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

princpio bsico de modelao, onde um procedimento construtivo utiliza recursos de


construo para alcanar resultados. Deste modo, todas as classes, apesar de poderem classificar
informaes diversas, ficam estruturadas de modo idntico. Uma vez que se pretende envolver
todo o setor no desenvolvimento e evoluo do sistema, este dever ser disponibilizado em
formato digital, numa plataforma apropriada, que permita receber crticas e comentrios sobre
as tabelas e a sua utilizao.

Sugere-se que sejam adotados outros princpios: i) a etapa do ciclo de vida, onde decorrem os
processos de construo, caracteriza o processo construtivo, por sua vez, os processos
construtivos devero estar agrupados em quatro tipologias: processos anteriores conceo, de
conceo, de produo e de manuteno; ii) as entidades de construo so responsveis pelas
atividades e funcionalidades disponveis para o utilizador, estas entidades so compostas por
elementos construtivos que podem por sua vez ser compostos por diferentes partes, com
diferentes nveis de complexidade; iii) um espao pode ter relaes espaciais (estar contido
em, ao lado de, etc.) e pode ser interpretado como um espao onde se realizam atividades,
um espao construdo (caracterizado pelos resultados da construo) ou um espao onde se
constri; iv) os recursos de construo compreendem produtos de construo, agentes de
construo, ajudas de construo e informao da construo. A diferena entre um recurso de
construo e um resultado da construo depende da relao com o procedimento construtivo,
isto , o recurso da construo pode ser utilizado na gesto de determinado procedimento ou
pode ser o resultado de determinado procedimento; v) os objetos de construo contm
propriedades construtivas que por sua vez so representadas como atributos na informao da
construo [4].

Relativamente forma como a informao classificada, esta dever ser estruturada de modo
hierrquico e, dependendo do tipo de informao que se pretende classificar, o tipo de
classificao a utilizar deve ser analisado e adotado para cada tabela, em funo do seu
propsito (recorrer a uma classificao enumerativa, para classificar produtos de construo,
por oposio a uma geral, aparenta ser uma escolha mais correta). Reala-se que o tipo de
classificao a adotar no deve ter carcter exclusivo, sendo possvel que a informao possa,
por exemplo, ser organizada por meio de facetas e ser enumerativa.

A anlise dos diferentes CICS, permitiu concluir que ao agregar diferentes tipos de classificao
(geralmente, por facetas complementada por outro tipo) consegue-se obter um maior nvel de
abrangncia e complexidade. Assim, considera-se aconselhvel seguir o mesmo procedimento
na anlise e organizao de informao com base no tipo de classificao por facetas.
Sugere-se que se adote o seguinte procedimento: i) identificao das classes principais; ii)
criao das facetas (caracterstica particular que possibilita a distino entre objetos) para cada
classe principal iii) estabelecer a ordem entre objetos dentro de cada faceta; iv) estabelecer a
ordem de citao para facetas compostas (duas ou mais facetas so utilizadas para distinguir
objetos); v) estabelecer a ordenao das facetas; vi) acrescentar a notao.

Relativamente codificao utilizada, sugere-se esta seja alfanumrica, composta por 2


caracteres iniciais com o propsito de identificar a tabela, seguido de 4 pares de carateres
numricos, com a funo de identificar o grupo, subgrupo, seco e objeto. A ISO12006-2[4]
recomenda que cada objeto seja classificado por uma nica tabela, com apenas um cdigo

150
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

correspondente, evitando assim incongruncias ou ambiguidades no sistema. No entanto,


possvel classificar determinado objeto com recurso a vrias tabelas.

Com base na proposta apresentada e tendo como base de referncia o sistema UniClass 2015,
encontra-se em desenvolvimento a tabela de Elementos / Funes, tendo sido realizada a sua
traduo e adaptao ao contexto nacional, com o auxlio dos complementos de termos e
definies patentes nos sistemas nacionais de classificao. Apresenta-se na Tabela 4 um
excerto dessa tabela.

Tabela 4: Excerto da tabela Elementos / Funes.


Cdigo Grupo Subgrupo Seco Objeto Ttulo
EF 25 25 Paredes e elementos divisrios
EF 25 10 25 10 Paredes
EF 25 30 25 30 Portas e Janelas
EF 25 55 25 55 Divisrias

Atualmente a tabela contem cerca de 70 itens, compreendidos entre os primeiros dois nveis de
detalhe (grupo e subgrupo). Prev-se complementar a tabela com termos e definies, bem
como com a criao de um porteflio grfico, que permita a associao de modelos
tridimensionais digitais respetiva classificao.

5. Concluses

A proposta de modelo de classificao apresentada sustentada pela anlise e identificao dos


princpios de desenvolvimento de diversos sistemas de classificao de informao,
internacionais e nacionais, reflete a reviso de outra metodologia proposta e considera as
recomendaes patentes no padro ISO12006-2. Deste modo procura-se dotar o CICS nacional
de princpios que lhe confiram um grau de abrangncia, complexidade e normalizao tal, que
possibilite a sua adoo como referncia no setor AECO nacional.

A utilizao generalizada de um CICS nacional poder contribuir para a normalizao da


informao da construo, facilitando a criao de bases de dados, a troca de informaes entre
os diversos intervenientes dos procedimentos construtivos, ultrapassando barreiras geogrficas
e lingusticas. Constitui, por essas razes, uma ferramenta til na Indstria da Construo, onde
se tem observado o aumento da quantidade e complexidade da informao.

Referncias

[1] Federao Portuguesa da Indstria da Construo e Obras Pblicas, Conjuntura da


Construo no81, 2015.
[2] R. Pereira, Sistemas de classificao na construo. Sntese comparada de mtodos.,

151
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Dissertao de Mestrado, DEC, FEUP, Porto, 2013.


[3] M. Venugopal, C. M. Eastman, R. Sacks, e J. Teizer, Semantics of model views for
information exchanges using the industry foundation class schema, Advanced
Engineering Informatics, vol. 26, n. 2, pp. 411428, 2012.
[4] ISO, ISO 12006-2:2015 - Building construction - Organization of information about
construction works - Part 2: Framework for classification. 2015.
[5] ISO, ISO 12006-3:2007 - Building construction - Organization of information about
construction works - Part 3: Framework for object-oriented information, 2012. [Online].
Disponvel em:
http://www.iso.org/iso/iso_catalogue/catalogue_tc/catalogue_detail.htm?csnumber=38
706. [Acedido: 04-Set-2016].
[6] CPIC, CPIC Uniclass2, 2015. [Online]. Disponvel em:
http://www.cpic.org.uk/uniclass/. [Acedido: 11-Mar-2016].
[7] CSI, MasterFormat. [Online]. Disponvel em: http://www.csinet.org/Home-Page-
Category/Formats/MasterFormat.aspx. [Acedido: 22-Mar-2016].
[8] Secretariat OCCS Development Committee, OmniClass: A Strategy for Classifying the
Built Environment. [Online]. Disponvel em: http://www.omniclass.org/about.asp.
[Acedido: 22-Mar-2016].
[9] A. A. Costa, PTPC na CT 197: A indstria do lado da Normalizao BIM - Plataforma
Tecnolgica Portuguesa da Construo, 2015. [Online]. Disponvel em:
http://www.ptpc.pt/index.php/pt/400-ptpc-na-ct-197-a-industria-do-lado-da-
normalizacao-bim. [Acedido: 08-Out-2016].
[10] M. Monteiro, Classificao da Informao na Indstria da Construo - Prespectivas e
Percursos, Dissertao de Mestrado, DEC, FEUP, Porto, 1998.
[11] C. D. Needham, Organizing Knowledge in Libraries: An introduction to information
retrieval, em Organizing Knowledge in Libraries: An introduction to information
retrieval, Second Rev., London: Christopher D. Needham, 1971.
[12] CSI, UniFormat. [Online]. Disponvel em: http://www.csinet.org/Home-Page-
Category/Formats/UniFormat.aspx. [Acedido: 22-Mar-2016].
[13] eCl@ss Home. [Online]. Disponvel em:
http://www.eclass.eu/eclasscontent/index.html.en. [Acedido: 15-Mar-2016].
[14] Instituto Nacional de Estatstica, Classificao Portuguesa das Actividades Econmicas
Reviso 3 (CAERev. 3). 2007.
[15] CE, Guia do Vocabulrio Comum para os Contratos. pp. 117, 2008.
[16] Instituto Nacional de Estatstica, Classificao Portuguesa das Construes, 1a Edio.
Lisboa, 2005.
[17] A. A. Costa, ProNIC Protocolo para a Normalizao da Informao Tcnica na
Construo. IMPIC, pp. 1143, 2016.
[18] J. Gelder, The design and development of a classification system for BIM, Building
Information Modelling (BIM) in Design, Construction and Operations, vol. 149, pp.
477491, 2015.
[19] J. Gelder, The principles of a classification system for BIM: Uniclass 2015, Living and
Learning: Research for a Better Built Environment: 49th International Conference of
the Architectural Science Association, vol. 1, pp. 287297, 2015.

152
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

CLASSIFICAO E ORGANIZAO DE OBJETOS BIM E SUA


APLICAO EM MODELOS 4D & 5D
Ana Quintela (1), Joo Pedro Couto (2), Francisco Reis (3)

(1) Efacec Engenharia e Sistemas, SA, Maia


(2) Universidade do Minho, Guimares
(3) BIMMS, Lda, Porto

Resumo
No presente artigo, o conceito BIM (Building Information Modeling) e os sistemas de
classificao da informao foram combinados no sentido de entender de que forma os sistemas
de gesto da informao contribuem para a otimizao dos processos de gesto da construo.

O objetivo centra-se na identificao e estudo dos diferentes tipos de sistemas de classificao,


integrando-os com os modelos BIM de modo a obter uma melhor organizao da informao
desde a fase do projeto de engenharia, com o objetivo da melhoria do desempenho dos
utilizadores no desenvolvimento dos modelos de planeamento e custo (4D e 5D).
Adicionalmente e face aos resultados da aplicao dos sistemas existentes, este artigo amplia o
tema explorando um sistema de classificao de sistemas e organizao da informao baseado
num sistema internacional existente mais adequado os objetivos de aplicao, com o intuito de
retirar vantagens competitivas da sua utilizao no mbito da gesto. Este modelo de sistema
pretende organizar de toda a informao dos modelos 3D por forma a promover uma linguagem
transversal e melhorar o rigor da informao e comunicao entre os diversos intervenientes,
uniformizando processos funcionais e organizacionais, aumentando a eficincia, a
produtividade e rentabilidade nas diversas fases da cadeia de valor de uma organizao
sistemista.

1. Introduo

Desde o sculo XIX, o setor da Arquitetura, Engenharia e Construo (AEC) tem perdido o seu
posicionamento, relativamente ao desenvolvimento tecnolgico, para outras indstrias,
revelando-se um setor com baixa produtividade [1]. A falta de capacidade de aceitar e
implementar estas tecnologias da informao ou a sua adoo demasiado lenta um dos fatores
que elucida as diferenas entre o sector AEC e as outras indstrias. [2], [3].

153
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

As tecnologias da informao e comunicao surgem, com o intuito de promover o crescimento


das vrias indstrias e de as modernizar atravs de novos mtodos de trabalho [4].

O BIM apresentado como uma soluo, para ajudar na resoluo dos problemas inerentes ao
setor AEC, pela sua metodologia que apresenta uma nova abordagem gesto da informao,
sistematizando um conjunto de polticas, processos e tecnologias interrelacionadas, e
proporciona uma metodologia para gerir um projeto e toda a sua informao atravs de um
formato digital, ao longo do ciclo de vida do edifcio [5][7]. Dada a grande quantidade de
informao que o sector AEC pode gerar, necessrio que esta informao esteja organizada e
padronizada de modo a alcanar a sua gesto eficaz. Deste modo, surgem os sistemas de
classificao, que so metodologias de uniformizao, organizao e partilha da informao
[8].

Ainda que, as metodologias BIM apresentem ainda apresenta algumas fragilidades na aplicao
direta dos sistemas de classificao. No entanto, relevante destacar que ainda que existam
muitos sistemas de classificao internacionais, estes sistemas ainda se encontram numa fase
de desenvolvimento incapaz de satisfazer algumas das necessidades existentes.

Perante estas consideraes o tema deste artigo centra-se no estudo e aplicao de metodologias
de organizao e classificao da informao, gerada pelos modelos BIM, com o intuito de
facilitar a preparao e gesto da construo. Neste sentido os domnios explorados foram os
sistemas de classificao existentes, metodologia BIM nas diversas dimenses com especial
enfase para 4D e 5D e os processos utilizados em organizaes sistemistas.

2. Terminologias e Sistema de Classificao no setor da construo

O setor AEC, envolve um conjunto vasto de informao, pelo que importante que toda esta
esteja organizada padronizada [9]. No sentido de suprimir algumas debilidades presentes neste
setor relativa organizao da informao que se iam acentuando em determinados processos,
muitas industrias do setor, no inicio do sculo XX comearam a desenvolver os sistemas de
classificao [10], [11].

Desde ento ao longo dos anos tm sido desenvolvidos vrios sistemas variando consoante a
sua aplicao. Neste sentido com o intuito de apoiar a cooperao dentro e entre os diferentes
pases, foram desenvolvidas normas internacionais. Relativamente classificao da
informao do setor da construo a International Organization for Standardization (ISO)
desenvolveu a norma ISO 12006-2, que define uma estrutura e um conjunto de ttulos de tabelas
recomendadas, mas no o seu contedo detalhado dessas tabelas, pois as tabelas de classificao
podem variar em detalhes para atender s necessidades locais [12], [13].

Existem inmeros sistemas de classificao usados em todo o mundo. Neste artigo sero
apresentados quatro sistemas de classificao considerados como dos mais importantes e
utilizados no setor da construo e que apoiam a metodologia BIM, nomeadamente Omniclass,
MasterFormat, Uniformat e Uniclass.

154
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Omniclass Construction Classification system, elaborado pelo Construction Specification


Institute (CSI), Construction Specifications Canada (CSC) e International Alliance for
Interoperability (IAI), um sistema de classificao para a indstria da construo, usado para
organizar a biblioteca de materiais, literatura de produtos, informao do projeto. Este sistema
deriva das normas elaboradas pela ISO 12006-2 e incorpora outros sistemas como base das sua
tabelas, como o MasterFormat para resultados de trabalho, UniFormat para elementos e EPIC
para produtos [14]. Estas tabelas permitem a classificao de produtos (como por exemplo
beto, tijolos, portas de mandeira) atravs da tabela Produtos (tabela 23), pela sua
funcionalidade (como por exemplo, paredes exteriores, escadas, coberturas) atravs da tabela
Elementos (tabela21) e por resultados de trabalho (como por exemplo, beto, alvenaria, vos,
acabamentos)pela tabela Resultados de Trabalho (Tabela 22). A combinao destas tabelas
numa abordagem multifacetada permite classificar um produto e a sua funo precisa [15].

O Masterformat foi desenvolvido pelo CSI e CSC e amplamente adotado e usado na indstria
da construo no Norte da Amrica. Este sistema consiste numa lista de nmeros e ttulos
classificados por atividades de construo e utilizados na organizao das especificaes, dados
do produto, base de dados de custos da construo, notaes de desenho, dados de gesto de
instalaes e outras informaes da construo. Embora fornea uma lista detalhada e ordenada
de possveis ttulos, MasterFormat projetado para maximizar a flexibilidade para usurios
individuais, permitindo o usurio atribuir de novos cdigos e ttulos nos locais apropriados[16]
[14], [17]. Este sistema segue uma organizao enumerativa.

O Uniformat foi desenvolvido no Norte da Amrica e um mtodo de organizao de


informaes da construo com base em elementos, ou partes de uma instalao caracterizadas
pelas suas funes, sem ter em conta os materiais e mtodos utilizados para a sua realizao.
Este sistema visto frequentemente em especificaes de desempenho e descries de projetos
preliminares (PPD). O uso do presente sistema, mais notvel como um formato para
oramentistas apresentar estimativas de custos durante a fase de desenho conceptual.Uniformat
um sistema hierrquico e permite a agregao e resumo em diferentes nveis. [18], [19].

Uniclass foi desenvolvido no Reino Unido. Este sistema baseou-se nos princpios da ISO
12006-2 e teve como principal objetivo ser utilizado no planeamento e gesto da construo.
Inicialmente este sistema foi fundado com 15 tabelas, cada uma com subttulos e cdigos que,
segundo seus autores, cobrem os interesses de toda a indstria construo. No entanto, em 2013
o sistema foi atualizado e renomeado para Uniclass2. Esta atualizao deveu-se a problemas de
alcance, cdigo, profundidade, colocao dos objetos e granulao. Como resposta ao feedback
da indstria relativamente s tabelas publicadas pelo Construction Project Information
Committee (CPIC) em 2013, surge o Uniclass2015 [12], [20] [21] [22].

3. Contribuio dos sistemas de classificao no desenvolvimento de modelos 4D e 5D

Dentro do ambiente BIM a importncia dos sistemas de classificao resulta da necessidade de


normalizar as designaes atribudas aos elementos de um modelo, de modo a permitir que os
dados sejam pesquisveis de forma adequada, a evitar que estes dados se percam e que sejam
cometidos erros. Para alm disso, ter a informao toda organizada segundo uma estrutura

155
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

normalizada conveniente para a utilizao de todos os intervenientes, pois permite que a


informao seja comunicada entre eles de forma eficiente.

Antes de escolher um sistema de classificao necessrio ter noo do mbito e objetivo de


aplicao do sistema. Neste sentido iremos procurar entender a importncia e aplicabilidade
dos 4 principais sistemas realizados na Amrica do Norte e no Reino Unido e que so os mais
adequados s necessidades da fase de planeamento e estimativa de custos. Os sistemas de
classificao contm informaes e metodologias de organizao diferentes dependendo dos
objetivos de aplicao. Assim importante avaliar as principais caractersticas destes sistemas
compar-los por forma a entender qual o mais adequado s necessidades de aplicao
pretendida. Na comparao entre sistemas importante ter ateno a esta comparao, de forma
a no serem comparados sistemas com diferentes propsitos e estrutura. Para tal preciso
entender que existem dois de sistema, no que diz respeito sua estrutura, a classificao
enumerativa que representa uma nica lista hierrquica de codificao e designao
correspondente e a classificao faceteada que composta por vrias tabelas paralelas e que se
estruturam hierarquicamente. O que significa que os sistemas como Omniclass e Uniclass,
podem ser comparados na sua integra, mas sistemas como o Uniformat e Masterformat apenas
podem ser comparados com as tabelas correspondentes a estes no sistema Uniclass.

No sentido de avaliar a pertinncia dos sistemas de classificao ao objetivo de aplicao


estabelecido, iremos ver de que forma estes sistemas se alinham de forma a obter uma estrutura
organizacional adequada.

O Omniclass consiste em 15 tabelas hierrquicas, que representam diferentes formas de


classificar a informao da construo. Este sistema tem diferentes aplicaes dentro do
ambiente BIM e cada tabela deste sistema pode ser usada independentemente ou pode ser
combinada com outras, dependo do objetivo de aplicao.

Os sistemas Masterformat e Uniformat, que o Omniclass incorpora em suas tabelas, so os


sistemas Norte Americanos mais apropriados na aplicao do planeamento e estimativas de
custo. O Uniformat tem a capacidade de organizar a informao de forma mais intuitiva durante
as fases do projeto de construo, uma vez que os elementos so agrupados em categorias
lgicas baseado na localizao ao invs da sua finalidade. Contrariamente o Masterformat
baseia-se numa classificao consoante o que foi realizado e o objetivo que foi alcanado, o
que por vezes pode ser mais relevante para a gesto da construo.

O Masterformat, permite a classificao segundo os resultados de trabalho ou as prticas de


construo, baseado nos materiais de construo, possibilitando uma organizao mais
detalhada e adequada para os custos. Contudo a complementaridade destes dois sistemas
permite uma maior preciso nas decises de projeto, pelo que se devem alinhar no sentido de
organizarem a informao do modelo de forma mais detalhada e eficiente. Utilizando como
exemplo o Beto, no Masterformat o cdigo 03-31-00 reservado para a classificao material
Beto, no entanto este pode ser utilizado em diferentes sistemas (como paredes e lajes), pelo
que podemos utilizar o Uniformat para identificar o local de aplicao deste, como podemos
ver no exemplo apresentado na Figura 1. Neste exemplo, foi utilizado os sistemas Uniformat e

156
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Masterformat, contudo podero ser utilizadas as tabelas do Omniclass correspondente a estes


sistemas (nomeadamente as tabelas 21 e 22).

Figura 1: Mapeamento entre os sistemas Uniformat e Masterformat.

Assim como o Omniclass, o Uniclass 2015 tem aplicao ao longo do ciclo de vida dos
empreendimentos e cada tabela deste sistema tanto podem ser utilizadas de forma independente
como podem ser combinadas.

Apesar de ambos estarem ambos em consonncia com os pressupostos definidos pela ISO, cada
um tem diferentes interpretaes para estrutura de classificao e tambm tem diferentes
estratgias para a sua organizao. Uniclass ao contrario do Omniclass apresenta uma relao
direta com as tabelas propostas pela ISO 12006-2 mais recente e apresentam-se
hierarquicamente definidas, promovendo a maturao progressiva da informao. Alm disso
o Uniclass 2015 apresenta maior proximidade aos costumes correntes da empresa e do pas. O
conjunto de tabelas permite que as informaes de um projeto sejam definidas a partir de uma
viso mais ampla para o mais detalhado e de acordo com as necessidades dos utilizadores, como
podemos verificar na Figura 2. O BIM requer uma abordagem unificada para que a classificao
da informao funcione de forma eficiente. Por forma a atender este requisito da metodologia
BIM o Uniclass 2015 apresenta as suas tabelas de forma mapeada ao contrario do Omniclass,
que no apresenta alinhamento entre suas tabelas.

Ainda de o Uniclass 2015 tenha sido um dos primeiros sistemas alinhados com as novas
definies da ISO, este sistema ao contrario do estabelecido na ISO 12006-2:2015 removeu a
tabela Resultados de Trabalho, substituindo por duas tabelas Sistemas e Produtos.

Figura 2: Alinhamento entre tabelas do Uniclass 2015 [22].

Entende-se a importncia da utilizao de um sistema de classificao no conceito BIM, uma


vez que estes sistemas oferecem informaes organizadas e estruturadas sobre os elementos
utilizados no projeto. Entende-se tambm que estes processos de organizao da informao
geram bons resultados, aperfeioando a forma de se trabalhar na indstria da construo
apoiados nos sistemas organizacionais abordados. Contudo, aps o estudo dos sistemas de

157
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

classificao abordados, constatou-se que apesar dos sistemas de classificao serem


fundamentais na organizao da informao para a gesto da construo, a organizao destes
demasiada dispersa para a sua aplicao direta em organizaes nacionais sistemistas,
influenciando procedimentos e mtodos de trabalho fortemente enraizados. Acresce a isto o
facto de serem sistemas com origem noutros pases e naturalmente os processos de construo
variam dos restantes pases, embora existam sistemas como o Uniclass 2015 com fatores
comuns aos aplicados em Portugal.

No que diz respeito aos desenvolvimentos nacionais no mbito dos sistemas de classificao,
prev-se o desenvolvimento de um sistema de classificao da informao, tendo como base o
sistema Portugus ProNIC (Protocolo para a Normalizao da Informao Tcnicas na
Construo). Estes desenvolvimentos decorrero no mbito da Subcomisso 2 Trocas e
Requisitos de Informao da Comisso Tcnica de Normalizao de BIM (CT197).

Dada a complexidade nas organizaes, maturidade e todo o trabalho desenvolvido, os sistemas


originados nos EUA e no UK devero ser alvo de estudo de adaptao realidade portuguesa.
De acordo com o referido anteriormente, o Uniclass 2015 para alm de apresentar maior
proximidade aos costumes nacionais est alinhado com as novas definies da ISO 12006-
2:2015, pelo que importante que seja estudada a viabilidade de adaptao do ProNIC
estrutura de organizao proposta pelo Uniclass 2015, pois permitir uma maior integrao do
ProNIC no mbito do BIM.

4. Contributo para o estabelecimento de uma norma para a classificao da informao


de sistemas

Embora devam existir normas internacionais para melhorar a colaborao entre pases,
necessrio um sistema nacional bem definido para atender s necessidades locais. Uma vez que
no existe um sistema de classificao nacional alinhado com a metodologia BIM, viu-se a
necessidade de estudar uma estrutura de organizao e classificao da informao de sistemas
baseado na adaptao das prticas correntes nas organizaes sistemistas ao sistema de
classificao Uniclass 2015, para o uso em projetos destas organizaes de modo a classificar
a informao associada aos modelos BIM e retirar vantagens competitivas para a utilizao
desta no mbito da gesto (4D e 5D).

Requisitos e propsito
No mbito deste artigo o sistema em estudo tem como principais objetivos a organizao da
informao tcnica disponvel nos objetos tridimensionais, para apoio criao de Mapas de
quantidades, Custo e Planeamento, de modo a qua haja uma reduo do tempo despendido,
erros e incertezas na extrao de quantidades. Alm disso, este sistema dever promover uma
linguagem transversal entre os diferentes intervenientes e melhorar a performance na gesto
dos projetos.

Para alm dos principais objetivos so apresentados os princpios gerais deste sistema:
Aproveitamento dos sistemas de classificao internacionais existentes e baseado nas
normas estabelecidas na ISO12006-2 e ISO 12006-3;

158
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Adequao/Adaptao dos procedimentos existentes nas organizaes aos sistemas de


classificao internacionais existentes e o seu mapeamento;
Flexibilidade e adaptabilidade da taxonomia, permitindo a insero quando necessria
de novos cdigos e ttulos;
Adequao da taxonomia para a fcil organizao do Mapa de Quantidades;
Taxonomia user-friendly de modo a facilitar a sua utilizao para os diferentes
utilizadores;
Cobertura de todo o processo de construo ao longo do ciclo de vida dos objetos.

Permitir a classificao e estruturao de diversas formas para atingir os diferentes objetivos de


aplicao.

Estrutura e organizao do sistema


A abordagem proposta para esta estrutura classificativa a classificao faceteada por permitir
atender os diferentes objetivos de aplicao, ainda que no mbito deste artigo o foco seja o
planeamento e custos. A estratgia de organizao utilizada semelhante ao sistema Uniclass
2015, por ser o mais adequado s prticas existentes e por responder s necessidades de
organizao de sistemas.

Para este sistema proposto uma hierarquia para onde os elementos de Construo Civil o
principal ponto de partida seguido de Complexos so as Entidades ou Espaos. Quando se trata
de Sistemas o principal ponto de partida seguido de Complexo sero os Sistemas, pois para as
unidades sistemistas a primeira necessidade identificar que um conjunto de tubos, vlvulas ou
bombas pertence a determinado sistema ao invs de local/espao. A classificao e associao
dos objetos aos sistemas no que diz respeito organizao e estruturao da informao
fundamental, j que se um sistema partilhado por diferentes edifcios/espaos torna-se difcil
identificar a utilizao, funo e localizao dos elementos. Ainda que a necessidade primria
seja a identificao do sistema, esta informao poder ser complementada pela identificao
espacial, ainda que no seja essencial organizao. Na Figura 3 encontra-se um exemplo
esquematizado um circuito de uma Estao de Tratamento de Lamas, de forma muito
simplificada, partilhado por diferentes locais/espaos.

Figura 3: Circuito partilhado por varios edificios.

159
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Esta estrutura poder ser base para extrao de quantidades e custos, onde nveis mais elevados
da hierarquia podem representar toda a informao agregada por exemplo de custos. Como se
encontra identificado na Figura 3, existem nveis que so inerentes ao projeto e no ao produto,
o significa que um produto pode ser classificado quando criado, pois, a sua classificao no
sofrer alteraes, o mesmo no acontece quando a classificao depende do tipo de
obra/espao/sistema. Outras estruturas podero ser formadas dependendo do objetivo de
aplicao. Este exemplo de estrutura entende-se a mais adequada para organizar os elementos
para extrao de quantidade e estimativas de custo.

A estrutura classificativa em estudo foi projetada para maximizar a flexibilidade dos


utilizadores podendo ser expansvel. Ainda que seja possvel a adio de novos cdigos, os
cdigos existentes no devem ser alterados de modo a manter a consistncia e fiabilidade da
estrutura.

Na Figura 4 encontra representado um exemplo de classificao de elementos de Construo


Civil e Sistemas de uma Estao de Tratamento de Aguas Residuais baseado no sistema de
classificao em estudo.

Figura 4: Classificao de elementos de um projeto de uma ETAR.

Aplicao do sistema no desenvolvimento de modelos 4D e 5D


Um dos aspetos mais importantes na indstria da construo a quantificao dos materiais e
elementos de um projeto, sendo estes os elementos chave para uma anlise de planeamento e
custos.

A importncia na preciso do processo de quantificao deve-se pelo facto do planeamento e


custos estarem dependentes deste processo, pois simples falhas no processo de quantificao
do projeto podero ter um impacto forte no processo de gesto da construo.

A utilizao do sistema de classificao que organiza a informao de acordo com o projeto em


questo (Figura 4) podendo apoiar a fase de planeamento no processo exaustivo de construo
do programa de trabalhos. Sem uma abordagem de classificao por local/espao (no caso dos
elementos de Construo Civil) e Sistemas (no caso de elementos pertencentes a Sistemas), o

160
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

modelo consistia num conjunto de elementos desorganizados, pelo que no seria til para as
fases de Planeamento e Custos.

A extrao de quantidades sistematizada e organizada segundo o sistema de classificao pode


ser comunicada com uma base de dados de preos, desde os preos de diferentes fornecedores,
ao preo de venda atravs de cdigos de classificao dos objetos para que todo este processo
seja automtico. Uma extrao de quantidades baseada no modelo permite uma atualizao
dinmica aquando das alteraes dos modelos pelo que, os custos tero tambm a respetiva
atualizao. Sendo que para a modelao se utilizam ferramentas BIM diferentes das utilizadas
para controlo de custos requerido que exista interoperabilidade entre diversos softwares com
o intuito de construir uma estimativa vivel, evitando erros na interpretao da informao.

Toda a informao que o modelo 3D incorpora e que organizada e estruturada, integrada com
sistemas de gesto para alm de economizarem tempo e esforo em atividades de planeamento
e custo permitir tomar decises fundamentadas em fase de projeto.

6. Consideraes Finais

A utilizao dos sistemas de classificao permite a otimizao dos processos associados ao


planeamento e custos, atravs da organizao, estruturao e codificao da informao
inserida nos modelos 3D. Contudo, constatou-se que a fase de desenvolvimento em que
sistemas de classificao existentes se encontram ainda incapaz de satisfazer as necessidades
de organizao e estruturao da informao para apoio a modelos BIM 4D e 5D,
principalmente no que diz respeito classificao de Sistemas.

O exemplo de sistema apresentado no mbito deste artigo, ainda numa fase preliminar, pretende
para alm de colmatar uma necessidade existente dos sistemistas, estabelecer uma relao com
a classificao dos trabalhos tendo ateno legislao nacional (nomeadamente ProNIC) e ao
aproveitamento das oportunidades que as tecnologias da informao atualmente oferecem na
otimizao dos processos e desenvolvimento de aplicaes que apoiem os conceitos abordados.

Referncias

[1] J. Martins, Modelao do Fluxo de Informao no Processo de Construo, Tese de


Doutoramento, Faculdade de Engenharia da Universidade do Porto, 2009.
[2] C. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook: a guide to building
information modeling for owners, managers, designers, engineers, and constractor. 2011.
[3] Bruno Caires, BIM as a tool to support the collaborative project between the Structural
Engineer and the Architect, Tese de Mestrado, Universidade do Minho, 2013.
[4] P. M. A. Lzaro, Gesto Da Informao Na Construo - Aplicao De Ferramentas
Colaborativas No Desenvolvimento De Projectos De Construo, Tese de Mestrado,
Faculdade de Engenharia da Universidade do Porto, 2010.
[5] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, Encontro Nac. Beto Estrutural -BE2012, pp. 2426, 2012.

161
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[6] A. Monteiro and J. P. Martins, Building Information Modeling - Funcionalidades e


Aplicao, pp. 111, 2011.
[7] A. Barbosa, A Metodologia BIM 4D e BIM 5D aplicada a um caso prtico Construo
de uma ETAR na Arglia, Relatrio de Estgio, Instituto de Superior de Engenharia do
Porto, 2014.
[8] A. F. Quintela, J. P. P. M. Couto, and F. Reis, Classificao e Organizao de Objetos
BIM e sua Aplicao em Modelos 4D e 5D. Tese de Mestrado, Universidade do Minho,
2015
[9] S. M. de C. Jesus, Anlise e Alinhamento de Tecnologias de Construo, Tese de
Mestrado Universidade do Minho, 2010.
[10] A. Monteiro, P. Mda, and J. Poas Martins, Framework for the coordinated application
of two different integrated project delivery platforms, Automation in Construction, vol.
38, pp. 8799, 2014.
[11] R. Scherer , Ardeshir Mahdavi, Bob Martens, eWork and eBusiness in Archiceture,
Engineering and Construction, 2015.
[12] M. Monteiro, Classificao da Informao na Indstria da Construo - Prespectivas e
Percursos, Faculdade de Engenharida da Universidade do porto, 1998.
[13] ISO 12006-2, Building Construction - Organization of information about construction
works Part 2: Framework for classification of classification, 2001st11th01 ed. 2001.
[14] CSI, OmniClass: Introduction and Users Guide, p. 29, 2006.
[15] Robert W. Johnson, Classifying product information, CSRF- the Construction
Sciences Research Foundation, 2008. [Online]. Disponvel:
http://www.csrf.org/pubs/classify_prod_info.html.
[16] R. S. W. e J. R. R. J. Harold J.Rosen , Mark Kalin, Construction Sprecifications Writing
- Principles and Procedures, 6Th ed. 2010.
[17] CSI, CSI- MasterFormat. [Online]. Disponvel: http://www.csinet.org/masterformat.
[Acedido: 20-Agosto-2016].
[18] CSC CSI, UniFormat, A Uniform Classification of Construction Systems and
Assemblies. 2010.
[19] R. P. Charette and H. E. Marshall, UNIFORMAT II Elemental Classification for
Building Specifications, Cost Estimating, and Cost Analysis, p. 103, 1999.
[20] S. V. N. Biscaya, Coordination and management of information for construction design
projects a framework for Portugal, University of Salford, Salford, UK, 2012.
[21] CPIC, Proposed changes to the UK construction sectors classification system,
Uniclass2 why and how. [Online]. Disponvel:
http://www.cpic.org.uk/uniclass/uniclass2/. [Acedido: 13-Agosto-2016].
[22] S. Delany, Classification, NBS BIM Toolkit Beta, 2015. [Online]. Disponvel:
https://toolkit.thenbs.com/articles/classification#classificationtables. [Acedido: 20-
Agosto-2016].

162
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM NO PROJETO DE ESTRUTURAS DE OBRAS HIDROELTRICAS

Alexandre Marques (1), Miguel Azenha (1), Andr Ferreira (2)

(1) ISISE, Universidade do Minho, Guimares


(2) EDP Produo, Porto

Resumo
Pretendeu-se com este trabalho avaliar os principais desafios implementao do BIM na fase
de projeto de obras hidroeltricas. Para isso, foram elaborados modelos BIM deste tipo de
empreendimentos, com aplicao a vrias componentes estruturais no contexto do reforo de
potncia Venda Nova III. Um dos mais importantes desafios prendeu-se com a complexidade
geomtrica das peas a modelar, tendo-se recorrido sinergia entre a linguagem de
programao visual Dynamo e a plataforma BIM Revit. Os modelos criados foram explorados
para diversos usos BIM, como obteno de desenhos de execuo e extrao de quantidades.
Adicionalmente descrio da elaborao e explorao de modelos, este artigo detalha tambm
um plano de implementao BIM especfico com a finalidade de impulsionar e facilitar a
implementao de metodologias BIM no departamento de Fundaes e Estruturas da Direo
de Engenharia de Barragens da EDP Produo.

1. Introduo

A indstria da Arquitetura, Engenharia e Construo sofre mudanas graduais nos seus


processos, nomeadamente com a aplicao crescente de tecnologias de informao,
materializada na implementao do BIM Building Information Modelling. A nvel
internacional, j h relatos de empresas que implementaram esta metodologia, tendo apontado
diversos benefcios com a mudana, nomeadamente em termos de gesto de cronogramas,
estimativas e anlises de risco, havendo tambm melhoria nos processos colaborativos e uma
gesto mais eficaz de instalaes. Alm destes fatores, a metodologia BIM permite ainda testar
diversas solues em curtos intervalos de tempo, visto que se materializa num modelo
tridimensional parametrizado, e permite uma melhor integrao das diferentes especialidades
de um projeto, podendo facilmente ser detetados e corrigidos problemas relacionados com erros
e incompatibilidades [1].

163
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Em termos de aplicao do BIM a obras hidroeltricas, a informao disponvel bastante


parca, havendo apenas relatos de implementaes na China, embora no tenham sido, ainda,
exploradas todas as dimenses e potencial associados metodologia. Apesar disso, a
expectativa que no futuro se atinjam os mesmos resultados que em obras de complexidade
menor [2].

Tendo em conta o exposto, o presente trabalho pretende avaliar os principais entraves, em


termos tcnicos de modelao e processos de implementao, mudana de paradigma para
obras hidroeltricas, nomeadamente na fase de projeto. O artigo contempla uma parte inicial de
descrio das particularidades inerentes s obras hidroeltricas, bem como dos principais
desafios que se colocam utilizao de metodologias BIM nesse contexto (Seco 2).
Seguidamente, na Seco 3, apresentada a modelao de duas peas teste do aproveitamento
hidroeltrico Venda Nova III, com recurso a programao visual (Dynamo/Revit): (i) a central;
(ii) a tomada de gua. Com base na informao incorporada nos modelos, na Seco 4, so
explorados alguns usos BIM de interesse para o departamento de Fundaes e Estruturas da
Direo de Engenharia de Barragens da EDP Produo: gerao automtica de peas
desenhadas e extrao de quantidades. Finalmente discutem-se alguns aspetos relativos ao
plano de implementao/execuo BIM elaborado (Seco 5) e concluses finais do trabalho
(Seco 6).

2. Obras Hidroeltricas e Implementao BIM

2.1 Aspetos gerais de um Aproveitamento Hidroeltrico


Um aproveitamento hidroeltrico tem como objetivo a utilizao da energia potencial de uma
massa de gua, num dado desnvel topogrfico, transformando-a em energia eltrica. Assim, as
zonas preferenciais para a produo de energia so zonas montanhosas, zonas de elevada
pluviosidade e bacias hidrogrficas de maior dimenso.

O processo para produo de eletricidade baseia-se em converso sucessiva de energia. A


barragem, componente de um aproveitamento hidroeltrico, forma uma reserva de gua, rica
em energia potencial gravtica. Esta reserva de gua depois captada para o circuito hidrulico,
na tomada de gua, percorrendo o tnel de aduo at turbina, que se encontra na central.
Neste escoamento h converso de energia potencial gravtica em energia cintica. A passagem
da gua pela turbina move as lminas desta num movimento rotacional, sendo a energia cintica
convertida em energia mecnica. O alternador transforma, depois, a energia mecnica em
energia eltrica.

Figura 1: Perfil longitudinal de Picote II. Adaptado de [3].

164
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Aps passagem pela turbina a gua segue para a restituio, atravs do tnel da restituio. Na
Figura 1 possvel observar um corte longitudinal adaptado do reforo de potncia do
Aproveitamento Hidroeltrico de Picote - Picote II - estando identificadas as principais
componentes do circuito hidrulico (tomada de gua, tnel de aduo, tnel de restituio e
restituio) e a central.

2.2 Desafios implementao BIM


H um conjunto de barreiras e limitaes que tm culminado numa adoo relativamente lenta
das prticas BIM em contexto profissional. Alm das condicionantes de natureza tcnica, que
procuram ser ultrapassadas pelos produtores de software com a criao de plataformas BIM
cada vez mais potentes e pela evoluo tecnolgica que permite hardware cada vez mais capaz,
h ainda a considerar a mudana cultural, interpretada por muitas empresas como o principal
entrave alterao de paradigma na indstria. O conservadorismo e resistncia mudana por
parte de profissionais experientes da indstria , apesar de tudo, tendencialmente contrariado
pelos profissionais mais novos, que so em geral mais recetivos adoo de tecnologias de
informao. H ainda a destacar o investimento (a nvel de software e treino de colaboradores),
a lenta curva de aprendizagem (alm dos softwares h novos processos de trabalho), o maior
envolvimento de equipa (necessrio promover uma maior interao colaborativa), a
interoperabilidade (o formato IFC no est, ainda, isento de falhas) e aspetos relacionados com
responsabilizao/autoridade (no devem ser comprometidos direitos de autor e
responsabilizao dos diferentes intervenientes) [4].

No caso particular de projetos de aproveitamentos hidroeltricos, h um agravamento de alguns


dos aspetos anteriormente referidos. A elevada dimenso destes empreendimentos eleva o risco
da adoo de metodologias BIM e o nmero de entidades envolvidas. Alm do dono de obra e
do empreiteiro, h ainda a considerar a influncia que o fornecedor de equipamentos ou
empresas subcontratadas (para estudos, projeto de estruturas, medidas geotcnicas, entre
outros) tm no processo, sendo ponto assente que quanto maior for a adoo por parte dos
diferentes intervenientes, maiores sero os potenciais benefcios obtidos com a mudana de
paradigma. Tambm o facto de se tratarem de empreendimentos de elevada complexidade
conduz a um aumento da inrcia por parte das empresas na adoo do BIM, pois requer maiores
conhecimentos por parte dos colaboradores na explorao de software, agrava as limitaes da
interoperabilidade e complica as questes de responsabilizao/autoridade devido maior
complexidade do ambiente de partilha.

3. Modelao

Com o objetivo de obter uma melhor perceo acerca dos desafios tcnicos implementao
BIM no contexto da Direo de Engenharia de Barragens da EDP, optou-se pela modelao de
trs constituintes de um aproveitamento hidroeltrico em casos particulares que foram objeto
de projeto recente na EDP: uma central (Venda Nova III), uma tomada de gua (Venda Nova
III) e uma restituio (Frido). No presente artigo ser apresentada a modelao da central e da
tomada de gua, sendo que a restituio seguiu uma estratgia anloga adotada no caso da
tomada de gua.

165
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.1 Estratgia global


O software escolhido para a modelao das componentes supracitadas foi o Revit Structure, da
Autodesk. Esta escolha baseou-se em trs aspetos fundamentais: (i) comprovada capacidade do
software em questo no contexto BIM, sendo inclusive um lder de mercado a nvel global; (ii)
existncia de licena de utilizao Revit na EDP; (iii) experincia prvia disponvel na
utilizao da plataforma. No entanto, quer as plataformas BIM em geral, quer a plataforma
utilizada esto otimizadas para modelao de edifcios, no incorporando normalmente
capacidades de modelao expedita de peas complexas como as que compem os circuitos
hidrulicos de interesse no contexto deste trabalho. Por essa razo foi necessrio o recurso a
solues complementares. Considerou-se que a ferramenta de programao grfica Dynamo,
que gratuita e pode ser associada diretamente plataforma Revit (como uma extenso) poderia
constituir-se como uma soluo vivel, pelo que foi adotada para apoio modelao. Esta
associao direta entre Dynamo e Revit traz tambm a interessante caracterstica de minimizar
potenciais problemas de interoperabilidade caso fossem utilizadas aplicaes totalmente
independentes.

Assim, estabeleceu-se a estratgia de que a modelao de uma componente/obra seria repartida


pelo Revit e pelo Dynamo. Os elementos mais complexos, e que constituem um desafio de
modelao no Revit, so modelados recorrendo a programao visual (Dynamo), enquanto a
restante estrutura segue o processo de modelao corrente com base em classes de objetos j
disponveis nas plataformas BIM.

3.2 Central de Venda Nova III


A central a componente de um aproveitamento hidroeltrico que mais se assemelha a um
edifcio corrente. Apesar disso, a central contm estruturas de beto de elevada complexidade,
com o objetivo de fornecer suporte ao alternador e turbina. Na Figura 2 so apresentados
alguns cortes da central, a ttulo ilustrativo.

Figura 2: Cortes da Central de Venda Nova III: transversais (esquerda) e longitudinal


(direita).

A turbina, do tipo Francis, composta por diferentes componentes, nomeadamente a espiral e


tubo de aspirao, representados na Figura 3. A obteno do modelo de estruturas da Central
exigiu a modelao do macio de beto envolvente destes equipamentos, de forma a garantir a
adequada complementaridade geomtrica do macio de suporte.

166
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Equipamento hidromecnico de Venda Nova III: vista 3D da espiral (esquerda) e


corte longitudinal do tubo de aspirao (direita).

Esta modelao foi realizada com recurso ao Dynamo, tendo-se criado um algoritmo de
programao grfica em que os parmetros manipulveis pelo utilizador correspondem aos
parmetros identificados pelo fornecedor de equipamentos de forma a que, numa obra futura,
seja apenas necessrio adaptar o algoritmo ao invs da criao de raiz do objeto. Na Figura 4
so apresentadas ilustraes de objetos gerados pela ferramenta desenvolvida.

Figura 4: Modelos da espiral (esquerda) e tubo de aspirao (direita).

Para a restante estrutura foram utilizadas famlias nativas do Revit (p.ex. pilar, viga), sendo que
a modelao partiu de desenhos de execuo a duas dimenses. Nesta componente foram
aplicadas metodologias de modelao que visam uma extrao correta de quantidades a partir
do modelo. O modelo final apresenta um nvel de desenvolvimento (LOD) de 300 [5] para os
diferentes elementos, sendo apresentado na Figura 5.

Figura 5: Modelo da Central: modelo 3D (esquerda) e corte tridimensional (direita).

3.3 Tomada de gua de Venda Nova III


A tomada de gua, cuja fotografia se encontra na Figura 6, constituda por diferentes
elementos, nomeadamente: o bocal, macio de suporte, torre de manobra de comportas e um
prtico de apoio movimentao destas [6].

167
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Tomada de gua de Venda Nova III.

Dada a complexidade geomtrica da tomada de gua recorreu-se maioritariamente


programao visual em Dynamo para a sua modelao. Optou-se ainda por incorporar neste
modelo parte revestida do tnel de aduo e a topografia.

Foi, ento, realizada uma anlise dos elementos a modelar em Dynamo, estudando-se diferentes
estratgias de modelao, e entendeu-se que a mais intuitiva corresponde obteno do
elemento por subtrao sequencial de volumes modelados parametricamente, que
correspondem a vazios. Assim, para estes elementos, partiu-se de um prisma retangular de
geometria simples e, por operaes de subtrao de volumes cujos parmetros so controlados
pelo utilizador, obtm-se a geometria pretendida. Este processo demonstrado na Figura 7,
para o caso do bocal.

Figura 7: Evoluo da geometria do bocal.

O modelo final da tomada de gua apresentado na Figura 8, estando apto para obteno de
desenhos de execuo.

Uma vez obtido o modelo da tomada de gua, optou-se por explorar tambm outros fatores,
nomeadamente a modelao de armaduras para elementos desta complexidade. Assim, e tendo
em conta a existncia no mercado de softwares que agilizam este processo e a inteno de testar
a interoperabilidade neste mbito, optou-se por explorar o Tekla Structures. O modelo foi
transmitido entre softwares atravs do formato de ficheiros IFC.

168
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Modelo da tomada de gua: modelo global (esquerda) e corte tridimensional


(direita).

A modelao de armaduras constituiu um elevado esforo de modelao, com um incremento


significativo do tempo investido com a passagem de LOD 300 para LOD 400. Contudo, esta
passagem traduz-se na existncia de um modelo muito rico em informao, melhorando a
qualidade do projeto e reduzindo erros construtivos. O modelo parcialmente apresentado na
Figura 9.

Figura 9: Representao parcial do modelo de armaduras desenvolvido.

4. Usos BIM

Uma vez criado o modelo BIM, e tendo em conta que se trata de um modelo rico em informao
geomtrica e no geomtrica, este pode ser explorado para diferentes usos, de forma a ir ao
encontro das exigncias de um projeto. Assim, na presente seco, so explorados/discutidos
dois usos dos modelos BIM de especial interesse no contexto deste trabalho: gerao de peas
desenhadas e extrao de quantidades.

4.1 Gerao de peas desenhadas


Definiu-se como objetivo demonstrar que possvel aproximar, em termos de contedo e
aspeto, os desenhos obtidos a partir do modelo BIM aos desenhos de execuo tradicionais,
sendo que a componente escolhida para este fim foi a tomada de gua de Venda Nova III.
Optou-se tambm por iniciar a criao de um template (ficheiro Revit padro com
determinadas caractersticas j definidas) do departamento, de forma a facilitar a futura
obteno de mais desenhos noutros projetos. Na Figura 10 so comparados os desenhos obtidos
pela metodologia tradicional, com aqueles que se obtm de forma automtica a partir do modelo

169
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM. Pde confirmar-se um excelente desempenho e automatizao deste processo em


contexto BIM.

Figura 10: Desenho de execuo tradicional (esquerda) e desenho obtido a partir do modelo
BIM (direita).

4.2 Extrao de quantidades


O facto de os modelos BIM conterem informao bsica como volume, material e o
agrupamento dos elementos por famlias torna possvel a extrao automtica de quantidades a
partir do modelo. De facto, a extrao automtica de quantidades a partir do modelo BIM
constitui uma vantagem comparativamente com a metodologia de trabalho corrente, pois
transforma um processo tradicionalmente moroso e propenso ao erro num processo rpido
(medies so obtidas em poucos minutos) e com elevado rigor. O facto de ser possvel
adicionar parmetros e recorrer aos sistemas de classificao torna possvel um elevado nvel
de personalizao de tabelas/mapas de quantidades, de forma a corresponder da melhor maneira
ao que o utilizador pretende. Estas tabelas so tambm adequadas para obteno de rigorosas
estimativas de custo [1]. A ttulo exemplificativo apresentado na Tabela 1 um extrato da
medio das paredes da central de Venda Nova III compreendidas entre as cotas 217 m e 221
m.

Tabela 1: Parte de tabela com volumes de beto de paredes da Central de Venda Nova III
compreendidas entre as cotas 217 m e 221 m.
Paredes 217m 221m
Tipo Material Espessura Comprimento Volume
Parede 1,15m Beto 1,15m 18,44m 238,57 m3
Parede 1,15m Beto 1,15m 14,20m 183,71 m3
Parede 1,15m Beto 1,15m 5,80m 74,98 m3
Parede 1,15m Beto 1,15m 8,30m 107,38 m3
Parede 0,30m Beto 0,30m 2,14m 4,11 m3
Parede 0,30m Beto 0,30m 5,07m 9,52 m3

5. Plano de Execuo em contexto empresarial

De forma a promover uma implementao bem sucedida de metodologias BIM, essencial que
a equipa de projeto realize um planeamento detalhado e exaustivo [7]. Como resposta a este

170
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

fator, importante que a equipa de projeto desenvolva um plano de execuo BIM, doravante
designado BEP (BIM Execution Plan). O desenvolvimento deste documento deve permitir ao
dono de obra e aos membros de projeto [8]:
Entender claramente os objetivos estratgicos para a implementao BIM no projeto;
Perceber as suas funes e responsabilidades a nvel de criao de modelos, manuteno
e colaborao nas diferentes fases de projeto;
Desenvolver um processo apropriado para participarem na implementao;
Delinear eventuais recursos ou servios adicionais que possam ser necessrios;
Providenciar uma base de referncia para medir o progresso ao longo do projeto.

Neste contexto, optou-se pelo desenvolvimento de um documento de apoio implementao


de metodologias BIM na empresa. Neste documento so definidos elementos do plano de
execuo padro para diferentes projetos, tal como a definio de objetivos BIM, de usos BIM
(onde , tambm, sugerida uma metodologia para a sua seleo), so apresentadas novas
funes atribuveis aos recursos humanos, decorrentes da adoo do BIM, e atribudos os seus
responsveis. So tambm mapeados processos para garantir as adequadas trocas de informao
e so discutidos os formatos em que a informao deve ser trocada. Finalmente, so discutidos
aspetos organizacionais, tais como a organizao e nomenclatura da informao.

O plano apresentado visa a implementao de metodologias BIM no departamento de


fundaes e estruturas da DEB (Direo de Engenharia de Barragens), logo, corresponde a uma
verso adaptada de recomendaes genricas para o efeito [8], com simplificao no nmero
de itens abordados, pois trata-se de uma tipologia de trabalho de gabinete de projeto e dono de
obra, o que no requer todas as partes de um BEP geral. O documento maioritariamente
inspirado no BIM Project Execution Planning Guide [8].

O BEP foi ainda complementado com outros documentos que se entendem catalisadores na
implementao BIM, nomeadamente um procedimento para controlo de qualidade de modelos,
um documento de especificaes LOD e ainda um auxiliar de modelao, que visa apoiar os
colaboradores menos familiarizados com modelao BIM. A consulta do plano pode ser
efetuada na referncia [9].

6. Concluses

Com o trabalho desenvolvido foi possvel obter uma perceo dos reais desafios
implementao BIM na fase de projeto de obras hidroeltricas. No caso das componentes de
complexidade inferior como, por exemplo, o posto de observao e controlo e at a central,
inequvoca a possibilidade de aplicao da metodologia BIM e explorao de todas as suas
dimenses. No entanto, no caso das componentes mais complexas, como a tomada de gua, a
modelao exigiu o recurso a programao grfica, com maior investimento inicial, mas com
elevado potencial de retorno a longo prazo dada a possibilidade de reutilizao do cdigo.

A explorao dos modelos revelou ser possvel a obteno de relevantes benefcios para o
departamento de Fundaes e Estruturas da Direo de Engenharia de Barragens da EDP

171
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Produo. De facto, os modelos permitem uma melhoria de qualidade do projeto e podem ser
determinantes em processos especficos (a ttulo exemplificativo, a possibilidade de se poder
complementar desenhos 2D tradicionais com cortes tridimensionais promove uma melhor
compreenso da obra por parte dos diferentes intervenientes e pode prevenir erros construtivos).

O plano de execuo BIM proposto revela elevado potencial organizacional, constituindo-se


como um documento essencial na implementao BIM, pois promove uma melhor integrao
por parte dos colaboradores no novo paradigma.

Face aos trabalhos encetados e s potencialidades BIM exploradas, consideram-se criadas as


condies para aplicao sistemtica de metodologias BIM no contexto de projeto de obras
hidroeltricas, extraindo-se todas as vantagens e benefcios inerentes a este tipo de
metodologias.

Referncias

[1] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors, 2nd
ed. New Jersey: Wiley, 2011.
[2] Infrastructure, Model-based Design Powers China Dam Construction. Consultado em 11
de maio de 2016, https://informedinfrastructure.com/4362/model-based-design-powers-
china-dam-construction/.
[3] EDP, Picote II - Informao tcnica. Consultado em 13 de setembro de 2015,
http://www.a-nossa-
energia.edp.pt/centros_produtores/empreendimento.php?item_id=85&cp_type=he.
[4] J.C. Lino, M. Azenha, M. and P. Loureno, "Integrao da metodologia BIM na
Engenharia de Estruturas" in Encontro Nacional BETO ESTRUTURAL (2012),
Faculdade de Engenharia da Universidade do Porto, Porto, 2012.
[5] BIM Forum, Level of Development Specification, 2013, http://bimforum.org/wp-
content/uploads/2013/08/2013-LOD-Specification.pdf.
[6] A. Ferreira, C. Sarmento and C. Lima, "Tomada de gua do Reforo de Potncia de
Venda Nova III" in Encontro Nacional BETO ESTRUTURAL (2012), Faculdade de
Engenharia da Universidade do Porto, Porto, 2012.
[7] The Computer Integrated Construction Research Program, BIM Project Execution
Planning Guide version 2.1. The Pennsylvania State Unversity, 2011.
[8] Building and Construction Authority, BIM Essential Guide for BIM Execution Plan.
Singapore, 2013.
[9] A. Marques, "Implementao de metodologias BIM na Direo de Engenharia de
Barragens da EDP: Casos de estudo de projeto de estruturas em obras hidroeltricas"
Tese de Mestrado, Universidade do Minho, 2015.

172
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO DA METODOLOGIA BIM NA DIREO DE


ENGENHARIA DE BARRAGENS DA EDP PRODUO CASO DE
ESTUDO DO PROJETO DE ESTRUTURAS DA CENTRAL E
CIRCUITO HIDRULICO DO A.H. DE FRIDO
Andr Ferreira (1), Alexandre Marques (1), Celso Lima (1)

(1) EDP Produo, Porto

Resumo
O presente artigo retrata os primeiros progressos efetuados na Direo de Engenharia de
Barragens (DEB) da EDP Produo no sentido da implementao da metodologia BIM em
estruturas de obras hidroeltricas. Aborda-se o desenvolvimento de um Add-In, com recurso
API (Application Programming Interface) da plataforma BIM Revit, com o objetivo de
automatizar o processo de modelao paramtrica de geometrias complexas e transversais a
aproveitamentos hidroeltricos. A elaborao do processo de concurso do Aproveitamento
Hidroeltrico de Frido constitui um projeto piloto para a implementao BIM na DEB e, neste
contexto, so apresentados os diferentes modelos desenvolvidos para este empreendimento. D-
se particular nfase ao complexo da central e circuito hidrulico, registando-se os principais
desafios em termos de modelao, bem como ao software de programao grfica Dynamo
como importante complemento ao Revit na modelao de elementos de maior complexidade.
Discute-se ainda a explorao dos modelos elaborados na obteno de peas desenhadas e os
benefcios obtidos em termos de processo de trabalho. So tambm apresentadas reflexes
acerca do trabalho desenvolvido at escrita do presente artigo, bem como so apontados
diferentes fatores que se consideram ser importantes a considerar no futuro.

1. Introduo

O BIM constitui um passo importante no desenvolvimento da indstria da Arquitetura,


Engenharia e Construo (AEC). Embora a nvel nacional a aplicao da metodologia BIM
tenha vindo a aumentar, esta encontra-se ainda numa fase embrionria [1]. Se no mbito de
obras correntes (entendam-se como obras correntes as obras de edifcios habitacionais e
escritrios) a adoo do BIM a nvel nacional sofre uma lenta implementao, quando se tratam
de obras especiais, concretamente de aproveitamentos hidroeltricos, o nmero de casos
implementados nulo. No entanto, a nvel internacional, o BIM tem despertado o interesse de
empresas que possuem, operam e mantm aproveitamentos hidroeltricos, reconhecendo os

173
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

benefcios a longo prazo do modelo BIM na operao e em intervenes futuras no


aproveitamento. j possvel encontrar relatos de obras que incorporaram modelao BIM em
fase de projeto (como por exemplo o aproveitamento hidroeltrico de Huangdeng, China),
sendo o modelo explorado para obteno de informao para o mapa de quantidades e ligao
entre especialidades. Os balanos destas implementaes so positivos, com melhoria na
comunicao entre especialidades, decrscimo do desperdcio de recursos com alteraes no
projeto e melhor compreenso da obra por parte dos diferentes intervenientes. Embora neste
tipo de empreendimentos ainda seja difcil a explorao do BIM em todas as suas dimenses,
principalmente devido complexidade das obras, a expectativa que no futuro se atinjam
idnticos resultados que em obras correntes [2]. Com a perspetiva da realizao do projeto para
lanamento do concurso do Aproveitamento Hidroeltrico de Frido, a Direo de Engenharia
de Barragens (DEB) da EDP Produo viu como uma oportunidade a avaliao da possibilidade
da implementao BIM em estruturas de obras hidroeltricas. O elevado grau de complexidade
caracterstico de um empreendimento deste tipo, aliado inexperincia dos executantes na
metodologia BIM, conduziu a uma incerteza da capacidade de elaborao atempada dos
diferentes modelos. Este fator levou a que o presente projeto piloto fosse conduzido em paralelo
com a metodologia tradicional, com o objetivo de no comprometer a data chave para
elaborao do projeto.

2. Application Programming Interface

Em experincias anteriores, na modelao BIM de componentes de um aproveitamento


hidroeltrico, foi possvel identificar alguns elementos que constituem desafios na modelao
tridimensional, quer pela sua complexidade geomtrica, quer pelo tempo despendido para a sua
modelao [3]. Neste cenrio, com o objetivo de aumentar a produtividade e sistematizar o
processo de modelao tornando-o um processo mais acessvel aos utilizadores, optou-se pela
explorao da API (Application Programming Interface) da plataforma BIM Revit. Do ponto
de vista informtico a API corresponde, simplificadamente, a um conjunto de funes do
software, acessveis pelo utilizador atravs de programao, que permitem automatizar ou
estender as funcionalidades nativas do Revit [4]. Neste pressuposto e com recurso a
programao na linguagem C#, desenvolveu-se o Add-In para o software Autodesk Revit
denominado Ferramenta de modelao. Esta ferramenta, que pode ser acedida diretamente a
partir da interface do software, permite a modelao automtica e independente de quatro
elementos comuns na estrutura de aproveitamentos hidroeltricos, nomeadamente:
i) envolvente da espiral; ii) envolvente do tubo de aspirao; iii) zonas de transio de seces
quadradas ou retangulares para seces circulares (zonas usualmente denominadas como zonas
de transio quadrado-redondo); iv) troos de desenvolvimento reto de tneis (ver Figura 1).
Numa primeira fase testou-se a viabilidade de modelar cada um destes elementos nativamente
no software Autodesk Revit, realizando-se a modelao em ambiente de criao de famlias e
sem recurso a softwares de programao visual, como por exemplo o Dynamo. Este processo,
embora bastante moroso, permitiu no s validar a possibilidade de modelao dos elementos
no software mas tambm possibilitou a identificao dos comandos utilizados no seu processo.

174
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Possibilidades de modelao a partir da Ferramenta de modelao.

Com base no guia de desenvolvedores de API do Revit [5], foi possvel transformar este
processo em linguagem de cdigo executando os comandos utilizados por meio de
programao. Este processo foi depois parametrizado, de forma a permitir ao utilizador o
mximo de controlo sobre o elemento a modelar. A ttulo exemplificativo, descrevem-se as
funcionalidades deste Add-In para o caso de modelao da geometria do beto envolvente a um
tubo de aspirao. Esta ferramenta tem de ser executada num template de criao de famlias
do Autodesk Revit onde o utilizador, aps selecionar a opo Tubo de Aspirao no menu
principal, insere o nmero de seces de cada tipo de entre os trs tipos programados para este
Add-In. Em funo do nmero de seces existentes o utilizador procede posteriormente ao
preenchimento dos parmetros correspondentes e dependentes do tipo de seco em causa. Uma
vez preenchidos os parmetros relativos a todas as seces que definem a geometria do tubo o
objeto automaticamente modelado podendo ser guardado e utilizado em qualquer projeto. De
realar que a parametrizao da posio relativa das seces apenas tem lugar no momento da
criao do objeto. Na Figura 2 apresentado o fluxograma da modelao da envolvente do tubo
de aspirao com recurso Ferramenta de modelao.

Figura 2: Add-in desenvolvido em C#.

3. Modelos Desenvolvidos

No presente captulo so apresentados os aspetos mais relevantes dos modelos elaborados


relativamente ao edifcio principal da central, ao poo da central, tomada de gua, ao tnel de

175
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

aduo e restituio do projeto para concurso do aproveitamento hidroeltrico de Frido. feita


ainda uma breve referncia compatibilizao dos diferentes modelos num modelo nico
integrado. Foi definido como objetivo inicial que os elementos dos diferentes modelos
apresentassem um nvel de desenvolvimento (LOD) de 300, de forma a permitir obter
documentao (principalmente desenhos base) a partir dos modelos desenvolvidos. Convm,
no entanto, realar que, nesta fase e face aos objetivos definidos para o modelo BIM, o modelo
apenas contm informao relativa a geometria e materiais.

3.1 Edifcio principal da Central


O edifcio principal da central caracterizado por uma altura de 24 m, para permitir a manobra
de equipamentos com a ponte rolante, e por uma rea de implementao de cerca de 2050 m2 ,
resultado de dimenses em planta de 64m de comprimento por 32m de largura. Adjacente ao
edifcio principal, foi projetado um edifcio com 5.5m de altura e cerca de 750 m2 onde se
incluem a portaria, reservatrio de gua contra incndio, armazns e oficinas. Sob o ponto de
vista de modelao estrutural BIM o edifcio no constituiu um elevado desafio por se tratar de
uma estrutura reticulada comum e, tendo em conta as diferentes solues estruturais testadas, o
modelo paramtrico revelou-se bastante til para o trabalho da equipa de projeto nesta fase pois
permitiu agilizar a comunicao, por exemplo com ensaios de diferentes solues rapidamente
durante as reunies de trabalho. Na Figura 3 so apresentadas imagens deste modelo.

a) b)
Figura 3: Edifcio de Frido: a) vista exterior b) vista interior.

3.2 Poo da Central


Nesta fase a central de Frido foi concebida como uma central do tipo poo com,
aproximadamente, 80m de altura. Desde o trio ( cota 123,20 m) at cota 78,80 m, a central
apresenta uma forma oval, que se sobrepe ao macio de beto que envolve o grupo gerador
tipo Francis. A obteno do modelo estrutural BIM exigiu, nesta fase de projeto, a modelao
da envolvente deste equipamento de onde se destacam, como elementos de maior dificuldade
de modelao, a geometria da espiral e do tubo de aspirao. Para acomodar os espaos
necessrios a equipamentos, entre as cotas 78,80 e 77,00, a geometria de escavao do poo da
central sofre uma ligeira transio em planta e que se revelou uma dificuldade de modelao
com recurso a ferramentas nativas do software Revit. Esta transio consiste na passagem da
seco assinalada na Figura 4 a trao contnuo para a seco assinalada a trao interrompido na
mesma figura. Parte desta transio, preenchida na Figura 4 a cinzento, apresenta uma
geometria que no se conseguiu reproduzir corretamente no Revit. Assim, optou-se pela

176
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

modelao desta zona de transio da escavao com recurso ao Add-In de programao grfica
Dynamo [6].

Figura 4: Transio de escavao (em Figura 5: Modelo sem transio de


planta). escavao.

A soluo encontrada passou ento por, numa fase inicial, modelar a central sem esta transio,
ou seja, contendo apenas as extremidades desta (ver Figura 5). Posteriormente, foi criado um
algoritmo Dynamo em que, selecionando estas extremidades, gera superfcies entre elas e define
um slido a partir destas. Este slido depois exportado para o Revit e guardado como uma
famlia (ver Figura 6). Um corte tridimensional pelo eixo to tubo de aspirao do modelo do
poo da central apresentado na Figura 7.

Figura 6: Zona de transio de escavao Figura 7: Corte tridimensional da


(esquerda) e respetivo algoritmo Dynamo (direita). central.

O potencial do Dynamo foi ainda explorado para outras finalidades, nomeadamente a


modelao de armaduras de geometria complexa. Estudou-se a possibilidade de modelao das
armaduras envolventes da espiral, sendo criado para tal fim um algoritmo com cinco inputs: i) a
geometria da espiral (o utilizador apenas tem de selecionar a espiral no modelo que o programa
l a sua geometria); ii) o dimetro dos vares a introduzir; iii) o espaamento entre estes; iv) o
recobrimento; v) o tipo de amarrao. Apesar de ainda se revelar complexo este tipo de
modelao, foi possvel evidenciar com este teste o grande potencial do software Dynamo no
caso de se pretenderem nveis de desenvolvimento mais elevados para futuros trabalhos. Na
Figura 8 esquematizada a modelao de parte das armaduras da envolvente da espiral.

177
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Algoritmo de modelao das armaduras transversais da espiral.

3.3 Tomada de gua


A estrutura da tomada de gua do Aproveitamento Hidroeltrico de Frido tem,
aproximadamente, 37 m de altura e 40 m de extenso. Realam-se as caractersticas
geomtricas desta estrutura, que nem sempre so de fcil interpretao em desenhos
bidimensionais. De facto, a geometria de uma estrutura deste tipo definida segundo uma lgica
sequencial complexa. Assim de elevada importncia que o modelador perceba perfeitamente
essa lgica de definio de formas para que a consiga reproduzir no processo de modelao, a
fim de garantir uma coerncia nos elementos que constituem a construo virtual da tomada de
gua. Este fator, aliado elevada complexidade dos esquios disponveis para realizao do
modelo e ao facto de se tratar de uma estrutura singular, com um nmero reduzido de elementos
presentes nas bibliotecas de origem da plataforma BIM em que se trabalhou, constituram as
maiores dificuldades de modelao. A Ferramenta de modelao descrita no ponto 2 do
presente artigo foi tambm utilizada na construo deste modelo, nomeadamente para a
modelao geomtrica da zona de transio da seco retangular para seco circular,
denominada por transio quadrado-redondo. Apesar dos aspetos supracitados, foi possvel
efetuar a modelao da tomada de gua exclusivamente na plataforma BIM Revit. Importa no
entanto referir que, usando o Revit, foi identificado um aspeto de modelao que, no presente,
constitui uma limitao face ao tradicionalmente representado no projeto de definio de
circuitos hidrulicos. Tradicionalmente, e de modo a se poderem alinhar na mesma prumada os
limites da planta e do perfil do circuito hidrulico, feita a representao do circuito atravs de
um corte vertical contendo o eixo do circuito e, quando este inclinado, a representao em
projeo horizontal do corte correspondente a um plano inclinado contendo aquele mesmo eixo.
No software em questo no foi possvel realizar esta representao uma vez que no se
conseguiu no software a projeo em eixo horizontal de um corte definido segundo um eixo
inclinado. Neste modelo foi ainda includa a topografia onde a tomada de gua se insere e
realizada a escavao de acordo com o projeto. Na Figura 9 apresentado um corte
tridimensional do modelo e a integrao da topografia neste mesmo modelo.

a) b)

Figura 9: Tomada de gua: a) corte tridimensional b) integrao da topografia.

178
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.4 Tnel de aduo


O tnel de aduo de Frido apresenta uma extenso de aproximadamente 340 m e constitudo
por troos de diferentes seces (podendo estas ser constantes ou variveis) e inclinaes.
Devido elevada complexidade de cada seco, a modelao de cada troo constitui uma tarefa
morosa e que exige elevada capacidade de modelao. O tnel de aduo desenvolve-se ao
longo de um eixo que pode ser definido por diferentes troos. No caso do aproveitamento
hidroeltrico de Frido um destes troos desenvolve-se a partir de uma curva definida no
espao, o que constituiu o maior desafio de modelao para esta componente. A Ferramenta
de modelao no pde ser utilizada neste caso, pois apenas possibilita a modelao de troos
retos de um tnel. Assim, a primeira soluo testada passou por definir esse eixo a partir do
software Dynamo, exportando-o para o Revit como uma curva. Posteriormente, foi utilizado o
comando Sweep do Revit que cria um slido por varrimento de uma seco ao longo de um
eixo. No entanto, esta hiptese no se revelou vivel pois o comando utilizado na criao deste
troo do tnel realizava uma rotao da seco ao longo do seu eixo. Este fator implicaria
problemas de integrao deste troo com os troos a montante e a jusante, pelo que este
comando s poder ser utilizado desta forma quando a seco for circular, o que no se verifica
neste caso. Na Figura 10 esquematizada esta soluo testada.

a) b)
Figura 10: Fluxograma da primeira soluo testada: a) eixo definido no espao; b) integrao
do troo modelado com o troo a montante (evidenciada a vermelho a incompatibilidade entre
troos).

Alm desta soluo, testou-se ainda o comando Swept Blend que, dado um eixo e as seces
inicial e final, cria um slido por varrimento do eixo, com as seces a servirem de auxiliares
na definio do objeto. Esta hiptese tambm no se revelou vivel pois pressupe que as
seces transversais definidas sejam perpendiculares ao eixo de varrimento, constituindo uma
limitao, por exemplo, no caso de se pretender modelar um troo que antecede uma transio
de inclinao do eixo do circuito hidrulico, em que a seco transversal final do troo no
perpendicular ao eixo. Tendo em conta o exposto anteriormente, recorreu-se, ento, ao Dynamo
para definio deste troo. Foi criado um algoritmo de programao grfica que parte da
premissa que executado quando, no Revit, esto modelados os troos a montante e jusante do
troo a modelar (com desenvolvimento circular) e o eixo projetado na horizontal (curva num
plano e no no espao). O utilizador tem, ento, de definir 4 inputs: i) selecionar os extremos
do troo a montante (isto , a seco inicial); ii) selecionar os extremos do troo a jusante
(seco final); iii) selecionar o eixo projetado na horizontal; iv) definir a inclinao desse

179
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

mesmo eixo (input numrico). Uma vez definidos estes inputs o algoritmo pode ser executado,
sendo o objeto automaticamente modelado em ambiente Revit, e o resultado ser guardado como
uma famlia e complementado com parmetros no geomtricos, conforme esquematizado na
Figura 11. Para o modelo do tnel de aduo h ainda a realar o facto de o modelo ser
discretizado pelas diferentes componentes que o podem constituir, como o beto de
revestimento e beto projetado. A modelao exigiu elevada ateno e rigor geomtrico na
definio do tnel, de forma a garantir a correta integrao deste modelo com os restantes
desenvolvidos.

Figura 11: Soluo de modelao do troo curvo do tnel de aduo.

3.5 Restituio
A modelao da restituio seguiu uma estratgia semelhante aplicada no caso da tomada de
gua. A restituio apresenta, tambm, uma geometria complexa que visa minimizar perdas
hidrulicas, sendo alguns dos elementos definidos a partir de uma sequncia lgica complexa.
Devido reduzida extenso do tnel da restituio, comparativamente com o tnel de aduo,
optou-se por incorporar esta componente no modelo da restituio. De facto, o tnel da
restituio constituiu o maior desafio em termos de modelao deste elemento de obra devido
ao facto de se caracterizar por uma seco de escavao atpica, no complementada ainda na
Ferramenta de modelao, descrita no ponto 2. Assim, optou-se pela criao de uma famlia
correspondente ao tnel da restituio, o que se revelou um processo moroso mas que revela
elevado potencial no caso de alterao de projeto, havendo a possibilidade de realizar a
atualizao em curtos intervalos de tempo. Nesta famlia foi includa uma outra famlia, a do
negativo do tubo de aspirao, que se prolonga desde a central at ao tnel da restituio. Tal
como no caso do tnel de aduo, a modelao do tnel da restituio exigiu um elevado rigor
geomtrico com o objetivo de promover uma correta integrao dos diferentes modelos
desenvolvidos. Na Figura 12 apresentado um corte tridimensional do modelo da restituio.

Figura 12: Modelo da Restituio.

3.6 Integrao dos diferentes modelos


O conjunto dos modelos desenvolvidos foram integrados num modelo global. Esta integrao
foi realizada partindo de pontos georreferenciados no modelo da tomada de gua. A partir das

180
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

coordenadas partilhadas foram integrados os modelos do edifcio, da central e da restituio,


cuja posio tambm definida a partir de pontos georreferenciados. Relativamente ao tnel de
aduo, a integrao dos diferentes modelos permitiu validar e realizar um controlo de
qualidade do modelo do tnel, verificando-se a ligao deste modelo com os restantes (quer a
nvel de desenvolvimento, quer a nvel de cotas a jusante). Devido ao elevado rigor tido em
conta na modelao, a integrao foi realizada sem problemas. Como consequncia da elevada
dimenso dos diferentes modelos, a integrao foi realizada com recurso ao comando Revit
Link. Este comando permite uma melhor visualizao e integrao de modelos extensos
acoplando as partes, no permitindo a manipulao dos elementos dos modelos locais (modelos
isolados), ficando o ficheiro do modelo global relativamente leve e facilmente acessvel a
colaboradores com recursos correntes em termos de hardware. Este tipo de integrao apresenta
tambm a vantagem de o modelo global ser atualizado com alteraes nos modelos locais,
evitando a realizao de uma nova integrao com alteraes nos diferentes modelos. Na Figura
13 apresentada a integrao realizada.

Figura 13: Integrao dos diferentes modelos.

4. Explorao dos Modelos BIM

Tal como j referido, a elaborao do modelo BIM do aproveitamento hidroeltrico de Frido


no poderia comprometer a data chave da elaborao do projeto. Este fator, associado
incerteza da capacidade de se elaborar um modelo BIM de uma estrutura de elevado grau de
complexidade, como o caso de uma central hidroeltrica, com colaboradores no acostumados
metodologia e sem nenhuma ou pouca formao no software escolhido, levou a que a anlise
da viabilidade de aplicao da metodologia fosse feita paralelamente com o processo de
trabalho tradicional. Em todo caso a elaborao dos diferentes modelos deste projeto levou a
que, na verdade, muita da informao relevante existente nos modelos fosse utilizada e
aproveitada para otimizar as solues e o processo de trabalho tradicional. Apesar de muitas
das vantagens identificadas serem transversais metodologia BIM e no apenas sua aplicao
em obras hidroeltricas, apontam-se de seguida algumas das que se traduziram em significativo
aumento de rendimento do processo e que ao mesmo tempo foram tambm facilitadoras na
comunicao entre intervenientes no projeto.

4.1 Obteno de peas desenhadas


A gerao de peas desenhadas constitui um dos processos mais elementares na explorao de
um modelo BIM. Estes desenhos podem ser obtidos de forma fcil e tm a particularidade de

181
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

se manterem fiis ao modelo, com a atualizao automtica mediante alteraes do mesmo. O


facto de os tradicionais cortes e plantas bidimensionais poderem ser complementados com
perspetivas tridimensionais promove uma melhor compreenso dos desenhos e reduz o risco de
erros de interpretao. Na Figura 14 apresentado um exemplo de desenhos obtidos a partir do
modelo da central.

Figura 14: Desenhos obtidos a partir do modelo da Central.

Este ponto revelou-se como uma real vantagem e de primordial importncia no


desenvolvimento do processo de conceo do projeto. A comunicao com os intervenientes
das especialidades de engenharia de equipamentos e arquitetura foi significativamente
melhorada com a possibilidade de, rapidamente e de forma rigorosa, disponibilizar desenhos
para discusso em reunies de trabalho da equipa de projeto.

4.2 Processo de trabalho


A elaborao do modelo BIM foi tida em considerao desde a fase inicial do processo de
conceo no que respeita definio estrutural (desde nveis de desenvolvimento reduzidos).
Neste ponto de vista o modelo revelou-se de primordial importncia nos seguintes pontos:
Conceo estrutural: o modelo tridimensional forneceu uma melhor perspetiva do
empreendimento quando comparado com desenhos 2D, o que promoveu no s uma
melhor definio da estrutura como facilitou comunicao com os tcnicos de desenho;
Modelo de clculo: no que respeita ao edifcio principal da central, uma vez obtido o
modelo BIM, foi possvel exportar o seu modelo analtico para um software de clculo.
No macio de beto do poo da central e nas geometrias mais complexas onde no se
modelou com ferramentas nativas do software, no foi possvel obter um modelo
analtico diretamente do modelo BIM;
Anlise de diferentes opes: o facto de o modelo ser paramtrico permitiu testar
diferentes hipteses em intervalos de tempo curtos que se revelaram diferenciadores na
rentabilidade das reunies de trabalho da equipa de projeto;
Integrao de diferentes especialidades: ainda que as diferentes especialidades no
estejam ainda a explorar a metodologia BIM, o modelo de estruturas revelou-se
extremamente til no cruzamento de especialidades, facilitando a antecipao de
conflitos nas reunies com os diversos intervenientes.

182
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5. Concluses e Desenvolvimentos Futuros

O constante avano tecnolgico vai servindo de catalisador implementao da metodologia


BIM na indstria da Arquitetura, Engenharia e Construo, prevendo-se processos cada vez
mais automatizados, rigorosos e capazes. O trabalho desenvolvido e descrito no presente artigo
constitui o incio da implementao do novo paradigma na Direo de Engenharia de Barragens
(DEB) da EDP Produo. Este projeto piloto vai revelando o potencial da metodologia e o seu
contributo crescente para as diversas reas da indstria, nas diferentes fases de projeto. Com a
existncia de um modelo BIM, embora que apenas estrutural, foi inequvoco neste trabalho o
melhoramento da comunicao e da deteo e antecipao de conflitos entre as diferentes
especialidades intervenientes no processo. Ainda assim, tratando-se de uma fase bastante
prematura de implementao, h diferentes fatores a desenvolver. O envolvimento de um maior
nmero de especialidades potencia os benefcios obtidos com a metodologia BIM. A ttulo
exemplificativo, no caso de se possuir tambm o modelo dos equipamentos, seria possvel
detetar de forma automtica os conflitos destas componentes com as estruturas, tornando o
processo mais rigoroso. No entanto, e sob outro prisma, dado o detalhe da componente
mecnica num aproveitamento hidroeltrico, a integrao de modelos de equipamentos
complexos com a componente de civil poder conduzir a limitaes de hardware ou tornar de
difcil manuseamento os modelos globalmente integrados. Assim, entende-se que a
implementao da metodologia por parte de todos os stakeholders de um projeto hidroeltrico
um passo importante de evoluo mas que, o modo da sua interligao e comunicao, deve
ser devidamente analisado e ponderado. A progressiva mudana de processos de trabalho
implica tambm novas exigncias, devendo os cadernos de encargos dos concursos para o
fornecimento de equipamentos prever a entrega de informao em formato adequado a este
novo paradigma.

Referncias

[1] Lino, J.C., Azenha, M. and Loureno, P., "Integrao da metodologia BIM na
Engenharia de Estruturas" in Encontro Nacional BETO ESTRUTURAL (2012),
Faculdade de Engenharia da Universidade do Porto, Porto.
[2] Informed Infrastructure, Model-based Design Powers China Dam Construction.
Consultado em 11 de Maio de 2016, https://informedinfrastructure.com/4362/model-
based-design-powers-china-dam-construction/.
[3] A. Marques, "Implementao de metodologias BIM na Direo de Engenharia de
Barragens da EDP: Casos de estudo de projeto de estruturas em obras hidroeltricas"
Tese de Mestrado, Universidade do Minho, 2015.
[4] Autodesk, My first Revit Plug-In. Consultado em 10 de Maio de 2016,
http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=16777469.
[5] Autodesk, Revit API Developers Guide. Consultado em 13 de Maio de 2016,
http://help.autodesk.com/view/RVT/2016/ENU/?guid=GUID-F0A122E0-E556-4D0D-
9D0F-7E72A9315A42.
[6] Dynamo, Open Source Graphical Programming for Design. Consultado em 13 de Maio
de 2016, http://dynamobim.org/.

183
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

184
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

GUIA DE IMPLEMENTAO DA METODOLOGIA BIM

Claudio Gomes (1), Jos Carlos Lino (2), Ricardo Pereira Santos (3)

(1) BIMMS Building Information Modeling & Management Solutions, Porto


(2) BIMMS Building Information Modeling & Management Solutions, Porto
(3) ISEP Instituto Superior de Engenharia do Porto, Porto

Resumo
A adoo da metodologia Building Information Modeling (BIM) vista como um processo
transformador que engloba as empresas, os Projetos e, no global, toda a Indstria da Construo
Civil. Contudo, a sua implementao tem impactos sociais, tcnicos e metodolgicos, pelo que
h alguns anos tem sido alvo de inmeras pesquisas com o objetivo primordial de difundir as
prticas associadas ao BIM nas empresas, nos Projetos e na Indstria. Por todo o mundo, vrias
iniciativas de entidades pblicas e privadas, governamentais e no-governamentais, tm
produzido guias, normas, manuais ou outros documentos que funcionam como um motor
propulsor da implementao BIM. Torna-se pertinente o desenvolvimento de documentos
similares orientados para a indstria da Arquitetura, Engenharia, Construo e Operao
(AECO) nacional.

Em resposta a esta necessidade foi desenvolvido no contexto de uma empresa a BIMMS


(Building Information Modeling & Management Solutions) o Guia de Implementao da
Metodologia BIM em Organizaes e Projetos. Este guia de carcter generalista resultou do
estudo, compilao e adaptao de vrios documentos e artigos internacionais desde normas,
especificaes tcnicas e guias produzidos pela comunidade cientifica e pelas iniciativas de
implementao. Os seus contedos foram escritos com o objetivo de fornecer uma ferramenta
de caracter no s terico, mas tambm tcnico e prtico, que sirva de referncia para as
entidades que pretendem avanar com a implementao BIM no seu mbito organizacional
como em Projeto. Assim, o guia apresenta uma srie de procedimentos que podem ser seguidos
para que o processo de implementao BIM seja levado a cabo de uma forma organizada e
estruturada.

185
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

A metodologia BIM pode ser implementada em diferentes nveis, nomeadamente ao nvel da


Organizao como parte integrante da sua atividade, ao nvel de Projeto como um meio ou
ferramenta de atingir resultados de forma mais eficiente, rpida, competitiva e de qualidade
superior, e ao nvel da Indstria AECO como uma metodologia normalizada e universal seguida
por todas as entidades da Indstria [1]. O contedo do Guia de Implementao BIM abrange a
implementao BIM no mbito da Organizao e no mbito de Projeto. estruturado em dois
captulos principais, um que fornece um procedimento para implementar o BIM no mbito
organizacional e outro para implementar o BIM num Projeto de qualquer natureza (renovao,
construo nova, reabilitao). Esto ainda includas no guia algumas concluses e
recomendaes acerca de aspetos-chave considerados importantes para o sucesso da
implementao BIM em ambos os mbitos mencionados.

2. Implementao BIM na Organizao

A implementao da metodologia BIM na esfera organizacional algo que implica uma


profunda reestruturao na forma como esta desempenha a sua atividade, em particular nos seus
processos de trabalho, nos servios que disponibiliza, na tecnologia que utiliza. Tal implicao
deve-se ao facto que a metodologia BIM no s uma nova ferramenta, sistema ou software de
computador especifico. Mais do que isso na realidade uma nova metodologia de trabalho [2].
Assim, implementar o BIM numa empresa um processo transversal a todas as suas reas
funcionais (rea financeira, produo, recursos humanos, investigao e desenvolvimento at
mesmo marketing e vendas), e por consequncia igualmente transversal aos diferentes nveis
hierrquicos de gesto que formam uma organizao estratgico, ttico e operacional [3].

Figura 1: Influncia da Implementao BIM na estrutura organizacional, baseado em [4] e [5].

Implementar o BIM deve por isso seguir um procedimento estruturado numa sequncia de aes
de planeamento e aes de execuo, e como algo que tem um elevado impacto na

186
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Organizao deve ser planeado a um nvel estratgico pela gesto de topo e posteriormente
desenvolvido a um nvel ttico-operacional. O guia prope um procedimento constitudo por
dois tipos de planeamento, o Planeamento Estratgico e o Planeamento Detalhado e de
Execuo, que resultam em dois documentos, o Plano Estratgico e o Plano Detalhado e de
Execuo, respetivamente. Neles ficam registados todas os aspetos abordados ao longo do
planeamento da implementao. Com o Planeamento Estratgico proporcionada
Organizao a possibilidade de planear a sua estratgia global tendo em conta o BIM atravs
da determinao de metas e objetivos da sua implementao e a demarcao de uma estratgia
para os atingir. Possibilita ainda analisar a atual cultura organizacional e a sua posio no
ambiente que a rodeia e perspetivar o seu estado futuro bem como decidir at que ponto se
pretende implementar o BIM, ou seja, o nvel de integrao do BIM na Organizao.
Relativamente ao Planeamento Detalhado e de Execuo, o seu objetivo viabilizar de forma
detalhada as diretivas do Planeamento Estratgico determinando em concreto os recursos
necessrios e a eventual reestruturao da Organizao para implementar o BIM.

Figura 2: Procedimento de Implementao BIM numa Organizao, baseado em [6] e [4].

A implementao BIM no um ato isolado no tempo pelo que, tal como a figura anterior
demonstra, deve ser vista como um ciclo em que todo o planeamento envolvido revisto,
avaliado, controlado e melhorado, como parte integrante da Organizao.

187
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.1 Componentes da Implementao BIM


Implementar o BIM numa Organizao uma experincia sociotcnica que abarca uma
transformao social e tcnica. por isso um processo combinado entre implementar uma nova
tecnologia e uma nova metodologia num ambiente sociocultural que lhe serve de contexto [4].
Por estas razes so abordados 5 componentes essenciais, dependentes entre si e que formam
um mecanismo que deve ser harmonizado.

Figura 3: Componentes da Implementao BIM numa Organizao, baseado em [4].

Dentro de cada um destes componentes residem determinadas preocupaes/consideraes que


isoladamente no podem dirigir por si s a implementao BIM. Assim, o planeamento da
implementao BIM um processo integrador destes componentes e que os aborda como um
conjunto.

A interpretao da Figura 4 sugere que o perfil organizacional constitudo pela misso,


objetivos organizacionais e viso e objetivos da implementao BIM, o componente que
governa todos os restantes. Cada um destes suporta todos os outros que lhe esto acima. Em
particular, note-se que na base da pirmide encontra-se o componente Ferramentas constitudo
pelo Software e Hardware, o que refora a perspetiva de que no BIM a tecnologia apenas o
suporte de toda a metodologia e que acima de tudo se encontra a principal considerao, a
Misso Organizacional. Ou seja, o BIM deve ser visto com um novo meio, ferramenta ou
metodologia para atingir objetivos e no como um fim [8].

188
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Consideraes associadas aos Componentes de Planeamento BIM, baseado em [7].

3. Implementao BIM em Projeto

Em situao de Projeto, vrias Organizaes desempenham a sua atividade especfica para


conceber o produto final, o empreendimento. Em conjunto formam uma organizao
temporria, pelo que essencial que colaborem de forma coordenada e organizada para atingir
os objetivos da implementao BIM num Projeto. Assim, deve ser da responsabilidade de todas
as Organizaes envolvidas (e s que, entretanto, se associam ao Projeto em fases posteriores),
planear devidamente a implementao BIM em conjunto, formando assim uma Equipa de
Projeto BIM. O seu objetivo , pois, planear em que trmites o Projeto ser executado
recorrendo metodologia BIM.

O recurso metodologia BIM para a execuo de um Projeto leva centralizao de toda a


informao desenvolvida num meio partilhado. Esta uma das grandes vantagens de utilizar o
BIM, pois permite, entre outras possibilidades, a qualquer entidade envolvida no Projeto aceder
a essa informao em qualquer fase. Assim, importante que cada uma delas detenha mtodos
e procedimentos tpicos internos que definem como tencionam utilizar o BIM no seu mbito
organizacional, para suportar a implementao BIM no mbito do projeto [9].

189
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Diagrama representativo da forma como as Organizaes suportam a


implementao BIM em Projeto.

O planeamento da implementao BIM num Projeto deve ser registado num documento
denominado Plano de Execuo de Projeto em BIM, internacionalmente conhecido por BIM
Project Execution Plan (PxP) ou BIM Execution Plan (BEP) ou ainda BIM Management Plan
(BMP), variando de pas para pas. um documento formal com o objetivo de definir de que
forma o projeto ser executado, controlado e coordenado recorrendo metodologia BIM. Como
consequncia do facto de que o Plano de Execuo BIM elaborado pelas diversas entidades
intervenientes no Projeto, aquele diretamente influenciado pelo modelo de contratao
estipulado para o Projeto, j que os intervenientes se associam ao Projeto em diferentes fases
do seu ciclo de vida.

190
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Fase do empreendimento em que os intervenientes esto envolvidos, conforme o


modelo de contratao.

O guia de implementao prope que deve ser desenvolvido apenas um Plano de Execuo de
Projeto em BIM que transportado ao longo de todas as fases do Projeto e deve ser visto como
um documento vivo em constante desenvolvimento e evoluo. Um Plano de Execuo de
Projeto em BIM traz mais-valias, no s para o Projeto em si mas tambm para os
intervenientes, na medida em que: i) todos os intervenientes so capazes de entender atravs
dele os objetivos estratgicos de implementar o BIM no Projeto; ii) entender qual o papel que
cada interveniente desempenha no Projeto e qual a sua responsabilidade que detm em criar,
manter e partilhar os modelos BIM e a informao, em cada fase do Projeto; iii) conceber ou
adaptar os seus mtodos e procedimentos tpicos (no seu mbito organizacional)
implementao BIM no Projeto; iv) prever recursos e servios adicionais eventualmente
necessrios; v) estabelecer um planeamento base a partir do qual possvel medir o progresso
da implementao no Projeto.

3.1 Procedimento de Implementao BIM num Projeto


O procedimento de implementao sugerido pelo guia compreende uma sequncia estruturada
em quatro etapas. Comea pela especificao dos objetivos da implementao BIM no Projeto
a par dos Usos BIM, passando pelo desenvolvimento do processo de execuo do Projeto em
BIM e atravs do qual so previstas, identificadas e caracterizadas as trocas de informao entre
os intervenientes, e culmina com o planeamento da metodologia colaborativa a implementar,
com a determinao dos requisitos de infraestrutura tecnolgica e com a definio do sistema
de controlo da qualidade dos modelos e da informao.

191
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Procedimento de implementao BIM em Projeto, baseado em [8].

4. Recomendaes e Fatores Crticos de Sucesso

No mbito organizacional a probabilidade de sucesso da implementao BIM positivamente


influenciada se existir experincia na Organizao em saber gerir a resistncia comportamental.
Para tal, importante envolver toda a Organizao de forma proativa no processo de
implementao, atribuindo tarefas e objetivos realistas e atingveis a curto prazo aos seus
colaboradores. tambm importante ter conscincia que cada Organizao tem a sua
identidade, pelo que o processo de implementao deve ser adaptado a cada caso. Para alm
disto, a comunicao interna acerca do que o BIM, quais os seus benefcios, quais as razes
da sua adoo na Organizao algo essencial para o sucesso [4].

Em Projeto podem ser enumerados fatores crticos de sucesso que passam pelo envolvimento
ativo de todos os intervenientes (incluindo o cliente) no planeamento da execuo do Projeto
em BIM e na compilao do Plano de Execuo do Projeto em BIM, despender o tempo
necessrio para este planeamento, consultar e atualizar o plano medida que o projeto evolu,
ter algum que detenha capacidades adequadas para defender a implementao BIM no Projeto
[9].

5. Concluses e desenvolvimentos futuros

Todo o processo de estudo e compilao dos documentos BIM atualmente existentes e que
serviram de base ao Guia de Implementao BIM em Organizaes e Projetos permitiu

192
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

chegar a algumas concluses que sublinham a pertinncia no desenvolvimento deste tipo de


documentos, tais como: i) as iniciativas de implementao BIM so um importante motor de
difuso do BIM na indstria da construo civil e necessitam no s do apoio governamental,
mas tambm das diversas associaes profissionais e mesmo das prprias empresas da
indstria; ii) atualmente j existe uma panplia bastante extensa de documentos de carcter
legal e normativa noutros pases que abordam diferentes aspetos da metodologia BIM, o que
indica que a metodologia BIM est de facto a tornar-se prtica comum e obrigatria.

Este guia pretende ser uma base ao desenvolvimento de novas pesquisas e estudos. Assim,
como desenvolvimentos futuros proceder-se- sua aplicao prtica em casos reais com o
objetivo de criar casos de estudo que sustentem o seu contedo, para numa fase posterior
public-lo. Ambiciona-se tambm que sejam criados documentos similares que abordem
aspetos especficos da implementao BIM, nomeadamente especificaes que contenham
regras e metodologias de modelao gerais e especificas a cada disciplina. Por fim, a criao
de uma plataforma informtica que sirva de apoio gesto da implementao BIM no mbito
organizacional e no mbito de Projeto.

Referncias

[1] Y. Jung, Building Information Modeling (BIM) Framework for Practical


Implementation, Automation in Construciton, 2010.
[2] C. Eastman, P. Teicholz, R. Sacks and K. Liston, BIM Handbook, 2011.
[3] O. A. Olantunji, Modeling Organizations' Structural Adjustment to BIM Adoption: A
Pilot Study on Estimating Organizations, Journal of Information Technology in
Construction, 2010.
[4] Computer Integrated Construction Research Program, BIM Planning Guide for Facility
Owners. Version 2.0, The Pennsylvania State University, 2013.
[5] C. A. M. Pinto, J. A. M. S. Rodrigues, L. T. Melo, M. A. D. Moreira and R. B. Rodrigues,
Fundamentos de Gesto, 2006.
[6] NATSPEC, Information classification systems and the Australian construction
industry, 2008.
[7] NATSPEC, NATSPEC BIM Paper 001 - BIM and LOD, Building Information
Modelling and Level of Development, 2013.
[8] B. E. Caires, BIM as a tool to support the collaborative project between the structural
engineer and the architect : BIM execution plan, education and promotional initiatives,
2013.
[9] Computer Integrated Construction Research Program, BIM Project Execution Planning
Guide - Version 2.1, The Pennsylvania State University, 2011.

193
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

194
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO BIM NOS PROJETOS DE ENSINO DO


DEPARTAMENTO DE ENGENHARIA CIVIL DA UMINHO
Miguel Azenha (1), Jos Carlos Lino (1), Joo Pedro Couto (2)

(1) ISISE, Departamento de Engenharia Civil da Universidade do Minho, Guimares


(2) C-TAC, Departamento de Engenharia Civil da Universidade do Minho, Guimares

Resumo
O artigo pretende comunicar a estratgia de implementao de BIM nos vrios projetos de
ensino do Departamento de Engenharia Civil da Universidade do Minho, particularmente no
Mestrado Integrado em Engenharia Civil, no Mestrado em Construo e Reabilitao
Sustentveis e no International Master in Sustainable Built Environment.

Mais do que fazer um estado da arte sobre a implementao BIM em contexto acadmico,
pretende dar-se um testemunho de um processo que est em desenvolvimento j desde o ano
letivo 2012/2013 e que tem vindo paulatinamente a ser consolidado. Ser possvel ilustrar a
evoluo da qualidade e profundidade que os alunos tm atingido em anos consecutivos, que
se deve ao progresso da equipa docente, ao apoio de alunos de anos anteriores e tambm a
melhorias ao nvel das prprias aplicaes informticas.

1. Introduo

Tendo em conta o cariz deste congresso, bem como o conhecimento sobre a temtica BIM por
parte dos leitores, considera-se desnecessrio efetuar um enquadramento das razes bem
conhecidas pelas quais fundamental que as temticas BIM venham a ser versadas nos projetos
de ensino das Universidades. Esse enquadramento convenientemente feito nos trabalhos de
Barison e Santos [1-3] que tm encetado investigao especfica na anlise de iniciativas a nvel
internacional, bem como nas competncias BIM que devem ser transmitidas no contexto da
formao de Engenheiros.

Em estudos realizados com envolvimento da Universidade do Minho, j foram efetuadas


discusses sobre a possibilidade do recurso a ferramentas BIM no apoio transmisso de
conhecimento [4-5]. At presente data, apenas se encontrou um outro artigo cientfico

195
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

nacional relacionado com a implementao BIM no ensino de Engenharia e Arquitetura [6],


relacionado com a iniciativa Frum Acadmico BIM promovida no Instituto Superior
Tcnico e com um conjunto de reflexes resultantes dessa discusso. No entanto, no esto
ainda reportadas iniciativas concretas j implementadas. no entanto do conhecimento dos
autores que, em Portugal, j vrias escolas de ensino superior e politcnico em Engenharia e
Arquitetura, tm adotado iniciativas de divulgao do BIM pela comunidade estudantil,
algumas mais integradas pelo quadro pedaggico oficial enquanto outras mais livres ou
espordicas.

Tendo em conta a existncia de iniciativas relacionadas com o ensino BIM na Universidade do


Minho j desde 2010, bem como a existncia de Unidades Curriculares especficas desde o ano
letivo 2012/2013, o presente artigo pretende comunicar o historial da implementao BIM nos
projetos de ensino no Departamento de Engenharia Civil da Universidade do Minho
(DEC/UM). O artigo est organizado em quatro seces principais para alm da presente
introduo, compreendendo a descrio cronolgica da implementao BIM nos projetos de
ensino do DEC/UM, a descrio da Unidade Curricular BIM do 4 ano do Mestrado Integrado
em Engenharia Civil DEC/UM (MIEC), as iniciativas de disseminao BIM efetuadas
(seminrios e redes sociais) e finalmente um conjunto de ilaes e concluses tiradas
relativamente a este artigo.

2. Descrio cronolgica da implementao BIM nos projetos de ensino DEC/UM

Desde o incio do contacto dos autores deste trabalho com as metodologias BIM, foi
percecionado que seria importante tirar partido destas metodologias e mesmo ensin-las nos
projetos de ensino do DEC/UM. J desde o ano letivo 2010/2011 foram includos alguns
modelos BIM no ensino da Unidade Curricular de Estruturas de Beto I, como por exemplo
uma viga contnua de beto armado que objeto de anlise e dimensionamento, tornada
disponvel aos alunos em formato BIM (TeklaBIMSight) para apoio compreenso da
distribuio e dispensa de armaduras ver Figura 1 [4].

Figura 1: Modelo de viga de beto armado para apoio ao ensino em Estruturas de Beto I

Apesar de pequenas iniciativas avulsas no mbito das Unidades Curriculares em que os autores
deste artigo se encontravam envolvidos, o impacto do BIM nos processos de ensino era ainda
muito reduzido. Constatou-se desde bem cedo que seria estratgica a criao de Unidades

196
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Curriculares (UC) exclusivamente dedicadas a BIM nos projetos de ensino do DEC/UM, pois
permitira sensibilizar alunos e colegas de forma muito mais rpida para a premncia, relevncia
e complexidade desta temtica. Por essa razo, foram encetados esforos junto das direes dos
vrios projetos de ensino do DEC/UM para criao de nova UC. No entanto, este processo foi
difcil, por se tratarem de projetos de ensino j estabilizados, e sem espaos vazios para
preencher com um contedo que, invariavelmente, se substituiria a um outro contedo
anteriormente contemplado e j consolidado na estrutura desses projetos de ensino. No entanto,
a insistncia continuada na proposta de novas unidades curriculares BIM acabou por surtir
efeito a partir do ano letivo 2012/2013, seguindo o percurso cronolgico indicado nas 4 seces
seguintes. A descrio de contedos programticos ser feita no captulo 4 deste artigo,
relativamente edio mais recente de Unidade Curricular BIM no mbito do Mestrado
Integrado em Engenharia Civil da UMinho.

2.1 Ano letivo 2012/2013


No ano letivo 2012/2013, a direo do Mestrado em Construo e Reabilitao Sustentveis
(MCRS) convidou os autores deste artigo a propor um programa de Unidade Curricular a
apresentar aos alunos no mbito das disciplinas optativas do curso, durante o segundo semestre
letivo do mesmo (1 ano). Foi ento proposta uma UC denominada Building Information
Modeling (BIM): conceo, projeto e construo, com 45 horas de contacto e avaliao por
trabalho prtico. A disciplina opcional foi selecionada por 12 alunos, pelo que foi garantido o
seu funcionamento. O corpo docente contou com os autores deste artigo, bem como um
conjunto de colegas de outras instituies que gentilmente aceitaram o convite para partilhar as
suas experincias BIM em contexto acadmico e profissional.

2.2 Ano letivo 2013/2014


Apesar do sucesso da Unidade Curricular BIM do ano letivo anterior, no houve repetio da
mesma no ano 2013/2014 pelo facto de no ter havido edio de MCRS nesse mesmo ano
letivo. A direo do MCRS investiu num projeto semelhante em lngua inglesa, denominado
iMiSBE International Master in Sustainable Built Environment. Uma vez que no foi possvel
introduzir novas unidades curriculares optativas no iMiSBE, e tendo em conta que o
correspondente plano curricular j estava estabilizado h algum tempo, no foi possvel a
incluso de UC exclusivamente dedicada a BIM. Foi, no entanto, possvel incluir uma relevante
parcela na UC Integrated Design Process (2 semestre, sob responsabilidade do Prof. Cardoso
Teixeira). Com efeito, 30 das 45 horas de contacto da Unidade Curricular puderam ser
dedicadas a contedos BIM. A UC contou com 23 alunos, e a sua avaliao final foi efetuada
por teste escrito.

Foi tambm durante o ano letivo 2013/2014 que se iniciou o CursoBIM na Ordem dos
Engenheiros. O Curso baseou-se na experincia de ensino BIM tida no ano letivo anterior,
efetuando-se num esforo de equipa envolvendo formadores de vrias instituies acadmicas
e empresas, com coordenao da Universidade do Minho. Este curso tinha durao de 80 horas,
e realizou-se de forma praticamente simultnea no Porto e em Lisboa (uma semana de
desfasamento), nas respetivas sedes regionais da Ordem dos Engenheiros. Apesar deste Curso
no se enquadrar nos projetos de ensino do DEC/UM, entendeu-se ser relevante a sua referncia
neste artigo dada a inter-relao que teve com a crescente experincia docente da equipa UM
no contexto BIM.

197
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.3 Ano letivo 2014/2015


Tendo em conta as iniciativas de ensino BIM tidas nos anos letivos anteriores, bem como a
insistente proposta de UC no mbito BIM para o MIEC, foi aceite pela Direo do Curso MIEC
que no ano letivo 2014/2015 fosse criada uma UC opcional no 4 ano com a denominao:
BIM na Engenharia Civil: Projeto e Construo. A UC cingiu-se a uma turma de 30 alunos,
tendo em conta o cariz de avaliao contnua da mesma, bem como a forte necessidade de
acompanhamento por parte dos docentes. A unidade curricular foi disponibilizada para escolha
por parte dos alunos, no havendo partida garantia do seu funcionamento, que seria
naturalmente condicional ao nmero de alunos interessados na Unidade Curricular. O grande
interesse por parte dos alunos por parte das temticas BIM levou a que esta UC fosse
selecionada, com 1 turma de 30 alunos a funcionar em pleno. Considera-se que este foi um
importante marco no ensino BIM em contexto de Engenharia Civil em Portugal, uma vez que
foi a primeira implementao de uma Unidade Curricular exclusivamente dedicada a esta
temtica num curso de Mestrado Integrado em Engenharia Civil no Pas. O programa e
contedos veiculados basearam-se nos materiais j desenvolvidos para as iniciativas
anteriormente encetadas. O processo de avaliao foi baseado em dois trabalhos entregues pelos
alunos, agrupados em grupos de 5: (i) um primeiro trabalho subordinado descrio detalhada
de uma regulamentao BIM especfica; (ii) um segundo trabalho relacionado com um projeto
BIM realizado a partir de peas desenhadas e escritas de um projeto existente realizado atravs
de metodologias tradicionais. A descrio detalhada desta UC ser feita na seco 4 deste artigo.

A UC Integrated Design Process do iMiSBE voltou a realizar-se em 2014/2015 nos mesmos


moldes do ano letivo anterior.

Assinala-se tambm a realizao de edio especial do MCRS realizada de forma deslocalizada


no Instituto Superior Tcnico Militar (ISTM) em Luanda, Angola. Nesse mbito, o primeiro
autor deste artigo deslocou-se em fevereiro de 2015 ao ISTM para lecionar UC denominada
Seminrio BIM, com contedos semelhantes UC do MCRS j lecionada em Portugal no ano
letivo 2012/2013. Esta formao contou com 20 alunos que foram avaliados com recurso a teste
escrito.

Assinala-se tambm a realizao da 2 Edio do CursoBIM na Ordem dos Engenheiros entre


outubro e dezembro de 2014 (com 25 formandos no Porto e 25 formandos em Lisboa).

2.4 Ano letivo 2015/2016


Neste ano letivo, voltou a decorrer a UC opcional BIM na Engenharia Civil do MIEC, tendo
novamente atingido a plena ocupao com 30 alunos. Neste ano letivo houve evoluo ao nvel
dos contedos que passaram a incluir aula especfica sobre Regulamentao BIM,
Programao em contexto BIM e Implementao BIM. Foram tambm introduzidas
inovaes ao nvel da avaliao trabalhos prticos realizados pelos alunos, sendo que a primeira
etapa consistiu na redao de um plano de execuo BIM (BEP BIM Execution Plan), e a
segunda etapa no projeto BIM completo em consonncia com o BEP inicialmente realizado.
Voltou tambm a decorrer a edio do MCRS na UMinho, tendo sido a UC-BIM sido encetada
em linhas semelhantes quelas que foram descritas no contexto do ano letivo 2012/2013, i.e.,
com avaliao por teste escrito.

198
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Neste ano letivo foi tambm realizada a 3 edio do Curso BIM (Porto e Lisboa com total de
50 formandos). Nesta edio, que decorreu entre setembro e dezembro de 2015, foram
introduzidas vrias alteraes relevantes das quais se destacam: (i) realizao de perodos
expositivos especficos para demonstrao da aplicao de conceitos BIM com software
comercial; (ii) registo de vdeos formativos de contedos veiculados nas formaes
(particularmente sobre software), permitindo acompanhamento e repetio por parte dos
formandos fora dos perodos de contacto. Estas duas alteraes principais decorreram de
sugestes efetuadas nos inquritos de satisfao realizados nas edies anteriores do
CursoBIM, que apontaram de forma consistente nesse sentido.

3. A Unidade Curricular BIM na Engenharia Civil do MIEC

O processo de ensino BIM no DEC-UM foi evoluindo ao longo dos 4 anos letivos reportados
neste artigo. Naturalmente foram sendo introduzidos melhoramentos e contedos que
conduziram forma atual de ensinar. Pode considerar-se que a UC-BIM do MIEC ministrada
em 2015/2016 repercute a quase totalidade das evolues mencionadas, pelo que se optou pela
criao de uma seco independente neste artigo para a sua descrio detalhada.

3.1 Funcionamento e sistema de ensino/avaliao


As aulas desta UC decorreram sexta-feira, com um perodo da manh entre as 9h e 12h para
exposio de conceitos por parte dos docentes, e um perodo da tarde, entre as 13h e as 15h,
para elaborao do trabalho prtico por parte dos alunos. As aulas do perodo da manh eram
normalmente asseguradas por docente da UC, ou por convidado externo, conforme o calendrio
que ser explanado na seco 3.2. No que diz respeito ao perodo da tarde, o ensino adotou
formato tutorial, com acompanhamento por parte dos docentes e de um grupo de cerca de 10
ex-alunos da UC do ano letivo anterior que se voluntariou para dar apoio UC. A presena de
ex-alunos permitiu acelerar bastante a curva de aprendizagem inicial do software, que costuma
ser uma relevante barreira no contexto da aprendizagem BIM. Para alm disso, o registo
informal de interao entre colegas de curso, que inclusive teve lugar fora dos horrios letivos,
facilitou bastante a interao.

Dada a inexistncia de sala especfica no DEC-UM com computadores para formao BIM,
optou-se por solicitar aos alunos que usassem os respetivos computadores pessoais para
realizao dos trabalhos durante as aulas (e fora delas). As aulas decorreram numa sala de aulas
normal, equipada com projetor multimdia, quadro branco e lugares sentados para ~35 pessoas.
Adicionalmente ao material disponvel na sala, foi feito um esforo por parte de docentes e
alunos em garantir a existncia de extenses eltricas para permitir que todos os computadores
pessoais pudessem estar ligados corrente eltrica durante as aulas. Com efeito, as aplicaes
BIM podem ser extremamente exigentes sobre os computadores, reduzindo drasticamente a
autonomia a perodos inferiores s 2h de aula prtica. O arranjo da sala sofria evolues durante
o dia de aulas: enquanto que de manh se mantinha a localizao de mesas e cadeiras tpica de
uma sala de aulas, com orientao para o docente, durante a tarde era efetuado um rearranjo de
mesas/cadeiras para criar clulas individuais correspondentes aos grupos de trabalho.

199
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A avaliao dos alunos foi feita exclusivamente com base nos trabalhos prticos, com os alunos
separados em grupos de 5 e envolvendo duas entregas: (a) entrega 1 durante a primeira semana
de abril, subordinada elaborao de Plano de Execuo BIM; (b) entrega 2 no final do
semestre, respeitante ao relatrio final do projeto BIM realizado. Ambas as entregas
compreenderam um relatrio escrito e uma apresentao oral. Foi dada uma ponderao de 35%
entrega 1 e de 65% entrega 2. Foi tambm tida em conta a assiduidade e o desempenho
especfico de cada aluno no seio do seu grupo para efeitos de avaliao final da Unidade
Curricular.

A comunicao entre docentes, alunos e monitores foi garantida de forma facilitada pela
plataforma GLIP.COM, que gratuita e permite troca de mensagens e ficheiros de forma
instantnea em grupos pr-definidos. tambm possvel a instalao de app nos telemveis,
garantindo ainda mais disponibilidade de leitura/resposta. Para alm do grupo global que
envolvia todos os docentes/alunos/monitores, foi dada a sugesto dos alunos criarem grupos
independentes relativos aos grupos de trabalho ou at interesses especficos (como linguagens
de programao). A experincia de interao foi bastante positiva e ir ser mantida no ano letivo
2016/2017.

A partilha de ficheiros com os alunos foi feita atravs da plataforma DROPBOX, dada a grande
dimenso e nmero de ficheiros. Para os docentes o processo foi extremamente simples e
transparente, no tendo sido identificado nenhum problema por parte dos alunos relativamente
a esta modalidade de partilha.

3.2 Programa e planificao letiva


A UC decorreu durante 15 semanas praticamente consecutivas, apenas interrompidas pelo
perodo de frias da Pscoa e pela semana acadmica. O planeamento das aulas tericas e
prticas pode ser observado na Tabela 1, na qual os docentes responsveis pelas aulas tericas
se encontram identificados entre parntesis. Em termos de contedos programticos veiculados
nas aulas tericas, iniciou-se com os fundamentos relacionados com as definies genricas,
seguidas de conceitos detalhados sobre modelao paramtrica e interoperabilidade. Na quarta
semana foi dado nfase a planos de execuo e aplicao BIM, em consonncia com os
objetivos da primeira avaliao do trabalho prtico. Seguidamente, os contedos nas aulas
tericas seguiram a lgica das especialidades envolvidas em obras de construo civil:
arquitetura, estruturas e instalaes. J nas semanas 11-13 foram abordados aspetos
relacionados com o BIM na construo (incluindo 4D e 5D) e na gesto de
operaes/manuteno (BIM-FM). A semana final de formao incidiu sobre a implementao
BIM em perspetiva estratgica e organizacional.

200
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Planeamento de aulas tericas e prticas.


Semana Aula Terica (9h-12h) Aula prtica (13h-15h)
1 Introduo ao BIM (Miguel Azenha) -
2 Modelao paramtrica (Miguel Azenha) Trabalho prtico
3 Interoperabilidade (Miguel Azenha) Trabalho prtico
4 Planos de execuo e aplicao BIM (Bruno Caires) Trabalho prtico
5 BIM na Arquitetura (Vanessa Tavares) Trabalho prtico
6 BIM na Arquitetura (Nuno Lacerda) Trabalho prtico
- Pscoa Pscoa
7 Apresentao dos trabalhos TP1 Apresentao dos trabalhos TP1
8 BIM na Eng. Estruturas (Jos Carlos Lino) Trabalho prtico
9 BIM nas instalaes hidrulicas e eltricas (Francisco Reis) Trabalho prtico
10 Programao em contexto BIM (Carlos Gomes e Lus Bidarra) Trabalho prtico
11 BIM na Construo (Joo Pedro Couto) Trabalho prtico
12 BIM na Construo (Jos Antnio Ribeiro) Trabalho prtico
- Semana Acadmica Semana Acadmica
13 BIM-FM (Joo Poas Martins) Trabalho prtico
14 Implementao BIM (Antnio Aguiar Costa) Trabalho prtico
15 Apresentao dos Trabalhos TP2 Apresentao dos Trabalhos TP2

3.3 O trabalho prtico


Nesta seco ser dada nfase apenas ao trabalho prtico final da UC uma vez que, a primeira
entrega (do plano de execuo), corresponde na realidade a uma fase parcelar dos trabalhos
conducentes ao projeto BIM final.

Pretendeu-se com o trabalho prtico permitir aos alunos ter experincia direta na produo de
modelos BIM e, principalmente, na extrao de informao relevante dos mesmos.
Naturalmente, uma das importantes componentes do trabalho relacionou-se com a
aprendizagem do software, bem como a resposta aos desafios de interoperabilidade intrnsecos
aos processos BIM.

Os alunos foram desafiados a fazer o estudo completo em BIM de uma construo sorteada
aquando do arranque do trabalho. Este trabalho deveria envolver, potencialmente, as valncias
de Arquitetura, Estruturas, AVAC, Redes de guas, Oramentao e Faseamento Construtivo,
entre outras. Como material de base foram dados os processos completos de peas escritas
(PDF) e desenhadas (DWG) de 6 casos de estudo: 4 edifcios habitacionais em Guimares; um
Hotel em Lisboa; o novo edifcio do Instituto de Cincia e Inovao para a Bio-sustentabilidade
(IB-S) localizado no Campus de Azurm da UMinho, em Guimares.

Foram criados grupos de cinco alunos, encorajados desde o incio a definir claramente o papel
que cada um iria assumir no processo BIM, com a seguinte recomendao de papis:
coordenao BIM; arquitetura; engenharia de estruturas; engenharia de redes hidrulicas;
gesto da construo. Foi estabelecido um conjunto de objetivos recomendveis no contexto de
cada componente do modelo BIM e explanado no enunciado do trabalho. Alm disso, foram
estabelecidos os seguintes critrios de avaliao partida: (i) integrao e trabalho colaborativo;
(ii) abrangncia (integrao de vrias especialidades); (iii) utilizao de objetos e modelao

201
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

paramtrica na criao dos modelos; (iv) interoperabilidade (p.ex. IFC); (v) explorao de
visualizao avanada dos modelos; (vi) qualidade do relatrio; (vii) apresentao final
(incluindo respeito pelas regras/tempos).

Em termos de licenas de software, os processos a seguir so relativamente simples, uma vez


que a maior parte dos produtores permitem automaticamente o uso gratuito para fins de ensino,
bastando o simples registo do endereo de e-mail institucional dos alunos. Em alguns casos,
necessria a interveno dos docentes para que seja disponibilizada verso acadmica do
software. Regista-se que no ocorreu nenhum caso de rejeio de licena acadmica gratuita, o
que bastante positivo do ponto de vista da formao dos alunos.

Ainda relativamente ao software, indica-se que no ano letivo 2015/2016 se efetuou uma nova
experincia: tornar o uso de determinados softwares obrigatrio para determinadas
especialidades. Para o efeito, imediatamente aps o sorteio dos trabalhos a realizar, os alunos
foram informados de que teriam que usar um software especfico para cada especialidade. Esta
iniciativa foi tomada devido tendncia observada em formaes anteriores de os alunos
tendencialmente usarem apenas solues da Autodesk (lder de mercado em grande parte dos
segmentos BIM), em detrimento de se aventurarem em processos de aprendizagem de
plataformas alternativas, bem como de arriscar interoperabilidade entre plataformas distintas.
Esta prtica revelou-se interessante, mas dever ser aplicada com adaptaes no futuro, em face
das curvas de aprendizagem especialmente lentas de alguns softwares que disponibilizam
menos recursos de aprendizagem.

Apesar da entrega do trabalho estar marcada para o incio de junho, quer no ano letivo
2014/2015, quer no ano letivo 2015/2016, os alunos solicitaram adiamento da entrega do
trabalho e respetiva apresentao para o ms de julho, permitindo-lhes realizar trabalho
adicional durante a poca de exames e mesmo aps a mesma.

Da realizao dos trabalhos prticos tm resultado relatrios, apresentaes e vdeos de grande


maturidade, tendo em conta que se tratam de alunos do 4 ano. Com efeito, durante o semestre
sente-se o crescendo de conhecimento BIM por parte dos alunos, em face dos desafios prticos
que sentem. Por outro lado, interessante verificar que a UC-BIM tem servido para ensinar
bastante aos alunos sobre projeto de arquitetura/engenharia, na medida em que a primeira vez
no seu curso que tm acesso aos projetos completos de um edifcio. Uma parte interessante da
aprendizagem que se obtm , de facto, a capacidade de interpretar e compreender projetos,
reconstruindo-os na 3 dimenso (e outras) atravs do modelo BIM.

A ttulo exemplificativo de alguns resultados obtidos pelos alunos, mostram-se na Figura 2


algumas imagens finais de trabalhos desenvolvidos.

202
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Algumas imagens exemplificativas do resultado final dos trabalhos dos alunos da
UC-BIM no ano letivo 2015/2016.

4. Iniciativas de disseminao em contexto acadmico

No presente captulo so explanadas as vrias iniciativas tomadas no contexto do BIM para


disseminao desta relevante temtica, bem como de trabalhos realizados no contexto do
Departamento de Engenharia Civil da Universidade do Minho. O captulo separa-se em 3 partes
principais: (i) seminrios; (ii) a iniciativa BIMCLUB; (iii) canal YouTube e pgina Facebook
relativos a BIM no Departamento de Engenharia da Universidade do Minho.

4.1 Seminrios
Desde o primeiro seminrio realizado em 12/12/2012, ilustrado na Figura 3a, tentou-se realizar
sempre um seminrio por ano, at presente data: em 2013, 2014, 2015 e 2016. exceo da
primeira iniciativa de 2012, que foi claramente dirigida ao conjunto da comunidade acadmica
e comunidade profissional da regio, os seminrios dos anos subsequentes foram
essencialmente direcionados para a comunidade acadmica, particularmente aos alunos do
curso de Mestrado Integrado em Engenharia Civil. Nestas atividades de disseminao tentou-
se sempre manter uma componente formativa de demonstrao de aplicao prtica de BIM em
exemplos concretos, mas tambm com convidados externos para apresentao de testemunhos
de aplicao BIM em contexto profissional. Tem-se tambm utilizado estes seminrios para
disseminao do progresso de trabalhos de dissertao de Mestrado em curso, com
oportunidade de discusso entre colegas, e funcionando como agente motivador para futuros
alunos da UC-BIM e de realizao de dissertaes de mestrado neste contexto.

4.2 A iniciativa BIMCLUB www.bimclub.pt


No mbito do evento de 12/12/2012, foi proposta a criao de uma plataforma comum no meio
acadmico nacional, denominada BIMCLUB. O BIMCLUB uma iniciativa com gnese no
meio acadmico, tendo em vista o estabelecimento de uma plataforma virtual de discusso
informal e promoo de iniciativas relacionadas com a implementao e divulgao do BIM,
particularmente dirigido a estudantes e docentes. A iniciativa suportada numa pgina WEB
(www.bimclub.pt), contando com a associao de 9 instituies acadmicas e de investigao
data da escrita do presente artigo. Pretende ser uma forma agregadora das iniciativas encetadas
pelas vrias instituies, que podem obter sinergia direta atravs desta iniciativa comum.

203
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Numa comprovao cabal das suas caratersticas muito centradas na comunidade dos alunos
(servindo os docentes apenas como tutores e polos de ligao instituio universitria, por
uma questo mais de mera logstica de sites e espaos a utilizar do que propriamente de
envolvimento pedaggico/acadmico) e numa verdadeira estratgia de implementao
bottom-up, foi com grata satisfao que os autores se aperceberam da proliferao desta
iniciativa de um modo totalmente autnomo, para outras comunidades estudantis,
inclusivamente para Espanha (http://www.bimclub.es/).

4.3 Canal YouTube e pgina Facebook


Tendo como objetivo alargar o processo de disseminao das iniciativas BIM no Departamento
de Engenharia Civil da Escola de Engenharia da Universidade do Minho, foram criadas pginas
especficas no Facebook e no YouTube para o efeito, denominadas BIM no Departamento de
Engenharia Civil da Universidade do Minho. No canal YouTube, que conta j com um total
de 8 vdeos pblicos, so colocados vdeos alusivos a trabalhos de Mestrado em Curso, bem
como vdeos resultantes dos trabalhos realizados no mbito da Unidade Curricular do 4 ano do
MIEC. Na pgina do Facebook tm sido disseminados todos os eventos em que o DEC/UM
tem estado envolvido, bem como as atualizaes ao canal YouTube. Refira-se que o potencial
de disseminao se tem revelado bastante eficaz uma vez que, presente data, a pgina de
Facebook conta j com mais de 2500 seguidores.

5. Concluses

No presente artigo foi passado um testemunho sobre os processos de disseminao e


implementao BIM no contexto do Departamento de Engenharia Civil da Escola de
Engenharia da Universidade do Minho. O artigo compreendeu a descrio cronolgica da
implementao BIM em unidades curriculares especficas dos projetos de ensino do
departamento, bem como uma discusso sobre a estrutura e funcionamento da Unidade
Curricular BIM na Engenharia Civil do 4 ano do Mestrado Integrado em Engenharia Civil
da Universidade do Minho. Finalmente foram apresentadas as vrias iniciativas de
disseminao BIM do DEC-UM, compreendendo seminrios, o BIMCLUB e os canais
YouTube e Facebook.

A experincia de ensino BIM no decurso dos ltimos 4 anos letivos tem-se revelado bastante
produtiva, tendo-se confirmado a viabilidade de recurso aprendizagem baseada em projeto
(project based learning) com que se tem realizado o ensino/avaliao no mbito da unidade
curricular do 4 ano do MIEC. Esta unidade curricular, pioneira a nvel nacional no contexto
dos cursos de Mestrado Integrado em Engenharia Civil, tem tido um acolhimento bastante
positivo por parte dos alunos, e encontra-se em constante atualizao face evoluo das
regulamentaes potencialmente aplicveis, bem como pela evoluo do software de suporte.
Acredita-se que o caminho trilhado conduziu os autores a uma perceo melhorada das formas
de ensinar BIM e que este testemunho se poder revelar til para garantir que outros projetos
de ensino de outras Escolas/Faculdades de Engenharia Civil e Arquitectura possam
implementar de forma facilitada o ensino do BIM.

204
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Agradecimentos

O trabalho aqui apresentado resultou em muitos aspetos de trabalho de equipa bastante alargado
com alunos, ex-alunos e colegas de outras instituies e/ou empresas. Apesar de ser difcil
sermos justos para todos os envolvidos, destaca-se a colaborao dos ex-alunos Bruno Caires,
Carlos Gomes, Alexandre Marques, Lus Bidarra e Bruno Ribeiro. tambm de assinalar a
uma palavra de agradecimento aos formadores que apoiam a UC BIM do MIEC, com referncia
especial aos que participaram nos ltimos 2 anos letivos: Joo Poas Martins, Antnio Aguiar
Costa, Carlos Nuno Lacerda, Francisco Reis, Vanessa Tavares e Jos Antnio Ribeiro.

Referncias

[1] MB Barison e ET Santos, "A tool for assisting teachers in planning BIM courses".
Computing in Civil and Building Engineering - Proceedings of the 2014 International
Conference on Computing in Civil and Building Engineering. pp. 2159-2166, 2014.
[2] MB Barison e ET Santos, " The competencies of BIM specialists: A comparative analysis
of the literature review and job Ad descriptions ". Congress on Computing in Civil
Engineering, Proceedings pp. 594-602, 2011.
[3] MB Barison e ET Santos, "BIM teaching strategies: an overview of the current
approaches" in Proc. of the International Conference on Computing in Civil and Building
Engineering, Nottingham, 2010.
[4] H Fontes, M Azenha e R Sanches, "Potencialidades de aplicao de ferramentas
Building Information Modelling, Encontro Nacional Beto Estrutural 2010 Lisboa,
2010.
[5] JC Lino, M Azenha e PB Loureno, "Integrao da metodologia BIM na Engenharia de
Estruturas, Encontro Nacional Beto Estrutural 2012 Porto, 2012.
[6] F Bastos, A Aguiar Costa, "Building Information Modeling. O Ensino do BIM em
Portugal, Construo Magazine, n69, 2015.

205
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

206
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Parte II
BIM em projeto de arquitetura e engenharia

207
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

208
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O BIM APLICADO A ESTAES DE METRO

Lus Ribeirinho (1), Andr Monteiro (2), Miguel Conceio (1)

(1) CENOR Consultores, S.A., Lisboa


(2) bimTEC, Porto

Resumo
No presente artigo expe-se de que forma as metodologias e processos BIM podem contribuir
para a comunicao do faseamento executivo no projeto de grandes escavaes, nomeadamente
de escavaes a cu aberto com recurso a cortinas flexveis. De seguida apresentado um caso
prtico de aplicao do processo BIM a uma estao de metro com cerca de 6700 m2 de rea de
implantao e 28 m de profundidade. Esta estao foi desenvolvida recorrendo a ambas as
metodologias, CAD e BIM, permitindo, por isso, comparar resultados. Indicam-se ainda as
principais dificuldades encontradas na abordagem BIM, explicando como foram ultrapassadas
e dando exemplos concretos de procedimentos que se desenvolveram para dar resposta,
designadamente, modelao da escavao. Por fim, apresenta-se uma outra estao de metro,
desenvolvida apenas em BIM, o que suscitou medidas adicionais de organizao, e onde se
introduziu o modelo geolgico.

1. Introduo

O presente artigo refere-se aplicao do processo Building Information Modelling (BIM) [1]
a grandes escavaes, explorando as vantagens gerais e particulares do mesmo neste tipo de
obras.

A construo de estruturas subterrneas tem vindo a conhecer um assinalvel desenvolvimento


a nvel mundial. Este desenvolvimento tem sido particularmente importante nas reas
metropolitanas, onde as elevadas taxas de crescimento da populao tm originado carncias
em redes de transportes e de outras infraestruturas de gua, esgotos, gs, eletricidade e
telecomunicaes [2]. Estas obras podem ser complexas e com caractersticas muito prprias
onde, para alm da definio da estrutura de suporte, importa tambm definir com rigor o
faseamento executivo da escavao.

209
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Apesar de as ferramentas BIM no apresentarem ainda um grau de desenvolvimento elevado


no que respeita especificamente s obras geotcnicas, j possvel desenvolver projetos
completos de grandes escavaes neste ambiente, tirando partido das vantagens inerentes a esta
forma de trabalhar na indstria Arquitetura, Engenharia e Construo (AEC) e em especial das
ferramentas de definio de faseamento, que permitem transmitir a sequncia dos trabalhos de
forma mais intuitiva, facilitando assim a compreenso de todos os intervenientes e de quem
executa.

2. Contributo do BIM

A aplicao de metodologias BIM no desenvolvimento do projeto de geotecnia carece de


documentao cientfica, tanto do ponto de vista terico, descrevendo requisitos de aplicao,
mtodos e processos, como do ponto de vista prtico, onde sejam apresentados resultados
efetivos de casos de estudo. A utilidade de modelos de informao do projeto de geotecnia
comea a ser reconhecida pela indstria [3], sobretudo na fase de construo, onde so
utilizados para realizar uma melhor caracterizao do terreno e dos requisitos de construo,
permitindo reduzir riscos e custos de construo [4], [5]. A capacidade de utilizao dos dados
geolgicos e geotcnicos em diferentes tipos de modelo, isto , a interoperabilidade, um dos
requisitos fundamentais identificados para qualquer tipo de metodologia BIM.

O contributo mais imediato de uma aplicao de modelao BIM para o desenvolvimento do


projeto de geotecnia passa pela modelao e caracterizao do terreno em diferentes tipos de
vista, 2D e 3D. Funcionalidades mais avanadas, como a integrao da componente temporal
no desenvolvimento do modelo, so complementos de considervel valor acrescentado.

Ao assentar na simbiose entre representao tridimensional e informao, o BIM permite


associar a informao temporal relativa execuo de cada elemento respetiva representao
do elemento da obra no modelo BIM. Com base nesta informao, possvel definir as fases
necessrias execuo dos trabalhos e criar uma srie de vistas, para cada momento, onde se
evidenciam quais os elementos criados ou demolidos em cada fase, por meio de representao
grfica distinta para, por exemplo, cada tipo de operao a realizar. ainda possvel associar,
a cada fase, um perodo temporal para representar a durao dos trabalhos e fazer variar, ao
longo do tempo, a aparncia dos elementos, criando, desta forma, uma animao do faseamento
executivo. O grau de realismo desta animao depender, naturalmente do esforo despendido
e da complexidade da obra, sendo necessrio ponderar os benefcios e os custos. A informao
temporal relativa ao faseamento includa no modelo BIM podendo ser utilizada ou manipulada
por software especializado de gesto de obra, constituindo-se o modelo BIM como uma
ferramenta de visualizao e controlo da empreitada.

210
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Projeto-piloto

3.1 Caracterizao do projeto


No mbito da implementao BIM na CENOR foi escolhido o projeto de uma estao
subterrnea de metro como projeto-piloto para formao das equipas de geotecnia e estruturas
e em simultneo para validao da aplicabilidade das ferramentas a este tipo de obras.

A rea de implantao da estao, incluindo os acessos, cerca de 6700 m2. A escavao tem
130 m de comprimento, 22,6 m de largura mdia e 28 m de profundidade. Est ainda definido
um poo de bombagem no extremo sudoeste da estao onde a escavao 7 m mais profunda
(Figura 1). No que diz respeito estrutura de conteno, foram projetadas paredes moldadas.
Definiu-se o encastramento das paredes de 16 m para garantir a impermeabilizao do fundo
da escavao. A viga de coroamento do corpo principal da estao situa-se a uma profundidade
mdia de 3,5 m, o que implica uma escavao geral, com tratamento dos taludes de escavao
at ao terreno natural (Figura 2).

Figura 1: Vista em corte do modelo tridimensional da estao de metro.

Figura 2: Paredes moldadas e viga de coroamento.

211
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

As paredes moldadas so executadas por painis alternados em toda a profundidade, havendo


uma ligeira sobreposio entre os painis de primeira e de segunda fase, resultante da
necessidade de garantir a continuidade da parede. As zonas de contacto dos painis de primeira
fase so demolidas para que haja uma boa ligao entre os betes de ambas as fases. No interior
das paredes moldadas est prevista uma parede de forro, com 1,4 m de espessura, que ser
executada em conjunto com os nveis de apoio medida do avano da escavao.

Esto definidos 5 nveis de escoramento, dos quais quatro so metlicos e o restante uma laje
intermdia da estao com 0,70 m de espessura (Figura 3). Cada apoio da estao a materializar
pelos perfis metlicos ser formado por duas seces em caixo com um comportamento viga-
coluna independente (Figura 4). Tendo em conta os esforos atuantes em cada nvel, foi
necessrio definir contraventamento na direo de menor inrcia dos perfis nos trs nveis de
escoramento abaixo da laje intermdia (Figura 5). A localizao de cada nvel foi definida tendo
em conta as cotas de escavao e as juntas de betonagem da parede de forro.

Figura 3: Nveis de escoramento. Figura 4: Perfis metlicos.

Figura 5: Contraventamento dos nveis abaixo da laje intermdia.

A arquitetura da estao obrigou definio de trs nichos na parede sul para instalao de
poos de ventilao at superfcie, tendo-se definido o escoramento de forma a no ocupar o
espao corrente do interior da estao nessas zonas, para permitir a movimentao de materiais
e equipamentos entre o interior e o exterior da escavao (Figura 6). Foram ainda definidos
rolhes em jet-grout nas extremidades da estao.

212
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Aproveitamento dos nichos para permitir a movimentao de materiais e


equipamentos.

3.2 Abordagem e objetivos


A modelao desta estao em BIM foi feita em paralelo com a produo recorrendo
metodologia tradicional, uma vez que este era um trabalho em curso e no se achou prudente
comprometer a qualidade e prontido da entrega com as eventuais vicissitudes decorrentes de
uma nova metodologia ainda no experimentada pela equipa. O REVIT foi o software adotado
pela CENOR para o desenvolvimento de projetos BIM.

O projeto-piloto tinha trs propsitos fundamentais: formar uma equipa capaz de modelar em
BIM (usando REVIT); testar, na CENOR, a capacidade de desenvolvimento de projetos de
grandes escavaes em BIM; obter medies das principais quantidades de materiais do projeto.

Relativamente ao primeiro objetivo, a aquisio de competncias de modelao foi alm da


simples familiarizao com o funcionamento da aplicao, procurando dar-se nfase
modelao orientada para o projeto, em que o modelo construdo desde o incio tendo j em
conta os outputs finais, neste caso, os desenhos do projeto e as quantidades. Esta abordagem
reflete-se na forma como os elementos so modelados e como a informao introduzida nos
elementos. Particularmente no que diz respeito a este projeto, um exemplo desta abordagem
reflete-se na forma como as paredes moldadas foram modeladas painel a painel e contemplando
a sobreposio entre painis.

Uma forma de validar o segundo objetivo foi a replicao de alguns dos desenhos produzidos
em CAD, selecionando-se desenhos considerados representativos de cada tipo, nomeadamente,
plantas, cortes, alados e detalhes.

Em adio aos elementos produzidos de acordo com a representao tradicional, foi definido
um quarto objetivo mais ambicioso que os restantes, a animao do faseamento executivo
atravs da combinao do modelo com o planeamento das atividades de construo.

3.3 Comparao entre as metodologias CAD e BIM


A principal vantagem de o projeto ter sido desenvolvido recorrendo a ambas as metodologias,
CAD e BIM, foi permitir comparar resultados. As condies de trabalho nas duas abordagens
no foram as mesmas, no entanto, isso foi tido em conta na comparao realizada. A quantidade
de trabalho produzido em CAD foi maior, no s porque se produziram mais desenhos da

213
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

estao, mas tambm porque foram definidos os seus acessos, que no foram modelados em
BIM. Por outro lado, o tempo despendido em BIM reflete, em parte, o tempo necessrio para
adaptao a um novo software, o desenvolvimento de metodologias de modelao, a criao de
vrios objetos personalizados e o teste dos modelos, em virtude de este ser o primeiro projeto
do gnero realizado na empresa, o que justifica no existirem ainda as bases necessrias para
agilizar o processo.

Contabilizaram-se as horas gastas em CAD e em BIM. Em relao s horas gastas em CAD,


admitiu-se que 50% do total teria sido gasto a desenhar os acessos estao e que dessas horas,
5% teriam sido gastas em alteraes decorrentes da conceo. Considerou-se um valor bastante
reduzido para as alteraes, uma vez que os avanos e recuos da conceo foram praticamente
todos absorvidos pela engenharia e pelo clculo. Assim sendo, contabilizaram-se 473 horas em
CAD. No que diz respeito s horas gastas em BIM, o total das horas registadas de 464 horas,
ou seja, da mesma ordem de grandeza das horas gastas em CAD. Contudo, 150 dessas horas
foram de apoio modelao, valor que tender a diminuir com a maturidade da equipa.

Em relao qualidade do trabalho produzido, pode afirmar-se que se produziram entregveis


com o mesmo rigor e detalhe que pautam o restante trabalho produzido pela empresa, tendo
sido inclusivamente detetadas algumas incompatibilidades entre desenhos desenvolvidos pela
metodologia tradicional e que no tinham sido descobertas pela equipa CAD, tendo permitido
realizar algumas correes e evitando que as incompatibilidades surgissem na fase de medies
ou mesmo durante a preparao de obra.

No que se refere s dificuldades relativamente abordagem BIM, destaca-se a falta de


experincia dos modeladores, a necessidade de avaliar vrios cenrios possveis de modelao
e o facto de as ferramentas disponveis no estarem ainda totalmente amadurecidas. Estima-se
que, no futuro, o tempo necessrio para desenvolver os modelos e preparar as peas desenhadas
ser reduzido relativamente ao verificado neste projeto-piloto uma vez que a inexperincia dos
modeladores tender a desaparecer medida que a equipa for desenvolvendo mais projetos em
BIM. Para alm disso, expectvel o aparecimento de novas solues para dar resposta a
requisitos de utilizao especficos medida que cada vez mais empresas forem adotando a
metodologia BIM e as softwarehouses forem aprimorando os seus softwares.

3.4 Modelao do terreno e das estruturas de fundao e suporte


Ao longo do desenvolvimento do projeto-piloto foram identificadas alguns aspetos a evoluir
nos processos de modelao do projeto de geotecnia, sobretudo em relao a dois casos em
particular.

O primeiro est relacionado com a modelao da escavao (Figura 9). O primeiro passo foi a
importao do CAD com as curvas de nvel e os pontos que definiam o terreno natural,
convertendo-se de seguida essa informao numa topografia REVIT. Definida a fase zero
(existente), a topografia das fases seguintes foi, inicialmente, definida custa de uma
ferramenta especfica da aplicao para fasear alteraes topogrficas. Contudo, as ferramentas
de modelao de superfcies topogrficas, com as quais se definiriam as alteraes ao terreno
em relao sua forma original, limitam-se edio dos pontos que definem a topografia
(Figura 7). Esta operao, realizada com a referida ferramenta do REVIT, mostrou-se muito

214
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

trabalhosa, especialmente tendo em conta que a escavao em causa se executa na vertical, o


que se traduziu em frequentes erros de triangulao. A utilizao de Pads (elemento REVIT
que permite modelar escavaes na vertical) tambm se revelou limitado, dado que os limites
inferiores dos vrios nveis de escavao por fase tm uma pendente longitudinal, e o seu perfil
irregular (Figura 8). Houve ento necessidade de encontrar um procedimento mais apropriado
para definir as fases de escavao. Uma vez que uma das caractersticas do BIM passa pela
integrao da contribuio de diferente software para o desenvolvimento do modelo, a soluo
passou pela utilizao do Civil 3D, um programa orientado e estruturado para a modelao de
superfcies topogrficas.

Figura 7: Modelao de superfcie


Figura 8: Elementos genricos da topografia
topogrfica recorrendo edio de pontos
importada do Civil 3D.
no REVIT.

O procedimento adotado passou pela criao das superfcies de cada fase em Civil 3D, atravs
das quais se geraram slidos entre cada duas superfcies, representando os volumes a
movimentar em cada fase. Os slidos gerados automaticamente pelo Civil 3D foram importados
para o modelo REVIT como elementos genricos (Figura 8). Neste caso, optou-se por perder a
classificao do elemento como pertencendo categoria de topografia em prol da velocidade e
do rigor com que foi possvel definir a geometria.

Figura 9: Procedimentos adotados para modelar o terreno.

O segundo exemplo est relacionado com a escolha da ferramenta para modelao das paredes
moldadas. Atendendo ao prprio nome faria sentido que fossem modeladas com a ferramenta

215
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

disponvel para modelao de paredes. Contudo, dada a necessidade de modelar a sobreposio


dos painis, bem como a sua individualidade, isto , que cada painel se mantenha independente
e que no se funda com os painis adjacentes, optou-se por modelar cada painel como pilar,
cuja ferramenta no REVIT apresenta um comportamento mais parecido com o que se pretende
obter para os painis das paredes moldadas.

4. Desenvolvimentos ps projeto-piloto

Terminado o projeto-piloto, teve incio o desenvolvimento de uma nova estao exclusivamente


em BIM. O facto da conceo do projeto ter passado para o ambiente BIM, obrigou adoo
de medidas adicionais de organizao.

O arranque deste projeto foi marcado pela elaborao do BIM Execution Plan (BEP), onde se
define toda a informao relevante relacionada com o projeto: equipas; especialidades
envolvidas; responsveis; entregveis; datas de entrega; configuraes dos modelos; processos
de modelao. Este documento foi validado pelos responsveis das diferentes especialidades.

Foi tambm desenvolvido um sistema de gesto documental com o objetivo de evitar que se
perdesse o rasto da verso mais recente, ou que outras especialidades utilizassem modelos que
no estivessem validados.

Em relao ao projeto-piloto houve uma especialidade que se estreou nesta estao na


metodologia BIM: a Geologia. Na estao anterior modelou-se a camada de cascalho que
condicionou a profundidades das paredes moldadas, mas a sua utilidade cingiu-se
apresentao do projeto, na medida em que a soluo j estava definida. Como nesta estao a
soluo definida em ambiente BIM e como a soluo geotcnica depende da geologia do local
da estao, considerou-se que seria vantajoso que essa informao estivesse modelada.
Por um lado, a possibilidade de visualizar tridimensionalmente o modelo geolgico permite
uma melhor compreenso do mesmo. Para alm disso, permite que facilmente se faam cortes
com qualquer orientao dentro do volume definido, apesar de tal implicar um maior esforo
inicial, pois obriga interpolao e extrapolao de todo o volume definido pelas formaes
interessadas pela obra, em vez de se definirem apenas as seces consideradas representativas.
Uma outra vantagem da modelao tridimensional da geologia, menos operacional e mais
tcnica, a possibilidade de permitir escolher melhor o perfil de clculo a adotar.

No captulo 6 refere-se a ligao ao Civil 3D para a modelao da escavao e foi essa a


ferramenta inicialmente escolhida para modelar a geologia. A equipa de Geologia definiu uma
planta para cada limite com as respetivas isolinhas, tendo-se utilizado essa informao para
gerar superfcies de Civil 3D. Contudo, ao realizar os primeiros cortes, e sendo estas superfcies
muito mais complexas do que as testadas para os nveis de escavao da primeira estao, foi
possvel constatar que as superfcies no dispunham de detalhe suficiente, apresentando-se um
facetadas e com aspeto pouco orgnico. Para alm disso, controlar a geometria da superfcie na
aproximao a outro limite atravs de isolinhas mostrou ser uma tarefa rdua e com resultados
insatisfatrios. Foi ento que surgiu a ideia de testar outro software de modelao
tridimensional.

216
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os diferentes limites geolgicos acabaram por ser modelados em Rhinoceros, uma vez que este
programa dispe de um conjunto de ferramentas de modelao muito mais alargado, que
permitiu expressar melhor a conceo que a equipa de Geologia fez do local (Figura 10).

Figura 10: Modelao da geologia em Rhinoceros.

A ligao ao Revit foi feita atravs do formato SAT (Standard ACIS text). Cada limite foi
exportado para um ficheiro SAT, que por sua vez foi ligado a uma In-Place Mass. Foi
necessrio colocar os links em famlias para que pudessem ser controladas visualmente, serem
seccionadas em corte, aparecendo apenas as linhas de corte das superfcies, e fossem passveis
de ligao a anotaes automticas (Figura 11). Os textos com a identificao do tipo de
material so tags que leem o nome do tipo de cada famlia de massa.

Figura 11: Corte longitudinal extrado do REVIT.

5. Concluses e desenvolvimentos futuros

Os resultados do projeto-piloto apresentado no presente documento permitiram concluir que


efetivamente possvel utilizar uma metodologia BIM em projetos da indstria AEC, incluindo
especialidades menos frequentemente associadas ao BIM, como o caso da geotecnia, obtendo
benefcios a nvel da produtividade e da comunicao e instruo do projeto. A possibilidade
de planear de uma forma mais rigorosa o faseamento da construo, a segurana com que se
introduzem alteraes e se detetam incoerncias no modelo representa uma mais-valia
significativa para o Projetista, o Empreiteiro e o Dono de Obra. Apesar do nmero de horas
despendidas para o desenvolvimento do projeto em ambiente CAD e em ambiente BIM ter sido
muito aproximado, admite-se que o nmero de horas para desenvolvimento do projeto BIM
tender a baixar com o evoluir da metodologia interna e das competncias de modelao.

217
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os desafios relacionados com a modelao do projeto de geotecnia centram-se sobretudo na


modelao do terreno integrando a componente do faseamento construtivo. Para superar as
limitaes sentidas a este nvel, foi desenvolvido um workflow para a utilizao do Civil 3D e
do Revit para modelao de camadas de terreno sucessivas.

A introduo da Geologia na metodologia BIM continua a ser inovadora, apesar de ser


tecnicamente vivel desde o final da dcada de 80. A tomada de decises em obras geotcnicas
sem informao geolgica est altamente condicionada e nesse sentido parece inevitvel que
ambas as especialidades transitem em simultneo para a metodologia BIM.

No que diz respeito a avanos futuros, estes passaro decerto pela ligao dos modelos das
obras geotcnicas a programas de clculo geotcnico, nomeadamente de estabilidade, de
percolao, de anlise dinmica ou de tenso-deformao. Estando o faseamento construtivo e
as propriedades mecnicas das diferentes formaes geolgicas definidos no modelo, poderia
ser possvel importar tambm essa informao para o programa de clculo.

Agradecimentos

Os autores agradecem Arq. Sofia Henriques e ao Eng. Lus Rodrigues a sua colaborao na
elaborao deste artigo.

Referncias

[1] C. Eastman, P. Teicholz, R. Sacks e K. Liston, BIM handbook : a guide to building


information modeling for owners, managers, designers, engineers, and contractors,
Hoboken, N.J: Wiley, 2008.
[2] J. N. V. Almeida e Sousa, Tneis em macios terrosos. Comportamento e modelao
numrica. Dissertao de Doutoramento, Coimbra, Portugal: Faculdade de Cincias e
Tecnologia da Universidade de Coimbra, 1998.
[3] R. L. Tawelian e B. S. Mickovski, The Implementation of Geotechnical Data Into the
BIM Process, Procedia Engineering, vol. 143, n. Advances in Transportation
Geotechnics 3. The 3rd Internacional Conference on Transportation Geotechnics (ICTG
2016), pp. 734-741, 2016.
[4] H. Kessler, B. Wood, g. Morin, A. Gakis, G. McArdle, O. Dabson, R. Fitzgerald e R.
Dearden, Building Information Modelling (BIM) A Route for Geological Models to
Have Real World Impact, AER/AGS Special Report 101, 2015.
[5] G. McArdle, Geotechnical BIM Case Studies of Linear Asset Design, Tata Steel
Projects, UK, 2016.

218
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM EM PROJETO DE OBRAS HIDRULICAS O CASO DE UMA


ESTAO ELEVATRIA
Sofia Henriques (1), Lus M. P. Rodrigues (1), Jorge de Mello Vieira (1)

(1) CENOR Consultores, S.A., Lisboa

Resumo
Apresenta-se, neste artigo, o caso de estudo de modelao BIM da componente hidrulica
(tubagens, acessrios e equipamento) de uma estao elevatria de gua bruta.

O projeto foi desenvolvido pela CENOR em 2016 para um cliente internacional. A CENOR
desenvolveu o modelo BIM para produo das peas desenhadas e extrao de quantidades a
nvel de projeto de execuo.

Para enquadrar a modelao dos circuitos hidrulicos da estao elevatria, procedeu-se


modelao expedita e simplificada da cobertura, do reservatrio e do terreno.

Foram produzidas as peas desenhadas de definio dos circuitos hidrulicos e respetivos


equipamentos a instalar, bem como desenhos de produo das peas de tubagem, constitudas
por vistas isomtricas esquemticas.

Obtiveram-se tambm as listas de quantidades necessrias de tubagem, acessrios e


equipamentos modelados, salientando-se que foi necessrio contabilizar elementos to
pequenos como as juntas de vedao entre flanges, parafusos, anilhas e porcas. Um dos desafios
deste projeto foi a contagem destes elementos. No existindo a necessidade de serem modelados
de forma independente, foram utilizados parmetros associados a outros elementos para fazer
a sua contagem e identificao.

A modelao realizada permitiu cumprir os objetivos a que se props e revelou vantagens, face
metodologia CAD, de cada vez que surgiram alteraes.

219
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

A CENOR deu incio sua internacionalizao em 2005, e percebeu a necessidade de


acompanhar as tendncias globais de modernizao para se tornar mais competitiva nos
mercados internacionais, responder s exigncias dos seus clientes, e tornar mais eficiente o
desenvolvimento dos seus projetos.
No final de 2014 inicia-se a implementao BIM na empresa. integrado neste processo que o
projeto de execuo da Estao Elevatria desenvolvido.

Tendo em conta que se previam vrias iteraes no desenvolvimento do projeto, a necessidade


de extrao de quantidades e os prazos de execuo curtos, a CENOR apostou na utilizao da
metodologia BIM para elaborao do projeto de execuo da Estao Elevatria, mesmo no
sendo exigido pelo cliente. Apesar do risco associado a esta deciso, dado que a implementao
(formal) das metodologias e processos BIM na empresa no estava ainda concluda e os
utilizadores tinham ainda pouca experincia, as vantagens na articulao dos vrios desenhos,
incluindo desenhos esquemticos, e extrao direta de quantidades sobreponham-se utilizao
das metodologias e processos CAD tradicionais.

A modelao BIM da Estao Elevatria serviu ento de teste s capacidades da empresa para
a elaborao de projetos de obras hidrulicas em BIM.

2. O projeto da Estao Elevatria

A Estao Elevatria faz parte do complexo de instalaes que fornece gua a uma refinaria.
Este complexo est implantado junto captao de gua da albufeira e a cerca de 20 km da
refinaria.

A Estao Elevatria apresenta trs linhas de bombagem com capacidade mxima de 2000 m3/h
prevendo a ampliao futura para quatro linhas de bombagem. A aspirao realizada a partir
de um reservatrio metlico de planta circular com cerca de 4000 m3 de capacidade.

No circuito de compresso, foi prevista a instalao de dispositivos de proteo contra golpe de


ariete, incluindo trs Reservatrios de Ar Comprimido (RAC) com cerca de 20 m3 cada.
O equipamento ser instalado sob cobertura metlica, no tendo sido prevista a construo de
paredes, por opo do cliente.

3. Caso de Estudo

3.1 Modelo BIM da Estao Elevatria - Hidrulica


O modelo BIM da Estao Elevatria (Figura 1) foi desenvolvido em Revit 2016 e separado em
3 ficheiros para facilitar o seu uso e manipulao:
Modelo dos circuitos hidrulicos contm todos os equipamentos hidrulicos da
estao elevatria.

220
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Modelo da estrutura contm a estrutura da estao elevatria modelada de forma


expedita e com pouco detalhe (cobertura e lajes) para contextualizao dos
equipamentos hidrulicos.
Modelo da topografia contm a informao topogrfica (modelao do terreno em
Civil 3D pela CENOR).

O modelo foi utilizado para o desenvolvimento dos desenhos do projeto de execuo e para a
extrao de quantidades.

Figura 1: Modelo BIM da Estao Elevatria vista 3D.

3.2 Bibliotecas BIM para Projetos Hidrulicos e Normalizao


Tendo em conta que este foi um dos primeiros projetos a ser desenvolvido em BIM na CENOR,
foi necessrio criar uma biblioteca de objetos tubagens, acessrios e equipamento como
base para a modelao BIM da Estao Elevatria, pensando na sua utilizao futura dentro da
empresa.

Apesar das bibliotecas BIM internacionais disponveis na internet estarem a crescer, so ainda
muito vocacionadas para projetos de arquitetura e de edifcios, sendo difcil encontrar
disponveis objetos para projetos de engenharia hidrulica mais especficos e de maiores
dimenses, como o caso de uma Estao Elevatria.

Os elementos utilizados neste tipo de projeto devem seguir a normalizao em vigor, que
estabelece o dimensionamento geral da sua geometria em funo do material, do dimetro do
sistema, e da presso a que podem estar sujeitos.

No incio da modelao, os elementos criados foram parametrizados com base nas normas
europeias, com vista a poderem ser utilizados por toda a empresa. Mais tarde, com o
desenvolvimento do trabalho, houve necessidade de adaptar estes elementos s normas
americanas.

Este trabalho de parametrizao dos elementos um trabalho complexo dada a relao existente
entre os diferentes elementos de MEP. Veja-se o caso dos acessrios das tubagens, que devem

221
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ter o mesmo dimetro dos tubos a que esto ligadas. A alterao do dimetro do tubo tem
implicaes imediatas na geometria dos acessrios a eles associados. A parametrizao
implicou por isso a transferncia dos dados das normas europeias e americanas para lookup
tables que depois foram incorporadas nos elementos.

a) Modelo do
circuito hidrulico
com terreno e
estruturas

b) Modelo do
circuito hidrulico
isolado

c) Desenho
esquemtico

d) Folha com
desenho esquemtico
e tabelas de
quantidades.

Figura 2: Do modelo pea desenhada.

222
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A modelao dos elementos teve tambm de ter em conta as diferentes formas de representao,
conforme as diversas vistas. Para este projeto era necessrio que os elementos tivessem uma
representao reconhecvel, e no simblica, nas plantas, cortes, alados e vistas 3D de
definio dos circuitos. Mas para os desenhos de fabricao/construo vistas axonomtricas
as vrias linhas de tubagem, acessrios e equipamentos tinham que ter uma representao
simblica (Figura 2). Para este efeito utilizaram-se as vrias opes de visualizao (nveis de
detalhe) disponveis no programa (Revit) de forma a controlar a representao dos elementos
nos diferentes tipos de vista.

Foram ainda adicionados aos elementos os parmetros necessrios para a sua identificao e
legendagem em quadros inseridos posteriormente nos desenhos.

3.3 Produo de peas desenhadas


O modelo foi utilizado para o desenvolvimento das peas desenhadas do projeto da Estao
Elevatria. Foram criados no modelo os desenhos gerais (Figura 3) e de pormenor do sistema
hidrulico da estao.

Figura 3: Folha de projeto planta e cortes da estao elevatria.

Foi utilizado um desenho CAD para a representao da topografia e do reservatrio de gua em


planta. A modelao 3D da topografia foi utilizada nos cortes e nas vistas 3D criadas para
auxiliar a compreenso do projeto.

223
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Um dos desafios deste projeto foi a criao das axonometrias esquemticas das vrias linhas de
tubagem para construo. Neste tipo de vistas necessrio recorrer a planos auxiliares de
trabalho para realizar a cotagem dos elementos nas vrias direes e a utilizao quase exclusiva
de anotaes paramtricas (labels).

Ao contrrio do que acontece tradicionalmente nos desenhos axonomtricos de produo


onde a distncia geomtrica entre elementos apenas indicativa e a cota inscrita manualmente
no desenho com o modelo BIM, a posio geomtrica dos elementos e as suas relaes so
sempre reais e atualizadas.

3.4 Extrao de quantidades


O modelo BIM da estao elevatria serviu de base para a extrao de quantidades, que
aparecem tanto em tabelas nos desenhos, como nos mapas de quantidades. Foram
contabilizados todos os acessrios, equipamentos e tubagem necessrios para a instalao da
estao elevatria.

No sendo um projeto originalmente desenvolvido em BIM, e no estando todas as


especialidades em BIM, a forma de apresentao do projeto teve de seguir as formas
convencionais de apresentao, que por vezes no so as mais expeditas para a utilizao das
metodologias BIM.

A extrao das quantidades para o Mapa de Quantidades foi conseguida atravs da exportao
expedita de 5 tabelas, a partir do Revit, que depois foram trabalhadas em Excel.

Mas os desenhos com a representao axonomtrica esquemtica das vrias linhas tinham
tambm de conter a descrio de todos os elementos e as suas quantidades, indo ao encontro do
que se iria fazer para outras partes do projeto que estavam a ser desenvolvidas em CAD.

Esta forma de apresentao das quantidades significou um aumento no nmero de tabelas


criadas. Cada folha tinha descriminado todos os elementos visveis nesse desenho, sendo para
isso necessrio criar cerca de 90 tabelas, para 13 folhas.

Em cada folha foi necessrio subdividir os elementos pelas seguintes categorias:


Material de construo
o Tubagem (m)
o Acessrios (unidade)
o Equipamento (unidade)
o Parafusos (unidade) valores calculados
o Porcas e anilhas (unidade) valores calculados
Material pr-fabricado
o Tubagem (m)
o Acessrios (unidade)

224
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Foi necessria a modelao das juntas de neoprene de 3 mm que separam os acessrios do


equipamento, pois era necessrio contabilizar estes elementos, associar-lhe informao e
represent-los nas axonometrias para construo/produo do sistema hidrulico.
Foi a estes elementos que se associou a informao relativa quantidade de parafusos, porcas
e anilhas divididas por dimetro e tambm por comprimento (no caso dos parafusos).
A utilizao de vrios quadros gerais permitiu o controlo da descrio de todos os elementos e
a verificao da contabilizao.

3.4 Visualizao 3D
Uma das vantagens do desenvolvimento do projeto em BIM foi a utilizao de imagens 3D do
modelo para mais facilmente comunicar ou explicar o projeto ao cliente, outros consultores ou
intervenientes. Foram criadas vrias vistas 3D que foram exportadas para o formato JPEG e
que se revelaram de grande utilidade na transmisso da evoluo das solues adotadas para o
projeto no decorrer do trabalho (Figura 4 e 5).

a) b)
Figura 4: Vista 3D soluo inicial (a) e soluo final (b)

Figura 5: Perspectiva 3D detalhe.

225
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.5 Alteraes de projeto e reviso de desenhos


Uma das grandes vantagens da utilizao de metodologias e processo BIM torna-se evidente
quando o projeto sofre alteraes, e quando estas alteraes se propagam pelos vrios desenhos
simultaneamente.

Neste caso, o projeto sofreu algumas alteraes durante o processo de validao da soluo e
reviso de desenhos.

O recurso aos quadros de quantidades e descries torna-se, nesse momento, indispensvel e


muito til no controlo do projeto.

Com os desenhos montados nas folhas e os quadros de descrio/quantidades coordenados as


operaes de alterao e reviso de projeto tornam-se mais eficientes, rpidas e controladas.

4. Concluso

A adoo dos processos e metodologias BIM no projeto da Estao Elevatria revelou-se muito
eficaz na coordenao de representao entre todas as peas desenhadas e na extrao de
quantidades. A utilizao de vistas do modelo 3D foi tambm muito til para a transmisso
mais eficiente das solues de projeto.

A criao de elementos especficos para este tipo de projeto obras hidrulicas de maior
dimenso levou a um aumento do tempo gasto na fase inicial da modelao. No entanto, estes
elementos fazem agora parte da biblioteca BIM da CENOR e podero ser utilizados noutros
projetos.

O facto de todas as outras especialidades e partes do projeto no serem desenvolvidas em BIM


gerou algumas dificuldades na tentativa de recriar as representaes j utilizadas noutros
desenhos, e limitou a utilizao de ferramentas mais expeditas, ou formas de representao mais
apropriadas metodologia BIM. No entanto, a utilizao de um modelo BIM proporcionou
grande controlo sobre as alteraes realizadas ao longo do desenvolvimento do projeto e
permitiu a sua rpida atualizao.

226
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ENGINEERING PROJECTS SUPPORT BASED ON BIM


TECHNOLOGY
Taisiia Mitina (1)(3), Jos Carlos Lino (2), Lusa Maria da Silva Gonalves (1)(4)

(1) Polytechnic Institute of Leiria, School of Technology and Management, Portugal


(2) NEWTON - Engineering Consultancy Company, Portugal
(3) Kharkiv National University of Municipal Economy, Ukraine
(4) Institute for Systems and Computers Engineering at Coimbra, Portugal

Abstract
There was always a need for an accurate virtual representation of buildings containing actual
geometry and related data, required to support the design, execution and supply. Building
Information Modeling (BIM) technology has appeared to fulfill that demand. Offering a model
with regularly actualized and synchronized information, the BIM concept is able to reshape any
AECO project. This paper presents an overview of BIM with focus on its applications in the
project life cycle and benefits for project stakeholders through two case studies, out of five
carried out during the master degree internship in the engineering consultancy company -
NEWTON. In the first case study, attention was focused on the goals achieved through BIM
based design in comparison with traditional design, particularly by structural engineer, due to
the implementation of the mentioned technology on a complex project of residential building
in Porto and its architectural integration. On the second case study, the spatial coordination of
Mechanical, Electrical and Plumbing (MEP) systems on a large-scale hotel project has been
analyzed and accomplished, highlighting merits of BIM at this project stage. Through the
reduction of space used for facilities and infrastructures and the ability to identify conflicts and
to nullify the related costs, its advantage on a complex building was proved.

1. Introduction

As a fundamentally new way of creating, sharing, and using project life-cycle data, BIM has
reached different levels of development worldwide: in countries such as Ukraine the term BIM
technology has just shown up on the horizon of Ukrainian architecture, engineering,
construction, and operations (AECO) industry [1], active discussion and efforts to optimize and
disseminate the implementation of BIM have been repeatedly observed in Portugal in recent
years [2], while USA, United Kingdom, Singapore, Norway, South Korea, Denmark and
Finland already have introduced requirements of BIM for the public projects been
institutionally advocated due to its great potential to streamline all project processes [3].

227
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM consists of a set of interacting policies, processes and technologies that generate a work
methodology that is able to manage the building design and project data, in a digital format,
throughout the buildings lifecycle [4]. With BIM technology, an accurate virtual model of a
building is digitally constructed. When completed, the building information model contains
precise geometry and relevant data needed to support the design, procurement, fabrication, and
construction activities required to realize the building [5, 6]. The use of BIM goes beyond the
planning and design phase of the project, being extended throughout the life-cycle of buildings
and structures, from houses to malls, stadiums and bridges, and to a wide range of
infrastructures (water, wastewater, electricity, gas, waste etc.).

Within the framework of the internship in NEWTON Engineering Consultants company, five
projects from different engineering sectors were performed, two of which are presented in this
paper. For the development of these projects using BIM technology, a comprehensive literature
review of fundamental concepts was initially performed and the application of BIM process in
structural engineering and its impact on MEP coordination was reached. The main objective to
be established by these practical means was to figure out useful benefits and advantages of BIM
for engineering projects over traditional design approach, then highlighted in this article. In
addition, model inspection procedures for identification, inspection and report of interferences
in a 3D project model were investigated to justify BIM methodology application for the
coordination process and with all facilitations that follow.

2. Application of BIM in Structural Engineering project - Case study 1: Multilevel


residential building in Porto

Along with the rest, use of the Building Information Modeling (BIM) can be a beneficial
platform for structural engineers to stay competitive and match with needs of modern AECO
industry.

While using a building information model, both the physical, which contains the data used in
the analysis applications, and analytical information, which is the model applicable for the
structural analysis, are interconnected in the same place [7].

The project can be described as reinforced concrete building for habitation purposes with floor
area about 530 m. It consists of two parts (front and back), connected with elevated walkway
performed as steel structure and has complex multilevel floor marks. It was decided to carry
out modeling in phasing methodology of Revit. The main idea was that BIM development
process is needed to support the different uses of the model in different project phases.
According to official BIM regulations, such as [8], purposes of usage of BIM data were agreed
and confirmed for each phase of concrete project. Thus, the division into phases and
requirements to each model were as in Table 2.1:

228
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Table 2.1: Division the project into phases and Goal setting.
Phase

Existing terrain II. Demolishment and


III. Structural model
model excavation model

Detect complications Minimize excessive Detect inaccuracies/errors in


related to particular rock excavation; structural design;
BIM model goals

terrain qualities; Extract excavation Define final floors elevation


Minimize lack of data volumes by material marks;
through the categories; Transmit to an architect various
visualization; Prevent elements/parts approaches of structural design;
Enable extract of of elements intended to Justify a need in alteration of a
excavation volumes in maintain by the project list of architecture aspects;
future stages of from demolishment. Extract quantities of elements and
modeling. materials.

2.1 Model of existing terrain surface


The BIM technology applied to landscape was notably beneficial due to uneven slope with a
drop of 20 meters plus, as well as rapid change of nature of soil from earth to rock which, unlike
many sites, made it inconvenient to create a cut slope due to high cost of rock demolish at the
top of the worksite. Instead, the building follows the shape of the site, going over the rock
profile and including some elements of the building that remains. The toposurface in Revit can
be created either by importing Google Earth Picture or drawing contours lines and elevation
points directly [9]. In the instant case, the terrain modeling was built using the cartographic
altimetry, namely contour lines and elevation points, but the uncertainties of available
topographic survey data (Figure 2.1) have increased modeling effort. [9].

Figure 2.1: Data of topographic survey of Figure 2.2: 3D model of existing terrain and
worksite. structures remains.

229
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Modeling this phase was time-consuming (approximately 35 hours), but could be achieved
faster in more appropriate for terrain modeling software.

2.2 Demolishment and excavation model


The radical project design decision was the choice in favor of partly building restoration over
demolition. This decision, motivated by the desire to minimize the use of resources, brought a
series of challenges in terms of integration of new systems into the existing structure [6]. As it
can be seen from one of the longitudinal sections of the building (Figure 2.3), the elements to
maintain were marked (red hatching) on the architectural project which has tangled the
demolition procedure and increased the value of model.

To create the base of the building it was used Building Pad Revit tool, which generates flat
horizontal surfaces according to reference plans uploaded to the project as links. The excavation
volumes by soil type were extracted from Revit through its function to compare and trace the
changes in different phases of one model. It should be noted that the cut and fill volumes
calculated by Revit are approximate, generally providing results with +/- 1% to 2% accuracy
[10]. The excavation volumes were extracted from Revit taking in account terrain change from
rocky soil on the back part of the worksite to earth soil on the front (Figure 2.4).

This phase was accomplished in about 20 hours of learning and modeling.

Figure 2.3: The longitudinal section of the building. Figure 2.4: Excavation
volumes of rocky soil and
earth soil extracted from
Revit.

2.3 Structural model


Structural BIM is the part of the BIM process, where the majority of multi-material structural
information is created and refined to form the actual structure [11]. For the project under
consideration structural model of building has included columns, beams (both Reinforced
Concrete (RC) and metal), walls and slabs, as well as foundations, lift shaft and roofing. A
structural analysis model can be ready, with type, material, boundary conditions, element
properties (like area, moment of inertia, etc.) and imported into structural analysis software
[12].

230
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Architects models are not included in the scope of structural BIM [11], but, as for the presented
case study, when architectural BIM model isnt preliminarily developed, it is a structural model
that clarified some principal aspects and conceptual solutions of architectural project. This
follows from the fact that the information produced by the architect, engineer and all the various
contractors cannot always be represented in a drawing format [11].

As soon as the model had been accomplished (Figure 2.5) in Autodesk Revit and calculation of
structural elements were carried out in Robot Structural Analysis (Figure 2.6), a list of decisions
optimizing the project were taken. This was impracticable via traditional 2D drawings. Namely,
level marks of certain areas were changed, the position of beams (shallow, inverted or normal)
and columns location and elevation was chosen for the best architectural performance and,
simultaneously, without losses in bearing capacity.

Figure 2.5: 3D BIM structural model in Figure 2.6: Analytical model for
Revit. calculations in Robot Structural Analysis.

The main modeling concerns were associated with understanding of architectural drawings, and
their revision after some alterations were introduced. The received documentation contained
plans in quantity one plan per floor, while the building had 23 marks of finished ground level
for 6 floors, as it comes out of Figure 2.7.

231
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figure 2.7: Elevation view of building in Revit. Figure 2.8: Modeling of irregular
column (Source: (Standard
Approach of
Modelling(SAM),2014) [13], p.9).

Irregular shape elements, which also raised complexity of modeling, were modeled as elements
to be included into the building structure analytical model, by the principal demonstrated on
Figure 2.8. Structural model with schedules verification took more or less 40 hours to be created
following the structural modelling regulations.

Structural engineers can take advantage of BIM in different ways, as the model can be
constantly updated with any changes in the design or general specifications, keeping all the data
as accurate as possible [14]. BIM model allowed design team to assess impact of changes on
structure, design and quantities. Various projects carried out with BIM technology in past times
in NEWTON - Engineering Consultancy Company [15] and presented case study practically
proved BIMs merit of extracting quantities (volumes and lengths) of RC and steel elements
from model as schedules has been appreciated to the full extent, working on The bill of
quantities and processes.

3. Spatial MEP coordination in BIM environment: Case study 2 - BIM of large scale Hotel
in Asia

One of the most powerful tools and merits of BIM is its application for disciplines coordination
and clash detection. The task of spatial coordination has become a major challenge due to the
complexities of the various systems involved [16]. The coordination process involves locating
equipment and routing connecting elements for each system to avoid physical interferences
[17]. Unlike 2D method, no research was found that suggested the onset of BIM had anything
other than a positive effect on MEP spatial coordination [16].

232
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

For successful adoption of BIM and 3D modeling for spatial coordination of Mechanical,
Electrical, Plumbing, and Fire Protection Systems (MEP) well-defined, organized, consistent,
and repeatable framework has to be developed [18]. The introduced algorithm (Figure 3.1) was
worked out taking in account specific characteristic of the project large scale hotel building
with complex design to be constructed in Asia. As implies from the functional application,
building will accommodate, besides more than 700 rooms, numerous conference rooms,
restaurants, swimming pools and offices over approximate floor area 15.000 m. In this case
study the BIM effort was integrated into the project after design using 2D tools had already
been accomplished but was considered as insufficient for such great complexity of the project.

Figure 3.1: The MEP coordination process workflow developed for Case Study 2.

Nevertheless, the configuration of building systems in space is a complex process which


requires knowledge and experience of work with all specialties: the properties and functions,
limitations and restrictions of each network separately and in conjunction with others, as well
as the priorities in positioning between the different specialties. There are typical zones with
very complex configuration of installed services, among which building corridors, points of
entry and exit, openings in shear walls, and vertical utility chases [16], such as demonstrated
on Figure 3.2 and Figure 3.3. Ones need a few stages of coordination: primary visual and
secondary automatic, for which Autodesk Navisworks was selected, constantly analyzing the
installation sequence with extreme caution to guarantee conditions of accessibility for
maintenance operations.

Figure 3.2: The fragment of 3D model Figure 3.3: Rendering of the model of the
displaying an exit of core of the building proposed building: complex configuration of
with complex configuration of MEP MEP equipment over steel trusses.
equipment.

233
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Through effective identification, inspection, and reporting of potential interferences in a 3D


project model, Navisworks Manage helped to reduce error-prone manual checking [19]. As
defined by Figure 3.1, detected clashes were divided into 3 type-groups: 3rd type mostly
modeling errors possible to solve internally, 2nd type clash requires Request For Information
(RFI) [20] and involves the redesign of MEP systems configuration, 1st type architectural
changes are necessary due to the requirements of MEP installation.

Figure 3.4, 3.5 and 3.6 shows how the clashes between elements of different disciplines could
be identified easily in the 3D model, the proper zone is then corrected and redesigned by the
appropriate project team member. Figure 3.4 depicts utilization of the same service zone by
ventilation and firefighting system (clash 1) and near miss of wall opening (clash 2).

This case study covers the coordination process towards the minor part of the project - six floors
of the building, but even so, over 5000 clashes of 3 types were detected and resolved.
Coordination including clash detection is a continuous process which is carried out along with
modeling floor by floor, and in this case study was equal to 8 weeks. During this time the
strategy was developed and improved with practical experience, as well as ways of
communication between process members. The time dedicated to Intersections and errors
which were identified and managed before tendering and construction could be estimated by
avoided the direct and the indirect cost.

Analysis of return on investment (ROI) [21] has proved that the scale and size of a project
should be weight heavily by owners in ordered to invest in BIM, since on larger more
complicated projects benefit of BIM fees is the much higher. On an average, BIM results in the
potential savings in construction costs ranging from 15 40% [22]. BIM coordinations
efficiency effects on the clients budget, and invariably coordination issues affect the
programmed duration of the project [16].

Figure 3.4: The fragment of 3D model with clashes (left -Navisworks) sorted as 3rd type and
resolution after coordination process (right - Revit).

On Figure 3.6 architecture has suffered a change due to the presence of structural beam and
conducts passage downwards.

234
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figure 3.5: The fragment of Figure 3.6: The fragment of 3D model (Revit) with clash
3D model (Navisworks) with of the 1st type.
clash of the 2nd type.

The major advantages of BIM application in this case study, as well as in case studies presented
by other authors [5, 6, 23-25], were the reduction of MEP coordination time, reduction of RFIs
and avoid additional costs .

4. Conclusions

With BIM, engineers are empowered to achieve more efficient and intelligent design which
makes evident for the entire AECO industry, the benefits of using the technology. Especially
when analyzing the way how this methodology enhances the structural design workflow, it
turns out that optimal design solutions are more apparent and accessible, and procedure of
structural design data transfer to an architect and other stakeholders is facilitated in times.
Furthermore, productivity is rising without losses of quality due to high automation of
execution of construction documentation. Even though BIM is a relatively recent technology,
it has already provoked an idea, occasionally appeared in scientific literature, to abandon 2D
drawings, mostly due to reduction of the need in extensive checks and errors elimination even
before generate the documentation.

Regarding MEP coordination, the presence of BIM environment contributes to all steps to
dispose of the intersection: clash detection, finding solutions and final decisions realization.
Its important to note that resolving all physical interference during the MEP coordination
process does not necessary ensure that a facility has been well coordinated, since proper
methodologys application needs significant knowledge base and qualified specialists.

Moreover, before proceed to BIM process a bunch of properties of a project should be evaluated
to conclude that BIM usage is justified. Its definitely beneficial if BIM is implemented for the
entire life-cycle of the project, and return of investment has always positive value [21],
otherwise if model is developed for specific uses of different phases of the design and
construction process, the aspects as time available for design and deadlines of project execution,
need in future usage of model, skills of employees, architectural changes during the project,
complexity of the project, budget etc. should be considered.

235
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Acknowledgements

This work was possible due to the continuous support of all colleagues in NEWTON -
Engineering Consultancy Company and BIMMS-Building Information Modeling &
Management, who guided me through each of the presented case studies and accelerated my
learning curve. The paper was prepared during Master Degree Programme in Polytechnic
Institute of Leiria funded by INFINITY project in the framework of the EU Erasmus Mundus
Action 2.

References

[1] , .. and .. , BIM-modeling. Review of opportunities and perspectives


in Ukraine. 2015.
[2] Maria Joo Lima Venncio, Avaliao Da Implementao De BIM Building
Information Modeling Em Portugal. 2015, Universidade do Porto.
[3] Francom, T.C. and M. El Asmar, Project quality and change performance differences
associated with the use of building information modeling in design and construction
projects. . Univariate and multivariate analyses. , 2015.
[4] Succar, B., Building information modelling framework: A research and
delivery foundation for industry stakeholders. . Automation in Construction, 18, 357-
375. , 2009.
[5] AZHAR, S., Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry, in Leadership and Management in Engineering. 2011.
[6] Eastman, C., et al., BIM Handbook, in A Guide to Building Information Modeling for
Owners, Managers, Designers, Engineers, and Contractors 2011.
[7] Strafaci, A. What does BIM mean for Civil Engineers? 2008.
[8] AEC (UK) BIM Protocol, in Implementing UK BIM Standards for the Architectural,
Engineering and Construction industry. . 2012.
[9] Wang, M., Building Information Modeling (BIM): Site-Building Interoperability
Methods. 2011.
[10] Stine, D.J., Design Integration Using Autodesk Revit 2016. 2016.
[11] Robinson, C., STRUCTURAL BIM: DISCUSSION, CASE STUDIES AND LATEST
DEVELOPMENTS Tekla (UK) Ltd, Wiley Interscience, 2007.
[12] Hunt, C.A., The Benefits of Using Building Information Modeling in Structural
Engineering 2013, Utah State University.
[13] Standard Approach of Modelling(SAM),, in For Creating Building Information
Structural model for Development and Construction Division of Hong Kong Housing
Authority. 2014.
[14] Bhusar, A.A. and A.R. Akhare, Application of BIM in Structural Engineering. SSRG
International Journal of Civil Engineering (SSRG-IJCE), 2014.
[15] Lino , J.C., M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas (in Portuguese language), in Encontro Nacional BETO ESTRUTURAL
- BE2012 FEUP. 2012.
[16] Neil, J., How has Building Information Modelling changed the MEP Coordination
process? . 2014: University of Salford, Manchester.

236
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[17] Korman, T.M., L. Simonian, and E. Speidel, How building information modeling has
changed the MEP coordination process. 2010: California Polytechnic State University,
San Luis Obispo, CA, USA.
[18] AGC BIMForum, MEP Spatial Coordination Requirements for Building Information
Modeling 2009.
[19] Navisworks, A., Navisworks Manage Brochure:Coordinated, Complete Control. 2010.
[20] Hughes Nigel, et al., Impact & control of RFIs on construction projects, in Construction
Forum. 2013.
[21] Giel, B. and R.R.A. Issa, Return on Investment Analysis of Building Information
Modeling in Construction. ASCE Journal of Computing in Civil Engineering special
issue, 2011.
[22] Holness, G., Building Information Modeling. ASHRAE Journal, 48(8), 38-46, 2006.
[23] Kullven, F. and K. Nyberg, Possibilities with BIM in relation to cost estimation and
scheduling.A case study of a Swedish civil engineering project. 2014, CHALMERS
UNIVERSITY OF TECHNOLOGY: Gteborg, Sweden.
[24] Gerbov, A., Process improvement and BIM in infrastructure design projects findings
from 4 case studies in Finland. 2014: Aalto University.
[25] Hergunsel, M.F., Benefits of building information modeling for construction managers
and BIM based scheduling. 2011, Worcester Polytechnic Institute.

237
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

238
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

APLICAO DO DESIGN GENERATIVO NAS TECNOLOGIAS BIM

Ins Caetano (1), Antnio Leito (1) e Francisco Teixeira Bastos (2)

(1) INESC-ID/IST, Lisboa;


(2) CERis, Instituto de Engenharia de Estruturas Territrio e Construo/IST, Lisboa

Resumo
Ultimamente, as tecnologias BIM tm vindo a substituir as ferramentas CAD tradicionais, por
permitirem aos seus utilizadores associar informao de natureza construtiva e de
comportamento dos materiais aos elementos constituintes dos seus modelos 3D. Por outro lado,
o Design Generativo, uma abordagem algortima ao design, tem permitido a mecanizao de
tarefas de design e a produo de geometrias de crescente complexidade. Dadas as
potencialidades destas duas abordagens, tm sido desenvolvidas formas de combinar BIM com
Design Generativo.

O trabalho desenvolvido neste artigo est inserido num projeto de arquitetura da autoria do
Atelier dos Remdios e dos FOR-A. O desafio proposto foi a criao de um conjunto de
fachadas perfuradas para um edifcio de habitao na rea de Lisboa. A explorao destes
elementos arquitetnicos foi feita usando Design Generativo para BIM.

O desenvolvimento deste trabalho foi feito utilizando o Rosetta, um IDE para Design
Generativo que suporta scripts usando diversas linguagens de programao e permite a
visualizao e a edio dos seus resultados em diversas aplicaes CAD e BIM. Resultou um
modelo de informao que incluiu trs fachadas de composio geomtrica parametrizvel,
com capacidade de extrapolao de quantidades de material utilizado e de ensaios de
desempenho da construo.

1. Introduo

As ferramentas de Computer-Aided Design (CAD) foram criadas para aumentar a eficincia do


processo de projecto. No s tm ajudado os arquitetos a produzirem desenhos tcnicos e
modelos mais precisos, como tambm tm facilitado a edio dos mesmos. Contudo, quando a

239
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

complexidade dos modelos aumenta, estas ferramentas apresentam algumas limitaes devido
ao facto de no serem suficientemente flexveis. Para ultrapassarem estas limitaes, muitas
destas ferramentas foram estendidas de modo a j permitirem a utilizao do Design Generativo
(Generative Design-GD) [1].

Por outro lado, o Building Information Modeling (BIM) veio alterar o paradigma no processo
de projecto e construo, introduzindo novas funcionalidades na prtica de projecto digital. Isto
porque, para alm de lidarem com a geometria tipicamente suportada pelas ferramentas CAD,
as tecnologias BIM relacionam os elementos do edifcio de uma forma paramtrica e
associativa, atribuindo simultaneamente semntica aos mesmos [2]. Em termos prticos, esta
metodologia representa uma base de dados de informao a ser partilhada por todos os
intervenientes durante o ciclo de vida de um edifcio, entre eles a arquitetura, as especialidades
e a construo [3]. Esta informao pode ser tambm utilizada em processos de anlise com
vrios critrios de desempenho (i.e., arquitetural, estrutural, energtico, acstico, etc) [4].
Consequentemente, isto permite aos arquitetos, em especial, ganhar controlo sobre a
informao e a conceo do edifcio, em todas as fases do projeto [2].

Tal como aconteceu com as ferramentas CAD, o BIM foi tambm combinado com o GD numa
recente abordagem de projeto, ao qual podemos chamar de BIM Algortmico [5] [6]. O exemplo
desenvolvido neste artigo j utiliza esta nova abordagem no desenvolvimento de um conjunto
de fachadas algortmicas para um edifcio de habitao na rea de Lisboa.

2. Processos Algortmicos

A criatividade caracterizada pela inconstncia e a impreciso [7], sendo assim necessrio um


processo de concepo que aceite facilmente a mudana. Infelizmente, as ferramentas de
projecto tradicionais no facilitam as alteraes devido ao facto de exigirem muito tempo e
esforo para modificar os modelos desenvolvidos.

Contudo, as tecnologias mais recentes j permitem que a explorao arquitetnica v para alm
das possibilidades tradicionais, promovendo o desenvolvimento e a proliferao de formas
complexas, novos padres e mtodos de fabricao avanados [8].

O Design Generativo (GD) uma abordagem de desenho que gera formas atravs de algoritmos
[9]. Esta abordagem permite gerar uma gama variada de solues num curto espao de tempo,
ao mesmo tempo evitando as tarefas repetitivas e bastante morosas necessrias na modelao
usando as ferramentas CAD e BIM. De modo a usar esta abordagem, em vez do arquiteto ir
diretamente da ideia para a forma, ele tem que desenvolver uma etapa intermdia onde produz
uma definio algortmica do design a produzir [10], na qual esto declarados os parmetros do
mesmo e as dependncias entre estes (ver o exemplo na Figura 1).

Embora inicialmente a maioria das ferramentas de GD tenha sido desenvolvida para os


ambientes CAD, j existem algumas extenses capazes de incorporar esta abordagem no
paradigma BIM.

240
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. BIM Algortmico

Tal como as tecnologias CAD, algumas ferramentas BIM tambm j beneficiam de processos
algortmicos. Algorithm-Aided BIM [6] ou Algorithmic-Based BIM [5] so alguns dos nomes
pelo qual este novo paradigma conhecido. O Dynamo, o GenerativeComponents, o Lyrebird,
e o RosettaBIM so alguns exemplos de extenses que permitem aos seus utilizadores
explorarem abordagens algortmicas em aplicaes BIM.

O Dynamo [11] uma extenso do Revit que utiliza uma linguagem de programao visual,
cuja dinmica de trabalho se baseia na associao de ns atravs de fios que transportam
informao entre estes. As ligaes entre ns associam duas portas de ns distintos, uma de
sada e a outra de entrada, que suportem o mesmo tipo de informao.

Lyrebird [12] uma extenso que foi desenvolvida para o Grasshopper [13], uma linguagem
de programao visual para o Rhinoceros 3D (ver Figura 1) com uma dinmica de trabalho
muito semelhante do Dynamo, permitindo a utilizao do Grasshopper em ferramentas BIM
como o Revit.

Figura 1: Exemplo de Design Generativo - modelo em Rhinoceros (esquerda) gerado por um


conjunto de algoritmos implementados em Grasshopper (direita).

O GenerativeComponents [14] um sistema paramtrico e associativo desenvolvido para o


Microstation [15], a ferramenta BIM da Bentley.

Finalmente, o RosettaBIM [16] [5] [17] uma ferramenta de GD que suporta diversas
linguagens de programao textuais, como por exemplo o Python, AutoLISP e o Racket, e que
permite a portabilidade entre diversas ferramentas CAD, incluindo o AutoCAD, o Rhinoceros
3D e o SketchUP e BIM, incluindo o Revit e o ArchiCAD.

Para o desenvolvimento do projeto descrito neste artigo, utilizmos o RosettaBIM devido


portabilidade que este permite entre diferentes ferrametas BIM.

241
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Caso de Estudo

O trabalho desenvolvido est inserido num projeto de arquitetura da autoria do Atelier dos
Remdios em parceria com os FOR-A. O desafio proposto foi criar uma fachada perfurada que
assegurasse diferentes permeabilidades, para um edifcio de habitao na rea de Lisboa. Como
j foi referido em seces anteriores, optou-se pela explorao deste elemento arquitetnico
usando uma abordagem algortmica para BIM.

4.1 Descrio do Projeto


O projeto consistiu num edifcio de habitao para a zona de Belm. Mais precisamente, o lote
da interveno localizava-se na rua da Junqueira e possua uma preexistncia que teria de ser
mantida no desenvolvimento do novo projeto (Figura 2.A). Esta acabou por ficar incorporada
na fachada principal do edifcio, virada para a rua da Junqueira (Figura 2.B).

Figura 2: A- Fotografia de rua do lote de interveno, autoria Atelier dos Remdios; B-


Maquete de estudo do projeto. As preexistncias esto representadas a branco e a volumetria
da proposta a azul. C- Esquema da planta da proposta com os estudos de vistas e a
iluminao/exposio solar.

O projeto proposto era composto por cinco pisos, um piso de estacionamento e quatro de
habitao com quatro tipologias diferentes. Contudo, ao nvel da rua apenas estariam visveis
trs dos pisos, sendo que os dois primeiros ficariam a uma cota inferior, i.e. um estaria
totalmente enterrado (o estacionamento) e o outro semienterrado.

O edifcio em forma de U criava um ptio interior central localizado ao nvel do primeiro piso
de habitao, ou seja, com uma cota inferior do nvel da rua, facto que garantia que todos os
apartamentos estivessem virados para esse ptio. Como o lote em causa est localizado entre
dois lotes edificados, esta soluo conseguia assim fornecer iluminao natural a todos os
apartamentos (Figura 2.C).

242
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O desafio apresentado foi desenvolver um conjunto de trs fachadas para este edifcio de
habitao:
A fachada exterior norte, com frente para a rua da Junqueira;
A fachada exterior oeste, para o lote vizinho e futura rua a criar;
Uma fachada interior virada para o ptio central.

Inicialmente, foi feita a descrio da inspirao/conceito para as fachadas a desenvolver (ver


Figura 3), o que serviu como ponto de partida para a explorao do desenho da mesma. A ideia
dos arquitetos tinha como base a criao de uma pele arquitetnica que seria mais ou menos
perfurada consoante a funo do espao atrs: mais permevel, quando a rea da fachada
coincidisse com os ptios interiores; menos permevel ou opaca, quando coincidente com as
zonas privadas, como os quartos ou cozinha.

Numa primeira fase, a materializao deste conceito permeabilidade-opacidade foi deixado em


aberto. Como resultado, houve o desenvolvimento de um conjunto de solues possveis com
caractersticas bastante diversas. Deste modo, os arquitetos puderam assim avaliar as vrias
solues e, simultaneamente, sugerir alteraes que eram incorporadas nas solues seguintes.
Assim, o desenrolar deste processo foi feito de forma dinmica com a participao e feedback
imediato de ambas as partes. Isso permitiu uma escolha final mais pensada e de acordo com a
inteno dos arquitetos.

Figura 3: Kolumba Museum em Colnia, pelo arquiteto Peter Zumthor referncia de jogo de
tijolos para a fachada do edifcio (http://thetomorrow.net/events/venues/kolumba/).

4.2 Solues de Fachadas


Com base nas premissas fornecidas e nos dados do projeto de arquitetura do edifcio, gerou-se
um conjunto de fachadas com caractersticas bastantes diferentes, embora seguindo sempre o
conceito-base referido na seco anterior. Como foi referido anteriormente, o desenvolvimento
das diversas opes foi feito usando uma abordagem de DG. Para tal, foi desenvolvido
primeiramente um programa que codificou as vrias premissas e informaes relativas ao

243
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

projeto. De seguida, foram adicionados a esse programa base conjuntos de novos parmetros
de modo a gerar diferentes padres para as fachadas. A Figura 4 sumariza alguns dos modelos
que foram desenvolvidos.

Como nesta etapa ainda no havia a definio do material a aplicar na fachada, os resultados
propostos tiram proveito de diversas tcnicas e caractersticas de mais do que um material,
como por exemplo o tijolo (Figura 4.A), o azulejo (Figura 4.B), o metal (Figura 4.C) ou o beto
(Figura 4.D).

4.3 Desenho da Fachada Final


Do leque de solues apresentadas, escolheu-se conjugar as ideias subjacentes s propostas A
e B da Figura 4, optando por combinar a existncia de dois tamanhos diferentes de tijolos
(Figura 4.B), que seriam colocados de modo a criar salincias aleatrias, com a existncia
pontual de vazios, i.e. ausncia de tijolos (Figura 4.A).

Com vista a um maior controlo na exequibilidade e custo da soluo, os arquitetos ainda


sugeriram alterar o grau de variao do padro final. Tomando por exemplo a proposta da
Figura 4.A, que continha tijolos colocados de modo a criar salincias com quatro dimenses
diferentes, foi sugerido reduzir o nmero de dimenses possveis das salincias aleatrias para
apenas dois valores.

Figura 4: Algumas das ideias desenvolvidas para o padro da fachada. A- Elementos


quadrangulares colocados mais ou menos recuados de forma aleatria; B- Azulejos
quadrangulares aleatoriamente subdivididos em quadrados 5 vezes mais pequenos; C-
Perfuraes circulares para criar diferentes transparncias; D- Relevos inspirados num padro
tpico dos azulejos portugueses.

244
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Com o mesmo objetivo, foi proposto utilizarem-se apenas tijolos retangulares de dois tamanhos
diferentes, em que o maior tivesse o dobro das dimenses do mais pequeno (tijolos 60x20cm
ou 30x10cm), sendo a escolha entre colocar um tijolo grande ou quatro pequenos controlada
por um parmetro aleatrio.

Por fim, os arquitetos sugeriram apenas existirem vazios quando criados pela ausncia de tijolos
mais pequenos, controladas de forma aleatria.

Em suma, a ideia dos arquitetos consistia em manter o conceito de aleatoriedade e


irregularidade do padro mas com variveis de desenho mais restritas.

A Figura 5 representa conceptualmente o padro final obtido aps a implementao das


sugestes feitas pelos arquitetos, e tambm da aplicao das dimenses reais dos elementos que
viriam a constituir as fachadas.

Figura 5: Padro escolhido para aplicar nas fachadas utilizao de tijolos empilhados com
dois tamanhos diferentes, 60x20 cm ou 30x10 cm. Criao de vazios aleatrios atravs da
ausncia pontual dos tijolos mais pequenos.

As sugestes referidas foram adicionadas facilmente no programa de GD vindo a ser


desenvolvido e, produzindo uma nova proposta para a fachada, permitindo assim aos arquitetos
a visualizao rpida do resultado obtido j com as restries implementadas (ver Figura 6).
Na fase seguinte, produziram-se os modelos das trs fachadas j com base em medidas reais,
ou seja, j com as dimenses dos tijolos a utilizar no projeto final e as dimenses das trs
fachadas a desenvolver (comprimentos e alturas das mesmas e as zonas em que ocorreriam as
variaes de transparncia).

245
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: A visualizao do programa algortmico desenvolvido (A) e do modelo


correspondente produzido em Revit (B).

Devido ao facto de termos usado uma abordagem algortmica na explorao destas fachadas, a
aplicao de pequenas alteraes e variaes aos modelos foi feita de forma quase imediata, o
que permitiu aperfeioar os modelos gradualmente at ficarem totalmente de acordo com o
gosto e a inteno inicial dos arquitetos.

Na Figura 7 esto representadas algumas das variaes que foram sendo aplicadas ao modelo
da fachada interior do edifcio, i.e. virada para o ptio interior. As variaes que so testadas
so (1) a percentagem de tijolos que ficam salientes, e (2) o grau de perfurao/transparncia
de certas zonas da fachada.

Por fim, conjugaram-se os modelos das fachadas e do modelo final do edifcio, por importao
e implantao nos locais corretos, dos primeiros no ltimo ficando assim o modelo da proposta
completo. A Figura 8 mostra duas imagens finais da proposta j com as fachadas. Na imagem
da direita so visveis duas das fachadas, a norte e a oeste. Na imagem da esquerda visvel a
fachada interior que est virada para o ptio central.

246
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Variaes sobre o padro final da fachada interior variao do nmero de tijolos
salientes e da percentagem de ausncia de tijolos.

5. Concluses

Recentemente, o paradigma BIM e o Design Generativo comeam a ser combinados no


desenvolvimento de modelos arquitetnicos, possibilitando assim usufruir das vantagens de
ambas as abordagens no processo de desenho do arquiteto. Este artigo apresenta um caso de
estudo que se integra neste novo paradigma do BIM algortmico, pois utiliza processos
algortmicos em BIM no desenvolvimento de elementos arquitetnicos: um conjunto de
fachadas para um edifcio de habitao na rea de Lisboa.

Embora o objetivo inicial fosse desenvolver o conjunto de variaes dos diversos modelos
diretamente no Revit, por ser a ferramenta utilizada por ambos os ateliers, durante o projeto
constatmos que a gerao das solues neste software BIM era demasiado lenta, no permitido
assim o feedback imediato e a dinmica de design necessrios. Em situaes como esta, o
RosettaBIM bastante til pois permite a portabilidade necessria entre ferramentas, tirando
assim o melhor proveito de cada uma delas. Assim, numa fase mais inicial, como a gama de
variao das propostas era bastante ampla, os modelos produzidos foram visualizados em
AutoCAD, pois este permitiu uma performance superior. Numa fase mais avanada do
processo, em que a modelao geomtrica das fachadas j estava praticamente definida, o
programa desenvolvido que estava a gerar os resultados no AutoCAD, passou agora a produzir
modelos idnticos no Revit apenas sendo necessrio acrescentar a informao das famlias BIM
a utilizar.

247
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Imagens finais do projeto proposto. Direita: Fachada virada para a rua da
Junqueira (Norte). Esquerda: Fachada virada para o ptio interior.

O facto de utilizarmos uma abordagem algortmica potenciou o poder criativo dos arquitetos
envolvidos no projeto, em particular:
1. Permitiu explorar de forma controlada uma vasta gama de solues num curto espao
de tempo, o que seria difcil e moroso utilizando o processo manual;
2. Facilitou a integrao de alteraes nas solues sucessivamente desenvolvidas,
permitindo assim uma interatividade quase imediata entre os arquitetos e os modelos.
3. Possibilitou a gerao e visualizao de solues para alm das idealizadas pelos
arquitetos, tornando-se por isso uma ferramenta de apoio conceo.
4. Abriu a possibilidade de se elaborarem ensaios de desempenho da construo.

Por outro lado, como o programa foi desenvolvido no RosettaBIM, este permitiu tirar proveito
da velocidade e flexibilidade do AutoCAD numa fase inicial, cruzando-a com a informao
construtiva necessria para o modelo BIM em Revit numa fase de finalizao. Deste modo,
atravs da combinao das aplicaes CAD e BIM conseguiu-se beneficiar duma abordagem
algortmica e, simultaneamente, aplicar a mesma no paradigma BIM.

Referncias

[1] R. Hudson, Strategies for parametric design in architecture (PhD Thesis), University
of Bath, Department of Architecture and Civil Engineering, 2010.
[2] P. Russel e D. Elger, The Meaning of BIM, Antwerpen (Belgium) , 2008.
[3] J. C. Lino, M. Azenha e P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, em Encontro Nacional BETO ESTRUTURAL - BE2012 , FEUP, Porto,
2012.
[4] M. R. Asl, M. Bergin, A. Menter e W. Yan, BIM-based Parametric Building Energy

248
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Performance Multi-Objective Optimization, Newcastle upon Tyne, England, UK, 2014.


[5] S. Feist, G. Barreto, B. Ferreira e A. Leitao, Portable Generative Design for Building
Information Modelling, em CAADRIA 2016, Melbourne, Australia, 2016.
[6] H. Humppi e T. sterlund, Algorithm-Aided BIM, University of Oulu, Oulu, Finland,
2016.
[7] A. F. Bukhari, A Hierarchical Evolutionary Algorithmic Design (HEAD) System for
Generating and Evolving Buildings Design, Queensland University of Technology,
2011.
[8] B. Kolarevic, Architecture in the Digital Age: Designing and Manufacturing. Spon Press,
2003.
[9] K. Terzidis, Expressive Form: A Conceptual Approach to Computational Design: Spon
Press, 2003.
[10] A. Leito, Teaching Computer Science for Architecture, em Future Traditions: 1st
eCAADe Regional International Workshop, FAUP, Porto, Portugal, 2013.
[11] Autodesk, The Dynamo Primer, 2015. [Online]. http://www.dynamoprimer.com/.
[12] L. Architects, Superb Lyrebird, 2014. [Online]. https://lmnarchitects.com/tech-
studio/bim/superb-lyrebird/.
[13] D. Rutten, Grasshopper 3D, Robert McNeel & Associates, 2007. [Online].
http://www.grasshopper3d.com/.
[14] B. Systems, Bentley, 2007. [Online]. Available: www.bentley.com/en/products
[15] B. Systems, Bentley, [Online]. Available:
www.bentley.com/en/products/brands/microstation
[16] B. Ferreira e A. Leito, Generative Design for Building Information Modeling, em
33rd eCAADe Conference, Vienna University of Technology, Vienna, Austria, 2015.
[17] J. Lopes e A. Leito, Portable Generative Design for CAD Applications., em ACADIA
11: Integration Through Computation, Banff, Alberta, 2011.

249
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

250
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

DESIGN GENERATIVO PARA BUILDING INFORMATION


MODELING
Bruno Ferreira (1), Antnio Leito (1)

(1) INESC-ID/IST, Lisboa

Resumo
O Design Generativo (DG) uma abordagem algortmica para a criao de modelos
arquitetnicos, permitindo mecanizar tarefas, produzir geometrias complexas, e otimizar o
modelo criado. Uma vez que as aplicaes de Computer-Aided Design (CAD) so muito
utilizadas em Arquitetura e Engenharia, foram j criadas diversas ferramentas que combinam o
DG com as aplicaes CAD. Um exemplo a ter em conta o Rosetta, um ambiente de
programao para DG, desenvolvido para arquitetos e engenheiros, que permite aos utilizadores
escolher, no s em que linguagem querem programar, mas tambm em que ferramenta CAD
querem produzir os seus modelos. Mais recentemente, o paradigma CAD tem vindo a ser
substitudo pelo paradigma BIM, o que reduz a utilidade das ferramentas de DG que apenas
lidam com o paradigma CAD. Como as vantagens do DG se estendem naturalmente ao
paradigma BIM, propomos uma soluo que expande o Rosetta, permitindo a criao de
programas de DG que tiram proveito das capacidades do paradigma BIM. A nossa soluo
permite no s elevada portabilidade entre ferramentas BIM, mas ainda alguma portabilidade
entre os paradigmas CAD e BIM. De forma a avaliar a nossa soluo, apresentamos um
conjunto de casos de estudo onde mostramos o uso do Rosetta em combinao com o Revit.

1. Introduo

As aplicaes de Computer-Aided Design (CAD) aumentaram a eficincia com a qual se


realizavam diversas tarefas de design, permitindo aos arquitetos criar modelos cada vez mais
precisos e complexos. No entanto, mesmo recorrendo a ferramentas CAD, a modelao e
alterao de geometrias complexas continua a ser desafiante pois estas ferramentas ainda no
do ao utilizador o nvel de flexibilidade que , por vezes, necessrio.

O Design Generativo (DG) uma abordagem que resolve estes problemas [1]. DG pode ser
descrito como a criao de formas atravs de algoritmos [2]. Estes algoritmos, implementados

251
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

sob a forma de programas, permitem a fcil gerao de variaes do mesmo modelo [3]. Estes
programas podem tambm gerar geometria que seria difcil de criar por meios manuais.

Reconhecendo as vantagens da abordagem de DG, diversas ferramentas foram criadas com o


intuito de permitir a criao de programas de DG. Muitas destas ferramentas foram criadas a
pensar em arquitetos com poucos conhecimentos de programao e so, por isso, facilmente
utilizveis.

Uma dessas ferramentas o Rosetta. Esta ferramenta possui um ambiente de programao para
DG que permite aos utilizadores desenvolverem programas numa das diversas linguagens
disponveis. Estes programas so usados para gerar modelos em diversas ferramentas CAD [4].
Atualmente, as ferramentas CAD esto a ser substitudas por ferramentas de Building
Information Modeling (BIM), inviabilizando as ferramentas de DG como o Rosetta, que foram
desenvolvidas com as aplicaes CAD em mente. Isto acontece devido ao facto das ferramentas
CAD lidarem principalmente com geometria, enquanto que as ferramentas BIM lidam com
objetos BIM paramtricos. Estes so definidos por um conjunto de regras paramtricas, assim
como um conjunto de propriedades como material, preo, e fabricante, entre outras [5].

Estas propriedades permitem s ferramentas BIM detetar problemas nos modelos, como sejam
tubagens que atravessam vigas estruturais. Para alm disto, as regras paramtricas adaptam os
objetos sua utilizao no projeto, permitindo, por exemplo, que uma porta inserida numa
parede assuma as medidas corretas. Finalmente, toda a informao necessria durante o ciclo
de vida do edifcio armazenada no modelo, podendo ser utilizada para gerar um vasto conjunto
de documentos, desde oramentos a documentos de fabricao [5].

Estas capacidades implicam, no s, mudar a forma de trabalho dos utilizadores, mas tambm
a forma de trabalho das ferramentas de DG, de modo a possurem funcionalidades que permitam
tirar proveito do paradigma BIM, algo para o qual no estavam preparadas.

Desenvolver programas de DG para ferramentas BIM um problema atual, sendo que a maioria
das solues existentes envolvem a utilizao de Application Programing Interfaces (APIs)
disponibilizadas pelas ferramentas. No entanto, estas APIs requerem conhecimentos avanados
de programao e encontram-se escritas em linguagens de programao complexas como C# e
C++. Estas caractersticas tornam-nas inadequadas a utilizadores com reduzida experincia de
programao. Para resolver este problema, propomos uma soluo que permite a estes
utilizadores criar programas de DG no paradigma BIM. Na prxima seco descrevemos o
trabalho relacionado analisado para o desenvolvimento da soluo.

2. Trabalho Relacionado

Diversas ferramentas foram analisadas, de forma a guiar o desenvolvimento da nossa soluo.


O foco principal foram ferramentas que permitissem explorar DG com ferramentas BIM, assim
como plug-ins que atinjam o mesmo objetivo.

252
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.1 Grasshopper e Lyrebird


Grasshopper uma linguagem de programao visual desenvolvida para arquitectos e
disponibilizada como um plug-in para a aplicao CAD Rhinoceros 3D. Programas escritos
com esta linguagem representam um grafo de fluxo de dados que consiste num conjunto de
componentes e ligaes entre eles. Os componentes podem representar funes, parmetros ou
elementos geomtricos [6]. Uma vez que estes componentes podem ser ligados entre si, os
utilizadores podem combin-los de forma a produzir algoritmos complexos.

Para alm destes componentes, o Grasshopper disponibiliza componentes de scripting que


permitem escrever programas em VB.NET, C# e Python [6].

Uma vez que o Grasshopper uma linguagem visual, esta fcil de aprender e utilizar,
tornando-a popular entre arquitetos. No entanto, o seu aspeto grfico tambm uma
desvantagem, pois medida que os programas crescem, estes tornam-se difceis de
compreender e manipular. A Figura 1 ilustra um programa que torna evidente estes problemas.

Figura 1: Exemplo de programa em Grasshopper. (source:


http://workshopsfactory.wordpress.com/files/2009/08/parametric-table- grasshopper.jpg).

O Grasshopper apenas funciona com a ferramenta CAD Rhinoceros, mas a sua funcionalidade
tem vindo a ser estendida com plug-ins, como o Lyrebird, que tornam possvel a utilizao da
linguagem com outras aplicaes, nomeadamente aplicaes BIM.

O Lyrebird um plug-in, desenvolvido pelos LMN Architects, para funcionar como ferramenta
de interoperabilidade entre o Grasshopper 3D e o Revit. O Lyrebird tem como foco principal
transferir informao entre aplicaes, em vez de traduzir geometria entre elas [7]. Este plug-
in permite a utilizao do Grasshopper para estruturar a informao necessria para produzir
objetos no Revit. Esta informao utilizada para identificar e criar instncias das famlias
corretas com os parmetros desejados. Por exemplo, para criar uma viga, criada uma linha no
lado do Grasshopper, que passada para o Revit de forma a, em conjunto com a famlia de
objetos a utilizar, instanciar a viga. Um exemplo de utilizao pode ser visto na figura 2.

253
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Criao de vigas no Lyrebird com linhas criadas em Rhinoceros (source:


https://lmnarchitects.com/tech-studio/bim/superb-lyrebird/).

2.2 Dynamo
Dynamo um plug-in para o Revit fortemente influenciado por linguagens de programao
visuais como o Grasshopper. Tal como no Grasshopper, os utilizadores criam um grafo de fluxo
de dados, utilizando ns que se encontram ligados entre si com cabos, associados a portos que
cada n contm. Os ns podem representar diversos elementos do Revit, como linhas, funes
matemticas e objetos BIM. Os utilizadores podem tambm definir ns personalizados, de
forma a estender a funcionalidade base do Dynamo [8].

O Dynamo tambm suporta ns de cdigo, que so elementos que podem conter pequenos
programas escritos numa linguagem de programao como o Python.

2.3 GenerativeComponents
GenerativeComponents um sistema paramtrico e associativo para a ferramenta BIM
Microstation da Bentley.

Este sistema baseado em propagao, ou seja, o utilizador tem de determinar as regras,


ligaes e parmetros que definem a geometria desejada. Este sistema consiste num grafo
dirigido acclico gerado por dois algoritmos: um que ordena o grafo e outro que propaga os
valores por este [9].

O GenerativeComponents oferece diversas formas de interao aos utilizadores, tendo em conta


os seus diferentes nveis de conhecimentos. A primeira atravs de uma interface grfica que
permite a manipulao direta de geometria. A segunda recorre linguagem GCScript,
permitindo criar ligaes entre objetos com pequenos programas. Por fim, tambm possvel
escrever programas na linguagem C#, permitindo a criao de algoritmos complexos.

O GenerativeComponents demonstra que uma linguagem visual pode ser mais fcil de aprender
mas que medida que o utilizador evolui e quer produzir programas mais complexos, este tende
a transitar para uma linguagem mais textual.

254
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.4 RevitPythonShell
O RevitPythonShell um plug-in desenvolvido para o Revit que permite aceder API do
mesmo na linguagem Python, simplificando assim a sua utilizao [10].

O plug-in utiliza o IronPython como linguagem e um editor de cdigo fornecido pela Python
Tools. Com este editor, os utilizadores tm acesso a um Read-Eval-Print-Loop (REPL) que lhes
permite experimentar mais facilmente as funcionalidades da API. Com a REPL, basta apenas
escrever uma expresso, avali-la, ver os resultados e passar prxima expresso [10].

2.5 Comparao
A tabela 1 apresenta uma comparao entre as ferramentas analisadas.

Tabela 1: Comparao entre as ferramentas analisadas. O smbolo - indica suporte limitado,


indica suporte e indica o no suporte. Na ltima coluna o nmero de traduz a quantidade
de funcionalidade suportada.
Visual Textual Suporte Operaes Operaes
BIM Geomtricas BIM
Grasshopper -
Lyrebird
Dynamo -
GenerativeComponents
RevitPythonShell

Como possvel verificar, muitas destas ferramentas: (1) tiram proveito de linguagens de
programao visuais, dada a sua simplicidade e facilidade de aprendizagem; (2) oferecem
algum suporte a linguagens de programao textual, apesar de se restringirem a pequenos
programas; e (3) oferecem suporte a operaes BIM, demonstrando a necessidade de explorar
as ferramentas BIM com DG.

2.6 Problemas a Resolver


Uma das desvantagens das ferramentas analisadas est relacionada com a utilizao de
linguagens visuais. Apesar de mais fceis de aprender, estas no escalam bem com a
complexidade dos programas, ou seja, os programas tornam-se mais difceis de perceber e editar
[11].

Em relao s ferramentas que oferecem suporte a linguagens textuais, muitas destas tiram
proveito de linguagens profissionais, como C#, que so difceis de serem utilizadas por
principiantes. Para alm disto, algumas das ferramentas requerem conceitos avanados de
programao, o que dificulta a aprendizagem das mesmas.

Por fim, todas estas ferramentas esto ligadas a apenas uma ferramenta BIM/CAD e utilizam
linguagens de programao muito especficas. Caso o utilizador queira mudar de linguagem ou
ferramenta de modelao, ter de reescrever o seu programa.

255
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Estes so os problemas que pretendemos resolver com a nossa soluo.

3. Design Generativo para BIM

De forma a permitir que os utilizadores desenvolvam programas que escalam bem com a
complexidade, desenvolvemos uma soluo baseada em linguagens de programao textuais.
No entanto, como estas linguagens so mais difceis de aprender, decidimos utilizar linguagens
que tm qualidades pedaggicas, como Python e Racket. Alm disto, queremos disponibilizar
operaes BIM fceis de compreender e utilizar, assim como oferecer portabilidade entre
aplicaes BIM.

Por estas razes, a nossa soluo constituda por trs elementos: (1) um Integrated
Development Environment (IDE) onde o utilizador escreve os seus programas; (2) uma Camada
de Abstrao que fornece as operaes necessrias; e (3) um plug-in que permite comunicar e
produzir os resultados nas ferramentas BIM [12]. A arquitetura da soluo pode ser vista na
figura 3.

Figura 3: Arquitetura da soluo.

Nas prximas seces exploramos cada um destes componentes.

3.1 Integrated Development Environment


A soluo utiliza linguagens de programao textuais, dado a sua flexibilidade e escalabilidade,
embora estas sejam mais complexas para principiantes. Para alm da linguagem, necessrio
um IDE com funcionalidades adequadas para principiantes, para escrever e depurar os
programas. Estas funcionalidades so de extrema importncia, pois ajudam a ultrapassar as
barreiras de entrada das linguagens textuais. Por estas razes, decidimos usar o Rosetta e tirar
proveito do IDE que este utiliza, o DrRacket, um ambiente de programao pedaggico [13]
pensado para principiantes.

Ao utilizar o Rosetta, os utilizadores podem escolher em que linguagem de programao


querem escrever os seus programas. Racket, Python, Processing e Javascript so alguns
exemplos de linguagens disponveis. Esta possibilidade ajuda utilizadores que saibam algumas
destas linguagens, pois elimina a necessidade de terem de aprender a programar numa nova
linguagem. No entanto, mesmo que tenham de aprender, todas as linguagens disponibilizadas
so pedaggicas e usadas no ensino, o que facilita o processo.

256
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.2 Camada de Abstrao


Para escreverem programas de DG que produzam os resultados desejados, os utilizadores
precisam de funes que lhes permitam ter acesso a funcionalidades da ferramenta BIM. Estas
funes devem permitir aos utilizadores criar objetos BIM e definir toda a informao
necessria para produzir um projeto completo.

Por exemplo, se um utilizador quiser produzir uma parede com uma porta, este necessita de
funes capazes de produzir ambos os elementos. A funo capaz de criar paredes dever
receber informao acerca da altura, comprimento, posio e tipo de parede, de forma a criar o
objeto BIM correto. Aps criar a parede, a funo que cria a porta ser utilizada, recebendo no
s a posio e tipo da porta, mas tambm a parede onde a porta ser colocada, criando uma
dependncia entre os objetos.

Todas estas funes tm de ser disponibilizadas numa Camada de Abstrao, uma biblioteca de
funes que simplifica e traduz as necessidades do utilizador para cdigo, de forma a que
possam ser utilizadas nas diversas aplicaes BIM. De forma a implementar esta camada,
decidimos expandir o Rosetta, tirando proveito das funes e abstraes j criadas para as
ferramentas CAD, como sistemas de coordenadas e entidades geomtricas e crimos novas
funcionalidades, agora adaptadas ao paradigma BIM.

3.3 Plug-In
Finalmente, de forma a permitir que os utilizadores executem os seus programas e produzam
os modelos na aplicao BIM desejada, foi criado um componente que permite ao Rosetta
comunicar com uma aplicao BIM.

Uma vez que as ferramentas BIM disponibilizam uma API que expe as suas funcionalidades,
este componente pode ser implementado como um plug-in, escrito com a API mencionada.

Todas as funes implementadas na Camada de Abstrao tero uma funo correspondente no


plug-in. Quando uma funo executada no programa, a informao necessria enviada para
o plug-in e a funo correspondente executada na ferramenta BIM, produzindo os resultados
na mesma.
Cada ferramenta BIM necessita de um plug-in para comunicar com o Rosetta, e para testarmos
a nossa soluo comeamos por introduzir um plug-in para o Revit. Este foi desenvolvido
utilizando a API do Revit, tendo sido escrito na linguagem C#. No entanto, toda a complexidade
deste escondida pela Camada de Abstrao mencionada anteriormente, sendo esse um dos
seus principais objetivos. Desta forma, os utilizadores podem utilizar funes simples e
intuitivas, estando toda a complexidade necessria para trabalhar com as ferramentas escondida
no plug-in. neste componente que todos os clculos para criar os objetos so efetuados, assim
como toda a gesto de transaes aplicacionais necessrias para visualizar os resultados.

4. Avaliao

De forma a avaliar a nossa soluo, desenvolvemos um conjunto de casos de estudo que nos
permitiram demonstrar as diversas capacidades que pretendamos alcanar. Nas prximas

257
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

seces iremos descrever alguns modelos desenvolvidos que ilustram as funcionalidades BIM
da soluo, a portabilidade desta e a sua aplicao.

4.1 Funcionalidades BIM


Dado que o que pretendamos atingir era a capacidade de utilizar o paradigma BIM com DG,
comemos por desenvolver um modelo que tirasse proveito das capacidades das aplicaes
BIM, nomeadamente os objetos e as ligaes e dependncias entre estes. Para tal,
desenvolvemos para BIM um modelo que tinha sido previamente desenvolvido com DG para
CAD: as Dubai Towers, criadas por Sama Dubai. Este modelo tinha sido produzido por um
programa que gerava apenas geometria e era nosso objetivo produzir o mesmo modelo, mas
com conceitos BIM. Utilizando as novas funes que introduzimos na Camada de Abstrao
do Rosetta, foi possvel produzir o modelo em Revit, visvel na figura 4.

Ao examinarmos o modelo, pudemos verificar que todos os elementos eram objetos BIM
criados corretamente. Verificmos tambm que os elementos estavam devidamente associados,
estando cada laje associada a um nvel e cada parede associada a um nvel de base e topo, o que
condicionava a altura das mesmas. Para alm disto, foi tambm possvel criar as paredes com
as propriedades esperadas de um elemento deste tipo, apesar da sua forma irregular.

4.2 Portabilidade
Uma das principais funcionalidades oferecidas pelo Rosetta a portabilidade dos programas de
DG entre ferramentas CAD. Desta forma, quisemos manter esta funcionalidade para BIM.

Figura 4: Dubai Towers, produzidas atravs de DG no Revit.

Para demonstrar que seria possvel obter resultados semelhantes com o mesmo programa em
duas ferramentas BIM, desenvolvemos um programa que produzia um modelo das Absolute
Towers, criadas pelos MAD Architects. Dado que introduzimos funcionalidades a pensar em
conceitos gerais BIM, utilizamos o programa para produzir o modelo em Revit e em ArchiCAD,
a segunda ferramenta BIM que est atualmente a ser introduzida no Rosetta. Com algum
trabalho de uniformizao, facilitado pela Camada de Abstrao, foi possvel disponibilizar as
mesmas funes para ambas as ferramentas, o que permitiu utilizar o mesmo programa para
produzir os modelos visveis na figura 5.

258
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Absolute Towers, produzidas no Revit ( esquerda) e no ArchiCAD ( direita).

Como visvel na figura, o modelo obtido em ambas as ferramentas BIM era idntico,
possuindo o mesmo tipo de relaes entre os objetos, assim como os mesmos tipos de objetos.
Conseguimos assim obter portabilidade entre ferramentas BIM, tal como acontecia com as
ferramentas CAD. E uma vez que a portabilidade obtida atravs do programa, sendo o modelo
gerado nativamente na ferramenta alvo, no existem perdas de informao, um problema que
identificmos quando passvamos o modelo de uma ferramenta para a outra usando IFC.

Para alm da portabilidade entre ferramentas BIM, em modelos simples conseguimos tambm
alcanar portabilidade entre ferramentas CAD e BIM. Ao introduzir funes simples que
representam conceitos BIM para as ferramentas CAD, possvel ter algumas funcionalidades
BIM disponveis em todas as ferramentas. Utilizando estas funes foi possvel produzir um
modelo simples com lajes e uma fachada sinusoidal composta por vigas. Este modelo foi
produzido por um nico programa de DG, gerando o mesmo modelo em todas as ferramentas
de visualizao suportadas pelo Rosetta. O resultado visvel na figura 6.

Figura 6: Edifcio sinusoidal, produzido em OpenGL, Rhinoceros, ArchiCAD (em cima),


Sketchup, AutoCAD e Revit (em baixo).

259
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A portabilidade uma funcionalidade de extrema utilidade em DG, pois permite tirar proveito
dos pontos fortes de cada ferramenta, como seja a performance de ferramentas como o OpenGL,
para visualizar variaes simples e iniciais com rapidez, passando numa fase mais avanada
para ferramentas BIM com mais detalhe e informao.

5. Concluso

DG foi introduzido em Arquitetura como uma forma de utilizar algoritmos para explorar formas
complexas, difceis de obter por meios tradicionais. DG foi inicialmente combinado com
ferramentas CAD mas, com os avanos na rea da Arquitetura, passou a existir a necessidade
de combinar DG com ferramentas BIM. Assim, diversas ferramentas tm sido desenvolvidas
com o intuito de permitir ao utilizador produzir modelos BIM com programao. No entanto, a
maioria destas ferramentas condiciona os utilizadores a linguagens de programao
inadequadas ou limitam-no a uma s ferramenta BIM ou CAD.

Para resolver estes problemas propomos uma soluo que expande o Rosetta, um ambiente de
programao para DG adequado para principiantes. Atravs da nossa soluo, o utilizador pode
criar programas de DG para ferramentas BIM, tirando proveito das diversas funcionalidades
que o paradigma oferece. Para alm disto, o utilizador tem a liberdade de escolher em que
linguagem de programao quer programar, produzindo programas que podem ser facilmente
portados entre ferramentas BIM e, no caso de programas simples, tambm ferramentas CAD.
Atravs dos casos de estudo, mostramos a capacidade de produzir modelos BIM corretos com
programas DG desenvolvidos com a nossa soluo. tambm possvel verificar a utilidade da
portabilidade, permitindo alternar entre as ferramentas mais adequadas a cada fase do projeto,
utilizando ferramentas com melhor performance para variaes, e outras capazes de mais
detalhe em fases finais.

Como trabalho futuro pretendemos expandir as funcionalidades disponibilizadas pela


ferramenta, assim como adicionar suporte para mais ferramentas BIM. Outro objetivo ser
explorar formas de otimizao de modelos, em combinao com as ferramentas BIM,
permitindo gerar e avaliar variaes do modelo automaticamente.

Referncias

[1] J. McCormack, A. Dorian, and T. Innocent, "Generative design: a paradigm for design
research," in Proceedings of Futureground (2004), Design Research Society, Melbourne,
Australia, 2004.
[2] R. Garber, BIM Design, Realising the Creative Potential of Building Information
Modelling. Hoboken, N.J.: Wiley 2014.
[3] R. Fernandes, "Generative Design: a new stage in the design process," Tese de Mestrado,
Instituto Superior Tcnico, Lisboa, Portugal, 2013.
[4] J. Lopes, and A.Leito, "Portable generative design for CAD applications," in
Proceedings of the 31st annual conference of the Association for Computer Aided
Design in Architecture (2011), Calgary/Banff, Canada, 2011, pp. 196-203.

260
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[5] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors.
Hoboken, N.J.: Wiley, 2008.
[6] A.Payne, and R. Issa, Grasshopper Primer, Zen Edition. Robert McNeel & Associates,
2009.
[7] T. Logan, "Superb Lyrebird", February, 2014. Acedido em Abril de 2015. Disponvel
em: http://lmnts.lmnarchitects.com/bim/superb-lyrebird/
[8] Dynamo. Acedido em Dezembro de 2014. Disponvel em: http://dynamobim.com/learn/
[9] R. Aish, and R. Woodbury, "Multi-level interaction in parametric design," in Smart
Graphics (2005), Springer, Berlin, Germany, 2005.
[10] D. Thomas, "Introducing RevitPythonShell", December, 2009. Acedido em Abril de
2015. Disponvel em: http://darenatwork.blogspot.pt/2009/12/introducing-
revitpythonshell.html
[11] A. Leito, and L. Santos, "Programming languages for generative design," in Respecting
fragile places - Proceedings of the 29th Conference on Education in Computed Aided
Architectural Design in Europe (2011), Ljubljana, Slovenia, 2011, pp. 549-557.
[12] B. Ferreira, and A. Leito, "Generative design for building information modeling," in
Real Time - Proceedings of the 33rd International Conference on Education and
Research in Computed Aided Architectural Design in Europe (2015), Vienna, Austria,
2015, pp. 635- 644.
[13] R. B. Findler, C. Flanagan, M. Flatt, S. Krishnamurthi, and M.Felleisen, "DrScheme: A
pedagogic environment for Scheme," in Programming Languages: Implementations,
Logics, and Programs, Springer, 1997, pp. 369-388.

261
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

262
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

UMA ARQUITETURA DE OBJETOS

Rafael Vieira (1)

(1) Faculdade de Arquitetura da Universidade do Porto, Porto, rafael_vieira120@hotmail.com

Resumo
Entre as fundaes e cobertura, os edifcios compem-se de elementos definveis pela forma ou
funo. Sendo que, por um lado, os Arquitetos fundamentam o seu trabalho na idealizao de
planos, e, por outro, BIM est numa fase crescente dentro da indstria da construo por
melhorar a interdisciplinaridade entre profissionais ao sintetizar processos, verifica-se uma
oportunidade, para os primeiros, atravs do desenho por computador, de melhorarem o seu
Arquivo, compondo-o com DIM, e continuarem a apresentar-se como criadores.

A investigao centra-se no desenvolvimento de BEM para funcionar como acervo de


Arquitetura a usar em projeto. A metodologia utilizada de estudo de caso, desenvolvido no
ltimo ano, para o qual foram realizados testes de replicao de elementos correspondentes aos
vos de aberturas interiores e exteriores. O objetivo mostrar como a utilizao destes
elementos contribui para operacionalizar a realizao de uma forma mais organizada e
dinmica.

1. Introduo

As empresas devem ter a capacidade de desenvolver objetos paramtricos definidos pelo


utilizador, bibliotecas corporativas de objetos para controlo personalizado da qualidade
e estabelecer as suas melhores prticas [1].

Eastman et al referem-se, assim, tcnica para metodologias a utilizar em projeto, indicando


um caminho para que os escritrios desenvolvam princpios de autonomia, que lhes possibilite
acompanhar processos de base digital, partindo de um princpio desenvolver objetos
paramtricos que contribui para a atualizao da composio do Arquivo.

263
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os objetos, referidos pelos autores, correspondem aos utilizados nessas metodologias. Estes,
tm forma e funo especfica que variam de forma inteligente, aos quais associada
informao, e que, conjugados, possibilitam que se estude um edifcio pelas partes que o
compem. Um possvel caso, destes objetos, so os elementos de vos de abertura portas e
janelas , analisados, aqui, pela sua indispensabilidade ao projeto de Arquitetura, dada a funo
que desempenham na relao entre espaos.

Como j existem processos implementados, para este princpio, um caminho possvel pode ser
a adaptao de metodologias anteriores s novas ferramentas, que incluem possibilidades mais
completas de que se pode tirar partido para os processos aplicados execuo arquitetnica, a
utilizar dentro de BIM, para a interdisciplinaridade entre profissionais.

Neste sentido, o objetivo perceber a importncia do desenvolvimento de BEM de vos de


abertura, como podem evoluir os processos anteriormente utilizados para novas metodologias,
e as questes que se relacionam com o desenvolvimento destes elementos. Assim, ser possvel
perceber a importncia da definio dos objetos para a interdisciplinaridade em processo de
projeto, bem como, para a Arquitetura.

O mtodo utilizado o de investigao terico-prtica, com base no projeto de um edifcio


construdo o Pavilho de Portugal 98, lvaro Siza , realizada durante o ltimo ano para a
concluso dos estudos de grau de Mestre em Arquitetura.

2. De interdisciplinaridade e objetos

Em tempos de interdisciplinaridade compete-lhe [ao Arquiteto], sobretudo, promover e


coordenar a convergncia das muitas competncias que a construo e a realidade
envolvem. O objetivo atingvel de espontnea adio de saberes, simultaneamente
autnomos e ajustveis [2].

Sensatas palavras do Arquiteto lvaro Siza referindo-se ao arquiteto contemporneo,


apresentando-o como um autor, num apontamento de experincia de centenas de obras
espalhadas pelo mundo, e indicando tempos onde se tm verificado mudanas visveis de
comportamento e posicionamento na rea da construo, a encarar como uma oportunidade.
Nestas palavras, pode-se interpretar que o Arquiteto pode ter um papel importante na ateno
interao de cada disciplina, na procura de construir relaes, nos previsveis desacordos,
portando o equilbrio entre elas, pesando e medindo circunstncias, num enquadramento
comum e harmonioso, na procura de um resultado ajustado, entre as solues construtivas e as
pretenses espaciais.

Para a Arquitetura, os objetos tm a importncia de definir espaos, criar atmosferas, revelando


sentidos de evoluo de pensamento funcional, sendo reflexo das circunstncias de lugares e de
definio da singularidade de cada construo. A produo aliada ao processo criativo aumenta
a possibilidade de provveis solues a adotar, verificando-se a transio de elementos que se
repetem entre projetos para solucionar as formas desejadas, ou colocao de elementos
singulares, intransmissveis ou identitrios. Estes, podem colocar-se em dois grandes grupos:

264
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de Empresas enquadrando-se numa identidade de produtos desenvolvidos para produo; ou


de Arquitetos enquadrando-se na sua marca de identidade desenvolvida ao longo da sua vida
profissional. Cada vez mais se verifica o servio e a qualidade como fatores diferenciadores,
adequados transio do atual paradigma de produto de marca com garantia para produto com
garantia da marca, num sentido de identificao de qualidade.

Posto isto, difcil dizer o que um objeto porque pode ser visto tanto como uma pea com
uma forma num material qualquer, como um conjunto de peas que permitem que se cumpra
uma funo. Sem haver um limite que enquadre a sua definio, pensa-se que pode ser definido
pela fase em que se encontra, porque a ideia do que varia em funo dos objetivos que se
pretendem dele. Ou seja, por exemplo, uma porta um conjunto de objetos aro, folha,
moldura, entre outros na sua fase de construo e um objeto nico no desempenho da sua
funo, um todo constitudo pelas partes.

Mas no s de objetos visveis se faz um projeto. Um espao livre entre paredes e pisos
desenhado para definir o conforto, tem a caraterstica de ser uma massa fixa com forma e limites
definidos quando fechados, e massa mvel com formas variveis e moldveis quando aberto.
Nesta perspetiva, tal como os elementos visveis, pode pensar-se no espao livre como um
objeto criado para formalizar a definio do habitvel, do conforto.

Por tudo isto, o resultado final beneficiar com a definio dos objetos de composio para a
edificao, com relaes controladas de forma sequencial em hierarquia, por fases, que
cumpram ou faam cumprir funes clssicas ou modernas, de forma a ajudar o atual contexto
de maior complexidade construtiva verificado [Figura 1].

Figura 1: Visualizao tridimensional de um Modelo Integrado de Arquitetura.

2.1 No paradigma do digital


Projetar a partir do digital mantm o processo de trabalho de comunicao de ideias do
paradigma anterior, utilizando metodologias que recorrem a modelos de informao, para que

265
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

o Arquiteto teste o ambiente e o espao de uma realidade, numa simulao virtual, com
entidades, que Kennedy define como elemento grfico discreto e definvel [3].

Partindo desta definio, entidade no abrange todas as pretenses para BIM e, neste sentido,
Eastman et al identificam BEM Building Element Model [1] , o que, nesta sequncia, pode
levar a que se pense, neste, como uma evoluo natural do anterior.

Este, apresenta recursos direcionados para o entendimento do objeto real, por ser paramtrico,
autnomo, incluir mais informao geomtrica e escrita, referenciar a aplicabilidade
georreferenciao e apresentar potencialidades na qualificao da representao grfica para
visualizao 3D. da relao entre tipos de objetos de BEM, seja por associao a outro que
funcione como um hospedeiro, seja por funcionar autonomamente, seja por contar com luz
prpria, entre mais particularidades, que resulta a imagem geomtrica do modelo integrado
onde toda a informao desenvolvida corresponde escala 1:1 da construo. Estes, incluindo-
se dentro de BIM para dar resposta a procedimentos atuais, estabelecem direes processuais
complementares, tendo em conta especificaes de caractersticas, atravs do levantamento e
transferncia de informao para extrao de dados, de divulgao e partilha entre pessoas. O
seu formato aberto permite que possam ser alterados, reformulados ou transformados em
qualquer altura, criando, por um lado, mais alternativas para casos excecionais, mas, por outro,
fazendo com que seja necessrio confirmar os dados da modelao de forma regular.

Para alm do desenvolvimento de cada exemplar para um novo BEM, pode ser necessrio
proceder replicao de uns, derivados de outros, alterando ou transformando o primeiro,
verificando-se uma oportunidade de hereditariedade entre objetos, ou pelas suas caractersticas
de contacto com outros elementos variarem, ainda, ou por se comporem de elementos que
funcionam de maneira diferente, apesar de manterem, na gnese, a mesma imagem [Figura 2].

Figura 2: Visualizao tridimensional de um BEM.

266
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tirando partido da potencialidade das interligaes do digital, BIM pode funcionar como um
ponto de partida para aproximar o trabalho dos intervenientes, fazendo parte de uma nova forma
de projetar que evolui a partir do grau zero o projeto de Arquiteto , de onde se parte para
outros nveis de desenvolvimento, compreendendo as fases de projeto, construo ou gesto, e
para onde tudo converge, num processo ritmado e ondulante, at ao projeto de Arquitetura
sntese do trabalho interdisciplinar que inclui todas as especialidades .

Neste sentido, os Arquivos podem desempenhar um papel de comunicao em projeto,


permitindo trabalhar em vrias dimenses, mantendo a forma de comunicao anterior,
podendo atualizar um elemento particular e permitindo recuos e avanos, sem necessidade de
parar o desenvolvimento do projeto.

3. Por uma base de dados

H um grande interesse internacional no desenvolvimento de bibliotecas de objetos para


apoiar o uso do BIM [4].

Estas bibliotecas de objetos referidas por Duddy et al compem-se por objetos digitais,
definidos pela sua forma e funo, para projeto. Estes, aproximam-se do que pode ser um acervo
a fazer parte de um Arquivo de Projeto de Arquitetura. Por a definio de biblioteca de objetos
ser mais abrangente e no se associar diretamente a BIM, no sendo conhecida outra definio,
prope-se DIM Database Information Modelling numa perspetiva de definir o acervo de
projeto que se compe de elementos para uma metodologia dentro da corrente BIM, como
BEM, templates e exemplos de espaos desenvolvidos para modelos integrados.

DIM associa a representatividade formal composio tcnica e a sua criao no dispensa


uma margem mimtica, necessria para prever imponderveis. Desenvolve-lo, deve envolver o
conhecimento da soluo tradicional, adaptada s circunstncias da metodologia utilizada. Este,
deve ter as suas correspondncias alinhadas com as do template, para que a informao, tanto
escrita, como geomtrica, se associe da forma pretendida a esses modelos.

A informao selecionada, aps o levantamento, pode apresentar indicaes de como pode ser
pensada a estrutura de composio para DIM, sendo possvel pensar-se numa organizao que
parte das classes de famlias e famlias de objetos onde se organizam os ficheiros de BEM, de
maneira a que os grupos fiquem cada vez mais restritivos [Figura 3].

267
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Organizao de um DIM.

3.1 Da modelao de BEM


Este princpio de desenvolvimento, baseando-se nas indicaes fornecidas pela informao,
tambm se podem transpor para BEM, seguindo o processo hierrquico de posio, a partir das
partes em contacto com a parede, at ao interior do objeto estudado.

O seu desenvolvimento deve partir de um ponto de origem que oriente a navegao dentro do
espao digital, de forma a servir como referncia para a sua prpria rotao ou cpia, que pode
ser o seu centro geomtrico, um vrtice, ou outro.

A partir deste ponto, necessrio ter controlo sobre as massas e, neste sentido, pode-se tomar
medidas que funcionem de forma auxiliar para regularizao da composio. Para isso, podem
ser utilizados eixos orientadores das geometrias, funcionando como o elemento que aproxima
o funcionamento entre as instncias que compem os tipos de objetos. Estes, so elementos de
visibilidade opcional, a utilizar para auxiliar o processo de modelao, ao qual so associadas
as faces das massas que esto em contacto entre si ou no mesmo plano.

Com estes eixos, torna-se mais fcil utilizar parmetros que funcionam como o veculo para
controlar as vrias formas de cada tipo de objeto. Nestes, indicada uma pretenso, que
despoletar uma ao, atravs de cotas parametrizadas que, segundo estes casos de estudos, se
organizam em trs tipos: ora por paralelismo distncia entre si, refletindo-se na altura, largura,
profundidade; ora por ngulo a partir de um ponto de convergncia ou repetio nmero
de instncias pretendidas em linha . Em situaes mais avanadas, pode-se verificar uma
indicao de um parmetro que controla a definio de outros parmetros que recebem a
informao indicada neste. A conjugao de parmetros dentro de um BEM deve ser controlada
de forma a manter a lgica coletiva, tendo cuidado com desacordos.

Os elementos de modelao so representados por ferramentas com vrias funes a partir de


formas 2D, que so tratadas por extruso com medida ou percurso, por rotao para um objeto
circular simtrico e por unio de percurso ou de arestas entre perfis.

268
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Entre as variaes de medidas, que correspondem criao de novos tipos de objetos e a


necessidade de criar uma nova famlia de objetos, a criao de parmetros de visibilidade de
ocultao de informao grfica ou escrita permite mais alternativas para a sua utilizao.

No final da modelao, acrescentada a informao escrita reconhecida, como descrio que


acompanha os desenhos, indicaes do seu autor, o ttulo da obra, entre outras [Figura 4].

Figura 4: Exemplo de tratamento da informao dentro da classe correspondente [5].

3.2 Especificaes de aberturas em paredes exteriores e interiores


Para um DIM associado a projeto de Arquitetura, poderiam ser estudados vrios casos de
elementos. Aqui, opta-se por estudar as aberturas em paredes interiores e exteriores de um
edifcio, dada a sua importncia na definio da forma, funo e relao entre os espaos de
que fazem parte, abordando especificidades no tema do desenvolvimento de BEM.

Para o processo de modelao, deve-se ter em conta o desenho da abertura do vo para a forma
como podem ser trabalhadas as posies de acordo com o funcionamento, pelo que se deve
criar um sistema que possibilite a colocao em qualquer uma das posies desejadas. No caso
de aberturas do interior, espectvel esperar tanto as duas posies esquerda ou direita
como as duas direes de abertura de entrada ou sada de espaos . No caso de aberturas do
exterior, verifica-se, como no anterior, as duas posies de abertura esquerda ou direita ,
sendo que, para a direo, apenas para um dos lados ou interior ou exterior .

Tanto para paredes exteriores como interiores, deve-se considerar a colocao da porta de
acordo com a face da parede, criando um sistema que possibilite alinhamentos ou afastamentos
de forma a que a sua colocao seja mais rpida e precisa.

Com as ferramentas apresentadas anteriormente, so desenhadas as peas que compem o


objeto, como a folha da porta, moldura, vidro, aro, entre outros. Para isso, deve-se ter em conta

269
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

que a dimenso de BEM pode sobrecarregar o modelo integrado, tornando o modelo pouco
operativo. Assim, de forma a no sobrecarregar o BEM, pode-se evitar modelar elementos de
menor dimenso parafusos, entre outros que possam no ter expresso para as escalas usadas
na representao grfica dentro do modelo integrado.

Para alm da composio visvel, pode verificar-se a necessidade de modelar os elementos com
funo tcnica invisvel ex.: pr-aro para utilizar na fase de pormenorizao, a acrescentar
a BEM, que deixam essa alternativa em aberto. Para os exemplos que no tm que ter
representao tridimensional, como informaes de funo ou a direo da abertura, por
exemplo, podem ter representao grfica bidimensional, para que sirva a compreenso da
utilizao do objeto em causa sem sobrecarregar o ficheiro.

Figura 5: Exemplo de tratamento de informao de BEM no Modelo Integrado [5].

Durante o processo de modelao devem ser realizados testes de funcionamento dentro do


modelo integrado, para testar a representao com o conjunto [Figura 5].

Estes testes, como se colocam numa fase intermdia entre o incio da modelao e a sua
concluso, so importantes para revelar as fragilidades prprias de cada BEM, a serem tidas em
conta nas fases seguintes, e para que sejam criadas solues que, quando este for usado de forma
definitiva, no se verifiquem.

Da realizao para estes casos de estudo, so apresentados alguns dos desacordos mais
verificadas ao longo deste processo. Assim:
nas peas de contacto com a parede necessrio ter ateno se mantm a sua prpria
espessura, se a profundidade pretendida acompanha a espessura da parede e se os seus
recortes para encaixe e faces de contacto com a parede mantm a posio pretendida;
nas peas internas necessrio verificar se mantm a sua prpria espessura e se as suas
faces mantm a posio de relao pretendida com outras peas.

270
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

no caso de ter mais que uma folha, seja a manter o nmero de folhas com ou sem
variao do tamanho, seja a aumentar ou diminuir o seu nmero com ou sem variao
do mesmo, independentemente da forma de funcionamento, deve-se ter ateno se
mantm a proporcionalidade entre medidas individuais e de conjunto, os contactos entre
folhas, bem como se a definio de contacto com a parede a pretendida.
nos parmetros que controlam os eixos necessrio ter ateno se h mais que um com
a mesma funo ou se o controlo que executam entra em conflito com outros.

Para todos os objetos necessrio ter ateno se o desenho da abertura corresponde pretenso
exigida e se o puxador mantm a sua altura a partir do piso e a sua proximidade a partir do lado
de abertura [Figura 6].

Figura 6: Tratamento da informao: cima paredes exteriores; baixo paredes interiores.

Assim, este DIM de vos de abertura est pronto a ser utilizado e atualizado em ambiente prtico
de processo de modelao de projeto e, ainda, de ser reutilizado ou transformado, para outros
projetos.

4. Consideraes e trabalhos futuros

Iniciativas de bibliotecas de produtos so conduzidas por organismos nacionais,


fabricantes e empresas privadas que veem o seu potencial [4].

Estas iniciativas revelam a importncia de se investigar este tema que contribui para
operacionalizar a realizao, de uma forma mais organizada e dinmica, para novos
procedimentos ao servio do utilizador, de forma a serem implementadas e difundidas.

A criao de um DIM valida a metodologia de conceo assente em objetos de construo


arquitetnica se cada objeto integrar uma listagem da informao tcnica e administrativa
correspondente, desde a fase de conceo aplicao. Este, na organizao proposta, segundo
a investigao realizada, revela menos conflitos e serve como princpio para estruturar a
informao dos dados.

271
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Do desenvolvimento de vo de abertura em paredes interiores e exteriores, verifica-se que no


tm que substituir processos anteriores, mas, sim, completa-los, integrando-se de uma forma
progressiva, capaz de incluir mais valncias e fazer com que o arquivo se torne mais operativo.
Trabalhar com estes permite que as pessoas envolvidas em projeto sejam colocadas no centro
do tema por perderem menos tempo com trabalhos repetitivos que, de outra forma, teriam que
ser elas a fazer.

Neste sentido, para os casos, pode-se verificar a necessidade de ser desenvolvido mais que um
BEM para alguns casos, devido a variaes de elementos de composio, bem como mudanas
no contacto com a parede e na associao camada respetiva, sendo necessrio tomar
iniciativas para que a informao integrada seja compreendida nas tabelas de quantidades, ora
com novas interligaes, ora com desunio, das informaes automaticamente validadas.
Tambm, nestes, deve-se realizar testes do seu desempenho dentro de um modelo integrado,
dadas as particularidades de cada objeto, e, ainda, a quantidade e tipo de informao, que pode
incluir, devem ser trabalhados de acordo com as necessidades pretendidas, pois, esta, quando
for transferida para o modelo integrado, ser repetida quantas vezes forem necessrias, o que
pode aumentar a tamanho do ficheiro e, por consequncia, reduzir a sua operabilidade e
diminuir as suas potencialidades.

Assim, destes casos, verificou-se que h uma sntese de processos por intermdio de modelos
integrados de Arquitetura recorrendo a BEM de vos de abertura.

Depois desta investigao, para futuro, a linha manter-se- em processos de projeto associados
a metodologias de interdisciplinaridade, seguindo para anlise de procedimentos associados a
outros objetos reconhecveis em projeto de Arquitetura. Ser analisada a relao entre o
template utilizado para o desenvolvimento de projeto e os BEM, de maneira a perceber a
importncia da sua definio na sua utilizao para o projeto. E, ainda, sero iniciadas anlises
de implementao em empresas, bem como outras dinmicas, para relacionar a investigao
individual com a aplicabilidade e utilizao em prtica coletiva.

Figura 7: Visualizao tridimensional de portas e janelas num Modelo Integrado [5].

272
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Referncias

[1] C. M. Eastman, P. Teicholz, R. Sacks, e K. Liston, Manual de BIM. So Paulo: Bookman


Editora Ltd., 2014.
[2] SPAutores 1925, lvaro Siza Vieira | Prmio Vida e Obra de Autor Nacional, RTP,
Portugal, 2015.
[3] E. L. Kennedy, CAD: Dibujo-Deseo-Gestion de Datos. Barcelona: Editorial Gilli, S.
A., 1998.
[4] K. Duddy, S. Beazley, R. Drogemuller, e J. Kiegeland, A platform-independent product
library for BIM, em 30th CIB W78 International Conference, 2013.
[5] R. S. Vieira, Progresso no Arquivo de Projeto: Acesso pelo BIM, Faculdade de
Arquitetura da Universidade do Porto, Porto, 2016.

273
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

274
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

OTIMIZAO EVOLUTIVA DE FORMA PARA


SUSTENTABILIDADE, CRUZANDO O BIM E A MODELAO
ALGORTMICA
Pedro Santiago (1)

(1) Universidade Fernando Pessoa, Porto

Resumo
As reas urbanas consolidadas apresentam geralmente um desafio para o arquiteto
relativamente s decises de desenho sustentvel a implementar. O local, a orientao e a
envolvente construda constituem um compromisso para os sistemas passivos e ativos,
reduzindo as possveis medidas de otimizao, deixando o arquiteto com incertezas quanto
eficincia do edifcio. O uso de tecnologias de BIM permite a medio e monitorizao dessas
decises de desenho, no entanto, a sua otimizao consiste num processo de tentativa e erro,
tornando-o lento e conduzindo a uma limitao significativa. Este artigo discute as
potencialidades do uso de algoritmos evolutivos para gerar solues otimizadas para a
orientao solar da fachada. A inter-conectividade em tempo real do sistema BIM e de
programas de modelao algortmica representa uma vantagem para a diversidade e rapidez nas
decises de desenho e projeto sustentveis.

275
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

Entre as vrias estratgias para melhorar a eficincia energtica na Europa, os edifcios devem
ser considerados como um dos principais objetivos, uma vez que so responsveis por cerca de
40% do consumo de energia na Europa. As atuais diretivas de eficincia energtica nos edifcios
da UE (Diretivas 2002/91 / CE, 2010/31 / UE, Nearly Zero Energy Building) impem novas
exigncias na construo e renovao de edifcios com o objetivo de criar um parque edificado
NZEB. Nessa premissa a abordagem ao ato de projetar ter que recorrer a estratgias
informadas e fundamentadas em dados concretos e realistas. A adoo de estratgias
inteligentes ser essencial para otimizar envolventes edificadas podendo comear desde o fator
forma com a finalidade de minimizar o consumo de energia garantindo em simultneo o
conforto dos seus ocupantes. No contexto da gerao prpria de energia a partir de fontes
renovveis, no sentido de atingir o ponto mais prximo do balano energtico nulo ou 0, gera-
se um problema antagnico de maximizao de ganhos solares (a fonte de energia mais
abundante) nos locais de implementao dos sistemas geradores, em paralelo com a
minimizao de ganhos nos perodos mais quentes do ano.

Os ganhos solares podem contribuir positivamente para o desempenho de energia trmica do


edifcio, na forma de ganhos passivos, ou negativamente, no caso de necessidade por falta de
exposio ou descontrolo formal e material. A radiao solar direta recebida pode aumentar o
conforto solar no interior do edifcio durante os meses frios e em simultneo diminuir a
necessidade de aquecimento. No entanto, durante o vero ocorre o efeito oposto, uma vez que
a radiao solar pode causar sobreaquecimento e, assim, aumentar a necessidade de
arrefecimento.

Se esta situao complexa num contexto isolado do edifcio, o contexto urbano, a partir do
ambiente construdo envolvente representa um desafio maior. Se considerarmos que metade da
populao mundial vive em cidades que consomem coletivamente trs quartos dos recursos
globais, com previses do seu aumento para trs quartos at 2050 [1], imperativo a
compreenso e criao de estratgias para minimizar o consumo de energia neste ambiente
concreto. A abordagem de maximizar a utilizao de energia solar ambiente - seja para a
converso ativa usando coletores trmicos e / ou fotovoltaicos solares ou por estratgias
passivas bioclimticas, permitem reduzir a necessidade de energia para aquecimento e
iluminao. Para trabalhar com este objetivo, a modelao computacional direcionada
disponibilidade de radiao solar pode ser uma ferramenta de apoio s decises de desenho para
arquitetura e urbanismo. No entanto a probabilidade de encontrar uma soluo ideal para a
forma geomtrica do edifcio pelo mtodo manual de tentativa e erro extremamente pequena.

possvel fazer clculos para a determinao da envolvente solar em papel utilizando os dados
do azimute solar e de elevao a par das alturas chave do ano. No entanto, o clculo no papel
um processo longo e pouco preciso para ambientes urbanos. No entanto, hoje em dia muitos
programas de desenho assistido por computador e paramtricos integram ferramentas de
simulao ambiental que incluem a possibilidade de avaliar envolventes solares de forma
automtica. um procedimento simples que requer pouca informao externa, onde se
encontram por exemplo a localizao, volumes envolventes, planos que definam a rea a avaliar
e perodos de anlise. No entanto este sistema permite apenas avaliar o potencial da envolvente

276
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

solar, sendo o processo de otimizao manual, muitas vezes baseado na experincia e


conhecimento adquirido do projetista, limitando o loque de solues a estes fatores e ao tempo
disponvel para o desenho. Dada a complexidade geomtrica e volumtrica do ambiente urbano
a par dos objetivos do estudo prope-se um mtodo alternativo e mais eficiente.

Prope-se um mtodo para gerar envolventes solares que consideram requisitos


multidirecionais de acesso a ganhos solares diretos em ambientes urbanos complexos. Este
mtodo foi desenvolvido para a avaliao das potencialidades de construo em reas
consolidadas existentes na cidade do Porto, integrando clculos de acesso direto solar a partir
de simulaes computacionais ambientais, gerao de envolventes solares usando desenho
paramtrico e plugin de otimizao. O modelo urbano a integrar a proposta foi construdo num
programa BIM, o Archicad que permite a conexo em tempo real com a ferramenta de
programao visual Grasshopper onde foi desenvolvido o algoritmo. A ferramenta de
simulao ambiental utilizada para o clculo das horas de exposio solar direta no Grasshopper
o Ladybug [2], com base no seu componente sun-path Radiance, uma ferramenta validada
para simulao de radiao solar [2]. O plugin de otimizao utilizado o Galapagos [3] que
permite aplicar os princpios de otimizao evolutiva no Grasshopper.

2. Metodologia

O mtodo descrito aplicado a um edifcio situado num contexto urbano consolidado da cidade
do Porto. A envolvente direta representa dois edifcios residenciais com 4 pisos voltados para
a rua de acesso e 6 pisos voltados para o logradouro. Ambos apresentam coberturas inclinadas
de duas guas. A orientao das parcelas sobre o eixo nordeste sudoeste, representado uma
orientao pouco favorvel do ponto de vista dos ganhos e controlo solar, dada a predominncia
de sol com um angulo baixo correspondente a nascente e poente. O nmero de horas de
exposio na fachada voltada para a rua escasso por dois fatores: orientao e envolvente
direta. A fachada posterior a que apresenta maior potencial a par da cobertura inclinada. A
rea da implantao de aproximadamente 175 m2 sendo que o alinhamento com as empenas
respetivas permite alguma liberdade formal dado o desfasamento de limites no logradouro e
nas coberturas.

Numa primeira fase foi realizado um estudo do potencial solar do local no perodo de um ano.
O desenho evidente ou tradicional de concordncias de alinhamentos e geometria gerou um
volume que foi tambm submetido a anlise para referencia, base e comparao de resultados.

As superfcies e volumes gerados em ambiente BIM so exportados para o Grasshopper onde


so efetuadas as anlises a partir da construo de um algoritmo. Qualquer alterao pode ser
reintroduzida no Archicad, o que permite o acrescentar de informao e no a sua perda ao
longo do processo.

277
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Anlise do volume base.

Assim consideraram-se dois perodos do ano correspondentes estao de vero e s restantes


estaes com o objetivo de obter o mximo de exposio solar nos meses temperados e frios e
ter a situao oposta nos meses quentes do ano. A soluo incidir nica e exclusivamente no
fator forma do edifcio proposto.

O algoritmo permite controlar pontos manipulveis a partir de valores variveis dentro de um


limite e direo. A unio destes ltimos gera linhas cuja unio gera por sua vez superfcies.
Uma vez que o sistema no esttico permite um grande grau de liberdade e combinaes
dentro dos alinhamentos impostos pelas normas urbansticas. Este sistema repetido na
cobertura, permitindo a gerao de toda a pele do edifcio de acordo com as necessidades e
quadrantes solares respetivos. No final essas mesmas superfcies sero conectadas com os
elementos nativos do Archicad ainda como elementos do algoritmo permitindo a simbiose dos
sistemas de trabalho.

Figura 2: Perodos de anlise.

278
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Eficincia versus inspirao

Os problemas tcnicos ou de eficincia podem ser encarados ou mesmo interpretados como


oportunidades para melhorar a qualidade arquitetnica de um projeto. A eficincia cada vez
mais uma exigncia, principalmente quando se relaciona com questes de consumo de energia
e conforto. Um edifcio dependente de sistemas mecnicos tem gastos energticos e
manuteno constante. A eficincia depende da abordagem ao desenho desde os primeiros
passos do processo de projetar. Nem sempre esta abordagem compatvel com os elementos
formais resultantes de anlises culturais e vontades de materializao a partir de ideias. No
entanto, quando esse processo evolui ou desenvolvido em paralelo tem menos probabilidade
de entrar em conflito.

Muitas vezes a busca pela forma passa por tentativas de representao onde se afina a partir do
desenho e da maqueta a busca pelo resultado fruto da inspirao. Com isto pretende-se apontar
a eficincia como elemento gerador de solues formais interessantes e funcionais.

Os algoritmos genticos ou evolutivos so inspirados na teoria de Darwin relatada no seu A


origem das espcies. Em sntese extrema, Darwin mostra que na natureza os indivduos
competem pela sua prpria sobrevivncia, e dentro das populaes, h uma enorme variao de
indivduos: as diferentes caractersticas dos indivduos so herdadas atravs de geraes. O
importante que nem todos tm as mesmas oportunidades para transferir os seus genes ou
caractersticas para as geraes seguintes: os seres mais adaptados ao seu ambiente local tm
mais oportunidades de sobreviver e, portanto, de se reproduzir. Desta forma, eles transmitem
os seus genes sucessivamente s geraes seguintes, e, portanto, as populaes evoluem
adaptam-se cada vez melhor ao ambiente.

Os algoritmos evolutivos baseiam-se nesta seleo natural criando grupos de genes que so
testados e posteriormente cruzados entre os mais adaptados gerando solues otimizadas. Um
processo tpico do algoritmo evolutivo inclui a seleo, cruzamento e mutao. Em primeiro
lugar, so gerados aleatoriamente uma srie de pontos como populao inicial. Uma avaliao
ento conduzida para avaliar a aptido de cada indivduo. Os indivduos mais adequados
soluo ideal so escolhidos como pais da prxima srie ou gerao por cruzamento e mutao.
As geraes seguintes passam pelo mesmo processo repetidamente at ao trmino do processo
ou algoritmo. Em comparao com a metodologia de pesquisa direta, o algoritmo evolutivo tem
uma velocidade de clculo mais elevada, maior preciso e uma adaptabilidade mais forte. Com
base nos seus diferentes detalhes de implementao, os algoritmos evolutivos foram
classificados como genticos, neuro-evolutivos, de otimizao por enxame de partculas e
outros tipos.

Do ponto de vista arquitetnico as solues so extremamente variadas dentro de valores muito


semelhantes, no entanto formalmente podem apresentar caractersticas muito interessantes pois
no conhecem barreiras nem descriminam hipteses.

A utilizao de algoritmos evolutivos para melhorar aspetos energticos e de conforto interior


em edifcios apresenta vrias vantagens j testadas e implementadas em vrios casos. No campo
da reduo de necessidades de climatizao Caruso et al. recorreram ao algoritmo hibrido

279
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

CMA-ES/HDE em conjunto com o programa Radiance para explorar a forma edificada tima
e a minimizao do consumo anual de ar condicionado. A partir de um mtodo de explorao
de vrias formas e sistemas concluram a eficcia desta abordagem e da incorporao destes
algoritmos e princpios. As solues formais foram obtidas depois de 10.000 a 20.000
avaliaes com um nmero de variveis entre 18 e 26, tendo concludo que a parametrizao
Taylor conduz s melhores solues. [5] No que respeita a otimizao da radiao solar em
edifcios e formas geomtricas urbanas, quer para solues ativas como passivas Kampf et al.
atingiu um incremento de 20% a partir de simulaes com recurso ao programa Radiance em
conjunto com o algoritmo evolutivo hibrido CMA-ES/HDE, concluindo que o algoritmo
conduziu a boas solues de forma consistente e que os resultados formais so muitas vezes
pouco intuitivos revelando inovao formal. [6] Huang et al. concluram que os algoritmos
generativos so os mais populares pela sua versatilidade, velocidade e preciso, principalmente
quando envolvem problemas complexos. Os algoritmos de objetivo nico so os dominantes
[7].

O AE e suas modificaes so consideradas as melhores escolhas para resolver problemas de


otimizao de desenho de edifcios. J em 2002, Coley e Schukat tentaram introduzir AE no
processo de desenho. Construram um modelo trmico muito simples em que foram
consideradas apenas cinco variveis, onde aplicaram o AE para procurar as solues com o
mnimo consumo anual de energia. Os resultados foram satisfatrios, e foram geradas e
identificadas um grande nmero de solues timas [8]. Em 2003, Wang et al. apresentou um
estudo de caso em que o AE foi aplicado para minimizar a exergia do ciclo de vida. Em 2005,
Wang et al. aplicou um AE para a otimizao de um edifcio de forma retangular com uma rea
fixa. Considerou novamente a exergia do ciclo de vida como objetivo, e tentou encontrar a
soluo ideal para a orientao do edifcio e para os materiais de construo [9, 10]. Mais tarde,
Wang et al. resumiu os estudos de otimizao anteriores, e afirmou que, apesar de todos estes
estudos aplicados a AE, as metodologias que utilizadas no tinham versatilidade. A abordagem
de otimizao iria falhar quando aplicada a outro caso. Wang et al. sugeriu o desenvolvimento
de uma estrutura orientada ao objeto, para que o mtodo de AE pudesse ser facilmente adotado
com simulao numrica dentro de uma interface muito mais amigvel. Esta abordagem poderia
melhorar significativamente a eficincia do processo de otimizao [11]. Com a abordagem
desenvolvida, Wang et al. realizou um estudo sistemtico de considerar variveis de projeto de
fachada, incluindo forma, estrutura, tipo de material e dispositivo de sombreamento [12].

Wright e Mourshed conceberam um estudo interessante para testar o comportamento


estocstico e a fiabilidade do AE na otimizao da relao janela/parede na envolvente de um
edifcio. Dividiram a fachada em clulas retangulares pequenas em que cada uma poderia ser
dotada de material opaco ou de vidro. Correram a otimizao baseada em AE vrias vezes, e
descobriram que, embora a distribuio de clulas de envidraadas fosse diferente para cada
soluo otimizada, o nmero de clulas de vidro permaneceu constante [13]. Tuhus-Dubrow e
Krarti conduziram uma otimizao na forma da envolvente de um edifcio residencial nos EUA.
Escolheram a minimizao do consumo de energia como objetivo. Os resultados mostraram
que, embora existissem algumas diferenas no consumo de energia entre as diferentes formas
de envolvente, estes desvios estavam dentro de 0,5%. Estes autores afirmaram que outras
variveis, como orientao ou materiais de construo podem afetar o desempenho energtico
do edifcio de forma mais significativa, e, portanto, devem receber mais ateno [14]. Sahu et

280
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

al. realizou uma otimizao de projeto baseado em AE com incidncia na forma, orientao e
materiais da envolvente do edifcio. Selecionou a minimizao do consumo de energia como
objetivo e fez uma validao detalhada com a ferramenta de simulao TRSYS. Descobriu que
o clima teve um efeito na preciso da otimizao. Se a situao de carga isolada para o espao
era complexa, com uma combinao amplamente varivel de condies de aquecimento, de
arrefecimento e de humidade, o grau de erro seria maior [15]. De Luca recorreu a um algoritmo
evolutivo dentro do sistema do Grasshopper com recurso ao plugin de anlise Ladybug e aos
algoritmos evolutivos do plugin Octopus para otimizar a envolvente edificada possvel dentro
dos constrangimentos legais locais de ensombramento entre volumes edificados. O processo
atingiu valores de otimizao de 60% com volumes possveis de construo superiores [16].
Jonathan A. Wright et al. recorreu ao algoritmo evolutivo multi-objectivo NSGA-II para
otimizar a percentagem de rea envidraada na fachada de um edifcio para minimizar os gastos
energticos necessrios a iluminao e climatizao. O sucesso da investigao foi uma reduo
significativa no consumo de energia com solues pouco convencionais do ponto de vista do
desenho [17]. Mais recentemente, Figueiredo et al. conduziu uma investigao de otimizao
energtica com aplicao de algoritmos evolutivos em Portugal onde geraram um grande leque
de solues otimizadas dentro do contexto construtivo local para vrias regies do pas [18].

4. Resultados

A soluo base apresenta uma radiao total anual de 498482 kw/h distribudos por 164472
kw/h nos trs meses de vero e os restantes 334010 kw/h pelos restantes meses do ano. Apesar
destes resultados absolutos pode-se verificar pela geometria do volume a presena de algumas
reas em sombra, o que cria pouca uniformidade na distribuio da energia solar.

A soluo proposta pelo resultado dos clculos do algoritmo apresenta uma radiao total anual
superior, o que poder partida conduzir a uma concluso negativa do processo. No entanto
dos 508609 kw/h anuais, a sua distribuio de 153190 kw/h nos meses quentes e os restantes
355419 kw/h nos meses frios. Assim temos menos incidncia solar no vero e maior ao longo
do ano. O potencial energtico mais elevado e distribudo de acordo com as necessidades do
edifcio.

Tabela 1: Comparao de resultados.


Radiao solar Radiao solar Radiao anual
meses quentes meses frios total
Caso base 164472 334010 498482
Caso proposto 153190 355419 508609
Caso 3 - 11 282 + 21 409 + 10 127

O fator forma do edifcio foi alterado provocando uma distoro na cobertura e na fachada
permitindo o aumento de insolao nos planos inclinados do telhado a par de um
ensombramento natural na fachada dada a inclinao subtil gerada pela manipulao dos pontos
geradores.

281
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A nova envolvente edificada apresentou uma configurao mais favorvel sem comprometer a
rea de implantao ou o volume total de construo.

Figura 3: Primeiras fases do processo de otimizao evolutiva.

Figura 4: Fluxo de trabalho entre todos os programas envolvidos.

5. Concluses

As tcnicas e sistemas de otimizao utilizados atualmente apresentam vrias limitaes. O


desenho e o projeto informado por dados implica muitas vezes o recurso a vrios programas
com metodologias muito distantes que criam alienao dos conceitos iniciais. A migrao de
informao entre programas provoca perdas e distores de resultados. O mtodo proposto tira
partido das capacidades de vrios programas sem sair do programa base, neste caso o Archicad.
A metodologia BIM no permitia de forma isolada incorporar as vantagens e capacidades de
gerao de solues possibilitadas pelos programas de construo de algoritmos paramtricos
e generativos, a par de todos os subprogramas acoplados.

A vantagem do mtodo proposto a permisso em tempo real, fator muito importante no


desenvolvimento do processo de trabalho na fase inicial do projeto, de constituir um sistema de
trabalho que passa pelo processo de implementao do conceito, respetiva anlise e processos
de otimizao de forma, neste caso com recurso a processos evolutivos. Os exemplos
apresentados recorrem sempre a ambientes digitais externos ao programa de conceo base, o
que compromete sempre a agilizao de processos de pensamento e anlise, a par de erros de
importao exportao e por vezes perda de dados. Esta proposta integral, dinmica e
consegue potenciar as vantagens de ambos sistemas. O resultado de base mais vantajoso,

282
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

permitindo tambm o trabalho com formas mais adaptadas sem comprometer outros fatores e
condicionantes.

Referncias

[1] United Nations, World Urbanization Prospects: The 2014 Revision, 2004.
[2] Sadeghipour, M. and Smith, A., Ladybug: a parametric environmental plugin for
Grasshopper to help designers create an environmentally-conscious design, Proceedings
of BS2013: 13th Conference of International Building Performance Simulation
Association, 2013, p. 3128-3135.
[3] Yi, Y. K. and Hyoungsub, K., Agent-based geometry optimization with Genetic
Algorithm (GA) for tall apartments solar right, Solar Energy, vol.113, 2015, p. 236-250.
[4] G. Zemella, A. Faraguna, Evolutionary optimization of faade design, a new approach
for the design of building envelopes. Springer, 2014.
[5] Caruso G., Kampf J.H., Building shape optimisation to reduce air-conditioning needs
using constrained evolutionary algorithms, Solar Energy vol. 118, 2015, p. 186196
[6] Kampf J.H, Robinson D., Optimisation of building form for solar energy utilisation using
constrained evolutionary algorithms, Energy and Buildings vol. 42, 2010, p. 807814
[7] Huang Y., Niu J., Optimal building envelope design based on simulated performance:
History, current status and new potentials, Energy and Buildings vol. 117, 2016, p. 387
398
[8] D.A. Coley, S. Schukat, Low-energy design: combining computer-based optimisation
and human judgement, Build. Environ. Vol. 37, 2002, p. 12411247.
[9] W. Wang, H. Rivard, R.G. Zmeureanu, Optimizing building design with respect to life-
cycle environmental impacts, in: Proceedings of the building simulation, Eindhoven,
Netherlands, 2003.
[10] W. Wang, R. Zmeureanu, H. Rivard, Applying multi-objective geneti calgorithms in
green building design optimization, Build. Environ. vol. 40, 2005, p.15121525.
[11] W. Wang, H. Rivard, R. Zmeureanu, An object-oriented framework for simulation-based
green building design optimization with genetic algorithms, Adv. Eng. Inform. Vol. 19,
2005, p. 523.
[12] W. Wang, H. Rivard, R. Zmeureanu, Floor shape optimization for green building design,
Adv. Eng. Inform. Vol. 20, 2006, p. 367378.
[13] J. Wright, M. Mourshed, Geometric optimization of fenestration, in: Proceedings of the
building simulation, Glasgow, Scotland, 2009.
[14] D. Tuhus-Dubrow, M. Krarti, Genetic-algorithm based approach to optimize building
envelope design for residential buildings, Build. Environ. vol. 45, 2010, p.15741581.
[15] M. Sahu, B. Bhattacharjee, S.C. Kaushik, Thermal design of air-conditioned building for
tropical climate using admittance method and genetic algorithm, Energy Build. Vol. 53,
2012, p. 16.
[16] De Luca F., Solar Envelope Optimization Method for Complex Urban Environments,
DOI: 10.3311/CAADence.1657
[17] Wright J. A., Brownlee A., Mourshed M, Wang M., Multi-objective optimization of
cellular fenestration by an evolutionary algorithm, 2014, Journal of Building
Performance Simulation, 7:1, 33-51, DOI: 10.1080/19401493.2012.762808

283
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[18] Figueiredo A., Kmpf J., Vicentea R., Passive house optimization for Portugal:
Overheating evaluation and energy performance, Energy and Buildings vol. 118, 2016,
p. 181196

284
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A-BIM: ALGORITHMIC-BASED BUILDING INFORMATION


MODELLING
Sofia Feist (1), Antnio Leito (1)

(1) Instituto Superior Tcnico, Lisboa

Resumo
O Projeto Algortmico (PA) uma abordagem de design baseada em programao em que, ao
invs de ser criado o modelo 3D do design pretendido, criado um programa que gera o modelo
3D do design pretendido. Esta abordagem permite trazer grandes vantagens a todo o processo
de design e de construo, incluindo, por exemplo, a produo de geometrias complexas e a
automatizao de tarefas e processos repetitivos que seriam muito morosos na modelao
manual. Graas sua natureza parametrizvel, esta abordagem permite tambm a fcil e rpida
explorao de alternativas ao modelo inicial.

Apesar destas vantagens, o PA tem sido pouco explorado em combinao com a metodologia
Building Information Modelling (BIM). Ao combinar processos algortmicos com a
metodologia BIM surge uma nova abordagem de design baseada no desenvolvimento de
programas que geram modelos BIM do design pretendido. A esta abordagem designamos
Algorithmic-based Building Information Modelling (A-BIM).

Neste paper, definimos, exploramos e avaliamos o A-BIM num contexto arquitetnico. A partir
de um caso de estudo, comparamos o A-BIM a uma abordagem BIM manual, e demonstramos
que o A-BIM pode oferecer grandes vantagens prtica arquitetnica.

1. Introduo

Apesar das ferramentas de Computer-Aided Design (CAD), i.e., Desenho Assistido por
Computadores, trazerem vrias melhorias ao processo de design e de construo de edifcios,
estas tm algumas limitaes na mecanizao de tarefas e na criao e manipulao de
geometrias complexas. Estas limitaes podem ser ultrapassadas atravs da introduo, na
arquitectura, da programao e de processos algortmicos.

285
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O Projeto Algortmico (PA) uma abordagem de design baseada em programao que permite
a gerao de modelos 3D atravs de algoritmos. Usando esta abordagem, ao invs de ser criado
o modelo 3D do design pretendido, criado um programa que gera o modelo 3D do design
pretendido. O PA promove a explorao em arquitetura, permitindo aos arquitetos abordar
formas geomtricas complexas difceis de produzir usando meios manuais [1]. Para alm disso,
sendo o modelo gerado com PA tipicamente paramtrico, ao variar os parmetros que controlam
o modelo torna-se possvel produzir rapidamente vrias alternativas ao design. Finalmente, o
PA permite a automatizao de tarefas e processos repetitivos que consumiriam demasiado
tempo e esforo se tivessem de ser executados manualmente.

Para tirar partido do PA, vrios ambientes de programao tm vindo a ser introduzidos em
ferramentas de design geralmente usadas por arquitetos, e.g., AutoCAD e Rhinoceros 3D,
permitindo-lhes desenvolver programas que geram modelos nessas ferramentas. O Grasshopper
[2] um dos exemplos mais populares.

Apesar das vantagens do PA, esta abordagem tem sido pouco utilizada em combinao com o
Building Information Modelling (BIM), uma metodologia de trabalho que traz vrias vantagens
ao processo de design e de construo de edifcios [3]. Esta combinao de processos
algortmicos com a metodologia BIM cria uma nova abordagem de design baseada no
desenvolvimento de programas que geram modelos BIM, uma abordagem que denominamos
Algorithmic-based Building Information Modelling (A-BIM).

Neste paper, definimos, exploramos e avaliamos o A-BIM no contexto arquitetnico. Atravs


de um caso de estudo, comparamos o A-BIM com a abordagem BIM manual, e analisamos as
diferenas. No final, avaliamos o A-BIM, explicando as vantagens e desvantagens de trabalhar
com esta abordagem.

2. Algorithmic-based Building Information Modelling

O A-BIM uma abordagem algortmica para BIM que permite gerar modelos BIM atravs de
algoritmos. Tal como no PA, o A-BIM oferece uma nova abordagem de projecto: ao invs de
ser desenvolvido o modelo do design pretendido diretamente na ferramenta BIM,
desenvolvido o programa que vai gerar esse modelo na ferramenta BIM.

Semelhante a uma abordagem BIM manual, o modelo gerado atravs da abordagem A-BIM
contm informao relevante para o projeto, sendo a inteno final simular digitalmente todo o
processo de design e de construo do edifcio. No entanto, ao contrrio da abordagem manual,
a origem desta informao o programa que gera o modelo. Este programa, tal como um
modelo BIM, pode ser partilhado e desenvolvido em paralelo entre os diversos intervenientes
do projeto assegurando assim a colaborao e coordenao destes durante todo o
desenvolvimento do projeto. Naturalmente, este processo pressupe que todos estes
intervenientes saibam programar, um requisito que, no sculo XXI, comea a ser to importante
como saber ler e escrever.

286
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Para utilizar uma abordagem algortmica como o A-BIM necessrio a formalizao das
intenes e ideias do projecto de forma a construir um algoritmo que produza a soluo de
design pretendida. Este algoritmo depois transformado num programa, i.e., numa srie de
instrues especficas e rigorosas escritas numa linguagem de programao que o computador
consiga compreender e executar.

Antes de percebermos como que o A-BIM se aplica em arquitetura e quais as vantagens que
podemos obter desta abordagem, necessrio primeiro perceber exactamente o que que
significa programar para BIM. Para isso, relevante perceber como que as ferramentas BIM
funcionam e quais as diferenas entre estas e as suas precedentes: as ferramentas CAD. Dadas
as diferenas entre estas ferramentas, as suas metodologias de programao vo tambm diferir.
Na seco seguinte, definimos uma metodologia de programao para BIM baseada nestas
diferenas.

2.1 Do CAD para o BIM


A principal diferena entre trabalhar com ferramentas CAD e ferramentas BIM est ligada ao
facto de que, enquanto que a ferramenta CAD lida essencialmente com entidades geomtricas,
e.g., cilindros e paralelippedos, uma ferramenta BIM no lida s com geometria; lida com
representaes digitais de objetos arquitetnicos, semanticamente identificados e contendo toda
a informao relevante sobre esse objeto [3]. Como exemplo, podemos considerar uma laje e
uma laje de cobertura genricas: geometricamente, so muito semelhantes mas semanticamente
so objetos distintos com funes, propriedades e requisitos diferentes. Ao programar para
CAD, que se baseia apenas nas propriedades geomtricas dos objectos, tanto a laje como a laje
da cobertura podem ser criadas usando uma mesma operao geomtrica genrica, (e.g., 'box').
Por outro lado, ao programar para BIM, estes objetos requerem operaes distintas, especficas
do tipo de objeto que se pretende criar.

Outra diferena entre CAD e BIM resulta do facto dos objetos BIM terem regras paramtricas
e associativas que controlam o seu comportamento no modelo e conferem aos objetos um
sentido arquitetnico. Por exemplo, em BIM, uma porta s pode existir numa parede. Isto quer
dizer que, para criar uma porta, necessrio primeiro criar uma parede. Estas regras refletem-
se na programao onde, de facto, uma parede um dos parmetros necessrios para criar uma
porta. Diferentemente, em CAD, os objetos podem ser criados separadamente e a ordem de
criao dos elementos irrelevante para o resultado final.

Finalmente, uma outra diferena entre as ferramentas CAD e BIM est nas bibliotecas de
objetos paramtricos pr-modelados. Por exemplo, enquanto que numa ferramenta BIM uma
porta pode ser selecionada de uma biblioteca, numa ferramenta CAD todos os subcomponentes
da mesma porta podero ter de ser criados de raiz. Quando esta modelao feita atravs da
programao, isto traduz-se num programa longo e complexo, que pode demorar demasiado
tempo a desenvolver. Embora as ferramentas CAD tambm permitam a importao de blocos
externos de geometria pr-modelada, tipicamente estes objetos no so paramtricos, o que
dificulta a manipulao da sua geometria. Em muitos casos, esta geometria tem de ser
manualmente alterada para se adequar s especificaes do projeto, sendo muitas vezes mais
simples reconstrui-la de raiz.

287
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Caso de Estudo: As Torres Absolute World

Para testar e avaliar as capacidades da abordagem A-BIM, selecionmos um caso de estudo


arquitetnico - as Torres Absolute World (TAWs), projetadas pelos MAD Architects e
localizada em Mississauga, no Canad (ver Figura 1) - que modelmos com (1) uma abordagem
BIM manual, e (2) a abordagem A-BIM proposta. Este processo de modelao permitiu analisar
e comparar diretamente estas duas abordagens de modo a perceber quais as vantagens e
desvantagens de cada uma.

Enquanto que a abordagem BIM manual foi modelada diretamente em Revit, a abordagem A-
BIM foi implementada usando o Rosetta. Esta ferramenta de programao foi escolhida devido
sua caracterstica portvel [4] que, ao contrrio de outras ferramentas recentemente
desenvolvidas tal como o Dynamo e o Rhino-Grasshopper-ArchiCAD, permite a gerao do
mesmo modelo em mais do que apenas uma ferramenta BIM. Usando o Rosetta, o modelo das
TAWs podem ser igualmente geradas tanto no Revit como no ArchiCAD.

Figura 1: As Torres Absolute World, localizadas em Mississauga, no Canad (Fonte da


imagem: www.domusweb.it/).

O processo de modelao foi dividido nos vrios objetos arquitetnicos que compem o edifcio
uma vez que o mesmo objeto pode ser modelado de duas maneiras completamente distintas
dependendo da abordagem usada. Os objetos considerados foram: os nveis (embora no
exatamente um objeto arquitetnico, so um elemento BIM importante), as lajes, as aberturas
nas lajes, as paredes, a laje da cobertura, as escadas, as portas e as guardas.

Como exemplo, vamos considerar a modelao das paredes das TAWs. Ambas as torres
possuem uma grelha de paredes estruturais que se repete em todos os pisos, garantindo assim a
continuidade estrutural da torre. No entanto, devido rotao da torre, o comprimento destas
paredes aumenta e encolhe de piso para piso de forma a adaptar as paredes forma do edifcio,
tal como illustrado na Figura 2.

288
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Diagrama estrutural das TAWs [5].

Nas seces seguintes, o processo de modelao das paredes explicado para as duas
abordagens consideradas, sendo estas de seguida comparadas para descobrir as vantagens e
desvantagens entre elas.

3.1 BIM Manual


Antes de criar as paredes, foram definidas as propriedades desejadas para as mesmas, e.g., as
camadas de materiais e as respetivas espessuras. De seguida, foi usada a funcionalidade
disponvel no Revit para criar paredes. Para isso, escolhemos um nvel inferior para a base das
paredes, um nvel superior onde estas acabam e colocmos as paredes de acordo com a
configurao em planta desejada.

Ao colocar as paredes entre nveis, torna-se mais fcil controlar a sua altura j que esta passa a
ser calculada como a distncia entre o nvel inferior e superior. Neste caso, cada nvel
corresponde a um piso das TAWs. Deste modo, se for aplicada alguma mudana s alturas dos
pisos da torre, as paredes e as suas respetivas alturas iro ajustar-se automaticamente.

Devido rotao da torre, o comprimento das paredes varia consoante o piso, pelo que as
restantes paredes tiveram de ser criadas individualmente (ou copiadas do piso anterior) e os
seus comprimentos ajustados manualmente a cada piso, para todos os pisos das TAWs, um
processo moroso e entediante.

3.2 A-BIM
Usando o Rosetta, podemos tirar partido dos objetos paramtricos pr-modelados fornecidos
pelas ferramentas BIM e manipul-los consoante os requisitos do projeto. Estes objetos so
disponibilizados pelo Rosetta sob a forma de operaes pr-definidas que permitem a criao
dos respetivos objetos nas ferramentas BIM.

Para criar paredes, a correspondente operao requer como parmetros uma lista de pontos que
representa os eixos das paredes e o nvel inferior e superior dessas paredes que determinam o

289
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

seu posicionamento e altura. Esta operao pode tambm receber como parmetros adicionais
as propriedades desejadas das paredes, sendo utilizados valores genricos pr-definidos caso
estes parmetros no sejam fornecidos.

Usando esta operao, crimos uma grelha de paredes de acordo com a configurao em planta
das TAWs, a qual distribumos para todos os pisos. Para representar os pisos, foi criada uma
lista de nveis correspondente ao conjunto das alturas de todos os pisos das TAWs. Usando esta
lista, podemos facilmente controlar o nmero de pisos e, consequentemente, o nmero de
grelhas de paredes distribudas pela torre.

Para simplificar o processo de modelao, considermos uma grelha de paredes com


comprimentos idnticos para todos os pisos que depois adaptamos rotao da torre. Isto foi
conseguido atravs da implementao de um procedimento que simula uma interseco entre
paredes e lajes, no deixando as paredes ultrapassar os limites da laje. No caso das TAWs, o
comprimento das paredes calculado em relao a uma laje auxiliar que corresponde ao espao
interior do edifcio num dado piso, tal como ilustrado na Figura 3. Devido rotao da torre,
isto implica que as paredes tero comprimentos diferentes em cada piso. No final deste
processo, as lajes auxiliares so eliminadas.

Finalmente, para generalizar a forma do edifcio e oferecer uma maior flexibilidade de solues,
a grelha de paredes que distribuda pelos pisos e a forma da laje auxiliar correspondente ao
espao interior do edifcio so dados com parmetros independentes que podem ser facilmente
modificados pelo utilizador.

Figura 3: Para cada piso, o comprimento das paredes ajustado em relao ao permetro de
uma laje auxiliar correspondente ao espao interior do edifcio nesse piso.

3.3 Comparao
Enquanto que para a abordagem manual as paredes tiveram de ser criadas e adaptadas
manualmente a cada piso devido rotao da torre, ao usarmos uma abordagem algortmica
podemos tirar partido da lgica construtiva das paredes ser a mesma para todos os pisos,
permitindo assim que a criao e a adaptao destas rotao da torre seja automatizada.

290
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Para ambas as abordagens, as paredes foram criadas de forma a estarem parametricamente


contidas entre nveis consecutivos garantindo assim que, se houver alguma alterao s alturas
dos pisos, essas alteraes sero automaticamente propagadas para as paredes.

Embora til, esta capacidade de propagao de alteraes proporcionada pelas ferramentas BIM
no to abrangente nem flexvel como a de uma abordagem algortmica. Por exemplo, esta
propagao no tem em considerao o ajuste necessrio no comprimento das paredes das
TAWs, que ter de ser executado manualmente em todos os pisos para as adaptar forma e
rotao de cada piso. Este processo repetitivo e moroso pode efetivamente desencorajar
alteraes futuras, sendo portanto um obstculo explorao.

Em contraponto, numa abordagem algortmica, os objetos criados so parametricamente


dependentes entre si, o que quer dizer que as alteraes so propagadas a todo o modelo.

Para alm disto, uma vez que no modelo das TAWs, tanto a grelha de paredes como a forma
interior do edifcio so parmetros independentes, podemos vari-los de forma ortogonal:
podemos experimentar diferentes grelhas de paredes que sero automaticamente adaptadas
forma do edifcio, tal como podemos experimentar diferentes formas para o interior do edifcio,
que ajustar automaticamente o comprimento das paredes.

4. Avaliao

O A-BIM tem uma vasta aplicabilidade em arquitetura: pode ser usado para desenvolver
modelos paramtricos de partes de edifcios (e.g., uma fachada), de edifcios inteiros, ou at de
cidades inteiras. No entanto, esta abordagem poder nem sempre ser a mais apropriada para um
dado projeto, pois necessita de um investimento inicial de esforo e tempo que poder no ser
inteiramente recuperado no final. Como tal, antes de escolher a abordagem que se pretende usar
num projeto, essencial que os arquitetos primeiro estabeleam as prioridades do projeto em
questo e avaliem se o desenvolvimento deste poder beneficiar da abordagem A-BIM. Nas
seces seguintes, discutimos alguns aspetos importantes a ter em considerao nesta avaliao.

4.1 Automatizao de Tarefas Repetitivas


Devido sua natureza algortmica, o A-BIM permite a automatizao de procedimentos
repetitivos e morosos, permitindo assim poupar bastante tempo e trabalho que poder ser
melhor aproveitado em tarefas mais importantes. Tal como demonstrado no ajustamento do
comprimento das paredes forma e rotao das TAWs, isto pode ser muito til em edifcios
com carcter repetitivo, sendo portanto uma importante vantagem.

4.2 Propagao de Alteraes


Tal como explicado na seco 3.3, os objetos gerados a partir de uma abordagem A-BIM so
parametricamente dependentes entre si, sendo as alteraes propagadas em todo o modelo de
forma muito mais abrangente e flexvel do que a tipicamente disponvel nas ferramentas BIM.
Isto no s permite poupar bastante tempo e trabalho em processos de atualizao do modelo,
como tambm evita erros e inconsistncias. Para uma metodologia BIM, isto especialmente

291
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

importante para que se possa extrair informao (e.g., quantidades de materiais) correcta para
a construo do edifcio.

4.3 Explorao de Alternativas


Sendo o programa desenvolvido intrinsicamente paramtrico, possvel explorar e visualizar
mais facilmente e rapidamente uma maior variedade de alternativas ao design inicial das torres
sem ser necessrio modificar ou refazer o algoritmo que as gera. Na verdade, ao usarmos A-
BIM no estamos a desenvolver uma soluo fixa mas sim uma infinidade de potenciais
variaes da mesma soluo. A Figura 4 illustra apenas alguns exemplos de variaes que se
conseguem explorar com o algoritmo desenvolvido, fazendo variar os parmetros que
controlam o modelo:

Figura 4: Possveis variaes das TAWs.

Neste aspeto, o A-BIM promove significativamente a explorao durante todo o


desenvolvimento do projeto e, como tal, pode beneficiar bastante a atividade de design que
prospera com explorao.

4.4 Otimizao
As variaes ao design inicial discutidas na seco anterior podem tambm ser analisadas e
comparadas em relao, por exemplo, sua performance trmica ou s suas caractersticas
aerodinmicas. No caso das TAWs, poderiamos rapidamente testar diferentes formas para a laje
e diferentes ngulos de rotao de modo a perceber qual a forma e ngulo que oferecem
melhores condies aerodinmicas para as torres.

O prximo passo neste cenrio seria automatizar esse processo de anlise e comparao de
alternativas de forma a deixar o computador encontrar as que melhor satisfazem certos critrios,
o que conduzir a um processo de otimizao do design. Isto permite priorizar aspectos da
performance de um edifcio sobre a sua forma, o que constitui uma diferena significativa em
relao aos mtodos tradicionais onde as anlises de performance (e.g., estruturais, trmicas e
aerodinmicas) so tipicamente feitas no final do processo de design, j depois da forma estar
estabelecida, sendo raramente uma prioridade [6].

292
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.5 Investimento inicial


Devido aos desafios impostos pela abordagem algortmica, o A-BIM requer um maior
investimento inicial em termos de tempo e trabalho, no s para produzir o programa que gera
o modelo, como tambm para o tornar flexvel e facilitar a explorao de alternativas.

Para avaliar este investimento inicial, foi simulado um processo de design onde so exploradas
uma srie de alternativas ao design inicial das TAWs de forma a medir o impacto que esta
explorao tem no projeto, i.e., o tempo e esforo necessrios, tanto na abordagem A-BIM
como na abordagem BIM manual. A simulao para a abordagem A-BIM foi implementada
por ns usando o Rosetta, enquanto que a abordagem manual foi implementada em Revit por
um utilizador experiente.

Como exemplo, vamos considerar o modelo da segunda TAW tal como ela na realidade, i.e.,
com 50 pisos e rotao constante de 4 por piso (ver primeiro modelo na Figura 4). Os tempos
de modelao desta torre em ambas as abordagens podem ser observados na Tabela 1.

Tabela 1: Tempo necessrio para produzir o modelo da segunda TAW na abordagem A-BIM e
na abordagem BIM Manual.
Tempo de Modelao
(aprox.)
A-BIM 14h
BIM Manual 2h

Ao comparar os tempos, podemos observar que a abordagem A-BIM requer mais tempo para a
produo do modelo inicial, consequncia do maior esforo intelectual necessrio para formular
o algoritmo e tornar o programa parametrizvel. Neste caso, se o modelo inicial no sofresse
mais alteraes, a abordagem A-BIM seria muito menos eficiente do que a modelao manual.
No entanto, se tivermos em considerao alteraes futuras e a possibilidade de explorar
alternativas ao modelo inicial, esta situao pode mudar consideravelmente.

Considerando um outro exemplo, vamos supor que se pretende mudar o ngulo de rotao da
torre de 4 para 6. Esta alterao implica actualizar todas as lajes (incluindo a da cobertura) e
guardas para o novo ngulo de rotao, bem como ajustar todas as paredes nova forma do
edifcio.

Para aplicar esta alterao na abordagem A-BIM, temos simplesmente de mudar o parmetro
correspondente ao ngulo de rotao da torre e as dependncias no modelo tratam de propagar
esta alterao para o modelo inteiro. Por outro lado, numa abordagem manual, a maioria destas
alteraes tm de ser aplicadas manualmente, o que resulta em tempos significativamente
diferentes para executar estas alteraes em ambas as abordagens, tal como ilustrado na Tabela
2:

293
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 2: Tempo necessrio para alterar o ngulo de rotao da torre na abordagem A-BIM e
na abordagem BIM Manual.
Tempo de Modelao
(aprox.)
A-BIM 1min
BIM Manual 1h 40min

Numa situao inversa da verificada para a produo do modelo inicial, a abordagem manual
requer bastante mais tempo para aplicar alteraes ao modelo. Isto acontece pois, apesar das
capacidades paramtricas das ferramentas BIM, muitas das mudanas continuam a ter de ser
executadas manualmente.

Finalmente, vamos supor que se pretende explorar uma variao ao design inicial da torre,
fazendo diminuir consistentemente as dimenses das lajes ao longo do edifcio. Mais uma vez,
esta alterao implica atualizar todas as lajes, paredes e guardas.

Para a abordagem A-BIM, podemos simplesmente aplicar um factor decrescente tanto forma
da laje como forma que define o interior do edifcio e esta alterao ir-se- propagar para os
restantes elementos. Por outro lado, para a abordagem manual, temos de refazer manualmente
todas as lajes e adaptar todas as paredes s novas dimenses do edifcio. Temos tambm de
redesenhar todas as guardas em todos os pisos. Os tempos resultantes desta alterao so os
seguintes:

Tabela 3: Tempo necessrio para aplicar um factor decrescente s dimenses da torre na


abordagem A-BIM e na abordagem BIM Manual.
Tempo de Modelao
(aprox.)
A-BIM 1min
BIM Manual 1h 50min

Mais uma vez, a abordagem manual requer mais tempo para a execuo das alteraes ao
modelo, sendo mesmo necessrio quase tanto tempo para aplicar as alteraes como para
refazer o modelo de raiz. Este tempo torna-se um obstculo quando se pretende explorar
rapidamente alternativas ao design inicial.

A tendncia observada com estes exemplos para que, medida que o projeto evolui e as
alteraes so cada vez mais frequentes, o processo de actualizao manual do modelo torna-
se moroso e dispendioso. Ao mesmo tempo, a explorao de alternativas s vivel e produtiva
se esta puder ser executada facilmente e rapidamente. Nestes casos, o investimento inicial pode
ser recuperado medida que o projecto evolui.

294
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5. Concluso

O A-BIM combina o Projeto Algortmico com a metodologia de Building Information


Modelling, oferecendo uma nova abordagem de projecto que permite a automatizao de
processos repetitivos e facilita a explorao rpida e sem esforo de alternativas. Esta
abordagem oferece tambm a capacidade de propagar alteraes ao design de forma mais vasta
e flexvel do que aquela usualmente permitida pelas ferramentas BIM.

Apesar destas caractersticas, o modelo gerado com a abordagem A-BIM continua a ser um
modelo BIM idntico a um modelo criado manualmente, i.e., carregado de informao de
construo, permitindo assim a integrao desta abordagem nos processos tradicionais baseados
em BIM. A partir desta informao, o modelo pode ser trabalhado para alm da sua forma,
usando por exemplo processos de otimizao para combinar e gerir os requisitos do projeto e
priorizar aspetos da performance durante o desenvolvimento do mesmo.

Embora a abordagem A-BIM tenha uma grande aplicabilidade em arquitetura, nem sempre a
abordagem mais vantajosa para um determinado projeto, pois necessrio um investimento
inicial para formular o algoritmo que gera o modelo. Neste artigo, demonstramos que esse
investimento pode ser rapidamente recuperado em projectos em que ocorrem mudanas
frequentes.

No futuro, pretendemos continuar a explorar as capacidades do A-BIM, nomeadamente


perceber melhor qual o impacto desta abordagem na colaborao entre os vrios intervenientes
de um projeto e combinar processos de otimizao com A-BIM.

Referncias

[1] K. Terzidis, Expressive Form: a conceptual approach to computational design. London,


U.K.: Spon Press, 2003.
[2] A. Tedeschi, AAD Algorithms-aided design: Parametric strategies using Grasshopper.
Brienza, Italy: Edizioni Le Penseur, 2014.
[3] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors.
Hoboken, N.J.: Wiley, 2008.
[4] S. Feist, G. Barreto, B. Ferreira, A. Leito, Portable Generative Design for Building
Information Modelling, in Proceedings of the 21st International Conference on
Computer-Aided Architectural Design Research in Asia (CAADRIA 2016), Melbourne,
Australia, 2016, pp. 147-156.
[5] B. Lagendijk, S. Vadlotto, and A. Pignetti Case Study: Absolute World Towers,
Mississauga, CTBUH Journal, Issue IV, pp. 12-17, 2012.
[6] Y. Kalay, Architectures new media : principles, theories and methods of computer-aided
design. Cambridge, Massachusetts: The MIT Press, 2004.

295
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

296
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

DA LINHA AO VARO: CASO DE ESTUDO DO PROJETO DE


ESTABILIDADE, TENDO O CONCEITO BIM COMO BASE
Gabriel Lopes (1)

(1) LAIII Lopes Associados, Engenheiros Consultores, Porto

Resumo
At muito recentemente, na rea de projeto de engenharia civil, nomeadamente de estruturas, a
tecnologia pouco inovou, tendo vindo apenas a automatizar os processos tradicionais j
existentes. A grande viragem deu-se quando surgiu a possibilidade do utilizador interagir com
os objetos de forma inteligente e paramtrica.

O presente caso de estudo pretende dar a conhecer um exemplo de um projeto de estabilidade


feito numa plataforma que utiliza o conceito BIM, desde a sua conceo at ao detalhe e
medio de todos os elementos da estrutura. A inteno passa por explorar o processo de
trabalho e otimiz-lo em relao aos mtodos clssicos, dando a conhecer as limitaes
existentes inerentes a esses mtodos, as mais ou menos valias encontradas e a importncia que
a organizao e a estruturao do processo tm no desenvolvimento do projeto e no seu
resultado final.

1. Introduo

O caso de estudo apresentado debrua-se sobre um projeto de estabilidade de um edifcio de


habitao, no qual se utilizou um processo integrado, numa plataforma BIM, durante o seu
desenvolvimento, desde a conceo at fase de fabrico.

Apesar de se tratar de um projeto de escala reduzida, o processo de modelao foi bastante


desafiador, devido grande variedade de elementos e pouca repetio geomtrica,
caracterstica que muitos edifcios de grande porte no tm.

Neste caso de estudo apresenta-se a abordagem utilizada, considerando as vrias variantes e


condicionantes do projeto. O enfoque ter incidncia, sobretudo, na metodologia utilizada e na
apreciao dos vrios passos do processo de realizao do trabalho. Sero feitas menes s

297
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

potencialidades que surgem na utilizao de uma modelao deste tipo, seja ao nvel da
interoperabilidade, da coordenao ou da interao com processos de trabalho a jusante do
projeto. Por ltimo, mencionar-se-o algumas curiosidades do projeto, como tambm alguns
dos seus elementos finais.

2. Enquadramento

Importa referir que o desenvolvimento do presente projeto de estabilidade foi realizado


integralmente em BIM. Contudo, algumas das formalidades associadas a este processo no
foram estabelecidas de forma explcita, nomeadamente o Plano de Execuo BIM (BIM
Execution Plan BEP). No obstante a isto, tal no implicou que todo o trabalho desenvolvido
no tivesse enquadramento num BEP, como se ir expor mais frente.

Convm tambm mencionar que o gestor de projeto era da equipa de arquitetura (Cliente) e que
no foi do conhecimento do consultor do projeto de estabilidade a forma de gesto e
coordenao dos restantes projetos de especialidade. A prestao dos servios cingiu-se apenas
consultoria e projeto de estabilidade.

de salientar que este projeto foi concretizado utilizando procedimentos de trabalho j


consolidados no processo BIM, no se tratando de um ensaio nem de um projeto piloto.

3. Abordagem

Previamente ao incio de um projeto BIM (ou logo nas fases iniciais) deve ser acordado, entre
as partes, o plano de execuo BIM BEP que visa estabelecer, entre os diversos
intervenientes, um conjunto de fatores representativos das intenes e responsabilidades
associadas incorporao do BIM. Como j foi referido, no presente caso de estudo no foi
formalmente estabelecido um BEP. No entanto, o desenvolvimento do trabalho teve em conta,
mesmo que de forma implcita e abstrada de formalismos, vrios aspetos inerentes a um PEB,
mais concretamente, os usos e objetivos BIM, o nvel de desenvolvimento do projeto, o nvel
de informao e a forma de interao com as restantes partes interessadas (neste caso, apenas a
equipa de arquitetura).

3.1 Objetivos BIM


Alguns dos objetivos delineados na utilizao do BIM, durante a elaborao do presente
projeto, assim como a sua priorizao e respetiva associao com os usos BIM, apresentam-se
na Tabela 1. Optou-se por colocar nesta os termos anglo-saxnicos para manter um paralelismo
com as indicaes constantes no BIM Project Execution Planning Guide [1].

298
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Objetivos da utilizao do BIM.


Prioridade Objetivos Usos BIM
2 (mdia) Clarificar as condies existentes do terreno com a Existing Conditions
implantao da obra. Modeling
2 (mdia) Diviso da informao pelo faseamento da Phase Planning
construo.
3 (baixa) Facilitar a interoperabilidade para a anlise estrutural. Structural Analysis
1 (alta) Aumentar a produtividade no desenvolvimento do Digital Fabrication,
projeto no que se refere a quantificao dos elementos Quantity Take-Off
estruturais e a obteno da informao de fabrico.
1 (alta) Obter informao relativa s quantidades da estrutura. Quantity Take-Off
2 (mdia) Obteno de informao do modelo para fabrico, Digital Fabrication
nomeadamente de armaduras para beto armado.
1 (alta) Melhorar a perceo visual e compreenso da 3D Coordination,
estrutura e a sua coordenao com as restantes Design Authoring
especialidades.

3.2 Fases do Desenvolvimento do Projeto


Tratando-se de um projeto localizado num pas francfono, sem legislao especfica para o
faseamento da sua elaborao, foi acordado com o Cliente a adoo da Loi du Matrise
dOuvrage Publique [2], mais conhecida por Loi MOP como base de referncia e a
Dcomposition des tches de matrise duvre [3] pela listagem dos contedos mnimos a
incluir nos projetos.

Contratualmente estava previsto o desenvolvimento dos estudos de estabilidade nas seguintes


fases: Avant-Projet Sommaire (APS); Avant-Projet Dfinitif (APD); Projet (PRO) e
Excution (EXE). Fazendo um paralelismo com a legislao nacional a este respeito, para
melhor familiarizao do leitor com a Loi MOP, pode dizer-se que, em geral, as fases
correspondentes so: Estudo Prvio; Anteprojeto, Projeto de Execuo e fabrico que, no
caso de estudo, se limitou apenas informao associada s armaduras de beto armado.

3.3 Level of Development (LOD)


Outro conceito importante a ter em conta o nvel de desenvolvimento Level of
Development de um modelo BIM, que se refere ao nvel de rigor da informao grfica e
no grfica que os elementos do modelo possuem (no confundir com Level of Detail). O
LOD progressivo e cumulativo ao longo do desenvolvimento do projeto, uma vez que a
informao incorporada no modelo vai aumentando e tornando-se mais concreta. Esta
nomenclatura no tem que ser igual em todos os elementos do modelo na mesma ocasio, nem
o seu grau tem necessariamente que estar associado s fases de desenvolvimento do projeto. O
LOD a considerar em cada momento do projeto , em geral, acordado com o Cliente, podendo
ser alterado de projeto para projeto (ou mesmo ao longo de um projeto).

Neste caso, em concreto, apesar de no ter sido estabelecido um BEP com a indicao dos
LODs a observar durante o desenvolvimento do projeto, nem ter sido acordado formalmente

299
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

com o Cliente a observncia de uma diretriz em particular, recorreu-se s especificaes Level


of Development Specification 2015 do BIMForum [4] como referncia.

No existe uma delimitao clara entre o LOD a usar para cada fase, mas, tratando-se sobretudo
de um projeto de estruturas praticamente s com elementos de beto armado, o LOD acabou
por estar, de certa forma, relacionado com a fase de projeto desenvolvida Figura 1. O grau do
LOD da especificao utilizada varia entre LOD 100 informao genrica e o LOD 500
informao da realidade (outras especificaes podem usar uma classificao diferente, mas a
categorizao , em geral, semelhante).

3.4 Sistemas de classificao


No que toca classificao da informao, sobretudo para categorizao dos mapas de
quantidades (neste caso, como principal objetivo), foi utilizado um sistema de classificao
prprio criado com base no UniFormat [5] para a estruturao da informao das partes fsicas
da construo e o MasterFormat [6] para os produtos e resultados dos trabalhos de construo.

3.5 Metodologia
A metodologia utilizada foi estabelecida com base na experincia de projetos anteriores. O
processo de trabalho centrou-se na utilizao de um modelo BIM principal, correspondente
especialidade em estudo que, neste caso, foi a estrutura. Neste projeto em particular, devido a
restries de ordem tcnica, particularmente na instabilidade e morosidade da transferncia
eletrnica de dados, no foi possvel proceder a uma forma de trabalho colaborativa genuna a
partir de um modelo central partilhado (single shared project model) com a equipa de
arquitetura. A interao realizou-se, apenas, com a troca peridica (no incio do projeto e,
geralmente, uma vez no fim de cada fase) de modelos BIM para posterior importao por cada
uma das partes, tornando esta ligao esttica (a informao atualizada do modelo por uma das
partes s conseguida atravs de nova partilha do modelo da outra parte).

Uma vez que a equipa de arquitetura estava a utilizar a mesma aplicao de modelao BIM
(Autodesk Revit 2015), o formato de intercmbio foi o nativo da aplicao (.rvt).

Figura 1: Interao na execuo do trabalho.

Relativamente anlise e dimensionamento da estrutura, outra parte importante do processo,


foi realizada com uma aplicao independente do software de modelao. Apesar da aplicao

300
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de modelao BIM utilizada ter algumas capacidades para anlises estruturais, estas so
bastante reduzidas. A aplicao utilizada para a anlise estrutural foi o Autodesk Robot
Structural Analysis Professional 2015. possvel a interoperabilidade entre estas aplicaes de
modelao BIM e de anlise estrutural, mas com limitaes.

O processo evolutivo do projeto fez-se por iteraes entre a interao da arquitetura com a
estabilidade at que o dimensionamento estrutural satisfizesse totalmente os requisitos
arquitetnicos. Esta evoluo do modelo, associada ao desenvolvimento do projeto e articulada
com a incrementao do LOD, terminou quando todos os aspetos dimensionais e caractersticos
de todos os elementos da estrutura estavam definidos no modelo da estrutura.

4. Caso de estudo

Para a elaborao do projeto, foi rececionado um conjunto de informaes do Cliente como: o


modelo inicial de arquitetura em BIM; o levantamento topogrfico georreferenciado em CAD
(2D); o relatrio do estudo geolgico e geotcnico e o plano cronolgico para a construo.

A principal condicionante do projeto estava nos prazos de construo apertados e na urgncia


de iniciar os trabalhos em obra. Posto isso, foi acordado com o Cliente que o projeto e toda a
informao associada seriam divididos em trs partes em conformidade com o planeamento da
construo de acordo com a Figura 2 (por ordem de prioridades, a parte A, B e C a azul, verde
e laranja, respetivamente).

Para o modelo da estrutura estar coerente com a implantao pretendida no terreno e para se
poder verificar com rigor as zonas de conteno a realizar, foi modelada a topografia existente
a partir do levantamento topogrfico. Para se conseguir uma maior exatido, o terreno foi
modelado numa outra aplicao mais adequada (o Autodesk Civil 3D 2014) a partir da qual se
extraram um conjunto de pontos (via .csv) que, posteriormente, foram importados para o Revit
para a construo da superfcie. possvel verificar, atravs da Figura 2, que este processo
proporcionou uma superfcie com uma malha triangular bastante homognea e coerente.

Figura 2: Modelo BIM com o terreno existente (esquerda) e o edifcio colorido por partes,
com o terreno e implantao finais (direita).

301
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.1 Modelao da estrutura


A modelao da estrutura iniciou-se aps um estudo preliminar do esquema e layout estrutural
a adotar. Essencialmente, a estrutura principal foi composta por um sistema de fundaes
diretas que suportavam uma estrutura vertical mista paredes-pilares que serviam de apoio
estrutura horizontal composta por um conjunto de vigas, dispostas ao longo do permetro do
edifcio, e lajes macias apoiadas nestas ou diretamente nos pilares. Com exceo de dois
pilares metlicos, toda a estrutura foi feita em beto armado.

O posicionamento dos elementos estruturais foi baseado numa grelha planimtrica ortogonal e
num conjunto de nveis. Todos estes elementos, que auxiliam o posicionamento dos elementos
estruturais, foram georreferenciados. Desta forma, qualquer elemento estava na sua posio
verdadeiramente real (tanto planimtrica como altimetricamente), permitindo uma implantao
rigorosa durante a execuo da obra.

A estruturao da modelao por fases de construo (em conformidade com o programa do


Cliente), facilitou no s a apresentao de esquemas elucidativos do faseamento construtivo
Figura 3 como tambm na clara diviso dos diversos elementos por fases de construo com
as informaes grficas e no grficas correspondentes, tal e qual como apresentado nas
medies de armadura apresentadas na Figura 5.
Existente Parte A Parte A & B Parte A, B & C

Figura 3: Faseamento construtivo.

4.2 Anlise e dimensionamento estrutural


Apesar do modelo para a anlise estrutural, chamado de modelo analtico (Analytical Model),
poder ser obtido atravs do modelo geomtrico, existem algumas limitaes inerentes.
importante salientar que, pequenas imprecises no modelo geomtrico no acarretam grandes
consequncias, contrariamente ao modelo analtico onde, as ligaes entre os objetos tm que
ser matematicamente exatas. Na aplicao utilizada, um modelo analtico automaticamente
gerado para os objetos standardizados (e.g. walls, floors, beams, columns,
foundations, etc.). exceo de esquemas estruturais muito simples, o modelo analtico tem
que ser, mesmo a modelao geomtrica tendo grande preciso, quase sempre ajustado
manualmente. Esse ajuste nem sempre amigvel e obriga a algum exerccio de coordenao
entre a geometria 3D e os elementos lineares e planos do modelo analtico. possvel
estabelecer uma ligao dinmica entre o modelo geomtrico e o modelo analtico para a anlise
estrutural (Figura 4) aumentando tanto a rapidez e automatizao na procura das seces
estruturais mais otimizadas com na respetiva atualizao no modelo BIM.

302
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Resultado da anlise estrutural


Modelo geomtrico Modelo analtico Modelo analtico (deformao da laje principal da cobertura)
(no ajustado) (ajustado)

Figura 4: Exemplo do processo de anlise estrutural a partir do modelo BIM.

Apesar das grandes melhorias a que se tem vindo a assistir ao longo dos anos neste processo,
ainda existem algumas restries, faltando ainda um melhor e mais eficaz controlo por parte do
utilizador. Por exemplo, com as aplicaes utilizadas, surgem problemas de interoperabilidade
quando o modelo analtico [do modelo Revit] tem rigid links ou quando so adicionados
alguns tipos de objetos no modelo analtico do clculo [modelo do Robot]. Assim sendo, optou-
se por fazer a anlise e dimensionamento estrutural num modelo prprio independente [no
Robot] e o processo de ajuste das seces dos elementos estruturais no modelo geomtrico foi
realizado de forma manual a partir da informao obtida na anlise da estrutura, bem como as
seces de armaduras para os diferentes tipos de elementos de beto armado.

4.3 Modelao de armaduras


Todas as armaduras do projeto foram modeladas no modelo BIM, manualmente, considerando
os resultados obtidos na anlise estrutural. A principal razo para esta tarefa foi a de possibilitar
a pormenorizao dos elementos de beto armado com informao dinamicamente ligada
modelao, fosse esta grfica ou quantitativa. Outras razes, tambm com alguma significncia,
foram a possibilidade de obter os dados para o fabrico das armaduras (um requisito para o
Cliente) de forma automatizada e a quantificao rigorosa dos consumos de varo por dimetro
em cada parte do projeto, como apresentado na Figura 5.

Figura 5: Vista das tabelas de medio de armaduras por dimetro, para a Parte C e para a
totalidade do projeto, obtidas no modelo BIM.

Para a modelao das armaduras foram parametrizadas famlias individuais por cada uma das
formas de dobragem. Essa parametrizao teve em considerao alguns fatores como, a forma
de dobragem (para estar em concordncia com a ISO 3766 [7]), os dimetros dos vares
disponveis e respetivos dimetros de dobragem e os ganchos de amarrao tpicos.

Na modelao de armaduras, a maior dificuldade est no correto posicionamento destas.


Existem algumas utilidades capazes de condicionar o posicionamento em funo da localizao
relativa com outros componentes. Estas funcionalidades tm vindo a ser melhoradas nas verses
mais recentes do software utilizado, tornando a modelao das armaduras menos penosa,

303
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

principalmente na facilidade destas se adaptarem a alteraes de geometria ou alterao de


parmetros (por exemplo, o recobrimento) dos objetos onde esto alojadas.

Uma vez feita a modelao, possvel obter informaes de vrios tipos, sejam elas grficas
ou no. A ttulo de exemplo, na Figura 6 apresenta-se um desenho de uma das lajes com as
respetivas armaduras superiores. Para cada uma destas armaduras existe um conjunto de
informaes que podem ser apresentadas (por exemplo, na planta esto indicados os dimetros,
o nmero de vares e o afastamento entre eles por cada grupo, assim como um cdigo de
identificao que faz a associao com a tabela do fabrico) ou tratadas (no mesmo conjunto de
figuras apresentado um excerto da tabela de armaduras com os parmetros necessrios ao
fabrico, em concordncia com o desenho apresentado) de forma dinmica. O parmetro de
identificao unvoca das armaduras permite fazer a ligao dos desenhos com as tabelas de
fabrico. Assim, durante a construo, cada um dos lotes fabricados so colocados na localizao
correta.

Finalizada a modelao, a informao de fabrico foi passada ao Cliente (requisito contratual)


possibilitando-o automatizar o fabrico das armaduras.

Do ponto de vista do controlo, realizado durante o desenvolvimento do projeto, foi analisada a


taxa de armadura contida em cada elemento estrutural. Este tipo de informao pode ir sendo
examinado de forma intermdia, isto , a cada passo na modelao, seja na adio de novos
objetos ou na alterao de objetos existentes, a informao a eles associada automaticamente
atualizada (e.g. anotaes, informao de fabrico, medies, etc.) para refletir as novas
condies.

A ttulo de curiosidade, o comprimento total de varo foi de, aproximadamente, 99 quilmetros


repartidos por cerca de 30 mil segmentos divididos por 2388 grupos diferentes.

4.4 Obteno de elementos finais do projeto


Aps toda a modelao estar finalizada, procedeu-se obteno dos elementos do projeto,
nomeadamente, desenhos, medies, informao de fabrico e o modelo 3D inteligente.

A informao sobre o fabrico, particularmente das armaduras, foi incorporada nas peas
desenhadas e exportadas para posterior utilizao pelo construtor Figura 6 (inferior direita).

No que respeita s medies, devido s capacidades existentes em depurar a informao por


tipo de objeto e filtr-la por condies impostas (e.g. por fase), foi possvel a obteno rpida
dos valores pretendidos, como demonstrado pela Figura 5.

O sistema de classificao foi utilizado para a organizao e identificao dos elementos a


incluir nos mapas de quantidades. Pela forma como foi realizado o modelo, foi possvel fazer a
associao entre o contedo deste documento com os objetos do modelo, mas, essa informao
no foi evidenciada nos desenhos finais do projeto transmitidos ao Cliente.

304
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Armaduras superiores de uma laje (superior), excerto da tabela da taxa de armadura
nos pilares (esquerda) e da listagem de armaduras elementares para fabrico (direita).

Uma outra vantagem evidente est, no s na possibilidade de visualizao do modelo e dos


seus objetos, mas tambm em se poder condicionar os objetos a visualizar e o modo como so
visualmente apresentados. Na Figura 7 apresenta-se um conjunto de imagens onde inequvoca
a facilidade com que os utilizadores e intervenientes no projeto podem perceber o modelo e
esclarecer dvidas muito mais rapidamente do que atravs de um conjunto de desenhos em 2D.

305
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Exemplo da visualizao do modelo slido da estrutura (esquerda) e das armaduras


incorporadas com os dimetros diferenciados por cores (direita).

5. Consideraes finais

A utilizao de uma aplicao BIM obriga a encarar o processo de maneira diferente da forma
tradicional, no apenas pelo modo de interagir com as ferramentas de trabalho, mas tambm
porque, para se tirar partido das mais valias que este tipo de aplicaes oferece, necessrio
pensar e estruturar a forma de trabalho em concordncia com as potencialidades das aplicaes
utilizadas. No ter o cuidado de fazer essa adaptao ir na direo errada. Pois tal se ir
traduzir num maior volume de esforo para obter o mesmo resultado final. Outro aspeto que
importante ter em mente que o BIM um processo concretizado atravs de ferramentas que
tm limitaes de vrios tipos. Por exemplo, especificamente na aplicao utilizada, o modo de
representao simplificado de armaduras em vista menos flexvel do que no CAD. Acaba por
sem mais fcil fazer um corte normal para mostrar determinados pormenores na forma da
armadura (e.g. ganchos) do que incluir manualmente essa representao simblica na vista.

A grande viragem no detalhe de beto armado est na passagem de informao baseada em


objetos apenas geomtricos para objetos que conjugam a geometria com informao adicional
a eles associada. No caso das armaduras de beto armado, tal traz grandes vantagens, porque
permite usar a informao em vrias fases do processo e por vrios intervenientes, alm da
possibilidade de a manter atualizada em tempo real quando ocorrem alteraes. A grande
desvantagem deste processo que, embora o rigor e nvel de informao acessvel sejam
superiores, o trabalho de detalhe ao nvel do projeto bastante maior. Tipicamente, o detalhe
satisfatrio ao nvel do projeto de beto armado de seces genricas de armadura e a sua
estimativa em termos de quantidades mais superficial. O aumento do nvel de pormenorizao
vem a custo de um consumo de recursos e de um nvel de exigncia de detalhe e organizao
superiores, com a possibilidade de uma integrao alm do projeto em si.

Uma das maiores dificuldades e, possivelmente, um dos maiores fatores de desapontamento, na


utilizao de uma aplicao BIM, a reduzida eficincia e fluidez na manipulao dos modelos
quando o nmero de objetos bastante elevado (outros fatores como o grau de complexidade
dos objetos tambm so importantes, mas mais difcil de mensurar e comparar). A ttulo de
exemplo, o modelo final de arquitetura tinha 1250 objetos e ocupava cerca de 400 Mb. O da

306
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

estrutura tinha mais do dobro dos objetos, aproximadamente 3000, e ocupava cerca de 30 Mb,
ou seja, tinha mais do dobro dos objetos e menos de um dcimo do tamanho em memria.

A utilizao de processos BIM s faz verdadeiramente sentido se a integrao entre as


diferentes fases do desenvolvimento de um empreendimento e os diferentes intervenientes
estiverem sincronizados e verdadeiramente mentalizados para empregarem um processo
colaborativo. De outra forma, o consumo de recursos no otimizado e as verdadeiras
potencialidades desta tecnologia tornam-se subaproveitadas. Em suma, as mais-valias do BIM
s so conseguidas na sua totalidade em processos colaborativos entre todas as partes, da
conceo utilizao, de forma organizada e estruturada, com procedimentos bem definidos.

Com as rpidas mudanas na indstria, fundamental estar modernizado. Certamente que,


como em todas as tecnologias e aplicaes, existem melhorias a realizar. Mas importante
referir que a evoluo no rumo certo s ser conseguida custa do feedback dos intervenientes,
principalmente dos utilizadores destes processos.

Sem qualquer margem para dvida, este tipo de tecnologia ir consolidar-se e a tendncia ser
a utilizao cada vez mais acentuada de modelos tridimensionais inteligentes como forma de
troca de informao no setor da construo. Muito provavelmente, os tpicos desenhos 2D de
projeto, como base de partilha de informao, estaro, brevemente, associados ao passado.

Referncias

[1] Computer Integrated Construction Research Program. BIM Project Execution Planning
Guide Version 2.1. University Park, PA, USA: The Pennsylvania State University,
2011.
[2] Guide a l'intention des mai tres d'ouvrage publics pour la negociation des remunerations
de mai trise d'uvre: loi MOP, Paris: Direction des journaux officiels, France. 2008.
[3] Dcomposition des tches de matrise duvre, Syntec-Ingenierie, CICF, UNAPOC,
UNTEC, 2004.
[4] BIMForum, Level of Development Specification 2015, Version 2015.
[5] Bowen, Brian, Robert P. Charette, and Harold E. Marshall. 1992. Uniformat II: a
recommended classification for building elements and related sitework. Gaithersburg,
MD: U.S. Dept. of Commerence, National Institute of Standards and Technology
[6] Construction Specifications Institute, and Construction Specifications Canada. 2010.
MasterFormat, 2010 update: master list of numbers and titles for the construction
industry. Alexandria, VA: Construction Specifications Institute.
[7] ISO 3766:2003, Construction drawings Simplified representation of concrete
reinforcement.

307
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

308
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ENERGY ANALYSIS USING COOPERATION BETWEEN BIM TOOLS


(REVIT AND GREEN BUILDING STUDIO) AND ENERGY PLUS
Kamar Aljundi (1), Armando Pinto (2), Fernanda Rodrigues (1)

(1) RISCO, Civil Engineering Department, University of Aveiro, Aveiro, Portugal


(2) LNEC, Civil Engineering National Laboratory, Lisboa

Summary
Building design starts with the inception phase and follow to the digitally representation of the
design program in order to obtain a real approach of the final construction product. Building
Information Modelling (BIM) tools provide digital models very similar to the reality. During
this digital process, the information can be managed during the whole lifecycle of the project
by a collaborative environment that BIM methodologies and tools provide. This paper depicts
the results about the reliability and flexibility of energy analysis using BIM-based simulations
(with Revit software and Green Building Studio Autodesk), as well as the benefits and
challenges of these BIM tools when compared with Energy Plus results and measurements.
These tools were used to study the thermal and energy performance of a well-insulated test cell
and to study the impact of a change of thermal mass and insulation thickness to figure out the
advantages and disadvantages of each tool. It was concluded that these BIM tools enabled the
designers to easily experiment different design alternatives for the entire life cycle of the
project, before they start implementing the final design solutions, saving time and money, while
contributing for the achievement of more energy efficient buildings.

1. Introduction

Nowadays the growing concern about climatic changes and the high exigency of buildings
design regulations have powerful impact on their energy performance. So, special attention to
architecture, structure, constructive elements and installations should be developed and given
[1]. This requires a straight collaborative approach among all the specialist and decision makers
involved, and the Building Information Modeling (BIM) methodology is pointed out as a
reliable process to achieve those goals [2]. BIM consists on a process of generation and
management of all the information corresponding to the building in the design and execution
phase and during all its life cycle. This methodology use 3D models containing all the

309
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

information about geometry, spatial relations, constructive processes, quantities and materials
properties [3]. BIM tools allow easy simulation and consequent selection of different and more
efficient solutions of the envelope and thermal mass, taking into account the building lifecycle.
The main objective of this study is to analyze the potentialities of thermal simulation with
software tools included in a BIM software to study the impact of envelope thermal insulation
and thermal mass on the thermal comfort of a test cell. It will focus on the Energy analysis
using BIM tools (Autodesk Revit and Green Building Studio Autodesk (GBS)), the input
difficulties and limitations and the outputs accuracy that were found during the design process,
when comparing with a recognized validate software (EnergyPlus).

2. Methodology

2.1 General description


To analyse the performance of thermal simulation with Revit and GBS in this study, the results
of an experimental evaluation of a test cell placed in LNEC-National Laboratory of Civil
Engineering in Lisbon [4] were used. This test cell was selected due to its simplicity and the
existence of a previous experimental evaluation of all the boundary conditions (Figure 1), that
allows to validate the use of this software. As it is a test cell, it also has the advantage of
avoiding the uncertainty associated to occupancy and internal heat gains of real buildings,
making it a good starting point to analyse the performance of those tools.

Figure 1: Measured temperature of the test cell in LNEC [4].

Since the experimental mock-up described in section 3.1 did not cover all the configuration
required to assess the impact of thermal insulation and thermal mass change, it was necessary
to test and use a validated software (EnergyPlus) to obtain a set of results of those particular
aspect of sustainable building design. Energy Plus (E+) has been tested and validated since
1993 and it is presently considered a reference tool for sub-dynamic thermal simulation [5, 6]).
With this software, it was possible to produce accurate results that were crucial to check the
results obtained by Revit 2016 and GBS. The stages of this study have been summarised in
Table 1.

310
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Table 1: Methodology stages and objectives.


Stage Stage description Stage objectives
number
1 Information from test cell and experimental Ability to introduce the
results following data:
2 Development of thermal model of test cell Weather data
with BIM tools and E+ Material properties
3 Comparison between calculated and Boundary condition
experimental results Compare with measurements
4 Parametric study of the impact of thermal Tools performance to assess
insulation and thermal mass with BIM tools the impact of:
5 Parametric study of the impact of thermal Thermal insulation
insulation and thermal mass with Energy Thermal mass
Plus
6 Results analysis

2.2 Simulation Tools description


Revit software is a BIM tool that allow professional designers to build and maintain higher-
quality and more energy-efficient buildings. Using the information of the models designed with
Revit allow architects, engineers, and construction firms to make their decisions collaboratively
earlier in the design process to deliver projects more efficiently [7]. Any design changes made
in any Revit plan, elevation or cross section are automatically updated throughout the model,
keeping designs and documentation coordinated and more reliable [7].

GBS is a flexible cloud-based service that allows the designer to run building performance
simulations and optimize energy efficiency earlier in the design process, helping to extend the
ability to design high performance buildings consuming less time and at lower costs when
compared with conventional methods [8]. As mentioned in the previous section the test cell was
also simulated with E+ to obtain reliable results to compare with the results obtained with the
other tools. To simulate the test cell model with E+, a SketchUp model constructed with the
OpenStudio plugin was first developed. SketchUp is a graphical interface used to reproduce
the geometry of the model and the thermal zoning division (in this case only a thermal zone).
The annual thermal behaviour of the building was simulated and calculated with the E+ engine,
adopting the conduction transfer function (CTF) method to solve the heat conduction and
envelope surface energy balance.

In this study, because of their simplicity and use to study annual heating and cooling demand,
it was also used a seasonal stationary method to assess the annual heating and cooling load of
the test cell [9].

311
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Case study

3.1 Information from test cell and models


The test cell is shown in Figure 2 and has 8,6 m2 of internal floor area, with an interior height
of 2,35 m, and a window facing south that represents 11% of the floor area. The test cell has
the following characteristics (all layers described from outside to inside):
Ground floor: 23 cm pre-fabricated slab (with ceramic blocks and pre-stressed concrete
beams), 3 cm of concrete and 60 mm of EPS (Ufloor=0,57 W/(m2.C)).
Flat roof: 3 cm of concrete, 10 cm of concrete regularization, 5 mm of waterproof
membrane, 23 cm of pre-fabricated slab (with ceramic blocks and pre-stressed concrete
beams), 15 mm of plaster, and 60 mm of EPS (Uroof=0,47 W/(m2.C)).
Walls: 15 mm of plaster, 11cm of ceramic brick, 5 cm of air gap, 11 cm of ceramic
brick, 15 mm of plaster and 60 mm of EPS (Uwall=0,40 W/(m2.C)).
Window facing south: Single glazed aluminium window (with 0,90 m x 0,92 m;
Uw=5,9 W/(m2.C); g =0,85).
Door facing east: opaque aluminium door, 60 mm of EPS (with 0,72 m x1,90 m;
Ud=0,49 W/(m2.C)).

Figure 2 shows a photography of the test cell placed in LNEC, Lisbon (Figure 2a), the Revit
3D model (Figure 2b), its plan (Figure 2c) and cross section (Figure 2d).

Test cell photography Test cell 3D model - Revit Model plan view - Revit Model cross section -
Revit

Figure 2: 3D model, plan and cross section of the test cell.

In Figure 1 has been presented the measurement results of indoor and outdoor temperatures in
two similar test cells and the global horizontal solar radiation. The measurement was carried
out in February, 2005, with outside average air temperature of 10C and sunny days. Due to
solar heat gains, thermal insulation and low thermal mass, the inside temperature has daily
variation of almost 15C.

3.2 Thermal Models development throughout BIM tools and Energy Plus
Using Revit as a BIM tool the design process of the test cell model was facilitated. Each element
was designed by inserting each layer with its physical and thermal properties, compatible with
the real materials' characteristics of the test cell mass [7]. While the different situations are
tested, Revit has worked efficiently with improved performance during redraw process, by
navigating models more smoothly and continuously without having to wait for the software to

312
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

finish drawing elements at each step [7]. The model with its 3D views and sections was updated
automatically. Once the energy analysis button is clicked, the results run in both programs,
Revit and GBS, due to their collaborative capabilities. This 100% interoperability between
these two tools save time to designer team and help them to obtain an easy cooperation and
wisely decisions during the design process [7]. The Revit 3D model of the test cell has a more
realist aspect than using the Open Studio plugin model. However, as the interoperability
between Revit and E+ was not obtained it was necessary to develop a model with Open Studio
to be used by E+. The development of this model was more complex without the data base
management of construction materials, but the major limitation is the lack of interaction with
other design areas and updates, as it is possible with Revit.

The Revit and GBS presented limitations in the input of weather data from other sources than
the ones available in the software (Figure 3b). This is a limitation for the analysis of thermal
performance of the test cell. Thus, in Revit Lisbon was chosen as the test cell location (Figure
3b), consequently the weather data was selected and it is not allowed to update it or to upload
another weather data file as it is possible in E+ (upload a weather data file with epw extension,
Figure 3a).

Figure 4 and 5 depict the weather data from E+ and Revit files. The weather data from Revit
has slight differences compared with energy plus weather data in the temperature and solar
radiation.

Weather data inserted by E+ Weather data inserted by GBS


Figure 3: Weather data uploading process using E+ and GBS.

313
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figure 4: Data from Energy Plus weather file of Lisboa.

Figure 5: Data from Revit weather file of Lisboa.

GBS and Revit were not able to calculate the internal temperature, only the heating and cooling
loads. This constitutes a major drawback of those tools to study thermal comfort, green
buildings and nearly zero energy buildings. Energy Plus as a detailed building energy
simulation tool has the ability to calculate internal environmental conditions. Figure 6 depicts
the measurements values of outdoor and indoor air temperature and the calculated values with
Energy Plus. Analysing the results of measurements and calculation with E+, it was concluded
that the thermal models gather the thermal performance of test cell and the measurements and
simulation has an average air temperature of 15.5C, the calculation has an average error (MBE,
equation 1) of -1% (0.2 C) and a root mean square error (RMSE, equation 2) of 6% (0.9 C).

=1(TairEnergy+ Tairmeasured ) (1)



MBE = /Tairmeasured

2 (2)
=1(TairEnergy+ Tairmeasured )
RMSE =
/Tairmeasured

314
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figure 6: Internal/External temperature obtained with Energy Plus and by measurments.

Another limitation of Revit and GBS is the fact that this software always considers by default
heat gains for occupancy, lighting and equipment. In the present case study, it was considered
8 W/m2, despite the test cell has no internal heat gains.

4. Parametric study: impact of thermal insulation and thermal mass with BIM tools,
EnergyPlus and seasonal method

The test cell is insulated with 60 mm of EPS and has low thermal mass due to the existing
internal insulation layer. To assess the impact of thermal insulation, the thermal performance
of the test cell was simulated with the validated model and with several insulation thicknesses
as given in Table 2. In the case named low thermal mass, the insulation is applied in the
interior face of the construction elements; and in the solution named high the insulation is
applied in the outside face of the roof, the floor and in the air gap of the walls. For the low
solutions the thermal inertia of the test cell is low, while in high the thermal inertia is high
[10]. The heat transfer coefficient of the different solutions is given in Table 2. In all cases the
window thermal transmittance (Uw) was 5,9 W/(m2.C). The results will be presented in the
next section.

Table 2: Parametric study of the impact of thermal insulation.


Thermal insulation Solutions Uwall Uroof Ufloor
thickness W/(m2.C) W/(m2.C) W/(m2.C)
no insulation 00_high, 1,02 1,56 3,70
20 mm 20_low ; 20_high, 0,68 0,89 1,34
40 mm 40_low ; 40_ high, 0,51 0,62 0,80
60 mm 60_low ; 60_ high, 0,40 0,47 0,57
100 mm 100_low ; 100_ high, 0,29 0,35 0,36

The nine parametric solutions described in Table 2 have been tested to experiment the flexibility
and the reliability of Revit/GBS to study the impact of changes in thermal insulation of opaque
building envelop and the effect of thermal mass changes between low and high, against the
results obtained with Energy Plus. The annual heating and cooling loads calculated with Energy
Plus, Revit/GBS and seasonal method are shown in Figure 7. With those tools, as it is expected,
heating loads using high thermal mass and thermal insulation were smaller than using low

315
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

thermal mass and lower thermal insulation. Its interesting to note that the seasonal method
gives better agreement with energy plus, for heating and cooling demand, than the Revit/GBS.

Annual heating loads. Annual cooling loads.


Figure 7: Heating and cooling loads comparison between Energy Plus, GBS and Seasonal.

5. Results discussion

5.1 General aspects


The heating and cooling loads calculated with E+ and Revit/GBS show a large difference, and
Revit over predicts the heating demand on average 5 times and the cooling demand 2.5 times.
Despite their simplicity, the seasonal meth predicts correctly the cooling load, while over
predict the heating load when compared with the energy plus.

5.2 Assessment of the impact of thermal insulation thickness


As presented in Figure 7, increasing the thermal insulation thickness of 20 mm to 100 mm with
high thermal mass in energy plus it is predicted a decrease of 100% in heating demand and an
increase in cooling demand of 60%, while with Revit it is predicted a small decrease in heating
demand of 5% and an increase in cooling demand of 35%. With the low thermal mass solution,
the impact of changes of thermal insulation thickness in heating and cooling load are almost the
same. These results show that Revit is a tool with limited capacity to assess the impact of
thermal insulation thickness changes in the heating and cooling demand of this test cell, despite
giving a correct trend.

In figures 8 and 9, the monthly heating loads for the test cell are shown with 60 mm of insulation
layer (EPS) low thermal mass calculated using Revit/GBS and Energy Plus. In this figures both
tool predict heating and cooling demand of the test cell in February, agreeing with the
temperature measurements in the test cell (Figure 1), that were higher than 25C during the day
and lower than 20 C in the night.

It is also highlighted that both Revit and GBS presented more interesting graphs, showing
details about building heat transfer, contrasting with E+ which presents a bar with only the total
for heating/cooling demand, do not allowing the designer to identify weak points that could be
improved.

316
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Monthly heating loads Monthly cooling loads

Figure 8: Results provided by Revit 2016 - 60 mm thermal insulation low thermal mass.

Monthly heating loads by E+ Monthly cooling loads by E+


Figure 9: Results provided by Energy Plus - 60 mm thermal insulation low thermal mass.

5.3 Thermal mass


By changing the position of thermal insulation layer between the inside surface to the outside
face of the roof and floor and the air cavity in the walls, it was possible to simulate the effect
of thermal inertia changes by Revit/Green Building Studio and by Energy Plus. As shown in
Figure 7, all simulation models predict higher heating demands for low thermal mass model
than for high thermal mass and the cooling load is almost the same and independent of the
thermal mass of the test cell. In Energy Plus the change in heating loads for the 60 mm test cell
with the high thermal mass compared with low thermal mass were 85%, 65% with the seasonal
method while with Revit there were no change, giving the idea that Revit is not assessing
correctly the effect of thermal inertia of construction.

In Figures 10 are given the monthly heating and cooling loads for the test cell with 60 mm
thermal insulation and high thermal mass calculated with energy plus. Comparing those results
with the previous ones for the low thermal mass test cell (Figure 8 and 9) it is interesting to note
that the thermal model with high thermal mass in winter the cooling demand is almost zero, due
to the energy storage in the thermal mass, which is also responsible for the decrease in the
heating demand of the test cell.

317
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Monthly Heating Loads Monthly Cooling loads


Figure 10: Results provided by Energy Plus - 60 mm thermal insulation high thermal mass.

6. Conclusion

To conclude, BIM tools have provided an integrated solution about testing the building during
the design phase and exporting the model softly from one tool to another inside BIM platform
of the same software house (with 100% of interoperability). The model can be analysed
automatically and allow a simple study of alternative solutions to be discussed directly through
this BIM collaborative environment. The use of BIM to study this simple test cell presents
several limitations, because we were not able to study the passive behaviour of test cell and
were compiled to use HVAC system to assess the heating and cooling load. In this calculation
Revit present big differences compared with the more detailed and validated software (Energy
Plus) and also presented to be a tool that has bigger errors than the seasonal annual method,
usually used in the thermal regulation. This research will continue to identify the sources of this
errors in Revit/GBS tool. For this, a deep analysis for the calculation method used by Revit is
in progress.

References

[1] A Schlueter, F. Thesseling, "Building Information Model based energy/exergy


performance assessment study in the early design stages", in Institute of Building
Technologies, Building Systems Group, ETH Zurich, Switzerland 2008 Elsevier.
http://dx.doi.org/10.1016/j.autcon.2008.07.003.
[2] P. Capone, V. Getuli, and T. Giusti, Constructability and safety performance based
design: a design and assessment tool for the building process, in The 31st International
Symposium on Automation and Robotics in Construction and Mining (ISARC 2014)
[3] Svetlana Olbina, Thomas Reeves, Raymond Issa, Validation of Building Energy
Modeling Tools: Ecotect, Green Building Studio and IES<VE>, Proceedings of
the 2012 Winter Simulation Conference.
[4] A. Pinto, Life cycle assessment applied to the environmental and energy analysis of
buildings. Instituto Superior Tcnico, of Universidade Tcnica de Lisboa, 2008. PhD
thesis.
[5] L. Tronchin, K. Fabbri, Energy performance building evaluation in Mediterranean
countries: Comparison between software simulations and operating rating simulation,
Energy and Buildings 40 (2008) 11761187.
[6] D. B. Crawley, J. W. Hand, M. Kummert, B. T. Gri_th, Contrasting the capabilities of

318
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

building energy performance simulation programs, Building and Environment 43 (4)


(2008) 661673.
[7] Autodesk website: http://www.autodesk.com/.
[8] Autodesk Green Building Studio: https://gbs.autodesk.com/GBS/.
[9] ISO 13790:2008 - Energy performance of buildings -- Calculation of energy use for
space heating and cooling
[10] Despacho (extrato) n. 15793-K/2013 com as alteraes introduzidas pela Declarao de
retificao n. 127/2014 (in Portuguese).

319
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

320
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

CONTRIBUTO DOS MODELOS BIM PARA A EXPOSIO,


REPRESENTAO E DOCUMENTAO DA ARQUITETURA
Rita Rebelo Pvoas (1), Francisco Teixeira Bastos (2)

(1) Estudante do Instituto Superior Tcnico, Lisboa


(2) Instituto Superior Tcnico, Lisboa

Resumo
O recurso da arquitetura s reas artsticas, humanas, cientficas e tecnolgicas evidencia a
multiplicidade de informao sintetizada no objeto arquitetnico, tornando a sua comunicao
algo difcil. Por outro lado, por se tratar de matria construda, pelas funes que lhe esto
associadas e pelo caracter privado de muitos dos seus exemplares, a sua visita muitas vezes
impossibilitada. Assim, o contacto com a arquitetura relevante por isso maioritariamente feito
por via de meios de comunicao e no atravs dos seus originais. Torna-se por isso essencial
investir em modos de divulgao de arquitetura que aproximem o objeto comunicante do objeto
comunicado. Para tal procurou-se, explorar a forma como os objetos de arquitetura so dados a
conhecer, abordando para tal as capacidades e limitaes de cada um dos meios tradicionais de
comunicao da mesma o desenho, o texto, a maquete, a fotografia e o vdeo para expor,
representar e documentar arquitetura. Procurou-se tambm analisar o BIM, considerando para
tal, no s as competncias do software, mas tambm as competncias atribudas pelos meios
e comunicao, passiveis de lhe serem associados. Por ltimo, procurou-se testar algumas das
qualidades de uma ferramenta BIM para esta rea de conhecimento, atravs do exerccio prtico
de modelao da Casa Albarraque em Revit. Concluiu-se que o BIM uma ferramenta relevante
para expor, representar e documentar arquitetura, no s devido capacidade de suportar outros
meios de comunicao, tirando partido das qualidades dos mesmos, como tambm pelas
prprias qualidades desta tecnologia, que se apresenta uma alternativa nica para experienciar
arquitetura.

1. Introduo

A investigao apresentada trata o contributo que a tecnologia BIM apresenta para a


qualificao do tratamento museolgico da arquitetura, considerando aos mtodos existentes.
Neste universo mais vasto circunscreveu-se a questo investigada na relevncia que os meios
de comunicao de arquitetura assumem para a divulgao e apresentao de obras de
qualidade, uma vez que o contato com os objetos originais se encontra, na maioria das vezes,

321
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

inacessvel. Neste sentido, reporta-se como necessrio garantir que a arquitetura seja descrita e
apresentada aos seus observadores da forma mais aproximada relativamente ao seu original.
Para tal, importa avaliar a qualidade da aproximao, entre o objeto original e os diferentes
suportes comunicativos, partindo de critrios prprios para o tratamento museolgico da
arquitetura. Assim, com base no International Council of Museums [1] [2] e na Direo Geral
de Patrimnio-Cultural [3], foi descortinada uma trilogia de anlise para avaliar os meios
utilizados para comunicar arquitetura (meios tradicionais e tecnologia BIM) conforme ilustrado
na Figura 1.
Trilogia de Anlise

Museologia da Cdigo Deontolgico Exposio


Arquitetura do ICOM e DGPC Representao
Documentao

Figura 1: Vetores fundamentais para o tratamento museolgico da Arquitetura.

Para estimar a qualidade de qualquer suporte comunicativo seja para expor, representar ou
documentar arquitetura tornou-se importante definir previamente o que so qualidades prprias
da arquitetura. Assim, a partir do pensamento de Bruno Zevi [4] foram consideradas trs
grandes qualidades da arquitetura que devem ser comunicadas: as suas qualidades sensitivas,
fsicas e identitrias (Figura 2).

Qualidades Qualidades Qualidades Projeto De


Sensitivas Fsicas Identitrias Arquitetura

Figura 2: Qualidades da Arquitetura.

Foi ento, a partir destas trs categorias, que se procurou avaliar a capacidade dos diferentes
meios para expor, representar e documentar as qualidades da arquitetura.

Desta forma, para a exposio de arquitetura, um dos aspetos mais relevantes a considerar
prende-se com a descrio das qualidades sensitivas de um espao. Assim, quando se trata a
dimenso sensitiva da arquitetura, procura-se apresentar as suas qualidades sensoriais e
emocionais, revelando to-somente os elementos estruturantes da atmosfera e dos ambientes
que o espao apresenta [4].

No caso da representao, considera-se pertinente comunicar a dimenso sensitiva e fsica do


objeto arquitetnico. A representao dever ento procurar descrever integralmente todos os
elementos do projeto permitindo, no limite, a sua reconstruo [4].

Para a documentao da arquitetura, considera-se imprescindvel o registo das qualidades


sensitivas e fsicas do objeto arquitetnico, acrescentando-se ainda a descrio das qualidades
identitrias do projeto em causa. As qualidades identitrias dizem respeito ao registo da
memria, identidade e os significados de um dado objeto arquitetnico nos seus diversos

322
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

contextos sociais, culturais, econmicos e polticos [4]. Estes conceitos encontram-se ilustrados
no esquema da Figura 3.
Trilogia de Anlise

Exposio Representao Documentao

qualidades qualidades qualidades qualidades qualidades qualidades


sensitivas sensitivas fsicas sensitivas fsicas identitrias
Figura 3: Trilogia de anlise adotada

Os pressupostos estabelecidos tm como objetivo fundamental lanar o debate para possveis


desenvolvimentos na rea da exposio, representao e documentao de arquitetura,
centrando a discusso nas mais-valias que a tecnologia BIM possa assumir relativamente aos
mtodos tradicionais de comunicao, bem como nas novas valncias que a mesma suscita para
o campo da experincia do espao arquitetnico.

O trabalho aqui apresentado, de ndole terico-prtica, procura destacar algumas das mais-
valias que o BIM trs para o tratamento museolgico da arquitetura, focando-se nos seus
suportes comunicativos.

Numa ltima fase, com base em toda a informaes consultada, tornou-se possvel calcular
alguns dos benefcios da tecnologia BIM comunicar arquitetura. Considerando para tal, no s
a capacidade de agregar as competncias apresentadas pelos mtodos tradicionais de
comunicao, mas tambm de se constituir uma alternativa com valncias nicas de
experienciar arquitetura.

2. Contextualizao do tema

Num primeiro momento da investigao considerou-se pertinente aprofundar alguns conceitos


que, embora independentes da questo investigada, se relacionam com ela destacando aqui
aqueles que se afiguraram pertinentes destacar. Neste sentido procurou-se investigar o tema dos
museus e a misso deste tipo de instituies e, merecendo particular ateno, o tema dos museus
digitais, decisivos para compreender o alcance e a complexidade do tema em anlise [5] [6] [7]
[8].
Estudou-se tambm o tema do ciberespao como plataforma e veculo de cultura, bem como
as possibilidades que a estrutura rizomtica oferece ao universo da museologia da arquitetura.
Procurou-se tambm ter um conhecimento mais exato no que diz respeito realidade virtual e,
no seio desta, a realidade imersiva [9] [10]. Para alm disso aprofundou-se o tema da era da
informao, tomando conhecimento do impacto da mesma na forma como se comunica
arquitetura atualmente, bem como das plataformas existentes de exposio, representao e
documentao da arquitetura online [11] [12] [13] [14]. Por fim considerou-se pertinente
estudar a problemtica da comunicao da arquitetura [15] [4] [16] [17] [18].

323
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Aplicao da trilogia de anlise aos meios tradicionais de comunicao

A investigao sobre a exposio, representao e documentao da arquitetura prosseguiu por


via da pesquisa individualizada de cada um dos meios tradicionais de comunicao da
arquitetura o desenho livre, o desenho tcnico, o texto, a maquete, a fotografia e o vdeo , de
forma a compreender o papel de cada um no exerccio, e subsequente comunicao da
arquitetura.

Aps anlise sistemtica dos diferentes meios de comunicao pode concluir-se que a
exposio, representao e documentao de arquitetura tanto mais rica quanto mais
diversificados forem os meios utilizados para a comunicar.

Uma vez que cada um dos meios referidos se encontra intimamente relacionado com a produo
do projeto ou pelo contributo nico que os carateriza, considera-se ento que so todos eles
relevantes para comunicar as qualidades arquitetnicas.

Por essa razo para comunicar arquitetura com rigor necessrio recorrer a suportes
heterogneos que permitam complementar o discurso descritivo, colmatando assim as
limitaes inerentes de cada um dos suportes comunicativos, representando assim de forma
mais completa as diferentes qualidades sensitivas, fsicas e identitrias de um projeto.

A forma como a arquitetura se d a conhecer, ainda hoje, encontra na comunicao do espao


o seu maior desafio, sendo esta uma problemtica reclamada inclusivamente por Bruno Zevi
[15]. Atualmente, no se tratando apenas de uma limitao de meios disponveis ou da
ineficcia da sua utilizao, identifica-se que no existe ainda o uso pleno das potencialidades
que a era da informao, mais digital, inteligente, interativa e sobretudo em rede oferece.

4. BIM: Estado de conhecimento

Sendo o BIM uma tecnologia orientada para a conceo e gesto do ciclo de vida de edifcios
novos neste sentido que tm vindo a ser promovidas investigaes e consequentemente a
evoluo da sua tecnologia. No entanto, j alguns trabalhos tm vindo a ser desenvolvidos no
campo da aplicao da tecnologia BIM a edifcios pr-existentes, especialmente sobre edifcios
de relevncia histrica ou patrimonial [19].

Nas ltimas duas dcadas assistiu-se a um crescente processo de digitalizao, gesto e criao
de plataformas virtuais com o objetivo de disponibilizar e permitir o acesso a informaes
relativas a patrimnio histrico. O processo de digitalizao apostou inicialmente na modelao
virtual 3D para a documentao rigorosa da geometria e das propriedades visuais dos objetos
arquitetnicos, recorrendo para isso fotogrametria e ao laser scanning. Contudo a descrio
das superfcies de um objeto arquitetnico no tem qualquer tipo de informao para alm da
descrio do invlucro que contem a matria descrita [20].

Neste sentido a primeira aplicao da tecnologia BIM, ao servio de edifcios j construdos,


foi desenvolvida no mbito de uma investigao levada a cabo por Yusuf Arayci em 2008. O

324
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

autor reclamou a necessidade de transpor a barreira da modelao grfica 3D e adotar a


ferramenta BIM de forma a dotar os modelos com informao multifuncional, interopervel,
inteligente e muti-representacional. Esta investigao propunha o desenvolvimento de cidades
mais sustentveis e otimizadas. A investigao focou-se na adoo da tecnologia BIM para
modelar edifcios j construdos combinando-a com a tecnologia do laser scanning [21].

Para alm da informao construda no mbito do sistema BIM, a incluso de informao


heterognea, tal como o desenho, o texto, a fotografia e o vdeo, atestam a vocao dos modelos
BIM para funcionarem como base de dados para armazenar a informao referente objeto
arquitetnico simulado virtualmente [21].

Posteriormente, foi desenvolvido pelo Dublin Institute of Technology um novo conceito, o


Historic Building Information Modeling (HBIM). O HBIM um plug-in (extenso de software)
do BIM que tem como objetivo produzir uma biblioteca de objetos paramtricos construdos a
partir de informao histrica. Para tal combinada a tecnologia BIM com a informao
recolhida atravs de laser scanners e do levantamento fotogramtrico [22, pp. 369-370].

O HBIM foi utilizado num projeto de restauro em 2014 que, aps a sua destruio causada por
um terramoto, recorreu a esta tecnologia para simular e analisar o comportamento estrutural do
edifcio assim como para oramentar e desenvolver o projeto de restauro [23, p. 1].

Ramtin Attar et al. desenvolveram o modelo BIM do escritrio da Autodesk. O objetivo foi o
de construir um modelo que funcionasse como base de dados de toda a informao sobre o
edifcio. Assim o modelo do edifcio de relevncia histrica, regista as diferentes intervenes
que sofreu ao longo do tempo e opera como um repositrio de informao capaz de descrever
a geometria e a semntica associadas ao objeto arquitetnico. O autor acrescenta ainda que uma
das motivaes para a adoo do BIM foi a possibilidade de centralizar a informao referente
ao edifcio e permitir a produo de uma grande variedade de anlises a partir do modelo [24,
p. 3].

Em 2011, Stephen Fai et al. alerta que, apesar da proliferao da adoo do BIM para projetar
e gerir o ciclo de vida de edifcios novos, muito reduzido o nmero de investigaes
desenvolvidas com o intuito de explorar as capacidades do BIM para a gesto de informao
relativa a edifcios construdos de relevncia cultural [19, p. 1].

Apesar dos desenvolvimentos at data, Logothetis et al. reforam esta ideia em 2015 na
reviso do estado da arte sobre a aplicao da tecnologia BIM ao patrimnio cultural [25, p.
177].

Stephen Fai et al. estudaram a construo de modelos BIM que incorporassem dados
quantitativos, como o caso de objetos inteligentes e a informao do seu desempenho
estrutural, e informao qualitativa, tal como a incluso de fotografias e elementos textuais. Os
autores identificaram tambm a capacidade do BIM permitir organizar informao numa linha
de tempo navegvel, possibilitando assim o registo das alteraes tangveis e inatingveis que
foram ocorrendo ao longo do ciclo de vida do edifcio e eventuais projees futuras [19, p. 1].

325
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Todas estas capacidades podem ser exploradas como matria de base para a exposio,
representao ou documentao extensiva de um projeto de arquitetura relevante, enquanto
matria realizada ou enquanto processo.

A adoo da tecnologia BIM, podendo no se tratar de uma ferramenta imediatamente


equacionada para a construo de museus virtuais de arquitetura, pode verificar-se til como
ferramenta de trabalho para o tratamento museolgico de esplios de arquitetos ou gabinetes
de arquitetura sediados em museus. Podendo tratar tambm edifcios demolidos ou edifcios
que no chegaram a ser construdos como o caso de alguns dos projetos de Louis Kahn.

4.1 BIM: Dificuldades Identificadas


A modelao em BIM de edifcios pr-existentes para expor, representar ou documentar
arquitetura est ainda numa fase embrionria. As investigaes nesta rea de aplicao do BIM
tm como denominador comum partir das capacidades tecnolgicas disponveis no sistema
BIM, orientadas para servir a produo e gesto de edifcios novos, e adaptar essas capacidades
aos objetivos da rea de estudo.

Uma vez que os edifcios pr-existentes de relevncia histrica apresentam muitas vezes
elementos de geometria irregular, a modelao dos mesmos revela-se muitas vezes difcil [25,
p. 179]. Por outro lado, os materiais tambm sofrem alteraes sua morfologia e propriedades
originais, apresentando o desgaste prprio do uso e do tempo. Por isso, para documentar a
heterogeneidade da morfologia do edifcio ou o desgaste do mesmo, necessrio recorrer a
mecanismos de anlise tais como o laser scanner ou a fotogrametria [25, p. 179].

Para a construo de um modelo desta natureza a modelao em BIM tem de ser produzida
manualmente, uma vez que ainda no existe a capacidade de reconhecer os planos atravs da
nuvem de pontos ou dos levantamentos fotogramtricos, o que torna este mtodo pouco eficaz.
Neste campo, apenas possvel ultrapassar as dificuldades apresentadas pela falta de primitivas
da linguagem das bibliotecas BIM atravs do recurso ao HBIM referido anteriormente [25, p.
179].

4.2 BIM: O contributo atual


Apesar de se verificar uma carncia de ferramentas e software especfico para tirar mais partido
das potencialidades do BIM j possvel identificar as mais-valias de algumas das ferramentas
existentes para este campo de aplicabilidade. Destaca-se alguns dos benefcios que o BIM
comprovou trazer a este campo de investigao [25] [26]:
Permitir o acesso virtual ao interior e exterior de um projeto, viabilizando a consulta de
obras arquitetnicas inacessveis de forma real;
Permite, atravs da disponibilizao de contedo, que estudantes e investigadores
estudem e analisem o edifcio, possibilitando assim promover e desenvolver mais
conhecimento;
Permite o registo da evoluo do edifcio ao longo do tempo, atravs da organizao
cronolgica da informao e documentao do modelo;
Permite estimar toda a estrutura do edifcio atravs da utilizao de imagens para
considerar a textura, a volumetria e forma do mesmo;

326
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Permite simular de uma forma virtual diferentes propostas para reabilitaes,


reconstrues ou adaptaes ao edifcio original;
Permite, por se tratar de uma modelao 3D comunicar informao a um pbico mais
alargado, que tem mais dificuldade em interpretar a informao 2D;
Permite consultar informao detalhada associada a cada elemento do modelo.
Acrescenta-se tambm a capacidade de integrao de diferentes tipos de dados
heterogneos, tais como o desenho, o texto, a fotografia, o vdeo e som e a possibilidade
de extrao de renders, walkthougs e maquetes 3D.
Fica tambm em aberto o potencial que um conjunto de modelos BIM pode vir a
representar, seja para a construo de museus de arquitetura virtual imersiva ou para a
construo de arquivos de modelos BIM, onde possvel tirar partido do cruzamento
de informao entre os diferentes modelos.

5. Aplicao da trilogia de anlise ao Modelo BIM da Casa Albarraque

No mbito da investigao apresentada, procurou-se explorar as capacidades que um software


especifico BIM, o Revit Architecture 2016, tem para expor, representar e documentar
arquitetura. Aps o exerccio prtico de construo do modelo da Casa Albarraque, do Arq.
Ral Hestnes Ferreira, distinguem-se dois tipos de informaes consultveis a partir do mesmo:
a gerada e a associada.

Relativamente informao gerada destaca-se:


A completa descrio da geometria da casa, definindo todos os desenhos possveis
plantas, alados e cortes do objeto arquitetnico.
O modelo tridimensional que permite ao utilizador explorar a espacialidade da Casa em
diferentes modos de visualizao, selecionar a informao que pretende visualizar ou
esconder. Assim, esto representadas no modelo todas as perspetivas possveis sobre a
casa.
A identificao dos nomes e quantificao das reas das divises da Casa.
A identificao dos materiais dos diferentes elementos do projeto com um nome,
qualidades visuais e propriedades fsicas, e quantificao da sua rea e volume.
A capacidade de associar links, descries, e definir propriedades a cada um dos
elementos do projeto.
A possibilidade de criar imagens fotorealistas a partir do modelo.
A capacidade criar vdeos de percursos no modelo (walkthroughs).
Criar suportes bidimensionais (folhas), onde possvel apresentar a informao que se
encontra no modelo disposta e arranjada nesse suporte.
Relativamente informao associada:
Destaca-se a capacidade do modelo incluir dados qualitativos no modelo, atravs da
incluso de imagens de fotografias, desenhos livres ou tcnicos nas folhas do modelo.
Sendo possvel tambm associar informao escrita e numrica a objetos do modelo.

327
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5.1 Modelos BIM: Exposio


O modelo comunica de forma rpida, intuitiva e apelativa as qualidades sensitivas de um espao
atravs da manipulao do modelo e consulta das suas folhas (sheets).

O modelo produzido da Casa Albarraque permite ao utilizador explorar de forma interativa o


modelo partilhando as qualidades atrativas prprias da manipulao e explorao
tridimensional, tal como se verifica nos modelos de maquete.

Num segundo ponto, identifica-se a mais-valia de apresentar a casa de uma forma mais intuitiva
a um pblico no especializado, uma vez que o modelo 3D prescinde de uma viso
tridimensional treinada para imaginar os espaos modelados.

As imagens e vdeos renders produzidos a partir do modelo permitem expor o projeto da casa
sem o vestgio das marcas do tempo, as imperfeies prprias do objeto original e sem o
mobilirio e as naturais apropriaes do espao. Estes meios, distintos da fotografia e do vdeo,
permitem focar a ateno do visitante apenas na arquitetura apresentando-se como uma visita
virtual distinta da visita real. Permite tambm apresentar perspetivas do projeto sobre o qual
pode no existir informao nos restantes suportes, como por exemplo em perspetivas areas.

Foi explorada tambm a capacidade de insero de diferentes meios comunicativos de


arquitetura imagens (que podem ser desenhos ou fotografias) e texto, e organizada essa
mesma informao nas folhas do documento, complementando assim o discurso expositivo e
tirando os benefcios destes suportes nicos.

Outro ponto a destacar, no mbito do caso de estudo do modelo da Casa Albarraque, recai sobre
a possibilidade do mesmo ser facilmente consultado e partilhado atravs da internet. Assim, e
ao contrrio da maquete, o modelo partilha deste importante veculo de divulgao de
informao. Tal como referido anteriormente, a compatibilidade do suporte comunicativo com
o ciberespao atualmente condio sine qua non para a exposio de arquitetura numa
sociedade que se quer cada vez mais informada, com acesso a informao inteligente, em rede
e mais conservadora na utilizao de recursos naturais.

Por outro lado, o modelo da Casa Albarraque rene informao heterognea como a visual
(renders e vdeos), a espacial (modelo 3D), a tcnica (desenhos tcnicos, materiais, as diferentes
listas) e a histrica (importao de documentos e texto). A reunio dessa informao torna o
modelo um meio expositivo apelativo a um pblico alargado com nveis de interesse distintos
entre si. A interoperabilidade do modelo garante tambm a possibilidade aos utilizadores de
consultarem o modelo no suporte que melhor servir os seus interesses pessoais e selecionar o
contedo no qual estejam mais interessados.

5.2 Modelos BIM: Representao


O modelo da Casa Albarraque para alm da descrio das qualidades sensitivas da arquitetura,
tal como referido anteriormente, descreve tambm de forma integral as suas qualidades fsicas.
Assim, permite descrever tridimensionalmente toda a geometria do projeto permitindo, a partir
do mesmo, consultar todas a plantas cortes e alados que se pretendam.

328
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O modelo da Casa representa tambm a materialidade dos diferentes elementos do projeto assim
como as qualidades visuais associadas a cada material. Para a representao da dimenso fsica
do projeto, o modelo tem associado a cada material as suas propriedades, tais como: o
comportamento trmico, mecnico e a resistncia do material.

Uma vez que o modelo pode ser navegvel, algumas das sensaes que o espao suscita no
observador podem ser experimentadas atravs da explorao do modelo em realidade virtual.
Este tipo de experincia pode ser apenas comparado com a consulta de modelos de maquete
que dificilmente alcanaria o nvel de detalhe e realismo a que se conseguiu chegar com este
modelo.

O modelo da Casa desenvolvido constitui-se uma ferramenta de representao que pode ser
utilizado para continuar a representar alteraes futuras ao edifcio e servir de suporte para a
produo de anlises e para a gesto e manuteno do mesmo ao longo do seu ciclo de vida.
Permite tambm informar e ensaiar diferentes propostas de alterao ao projeto original no
mbito de projetos de reconstruo, reabilitao ou recuperao do edifcio de forma informada
e rigorosa.

5.3 Modelos BIM: Documentao


Tal como enunciado anteriormente o modelo da Casa Albarraque descreve qualidades
sensitivas e fsicas do projeto de arquitetura, e tambm de uma forma especial, procura refletir
as qualidades identitrias do mesmo.

O contributo do BIM para a comunicao das qualidades identitrias do projeto, associadas


memria ou aos simbolismos de um edifcio, identifica num primeiro momento, a capacidade
do modelo desenvolvido apresentar informao heterognea e multidisciplinar. Tornando
possvel comprovar a capacidade do BIM da Casa Albarraque funcionar um modelo inventrio
de toda a informao relevante relativa ao projeto. Tal facto evidente nas folhas do modelo
(sheets) onde se encontram inseridos documentos de imagem e texto, tirando partido dos
benefcios destes suportes enquanto meios documentais.

Num segundo momento, destaca-se a integrao de links e descries associadas a diferentes


elementos do modelo e a criao de anotaes dispostas sobre determinados documentos (como
os fotogrficos) onde podem estar associadas notas, descries ou links para pginas na internet.
Assim possvel aceder informao descritiva e complementar relativa a cada um dos
documentos ou elementos que se afigurem relevantes.

No campo da documentao, num terceiro ponto, considera-se til a capacidade do modelo em


apresentar uma grande quantidade de informao de forma organizada e inteligente. Seja
atravs de objeto ou da barra do explorador.

Por ltimo tambm particularmente vantajoso para o campo da documentao, a portabilidade


do documento rvt, compacto e por isso facilmente armazenvel, e partilhvel.

329
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

6. Concluses

O desenvolvimento do trabalho permitiu explorar a mais-valia que o BIM para expor,


representar e documentar arquitetura relevante.

Efetivamente, aps a abordagem sistemtica de cada um dos meios tradicionais de


comunicao, concluiu-se que todas estas ferramentas so nicas e indispensveis para a
descrio das diferentes qualidades da arquitetura, devido no s ao envolvimento das mesmas
na produo de arquitetura como tambm devido ao contributo original de cada uma delas para
expressar qualidades arquitetnicas. No entanto identificou-se tambm que todas estas
ferramentas apresentam limitaes para exibir, representar e documentar um projeto de
arquitetura.

No entanto, o BIM apresenta-se como uma ferramenta relevante para exibir, representar e
documentar a arquitetura, na medida em que se apresenta como uma soluo aglutinadora de
diferentes suportes comunicativos, assimilado consequentemente as valncias dos mesmos para
a comunicao de arquitetura.

Concluiu-se que o BIM tem a capacidade de expor arquitetura, propondo uma forma interativa
de interao e manipulao de projetos arquitetnicos, distinta dos meios tradicionais
abordados. Tambm, atravs da experincia imersiva de visita aos modelos BIM, possvel
aproximar o utilizador da experincia da visita real do objeto arquitetnico. Proporcionando
desta forma ao visitante uma experincia sensorial mais rica, informativa e interativa com a
arquitetura.

Demonstrou-se tambm que o BIM permite representar arquitetura de forma to rigorosa


quanto mais informao se pretender inserir no modelo, registando assim a descrio fsica do
edifcio e permitindo facilitar a gesto do ciclo de vida do edifcio modelado.

Finalmente, permite documentar com mais rigor do que os meios tradicionais de comunicao,
projetos de arquitetura relevante, uma vez que permite a incluso de um conjunto alargado de
elementos de diferentes formatos insinuando-se at mesmo como capaz de funcionar como um
modelo inventrio de projetos de arquitetura relevante com informao multidisciplinar, multi-
funcional, inteligente em organizada num suporte interopervel. De facto, por se tratar de uma
ferramenta digital, possvel organizar uma grande quantidade de informao disponibilizar o
modelo produzido na internet.

Referncias

[1] ICOM, ICOM Code of Ethics for Museums, I. C. o. Museums, Ed., Paris, 2013.
[2] ICOM, Museum Definition, 2007. [Online]. Available: http://icom.museum/the-
vision/museum-definition/. [Acedido em Fevereiro 2016].
[3] DGPC, Direco-Geral do Patrimnio Cultural: Patrimnio Arquitetnico, [Online].
Available: http://www.patrimoniocultural.pt/pt/patrimonio/patrimonio-
imovel/patrimonio-arquitetonico/. [Acedido em Maro 2016].

330
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[4] B. Zevi, Uma Definio de Arquitectura, Lisboa: Edies 70, 1986.


[5] H. Barranha e S. S. Martins, Uncertain Spaces: Virtual Configurations in Contemporary
Art and Museums, H. Barranha e S. S. Martins, Edits., Lisboa: Instituto de Histria da
Arte, FCSH - Universidade Nova de Lisboa, 2015.
[6] H. Barranha, S. S. Martins e A. P. Ribeiro, Museus sem lugar: ensaios, manifestos e
dilogos em rede, H. Barranha, S. S. Martins e A. P. Ribeiro, Edits., Lisboa: Instituto de
Histria da Arte, FCSH - Universidade Nova de Lisboa, 2015.
[7] T. Bailllargeon, Planning, Developing, and Evaluating eMuseums: Step-By-Step
Handbook for Museum Professionals, Kansas, 2008.
[8] H. Barranha, Utopia, simulao e realidade: Arquitetura de museus de arte na era
digital, arqa arquitetura e arte: Processos digitais, Vols. %1 de %2Ano - XIII, n 106,
pp. 108-111, 2013.
[9] M. Castells, The Information Age: Economy, Society, and Culture, 2 Edio ed., vol. I:
The Rise of the Network Society, Oxford: John Wiley & Sons, 2010.
[10] R. Tori, C. Kirner e S. R., Fundamentos e Tecnologia de Realidade Virtual e Aumentada,
S. B. d. Computao, Ed., Porto Alegre: pr-simpsio VIII Symposium on Virtual
Reality 2006, 2006.
[11] Google Arts & Culture, [Online]. Available:
https://www.google.com/culturalinstitute/beta/.
[12] MoMove, [Online]. Available: http://exhibition.docomomo.com/.
[13] CyArk, [Online]. Available: http://www.cyark.org/.
[14] MUDA, [Online]. Available: http://ciamh.up.pt/muda/.
[15] B. Zevi, Saber ver a arquitetura, So Paulo: Martins Fontes, 1992.
[16] W. Benjamin, The Work of Art in the Age of Mechanical Reproduction (The Work of
Art in the Age of Mechanical Reproduction, Londres: Penguin Books, 2008), 1936.
[17] P. Lucas, Representao de Arquitectura: Introduo s vrias formas de comunicao
da arquitectura, Lisboa, 2011.
[18] O. Beasley, In Search Of Distraction: Representing Benjamins Everyday Experience
of Architecture, Westminster, 2015.
[19] S. Fai, K. Graham, T. Duckworth, N. Wood e R. Attar, Building Information Modelling
and Heritage Documentation, em 23rd International Symposium, International
Scientific Committee for Documentation of Cultural Heritage (CIPA), Praga, 2011.
[20] P. Pauwels, R. Verstraeten, R. De Meyer e J. Van Campenhout, Architectural
Information Modelling for Virtual Heritage Application, em International Conference
on Virtual Systems and Multimedia (VSMM), 2008.
[21] Y. Arayici, Towards Building Information Modelling for Existing Structures, em
Structural Survey, 2008.
[22] C. Dore e M. Murphy, Integration of Historic Building Information Modeling (HBIM)
and 3D GIS for Recording and Managing Cultural Heritage Sites, em 18th International
Conference on Virtual Systems and Multimedia, Milo, 2012.
[23] D. Oreni, R. Brumana, S. Della Torre, F. Banfi, L. Barazzetti e M. Previtali, Survey
turned into HBIM: The restoration and the work involved concerning the Basilica di
Collemaggio after the earthquake (LAquila), em ISPRS Annals of the
Photogrammetry, Remote Sensing and Spatial Information Sciences, Riva del Garda,
2014.
[24] R. Attar, V. Prabhu, M. Glueck e A. Khan, 210 King Street: A Dataset for Integrated

331
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Performance Assessment, em 2010 Spring Simulation Multiconference. Society for


Computer Simulation International, Orlando, 2010.
[25] S. Logothetis, A. Delinasiou e E. Stylianidis, Building Information Modelling for
Cultural Heritage: A Review, em ISPRS Annals of the Photogrammetry, Remote
Sensing and Spatial Information Sciences, Taipei, 2015.
[26] J. Maddigan, HCF National Heritage Summit, Canadian Association of Heritage
Professionals, 2012.

332
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

MODELO INTEGRADO PARA A SIMULAO DO FASEAMENTO


CONSTRUTIVO DE BARRAGENS
Lus Pedro Bidarra (1), Miguel Azenha (1), Joo Pedro Couto (1), Jos Carlos Lino (2)

(1) Universidade do Minho, Guimares


(2) Universidade do Minho, Guimares; Newton, Porto

Resumo
A construo de barragens e o seu faseamento construtivo so atividades extremamente
complexas, que acarretam custos muito elevados e que assim requerem otimizao. Nesse
sentido impe-se cada vez mais uma tentativa de aproximao s abordagens de Integrated
Project Delivery (IPD) preconizadas pelas filosofias BIM, nomeadamente atravs da
integrao entre vrias valncias de uma forma automtica.

Assim sendo, este trabalho visa essencialmente estabelecer uma metodologia integrada que
permita a ligao entre a modelao, o clculo trmico e a definio do faseamento construtivo
de barragens (4D). No artigo so apresentadas trs principais ferramentas desenvolvidas
referentes modelao da barragem, ao clculo trmico e ao faseamento construtivo.

A barragem foi modelada atravs de programao visual com recurso ao Dynamo, sendo este
interopervel com as restantes ferramentas desenvolvidas. O clculo trmico faseado efetuado
pelo mtodo das diferenas finitas 2D atravs da linguagem MATLAB. A ferramenta
desenvolvida para gerao automtica do faseamento construtivo, igualmente implementada no
MATLAB, baseada num algoritmo de automao celular.

1. Introduo

Os custos associados construo de obras de grande dimenso, como o caso de barragens,


justificam a otimizao dos processos construtivos em fase de projeto e de preparao de
construo. No entanto, h ainda frequentes casos de elaborao dos projetos das barragens,
sem conhecimento da equipa construtora (uma vez que o trabalho ainda no se encontra
adjudicado nessa fase), o que no permite a interao direta nas fases preliminares do projeto,
e traz dificuldades ao processo de otimizao do processo construtivo. Impe-se, portanto, uma
tentativa de aproximao s abordagens de Integrated Project Delivery (IPD) [1] para melhor

333
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

planear e executar a construo de barragens. Para agilizar processos IPD, so frequentemente


despoletadas metodologias BIM [2] com forte suporte em ferramentas informticas que
permitam a rpida e eficaz modelao dos elementos a construir, bem como a eficaz
interoperabilidade entre aplicaes informticas para acelerao dos processos de anlise.

No caso particular do estudo do faseamento construtivo de barragens, uma das mais importantes
variveis a ter em conta a definio da espessura das camadas de betonagem, que por sua vez
est diretamente relacionada com o risco de fissurao decorrente das variaes trmicas
associadas ao calor gerado pela hidratao do cimento. Com efeito, caso sejam adotadas
espessuras de camadas de betonagem excessivamente grandes, as variaes de temperatura so
tambm bastante elevadas (sendo atingidas temperaturas de pico da ordem dos 60-70C) e
proporcionam expanses/contraes que so normalmente parcialmente impedidas, gerando,
portanto, nveis de tenses conducentes ao aparecimento de fissurao precoce de origem
trmica que altamente indesejvel. As fissuras trmicas so normalmente alvo de reparaes
com custos elevados, quer do ponto de vista da prpria reparao em si, quer tendo em conta
os atrasos induzidos concluso da obra. Por outro lado, se so adotadas espessuras de camada
muito pequenas para evitar risco de fissurao trmica, poder-se- incorrer em tempos de
construo demasiadamente longos e desnecessrios, com enormes sobrecustos associados ao
prolongamento do tempo de execuo da obra. relativamente frequente aceitar o aumento de
espessura das camadas de betonagem para acelerar o faseamento construtivo, acompanhado de
medidas de mitigao do risco de fissurao trmica, como por exemplo o abaixamento da
temperatura inicial do beto ou o recurso a tubagens de arrefecimento embebidas na prpria
barragem.

Tendo em conta os aspetos que acabam de ser explanados acerca do estudo do faseamento
construtivo de barragens, e caso se pretenda suportar filosofias de trabalho IPD com suporte em
modelos BIM, torna-se necessrio agilizar um conjunto de tarefas que partida no esto
garantidas nas aplicaes BIM disponveis no mercado: (i) estabelecer a modelao paramtrica
do corpo da barragem de forma facilitada, incluindo a definio das vrias fases de betonagem
que lhe so inerentes; (ii) estabelecer um fluxo de interoperabilidade que permita a anlise
trmica de cenrios de construo; (iii) estabelecer metodologia de definio automtica da
calendarizao das betonagens, tendo em conta a complexidade de definio manual em obras
com centenas de fases de betonagem.

O presente artigo reporta um trabalho de estabelecimento de metodologia integrada de definio


de faseamento construtivo com o objetivo de responder s trs tipologias de tarefas acima
indicadas, com base no caso de estudo de uma barragem abbada. Para isso foi efetuada
programao visual no plugin Dynamo do REVIT, permitindo o estabelecimento de modelao
paramtrica da barragem. Adicionalmente foi efetuado um programa em MATLAB baseado no
mtodo das diferenas finitas para efetuar clculos trmicos 2D expeditos, e capaz de
interoperabilidade com o REVIT. Finalmente foi desenvolvido um programa em MATLAB,
baseado em algoritmos de automao celular que, com base num conjunto de regras pr-
estabelecidas, permite atribuir as datas de construo de cada fase de betonagem, de forma
consistente com as restries de capacidade de betonagem, nmero de frentes de trabalho
simultneo, e tempos de espera entre fases de betonagem consecutivas, entre outros.

334
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Aps a descrio das trs ferramentas descritas, ser explanada a sua aplicao integrada
barragem em estudo, ilustrando-se a concretizao do processo IPD mencionado.

2. Programao visual aplicada a barragens

O corpo de uma barragem em arco tem dupla curvatura ao longo do seu desenvolvimento
vertical e em planta [3], assim devido a sua complexidade geomtrica, este apresenta-se como
um grande desafio de modelao.

A barragem escolhida como caso de estudo uma barragem em arco, tem 98 metros de altura,
300 metros de comprimento e est representada em planta, em corte e em alado na Figura 1,
onde os eixos de referncia x, y e z esto representados (origem localizada no folheto mdio do
coroamento da barragem).

Figura 1: Variveis de definio geomtrica do corpo da barragem.

A formulao matemtica da forma da barragem assim realizada de acordo com


procedimentos padro para barragens em arco [4]. (, ) corresponde diretriz do arco
(Equao 1), ao passo que (, ) a espessura do arco (Equao 2). A fim de definir y e e
necessrio conhecer () que corresponde ao raio de curvatura da diretriz do arco na consola
de fecho (Equao 3), bem como () que o eixo da consola de fecho (Equao 4), 0 () que
representa a espessura da consola de fecho (Equao 5) e () que est relacionado com a
evoluo crescente da espessura do arco para os encontros (Equao 6).

335
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Equao da diretriz do arco y:


2
(, ) = () (1)
2()

Equao da espessura do arco e:


(, ) = 0 ()(1 + () 2 ) (2)

Equao do raio de curvatura da diretriz do arco na consola de fecho p:


() = 1.2102 2.769025101 4.851959102 2
+ 2.177441103 3 5.768579105 4
(3)
+ 8.424111107 5 6.214043109 6
+ 1.8400751011 7

Equao do eixo da consola de fecho a:


() = 3.033612101 3.525621103 2 + 3.98983105 3
(4)
3.395747107 4

Equao da espessura da consola de fecho e0:


0 () = 5 + 1.696654101 + 6.206034104 2 4.299792106 3
(5)
3.838551108 4

Equao da evoluo crescente da espessura do arco para os encontros A:


() = 1.588312106 + 7.975187107 2 1.709577108 3
(6)
+ 1.8599551010 4 5.792291013 5

Outros detalhes geomtricos da barragem, relevantes para a modelao, como a localizao e


dimenses das galerias, a configurao das juntas verticais, o perfil do terreno e a sua interseo
com o corpo da barragem, podem ser consultadas em detalhe em [5].

O modelo da barragem foi efetuado com recurso ao plugin Dynamo do REVIT (Autodesk) que
permite a utilizao de programao visual para assistir o processo de criao de objetos BIM.
Assim, o procedimento implementado para a criao do modelo paramtrico da barragem em
estudo apresentado na Figura 2. Em primeiro lugar efetuou-se a modelao do folheto mdio
da barragem e da sua espessura com recurso s equaes acima indicadas, avaliadas para o
intervalo de valores de z compreendidos entre 0 e 98m. De seguida foi modelada a interseo
da barragem com o terreno considerado atravs de ferramentas padro disponveis na
plataforma BIM utilizada. As galerias foram modeladas por subtrao ao slido global da
barragem das suas seces transversais extrudidas ao longo das diretrizes correspondentes.
Finalmente, a barragem resultante foi sub-dividida segundo 19 planos verticais espaados
aproximadamente de 17,5 metros e por 49 planos horizontais espaados de aproximadamente
2 metros. Resultou um modelo da barragem compreendido por 841 elementos slidos
independentes, que compreendiam a respetiva informao no geomtrica relativa a volumes,
classe de beto e propriedades termo-fsicas, entre outras.

336
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Atribuio da Modelao
espessuar ao das galerias
plano mdio da barragem

Modelao da
Modelao do interseo Diviso da barragem
folheto mdio solo-barragem por juntas
betonagem vercais e
horizontais

Figura 2: Passos seguidos para a modelao do corpo da barragem.

Por forma a verificar adequada interoperabilidade entre a plataforma BIM utilizada (REVIT) e
as outras plataformas BIM, o modelo foi exportado para o formato IFC. Na Figura 3
apresentado o modelo IFC no Solibri Model Checker, onde podem ser verificados os parmetros
de identificao de uma camada, assim como as suas propriedades geomtricas.

Figura 3: Modelo IFC no Solibri Model Checker.

3. Clculo trmico

Para o clculo trmico desenvolveu-se uma ferramenta computacional em MATLAB que


permite a anlise bidimensional de barragens construdas por fases atravs do mtodo das
diferenas finitas. O modelo de clculo baseia-se na equao de equilbrio de energia do
domnio em estudo, com incluso das trocas de calor com o ambiente circundante por
conveco e radiao, bem como com contabilizao explcita do cariz exotrmico e
termicamente ativado das reaes de hidratao do cimento com base em modelo de Arrhenius
modificado. A ferramenta inclui biblioteca do potencial de gerao de calor de uma larga gama

337
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de cimentos comercializados em Portugal, tendo em conta os ensaios calorimtricos reportados


por [6]. Os detalhes tcnico-cientficos desta ferramenta esto descritos em [5] e [7].

A ferramenta informtica tem como parmetros de entrada a altura das camadas de betonagem,
a espessura mxima do perfil vertical em estudo e o nmero de camadas de betonagem
diretamente provenientes de processo de interoperabilidade com o modelo descrito na seco
2, assim como os tempos de espera entre betonagens e todas as caractersticas trmicas
introduzidos diretamente pelo utilizador. Refira-se que foi tambm considerada a possibilidade
de transferncia de calor para a camada de fundao, bem como o cariz evolutivo das vrias
fronteiras envolvidas, sendo tambm simulada a colocao e retirada das cofragens. Com base
nas temperaturas calculadas, possvel tirar ilaes sobre o risco de fissurao relativo entre
cenrios em anlise, tendo em conta os gradientes espaciais (TS) e temporais (TT) de
temperaturas calculados.

A ttulo exemplificativo, na Figura 4-a) so demonstrados os mapas de temperaturas para trs


fases distintas, nos quais possvel observar a dissipao progressiva do calor, bem como a
localizao da zona de temperatura mxima na ltima camada betonada. Na Figura 4-b) so
demonstrados os gradientes espaciais e temporais de temperaturas, parmetros revelantes para
avaliao do risco de fissurao trmico do beto.

a) b)
Figura 4: a) Mapas de temperaturas; b) Gradientes temporais de temperaturas.

4. Definio automtica do faseamento construtivo no modelo BIM

Tendo em conta a disponibilidade do modelo BIM definido na seco 2, bem como o estudo
trmico possibilitado pela ferramenta de clculo trmico descrita na seco 3, possvel a
tomada de deciso relativa espessura das camadas de betonagem a adotar. No entanto, aps
essa definio torna-se necessria a definio da sequncia de betonagem da barragem em si, o
que na barragem em estudo inclui mais de 800 fases. Tratar-se-ia de um processo extremamente
tedioso e sujeito a erros, pelo que se decidiu realizar uma ferramenta que automatizasse os
processos. No entanto, para esse processo poder ser automatizado, foi necessrio um
levantamento cuidado dos critrios a aplicar (ver seco 4.1), passando posteriormente sua

338
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

implementao em programa MATLAB baseado num algoritmo de automao celular (ver


seco 4.2). Registe-se que no foi encontrada nenhuma referncia bibliogrfica a trabalho
anlogo no contexto da definio automtica de faseamento construtivo neste tipo de obras.

4.1 Estratgias tpicas de construo de barragens


Na presente seco sero discutidos alguns aspetos estratgicos normalmente adotados na
construo de barragens, resultantes essencialmente de discusso presencial com o Eng Tefilo
Silva da Teixeira Duarte SA.

Sero, portanto, aqui explanados alguns critrios normalmente adotados na construo de obras
de beto em massa. O tempo mnimo de espera entre camadas de betonagem consecutivas est
normalmente fixado em 7 dias. Por outro lado, normalmente fixado o tempo mximo de espera
entre betonagens sucessivas, a fim de evitar a fendilhao na camada superior devido ao
avanado estado de endurecimento da camada inferior. O tempo mximo em questo
normalmente fixado em 2 semanas.

Outro fator importante, segundo as regras tradicionais encontradas na literatura [8] para a
definio do faseamento construtivo da barragem a mxima diferena de alturas entre
camadas adjacentes. Este limite permite tambm manter a temperatura da barragem
relativamente uniforme entre os blocos adjacentes. Normalmente a diferena de alturas entre
camadas adjacentes inferior a 4 camadas de betonagem.

Outros critrios como a construo da barragem do centro para as margens e como a diferena
de alturas entre as camadas mais baixa e mais alta devem tambm ser tidos em conta na
elaborao do faseamento construtivo da barragem.

4.2 Desenvolvimento e aplicao da ferramenta computacional


A ferramenta computacional foi desenvolvida com base nas estratgias tpicas de construo de
barragens acima descritas e em algoritmos de automao celular.

Os algoritmos de automao celular so algoritmos de inteligncia artificial que com base num
simples conjunto de regras permitem a resoluo de problemas complexos de tomada de
deciso. Para mais detalhes acerca dos algoritmos de automao celular, bem com da sua
implementao na ferramenta computacional, consultar [5].

As estratgias tpicas de construo acima foram implementadas como regras para a colocao
de camadas de betonagem por parte da ferramenta computacional. Estas regras foram
hierarquizadas em funo da sua importncia na elaborao do faseamento construtivo de
barragens encontrado na literatura. Assim a hierarquia de prioridades de implementao das
regras por parte da ferramenta computacional a seguinte:
1. Tempo de espera mximo entre as camadas de betonagem sucessivas;
2. Mnimo tempo de espera entre betonagens sucessivas;
3. Diferena de alturas entre camadas de betonagem vizinhas.

O utilizador atravs de programao pode tambm implementar as suas prprias regras ou


alterar valores utilizados nas regras implementadas.

339
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Efetuou-se, portanto, uma implementao do algoritmo barragem em estudo considerando as


seguintes regras:
Nmero de frentes de trabalho simultneas: 3 frentes;
Comeo dos trabalhos: 19 de novembro de 2015;
Tempo mnimo de espera de betonagens sucessivas: 7 dias;
Tempo mximo de espera entre betonagens sucessivas: 14 dias;
Mxima diferena de alturas de camadas de betonagem adjacentes: 4 camadas.

Para manter as frentes de trabalho relativamente prximas e no espalhar muito a localizao


das betonagens, foram implementadas tambm regras internas que mantm as frentes de
betonagem relativamente prximas e o mais ao centro possvel.

Os resultados da aplicao deste algoritmo podem ser vistos nas Figuras 5 e 6, onde so
apresentadas a datas de betonagem das vrias camadas (Figura 5) e a evoluo trimestral da
construo (Figura 6).

Figura 5: Datas de betonagem de todas as camadas de betonagem da barragem.

340
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Evoluo trimestral da construo.

5. Concluses

Apresentou-se neste artigo o desenvolvimento e aplicao de uma metodologia para apoio


deciso no contexto da definio do faseamento construtivo de barragens ou obras de
complexidade construtiva anloga. A metodologia integrada compreende trs vrtices
principais que funcionam de forma sinergtica: (i) modelo paramtrico da barragem
compreendendo as equaes definidoras fundamentais da geometria, a interseco com o
terreno, bem como a modelao das galerias e da separao de corpos resultante de juntas
verticais e horizontais; (ii) programa MATLAB com interoperabilidade com o modelo da
barragem que permite o clculo trmico expedito da barragem em estado 2D, com considerao
explcita do faseamento construtivo, do cariz exotrmico e termicamente ativado da reao de
hidratao do cimento e das propriedades trmicas do beto; (iii) programa MATLAB
interopervel com o modelo BIM com implementao de algoritmo baseado em automao
celular que permite a aplicao de um conjunto de regras de sequncia de construo aos vrios
blocos de construo da barragem, aplicando-o de forma automtica s centenas de unidades
independentes de betonagem da barragem.

No que diz respeito modelao paramtrica de barragens com recurso a programao visual,
foi atingido o objetivo inicial traado que permite a definio rpida de variantes geometria
da barragem, quer do ponto de vista de estudo de cenrios alternativos, quer do ponto de vista
de utilizao em projetos subsequentes. Trata-se de facto de uma ferramenta que permite criar
objetos BIM com toda a informao no-geomtrica relevante de forma rpida e conveniente,
viabilizando a utilizao de plataformas BIM neste contexto.

No que concerne ferramenta desenvolvida baseada para o clculo trmico, baseada no mtodo
das diferenas finitas, foi possvel verificar o seu adequado desempenho no clculo relativo a
estruturas de beto em massa construdas por fases. De facto, em sinergia com a ferramenta de
modelao paramtrica anteriormente descrita, permite o estudo de vrios cenrios de
construo distintos, em termos de temperatura ambiente, temperatura de colocao,
composio do beto e faseamento construtivo (entre outros), permitindo melhor apoiar

341
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

decises a tomar em funo de todas estas variveis para agilizar a rpida tomada de deciso
em fases iniciais de projeto.

No contexto da definio do faseamento construtivo, foi proposta e implementada uma forma


expedita de aplicar um conjunto de regras de construo ao modelo BIM, com definio e
aplicao automtica de todas as datas de construo a todos os objetos do modelo. A
ferramenta desenvolvida para o efeito permite o rpido estudo das consequncias de alterao
de critrios de definio do faseamento construtivo (p.ex espessura de camadas de betonagem
e temperatura de colocao do beto, entre outras) sobre os prazos de execuo da obra.

A metodologia integradora exposta, aqui explanada segundo as suas trs vertentes principais,
permite tornar mais adequado e eficiente todo o processo de tomada de decises nas fases
iniciais do projeto, j em colaborao com a equipa de construo, permitindo uma rpida
integrao de valncias e anlise de cenrios de uma forma que no normalmente acessvel
desta forma facilitada nas fases preliminares do projeto de barragens. Esta tomada de decises
nas fases preliminares do projeto permitir ganhos de tempos de construo e
consequentemente de custos substanciais na construo de barragens e estruturas com desafios
de faseamento construtivo anlogos, como o caso de obras com beto em massa.

Referncias

[1] Aia, Integrated Project Delivery: A Guide, Am. Inst. Archit., pp. 162, 2007.
[2] M. Azenha, J. C. Lino, and B. Caires, Curso BIM: Building Information Modeling., in
Ordem dos Engenheiros, 2015.
[3] USDI, (United States Department Of The Interior). Design of arch dams. Design Manual
For Concrete Arch Dams. Denver: United States Government Printing Office, 1977.
[4] U.S. Army Corps of Engineers, Engineering and Design: Arch dam design.,
Department of the Army, Washingtom DC, 1994.
[5] L. P. Bidarra, An integrated model for simulation of construction phasing of arch
concrete dams,, MSC dissertation,University of Minho, 2015.
[6] Azenha, Numerical simulation of the structural behaviour of concrete since its early
ages, University of Porto, 2009.
[7] L. Bidarra and M. Azenha, Ferramenta baseada no mtodo das diferenas finitas 2D
para clculos trmicos expeditos de faseamento construtivo de estruturas de beto em
massa, Encontro Nacional Beto Estrutural, Coimbra, 2016.
[8] Spanish Commitee on Large Dams, Conventional Methods in Dam Construction,
CIGB ICOLD, 1990.

342
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

MODELAO BIM DE ARMADURAS EM ESTRUTURAS DE BETO


ARMADO: POSSIBILIDADES, DESAFIOS E INTEROPERABILIDADE
Joo Fernandes (1), Jos Carlos Lino (2), Ricardo Santos (1)

(1) ISEP Instituto Superior de Engenharia do Porto, Porto


(2) NEWTON Consultores de Engenharia, Porto

Resumo
A evoluo da tecnologia de modelao na rea especfica da pormenorizao de estruturas de
beto armado e das capacidades de interoperabilidade entre aplicaes, associadas ao conceito
BIM, j permite obter resultados satisfatrios. A integrao de novas capacidades para
avaliao de viabilidade em modelos tridimensionais, produo de desenhos tcnicos,
estimativa de custos e medio de quantidades tm vindo a facilitar o uso destas aplicaes.

No entanto, existe ainda uma certa resistncia, por parte dos projetistas, modelao das
armaduras, em modelos tridimensionais BIM, preferindo a alternativa do CAD como apoio
produo da documentao tcnica.

Este artigo tem como objetivo apresentar algumas das funcionalidades de modelao desses
elementos, em software BIM, e enunciar as principais vantagens dessa modelao, as principais
dificuldades e algumas estratgias na resoluo de problemas de interoperabilidade.

As aplicaes em anlise so o Robot Structural Analysis, o Revit, o Advance Concrete e o


Dynamo da Autodesk e o Tekla Structures da Trimble. Cada uma destas aplicaes corresponde
a uma rea especfica do projeto de estruturas, anlise e dimensionamento estrutural, conceo
e coordenao de construo e pormenorizao de armaduras. Apesar desta categorizao, estes
programas possuem funcionalidades comuns ou semelhantes (por exemplo, a medio de
quantidade de materiais), facilitando o dilogo entre aplicaes e reduzindo os erros associados.

O tema abordado foi desenvolvido em ambiente de estgio curricular, numa parceria entre o
ISEP e a NEWTON Consultores de Engenharia no mbito da dissertao de Mestrado em
Engenharia Civil Produo automtica de modelos BIM de armaduras de beto armado:
Pormenorizao e Medio, da qual foi parte integrante.

343
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

O Building Information Modeling (BIM) veio introduzir na indstria AEC (Arquitetura,


Engenharia e Construo) novas ferramentas e abordagens para execuo de empreendimentos.
Nesse novo conjunto de instrumentos surgiram novas oportunidades, assim como novos
desafios, de entre os quais a possibilidade de incorporar elementos de ao em peas de beto
armado, como vares, estribos, cordes de pr-esforo e qualquer outro elemento caraterstico
constituinte de um componente estrutural em beto armado.

Esta possibilidade de modelao de armaduras j se encontra presente em alguns aplicativos


compatveis com o BIM e sobre alguns desses que o estudo se centrou nas suas principais
vantagens e desvantagens.

A principal dificuldade relativa s sobreposies de elementos cruzados, ou seja, num n de


enlace de vigas com pilares poder existir sobreposio de armaduras. A correo destas
sobreposies pode ser alcanada atravs de ajustes dos elementos, mas o tempo e a qualidade
destas correes esto dependentes do LOD de modelao desejado. O uso de ferramentas de
clash detection j auxiliam imenso numa eventual procura de incompatibilidades entre as
diversas solues individuais, ficando a cargo do utilizador determinar se deve ou no proceder
s alteraes. Numa fase de verificao de viabilidade das solues, a possibilidade de anlise
visual das solues implementadas um passo em frente no caminho para a conceo de
projetos medida do empreendimento e de um dimensionamento mais econmico de solues.

Quer isto dizer que no ato da modelao, seja ela numa fase ps-dimensionamento ou numa
fase de conceo estrutural, possvel antecipar possveis problemas de compatibilidade, ou
criar documentos de apoio execuo e montagem de armaduras em obra de peas simples ou
peas de execuo complexa, agilizando o processo de construo.

Outras vantagens da utilizao desta modelao vm da possibilidade de realizar medies e


oramentaes de forma fcil e rpida e at de organizar esses modelos numa ordem temporal,
ajudando gesto de obra com a definio de prazos para a execuo de elementos da
superestrutura e permitindo uma melhor organizao do espao e das quantidades de material
em estaleiro, em funo desse calendrio de execuo.

Relativamente ao formato CAD, no que respeita criao de desenhos, a modelao pode ser,
em termos de tempo despendido na criao de documentos para obra, muito semelhante
alternativa 2D na criao de representaes de armaduras, uma vez que para alcanar os
resultados finais necessrio, com as ferramentas atuais, realizar alteraes pontuais s
solues. Neste ponto, a alternativa CAD j no possui a vantagem de outrora, uma vez que, a
possibilidade de utilizar blocos CAD com pormenores tipo de distribuio de armaduras, que
tornavam a criao de desenhos muito mais rpida, j no exclusiva deste formato. verdade
que numa modelao 3D de uma estrutura estamos obrigados criao de armaduras e
pormenores novos adaptados ao modelo, mas tambm existe a possibilidade de preparar
templates com pormenores tipo para uma criao rpida de desenhos tcnicos. Existe ainda a
possibilidade de transio facilitada para formato CAD e a criao automtica de vistas nos

344
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

programas de modelao, como por exemplo os Assemblies em Revit, que ajudam a reduzir os
atrasos na preparao de desenhos.

Sempre com o objetivo do modelador e do grau de detalhe que o mesmo pretende alcanar em
mente, pode-se dizer que a opo de recorrer aos dois formatos e s suas principais vantagens
e funcionalidades ser a melhor abordagem no panorama atual de projeto.

2. Software

O software estudado abrange vrias reas da engenharia civil, comeando com o Robot
Structural Analysis e as suas ferramentas de anlise estrutural e dimensionamento, o Revit e o
Tekla Structures, com as suas capacidades de modelao e organizao de informao, e o
Advance Concrete, que surge como uma espcie hibrida cruzando a modelao BIM com a
plataforma CAD (base de funcionamento do programa), na criao de desenhos de pormenor
em estruturas de beto armado.

Convm referir que isto uma pequena amostra dos programas, com capacidade para criar uma
representao tridimensional detalhada de elementos de beto armado. O mercado do software
de modelao e mesmo o mercado dos aplicativos para dimensionamento e anlise estrutural j
contam com dezenas de opes e na altura de eleger quais as ferramentas a utilizar so diversos
os fatores que vo influenciar essa escolha, seja ela por motivos de ordem financeira ou pelas
capacidades e/ou funcionalidades dos programas. Por essa razo, e tendo consciente o prprio
fundamento da interoperabilidade defendida pela metodologia BIM, por vezes mais vantajoso
recorrer a diversos programas que se complementem ao invs de procurar um que faa tudo.

Atualmente j no necessrio esperar pela resoluo de algum problema de software ou


simplesmente aguardar que a prxima verso j possua alguma funcionalidade nova. O
modelador, engenheiro, arquiteto, pode optar por utilizar uma linguagem de programao e
criar os seus prprios aplicativos e ferramentas de suporte modelao de forma relativamente
fcil. No ponto 2.4 dado como exemplo o Dynamo, que recorre a um tipo de linguagem mais
simples, mas existem diversas possibilidades nos dias que correm, com os desenvolvedores a
deixarem espao para o desenvolvimento individual de APIs (Application Programming
Interface) e plug-ins, que criam capacidade de resposta a determinados problemas de um
projetista.

2.1 Robot Structural Analysis


O programa aqui analisado tem capacidades de modelao e dimensionamento em funo de
documentos de regulamentao estrutural como o caso dos Eurocdigos Estruturais Europeus
ou de outras normas internacionais.

Este software tem como principal objetivo a modelao estrutural para propsitos de anlise,
sendo os mdulos de dimensionamento, elementos mais secundrios, pelo menos no que
respeita a dimensionamento de peas de beto armado. Variveis como a largura do apoio, a
posio dos vares na seco, os comprimentos de amarrao, so pormenores essenciais ao
dimensionamento e que ainda no esto bem assumidos. Todos estes condicionamentos

345
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

conduziram a ferramenta a evoluir para a situao atual, que apesar de no ser perfeita j permite
ter uma noo de uma soluo final de armadura.

O programa est concebido para o dimensionamento de elementos de barra, como vigas e


pilares, dimensionamento de paredes e lajes e dimensionamento de fundaes. necessrio
proceder definio um conjunto de parmetros, que varia em funo do tipo de elemento a
dimensionar, e que comeam a ser definidos logo a partir da fase de modelao, com a definio
da classe de beto e da geometria da pea, as combinaes de esforos atuantes, a categoria da
estrutura, classe de exposio, parmetros de clculo e aes adicionais a considerar no
dimensionamento, terminando com a definio de alguns parmetros construtivos, como o
nmero de fiadas de vares ou comprimento mximo dos mesmos.

Definidos os parmetros, o programa tem a possibilidade de definir por si s uma soluo. Esta
pode ser simples ou, dependendo da pea, ser algo mais complexo e menos compreensvel para
aplicar num caso real. O programa capaz de fornecer desenhos das seces longitudinais,
cortes e quadros representativos das quantidades. No relatrio de clculo fornecida uma lista
de quantidades com o volume de beto, rea de cofragem, nmero de vares e os respetivos
comprimentos.

O programa est limitado criao de modelos pea a pea, excetuando alguns casos onde o
programa assume o agrupamento de elementos, como pilares com caratersticas iguais, ou uma
viga com vrios vos.

Figura 1: Exemplo de modelo tridimensional de armaduras em vigas.

Para retirar alguma da dependncia das decises do mdulo, existe uma ferramenta com o nome
de Typical Reinforcement que permite personalizar uma soluo e analisar a viabilidade da
mesma. A desvantagem que s pode ser aplicada a alguns tipos de seco mais simples.
Em relao interoperabilidade, esta pode ser feita atravs de integrao direta com o Revit,
que suporta a passagem de geometrias e de armaduras, ou ainda existe a possibilidade de criar
um fluxo de trabalho com o Tekla Structures. A interoperabilidade com o Revit possui alguns
problemas dependendo do sentido em que a informao flui. Se considerarmos um fluxo
iniciado a partir do software de clculo, o primeiro problema ocorre com as texturas dos
elementos que podem no ser as desejadas. As geometrias, se no forem muito complexas,
passam sem problemas, mas paredes com inclinaes para fora do plano podem no ser
transferidas e aberturas tambm no passam, mas se o fluxo for feito no sentido inverso alguns
destes problemas podem ser eliminados.

346
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A passagem de armaduras est dependente da forma como o prprio Robot passa a informao.
Por exemplo, em pilares, o Robot reconhece a altura do vo como a distncia entre dois ns da
estrutura, mas cria a armadura com um comprimento adicional igual a metade da altura da viga
de maior seco ligada ao n superior, isto faz com que as armaduras transferidas para Revit
possuam esse excedente. Em vigas o problema ocorre quando considerado um encadeamento
de vos. O Revit informado que uma dada viga com dois ou mais vos possui uma
determinada soluo, mas o problema est na forma como ele reconhece a soluo. Em vez de
reconhecer que a soluo aplicada j tem as informaes relativas aos restantes vos, ele vai
duplicar a soluo total para cada vo. Este ltimo erro ocorre quando utilizada a opo a
partir do Typical Reinforcement para personalizao de armaduras em Robot.

Em lajes o mdulo de dimensionamento no cria modelos de armadura capazes de serem


transferidos.

Figura 2: Exemplo de duplicao de informao na passagem de armaduras para Revit.

2.2 Revit & Tekla Structures


A juno destes dois aplicativos feita devido natureza semelhante de objetivos e
funcionalidades na utilizao de ambos, mas apesar das semelhanas, estes so dois programas
distintos e com abordagens um pouco diferentes no mbito da modelao estrutural.

Comeando logo com o aspeto visual dos modelos, onde o software da Trimble se destaca pela
modelao mais colorida, mais conceitual, e o Revit pela tentativa de aproximao ao real na
sua palete de cores e texturas. No entanto, a principal diferena ocorre na especificidade que o
Tekla tem ao dar maior foco modelao estrutural, servindo-se atualmente do Sketchup como
principal suporte modelao de arquitetura e do BIMsight para controlo e gesto de
obra/projeto. O Revit procura uma aposta na diversidade e na modelao multifacetada,
contando tambm com o suporte de aplicativos como o Navisworks para atividades de apoio
gesto de projeto/obra. O Tekla tambm tem algumas ferramentas que permitem a modelao
de elementos externos conceo de superestruturas, mas no aprofunda ao nvel do Revit em
reas como a Arquitetura ou Infraestruturas.

Isso no implica que um seja melhor que o outro, at porque a disperso do foco que acontece
no Revit acaba por criar solues para algumas necessidades especficas, mas est mais sujeito
a falhas. Fica a ttulo de exemplo a criao em simultneo de um modelo de clculo estrutural
com o modelo de arquitetura da superestrutura. A compatibilizao dos dois modelos ainda

347
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

se encontra exposta a erros de ligao entre elementos e a sua sobreposio por vezes no atinge
os resultados desejados, o que obriga a realizar correes, ou criao em separado de um
modelo de clculo. Um exemplo ser a criao de lajes em Revit, que dependendo da dimenso
dos pilares, as ligaes nos ns do modelo de clculo podero ficar desfasadas, o que obriga a
entrar no modo analtico do Revit e a proceder a ajustes do modelo de clculo. Nos testes
efetuados, chegou-se concluso que a modelao de lajes utilizando as faces exteriores de
pilares, com cerca de 40/50 cm de dimenso numa das faces, como fronteira para definio do
bordo da laje podero gerar incoerncias nas ligaes do modelo de clculo.

A viso mais centrada do Tekla, principalmente em estruturas metlicas j permite, desde h


alguns anos, atingir resultados com elevado detalhe. O Revit j introduziu na sua verso de
2017 ferramentas de criao automtica de ligaes metlicas, reduzindo alguma dessa
desvantagem. Mas ainda assim o Tekla destaca-se pela sua capacidade de gerar informao e
modelos aptos para a criao de documentao para fabrico e produo de peas reais, algo que
o Revit ainda no faz isoladamente, tendo ferramentas externas para o suporte criao deste
tipo de documentao.

Passando modelao de armaduras, ambos tm capacidade para criar elementos de armadura


e extrair ou at inferir informao detalhada sobre os materiais e quantidades. As bibliotecas
so bastante completas e possvel criar/personalizar materiais e informao especfica para
esses elementos. A principal diferena, em termos de edio e modelao manual de
armaduras, est na metodologia de criao, com o Revit a necessitar de uma definio de planos
de trabalho baseados em cortes transversais ou longitudinais de algumas das peas, vigas e
pilares principalmente, enquanto o Tekla Structures permite realizar essa modelao
diretamente no universo tridimensional da estrutura. Chegam a ter ferramentas de criao
semelhantes, como a criao de armaduras por rea que pode ser diretamente aplicada no
ambiente 3D de ambos os programas, mas sempre com essa ligeira diferena, que pode resultar
num desenvolvimento mais lento das armaduras em Revit. Outra diferena que se encontra
diretamente relacionada com a anterior a edio pontual de armaduras para a atribuio de
formas, shapes, especiais que no se encontrem definidas no catlogo base. Aps a criao das
shapes a edio de comprimentos, por exemplo, fica disponvel a partir dos menus de
propriedades desses elementos, sejam eles vares isolados ou um grupo de vares. Para a
criao ou edio de shapes o Revit entra num modo de edio especifico, semelhante aos
modos de edio de lajes ou de paredes, enquanto o aplicativo concorrente deixa ao dispor do
modelador um conjunto de pontos de referncia que permitem editar em conjunto ou
individualmente as formas das armaduras. Existe ainda a possibilidade de inserir novos pontos
de edio e inserir novos elementos em funo de pontos intermdios entre vares previamente
criados. Apesar do modo de edio em Tekla aparentar ser mais rpido, no significa que seja
mais simples e nesse aspeto, a edio em Revit, pode possuir algumas vantagens face
modelao por pontos de referncia, ao permitir uma liberdade na definio de trajetos mais
simples e fcil de interpretar.

Outro modo de criao de armaduras atravs de plug-ins integrados nos programas e que
permitem agilizar o processo de modelao, simplificando a introduo de dados e criando a
totalidade das armaduras para as diferentes peas. Esta criao feita elemento a elemento e as
opes que existem ainda no tm uma base de criao para toda e qualquer situao que possa

348
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ocorrer em projeto. Ainda assim, o software Tekla, possui uma panplia de plug-ins mais vasta,
como a introduo de cordes de pr-esforo e com mais opes que o Revit, que se v limitado
automatizao para elementos mais simples, como, por exemplo, vigas retangulares. Isto no
implica que o Revit fique atrs do seu concorrente, uma vez que os modos de criao e interface
so mais simples de aplicar e compreender numa primeira aproximao. As ferramentas
disponveis em Tekla nem sempre possuem instrues claras e necessrio perder mais tempo
em formao para ter uma clara compreenso das funcionalidades dos diversos plug-ins.

Revit Tekla Structures


Figura 3: Exemplo de modelao de armaduras em Revit e em Tekla Structures.

Na produo de desenhos o Tekla mais rpido, pois aps a definio dos diversos parmetros
e a criao de um template adaptado s necessidades do projeto, a produo de desenhos feita
em segundos e com uma excelente qualidade. Em Revit o processo mais demorado porque
obriga montagem manual dos diversos planos e vistas, previamente definidas de forma manual
ou a partir de Assemblies. Estas vistas tm de ser integradas numa folha especifica, baseada
num template, editvel ou previamente criado, num processo de conceo que quase se
assemelha criao de Layouts em software CAD, mas sempre com garantias de que os
resultados alcanados possuem uma excelente qualidade.

Revit Tekla Structures


Figura 4: Exemplo de desenhos produzidos em Revit e no Tekla Structures.

Relativamente extrao de quantidades, a diferena praticamente irrelevante, com ambos os


programas a permitirem a gerao de tabelas detalhadas e com a possibilidade de filtrar toda a
informao. A principal diferena est no mtodo de quantificao de comprimentos de vares,
onde o Tekla se mostra mais preciso na contabilizao de comprimentos das zonas curvas
(dobras) de vares de ao. O Tekla segue uma biblioteca especfica com dados relativos aos

349
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

dimetros de mandril que os diversos vares podem ter, enquanto o Revit tem uma abordagem
mais genrica dando ao utilizador a possibilidade de definir esses pormenores.

Em termos de interoperabilidade, se tivermos como principal foco o formato IFC, vemos que o
Tekla se encontra mais preparado para criar e receber este tipo de ficheiro, principalmente
porque o software permite a converso de elementos em formato IFC para o formato nativo do
Tekla Structures, seja esta uma converso global do modelo ou de elementos especficos.
certo que ainda no uma converso isenta de falhas, mas uma funcionalidade diferenciadora
e com bastante interesse. O Revit, de ano para ano, tem vindo a melhorar as suas capacidades
de reconhecimento e traduo de informao em formato RVT para IFC e muito em breve a
diferena entre os dois programas poder ser nula.

2.3 Advance Concrete


Este o ltimo software de modelao aqui analisado e pode-se dizer que no mais que um
simples upgrade s funcionalidades nativas do AutoCAD. Pode-se pensar que conhecendo a
sua base de aplicao CAD a interao com o aplicativo estaria totalmente esclarecida, mas isto
no totalmente verdade. Quem estiver familiarizado com o mtodo de modelao
tridimensional CAD ver que o mtodo presente no Advance Concrete muito mais simples e
tem inclusive algumas semelhanas com outros programas de modelao como o Revit e at
mesmo o Robot Structural Analysis, introduzindo a possibilidade de modelao com base em
famlias e informao acerca do material de composio ou da seco base para a criao do
elemento de beto. , portanto, mais simples criar elementos com geometria mais complexa e
a forma como o elemento reconhecido mais apurada e completa do que na modelao CAD
genrica. Estas capacidades de modelao so introduzidas atravs de um conjunto de
funcionalidades especificas do programa e que se encontram disponveis em conjunto com as
ferramentas base do AutoCAD. S possvel atribuir uma soluo de armaduras aos elementos
criados com estas novas ferramentas.

J foi referido que a possibilidade de recorrer a blocos com representaes tipo de pormenores
esquemticos de armaduras em elementos de beto armado ser uma opo mais vantajosa na
produo rpida de desenhos tcnicos, mas se o objetivo for a produo de desenhos mais
detalhados, o Advance Concrete uma opo com sentido. Isto porque o programa apesar de
possuir ferramentas de criao dinmica a partir de pontos de referncia e de ser possvel definir
templates para definio de desenhos e tags, o processo de edio manual de armaduras pode
ser algo moroso e que obriga definio de elementos num mnimo de dois planos, um
longitudinal para definio do perfil ao longo do elemento de beto e um transversal para definir
o posicionamento face ao eixo transversal da seco da pea a ser armada. Tambm existem
ferramentas para atribuio automtica de armaduras aos diferentes constituintes da
superestrutura, mas estas ferramentas ainda pecam por falhas na compatibilizao de elementos
entrecruzados. O que acontece que o ao tentarmos atribuir armadura em simultneo a duas
vigas que partilhem um n de ligao, a soluo final das armaduras de pelo menos uma das
vigas vai-se encontrar deslocada em relao ao n para que no ocorra uma sobreposio dos
elementos. No que toca a opes de modelao, existem algumas opes que no existem em
Revit, mas tambm existem opes muito teis do Revit que no existem neste aplicativo.

350
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Exemplo de deslocamento de uma armadura em Advance Concrete.

Como a produo de desenhos est inteiramente dependente das configuraes prvias


definio das armaduras, a qualidade dos mesmos fica igualmente dependente das opes
tomadas. A modelao funciona quase como um elemento extra, uma vez que as armaduras so
criadas numa plataforma 2D que atravs de uma funcionalidade especfica do programa
posteriormente convertida para uma visualizao tridimensional do modelo. Sendo assim
possvel afirmar que se trata de uma criao mais tpica de elementos CAD, apenas possuindo
algumas vantagens face ao mtodo CAD, dito tradicional, ao incluir ferramentas de apoio e
agilizao do processo de criao.

O ponto forte deste software ser a extrao de quantidades, mais especificamente a extrao
de volumes de beto da superestrutura e as respetivas reas de cofragem dos diversos elementos.
O documento gerado organiza toda a informao relativa aos diversos elementos e ainda
apresenta uma previso oramental. A nvel de extrao de quantidades de armadura, a
informao extrada , em tudo, semelhante ao que os restantes programas anteriormente
analisados fornecem. uma funcionalidade que pode ser encarada como algo com pouco peso
numa fase de aprovao quanto imprescindibilidade do programa, mas no deixa de ser
interessante.

A interoperabilidade a maior falha deste aplicativo, o primeiro grande desmotivador ao seu


uso ser a limitao do prprio programa em gerar modelos tridimensionais de armaduras que
possam ser integrados num modelo final BIM da forma correta. No que o programa no seja
capaz de criar um modelo global, o problema est no modo como cria. Como as peas so todas
criadas em 2D, o modelo 3D tem de ser criado a partir da ferramenta de visualizao 3D, e o
ficheiro alm de ser gerado em formato DWG, rebatido sobre o plano XY num referencial
do tipo XYZ tornando-se dispensvel uma vez que a sua integrao fica comprometida.

Figura 6: Exemplo de integrao do modelo de armaduras Advance Concrete em Revit.

351
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Outra limitao est na comunicao com o Revit, principal objeto de ligao com o programa
em anlise. Em suma o Advance Concrete obriga converso do ficheiro para um formato
especfico ou para formato IFC que no o padro. O uso do ficheiro IFC regular tambm
possvel, mas encontra-se muito mais sujeito perda de informao. O uso dos outros dois
formatos de ligao leva ao reconhecimento das geometrias, mas podem estar sujeitos ao
deslocamento de elementos sobre os seus prprios eixos e, graas a essa pequena
particularidade, a erros que se mantm no retorno da informao ao modelo base. Outra
particularidade que o modelo importado para o Advance Concrete deixa de ser global e a
informao dos diversos nveis passa a estar repartida por diferentes parties, muito
semelhante ao que acontece na hora de gerar um novo desenho. Mesmo o modelo de armaduras
criado fica separado do modelo geral da estrutura e por essa razo no existe uma passagem
direta dessa informao, tendo o modelo DWG de ser integrado separadamente e com as
limitaes j mencionadas.

2.4 Dynamo
O Dynamo possui uma linguagem mais simples de programao visual. Esta permite ao
utilizador de programas como o Revit criar as suas prprias ferramentas de modelao e deixa
ao nosso dispor ferramentas que permitem criar modelos paramtricos de grande simplicidade
ou atingir nveis de modelao de grande complexidade com poucos elementos de
programao. Dizer que esta uma linguagem mais simples, no implica dizer que mais fcil,
pois para atingir resultados mais complexos tambm necessrio recorrer a elementos mais
avanados ou at a programas de suporte. O programa permite desenvolver comandos atravs
da linguagem Python, ou recorrer a folhas de clculo, como as que so programadas em MS-
Excel, para receber informao especfica ou realizar comandos que possam no estar
configurados. Outra forma de obter novas funcionalidades recorrer a pacotes de ns
elementos de programao visual disponibilizados pelo prprio software e que provm de
uma rede internacional de partilha. O Tekla Structures pode contar com o apoio deste tipo de
programao, mas tem de recorrer ao Grasshopper e a uma ligao com o Rhinoceros.

Figura 7: Exemplo de ns de programao Dynamo para importao de dados MS-Excel.

2.4.1 Modelao Elemento a Elemento


Para a modelao de armaduras podemos recorrer a um mtodo semelhante ao que j
alcanado com as ferramentas de modelao automtica existentes. Aqui fica a recomendao
de uma ferramenta para criao de armaduras em pilares de geometria complexa. Que pode no
parecer muito simples de utilizar, dado o nmero de parmetros que necessrio ter em conta,
mas que bastante completo, uma vez que gera todos os tipos de elementos desejados, desde

352
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

estribos a elementos longitudinais. O script e todos os elementos de apoio para a correta


utilizao em Dynamo podem ser obtidos na pgina Revit beyond BIM no artigo Rebar
modelling in Revit with Dynamo for blended shapes.[10] O resultado alcanado com este tipo
de ferramenta semelhante ao que se v na seguinte figura.

Figura 8: Exemplo de criao de armaduras em Revit pelo Dynamo [10].

Este tipo de programao tem por base a seleo de um elemento para a base de aplicao dos
comandos e todos os elementos de armadura so introduzidos com base em ns prprios para
criao de armaduras e a um conjunto de informaes que so tratadas previamente, como por
exemplo, a criao de uma linha base representativa do percurso das armaduras longitudinais,
o nmero de vares e a posio ou espaamento entre vares. A modelao recorrendo a este
tipo de script garante que todos os elementos de ao gerados so reconhecidos pelo Revit como
o um elemento original Revit e todas informaes anexas inerentes ao objetos so mantidas,
sendo possvel tratar a informao para a a recolha de dados para oramentao ou medio de
quantidade de ao.

2.4.2 Modelao Conjunta


A modelao conjunta j pressupe a existncia de um conjunto de dados que permita a criao
destes elementos. Uma desvantagem dos scripts criados face gerao elemento a elemento
est na informao retida pelo Revit aps a criao. Isto porque as armaduras geradas so
elementos paramtricos com geometria semelhante dos elementos de armadura mas que no
so gerados atravs dos ns de importao de dados como elementos de armadura. possivel
import-los como sendo da categoria especfica, mas a informao no assimilada devido ao
processo de integrao utilizado. No entanto uma vez que no exemplo criado existe o apoio de
uma folha de clculo para alcanar os objetivos finais, esta mesma folha tambm foi pensada
para produzir a informao relativa extrao de quantidades e oramentao da estrutura.

Esta folha de clculo foi criada com o intuito de importar todos os dados referentes
composio da estrutura e todos os esforos do modelo de clculo criado em Robot Structural
Analysis e deixar s mos do modelador/projetista toda a informao e um conjunto de
funcionalidades que permitem realizar o dimensionamento dos elementos de beto armado. A
informao gerada permite alm de gerar elementos paramtricos representativos das

353
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

armaduras, colmatar falhas, da interoperabilidade relativas s texturas, desvios posicionais de


alguns elementos e a importao de negativos, encontradas no fluxo Robot-Revit.

Fluxo RobotRevit Fluxo RobotMSExcelDynamoRevit


Figura 9: Exemplo de modelao em Revit recorrendo ao Dynamo comparativamente
integrao direta Robot-Revit.

Toda esta informao importada permite um fluxo de trabalho de sentido nico que envolve a
passagem e o tratamento da informao desde o Robot, passando pelo MS-Excel, seguindo pelo
Dynamo e terminando no Revit. O processo pode parecer longo, mas aps a finalizao da
programao e do ajustamento de todos os elementos, a velocidade de execuo bastante mais
clere do que se fosse necessria a modelao de uma nova estrutura em Revit. Se no
quisermos a representao de armadura possvel ter uma estrutura modelada em Revit de
forma relativamente rpida aps a modelao em Robot estar completa. claro que o modelo
de clculo pode conter simplificaes face ao modelo Revit, mas ser prefervel introduzir
alguns pormenores ou elementos adicionais alternativa de realizar esta tarefa na totalidade. E
o utilizador pode sempre optar pela via inversa, um fluxo Revit-Robot, para obter um resultado
semelhante, apesar dos cuidados acrescidos que so necessrios para ter o modelo de clculo
criado em Revit definido de forma correta.

Quanto s armaduras e ao grau de detalhe alcanado, a representao fica dependente do grau


de programao aplicado uma vez que o programador/modelador tem de decidir de antemo
qual o objetivo da sua modelao. Os elementos a ser demonstrados de seguida foram criados
com o intuito de demonstrar quais as possibilidades de gerar uma representao global do
modelo de estruturas, no se procurou atingir um grau de detalhe realista, mas tambm no se
deixou o modelo com o formato mais simplista. A criao destes modelos feita com base na
informao extrada relativa s coordenadas geomtricas de cada elemento do modelo de
clculo e no ato do dimensionamento so definidas todas as informaes necessrias criao
dos elementos paramtricos em Dynamo. Estas informaes contm dados relativos a
dimetros, coordenadas e espaamentos, entre outras informaes relevantes. O resultado final
para vigas, pilares e lajes demonstrado de seguida.

354
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 10: Exemplo de modelao de armaduras em Revit recorrendo ao Dynamo.

Existe uma particularidade na utilizao deste mtodo relativamente ao mtodo de criao


elemento a elemento que a possibilidade de gerar os modelos sem necessitar de um hospedeiro
(elemento base de acolhimento de armaduras), o que pode ser uma desvantagem para a
informao contida no modelo. As limitaes deste tipo de modelao esto, como j foi dito,
dependentes dos objetivos do modelador e com a devida informao possvel gerar modelos
de armaduras para qualquer tipo de situao.

Este foco pode no ser o ideal, mas alm de serem controlados com maior preciso todos os
resultados, evitando problemas relativos a espaamentos e demais detalhes construtivos,
tambm dada uma noo oramental numa fase prvia de modelao de elementos, a
possibilidade de visualizao de elementos de armadura e a antecipao de possveis
incompatibilidades de execuo das solues.

O facto de no ser possvel realizar clash tests com garantias de verificar de forma precisa
eventuais conflitos entre elementos de armaduras com os modelos criados no grave uma vez
que muitos dos problemas que surgem nessas sobreposies podem ser facilmente resolvidos
em obra sem necessitar de grandes ajustes soluo desenvolvida em projeto, os principais
problemas a detetar consistem na deteo de zonas de ns no cruzamento de armaduras
longitudinais de pilares com armaduras longitudinais de vigas, onde muitas vezes os
espaamentos existentes podem no ter dimenso suficiente para acondicionar a passagem dos
diversos elementos.

355
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Existem outros pontos de interesse como a verificao dos comprimentos de amarrao e a


interao entre todos os elementos da superestrutura que necessitavam de ser aperfeioadas, de
forma a garantir que a soluo prevista possui as condies para a execuo ideal da betonagem
e assim certificar a segurana da obra e a qualidade do projeto. Estes so problemas que podem
ser detetados com uma simples inspeo visual, com uma visualizao aparte das armaduras ou
em conjunto com o modelo da estrutura, mas demonstram que as ferramentas atuais e a criao
de outras dedicadas modelao elemento a elemento tm, comparativamente modelao em
massa alcanada com o exemplo criado, algumas vantagens. A principal ser a maior facilidade
de aplicao, outra razo ser a rapidez e a facilidade com que este tipo de ferramentas pode
ser criado.

3. Concluses

As solues existentes para modelao de armaduras so ferramentas em constante


desenvolvimento e ainda no alcanaram o patamar de perfeio requerido, mas j existe uma
compreenso destes problemas e a liberdade para desenvolver mtodos para a reduo de falhas.

O Robot Strucutral analysis, apesar de j possuir ferramentas de clculo, deixa disponvel


elementos para exportao/importao de dados que permitem a criao de folhas de clculo
ao gosto do projetista. E ainda que as ferramentas existentes, como o provided reinforcement,
no prevejam a personalizao do dimensionamento de inmeros casos, estando limitadas a
seces mais simples, como a retangular, estas j atribuem ao utilizador alguma liberdade na
definio de solues e so capazes de atribuir solues, de forma automtica, a qualquer
seco, mesmo que estas depois no possam ser editadas de forma manual a alterao de
parmetros, como o dimetro mximo a utilizar no dimensionamento, podem ajudar a ter uma
soluo semi personalizada.

A nvel do software de modelao Revit e do Tekla Structures, as ferramentas que existem


permitem de forma mais ou menos rpida personalizar e editar qualquer soluo de armadura
que seja concebida em projeto, armazenando toda a informao relevante para medio e
oramentao, assim como auxiliar na criao de documentao. A facilidade com que um
modelador consegue atribuir uma soluo de armadura a um modelo de estruturas de beto
armado tambm otimizada com a introduo de programas como o Dynamo, que permitem a
criao de ferramentas personalizadas, de forma relativamente simples, capazes de corrigir
alguns defeitos de interoperabilidade ou de modelao.

O Advance Concrete apresenta-se como um software com valor muito especifico, mas que
dadas as falhas de interoperabilidade e algumas limitaes encontradas, no se mostra como
um aplicativo capaz de adicionar mais valor a um projeto. uma ideia que pode ser til se a
integrao com o programa de modelao, Revit, for melhorada.

Hoje em dia, ficarmos inteiramente dependentes de um nico software pode no ser o cenrio
mais desejado e cabe ao modelador, engenheiro, ou arquiteto procurar a soluo s limitaes
impostas. A qualidade das solues e de alternativas presentes na rea de modelao de

356
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

armaduras garantem qualidade aos elementos modelados, mas podemos estar sujeitos a
limitaes impostas por ns prprios para atingir determinados resultados.

Esta procura de alternativas no precisa de ser inteiramente dedicada produo de modelos,


j que possvel recorrer a diversas ferramentas freeware ou desenvolver ferramentas prprias
para dimensionamento e clculo estrutural ou medio de quantidades e previso oramental,
por exemplo.

Referncias

[1] J. Fernandes, "Produo automtica de modelos BIM de armaduras de beto armado:


Pormenorizao e Medio", Tese de Mestrado, Instituto Superior de Engenharia do
Porto, Porto, Portugal, 2016.
[2] C. Ribeiro, "Desenvolvimento de processos CAD/CAM para a pormenorizao e
produo industrial de armaduras para elementos de beto armado.", Tese de Mestrado,
Faculdade de Engenharia da Universidade do Porto, Porto, Portugal, 2013.
[3] I. Gonalves, "Aplicao do BIM ao projeto de estruturas: Abordagem de programao
ao processo de pormenorizao de vigas de beto armado.", Tese de Mestrado, Instituto
Politcnico de Viana do Castelo, Viana do Castelo, Portugal, 2014.
[4] B. Ribeiro, "Aplicao de metodologias BIM no contexto da construo da nova ponte
sobre o Rio Do.", Tese de Mestrado, Universidade do Minho, Guimares, Portugal,
2015.
[5] M. Magalhes, "Projeto de estruturas de edifcios em beto armado apoiado em
ferramentas BIM.", Tese de Mestrado, Instituto Superior de Engenharia do Porto, Porto,
Portugal, 2015.
[6] H. Sousa, "Modelao em BIM de armaduras de beto armado de um edifcio: Anlise
da sua contribuio para processos de medio e oramentao mais eficientes.", Tese
de Mestrado, Universidade do Minho, Guimares, Portugal, 2013.
[7] J. Fernandes, "A metodologia Building Information Modeling aplicada ao projeto de
estruturas.", Tese de Mestrado, Universidade do Minho, Guimares, Portugal, 2013.
[8] M. Almeida, "Tecnologia BIM aplicada ao Projeto de Estruturas Metlicas.", Tese de
Mestrado, Instituto Superior de Engenharia do Porto, Porto, Portugal, 2015.
[9] J. Lino et al, "Integrao da Metodologia BIM na Engenharia de Estruturas.", Artigo para
o Encontro Nacional BETO ESTRUTURAL - BE2012, Faculdade de Engenharia da
Universidade do Porto, Porto, Portugal, 2012.
[10] D. Vermeulen, "Rebar modelling in Revit with Dynamo for blended shapes." [HTML],
Disponvel em https://revitbeyondbim.wordpress.com/2015/10/09/rebar-modelling-in-
revit-with-dynamo-blended-shapes/

357
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

358
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

CASO DE ESTUDO DA UTILIZAO DO BIM NO APOIO AO


PROJETO DE REDES URBANAS DE ABASTECIMENTO DE GUA
EM FRICA
Gabriel Lopes (1)

(1) LAIII Lopes Associados, Engenheiros Consultores, Porto

Resumo
O desenvolvimento de projeto em engenharia civil tem estado assente em processos clssicos
que dificilmente tiram partido das potencialidades das ferramentas existentes (e.g. Civil 3D).

No presente caso de estudo, restries de vrias ordens obrigaram elaborao de uma


abordagem desprendida da tradio, pensada de forma integrada, desde o levantamento
topogrfico e demogrfico at quantificao e implantao de todos os elementos do projeto.
Os levantamentos topogrfico e fotogramtrico georreferenciados que posteriormente foram
filtrados e verificados foram obtidos atravs do rastreamento de satlite com as respetivas
correes planimtricas. O levantamento demogrfico foi feito por estimativa da densidade
habitacional e atravs de taxas de crescimento previstas pelas Naes Unidas. Para as
estimativas dos consumos e sua distribuio, assim como para a interoperabilidade entre o
software de modelao e o software de clculo, foi desenvolvida uma ferramenta prpria com
base na regulamentao e na metodologia proposta pelo Dono de Obra. A parametrizao dos
elementos utilizados na modelao beneficiou a interoperabilidade e permitiu auferir vrias
informaes do projeto de forma rpida, como, por exemplo, medies, implantao,
localizao de rgos e peas desenhadas e grficas.

O desenvolvimento do projeto (do caso de estudo em causa) com recurso a ferramentas


sustentadas no conceito BIM permitiu contornar restries financeiras, temporais e espaciais,
originando economias substanciais em todas as fases do processo do projeto, bem como testar
e otimizar vrias solues num curto espao de tempo.

359
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

O caso de estudo exposto refere-se ao projeto da rede urbana de abastecimento de gua da


cidade de Quibala em Angola. As metodologias aqui apresentadas pretendem expor o fluxo de
trabalho utilizado durante o desenvolvimento do projeto, mas, principalmente, dar a conhecer
a contribuio que o conceito BIM e as ferramentas utilizadas, que o suportam, tiveram ao
longo de todo o processo.

2. Objetivos

Antes de dar incio ao desenvolvimento dos estudos do presente projeto, foram estabelecidos
alguns objetivos com o propsito ltimo de conseguir desenvolver as tarefas de forma rpida e
eficiente, mantendo um padro de qualidade elevado.
Dos objetivos principais definidos destacaram-se os seguintes:
Cumprir com os requisitos do Caderno de Encargos definidos pelo Dono de Obra;
Aplicar os parmetros de dimensionamento definidos pelo Dono de Obra e pela
regulamentao;
Utilizar ferramentas e metodologias para tornar o fluxo de trabalho mais rpido e
eficiente;
Evitar tarefas repetitivas e com grande propenso ocorrncia e introduo de erros que
impliquem um grande volume de trabalho na sua correo;
Realizar um trabalho com um elevado padro de qualidade.

3. Abordagem

Para dar resposta aos objetivos propostos, foi equacionada a metodologia tipicamente utilizada
neste tipo de estudo e foi pensada a sua reformulao, de forma mais integrada e com o desejo
de tirar partido das vrias ferramentas disponveis, para ultrapassar as condicionantes que o
prprio projeto impunha.

As ferramentas disponveis e utilizadas durante o processo foram essencialmente o Autodesk


Civil 3D (verso 2014), o EPANET (verso 2.0) por imposio do Caderno de Encargos do
Dono de Obra e o Microsoft Excel (verso 2007).

Na realizao destes estudos, associados observncia dos objetivos delineados, foi denotado
um conjunto de condicionantes que tiveram de ser contornadas durante a realizao das tarefas,
tais como: a falta de dados cadastrais fiveis, a inexistncia de levantamentos (topogrficos e
demogrficos) e os custos associados sua realizao, a obrigao da utilizao de
determinadas aplicaes de dimensionamento impostas pelo Dono de Obra (o caso do EPANET
para o dimensionamento da rede), a dificuldade em visitar o local da obra e os prazos para a
realizao dos estudos.

360
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.1 Fluxo de trabalho tradicional


Um fluxo de trabalho tpico e amplamente utilizado no estudo de um projeto de uma rede urbana
de abastecimento de gua pode ser similar ao apresentado na Figura 1.

O esquema apresentado na Figura 1 no pretende ser exaustivo at porque cada grupo de


trabalho tem as suas prprias metodologias e ferramentas e, muitas vezes, existem
caractersticas que variam de projeto para projeto, obrigando a ajustes no fluxo de trabalho. No
entanto, possvel perceber que todo o processo assenta num conjunto de tarefas que, de algum
modo, se repetem e, alm disso, grande parte dessas tarefas so feitas de forma manual (ou
quase) e, consequentemente, muito suscetveis introduo de erros.

Figura 1: Fluxo de trabalho tpico para um projeto de abastecimento de gua.

No que se refere ao Desenho do Layout da Rede, este normalmente pensado sobre o papel
com uma base cartogrfica ou levantamento cadastral existente. Aps o estudo de um potencial
layout, necessrio determinar manualmente a altimetria de cada um dos elementos da rede
(ns, tubos, rgos, etc.) sobre a base altimtrica utilizada. Posteriormente, necessrio estudar
os consumos existentes e previstos para se determinarem os caudais de clculo dos diferentes
cenrios a simular e a sua distribuio ao longo da rede (no caso do EPANET os consumos s
podem ser aplicados nos ns da rede). Despois necessrio fazer a modelao da rede na
aplicao de dimensionamento/clculo. No caso do EPANET, uma forma de realizar isso
poderia ser atravs da introduo manual dos ns (Junctions no EPANET), especificando os
seus parmetros planimtricos, altimtrico e de consumo, ligando-os, manualmente, por tubos
(Pipes) com as caractersticas dimensionais e materiais (incluindo o comprimento que deve
ser corrigido para o comprimento real). Todo este processo seria manual, fosse feito diretamente
no EPANET ou indiretamente atravs de um ficheiro de CAD que seria posteriormente
processado, importado e corrigido. fundamental que a base de trabalho sobre a qual feita a
modelao tenha rigor suficiente e escada adequada para o tipo de projeto em estudo, seja um
ortofotomapa ou um levantamento topogrfico. O estudo de um cenrio de consumo diferente

361
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

implicaria a alterao manual de todos os consumos nos ns e para o estudo de layout da rede
diferente seria imprescindvel refazer manualmente todo (ou quase todo) o processo descrito
aplicado nova configurao.

Dadas as restries ao nvel da modelao e o dispndio de tempo que este tipo de atividades
repetitivas e sem valor acrescentado normalmente consome no desenvolvimento de um projeto
desta natureza, foi fundamental pensar numa abordagem que permitisse reduzir
substancialmente o tempo aplicado na realizao de tarefas tpicas de uma abordagem
tradicional.

3.2 Fluxo de trabalho desenvolvido


Considerando todas as condicionantes apresentadas e os objetivos traados, foi delineada uma
estratgia que provou ser bastante vantajosa. Tirou-se proveito das potencialidades das
aplicaes utilizadas, permitindo reduzir substancialmente o tempo despendido em tarefas
acessrias no relacionadas com o estudo da rede em si.

Apesar de algumas semelhanas com o fluxo de trabalho tradicional, o fluxo de trabalho


utilizado tirou grande partido da automatizao das tarefas, atravs da interoperabilidade
existente (ou desenvolvida) entre as diferentes aplicaes, reduzindo ao mximo as tarefas
realizadas de forma manual e repetitiva.

De forma esquemtica, o fluxo de trabalho utilizado apresenta-se globalmente na Figura 2.

Figura 2: Fluxo de trabalho desenvolvido.

Analisando a Figura 2 notrio que todo o fluxo de trabalho foi centralizado num modelo BIM
(Building Information Modeling). Este modelo central constitudo por um conjunto de objetos
que dependem de informao de entrada e que, muitas vezes, no est disponvel ou, os custos
e morosidade associados sua obteno so muito elevados como, por exemplo, o levantamento
topogrfico e fotogramtrico.

362
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Caso de estudo

4.1 Levantamento fotogramtrico e topogrfico


No caso de estudo apresentado, o levantamento fotogramtrico datado de 21 de julho de 2013
foi obtido atravs do rastreamento por satlite da constelao Pleiades com uma resoluo de
50 centmetros e disponibilizado pela Astrium atravs do Google Earth Pro. O levantamento
topogrfico foi obtido atravs de uma nuvem de pontos da interpolao de uma superfcie DEM
(Digital Elevation Model) recolhida pela SRTM (Shuttle Radar Topography Mission) da NASA
com uma resoluo de um arco-segundo (aproximadamente 30 metros). Como alternativa foi
tambm utilizado um GeoTIFF com a mesma resoluo disponibilizado pelo ASTER GDEM
V2 (Advanced Spaceborne Thermal Emission and Reflection Radiometer Global Digital
Elevation Model Version 2). Contudo, estes ltimos dados foram descartados pela maior
dificuldade em serem processados quando comparados com os anteriores. de salientar que
em termos de preciso, os levantamentos mostraram-se bastante aceitveis, tanto pelo facto de
a resoluo da obteno dos dados ser compatvel com a escala e o tipo de projeto em causa,
como pela experincia em casos de projetos semelhantes em que o levantamento topogrfico
de campo no apresentava diferenas altimtricas relativas acentuadas quando comparado com
o levantamento por satlite. Outra observao a ter em conta que este tipo de levantamento
apresenta dados bastante corretos quando no existem obstculos significativos ao rastreamento
(e.g. rvores, nuvens, etc.) e quando a diferena altimtrica entre dois pontos no discretizados
pela resoluo do varrimento no relevante para o processo (e.g. salincias no terreno com
dimenses em planta inferiores a 30 metros). Considerando estas limitaes do levantamento
topogrfico por satlite, o estudo de zonas e rgos importantes como as captaes, adutoras e
reservatrios, foi complementado com um levantamento topogrfico de campo. Este, exceo
de situaes muito pontuais, mostrou-se bastante prximo do levantamento por satlite, sem
diferenas significativas, demonstrando apenas maior resoluo de discretizao de alguns
pormenores e zonas do terreno. de referir que os levantamentos obtidos foram referenciados
no sistema de coordenadas com projeo UTM, datum WGS84, zona 33 sul e ps-processados
(filtragem e otimizao da malha de varrimento) Figura 3.

Figura 3: Levantamento fotogramtrico (esquerda) e topogrfico (direita).

363
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.2 Levantamento demogrfico


Os dados cadastrais relativos s populaes em Angola so praticamente inexistentes e, por
razes de vrias ordens, muito pouco fiveis. Devido falta de dados reais e dificuldade em
obt-los em tempo til atravs de censos no local, o Dono de Obra sugeriu uma metodologia
que foi seguida e consistia na determinao da densidade populacional atravs da densidade
habitacional. Este processo foi realizado manualmente ao longo dos setores da rede utilizando
o levantamento fotogramtrico como base. A evoluo demogrfica foi determinada atravs da
metodologia apresentada no Caderno de Encargos e as taxas de crescimento aplicadas, entre o
ano do levantamento demogrfico (neste caso considerou-se o ano da data das imagens de
satlite) e os diferentes horizontes de projeto (neste caso de estudo foi o ano 0, o ano 10 e o ano
20), foram as indicadas pelas Naes Unidas [1].

4.3 Modelao da rede


O esboo do layout da rede foi feito em papel, utilizando os levantamentos obtidos como
indicado anteriormente. O layout e a setorizao da rede baseou-se na informao de um
anteprojeto j realizado (entretanto desatualizado) disponibilizado pelo Dono de Obra. Foi
estudado um layout com base nessa informao e tambm em novas zonas a abastecer que
entretanto surgiram. Foram estudadas algumas configuraes ligeiramente diferentes como
forma de otimizao da rede, mas isto s foi efetuado depois das anlises hidrulicas iniciais
terem sido realizadas.

Aps a definio do layout a estudar, modelou-se a rede numa plataforma suportada no conceito
BIM, que teve um papel fundamental a partir do qual se tirou o verdadeiro usufruto das
vantagens dessa modelao. A modelao da rede foi feita no Autodesk Civil 3D com objetos
Pressure Pipes no mesmo modelo onde j se encontrava a superfcie do terreno resultante do
levantamento topogrfico (Tin Surface). Previamente modelao, as caractersticas dos
tubos foram parametrizadas e includas no catlogo para posterior escolha durante a modelao
(similar ao conceito de famlia) Figura 4.

Figura 4: Excerto exemplificativo do quadro da parametrizao da tubagem.

Como ponto de partida para a modelao e aps a avaliao do resultado de alguns testes
realizados anteriormente, a forma mais eficiente encontrada para modelar toda a rede foi a de
utilizar apenas um tipo de tubo (aquele que partida se estimava como sendo o que teria mais
extenso na rede, que no caso foi o de dimetro DN63), e sempre ao mesmo nvel, neste caso
foi cota zero. de salientar que durante a modelao, tratando-se da utilizao de Polietileno
de Alta Densidade (PEAD) como material da tubagem, foi possvel fazer troos com diferentes
curvaturas e limit-las ao raio de flexo mximo definido na parametrizao da tubagem.

364
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Durante a modelao foi tido o cuidado de separar toda a setorizao em sub-redes. Outra nota
a reter que tanto o comprimento dos arcos como a extenso dos tubos no deveriam ser
demasiado extensos, sobretudo se o perfil real da tubagem for bastante acidentado entre o ponto
inicial e final do tubo, dadas as limitaes da aplicao de dimensionamento (no EPANET todos
os troos de tubagem so retos, tanto em planta com em perfil, sendo a configurao em perfil
feita atravs de ns intermdios introduzidos manualmente). Esta limitao condicionou
bastante a modelao no modelo BIM, no por limitaes da aplicao BIM mas porque
necessrio ter o cuidado de fazer uma discretizao adequada da tubagem (modelar com ns
intermdios), pois o EPANET apenas considera as coordenadas das extremidades da tubagem.
possvel observar pela Figura 5 as consequncias que o tipo de discretizao pode ter,
principalmente no resultado final, ao nvel das presses na tubagem.

Figura 5: Comparao entre diferentes discretizaes.

4.4 Anlise e dimensionamento da rede


Depois de toda a modelao inicial da rede em planta estar concluda ( mesma cota) no mesmo
modelo onde se encontra a superfcie do terreno, toda a rede de tubagem foi rebatida sobre essa
superfcie. Por outras palavras, todos os eixos da tubagem foram automaticamente definidos
para acompanhar a superfcie do terreno com um desfasamento de um metro (obrigando a que
toda a tubagem estivesse enterrada pelo menos 80 centmetros contabilizados entre o seu
extradorso superior e a superfcie do terreno, para dimetros iguais ou inferiores ao DN400),
assumindo, assim, a altimetria real e no a cota inicial da modelao (as redes urbanas de
abastecimento de gua em baixa, salvo raras excees, est sempre enterrada com a mesma
profundidade) Figura 6.

Figura 6: Exemplo do processo de rebatimento.

365
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Nesta fase do processo a rede encontra-se modelada e divida de acordo com a setorizao
todas as tubagens tm o mesmo dimetro e o eixo da tubagem segue a superfcie do terreno a
um metro de profundidade Figura 7.

O passo seguinte foi o de conseguir transferir esta informao para o programa de


dimensionamento/clculo. Como, at data de realizao do projeto no era conhecida
nenhuma aplicao/funcionalidade para automatizar este processo, foi desenvolvida uma
aplicao (com recurso ao Microsoft Excel) que tinha como principal objetivo receber os dados
da rede do modelo BIM, processar esses mesmos dados, complement-los com os consumos e
transform-los num formato importvel pelo EPANET (no caso foi o formato .inp) [2] onde
foram realizadas as anlises e as simulaes hidrulicas da rede.

Figura 7: Modelo BIM com a setorizao da rede (esquerda) e layout inicial da rede com os
consumos principais (direita).

Por imposio do Dono de Obra, o clculo/dimensionamento da rede foi feito com recurso ao
software EPANET. Este software gratuito, desenvolvido e distribudo pela United States
Environmental Protection Agency, tem (apesar da boa capacidade de clculo) elevadas
limitaes no que respeita introduo de dados e interoperabilidade com outras aplicaes.
A aplicao desenvolvida teve como dados de entrada a informao da modelao da rede da
aplicao BIM, os dados relativos aos parmetros de dimensionamento hidrulico (capitaes,
tipos de consumos, anos horizontes de projeto, fatores de ponta, forma de distribuio do
caudal) e a informao do levantamento demogrfico e os parmetros relativos evoluo da
populao. As rotinas desenvolvidas determinaram a disposio dos ns e a sua localizao, a
sua associao com as tubagens, assim como com os consumos determinados nos ns. Os
consumos foram determinados para os cenrios de simulao especficos e a distribuio foi
feita ao longo da rede em funo do tipo de distribuio no setor. O consumo nos setores
periurbanos da rede de distribuio foi concentrado em apenas alguns ns pr-definidos e no
distribudo ao longo de toda a rede do setor (setores da malha urbana consolidada ou prevista).
Por ltimo os dados foram processados e exportados para um formato prprio de importao
no EPANET.

366
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Horizonte de Projeto: Ano 0 Horizonte de Projeto: Ano 10 Horizonte de Projeto: Ano 20

(presses nos
ns; velocidades
nas tubagens)

Figura 8: Resultados de simulaes hidrulicas para diferentes horizontes de projeto.

Com a importao para o EPANET, os modelos para os diferentes cenrios foram calculados e
os dimetros ajustados iterativamente (este processo foi complementado com o plug-in para
EPANET WaterNetGen 1.0.0.210 [3]). O processo de ajuste dos dimetros terminou quando o
valor das velocidades e das presses ao longo da rede se encontraram dentro dos limites
estipulados no Caderno de Encargos Figura 8.

O modelo de clculo para as simulaes hidrulicas finais contou com 557 ns e 564 tubos.

4.5 Atualizao do modelo da rede


Determinados os dimetros finais da rede, atualizou-se os objetos da rede do modelo BIM para
os dimetros finais. Infelizmente este processo teve que ser feito manualmente, porque a
interoperabilidade com o programa de modelao BIM no permitiu essa atualizao de forma
simples e automtica, nem complementar a informao do modelo BIM com dados
determinados no clculo como, por exemplo, velocidades e presses.
Pode dizer-se, contudo, que este processo manual foi relativamente simples e rpido de
completar. Foi possvel complementar o modelo BIM com a informao das presses atravs
de uma superfcie do tipo TIN (Triangulated Irregular Network) Figura 9. A desvantagem
associada a esta soluo alternativa que a informao das presses no estava direta e
dinamicamente associada aos objetos da tubagem do modelo.

367
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 9: Diagrama de presses de uma simulao (esquerda) e layout final com a


diferenciao dos dimetros por cores (direita).

4.6 Obteno de elementos finais do projeto


Os elementos finais do projeto, no que se refere a peas desenhadas, tabelas de localizao de
rgos e acessrios e a medies dos comprimentos de tubagem foram obtidos diretamente do
modelo BIM. Outra grande vantagem da utilizao deste modelo vem da ligao dinmica entre
os diferentes objetos e a possibilidade de processar a sua informao como um grupo. A ttulo
de exemplo, as indicaes relativas aos dimetros da tubagem, aos desenhos dos perfis,
localizao de rgos e acessrios, listagem dos comprimentos so imediata e
automaticamente atualizadas quando realizada alguma alterao no objeto associado.

Para registo, a rea de cobertura da rede de, aproximadamente, 20 quilmetros quadrados, o


comprimento total de tubagem de 36 645 metros, divididos por diferentes dimetros entre o
DN63 e o DN400. O nmero de ns na rede foi de 166 com 56 tipos diferentes e o nmero total
de rgos e acessrios principais foi de 253. A localizao de todos os rgos, acessrios e ns
foram referenciados dinamicamente no projeto. Logo, qualquer ajuste na posio destes
elementos automaticamente atualizada nas tabelas de localizao.

5. Consideraes Finais

Como foi possvel verificar, existem enormes vantagens na utilizao de modelo BIM pela
abertura que permite na explorao da informao associada aos objetos.

Estas passam, sem dvida, pela possibilidade de incorporar informao de diferentes tipos de
objetos e a possibilidade de manter uma ligao dinmica entre eles. De uma forma prtica e
com a devida interoperabilidade, possvel automatizar um conjunto de tarefas que tipicamente
so feitas manual e repetitivamente sem adicionarem valor ao resultado final e muito suscetveis
introduo de erros. No caso apresentado essas vantagens foram notrias em vrias fases,
mas, principalmente, na modelao inicial da rede e na obteno da informao final do projeto
(peas desenhadas, tabelas e medies). Outro benefcio da ligao dinmica a de possibilitar
que o processo de trabalho se processe em paralelo entre a equipa de desenho e a equipa de

368
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

engenharia. Como a informao do desenho (e.g. anotaes, cotagem, etc.) est associada
dinamicamente aos objetos, quaisquer alteraes posteriores deste so refletidas
automaticamente nos desenhos, no sendo necessrio editar manualmente.

Com a automatizao de quase todo o processo, o tempo necessrio para obter o um resultado
final substancialmente encurtado comparativamente com o processo tradicional. Esse tempo
pode ser aproveitado tanto para otimizar e experimentar diferentes solues como tambm para
dar resposta aos prazos de realizao dos projetos, que so cada vez mais apertados. Associada
reduo do tempo est igualmente a poupana nos recursos utilizados que podem ser
aproveitados na procura e desenvolvimento de tcnicas mais eficientes, como tambm na
realizao de estudos complementares para uma maior economia em obra.

Nas aplicaes utilizadas existiram algumas limitaes que no permitiram uma maior
automatizao do fluxo de trabalho, sobretudo pelas dificuldades na importao de informao
para o modelo BIM a partir de aplicaes externas e da impossibilidade em adicionar
parmetros personalizados aos objetos (e.g. valor das presses, velocidades, etc.).

A evoluo das aplicaes BIM deve ser no sentido da integrao de aplicaes com diversas
funcionalidades, mas deve tambm ser no sentido de permitir uma maior flexibilidade de
importao e exportao da informao do modelo e dos seus objetos. Este tipo de
interoperabilidade muito importante para os utilizadores, uma vez que permite a manipulao
da informao com aplicaes independentes de forma fcil e rpida.

Referncias

[1] ESA/P/WP.228, World Population Prospects The 2012 Revision, Highlights and
Advance Tables, UN, Department of Economic and Social Affairs, Population Division,
2013
[2] Rossman, L. A., EPANET 2 Users Manual, US Environmental Protection Agency, 2000
[3] Muranho, J., Ferreira, A., Sousa, J, Gomes, A., & S Marques, A. WaterNetGen - an
EPANET extension for automatic water distribution networks models generation and
pipe sizing. Water Science and Technology: Water Supply (2012), 12(1), pp. 117-123.

369
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

370
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO BIM DE UM PROJETO DE INSTALAES


HIDRULICAS DE UM EDIFCIO UNIFAMILIAR
Miguel Chichorro Gonalves (1), Pedro Rocha (2), Martim Bernardo Ribeiro (1)

(1) FEUP, Porto


(2) UCL, Londres

Resumo
A aplicao de Building Information Modelling (BIM) tem crescido como forma de
metodologia de trabalho entre as vrias especialidades de projeto.

Em relao s diferentes opes de software existentes no mercado notria uma orientao


particular que cada um tem relativamente a um determinado projeto de especialidade. Esta
orientao especfica a cada rea de projeto faz com que a cada software estejam associadas
ferramentas, modos de trabalho e formatos proprietrios diferentes. Com a utilizao cada vez
maior do conceito BIM ligada diversificao e especificidade de cada ferramenta surge a
necessidade de implementao de procedimentos de trabalho eficazes e explorao de formas
de interoperabilidade entre os diversos intervenientes no projeto.

O presente artigo explora os procedimentos e formas de interoperabilidade adotadas num caso


de estudo de um projeto de instalaes de um edifcio. Neste caso de estudo foi considerado o
uso do Revit para realizao dos projetos de abastecimento de guas, guas residuais e pluviais
e aspirao central. O desenvolvimento destes projetos em Revit teve por base um projeto de
arquitetura previamente concebido com o ArchiCAD. A utilizao de diferentes tipos de
software implica uma srie de consideraes de interoperabilidade e de procedimentos de
implementao a adotar ao longo das vrias etapas de projeto.

1. Introduo

Nos ltimos anos tornou-se evidente o crescimento da utilizao de Building Information


Modelling (BIM) nas vrias especialidades de projeto. Este crescimento aliado ao rpido
desenvolvimento tecnolgico permitiu a criao e desenvolvimento de diversos tipos de
software, cada um deles com ferramentas e formas de trabalho especficas. Cada software

371
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

encontrou um nicho de mercado prprio apresentando deste modo uma maior aplicabilidade
em relao a uma especialidade especfica e encontrando-se limitado em relao s outras. O
software ArchiCAD apresenta uma orientao mais focada no projeto de arquitetura,
apresentando fraquezas fora desta especialidade de projeto. O mesmo poder ser dito do
software Tekla Structures uma vez que fora da rea das estruturas tem pouca aplicabilidade [1].
A orientao especfica a nvel de ferramentas e procedimentos que cada software apresenta faz
com que existam diferentes ferramentas que podem ser utilizadas por cada uma das
especialidades. Desta forma existe um grande foco de ateno em questes ligadas a formas de
estabelecer colaborao entre os diferentes intervenientes num dado projeto. A
interoperabilidade BIM essencial dado que influencia toda a comunicao existente entre as
diferentes ferramentas usadas num projeto BIM.

O presente artigo explora um caso de estudo real de elaborao de um projeto de instalaes


hidrulicas e de aspirao central num edifcio unifamiliar. O caso de estudo foi realizado tendo
em conta um projeto de arquitetura previamente concebido em ArchiCAD pelos arquitetos
Filipe Moreira da Silva, Joana Restivo e Ins Pimentel. O processo de desenvolvimento do
projeto de instalaes recorreu ao uso do software Revit explorando desta forma a
interoperabilidade entre este e a plataforma ArchiCAD. Durante o presente caso de estudo
foram tambm abordados aspetos mais relacionados com procedimentos a utilizar durante a
implementao em Revit do conjunto das instalaes bem como na criao de objetos
paramtricos. Desta forma o presente artigo explora os benefcios e dificuldades que podero
ocorrer ao longo de um processo de implementao BIM de um projeto de instalaes.

2. Caso de estudo

O presente caso de estudo simula um ambiente real de colaborao BIM em que duas
especialidades distintas fazem uso da lgica BIM para desenvolver o seu projeto de
especialidade: arquitetura e instalaes, cada uma utilizando software distinto. O caso de estudo
utiliza uma habitao unifamiliar como objeto de estudo para elaborao do conjunto das
instalaes hidrulicas e de aspirao central. Este pode ser dividido em 3 partes distintas: 1) a
explorao da interoperabilidade entre a equipa de arquitetura e engenharia, 2) a implementao
do projeto de instalaes hidrulicas e de aspirao central e, finalmente, 3) a concluso de
vantagens e desvantagens encontradas com a utilizao do BIM. O projeto de arquitetura
representado na Figura 1, j tinha sido previamente concebido de raiz pela equipa de arquitetura,
usando uma logica BIM com o recurso ao ArchiCAD. Relativamente arquitetura, o software
ArchiCAD foi usado como raiz para modelao de todos os objetos paramtricos relativos
especialidade bem como instrumento de colaborao entre os arquitetos envolvidos no projeto.
Contudo, a elaborao do projeto de instalaes foi realizada em Revit a partir de um projeto
previamente desenhado em AutoCAD e do respetivo mapa de trabalhos e quantidades.
Procurou-se deste modo analisar as vantagens e dificuldades de implementao da metodologia
BIM, quando comparada utilizao de uma lgica de projeto tradicional em CAD.

372
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Projeto de Arquitetura em ArchiCAD [2].

2.1 Interoperabilidade entre ArchiCAD e Revit


As ferramentas BIM que abrangem as diferentes especialidades tm formas de trabalho
diferentes e consequentemente diferentes formas de tratar os dados fazendo com que a
representao do modelo virtual esteja adaptada a cada especialidade [3]. As diferentes formas
de tratamento de dados consideradas pelas diversas ferramentas BIM levou procura de uma
linguagem comum de troca de informao. O industry foundation classes (IFC) o formato de
eleio para interoperabilidade em BIM, tendo sido desenvolvido por uma organizao fundada
em 1995 com o nome de Internatonal Alliance for Interoperability e que apresentou vrios
verses do formato IFC desde 1997 [4]. Este um formato aberto que permite a troca de
geometria, informaes e relaes associadas aos objetos existentes no modelo BIM. Foi assim
considerado para efetuar a exportao e importao do projeto de arquitetura do ArchiCAD
para Revit.

Na interoperabilidade explorada entre as especialidades de arquitetura e instalaes de


engenharia foi considerada a partilha de informao do software ArchiCAD para o Revit de
modo a que fosse possvel aceder a toda a informao relativamente ao projeto de arquitetura
no software Revit.

Com o projeto de arquitetura j elaborado previamente em ArchiCAD, procedeu-se a um


conjunto de iteraes de opes de exportao disponveis com o formato IFC no ArchiCAD.
Estas iteraes foram exploradas ao nvel das diferentes opes de translator existentes no
ArchiCAD e que permite escolher um conjunto de opes que melhor se adequam ao software
de destino para o qual se pretende exportar. De notar que opes de exportao consideradas
em ArchiCAD foram realizadas com a verso 23 do formato IFC. Aps a exportao das
diferentes opes consideradas foi realizada a importao de cada uma destas para Revit. As
tabelas 1 e 2 sumarizam os erros detetados nas diferentes opes utilizadas durante o processo
de interoperabilidade ArchiCAD para Revit. Nesta fase de troca de dados entre as duas
ferramentas BIM utilizadas, considera-se que os erros de interoperabilidade so extremamente
importantes uma vez que uma pequena alterao ao projeto original de arquitetura poder levar

373
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

a erros graves de interpretao do mesmo em Revit e como tal suscitar a produo de vrios
erros na realizao do projeto de instalaes. Embora o somatrio dos erros de exportao e
importao de qualquer uma das opes utilizadas, apresentada nas tabelas 1 e 2 parea ser algo
elevado, este somatrio de nmero de erros no se revelou significativo. Uma anlise cuidadosa
ao projeto de arquitetura aps a importao deste em Revit e tendo como elemento de
comparao o mesmo projeto em ArchiCAD mostrou que os erros apresentados por ambas as
ferramentas no eram de grande importncia, e como tal no colocavam em risco a correta
leitura do projeto de arquitetura quando importado para Revit. Tambm foi observado que
propriedades base dos objetos tais como as categorias-tipo foram mantidas, contudo estas no
tiveram uma relevncia acentuada para o desenvolvimento o projeto de instalaes.

Tabela 1: Erros associados s opes de interoperabilidade na exportao para IFC.


Exportao de ArchiCAD para IFC
Modelo Completo Elementos visveis
General Data Exchange Data Exchange General Data Data
Translator with Autodesk with Autodesk Translator Exchange Exchange
Revit MEP Revit Structure with with
Autodesk Autodesk
Revit MEP Revit
Structure
76 79 76 76 79 76

Tabela 2: Erros associados s opes de interoperabilidade na importao IFC


Importao de IFC para Revit
Modelo Completo Elementos visveis
General Data Exchange Data Exchange General Data Data
Translator with Autodesk with Autodesk Translator Exchange Exchange
Revit MEP Revit Structure with with
Autodesk Autodesk
Revit MEP Revit
Structure
3 1 3 3 1 3

2.2 Implementao Revit das Instalaes hidrulicas e aspirao central


Aps a importao do projeto de arquitetura para Revit, procedeu-se elaborao do projeto de
instalaes em Revit. O principal objetivo da implantao BIM do projeto de instalaes
previamente realizado em AutoCAD foi o de estabelecer uma comparao entre as duas lgicas
de trabalho, explorando as vantagens e inconvenientes que advm da utilizao da lgica BIM
pelas especialidades de engenharia.

374
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Em ambiente Revit foram exploradas as ferramentas existentes no toolbar systems onde se


encontram as instalaes. Os principais comandos utilizados foram: Pipe, Pipe Fitting, Pipe
Accessory e Plumbing Fixtures. Cada um dos comandos existentes em Revit apresentam objetos
paramtricos com propriedades standard que podem ser editadas e modificadas de modo a
ajustar cada elemento realidade do projeto em estudo. Nos casos em que os elementos
selecionados no mapa de trabalhos e quantidades apresentaram propriedades demasiado
diferentes, foi considerada a modelao de objetos paramtricos em ambiente Revit. Alm
destas duas opes foram tambm exploradas outras duas opes para obteno dos elementos
das instalaes, tendo-se, no entanto, revelado de pouca aplicabilidade. Uma destas opes foi
a obteno de objetos paramtricos atravs de bibliotecas online de objetos, onde os diferentes
fabricantes colocam os seus produtos disponveis para serem utilizados pela equipa projetista
sem esta ter de proceder a quaisquer alteraes. Esta forma de obteno, embora tenha bvias
vantagens tanto para o produtor como para a equipa projetista, no se revelou muito relevante
no caso de estudo uma vez que os elementos disponibilizados online so ainda reduzidos e
difceis de obter atravs de uma pesquisa rpida. A outra opo que revelou aplicabilidade
prtica reduzida foi a de utilizar um software externo de modelao dos elementos e de seguida
proceder sua importao para Revit. Esta forma de trabalho no uma opo a considerar em
trabalhos futuros uma vez que os objetos importados a partir do software externo utilizado no
puderam ser geometricamente parametrizados.

O procedimento utilizado para implementao das guas e abastecimento que se revelou mais
eficiente foi o seguinte:
Implantao de todos os equipamentos relativos s instalaes.
Desenho de todas as tubagens.
Implantao de todos os acessrios.

Na elaborao das guas de abastecimento foram consideradas todas as propriedades relativas


ao sistema de tubagem escolhido. Todas as propriedades relativas a dimetros, tipos de juntas
e isolamento foram configuradas, consultando inicialmente fichas tcnicas de produto de forma
a proceder a uma correta implementao. Embora poucos elementos se encontrassem
modelados em bibliotecas de objetos online, sempre que foi possvel foram usados objetos
paramtricos existentes fornecidos pelos produtores uma vez que estes oferecem a vantagem de
j estarem modelados.

O procedimento adotado para elaborao das guas residuais e pluviais foi o seguinte:
Desenho de todos os tubos de queda;
Implantao de todo o equipamento.
Implantao das restantes tubagens.

Durante a implementao verificou-se que o desenho prvio de todas as tubagens verticais


relativas s guas residuais e pluviais, foi a forma de evitar conflitos posteriores entre os
diversos objetos paramtricos considerados. Todas as propriedades do sistema escolhido foram
consideradas recorrendo modelao dos elementos.

375
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Mostra-se na figura 2 uma casa de banho com a completa implantao das instalaes
hidrulicas.

Figura 2: Casa de banho implementada em Revit.

Na implementao do projeto de instalaes foi tambm considerada a aspirao central com a


seguinte ordem de procedimentos:
Estudo do nmero de condutas verticais a usar a partir do alcance das mangueiras de
aspirao.
Implantao de todos os equipamentos.
Desenho das condutas.

Na realizao da aspirao central foi considerado o tipo de juntas possveis de serem utilizadas
a partir do sistema de condutas escolhido recorrendo assim modelao destas.

De todos os elementos utilizados ao longo dos projetos de instalaes hidrulicas e aspirao


central poucos foram os equipamentos obtidos a partir de bibliotecas de objetos. Destes os mais
notrios correspondem s bacias de retrete, lavatrios e banheiras Duravit. Os elementos
Duravit foram os nicos existentes no mapa de trabalhos e quantidades que foram possveis
encontrar online modelados pela prpria empresa produtora.

Todos os restantes objetos com a excluso das tubagens foram modelados em Revit atravz de
component families. A modelao por component families foi escolhida uma vez que os

376
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

elementos so modelados externamente ao projeto atravs de templates especficos pr-


configurados pelo Revit. Estes objetos paramtricos modelados como component families
foram posteriormente importados para o projeto e duplicados consoante o numero de repeties
do mesmo objeto ao longo do projeto.

Apenas as tubagens foram modeladas como system families uma vez que neste caso s se
procedeu simples adaptao dos parmetros existentes na tubagem standard Revit.

Os procedimentos seguindo a ordem de implementao acima mencionada provaram ser os


mais eficientes devido ao tempo ganho e que de outra forma seriam mais demorados. Foi apenas
no caso das guas residuais que a colocao prvia dos equipamentos mostrou-se ser ineficiente,
devido ao facto dos tubos de queda terem condutas verticais previamente definidas. Assim, se
colocados depois dos restantes equipamentos iriam provocar incompatibilidades e erros devido
s inclinaes mnimas e mximas das condutas horizontais, obrigando o utilizador a colocar
os tubos de queda fora do local definido para tal. Mostra-se na figura 3 um corte do projeto de
instalaes em que possvel observar os projetos de guas residuais e de abastecimento bem
como equipamento relativo ao sistema de aspirao central.

Figura 3: Conjunto de instalaes numa seco em corte

Observa-se na figura 4, em ambiente Revit, todo o conjunto de instalaes desenvolvidas, bem


como o projeto de arquitetura.

377
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Vista 3D do projeto de arquitetura com o conjunto das instalaes implementadas

3. Anlise de resultados e concluses

Com a execuo em Revit do projeto das instalaes hidrulicas e de aspirao central foram
verificadas algumas dificuldades ao realizar os procedimentos estudados, das quais se destacam
as principais:
Difcil obteno de objetos paramtricos em bibliotecas.
Dificuldades na modelao e parametrizao dos vrios objetos.
Lentido de implementao associada a restries e incompatibilidades verificadas pelo
software.

A juntar a estas poder-se- tambm considerar todo um conjunto de dificuldades sentidas na


aprendizagem de modelao paramtrica que necessrio que exista em Revit bem como as
restries de hardware que podero existir.

No desconsiderando as dificuldades sentidas existe um conjunto de vantagens que foram sendo


reveladas ao longo de todo o processo, indicando-se de seguidas as principais:
Facilidade de obteno de projeto de arquitetura sem ser necessrio novo desenho deste
apresentando vantagens de visualizao como exemplo a ocultao de categorias-tipo
de elementos pretendidos;

378
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Deteo fcil de erros, omisses e incompatibilidades entre os projetos de arquitetura e


instalaes.
Facilidade em proceder a alteraes ao projeto de instalaes desenvolvido.
Leitura de projeto facilitada atravs da existncia de vrias opes de visualizao
existentes em Revit.

Com o desenvolvimento Revit do projeto de instalaes verificou-se que aps, um certo esforo
inicial de explorao da forma de trabalho em Revit, o trabalho de modelao paramtrica e
implantao dos vrios objetos torna-se substancialmente mais simples e rpido. O
desenvolvimento do projeto em Revit trouxe inmeras vantagens quando comparadas com o
projeto em formato CAD, uma vez que todos os objetos desenhados em Revit tm um
significado fsico virtual correspondente ao real. Estes objetos, que no seu todo formam o
projeto de instalaes, partilham entre si um conjunto de relaes e regras que permitem a
obteno das vantagens supramencionadas.

Referncias

[1] Alastir Watson, "Digital buildings - Chalenges and opportunities" , Advanced


Engineering Informatics, vol.25, pp.573-581, 2011.
[2] M. C. Gonalves and P. Rocha, "BIM case study - Housing plumbing infrastructures" in
8th AECEF Symposium - New actions and roles of civil engineers: sustainability and
energy (2015), Porto, Portugal, pp.133-138.
[3] M. Venugopal, C. M. Eastman, R. Sacks, J. Teizer, "Semantics of model views for
information exchanges using the industry", Advanced Engineering Informatics, vol.26,
pp.411-428, 2012.
[4] S. M. F. Pinho, "O modelo IFC como agente de interoperabilidade", Tese de Mestrado,
Porto, FEUP, Portugal, 2013.
[5] P. J. M. Rocha, "Implementao BIM num projeto de instalaes de um edificio
unifamiliar - Abastecimento de guas, guas residuais e pluviais e aspirao central",
Tese de Mestrado, Porto, FEUP, Portugal, 2015.

379
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

380
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

FERRAMENTA BIM PARA O DIMENSIONAMENTO DE POOS DE


FUNDAO
Cludio Gomes (1), Diogo Ribeiro (2), Rui Gavina (3), Bruno Costa (4) e Andr Santos (3)

(1) ISEP/ISEPBIM, Porto


(2) CONSTRUCT-LESE, ISEP/ISEPBIM, Porto
(3) ISEP, Porto
(4) CONSTRUCT-LESE, FEUP, Porto

Resumo
Este artigo centra-se no desenvolvimento de uma ferramenta BIM para o dimensionamento
expedito de fundaes semi-profundas, do tipo poos de fundao, com base no mtodo do
Bloco Rgido. Para o efeito, foi desenvolvido um programa de clculo, utilizando a Interface
de Programao de Aplicaes (API) da plataforma BIM, Autodesk Revit. A interao entre o
programa de clculo e o modelo BIM feita em ambiente Revit, a partir de uma interface grfica
intuitiva por intermdio de modeless forms, permitindo a manipulao do modelo enquanto
efetuada a introduo de parmetros de clculo. O detalhamento do poo em peas desenhadas
feito automaticamente pelo programa Revit por intermdio da criao de um objeto autnomo
que inclui diversas propriedades avanadas. Com base no caso de um pavilho metlico
demonstrada a implementao desta ferramenta automtica na procura da soluo tima para
os poos de fundao, e que possibilita uma reduo do tempo de anlise e dos erros no seu
detalhamento comparativamente s ferramentas tradicionais.

1. Introduo

O aumento da complexidade arquitetnica das construes, a diversidade de materiais


aplicados, o recurso a tcnicas de construo mais especializadas e a necessidade do uso de
diferentes ferramentas computacionais de apoio ao projeto, tm lanado novos desafios ao nvel
da gesto da informao entre os vrios intervenientes durante o ciclo de vida de uma
construo. Esta nova realidade tem tornado visveis as debilidades associadas aos
procedimentos tradicionais do projeto de estruturas, que revelam ser fragmentados e
dependentes de um fluxo de informao baseado em documentos escritos. Desta forma tornam-
se frequentes os erros e omisses que originam o aumento dos pedidos de esclarecimento,

381
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

atrasos, o aumento dos custos em projeto e em obra e eventuais atritos entre intervenientes [1].
Neste contexto surge a tecnologia BIM, que tem sido disseminada na indstria AEC e que em
muito tem contribudo para uma considervel diminuio destes problemas. O BIM pressupe
no s a representao geomtrica das construes em modelos virtuais, facilmente adaptveis
a alteraes nos projetos e a deteo de incompatibilidades, mas tambm a organizao no
modelo de toda a informao relevante para o ciclo de vida de uma construo e uma alterao
profunda no uso e comunicao da informao [2].

Na maioria dos projetos requerido um controlo de custos e prazos bastante rigoroso, exigindo
da parte dos projetistas o mximo compromisso entre a segurana, a economia e a rapidez em
dar respostas. Isto implica que a equipa de projeto crie e analise diferentes cenrios estruturais
e controle em tempo til a estimativa de custos de cada um deles, permitindo o atempado
planeamento e oramentao das obras. Os programas de clculo correntes encontram-se
preparados, para com algum automatismo, auxiliar o engenheiro de estruturas a chegar a uma
soluo otimizada no que diz respeito definio de formas das solues mais tradicionais em
beto armado e ao. No entanto, no que se refere a fundaes especiais, como o caso dos
poos de fundao, existem lacunas, sobretudo na perspetiva da obteno da soluo mais
econmica e da sua integrao eficiente no fluxo de projeto.

Este trabalho incide no desenvolvimento de uma ferramenta BIM direcionada para o


dimensionamento expedito de poos de fundaes em ambiente Revit. Esta ferramenta,
desenvolvida na linguagem de programao C#, assenta num conjunto de rotinas que
incorporam uma metodologia analtica de dimensionamento de poos de fundao, o Mtodo
do Bloco Rgido, e incorpora uma interface grfica avanada que permite ao utilizador obter
uma soluo otimizada do poo, alm da gerao automtica das peas desenhadas.

2. Metodologia de dimensionamento de poos de fundao

O dimensionamento de poos de fundao geralmente realizado por meio de duas


metodologias distintas: os mtodos numricos, baseados num modelo numrico de elementos
finitos, e os mtodos analticos, mais ou menos simplificados, e baseados em expresses semi-
empricas com campos de aplicao limitados.

Os mtodos analticos so geralmente mais eficientes, quer na rapidez da aplicao, quer pelo
facto de permitirem muito boas aproximaes ao comportamento real da estrutura, uma vez que
na maioria das situaes so validados experimentalmente. Por outro lado, uma vez que o
dimensionamento deste tipo de fundao geralmente baseado num processo iterativo, em que
so sucessivamente alteradas as dimenses do poo, os mtodos analticos tornam-se mais
apelativos e eficientes.

Existem inmeros mtodos analticos direcionados para o dimensionamento de poos de


fundao [3], no entanto, no mbito do presente trabalho, foi utilizado o mtodo do Bloco
Rgido [4, 5].

382
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O mtodo do Bloco Rgido particularmente adequado ao dimensionamento de poos de


fundao com uma profundidade inferior a 4 m e submetidos a aes aplicadas na sua face
superior [4]. Relativamente a outros mtodos analticos o Mtodo do Bloco Rgido tem como
principais vantagens: i) permitir o clculo das tenses atuantes na base e nas faces laterais do
bloco para qualquer solicitao exterior; ii) prever a possibilidade de a resultante das foras
atuantes na base do bloco estar localizada no interior ou exterior do ncleo central, iii)
considerar a deformabilidade do terreno de fundao.

A verificao da segurana do poo de fundao proposta por Delesques [5] envolve as tenses
actantes e resistentes do terreno, sendo realizada separadamente na base e nas faces laterais do
macio para cada uma das direes ortogonais. Para a verificao da segurana por rotura do
terreno necessrio satisfazer a seguinte condio:

ref,i (1)

em que ref,i a tenso de referncia instalada na face i do poo (i = 1 a 3), ou seja, na base ou
nas faces laterais, e calculada a partir da seguinte expresso:

3 max + min
ref,i = (2)
4

onde max a tenso mxima instalada na face i do bloco e min a tenso mnima instalada
nessa face, e adm a tenso admissvel do solo de fundao.

O mtodo do Bloco Rgido admite o comportamento elstico do solo sendo a sua


deformabilidade simulada por intermdio de molas dispostas nas direes vertical (na base) e
horizontal (nas faces laterais do poo). A rigidez das molas nas direes vertical e horizontal
definida atravs de um coeficiente de Winkler que traduz a compressibilidade horizontal (kh) e
vertical (kv) do terreno, respetivamente, e com valores assumidos constantes em profundidade.
Este mtodo despreza ainda o atrito entre o solo e a fundao, quer na base quer nas faces
laterais do bloco, pelo que as tenses no terreno so normais base e s faces laterais do poo.

Na Tabela 1 so apresentadas as expresses analticas do Mtodo do Bloco Rgido que


permitem calcular, para os cenrios em que a resultante das foras est localizada no interior e
no exterior do ncleo central, os seguintes parmetros: a dimenso da base do poo
compresso (z), a excentricidade da resultante das foras atuantes em relao ao seu centro
geomtrico (ex), os valores mximo e mnimo das tenses atuantes na base (pF) e faces laterais
(pL) do poo, o ngulo de rotao () e o deslocamento horizontal do poo (). Caso a
excentricidade ex seja inferior a a/6 a resultante est localizada no interior do ncleo central.
Importa referir que o macio, com dimenses em planta a b e altura h1, encontra-se solicitado
por um conjunto de aes aplicadas ao nvel do seu centro de gravidade, designadas por T, N e
Mo, em que T e N so as aes de clculo na direo vertical, incluindo o peso prprio do poo,
e horizontal, respetivamente, e Mo o momento fletor na direo paralela ao plano de solicitao.

383
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Cenrios de clculo dos poos de fundao atravs do Mtodo do Bloco Rgido.
Resultante das foras Resultante das foras no
no interior do ncleo central exterior do ncleo central

Diagrama de
corpo livre

Dimenso da base a
a 3 ( -e )
compresso (z) 2 x


( ) N h1 3

M0 1 M0 = 2
+ N ex
Excentricidade (ex) a
N h 3 54 ( - ex )
2
1 + ( a1 ) (resoluo de equao 3 grau em
[ ]
ordem a ex)

N 6 M0 a
Valor + 2N
mximo ab
b ( h13 + a 3 )
bz
Tenso na base
(pF) N 6 M0 a
Valor -
mnimo ab
b ( h13 + a 3 )
0


T 6 ( ) M0 h 1
( ) N h 1
Valor T
+ + 2
mximo b h1
b ( h13 + a 3 ) b h1 bz
Tenso nas
faces laterais
Valor
(pL)
T 6 ( ) M0 h 1 T ( ) N h 1
mnimo
- - 2
b h1
b ( h13 + a 3 ) b h1 bz

M0 2N
ngulo de
rotao () b a3 b h1 3 a 2
kv ( + ( )
12 12 ) 9 ( 2 - ex ) b kv

Deslocamento
tan () h1
horizontal ()

384
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Desenvolvimento de Add-In no programa Revit

Para o desenvolvimento do Add-In recorreu-se ao programa Microsoft Visual Studio 2013 [6],
o qual foi configurado para compilar, executar e testar o cdigo produzido em ambiente Revit
[7]. O recurso a esta soluo, alternativamente s macros disponibilizadas pelo programa Revit,
facilita a criao de interfaces grficas, oferecendo a possibilidade de usufruir das
funcionalidades de ajuda escrita de cdigo disponibilizadas pelo Visual Studio e agiliza a
distribuio da ferramenta de clculo entre diferentes utilizadores.

Em conjunto com o Add-In foi tambm desenvolvida uma famlia em Revit parametrizada e
representativa do poo de fundao e que possibilita o armazenamento das informaes
geomtricas e no geomtricas, incluindo os dados de entrada e os parmetros provenientes do
clculo.
As caractersticas desta famlia so alteradas pelo prprio Add-In de forma automtica sendo
classificada com o cdigo A1010 do sistema Uniformat, correspondente ao item Standard
Foundations includo na seco Foundations/Substructures [8]. As propriedades da famlia
atrs especificadas permitem atribuir-lhe o nvel de desenvolvimento LOD 300.

3.1 Interface grfica


A interface grfica implementada do tipo modeless form e constituda por um formulrio
que permite ao utilizador selecionar no Revit a fundao a dimensionar, introduzir os dados
requeridos para o clculo e visualizar os resultados do dimensionamento (Figura 1). A utilizao
deste tipo de forms tem como vantagem permitir ao utilizador interagir com o programa sem a
necessidade de o encerrar, ao contrrio das modal forms [9]. Desta forma possvel operar o
Revit em todas as suas funcionalidades e simultaneamente visualizar e interagir com a interface
grfica, tornando a sua utilizao mais simples e intuitiva.

Figura 1: Interface grfica do tipo modeless form em ambiente Revit.

O formulrio includo na interface est dividido em 3 seces: uma seco de dados gerais para
introduo de informao geomtrica do poo (Figura 2a), uma seco de parmetros de anlise
para introduo de dados respeitantes s caractersticas mecnicas do solo e das cargas atuantes
na sapata (Figura 2b), e uma seco para visualizar os resultados do clculo (Figura 3), em
particular, os valores das aes e tenses atuantes no terreno, os valores dos deslocamentos e
rotaes do poo, as verificaes de segurana e ao fator de eficincia do dimensionamento do

385
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

poo. Aps o clculo, todos os dados so sincronizados com os parmetros do elemento de


fundao selecionado.

a) b)
Figura 2: Interface grfica: a) dados gerais; b) parmetros da anlise.

a) b) c)

d) e)
Figura 3: Interface grfica de resultados: a) valores de clculo das aes; b) valores das
tenses na base e faces laterais; c) deslocamentos e rotaes; d) verificaes de segurana e
coeficientes de segurana; e) fatores de eficincia.

386
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.2 Aspetos de utilizao


O Add-In desenvolvido traz inmeras vantagens na perspetiva do utilizador, nomeadamente: i)
a incorporao do dimensionamento automtico de um tipo de fundao geralmente no
includa nos programas de clculo automtico e muito utilizada na construo em Portugal, num
fluxo BIM; ii) fornecer ao projetista uma ferramenta de clculo expedita incorporada num
programa de modelao sem recorrer a um software intermedirio, como por exemplo o Excel;
iii) obter peas desenhadas do poo de fundao de forma dinmica e automtica; iv) otimizar
o dimensionamento dos poos de fundao; v) a possibilidade de incorporar propriedades
avanadas no objeto Revit, sobretudo de dados recolhidos em obra e relacionados com aspetos
de execuo, ensaios, monitorizao; vi) garantir a centralizao da informao relevante de
projeto, reduzindo os erros e omisses decorrentes da duplicao de dados e passagem incorreta
de informao entre diferentes intervenientes.

Apesar das muitas funcionalidades j implementadas o Add-In desenvolvido apresenta algumas


limitaes, nomeadamente, estar programado para utilizar apenas poos de fundao
retangulares, no permitir gravar ou pesquisar caractersticas dos solos numa base de dados, o
reduzido automatismo na introduo das aes de clculo, a falta de diferenciao em grandezas
fsicas dos dados gravados nos parmetros da famlia Revit o que obriga a que todos eles sejam
parmetros do tipo numrico, e a utilizao de um nico mtodo de dimensionamento do poo
de fundao.

3.3 Rotinas
A ferramenta Add-In foi desenvolvida recorrendo linguagem de programao C# que uma
linguagem orientada a objetos. Deste modo as rotinas de clculo foram naturalmente agrupadas
por diferentes classes representativas das propriedades da fundao (geomtricas e no
geomtricas), as metodologias de clculo de poos de fundao e a interao da interface grfica
com o programa Revit enquanto evento externo.

A forma de organizao do cdigo foi concebida para flexibilizar ao mximo a interao entre
as vrias rotinas. Assim, na prtica, aps o utilizador selecionar um determinado elemento os
dados de entrada do formulrio aparecem previamente preenchidos com a informao j
existente no elemento, alm de aps o clculo o Add-In avaliar se j existe, ou no, um tipo de
famlia com as caractersticas indicadas no formulrio. Caso exista, o tipo de famlia do
elemento selecionado modificado, caso no exista, criada uma nova famlia com as
caractersticas pretendidas que so atribudas ao elemento. Outro modo de o utilizador interagir
com o Add-In modificar os parmetros ou o tipo de famlia de um determinado elemento e
ordenar o seu clculo. Todos os dados do formulrio so atualizados a partir dos valores dos
parmetros do elemento e feito o clculo.

As formas de interao descritas so visualizadas atravs das classes principais Foundation,


CalculationMethods e ExtEventInteractionHandler (ver Figura 4).

A primeira responsvel por referenciar todas as propriedades geomtricas e no geomtricas


do poo, a segunda responsvel por aplicar o mtodo do Bloco Rgido com base nas
expresses apresentadas na Tabela 1, e a terceira responsvel por permitir a interao da form
com o Revit enquanto evento externo.

387
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

No caso da terceira classe principal, saliente-se que, como o Add-In constitudo por uma form
representada por uma classe fora do contexto do API Revit, as eventuais alteraes nos
contedos do documento Revit so negados. Deste modo a classe ExtEventInteractionHandler
chamada a intervir com a funo especifica de integrao do cdigo no API Revit, uma vez
que deriva da classe ExternalEvents.

O encadeamento do cdigo que o Add-In segue iniciado quando o utilizador clica no boto
Element Selection e seleciona um elemento (Figura 2a). Os parmetros do elemento so lidos
pela rotina ReadElementParameters da classe ExtEventInteractionHandler e expostos no
formulrio. Em seguida o utilizador procede s modificaes que entender e aps o clique no
boto Calculate (Figura 2a) o Add-In assume a informao contida no formulrio e a transponha
rotina CalcRigidBlockMethods da classe CalculationMethods para proceder ao clculo
segundo o mtodo do Bloco Rgido. Esta rotina serve-se de 4 outras rotinas, a CalcEccentricity
para clculo da excentricidade, a CalcDesignForces para a determinao dos esforos de
clculo, a CalcDisplacements para o clculo dos deslocamentos e finalmente da
CalcVerificationsAndEfficiency para a verificao da segurana e eficincia. A rotina
PolyThirdSquare faz parte tambm da classe CalculationMethods e serve para resolver um
polinmio de terceiro grau no caso da resultante das foras estar fora do ncleo central.
Aplicado o mtodo do Bloco Rgido a classe ExtEventInteractionHandler chamada
novamente a intervir, e atravs da rotina SelectOrCreateFamilySymbol, decide se atribui um
tipo de famlia j existente ou cria um novo com base nas dimenses introduzidas. A classe
Foundation existe com o intuito de referenciar todos os valores envolvidos e que dizem respeito
sapata e serve como veculo sua transmisso entre as rotinas das outras classes.

Figura 4: Estrutura do Add-In: classes principais e propriedades.

388
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Aplicao da ferramenta ao dimensionamento das fundaes de um pavilho metlico

4.1 Descrio
O pavilho metlico composto por uma estrutura porticada constituda por perfis metlicos
comerciais, laminados a quente. O edifcio encontra-se localizado na periferia de Vila Real a
1000 m de altitude, possuindo uma rea de implantao de 16 36 m2 e uma altura de 9 m.
A estrutura da nave industrial constituda por 7 prticos afastados entre si de 6 m, cujos pilares
so perfis metlicos HEB 550 e vigas asna IPE 360. A ligao entre os prticos nas faces laterais
e na cumeeira da cobertura realizada por intermdio de vigas de travamento HEB 220. O
contraventamento dos prticos realizado atravs de cantoneiras do tipo L120 120 10
dispostas em cruz de Santo Andr. A estrutura que acolhe as cargas rolantes constituda por
vigas de caminho de rolamento IPE 600 apoiadas em consolas curtas IPE 240 escoradas com
perfis do mesmo tipo. A cobertura inclinada com duas guas constituda por madres
materializadas em perfis metlicos UNP 160 que apoiam as chapas do tipo sandwich como
revestimento.

O solo de fundao dotado das seguintes caractersticas: peso especifico 19 kN/m3, tenso
admissvel igual a 300 kPa, ngulo de atrito interno igual a 30, e um comportamento elstico
caracterizado por um coeficiente de Winkler vertical e horizontal igual a 100000 kN/m3.
A Figura 5 apresenta uma planta, um alado lateral e um corte da estrutura analisada.

a)

b) c)
Figura 5: Pavilho metlico: a) planta da cobertura; b) alado lateral; c) corte transversal.

389
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.2 Modelo numrico


O modelo de anlise estrutural foi desenvolvido no programa Autodesk Robot Structural
Analysis [10]. Na Figura 6 ilustra-se a perspetiva tridimensional do modelo numrico
desenvolvido.

Figura 6: Modelo numrico.

Os diversos elementos estruturais foram simulados numericamente com recurso a elementos


finitos de barra com 6 graus de liberdade por n. As barras de contraventamento foram dotadas
de ligaes rotuladas restante estrutura e foram assumidos encastramentos para os ns de
apoio dos pilares dos prticos. Relativamente s aes atuantes na estrutura, para alm do peso
prprio estrutural foram consideradas as cargas devidas restante carga permanente e
sobrecarga que atuam na cobertura, ao vento atuante nas duas direes principais do edifcio,
em cada um dos sentidos, neve e carga rolante. Foram calculadas as combinaes de aes
de acordo com a norma EN 1990 [11] contemplando os estados limites ltimos de rotura do
terreno (GEO) e de equilbrio (EQU).

4.2 Resultados
Os resultados obtidos da anlise estrutural conduziram seleo das reaes apresentadas na
Tabela 2, correspondentes s combinaes de aes C1 a C8, como as mais condicionantes para
o dimensionamento dos poos de fundao.

Tabela 2: Valores dos esforos na base dos pilares para 8 combinaes de aes em estados
limites ltimos.
FX (kN) FY (kN) FZ (kN) MX (kN.m) MY (kN.m) MZ (kN.m)
C1 -25.02 -13.73 -54.73 12.25 -6.2 0.67
C2 10.43 -57.57 348.94 122.6 -23.37 3.16
C3 6.73 78.91 227.85 -310.15 0.97 -0.15
C4 2.88 -78.7 155.5 293.91 -3.07 0.47
C5 -28.52 -52.61 250.42 95.06 -29.48 3.23
C6 36.26 6.96 -1.37 -2.01 27.14 -0.18

O Add-In foi aplicado ao caso prtico com base na introduo manual dos esforos associados
a cada combinao de aes em estado limite ltimo, por meio de um processo iterativo baseado
no ajuste das dimenses da sapata e do poo de fundao (ver Figura 7).

390
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Factor de Segurana - Direco X Factor de Segurana - Direco Y Eficincia - Direco X Eficincia - Direco Y
A B H h1
Base Lateral Base Lateral Base Lateral Base Lateral
1.20 1.20 2.00 0.80 3.47 5.27 3.73 7.88 29% 19% 27% 13%
1.50 1.50 2.00 0.80 3.08 7.52 3.26 11.30 32% 13% 31% 9%
C1 1.20 1.50 2.00 0.80 3.33 6.58 3.38 9.04 30% 15% 30% 11%
1.20 1.60 2.00 0.80 3.29 3.30 7.02 9.53 30% 14% 30% 10%
1.20 1.50 3.00 0.80 2.65 10.69 2.65 13.87 38% 9% 38% 7%
1.20 1.50 2.00 0.80 1.00 80.40 0.78 1.61 100% 1% 128% 62%
2.00 2.00 2.00 0.80 1.56 110.15 1.25 3.64 64% 1% 80% 28%
C2 2.00 2.00 3.00 0.80 1.33 120.56 1.21 4.84 75% 1% 83% 21%
1.50 2.00 3.00 0.80 1.18 115.27 1.05 3.63 85% 1% 95% 28%
2.00 1.50 3.00 0.80 1.18 90.42 1.09 4.27 85% 1% 91% 23%
1.50 2.00 3.00 0.80 1.40 57.20 1.10 2.00 72% 2% 91% 50%
C3
2.00 2.00 3.00 0.80 1.53 64.34 1.25 2.67 65% 2% 80% 37%
1.50 2.00 3.00 0.80 1.58 204.11 1.21 2.06 63% 0% 83% 48%
C4
2.00 2.00 3.00 0.80 1.70 226.74 1.36 2.75 59% 0% 73% 36%
1.50 2.00 3.00 0.80 1.32 13.64 1.21 4.22 76% 7% 83% 24%
C5
2.00 2.00 3.00 0.80 1.45 15.34 1.36 5.63 59% 7% 73% 18%
1.50 2.00 3.00 0.80 2.05 9.06 2.16 44.86 49% 11% 46% 2%
C6
2.00 2.00 3.00 0.80 2.03 10.22 2.16 59.81 49% 10% 46% 2%

Figura 7: Resumo dos principais resultados do processo iterativo de clculo baseado no ajuste
das dimenses da sapata e do poo de fundao.

O processo iterativo teve inicio com uma sapata de dimenses 1.201.200.8 m e com um poo
de fundao de profundidade 2 m. Para a combinao de aes C1 chegou-se s dimenses de
uma sapata de 1.201.500.8 m e o poo de fundao com uma profundidade de 2 m. Esta foi
a soluo que apresenta valores dos fatores de eficincia mais prximos em ambas as direes,
na base e nas faces laterais do poo (ver Figura 7). Com base nesta soluo partiu-se para o
clculo para a combinao de aes C2 e constatou-se que a mesma no cumpria as verificaes
de segurana exigidas, como atesta um dos correspondentes valores do fator de eficincia
superior a 100%. Assim, por meio de iteraes sucessivas, chegou-se soluo tima de uma
sapata de 1.502.000.8 m e um poo de fundao com 3 m de profundidade, como atestam os
fatores de eficincia (ver Figura 7). Esta soluo foi depois testada com sucesso para as restantes
combinaes de aes (C3 a C6), pese embora se tenham tentado sapatas de dimenses
diferentes com o intuito de atingir uma soluo mais otimizada, no entanto, tal no foi
verificado com se demonstra nas diversas tentativas ilustradas na Figura 7.

A Figura 8 exemplifica os resultados obtidos atravs do Add-In para a soluo encontrada, ou


seja, uma sapata com dimenses 1.502.000.8 m e o poo de fundao com 3 m de
profundidade, e para a situao em que est sujeita s aes da combinao C6.

391
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Aspeto dos resultados apresentados pelo Add-In.

5. Concluses e desenvolvimentos futuros

O presente artigo realiza a descrio de uma ferramenta BIM para o dimensionamento de poos
de fundao assente uma metodologia analtica de dimensionamento baseada no mtodo do
Bloco Rgido. Para o efeito foi desenvolvido um Add-In no programa Revit, programado com
base na linguagem por objetos C# e assente numa interface grfica interativa e de simples
utilizao.
A aplicao desta ferramenta ao caso das fundaes de um pavilho metlico permitiu
comprovar a sua eficincia e robustez tendo em vista a obteno de solues mais econmicas
e cumprindo os requisitos regulamentares estabelecidos pelos Eurocdigos. Acresce que o
recurso ferramenta BIM desenvolvida possibilita aos projetistas tomarem decises mais
sustentadas e menos baseadas na experincia, permitindo a criao de mltiplos cenrios com
brevidade e viabilizando a soluo mais adequada.

Por ltimo, importa salientar os trabalhos em curso, ou a realizar no futuro, ao nvel do


desenvolvimento da ferramenta BIM apresentada, nomeadamente: i) evoluir o Add-In e a
famlia Revit de modo a possibilitar a utilizao de parmetros associados a grandezas fsicas
e respeitando as diretivas do IFC, viabilizando, deste modo, a interoperabilidade com outros
programas; ii) a ligao ao programa de clculo de estruturas Autodesk Robot tendo em vista a
importao automtica dos esforos na base dos pilares do modelo numrico; iii) a aplicao
de algoritmos avanados de otimizao, em particular os algoritmos genticos e as redes
neuronais, perspetivando a busca de solues mais otimizadas, e iv) o desenvolvimento de uma
aplicao Android para telemvel, que permitir aceder remotamente ferramenta

392
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

desenvolvida, possibilitando uma tomada de deciso mais rpida e eficiente, e particularmente


til no contexto de reunies de projeto ou em obra.

Referncias

[1] Eastman, C.; Teicholz, P.; Sacks, R.; Liston, K. BIM Handbook: A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers, and Contractors.
Hoboken, New Jersey, John Wiley & Sons, Inc, 2011.
[2] Azhar, S. Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry. Leadership Manage, 15/06/2011, 241252.
[3] Freitas, M. (2005) Apontamentos de Fundaes Encastradas no Terreno Poos de
Fundao. Unidade curricular de Fundaes e Estruturas de Suporte do Mestrado
Integrado em Engenharia Civil. FEUP, Porto.
[4] Salas, J. (1980) Geotcnia y cimientos III. Cimentaciones, excavaciones y aplicaciones
de la geotcnia. Volume 1. Editorial: Rueda. Espanha.
[5] Delesques, R. (1983) - Calcul des Fondations, Rubrique du Praticien. Construction
Mtallique, n 3. France.
[6] Microsoft Visual Studio (2015) - Visual Studio Homepage, specifications and features.
URL: https://www.visualstudio.com/vs/ (consultado em outubro de 2016).
[7] Autodesk Revit (2015) - Autodesk Web Page, My First Plugin Training.
http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=20132893 (consultado
em outubro de 2016).
[8] BIM Forum (2016) Level Of Development Specification, For Building Information
Models, Version 2016 August 25.
[9] Microsoft Developer Network (2016) Visual Basic Concepts, Modal and Modeless
Dialog Boxes. https://msdn.microsoft.com/en-us/library/aa263470(v=vs.60).aspx
(consultado em outubro de 2016).
[10] RSA (2015) - Manual do Robot Structural Analysis Professional 2015. URL:
http://help.autodesk.com/view/RSAPRO/2015/ENU/ (consultado em outubro de 2016).
[11] EN 1990 (2009) - Eurocdigo: Bases para o projeto de estruturas. Comit Europeu de
Normalizao (CEN). Bruxelas, Blgica.

393
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

394
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

DESENVOLVIMENTO DE UM SOFTWARE PARA A


DETERMINAO E MITIGAO DO ESCOAMENTO SUPERFICIAL
Lus Sanhudo (1), Joo Poas Martins (2)

(1) Faculdade de Engenharia da Universidade do Porto, Porto


(2) Faculdade de Engenharia da Universidade do Porto, Porto

Resumo
Com a crescente consciencializao em torno do tpico sustentabilidade ao longo dos ltimos
anos, este conceito comeou a ser aplicado maioria dos sectores econmicos da nossa
sociedade, com a Indstria da Construo em particular a ter um impacto considervel nas
denominadas aces sustentveis. No entanto, embora tenham sido realizados esforos para
quantificar a sustentabilidade de um edifcio, a complexidade do termo e o seu mtodo de
avaliao pouco expedito, desafiam a sua fcil avaliao.

Considerando os enormes benefcios oferecidos pelo Building Information Modelling (BIM) na


utilizao de modelos ricos em informao, os obstculos previamente enunciados sero
abordados propondo um software em Dynamo linguagem de programao visual (VPL)
associada ao Autodesk Revit que estabelea uma ligao com o modelo BIM do edifcio.
Desta forma, o software contribui para a actualizao desta avaliao, simplificando os seus
termos, facilitando os seus clculos e auxiliando na escolha dos crditos a perseguir.

No entanto, visto a sustentabilidade ser um tema muito amplo, neste artigo a certificao
Leadership in Energy and Environmental Design (LEED), mais especificamente os crditos
relacionados com a gesto do escoamento superficial de guas pluviais, serviram de exemplo,
possibilitando a retirada de concluses que possam ser adaptadas certificao no geral.

1. Building Information Modelling

Nos ltimos anos, a capacidade para analisar e representar informaticamente modelos


tridimensionais de edifcios tem vindo a aumentar significativamente. Mais recentemente, o
aparecimento do Building Information Modeling (BIM) introduziu enormes alteraes na
indstria da Arquitetura, Engenharia e Construo (AEC), transformando um setor altamente

395
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

baseado em software de desenho assistido por computador (CAD) num sector dependente de
uma correta gerao, gesto, e transferncia de informaes entre os seus intervenientes.

Consequentemente, hoje em dia a indstria incentiva a anlise do modelo digital no apenas


como uma representao tridimensional do edifcio, mas tambm como um prottipo virtual.
Neste, possvel simular condies reais com vista a obter informao vital para o alcance da
eficincia exigida pelos investidores. Com este objetivo, a modelao paramtrica tem-se
mostrado extremamente eficaz na criao de modelos flexveis e adaptveis que facilitem a
combinao destes modelos digitais com ferramentas de anlise, otimizao e automao. Assim,
o uso destas ferramentas de simulao e anlise computacional, acompanhadas por um leque
de tcnicas de otimizao, permitem a anlise de vrios critrios de desempenho
simultaneamente. Isto permite obter um espectro de solues que satisfaam um conjunto de
objetivos pr-definidos, que a equipa de projeto pode avaliar e comparar nas fases preliminares
do projeto. Desta forma, este artigo pretende explorar esta tecnologia aliada ao tema da
sustentabilidade na construo.

2. Sustentabilidade na Indstria da Construo

No final do milnio, a sustentabilidade tornou-se num dos temas mais debatidos no Mundo mas,
discutivelmente, um dos menos compreendidos. Com a crescente consciencializao em torno
deste tpico, o conceito de sustentabilidade comeou a ser aplicado maioria dos sectores
econmicos, com a indstria da construo em particular a ter um impacto considervel nas
aes sustentveis da nossa sociedade [1]. Isto levou criao de normas de construo,
certificaes e sistemas de avaliao destinados a mitigar o impacto dos edifcios no meio
ambiente atravs do design sustentvel [2]. Desta forma os edifcios apresentariam um melhor
impacto ambiental e social na comunidade envolvente e, em simultneo, adquiriam novas
vantagens econmicas para o proprietrio, nomeadamente sobre a forma de marketing.

Criadas na dcada de 1990, estas ferramentas tiveram um crescimento exponencial no incio


dos anos 2000 como comprovado pelas 17 ferramentas apresentadas por Haapio e Viitaemi [3],
das quais apenas cinco se encontram entre as 26 revistas por Khasreen et al. [4]. Este
crescimento habitualmente atribudo aos sistemas de pontuao fortemente influenciados pelo
tipo de construo em estudo [5] e s situaes climticas, culturais e legais dos diversos pases
[1]. Ou seja, apesar dos conceitos base e as necessidades avaliadas serem semelhantes, devido
a todas estas vastas diferenas, atualmente diversos pases possuem dezenas de certificados,
resultando em centenas espalhadas pelo mundo. Neste artigo o certificado Leadership in Energy
and Envionmental Design (LEED) foi escolhido como representante destas ferramentas,
servindo de exemplo para o estudo da automatizao deste tipo de certificados.

O LEED um sistema voluntrio, baseado no sistema de classificao estabelecido pelo United


States Green Building Council (USGBC) para avaliar a sustentabilidade ambiental de um
edifcio [6]. Aps a sua introduo em 2000, a difuso no mercado e a popularidade do LEED
tem vindo a aumentar em todo o mundo [7]. Ao longo da sua histria de 16 anos, este certificado
manteve-se um ponto de referncia do green design [8], exibindo uma check list periodicamente
atualizada, composta por vrios crditos relacionados no s com o impacto ambiental do

396
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

edifcio, mas tambm com o seu impacto social e econmico. Entre estes crditos um dos temas
recorrentes o escoamento superficial de um edifcio, que serviu de exemplo neste artigo.

O escoamento superficial tem, nas ltimas dcadas, manifestando-se como uma das principais
causas de problemas no meio urbano, em grande parte devido ao incremento percentual de
populao mundial residente em cidades [9]. Como tal, as reas urbanas so continuamente
expandidas no s em termos de espao, mas tambm de densidade provocando o aumento das
superfcies impermeveis que, por sua vez, tem inmeras consequncias para as infraestruturas
da cidade bem como para o ambiente natural envolvente [10]. Consequentemente, a infiltrao
diminui e a presso sobre as infraestruturas de guas pluviais aumenta, criando problemas em
reas urbanas tais como [11]: poluio dos recetores naturais de gua; inundaes; deficit de
reposio de gua subterrnea; reduo do fluxo base da gua; entre outros. A proliferao de
superfcies impermeveis permite que a gua chegue aos rgos de armazenamento naturais
mais rapidamente elevando os picos de escoamento superficial, o que resulta em profundas
alteraes no curso de gua e na degradao de habitats naturais. Alm disso, dependendo do
uso do solo dentro da bacia, nutrientes, substncias txicas, materiais em suspenso, entre
outros poluentes, podem ser transportados por terra para cursos de gua naturais, tornando o
escoamento superficial numa potencial fonte de poluio [12]. Com a inteno de remover e
aproveitar o escoamento superficial, as Low-Impact Development (LID) Best Managing
Practices (BMP) devem ser implementadas.

De facto, atualmente o escoamento superficial reconhecido como um recurso que deve ser
usado para benefcios sociais, ambientais e econmicos. Assim, as LID-BMP tipicamente tm
como objetivo armazenar esta gua por longos perodos de tempo, filtrando-a e reutilizando-a
ou, simplesmente, eliminando-a por evaporao e infiltrao com o volume restante sendo
lentamente libertado para um recipiente natural. Com este propsito as LID-BMP devem ser
implementadas o mais cedo possvel num projeto, por forma a integrar estas medidas o mais
facilmente possvel com a paisagem natural e o plano de construo local [13].

Por fim, devido complexidade do conceito de sustentabilidade e ao mtodo de avaliao pouco


expedito associado a estes certificados, o tempo e custos necessrios para os adquirir podem
ser to elevados que obscurecem as possveis vantagens a serem adquiridas. Desta forma, neste
artigo, os conceitos acima mencionados so aplicados no desenvolvimento de um software
BIM, que procura oferecer uma forma rpida, fcil e intuitiva de automatizar crditos LEED
ligados ao controlo do volume do escoamento superficial.

3. StormWater Runoff

O software criado, intitulado StormWater Runoff, tem dois objetivos:


Determinar automaticamente o escoamento superficial de qualquer edifcio,
independentemente do seu uso;
Corrigir o escoamento previamente determinado atravs da concepo e proposta
automtica de solues utilizando LID-BMP.

397
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Para funcionar correctamente este software foi equipado com as exigncias encontradas nos
crditos LEED e o Mtodo Racional. Desta forma, o utilizador encontra no programa um
objectivo adequado e conciso a atingir, ao mesmo tempo que dispe dos meios para o alcanar.
Na criao deste software foram utilizadas vrias ferramentas BIM, nomeadamente o Revit, o
Dynamo (linguagem visual de programao) e o Dyno (software que serve de interface a
aplicaes criadas usando Dynamo).

O utilizador final representado principalmente como um profissional ligado indstria da


AEC, como por exemplo um arquiteto, engenheiro, proprietrio, entre outros; no entanto, o
software tambm poder ser utilizado por uma pessoa menos especializada, sem qualquer
ligao indstria da AEC. Este segundo utilizador uma parte essencial do software.

No site oficial do LEED, sugerida a contratao de profissionais credenciados e o uso de


manuais LEED, com o objectivo de identificar quais os crditos a serem perseguidos para
atingir um determinado patamar da certificao. O custo desta tarefa por si s pode ultrapassar
os 10.000, dependendo dos prazos, do nvel de certificao, da complexidade do projeto e da
calendarizao [14]. No entanto, utilizando o programa proposto, este custo pode ser
consideravelmente reduzido atravs da introduo de uma mnima quantidade de informao,
permitindo ao utilizador distinguir crditos relacionados com o escoamento superficial que
possam ser facilmente obtidos. Assm, este software foi desenvolvido para se comportar como
um programa tcnico com foco na obteno de conhecimentos especficos da AEC, utilizando
uma simples e intuitiva interface e uma linguagem adequada a um utilizador no especializado.
No entanto, embora sejam tomadas medidas para abranger o utilizador comum, tambm
possvel especificar mais detalhadamente a maioria dos inputs, a fim de alcanar um
escoamento com maior preciso. Este aspecto do programa conseguido no s atravs do uso
de bases de dados XML de fcil acesso e edio, mas tambm atravs da funcionalidade
override. Esta funcionalidade destina-se a utilizadores mais experientes, que pretendem utilizar
este software como uma ferramenta de preciso, cujo propsito substituir os valores mdios
armazenados na base de dados por valores calculados pelo utilizador. Assim, como objectivo
final subjacente ao software, este programa permite ao utilizador reunir todas as informaes
necessrias para validar qualquer um dos 62 crditos relacionados com a quantidade de
escoamento superficial do LEED V4, somados dos 20 crditos da verso LEED V3, que ainda
so possveis de adquirir. Por fim, este software pode ainda ser utilizado para justificar decises
tanto nas fases iniciais do projecto, como na fase de construo ou manuteno.

Como j mencionado, para o software funcionar necessria muito pouca informao. De facto,
os inputs esto limitados a algumas variveis relacionadas com a precipitao local, utilizao
do edfcio e preferncias do utilizador que indicam as prioridades no clculo das LID-BMP.
As restantes informaes so obtidas a partir do modelo Revit. No entanto, como j indicado,
para eficazmente alcanar um edifcio sustentvel necessrio considerar e incorporar as
questes da sustentabilidade numa fase preliminar do projecto. Assim, o modelo do edifcio
pode ainda estar pouco desenvolvido o que torna o Level of Development (LOD) do modelo um
conceito fulcral na conceo deste software [15]. Desta forma, conseguiu-se alcanar os
objectivos iniciais do programa utilizando apenas as reas horizontais do edifcio em estudo.
No entanto, para um correcto desempenho do programa, estas reas tm que se encontrar
devidamente categorizadas, com cada elemento a corresponder a uma das seguintes categorias

398
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

do Revit: Roofs, Floors e Topography. Isto resulta numa especificao mnima de LOD 200 ou,
se possvel, LOD 300 para alcanar uma maior preciso nos resultados indicados pelo software.

3.1 Arquitectura do Programa


O software desenvolvido divide-se em duas partes: Initial Runoff e LID-BMP. Na primeira
parte, "Initial Runoff", o utilizador encontra um conjunto de inputs necessrios ao correcto
funcionamento do software. Estes inputs so introduzidos no Dyno e enviados para o programa
atravs da ligao entre o Dyno e os input nodes (algoritmos grficos que substituem as tpicas
linhas de cdigo no Dynamo) do Dynamo. De salientar os override inputs, uma vez que, como
possvel constatar na Figura 1 onde se encontra ilustrado o fluxograma do programa, estes
alteram drasticamente o funcionamento do software. De facto, para obter o escoamento inicial,
o software extrai informaes do modelo Revit e da base de dados, utilizando uma enorme
quantidade de computao para o fazer. No entanto, se o utilizador substituir os valores
predefinidos, o software no requer a informao armazenada na base de dados, excluindo esta
ligao.

Figura 1: Arquitetura do programa.

Utilizando ou no esta funo, se todos os inputs forem correctamente introduzidos, esta


primeira parte permite calcular o volume total de escoamento superficial, utilizando para isso o

399
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Mtodo Racional em conjugao com as curvas de intensidade, durao e frequncia (IDF)


relativas zona em estudo [16]. Os valores destas curvas so obtidos atravs da ligao a uma
base de dados independente, que pode ser expandida para acomodar informao relativa a
qualquer pas mas que, para o presente artigo, inclui apenas informao relativa a Portugal.
Obtido o valor do escoamento inicial, o utilizador pode agora utilizar a segunda parte do
programa: o "LID-BMP". Esta segunda parte calcula os vrios LID-BMP disponibilizados pelo
software (cisterns, green roofs, permeable pavement, rain barrels, rain gardens e swales) para
alcanar o crdito LEED escolhido ou atingir um determinado volume de escoamento
superficial final. Na primeira opo o software calcula o escoamento a ser mitigado atravs dos
requisitos LEED, enquanto que na segunda f-lo atravs da subtrao do escoamento final
desejado pelo inicial. Uma vez determinado o escoamento a ser eliminado, o software calcula
mltiplas solues para alcanar o escoamento final. Obviamente, estes clculos dependeram
dos restantes inputs introduzidos, nomeadamente os que se encontram relacionados com a
prioridade atribuda s vrias variveis do clculo. Adquirida a melhor soluo, o software
exibe os LID-BMPs necessrios, respectivas reas ocupadas e custos individuais.

4. Caso de Estudo

No mbito deste artigo, fulcral o desenvolvimento de um caso de estudo que permita uma
melhor compreenso das capacidades e restries do software criado. Este captulo foca a
criao e descrio do modelo paramtrico usado juntamente com o programa, o executar deste
software e, por fim, a anlise dos resultados obtidos. Assim, este captulo visa contextualizar a
utilidade do programa StormWater Runoff na indstria da AEC, validando a capacidade de
produzir valores rigorosos de escoamento superficial e de gerar automaticamente solues
ambientalmente favorveis para o corrigir.

O modelo BIM estudado baseia-se no Departamento de Engenharia Civil da Faculdade de


Engenharia da Universidade do Porto (FEUP), Porto, Portugal. Como demonstrado pela Figura
2, o modelo em estudo apresenta dois corpos principais dispostos em T.

Figura 2: Departamento de Engenharia Civil da FEUP.

400
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.1 Construo do Modelo


Considera-se que o modelo apresenta um nvel de detalhe superior ao exigido pela tarefa de
verificao a realizar, dado que os nicos elementos paramtricos que realmente precisam estar
corretamente modelados pertencem s seguintes categorias do Revit: Topography, Roofs, e
Floors; ou seja, s categorias que possam contribuir para o escoamento superficial. Como tal,
usando as propriedades do Revit, foi possvel constatar que existem 29 elementos em categorias
de interesse: 1 Topography, 5 Roofs e 24 Floors. A enorme quantidade de pisos deve-se ao
facto de as escadas exteriores estarem categorizadas como Floors. Foi tambm possvel obter
as respectivas reas, totalizando cerca de 2115 m2 de Topography, 1883 m2 de Roofs e 8213 m2
de Floors. Estes valores sero utilizados como validao de vrios resultados do software na
seco 4.6.

4.2 Formulao do Problema


As capacidades do programa tm como propsito completar os seguintes objetivos:
Obter o atual escoamento superficial criado pelo Departamento de Engenharia Civil
com a devida preciso para ser utilizado na segunda parte do software;
Executar a segunda parte do programa com o objectivo de alcanar o crdito "LEED
O+M: Schools" atravs da implementao de infra-estruturas LID-BMP;
Calcular a rea e os custos associados s LID-BMP implementadas no objectivo
anterior.

Como tal, o primeiro passo identificar a utilizao associada a cada categoria do modelo Revit,
por forma a obter o respectivo coeficiente de escoamento (CE) superficial armazenado na base
de dados [16]. Posteriormente, a zona pluviomtrica do edifcio (obtida pelas curvas IDF) deve
ser identificada juntamente com o perodo de retorno e a durao da chuvada. Aps a execuo
da primeira parte do software, os resultados obtidos so introduzidos na segunda parte como
inputs. Estes incluem o escoamento superficial inicial, as reas de cada categoria, os respectivos
CE, e ainda a intensidade e durao da tempestade. De seguida, selecionado o crdito LEED
a obter e as prioridades a contabilizar na escolha da melhor soluo de LID-BMP.

4.3 Condies Iniciais Primeira parte do programa


Como j referido, os primeiros inputs a serem selecionados so o uso das vrias categorias ou,
em alternativa, o valor do CE a servir de override. No que diz respeito aos Roofs, o valor
indicado na base de dados [16] de 0,85, obtido do intervalo entre 0,75-0,95. Contudo, para
compensar o facto de o telhado ser plano (diminui significativamente o CE superficial), o valor
de 0,80 foi o utilizado como override. De seguida, os Floors adoptaram o uso do solo Business
com um CE de 0,75, uma vez que, o edifcio maioritariamente constitudo por escritrios e
secretariados. Por ltimo, a Topography adquiriu o uso Lawn, com um CE de 0,20.

Em seguida, os inputs relacionados com a chuvada (durao, perodo de retorno e zona


pluviomtrica) tm de ser determinados. Comeando pelo perodo de retorno, e segundo a
bibliografia LEED sugerida [17], o valor escolhido foi 10 anos. Este valor encontra-se tambm
de acordo com o Regulamento Geral dos Sistemas Pblicos e Prediais de Distribuio de gua
e de Drenagem de guas Residuais [18], Artigo n. 210, que indica um perodo de retorno
mnimo de 5 anos. A durao seleccionada foi de 10 minutos. Este valor est novamente de

401
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

acordo com a bibliografia LEED e o regulamento Portugus que, no Artigo n. 128, indica um
intervalo entre 5 e 15 minutos, dependendo da inclinao da superfcie. Sendo o local bastante
nivelado, foi selecionado o valor mdio. Por ltimo, consultando as zonas pluviomtricas
Portuguesas, foi selecionada a zona A. Todos estes inputs podem ser vistos na Figura 3.

4.4 Condies Iniciais Segunda parte do programa


Na segunda parte do software a maioria dos inputs necessrios so adquiridos aps a execuo
da primeira parte. Desta forma, esses valores no podem ainda ser discutidos. No entanto, os
inputs relativos aos LID-BMP e s prioridades a serem tidas em conta durante o clculo podem
j ser definidos. Assim, o software tem como objectivo tentar alcanar o crdito " LEED O+M",
usando para isso a combinao mais barata dos seguintes LID-BMP: Rain Barrels (mximo de
10), Permeable Pavement e Green Roofs. Todos estes inputs encontram-se na Figura 3.

4.5 Anlise e Discusso dos Resultados Primeira parte do programa


Nesta seco os resultados obtidos a partir do software sero apresentados e amplamente
discutidos a fim de provar a exactido e usabilidade do programa. Como tal, na Figura 3,
possvel observar um volume de escoamento inicial de aproximadamente 50405 litros, e ainda
outros valores necessrios para o correcto funcionamento da segunda metade do software.

Destes valores, alguns podem ser rapidamente determinados como correctos atravs de uma
simples comparao entre os resultados obtidos e a informao armazenada no modelo Revit e
na base de dados. Por exemplo, por anlise da Figura 2, facilmente se conclui que os elementos
das categorias Roofs e Topography contribuem em toda a sua extenso para o volume de
escoamento. Como tal, comparando as reas do Revit presentes na seco 4.2 com as obtidas
na Figura 3, possvel deduzir que estas reas se encontram correctas. Alm disso, tambm
compreensvel que a rea apresentada pelo software referente aos Floors seja inferior exibida
na seco 4.2, visto grande parte da categoria no ser atingida pela chuva. Finalmente,
comparando os CE apresentados na Figure 4.3 (indicados como "RC"), com o coeficiente que
foi overrided e os que esto presentes na base de dados [16], evidencia-se que esto corretos.

402
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Inputs (a verde) e resultados (a rosa) da 1. (esq.) e 2. (dir.) partes do programa.

No entanto, as concluses acima mencionadas no validam por si s o volume de escoamento


superficial inicial. Assim, o valor real deve ser calculado manualmente, atravs das equaes 1
e 2 do Mtodo Racional, respectivamente para determinar a intensidade da chuvada e o volume
de escoamento superficial (a primeira equao deriva das curvas IDF de Lisboa, Portugal ):

I = atb = 290.6810-0.549 = 82.116 mm/h = 0.0821 m/h (1)

Q = ACI = (1882.6250.80+2338.7190.75+2115.0080.2)0.082
= 3683.1410.082 = 302.018 m3 /h = 302017L/h 50336 L (2)
50406 L

De salientar que a diferena entre o escoamento obtido manualmente e o valor exibido pelo
software devido ao software trabalhar com nmeros de quinze dgitos (resultando em nove
casas dcimais) enquanto que os clculos manuais utilizaram apenas trs casas decimais.

4.6 Anlise e Discusso dos Resultados Segunda parte do programa


Na segunda parte, o software tenta alcanar o crdito " LEED O+M" usando a combinao mais
barata dos seguintes LID-BMP: Rain Barrels, Green Roofs, e Permeable Pavement. Assim, o
software indica a utilizao de 1844,1 m2 de pavimento permevel como a nica LID-BMP
necessria. Para validar este resultado trs aspectos devem ser abordados:

O primeiro a constatao de que o Permeable Pavement de facto a medida mais barata.


Analisando os custos presentes na base de dados do software [16], possvel concluir que com
um preo de 65 /m2, este LID-BMP o mais barato, resultando num total de 119867.9 .

403
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Custo do Permeable Pavement = Custo rea = 651844.1 = 119867.9

O segundo a rea ocupada. Ao analisar os inputs da segunda parte do software, possvel


verificar que a rea total introduzida referente ao Floor (nica rea relevnte para o Permeable
Pavement) de 2338.719 m2. Como tal, uma vez que os 1844.122 m2 associados ao Permeable
Pavement pelo programa so inferiores rea real disponvel, este aspecto tambm validado.
O terceiro e ltimo aspecto a reduo do volume de escoamento superficial necessrio para o
crdito LEED O+M. De facto, este crdito exige a reduo de pelo menos 25% do volume
de escoamento superficial inicial, ou seja, mitigao de 12601.498 litros neste caso de estudo:

Q(Permeable Pavement) = ACI = 1844.122(0.75-0.25)0.082 = 75.609 m3 /h = 75609 L/h

V(Permeable Pavement) = 7560910 minutos 160 = 12601.500L 12601.5 L

Com o objectivo de esclarecer este clculo, deve ser mencionado que a subtrao apresentada
acima se traduz na subtrao entre o CE da categoria Floor pelo CE do Permeable Pavement.

5. Concluses

Os dois temas principais deste artigo, Sustentabilidade e BIM, foram combinados para
automatizar crditos LEED. Embora o software criado concentre-se nos crditos relacionados
com o escoamento de guas pluviais, procurou-se generalizar esta metodologia a outros crditos
que podero ser facilmente automatizados. Com efeito, considera-se que os crditos
mencionados neste artigo so dos mais difceis de automatizar visto existirem crditos
relacionados com a orientao do edifcio, a proximidade a servios, entre outros, podem ser
determinados utilizando apenas a informao armazenada no modelo Revit.

A relevncia do software foi tambm comprovada na exibio das suas capacidades no caso de
estudo, e atravs dos factos referentes importncia das certificaes de sustentabilidade e
sua respectiva complexidade e custos. Este programa responde ainda falta de software tcnico
destinado ao pblico geral, selecionando cuidadosamente a linguagem aplicada e inputs
necessrios. Alm disso, graas utilizao de bases de dados flexveis e simples de modificar,
o software encontra-se tambm equipado para responder a consideraes mais tcnicas da
indstria da AEC podendo, eventualmente, ser utilizado como ferramenta de design no apoio
tomada de decises nas fases preliminares do projeto.

Referncias

[1] T. Ebert, N. Essig, and G. Hauser, Green Building Certification Systems: Assessing
Sustainability-International System Comparison-Economic Impact of Certifications:
Walter de Gruyter, 2011.
[2] S. Vierra, "Green Building Standards and Certification Systems," Green Building

404
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Standards and Certification Systems. October, vol. 27, 2014.


[3] A. Haapio and P. Viitaniemi, "A critical review of building enrironmental assessment
tools," Environmental impact assessment review, vol. 28, pp. 469-482, 2008.
[4] M. M. Khasreen, P. F. Banfill, and G. F. Menzies, "Life-cycle assessment and the
environmental impact of buildings: a review," Sustainability, vol. 1, pp. 674-701, 2009.
[5] T. Saraiva, M. G. d. Almeida, and L. Bragana, "Analysis and selection of indicators for
a sustainability assessment method for school buildings based on SBToolPT," 2015.
[6] U. S. G. B. C. USGBC, "An Introduction to the US Green Building Council and the
LEED Green Building Rating System," PowerPoint presentation on the USGBC website,
2005.
[7] J. H. Scofield, "Efficacy of LEED-certification in reducing energy consumption and
greenhouse gas emission for large New York City office buildings," Energy and
Buildings, vol. 67, pp. 517-524, 2013.
[8] J. Cidell, "A political ecology of the built environment: LEED certification for green
buildings," Local Environment, vol. 14, pp. 621-633, 2009.
[9] U. N. D. P. UNDP, Human Development Report 2007/2008 - Fighting climate change:
Human solidarity in a divided world: Palgrave Macmillan, 2008.
[10] J. C. Berndtsson, "Green roof performance towards management of runoff water quantity
and quality: A review," Ecological Engineering, vol. 36, pp. 351-360, 2010.
[11] H. W. Thurston, "Opportunity costs of residential best management practices for
stormwater runoff control," Journal of water resources planning and management, vol.
132, pp. 89-96, 2006.
[12] C. L. Arnold Jr and C. J. Gibbons, "Impervious surface coverage: the emergence of a
key environmental indicator," Journal of the American planning Association, vol. 62, pp.
243-258, 1996.
[13] H. Jia, Y. Lu, L. Y. Shaw, and Y. Chen, "Planning of LIDBMPs for urban runoff
control: The case of Beijing Olympic Village," Separation and Purification Technology,
vol. 84, pp. 112-119, 2012.
[14] U. S. G. B. C. USGBC. (2016, Apr, 2016). LEED Certification Fees. Available:
http://www.usgbc.org/cert-guide/fees
[15] B. Forum, "Level of Development Specification," ed, 2015.
[16] L. P. N. Sanhudo, "BIM assessment for Building Sustainability and automatic Rainwater
Runoff calculation," Master in Civil Engineering, Civil Engineering, Faculdade de
Engenharia da Universidade do Porto, 2016.
[17] U. S. E. P. A. USEPA, "Technical Guidance on Implementing the Stormwater Runoff
Requirements for Federal Projects under Section 438 of the Energy Independence and
Security Act ", O. o. Water, Ed., ed, 2009.
[18] d. Portugal. Leis, "Regulamento Geral dos Sistemas Pblicos e Prediais de Distribuio
de gua e de Drenagem de guas Residuais - Decreto-lei n. 23/95, Agosto 23," T. e. C.
Ministrio das Obras Pblicas, Ed., ed. Dirio da Repblica I Srie-B, 1995, pp. 5284-
5319.

405
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

406
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Parte III
BIM na construo

407
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

408
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

INTEGRAO DE FERRAMENTAS BIM APLICADAS A UM CASO DE


ESTUDO COORDENAO E QUANTIFICAO
Tiago Gouveia (1), Jos Carlos Lino (2), Joo Pedro Couto (1)

(1) Universidade do Minho, Guimares


(2) BIMMS Building Information Modeling & Management Solutions, Porto

Resumo
A adoo do BIM nos procedimentos e metodologias de trabalho tem vindo a abranger
transversalmente todos os intervenientes na indstria da Arquitetura, Engenharia, Construo e
Operao (AECO).

O BIM 4D adiciona ao BIM 3D paramtrico a varivel do tempo sendo possvel incorporar no


modelo um cronograma de tempo que permite simular e analisar as diferentes fases de execuo
da construo. A abordagem 4D integra tambm a deteo de conflitos entre as especialidades.

O BIM 5D acrescenta ao BIM 4D a varivel custo, permitindo aos profissionais obter uma
estimativa do custo total do projeto e tambm estudar virtualmente as vrias solues possveis
de forma a baixar o custo global do projeto.

O artigo incide sobre o trabalho realizado no mbito da dissertao de mestrado do primeiro


autor, que passa pela anlise 4D e 5D de um empreendimento e que tem sido realizada em
regime de estgio na empresa BIMMS. pretendido atravs da anlise 4D resolver de forma
rpida e eficaz os problemas encontrados em obra e tambm otimizar o cronograma das
atividades (otimizar o tempo). A anlise 5D permite quantificar analisar vrias solues na
perespectiva de otimizar o preo global do empreendimento, alm e permitir o seu controlo ao
longo do tempo. O projeto envolve duas fases: a primeira a modelao 3D e a segunda a
anlise 4D e 5D com base na modelao efetuada na primeira fase.

1. Introduo

O Building Information Modelling (BIM) atualmente reconhecido como um importante


desenvolvimento na indstria da arquitetura, engenharia e construo, estando conotado com

409
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

uma mudana no processo de execuo dos projetos das diferentes especialidades. No atual
contexto nacional, j se podem encontrar casos prticos de aplicao desta metodologia em
gabinetes de projeto, no entanto, alguns entraves tm contribudo para uma lenta adoo destes
novos procedimentos de modo mais generalizado [1].

O BIM representa um novo paradigma dentro da AEC, que encoraja a integrao de todas as
partes interessadas no projeto. Tem o potencial de promover uma grande eficincia e harmonia
entre os intervenientes, algo que no passado era uma adversidade [2].

Em Portugal, j se podem encontrar algumas equipas projetistas que adotam o BIM nas diversas
fases e com diferentes nveis de detalhe e trabalho colaborativo. Os construtores, apesar de
estarem atentos sua adoo globalizada e conscientes da sua generalizao a prazo, ainda o
tm testado em aplicaes pontuais e em casos de estudo localizados.

Alm das bvias vantagens da modelao 3D, a aplicao do BIM gesto de obra, em
particular nas fases de oramentao e de controlo da obra propriamente dito, assume cada vez
mais relevncia.

O BIM 4D adiciona ao BIM 3D paramtrico a varivel do tempo. Desta forma, possvel


incorporar ao modelo 3D um cronograma de tempo que permite simular e analisar as diferentes
fases de execuo da construo. Segundo alguns autores [3], o BIM 4D integra a extrao de
quantidades, as quantidades por localizao pretendida, os recursos, nveis de produtividade, e
custos de trabalho que do o respetivo valor ao I de Information (Informao) requerido do
BIM.

O BIM 5D acrescenta ao BIM 4D a varivel custo, permitindo ao projetista obter uma


estimativa de custo da obra e tambm estudar virtualmente variadas solues de forma a baixar
o custo global do projeto. Segundo [4], e baseado num estudo da Stanford University Center
for Integrated Facilities Engineering (CIFE), o uso de metodologias BIM indica que os
benefcios so: o uso da tecnologia BIM reduz at 40% as alteraes no oramento e reduz
tambm at 80% o tempo para gerar uma estimativa de custo [5].

O planeamento e o oramento devem estar suportados por um modelo inicial necessariamente


mais simplificado que por sua vez dever evoluir para um modelo mais detalhado para controlo
de tempos e custos ao longo da obra.

A elaborao de um oramento pode determinar o sucesso e/ou o fracasso de uma empresa


construtora. Um oramento errado acarreta imperfeies, falta de credibilidade e prejuzos a
curto e mdio prazo. O oramento, sendo a base de fixao do preo de um determinado projeto
e ou empreendimento, uma das mais importantes reas no negcio da construo civil [6].
A interligao entre as ferramentas de gesto habitualmente utilizadas pelos construtores e as
ferramentas BIM dever fornecer, quer fase de oramentao, quer fase de gesto de obra,
vantagens de integrao com os restantes intervenientes.

A elaborao deste trabalho pretende focar-se na integrao de ferramentas BIM na gesto de


obra, mais concretamente, no custo e no tempo, permitindo que o BIM seja o suporte destas

410
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ferramentas analticas e favorecendo a sua integrao com as aplicaes de Business Inteligence


das organizaes [7].

2. BIM Building Information Modeling

A descrio inicitica do que o BIM j no parece ter cabimento hoje em dia, de qualquer
modo, de forma a integrar os conceitos que apoiaro o trabalho aqui realizado, apresentam-se
de seguida as subreas do BIM que mais interessam gesto, em particular ao controlo do
tempo (4D) e do custo (5D).

2.1 BIM 4D
Um dos vetores de desenvolvimento nas ferramentas BIM tem sido a introduo da dimenso
tempo nos seus modelos. Em termos da produo na construo, esta dimenso, pode ser vista
na perspetiva de um planeamento de atividades. Atravs da integrao deste tipo de
funcionalidade num modelo tridimensional BIM, surge o conceito BIM 4D [8].

Os modelos 4D foram inicialmente desenvolvidos em meados da dcada de 80 por grandes


organizaes envolvidas em construes complexas de infraestruturas, energia e processo de
projetos onde os atrasos ou erros tinham impacto nos custos. Como a indstria AEC adotou
ferramentas 3D, as organizaes de construo construram modelos 4D, manualmente, e
combinaram (snapshots) de cada fase ou perodo de tempo no projeto. As ferramentas
personalizadas e comerciais desenvolveram-se em meados da dcada de 90, facilitando o
processo pela criao manual de modelos 4D com links automticos de geometrias 3D,
entidades ou grupos de entidades para atividades da construo. O BIM permite aos utilizadores
criar, rever e editar modelos 4D com mais frequncia. [9]

Figura 1: Modelo BIM 4D.

411
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os objetos no modelo devem ser agrupados de acordo com as fases de construo e ligados s
respetivas atividades no calendrio do projeto. Por exemplo, se uma plataforma de beto ir ser
colocada em trs fases de betonagem, ento a plataforma deve ser detalhada em trs seces,
para que a sua sequncia possa ser detalhada e ilustrada [9].

Os benefcios do uso da dimenso 4D nas ferramentas BIM so a melhor comunicao, o maior


envolvimento das partes interessadas. A comparao de cronogramas e rastreio do progresso
construtivo [9] alm das simulaes 4D, potencia o poder de deciso e de replaneamento bem
como a anlise e a deteo de conflitos [10].

2.2 BIM 5D
O BIM 5D significa o BIM 4D estendido com outra varivel extra que o custo quer da mo-
de-obra quer dos outros componentes at entrega de cada item. Com a ajuda do BIM 5D
facilmente se compara o tempo de execuo e o custo total de vrias alternativas em termos de
materiais a utilizar e tecnologia aplicada, o que pode promover a otimizao do custo total do
projeto [11].

Este custo pode ser estimado com base nos materiais, mo-de-obra, transportes, etc. Quanto
maior for a informao incorporada em cada objeto mais fcil ser o clculo oramental, mesmo
que a meio do processo o arquiteto ou designer altere algum material [9].

A extrao de quantidades uma das tarefas chave no processo construtivo, sendo a base para
decises importantes, j que ao medir os elementos do edifcio, essas quantidades, so usadas
para estimar o seu custo [12].

Figura 2: Processo BIM 5D [Trimble].

O uso de modelos 5D apresenta os seguintes benefcios: Reduo do tempo despendido para


extrao de quantidades e oramentao de semanas para minutos [13]; Atualizao automtica

412
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

do custo total do projeto quando ocorrem alteraes no mesmo [14]; Maior controlo dos custos
evitando as derrapagens de oramento [15].

O sucesso de um projeto BIM 5D significa o crescimento da reputao da empresa, ajudando-


a a obter futuros projetos. [14]

3. Caso de Estudo

3.1 Descrio geral dos trabalhos


O caso de estudo trata-se de uma ampliao de uma nave industrial. A interveno passa por
aumentar a rea da zona de produo para o dobro e tambm intervir na zona de escritrios,
com a construo de mais um piso e alterao e renovao do piso 0 existente.

O uso de ferramentas BIM pretende clarificar as alteraes a fazer na nave, introduzindo uma
perpectiva 3D combinada com a potencialidade de efetuar a extrao de quantidades de forma
quase instantnea e tambm integrar um diagrama Gantt, interligando cada elemento do mesmo
com cada elemento do modelo, visando uma melhor compreenso do processo construtivo.

3.2 Modelao
A modelao implicou 3 fases: modelao da parte existente, demolio e modelao da
ampliao a efetuar.

O processo de modelao iniciou-se pela parte estrutural. No processo inicial da modelao foi
importante a importao de algumas plantas CAD, nomeadamente as que continham a grelha
estrutural com a posio dos elementos. Toda a modelao estrutural foi efetuada com as
plantas CAD como fundo, contribuindo para uma melhor interpretao do projeto e reduzindo
os erros de modelao.

Quanto modelao da parte arquitetnica, comeou com um novo template Revit. A


modelao teve novamente como base de suporte as plantas CAD existentes, e tambm a parte
estrutural anteriormente modelada. O modelo estrutural foi carregado no novo template atravs
de um link Revit. Uma parte importante no processo de importao do modelo estrutural ter
em ateno que ambos os modelos (arquitetnico e estrutural) tm o mesmo ponto de origem.
Caso isso no acontea, futuramente, quando exportamos os dois modelos para o software
4D/5D eles ficam desfasados.

413
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Parte Estrutural existente.

Figura 4: Parte Estrutural a construir.

Figura 5: Parte Arquitectnica existente.

414
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Parte Arquitectnica a construir.

Figura 7: Demolies Piso 0.

3.3 Extrao de quantidades


A extrao de quantidades foi efetuada recorrendo ao software Autodesk Navisworks Manage
2017. O uso de um software para extrao de quantidades s obviamente eficaz, se aliarmos
uma boa modelao a uma anlise de conflitos coerente.

As quantidades extradas foram referentes s partes de nova construo (arquitetura e estrutura)


e demolies. O posterior tratamento da extrao foi efetuado no Microsoft Excel para uma
melhor interface com o utilizador, recorrendo funo de exportao existente no Autodesk
Navisworks.

415
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Extrao de quantidades a partir do software Autodesk Navisworks Manage 2017.

A Figura 9 mostra as quantidades obtidas atravs do modelo Revit, e a comparao dessas


mesmas quantidades com as do construtor. Como possvel observar, a percentagem de erro
obtida baixa, o que demonstra que o 4D e a introduo das ferramentas BIM para o processo
de extrao de quantidades podem ser substitudas pelo mtodo tradicional. Como foi
mencionado anteriormente, a fiabilidade dos nmeros obtidos neste processo depende sempre
de uma boa modelao.

Figura 9: Quantidades obtidas pela construtora vs modelo Revit.

416
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.4 Deteo de conflitos


Foi realizada uma anlise de conflitos entre as especialidades de arquitetura e estruturas. A
tolerncia desta anlise teve como base uma tolerncia de 3 cm, ou seja, todas as colises entre
0 e 3 cm no foram consideradas. Isto leva reduo do nmero de colises detetadas.
Dependendo da anlise, a tolerncia de erro pode aumentar ou diminuir.

A maioria das colises deram-se devido a erros de modelao. No tratamento e anlise de cada
coliso, o utilizador tem a capacidade de a aprovar ou rejeitar. Por fim poder ser emitido um
relatrio final, em formato .XML, que enviado para os responsveis das especialidades, de
forma a alterarem o modelo, eliminando o erro existente.

Figura 10: Exemplo de um conflito.

4. Concluso

Nesta fase possvel concluir que o uso de ferramentas BIM oferece uma enorme vantagem
aos profissionais da rea da construo.

Em fase de projeto, possvel detetar antecipadamente conflitos, que no decorrer da obra iriam
surgir. Este poder de os antever, traz ao construtor um acrscimo de segurana e eficcia,
comparado aos que fazem dos mtodos tradicionais a sua principal valncia. Os profissionais
que usam os mtodos BIM como primeira escolha partem com avano pelo facto de deterem
esse conhecimento. Para efeitos de oramentao, o uso destas ferramentas deve ser cuidadoso,
pois erros de modelao podem conduzir a derrapagens oramentais no decorrer da obra.
Contudo, a extrao de quantidades aliada a um modelo poder ser uma mais-valia para um
empreiteiro. Aliado a isso, temos o facto de poder percecionar tridimensionalmente o edifcio,
que por si s, j uma enorme vantagem para ultrapassar obstculos e ambiguidades relativas
obra.

417
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Um modelo visualmente bonito, no sinnimo de que seja til. No comeo de cada modelo
deve-se definir qual a finalidade do mesmo. Desta forma, o uso de ferramentas BIM requer
ento profissionais capacitados, suportados por boas equipas de coordenao de projeto, sendo
que esta far a diferena entre um bom e um mau modelo.

Referncias

[1] J. C. Lino, M. Azenha, and P. Loureno, "Integrao da Metodologia BIM na Engenharia


de Estruturas," presented at the Encontro Nacional BETO ESTRUTURAL - BE2012,
2012.
[2] S. Azhar, "Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry," ed, 2011, pp. 241-252.
[3] V. S. Trimble. (2016). 4D BIM. Available: http://www.vicosoftware.com/what-is-4D-
BIM/tabid/88206/
[4] S. Azhar, A. Nadeem, J. Y. N. Mok, and B. H. Y. Leung, "Building Information
Modeling (BIM): A New Paradigm for Visual Interactive Modeling and Simulation for
Construction Projects," presented at the Advancing and Integrating Construction
Education, Research & Practice, Karachi, Pakistan, 2008.
[5] CIFE. (2007). Available: http://cife.stanford.edu/
[6] I. Xavier, "Oramento, plajenamento e custo de Obras," ed, 2008.
[7] M. J. L. Venncio, "Avaliao da Implementao de BIM - Building Information
Modeling Em Portugal," FEUP, 2015.
[8] A. Monteiro and J. P. Martins, "Linha de Balano - Uma nova abordagem ao
planeamento e controlo das actividades da construo," ed, 2011.
[9] C. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM Handbook - A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers, and Contractors -
2nd Edition: John Wiley & Sons, Inc., 2011.
[10] A. U. Velasco, "Assessment of 4D BIM applications for project management functions,"
Master, University of Cantabria
Polytechnic University of Valencia, 2013.
[11] I. Czmocha and A. Pekalaa, "Traditional Design versus BIM Based Design," Department
of Structural Mechanics and Computer Aided Engineering, Faculty of Civil Engineering,
Warsaw University of Technology Al. Armii Ludowej 16, 00-637 Warszawa, Poland,
2014.
[12] A. Monteiro and J. P. Martins. (2013, A survey on modeling guidelines for quantity
takeoff-oriented BIM-based design.
[13] D. P. Smith, "BIM & the 5D Project Cost Manager," presented at the 27th IPMA World
Congress, 2014.
[14] H. Allison. (2010). 10 Reasons Why Project Managers Should Champion 5D BIM
Software. Available: http://www.vicosoftware.com/vico-blogs/guest-
blogger/tabid/88454/bid/27701/10-Reasons-Why-Project-Managers-Should-Champion-
5D-BIM-Software.aspx
[15] M. Azenha, J. C. Lino, and B. Caires, "Curso BIM: Interoperabilidade e
regulamentao," ed, 2014.

418
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

APLICAES RECENTES NO USO DE BIM NA SEGURANA NA


CONSTRUO
Alfredo Soeiro (1), Joo Pedro Poas Martins (1)

(1) Universidade do Porto FEUP, Porto

Resumo
A segurana na construo necessita de meios que permitam uma eficcia maior na preveno
de acidentes. As ferramentas empregues de modo corrente nas fases de concepo, projecto,
contratao, construo e operao no tm sido suficientes para evitar acidentes. Numa
sociedade desenvolvida inaceitvel que algum tenha um acidente a trabalhar e muito menos
que a consequncia do acidente seja a morte. O BIM tem vindo a desenvolver-se rapidamente
em termos de capacidades tecnolgicas e de campo de aplicaes. Como consequncia tem
havido investigao e aplicao explorando a adoo de ferramentas BIM para elevar o nvel
de preveno de acidentes na construo. De facto a concentrao e a gesto da informao
usando as ferramentas BIM possibilitam outros nveis de apreciao das medidas de preveno
a seguir de modo a evitar acidentes na construo e de modo a avaliar os riscos existentes na
construo ou na reabilitao. Este artigo prope abordar os avanos constatados num mbito
internacional relativos utilizao de BIM envolvendo os aspectos seguintes:
a) preveno na fase de projeto (PTD, Prevention Through Design);
b) simulao de fases da construo para anlise de riscos;
c) elaborao de contratos com garantias de nveis de preveno;
d) utilizao de dispositivos mveis durante a execuo da obra;
e) uso de localizadores para controlo de operaes;
f) anlise de medidas de preveno durante as fases de operao e de manuteno.

1. Descrio Breve

A conjugao de BIM com a possibilidade de diminuir a ocorrncia de acidentes na construo


foi abordada por vrios autores [1], [2], [3]. Apresenta-se neste artigo alguns casos de ensaios
e de aplicaes de programas BIM para preveno de acidentes. No final tecem-se
consideraes sobre desenvolvimentos futuros, sobretudo com a interveno dos intervenientes

419
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

nas actividades de coordenao e de preveno de acidentes na construo. Os casos de estudo


escolhidos abordam reas diferentes do processo construtivo mas tm como caracterstica
comum a gesto de informao apoiada em ferramentas BIM. A gesto da informao de modo
estruturado torna-se til na preveno por poder antecipar, registar ou evitar situaes
propiciadoras de causar acidentes na construo. De modo idntico, esta necessidade de gerir a
informao s beneficiar com a participao dos intervenientes directos na preveno de
acidentes como os coordenadores ou os tcnicos de segurana. Outros intervenientes, como
projectistas, fiscais, directores de obra, tcnicos e agentes reguladores, so tambm relevantes
na melhoria da qualidade da informao utilizada com as ferramentas BIM.

2. Casos de Estudo

2.1 Relatrio Dodge Data & Analytics


O estudo de 2016 [4] aponta para benefcios nomeadamente no Return on Investment (ROI,
Recompensa pelo investimento). Indica ainda que indstria tem abordado esta aplicao de
modo superficial. O relatrio indica ainda que nos EUA cerca de 70% das empresas de
construo utilizam BIM mas no em fazem na rea de preveno de acidentes. As razes desta
utilizao prendem-se com diminuio de custos de mo de obra e de materiais, melhor
planeamento com diminuio de prazos e oportunidades de fabrico fora do estaleiro.

Cerca de 43% das empresas que usam BIM realam o benefcio na preveno de acidentes e na
promoo dos nveis de segurana de operrios e de equipamentos. Nalguns casos o uso de
BIM permitiu lidar com obras complexas e tornarem-se mais competitivas elevando os nveis
de segurana. Estes benefcios resultaram da identificao de riscos antes do incio da obra.
Nestes riscos incluem-se sobretudo a identificao de situaes com conflitos de atividades e
com regulamentao existente como as provenientes da OSHA (Ocupational Safety and Health
Administration). A deteco de aberturas sem proteo ou de escadas sem guardas durante a
construo foi fcil de identificar na anlise 4D, combinando estrutura com o planeamento da
obra. Outros exemplos de benefcios so os da simulao de escavaes e de aterros com a
identificao de cenrios propcios a acidentes.

A combinao de utilizao de dispositivos mveis, como tablets, smartphones ou outros


dispositivos com GPS, podem beneficiar das ferramentas BIM na obra. Neste relatrio s cerca
de 12% das empresas que utilizam BIM que fazem a combinao com os dispositivos mveis
para identificao e resoluo dos problemas em situaes de risco.

Uma das vantagens apresentadas no relatrio tem sido a utilizao de ambientes de realidade
virtual com apoio nos modelos BIM para formao dos trabalhadores e dos tcnicos. Esta
capacidade de simulao, alm de permitir identificar riscos, fornece ambientes realsticos de
obra para visualizar riscos e medidas preventivas mas sem ter necessidade de expor os
intervenientes a perigos reais. Uma das particularidades foi apresentada pela Skanska que
conseguiu introduzir nos modelos BIM o efeito da gravidade. Esta possibilidade permitiu
identificar situaes que apresentavam efeitos inesperados e condies que motivaram
avaliaes diferentes dos riscos. Estas anlises permitiram verificar efeitos que tinham passado

420
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

despercebidos como queda de elementos e deslocaes de elementos de preveno que no


estavam fisicamente ligados estrutura ou ao edifcio.

2.2 BIM for Zero Harm


Este caso de estudo apresentado pela firma Balfour Beatty [5]. Apresenta as mudanas
verificadas na empresa de construo na tentativa de usar ferramentas BIM com a preveno
de acidentes. Esta experincias foram desenvolvidas pelas equipas da empresa de Loss
Prevention (Eliminao de perdas) e de Technology and Process Development
(Desenvolvimento de tecnologia e de processos).

Neste caso, o objetivo construir num ambiente sem riscos: Zero Harm (Danos Zero). A ideia
a mudar a cultura na empresa, criando condies para que a segurana da construo seja
considerada quando se fazem escavaes ou movimento de terras. Desenvolvendo modelos
virtuais de escavaes para a construo de modo a aplicar as normas em sesses de formao
para tcnicos e operrios da empresa e para sub-empreiteiros pode ser um modelo eficaz na
preveno de acidentes e na implementao de processos de construo mais seguros.

A capacidade de visualizar os processos e as prcticas seguras usando modelos 3D ajudaram a


Balfour Beatty a comunicar os meios e os mtodos seguros para a realizao de tarefas simples
e complexas de modo a obter resultados de acordo com o objetivo Zero Harm.

Os riscos associados e os perigos envolvidos com operaes como a abertura de valas e as


escavaes colocam questes como proteger patrimnio adjacente ou como evitar a exposio
dos trabalhadores a um desmoronamento. Os modelos 3D permitem ao instrutor ensinar num
ambiente virtual. Neste tipo de ambiente consegue-se simular prticas inseguras para anlise
dos formandos sem colocar em perigo esses mesmos formandos. Estas formaes abrangem os
directores de obra, tcnicos, encarregados, tcnicos de segurana e operrios que podem
visualizar as situaes mais arriscadas e aprender a evit-las. Esse resultado obtido atravs de
visualizao, discusso e soluo. As ferramentas utilizadas incluem Google Sktechup e Revit
Autodesk.

2.3 Utilizao de BIM 360


uma ferramenta integrada de BIM que providencia algumas aplicaes (apps) que podem ser
usadas nos estaleiros [6]. Outras aplicaes existentes de visualizao como Tekla Bimsight ou
Solibri Model Viewer podero ter benefcios idnticos. O exemplo apresentado insere-se no
grupo de aplicaes disponveis para equipamentos mveis que permitem, por exemplo, a
verificao das medidas prescritas no plano de segurana relativas a cada local. Esta capacidade
permite aplicaes na rea da implementao da preveno de acidentes na construo. De facto
a visualizao do previsto nos planos de segurana para cada frente de trabalho e a confrontao
com o executado permite aos responsveis pelo controlo da execuo encontrar no-
conformidades em tempo real.

Esta capacidade de modelar o que se espera em cada local, requerido pelo plano de segurana
e pelas medidas de preveno, permite tambm a formao do pessoal e das equipas envolvidas.
Esta formao e a sensibilizao pode reduzir riscos de modo integrado com a produo. A

421
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

verificao dos equipamentos de segurana a utilizar em cada tarefa pode ser feita atravs do
recurso de gesto do mapa de produo das medidas e dos equipamentos de segurana.

A aplicao permite que os operrios, encarregados e outros operrios consultem atravs dos
dispositivos mveis as fichas de segurana associadas a cada tarefa ou funo. As fichas de
segurana so instrumentos valiosos para identificar riscos habituais em cada tarefa, para
escolher as medidas preventivas relacionadas com cada um dos riscos e a empregar os
equipamentos de proteo individual ou colectiva prprios para esses riscos. Ao contrrio da
utilizao dos equipamentos mveis para verificao do plano de segurana verifica-se que o
uso dos mesmos para anlise das fichas de segurana tem uma componente mais genrica e
fcil de utilizar por ser mais modular.

2.4 Hourigan
Neste caso de estudo a empresa de cosntruo decidiu utilizar BIM para melhorar a segurana
com trs tipos de medidas [7]. A primeira medida tem a ver com a representao virtual do
estaleiro e da obra para fazer participar os envolvidos na obra. O envolvimento passava pela
contribuio dos operrios e dos tcnicos na identificao de riscos, na proposta de medidas de
preveno e da anlise proposta para controlo da eficcia das medidas. Tambm servia para
formar os construtores sobre as medidas de preveno e sobre os processos de contruo e
equipamentos.

A segunda medida adoptada pela empresa foi baseada numa visualizao 4D que permitia
identificar riscos resultantes da montagem de estruturas provisrias, como andaimes ou gruas,
e de perigos resultantes da movimentao de cargas e de equipamentos. Esta anlise sequencial
das tarefas permitiu ensaios das medidas preventivas com indicao de custos e de eficcia.

A terceira medida permitiu uma anlise detalhada de tarefas selecionadas para anlise em
termos de preveno de riscos. A anlise de alternativas de execuo para cada tarefa em termos
de processos e de equipamentos possibilitou a considerao da hiptese que combinava nvel
de risco com custo e com preos. Estas simulaes revelaram-se teis para atingir os objectivos
de nvel de preveno adequados.

2.5 Prevention through Design (PtD)


A preveno de acidentes atravs do projecto (PtD) utilizando BIM na fase de projecto foi
analisada estudada por vrios investigadores [8]. Uma das vertentes dessa investigao baseia-
se na aplicao das regras de segurana atravs de processos de deciso apoiados por
ferramentas de inteligncia artificial. De facto os algoritmos que analisam os modelos
produzidos pelas ferramentas BIM tentam encontrar riscos potenciais de acidentes e propor
medidas preventivas.

Tendo em ateno a combinao dos motores automticos de deciso com as ferramentas BIM
foi criada uma plataforma que prope aos projectistas e aos contrutores medidas preventivas
para minimizar os riscos. A aplicao da plataforma foi feita para os riscos de queda que
representam a causa para o maior nmero de acidentes mortais na construo.
O processo de deciso para proposta de medidas preventivas das quedas potenciais usando BIM
tem quatro fases. A primeira consiste na parametrizao das regras de escolha das medidas

422
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

preventivas. A segunda consiste na adaptao do modelo BIM para gerir a informao


necessria para ser analisada pelas regras. A terceira fase composta pela comparao das
regras com a informao fornecida pelo modelo. A ltima fase serve para apresentar os
resultados da aplicao das regras ao modelo BIM.

O ltimo desenvolvimento consiste na combinao dos processos de deciso com simulao de


modo a expandir a anlise das consequncias da aplicao das regras. A plataforma de anlise
baseou-se na ferramenta disponibilizada por TEKLA, nomeadamente TEKLA Structures [9].
A simulao das medidas obtidas pela verificao automtica permitiu nesta plataforma
verificar as implicaes no planeamento da obra. Esta simulao melhorou o contexto de anlise
pelos gestores do projecto de modo a tomar as decises que equilibrassem o impacto das
medidas no custo e no prazo da obra.

2.6 Modelo MMPtD (Management Model for Prevention through Design) e BIM
O modelo MMPtD foi elaborado a partir duma tese de doutoramento que analisou as causas de
cerca de 2000 acidentes mortais ou graves [10]. A anlise permitiu identificar para cada uma
das ocorrncias quais as medidas que poderiam ter sido tomadas para eliminar ou aligeirar os
riscos de acidentes. As concluses mostraram que cerca de 60% dos acidentes poderiam ter sido
evitados ou atenuados na fase antes do incio da obra. Foram feitos guias de procedimentos para
os intervenientes nas fases anteriores abertura do estaleiro.

A interao com o modelo BIM da obra com as medidas preventivas elaboradas no modelo
MMPtD foi feita atravs da associao com as diferentes tarefas que poderiam estar envolvidas
em acidentes. Esta associao permite na fase de projecto e na fase de planeamento alertar os
decisores para as medidas preventivas adequadas. A deciso de as empregar depende do
julgamento dos projectistas ou dos directores de obra.

A vantagem da utilizao do modelo em dispositivos mveis empregues pelos operrios e pelos


tcnicos na obra permite abordar os riscos causadores de cerca de 40% dos acidentes na obra
depois desta comear. Esta percentagem de 40% obtida pelos resultados de vrios estudos que
estimam que cerca de 60% aos acidentes podem ser evitados com medidas tomadas antes do
incio da obra [11]. De facto cada responsvel pela segurana ou encarregado ou tcnico pode
em qualquer altura e em qualquer tarefa verificar usando o modelo BIM, que contm a
informao MMPtD, controlar os riscos presentes e as medidas preventivas existentes e as
medidas sugeridas. As medidas deste guia para projeto foram especificadas de modo a poderem
ser includas como regras em modelos de deciso automtica envolvendo BIM. A
implementao desta conjugao decorre com investigadores da Universidade de Recife,
Brasil.

Esta possibilidade de relacionar o local de trabalho na obra com os riscos da tarefa a executar
usando o modelo BIM que integra as recomendaes do modelo MMPtD pode ser uma
ferrramenta poderosa na eliminao dos acidentes. Os trabalhadores so os maiores
interessados em nveis adequados de segurana e so tambm os melhores defensores de nveis
de preveno aceitveis. Por isso a possibilidade de poderem ser informados em tempo real
atravs duma plataforma BIM, que incorpora o modelo MMPtD, dos riscos a evitar e das
medidas preventivas respectivas poder ser a estratgia ganhadora.

423
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Esta associao da informao especifca sobre riscos e acidentes com a tarefa a executar pode
beneficiar da visualizao da obra em modelo digital pelos executantes. Este benefcio pode
ainda se acrescido pela utilizao de localizadores geoespaciais por cada operrio. Esta
geolocalizao poder ajudar os gestores de segurana a determinar se h necessidade de
intervirem na execuo da tarefa ao detectarem tarefas a serem executadas sem a existncia de
medidas preventivas adequadas. A interveno dos responsveis de segurana depois de
alertados pelos geolocalizadores poder ser substituda por programas de deciso que lidaro
com os dados do modelo MMPtD, com as informaes do BIM e com os registos das posies
dos trabalhadores envolvidos.

3. Concluses e desenvolvimentos futuros

A considerao destes casos de estudo leva a concluir que a utlizao do modelo BIM para
diminuir, ou eliminar, a sinistralidade nas obras pode ser uma ferramenta eficaz. Esta utilizao
pode variar entre a utilizao na fase de preparao e de projecto at s operaes de reparao
e de manuteno.

O facto de haver estudos que mostram que cerca de 60% dos acidentes podem ser evitados antes
das obras comearem leva a concluir que nesta fase pr-obra que se deve concentrar o uso de
ferramentas BIM para garantir medidas preventivas eficazes.

O projecto e a preparao da obra so propcios ao uso dos modelos BIM 3D, 4D ou 5D para
evitar acidentes na obra. Durante a execuo da obra tambm se apresentaram exemplos de
como melhorar a preveno de acidentes atravs da integrao do modelo BIM com
dispositivos mveis ou com geolocalizadores.

Um dos desenvolvimentos futuros poder ser a utlizao de drones que podero constatar o
desenvolvimento de cada tarefa e comunicar a um controlador, virtual ou real, os dados em
tempo real. O modelo BIM poder ser utilizado para comparar o modelo virtual desejvel com
o obra e verificar se h medidas preventivas que faltem, Poder tambm servir para actualizar
o modelo BIM virtual caso existam alteraes ocorridas na obra devidas a intempries,
incidentes ou a m execuo.

Outro desenvolvimento futuro na melhoria do uso de modelos BIM para melhorar a preveno
poder ser a integrao com dispositivos mveis que permitam um fluxo de informao em
tempo real. Esta informao sobre os trabalhadores e sobre as tarefas poder contribuir para
uma avaliao integral da obra com possibilidade de interveno atempada de modo a evitar
acidentes.

424
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Referncias

[1] K. Sulankiv, M. Kiviniemi, and T. Mkel. (2009, 03/05/2010). Building Information


Model (BIM) promoting safety in the construction site process. SafetyBIM research
project 10/2007 2/2009.
http://www.vtt.fi/files/projects/turvabim/turvabim_english.pdf, acedido em Setembro de
2016.
[2] M. Kiviniemi, K. Sulankivi, K. Kahkonen, T. Makele, and M.-L. Merivirta, "BIM-based
safety management and communication for building construction," VTT research notes,
vol. 2597, 2011.
[3] M. Yalcinkaya and V. Singh, "Patterns and trends in Building Information Modeling
(BIM) research: A Latent Semantic Analysis," Automation in Construction, vol. 59, pp.
68-80, 11// 2015. doi: http://dx.doi.org/10.1016/j.autcon.2015.07.012.
[4] S. Jones, "Building a Safety Culture: Improving Safety and Health Management in the
Construction Industry" Smart Market Report, Dodge Data and Analytics, Bedford, MA,
USA, 2016.
[5] Balfour Beatty, "Making BIM work for Balfour Beatty, Association for Project Safety,
https://www.aps.org.uk/sites/default/files/Balfour%20Beatty%20case%20study%20on
%20BIM.pdf, acedido em Setembro de 2016.
[6] BIM360, "Autodesk BIM360", http://bim360.com/, acedido em Setembro de 2016.
[7] Hourigan Construction, "3 Ways BIM Improves Safety in Construction", Blog,
http://www.houriganconstruction.com/hc-post/925/3-ways-bim-improves-safety-in-
construction/, acedido em Setembro de 2016.
[8] S. Zhang, J. Teizer, J. Lee, C. Eastman, M. Venugopal, "Building Information Modeling
(BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules"
Automation in Construction, vol. 29, pp. 183-195, May 2012. doi:
10.1016/j.autcon.2012.05.006.
[9] S. Zhang, J. Lee, M. Venugopal, J. Teizer, C.M. Eastman, Integrating BIM and safety:
an automated rule-based checking system for safety planning and simulation,
Proceedings of CIB W099, Washington D.C., August 2426, 2011.
[10] B. Vasconcelos, "Modelo de Preveno de Acidentes na Fase de Concepo" Tese de
Doutoramento, Porto, Universidade do Porto, Portugal, 2013.
[11] M. Behm, Linking construction fatalities to the design for construction safety concept,
Safety Science, Volume 43, Issue 8, pp. 589611, October 2005, doi:
10.1016/j.ssci.2005.04.002.

425
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

426
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

UTILIZAO DO BIM NA GESTO DE SEGURANA DO


ESTALEIRO DA CONSTRUO DO TNEL DO MARO
Juliana Fernandes (1), Joo Pedro Couto (2), Manuel Tender (3)

(1) Mestranda MIEC UM, Braga


(2) Prof. Auxiliar UM, Braga
(3) PhD student UM, Braga

Resumo
A deficiente organizao dos estaleiros uma das causas dos acidentes de trabalho relativos
construo. A realizao deste estudo foca-se na importncia que um estaleiro gerido de uma
forma otimizada, utilizando as tecnologias BIM, representa para um maior controlo da
segurana no decorrer das tarefas de uma obra. Neste caso, relativo ao estaleiro da construo
do tnel do Maro. Os objetivos principais consistiram em modelar o estaleiro da construo
para assim obter uma visualizao tridimensional do mesmo. Com esta visualizao possvel
manipular o estaleiro conforme as necessidades no decorrer da obra, ajudando a otimizar a
ocupao do espao, a gerir a circulao de viaturas e trabalhadores e gerir o armazenamento
de materiais e equipamentos. Deste modo, possvel prever e prevenir eventuais
comportamentos de risco que possam surgir, garantindo uma maior segurana aos
intervenientes da empreitada. importante referir que a modelao foi realizada aps
montagem dos estaleiros. Sendo assim, como resultado apresenta-se uma anlise critica
relativamente introduo do BIM na gesto dos estaleiros de construo, descrevendo a sua
influncia nos mesmos. Para o desenvolvimento deste trabalho recorreu-se anlise
bibliogrfica e ao estudo de caso.

1. Introduo

Building Information Modelling (BIM) uma metodologia que est a ser implementada em
Portugal. Apresenta-se como uma metodologia que obriga as pessoas a mudarem os hbitos, ou
seja, abandonar mtodos tradicionais para adotar mtodos atuais e em desenvolvimento. Esta
uma das razes para os quais esta metodologia recebe resistncia por parte dos trabalhadores,
levando muitos profissionais a debater-se com a nova realidade e a deixar-se ultrapassar por
quem j a conquistou.

427
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A prtica do BIM na gesto de estaleiros em Portugal uma rea em estudo que vem enaltecer
a importncia da sua introduo no quotidiano da gesto dos estaleiros de construo.

Este estudo vem na sequncia de uma dissertao em curso de Mestrado Integrado em


Engenharia Civil pela Universidade do Minho. Tem como objetivo a gesto da segurana do
estaleiro de construo do tnel do Maro, utilizando o BIM para minimizao dos riscos
associados s tarefas correntes nos estaleiros, contribuindo assim para o aumento da segurana
e sade de todos os intervenientes.

construo de um tnel esto associados elevados riscos, muitos deles por atropelamento,
que podem resultar em acidentes de trabalho graves, por isso, com este estudo pretende-se
mostrar uma alternativa de gesto da segurana com vista a melhoria nesta rea.

A ferramenta utilizada para a visualizao 3D dos estaleiros de construo do tnel do Maro


foi o Autodesk Revit. Foi utilizada esta ferramenta por haver um conhecimento prvio acerca
do seu funcionamento. Com este mtodo possvel a visualizao em tempo real, desde que o
modelo 3D esteja atualizado de forma a prevenir riscos futuros.

Relativamente a estudos concludos sobre a implementao do BIM nos estaleiros, a


informao encontrada no nacional, contudo, noutros pases da Europa, como a Inglaterra,
Finlndia e Noruega, o BIM j obrigatrio para obras pblicas. Para alm destes, existem
outros pases em que j se faz do BIM um mtodo obrigatrio de trabalho.

Devido necessidade de acompanhar o desenvolvimento do estaleiro a qualquer hora (mesmo


no prprio estaleiro), tornou-se necessria a utilizao de dispositivos informticos portteis,
no s de um computador porttil, mas tambm de telemveis ou tablets, que se tornaram
ferramentas de trabalho e onde possvel uma visualizao quando for necessrio. Com isto,
levantou-se a necessidade de estudar o impacto que estes dispositivos tm na sade e segurana
em estaleiros de construo [2]. O mtodo utilizado para o desenvolvimento deste estudo foi a
realizao de inquritos a funcionrios do ramo da construo civil. Concluiu-se que o uso dos
dispositivos mveis pode criar riscos na segurana e sade dos utilizadores; contudo, os
profissionais da construo concordaram que estes riscos podem ser gerados devido sua
utilizao inadequada que pode conduzir exposio ao perigo. Ficou tambm explcito que os
resultados deste estudo vo dar a conhecer os potenciais perigos no uso dos dispositivos e ajudar
a tomar medidas prticas para os combater, enquanto aumentam a produtividade, sem
comprometer a segurana e sade de quem os utiliza.

Para comprovar que utilizando o BIM se pode, efetivamente, otimizar os espaos dos estaleiros,
Srinath S. Kumar e Jack C. P. Cheng [4] elaboraram um estudo em que criaram um modelo de
estaleiro dinmico. A partir daqui estudaram vrias variveis sendo uma delas o clculo de
quantas e quais as instalaes que foram necessrias para colocar no estaleiro, assim como, o
espao que foi ocupado. Outra varivel estudada foi a quantificao do espao interior do
edifcio a construir para armazenamento de materiais respeitando certas regras de segurana.
Para alm disso, tambm foi otimizada a distncia a percorrer entre instalaes tendo em conta
os obstculos temporrios e os equipamentos presentes no estaleiro. Com este estudo

428
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

concluram que com o uso das ferramentas BIM possvel poupar tempo e recursos uma vez
que todo o processo foi feito devido a clculo automtico.

Tao Cheng e Jochen Teizer [1] realizaram um estudo com o objetivo de relacionar a tecnologia
de visualizao e recolha de dados em tempo real para uma construo segura. Para tal,
realizaram vrias experincias para testar a aplicao de recolha de dados e tecnologia de
visualizao em tempo real em operaes de construo. As experincias concentraram-se nas
relaes de proximidade entre trabalhadores e equipamentos como a simulao de violaes na
segurana. Centraram-se, tambm, em situaes que podem ocorrer em ambientes de trabalho
fechados e ao ar livre. Por exemplo, um trabalhador enfrenta o perigo de andar debaixo de uma
carga elevada (Figura 1). Os resultados do estudo mostram que a informao relacionada tanto
com a segurana como com as atividades de construo em estaleiros podem ser
automaticamente monitorizadas e visualizadas em tempo real, concluindo que podem oferecer
benefcios como a sensibilizao para os perigos de cada situao, que podem ser visualizados
e monitorizados quer no estaleiro de construo, quer noutra localizao fora do mesmo.

Figura 1: Trabalhadores debaixo de uma carga elevada (Fonte: [1])

Relativamente utilizao do BIM, baseado na verificao automtica da segurana em


planeamento da construo, Kristiina Sulankivi et al. [5] realizou um estudo com o objetivo de
investigar como os problemas de segurana que esto, inconscientemente, estabelecidos no
cronograma das tarefas de construo podem ser, de uma forma prvia, identificados
automaticamente na fase de planeamento de um projeto. A metodologia adotada baseou-se num
estudo de caso de um projeto de um edifcio residencial situado na Finlndia em que a inteno
foi identificar automaticamente as condies dinmicas em que o edifcio foi construdo,
identificar a sua localizao num espao 3D virtual e, de um modo interativo ou automtico,
fornecer solues e visualizaes de sistemas de proteo para mitigar os perigos identificados.
Como resultado deste estudo, mostrou-se a utilidade da abordagem proposta na deteo e
visualizao de potenciais riscos de queda, em particular, durante a fase de planeamento de
obra. Para alm disso, recomendou-se que as estruturas temporrias e os mtodos de proteo
de segurana estejam includos durante o planeamento do projeto para melhorar a compreenso
da segurana e a comunicao do mesmo. Este estudo demonstrou a viabilidade da integrao
da segurana no BIM como um mtodo eficaz e prtico para detetar e eliminar riscos
relacionados com quedas.

Sendo a segurana uma das principais preocupaes da indstria da construo, importante


estudar novos mtodos que ajudem a minimizar fatores de risco presentes nesta rea, por isso,

429
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Salman Azhar e Alex Behringer [6] desenvolveram um estudo com o objetivo de investigar a
eficcia das tecnologias BIM no desenvolvimento e implementao de um plano de segurana
num estaleiro de construo. Para tal, recorreu-se a um caso de estudo onde foram realizadas
simulaes de planeamento 4D e desenhos em 3D para a identificao de perigos. Com este
estudo obtiveram-se vrios resultados, sendo que um deles concluiu que as ferramentas 4D e
3D so mais eficientes no planeamento e na gesto da segurana, em comparao com os
desenhos 2D, por permitir simular as condies reais de trabalho (Figura 2). Para melhorar os
mtodos atuais concluiu-se que as tecnologias BIM podem ser utilizadas como novas
ferramentas de planeamento de segurana colaborativa, devido ao facto de, atravs dos modelos
BIM, projetistas, engenheiros e construtores poderem tomar medidas de proteo eficazes na
fase de planeamento do projeto para eliminar ou minimizar os perigos nos estaleiros de
construo durante a fase de obra. Concluiu-se que o BIM pode tambm ser usado durante uma
investigao de acidente, por ser possvel recriar a sequncia de acontecimentos que o
antecederam. Outra concluso obtida diz respeito ao comportamento humano, em que este no
pode ser mudado rapidamente. Pode concluir-se que as tecnologias BIM no devem ser
consideradas como um mtodo de resoluo de todos os problemas de segurana e sade nos
estaleiros de construo, apenas vo ajudar a melhorar a situao de segurana, no entanto, a
melhoria global poder ser visvel em vrias dcadas.

Figura 2: Simulao de escavao 4D retratando intalaes de estacas-pranchas e tubo (Fonte:


[6])

M. Natrop, Mahdavi A. e Martens B. [3] realizaram um estudo acerca do BIM nos estaleiros de
construo, referindo-se informao presente nos desenhos. O propsito do estudo relativo
informao que aparece nos desenhos ou modelos e que no necessria para desempenhar
uma determinada tarefa, ou ento, a informao que deveria estar presente e se encontra oculta.
O objetivo do estudo foi gerar desenhos com informao que apenas necessria para
desempenhar uma determinada tarefa com recurso a um caso prtico. Concluram que fornecer
desenhos com informao estritamente necessria para o desenvolvimento de uma tarefa
especfica a um trabalhador evita distraes com outros dados, aumenta a qualidade dos
trabalhos e reduz a probabilidade de erros. Por ltimo, concluram que essencial uma boa
comunicao entre projetistas e trabalhadores presentes nos estaleiros.

430
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2. Metodologia de estudo

A metodologia adotada centrou-se numa pesquisa relativa ao BIM nos estaleiros de construo
e num estudo de caso referente construo do tnel do Maro, de onde resultou a modelao
dos estaleiros da obra de forma a perceber melhor o seu funcionamento e que, utilizando a
visualizao 3D, se pode prevenir riscos associados s tarefas da construo.

Para iniciar o modelo do estaleiro comeou por se importar o ficheiro do formato dwg para o
Autodesk Revit para se obter o terreno topogrfico em 3D. De seguida, com base nos desenhos
2D disponibilizados, modelaram-se todas as instalaes presentes no estaleiro. Recorrendo s
famlias de objetos, carregaram-se mquinas, veculos e pessoas para conseguir obter uma
perceo do espao e mostrar que a circulao deles influencia o funcionamento do estaleiro.

3. Gesto da segurana dos estaleiros da construo

Os estaleiros de construo do tnel do Maro foram implementados em zonas ambiental e


socialmente delicadas. Devido ao declive acentuado da zona, como demonstra a figura 3,
juntamente com a permanente presena de grandes quantidades de gua, poderia resultar em
deslizamentos de terras conduzindo a soterramentos ou esmagamentos. Outro problema surgiu
no acesso ao estaleiro nascente por se encontrar localizado junto a habitaes.

Os estaleiros no eram de grandes dimenses, pelo contrrio, pela obra em si, as dimenses
eram bastante reduzidas. Com isto surgiram dificuldades na gesto do estaleiro, nomeadamente
na gesto do espao, por este ser exguo para caminhos pedonais e para a circulao de veculos
e pessoas, sendo necessrio ter em considerao a conjugao de todos os fatores. Ainda em
relao ao espao, este tambm era pequeno para a montagem da oficina mecnica, de
eletricidade, para as instalaes do refeitrio e vestirios e limitado para o estacionamento.
Outras dificuldades encontradas so relativas acumulao de lamas, que dificultaram o
trnsito, e o levantamento de poeiras, que afetaram todos os utentes do estaleiro. Para alm
disso, outra considerao a ter foi o armazenamento de combustveis em local protegido que
poderia provocar danos para o ambiente.

Face ao prazo estabelecido, o estaleiro teve necessidade de suportar diversas tarefas em


simultneo, nomeadamente, atividades de escavao, revestimentos definitivos e
infraestruturas enterradas, tendo sido um acontecimento nico em Portugal. Devido a este
ltimo foram vrios os fatores considerados para controlar o estaleiro uma vez que estiveram
presentes grandes quantidades de equipamentos e recursos humanos.

Todos estes entraves provocaram situaes de risco. Com a utilizao do BIM na gesto da
segurana nos estaleiros possvel um maior controlo dos mesmos, uma vez que com a
visualizao 3D e em tempo real possvel manipular o estaleiro e ver a melhor forma de
conjugar todas as situaes acima descritas evitando comportamentos de risco. Com o uso deste
mtodo possvel prever e prevenir atempadamente os perigos, conduzindo a uma gesto
otimizada da segurana e sade nos estaleiros.

431
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Estaleiro nascente e poente respetivamente. (Fonte: Teixeira Duarte).

Como se pode constar, foram vrios os fatores considerados para gerir a segurana do estaleiro
da construo do tnel, tarefa esta bem-sucedida pois no houve ocorrncia de acidentes graves.

4. Modelo do estaleiro

Embora esta modelao tenha ocorrido aps a montagem do estaleiro, no deixa de ser
vantajoso elaborar uma simulao 3D para diferenciar o mtodo de gesto do estaleiro utilizado
relativamente ao estudado neste trabalho. A figura 4 apresenta uma perspetiva geral do estaleiro
nascente no local onde estava inserido.

Uma das vantagens desta metodologia ser possvel o reconhecimento mais eficaz do espao
antes de se colocarem os equipamentos, maquinarias e instalaes necessrias para o decorrer
dos trabalhos. Para uma melhor perceo da rea do estaleiro em estudo apresentam-se as
figuras 5 e 6, relativas ao modelo, de maneira a ser possvel idealizar a distribuio das
instalaes e equipamentos. Para simplificao apenas esto apresentadas imagens do modelo
do estaleiro nascente.

Figura 4: Perspetiva geral do modelo do estaleiro nascente.

432
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: Distribuio das instalaes e equipamentos do estaleiro nascente.

Figura 6: Distribuio das instalaes e equipamentos do estaleiro nascente.

4.1 Anlise de resultados e discusso


Como se pode verificar nas figuras 5 e 6, o estaleiro era bastante limitado em relao ao espao,
o que poderia provocar situaes de risco na conjugao da circulao de mquinas e pessoas
principalmente na zona onde esto montadas as instalaes. Como era necessrio precauo
acrescida nestas situaes diariamente, a exposio ao perigo era elevada, aumentando a
probabilidade de ocorrncia de fatalidades.

Os caminhos no estaleiro eram bastante estreitos, por isso, seria importante poder antever como
se cruzariam os veculos de modo a no perturbar os trabalhos nem criar perigos. Neste modelo,
foi criada uma simulao referente a esta situao, onde tambm, se encontram trabalhadores
nas mediaes (figura 7 e 8). Com a realizao de simulaes como esta, possvel visualizar

433
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

atempadamente como seria o cruzamento de veculos entre si e tambm entre veculos e pessoas
nos estaleiros. Para cada situao, tornar-se-ia possvel o estudo prvio de medidas e solues
a tomar para estes casos e a elaborao prvia de medidas de segurana, evitando decises
precipitadas no local. A gesto deste tipo de situaes vem minimizar os perigos a todos os
intervenientes, aumentando a segurana dos mesmos. Posto isto, verifica-se a necessidade de
uma gesto cuidada e otimizada relativamente a este assunto.

Figura 7: Circulao de mquinas e pessoas em simultneo.

Figura 8: Cruzamento entre veculos.

Outros resultados que se podem retirar deste estudo so relativos aos equipamentos presentes
nos estaleiros. Com um alinhamento correto das tarefas de determinada obra e com um modelo

434
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

tridimensional possvel colocar em estaleiro apenas os recursos de que essa tarefa carea,
podendo visualizar-se a disposio dos mesmos oportunamente. Assim, evita-se o
congestionamento nos estaleiros e previne-se eventuais situaes de risco, aumentando,
naturalmente, a segurana. Daqui pode, tambm, inferir-se que os custos podem ser mais
controlados evitando derrapagens nos oramentos.

Relativamente simultaneidade das tarefas, as solues e os mecanismos que se adotam para


estas situaes podem resultar numa incompatibilidade que pode ser detetada s no momento
de execuo conduzindo a desperdcio de tempo e recursos, aumentando os custos. Com a
metodologia BIM estes problemas podem ser evitados uma vez que possvel prever se a
execuo de uma determinada tarefa compatvel com outra, prevenindo os perigos e
otimizando os custos das tarefas. Como h a possibilidade de simular as diferentes tarefas de
uma obra em 3D tambm possvel visualizar se a sua conjugao favorvel.

Os mtodos convencionais de gesto de estaleiros so morosos, dispendiosos e com mais


probabilidades de erros humanos. Muitas vezes a informao no passa atravs dos vrios
intervenientes de um projeto, perdendo-se no meio de toda a documentao.

Para que tal no acontea, a informao pode ser partilhada entre todos os intervenientes na
obra, nomeadamente, dono de obra, coordenadores de segurana em obra e em projeto,
projetistas e mesmo os prprios operrios. A visualizao simples e informatizada, evitando
os desenhos de grandes dimenses. Com esta partilha de informao possvel alertar todos os
trabalhadores para a sua exposio aos riscos das obras. Para alm disso, apresenta a vantagem
de se poderem esclarecer dvidas de execuo e planeamento in situ evitando perdas de tempo
que em obra podem ser valiosas.

legtimo afirmar que com um ambiente de trabalho seguro os trabalhadores sentem-se mais
confiantes para desempenhar as suas tarefas. Esta metodologia vem contribuir para oferecer
essa confiana, uma vez que tudo planeado e revisto atempadamente e atualizado
automaticamente face s circunstncias e condicionalismos concretos da obra, minimizando
qualquer comportamento arriscado que possa surgir.

5. Concluses

O bom planeamento de qualquer projeto crucial para o desenvolvimento do mesmo, por isso,
conclui-se com este estudo, que para obras de elevada envergadura e complexidade como foi a
do tnel do Maro, o BIM apresenta-se como essencial na gesto dos estaleiros.

Relativamente circulao de veculos e pessoas em simultneo, concluiu-se que possvel


planear como agir nestas situaes, alertando todos os intervenientes para possveis perigos. O
estudo desta vertente tornou-se importante porque os atropelamentos so uma das principais
causas de acidentes em estaleiros de construo. Para o caso desta obra em concreto, a
investigao deste tema era relevante devido ao espao do estaleiro ser limitado para caminhos
pedonais e tambm pela ocorrncia de conflitos entre veculos e pees que se tornou uma grande
dificuldade na gesto do estaleiro.

435
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Facilmente se pode inferir - e os resultados de vrios estudos fundamentam isso mesmo - que
as metodologias BIM so ideais para a otimizao e controlo de tarefas das obras, possibilitando
consequentemente uma melhor gesto e um maior controlo da obra e do estaleiro, especialmente
se estes, em consequncia do reduzido espao disponvel, primarem por uma densidade de
constituintes significativa e potencializadora de conflitos e impactos na produtividade.

Outro fator importante na gesto da segurana utilizando o BIM referente tomada de


decises. A visualizao 3D do estaleiro evita a tomada de decises precipitadas relativas a uma
determinada situao, impedindo a ocorrncia de erros e aumentando a segurana nos estaleiros.

De uma forma geral, a conjugao de todas as reas que foram estudadas neste trabalho
contribui para uma gesto da segurana mais eficiente, uma vez que fornece a possibilidade de
um maior controlo das movimentaes do estaleiro, e atravs da escolha das melhores solues
de preveno, evita comportamentos de risco.

Concluiu-se ainda que o ideal na gesto da segurana a mesma ter incio na fase de projeto,
contando com a participao ativa de todos os intervenientes, situao que a utilizao do BIM
poder ajudar a potenciar.

Pode assim concluir-se que o BIM importante para que se prossiga a imposio de uma cultura
de segurana transversal e integrada em todos os projetos de construo.

Referncias

[1] Cheng, T., & Teizer, J. (2013). "Real-time resource location data collection and
visualization technology for construction safety and activity monitoring applications," in
Automation in Construction, vol. 34, pp. 315, November 2012.
http://doi.org/10.1016/j.autcon.2012.10.017
[2] Shah, R., & Edwards, J. (2016). "Investigation of health and s afety impact from the
Site BIM tools in the live construction sites", Vol. 6, No.2, June 2016.
http://dx.doi.org/10.6106/JCEPM.2016.6.2.001
[3] Lon A.H.M., & Natrop, M. (2015). "BIM on the construction site: providing
information on task specific drawings," Netherlands organization for applied scientific
research TNO & Solidu, 20 (November 2014), 97106.
[4] Kumar, S. S., & Cheng, J. C. P. (2015). "A BIM-based automated site layout planning
framework for congested construction sites," in Automation in Construction, vol. 59, pp.
2437, August 2015. http://doi.org/10.1016/j.autcon.2015.07.008
[5] Sulankivi, K., Zhang, S., Teizer, J., Charles, M., Kiviniemi, M., Romo, I., & Granholm,
L. (n.d.). "Utilization of BIM-based Automated Safety Checking in Construction
Planning," Technical Research Center of Finland, School of Civil and Environment
Engineering, Georgia Institute of Techocology, Georgia Institute of Technology,
Skanska Finland & Tekla Finland, 2013.
[6] Azhar, S., Ph, D., & Behringer, A.,B.S (2013). A BIM-based Approach for
Communicating and Implementing a Construction Site Safety Plan, Auburn University
Auburn, Alabama & The Whiting-Turner Contracting Company Orlando, Florida, 2013.

436
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

UTILIZAO DO BIM 4D E 5D ENQUANTO METODOLOGIA


AVANADA PARA O PLANEAMENTO, PREPARAO E
MONITORIZAO DE OBRAS
Diogo Coelho (1), Joo Pedro Couto (2), Dinis Leito (3), Joo Morgado (4)

(1) Universidade do Minho, Guimares


(2) Universidade do Minho, Guimares
(3) Universidade do Minho, Guimares
(4) Construes Gabriel A.S. Couto, S.A., Vila Nova de Famalico

Resumo
O estudo apresentado enquadra-se na dissertao de Mestrado Integrado em Engenharia Civil
realizada em parceria com a empresa CONSTRUES GABRIEL A.S. COUTO, S.A,
possibilitando ao autor estar envolvido no Projeto Jpiter da SAKTHI Portugal SP21.

O desenvolvimento deste artigo passa pela demonstrao das vantagens da implementao das
metodologias BIM no setor da construo. Contudo, ter maior incidncia no BIM 4D e 5D, os
quais permitem evitar atrasos no cumprimento de prazos e precaver possveis derrapagens
oramentais. Primeiramente, proceder-se- avaliao da qualidade dos modelos recebidos,
avaliando as incompatibilidades existentes entre os modelos. Posteriormente proceder-se-
realizao do 4D sendo necessrio efetuar-se a monitorizao da obra atravs do levantamento
do que vai sendo executado ao longo de todo o perodo de construo. Contudo, dadas as
caractersticas do software utilizado, proceder-se- primeiramente elaborao do BIM 5D e
s depois o BIM 4D, sendo que nesta fase necessrio associar a todas as tarefas do mapa de
trabalhos fornecido pela empresa, os recursos necessrios realizao das mesmas. J numa
fase final ser possvel obter-se um conjunto de documentos, nomeadamente, o oramento e o
plano de trabalhos, os quais sero comparados com os mesmos documentos elaborados pela
empresa atravs da metodologia tradicional.

1. Introduo

Durante muitos anos, o setor da construo foi um dos setores responsveis pela evoluo
tecnolgica. Contudo, esse estatuto foi-se perdendo com o passar dos anos, por consequncia
da crise econmica que afetou este setor. Tratando-se da indstria mais afetado pela crise, foi
importante encontrar e estudar novos mtodos de trabalho por forma a reverter toda esta
situao. Desta forma, tm estudados tcnicas e formas de aumentar a competitividade,

437
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

melhorar o desempenho, aumentar a satisfao do cliente e aumentar os lucros [1]. A utilizao


de tecnologias de informao na indstria da arquitetura, engenharia e construo (AEC) tem
sido apontada como uma das opes para reduzir os desperdcios e ineficincias caractersticos
do setor da construo [2]. De tal forma, esta indstria encontra-se numa fase de mudanas e
desafios, destacando-se o crescimento na partilha de informao, a necessidade da
implementao apropriada de prticas sustentveis, as preocupaes energticas e a melhoria
da produtividade atravs de prticas LEAN, optando-se por solues de automatizao e
modernizao. Contudo, nem sempre todos os desafios foram superados como era espetvel
devido aos projetos serem cada vez mais exigentes no que diz respeito aos custos e prazos da
execuo da obra [3]. Desta forma, torna-se imprescindvel a colaborao eficiente dos vrios
intervenientes do projeto, isto , desde os projetistas, proprietrios, empreiteiros,
subempreiteiros e outros participantes. Consequentemente, as tecnologias da informao e
comunicao (TIC) tm vindo a crescer de forma exponencial nos ltimos tempos, tentando
oferecer as ferramentas certas para satisfazer as novas exigncias do mercado [1].

O Building Information Modelling (BIM) uma das tendncias que tm vindo a ser introduzida
no setor da construo sendo que passa, primeiramente, pela construo virtual do edifcio num
modelo digital, conhecido como BIM 3D. Esse modelo deve ser acompanhado com o maior
nmero de informao possvel, nomeadamente, geometria, relaes espaciais, informao
geogrfica, quantidades e caratersticas dos elementos de construo, estimativa de custos,
stock de materiais e cronograma de projeto [4]. Torna-se importante referir que esta
metodologia apenas tira verdadeiros benefcios quando aplicado totalidade do projeto, ou seja,
no deve ficar-se apenas pela representao 3D do mesmo, mas tambm deve ser estendida ao
planeamento (BIM 4D) e controlo de custos (BIM 5D) [1].

O BIM 4D conecta no s os aspetos espaciais como tambm os temporais do projeto,


melhorando a confiabilidade dos cronogramas e minimizando os problemas de comunicao
[5]. Basicamente consiste na combinao do modelo geomtrico digital e das informaes
referentes ao planeamento da obra. A crescente adoo de metodologias BIM nas empresas de
construo tem contribudo para um aumento no interesse em utilizar modelao 4D. Contudo,
a adoo desta fase apresenta alguns obstculos, tais como a necessidade de mecanismos para
visualizao do avano das atividades internas, a existncia de limitao na deteo de conflitos
de espao e tempo e a falta de anlise de algumas informaes do modelo [5]. Se ao BIM 4D
lhe for adicionado a varivel custo, esta metodologia fica conhecida como BIM 5D, sendo que
a mesma incorpora os relatrios de quantidades e o respetivo oramento baseado nas
quantidades obtidos na dimenso anterior [6]. Esta fase do BIM capaz de simular vrios
cenrios para o cliente em tempo real atravs dos dados de custo e quantidades ligadas ao
modelo BIM [7].

A realizao desta dissertao tem como objetivo avaliar as vantagens e as desvantagens da


implementao da metodologia BIM numa empresa do setor da construo, mais
concretamente, a empresa Construes Gabriel A.S. Couto, S.A., para desta forma a prpria
empresa avalie internamente o interesse em implementar no futuro esta abordagem. Contudo,
este trabalho estar mais centrado no BIM 4D e 5D, procurando-se elaborar todo o planeamento
da obra e a avaliao dos custos da mesma. Tal como j se referiu anteriormente, a aplicao
desta metodologia tira maiores proveitos quando aplicada totalidade das dimenses existentes,

438
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

por exemplo, deve-se procurar que o 4D da metodologia BIM seja sempre que possvel
acompanhado pelo 5D, pois quando existem alteraes ao nvel das quantidades ou dos recursos
necessrios (4D), estas so refletidas automaticamente no oramento, caso contrario isso no
acontece. Adicionalmente, ser feita uma avaliao dos documentos obtidos nas duas
metodologias por forma a ser possvel efetuar-se uma comparao.

Para finalizar, espera-se que a empresa perceba as grandes potencialidades da implementao


desta metodologia neste setor e que seja possvel verificar-se as grandes diferenas entre as
duas metodologias avaliadas neste trabalho, esperando-se essencialmente uma reduo dos
prazos de execuo de cada tarefa bem como uma poupana no oramento final da obra.

2. Building Information Modelling - BIM

2.1 Definio
O BIM pode ser definido como sendo uma tecnologia de modelao e um conjunto de processos
associados, com a finalidade de produzir, comunicar e analisar modelos de uma construo.
Trata-se de uma metodologia de partilha de informao entre todos os intervenientes do projeto
(arquitetos, engenheiros, empresa(s) de construo, dono de obra) passando por todas as fases
do ciclo de vida do edifcio (projeto, construo, manuteno, desconstruo). Porm, necessita
de um modelo digital em trs dimenses, o qual pode conter diversas informaes relacionadas
com o projeto, nomeadamente, caractersticas geomtricas, propriedades (fsicas e mecnicas),
atributos, prazos, custo de construo, entre outras. Alm disso, tem a capacidade para guardar
informaes paramtricas com relao entre os diversos elementos e ainda permite o apoio nos
fluxos de trabalho entre as diferentes atividades relacionadas com o processo construtivo [3].

Esta metodologia permite efetuar uma simulao do projeto num ambiente virtual e como
resultado possvel extrair-se com facilidade quantidades e propriedades dos materiais. Alm
disso, trata-se de um processo que engloba todas as especialidades num nico modelo virtual
permitindo uma colaborao mais precisa e eficiente quando comparada com o mtodo
tradicional. [4].

2.2 Dimenses BIM


A dimenso 3D desta metodologia permite a criao de um modelo tridimensional do projeto
ligeiramente diferente do 3D convencional, visto que possvel atribuir a cada elemento as
respetivas propriedades. Alm disso, permite identificar possveis conflitos numa fase inicial
do projeto, sendo assim possvel resolv-los antes de iniciar a respetiva construo. Se ao
modelo 3D lhe for associado a varivel tempo, entra-se numa nova dimenso, conhecida como
BIM 4D. Nesta fase do projeto possvel efetuar-se o planeamento e a organizao da
construo, visto que os programas aptos para trabalhar nesta dimenso apresentarem
ferramentas que permitem a representao visual da utilizao do espao envolvente obra
durante o perodo de construo, permitindo ainda a colocao de componentes temporrios,
tais como, gruas, veculos e respetivos acessos. Ainda nesta dimenso possvel efetuar um
planeamento, o qual pode sofrer alterao medida que a obra vai avanando e se vai
verificando derrapagens no prazo estipulado para a entrega da obra [8]. Na metodologia
tradicional, habitualmente usa-se o diagrama de barras ou de redes para planear as atividades

439
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

de construo, contudo estes no consideram a configurao espacial relacionada com as


atividades e nem permitem a criao de um vinculo entre as atividades e os elementos do
respetivo modelo. Desta forma, os modelos BIM 4D trazem uma nova abordagem ao
planeamento e controlo de obra, sendo considerado uma abordagem superior ao mtodo
tradicional, verificando-se mais melhorias ao nvel da visualizao, pois permitem clarificar a
sequncia de construo e diminuir a ambiguidade na perceo de constrangimentos espaciais,
obtendo-se benefcios em termo de tempo e custos, como admitem vrios estudos. De uma
forma sucinta, o BIM 4D consiste na associao do BIM 3D com o mtodo CPM (Critical Path
Methods), sendo utilizado essencialmente como ferramenta de visualizao e comunicao,
visto que assinala os trabalhos j realizados e os que ainda falta executar. Contudo, torna-se
complicado a utilizao de modelos 4D no planeamento visto ser necessrio modelos 3D e
CPMs muito detalhados de modo a refletir a estrutura de tarefas que a obra na realidade tem
que seguir [9]. Os grficos de Gantt ainda continuam a ser uma das apostas no setor da
construo relativamente aos mtodos CPM, apesar de j serem conhecidas as suas limitaes.
Estes diagramas foram desenvolvidos com um nico objetivo, nomeadamente, planear a carga
de trabalhos, prazos e responsabilidades, sendo para isso suficiente. O grande problema reside
em descreverem o processo numa nica localizao, no permitindo planear e monitorizar
mltiplas equipas simultaneamente. Desta forma, a Linha de Balano (LOD) surge como sendo
uma soluo face s limitaes do mtodo tradicional tendo a capacidade de responder a
mltiplas localizaes, representar de forma contnua as diferentes tarefas e ainda permite a
visualizao de dependncias, movimentos de recursos e planeamento de equipas,
possibilitando a medio da produtividade dessas equipas (Figura 1) [10].

Figura 1: Comparao entre o Diagrama de Gantt e a Linha de Balano.

De seguida, tem-se a dimenso 5D a qual corresponde uma evoluo da dimenso 4D atravs


da adio da varivel custo, tornando-se possvel prever e controlar os custos em todas as fases
de construo. Com a evoluo do modelo, as estimativas de custo so melhoradas consoante
o aumento do nvel de detalhe do mesmo. Adicionalmente, permite aos profissionais da AEC a
anlise de diferentes alternativas de custo em qualquer fase do projeto, sendo que a anlise de
custos extradas do modelo 5D tambm pode ser utilizado para medir o desempenho financeiro
do estado atual de construo. De forma sucinta, esta dimenso procura extrair as quantidades
para execuo dos elementos. No caso de um pilar, necessrio extrair as quantidades
referentes armadura, cofragem, ao beto e ao revestimento final (Figura 3). Alm da
quantificao das reas necessrio identificar os recursos envolvidos, tais como
equipamentos, mo-de-obra e materiais. Nesta fase possvel determinar o custo de construo

440
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

do projeto atravs das quantidades takeoffs obtidas na dimenso anterior. Torna-se importante
referir que todas as alteraes efetuadas ao longo do projeto so refletidas nos valores obtidos
inicialmente. Nesta fase necessrio avaliar todos os recursos necessrios para realizao de
uma determinada tarefa sendo que o custo dessa mesma tarefa influenciado pelo valor
associado a cada recurso.

Figura 2: Processo utilizado no BIM 5D.

Na dimenso 6D, normalmente conhecida como Facilities Management (FM), possvel gerir
o ciclo de vida do projeto visto que at chegar a esta fase os projetistas criaram e atualizaram
todos os modelos durante toda a fase de construo, podendo-se considerar que o modelo
construdo corresponde ao real, sendo atribudo a cada elemento todas as informaes de
operaes e manutenes efetuadas. Desta forma, o modelo dever ser capaz de dizer quando
que determinado elemento ir necessitar de manuteno [8].

3. Implementao BIM - Caso de Estudo

3.1 Projeto SAKTHI Portugal SP21


A empresa Construes Gabriel A.S. Couto S.A iniciou no ms de maro de 2016, a construo
das novas instalaes da SAKTHI Portugal SP21. A mesma ser construda no Parque
Empresarial do Casaro, concelho de gueda, tendo um prazo de execuo de 340 dias a contar
com a data da adjudicao, estando previsto o arranque da produo para 01 de fevereiro de
2017.

A nova unidade ir produzir componentes de segurana crtica para automveis em ferro


nodular, tais como sistemas de travo, transmisso, suspenso e motor.

Dado o curto perodo de execuo da empreitada verificou-se a necessidade decorrer em


paralelo a execuo das estruturas de beto armado, bem como da preparao e fabricao da
estrutura metlica, das estruturas e elementos referentes chapa estrutural.

441
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A construo da nova Unidade Industrial Jpiter desenvolve-se num terreno com


aproximadamente 232 mil metros quadrados. A nave principal ser concebida como uma
estrutura porticada que se desenvolve em planta, num retngulo de 260x75 m2, estando os
prticos espaados entre si a uma distncia de 10 metros, sendo garantida a entrada de luz
natural a cada 20 metros, medida correspondente distncia entre os prticos principais.
Transversalmente, o edifcio apresenta duas zonas laterais de 12,5 metros cada e uma zona
central de 50 metros, com uma fiada de pilares ao eixo, perfazendo uma largura total de 75
metros. de salientar que a geometria da empreitada foi adaptada s necessidades funcionais
de explorao, havendo a necessidade de um p direito de 26,5 metros na zona da fuso (fachada
norte) e de 14 metros na zona de expedio (fachada sul).

A estrutura do edifcio constituda pelas fundaes em beto armado, estruturas principais em


perfis laminados e reconstrudos e chapas autoportantes entre os prticos principais. A parte da
estrutura metlica central ser apoiada sobre os pilares circulares centrais enquanto a restante
parte sobre os plintos de beto armado.

Assim sendo, pode-se admitir que a construo desta empreitada encontra-se dividida em 4
fases:
Execuo das fundaes e pilares de beto armado, incluindo aplicao de
chumbadouros.
Montagem dos prticos principais, pilares, vigas e travamentos.
Montagem de cavaletes e calhas sobre a estrutura metlica para apoio da chapa
estrutural.
Montagem da chapa estrutural entre prticos principais, com um comprimento de 20
metros cada.

Tendo em conta a entrega definida para os equipamentos, foi verificada a necessidade de se


iniciar a empreitada a partir da fachada norte (zona da fuso) para a sul (zona de expedio).
No entanto, essa tomada de deciso condicionou o desenrolar dos trabalhos, pois a zona junto
fachada norte corresponde zona mais complexa da obra, quer em termos de estrutura de
beto armado como tambm de estrutura metlica [11]. A figura seguinte mostra os modelos
Revit criados pelos respetivos projetistas.

Figura 3: Edificio Jpiter Estrutura (esq.) e Arquitetura (dir.).

3.2 Metodologia Utilizada


Numa fase inicial foi necessrio proceder recolha de toda a informao e/ou documentao
necessria relativamente ao projeto, tendo esta sido disponibilizada pela empresa. Foram

442
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

disponibilizados documentos em formato PDF e DWG do projeto, bem como os respetivos


modelos em Revit por especialidade, nomeadamente, modelo de arquitetura, estruturas e
AVAC. No entanto, ao longo do desenvolvimento do projeto, o mesmo foi sujeito a vrias
revises e/ou alteraes, feitas pelas respetivas equipas de projeto, por forma a aproximar-se o
mais possvel do resultado final pretendido e tambm corrigir algumas incoerncias encontradas
entre as diferentes especialidades. Apesar das vrias informaes recebidas, importante referir
que para este trabalho achou-se por bem centrar nas especialidades mais importantes da obra e
as que apresentam um maior volume de obra, nomeadamente, Estruturas, Arquitetura e AVAC.
Alm disso, tendo em conta o tempo de execuo e a dimenso da obra, optou-se por tratar
apenas da nave principal da obra, mais propriamente, o Edifcio Jpiter.

Recolhida toda a informao procedeu-se anlise dos modelos recebidos de forma a avaliar a
forma de modelao usada por cada equipa de projeto. Posteriormente, com o auxlio de um
software de coordenao (Solibri Model Checker), avaliou-se a qualidade dos modelos atravs
da anlise das incompatibilidades entre os diferentes modelos e alm disso verificou-se at que
ponto os modelos se encontravam parametrizados, isto , avaliou-se se os modelos
apresentavam informaes referentes geometria e propriedades dos elementos e tambm se
estes se encontravam classificados. Posto isto, deu-se inicio implementao do BIM 4D e 5D
para o projeto em estudo.

Antes de iniciar qualquer trabalho no software Vico foi necessrio elaborar alguns trabalhos
prvios, nomeadamente, atualizao do mapa de trabalhos e quantidades (MTQ) fornecido pela
empresa, documento que serviu de base ao processo de concurso. No MTQ foi necessrio
acrescentar algumas colunas e linhas de trabalho para adicionar dados que so necessrios
fornecer ao software, nomeadamente, linhas para definir todos os recursos necessrios para
cada tarefa, desde de mo-de-obra, materiais e equipamentos e colunas para adicionar a esses
recursos os respetivos rendimentos e preos unitrios. Nesta fase foi necessrio a utilizao do
software disponibilizado na plataforma online denominado por Gerador de Preos da CYPE,
que permite retirar os recursos associados a cada recurso, bem como os respetivos rendimentos
e preos unitrios [12]. Porm, foi necessrio proceder a alguns ajustes dos valores
correspondentes aos rendimentos e preos unitrios de cada recurso porque como foram
retirados diretamente do CYPE no correspondem na integra aos valores reais que serviram de
base ao clculo do valor total de cada tarefa. No entanto, se se fosse a trabalhar da forma mais
correto ter-se-ia de utilizar os valores reais dos rendimentos calculados pela empresa. Aps
colocados todos os recursos e respetivos rendimentos e preos unitrios, falta s proceder
classificao das tarefas e respetivos recursos, como manda o software. O Vico prev a
classificao em 6 nveis, desde do Code 1 ao Code 6, sendo que as classificaes utilizadas
em cada um desses nveis ligeiramente diferente. Do nvel 1 ao 4, inclusive, utiliza-se a
classificao Uniformat II, sendo que os Codes 1, 2, 3 e 4 correspondem aos Levels 1, 2, 3 e 4
dessa classificao, respetivamente. O Code 5 diz respeito tabela 22 do sistema de
classificao Omniclasse e por fim, o Code 6 consiste num sistema de classificao
desenvolvido pelo aluno, em que a primeira letra do cdigo diz respeito ao tipo de recurso em
questo, sendo que foi definido que a letra L correspondia mo de obra (Labor), o E
corresponde aos equipamentos e o M aos materiais.

443
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Finalizado e organizado o respetivo MTQ pode-se tratar da importao do mesmo para o


software utilizado, nomeadamente, Vico Office, sendo assim possvel trabalhar as dimenses
4D e 5D do BIM. Tendo em conta o funcionamento do programa, inicialmente procedeu-se
realizao do 5D do BIM, responsvel pela associao da varivel custo ao projeto. Neste caso
faz-se a associao direta das quantidades respetiva tarefa, calculando automaticamente o
custo associado a essa tarefa, sendo possvel no final obter um oramento da obra, o qual
comparado com elaborado pelo mtodo tradicional. Posto isto, pode-se dar inicio elaborao
do BIM 4D, responsvel pela associao da varivel tempo ao modelo 3D. Nesta fase do
trabalho possvel retirar do software o planeamento da obra atravs do mtodo da linha de
balano, sendo elaborado a partir dos dados fornecidos pela empresa. Neste caso, o planeamento
elaborado pela empresa foi feito atravs do mtodo CPM, mais concretamente, num diagrama
de barra, como dita a metodologia tradicional. Porm, semanalmente feito um levantamento
do executado em obra para perceber a evoluo da obra, funcionando como ferramenta de
monitorizao de obra.

3.3 Softwares Utilizados


A metodologia BIM exige a utilizao de vrios softwares de modo a cobrir todos as dimenses
BIM existentes e ainda assim, dentro da mesma dimenso possvel utilizar uma panplia de
softwares que no apresentam grandes diferenas entre si.

Neste caso, a escolha passou pela utilizao de programas que apresentam uma maior utilizao
ao nvel mundial, evidenciem maiores potencialidades e aqueles que o aluno j apresenta algum
conhecimento. Assim sendo, optou-se pela utilizao do Revit 2015 e 2016 para a modelao
em 3D, o Vico Office 5.1 para trabalhar a dimenso 4D e 5D do BIM, o Solibri Model Checker
v9.6 para a avaliao da qualidade de modelos funcionando como software de coordenao e
por fim, o Tekla BIM Sight como visualizador.

4. Resultados Obtidos

Dentro das responsabilidades assumidas, foi possvel tirar diversos resultados atravs do uso da
metodologia BIM no caso de estudo em anlise. Apesar deste trabalho se encontrar mais
centrado no BIM 4D e 5D foram realizados outros trabalhos associados ao BIM 3D, tendo estes
sido executados numa fase inicial do trabalho. Posto isto, com a realizao deste trabalho
procedeu-se inicialmente deteo das incompatibilidades entre os vrios modelos existentes
em obra (estrutura, arquitetura e AVAC), antecipando a deteo de alguns erros de projeto.
Procedeu-se ento importao em ifc dos modelos para o software Solibri Model Checker de
modo a efetuar-se a anlise das incompatibilidades. Isto s conseguido porque este software
permite a compatibilizao de todas as especialidades num nico modelo e a partir das regras
associadas a esse programa possvel verificar as incompatibilidades existentes sendo que
algumas colises merecem maior ateno comparativamente a outras. No que diz respeito
avaliao da qualidade dos modelos, o aspeto que mereceu mais ateno foi o facto que a
modelao das condutas enterradas do sistema de AVAC encontravam-se modeladas tendo em
conta o dimetro interior. Em consequncia, fez com que numa anlise preliminar se conclusse
que no existiam incompatibilidades entre o modelo de Estruturas e o de AVAC, sendo que tal
no estava certo. Desta forma, foi necessrio proceder a uma segunda anlise em que se teve

444
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

em considerao o dimetro real da tubagem. Neste caso, alm de ser necessrio ter em conta
o dimetro exterior, tambm preciso ter em ateno o dimetro da tubagem na zona da
campnula. Alm das incompatibilidades associadas aos elementos estruturais e as tubagens de
ventilao, tambm foram verificadas colises entre elementos constituintes do modelo de
AVAC e de Arquitetura, nomeadamente, conflitos entre difusores e portas/portes (Figura 4).

Figura 4: Incompatibilidades entre o modelo de Arquitetura e o de AVAC.

Ainda associado de certa forma ao BIM 3D procedeu-se extrao de algumas quantidades no


Revit que serviram como comparativo aos valores apresentados pelos subempreiteiros, como
por exemplo, quantificao da estrutura metlica, tal como se pode ver na figura seguinte.
importante referir que a extrao destas quantidades se tratou de uma situao especifica.
SAKTHI GASC GASC GASC GASC
A R T IGOS DESIGNAO UN Contrato PE 14,03,16 PE 09.06.16 PE 16.06.16 PE 20.07.16
MQT REVIT REVIT REVIT REVIT
2.2.7 AO PARA ESTRUTURAS METLICAS E MISTAS
2.2.7.1. Elementos metlicos com esquema de pintura tipo 1 sem proteo ao fogo 844.178,96 838.734,00 839.982,00 846.144,00 843.492,00
(ambiente C4)
2.2.7.1.1. Perfis laminados de seco aberta em ao S355JO kg 310.353,57 293.826,00 292.578,00 297.804,00 297.336,00
2.2.7.1.2. Perfis reconstitudos soldados em ao S355JO kg 430.013,76 427.284,00 430.872,00 430.872,00 430.872,00
2.2.7.1.3. Perfis tubulares em ao S355J2H kg 103.811,63 117.624,00 116.532,00 117.468,00 115.284,00
2.2.7.2. Elementos metlicos com esquema de pintura tipo 2 com proteo ao fogo R60 494.740,99 484.926,00 489.138,00 489.138,00 489.138,00
(ambiente C4)
2.2.7.2.1. Perfis laminados de seco aberta em ao S355JO kg 428.334,35 418.860,00 424.398,00 424.398,00 424.398,00
2.2.7.2.2. Perfis reconstitudos soldados em ao S355JO kg 40.567,18 40.404,00 37.674,00 37.674,00 37.674,00
2.2.7.2.3. Perfis tubulares em ao S355J2H kg 25.839,46 25.662,00 27.066,00 27.066,00 27.066,00

Figura 5: Quantificao da estrutura metlica.

Semanalmente procedeu-se criao de vista 3D do executado em obra atravs do


levantamento semanal dos novos elementos que vo sendo executados. A passagem dessa
informao para o modelo pode ser feita de vrias formas, ou atravs da alterao da fase do
elemento ou ento atravs da criao de um novo parmetro e a esse associar-se uma gradao
diferente. Este ltimo mtodo foi mais utilizado para a cobertura porque neste caso pretendia-
se fazer uma distino para cada elemento que a constitui, nomeadamente chapa BT114 (verde),
barreira pra-vapor (amarelo) e SkinZip (laranja), tal como possvel verificar na imagem
seguinte (Figura 6).

445
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Executado Cobertura a 19/09/2016 (Revit)

Alm dos 3D referentes cobertura, tambm so elaboradores todas as semanas vistas


referentes ao levantamento da estrutura metlica, bem como das estruturas em beto armado
(sapatas, plintos, pilares, entre outros). No entanto, para estes casos apenas se diferenciava os
elementos que j se encontravam executados atravs da alterao da fase em que o mesmo se
encontrava, ou seja, o elemento passava de uma fase com designao New Constrution para
Existing, sendo que a cor associada a cada uma dessas fases o cinza e o verde, respetivamente.
Atravs desta alterao de fases possvel de uma forma rpida destinguir os elementos
executados em obra comparativamente com os que ainda faltam concluir, tal como mostra a
figura seguinte.

Figura 7: Executado Estrutura Metlica (esq.) e Beto Armado (dir.) a 19/09/2016 (Revit).

Aquando a importao e ativao dos modelos no Vico possvel verificar todas as quantidades
existentes, podendo estas ser organizadas de forma diferente. No entanto, o objetivo passa
sempre pela agregao do maior nmero de informao num nico parmetro, isto , pretende-
se por exemplo agrupar todas as sapatas num nico cone, sendo que, tambm se pretende que
a poltica adotada na organizao das quantidades se adapte o mais prximo possvel ao
articulado da obra, para assim ser mais fcil organizar toda a informao para o oramento que
ser elaborado na 5 dimenso do BIM (Figura 8). No entanto, a organizao da informao foi
diferente de modelo para modelo. No caso da especialidade de estruturas, procurou-se agrupar
elementos iguais na mesma categoria, isto , juntar todas as sapatas da obra num nico tpico.
Isto s foi possvel porque o Revit tem a capacidade de criar novos parmetros, o que permitiu
a criao de um parmetro Vico 01, igual ao que aparecia quando se escolhia de que forma se
pretende organizar a informao no Vico. Quando ao modelo de arquitetura e de AVAC, a
informao foi organizada tendo em conta o nome e tipo de famlia.

446
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Quantidades obtidas a patir da importaao dos modelos para o Vico.

Contrariamente ao habitual, e conforme referido, neste software a parte referente ao BIM 5D


necessita de ser elaborada numa fase anterior ao BIM 4D, visto que para a realizao do
planeamento necessrio a quantificao de todas os recursos necessrios a todas as tarefas.
Assim sendo, foi necessrio trabalhar o articulado por forma a colocar todos os recursos nas
diferentes tarefas, bem como os respetivos rendimentos e preos unitrios de cada recurso.
Nesta fase, as quantidades associadas a cada recurso so feitas atravs da associao direta das
quantidades do modelo o que permite, caso haja atualizao e/ou reviso do projeto, fazer de
forma automtica a alterao das quantidades. Preenchidos todos esses critrios pode-se dar por
concludo a primeira verso do oramento elaborado atravs da metodologia BIM. Contudo,
importante salientar que o mesmo pode sofrer alteraes medida que se vai tratando do BIM
4D pois caso se verifique necessidade de recorrer a mais mo-de-obra, material e/ou
equipamento para uma determinada tarefa por forma a garantir o cumprimento dos prazos, o
ajustamento no BIM 5D feito de forma automtica. Na tabela seguinte pode-se verificar as
diferenas existentes entre os valores obtidos no mapa de quantidades atravs da metodologia
tradicional e da metodologia BIM.

447
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Comparao dos valores do Mapa de Quantidades obtidos atravs da metodologia


tradicional e da metodologia BIM.
Mapa de trabalhos e quantidades
Valores totais
Code 1 Designao
Metodologia Tradicional Metodologia BIM
A Substruture 1.284.479,85 1.452.290,64
B Shell 2.953.608,14 2.325.533,05
C Interiors 1.264.475,72 957.265,55
D Services 974.787,62 1.268.570,48
E Equipment & furnishings 71.151,94 110.840,29
F Special construction & demolition 2.435.458,90 1.850.738,98
G Building sitework 23.965,93 24.085,78
Total 9.007.928,11 7.989.324,77

5. Concluses

O BIM surge como sendo um novo paradigma dentro do setor das AEC, o qual incentiva uma
interao entre todas as especialidades existentes num projeto de construo, permitindo um
aumento da eficincia de todas as partes interessadas.

Atravs da construo de modelos virtuais parametrizados consegue-se extrair quantidade de


forma automtica, evitando-se a ocorrncia de erros, tal como se verificou aquando a
importao dos modelos para o Vico e atravs das tabelas de quantidades obtidas a partir do
Revit. Quanto ao BIM 4D e 5D, estas dimenses tm fortes potencialidades, pois nesta fase
procura-se associar os elementos de forma automtica aos recursos, e no caso de haver uma
reviso do projeto, basta atualizar o respetivo modelo e as alteraes so efetuadas
automaticamente. Numa das revises do projeto verificou a necessidade de construir uns
macios que no estavam contabilizados no projeto inicial numa determinada zona da obra.
Caso se estive a utilizar a metodologia tradicional, para quantificao desses novos macios
seria necessrio avaliar as dimenses e calcular mo as respetivas quantidades. Em
contrapartida, a metodologia BIM faz isso de forma automtica, isto , atualizando-se o modelo,
o prprio programa faz uma leitura das diferenas entre o modelo inicial e a atualizao,
quantificando de forma automtica essas alteraes.

Quando se compara as metodologias na parte do 5D verifica-se que na metodologia BIM avalia-


se e contabiliza-se todos os recursos associados a uma determinada tarefa contrariamente ao
mtodo tradicional que apenas tem em considerao a quantificao da tarefa e no dos
recursos. Alm disso, nesta metodologia o oramento gerado de fcil leitura em qualquer pas
visto que se encontra classificado com uma classificao mundial. Adicionalmente, tambm se

448
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

pode verificar que a aplicao desta metodologia trs diversas vantagens na deteo de
incompatibilidade, pois possvel detet-las de uma forma rpida e numa fase antecedente ao
inicio da empreitada, o que permite uma resoluo prvia dos problemas. Alm disso, permite
a produo automtica de informao. Apesar disso, esta metodologia apresentou algumas
limitaes e/ou problemas relativamente a este caso de estudo, os quais so relacionados com
a organizao das quantidades e com a importao do modelo de AVAC para o software. Este
ltimo problema est relacionado com a incompatibilidade entre o Revit 2016 e o software Vico
instalado. Desta forma, foi necessrio exportar o modelo em formato ifc e da importar para o
Vico, o que tambm trouxe algumas limitaes na organizao da informao.

Nesta situao em concreto, a empresa encontra-se a avaliar as vantagens e desvantagens da


implementao desta metodologia, tornando-se importante salientar que a implementao BIM
passa por vrios estgios, sendo que o ritmo de trabalho e aprendizagem numa fase inicial
bastante lenta comparativamente com investimento necessrio. Porm, medida que a empresa
vai evoluindo neste ambiente, a aprendizagem ter um aumento exponencial retirando-se mais
benefcios da sua implementao.

Referncias

[1] A. R. F. Poas, Planeamento e controlo de projetos de construo com recurso ao BIM,


Universidade do Minho, 2015.
[2] J. Patacas and N. Cachadinha, Metodologia para suporte da colaborao na indstria
AEC baseada em BIM e em interoperabilidade, pp. 112, 2012.
[3] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, Encontro Nac. Beto Estrutural -BE2012, pp. 2426, 2012.
[4] S. Azhar, Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry, vol. 11, no. Bazjanac 2006, pp. 241252, 2011.
[5] D. M. de Brito and E. de A. M. Ferreira, Avaliao de estratgias para representao e
anlise do planejamento e controle de obras utilizando modelos BIM 4D, Ambient.
Construdo, vol. 15, no. 4, pp. 203223, 2015.
[6] A. C. M. Barbosa, A Metodologia BIM 4D e BIM 5D aplicada a um caso prtico
Construo de uma ETAR na Arglia, Instituto Superior de Engenharia do Porto, 2014.
[7] P. Smith, Project cost management with 5D BIM, Procedia - Soc. Behav. Sci., vol.
226, no. October 2015, pp. 193200, 2016.
[8] Out-Low.com, Building Information Modelling. [Online]. Available: http://www.out-
law.com/en/topics/projects--construction/projects-and-procurement/building-
information-modelling/. [Accessed: 25-Aug-2016].
[9] A. Monteiro and J. P. Martins, Linha de Balano- Uma nova aboragem ao planeamento
e controlo de actividades de construo, 2011.
[10] ndBIM Virtual Building, Uma metodologia avanada de planeamento potenciada pelo
BIM, 2015. [Online]. Available: http://ndbim.com/index.php/pt/component/k2/item/4-
uma-metodologia-avancada-de-planeamento-potenciada-pelo-bim. [Accessed: 23-Sep-
2016].
[11] C. Rito, R. Poas, and T. Couto, Em foco, pp. 89, 2016.
[12] S. A. CYPE Ingenieros, Gerador de Preos.Portugal. [Online]. Available:
http://www.geradordeprecos.info/.

449
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

450
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

REABILITAO DE UM EDIFCIO PBLICO: CONTRIBUTO PARA


A INTEROPERABILIDADE ENTRE BIM E PRONIC
Rodrigo Giollo(1), Maria Joo Falco Silva(2), Paula Couto(3)

(1) Universidade Lusfona de Humanidades e Tecnologias (ULHT), Lisboa


(2) Laboratrio Nacional de Engenharia Civil (LNEC) / ULHT, Lisboa
(3) LNEC, Lisboa

Resumo
A necessidade de evoluo dos mtodos e processos, conduz a uma procura constante por
tecnologias mais eficientes, com vista maximizao da qualidade. O setor da Arquitetura,
Engenharia, Construo e Operao (AECO) deve acompanhar o desenvolvimento tecnolgico.
Por mais heterogneo que o setor seja, j no so aceitveis desvios de prazos e custos.

O Building Information Modelling (BIM), fundamentado em sistemas de informao que


permitem o registo e armazenamento de dados por todos os intervenientes e durante todas as
fases do ciclo de vida do projeto, baseia-se numa modelao parametrizada de objetos que
originam modelos inteligentes. O BIM atualmente uma realidade em alguns dos pases mais
desenvolvidos do mundo, sendo os ganhos obtidos pela sua implementao inegveis, tanto na
construo nova como na reabilitao.

Uma ligao entre o BIM e o Protocolo para Normalizao da Informao Tcnica da


Construo (ProNIC), apta a produzir de forma normalizada toda a informao tcnica e
econmica de um empreendimento, seria uma mais valia para a gesto da informao na
construo.

Este artigo tem por finalidade estruturar um mtodo que permita a interoperabilidade, sem
contemplar a parte informtica da ligao, entre BIM e ProNIC, e que englobe todo o processo
construtivo no setor AECO, e ainda aplic-lo ao caso de estudo da reabilitao de um edifcio.

1. Introduo

O setor da construo civil, de participao reconhecidamente significativa no Produto Interno


Bruto nacional portugus, semelhana do que acontece na maioria das economias mundiais,
um forte indicador de desenvolvimento, tanto econmico quanto social do pas.

451
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Estima-se que para cada posto de trabalho direto criado pela atividade, cerca de outros 3 novos
empregos sejam gerados [1]. O que torna o setor merecedor de primordial importncia junto do
Estado, uma vez que grande parte das obras realizadas advm de contrataes pblicas,
principalmente frente a um cenrio de crise econmica e escassez de investimentos.

Trata-se de uma atividade diferenciada das pertencentes a outros ramos da economia, devido
grande diversidade de mo-de-obra, produtos, clientes (setor pblico e privado), mtodos,
processos e tecnologias associadas, as ferramentas de trocas e uniformizao de informao
tm impacto direto na qualidade final do empreendimento.

As ferramentas que proporcionem ao utilizador uma antecipao na deteo de erros,


constrangimentos, sobreposies de elementos, testes de solues construtivas e at mesmo
avaliaes de eficincia energtica de edifcios, como o que acontece no caso do BIM, so
fundamentais para o desenvolvimento do setor onde a competitividade cada vez maior e j
no so admitidas derrapagens nos custos e prazos de realizao ainda presentes. Uma ligao
que pudesse ser elaborada entre os modelos BIM e a aplicao ProNIC, que possui como
funcionalidade a produo de forma automtica de todo o contedo tcnico necessrio na
elaborao de projetos, de forma padronizada, tornaria possvel gerar toda a documentao
escrita e desenhada de uma obra, estimativas oramentais mais precisas, evitando derrapagens
nos prazos por evitar a repetio de trabalhos bem como desperdcios de materiais. De facto,
esta proposta constitui um grande salto em direo qualidade para o setor.

Este artigo baseia-se na tese de mestrado do mesmo ttulo que tem vindo a ser desenvolvida ao
abrigo do protocolo existente entre o LNEC e a ULHT e que tem como objeto de estudo a
reabilitao de um edifcio pblico localizado na zona metropolitana de Lisboa.

2. Tecnologias e sistemas de informao

Os sistemas de informao correspondem a conjuntos organizados de elementos (pessoas,


procedimentos, dados) que interagem entre si com a finalidade de recolher, processar,
armazenar, analisar e distribuir a informao com objetivos especficos [2].

2.1 BIM
Do ponto de vista conceptual, o BIM um mtodo de produo, integrao e gesto da
informao entre todos os intervenientes de um projeto e transversal a todas as fases do ciclo
de vida de uma construo. Tem por base um modelo digital manipulvel que permite simular
virtualmente, atravs de um software adequado s necessidades, o ambiente real [3].

O conceito BIM possui diversas interpretaes. O National Institute of Building Sciences


(NIBS), para fins de estudo, divide o BIM em trs nveis de abordagem. O BIM pode ser
entendido como [4]:

Produto: o modelo final da edificao. Depois de passar pelo processo de criao que
teve por base as ferramentas de informao e os processos abertos do projeto o resultado
um modelo da edificao;

452
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Ferramenta: so as aplicaes informticas capazes de interpretar, representar, agregar,


transmitir e receber as informaes do modelo da edificao;
Processo: as diferentes especialidades de um projeto trabalham simultaneamente e em
colaborao umas com as outras durante todas as fases do ciclo de vida de uma
construo.

Os modelos BIM tm como principais particularidades, e que os diferenciam da modelao


comum tridimensional, o fato de utilizarem uma modelao orientada por objetos e respeitarem
as relaes paramtricas dos elementos, o que agrega ao modelo no s as caractersticas
geomtricas dos elementos presentes na construo como janelas, portas, pilares, vigas ou
qualquer outro, mas tambm as particularidades, propriedades e atributos de cada um dos
elementos. capaz de associar informaes topogrficas, materiais construtivos, quantidades,
custos e prazos [5]. Por esta razo e consoante o tipo de informao a ser analisada, diz-se que
os modelos BIM so capazes de alcanar para alm das 3 dimenses do espao euclidiano,
sendo conhecidos por modelos nD e tm em conta:

Figura 1: Dimenses de um modelo BIM, adaptado de [6]

Alguns autores divergem a respeito de quais informaes poderiam ocupar os nveis 6D e 7D,
outros consideram a existncia de um nvel 8D representado pelas componentes de segurana
e preveno de acidentes [7]. Neste sentido, verifica-se a inexistncia de uma opinio
consensual no que se refere a este assunto. A Figura 1 ilustra as caractersticas mais
frequentemente aceites.

Os modelos BIM podem ser classificados ainda quanto ao seu Level of Development (LOD),
ou em portugus, Nvel de Desenvolvimento, que diz respeito quantidade, ao tipo e
qualidade da informao armazenada no modelo. Os LODs so divididos pela American
Institute of Architects (AIA) em 5 categorias e vo do LOD100 ao LOD500 [8]. Quanto maior
for o LOD, maior o nmero de detalhes e maior a fiabilidade das informaes. Deve-se,
entretanto, estar atento s reais necessidades de detalhes que cada fase do projeto requer, uma
vez que medida que o LOD aumenta, cresce significativamente o investimento empregado
em tempos, recursos e esforos para introduo de informaes no modelo.

453
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.2 ProNIC
O ProNIC funciona como uma grande biblioteca de dados de conhecimento de trabalhos de
construo, que inclui a informao tcnica necessria ao projeto e abrange dois dos maiores
tipos de construo do setor, nomeadamente, Edifcios (tanto na construo nova como na
reabilitao) e Estradas. Neste sentido, atua como uma eficiente ferramenta de gesto e
articulao dos contedos tcnicos, por estar associado a aplicaes informticas que permitem,
aos diferentes agentes que participam do processo construtivo, cumprir as exigncias
regulatrias e legais impostas, de forma mais facilitada e precisa, com destaque para as
Medies Detalhadas, Estimativas Oramentais, Mapas de Quantidade de Trabalhos e ainda os
Cadernos de Encargos (CE) [9].

A base de dados do ProNIC organizada segundo uma estrutura hierarquizada de trabalhos em


Work Breakdown Structure (WBS), ou seja, a totalidade da informao estruturada e
organizada dividindo-se o projeto em trabalhos, atividades ou tarefas. uma forma de
subdividir os trabalhos e gerir a informao, com resultados orientados em formato de rvore
ou grfico, do mais geral para o mais especfico at que se chegue no grau de pormenorizao
pretendido, um artigo, que corresponda a uma medio de um trabalho especfico e que tenha
associado a si um preo unitrio individualizado [10,11].

O ProNIC conta com um primeiro nvel de desagregao da WBS para Edifcios, que engloba
trabalhos de construo em geral e tcnicas de reabilitao, e que compreende 26 captulos. E
uma segunda WBS para obras de infraestruturas rodovirias dividida em 10 captulos. Esta
desagregao da obra por captulos usada pelas diferentes especialidades e tem por base as
regras de medio do LNEC [12]. Os nveis hierrquicos subsequentes decompem estes
captulos e, para cada nvel, associam um cdigo numrico:

Figura 2: Nveis hierrquicos dos captulos no ProNIC

O modelo adotado para trabalhos de construo nova de Edifcios segue a diviso por captulos,
consoante as diferentes especialidades, enquanto que as obras de reabilitao se encontram
estruturadas segundo as diferentes tcnicas de interveno. Neste caso so definidas segundo
um artigo de reabilitao ou combinao de vrios artigos de trabalhos de Edifcios at que os
trabalhos fiquem completamente definidos [13].

No que diz respeito aos contedos tcnicos, o ProNIC capaz de gerar automaticamente Fichas
de Execuo de Trabalhos e Fichas de Materiais, organizadas e estruturadas uniformemente.
Trazem, associadas a si, referncias s boas prticas de execuo, normas e especificaes
aplicveis a cada caso (trabalhos e materiais) e ainda indicam medidas relacionadas com a
segurana, manuteno e utilizao. So as fichas que posteriormente daro origem as clusulas
tcnicas gerais do CE. O resultado um documento com toda a informao organizada por

454
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

captulos, consoante o tipo de obra e disposta segundo uma estrutura padronizada de descrio
de trabalhos e de materiais [14].

3. Interoperabilidade

A interoperabilidade corresponde capacidade que um sistema possui de interagir com outro,


transmitir e receber informaes de forma clara e inequvoca apesar da diversidade de formatos
e softwares existentes.

3.1 Enquadramento terico


No sentido de existir a interoperabilidade entre dois sistemas importante que ambos trabalhem
com formatos abertos. O Industry Foundation Classes (IFC), o formato universal habitual de
representao de objetos e de trocas de dados entre sistemas e modelos BIM. Ele funciona como
um desmaterializador de elementos em componentes bsicos: geometria, relaes e
propriedades.

A estrutura IFC dividida em camadas que funcionam de acordo com uma hierarquia de
referncia em rvore, dos mdulos mais genricos aos mais especficos [15]. Assim, tanto o
utilizador poderia introduzir dados em ProNIC e ter a equivalncia representada por meio de
IFC no BIM, como introduzir diretamente o cdigo IFC no BIM e dele extrair a informao do
ProNIC.

3.2 Metodologia proposta


Depois de vencida a barreira da interoperabilidade entre os dois sistemas que exigir um
minucioso trabalho informtico que no est no mbito do presente trabalho, torna-se possvel
no s que as diferentes especialidades do projeto trabalhem em simultneo como ainda se
alcance ao pormenor, cada detalhe necessrio, tanto do ponto de vista normativo e documental
quanto dos elementos desenhados e suas relaes. Acrescenta-se aos benefcios j referidos as
vantagens de que a qualquer momento, alteraes efetuadas no projeto por qualquer das
especialidades, se propagam em tempo real e para todos os intervenientes.

Com efeito, prope-se que seja adotado o seguinte mtodo de associao ao estabelecer-se a
ligao entre o BIM e ProNIC [16]:

Fase 1: Estabelecimento de um procedimento sequencial normalizado de construo de objetos


em BIM de forma a satisfazer os requisitos de informaes e de detalhes (LOD), que cada fase
do processo construtivo necessita, por parte de cada interveniente envolvido no processo
construtivo;
Fase 2: Definio das regras de cumprimento da legislao portuguesa em vigor,
aplicadas ao setor, estabelecidas por mtodos de gesto da informao;
Fase 3: Estabelecimento de uma ligao de correspondncia da ferramenta geradora
documental de trabalhos da construo ProNIC com a metodologia BIM;
ProNIC procede de forma a dividir os trabalhos de construo em captulos,
subcaptulos e por fim, artigos. Atribui um cdigo numrico nico a cada um dos

455
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

trabalhos de construo que funciona como uma legenda associativa, isto , certo cdigo
diz respeito sempre a certo trabalho de construo;
Na parametrizao de objetos BIM, a cada elemento presente no modelo estariam
associados vrios artigos do ProNIC, tantos quanto se fizessem necessrios de forma a
caracteriza-lo perfeitamente;
No diz respeito s especialidades de projeto, as duas ferramentas, BIM e ProNIC j
esto de acordo e compreendem a legislao.

A medida que o modelo BIM vai sendo construdo e que os LODs forem aumentando, os
objetos integrantes do modelo vo ganhando as informaes requeridas pelo software BIM
utilizado [8], bem como, e de forma automtica, as informaes tcnicas geradas pelo ProNIC,
para que desta maneira se possa elaborar o CE, as medies detalhadas, os mapas de
quantidades de trabalho e as estimativas oramentais precisas com relativa facilidade. O
ProNIC faz ainda meno s boas prticas de trabalho, normas de segurana a serem seguidas
e toda a informao tcnica dos materiais de construo utilizados, todas de acordo com a
legislao vigente [13], desta forma, quando associados ao modelo construdo em BIM o
utilizador pode contar com informaes fiveis, completas e em qualquer fase do projeto de um
empreendimento.

4. Caso de estudo

O Instituto Nacional de Investigao Agrria e Veterinria (INIAV) pretende concentrar os


diversos laboratrios dos organismos ligados investigao, em funcionamento em diferentes
locais de Lisboa, num s local, no edifcio existente na Quinta do Marqus, em Oeiras.

Com este propsito, o edifcio construdo em 1966 ser o alvo de uma interveno que
compreende a reabilitao e adaptao das salas e laboratrios existentes, as novas instalaes
do Laboratrio Nacional de Referncia de Sade Animal, bem como adaptar redes de energia,
rede estruturada (voz e dados) e segurana contra incndio do edifcio.

A interveno no se deu na totalidade do edifcio, mas apenas numa parcela, nomeadamente a


ala poente.

Figura 3: rea intervencionada.

456
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.1 Modelao em BIM


A primeira deciso a tomar aquando da modelao do edifcio em BIM foi a seleo do software
a utilizar. Tendo em vista os objetivos a alcanar atravs da metodologia a ser proposta de
interligao das ferramentas que utilizam BIM e a aplicao ProNIC, e que o foco da
interveno foi orientado principalmente para a reabilitao, entendeu-se que a melhor escolha
fosse um software BIM voltado para a arquitetura.

O BIM agrega ao modelo no s as caractersticas geomtricas dos elementos presentes na


construo como janelas, portas, pilares, vigas ou qualquer outro, como tambm incorpora as
particularidades, propriedades e atributos de cada um dos elementos, desta froma, qualquer
objeto presente no modelo carrega consigo informaes importantes, ainda que visualmente
aparente ser apenas uma representao em 3 dimenes.

A figura 4, que se apresenta a seguir, demonstra a capacidade de aproximao que o modelo


possui quando comparado com o ambiente real, mesmo em LODs intermdios. Apesar de no
se justificar um acrscimo at os nveis mais altos de desenvolvimento da informao, no
mbito deste estudo, de referir que poderamos ir muito alm, a ferramenta permite que nos
aproximemos ainda mais da realidade que est representada, chegando-se a pormenores como
a textura dos objetos.

Figura 4: a) Fachada; b) Modelo-fachada; c) Sala-edifcio; d) Modelo-sala-edifcio.

Levou-se em considerao ainda a capacidade para demonstrar, em qualquer momento, os


diferentes estgios da obra, especialmente importante em reabilitaes de edifcios como o do
caso de estudo.

A ttulo exemplificativo, apresentam-se em seguida as imagens referentes aos trabalhos de


reabilitao do piso da cave do edifcio.

457
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 5: a) Pr-demolio; b) A demolir; c) A construir; d) Estado final.

Conforme pode-se observar na Figura 5, o software adotado permite ao utilizador ter no s


uma viso parcial, mas tambm uma viso geral da interveno, em diferentes fases da
renovao, com possibilidade de sinalizar elementos a construir (representados a vermelho) ou
a demolir (representados a amarelo) facilitando a visualizao e, por conseguinte, garantindo a
fiabilidade do projeto.

4.2 Modelao em ProNIC


De forma a ilustrar o funcionamento da modelao no ProNIC e dado o elevado nmero de
trabalhos existente, optou-se por apresentar neste artigo dois dos itens constantes na
interveno, nomeadamente a demolio de paredes interiores e o isolamento trmico de
coberturas.

Figura 6: Estrutura em rvore dos trabalhos

O captulo 3 do ProNIC trata dos trabalhos de demolio. O utilizador tem diante de si, ao nvel
do artigo, opes de preenchimento representadas em cada campo editvel por $ e
apresentadas na Tabela 1, que posteriormente conduzem descrio completa do trabalho,

458
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

conforme segue: Demolio parcial ($8) de paredes simples de tijolo ($1) cermico furado ou
perfurado ($2) e a dos seus eventuais revestimentos, considerando triagem na prpria obra
($3) e reciclagem de todos os materiais, de acordo com as peas escritas e desenhadas do projeto
e a legislao em vigor. Inclui carga, transporte e descarga ($5), todas as tarefas necessrias
para a realizao dos trabalhos, assim como para a limpeza do local. Considera-se includa a
implementao das medidas de segurana consideradas necessrias para a realizao dos
trabalhos.

Tabela 1: Caractersticas das demolies de alvenarias de paredes internas do ProNIC


Campos a preencher Caractersticas tcnicas
$8 Tipo de Demolio Integral; Parcial; Localizada
$1 Tipos de Paredes Armadas; No armadas
$2 Tipo de Tijolo Furado ou perfurado; Macio; Outros
$3 Local de Triagem Na prpria obra; Local no afecto a obra
$6 Escoramento Incluindo escoramento; Sem considerar escoramento
$5 Transporte Incluindo transporte; No incluindo transporte

Da mesma maneira, no captulo 17 do ProNIC que trata dos Isolamentos e


Impermeabilizaes e, aps inseridos os dados de caracterizao do trabalho de isolamento
trmico da cobertura (Tabela 2) pertencente ao caso de estudo apresenta a seguinte descrio:
Isolamento trmico em coberturas inclinadas com desvo ventilado sem condies de
habitabilidade, com acessibilidade limitada a arrumos, com isolante trmico prefabricado em
placas ($1) de roofmate com 50mm de espessura ($2), devidamente aplicado sobre laje de
esteira com proteo mecnica adequada, incluindo a execuo de corredores de manuteno
atravs de betonilha armada de proteo ($10), incluindo todos os dispositivos e acessrios
necessrios, fornecimento, transporte, cargas, descargas e colocao, de acordo dos os desenhos
de pormenor e o caderno de encargos. ($9)

Tabela 2: Caractersticas dos isolamentos trmicos de coberturas do ProNIC


Campos a preencher Caractersticas tcnicas
$1 Forma do material isolante Em placas; Em mantas semi-rgidas
$2 Designao/natureza do Aglomerado de cortia expandido; Ls minerais;
material Poliestireno expandido extrudido; Poliestireno
expandido moldado; Outros
$ 10 Outras caractersticas Execuo de corredores de manuteno atravs
de betonilha armada de proteo
$9 Designao do sistema da N/A
cobertura (Campo Opcional)

459
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tendo por base a informao apresentada, verifica-se que daqui que se retiram as informaes
que sero incorporadas nos objetos do modelo BIM, seja sobre os materiais de construo, seja
sobre os trabalhos a eles associados. medida que se avana nos LODs do modelo BIM,
avana-se em simultneo nos captulos do ProNIC, at o nvel dos $, que caracterizam
perfeitamente o trabalho a ser realizado.

5. Concluses

O BIM e o ProNIC que individualmente j so capazes de trazer ganhos considerveis de


qualidade para o setor AECO, nos mais diversos aspetos, e que combinados podem tornar-se,
num futuro prximo, os moldes nos quais os projetos das mais diversas especialidades devero
ser desenvolvidos.

A principal dificuldade residiu no fato de no software utilizado para modelao em BIM ainda
no contemplar de forma especfica os materiais de construo e suas propriedades. Estas
informaes foram completas quando na utilizao do ProNIC, mas perde-se a chance de fazer-
se o cruzamento de dados. A integrao de informao no dimensional, existente no ProNIC,
em modelos BIM, enriquece os modelos, tornando-os mais eficientes em todo o ciclo de vida.
Identifica-se um trabalho extenso no ponto de vista informtico, ao nvel do desenvolvimento
dos IFCs, para que os diferentes softwares possam importar e exportar ficheiros sem qualquer
constrangimento ou limitao. Devem para isso, contar com uma regulamentao detalhada e
uma normalizao dos processos.

O sucesso dos projetos realizados nestes novos moldes est intimamente ligado com a
disseminao e conscientizao, por todos os agentes do setor construtivo, dos benefcios que
se podem alcanar com a sua utilizao.

Referncias

[1] F.P.Afonso et al., O sector da construo diagnstico e eixos de interveno (1998),


Liboa: IAPEMEI (Instituto de Apoio s Mdias e Pequenas Empresas e ao Investimento).
[2] E.Turban, E.McLean, J.Wetcherbe, Information Technology for Management Making
Connections for Strategic Advantage (1999), Jonh Wiley, New York.
[3] 3Frum PTPC,2014. Plataforma Tecnolgica Portuguesa da Construo.O BIM no
futuro da Construo, em 3 Frum PTPC (2014), Lisboa, Portugal, 2014.
[4] National Institute of Building Sciences. National Building Information Modeling
Standard. V.1 Part1: Overview, principles and methodologies. Whashington, 2007.1-
183 pp.
[5] M.J.L.Venncio, Avaliao da Implementao de BIM Building Information
Modeling em Portugal. Dissertao de Mestrado, Universidade do Porto, Porto,
Portugal, 2015.
[6] BIM 3D, 4D, 5D, 6D and 7D. [em linha]. Disponvel em:
http://www.bimpanzee.com/bim-3d-4d--5d--6d---7d.html. Consult. em 09/2016.
[7] I. Kamardeen,8D BIM Modelling Tool for Accident Prevention Through Design, em

460
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Proceedings of the 26th Annual Conference, 6-8 September, 2010, pp. 281289.
[8] AIA G202TM-2013, "Guide and Instructions to AIA Digital Practice Documents" em
Project Building Information Modeling Protocol Form, AIA G202TM -2013.
[9] P. Couto, S. Raposo, A.F. Salvado, L. Gonalves, Projecto de Investigao ProNIC,
Trabalhos Realizados e Desenvolvimentos Futuros, em Cidades e Desenvolvimento:
Jornadas de Investigao e Inovao LNEC, Lisboa, Portugal, 2012.
[10] J.R.Chapman, Work Breakdown Structure. Disponvel em:
http://www.hyperthot.com/pm_wbs.htm. Consult. em 10/2015.
[11] S. Carvalho, Anlise e Alinhamento de Tecnologias de Construo. Dissertao de
Mestrado. Universidade do Minho, Guimares, Portugal, 2010.
[12] M.S. Fonseca, Curso sobre Regras de Medio na Construo, LNEC, Lisboa, 1997.
[13] Instituto de Engenharia de Sistemas e Computadores, Tecnologia e Cincias
(INESCTEC, 2008). Disponvel em: https://www.inesctec.pt/cese/noticias-eventos/nos-
na-imprensa/pronic-sistema-de-geracao-e-gestao-de-informacaotecnica-para-cadernos-
de-encargos/. Consult. em 08/2015.
[14] P.Mda,Integrated Construction Organization - Contributions to the Portuguese
Framework. Tese de Mestrado, Universidade Porto, Porto, Portugal, 2014.
[15] M. El-Desouki, and A.H. Hosny. A Framework Model for Workflow Automation in
Construction Industry em International Workshop on Innovations in Materials and
Design of Civil Infraestruture (2005), Cairo, Egito, 2005.
[16] M. J. Falco Silva, F. Salvado, P. Couto, A. Vale e Azevedo,Sistematizao da
informao tcnica e econmica da construo para incorporao em objetos BIM, em
COMPAT 2015, Lisboa, Portugal, 2015.

461
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

462
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BIM NO APOIO A GESTO DA CONSTRUO

Anne-Marie Mushamalirwa(1), Andr Reis Antunes (2), Antnio Aguiar Costa (2)

(1) Instituto Superior Tcnico, Universidade de Lisboa, Lisboa - Portugal


(2) CERIS, Instituto Superior Tcnico, Universidade de Lisboa, Lisboa - Portugal

Resumo
A tecnologia BIM tem crescido consideravelmente nos ltimos anos, tendo-se tornado uma
ferramenta essencial na rea da gesto da construo. A fase de construo de um
empreendimento de construo tem sido sempre sensvel a inmeras restries e incertezas,
entre as quais as mais relevantes sero de ndole financeira e de prazos, e a implementao
eficiente do BIM pode reduzir significativamente os impactos potencialmente negativos
causados por estas situaes.

Este trabalho apresenta uma ferramenta que visa apoiar os gestores da construo durante esta
fase especfica, em particular combinando a tecnologia BIM e a tcnica de gesto Earned Value
Management, permitindo visualizar diretamente num modelo 3D BIM, atravs de um
computador ou um dispositivo mvel, o desempenho nas vertentes de custo e prazo.

Os gestores podero introduzir os dados necessrios numa folha de Excel e obter um modelo
BIM atualizado em tempo real, de acordo com um sistema pr-definido de cores, que permite
identificar rapidamente o ndice de desempenho de cada elemento do modelo. A ferramenta
permite no s identificar reas sensveis do projeto, como tambm categoriz-las em termos
do seu grau de importncia.

1. Introduo

A tecnologia BIM tem tido um impacto significativo na Arquitetura, Engenharia e Construo/


Gesto de Edifcios (Facilities Management) (AEC/FM) nos ltimos anos. Permitiu acelerar a
resposta a diferentes presses, tal como a crescente complexidade de projetos ou a necessidade
de alcanar nveis mais altos de sustentabilidade, reduzindo custo e tempo dos projetos de
construo [1]. O BIM mudou a abordagem de planeamento, conceo, construo e operao

463
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

em projetos de construo [2] e permitiu uma colaborao mais eficiente entre todas as partes
interessadas do projeto durante o ciclo de vida do empreendimento [1].

Uma das fases que pode realmente beneficiar de BIM a fase de construo. Esta fase uma
das mais desafiadoras e sempre enfrentou problemas in-situ, motivados pelas alteraes ou
erros de projeto, atrasos etc. Alm disso, o tempo de resposta dos gestores no local deve ser
capaz de dar resposta ao planeamento e oramento definidos. A implementao do BIM pode
reduzir em muito as restries mencionadas acima e ser uma ferramenta til para os gestores
da construo.

O objetivo deste trabalho apresentar uma ferramenta inovadora baseada em BIM para apoiar
os gestores durante esta fase delicada e complexa. Esta ferramenta baseia-se numa sinergia
entre BIM e o Earned Value Management (EVM) e utiliza duas ferramentas conhecidas,
Microsoft Excel e Autodesk Revit, para mostrar o desempenho de custo e de prazo de uma obra
em curso num ponto especfico do tempo e utilizando um modelo tridimensional BIM. Para
isso, o utilizador deve fornecer os dados de entrada necessrios com o uso de dispositivos
mveis, como um porttil ou Tablet.

Este artigo est dividido em quatro partes. A primeira parte apresenta uma reviso da literatura
que foi conduzida para compreender os conceitos e aplicao do BIM e do EVM. A segunda
parte explica a metodologia utilizada no estudo. A terceira parte descreve como a ferramenta
EVM / BIM foi desenvolvida e implementada, e, finalmente, a ltima parte apresenta os
resultados obtidos num caso-piloto de uma casa residencial. Pretende-se ainda que a ferramenta
seja expandida de forma a identificar variveis exteriores e assim identificar quais as reas que,
sendo sensveis em termos do seu ndice de desempenho, possam ser alvo de interveno
imediata pelo gestor da construo.

2. Reviso de literatura

2.1 BIM e a Gesto da Construo


O BIM permite criar um modelo 3D de um empreendimento de construo, podendo reunir
todas as informaes produzidas durante todo o seu ciclo de vida [1]. Torna-se, assim, um
poderoso instrumento de apoio na otimizao do projeto em relao ao custo e prazo,
permitindo melhorar, por exemplo, a eficincia do clculo das quantidades de materiais, que se
torna especialmente importante durante a fase de estimativa dos custos de produo [1]. Este
aspeto foi destacado por Manning & Messner [3] como um dos principais benefcios do BIM,
quando implementado em dois projetos de construo nos Estados Unidos, um laboratrio de
investigao mdica e um centro de sade.

Em relao anlise e planeamento da construo, os mtodos tradicionais apresentam algumas


fragilidades, sendo mtodos morosos e propensos ao erro [4], principalmente devido falta de
aplicaes de software para auxiliar [5]. No entanto, uma explorao eficiente dos dados em
BIM pode ajudar a alcanar redues significativas de tempo, por exemplo, atravs da gerao
de cronogramas de construo de forma automatizada [6-7].

464
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O BIM tambm est a mudar a abordagem a respeito da segurana na construo, o que constitui
uma questo da maior relevncia. Por exemplo, no Centro de Pesquisa Tcnica Estatal da
Finlndia foi desenvolvido um procedimento que recorre tecnologia BIM para visualizar o
nvel de segurana contra quedas de um varandim [8]. Zhang et al [9] tambm desenvolveu um
sistema de verificao automtica baseada em regras de segurana para proteo contra quedas
baseado em software BIM, com foco em possveis riscos de queda, como aberturas sejam elas
janelas desprotegidas, ou buracos nas lajes.

2.2 Conceito do EVM (Earned Value Management)


O EVM uma tcnica de gesto utilizada em diferentes reas, tais como nas tecnologias da
informao (TIs) ou na construo, que visa monitorizar o custo, o cronograma, bem como o
desempenho tcnico de um projeto [10]. Um dos seus principais usos a previso de custos e
prazos do projeto atravs do uso de indicadores de desempenho [11]. Constitui tambm um
alerta precoce de problemas de desempenho quando devidamente aplicado [12].

O conceito baseia-se na interpretao de trs parmetros que permitem o clculo dos


indicadores de desempenho. O primeiro parmetro o valor previsto (VP), que o custo do
trabalho planeado do projeto que deveria ser realizado at um dado momento [13]. O valor mais
elevado e ltimo do VP o valor na concluso (VC), correspondente ao oramento total base
definido para uma determinada atividade [14]. O segundo parmetro o custo real (CR), que
representa o valor total dos recursos que foram utilizados para o trabalho efetivamente realizado
num determinado instante. Para obter esse valor, o utilizador precisa ter um sistema de
monitorizao de custos ao longo do tempo, por componente do projeto. O ltimo parmetro
o Valor Adquirido (VA), que representa a quantidade de trabalho realizado at data ou num
determinado perodo. Existem diferentes maneiras de avaliar o VA. No entanto, a tcnica mais
simples e mais fcil baseada na determinao da percentagem concluda, isto , a percentagem
do trabalho realizado em cada perodo de medio pelo responsvel [13].

2.3 Sinergias BIM e EVM


Individualmente, o EVM representa uma das metodologias de controlo de projetos com mais
potencial de melhoria da produtividade e o BIM surge como um apoio gesto de projectos, de
acordo com uma investigao feita a 50 gestores de projeto internacionais [11]. Vrios estudos
atestam o potencial de combinar estes dois conceitos no mbito da gesto da construo. Por
exemplo, na Polnia, Foremny, Kluczuk e Nical [15] desenvolveram um sistema mvel de
Gesto de Valor Acrescentado (Mobile Earned Value Management System) com o objetivo de
aumentar a velocidade e qualidade da monitorizao do custo e prazo in-situ. Marzouk e Icham
[16] tambm implementaram o EVM em Bridge Information Modelling (BrIM) - uma aplicao
do conceito BIM em pontes, propondo uma aplicao de oramentao baseada em BIM, que
integra o conceito EVM para controlar custos e prazos durante a fase de execuo do projeto.

Com uma abordagem diferente, a combinao de 3D Laser Scanning e EVM pode tambm ser
potenciada como uma forma eficiente de avaliar o desempenho da construo de uma obra. O
Laser Scanning tem sido considerado como a melhor tecnologia disponvel na AEC/FM para
capturar informaes 3D com velocidade e preciso num projeto [17], apoiando, por exemplo,
a reconstruo de modelos 3D BIM com base em nuvens de pontos 3D de estruturas existentes
[18]. A comparao entre esses modelos e o estado planeado, com base no modelo BIM, permite

465
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

realizar uma anlise EVM e, assim, obter o desempenho do custo e prazo de obras de
construo. Este princpio foi utilizado j na mecnica, eletricidade e hidrulica [18], estruturas
de ao e estruturas de beto armado [19].

3. Mtodo de Investigao

O objetivo deste estudo foi a criao de uma ferramenta EVM / BIM capaz de apoiar os gestores
da construo durante a fase de execuo, mostrando o desempenho de custo e prazo num
modelo BIM. Para alcanar este objetivo, foi desenhado um modelo conceptual da ferramenta
para delinear o contexto da sua utilizao, os diferentes componentes, a tecnologia utilizada e
o modo de operar com a ferramenta. Em segundo lugar, foi criada uma tabela do Excel, onde
todos os dados de entrada necessrios para todas as tarefas do cronograma do projeto devem
ser inseridos manualmente. Esta folha permite executar o clculo dos diferentes indicadores
EVM de uma forma automtica, sendo estes apresentados por tarefa, em primeiro lugar, e, em
seguida, para todos os elementos que constituem o modelo de BIM, assumindo que todos estes
elementos so conhecidos. Em terceiro lugar, foi desenvolvido um algoritmo em Dynamo para
implementar a ligao automtica entre o ficheiro de Excel e o software BIM. O Dynamo um
suplemento de programao visual do Autodesk Revit que permite automatizar vrias
operaes baseadas no modelo BIM e foi, neste caso, utilizado para realizar uma troca de
informaes desde o Revit para o Excel, pela extrao de uma lista de todos os elementos e
suas propriedades a partir do modelo Revit para uma tabela, e do Excel para o Revit, pela
recolha de informaes de todos os elementos ao nvel do seu desempenho. Posteriormente,
com base nesses indicadores de desempenho, o Dynamo foi tambm usado para colorir os
elementos no modelo BIM de acordo com o seu indicador de desempenho. Para isso, foram
definidos 9 estados, que correspondem a 9 cores diferentes. Finalmente, vrios ensaios foram
realizados para testar o prottipo de ferramenta, com base num modelo Revit de uma casa
residencial.

4. Desenvolvimento da ferramenta EVM / BIM

4.1 Modelo Conceptual


A Figura 1 apresenta o modelo terico da ferramenta EVM/BIM. Em primeiro lugar, o gestor
deve preencher uma folha de Excel com a lista das tarefas de construo e respetivos parmetros
EVM, o que pode ser feito utilizando um computador ou um dispositivo mvel, tal como um
Tablet. Os indicadores EVM so ento calculados, e com base nesses indicadores o desempenho
obtido. O prximo passo o de extrair uma lista de elementos do modelo BIM, o que pode
ser conseguido utilizando a utilizao do Dynamo. A lista de tarefas e a lista de elementos so
pr-conectados ao arquivo Excel, de modo a que quando um desempenho atribudo a uma
tarefa, todos os elementos relacionados possam obter o desempenho correspondente. Assim, a
cada elemento atribudo um desempenho EVM e o modelo BIM ento colorido usando o
Dynamo, seguindo o sistema de cdigo de cores estabelecido

466
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Modelo conceptual terico da ferramenta EVM / BIM.

4.2 Criao da interface Excel


O ficheiro Excel composto por 7 folhas diferentes. A primeira folha contm os termos de uso
da interface. Descreve o cdigo de cores utilizado e apresenta o modo de funcionamento, ou
seja, o que o utilizador tem que fazer em cada folha. As trs folhas seguintes so para o VP, o
CR e o VO, devendo ser preenchidas pelo utilizador com os dados de entrada para um dado
momento. Finalmente, as trs ltimas folhas mostram o desempenho do projeto por atividade,
por elemento, e o global. A quinta folha designada "Performance per Activity" a mais
importante. Na verdade, ela rene, para cada atividade, o VP acumulado, CR e VO para que a
Variao do Prazo (VP) e Variao de Custo (VC) sejam calculados, com as seguintes frmulas:

= (1)

= (2)

A VP permite conhecer se o projeto est adiantado, ou em atraso; a VC se o projeto est acima,


abaixo ou de acordo com o oramento. Assim, depois de calcular esses indicadores, o
desempenho EVM obtido para cada tarefa. Para cada desempenho atribudo um nmero e
uma cor (Tabela 1). Em seguida, na sexta folha, "Desempenho por elemento", um determinado
desempenho atribudo a cada elemento do modelo 3D, de acordo com a folha anterior.
Finalmente, a ltima folha, "Desempenho Global", rene todas as entradas para obter um
grfico com VP, VR e evoluo do VA ao longo do tempo, para apresentar o desempenho geral
EVM de todo o projeto.

467
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Sistema de cdigo de cores.


Desempenho e Cor VP VC
0 Elemento/Tarefa ainda no executada / /
1 Adiantado e abaixo do oramento >0 >0
2 Adiantado e de acordo com o oramento >0 =0
3 Adiantado e acima do oramento >0 <0
4 Dentro do prazo e abaixo do oramento =0 >0
5 Dentro do prazo e de acordo com o oramento =0 =0
6 Dentro do prazo e acima do oramento =0 <0
7 Atrasado e abaixo do oramento SV < 0 CV > 0
8 Atrasado e de acordo com o oramento SV < 0 CV = 0
9 Atrasado e acima do oramento SV < 0 CV < 0

4.3 Interoperabilidade entre Excel e Revit


As interfaces de programao visual tornaram-se uma ferramenta importante para as reas de
projeto e construo. Elas fornecem uma alternativa programao tradicional, substituindo a
elaborada codificao convencional com um sistema visual de conectar pequenos blocos de
funcionalidades independentes para o sistema como um todo [20]. O Dynamo uma dessas
interfaces de programao visual, que funciona como um plug-in para o Autodesk Revit,
estendendo as suas capacidades de modelao paramtrica. O utilizador interage com Dynamo
usando elementos chamados "ns". Cada n tem um nmero de "portas" para permitir a
comunicao entre os restantes ns ao longo de "conectores". As portas de entrada s podem
ser conectadas a outras portas cujo tipo de sada coincida com o tipo de entrada dessa porta
(Figura 2). Todos os elementos ligados criam o "fluxo" [21].

Figura 2: Extrato do algoritmo em Dynamo.

Neste estudo, necessria uma permuta de diversa informao entre o modelo BIM e o Excel.
Como j referido, o Dynamo foi a interface escolhida para realizar esta interoperabilidade
bidirecional, enquanto que o Excel foi usado para calcular o desempenho por elemento, depois
de receber informaes do Revit. Assim, o Dynamo foi utilizado para 4 funes essenciais, que
so apresentadas na Tabela 2.

468
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 2: principais funes do Dynamo utilizadas.


Funo Principais ns Descrio
utilizados
All Elements of Os elementos a partir dos quais a informao ser
Category extrada so seleccionados. Esta seleo feita por
1. Extrao de categorias.
Informao Select Model A seleo pode tambm ser feita manualmente,
(nmero de Elements selecionando-se diretamente no modelo em Revit.
identificao Element.GetParamete Assim que a lista de elementos obtida, o Dynamo
do elemento e rByName permite obter o valor de qualquer parmetro existente
Nmero da em determinado elemento. apenas necessrio que
Tarefa) este n receba como entrada o nome exato desse
parmetro.
Element.Id O ID do elemento diretamente obtido com este n.
Live Write Excel O objetivo inserir as listas obtidas anteriormente
2. Enviar
numa tabela da folha Desempenho por Elemento.
informao
Este n permite escrever essa informao no ficheiro
para o Excel
Excel ativo.
Excel.ReadFromFile Nesta fase, no ficheiro Excel, a cada elemento
3. Ler dados do
previamente identificado pelo seu ID atribudo um
Excel
ndice de desempenho entre 0 e 9.
List.FilterByBoolMas O objetivo filtrar a lista de acordo com o ndice de
k desempenho, ou seja, separar em grupos de
elementos de acordo com cada ndice de desempenho
4. Atualizar o Element.OverrideCol Em seguida atribuda uma cor a cada grupo de
modelo BIM orInView acordo com a Tabela 1.
Element.Temporarily Este n permite que apenas os elementos aos quais
IsolateInView foram atribudas cores sejam mostrados na vista 3D
do Revit.

4.4 Desafios
O maior desafio do estudo foi a conexo entre a lista de atividades e a lista de elementos. At
ao presente, a ligao entre objetos e tarefas feita manualmente [1], visto no existir nenhum
processo automatizado para conectar objetos com as tarefas [7]. Nesta ferramenta, esta ligao
necessria porque, quando o desempenho por tarefa obtido, os elementos tm tambm de
ser creditados de um valor de desempenho. Normalmente, um planeamento apresenta o seguinte
formato ou, se no, fcil de se converter no seguinte formato:
1. Sapatas
1.1. Cofragem, etc.

Isto requer que a cada tarefa seja atribudo um nmero hierrquico como "1.1.2.". Portanto, a
soluo para isso criar no Revit um parmetro partilhado chamado "nmero da tarefa". O
nmero de tarefa de um elemento corresponde ao nmero da tarefa em que est envolvido. Esta
atribuio pode ser feita manualmente ou diretamente no Revit usando mais uma vez o
Dynamo, que mais expedito. O prximo passo envolve a transferncia da lista de elementos

469
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

com a respetiva identificao (ID) e o nmero da tarefa para a folha de Excel intitulada
"Desempenho por elemento".

5. Resultados

O prottipo foi testado num modelo Revit de uma casa residencial com uma tipologia T3, com
2 pisos e uma rea de 325 m2. Antes de se iniciarem as simulaes, foi elaborado um
cronograma de construo, com base no qual foram introduzidos os nmeros de tarefa
correspondentes a cada elemento no arquivo do Revit, desde a construo das fundaes at
instalao de mobilirio residencial. A introduo destes dados foi feita usando um cdigo de
Dynamo com o n "Element.SetParameterByName" que muda o valor de um parmetro para
um determinado valor de entrada.

De seguida, foram feitas simulaes correspondentes a dois cenrios distintos, um com as obras
a comear bem, mas a acabar de forma crtica e outro considerando a situao oposta. Estas
simulaes so apresentadas na Tabela 3.

Tabela 3: Apresentao das simulaes.


Simulao Estado da construo Cenrio/Pressupostos
Cenrio 1.a: Os elementos de fundao esto As tarefas encontram-se concludas com
Otimista terminados. No piso 0 a laje, paredes um nvel de desempenho igual ou inferior
e pilares esto terminados. No piso 1, a 5 (exceto o 3), o que significa que nada
a laje, as vigas, as paredes e as est acima do oramento ou atrasado.
colunas esto terminadas
Cenrio 1.b: Todos os elementos estruturais e no As tarefas remanescentes possuem
Pessimista estruturais esto terminados desempenho superior ou igual a 5 (ou
igual a 3) o que significa que os trabalhos
correspondentes esto acima do
oramento e/ou atrasados.
Cenrio 2.a: O mesmo que 1.b Parte 1 As tarefas completas possuem
Pessimista desempenho superior ou igual a 5 (ou
igual a 3).
Cenrio 2.b: O mesmo que 1.a Parte 2 As tarefas remanescentes possuem
Otimista desempenho inferior ou igual a 5 (exceto
o 3).

470
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Resultados obtidos.

A Figura 3 ilustra os resultados obtidos em vista temporria, para as quatro simulaes que
representam o contorno da casa. No entanto, se o objetivo visualizar a parte no estrutural da
casa, tais como equipamento ou paredes divisrias, devem ser fornecidas outras vistas. Neste
caso, mais apropriado para fazer uma vista de corte da casa.

As vistas apresentadas mostram que a transposio do desempenho de tarefas para o Revit


elementos foi bem-sucedida, uma vez que as cores refletem as suposies feitas. Pode verificar-
se que, com o cdigo de cor, fcil identificar quais so as reas sensveis do projeto. As cores
frias, por exemplo, azul e verde so indicativos de que no existem problemas, enquanto as
cores quentes por exemplo vermelho e amarelo alertam para um aspeto crtico. Alm disso, os
nmeros de identificao esto disponveis na folha de Excel "Desempenho por elemento",
podendo o utilizador ter acesso a qualquer elemento caso pretenda ter mais informaes, se
necessrio.

No entanto, a utilizao da ferramenta neste caso piloto possui vrias fragilidades. Em primeiro
lugar, a entrada manual de nmeros de tarefas no modelo Revit inconveniente, porque
bastante propenso a erros. Alm disso, a conexo no automatizada entre tarefas e elementos
requer que o cronograma, ou mais especificamente a ordem das tarefas, no mude. Caso
contrrio, a entrada de nmeros de tarefa tem de ser repetida e, para grandes projetos, pode ser
demorado. Em segundo lugar, uma vez que o Revit orientado a objetos, o nvel de detalhe do
calendrio no pode ser sempre transposto para o modelo. Por exemplo, a tarefa Acabamento
das paredes uma tarefa que no se considera de forma individual, porque o elemento "parede"
inclui todas as tarefas relacionadas com este elemento, inclusive as relacionadas com os
acabamentos. Alm disso, a conexo elemento / tarefa no necessariamente unvoca. Assim,

471
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

a eficincia da transposio para a tarefa elemento limitada pelo elemento de inserido no


modelo Revit.

6. Concluses

A ferramenta EVM / BIM criada mostrou que o EVM uma tcnica de gesto poderosa que
permite ao utilizador visualizar facilmente o desempenho do custo e tempo de uma obra com a
ajuda de um sistema de cdigo de cores. O estudo piloto globalmente positivo. No entanto, as
simulaes apresentadas foram duas situaes extremas: uma otimista e outra pessimista.
Normalmente, a realidade mais complexa, por isso, a fim de verificar a sua verdadeira
eficcia, com um maior desenvolvimento, a ferramenta deve ser testada em condies reais.
Um caso de estudo concreto permitiria tambm ter algum feedback dos gestores da construo,
a fim de verificar se a ferramenta til para alert-los quando uma situao se torna crtica em
termos de prazo e/ou custo, e ajuda na tomada de decises mais eficientes. Finalmente, a
ferramenta tem um bom potencial para um uso mais automatizado.

Referncias

[1] C. Eastman, P. Teicholz, R. Sack and K. Liston, BIM Handbook, A Guide for Building
Information Modeling for Owners, Managers, Designers, Engineers and Contractors,
2nd ed., New Jersey: John Wiley & Sons, Inc., 2011.
[2] B. Hardin, BIM and Construction Management, Indianapolis: Wiley Publishing, 2009.
[3] R. Manning and J. Messner, Case studies in BIM implementation for programming of
healthcare facilities, ITcon, vol. 13, pp. 246-257, 2008.
[4] N. Chevallier and A. Russel, Automated schedule generation, Canadian Journal of
Civil Engineering, vol. 26, no. 6, pp. 1056-1077, 1998.
[5] E. Tauscher, E. Mikulakova, E. Beucke and M. Knig, Automated generation of
construction schedules based on the IFC object model, Computing in Civil Engineering
2009, pp. 666-675, 2009.
[6] M. Kataoka, Automated generation of construction plans from primitive geometries,
Journal of Construction Engineering and Management, vol. 134, no. 8, pp. 592-600,
2008.
[7] H. Kim, K. Anderson, L. SangHyun and J. Hildreth, Generating construction schedules
through automatic data extraction using open BIM (building information modeling)
technology, Automation in Construction, vol. 35, pp. 285-295, 2013.
[8] K. Sulankivi, K. Khknen, T. Mkel and M. Kiviniemi, 4D-BIM for Construction
Safety Planning, 2010. [Online]. Available:
http://www.vtt.fi/files/sites/bimsafety/bim_safety_cib2010_1167.pdf. [Accessed 11
November 2015].
[9] S. Zhang, J. Teizer, J.-K. Lee, C. M. Eastman and M. Venugopal, Building Information
Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and
Schedules, Automation in Construction, vol. 29, pp. 183-195, 2013.
[10] Q. Fleming and J. Koppelman, Earned value project management, 4th ed., Newtowns
Square: Project Management Institute, 2010.

472
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[11] R. Kenley and T. Harfield, Construction Project Control Methodologies and


Productivity Improvement: EVM, BIM, LBM, in Engineering, Project, and Production
Management Conference, Gold Coast, Australia, September 2-5, 2015.
[12] W. Abba, How Earned Value Got to Prime Time: A Short Look Back and Glance
Ahead, 2000. [Online]. Available:
http://www.evmlibrary.org/library/EVLook%20Back-Glance%20Ahead.abba.pdf.
[Accessed 28 October 2015].
[13] Project Management Institute, Practical Standard for Earned Value Management,
Newtowns Square: Project Management Institute, 2005.
[14] F. Anbari, Earned Value Project Management Methods and Extensions, Project
Management Journal, vol. 34, no. 4, pp. 12-23, 2003.
[15] Foremny, P. Kluczuk and A. Nica, Design and implementation of automated, mobile
construction projects monitoring system (MEVMS) based on Earned Value Management
as an element of BIM in the execution stage, in Creative Construction Conference 2014,
Prague, Czech Republic, June 21-24, 2014.
[16] M. Marzouk and M. Hisham, Implementing Earned Value Management using Bridge
Information Modeling, KSCE Journal of Civil Engineering, pp. 123-130, 20 May 2014.
[17] G. Jacobs, 3D scanning: Using multiple laser scanners on projects, Professional
Surveyor Magazine, vol. 28, 2008.
[18] F. N. Bosche, A. Guillemet, Y. Turkan, C. T. Haas and R. Haas, Tracking the built
status of MEP works: Assessing the value of a Scan-vs-BIM system, Journal of
Computing in Civil Engineering, pp. 1-28, July/August 2014.
[19] Y. Turkan, F. N. Bosche, C. Haas and R. Haas, Toward automated earned value tracking
using 3D imaging tools, Journal of Construction Engineering and Management, 2013.
[20] S. Boeyckens and H. Neuckermans, Visual Programming in Architecture: Should
Architects Be Trained as Programmers?, T. Tidafi and T. Dorta (eds) Joining Languages
Cultures and Visions: CAADFutures 2009 CD-Rom, 2009.
[21] I. Keough, Dynamo: designing a visual scripting interface for the Revit API (notes), See
also https://github.com/ikeough/Dynamo/wiki for more information about coding
Dynamo, 2011.

473
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

474
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

FERRAMENTAS BIM DE APOIO GESTO DE OBRA

Joana Arajo (1), Jos Carlos Lino (2), Joo Pedro Couto (3)

(1) Universidade do Minho, Guimares


(2) BIMMS, Porto
(3) Universidade do Minho, Guimares

Resumo
Ao contrrio de outras indstrias, onde se privilegia a produo em srie e em ambientes
controlados, a indstria da construo tem, em cada projeto, um produto nico, variando a
localizao, a forma e a diversidade dos materiais aplicados, o que dificulta a implementao
sistemtica de processos de gesto neste tipo de empreendimentos.

Na tica da construo, as direes de obra tm procurado aplicar diversas ferramentas para o


controlo dos custos e dos prazos da obra, mas que, usualmente, no esto interligados. O BIM
(Building Information Modeling) surge como resposta a esta problemtica, como metodologia
colaborativa integrada.

Este artigo tem como principal objetivo, apresentar um conjunto de ferramentas de gesto que
controlam melhor o tempo e o custo ao longo da construo, integrando-as com o BIM 4D e
5D.

Como exemplo prtico, modelou-se um edifcio de servios em REVIT, aplicou-se a clash-


detection a esse modelo atravs do Solibri Model Checker e incluiu-se o faseamento construtivo
com o Navisworks Manage. A partir deste, integraram-se grficos, tabelas dinmicas de tempos
e custos, baseados no Earned Value Management (EVM).

Atravs desta metodologia resultou um modelo de cores identificativas dos elementos e do


estado da construo para uma determinada data estado.

1. Introduo

Atualmente, a indstria da arquitetura, engenharia e construo (AEC) est perante mudanas


e desafios desde a ordem tecnolgica at s preocupaes energticas atuais e da melhoria de

475
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

produtividade [1]. A competitividade no setor outra razo das mudanas que se vivem: a
necessidade de produzir mais, melhor e em menos tempo so um novo desafio para as empresas
do setor que queiram sobreviver no mercado [2].

Segundo vrios autores [3][5], a indstria da construo caracterizada por ser diversificada
em vrios domnios, comparativamente com outras atividades industriais.

O maior indicador desta realidade a relao tempo/custo/dimenso entre o projeto, a execuo


e a entrega final do produto. Ao contrrio das indstrias no-agrcolas, que incorporam a
produo em srie de produtos de pequena a mdia dimenso, a indstria da AEC
caracterizada por um produto nico, no propenso a produo em massa e a processos contnuos
e repetitivos [3], [4].

Por outro lado, o ciclo-de-vida do projeto encontra muitas vezes situaes caticas na
contribuio de vrios agentes, que usam diferentes mtodos e formatos para organizar e
entregar a informao. De certa forma, estes fatores tendem a desencorajar os profissionais da
indstria AEC em colocar esforo na garantia da qualidade e especificao das tarefas do
projeto. Estando perante um desafio no desenvolvimento da sua produtividade, de uma forma
mais flexvel [3].

Numa obra existem fatores nos quais se associa um grau de incerteza, tais como acidentes de
trabalho, avarias ou condies atmosfricas inesperadas, entre outros. Contudo, a maioria dos
fatores de incerteza est ligada a fatores humanos resultantes de uma deficiente gesto do tempo
e dos recursos [6].

Um estudo feito por Paul Teicholz [7] sobre o declnio da produtividade na indstria da
construo, mede uma taxa geral de declnio com uma linha de tendncia de -0.32% por ano,
em contrapartida tendncia positiva de 3.06% por ano das indstrias no-agrcolas. Este
impacto ao longo de 48 anos bastante significativo (desde 1964 a 2012).

Building Information Modeling (BIM) uma das recentes tecnologias mais promissoras na
indstria da AEC [5], [8]. Segundo Eastman [5], num modelo BIM, um ou mais modelos
virtuais de um edifcio so produzidos digitalmente servindo de suporte ao projeto e aos seus
envolventes.

2. Enquadramento terico

2.1 Gesto de Obra Earned Value Management (EVM)


A obteno de Feedback torna-se relevante no sucesso de um projeto [9]. A obteno de
informao atempadamente e de forma orientada permite ao gestor de projeto identificar e
antecipar problemas, e fazer ajustes que mantenham o projeto dentro dos prazos e custos
estipulados.

476
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Assim, o EVM fornece um sistema de gesto que permite a monitorizao integrada, de custos
e prazos, fornecendo indicadores de desempenho sobre o estado do projeto e estimativas para a
sua concluso.

Este mtodo baseia-se essencialmente em trs mtricas de medio: o valor do oramento


planeado (Planned value), o valor oramentado para os trabalhos realizados (Earned Value) e
o custo real dos trabalhos realizados (Actual Cost).

O Planned Value (PV) ou Budgeted Cost of Work Schedule (BCWS), em portugus Custo
oramentado acumulado para o planeamento ao longo do plano base, descreve a evoluo que
o projeto dever ter para qualquer ponto do planeamento.

O Earned Value (EV) ou Budgeted Cost of Work Performed (BCWP), o custo oramentado
dos trabalhos realizados para um determinado instante ou plano base.

Trata-se de um medidor do trabalho elaborado em termos de oramento e pode ser representado


pelo valor acumulado dos custos oramentados associados a todas as atividades realizadas at
a data de estudo.

Por fim, o Actual Cost (AC) ou Actual Cost of Work Performed (ACWP), o custo real dos
trabalhos realizados, ou seja, o que efetivamente foi gasto com os trabalhos realizados.

Estas trs mtricas podem ser representadas e interpretadas com base no grfico genrico da
Figura 1, sendo o PV, EV e o AC representados por trs curvas tipo-S, e medidos como referido
anteriormente a partir de uma data de estado (status date).

Com base nestas trs medidas e a introduo de uma quarta data, Budget at completion (BAC)
ou oramento total previsto na concluso do projeto, desenvolvem-se os restantes desvios/
variaes, ndices de medio e previses relativamente aos prazos e aos custos. O grfico da
Figura 1 permite representar estas relaes e dar informao das equaes de clculo, e a Tabela
1 em interligar medir os vrios ndices [9][11].

Figura 1: Grfico Tipo EVM, [12].

477
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 1: Quadro de medio do projeto com base nos ndices de tempo e custo, [11].

2.2 BIM
Para alm de uma geometria paramtrica precisa, os modelos BIM contm datas e funes
necessrias no uso do ciclo de vida de um edifcio. Trazem mudanas na forma como a equipa
projetista se relaciona, pela integrao das fases de projeto e de construo numa plataforma
comum, resultando a otimizao da construo, reduzindo os custos e a durao dos projetos.
A Figura 2 mostra a evoluo trazida pelo BIM na interligao das vrias fases de trabalho a
iniciar no mesmo instante [13], [14].

Figura 3: Integrao das vrias fases da construo, [13].

2.2.1 BIM 4D
O BIM 4D consiste na adio do tempo ao modelo 3D paramtrico.

Os modelos BIM-4D mostram a evoluo da construo ao longo do tempo, pela combinao


das atividades da construo com os elementos, sendo que o principal objetivo mostrar
visualmente o plano de construo, as reas afetadas por fases e/ou equipas de trabalho. No
planeamento tem como objetivo a criao de um modelo esttico de visualizao, pela
sobreposio de cores de informao (override de cores) e diviso dos elementos de construo
por implantaes e prazos (ver Figura 3) [15].

478
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Exemplo de modelo esttico de cores, [15].

2.2.2. BIM 5D
O BIM 5D consiste na adio do custo ao modelo BIM (4D) [8].

O 5D integra todo o tipo de informao das datas de custo, como quantidades, cronogramas e
oramentos [16].

O objetivo da utilizao do 5D consiste na possibilidade de ter um modelo BIM que gere


automaticamente todos os custos e as suas representaes em funo do tempo. Isto permitiria
uma reduo instantnea, do tempo despendido com esta fase de projeto, para alm de aumentar
a preciso das quantidades retiradas, graas reduo das ambiguidades criadas pela utilizao
de modelos em CAD e pela consulta de informao externa ao modelo [17], [18].

Num estudo elaborado pela McGraw Hill Construction em 2012, [19], relata que a adio dos
custos (5D) ao BIM reconhecido ainda como um processo dificultado, mesmo que se
reconhea como um potencial valor do BIM no futuro, caso esta dificuldade seja ultrapassada.
Monteiro [20], reconhece ainda que a maioria das ferramentas BIM so capazes de realizar a
extrao de quantidades, mas no efetuam a estimativa de custo, que geralmente efetuada num
software diferente, sendo esta transferncia feita atravs de um ficheiro em formato IFC que
ainda no garante que a totalidade da informao transferida, existindo assim perda de
informao que pode levar, em ltima anlise a quantidades e estimativas incorretas.

3. Aplicao Prtica Metodologia

A metodologia da Figura 4 descreve a estrutura prtica deste artigo composto sucessivamente


em quatro principais fases de trabalho (identificados a roxo), a modelao 3D do caso de estudo,
a identificao de incompatibilidades (clash-detection), a simulao 4D e por fim a elaborao
de uma anlise de gesto com base no mtodo EVM.

Na primeira fase criaram-se modelos de vista que permitem o apoio s restantes fases.

Este esquema identifica os caminhos que foram percorridos para se fazer a gesto de obra e
explica tambm as relaes entre os vrios softwares usados e como se fez a passagem entre
eles.

479
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Por fim resultou uma anlise de gesto alicerada numa animao 4D e num modelo esttico
de cores identificativas do estado da construo.

Figura 5: Esquema representativo da metodologia usada.

3.1 Modelao 3D de um caso de estudo


O caso prtico trata-se de um edifcio de servios com uma implantao de 1.200 m, com um
piso de p-direito de 4,0 m e com uma altura til no inferior a 2,0 m.

A modelao 3D destas componentes foi feita de acordo com o faseamento construtivo, para
que houvesse uma melhor interao entre o modelo virtual e a realidade e facilitasse mais tarde
na ligao das tarefas do planeamento no modelo 4D. Como exemplo, os pilares estruturais
foram modelados por pisos, o que permite sequenciar o seu processo construtivo em alturas de
betonagem por nveis.

Para a modelao utilizou-se o software Revit 2016, e foram modeladas todas as especialidades,
em primeiro as estruturas, a arquitetura e por ltimo as instalaes MEP ( exceo das redes
eltricas), resultando no modelo federado da Figura 5.

Figura 5: Modelao 3D.

480
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.2 Modelos de Vista


Aps a modelao 3D do edifcio houve a necessidade de criar modelos de vista, para que se
pudesse selecionar e visualizar apenas os objetos pretendidos para cada especialidade, e
facilitasse na coordenao do modelo e correo das incompatibilidades do mesmo (Passo 2).
A criao de vistas no Revit foi elaborada em trs passos presentes na Figura 6. Em primeiro,
criou-se project parameters do tipo texto (parmetro subdiscipline) inserido no grupo
visibility do Revit. Depois atriburam-se filtros filters para cada disciplina e, por ltimo,
gravaram-se view templates resultando as vistas de objetos de cada especialidade em baixo
(ver Figura 7).

Figura 6: Esquema para criao de modelos de vista no Revit.

Figura 7: Modelos de vista; (a) Estruturas; (b) Arquitetura e (c) MEP.

481
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.3 Deteo de conflitos


A deteo de conflitos (clash-Detection) relevante no apoio gesto de obra, pois permite
antecipadamente e de uma forma eficaz perceber onde h incompatibilidades, entre todos os
elementos envolvidos no processo da construo (importncia devido a grande quantidade de
objetos/especialidades e dimenso do projeto).

O software usado para determinao das incompatibilidades foi o Solibri Model Checker
(SMC), da Nemetschek group, por se tratar de um software bastante completo, no sendo s um
identificador das clashes mas um bom gestor dos projetos em ambiente BIM.

A interoperabilidade entre o Revit e o SMC fez-se atravs de trs ficheiros IFC 2x3 (Estruturas,
Arquitetura e MEP). A coordenao dos trs ficheiros automtica no solibri, atribuindo a cada
IFC um tipo de servio.

A deteo um processo iterativo entre os softwares Revit e SMC, sendo que as regras
encontram-se por defeito no Solibri atravs de um ficheiro (.cset).

Uma vez que se trata de um modelo completo envolvendo todas as especialidades da AEC,
necessrio verificar as compatibilidades entre todos os tipos.

Em particular, algumas clashes foram importantes de ser estudadas, como a interseo de


condutas de AVAC e tubagens de gua com os capitis estruturais.

A compatibilizao entre os capitis e as instalaes limitou-se ao espao livre existente entre


a laje da cobertura e o teto falso (cerca de 90 cm). Sendo que em alguns casos, nos espaos
onde existiam capitis (35 cm de espessura) houve um desvio das redes para que se pudessem
cruzar com os capitis e os restantes traados.

Por fim apresenta-se na Figura 8 a coordenao entre o Solibri e o Revit lado a lado e respetiva
correo efetuada no Revit na Figura 9.

Figura 8: Trabalho colaborativo entre os softwares Revit e SMC.

482
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 9: Correo das tubagens no Revit.

3.4 Simulao 4D
A simulao 4D da construo baseia-se na ligao das tarefas do cronograma/planeamento aos
objetos da modelao 3D, em funo do tempo e do espao, originando um vdeo 4D.

importante referir que quanto mais detalhado for o planeamento maior a qualidade da
simulao. Deve tambm haver uma coerncia entre o planeamento e a modelao 3D tal como
referido no subcaptulo da modelao.

O planeamento da empreitada fez-se no MS Project 2013 e a exportao direta do modelo do


Revit para o Navisworks Manage 2016. A associao dos elementos s respetivas tarefas foi
feita pela utilizao de selection sets do Navisworks e do campo find items usando o
parmetro subdisciplines criado no Revit para dividir a informao.

Obteve-se assim a animao 4D.

4. Ferramentas de apoio gesto de obra

4.1 Planeamento atravs do MS Project


O primeiro passo para uma boa gesto consiste em definir o melhor possvel o planeamento que
ir servir de base para a obra, com o detalhe que se pretenda para a mesma. Assim, no Project
editou-se o Planeamento inicial por semanas (ver Figura 10), que permitir ao gestor de obra
preencher os custos efetuados em cada semana de construo.

A WBS presente na Figura 10 foi criada pelo Project estruturando as tarefas da construo para
este artigo.

Por fim, criou-se duas funes no Project, a week number e a week number finish que
registam em que semana (do ano) corresponde as datas de inicio e fim planeadas. Estas funes
iro guiar na construo das tabelas dinmicas no Excel e do informao ao utilizador (gestor
de obra).

483
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 10: Planeamento editado no MS Project 2013.

4.2 Ligao do Navisworks ao Excel


Para se poder trabalhar os dados no Excel importou-se um ficheiro CSV gravado do Navisworks
e fez-se a ligao desse ficheiro a partir de uma nova folha no Excel (separador Dados-
Ligaes, ver Figura 11-(c)).

a) b) c)
Figura 11: a) Planeamento por semanas; b) Custos e datas das tarefas; c) Ligao Excel.

Esta folha pode ser atualizada sempre que houverem alteraes feitas no software de simulao.
As colunas das tarefas Name (Figura 11-(a)), do registo das semanas de inicio e fim (colunas
X e AB da Figura 11-(b)) e as colunas de custo (ver colunas T, Z e AA da Figura
11-(b)) encontram-se conectadas as restantes folhas para a anlise EVM do Excel, de modo a
que a informao seja introduzida e editada de forma automtica.

4.3 Anlise EVM - Grficos e Tabelas dinmicas Excel


Neste artigo apenas ser abordada a especialidade de Estruturas para a anlise EVM, como
validao da metodologia usada em 3.

Pela recolha dos dados dos custos e datas, referidos no subcaptulo 4.2, determinou-se
automaticamente os acumulados do PV (azul), EV (verde) e AC (vermelho) e criou-se o grfico
da Figura 12.

484
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os valores apresentados para o EV e o AC so meramente hipotticos, para se fazer o estudo


presente neste artigo.

Anlise EVM - Especialidade de Estruturas


550 000.00
Data estado
500 000.00
450 000.00
400 000.00
350 000.00
300 000.00
250 000.00 PV
200 000.00 EV
150 000.00
AC
100 000.00
50 000.00
0.00

Figura 12: Anlise EVM feita no Excel.

Pela anlise do grfico verifica-se que ao longo das semanas 12 a 15 e 23 a 29, a curva EV est
por cima da curva PV, ou seja, que se realizou mais trabalho do que o planeado fazer nessas
semanas (em termos monetrios), e nas semanas 15 a 23 realizou-se menos trabalho do que o
planeado, em que no primeiro caso a curva AC est acima da EV e no segundo intervalo abaixo
da EV, sucessivamente no primeiro caso gastou-se mais do que o que se planeou, e no segundo
caso gastou-se menos do que planeado.

4.4 Anlise dos dados Indicadores EVM


O exemplo da seguinte Tabela 2 apresenta os valores e os indicadores de medio (SV, CV,
SPI, CPI) para as semanas da construo at a semana 19, semana de estudo deste artigo para a
data estado (ver Figura 12, a reta a tracejado).

Tabela 2: Resultados semanais da consruo.


week 8 week 9 week 10 week 11 week 12 week 13 week 14 week 15 week 16 week 17 week 18 week 19
SV 0,00 0,00 0,00 0,00 0,00 8 533,51 9 189,89 -17 471,62 -25 274,99 -33 691,83 -42 108,66 -39 211,71

CV 0,00 0,00 0,00 2 556,06 0,00 0,00 0,00 -10 056,90 -7 781,73 -25 642,46 -35 003,18 -30 686,77

SV 1,00 1,00 1,00 0,00 0,00 0,26 0,14 -0,14 -0,17 -0,19 -0,20 -0,17
(%)
CV 1,00 1,00 1,00 1,00 0,00 0,00 0,00 -0,10 -0,06 -0,18 -0,21 -0,16
(%)
SPI 1 1 1 1,0 1,0 1,3 1,1 0,9 0,8 0,8 0,8 0,8

CPI 1,0 1,0 1,0 1,0 1,0 1,0 1,0 0,9 0,9 0,8 0,8 0,9

Pela consulta do quadro da Tabela 1 presente no captulo 2 percebe-se que o projeto na semana
19 de estudo est atrasado e abaixo do oramento.

485
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.5 Representao/ Criao do modelo de cores - Integrao do mtodo EVM no BIM


Depois de analisados os indicadores da Tabela 2 do subcaptulo 4.4 e atravs do DataTools
no Navisworks atriburam-se esses dados a uma nova coluna adicionada s propriedades de
cada elemento Override_cores, que regista a semana da construo, a cor do seu estado, o
nome do elemento e o seu Element ID, ver Figura 13 sublinhado a amarelo no canto inferior
esquerdo.

De seguida, atravs do Appearence Profiler seleciona-se essa informao (Category,


Property e equals), ver Figura 13 sublinhado a amarelo no canto inferior direito. E por fim,
grava-se esse registo atravs de um ficheiro .DAT.

O modelo de cores (Override de cores) resulta pela seleo desses objetos e pela atribuio da
cor que se pretende (ver exemplo da Figura 13), em que os objetos da semana 19 se encontram
pintados a vermelho.

Figura 13: Override de cores ligados a anlise da Semana 19.

5. Concluses

O desenvolvimento de trabalhos em BIM permite acrescentar valor aos projetos, sem perda de
informao, com as vrias especialidades.

Assim, o objetivo deste artigo consistiu em agregar a vria informao do modelo, fornecendo
bases que poderiam antecipar os problemas a surgir em obra (compatibilizao da modelao),
e apresentar ferramentas para a gesto dos custos e do tempo ao longo da construo.

Com base nestes pressupostos concluiu-se que a criao de modelos de vista e de parmetros
para cada objeto da modelao, no software Revit 2016 contribuiu para uma eficiente
visualizao/ filtro da informao e facilitou nos processos envolvidos no restante software

486
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

(SMC e Navisworks Manage 2016), uma vez que o parmetro SUBDISCIPLINE passou
eficazmente atravs de um ficheiro IFC ou por exportao direta (no caso do Navisworks).

Concluiu-se tambm que a necessidade de um modelo completo (constitudo por todas as


especialidades) pertinente, sendo que cada elemento/objeto da modelao 3D pode ser
associado de um modo detalhado a tarefa do planeamento correspondente acrescentando a
informao necessria para a gesto de obra. Alm disso, a clash-detection permitiu perceber
que haviam colises entre as vrias especialidades antes da construo, havendo a necessidade
de reajustar a modelao. Permitiu tambm a passagem de informao limpa para software de
simulao 4D. A integrao entre os vrios softwares e metodologias de cada captulo foi
conseguida. Por ltimo, de uma forma indireta, possvel integrar a gesto de obra a um modelo
BIM, introduzindo a informao relevante no software da simulao 4D e na criao de um
modelo esttico de cores que acrescenta informao do estado da obra (no tempo e do custo) a
cada objeto/ elemento 3D.

Referncias

[1] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia


de Estruturas, Encontro Nac. Beto Estrutural -BE2012, pp. 2426, 2012.
[2] ndBIM Virtual Building, Uma metodologia avanada de planeamento potenciada pelo
BIM, 2014. [Online]. Available: http://www.ndbim.pt. [Accessed: 15-Jun-2015].
[3] A. Monteiro, P. Mda, and J. P. Martins, Framework for the coordinated application of
two different integrated project delivery platforms, Autom. Constr., no. 38, pp. 8799,
2014.
[4] P. Teicholz, Labor Productivity Declines in the Construction Industry: Causes and
Remedies., 2004. [Online]. Available: http://www.aecbytes.com/archive-
articles/index.html.
[5] C. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM Handbook: A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers, and Contractors,
2nd ed. John Wiley & Sons, Inc., 2011.
[6] H. De Sousa and A. Monteiro, Linha de Balano-Uma nova abordagem ao Planeamento
e Controlo na Construo, CD do 2o Frum Int. Gesto da Construo GESCON
2011, pp. 112, 2011.
[7] P. Teicholz, Labor productivity declines in the construction industry: causes and
remedies (Another Look), AECbytes, no. 67, 2013.
[8] S. Azhar, Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry, no. Bazjanac 2006, pp. 241253, 2011.
[9] PMI, Practice Standard for Earned Value Management. USA: Project Management
Institute, Inc., 2005.
[10] PMI, Practice standard for scheduling, 2nd ed. Pennsylvania - USA: Project
Management Institute, Inc., 2011.
[11] N. Sousa, Gesto de Projectos Na Construo - Modelo de avaliao do desempenho
em projectos, Universidade Tcnica de Lisboa, 2008.
[12] R. Ambriz and M. Landa, Dynamic Scheduling with Microsoft Project 2013 - The
Book by and for Professionals. Plantation, FL: J. Ross Publishing, Inc., 2015.

487
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[13] B. Succar, Building information modelling framework: A research and delivery


foundation for industry stakeholders, Autom. Constr., vol. 18, no. 3, pp. 357375, 2009.
[14] Vico Software and Trimble Navigation Limited, 4D BIM Scheduling, pp. 35, 2015.
[15] US General Services Administration, 04 - GSA BIM Guide for 4D Phasing, 2009, pp.
67.
[16] P. Smith, BIM & the 5D Project Cost Manager, Procedia - Soc. Behav. Sci., vol. 119,
pp. 475484, 2014.
[17] I. Kamardeen, 8D BIM modelling tool for accident prevention through design, 26th
Annu. ARCOM Conf., no. September, pp. 281289, 2010.
[18] D. Mitchell, 5D Bim: Creating Cost Certainty and Better Buildings, 2012 RICS
COBRA, Las Vegas, Nevada USA, Sept. 11-13, pp. 19, 2012.
[19] McGraw Hill Construction, The Business Value of BIM in North America, 2012.
[20] A. Monteiro and J. Poas Martins, A survey on modeling guidelines for quantity
takeoff-oriented BIM-based design, Autom. Constr., vol. 35, pp. 238253, 2013.

488
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

DO MODELO OBRA CASO INTERNACIONAL DE PRTICA


COLABORATIVA
Jos Carlos Lino (1), Nuno Pires (2)

(1) BIMMS Building Information Modeling & Management Solutions


(2) ImasD Consult

Resumo
A metodologia Building Information Modelling (BIM) aplica-se a todo o ciclo de vida da
construo. Hoje, j possvel identificar mltiplos casos de estudo a nvel internacional, desde
as fases de planeamento e programao, passando pelos projetos, construo e fabrico, at
fase de operao e manuteno. O presente artigo foca-se na fase de preparao, fabrico e
montagem de estruturas.

As empresas ImasD Consult e BIMMS trabalharam conjuntamente, coordenando uma equipa


internacional e multidisciplinar, com o intuito de produzirem um modelo de preparao do
fabrico e montagem de estruturas metlicas e de beto armado das fundaes e superestrutura
de um moinho de cru numa cimenteira na Bolvia.

A necessidade de coordenar um trabalho colaborativo internacional entre mltiplas equipas e


intervenientes deslocados e interessados em partilhar os seus modelos parciais num modelo
federado, levou ao uso de plataformas colaborativas, suportadas em mquinas virtuais de acesso
distncia.

A modelao de estruturas para preparao de obra, fabrico e montagem exige um nvel de


detalhe mais elevado que o correntemente usado em projeto, implicando um conhecimento
avanado dos processos de fabrico para que os mesmos sejam exequveis. Ilustra-se a
modelao da estrutura metlica, complementada com a modelao das armaduras, o que no
considerado como um requisito corrente na modelao de estruturas.

489
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

Um dos grandes atrativos da metodologia BIM, est na sua caracterstica holstica de


interconectar os diversos interessados na indstria da Arquitetura, Engenharia, Construo e
Operao (AECO), ao longo das diversas fases do ciclo de vida de uma construo [1]. A
identificao e estudo de aplicaes concretas e casos de estudo tm sido alvo de mltiplos
trabalhos a ttulo nacional e internacional [2]. Neste artigo, ser dado nfase fase da
preparao quer do fabrico, quer da montagem de estruturas.

Para tal ser apresentado um caso de estudo de aplicao prtica, promovido pelas empresas
BIMMS-BIM Management Solutions e ImasD Consult, na modelao e preparao da
construo de uma estrutura complexa de apoio a um moinho de cru numa cimenteira na
Bolvia. A estrutura composta por fundaes em beto armado ps-esforado para apoio de
uma torre de um moinho Quadropol, da ThyssenKrupp [3] (ver figura 1), inserido numa
cimenteira em Oruro, na Bolvia, com a particularidade desta obra se localizar a 4500 metros
de altitude.

A BIMMS uma empresa dedicada consultoria em BIM de apoio s atividades de arquitetura,


engenharia e construo. Alm das habituais tarefas de modelao e coordenao, a BIMMS
destaca-se pelo apoio implementao BIM em projetos, com a incorporao dos seus
consultores na obra e na inerente atividade de divulgao e formao dentro das organizaes,
na metodologia e em plataformas e ferramentas BIM. A ImasD Consult dedica-se modelao
avanada de estruturas metlicas com vista sua preparao e fabrico. A ImasD Consult apoia
habitualmente a obra e o fabrico, com modeladores junto das obras e fbricas, para imediata
resposta s solicitaes e ajustes necessrios. Igualmente a ImasD Consult presta consultoria
na rea de organizao e fabrico industrial, quer na gesto, quer no layout dos processos de
produo e montagem de estruturas metlicas.

Neste projeto, o principal objetivo foi o de desenvolver um trabalho colaborativo, coordenando


as equipas multidisciplinares envolvidas, com o intuito de se produzir um modelo de preparao
para fabrico e montagem de estruturas metlicas, de beto armado e de beto pr-esforado das
fundaes.

490
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1. a) Modelo 3D do Moinho Quadropol da ThyssenKrupp [4] b) foto.

2. Organizao e Planeamento

Um dos principais desafios deste trabalho foi a coordenao, execuo, verificao,


planeamento e aprovao de um modelo BIM que inclusse toda a informao relativa a cada
um dos intervenientes que estiveram envolvidos no projeto da cimenteira. A equipa
multidisciplinar e internacional envolvida neste trabalho foi constituda por um gabinete de
projeto de Estruturas de Espanha, uma empresa de Fiscalizao do Equador e um conjunto de
empresas de Portugal, Espanha, Mxico, Peru e Bolvia responsveis pela Fabricao da
Estrutura Metlica ficando a montagem a cargo de uma empresa portuguesa. Em termos
logsticos, o transporte de material foi feito atravs de meios martimos e terrestres.
Para organizao deste trabalho foi necessrio documentar e fasear todo o processo de trabalho
desde a conceo at execuo. Sinteticamente, as fases foram as seguintes:
a) Cliente (ECEBOL Empresa Pblica Produtiva Cimentos da Bolvia) que recebia toda
a informao dos tcnicos (maquinaria, cargas estticas e dinmicas) e condicionantes
tcnicas;
b) Preparao de um primeiro estudo da torre do moinho, pelo gabinete de clculo;
c) Modelao, na plataforma BIM, da torre e do macio, em paralelo, com o clculo
estrutural;
d) Modelao simultnea das estruturas metlica, de beto armado, com importao de
modelos BIM relativos a equipamentos, para deteo de colises, posicionamento de
apoios e outras no conformidades;
e) Comunicao bidirecional entre todos os intervenientes para ajustamento e adaptao
em tempo real do modelo BIM com o clculo;
f) Especial ateno para alteraes e eventual atualizao de equipamentos por parte das
equipas tcnicas;

491
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

g) Verificao com empresas de logstica e de montagem de dimenses e pesos de


elementos antes da fase de fabricao;
h) Realizao de planos de fabricao, listagem e ficheiros de controlo numrico;
i) Realizao de planos de montagem;
j) Apoio em obra para a execuo.

3. Modelao BIM

No modelo BIM foram includos todos os edifcios da Cimenteira e modeladas as diferentes


disciplinas. Neste artigo vamos centrar-nos na estrutura metlica, nas armaduras ativas e
passivas, no pr-esforo e no beto do moinho. Esta estrutura foi considerada uma estrutura
bastante complexa, dada a elevada probabilidade de conflitos entre os diversos constituintes.

A plataforma BIM de trabalho utilizada para a modelao foi o Tekla Structures.

As fundaes do moinho, tinham a particularidade de conter uma estrutura metlica no seu


interior, que servir de apoio ao Quadropol. Por essa razo, a coordenao de todos os
modelos de especialidades das fundaes tornou-se ainda mais relevante pois qualquer tipo de
no conformidade poderia por em causa a montagem de toda a soluo estrutural proposta.

A estrutura metlica foi modelada paralelamente com o desenvolvimento do projeto de


estruturas, tendo sido adotada a biblioteca de perfis metlicos disponveis na Bolvia. Este
modelo teve que contemplar toda a informao necessria para a produo, desde o tipo de ao,
os perfis, as ligaes, at ao faseamento construtivo e pinturas. Na figura 2 apresenta-se a
imagem deste modelo, constitudo por quatro torres treliadas bem como o modelo envolvente
geomtrico final.

Figura 2: a) Modelo da Estrutura Metlica b) Modelo envolvente geomtrica.

492
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A modelao dos elementos de beto armado, pr-esforo e armaduras ativas e passivas foi
integrada num nico modelo, devido a questes de montagem e execuo. Desta forma,
conseguiu-se montar o modelo de acordo com um sistema de classificao definido para esta
obra. Este sistema contempla a zona da cimenteira, o equipamento, o elemento e a fase de
betonagem.
As armaduras foram organizadas e agrupadas de acordo com a nomenclatura definida no projeto
de estruturas. Como a modelao ocorreu, lado a lado, com o projeto de estruturas, o modelo
BIM tornou-se essencial no agrupamento de armaduras para fabrico, uma vez que, em casos
especficos, a apresentao bidimensional no permitiu obter uma perceo real da totalidade
das armaduras envolvidas. Assim, o modelo BIM possibilitou uma verificao contnua do
projeto com consequncias diretas na produo. Na figura 3 apresenta-se a imagem final deste
modelo, igualmente com quatro torres, que j permite uma noo da complexidade envolvida.

Figura 3: Armaduras passivas, ativas e pr-esforo.

O sistema de pr-esforo incluiu a modelao de 52 bainhas de pr-esforo e as respetivas 104


ancoragens. No modelo foi includa tambm a informao do nmero de cabos de pr-esforo
por cada bainha. Na Figura 4 pode-se visualizar as bainhas de pr-esforo quer vertical, quer
horizontal.

Figura 4: a) Bainhas de pr-esforo e ancoragens b) Em obra.

493
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Conforme as solicitaes e interaes com a equipa de obra tornou-se necessrio o envio de


vrios estudos e detalhes das montagens. Na figura 5 apresentamos uma sequncia de imagens
fornecida ao construtor para apoio das montagens e fases de betonagem.

Figura 5: Faseamento construtivo utilizado durante uma reunio de coordenao.

4. Coordenao BIM

Como aludido anteriormente, a equipa de trabalho neste projeto foi bastante vasta. A
coordenao acabou por ser um processo complexo, mas que veio ser simplificado e otimizado
com a utilizao das seguintes plataformas distribudas para comunicao e colaborao:
Tekla BIMSight;
Trimble Connect;
ImasD VirtualOffice;
AtView.

O Tekla BIMSight um software gratuito com ferramentas de coordenao que permitiu efetuar
deteo de colises entre modelos e comunicar via modelo 3D.

O Trimble Connect uma plataforma de partilha colaborativa que permite respeitar as


recomendaes de normalizao BIM referentes ao Common Data Environment (CDE).

O ImasD VirtualOffice uma plataforma de trabalho colaborativo que possibilita um sistema


de trabalho interno (BIMMS e ImasD Consult) para aceder a mquinas de trabalho virtuais
eliminando a necessidade de todos trabalharem fisicamente no mesmo local.

AtView a plataforma de gesto de ficheiros utilizada pelo cliente final e disponibilizada para
partilha de documentao a todos os intervenientes no projeto.

494
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4.1 Coordenao interna - Equipas de Projeto e de Preparao de Estruturas


Como coordenao interna subentende-se toda a coordenao existente entre a ImasD Consult
e a BIMMS com os projetistas de estruturas e de preparao de obra.

A plataforma de trabalho colaborativo ImasD Virtual Office consiste num sistema de mquinas
virtuais com processamento grfico real por hardware, utilizando sistema de acesso seguro por
NetScaller e optimizado por Citrix para rendimento grfico remoto superior.

Esta plataforma permite o acesso remoto a uma rede privada para trabalho colaborativo
utilizando neste caso o software de modelao Tekla Structures na sua funcionalidade de
MultiUser.

Na Figura 6 apresenta-se uma imagem utilizada numa reunio de coordenao para a discusso
do posicionamento das ancoragens do sistema de pr-esforo das torres. O processo para
preparao e agendamento das reunies de coordenao semanais foi organizado com base no
modelo BIM. O coordenador de projeto da equipa ImasD/BIMMS produzia um documento
formal onde constava os assuntos a discutir e apresentava como anexo um ficheiro Tekla
BIMSight com os mesmos assuntos, para uma prvia anlise por todos os intervenientes.

Figura 6: Colises entre a estrutura metlica e as ancoragens do sistema de pr-esforo.

Devido constante evoluo do projeto e s diversas alteraes que se produzem durante o


mesmo, sejam elas de caracter tcnico, comercial (por alteraes do objetivo do cliente) ou
financeiras (por compra de equipamentos), podemos considerar que qualquer projeto de
construo que inclua tal quantidade de disciplinas se pode considerar como um projeto
dinmico.

4.2 Coordenao externa - Com obra e outros projetistas


Como coordenao externa subentende-se toda a coordenao existente entre a ImasD Consult
e a BIMMS com a obra e os projetistas de especialidades. Neste mbito, o principal desafio
reside em tentar tirar partido de todo o potencial do modelo, apesar de termos equipas com
nveis diferentes de maturidade na sua manipulao. Na Figura 7a, apresenta-se uma imagem
proveniente de uma das reunies de coordenao, onde se discutiram novas solues, neste caso
em particular, para impedir uma coliso de armadura com a bainha de pr-esforo. Na figura
7b pode ver-se a obra e o seu elevado grau de complexidade.

495
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: a) Coliso detetada em fase de projeto b) obra.

Num projeto, principalmente de ndole industrial, o progresso do projeto no o mesmo em


todas as disciplinas. Como exemplo, podemos abordar o caso das estruturas metlicas deste
mesmo projeto. No momento em que se esto a montar estruturas em obra no esto definidos
de forma exata todos os equipamentos que trabalharam sobre essa mesma estrutura. A
realizao de um modelo BIM permite numa fase inicial do projeto prever, de forma virtual, as
implicaes que os diferentes equipamentos vo ter sobre a superestrutura, evitando de esta
forma ajustes em obra bastante mais longos no tempo e altos no custo.

5. Concluses

O presente trabalho permitiu acompanhar todas as fases de projeto e construo de uma obra
de elevada dimenso e complexidade atravs de ferramentas, aplicaes e plataformas BIM. A
documentao e detalhamento de todos os processos permitiu equipa uma constante
otimizao de recursos e produtividade graas clareza do sistema montado. Alm disso, este
projeto possibilitou identificar e aferir os requisitos tcnicos para equipas de trabalho idnticas,
no futuro.

Relativamente fase de projeto de execuo e montagem, apesar de este tipo de trabalho j ser
uma prtica corrente no mercado das estruturas metlicas, a aplicao do detalhe do beto
armado pr-esforado demonstrou-se essencial, quer na coordenao de projeto, quer na
construo.

Finalmente, importa tambm referir que a utilizao de ferramentas BIM neste projeto permitiu
facilitar a comunicao com o exterior, isto , com operadores da cimenteira, cliente e mesmo
com futuros clientes (ver figuras 8 e 9).

496
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Aplicaes geradas a partir do modelo para comunicao exterior.

Figura 9: Modelo global.

Referncias

[1] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia


de Estruturas, Encontro Nac. Beto Estrutural -BE2012, pp. 2426, 2012.
[2] C. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM Handbook: A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers, and Contractors,
2nd ed. John Wiley & Sons, Inc., 2011.
[3] ThyssenKrupp Polysius, QUADROPOL QMC Roller mill for the grinding of cement
and blast furnace slag. 2016.
[4] ThyssenKrupp Industrial Solutions, QUADROPOL QMC, in Disponvel:
http://www.polysiususa.com/cement/cement-
manufacturing/grinding/cem_menu_roller_mill_QUADROPOL.html?q=1621
[Acessado 01/10/2016].

497
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

498
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Parte IV
BIM na gesto de operaes e manuteno

499
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

500
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

PLATAFORMA WEB-BIM PARA GESTO DE INSTALAES DE UM


CAMPUS UNIVERSITRIO
Ricardo Resende (1), Lus Coroado (1), Antnio Lopes (1), Rodrigo Sacadura (1), Maria
Helena Teixeira (1), Sara Eloy (1), Miguel Sales Dias (1)

(1) ISCTE Instituto Universitrio de Lisboa, Lisboa

Resumo
As instalaes das instituies de Ensino Superior, que no caso do ISCTE-IUL esto
concentradas num campus no centro de Lisboa, so usadas diariamente por vrios milhares de
utentes, acolhem inmeros eventos e o exerccio prprio da instituio e requerem
investimentos constantes de manuteno, renovao e adaptao. Ao contrrio de outros ativos
estratgicos a sua gesto frequentemente suportada por instrumentos informais: folhas de
clculo, documentao em papel e registos pessoais, tornando-se difcil controlar e planear
operaes e custos globais de manuteno por equipamento ou sistema. Por outro lado, os
desenhos tcnicos das instalaes esto dispersos e no so fiis realidade construda, o que
tambm dificulta as operaes de manuteno, modernizao e estudo de cenrios de melhoria.

Perante este cenrio, o ISCTE-IUL montou uma equipa multidisciplinar, tendo-se definido uma
metodologia para o desenvolvimento de uma soluo hbrida de gesto de edifcios e apoio ao
utilizador. A primeira etapa consiste na uniformizao e verificao no terreno dos desenhos
dos projetos incluindo equipamentos fixos e mveis e redes, numa Base Digital de Desenhos
em 2D CAD. A segunda etapa consiste na migrao desta informao para um modelo BIM,
mais completo e fcil de atualizar, principalmente no que diz respeito extrao de mtricas.
Simultaneamente com estas duas tarefas realizada a anlise, levantamento e especificao de
requisitos de uma aplicao web que, interligada com o modelo BIM, ir registar intervenes
de manuteno programada e reativa, oramentos, controlo de stocks de material de reparao
e restantes operaes.

501
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

1.1 Gesto de Instalaes


A Gesto de Instalaes, ou Facility Management (FM), pode ser definida como o conjunto de
operaes que asseguram o bom funcionamento das infraestruturas, nomeadamente edifcios,
nas suas diversas componentes. por natureza, uma atividade de suporte s funes primrias
da organizao e multidisciplinar, exigindo competncias to dspares como a gesto de
projetos, gesto da qualidade, engenharia, finanas, imobilirio, sustentabilidade, segurana,
negociao, gesto da tecnologia ou a comunicao [1].

O FM tem ainda pouca visibilidade na indstria da construo em parte porque a quantidade de


nova construo at crise financeira e econmica absorveu toda a ateno (sendo possvel
percorrer o currculo de um curso de engenharia civil ou arquitetura sem encontrar meno ao
FM), mas tambm porque consiste numa srie de atividades, fragmentadas, que decorrem
continuamente, mas largamente ignoradas, sob o nosso olhar. Curiosamente, das grandes
organizaes, so as instituies de ensino que mais rapidamente esto a adotar medidas para
agilizar os processos de gesto, nomeadamente atravs da aplicao de novas tecnologias [2].

No entanto, considerando todo o ciclo de vida, os custos de operao e manuteno de um


edifcio so vrias vezes superiores ao de construo. Enquanto um ganho de eficincia na
construo tem efeito nessa atividade, um ganho na gesto, seja a diminuio do consumo
energtico, melhorias ambientais, a organizao duma rea de trabalho ou a renegociao de
um contrato, tem efeito repetido nos anos seguintes.

1.2 Gesto de instalaes em instituio de Ensino Superior


As instituies de Ensino Superior tm sofrido alteraes estruturantes nos ltimos anos. A
organizao acadmica evolui mais rapidamente que h alguns anos, os postos de trabalho so
mais fluidos refletindo a circulao de docentes, alunos e investigadores, coexistem centros de
investigao, entidades independentes e participadas e os espaos so arrendados para eventos.
Os calendrios letivos dos inmeros cursos variam e so frequentemente adaptados e o nmero
de eventos pontuais crescente. Diariamente h milhares de utentes internos e externos que
trabalham, frequentam aulas, mas tambm se alimentam, divertem em espaos de descontrao,
estudam individualmente ou em grupo, usam bibliotecas, laboratrios, ginsios, etc. Esta
exigncia logstica e o crescente rigor financeiro obrigam quantificao detalhada dos custos,
sendo, portanto, essencial poder imputar o custo de cada entidade, posto de trabalho, evento ou
aula.

As ferramentas bsicas para a gesto de instalaes variam desde a coleo de folhas de clculo,
desenhos e manuais de equipamentos em pastas e arquivos em papel ao know-how dos
funcionrios sobre as instalaes. Existem no mercado ferramentas informticas que vo desde
a gesto de equipamentos e operaes dirias (Computer Aided Facility Management - CAFM)
aos sistemas de gesto total de patrimnio incluindo arrendamentos, energia, hospitalidade ou
helpdesk (Integrated Workspace Management System - IWMS) [1], [3]. Estes sistemas agregam
informao atualizada, disponibilizam interfaces uniformes, perfis de utilizador com diferentes
nveis de acesso, conduzem os processos, disponibilizam ferramentas de reporting e ligam-se
aos departamentos financeiros, de compras, ou de patrimnio. Tal como acontece com qualquer

502
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

sistema que integrado intimamente com a instituio, a sua instalao e configurao


naturalmente complexa e demorada.

1.3 Ferramentas BIM no FM


O BIM est a transformar toda a indstria da construo, desde o projeto e construo vida
til dos edifcios, passando pela gesto, operao e manuteno, interligando estas fases de
forma mais eficaz [4]. Para os donos de obra a metodologia BIM, sendo adotada no processo
de projeto e construo, revela-se muito til para armazenar e trabalhar a informao sobre o
seu edifcio [5], pois possibilita o armazenamento, atualizao e utilizao de informao
georreferenciada sobre os edifcios e outras infraestruturas para gerir operaes e manuteno
do edifcio. Apesar de haver algumas diferenas entre o nvel de desenvolvimento [6] e os usos
[7] dos modelos usados na construo e na gesto dos edifcios, o modelo BIM poder transitar
da fase de construo ou ser construdo especificamente para a gesto do edifcio. O interesse
dos gestores de edifcios na metodologia BIM advm do apoio que esta ferramenta pode dar s
operaes de gesto de espaos e de equipamentos, anlises de performance energtica real e
simulao de cenrios, obras de interveno, e renovao e reabilitao e gesto de ciclo de
vida (adaptado de [8]).

2. Metodologia

2.1 A Equipa
Para responder necessidade de modernizao do funcionamento integrado das unidades do
ISCTE envolvidas na gesto do campus, montou-se uma equipa multidisciplinar composta por
tcnicos de vrias reas. O grupo Digital Living Spaces (DLS) do Centro de Investigao em
Cincias da Informao, Tecnologias e Arquitetura (ISTAR-IUL) um centro de investigao
nas reas de Desenho Assistido por Computador e ferramentas digitais interativas, Realidade
Virtual e Aumentada aplicadas Arquitetura e Construo ([4][7]). Ao Gabinete de
Desenvolvimento de Sistemas de Informao (GDSI) compete conceber e manter os sistemas
de informao bem como garantir a integrao dos mesmos promovendo o aumento contnuo
da qualidade do ensino e investigao no ISCTE-IUL. Finalmente, e com papel fulcral, a
Unidade de Edifcios e Recursos (UER) a unidade que faz a gesto dos edifcios e
infraestruturas do campus e tem procurado implementar sistemas que tornem esta gesto mais
eficiente.

2.2 A gesto do campus do ISCTE-IUL


O campus do ISCTE-IUL concentra-se num s local no centro de Lisboa inserido na Cidade
Universitria, com uma rea til construda superior a 100.000 m2, dividindo-se por trs
edifcios com idades entre os 15 e os 40 anos, de dimenso e estilo distintos, sendo a navegao
entre e dentro dos edifcios pouco intuitiva (figura 1).

A comunidade ISCTE-IUL composta por alunos, docentes, investigadores e funcionrios no


docentes, distribudos por quatro escolas e oito unidades de investigao, reunindo uma
populao superior a 10.000 utentes. Para alm destes utilizadores, o ISCTE-IUL acolhe
inmeros eventos peridicos e singulares, nacionais e internacionais, como provas acadmicas,

503
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

eventos e reunies de diversa ndole, prestando ainda servios de aluguer de espaos e


organizao de eventos, que em 2015 trouxeram ao campus cerca de 65.000 visitantes.

Ao contrrio de outros ativos estratgicos como os recursos humanos, a gesto das


infraestruturas no ISCTE-IUL ainda suportada por folhas de clculo, documentao em
formato digital e alguns casos especiais em papel, estando os registos organizados em pastas de
rede. Apesar da organizao existente, moroso agregar a informao para obter sumrios de
afetao de reas e outras mtricas ou controlar e prever custos de manuteno globais, por
equipamento ou sistema. Por outro lado, os desenhos tcnicos das instalaes e redes esto
dispersos em diversos formatos e frequentemente no esto de acordo com a realidade, em parte
devido requalificao e reabilitao dos espaos que o ISCTE-IUL tem realizado, visto que
obrigado a crescer dentro de fronteiras espaciais rgidas.

Figura 1: Vista do campus do ISCTE enquadrado na malha urbano do centro de Lisboa.

Apesar de estar ao corrente das solues existentes no mercado para gesto de infraestruturas,
o ISCTE-IUL no as adotou devido expectativa de difcil adequao aos sistemas em uso e
ainda aos custos de licenas e de atualizao.

A equipa interna da UER sentia h vrios anos a necessidade de basear a sua atividade em
melhor informao e num sistema de controlo de processos formal e baseado em ferramentas
que refletissem de forma atualizada o estado dos edifcios e sistemas associados. Nasceu assim
este projeto, em ligao com as restantes unidades da instituio como a Qualidade,
Comunicao, Servios Acadmicos e de Apoio Investigao.

2.3 A Base de Digital de Desenhos (BDD)


A primeira iniciativa a arrancar consiste na produo de plantas fiis e atualizadas do campus
em formato CAD 2D. Estes desenhos so elaborados a partir da compatibilizao das telas
finais originais com as mltiplas intervenes, o que implica, inmeras medies no terreno.
Apesar de os desenhos mais recentes (em geral ps-2000) existirem em formato digital, os
restantes, em particular os de especialidades, esto em papel, sendo necessrio a sua
digitalizao. Uma das dificuldades encontra-se na incoerncia entre a realidade e as verses

504
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

em desenho (digital ou papel), sendo indispensvel a contribuio dos funcionrios que


acompanham o campus desde a sua origem.

A BDD tem por base uma hierarquia de ficheiros CAD em quatro nveis e por edifcio,
permitindo o trabalho simultneo de diferentes utilizadores em matrias especficas. Para a
introduo de toda a informao de geometria e especialidades de forma codificada e uniforme
adotou-se a Norma EN ISO 13567 [9], facilitando tambm a filtragem de informao no s
enquanto se utiliza a base CAD, como tambm na relao com a aplicao web, e na
organizao e visualizao de desenhos produzidos para distribuio (formato PDF). medida
que este trabalho foi avanando, os tcnicos da UER foram solicitando no s desenhos, mas
tambm listas de quantidades, reas, etc. Por outro lado, verificou-se que a representao de
equipamentos como mesas, cadeiras ou sanitrios, atravs de blocos com atributos, era
insuficiente para listar a informao necessria e relacion-la com outras aplicaes. Tornou-
se evidente que se estava a aumentar a ferramenta CAD (Autocad 2016) para cumprir o papel
de um BIM, tendo-se ento tomado a opo de terminar o levantamento da geometria em 2D
em algumas das especialidades, mas arrancar com o modelo BIM, substituindo-se gradualmente
os processos de trabalho. No obstante, foi dada formao presencial e na plataforma interna
de e-learning e a BDD 2D j usada internamente e diminui a necessidade de verificaes no
terreno, facilita a comunicao e interao com fornecedores e disponibiliza alguns valores
fiveis que servem de base s avaliaes de desempenho de equipas de manuteno.

2.4 Modelao em BIM


A passagem dos desenhos em base CAD para BIM torna-se necessria no s pela dificuldade
de armazenamento, tratamento e extrao de informao, referidas na seco anterior, mas
tambm pela necessidade de visualizao e comunicao atravs de um modelo tridimensional,
no s para intervenes de manuteno, como tambm pela potencialidade associada a
ferramentas de navegao e visualizao a desenvolver internamente.

O levantamento das necessidades, ou seja, os dados que as diferentes unidades de gesto


necessitam e a forma como querem consumir essa informao iniciou-se no seio da prpria
UER, visto que para esta unidade que as restantes se viram quando necessitam de plantas,
listagens e relatrios. No entanto, um modelo de informao bem estruturado e explorado pode
fornecer informao muito mais rica, pelo que se planeou a construo de um modelo-piloto
que demonstra todo o potencial desta metodologia e assim poder suscitar maior interesse,
recolher mais opinies e necessidades.

A plataforma web Fenix (https://fenix.iscte-iul.pt), parcialmente desenvolvida internamente,


alberga toda a informao necessria gesto acadmica, incluindo salas de aulas, horrios,
exames, registo de presenas automtico atravs de leitores de cartes nas salas, abertura de
portas, eventos, etc. Naturalmente, vrias outras aplicaes de gesto interagem com o Fenix
pelo que um requisito indispensvel do modelo BIM e da aplicao web de manuteno a
ligao e harmonizao da informao entre as diferentes bases de dados pois a informao
sobre os espaos no modelo com a j existente, o que apresenta vrios desafios pois os objetivos
das plataformas so distintos e isso reflete-se na organizao da informao.

505
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Aps a concluso da BDD, a metodologia traada (figura 2) comea pela reviso dos projetos
de arquitetura e restantes especialidades lgica BIM, e extruso da geometria elaborada em
2D para 3D, conforme ilustra a figura 3.

Figura 2: Processo de desenvolvimento e fluxos de informao.

Figura 3: Vista dos modelos dos edifcios do campus ISCTE-IUL em diferentes estgios do
processo de modelao. Cada edifcio modelado separadamente sendo referenciado no
modelo global e inserido no modelo da envolvente urbana (no visvel nesta figura).

Atualmente verifica-se melhorias na gesto de ativos, atravs da extrao de dados


quantificveis de espaos, tipologias e afetaes, reas e volumes, bem como dados relativos a
caractersticas de paredes, pavimentos ou outros (figuras 4 e 5). Em seguida, inserem-se
equipamentos mveis e fixos, como portas, secretrias e cadeiras, computadores, sanitrios,
extintores, seguindo de forma sistemtica as especialidades inerentes. Apesar da generalidade
dos equipamentos ainda no ter o detalhe pretendido sendo utilizado nesta fase um nvel de
desenvolvimento 300 (LOD, ver [6], [10]) j possvel criar inventrios e obter dados

506
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

necessrios para simular e projetar alteraes nos espaos, calcular capacidades de ocupao e
alocao de equipamentos, entre outros.

Posteriormente, pretende-se realizar a passagem da generalidade das redes e sistemas das


diversas especialidades, bem como, introduzir a informao estritamente necessria com nvel
de informao 500, para facilitar o planeamento e a manuteno programada e corretiva, bem
como fornecer indicadores-chave para auxiliar a tomada eficaz de decises e prevenir conflitos
de especialidades na realizao de intervenes no Campus. A informao gerada e recolhida
durante a utilizao do binmio Modelo BIM Plataforma Web de Manuteno ser
constantemente usada para atualizar os planos de manuteno existentes (e.g. [11]).

Os principais usos do modelo BIM, dividido numa hierarquia de ficheiros de acordo com
especialidades e com os diversos edifcios, sero:
Visualizao do campus para a comunicao institucional, sinaltica, desenhos 2D,
aplicaes de navegao, suporte aos projetos de intervenes no campus, sistemas de
realidade virtual e aumentada, entre outros;
Sincronizao com informao sobre os espaos contida em diversos sistemas tal como
ocupao (funcionrios, unidades de ensino e de investigao, espaos de estudo,
restaurao, etc.), caratersticas dos espaos (como tipo de iluminao, capacidade,
conforto, idade, ventilao);
Compilao, armazenamento e tratamento de informao referente aos equipamentos
mais relevantes, no s no que diz respeito informao geomtrica (caractersticas e
localizao) mas tambm caractersticas como fabrico, fornecedor, ligao a manuais
de instrues, garantias, datas de manuteno, etc.
Gerao de relatrios escritos e grficos sobre a informao contida no modelo,
satisfazendo os requisitos regulares de vrias unidades, mas tambm para apoiar a
tomada de deciso e o planeamento estratgico da instituio (figuras 4 e 5).

Simultaneamente ao trabalho de modelao 3D, insero, verificao e tratamento de dados,


so conjugados os requisitos para a aplicao em desenvolvimento no GDSI, de forma a
compatibilizar e integrar a aplicao com o modelo BIM, adequando e definindo tambm o
workflow da UER (figura 2).

Uma das dificuldades prticas encontradas no processo de trabalho colaborativo em BIM, foi a
de permitir a vrios utilizadores aceder e contribuir para o mesmo modelo e de forma sncrona.
Os testes feitos com pastas de rede, atravs de servidor interno do ISCTE-IUL, no se
traduziram nos resultados expetveis, no sendo possvel sincronizar ficheiros, locais e centrais,
devido a permisses de escrita definidas ao nvel dos servidores, eventualmente devido
estrutura complexa da rede do ISCTE. A soluo atualmente em testes passa pela utilizao de
pastas de rede que acedem diretamente cloud da Microsoft (www.onedrive.com).

507
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Schedule de salas do piso 0 do Edifcio 1 com alguns dos atributos.

Figura 5: Planta de espaos de acordo com as suas afetaes: circulao, sala de aula,
gabinete, etc.

508
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.5 Aplicao Web


Como referido, a UER do ISCTE-IUL no dispe de ferramentas integradas para planeamento
e controlo dos seus processos. O elevado volume de trabalho e informao a gerir associados
s atividades descritas anteriormente tornam urgente a adoo de metodologias mais eficientes.

Surge, portanto, a necessidade de fornecer uma aplicao que facilite a misso da UER
permitindo, por um lado, a correta gesto das equipas de interveno na resposta a anomalias
comunicadas por terceiros (figura 6) ou na realizao de tarefas inerentes ao plano preventivo
de manuteno e, por outro lado, que toda a informao associada (equipamentos, inventrio)
fique organizada de forma a ser facilmente consultvel e pesquisvel.

No mbito desta iniciativa est em curso a especificao funcional de uma aplicao de suporte
a atividade da UER enquanto ferramenta de acompanhamento e monitorizao de atividades de
interveno nos espaos e equipamentos do campus universitrio. Pretende-se assim constituir
uma base de informao facilmente acessvel e rastreavel, que permita realizar diferentes tipos
de anlise de dados e constituir indicadores de desempenho relacionados com a atividade da
UER.

A aplicao ser desenvolvida segundo uma metodologia Web responsiva para permitir o
acesso e a manipulao da informao atravs de todo o tipo de dispositivos fixos e mveis. A
construo da aplicao ir culminar no desenvolvimento de um conjunto de funcionalidades
que permita cumprir os seguintes objetivos:
Constituio de histrico de aes realizadas sobre espaos, equipamentos e sistemas,
incluindo os custos com materiais, mo-de-obra e outros meios associados;
Avaliao de desempenho dos prestadores de aes interventivas e monitorizao do
nvel de satisfao dos utentes do campus face s intervenes realizadas;
Interligao com informao grfica na BDD de modo a: promover a integrao de
novos projetos; realizar o acompanhamento das respetivas obras; constituir inventrio
de espaos, sistemas e equipamentos georreferenciados;
Realizao de anlises econmicas ao ciclo de vida dos equipamentos (relao de custos
de investimento, operao, conservao, abate e oportunidade) e estimativa de custos
de explorao por espao para imputao de custos em eventos ou atividades letivas
Integrao com sistemas de gesto tcnica centralizada para efeitos de monitorizao e
minorao de consumos e horas de funcionamento de equipamentos;
Interligao com o modelo BIM para permitir o acesso fixo e mvel, atravs de
realidade virtual, a espaos e equipamentos e a contabilizao rigorosa da durao das
aes realizadas sobre espaos, equipamentos e sistemas para reduzir o erro das
estimativas de custos com mo-de-obra associadas a essas aes.

509
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Mockup de pgina de reporte de anomalias.

3. Trabalho Futuro

A modelao em BIM das instalaes do ISCTE-IUL no mbito da modernizao da gesto de


instalaes tem j repercusses positivas no funcionamento interno, sendo j possvel obter
listagens de reas e algumas contagens de equipamentos. Estes dados assistem a relao com
os fornecedores e facilitam a aplicao de contabilidade analtica. Como pontos positivos
salienta-se ainda o entusiasmo dos funcionrios da UER e docentes/investigadores envolvidos
e o enriquecimento dos produtos de ensino, e a regularizao dos processos de trabalho.

Entre as dificuldades deste processo salienta-se a utilizao de vrios sistemas em simultneo,


a base de desenhos 2D e o modelo BIM. A base de desenhos est relativamente estabilizada em
algumas especialidades, o modelo BIM est ainda em fase piloto para um dos edifcios. A opo
por desenvolver internamente uma soluo integrada BIM-aplicao web de gesto, deve-se
em grande parte confiana na capacidade interna em termos de utilizao de ferramentas de
desenho e BIM e desenvolvimento de aplicaes informticas.

Para alm do plano de trabalho exposto atrs, pretende-se expandir o sistema integrado em
diversas direes:
Integrao com sensores existentes nos edifcios, nomeadamente leitores de cartes de
abertura de salas;
Ligao com sensores ambientais e de consumo de gua e eletricidade e com sistemas
de Gesto Tcnica de Edifcios;
Integrao com sistema de gesto acadmica para representao de informao, tal
como histrico de utilizao de espaos;
Disponibilizao online de informao comunidade interna e externa.

510
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Produo de modelos para navegao virtual pelo Campus com vista promoo externa do
ISCTE-IUL e incluso em quiosque digital para apoio aos utilizadores usuais e ocasionais com
informao sobre servios, sua localizao e navegao, horrio, contactos, status, filas espera.
Finalmente, pretende-se com este trabalho receber a opinio e os contributos da comunidade
tcnica e cientfica e, de futuro, transmitir o know-how ganho atravs de comunicaes tcnicas
e cientficas regulares, prestao de servios e produtos de ensino.

Referncias

[1] K. O. Roper and R. P. Payant, The Facility Management Handbook, 4th ed. American
Management Association, 2014.
[2] B. Becerik-Gerber, F. Jazizadeh, N. Li, and G. Calis, Application Areas and Data
Requirements for BIM-Enabled Facilities Management, J. Constr. Eng. Manag., no.
March, pp. 431442, 2012.
[3] E. Teicholz and IFMA Foundation, Technology for facility managers: the impact of
cutting-edge technology on facility management. Hoboken, New Jersey: John Wiley &
Sons, 2013.
[4] McGraw Hill Construction, The Business Value of BIM for Owners, 2014.
[5] GSA, BIM Guide for Facility Management, 2011.
[6] BIMForum, Level of Development Specification, 2015.
[7] R. G. Kreider and J. I. Messner, The Uses of BIM: Classifying and Selecting BIM Uses
(v 0.9), 2013.
[8] Brian Haines (FM:Systems), The Benefits of Lifecycle BIM for Facility Management |
FM Systems, 2016. [Online]. Available: https://fmsystems.com/blog/the-benefits-of-
lifecycle-bim-for-facility-management/. [Accessed: 02-Sep-2016].
[9] NP ISO 13567 - Documentao tcnica de produtos. Organizao e designao de
camadas (layers) em CAD. Parte 3: 2011.
[10] Chuck Eastman, Paul Teicholz, Rafael Sacks, and Kathleen Liston, BIM Handbook: a
guide to building information modeling for owners, managers, designers, engineers and
contractors, 2nd ed. John Wiley & Sons, 2011.
[11] Y. Wang, X. Wang, J. Wang, P. Yung, and G. Jun, Engagement of Facilities
Management in Design Stage through BIM: Framework and a Case Study, Adv. Civ.
Eng., vol. 2013, no. 189105, 2013.

511
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

512
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O USO DA TECNOLOGIA BIM EM PATRIMNIO HISTRICO. UM


CASO DE ESTUDO: O CONVENTO DOS CAPUCHOS DA CAPARICA
Joo Frescata Pereira (1), Ana Tom (2)

(1) Instituto Superior Tcnico da Universidade de Lisboa, Lisboa


(2) CERIS Investigao e Inovao em Engenharia Civil para a Sustentabilidade, DECivil,
Instituto Superior Tcnico, Universidade de Lisboa, Lisboa

Resumo
Esta investigao visa explorar as potencialidades da tecnologia BIM (Building Information
Modelling) aplicadas a procedimentos de gesto e manuteno de edifcios pr-existentes, mais
especificamente, de edifcios patrimoniais. A tecnologia BIM, centrada no conceito de Objeto
e vocacionada para a descrio tridimensional do ambiente construdo, baseia-se numa
metodologia de trabalho mais aproximada da realidade. Permite-nos a sua descrio e
representao de um modo holstico (ao descrever o objeto construdo atravs de escalas de
maior e de menor detalhe) e complexo (ao integrar um conjunto de dados geomtricos e no
geomtricos e a possibilidade de parametrizar objetos). A aplicao da tecnologia BIM a
edifcios patrimoniais permite fixar para memria futura a sua verdade construtiva, registar
intervenes e adaptaes, divulgar o patrimnio junto de um pblico mais vasto e/ou
longnquo, preservando simultaneamente a fragilidade da sua construo. No entanto, no
existem muitos exemplos disponveis que permitam aprofundar o conhecimento sobre estas
vantagens. A abordagem desenvolvida recorreu a um caso de estudo o Convento dos
Capuchos situado na Caparica, em Almada, patrimnio municipal e espao vocacionado para
eventos de msica erudita de carter intimista. A maquete virtual deste convento franciscano
foi desenvolvida considerando todos os dados disponveis sobre o edifcio e procurando
detalhar, sobretudo, os seus aspetos geomtricos e construtivos. Esta abordagem permitiu
descrever cenrios demonstrativos do modo como a base de dados criada pode ajudar na
manuteno e gesto correntes deste edifcio patrimonial.

1. Introduo

Tendo em conta os tempos acelerados que se vivem nos dias de hoje, torna-se cada vez mais
prtico e til possuir ferramentas, nos campos da engenharia, arquitetura e construo, que nos
facilitem a comunicao e eficincia no trabalho. Para tal encontramos mltiplos softwares
centrados no conceito de Objeto, assim vocacionados para a tridimensionalidade, justificando
a sua existncia por se basearem numa metodologia mais aproximada da realidade - a linha
abandonada em detrimento do slido. Estas ferramentas digitais permitem uma viso mais

513
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

concreta e completa do prottipo ou projeto em questo. De seu nome Building Information


Modelling (BIM) esta tecnologia consegue dar a conhecer toda a complexidade que envolve
um projeto, contendo informaes detalhadas de cada elemento que o constitu.

Comparando esta metodologia de trabalho com a tradicional evidencia-se que, de um modo


genrico, h uma otimizao dos desenhos tcnicos para a construo, existe maior exatido
nas medies e oramentos realizados, a colaborao entre equipas multidisciplinares bastante
mais eficaz e, consequentemente, os prazos de entrega e construo de projetos so cumpridos
com uma rapidez superior [1].

Consideradas algumas das vantagens do BIM, importa referir a sua aplicao somente em novos
projetos e construes, ou seja, em obras que se encontram na fase de conceo e execuo.
Faltando assim o enquadramento nas fases posteriores, de explorao, como o caso da fase de
utilizao e manuteno ou ainda a fase posterior a esta, de reabilitao ou demolio.

Ao nvel da literatura, j vem sendo estudado o benefcio da conjugao desta metodologia em


edifcios pr-existentes e/ou edifcios pertencentes ao patrimnio cultural e histrico. O intuito
de tal ligao advm das potencialidades de gesto e manuteno desta ferramenta. Quer-se
assim, num futuro prximo, usufruir do BIM tambm para este tipo de procedimentos, na
reabilitao. Ambicionam-se executar trabalhos de restauro e mesmo de demolio com o apoio
do BIM, mas o passo para a prtica ainda no foi dado. Da um dos objetivos a alcanar com
este trabalho ser a comprovao da utilidade do BIM ao servio da gesto e manuteno de uma
obra construda.

Contextualizando esta temtica em pases industrializados, com as taxas de construo


estagnadas, reforando-se assim a importncia do planeamento e restauro, e tendo em conta que
esta uma rea em expanso, da qual ainda no h grande experincia (da implementao do
BIM em edifcios pr-existentes), perceptvel a validade desta investigao.

As potencialidades desta ferramenta so numerosas neste campo. Como por exemplo, o clculo
de alternativas e otimizaes; a mitigao de riscos ou o limitar de custos; uma gesto de
recursos mais eficiente; o planeamento de uma demolio de infraestruturas complexas; a
criao de agendas de demolio; o planeamento de remodelaes; a gesto na segurana no
trabalho; a aprimorada colaborao, documentao, gesto de dados e visualizaes; a
contabilizao da eficincia energtica e emisses acrescidas das demolies [2].

De realar que modelar objectos BIM representar os componentes de um edifcio, incluindo


atributos geomtricos e no geomtricos e as relaes entre ambos. Desta forma, essa
informao necessita de ter preciso e de estar constantemente a ser atualizada de acordo com
os procedimentos que vo ocorrendo, por forma a qualquer alterao se refletir no modelo de
um modo automtico e imediato.

Se somarmos estes atributos vantajosos, que o BIM pode acrescentar aos edifcios pr-
existentes, aos benefcios decorrentes do seu uso em edifcios patrimoniais, encontramos uma
vasta gama de vantagens asseguradas por esta ferramenta. De facto, a introduo do BIM no
campo do patrimnio construdo capaz de suportar a gesto da informao colectada,

514
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

modelada, utilizada e partilhada pelos diferentes intervenientes envolvidos no processo de


investigao e conservao. Isto melhora a disponibilidade e acessibilidade de todo o
conhecimento relacionado com a histria e arqueologia ligada ao artefacto, tornando mais fcil
a sua interpretao, monitorizar as suas mudanas e documentar cada actividade de investigao
e interveno. Como consequncia, as decises interventivas sero tomadas tendo em conta o
conhecimento exato, formalizado no modelo; sero identificadas situaes de emergncia; e
poder-se- ainda programar as actividades de interveno e planear uma rotina de gesto e
manuteno do edificado.

A modelao BIM serve assim como um inteligente dossi electrnico de dados sobre um
artefacto, durante as actividades de investigao e conservao, integrando a representao
geomtrica e os dados no geomtricos.

De notar que, para representar e compreender completamente um artefacto histrico


necessrio incluir no s a informao directamente relacionada com o objecto ou com as suas
partes (ambas tangveis ou intangveis, como o material, a sua poca/data, fase de deteriorao),
mas tambm uma larga quantidade de semnticas sobre diferentes aspectos contextuais (por
exemplo, contexto histrico, informao social, recursos disponveis naquele ambiente, outra
informao sobre patrimnio, etc.). Esta tecnologia consegue armazenar todo esse tipo de
informao, num modelo unificado, onde a representao geomtrica e a necessidade de
semnticas podem ser ligadas e adaptadas ao longo de todo o processo, permitindo que as
pessoas acessem, editem e procedam gesto da informao de acordo com o seu papel, tarefas
e competncias [3].

Para explorar e aprofundar estas potenciais vantagens aplicadas ao patrimnio construdo,


selecionou-se como caso de estudo o Convento dos Capuchos da Caparica, em Almada,
Portugal. Traaram-se desde o incio as seguintes metas, como forma de comprovar a premissa
desenvolvida nesta seo:
criao do modelo tridimensional do Convento dos Capuchos contemplando a sua rea
envolvente (jardins e arriba fssil).
realizao de uma base de dados pormenorizada relativa a cada elemento constituinte
do projeto arquitetnico, por forma a ser criado um arquivo onde toda a informao
necessria poder ser acedida com facilidade.
dar a conhecer as principais fases de construo e restauro que o convento sofreu,
executando a modelao de cada uma;
demonstrar as vantagens em converter o patrimnio construdo para uma representao
digital, utilizando a tecnologia BIM.

515
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2. Caso de Estudo Convento dos Capuchos, Caparica

2.1 Breve apresentao


O Convento dos Capuchos da Caparica, fundado em 1558, um de trs conventos capuchinhos
erigidos em Portugal, no sculo XVI, perto da capital lisboeta, e pertencentes Ordem
Franciscana. Para alm deste convento, existem tambm um na Serra de Sintra, fundado em
1560 e outro, o primeiro a ser construdo, em 1542, na Serra da Arrbida.

O Convento dos Capuchos da Caparica localiza-se no topo de uma extensa escarpa em frente
ao Oceano Atlntico a arriba fssil da Costa da Caparica. Esta paisagem protegida prolonga-
se ao longo da faixa costeira por uma distncia de 13km, cobrindo 1599 hectares (Figura 1).
Antigamente, esta arriba fssil estava em contacto direto com o mar, porm, com a regresso
marinha, tal deixou de acontecer, apesar deste elemento, a gua, continuar a ser a referncia de
contemplao, e a dominar as vistas e perspetivas que se obtm daquele lugar.

Numa gramtica construtiva que, em larga medida, se mostraria transversal s vrias provncias
capuchas, os Estatutos arrbidos descriminavam cuidadosamente as caractersticas dos diversos
espaos conventuais (Figura 5), assumindo como grandes elementos definidores a igreja, de
planta retangular, e o claustro, quadrangular, em torno do qual se alinhavam a maioria das
restantes dependncias (Figura 2).

Figura 1: Localizao do Convento dos Capuchos da Caparica na paisagem protegida da


arriba fssil da Costa da Caparica (esquerda); entrada principal do convento (superior direita);
vista area com delimitao da antiga cerca do convento (inferior direita). Fonte: Bing Maps,
2016.

Este documento/livro dos Estatutos da Provncia de Santa Maria da Arrbida, escrito pelos
primeiros frades que se estabeleceram na Arrbida, funciona como uma espcie de RGEU
(Regulamento Geral de Edificaes Urbanas) para os conventos capuchos, i.e, aqui so
descritas as normas construtivas necessrias edificao de um convento pertencente Ordem
dos Frades Menores Capuchinhos.
Segundo os critrios de classificao nacionais, o edifcio escolhido para servir de estudo de
caso do presente artigo insere-se na categoria de Imvel de Interesse Municipal ou Patrimnio

516
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Municipal, como comummente descrito. J a nvel internacional, o convento encontra-se


englobado na classificao de Monumento [4].

Figura 2: Perceo volumtrica do Convento dos Capuchos da Caparica a partir de uma vista
area. Fonte: Bing Maps, 2016.

No sculo XIX, com a extino das ordens religiosas em Portugal, ocorrida no contexto da
consolidao do liberalismo no pas, ao final da guerra civil portuguesa (1828-1834), a casa dos
frades capuchinhos na Caparica acaba por conhecer o seu fim, apesar de temporrio (Figura 3).
bem conhecido que a animosidade se fora instalando e crescendo face s ordens religiosas,
desde finais do sculo XVII, quer por certa decadncia interna das prprias ordens e
congregaes, quer por toda a mentalidade iluminista do sculo XVIII que com dificuldade
entendia o papel da dimenso contemplativa da vida religiosa.

Em 1950, a Cmara Municipal de Almada considera o convento como imvel de interesse


pblico e adquire o Convento dos Capuchos da Caparica e o terreno que o confina o qual,
altura, estaria na posse de um particular. Este ato de compra por parte da Cmara abriu o
caminho para o resgate efetivo do convento e para a sua recuperao, que urgia h j algum
tempo. Procederam-se ento as obras de reabilitao. Esta grande interveno foi extremamente
importante para a poca e para a histria do Convento dos Capuchos.

Figura 3: Estado de runa e degradao do Convento dos Capuchos da Caparica aps a


extino das ordens religiosas em Portugal (esquerda); e depois do restauro de 1950, aquando
da aquisio do imvel pela Cmara Municipal de Almada. Fonte: Caeiro e Fontes, 2013.

517
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Depois da recuperao deste patrimnio municipal estar completamente concluda, o convento


foi devolvido comunidade e conheceu diferentes usos (como por exemplo, o de escola
primria e de museu municipal). O edifcio foi obrigado a ajustar-se ao programa exigido pelas
novas funcionalidades.

Atualmente o Convento dos Capuchos um edifcio cultural, dedicado principalmente a


eventos de msica erudita. A escala do edifcio adequa-se atmosfera intimista criada nos
concertos promovidos pela Cmara. Esta condio privilegiada pelas condies acsticas
favorveis do claustro. Passou-se a celebrar anualmente o Festival de Msica dos Capuchos
neste convento aproveitando no vero as noites quentes da Caparica.

Desta forma a imagem do convento passa a afirmar a sua vocao para o acolhimento de
mltiplas iniciativas (Figura 4), desde a realizao de espetculos a exposies e conferncias.
A msica, atravs de ciclos de concertos entre o repertrio medieval e moderno e as expresses
mais contemporneas, cruza-se com outras linguagens e discursos, presentes,
fundamentalmente nas diversas exposies, propondo percursos pela pintura ou pela escultura,
pela fotografia ou pela joalharia, pela arte sacra ou pelo patrimnio mvel [5].

Figura 4: Instalao artstica no trio (24 de Outubro de 2015). As colunas foram cobertas por
espelhos, permitindo um jogo de perspetivas e visualizaes aos seus utilizadores como forma
de explorar a sua luz, espao e tempo de diferentes maneiras. Fontes: Ana Tom, 2016.

Estas atividades so sempre dispersas ao longo do interior e exterior do edifcio funcionando


como um convite experincia da fruio do espao. O convento possui ainda uma exposio
permanente O Convento dos Capuchos Vida Memria e Identidade sobre a sua histria,
usos e reconstruo. Esta exposio visa polarizar a investigao sobre as razes da Ordem
Franciscana em Portugal e as suas ligaes com este espao fsico. O seu objetivo a
compreenso do passado histrico do convento para um melhor planeamento das futuras
atividades. Como espao devolvido comunidade e ao seu servio, o convento tambm tem
acolhido vrias iniciativas propostas por instituies ou relativas prpria vida do concelho e
aos dinamismos das suas polticas culturais ou de promoo de cidadania. A capela do convento
acolhe, at aos dias de hoje, cerimnias religiosas, como batizados ou casamentos.

Assim, particularmente importante para uma dinmica funcional bem sucedida, o


desenvolvimento de uma ferramenta que apoie as decises de gesto, considerando as duas
principais perspetivas da manuteno do edifcio: por um lado a sua utilizao e, por outro, a
integridade e preservao da sua construo.

518
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.2 Procedimentos de recolha de informao


De acordo com os objetivos traados e como forma de os atingir, foi necessrio considerar
quatro aspetos simultaneamente: 1) o valor patrimonial do edifcio; 2) o prprio edifcio em
questo; 3) os seus detalhes e tcnicas construtivas; 4) e a metodologia de modelao BIM
utilizada.

Para perceber as implicaes da modelao BIM neste caso de estudo e reconstru-lo


virtualmente, foi importante analisar as tcnicas e materiais que eram usados data, em
Portugal, assim como procurar artefactos arqueolgicos que pudessem ajudar na compreenso
sobre a constituio dos elementos construtivos que compem o convento. No entanto, a
informao disponibilizada sobre as intervenes passadas verificou-se no ser coerente nem
conclusiva. Alm disso, analisaram-se ainda os principais fatores de deteriorao e eroso que
afetavam o edificado. Foi, ainda, realizado um levantamento arquitetnico detalhado, com o
auxlio de medies, fotografia, vdeo e esquissos.

A exposio permanente do convento, sobre o prprio edifcio em si e sua histria, foi tambm
uma tima fonte de recolha de informao. Outro elemento importante de recolha de dados de
apoio investigao foram os, j referidos anteriormente, Estatutos da Provncia de Santa Maria
da Arrbida, como forma de perceber a origem do convento, as necessidades de quem o habitou
regularmente ao longo da histria, assim como, o trao definidor caracterstico dos cenbios da
Ordem dos Frades Menores Capuchinhos (Figura 5).

Figura 5: Primeira pgina dos Estatutos da Provncia de Santa Maria da Arrbida. Fonte:
Caeiro e Fontes, 2013.

Os planos de construo relativos s duas grandes intervenes realizadas no convento, 1950-


52 e 2000-2001, ao servio da Cmara Municipal de Almada, foram um importante recurso
para a conceo do modelo tridimensional do convento no seu estado atual.

A campanha de 1950-52 incidiu na reconstruo total do convento j que este se apresentava


em estado total de runa. Esta interveno procurou respeitar o quanto possvel, o estilo e a
tradio do antigo cenbio. Sendo assim, o trabalho desenvolvido refletiu-se na recuperao
estrutural do edificado, no arranjo dos espaos exteriores e na procura de novas solues
decorativas que remetessem para o conceito original de um convento capuchinho.

519
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

J a campanha de 2000-01 ambicionava consolidar esta recuperao do convento original e,


simultaneamente, criar as condies requeridas s novas funcionalidades que o edifcio se
propunha abrigar. Esta interveno teve em conta a reorganizao espacial interior e dos
principais acessos ao edifcio, assim como a reabilitao de reas incaractersticas
transformadas e adaptadas aos novos usos. Puderam-se reparar antigos erros, obviar novos
danos e patologias que afetavam o edifcio e recuperar a volumetria primitiva de algumas das
antigas dependncias conventuais [5].

Outra grande fonte de informao foi o Diretor do Convento dos Capuchos cuja colaborao
mostrou-se essencial. Em conjunto houve uma reflexo sobre quais as caractersticas que o
modelo BIM deveria incorporar de modo a se tornar til e preencher as necessidades
particulares deste espao de ndole cultural.

3. O desenvolvimento do modelo BIM

3.1 Pr-modelao (ou recolha de dados)


Para se proceder modelao propriamente dita preciso uma base, na qual o utilizador se vai
fundamentar para dar incio ao seu trabalho. Designamos por base todos os dados utilizados
que apoiaram a conceo do modelo. Assim sendo, podem-se distinguir dois tipos de dados ou
informao: os geomtricos e os no geomtricos.

Por informao geomtrica compreendem-se os levantamentos feitos no terreno (dimensionais,


fotogrficos e audiovisuais) e os desenhos tcnicos cedidos (em formato AutoCAD) para o
propsito da modelao do convento. J a informao no geomtrica engloba a pesquisa
bibliogrfica realizada sobre o edificado e tambm sobre as potencialidades do software
utilizado, Revit - as entrevistas e reunies com os intervenientes do projeto de reabilitao e
as palestras e conferncias assistidas sobre a temtica BIM.

De um modo sucinto, toda esta informao foi muito importante para obter o modelo final,
sendo que os dados geomtricos influenciaram diretamente a execuo do modelo e os dados
no geomtricos tiveram uma influncia indireta.

3.2 Modelao da envolvente


Primeiramente foi modelada a rea envolvente do convento. Esta rea determinada acabou por
ser bastante extensa e englobar diversos objetos, de modo a permitir situar o edificado no
terreno e compreender a sua relao com a periferia que o rodeia.

Assim, neste ficheiro principal, denominado por Project_CCC, existiria a superfcie


topogrfica e eixos virios confinantes, edifcios circunjacentes, representados atravs de
volumes com a cota correspondente - vegetao existente no local (rvores e arbustos
predominantes) e alguns elementos exteriores ao convento, mas que fazem parte do complexo
do mesmo, como o muro que delimita os seus jardins, por exemplo (Figura 6).
Devido complexidade do Convento dos Capuchos optou-se por fazer a modelao do edifcio
num ficheiro independente ao da envolvente e, posteriormente, ligar os ficheiros Revit entre si.

520
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: rea Envolvente do modelo BIM do Convento dos Capuchos da Caparica.

3.3 Modelao do Convento atual


Trabalhando agora no ficheiro Project_CCatual, e depois de efetuada a ligao dinmica entre
o modelo do edifcio e da envolvente, iniciou-se o processo de modelao do edifcio
conventual. Este processo de modelao atingiu um grau de detalhe bastante minucioso
(LoD300) pois, no caso de edifcios patrimoniais, o pormenor da representao assume um
papel muito importante na representao virtual do objeto e preservao da sua memria e
verdade geomtrica.

Modelou-se primeiro os objetos mais simples ou regulares, como pavimentos, paredes, tetos,
coberturas, escadas e rampas. Para os objetos mais complexos e que fugiam a esta regularidade,
pelo seu detalhe ou forma especial, criaram-se famlias.

As Famlias correspondem a uma entidade do Revit com uma importncia determinante no


desenrolar das atividades ligadas ao processo de construo de elementos personalizados, i.e.,
tudo o que no vem com o programa de origem. Outra caracterstica de grande destaque neste
tipo de componentes facto de serem parametrizveis, tornando muito til a sua utilizao e
facilitando o processo construtivo dos modelos.

521
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Vista area poente do modelo BIM do Convento dos Capuchos da Caparica.

As Famlias, foram utilizadas para criar os vos (janelas, portas e vos simples) e ornamentos
que o convento possu. O detalhe nestes objetos atingiu a medida mnima de 5mm.

Em larga medida foi este tipo de objetos que conferiu uma maior autenticidade ao modelo, uma
vez que foram modelados todos os pormenores de acordo com a realidade existente.

Figura 8: Render da Janela com caixilho 3x4 - exemplo de uma Famlia existente no
modelo BIM do Convento dos Capuchos da Caparica.

3.4 Modelao do antigo convento


Para a conceo do convento no seu estgio anterior recorreu-se documentao existente
desenhos tcnicos e livros que documentavam as alteraes em relao ao edificado presente
hoje em dia.

Criou-se ento o Project_CCantigo que mais no do que o Project_CCatual com as


devidas alteraes ocorridas, onde se eliminaram certos objetos e se acrescentaram outros, de
acordo com a obra que foi realizada. Abaixo seguem algumas dessas alteraes constatadas.

Figura 9: Renders do interior do claustro, atualmente (esquerda) e nos anos cinquenta (direita)
do modelo BIM do Convento dos Capuchos da Caparica. Pode observar-se a alterao do
pavimento e o desaparecimento dos espelhos de gua.

3.5 Modelo do Convento dos Capuchos da Caparica

522
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tendo todas as partes criadas envolvente, convento atual e convento antigo e estando os
modelos dos edifcios conventuais ligados ao modelo do territrio, poder-se-ia dar como
terminado o trabalho de modelao efetuado. Porm, como forma de dar a conhecer a
reconstituio digital desenvolvida a um pblico mais vasto, exportou-se o modelo do Revit
para um formato que atualmente se pode considerar universal, o Adobe Acrobat Reader, criando
um PDF 3D de todo o modelo.

Figura 10: Renders do modelo BIM do Convento dos Capuchos da Caparica.


4. Concluses

Como demonstrado na seo anterior, foi possvel criar um modelo tridimensional do Convento
dos Capuchos da Caparica e rea de implantao onde o mesmo se insere, o qual, por ter sido
desenvolvido num software BIM, fornece partida uma panplia de informao sobre os
objetos modelados, como por exemplo, a materialidade ou dimensionamentos dos objetos
criados. Foram ainda realizados dois modelos concernes a duas pocas distintas, dando assim a
conhecer as duas principais intervenes ao qual o edifcio esteve sujeito. De notar que a
modelao no contemplou o estgio original por falta de informao e documentao sobre o
mesmo, visto que o convento foi fundado no sculo XVI. No entanto, e dado ser um modelo
BIM, esta informao pode ser incorporada posteriormente dada a pretenso do Municpio em
dar continuidade investigao histrica e arqueolgica sobre a fundao deste espao
conventual.

523
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Concludo o trabalho prtico e terico relativo ao caso de estudo, foi possvel sistematizar
algumas ilaes quanto aplicao da tecnologia BIM no patrimnio edificado. Sublinhe-se,
porm que, s com a experincia e prtica desta atividade relativa preservao do patrimnio
usando a metodologia BIM, que se poder aprofundar resultados, identificar benefcios mais
especficos e quantificar melhor a utilidade deste processo.

De entre as ilaes retiradas, identificou-se a existncia de duas grandes reas de influncia da


aplicao do BIM no patrimnio: a grfica e a alfanumrica.

Quanto parte grfica constatou-se que a aplicao da tecnologia BIM na representao fornece
um ambiente de modelao capaz de melhorar a gesto da informao, alcanando uma clareza,
consistncia e coordenao de todo o conhecimento disponvel para o perfeito entendimento do
edifcio que, de outra maneira, no existiria. Desta forma, a gesto e manuteno dos edifcios
beneficia das propriedades visuais do BIM, j que estas mesmas propriedades elevam o grau da
visualizao da informao disponvel, fator este que se traduz numa perceo da realidade
mais coerente, acessvel e completa.

J a componente no geomtrica, que compreende os dados numricos, percentuais, textuais,


entre muitos outros, torna acessvel toda a informao possvel e atualizada, sobre um
determinado edificado. Tal propriedade mostra-se de extrema importncia na gesto de um
edifcio pelo facto de esta compilar a realidade existente num ficheiro digital, ou seja, tudo o
que se sabe sobre uma pea arquitetnica pode estar armazenado num lugar de fcil acesso para
consulta ou edio.

Resumindo, as grandes vantagens da converso para modo digital do patrimnio pr-existente,


atravs da tecnologia BIM, residem:
na unificao de toda a informao de um edifcio, sistematizada, organizada e
armazenada num repositrio nico (plataforma digital), acessvel e editvel por parte
dos seus utilizadores.
na preciso dos dados, i.e., na representao virtual da realidade existente, sendo
possvel efetuar alteraes, parametrizveis ou no, que avaliam as mltiplas
alternativas num processo de escolha ou de tomada de deciso.
As duas caractersticas acima referidas podem, em conjunto, melhorar a gesto e manuteno
de um edifcio, isto porque prometem aumentar a eficincia dos trabalhos que as referidas
atividades compreendem assim como criar um organizado arquivo de dados.

A misso do Convento dos Capuchos, hoje em dia, a de Servio Pblico, adquirindo um


carcter social, na medida em que este edifcio conventual est integrado numa rede de espaos
culturais alicerados na perspetiva de servir a populao, mantendo uma interveno ativa na
cidade e no seu projeto cultural. Com o modelo BIM criado muitas oportunidades surgem, como
a de dinamizao e registo dos usos culturais que o imvel oferece, atravs da simulao de
eventos, os quais podem ser planeados neste modelo desenvolvido. Para alm disso, toda e
qualquer interveno futura no convento dever ser testada em primeiro lugar no modelo,
obviando possveis erros de desenho e quantificando os custos de determinado projeto, por
exemplo. Outro uso inteligente do modelo poder passar pela disponibilizao de visualizao

524
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

do mesmo ao pblico, numa webpage ou numa aplicao, possibilitando aos utilizadores uma
navegao ou visita virtual pelo convento nunca antes conseguida.

H, porm, uma falta de uso do BIM em patrimnio como forma de mostrar o quo til poder
ser a conjugao desta ferramenta a este tipo de estruturas. J se tem estudado e verificado os
benefcios desta utilizao das novas tecnologias ao servio da herana cultural edificada, como
foi referido anteriormente, todavia, a parte prtica continua a ser o ncleo ou a chave dos
acontecimentos futuros. Por essa razo torna-se relevante que alguma entidade comece ou inicie
este processo, para se terem resultados mais especficos, que justifiquem e sugestionem outras
entidades, por sua vez, a usarem tambm esta metodologia de preservao do patrimnio.

Referncias

[1] J. Garcia and J. Leito, BIM value, in Revit Course by Lusocuanza (2014), Lisbon,
Portugal, 2014, pp. 6.
[2] F. Schultmann, J. Stengel and R. Volk, Building Information Modelling (BIM) for
existing buildings Literature review and future needs, Automation in Construction,
vol. 38, pp. 109-127, December 2013. doi: 10.1016/j.autcon.2013.10.023.
[3] G. Carrara, S. Cursi, D. Simeone and I. Toldo, BIM and knowledge management for
building heritage, Acadia 2014, pp. 681-690, 2013.
[4] Dirio da Repblica n 209/01 - IA Srie, Portaria n 107/01 de 8 de setembro de 2001,
Lei Fundamental do Patrimnio Cultural Portugus, 2001.
[5] N. Caeiro and J. Fontes, O Convento dos Capuchos Vida, Memria e Identidade
Catlogo da Exposio. Cmara Municipal de Almada, 2013.

525
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

526
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

BUILDING LIFE CYCLE MANAGEMENT NA REABILITAO DE


EDIFICIOS
Raquel Matos (1), Fernanda Rodrigues (2), Hugo Rodrigues (3), Ana Alves (1), Paulo
Ribeirinho (2)

(1) Departamento de Engenharia Civil, Universidade de Aveiro


(2) RISCO, Departamento de Engenharia Civil, Universidade de Aveiro Aveiro
(3) RISCO, Escola Superior de Tecnologia e Gesto, Politcnico de Leiria, Leiria

Resumo
A gesto de edifcios ao longo do seu ciclo de vida atualmente um problema que requer
otimizao, considerando o alto custo associado utilizao dos edifcios e aos seus custos de
operao e manuteno. O nmero de edifcios existentes que necessitam de aes de
reabilitao, justifica a necessidade de um modelo de interveno que otimize a sua vida til,
aps o processo de reabilitao. Assim, a reabilitao, manuteno e os custos de planeamento
devem ser estabelecidos e guiados pelo valor dos princpios monetrios. Para melhorar o
planeamento e para diminuir a perda de informao, pode ser usado o Building Information
Modeling (BIM), que tem vantagens para todas as fases do ciclo de vida de uma edificao,
devendo ser utilizado para apoiar a respetiva gesto. O BIM baseia-se num modelo 3D de
estruturao de informao, que associado a vrias dimenses, pode apoiar a determinao do
custo do ciclo de vida (CCV) e o Building Life Cycle Management (BLCM). Assim, este artigo
analisa a aplicao da metodologia BIM reabilitao de um edifcio e as suas vantagens para
a determinao do CCV quando se consideram diferentes cenrios de manuteno. Analisa
tambm diferentes solues de reabilitao em termos de durabilidade e custos.

1. Introduo

O conhecimento para modelar, analisar, manter, monitorizar, gerir, prever e otimizar o


desempenho do ciclo de vida de estruturas e infraestruturas est a crescer continuamente. Estas,
ao longo do seu ciclo de vida vo apresentando nveis no adequados de desempenho e
segurana, pelo que, as decises relativamente aos seus sistemas devem ser apoiadas por uma
anlise do ciclo de vida, baseada em mltiplos critrios de deciso, considerando entre outros
fatores, o desempenho e o custo acumulado total esperado [1].

527
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Os principais objetivos deste estudo so analisar a avaliao do desempenho do edifcio ao


longo seu ciclo de vida e otimizar a manuteno dos sistemas de construo e aplicar essa
anlise a um edifcio caso de estudo. Pretende-se ainda ligar o Building Life Cycle Management
(BLCM) e o Building Information Modelling (BIM) e realar a importncia do BIM no BLCM.
O estudo organizado da seguinte forma: primeiro so apresentados conceitos relacionados
com o BLCM, avaliao do ciclo de Vida (ACV), custo do ciclo de vida (CCV) e BIM. Estes
conceitos so importantes, uma vez que com base neles, apresentada de seguida a metodologia
aplicada e o caso de estudo realizado com base no CCV e na metodologia BIM. Por ltimo,
apresentam-se as concluses.

2. Building Life Cycle Management

Building life cycle management (BLCM) uma metodologia que inclui o planeamento,
construo, operao e manuteno do edifcio ao longo do seu ciclo de vida. Engloba todo o
ciclo da construo, usando o processo digital para criar, gerir e compartilhar informaes de
ativos, desenvolvendo um modelo colaborativo virtual: a metodologia BIM, que surge como
um suporte essencial ao BLCM, permitindo a gesto e partilha de informao durante todo o
ciclo de vida do edifcio [2].

O Building life cycle management um conceito holstico desenvolvido para gerir um edifcio
e o seu ciclo de vida, incluindo materiais, processos de construo, qualidade de construo,
qualidade de fabricao, anlise de resultados, especificaes de teste, informaes de
componentes ambientais, normas de qualidade, requisitos de engenharia, mudana de ordens,
processos de fabrico, fornecedores de componentes, etc [3].

Para realizar a gesto do ciclo de vida muito importante saber como criar e realizar a gesto
de dados e das informaes corretamente [2]. As capacidades do Building life cycle
management incluem Workflow, gesto de programas, processos que agilizam as operaes de
gesto e um backbone de colaborao, permitindo que as pessoas nas vrias empresas possam
trabalhar em conjunto associando tambm o ACV e o CCV [3].Torna possvel controlar toda a
vida til de um edifcio e as informaes relacionadas com o mesmo, ou seja, permite uma
gesto eficiente do ciclo de vida de um edifcio, possibilitando aos proprietrios comparar
solues diferentes, para encontrar a mais econmica e menos prejudicial ao longo do seu ciclo
de vida [3].

Considerando que cada edifcio nico, a necessidade de manuteno, reparao e renovao


de ativos varia de acordo com vrios fatores, incluindo: a qualidade da construo,
especificidades do projeto, condies de exposio, e o cuidado na utilizao pelo proprietrio
e pela equipa de manuteno e gesto da propriedade. Apesar das diferenas entre construes,
determinou-se que muitas delas seguem um padro semelhante medida que passam pelas
diferentes fases que constituem os seus ciclos de vida [4]. Desta forma, indicam-se de seguida
as fases gerais do ciclo de vida de um edifcio.

528
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.1 Fases do ciclo de vida


O ciclo de vida comea com o fabrico do material, que inclui a extrao da matria-prima,
transporte para o local de fabrico, fabrico de materiais intermdios, fabrico embalagem e
distribuio de produtos de construo [5]. A fase de construo inclui atividades relacionadas
com a construo e reabilitao de um projeto, incluindo, normalmente, as seguintes atividades:
transporte de materiais e produtos para o local de construo, uso de ferramentas e
equipamentos, fabrico no local e uso de energia para o estaleiro. A determinao dos impactos
permanentes para o local de construo tambm se enquadra nesta fase, embora estes impactos
sejam includos no ACV [5]. Na fase de utilizao e manuteno, que se refere fase
operacional do edifcio, inclui todas as atividades relativas ao uso do edifcio ao longo da sua
vida til. Estas atividades incluem a manuteno das condies de conforto no interior do
edifcio, consumo de energia, consumo de gua e produo de resduos e poluentes ambientais.
Tambm considera a reparao e substituio de sistemas de construo, bem como o transporte
e uso de equipamentos necessrios para estas atividades [5] e [6]. Finalmente, h o fim de vida,
que inclui a energia consumida e os resduos produzidos, devido demolio, incluindo o
transporte de materiais, depsito, atividades de reciclagem e reutilizao [6].

Note-se que esta descrio das fases do ciclo de vida, baseia-se nos estudos de ACV. Cada ciclo
de vida, pode incluir ou no todas as atividades descritas dependendo do mbito do projeto [5].

2.2 Avaliao do ciclo de vida (ACV) e Custo do ciclo de vida (CCV)


Embora estas metodologias no sejam muito desenvolvidas neste trabalho considerou-se
importante dar uma breve descrio sobre estes conceitos, uma vez que esto diretamente
relacionados com o BLCM. O BLCM uma estrutura que utiliza o ACV e CCV para apoiar as
decises sobre o desenvolvimento sustentvel da gesto do ciclo de vida [5].

Avaliao do ciclo de vida compreende a avaliao do impacto ambiental de um produto ou


servio durante todo o seu ciclo de vida [7], apresentando 3 variantes, dependendo das fases do
ciclo de vida estudadas: Cradle-to-Grave , Cradle-to-Gate e Cradle-to-Cradle, [8].

De acordo com a ISO 15686:2008 e Dixon (2012), o Custo do ciclo de vida (CCV) o custo
de um ativo ou de uma parte ao longo do seu ciclo de vida, enquanto cumprem os requisitos de
desempenho. Estes custos podem ser calculados pela expresso (1) [9].

= + (1)

Na qual: CCV o custo do ciclo de vida, C o custo de construo no ano 0 (custos indiretos
e diretos), o valor atual liquido de todos os custos recorrentes (de utilizao,
manuteno, substituio, servios, etc)e o valor atual liquido do valor
residual do edifcio em estudo ( recomendado ser igual a 0).

O trabalho desenvolvido, para alm deste artigo, foca-se no custo, mas importante reconhecer
que a escolha dos materiais e produtos para cada projeto tm impactos diretos e indiretos no
ambiente, bem como nos custos operacionais. A aplicao do CCV e do ACV permite s
equipas de projeto demonstrar que consideraram os impactos ambientais e econmicos nas suas

529
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

decises e, desta forma, escolheram os melhores materiais e produtos para o trabalho a realizar
[7].

Em todo o ciclo de vida do edifcio, quer na fase de construo, quer na de manuteno ou no


fim de vida, a minimizao dos custos e dos seus impactos ambientais, crucial, o que pode ser
alcanado atravs da previso das atividades de manuteno e do seu custo, logo na fase de
projeto.

De seguida, apresenta-se a importncia do BIM na gesto de edifcios e de seguida explica-se


a aplicao da metodologia BIM ao caso de estudo.

2.3 BIM e BLCM


Combinando o BLCM com a informao digital criada, gerida e partilhada, o BIM surge como
um suporte essencial que permite reduzir a perda de informaes durante o processo de
conceo, construo e gesto [2]. Alm disso, os modelos virtuais precisos de um edifcio so
construdos digitalmente, apoiando o projeto em todas as suas fases, permitindo uma melhor
anlise e controle, do que os processos manuais. Os modelos digitais, quando concludos,
contm geometria precisa e os dados necessrios para apoiar a construo, fabricao e
atividades de gesto, atravs das quais o edifcio realizado.

Quando bem adotado, o BIM facilita um processo de conceo e construo mais integrado que
resulta numa melhor qualidade dos edifcios, a custos mais baixos e com reduo da durao
do projeto. Esta metodologia tambm melhora novas capacidades tais como, a verificao e
deteo de conflitos num modelo multidisciplinar, antes da fase de construo, e a verificao
automtica do projeto quanto ao cumprimento de exigncias legais e regulamentares [10].

O BIM tem benefcios para a fase de construo, atravs das suas ferramentas de coordenao
e controlo do planeamento e para a deteo de conflitos, permitindo a deteo e consequente
resoluo de erros com antecedncia, permitindo assim solues mais econmicas e menos
pedidos de alteraes que tornam os projetos e as construes mais caras [11]. Alm disso, a
combinao de Industry Foundation Classes (IFC), BIM, BLCM e web services (soluo
utilizada na integrao de sistemas e na comunicao entre aplicaes diferentes), torna
possvel chegar a uma plataforma que apresenta uma forma prtica de perceber, criar, trocar,
partilhar e gerir informaes de todos os participantes da indstria da construo.

As diferentes informaes tais como tempo, custos, medidas de segurana e qualidade, podem
ser integradas nas bases de dados do BIM, e por isso os investigadores acreditam que o BIM
tem um grande potencial para melhorar a construo e para gerir e partilhar informao durante
todo o ciclo de vida do edifcio [2]. O BIM torna ainda, a coordenao e a gesto do trabalho
no estaleiro mais eficiente, devido fcil compreenso do modelo, sua capacidade de deteo
de erros e omisses antecipadamente, facilitando a sua atualizao e evitando problemas, custos
e horas de trabalho a mais, durante a fase de construo.

Tambm importante notar, que o BIM considerado um sistema tcnico-social multicamadas,


que inclui o ncleo tcnico e a parte social, que combina a tecnologia feita pelo Homem e as
consequncias sociais e institucionais da sua execuo na sociedade. O ncleo tcnico do BIM

530
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

o software que permite a modelao 3D e a gesto de informaes, no qual possvel inserir


informaes adicionais, tais como informao sobre sustentabilidade e aes de manuteno,
como possvel no software Autodesk Revit [12].

No presente estudo, o BIM aplicado na gesto do ciclo de vida, com o objetivo de introduzir
as aes de manuteno preventiva associadas ao modelo do edifcio. Alguns projetistas
incorporam dados sobre custos de substituio esperados durante a vida do edificado,
contribuindo assim para facilitar a anlise de alternativas, nomeadamente permitindo ao
proprietrio analisar os benefcios de investir em materiais e sistemas que podem custar mais
inicialmente, mas que tm um melhor retorno ao longo do ciclo de vida do edifcio. Considera-
se desta forma, a tecnologia BIM vantajosa na gesto de informaes durante todo o ciclo de
vida do edifcio na arquitetura, engenharia e construo.

Neste caso de estudo, atravs do modelo BIM, pretende-se criar apoio ao desenvolvimento do
CCV na reabilitao e s futuras aes de manuteno de um edifcio. No entanto, a inovao
da tecnologia BIM tambm pode melhorar a previso, gesto e monitorizao dos impactos
ambientais dos projetos de construo [12]. Assim, possvel concluir que o BIM traz
vantagens tanto para a ACV como para o CCV.

3. Caso de estudo

Foi considerado um edifcio do sculo XX, sujeito a reabilitao, localizado em Vila Nova de
Gaia, em Portugal, tendo sido aplicada a seguinte metodologia:
1. Caracterizao do edifcio;
2. Determinao da vida til estimada dos materiais e componentes;
3. Definio de alternativas;
4. Planeamentos das aes de manuteno e reabilitaes;
5. Estimativa de custos;
6. Clculo do Custo do ciclo de vida;
7. Anlise dos resultados;
8. Modelao do edifcio em Revit, incluindo a integrao de custos unitrios e aes de
manuteno correspondentes aos objetos.

No entanto, o mbito deste artigo foca-se sobretudo nos passos 1 e 8.

3.1 Caracterizao do edifcio


O edifcio em estudo localiza-se em Vila Nova de Gaia, numa encosta sob terreno argiloso com
afloramentos rochosos. A fachada principal orientada a norte e o edifcio foi sujeito a uma
profunda reabilitao recentemente.

um edifcio tpico do Porto, de 2 pisos, constitudo por paredes de alvenaria de pedra de


granito, lajes com vigamento de madeira, e com cobertura constituda por asna de madeira com
apoio nas paredes de granito laterais. A espessura das paredes de granito varia entre 0.50 m a
0.90 m. A reabilitao do edifcio inclui a elaborao de uma laje colaborante para o primeiro
piso, suportada pelas paredes de granito laterais. O acabamento das paredes interiores de

531
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

reboco com pintura ou gesso cartonado e os forros do teto so, sobretudo, de gesso cartonado,
havendo um de madeira. O acabamento das paredes exteriores em pintura. Relativamente aos
revestimentos de pavimento so de madeira e pedra natural.

De acordo com a sondagem geotcnica, o nvel fretico encontra-se profundida de 2.8 m.


Embora a maior parte das anomalias identificadas estarem relacionadas com humidades e
condensaes, estas so relatadas como sendo provenientes da infiltrao de gua pela
cobertura, causada por um sub dimensionamento das caleiras. Alm disso, o edifcio tem
materiais e componentes envelhecidos e degradados que necessitam de uma remodelao para
serem mais seguros e modernos. As Figuras 1 3 mostram o exterior do edifcio antes e depois
da reabilitao e as Figuras 4 6 mostram o interior do edifcio durante e depois da reabilitao.

Figura 1: Edifcio antes da Figura 2: Edifcio depois da Figure 3:


reabilitao. reabilitao. Edifcio depois
da reabilitao.

Figure 4: Edifcio Figura 5: Edifcio depois da Figura 6: Edifcio depois da


durante a reabilitao. reabilitao. reabilitao.

3.2 Metodologia
Foi desenvolvido um modelo 3D no software Revit 2016. Atravs da criao de parmetros
compartilhados foi possvel associar cada ao de reabilitao ao modelo 3D, a cada objeto em
cada famlia como se pode observar na Figura 7 relativamente Cobertura EP.

532
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 7: Parmetros compartilhados associados aos elementos do modelo 3D.

O mesmo foi feito para os custos unitrios das aes de manuteno consideradas. Atravs de
uma Schedule pode ser extrado o custo de manuteno total de uma ao especfica, bem como
a listas dos trabalhos de manuteno a serem realizados, incluindo a sua periodicidade. Assim,
atravs dos parmetros compartilhados, das aes de manuteno e periodicidades adicionadas
e dos custos includos possvel a elaborao do plano de manuteno.

Relativamente ao CCV, o custo do ciclo de vida deve ser usado para avaliar as alternativas em
termos de custo e tempo. Neste caso de estudo, o CCV compara as vantagens de 3 estratgias
de manuteno. Assim, foram criadas 3 alternativas (ciclo de vida sem manuteno, ciclo de
vida com manuteno reativa e ciclo de vida com manuteno preventiva) e os respetivos
cenrios de manuteno, nos quais os fatores e as estratgias de manuteno mudam.

Para o clculo do CCV foi necessrio identificar os elementos fonte de manuteno e as suas
vidas teis de referncia. Em seguida, foi determinada a vida til estimada dos materiais atravs
do mtodo fatorial definido em [14]. Para aplicar este mtodo, foi necessrio definir e
caracterizar um conjunto de condies e fatores que tm implicaes no desempenho ao longo
do ciclo de vida do elemento. ainda necessrio o planeamento das aes de manuteno, os
seus custos e a sua programao, que permitem o clculo do CCV atualizado ao longo de 50
anos, que o perodo considerado neste estudo.

Em relao ao planeamento da manuteno e reabilitao, foram desenvolvidas um conjunto


de especificaes em projeto para estabelecer as aes de manuteno preventiva [15]. Estas,
so includas no modelo BIM, processo que est em progresso.

3.3 Resultados obtidos


Neste trabalho, procedeu-se modelao do edifcio objeto de estudo no software Revit 2016,
com o objetivo de obter os planos de manuteno, atravs da introduo de parmetros
compartilhados como foi explicado no subcaptulo 3.2, pretendendo-se concluir sobre as
vantagens do BIM neste mbito.

533
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ainda de notar que o BIM est a transformar o setor da arquitetura, engenharia e construo
fornecendo informaes precisas e relevantes ao longo do ciclo de vida dos edifcios. Embora
o uso da tecnologia BIM ainda esteja em desenvolvimento, claro o seu potencial para melhorar
a eficcia do BLCM [11].

As Figuras 8 a 11 mostram o modelo 3D realizado em Revit, onde possvel observar a


modelao de guardas, claraboias, escadas, estrutura do piso, forros e sancas, janelas, portas,
paredes, vigas estruturais, telhado, sistema de drenagem de guas pluviais entre outros.

Figura 8: Modelo 3D alado Norte. Figura 9: Modelo 3D corte no


alado Este.

Figura 10: Modelo 3D corte no alado Oeste. Figura 11: Modelo 3D corte a
meio do edifcio.

O BIM mais do que um software [16], pois alm da modelao em 3D, inclui a colaborao
de pessoas com diferentes funes, competncias e interesses, atividades e processos. Permite,
entre outras informaes, extrair tabelas com a codificao do material e a sua respetiva
medio, custos, descrio e tipo.

A Figura 12, mostra uma tabela extrada automaticamente do modelo 3D, que inclui as
quantidades dos materiais, o custo total de manuteno e a lista de trabalhos de manuteno
incluindo as respetivas periodicidades.

534
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 12: Exemplo de tabela extrada do modelo 3D, no Revit, relativamente aos
revestimentos de pavimento.

Quando o modelo modificado, esta informao automaticamente modificada tambm.


Assim, para tirar vantagem desta metodologia, o modelo 3D desenvolvido tem como objetivo
auxiliar na elaborao de planos de manuteno que sejam uteis durante a vida til do edifcio.

4. Concluso

O caso de estudo apresentado destina-se a aplicar a metodologia BIM e explorar as suas


potencialidades para o BLCM. Embora o BIM tenha muitas vantagens, uma metodologia
ainda pouco usada, e, quando utilizada, geralmente, s explora a representao tridimensional,
no implementando todo o potencial do conceito.

O uso da metodologia BIM revelou-se importante, uma vez que alm de reduzir a perda de
informao, facilita a comunicao dos vrios intervenientes, o que acaba por tornar mais
eficiente a sua interao com o projeto. Assim, possvel detetar conflitos, minimizar o pedido
de alteraes, o que acaba para contribui para a reduo do custo de construo. Alm disso,
permite a insero de aes de manuteno no modelo, o que facilita a realizao dos planos de
manuteno e minimiza o respetivo custo. Conclui-se assim que esta metodologia vantajosa
quando aplicada manuteno do edifcio permitindo a anlise e otimizao do CCV.

Os resultados obtidos permitiram concluir que a abordagem explorada, pode ajudar os


profissionais, utilizadores e decisores a melhorar a gesto da manuteno, no mbito do ciclo
de vida, com o objetivo de atingir o mais alto desempenho. No futuro, o presente estudo poderia
ser estendido para uma amostra representativa do edificado Portugus e portanto, poderia
influenciar o mercado imobilirio e todas as partes interessadas, de acordo com as necessidades
e desejos dos seus utilizadores.

Relativamente metodologia aqui descrita, a presente abordagem destinou-se a analisar o custo


do ciclo de vida para investigar os benefcios de diferentes alternativas de manuteno do
edifcio (ciclo de vida sem manuteno, ciclo de vida com manuteno reativa, ciclo de vida
com manuteno preventiva). Para estudos futuros prope-se a continuao deste trabalho na
vertente do ACV, com o objetivo de analisar como que o BIM pode ajudar a melhorar o estudo
e aplicao do ACV na reabilitao de edifcios.

535
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Referncias

[1] LCP, consulted on 4, June, 2016. available in


http://www.tandfonline.com/doi/full/10.1080/15732471003594427.
[2] L. Quing, T. Tao, W. Ping, " Study in Building Lifecycle Management Platform Based
on BIM " in . Research Journal of Applied Sciences, Engineering and Technology, 2014,
pp. 1-8.
[3] A. Saaksvuori, A. Immonem, Product life cycle management. Springer, 2008.
[4] M. Duraibi, "FM in Building Life Cycle MEFMA Middle East Management
Association Presented by Arch Mohammad Al Duraibi CEO Daem Real State
Investement Company One of Manafea Golding Group, 2016.
[5] C. Bayer, M. Gamble, R. Genry, and S. Joshi, AIA Guide to Building Life Cycle
Assessment in Practice. American Institute of Architects, Washington, USA, 2010.
[6] L. Cabeza, L. Rincn, V. Vilario, G. Prez, A. Castell, "Life cycle assessment (LCA)
and life energy analysis (LCEA) of buildings and the building sector: A review " in
Renewable and Sustainable Energy Reviews 2014, pp. 394-416.
[7] W. Dixon, What is whole Life Cycle Costing, Life Cycle Analysis and Life Cycle
Costing? WD Re-Thinking Ltd, 2012.
[8] R. Mateus, "Avaliao da Sustentabilidade na Construo: Propostas para o
Desenvolvimento de Edifcios mais Sustentveis.," Tese de Doutoramento, Braga,
Universidade do Minho, 2009.
[9] SULB, Guidelines for life cycle cost analysis" in Stanford University Land and
Buildings, 2005.
[10] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors.
Hoboken, N.J.: Wiley, 2011.
[11] FM, BIM: Revolutionizing Building Life Cycle Management. Article Magazine,
Consulted on 4 June, 2016 available in http://fmlink.com/articles/bim-revolutionizing-
building-life-cycle-management/.2016
[12] J. Wong, J. Zhou, " Enhancing environmental sustainability over building life cycles
through green BIM: A review " in Automation in Construction 2015, pp. 156-165.
[13] R. Vanlande, C. Nicolle, C. Cruz, "IFC and building lifecycle management in
Automation in Construction, 2008, pp. 70-78.
[14] ISO 15686-1, " ISO 15686-1: (2008). Buildings and constructed assets Service-life
planning Part 1: General principles," International Organization for Standardization
(ISO),2008.
[15] R. Rodrigues, " Gesto de edifcios: Modelo de simulao tcnico-econmica," Tese de
Doutoramento, Porto, Faculdade de Engenharia da Universidade do Porto, 2001.
[16] E. Johansson, D. Haftor, B. Magnusson, J. Rosvall, " On Building Information Modeling:
an explorative study." Department of Informatics and Department of Construction
Technology, Linnaeus University, Linnaeus University Press Vxj, Sweden, 2014.
[17] S. Pinho, " O Modelo IFC como Agente de Interoperabilidade," Tese de Mestrado, Porto,
Faculdade de Engenharia da Universidade do Porto, 2013.

536
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

MODELAO BIM DO PATRIMNIO EXISTENTE. O CASO DE UMA


ETAR
Lus M. P. Rodrigues (1), Sofia Henriques (1), Jorge de Mello Vieira (1)

(1) CENOR Consultores, S.A., Lisboa

Resumo
Apresenta-se o caso de estudo da modelao BIM de uma ETAR para a qual foram previstas
obras de beneficiao e ampliao na obra de entrada e respetiva unidade de desodorizao.

A CENOR identificou a oportunidade de criar o modelo BIM da obra existente passando este
modelo a ser a base para o desenvolvimento do projeto por parte do Empreiteiro e com o intuito
de obter, no final da empreitada, o modelo as built dos rgos sujeitos a interveno.

O trabalho foi desenvolvido na perspetiva da realizao de um cadastro do patrimnio existente


e teve por base a informao disponvel sobre a obra.

Apresentam-se as principais dificuldades decorrentes de se tratar da primeira experincia BIM


da CENOR, no tendo ainda iniciado um processo formal de adoo de metodologias BIM e
da insuficiente definio de objetivos e de nveis de detalhe (LOD) do modelo.

Durante o processo os objetivos do modelo BIM passaram a incluir, tambm, a possibilidade


de integrao com o sistema de Gesto, Operao e Manuteno, mediante ligao do modelo
s bases de dados.

Na sequncia deste processo, constatou-se que a adoo e implementao de processos,


metodologia e tecnologias BIM obriga a um planeamento estratgico dessa implementao

1. Introduo

A gesto e manuteno de patrimnio tm ganho importncia no sector AECO (Arquitetura,


Engenharia, Construo e Operao), nos pases mais infraestruturados. Em grande parte dos
casos, tais infraestruturas aproximam-se do final do seu ciclo de vida mas absolutamente

537
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

necessrio mant-las em funcionamento e/ou dot-las de capacidade adicional. Assim, torna-se


muitas vezes necessrio realizar obras de conservao, beneficiao, ou ampliao das
infraestruturas j construdas.

Face necessidade de garantir o adequado funcionamento das infraestruturas, garantir os nveis


de desempenho e de aumentar a eficincia da gesto e manuteno, as entidades gestoras
necessitam de encontrar ferramentas de suporte apropriadas s novas exigncias.

A adoo das metodologias e processos BIM (Building Information Modelling) na indstria


AECO um dos mais promissores e abrangentes desenvolvimentos para o sector e tem vindo a
crescer por todo o mundo, tornando-se claramente uma tendncia global, que no pode ser
ignorada e sendo.

Um dos exemplos mais mediticos da adoo de BIM na construo o projeto Crossrail em


Londres.

Contudo, as vantagens da utilizao de BIM no se limitam s novas construes. O caso da


Opera de Sydney, um edifcio de grande complexidade, construdo entre 1958-1973, disso um
exemplo, onde as vantagens de utilizao dos modelos BIM para FM (Facility Management)
so muito relevantes. A converso dos desenhos originais (desenhado mo) para CAD
concretizou-se no final dos anos 80 e em 2005 foi criado o Modelo BIM para FM, dadas as
limitaes e incoerncias que encontravam nos desenhos 2D.

Segundo S. Ballesty et al. [1] desta experincia na pera de Sidney foi possvel concluir que:

The FM Exemplar Project has established that building information modelling is an appropriate beneficial
technology enabling storage and retrieval of integrated building, maintenance and management data for Sydney Opera
House. Using this approach yielded several advantages such as consistency in the data, intelligence in the model,
multiple representations such as two- and threedimensional (2D and 3D) reports, an integrated source of information
for existing software applications, and integrated queries for data mining. The standardised building model acts as
main data structure which can be extended with other data sources as each element of the model such as a wall,
furniture, a room, or a grouping of elements has a unique identifier. This unique identifier can be used as a basis for
correlating different datasets, thereby opening up query capabilities across different datasets

no mbito da modelao BIM de patrimnio existente que se apresenta o caso de estudo de


desenvolvimento de um modelo BIM de uma ETAR (Estao de Tratamento de guas
Residuais) existente.

2. Enquadramento

Para a ETAR em estudo foram previstas obras de beneficiao e ampliao na obra de entrada
e respetiva unidade de desodorizao, para alm de outras pequenas intervenes de
substituio de equipamento noutros rgos.

538
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O Programa Base da obra a realizar, foi desenvolvido pelo consrcio CENOR/SISAQUA em


2014, constituindo a base para o projeto de execuo, a realizar no mbito de uma empreitada
em regime de conceo/construo pelo Empreiteiro a selecionar por concurso.

O Projeto Base foi desenvolvido sobre a informao da obra existente, designadamente:


arquivo em papel do projeto de execuo da ETAR de 1987
arquivo em papel de projeto de ampliao de 1998
arquivo digital de desenhos CAD de empreitada de renovao de equipamento de 2005

Durante a fase de elaborao do projeto, a CENOR identificou uma srie de lacunas na


informao de base disponvel, pelo que se identificou a necessidade de realizar levantamento
cadastral da obra existente.

Tendo a CENOR j identificado as potencialidades da metodologia BIM, props-se ao cliente


a execuo de modelo BIM da obra existente que constitusse a base para o desenvolvimento
do projeto por parte do Empreiteiro, com o intuito de obter, no final da empreitada, o modelo
as built dos rgos sujeitos a interveno.

O cliente aceitou o desafio proposto e deu-se incio primeira experincia BIM da CENOR que
consistiu na modelao dos rgos alvo de interveno.

Note-se que, nesta altura, a CENOR no havia ainda iniciado um processo formal de adoo de
metodologias BIM, pelo que a modelao teve tambm um carcter exploratrio.

3. Caso de Estudo: Modelao BIM de uma ETAR

3.1 Objetivos e mbito do projeto


O modelo BIM da Obra de Entrada da ETAR foi desenvolvido com o objetivo de reunir
informao dispersa em telas finais de diversas empreitadas sucessivas de forma a servir de
base ao projeto da empreitada de ampliao da infraestrutura.

Na prtica, foi necessrio recriar o construdo (as built) a partir da documentao existente
complementada com levantamentos locais para definio de alteraes ao projeto no
documentadas.

O modelo de levantamento existente, desenvolvido em Revit 2015, abrangeu a Construo


Civil, Circuitos Hidrulicos e Equipamentos Hidromecnicos existentes dos rgos afetados
pela futura ampliao, nomeadamente:
Obra de entrada e Pr-Tratamento (gradagem, elevao, separao e lavagem de areias
e leos);
Desodorizao da Obra de Entrada.

539
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Foram tambm includos no modelo BIM os Decantadores Primrios e o edifcio de


Desidratao de Lamas por se prever tambm a necessidade de substituio de equipamento
nestes rgos.

Durante o decorrer do processo de modelao do existente foi reconhecido o potencial do


modelo BIM como ferramenta de apoio aos processos de Gesto, Operao e Manuteno,
servindo para visualizao e localizao de equipamentos, permitindo o fcil acesso s suas
caractersticas tcnicas e outras informaes relevantes para a gesto, operao e manuteno.

Este reconhecimento, por parte do cliente, foi facilitado pela perceo de que o modelo BIM
pode ser encarado como uma representao grfica e ponto de acesso a uma base de dados,
semelhana dos SIG (Sistemas de Informao Geogrfica) que so j uma ferramenta
plenamente adotada pelo cliente, e cujas vantagens so reconhecidas. Note-se, no entanto, que
os SIG so uma ferramenta poderosa mas vocacionada para obras com disperso geogrfica,
carecendo de capacidade para representar obras localizadas e com alto grau de complexidade
num espao relativamente concentrado e com o detalhe necessrio.

Assim, os objetivos do modelo BIM passaram a incluir, tambm, a sua futura integrao com o
sistema de Gesto, Operao e Manuteno do cliente.

Foi entanto, definido que, no final da Empreitada o modelo as built, atualizado pelo Empreiteiro
e incluindo a informao tcnica relativa Empreitada, ser entregue ao cliente e submetido a
um processo de validao para conferir a compatibilidade da informao com as Bases de
Dados existentes e a adequao da mesma s necessidades dos intervenientes dos processos de
Operao e Manuteno.

Face a esta redefinio de objetivos, pretendeu-se dotar o modelo de levantamento do existente


realizado pela CENOR das caractersticas adequadas integrao com o sistema de Gesto,
Operao e Manuteno do Cliente, designadamente a identificao dos elementos e sua
caracterizao de acordo com os parmetros da Base de Dados.

3.2 Bases para a construo do modelo BIM


A informao existente e disponvel sobre a ETAR que serviu de base ao desenvolvimento do
modelo BIM encontrava-se dispersa por diversos arquivos e em formatos variveis.

O modelo BIM foi desenvolvido, essencialmente, com base nos seguintes elementos (Figura
1):
desenhos existentes em Arquivo: Telas Finais do projeto inicial da ETAR de 1987 e
Telas Finais da Empreitada de Adaptao e Completamento da ETAR de 1998;
levantamento por Nuvem de Pontos do exterior de toda a ETAR, realizado para apoio
ao projeto de beneficiao.

540
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Informao base (da esq. para a dir.): telas finais (1987),
desenhos da ampliao (1998), desenhos da renovao de equipamento (2005),
levantamento por nuvem de pontos (2014), fotografia e vdeo (2014-2015)

O conjunto de desenhos das telas finais do projeto original de 1987, que se encontrava
arquivado apenas em papel, foi encontrado incompleto e apresentava alguns desenhos de fraca
leitura, devido ao seu estado de degradao.

Foi essencial, por isso, a recolha de informao no local medies, verificao de cdigos de
identificao dos elementos, dimetros de tubagem apoiada por registo fotogrfico e vdeo.
Estes levantamentos revelaram a transposio incompleta das alteraes realizadas para o
arquivo de telas finais da obra.

Foram desenvolvidos 3 modelos, interligados entre si, de acordo com as especialidades


Modelo de Construo Civil, Circuitos Hidrulicos e Topografia de forma a facilitar a gesto
da informao em cada modelo.

3.3 Modelao
Refira-se que as peas de projeto encontradas em arquivo no referiam o sistema de
coordenadas e os vrios projetos divergiam do levantamento mais recente e entre si.

Figura 2: Telas finais (1987) corte (extrato).

541
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Modelo BIM corte.

Figura 4: Modelo BIM corte perspetivado.

O Modelo BIM foi posicionado em relao ao ltimo levantamento realizado, por Nuvem de
Pontos em Maio de 2014, tendo sido posteriormente conferidos alguns pontos de
georreferenciao, de forma a clarificar as cotas de alguns pontos e esclarecer as diferenas
entre os projetos antigos. O mbito da Nuvem de Pontos cingiu-se ao levantamento externo da
infraestrutura, mas foi uma referncia importante para posicionar coberturas e outros elementos
inacessveis que foram ao longo dos anos acrescentados ou alterados e no registados nas telas
finais existentes.

Ao longo da realizao dos estudos, foram identificadas vrias discrepncias geomtricas e


incongruncia entre os Datum altimtricos utilizados nos vrios projetos, bem como diferenas
entre o existente e o arquivo documental.

A criao do modelo 3D obrigou verificao sucessiva da informao de base por comparao


com a informao da nuvem de pontos e do apoio topogrfico no terreno.

O modelo 3D (Figura 2 a 4) resultante apresenta grau de coerncia muito superior aos diversos
projetos anteriores e foi includo como parte integrante do processo de concurso.

542
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Trata-se de um dos primeiros processos de contratao pblica em Portugal com a exigncia de


desenvolvimento do projeto em BIM de que temos conhecimento.

3.4 O Modelo BIM para FM


Conforme j referido, durante a elaborao do modelo, verificou-se que o cliente possui um
sistema de gesto de ativos armazenado sob a forma de base de dados estruturada, integrada
com SIG, bem como sistemas de apoio explorao e manuteno FM.

Nesta fase foi identificada a necessidade de ligao s bases de dados de gesto, explorao e
manuteno FM, o que permitiria a utilizao do modelo BIM como representao grfica
para interface de acesso informao da base de dados.

Atualmente as bases de dados utilizadas na gesto, manuteno e operao da ETAR


demonstram a raiz numa base de dados de cariz de gesto financeira, o que impe alguns
desafios s equipas no terreno, como por exemplo a identificao e localizao exata de um
dado equipamento. A interligao do modelo BIM s bases de dados da ETAR viria responder
s dificuldades sentidas na gesto da infraestrutura e aumentar a sua eficincia.

Sendo a ETAR uma infraestrutura onde os equipamentos assumem grande importncia nos
processos de Operao e Manuteno, e sendo tambm os elementos que melhor esto
caracterizados nas bases de dados existentes, foi escolhido o modelo dos Circuitos Hidrulicos
como agregador da informao.

Uma das dificuldades sentidas na modelao da ETAR foi a definio do nvel de detalhe (LOD
- Level of Detail) da modelao em relao aos objetivos do modelo. O objetivo base era o
cadastro do existente para servir de base ao projeto da empreitada de ampliao da
infraestrutura, contudo o objetivo foi posteriormente alargado para incluir tambm a utilizao
como ferramenta auxiliar dos processos de FM.

Estes dois objetivos podem ter modos de modelao, principalmente a de cariz tridimensional,
muito distintos: o primeiro requer um nvel de modelao mais detalhado e elaborado; o
segundo poder ter uma modelao tridimensional mais simplificada, mas com informao
associada detalhada e desenvolvida.

Neste projeto optou-se ento por uma estratgia de compromisso. Os elementos tridimensionais
foram desenvolvidos com algum detalhe (Figura 5 e 6), de modo a servir de base para o projeto
da empreitada de ampliao da infraestrutura, mas de forma a no serem demasiado complexos
e a permitirem uma ligao facilitada do modelo BIM s bases de dados existentes.

Todos os elementos foram caracterizados com parmetros de localizao que do origem a


um identificador nico que permitem o relacionamento dos elementos com as base de dados
utilizada pelo cliente e associ-los correspondente informao disponvel.
Tendo em conta que as bases de dados utilizadas na gesto, manuteno e operao j estavam
estruturadas e organizadas, foi necessrio encontrar uma forma eficiente de carregamento dos
parmetros e dos respetivos dados no modelo. Para este efeito, foi desenvolvido um plug-in
especfico para o projeto que automatizou o preenchimento dos campos de caractersticas. A

543
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

informao carregada para o modelo teve origem em ficheiros Excel disponibilizados pelo
cliente. No decorrer deste processo foi possvel identificar e retificar situaes de incoerncia
nos dados, que foram posteriormente transmitidas ao cliente.

A incluso e criao de parmetros relacionados especificamente com a base de dados do


cliente, no invalidou a possvel criao dos parmetros necessrios para o desenvolvimento e
entrega do Projeto de Execuo e Telas Finais (Modelo BIM as built), de forma a permitir uma
melhor incorporao do Modelo fornecido pelo Empreiteiro no Sistema de Gesto e
Manuteno de Ativos do cliente e nos processos de Operao e Manuteno.

Durante o desenvolvimento do modelo foi fundamental o envolvimento das equipas de gesto


e de manuteno e operao que trabalham no terreno, para encontrar a melhor estratgia para
a interligao do modelo com as bases de dados existentes.

Por fim, para que o modelo estivesse preparado para a sua integrao na soluo de gesto de
ativos utilizada pelo cliente era necessrio que houvesse uma ligao inequvoca de cada
elemento do modelo a um item da base de dados. Contudo, esse trabalho no foi concludo,
porque certas zonas do modelo esto mais detalhadas do que a base de dados, no estando por
isso disponvel um cdigo de localizao para esses elementos.

Figura 5: Elevao - Corte perspetivado. Figura 6: Desodorizao Perspetiva.

4. Concluso

Conforme referido, este projeto foi a primeira experincia BIM da CENOR e foi desenvolvido
numa altura em que a CENOR no havia ainda iniciado um processo formal de adoo de
metodologias BIM, tendo um carcter exploratrio.

Por estes motivos se compreende que a contratao do servio de realizao do modelo BIM
revele insuficincias no que respeita definio de objetivos e de nveis de detalhe (LOD) a
atingir face aos mesmos. Assim verificou-se uma dificuldade na gesto de expectativas entre a
CENOR e o cliente. Naturalmente, o cliente pretendia uma modelao com elevado nvel de
detalhe grfico, pelo que o modelo foi desenvolvido com um nvel de detalhe que, em
retrospetiva, excessivo no que respeita a alguns equipamentos, para o cumprimento dos
objetivos do modelo, tanto de cadastro como de FM.

544
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Na sequncia deste processo, a CENOR constatou que a adoo e implementao de processos,


metodologia e tecnologias BIM carece de um elevado grau de planeamento e necessita de um
desenvolvimento adicional de normalizao, definio de novos fluxos de trabalho e de
regulamentao e que obriga a uma adaptao da formao de contratos.

No entanto, o desenvolvimento de um modelo tridimensional mais apelativo permitiu que as


equipas de Gesto, Manuteno e Operao que trabalham no terreno, reconhecessem e
identificassem de forma imediata os espaos e elementos da ETAR, tendo resultado num
estmulo para a compreenso dos processos e metodologias BIM.

A interligao do modelo BIM s bases de dados existentes, que tm uma estrutura


predominante de origem financeira, permitiria a mais fcil identificao e localizao dos ativos
e equipamentos para a gesto, manuteno e operao da ETAR. A integrao total no sistema
de Gesto, Operao e Manuteno, no foi ainda realizada por no ser oportuno, para o cliente,
investir os recursos necessrios. No futuro, ser essencial a interligao do modelo BIM s
ferramentas de gesto, manuteno e operao destas infraestruturas. Com esta interligao,
outros parmetros de anlise poderiam ser explorados e rastreados, como custos associados
manuteno e operao dos equipamentos, incluindo a sua eficincia energtica, permitindo a
tomada de decises mais informadas no que respeita a obras de beneficiao.

No caso em apreo, o modelo BIM, alm de ser repositrio e agregador da informao existente
dispersa e em risco de se perder, cumprindo a funo de cadastro, poder tambm ser um ponto
de acesso s bases de dados de Gesto, Operao e Manuteno existentes. Note-se que a
entidade gestora, por j utilizar SIG e ter j obtido benefcios desse sistema, muito prontamente
entendeu as vantagens do BIM para cadastro de infraestruturas tridimensionalmente complexas
que os SIG no tm facilidade em representar.

O desenvolvimento do projeto apresentado neste artigo permitiu concluir que os processos,


metodologias, e tecnologias BIM podem ser aplicados e trazer vantagens para as entidades
gestoras de infraestruturas existentes.

O resultado foi includo no processo de concurso, tratando-se de um dos primeiros processos


de contratao pblica em Portugal com exigncia de modelao BIM.

Agradecimentos

Os autores agradecem ao Eng. Lus Ribeirinho a sua colaborao na elaborao deste artigo.

Referncias

[1] S. Ballesty et al., Adopting BIM for facilities management: Solutions for managing the
Sydney Opera House, Brisbane, Queensland, Austrlia, Cooperative Research Centre for
Construction Innovation, 2007.

545
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

546
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

INTERFACE BIM PARA A GESTO DE INSTALAES

Andr Reis Antunes (1), Ruben Santos (1), Antnio Aguiar Costa (1)

(1) CERIS, Instituto Superior Tcnico - UL, Lisboa

Resumo
As aplicaes da tecnologia Building Information Modelling (BIM) tm sido amplamente
exploradas nas diversas fases do ciclo de vida dos empreendimentos. A possibilidade de
integrao de modelos BIM com tecnologia existente e as vantagens da visualizao em tempo
real potenciam a versatilidade destes modelos para a manuteno de edifcios complexos.

Neste artigo, proposta uma plataforma direcionada para infraestruturas urbanas complexas
(hospitais, centros comerciais, aeroportos, etc.) que funcionar como repositrio de informao
e assegurar a interoperabilidade de fluxos de dados entre entidades, sistemas e dispositivos.
Alm disso, pretende-se que esta ferramenta de gesto seja capaz de captar em tempo real um
grande volume de dados gerados no seu interior, por meio de elementos de monitorizao
(equipamentos, espaos, objetos, etc.) e pessoas (opinies, nveis de satisfao, incidentes ou
emergncias, etc.), sendo possvel visualizar os resultados diretamente no modelo BIM. O
volume de dados gerado carregado numa base de dados, permanentemente online, acedida em
tempo real por meio de instrues em Linguagem de Consulta Estruturada (SQL) enviadas do
modelo BIM atravs de um mdulo de comunicao em programao visual criado em
Dynamo.

1. Introduo

A metodologia Building Information Modelling (BIM) tem impacto significativo ao nvel da


Gesto de Instalaes (GI), em que a sua utilizao permite no s acelerar a resposta a
diferentes presses, mas tambm adaptar-se crescente complexidade de instalaes existentes
e os padres elevados de sustentabilidade [1]. A principal vantagem do BIM ao nvel da GI
consiste na agregao e tratamento de dados, permitindo aos responsveis pela gesto das
infraestruturas estruturar e controlar a informao do seu ciclo de vida e integrar, numa s
soluo, a gesto dos seus diferentes sistemas internos (e.g. eficincia energtica, fluxos de
pessoas, manuteno, segurana).

547
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Uma eficiente GI determinante na anlise de custos ao longo do ciclo de vida do


empreendimento, na deteo mais eficaz de anomalias nos sistemas, bem como numa reduo
do tempo de resposta das equipas no local, sendo estes fatores-chave para a minimizao de
encargos adicionais. Incorporando novas tecnologias e sensores possvel incrementar a
eficincia da GI, possibilitando-se, por exemplo, que uma predio dos fluxos de pessoas nos
diferentes espaos permita ativar os mecanismos de climatizao de forma preventiva e no
reativa, contribuindo para a eficincia energtica e o conforto dos utilizadores do edifcio.

O trabalho que se apresenta surge no seguimento de um projeto desenvolvido conjuntamente


com a Siemens Portugal designado 3i Buildings [2], no qual foi desenvolvida uma ferramenta
de gesto de instalaes incorporando a tecnologia BIM por meio de modelao 3D e motores
de jogo (game engines) para virtualizao dos modelos, abordando desta forma o conceito de
gamificao e captao de grandes fluxos de informao. O sistema proposto capaz de captar
um grande volume de dados referente monitorizao em tempo real do interior das instalaes,
dos seus espaos e suas condies de temperatura e humidade, do fluxo de pessoas, dos sistemas
que os constituem, etc.

No presente trabalho, pretende-se apresentar um avano no prottipo desenvolvido, rumo a uma


maior sinergia entre os modelos BIM e a GI, criando-se uma interface dentro do prprio
software Autodesk Revit, que permite, a qualquer utilizador deste software, a manipulao e
visualizao de toda a informao do edifcio em tempo real, permitindo integrar, num nico
modelo, toda a informao anteriormente referida e visualiz-la atravs de uma interface grfica
sobre um modelo tridimensional BIM. Assim sendo, toda a informao deste sistema
multidisciplinar ficar estruturada numa nica base de dados comum, podendo ser monitorizada
em tempo real por meio de uma interface BIM.

Este artigo est dividido em quatro partes. A primeira parte apresenta uma reviso da literatura
de forma a compreender os conceitos e aplicao do BIM e GI. A segunda parte explica a
metodologia utilizada no estudo, enquanto a terceira parte descreve o desenvolvimento da
interface BIM e sua implementao. Por ltimo, a quarta parte apresenta os resultados obtidos
num dos modelos dos trs casos piloto do projeto 3i Buildings. Pretende-se ainda que esta
ferramenta seja expandida de forma a incluir outras variveis exteriores e conferir uma
capacidade preditiva interface.

2. Reviso de literatura

2.1 Building Information Modelling


O paradigma BIM abre novas perspetivas sobre a forma de encarar o ciclo de vida do
empreendimento da construo, em que todo o processo se desenvolve com base num modelo
tridimensional (3D) capaz de englobar a informao relativa a todo o projeto [1]. O modelo 3D
paramtrico do empreendimento de construo permite automatizar diversas operaes
geomtricas, constituindo uma grande base de dados do empreendimento. Tendo em conta que
toda a informao do edifcio concentra-se num nico modelo 3D paramtrico, no s possvel
agilizar a partilha de informao e a colaborao entre os diversos intervenientes no projeto,

548
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

como tambm permite o desenvolvimento de aplicaes capazes de automatizar processos,


clculos e verificaes com base na informao existente no modelo.

O termo BIM , provavelmente, um dos termos mais utilizados e menos compreendidos na


indstria da construo, sendo muitas vezes utilizado quando algum cria um modelo 3D de
um edifcio ou de uma parte do mesmo. Estabelecer uma definio do BIM importante para a
sua compreenso, no sendo uma tarefa fcil no entanto, visto este ser um conceito em constante
evoluo que depende dos avanos da tecnologia e das capacidades dos utilizadores [3].

O BIM, resumidamente, pode ser definido como um processo de criao e gesto da informao
do empreendimento de construo de uma forma interopervel que permite a integrao e
reutilizao da informao da obra e o domnio do conhecimento ao longo do ciclo de vida da
mesma por parte dos utilizadores [4]. Permite tambm que um edifcio seja representado por
componentes inteligentes, que contm informao detalhada, e possibilita a estruturao das
relaes semnticas entre os componentes do mesmo modelo [1]. Assim sendo, a mudana de
paradigma entre o desenho assistido por computador (CAD) e o BIM notria, fazendo com
que a comparao entre os mesmos seja totalmente irrealista [5].

2.2 Avanos na Gesto de Instalaes: otimizao com base em diversas fontes de


informao
No contexto da GI so tipicamente implementados sensores para avaliar as variveis
temperatura, corrente e tenso eltrica, caudais, presena de fumo, concentrao de monxido
de carbono (CO) e dixido de carbono (CO2), humidade, luminosidade e ocupao. Contudo,
possvel encontrar na literatura o desenvolvimento de tcnicas e modelos capazes de determinar
valores para outras variveis com relevncia significativa neste contexto.

Por exemplo, Liao e Barooah [6] desenvolveram um modelo estocstico com o objetivo de
determinar o nmero aproximado de ocupantes em diferentes locais de um edifcio, em
contraste com os mtodos utilizados atualmente, onde um espao poder estar apenas ocupado
ou desocupado, de forma binria. Para este efeito, utilizaram um modelo baseado em agentes1
(agent-based model) para simular o comportamento de um nmero arbitrrio de ocupantes
individuais (agentes) de um edifcio com um nmero arbitrrio de zonas, extraindo de seguida,
atravs de uma simulao de Monte-Carlo, os modelos grficos da ocupao por zonas. Liu et
al. [7] desenvolveram um sistema que determina com preciso a taxa de ocupao de uma
diviso, adquirindo dados atravs da utilizao de sensores de viso inteligente. Um grupo de
sensores instalado no interior da diviso para medir a ocupao interna e outro grupo
instalado na sua entrada, de forma a contar os ocupantes de passagem. O espao dividido em
diversas sub-regies e cada uma delas equipada com um sensor de viso colocado nos cantos
da diviso junto ao teto, para medir a ocupao no seu interior sem sobreposio das reas
cobertas e sem interferncia de objetos como secretrias ou cadeiras. Esta deteo feita atravs
de reconhecimento de imagem, com base no contorno das cabeas. A ocupao de toda a
diviso estimada atravs do somatrio das detees nas sub-regies, combinado com as

1 Agent-Based Models uma categoria de modelos computacionais que simula as aes e interaes de agentes autnomos, que tanto podem
ser entidades individuais como coletivas, como organizaes ou grupos, com vista a avaliar os seus efeitos no sistema como um todo. Combina
elementos de Teoria de Jogos, Sistemas Complexos e Emergncia, Sociologia Computacional, Sistemas Multiagentes e Programao
Evolutiva.

549
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

detees do sensor de movimento da entrada por intervalos de tempo. No seu trabalho no mbito
da domtica (home automation), Silva et al. [8] fizeram um levantamento do estado da arte
referente a edifcios inteligentes, enfatizando as aplicaes das tecnologias de vdeo, udio,
sensores e sistemas integrados de vdeo, udio e sensores (multimodais). Destacam-se as
aplicaes para segurana por intermdio da deteo de rudo e movimento, cuidados de sade,
cuidados a idosos e a crianas por intermdio de deteo de movimento, rudo e reconhecimento
de imagem (detetando, por exemplo, a queda de um idoso), eficincia energtica com base na
ocupao das divises e atravs de interruptores equipados com Wi-Fi, e a melhoria da
qualidade de vida.

2.3 Desafios da aplicao do BIM Gesto Inteligente de Instalaes


A GI uma rea de conhecimento multidisciplinar que requer a colaborao de profissionais
com experincia nos mais diversos campos de conhecimento e que envolve grandes quantidades
de informao dispersa por diferentes especialidades [9]. Este ambiente complexo beneficia
fortemente a implementao de tecnologias de informao e comunicao (TICs), que podem
ter um papel relevante no incentivo colaborao e otimizao de processos e um papel crtico
na eficincia da GI [11-13]. O dinamismo das operaes da GI exige uma anlise em tempo
real de informaes de vrias fontes e resoluo urgente, obrigando os responsveis a interagir
com interfaces diferentes de ferramentas TIC, levando muitas vezes a anlises dispersas. Apesar
da sua importncia, a integrao de ferramentas TIC em GI tem sido tradicionalmente difcil
[10]. No sentido de garantir o mximo proveito da implementao das TICs no mbito da GI,
diversos padres de intercmbio de informaes tm sido desenvolvidos [14] e algumas bases
de dados integradas para a gesto de informao dos edifcios tm sido propostas [15]. No
contexto de complexidade referido, a criao de um ambiente interopervel onde diferentes
ferramentas tecnolgicas combinam-se, tornando-se componentes do mesmo sistema de
informao, incontornvel [16, 17].

O problema da integrao de ferramentas TIC na GI transpe a partilha de informao entre


sistemas, sendo a visualizao da informao de forma unificada um dos principais desafios e
que no tm sido abordados de forma consistente. Com a exceo do desenvolvimento de
interfaces de colaborao online multidisciplinar [18], no existem desenvolvimentos
relevantes a este nvel. Atividades como a inspeo virtual do edifcio para a localizao de um
equipamento e verificao do seu estado, anlise visual do perfil de consumo de energia de um
determinado espao ou obteno de informaes de ocupao so exemplos de interaes que
ainda no foram devidamente aprofundadas. Na base de todos estes exemplos est a existncia
de informao espacial que deve ser integrada com a restante informao, levantando desafios
considerveis. A virtualizao tem sido, alis, a tendncia recente no s na arquitetura,
engenharia e construo (AEC) [19], como em outras atividades especficas, como a gesto de
projetos [20] e a manuteno [21, 22]. No entanto, as interfaces no esto ainda utilizando as
ferramentas virtuais de uma forma consistente, nem tm por base os modelos BIM gerados ao
longo do ciclo de vida dos empreendimentos.

O desenvolvimento de um sistema capaz de representar graficamente a fuso entre a informao


espacial e a restante informao do edifcio assim um desafio inovador no mbito da GI, que
poder transformar a experincia do gestor e do utilizador numa interao mais intuitiva e
imersiva, capaz de potenciar operaes mais avanadas. A disseminao crescente da

550
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

tecnologia BIM promove de forma incontornvel este desenvolvimento, no s porque os


modelos BIM representam o suporte espacial ideal para a construo de uma interface 3D mas
tambm porque estes modelos incluem toda a informao gerada ao longo do ciclo de vida dos
empreendimentos.

3. Mtodo de Investigao

O objetivo deste estudo foi o desenvolvimento de uma ferramenta BIM-GI com base num
conhecido software de modelao BIM, o RevitTM, para apoiar os gestores das instalaes ao
longo do ciclo de vida do empreendimento, permitindo recolher uma diversidade de dados e
estrutura-los de forma a serem acedidos por um modelo BIM. Para alcanar este objetivo, foi
desenhado um modelo conceptual da interface para mostrar o seu espectro de aplicao, os
diferentes componentes, a tecnologia utilizada e o modo de utilizao da interface. Em segundo
lugar, foi criada uma base de dados, onde todos os tipos de dados que se pretendem monitorizar
foram estruturados manualmente. Os dados so obtidos atravs de sensores e transferidos para
a base de dados alojada num servidor atualizado em tempo real. Estes dados so organizados
associados a um determinado espao, perfeitamente identificado no modelo BIM. Deste modo,
o modelo BIM capaz de captar essa informao e mostrar, de forma tridimensional, os seus
efeitos, atravs de uma ligao assegurada por um algoritmo desenvolvido em Dynamo. O
Dynamo um suplemento de programao visual do Autodesk Revit que permite automatizar
vrias operaes baseadas no modelo BIM. Neste caso foi utilizado para realizar uma troca de
diversa informao entre a base de dados estruturada e o modelo software BIM, extraindo a
informao de uma lista com todos os dados recolhidos pelos sensores, e tambm do Revit para
a base de dados, em situaes que seja necessria a atualizao da nomenclatura ou numerao
de espaos. Posteriormente, por meio da aplicao de filtros de visualizao e esquemas de
cores, o Dynamo usado para colorir os espaos no modelo BIM de acordo com o critrio
escolhido. Neste sentido, foram definidas 4 variveis: Ocupao, Temperatura, Nveis de CO2
e Humidade. Finalmente, vrios ensaios foram realizados para testar o prottipo da interface,
com base num modelo Revit de um edifcio de escritrios.

4. Desenvolvimento da interface BIM

4.1 Modelo Conceptual


Na Figura 1 possvel observar o modelo terico da interface BIM proposto neste artigo.
Inicialmente, os dados obtidos atravs dos sensores so enviados para um Servidor BIM. Os
identificadores (IDs) de cada espao tm leitura comum no Modelo e no Servidor sendo que,
com base nesses IDs, os dados recolhidos so inequivocamente associados a cada espao. O
prximo passo consiste na extrao de uma lista de espaos do modelo BIM, obtido atravs da
utilizao do Dynamo. O Gestor da Instalao pode, assim, atravs da interface BIM, fazer as
leituras dos dados obtidos sobre um modelo 3D onde toda a informao acerca de cada espao
se encontra facilmente visvel, auxiliando a tomada de deciso do Gestor do Edifcio. Para tal,
a cada espao atribudo, conforme a varivel em anlise, uma cor no modelo BIM seguindo o
sistema de cdigo de cores estabelecido.

551
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Modelo conceptual terico da interface BIM.

4.2 Criao da interface BIM


Atravs das potencialidades de programao visual fornecidas pelo Dynamo, possvel criar
de forma intuitiva o algoritmo que ir desempenhar a ligao entre os dados medidos e o modelo
BIM. Na tabela 1 possvel identificar que o algoritmo se encontra dividido em grupos, sendo
que cada grupo desempenha um papel especfico no algoritmo.

Tabela 1: principais grupos do algoritmo.


Grupo Descrio
Interao com Neste grupo possvel ao gestor do edifcio organizar a estrutura
a Base de da base de dados, edio de tabelas e de parmetros permitindo a
Dados sua expansibilidade ao longo do empreendimento.
Carregamento
Neste grupo a informao recolhida da base de dados inserida
de Informaes
nos espaos do modelo BIM atravs do seu ID de elemento.
no Modelo
Constitudo por 4 conjuntos de cdigo, este grupo filtra cada um
Esquema de dos espaos em funo do valor atribudo para determinado
Cores parmetro e atribuir-lhe uma cor mediante um esquema de cores
pr-definido, podendo facilmente ser alterado.
Atualizao do Este grupo permite que apenas os elementos que foram atribudos
modelo BIM por uma cor sejam mostrados na vista 3D do Revit.

Estas interfaces de programao visual permitem uma alternativa programao tradicional,


substituindo a codificao convencional por um sistema visual de blocos com
funcionalidades independentes [22], sendo o Dynamo desenhado para aumentar as capacidades
de modelao paramtrica do Revit. O utilizador interage com Dynamo usando elementos
chamados "ns", sendo que cada n tem um nmero de "portas" que permitir a comunicao
entre os restantes ns ao longo de "conectores". A ligao de todos os elementos cria o "fluxo,

552
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

demonstrado na figura 2 [22]. A figura 2 mostra o algoritmo no ambiente de trabalho do


Dynamo.

Figura 2: Algoritmo Dynamo.

4.3 Interoperabilidade entre a Interface e o Revit


Sendo o Dynamo um software que atua como suplemento de programao visual para o Revit,
as questes de interoperabilidade encontram-se salvaguardadas, conferindo um valor acrescido
soluo descrita anteriormente face s alternativas com mltiplos programas de diferentes
proprietrios. O Gestor da Instalao pode aceder interface BIM e consultar, em tempo real,
o modelo BIM do empreendimento, onde estaro agregados todos os dados respeitantes ao
edifcio, como as taxas de ocupao, a temperatura e as concentraes de CO2 de cada espao.
Para tal, o utilizador precisa somente de manipular o Selecionador de Parmetros consoante o
parmetro que pretenda monitorizar, conforme mostra a figura 3.

Figura 3: Escolha de parmetro a medir.

4.4 Desafios
Diversos autores referem que ainda existem vrios problemas por resolver no domnio da
interoperabilidade, nomeadamente ao nvel da perda de informao [23-26]. Neste caso
particular, a utilizao de ferramentas de programao de fcil compreenso permite aumentar
as capacidades de interoperabilidade alargando o espectro de aplicaes do BIM. Esta
diversidade torna a troca de informaes entre modelos BIM e programas um enorme desafio.

553
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Um outro desafio foi o desenvolvimento de uma interface que fosse orgnica o suficiente de
forma a poder ser adaptada pelo prprio gestor do edifcio, permitindo a introduo de novas
variveis de anlise, modificao do sistema de cores, alterao da origem dos dados ou at
mesmo dos prprios elementos no modelo, no perdendo a respetiva associao entre o modelo
BIM e os dados recolhidos.

5. Resultados

A interface foi testada num modelo de um edifcio de escritrios com um nico piso e uma rea
de 675 m2. Este modelo foi o mesmo utilizado para a ferramenta do projeto conjunto com a
Siemens, 3i Buildings. Antes de iniciar as simulaes, foi preparada uma base de dados de
forma a simular dados recolhidos pelos sensores, a fim de introduzir posteriormente esses dados
no modelo BIM. A introduo destes dados no modelo BIM foi feita usando um cdigo de
Dynamo, atravs de instrues SQL, e atribudos aos espaos respetivos conforme indicado na
tabela 2. Em seguida, foram executadas as simulaes para diferentes grandezas analisadas.

Tabela 2: Dados recolhidos no instante da simulao.

A Figura 4 ilustra os resultados obtidos em vista temporria para as duas simulaes que
representam o os espaos do edifcio. No entanto, se o objetivo for a visualizao da parte
estrutural do edifcio, tais como paredes e pavimentos, devem ser alterados os filtros aplicados.
Neste caso, considerou-se mais apropriado apenas a visualizao dos espaos do edifcio.

Figura 4: Anlise 2D e 3D para as dimenses Temperatura e Ocupao respetivamente.

As vistas apresentadas mostram que a transposio dos dados recolhidos para o Revit foi bem-
sucedida, uma vez que as cores refletem os valores gerados. Alm disso, devido ao cdigo de
cores adotado, facilmente se identifica quais as reas mais quentes e de maior ocupao do
edifcio. Por exemplo, as cores frias (azul e verde) indicam que no existem problemas,
enquanto as cores quentes (vermelho e amarelo) alertam para uma condio crtica. Alm disso,

554
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

possvel exportar os dados por cada simulao realizada sob a forma de relatrio numa folha
de Excel.

No entanto, importa referir o especial cuidado a ter caso sejam feitas alteraes manuais na base
de dados ou no modelo BIM, de forma a no corromper o emparelhamento dos dados a cada
um dos respetivos espaos.

A interface criada mostrou que a utilizao de ferramentas de programao visual aumenta as


capacidades de softwares BIM, possibilitando ao utilizador visualizar tridimensionalmente
zonas crticas em instalaes complexas com a ajuda de um sistema de cdigo de cores.

6. Concluses

Com o sistema de automao e controlo de edifcios modular desenvolvido, possvel, graas


sua versatilidade, adapt-lo a projetos de todas as dimenses e a todo o tipo de edifcios. Este
tipo de sistema normalizado pode ser expandido e alargado sempre que necessrio, evoluindo
de sistemas pequenos e simples para sistemas mais complexos.

O caso piloto foi globalmente positivo, embora no tenha sido testado o seu desempenho em
situao real. As simulaes apresentadas foram as leituras de cada um dos parmetros num
dado instante. No entanto, a simulao em tempo real bastante mais complexa. Um caso de
estudo real permitiria ter feedback de gestores das instalaes, verificando, deste modo, se a
ferramenta efetivamente til para monitorizao e gesto do conforto interior e eficincia
energtica. Por ltimo, importa referir que a ferramenta tem potencial para se estender a outras
aplicaes, favorecendo a automatizao e otimizao de processos.

Agradecimentos

A investigao desenvolvida enquadrou-se no mbito do projeto 3i Buildings, liderado pela


Siemens. Este projeto foi cofinanciado pelo Portugal2020.

Referncias

[1] C. Eastman, P. Teicholz, R. Sack and K. Liston, BIM Handbook, A Guide for Building
Information Modeling for Owners, Managers, Designers, Engineers and Contractors,
2nd ed., New Jersey: John Wiley & Sons, Inc., 2011.
[2] Costa, A. A. et al. (2015). Creative Construction Conference 2015 (CCC2015): 3I
Buildings: Intelligent, Interactive and Immersive Buildings. Procedia Engineering
[3] CDI. (2008). Getting to the Starting Line with BIM and VDC. Adding Value to Model
Integration and Design Collaboration, 1-9. Retrieved from Complete Digital Integration
website: http://www.cdi-grp.net/uploads/Starting_Line_for_BIM_and_VDC.pdf
[4] Lee, G., Sacks, R., & Eastman, C. M. (2006). Specifying parametric building object
behavior (BOB) for a building information modeling system. Automation in

555
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Construction, 15(6), 758-776. doi: 10.1016/j.autcon.2005.09.009


[5] Crowhurst, M. (2012). Misunderstanding BIM. website:
http://www.thenbs.com/topics/bim/articles/misunderstandingBIM.asp
[6] Liao, C. & Barooah, P., 2010. An Integrated Approach to Occupancy Modeling and
Estimation in Commercial Buildings. Baltimore, American Control Conference.
[7] Liu, D., Guan, X., Du, Y. & Zhao, Q., 2013. Measuring indoor occupancy in intelligent
buildings using the fusion of vision sensors. Measurement Science and Tecnlogy,
Volume 24.
[8] Silva, L. C. D., Morikawa, C. & Petra, I. M., 2012. State of the art of smarthomes.
Engineering Applications of Artificial Intelligence, Volume 25, pp. 1313-1321.
[9] Cotts, D. G., Roper, K. O., & Payant, R. P. (2010). The Facility Management Handbook.
[10] Elmualim, A., & Pelumi-Johnson, A. (2008). Computer-Aided Facilities Management
(CAFM) of Intelligent Buildings: Concepts and opportunities - CentAUR. Facilities,
27(11/12), 421 - 428.
[11] Elmualim, A., & Pelumi-Johnson, A. (2009). Application of Computer-Aided Facilities
Management (CAFM) for Intelligent Buildings operation. Facilities, 27(11/12), 421-428.
[12] Lewis, A., & Riley, D. (2010). Defining High Performance Buildings for Operations and
Maintenance. International Journal of Facility Management.
[13] Madritsch, T., M. May, H. O., & Staudinger, R. (2008). Computer Aided Facility
Management (CAFM) as a New Branch of Decision-making Support Technologies in
the Field of Facility Management. Paper presented at the Encyclopedia of Decision
Making and Decision Support Technologies.
[14] IAI. (1996). "End User Guide to Industry Foundation Classes: Enabling Interoperability
in the AEC/FM Industry."
[15] Yu, K., Froese, T., & Grobler, F. (2000). A development framework for data models for
computer-integrated facilities management. Automation in Construction, 9(2), 145 - 167.
[16] Dennis, D. (2003). Facility Management Information Systems.
[17] Mozaffari, E., Hammad, A., & El-Ammari, K. (2005). Virtual Reality Models for
Location-Based Facilities Management systems. Paper presented at the Procs. of the 1st
CSCE Speciality Conference on Infrastructure Technologies, Management and Policy.
[18] Maher, M. L., Rosenman, M., Merrick, K., & Marchant, D. (2006). DESIGNWORLD:
A Multidisciplinary Colaborative Design Environment Using Agents in a Virtual World
Design Computing and Cognition (pp. 695-710): Springer Netherlands.
[19] Campbell, D. A. (2007). Building Information Modeling: The Web3D Application for
AEC. Paper presented at the Procs. of the 12th Int'l Conf. on 3D web technology (Web3D
'07).
[20] Doil, F., Schreiber, W., Alt, T., & Patron, C. (2003). Augmented reality for
manufacturing planning. Paper presented at the Procs. of the Workshop on Virtual
environments 2003.
[21] de Almeida Sampaio, A. Z., Ferreira, M. M. B., Rosrio, D. P. E., & Martins, O. M. L.
P. (2010). 3D and VR models in Civil Engineering education: Construction,
rehabilitation and maintenance. Automation in Construction, 19, 819-828.
[22] Keough, Dynamo: designing a visual scripting interface for the Revit API (notes), See
also https://github.com/ikeough/Dynamo/wiki for more information about coding
Dynamo, 2011.
[23] Burt, B. A. (2009). BIM Interoperability (The Promise and the Reality). STRUCTURE

556
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

magazine.
[24] Hamil, S. (2012). Building Information Modelling and interoperability.
http://www.thenbs.com/topics/bim/articles/bimAndInteroperability.asp
[25] Steel, J., Drogemuller, R., & Toth, B. (2010). Model interoperability in building
information modelling. Faculty of Built Environment and Engineering; School of
Design.
[26] Weygant, R. S. (2011). BIM Content Development: Standards, Strategies, and Best
Practices: John Wiley & Sons.

557
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

558
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

IMPLEMENTAO DA METODOLOGIA BIM-FM A UMA UNIDADE


DESPORTIVA PISCINA OLMPICA
Diana Bastos Silva (1), Jos Pinto-Faria (1), Jos Carlos Lino (2)

(1) ISEP, Porto


(2) BIMMS Building Information Modelling & Management Solutions, Porto

Resumo
O Facility Management (FM) implementado na fase de operao e manuteno dos
empreendimentos baseando-se numa gesto integrada e pluridisciplinar. Apesar da necessidade
de verificao dos princpios bsicos duma metodologia de controlo, esta dever ser ajustada
s organizaes para que sejam alcanados os indicadores de desempenho mais eficientes.

O Building Information Modelling (BIM) uma abordagem suportada em meios tecnolgicos


de gesto de informao que, num ambiente colaborativo, permite a visualizao tridimensional
de um empreendimento nas suas diversas fases. Tal permite reduzir a incerteza, melhorar o
planeamento e o controlo, e ainda analisar e resolver potenciais problemas que possam ocorrer.

A integrao do FM e do BIM combina as capacidades de visualizao tridimensional e a


disponibilidade da base de dados do BIM s tcnicas do FM.

O artigo descreve o trabalho desenvolvido para um empreendimento sob explorao da


PortoEstdio, Piscina de Campanh, envolvendo a modelao tridimensional e o FM.

Aps estudo bibliogrfico da rea BIM-FM e anlise de casos de estudo em que a metodologia
foi aplicada, dividiu-se o trabalho em trs fases. Inicia-se pela identificao das exigncias de
informao para a gesto e manuteno de edifcios. A PortoEstdio definiu as prioridades da
rea da manuteno das instalaes, para obter resposta s suas principais necessidades. Na
segunda fase, tendo em conta a informao recolhida, procedeu-se modelao da arquitetura,
seguindo-se as especialidades de mecnica e hidrulica com base no primeiro modelo.
Finalmente, todas as informaes inseridas foram exportadas para o software adequado
organizao da PortoEstdio.

559
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

O presente artigo resultado de um estgio desenvolvido nas instalaes da BIMMS, e pretende


apresentar a implementao da metodologia BIM-FM a uma unidade desportiva neste caso a
piscina de Campanh, que est sob gesto da PortoEstdio, SA, bem como a modelao 3D das
referidas instalaes.

A BIMMS BIM Management Solutions uma instituio internacional de arquitetura e


engenharia que visa a criao e desenvolvimento de modelos digitais para a produo e
otimizao de processos de conceo e construo de edifcios. Para tal, utiliza as tecnologias
de informao e modelos de simulao para minimizar riscos e erros. A BIMMS formada por
uma equipa de profissionais com elevada experincia em projeto, com foco na integrao das
diferentes partes interessadas, bem como dos materiais e dos diversos processos tecnolgicos.
A utilizao de modelos BIM permite a simulao de alternativas em vrios contextos e
cenrios, de forma a atingir diferentes objetivos.

A PortoEstdio Gesto e Explorao de Equipamentos Desportivos, SA, enquanto prestadora


de servios, rene todas as valncias relacionadas com a gesto e explorao do patrimnio
imobilirio desportivo. A PortoEstdio tem, assim, como principal misso gerir, promover e
reabilitar continuamente todo o patrimnio imobilirio do grupo Futebol Clube do Porto, como
exemplo a Piscina de Campanh, alvo de estudo.

Inicialmente foram feitas visitas Piscina de Campanh de modo a perceber o mbito


preferencial de interveno da PortoEstdio relativamente manuteno; realizando-se apenas
a modelao das especialidades mais importantes para a organizao: rede de tratamento de
guas e AVAC.

2. Metodologia BIM-FM

A aplicao da metodologia BIM ao FM faz particular sentido quando aplicada a instalaes


que necessitem de manutenes peridicas como, por exemplo, piscinas, instituies
hospitalares, centros comerciais.

Graas capacidade dos modelos BIM em inclurem metadados como a idade dos
equipamentos, as suas dimenses, a energia que consomem ou o tempo de manuteno, os
proprietrios e operadores renem informao suficiente para poderem antecipar os problemas
e planear os oramentos para explicar reparaes de equipamentos e substituies. O BIM pode
tambm ajudar a determinar onde um novo sistema de pode integrar no layout de uma
instalao.

Com este tipo de monitorizao dos equipamentos, o BIM torna-se especialmente til no
processo de aprovisionamento. Aquando a aquisio e instalao do equipamento, o contratante
pode enriquecer o modelo com todas as informaes pertinentes [1].

560
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Apesar da prtica do BIM-FM se encontrar ainda numa fase embrionria em Portugal, na


Europa j se encontra numa boa fase de aceitao podendo j destacar-se vantagens do seu uso
que, segundo Moreira e Ruschel [2], vo desde a melhoria de processos e preciso dos dados,
aumento da eficincia na execuo das ordens de trabalho e mesmo a melhoria de acesso aos
dados FM j que podem ser encontrados no modelo BIM.

Com a utilizao desta prtica, possvel aceder a informaes como manuais, garantias, ordens
de trabalho e planos de manuteno, permitindo uma significativa reduo no tempo de resposta
de uma equipa, tornando ainda possvel a visualizao em realidade aumentada para uma
tomada de deciso mais fcil e eficiente.

Atualmente, j existem no mercado solues BIM-FM que facilitam esta interao, sendo que
para tal sempre necessria a utilizao de um software extra para modelao e o clculo dos
key performance indicator (KPI). Estes indicadores permitem a gesto e controlo mais eficiente
da qualidade de um servio, existindo vrios autores que j realizaram estudos para medir os
indicadores de desempenho. Estes estudos, mais direcionados para a manuteno, como o de
Shohet [3] em equipamentos hospitalares e os da norma EN 15341, fornecem uma anlise
global aos edifcios, sendo possvel a adaptao dos KPI ao tipo de utilizao de cada edifcio.
At ao momento no foram ainda publicados estudos relevantes com aplicao em piscinas.

3. Piscina de Campanh Caso de Estudo

O projeto inicial da Piscina de Campanh data de 1972 e foi realizado pelo arquiteto Leopoldo
Coutinho. A piscina foi inaugurada a 21 junho de 1984, tendo beneficiado de remodelaes em
2001, vindo a ser reinaugurada em fevereiro de 2001.

Em 2015 foi requalificada pelo Futebol Clube do Porto que ficou responsvel pelas instalaes
durante 25 anos, com a obrigao de manter horrios para usufruto da comunidade. A Piscina
de Campanh a nica piscina olmpica do Porto com pista de 50 metros e uma das poucas
cobertas do pas. Para alm de constituir um complexo para natao do clube, alberga tambm
as seces de boxe e desporto adaptado. Estas instalaes atraem mais jovens para a prtica do
desporto e possibilita a obteno de melhores resultados desportivos.

3.1 Levantamento de dados


De modo a que o processo de modelao e integrao dos dados se concretizasse da melhor
forma, foram realizadas vrias visitas in situ, fazendo registo fotogrfico da estrutura e
arquitetura das instalaes, assim como o esboo das redes hidrulicas e AVAC, que teriam
sofrido alteraes no identificadas no projeto referenciado como telas finais.

Este pormenorizado levantamento de dados tornou-se muito til para a modelao, onde foram
detetadas diferenas entre o projetado e o construdo, como o exemplo referenciado na figura
1.

561
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 1: Alado-Corte Norte - Exemplo da diferena entre o projetado (cima) e o construdo


(baixo).

3.2 Modelao da Arquitetura, Hidrulica e Mecnica


A modelao da arquitetura (figuras 2) teve por base as telas finais fornecidas pelo Dono de
Obra. Como referido anteriormente, surgiu a dificuldade de encontrar conformidade entre os
desenhos fornecidos e o que foi construdo, sendo fulcrais as visitas ao local. Todas as plantas
foram entregues em formato DWG, sendo a base para a modelao. Procurou-se simplificar a
modelao, incluindo apenas a informao essencial afim de tornar o ficheiro digital o mais
pequeno possvel. Os pilares foram modelados apenas como elementos arquitetnicos, dado
no existir informao acerca da sua composio estrutural, como material e capacidade
resistente. O elevador no pertence especialidade de arquitetura, mas tem a necessidade de
ser acoplado a um elemento do tipo parede existente, tendo sido includo tambm nesta
disciplina.

No decorrer da modelao verificou-se que o software BIM Revit possibilita a monitorizao


do processo atravs das vrias vistas, sendo assim mais fcil a deteo de possveis erros que
em 2D no seriam fceis de encontrar.

Figura 2.1: Modelo de Arquitetura rea tcnica e balnerios vista exterior.

562
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2.2: Modelo de Arquitetura rea tcnica e balnerios vista interior.

Figura 2.3: Modelo de Arquitetura Nave exterior.

Figura 2.4: Modelo de Arquitetura Nave interior.

O modelo de tratamento de guas (figura 3) e o de AVAC seguiram o mesmo princpio, tendo


por base as telas finais, sendo aqui ainda mais importante a informao adicional e as visitas ao
local. Uma vez que a piscina sofreu uma reabilitao em tempo recorde, os projetos foram
sofrendo vrias alteraes j em fase de explorao das piscinas, sendo importante a inspeo
visual e o esboo do traado das redes e localizao dos equipamentos.

563
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Rede de Tratamento de guas.

Houve ainda a necessidade da criao de algumas famlias de equipamentos que no se


encontravam em bibliotecas online com os parmetros necessrios. Na criao destas famlias
necessrio ter em conta a colocao de conectores prprios para permitir a correta ligao aos
tubos, podendo assim ser possvel a constituio de um sistema.

Uma vez que o modelo ser utilizado para facility management, foram atribudos valores a
campos relevantes manuteno de edifcios, no type properties da famlia, assim como a
associao do objeto aos catlogos online ou manuais de instalao. (figura 4)

Figura 4: Atribuio de campos relevantes manuteno de edifcios.

3.3 FM Software
Inicialmente foram pesquisados vrios softwares com capacidade de utilizar os modelos BIM
juntamente com o FM, como o IBM Maximo, FM:Interact, EcoDomus, YouBIM, ArchiFM e
ArchiBus. Todos estes softwares BIM-FM oferecem funcionalidades semelhantes, como a
possibilidade de executar em navegador web. A soluo passa pela existncia de um modelo
BIM carregado com toda a informao inerente, facilitando a gesto dos edifcios. No que
respeita visualizao do modelo BIM, onde com um simples clique num equipamento

564
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

visualizado todo o histrico do mesmo, nem todos os softwares descritos anteriormente o


permitem, sendo assim uma desvantagem em relao a outros. Uma das principais vantagens
surge com a possibilidade de obter, com o software, ferramentas para manuteno programada
que, juntamente com as informaes sobre falhas dos componentes, permitem assegurar o
funcionamento normal da instalao.

No entanto, tentou-se adaptar as solues encontradas soluo de software FM utilizada pela


PortoEstdio, sendo assim descartada a opo de utilizao de um destes softwares, passando
o estudo para a plataforma NextBitt, uma plataforma recente que suporta modelos BIM. Surge,
assim, a possibilidade de utilizar o software em contexto real, moldado s necessidades da
PortoEstdio.

Esta uma soluo que se adapta aos modernos requisitos de gesto de edifcios, automatizando
pedidos com workflows, proporcionando uma proximidade entre os requisitantes e os
prestadores de servio. Desta forma, h garantia de que o gestor recebe informaes acerca das
aes que necessitem de interveno ou deciso. Este software permite ainda simplificar a
gesto de Service Level Agreement (SLA) e o controlo de custos e operaes, assim como
incluir hard e soft services.

4. Concluses

O trabalho realizado tem como objetivo contribuir para a implementao da metodologia BIM
no facility management em Portugal, atravs do estudo efetuado a um complexo de piscinas.
Muitas vezes, este tipo de instalaes constitui uma fonte de prejuzo para os proprietrios, a
maioria das vezes municpios ou empresas municipais que, por vezes, no fazem uma correta
gesto de manuteno das mesmas.

A elaborao de um modelo de gesto integrado associado a um modelo BIM , sem dvida,


uma mais valia pois contm toda a informao necessria e de fcil acesso.

A modelao um processo moroso e difcil quando as telas finais no esto de acordo com o
construdo, sendo assim bvia a importncia da realizao destes modelos desde a fase de
projeto, com realizao de alteraes sempre que necessrio. fulcral a existncia de um
modelo as-built de modo a que visualmente e intuitivamente se consiga navegar no modelo.

tambm de extremo interesse a utilizao de dados de manuteno credveis para a realizao


de um histrico de manuteno, sendo assim possvel a previso do tempo de vida til dos
equipamentos e at a elaborao de um plano de manuteno ajustado s necessidades da
organizao. A obteno dos KPI assume tambm grande importncia neste mbito para que
acompanhem o modelo no que respeita ao desempenho. At data no foram encontrados
estudos publicados da aplicao destes indicadores a este tipo de instalao desportiva,
procurando-se neste momento a obteno de um estudo relativo aos KPI para a Piscina de
Campanh, podendo este no futuro servir de exemplo para muitos.

565
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Deste modo, o software de manuteno aliado ao modelo BIM, constitui uma mais-valia no que
respeita a informao disponibilizada e ao tempo poupado ao descobrir onde ser a avaria. O
relatrio de um simples ato de manuteno constitui tambm uma vantagem para a diminuio
de tempos de tarefas e custos.

A organizao responsvel pelo caso em estudo, uma vez que j utiliza software de gesto da
manuteno, teria todo o interesse em implementar a metodologia BIM nos seus processos de
manuteno, podendo assim obter benefcios significativos ao nvel de tempos e custos.

Referncias

[1] J. Marchese e C. Rudderow, (2013) The Power of 3D: Using BIM for facility
Management, [Online] disponvel em:
http://www.areadevelopment.com/AssetManagement/Q2-2013/building-information-
modeling-facility-management-0272892.shtml ,
[2] L. C.. Moreira eR. C. Ruschel (2015), Impacto da adoo de BIM em Facility
Management: Uma classificao, [online] disponvel em
http://dx.doi.org/10.20396/parc.v6i4.8634982.
[3] I. Shohet, "Key performance indicators for strategic healthcare facilities maintenance"
in ASCE Journal of Construction Management and Economics 2006, 132(4), pp. 345-
352

566
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A METODOLOGIA BIM BUILDING INFORMATION MODELING


NA GESTO DA MANUTENO DOS EDIFCIOS: ESTUDO DE CASO
DO CAMPUS 2 DO IPLEIRIA
Cludio Carvalho (1)(4), Antnio Aguiar Costa (2), Lusa M. S. Gonalves (1)(3)(4)

(1) Instituto Politcnico de Leiria, Escola Superior de Tecnologia e Gesto (Portugal)


(2) CERIS/Instituto Superior Tcnico, Universidade de Lisboa (Portugal)
(3) Instituto de Engenharia de Sistemas e Computadores de Coimbra -INESC Coimbra
(Portugal)
(4) NOVA IMS - NOVA Information Management School, Universidade Nova de Lisboa
(Portugal)

Resumo
No processo de gesto de manuteno de um edifcio fundamental o uso e a boa gesto de um
vasto leque de informao, seja ela geogrfica, do edifcio, dos seus utilizadores, etc. A
metodologia BIM - Building Information Model surge, neste contexto, como uma ferramenta
integradora, que permite gerir de forma mais eficiente toda esta informao e, assim, apoiar a
manuteno otimizada das instalaes tcnicas (IT) e dos edifcios. Para o efeito, necessrio
garantir uma interligao entre o conceito BIM e a gesto da manuteno, com especial nfase
na adoo do 6D/7D BIM como aplicao ao Facility Management (FM).

Neste artigo apresentado o desenvolvimento de um modelo de GM integrando capacidades


6D/7D BIM, a partir da qual so desencadeadas e planeadas as operaes de manuteno das
IT e equipamentos dos edifcios num campus universitrio. O modelo foi implementado num
edifcio do campus 2 do Instituto Politcnico de Leiria (IPL), cuja arquitetura e IT foram
modeladas com recurso a ferramentas BIM.

Neste artigo so demonstradas as vantagens da implementao de um mtodo dinmico de


utilizao e atualizao de informao entre os gestores de manuteno e as equipas tcnicas,
permitindo assim um melhor planeamento e gesto dos trabalhos bem como uma melhor
quantificao dos custos de manuteno associados, comparativamente atual plataforma de
FM existente no IPL.

O estudo de caso demonstra a forma como a metodologia BIM dever ser parte integrante das
solues de gesto de manuteno assistida por computador GMAC, evidenciando a
necessria interoperabilidade entre BIM e GMAC.

567
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

Segundo [1] a Gesto de Edifcios uma rea de conhecimento que abrange as atividades
relacionadas com as operaes dirias do edifcio, a administrao de servios, o planeamento
estratgico, e a gesto de manuteno, ou facility management (FM). Embora a NP EN
13306:2001 defina o conceito de gesto de manuteno, segundo [2] o termo tem vindo a sofrer
alteraes ao longo do tempo, podendo ser considerado como o conjunto de processos
administrativos, tcnicos e de gesto (em torno de um edifcio), durante o seu ciclo de vida, e
que visam garantir as aes necessrias a manter ou repor o edifcio no estado para o qual foi
concebido. Os autores acrescentam que a gesto de manuteno um processo estratgico que
pode resumir-se a um termo a gesto de manuteno planeamento.

Segundo [3] o desempenho de um edifcio alcanado potenciando a sua utilizao otimizada


e promovendo aes de manuteno, que protejam o edifcio de fatores externos.

Outro aspeto relevante o custo de manuteno. Considerando que um edifcio novo tem um
valor aproximado de 80% do seu custo global (considerando uma vida til de 60 anos), o custo
anual de manuteno representa aproximadamente 1,3% dos custos de construo do edifcio
[1]. Por outro lado, de salientar que nas fases de conceo, projeto e fiscalizao (5%), que
podem ser introduzidas as melhores medidas de controlo de custos totais do edifcio, fase em
que a metodologia BIM pode contribuir de forma integrada, intervindo desde logo na fase
inicial de conceo. (ver figura 1).

Figura 1: Distribuio de custos globais de um edifcio (adaptado de [4]).

Atualmente, a metodologia BIM j demonstrou o potencial na indstria de arquitetura,


engenharia, construo (AEC), sendo agora igualmente reconhecida no contexto da Operao
e FM (AECOFM), acrescentando assim um interveniente no processo de interao entre os
vrios intervenientes, da arquitetura, engenharia, construo e operao. Contudo, existe ainda
um conhecimento pouco profundo da eventual integrao da metodologia BIM com outras
tecnologias e aplicaes que j operam na indstria de FM, tais como as solues de Gesto da
Manuteno Assistida por Computador (GMAC) da traduo de Computer Management
Maintenance Systems.

568
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Neste artigo pretende-se abordar quais os princpios a ter em considerao no desenvolvimento


de um modelo que suporte as aes de manuteno em edifcios, mais especificamente no
processo de GM no campus 2 do IPL. Para isso apresentado um estudo de caso em que a
metodologia BIM aplicada dever ser parte integrante das solues de gesto de manuteno
assistida por computador GMAC.

2. A manuteno e a gesto de edifcios

O Regulamento (UE) n. 305/2011 de 9 de Maro de 2011 (revogou a Diretiva 89/106/CEE de


21 de Dezembro), estabelece que so sete as exigncias essenciais a impor aos edifcios: (1)
Resistncia mecnica e estabilidade; (2) Segurana contra risco de incndio; (3) Higiene, sade
e ambiente; (4) Segurana e acessibilidade na utilizao; (5) Rudo; (6) Economia de energia e
isolamento trmico; (7) Utilizao sustentvel de recursos naturais.

A interao entre a conceo arquitetnica (fase de projeto), a construo e manuteno, e os


aspetos determinantes da manuteno do edifcio, devem obedecer a um conjunto de premissas
funcionais [5], tais como a segurana, conforto, durabilidade e economia.

Para [6], o desempenho da manuteno uma componente crtica na competitividade de uma


organizao, e portanto igualmente vital para o desempenho sustentvel de uma organizao
que dependa dos seus ativos fsicos. Os indicadores chave de desempenho (Key Performance
Indicators KPI), so hoje uma ferramenta usada para medir o desempenho do processo de
alcance dos objetivos traados.

A escolha dos KPIs de manuteno dependem dos objetivos definidos por uma organizao, e
est altamente relacionada com o seu contexto especfico de atividade. Segundo [7], os gestores
de manuteno tem a tarefa de lidar com as complexas tarefas de encontrar indicadores de
desempenho que possam ajudar a alcanar as metas. Segundo o mesmo autor, a NP 4483 refere
que uma organizao deve planear e implementar a monitorizao, medio, anlise e melhoria
dos processos de manuteno para: (1) Demonstrar a conformidade dos requisitos do servio;
(2) Assegurar a conformidade do sistema de gesto da manuteno; (3) Melhorar continuamente
a eficcia do sistema de gesto da manuteno.

Segundo a EN 15341, quando o desempenho real ou esperado de um objetivo no estejam a ser


atingidos, ou no se considere satisfatrio, devero ser utilizados os seguintes indicadores: (1)
Controlar o progresso e as alteraes; (2) Medir o estado; (3) Avaliar o desempenho; (4)
Comparar o desempenho;(5) Identificar as foras e fraquezas (anlise SWOT); (6) Elencar o
objetivos definidos; (7) Planear as estratgias e aes;(8) Divulgar os resultados.

O autor [8] refere que o gestor da manuteno hoje uma figura a quem compete a
responsabilidade de desenvolver indicadores que permitam assegurar o alcance dos objetivos
do negcio. Segundo o mesmo autor, a FM uma atividade desenvolvida por este gestor, a
quem compete entre outros objetivos, gerir os conflitos decorrentes da atividade, monitorizar e
acompanhar a evoluo dos objetivos com referncia ao alcance das metas, e determinar de
forma clara, as estratgias a aplicar aos procedimentos [8].

569
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

No estudo de caso apresentado, procura-se evidenciar os pontos chaves a ter em considerao


na implementao de um processo de GM em edifcios.

3. Gesto da manuteno assistida por computador

Para se garantir um eficiente processo de gesto de manuteno, hoje possvel recorrer a


solues informticas que disponibilizam um conjunto de ferramentas capazes de dar resposta
ao processo de gerir a manuteno. Um sistema de GMAC, traduzido do original Computerized
Maintenance Management System, hoje reconhecido por vrios autores como sendo uma
ferramenta indiscutvel no processo de gesto da manuteno [9]. No estudo de caso em
particular, o processo de FM feito recorrendo apenas a uma aplicao de gesto de pedidos,
que embora til, est j limitado nas capacidades de extrao e utilizao de informao. Por
outro lado, a aplicao no faz qualquer interao com pedidos anterioremente registados, nem
relaciona as intervenes com os equipamentos ou instalaes, muito menos possvel analisar
um pedido com referncia a um histrico, plantas, ou fotografias, que no seja por um processo
de consulta de pastas, arquivos e outras formas de armazenamento de informao.

Hoje um GMAC consiste num sistema de processamento de dados relativos a equipamentos e


instalaes, muitas vezes conhecidos como os ativos, e tem como principal objetivo: (1)
Estabelecer planos sistemticos para aes de manuteno preventiva; (2) Emitir ordens de
trabalho; (3) Registar ocorrncias e falhas; (4) Construir um repositrio de histrico de aes
para eventual uso em diagnstico de falhas possveis; (5) Descrio de como as falhas foram
identificadas informao do pedido; (6) Registo de eventuais causas capacidade preditiva;
(7) Recursos disponibilizados e utilizados; (8) Toda a informao associada que possa de certa
forma auxiliar ou ser relevante em ocorrncias futuras.

Tendo em conta a caractersticas descritas, e segundo [10], um GMAC dever cumprir 6


funes essenciais: (1) Permitir a gesto simples de ordens de trabalho; (2) Definir aes de
planeamento; (3) Interagir as aes de manuteno no tempo (calendrio/agenda); (4)
Oramentar aes e determinar previamente custos (diretos e indiretos); (5) Gerir inventrio;
(6) Permitir criar indicadores chave de desempenho KPI.

Um GMAC assim uma forma estruturada de consultar, armazenar e atualizar a quantidade de


informao que gerada na atividade de gesto de edifcios tornando o processo de gesto de
manuteno mais eficiente. De salientar que um GMAC no incide apenas na rea da gesto de
manuteno, como tambm na rea mais abrangente da Gesto de Edifcios ou vulgarmente
conhecida por FM Facilty Management.

Os GMAC so ferramentas sobejamente reconhecidas na indstria de AECO e por isso importa


aprofundar de que forma podero contribuir para a metodologia BIM. A integrao de GMAC
com a tecnologia BIM hoje o desafio de muitos intervenientes da indstria de AECO.

Segundo [11], existem alguns fatores a ter em conta no eventual processo de integrao do
processo BIM com GMAC:
A utilizao de informao em FM requere que a mesma seja exacta e atualizada;

570
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A implementao da metodologia BIM requer a curto prazo a necessidade de


integraes adicionais (eficincia energtica, recursos hdricos) nomeadamente com o
previsvel aumento de restries regulamentares;
Utilizao de ferramentas como COBie (Construction Operations Building Information
Exchange) e outras formas de transferncia de informao;
Considerar a compatibilidade de controladores BAS (building automation systems),
ATC (automatic temperatures controles) e SCADA (Supervisory control and data
acquisition), para desencadearem tickets (pedidos de interveno) em GMAC para que
sejam identificados os locais (edifcios, sala, equipamentos) e os associem com a
informao de fabricante, manuais de interveno/ reparao, garantia etc.

Segundo [12], um dos principais problemas dos atuais GMAC so os custos e tempo necessrio
para desenvolver e carregar os dados numa aplicao GMAC. Por este motivo, a indstria de
AECO procura na tecnologia BIM, novas formas de reunir e armazenar a informao,
explorando novas ferramentas de interligao ou troca de informao como COBie ou IFC [13].

4. estudo de caso

4.1 Metodologia
Atualmente o Instituto Politcnico de Leiria (IPL) tem um servio de manuteno e reparao
(SMR), onde efetuado o registo e gesto de pedidos de interveno. O SMR uma ferramenta
acessvel a todos os utilizadores: alunos, funcionrios docentes e no docentes do IPL (11000
utilizadores). O SMR alimentado por uma base de dados de espaos no espacial que
representa o cadastro de todos os espaos que compem os campi do IPL (Leiria, Caldas e
Peniche). Por consequncia, no h uma relao espacial entre os pedidos realizados, nem
possvel modelar a informao pelos seus atributos, quaisquer que sejam.

No referido formulrio do SMR, constam um conjunto de atributos que permitem caracterizar


a natureza do trabalho a realizar, e identificar o proponente do pedido, os seus dados pessoais
(ext. telefnica, gabinete e email), identificar a localizao da rea a intervir, sua prioridade,
etc. Contudo, de salientar que os pedidos no so geo-referenciados, nem existe forma de
associar a um pedido novo, o eventual histrico de intervenes efetuados, numa mesma
localizao, equipamento ou espao. Para isso, seria necessrio ser considerada a utilizao de
um GMAC com as funcionalidades evidenciadas na seco 3 e tendo por base os princpios do
processo de gesto da manuteno.

O estudo de caso apresentado foi desenvolvido num princpio de modelao as-managed, [14]
que significa que feita uma modelao do edifcio em funcionamento e no pleno perodo de
explorao. Por esse motivo, poder ser necessrio compatibilizar a informao existente em
projeto, com aquilo que efetivamente est executado.
Na figura 2 est representada a matriz de processo de uma interveno, desde o momento do
pedido at sua resoluo.

571
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 2: Matriz de Processo - Pedido de SMR (RTC Responsvel tcnico por campus;
RMAN Responsvel manuteno).

Para os autores [12], BIM dever estar no centro de interao entre os diversos intervenientes
da indstria de AEC. Os referidos autores referem que BIM representa um modelo grfico que
contm a informao paramtrica do edifcio. Por outro lado, um GMAC contem ferramentas
que permitem interagir com a informao do edifcio, desencadeando aes ordens de trabalho
(OT), a partir das quais se enviam para o campo as equipas necessrias interveno. As OT
contm uma breve descrio da interveno a efetuar, e permitem aos tcnicos de campo
descrever a resoluo, apontando ainda eventuais necessidades de melhoria, reposio de peas,
ou outras informaes que devero ficar associados reparao.

O processo de recolha e uniformizao desta informao poder ser oneroso quer seja para ser
utilizado num modelo BIM, quer seja para inserir num GMAC.

A metodologia proposta, esquematizada na figura 3, pretende demonstrar a interao entre BIM


e GMAC, evidenciando os aspetos que podero potenciar o desenvolvimento de interaes
especficas de BIM a outras aplicaes, nomeadamente na partilha (exportao/importao) de
informao, quer da eventual expanso dos atuais GMAC que possam recolher e devolver ao
BIM, informao de campo (informao decorrente do processo de interveno/ reparao).

572
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Interligao de BIM a GMAC.

4.2 Modelao e Interligao BIM e GMAC


Para desenvolvimento do estudo de caso, foi feita a modelao da Escola Superior de Sade do
Instituto Politcnicos de Leiria. O processo de modelao foi feito a partir da recolha de
informao vetorial (DWG), do cadastro existente e que corresponde por isso, ao edifcio
conforme est construdo as managed, e constituiu a base a partir da qual foi contrudo o
modelo. A modelao foi feita com recurso ao programa Autodesk Revit 2014. Com o
recurso s opes de ligao aos modelos CAD em 2D (link), foi possvel desenhar e adicionar
com maior rigor as componentes paramtricas do edifcio (paredes, janelas, portas, Etc.) e
complement-los com edio e criao de objetos das bibliotecas (figura 4, figura 5).

O nvel de desenvolvimento (LOD Level of Development) a considerar para um edifcio que


venha a ter funcionalidades de gesto de manuteno, implica que o mesmo contenha um grau
de detalhe considervel, e por isso, dever ser considerado o LOD 500. Por outro lado, quando
se modela um edifcio numa fase de explorao, a pormenorizao da informao pode no
corresponder ao detalhe pretendido, por no existir ou por ser de difcil acesso. No presente
estudo de caso foi modelado o edifcio considerando o detalhe necessrio a retirar a informao
para a gesto de manuteno.

A figura 4 representa a viso geral do edifcio modelado. Na figura 5 podemos ver alguns dos
pormenores construtivos, modelados de acordo com os objetos existente e efetivamente
construdos. Atravs da edio das propriedades dos componentes existentes nas bibliotecas,
possvel adequar as mesmas realidade.

573
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 4: Vista geral do Edifcio.

Figura 5: Vista de pormenores de modelao vos de fachada, escadas e portas.

No caso de estudo, foi modelada uma rede de guas e esgotos (figura 6) contendo informao
especfica dos materiais e suas caractersticas (fabricante; manual instalao; tipo material;
dimenses; tipo de ligao, etc.). O objeto em causa foi importado a partir do stio da internet,
do prprio fabricante, disponibilizando informao especfica do componente.

Figura 6: Rede de gua e esgotos com a tabela dos parmetros do objeto - Sanita.

Na figura 7 podemos ver os formulrios retirados de uma aplicao de GMAC com a


informao que pode estar associada a um objeto/componente. A informao que consta dos
referidos formulrios, pode ser carregada diretamente na aplicao, criando objetos inseridos
em estruturas me (em rvore). Alternativamente poderiam ser criados a partir da modelao
orientada por objetos, caracterstica base da metodologia BIM, em que so criados objetos e

574
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

estabelecidas as relaes paramtricas existentes com outros objetos. Para isso, aos objetos -
lhes atribuda uma natureza famlias, onde so adicionados os parmetros que determinam a
forma de interao e comportamento dos objetos [15].

Figura 7: Formulrio tipo de objeto em aplicaes GMAC (Navaltik - InnWinWin).

importante salientar que tanto o BIM, como o GMAC, contm o mesmo tipo de informao
e por isso, considerar eventual interligao, obrigar definio da melhor forma de recolha e
validao e armazenamento da informao. Se consideramos o BIM como um processo que se
inicia com a conceo na fase de arquitetura, ser legtimo considerar o fluxo de partilha e
exportao da informao de BIM para um GMAC na fase de operao. Quando abordamos a
metodologia BIM, e a forma como construdo o modelo do edifcio, a partir do princpio
colaborativo de partilha de dados correspondentes a cada especialidade desde a arquitetura,
estrutura e instalaes tcnicas at manuteno, torna-se percetvel que qualquer disciplina
complementar que esteja associada ao edifcio, dever fazer parte integrante da metodologia
BIM. Por esse motivo, toda e qualquer forma de partilha de informao entre BIM e outras
aplicaes de GMAC, dever garantir a integridade da informao.

Concluda a modelao, foi feita a exportao dos dados do modelo BIM, atravs de COBie,
com adio de um plug-in Autodesk para o Revit. COBie um formato para partilha dos
dados a partir de um modelo BIM para outras aplicaes tais como um GMAC. Contudo o
processo de exportao envolve um conjunto significativo de aes que tornam o processo
consideravelmente sensvel.

5. Concluso

O desafio deste estudo de caso passa por evidenciar os benefcios de interligao de BIM com
GMAC de forma a garantir um fluxo transversal de informao em processos de edio,
atualizao e alterao de informao para aes de manuteno. A utilizao da metodologia
BIM nas aes dirias de gesto de manuteno, obriga a uma interao constante entre os
sistemas de informao e as ferramentas j disponveis para realizao das operaes em
campo. A interao entre as equipas tcnicas a quem cabe o papel de planear, preparar e garantir

575
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

o bom funcionamento das instalaes, e as equipas especialistas intervenientes nas aes de


gesto e planeamento, obriga a uma maior agilidade no uso e manuseamento da informao.

Durante a realizao deste artigo, foi possvel verificar que a temtica BIM/GMAC ainda est
a dar os primeiros passos. Em Portugal, apesar da temtica ainda ser abordada de forma tmida,
ao consultar algumas empresas portuguesas de referncia que desenvolvem aplicaes de
GMAC, foi possvel constatar que apesar de j conhecerem a metodologia BIM, ainda no
desenvolveram processos que permitam avanar no sentido de eventual integrao.

As aplicaes de GMAC so produtos j com alguma maturidade de implementao em


Portugal, e por isso, devero ser parte integrante do processo de interao da indstria de
AECO, de forma a contriburem para o desenvolvimento de ferramentas capazes de integrarem
a metodologia BIM em todo o ciclo de interao do mesmo.

A continuao desta pesquisa poder passar por explorar formas mais eficazes de
interoperabilidade ou interligao de BIM a GMAC, atravs de processos mais colaborativos,
em tudo semelhantes aos que hoje j operam na metodologia BIM, tais como Dynamo.

A limitao de acesso a aplicaes de GMAC associada necessidade de as conhecer em


profundidade e detalhe, nomeadamente nas suas potencialidades, so uma limitao
investigao e pesquisa de solues cada vez mais eficientes.

Bibliografia

[1] C. Tavares, Gesto de Edifcios Informao Comportamental Tese de Mestrado,


FEUP, Porto, 2009.
[2] J. P. S. Cabral, Gesto de Manuteno de Equipamentos, Instalaes e Edifcios. 3.
edio - Lidl: Lisboa - 2013.
[3] R. Calejo, Gesto de edifcios: Modos de simulao tcnico-econmica. Tese de
Doutoramento. FEUP, Porto, 2001.
[4] A. Alves, Sistemas Integrados de Manuteno: Processo SIM. Tese de Mestrado,
FEUP, Porto, 2008.
[5] P. Rocha, Metodologias de conceo arquitetnica com base na perspetiva de
Manuteno. Tese de Mestrado em Reabilitao do Patrimnio Edificado. FEUP, Porto,
2005.
[6] Al-Najjar, B. The lack of maintenance and not maintenance which costs: A model to
describe and quantify the inpact of vibration-based maintenance on companys
business. International Journal of Production Economics, Vol. 107, No.1, pp 260-273,
Maio 2007 doi: 10.1016/j.ijpe.2006.09.005.
[7] C.D.F. Gonalves, Gesto da Manuteno em Edifcios: Modelos para uma abordagem
LARG (Lean, Agile, Resilient e Green) Tese de Doutoramento. FCT-UNL, Lisboa,
2014.
[8] S. Lavy, Facility Management practices in higher education buildings: A case study.
Journal of Facilities Management, Vol. 6 Iss: 4 pp 303-315, 2008, doi:
10.1108/14725960810908163.

576
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[9] C. D. F. Gonalves, J. A. M. Dias, V. A. C. Machado, Multi-criteria decision


methodology for selecting maintenance key performance indicators in Internacional
Journal of Management Science and Engineering Management, Taylor & Francis. doi:
10.1080/17509653.2014.954280.
[10] J. N. L. Barata, GMAC - computerized maintenance management systems : uma
abordagem integrada para PMEs industriais. Tese de Mestrado em Engenharia
Informtica, Faculdade de Cincias e Tecnologia da Universidade de Coimbra,
Coimbra,2004.
[11] G. R. Colins Integrating BIM with GMAC myfacilitiesnet: consultado em 26/07/2016:
https://myfacilitiesnet.com/general/f/6298/t/10778.
[12] M. Schley, P. Teicholz, A. Lewis BIM for Facility Managers IFMA Facility Fusion
Confrence & Expo, Los Angeles, EUA, 2013.
[13] A. Lewis, B. Foster, Maio 2013 BIM and COBie: Taking GMAC to Next Level:
http://www.facilitiesnet.com/software/article/BIM-and-Cobie-Taking-GMAC-to-Next-
Level--14048.
[14] T. Cerovsek, Bim Lifecycle/ BIM-FM in BIM Internacional Conference (2013), Porto,
Portugal, 2013, pp 5/57 - https://docs.google.com/file/d/0B-
Q65lRX0S3wR0ZPb0VaZXktWXc/edit.
[15] J. D. R. T. Soares, A metodologia BIM-FM aplicada a um caso prtico Tese de
Mestrado, ISEP, Porto 2013.

577
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

578
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

RENTABILIZAO DA GESTO DE ATIVOS DE


INFRAESTRUTURAS ATRAVS DO BIM
Hugo Pina (1), Pedro Mota da Silva (1), Hugo Rodrigues (2) e Fernanda Rodrigues (3)

(1) Departamento de Engenharia Civil, Universidade de Aveiro, Aveiro, Portugal


(2) RISCO Escola Superior de Tecnologia e Gesto, Instituo Politcnico de Leiria, Portugal
(3) RISCO-Departamento de Engenharia Civil, Universidade de Aveiro, Aveiro, Portugal

Resumo
As entidades gestoras de infraestruturas, aps os elevados investimentos efetuados para a sua
construo, tm atualmente preocupaes no mbito da gesto da sua explorao com o mximo
de rentabilizao e o mnimo de risco quer econmico quer de desempenho. Para se alcanar
este objetivo necessrio otimizar a explorao e manuteno dos seus ativos, ou seja, proceder
respetiva gesto. A gesto de ativos entre outras definies, consiste num processo integrado
de tomada de deciso, planeamento e controlo quanto aquisio, uso, proteo e eliminao
de ativos, visando maximizar o seu potencial de resposta em servio e benefcios e minimizar
os riscos e os custos que lhes esto associados ao longo do seu ciclo de vida. No entanto, para
se implementar eficazmente este processo de gesto as entidades gestoras enfrentam uma
dificuldade inerente falta de informao sistematizada dos seus ativos. Este trabalho pretende
demonstrar atravs de um caso de estudo, como que o BIM pode contribuir para a eficaz
gesto de ativos de infraestruturas de armazenamento e distribuio de guas, bem como para
a gesto dos riscos inerentes s mesmas. Para se atingir este objetivo procedeu-se elaborao
de modelos 3D de acordo com a metodologia BIM e desenvolveram-se os respetivos ficheiros
COBie, cuja integrao no sistema de gesto de ativos (Computerized Maintenance
Management System: CMMS) existente na empresa foi analisada. Concluiu-se que apesar da
empresa ter um software de gesto de ativos, este poder ser otimizado com a introduo da
metodologia BIM.

1. BIM e o Facility Management (FM)

As atuais dificuldades econmico-financeiras levam a que as oportunidades de negcio estejam


cada vez mais focadas na criao de valor com o mnimo de custos. A necessidade de avaliar,
identificar e coordenar torna-se cada vez mais crtica para atingir a sustentabilidade. Assim,
adotar uma abordagem estratgica no que respeita Facility Management (FM), ou gesto de

579
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ativos, est a comear a tornar-se uma atividade chave e uma norma para se atingir uma
organizao de excelncia por parte dos gestores de operaes e manuteno [1].

Ao longo da construo de uma instalao, um grande nmero de documentos gerado para


acompanhar as diferentes fases. O rpido crescimento do volume de informao sobre o projeto
ao longo destas fases torna cada vez mais difcil de encontrar, organizar, aceder e manter as
informaes exigidas pelos utilizadores do projeto. A necessidade dessas informaes
evidente, devido aos inmeros benefcios que pode trazer para os ocupantes e utilizadores do
edifcio, bem como para os operadores/gestores da instalao [2]. Este processo tem lugar na
fase exatamente antes do edifcio ser ocupado, onde se acredita ser o melhor perodo para
adquirir informaes da instalao.

Como referido anteriormente, os projetos de construo so cada vez mais complexos, sendo
necessrio um alto nvel de informao e detalhe para a sua gesto. Esta informao vital e
importante que se encontre disponvel de forma percetvel. Os grandes desafios do FM so
revelados quando os desafios de intercmbio de informaes durante a fase de
conceo/construo so multiplicados em todo o ciclo de vida de uma instalao [2].

Atualmente a utilizao do BIM no FM leva a que os gestores das edificaes e instalaes


tenham sua disposio uma ferramenta que lhes permite gerir com eficcia todas as aes de
manuteno e reparao, bem como os respetivos custos. De acordo com o GSA Guide [3],
para a implementao do BIM no FM, necessrio:
Definir as informaes necessrias e o modo como so utilizadas;
Determinar em que fase do ciclo de vida da instalao se est a iniciar a implementao;
Determinar em que fase do ciclo de vida da instalao a informao criada e por quem;
Avaliar qual a abordagem de entrega de projeto (tradicional, a ponte entre projetar e
contruir, ou outra alternativa para a sua entrega) poder afetar a responsabilidade
contratual para a entrega de informaes;
Desenvolvimento de clusulas contratuais adequadas para exigir as prestaes de
informao.

A ISO 55000:2014 fornece uma viso geral sobre a gesto de ativos, os seus princpios e
terminologias e os benefcios que podem advir da adoo desta metodologia. Esta norma pode
ser aplicada a todos os tipos de ativos e por qualquer organizao. Deste modo, a norma prope
como principais benefcios para a aplicao desta metodologia (ISO 55000, 2014) [4]:
Melhorar o desempenho financeiro: permite melhorar o retorno dos investimentos e
pode ser alcanada uma reduo de custos, preservando o valor patrimonial, sem que
seja necessrio comprometer a curto ou a longo prazo a concretizao dos objetivos das
organizaes.
Informar sobre as decises tomadas: permite a cada organizao melhorar as tomadas
de decises e equilibrar eficazmente os custos, riscos, as oportunidades e um melhor
desempenho;
Melhorar a gesto dos riscos: permite uma reduo de perdas a nvel financeiro,
minimizando o impacto social, melhorando o nvel de reputao, podendo resultar numa
reduo de passivos.

580
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Permitir a sustentabilidade da organizao: faz com que exista uma gesto eficaz das
despesas e do desempenho a curto e a longo prazo, podendo melhorar a sustentabilidade
das operaes e da organizao.
Melhorar a eficincia e eficcia: permite rever e melhorar processos, procedimentos e
desempenhos dos ativos, fazendo com que tenham melhor eficincia, levando
realizao dos objetivos da organizao.

Deste modo, a aplicao da metodologia BIM no FM consiste, resumidamente, na gesto das


instalaes com recurso s funcionalidades proporcionadas pelo modelo BIM, como modelo
geomtrico e uma base de dados que contm todos os dados necessrios de todos os elementos.
Assim, a sua aplicao requer a utilizao das ferramentas informticas compatveis com ambas
as metodologias, sendo assim necessria a utilizao de dois tipos diferentes de softwares [5].
O processo de integrao do BIM-FM consiste fundamentalmente em trs etapas, como mostra
a Figura 1.

Figura 1: Processo de integrao do BIM-FM [4].

A primeira etapa consiste em desenvolver o modelo tridimensional da instalao, onde,


recorrendo a um software especfico de modelao, se conseguem definir as propriedades de
todos os elementos e equipamentos dessa instalao. A metodologia BIM tem particular
interesse nesta fase, pois, atravs dela que se consegue definir um correto LOD para que seja
possvel integrar de forma detalhada todas as informaes numa base de dados, para posterior
anlise pelos intervenientes na instalao.

A integrao dos dados de todo o modelo em folhas de clculo especficas d-se na segunda
etapa. Depois de todos os parmetros se encontrarem corretamente atribudos a cada elemento
do modelo, o software pode, ou no, ter a capacidade de gerar os COBie que consistem em
spreadsheets onde toda a informao armazenada. Estes ficheiros sero detalhados
posteriormente.

Aps o armazenamento de toda a informao de uma determinada instalao nestas


spreadsheets, fundamental a integrao destes dados num software que tenha a capacidade de
importar estes ficheiros para fazer a gesto da manuteno da instalao. Nesta fase, a gesto
feita atravs de CMMS, que pode ser um software comercial. a partir daqui que os
responsveis pela manuteno conseguem gerir corretamente toda a rede da sem terem que
recorrer a mais ferramentas.

O grande objetivo da utilizao do BIM no FM permitir a utilizao de dados da instalao


atravs de todo o seu ciclo de vida, fornecendo segurana, garantia e ambientes de trabalho
eficientes. Como gerada uma vasta quantidade de dados durante a fase de construo da
instalao, a correta manuteno desses dados permite obter maior eficcia na gesto, atravs

581
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

das informaes as-built, na reduo de custos e tempo, no aumento da satisfao do cliente e


na otimizao da operao e manuteno dos sistemas e da prpria edificao [6].

No entanto, e face ao nmero elevado de construes existentes, muitas das instalaes j se


encontram construdas e em funcionamento, sendo necessrio tomar uma abordagem diferente.
Soares [5], referenciando Tomo Cerovsek, refere essa abordagem como as-managed, termo
utilizado na fase de operao e manuteno, pois implica a atualizao do modelo com todas as
alteraes que foram efetuadas durante a sua vida de servio at ao momento da implementao
do sistema de gesto da manuteno. Uma das particularidades das construes existentes
observveis nesta fase est relacionada com o facto de, mesmo na fase de projeto e construo,
no terem sido compilados com grande rigor todos os dados finais, sendo bastante provvel que
durante uma ao de reabilitao, tambm no sejam guardados os elementos relativos a essa
ao, trazendo dificuldades ao processo de modelao da edificao existente [5].

2. Caso de estudo

2.1. Enquadramento
A instalao utilizada no presente caso de estudo, para a implementao da metodologia BIM
na gesto da manuteno, uma estao elevatria (ver Figura 2).

A instalao em estudo constituda por anis de beto armado e possu diferentes cmaras,
tais como a de entrada, visita e de inspeo. A estao dotada dos seguintes equipamentos: i)
Grupo eletrobomba submersvel; ii) Medidor de caudal eletromagntico; iii) Conversor de sinal
do medidor de caudal; iv) Clula de carga; v) Conversor de sinal da clula de carga; vi) Sondas
de nvel; vii) Escadas de acesso cmara; viii) Vlvula de seccionamento de cunha elstica; ix)
Vlvula de reteno esfrica; x) Transdutor de nvel ultrassnico.

Uma estao elevatria, por norma, encontra-se num nvel abaixo do da superfcie (encontra-
se enterrada). A Figura 2 pretende ilustrar a vista do local da estao em estudo, e
posteriormente sero apresentadas as plantas e cortes da instalao.

Figura 2: Vista do local da instalao.

582
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A escolha desta instalao baseou-se na necessidade de interveno de forma planeada das


aes de manuteno em todos os seus elementos, pois neste sistema, importante prevenir
avarias ou falhas que possam ocorrer devido importncia do seu correto funcionamento para
eliminar/minimizar os possveis prejuzos causados por qualquer falha.

Foi necessrio definir algumas fases para o desenvolvimento deste caso de estudo, de forma a
ordenar e simplificar o processo. Assim, o trabalho dividido em trs fases principais:
Recolha de toda a informao necessria, quer da instalao, quer dos equipamentos da
mesma.
Modelao da instalao e dos seus constituintes.
Partilha da informao originada pelo modelo e o software de gesto da manuteno.

importante referir que o objeto de estudo apenas uma das estaes do plano de interveno
anteriormente referido. O objetivo passa por perceber e aplicar o conceito do FM para uma
estao, sendo possvel depois generalizar para toda a rede, desenvolvendo assim um sistema
de gesto da manuteno eficiente graas a esta metodologia. A dimenso deste trabalho, tanto
a nvel de modelao como ao nvel da prpria informao que extrada do modelo, enfrentou
algumas dificuldades: o tempo de realizao limitado e a pouca experincia na utilizao do
software de modelao.

2.2. Informaes sobre o modelo e seus constituintes


Toda a informao utilizada para a criao do modelo foi fornecida pela empresa responsvel
pela execuo da instalao, sendo que a sua entrega foi feita em formato digital, tendo sido
fornecida informao referente s telas finais do processo de entrega da obra. A informao foi
utilizada e dividida em duas partes: relativa construo e sobre os equipamentos.

A informao relativa construo da instalao foi utilizada no seu todo para a construo do
modelo e dos seus vrios sistemas, e a informao sobre os equipamentos foi utilizada para
inserir diretamente nos elementos modelados, para posteriormente ser possvel a criao dos
ficheiros COBie.

Para a realizao do modelo, foram utilizados os desenhos referentes a cada uma das
especialidades, disponibilizadas em formato digital 2D, mais concretamente as suas plantas e
cortes.

Relativamente informao dos equipamentos, foi necessrio fazer um estudo prvio de qual
a informao a utilizar, bem como quais os equipamentos mais importantes para inserir mais
ou menos informao. Como a informao disponibilizada era bastante elevada, tornou-se
fundamental ordenar essa informao segundo as caractersticas pretendidas na criao da folha
de clculo para a prxima fase de trabalho. A informao recolhida foi ento ordenada segundo:
i) Marca/Modelo; ii) Caractersticas da garantia; iii) Tempo de vida til; iv) Dimenses; v)
Forma, tamanho e cor; vi) Acabamento; vii) Constituintes; viii) Manual de utilizao.

importante ter em conta que esta informao dos equipamentos foi obtida com a finalidade
de ser inserida posteriormente no ficheiro COBie, que no mais que a base de dados do
modelo.

583
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Aplicao ao caso de estudo

A modelao foi feita com recurso ao software de modelao Autodesk Revit 2016. A escolha
deste software teve por base a dimenso do projeto e as especialidades a serem modeladas, uma
vez que se trata de uma instalao de pequenas dimenses e o Revit contempla todas as
especialidades, no sendo necessrio recorrer ao mtodo de worksharing. Apenas foram
modeladas as especialidades mais importantes para a finalidade deste trabalho: arquitetura e
rede de guas residuais. Os elementos presentes na especialidade de estruturas so elementos
que no precisam de manuteno sistemtica frequente, pelo que devem ser monitorizados, no
necessitando, contudo de inspees feitas regularmente, principalmente pela instalao ser
bastante recente. A especialidade de eletricidade tambm foi excluda do mbito deste trabalho.

O LOD obtido no presente trabalho foi condicionado por alguns aspetos: o desconhecimento
inicial do software de modelao, bem como as poucas competncias do autor em modelao,
foram um fator limitante, conjugado com a no existncia de uma base de dados com objetos
BIM de cada fornecedor, tornou quase impraticvel a modelao de todos os equipamentos do
objeto de estudo; outro fator a ter em conta est relacionado com a informao fornecida, dado
que esta informao, principalmente dos equipamentos, foi facultada atravs de catlogos dos
fabricantes. No entanto, o pretendido obter a maior base de dados para que o ficheiro COBie
criado esteja conforme as normas, e o que acontece que essa informao no igual para
todos os equipamentos, o que dificulta essa criao. Deste modo, o LOD obtido no presente
trabalho foi o LOD 400, que corresponde a um nvel de desenvolvimento de uma maturidade
elevada. Devido s condies anteriormente descritas, no foi possvel obter o LOD 500, apesar
de ser o indicado como o ideal no processo do Facility Management.

3.1. Arquitetura
Como referido anteriormente, a modelao da arquitetura teve por base os elementos de projeto
fornecidos. Uma das principais dificuldades sentidas no processo de modelao foi encontrar
coerncia entre os desenhos fornecidos e o que foi construdo na realidade. Depois de vrias
visitas ao local da instalao e reunies com a empresa responsvel pela execuo da mesma,
foi possvel verificar que o projeto fornecido corresponde a um projeto-tipo de uma estao
elevatria, tendo sido adaptado a cada uma das treze estaes existentes no plano de
interveno. Na estao em estudo, constatou-se que existiam algumas alteraes ao projeto
inicial. As mais visveis, principalmente ao nvel do solo, so as tampas de saneamento, que no
projeto esto marcadas como tendo uma forma quadrada e com uma determinada medida, e na
realidade so redondas e com um dimetro diferente. Outra dificuldade sentida reside no facto
de a planta no indicar com grande rigor a localizao das diferentes cmaras (aspirao,
entrada e inspeo), apenas tendo sido possvel concluir sobre ela com visitas ao local da
instalao. Foi tambm feito um levantamento no local de todas as medidas necessrias para
modelar corretamente os diferentes elementos da envolvente, como o passeio, lancis e
distncias entre tampas (Figura 3). A Figura 4 representa um corte da estao elevatria.

584
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 3: Modelo da envolvente da instalao.

Figura 4: Corte.

Concluda a modelao da parte fsica do modelo, foi tambm necessrio definir os espaos que
constituem cada zona, cuja identificao seguiu a estrutura organizacional dos COBie, pois s
segundo a definio correta dos espaos ser possvel saber a localizao dos vrios
componentes presentes nos vrios nveis. Assim, no presente trabalho, considerou-se a diviso
em quatro espaos principais, a cmara de aspirao, cmara de entrada, cmara de manobras
e cmara tcnica.

3.2. Model MEP


De modo semelhante ao modelo de arquitetura, a modelao dos MEP teve por base as plantas
e cortes fornecidos, bem como as informaes complementares dadas pelos responsveis da
obra, para saber a localizao exata dos componentes.

Nesta fase, a informao utilizada tem um papel fulcral no sucesso da metodologia. Para a
realizao deste modelo foi necessrio um maior nmero de informao, que teve por base o
maior nmero de especialidades, bem como um maior nmero de equipamentos que constitui
cada uma dessas especialidades. Por se tratar de equipamentos muito especficos, verifica-se
que o Revit no possui uma famlia que os represente, com os parmetros necessrios de acordo
com as especificaes do projeto. Por exemplo, para o grupo eletrobomba submersvel, apesar

585
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

da existncia de vrios exemplos na biblioteca do prprio software, no existia nenhum que se


equiparasse aos utilizados no projeto.

Deste modo, o prximo passo na criao do modelo MEP foi a modelao da especialidade das
instalaes hidrulicas, nomeadamente o sistema de saneamento de guas residuais. As
informaes fornecidas apenas indicavam as ligaes no interior da estao elevatria, no
tendo sido facultada qualquer informao da localizao e das cotas das tubagens na envolvente
da instalao. Estas informaes foram recolhidas junto da entidade responsvel pela
construo da instalao, o que permitiu ento concluir sobre a localizao das tubagens para a
criao do modelo (Figura 5).

Figura 5: Modelo Mecnico final.

Como referido anteriormente, os equipamentos utilizados no modelo no possuem as


caractersticas fornecidas pelo fabricante, uma vez que no se encontram ainda modelados ou
tm informao insuficiente. Surgiu ento a necessidade de criar alguns equipamentos que se
assemelhassem realidade. Segundo Aubin [7], para a criao de equipamentos necessrio
ter em considerao:
Atribuio de subcategorias ao objeto Este passo nem sempre necessrio, sendo
utilizado para atribuir a partes independentes de uma famlia um nvel extra de
visibilidade e controlo grfico.
Estabelecer regras de visibilidade A utilizao desta ferramenta permite controlar as
definies de visibilidade da famlia. Por vezes, pode ser benfico ver algumas partes
em determinadas circunstncias.
Criao de conectores Este passo tem uma grande importncia na modelao dos
elementos pertencentes especialidade dos MEP, sendo apenas aplicado a estes
elementos. As famlias que representam equipamentos e instalaes mecnicas ou
eltricas necessitam de conectores que lhes permitam ligar corretamente aos tubos,
cabos ou fios e fazendo parte de um sistema.

586
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Comentrios Finais

4.1. Trabalho em Desenvolvimento


Depois da instalao elevatria se encontrar devidamente modelada, bem como todos os seus
constituintes, necessrio atribuir as informaes previamente adquiridas, a fim de criar a base
de dados do modelo, atravs dos ficheiros COBie. Deste modo, fundamental escolher o
template que se ajuste aos requisitos do COBie, que no presente trabalho foi a verso COBie
2.4. Deste modo, e seguindo o manual de utilizao para a extenso do Maximo para BIM [8],
a escolha recaiu naturalmente para a utilizao do Autodesk COBie Toolkit 2014. De referir
que este tipo de ficheiro tem a capacidade de estabelecer relaes entre os diferentes
componentes da instalao e os espaos a que pertencem, como possvel observar na Figura
6. Esta base de dados, por si s, no tem a capacidade de definir ordens de trabalho ou
estabelecer sistemas de manuteno preventiva, algo que s acontece numa fase posterior
recorrendo a softwares de gesto da manuteno.

Figura 6: Exemplo de um ficheiro COBie.

Em funo do modelo criado, foram inseridas todas as informaes existentes dos


equipamentos que constituem a instalao, para posterior criao do ficheiro COBie, tendo este
sido exportado diretamente do software de modelao. Foi tambm explicado o processo de
importao do COBie para um software de gesto de manuteno, que neste trabalho foi o IBM
Maximo, bem como o exemplo da gesto de um ativo a partir do mesmo

4.2. Dificuldades sentidas


O grande objetivo da aplicao da metodologia BIM no FM consiste em formular uma base de
dados que consiga auxiliar o processo de manuteno dos ativos de uma determinada instalao.
Essa base de dados, representada pelo ficheiro COBie, pode ser integrada num CMMS, onde
as ordens de trabalho da manuteno preventiva podem ser automaticamente geradas. Como
tal, os dados facultados por parte da empresa responsvel pela construo da instalao so
fundamentais para o processo de criao do ficheiro COBie [9].

A principal dificuldade sentida na parte da modelao foi a falta de congruncia entre as peas
de projeto fornecidas e o que efetivamente foi construdo. Isto condiciona quem modela, uma

587
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

vez que, em edificaes j existentes, importante existir uma uniformidade na documentao,


para que o modelo seja as-built. Para a modelao deste tipo de instalaes, necessrio realizar
previamente um levantamento das alteraes realizadas na prpria instalao. Para tal, foi
necessrio recorrer empresa responsvel pela construo da estao elevatria, e efetuar
visitas peridicas ao local.

Outro problema que se verificou foi a falta de conhecimento por parte das empresas de
equipamentos sobre esta metodologia. No se encontrou, em grande parte dos casos, nenhum
equipamento modelado por parte da marca, e nos casos em que existia o equipamento, no era
possvel aceder informao que compe o ficheiro COBie. Isto faz com que se perca tempo
no processo de modelao dos equipamentos e na pesquisa da informao que necessrio
introduzir no modelo.

O desconhecimento do software de modelao tambm um fator condicionante, uma vez que


o nvel de detalhe obtido pode no ser o ideal. O facto de no existir total acesso ao software
de gesto da manuteno tambm condicionou os resultados obtidos, uma vez que no foi
possvel proceder importao do ficheiro COBie para a cloud, e logo no foi possvel concluir
sobre a dificuldade deste processo. A dificuldade de obter uma licena deste software reside no
facto de serem, por vezes, licenas bastante dispendiosas para uma aplicao nica num projeto
de investigao, como uma dissertao de mestrado.

Referncias

[1] Saleh, A., Kamarulzaman, N., Hashim, H., Hashim S. (2011). An Approach to Facilities
Management (FM) Practices in Higher Learning Institutions to Attain a Sustainable
Campus (Case Study: University Technology Mara -UiTM). Procedia Engineering, 20,
269-278. doi:10.1016/j.proeng.2011.11.165.
[2] Lavy, S., Jawadekar, S. (2014). A Case Study of Using BIM and COBie for Facility
Management.
[3] GSA Guide (2012). 3D-4D Building Information Modeling.
[4] ISO 55000 (2014). Asset management Overview, priciples and terminology.
[5] Soares, J. (2013). A metodologia BIM-FM aplicada a um caso prtico. Relatrio de
Estgio para obteno do Grau de Mestre em Engenharia Civil, Instituto Superior de
Engenharia do Porto, Porto.
[6] Jordani, D. (2010). BIM and FM: The Portal to Lifecycle Facility Management. Journal
of Building Information Modeling, 10, 13-16. Lavy, S., Jawadekar, S. (2014). A Case
Study of Using BIM and COBie for Facility Management.
[7] Aubin, P. F. (2011). Autodesk Revit Families: A Step-by-Step Introduction. Autodesk
University 2011 (p. 35). Las Vegas: Autodesk.
[8] Pilgrim, L., Wood, D., Lacey, P. (2011). Maximo Extension for Building Information
Models (BIM).
[9] Alves, A. (2008). Sistemas Integrados de Manuteno: Processo SIM. Dissertao
apresentada para a obteno do grau de Mestre em Engenharia Civil, Faculdade de
Engenharia da Universidade do Porto, Porto.

588
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

CONTRIBUTO DO BIM COMO SUPORTE DAS FASES DE


MANUTENO E OPERAO DOS EDIFCIOS
Wilson Dias (1), Jos Carlos Lino (2), Joo Pedro Couto (1)

(1) Universidade do Minho, Guimares


(2) BIMMS, Porto

Resumo
A evoluo crescente das construes levou visualizao de edificaes mais complexas e
sofisticadas usando novas tecnologias. Com esta evoluo, os nveis de exigncia dos
utilizadores aumentaram, fazendo com que seja necessrio acrescentar mais informao aos
edifcios. Surgem novas preocupaes no s na fase de conceo mas tambm ao longo da sua
vida til, acrescentando assim mais valor e ateno por parte dos donos de obra fase de
manuteno e operao.

O Facilities Management (FM) diz respeito gesto de recursos onde se combinam os locais
fsicos, os intervenientes e a gesto de processos. J o Building Information Modeling (BIM)
permite armazenar toda a informao ao longo de todas as fases do ciclo de vida de uma
edificao. Assim sendo, compreende-se a necessidade atual da utilizao do BIM no FM,
criando assim a metodologia BIM for Facilities Management (BIM-FM) que consiste na gesto
das instalaes tendo como apoio os recursos BIM.

Este artigo tem como principal objetivo a demonstrao do contributo que o BIM pode oferecer
na otimizao da gesto da utilizao dos edifcios bem como para a sustentabilidade dos
respetivos edifcios.

1. Introduo

O presente artigo baseia-se na dissertao de mestrado integrado que o primeiro autor est a
desenvolver na Universidade do Minho em regime de colaborao com a empresa BIMMS.
Vrios estudos indicam que com uma correta manuteno se consegue aumentar a durao de
vida de um equipamento entre 30 a 40% em comparao com um equipamento que tenha uma
manuteno inadequada [1].

589
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O Facilities Management (FM) diz respeito gesto de recursos onde se combinam locais
fsicos, os intervenientes e a gesto de processos, de maneira a criar uma gesto de servios
com maior organizao e eficincia na coordenao das operaes e manutenes [2]. Contudo,
o uso tradicional do FM contm algumas limitaes, nomeadamente, a sua tradicional falta de
capacidades grficas [3]. Para poder ultrapassar estas limitaes pode recorrer-se ao uso da
metodologia Building Information Modeling (BIM) que uma metodologia onde existe
comunicao entre todos os intervenientes do projeto e partilha da informao de todas as fases
do mesmo. Deste modo, compreende-se a incorporao do BIM na metodologia FM, tornando-
se assim a metodologia BIM for Facilities Management (BIM-FM) que apoia a gesto das
instalaes.

Considerando que o FM tem vindo a ser estudado e desenvolvido desde 1950 [4] e que o BIM
tambm se encontra em desenvolvimento e investigado por diversos especialistas, pretende-
se com este artigo contribuir para a divulgao do papel e contributo do BIM no FM, na
combinao BIM-FM.

2. Enquadramento

2.1 Manuteno
A manuteno um conjunto de diversas aes com o objetivo de garantir o bom
funcionamento de mquinas e instalaes, ou seja, com o propsito de reparar ou repor o que
se encontra estragado ou sem a funcionalidade desejada, de modo que consigam desempenhar
as funes primitivamente requeridas, evitando a perda de funo ou mesmo a reduo do
rendimento [5].

A gesto da manuteno consiste, assim, em assegurar a atividade de mquinas e de instalaes


de modo a obter o melhor do seu rendimento, em segurana, evitando avarias ou reparando-as
quando elas acontecem. Para que tal acontea, necessrio existir um empenhamento por parte
das equipas tcnicas e de engenharia que tm por objetivos o cumprimento das exigncias legais
relacionadas com a manuteno, o planeamento da manuteno, a gesto de equipamentos e
sistemas, a gesto energtica e da qualidade do ar, bem como a diminuio de avarias e a sua
rpida resoluo, entre outras. Resumindo, a manuteno um sistema que contribui para um
aumento da vida til tanto de edifcios como de maquinaria devido diminuio da sua
degradao.

Para conseguir que este tipo de sistema seja eficaz, necessrio adotar polticas planeadas por
um gestor com um forte domnio na rea da manuteno. Este gestor fica encarregue de definir
uma poltica que se adeque ao tipo de manuteno que se deseja realizar de forma a manter o
desempenho funcional exigido inicialmente, atravs de aes preventivas, corretivas ou mesmo
preditivas, tendo em considerao tanto aspetos econmicos, como sociais, culturais e
histricos [5] [6]. O proprietrio do edifcio ou maquinaria pode exercer o papel de gestor, bem
como o administrador do condomnio, se for o caso. possvel tambm dar esse cargo a uma
entidade especializada na rea da manuteno. Existem vrios tipos de manuteno tais como
manuteno preventiva, corretiva e preditiva [5].

590
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

2.1.1 Manuteno Preventiva


Realiza-se de modo planeado de forma a evitar avaria, perda ou mesmo reduo das funes.
Esta manuteno pode dividir-se em dois modelos, manuteno preventiva sistemtica, a qual
se realiza por intervalos de tempo pr-definidos, e a manuteno preventiva condicionada que
realizada tendo em conta o controlo de determinadas condies [5] [7].

2.1.2 Manuteno Corretiva


Realiza-se reactivamente na sequncia de uma avaria ou perda de funo. Neste caso podem
ter-se alguns tipos de intervenes como, por exemplo, as intervenes urgentes, as pequenas
e grandes intervenes [5] [7].

2.1.3 Manuteno Preditiva


Trata-se de um acompanhamento peridico dos equipamentos, com base em dados recolhidos
por meio de monitorizao ou inspees que informam o seu desgaste ou processo de
degradao [5] [7].

2.2 Facility Management


A metodologia Facility Management (FM) consiste numa gesto integrada com um nvel
estratgico e ttico de modo a combinar os locais fsicos, os intervenientes e a gesto de
processos com o intuito de melhorar a eficincia das atividades de cada organizao [8]. Esta
prtica cada vez mais utilizada pelas organizaes com o objetivo de gerir as instalaes da
melhor forma. Para tal, j que se trata de uma rea que abrange inmeras matrias, existem
diversas ferramentas de apoio ao FM.

A gesto e manuteno de edifcios uma rea que envolve um grande nmero de servios
(Figura 1) o que, consequentemente, torna o seu custo elevado, sendo de grande interesse para
qualquer entidade gestora a otimizao dos seus custos. Assim, compreensvel que o uso do
FM seja aplicado nesta rea, pois tem a finalidade de gerir da melhor forma os vrios processos
e servios existentes.

Figura 1: Diversos servios existentes na manuteno [9].

2.3 BIM
O BIM no se baseia apenas em modelos computacionais tridimensionais, mas sim, em toda a
informao associada aos componentes desses modelos e equipamentos neles existentes. Para

591
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

alm disto, toda esta informao pode ser gerida durante a vida til da edificao (Figura 2). A
utilizao do BIM uma mais-valia para a rea de gesto da manuteno, pois torna as
intervenes de manuteno mais rpidas, confiveis e corretas devido representao do
edifcio em 3D e ao facto de toda a informao do mesmo estar reunida numa nica base de
dados. Assim, qualquer responsvel pela operao do edifcio pode recorrer ao modelo
tridimensional, com o intuito de conseguir as informaes necessrias para operar, tendo
tambm a possibilidade de acrescentar informao nesse mesmo modelo, garantindo que
qualquer alterao que se efetue neste o torna automaticamente atualizado [10].

Figura 2: Os intervenientes e a informao utilizada num modelo BIM [11].

3. Software BIM

Ao realizar a modelao do edifcio virtual necessrio que o modelo virtual contenha toda a
informao, a sua representao grfica, a anlise construtiva, a quantificao de trabalhos e do
tempo de mo-de-obra. Para isto preciso utilizar software de modelao tal como o Revit,
Archicad, Allplan, VectorWorks, Cype, Tekla Structures, entre outros [12].

A metodologia BIM for Facilities Management (BIM-FM) consiste na gesto das instalaes
tendo como apoio os recursos obtidos, sejam estes modelos tridimensionais, base de dados ou
qualquer outro tipo de informao proporcionada pela metodologia BIM. O tempo que uma
equipa de gesto de instalaes demora a fazer uma avaliao, por vezes ultrapassa o desejvel.
Com todas as informaes disponibilizadas quando aplicada a metodologia BIM, possvel o
acesso quase instantneo a essas informaes, poupando assim bastante tempo em fazer anlises
morosas [13], como por exemplo os detalhes, a localizao e historial, o fabricante, as normas,
os custos de desempenho, entre outros.

Um dos protocolos de interoperabilidade mais utilizados em BIM-FM o Construction


Operations Building information exchange (COBie), consiste num padro internacional para
recolha e troca de informaes no grficas relacionadas com os ativos das instalaes. Esta
ferramenta encontra-se em formato digital (Figura 3) utilizada para compilar, compatibilizar
e partilhar os documentos gerados na conceo da edificao [13] [14]. Ao contrrio da
metodologia tradicional onde se acumula e rene muita informao no final da obra, o COBie

592
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

incentiva a recolher e a introduzir a informao no modelo assim que ela obtida, mudando
assim a forma como a informao reunida [14].

Com o desenvolvimento crescente da tecnologia, aparecem cada vez mais ferramentas e


mtodos com a funo de facilitar e implementar o BIM-FM. Apresentam-se de seguida alguns
pacotes de softwares, para o BIM-FM, existentes no mercado.

Figura 3: Exemplo de um folha de clculo COBie [15].

3.1 Archibus
O Archibus tem o objetivo de reduzir a complexidade da gesto das empresas [16]. Este
software permite: gesto do portflio imobilirio, gesto do investimento, gesto e planeamento
de espao, gesto de movimentos, gesto de ativos, gesto ambiental e de risco, operaes de
construo, gesto de servios e extenses de tecnologia (Figura 4).

Figura 4: reas do Archibus [17].

3.2 ArchiFM
O ArchiFM, desenvolvido pela vintoCON Ltd, uma ferramenta FM que funciona em conjunto
com o software ArchiCAD da Graphisoft (Figura 5). Esta soluo foi desenvolvida com o
intuito de proporcionar uma gesto das instalaes durante o ciclo de vida til do edifcio,
utilizando um modelo grfico criado no ArchiCAD.

Nesta parceria possvel aceder a um visualizador web onde o utilizador pode realizar a gesto
sem ter que possuir o software de modelao. Esta ferramenta possui trs reas, nomeadamente

593
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

ArchiFM Assset Planning (Gesto de ativos), ArchiFM Maintenance (Manuteno - permite


planear atividades relacionados com a manuteno das instalaes bem como os seus custos) e
ArchiFM ProFM Reporting Services (Servios de informao- permite criar, editar e gerir
relatrios em tempo real recorrendo a um navegador web) [13] [18].

Figura 5: Ligao entre ArchiCAD e ArchiFM [18].

3.3 Bentley Facilities


O Bentley Facilities foi desenvolvido pela prpria Bentley e uma ferramenta composta por
um conjunto de aplicaes para suportar a gesto de espaos, de ativos e documentao,
relacionados com as instalaes. As aplicaes referidas so: Bentley Facilities Space Planner
(possibilita obter e estruturar todas as informaes, tanto novas como as existentes na base de
dados), Bentley Facilities Manager (trata-se de um interface que possibilita criar e manter toda
a informao das instalaes), Enterprise Facility Management (consiste num servidor de
colaborao onde possvel registar todos os dados das instalaes) e Bentley Facilities Web
Reports (possibilita a criao de relatrios com as informaes das instalaes) [13].

3.4 EcoDomus
O EcoDomus fornece solues BIM-FM, que trabalham com vrios sistemas como modelos
BIM (Figura 6), sistemas FM, sistema GIS, sistema de automatizao predial (BAS Building
Automation Systems), o que permite gerir as instalaes com uma maior eficincia. O
EcoDomus fornece duas ferramentas, o EcoDomus PM e o EcoDomus FM. O primeiro
possibilita a integrao dos dados BIM em ferramentas FM e o segundo possibilita a integrao
em tempo real do BIM com Building Automation Systems. Pode servir como uma base de dados
das instalaes que pode ser sempre atualizada e que permite a filtragem de informao por
localizao e rea [13] [19].

594
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Utilizao de modelos no EcoDomus [20].

3.5 FM:Interact
O FM:Interact foi criado pela FM:Systems e consiste numa ferramenta composta por um
conjunto de aplicaes que permitem organizar e analisar os dados relativos s instalaes.
Contm uma ligao bidirecional (Figura 7) com o Revit da Autodesk, atravs do qual tem
acesso a plantas e dados do modelo BIM, com o intuito de usar essa informao para a fase de
operao e gesto das instalaes [13]. As reas principais desta ferramenta so Space
Management (Gesto do espao), Strategic Planning (Planeamento estratgico) e Asset
Management (Gesto de ativos). O Space Management possibilita a criao de inventrios com
os detalhes dos espaos, da ocupao e benchmarking das instalaes de forma a melhorar as
taxas tanto da utilizao do espao como da ocupao. O Strategic Planning permite criar
planos de estratgia com base em anlises de requisitos do nmero de funcionrios e previso
de espao necessrio. O Asset Management possibilita a localizao de ativos fsicos como
equipamentos, computadores, mveis e sistemas, entre outros. O FM:Interact contm ainda
outros mdulos que so: Facility Maintenance, Move Management, Project Management, Real
Estate, Space Reservation, Sustainability. FM:Mobile.

Figura 7: Ligao bidirecional do FM:Interact [21].

595
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3.6 Maximo
O IBM Maximo uma soluo destinada para a gesto de ativos fsicos. Esta ferramenta
permite que as organizaes consigam gerir todo o tipo de ativos (produo, infra-estrutura,
instalaes, transportes e comunicaes). Para fornecer servios de otimizao, o Maximo,
apresenta seis reas de gesto (Figura 8) nomeadamente gesto de ativos, gesto de trabalho,
gesto de servio, gesto de contratos, gesto de inventrios e gesto de Procurement [22].

Figura 8: reas de gesto do IBM Maximo [23].

3.7 YouBIM
O YouBIM proporciona uma base de dados integrada e com acesso instantneo informao
das instalaes. No que se trata de gesto das instalaes, o YouBIM permite aceder dados e
documentao do fabricante, aos objetos da base de dados do modelo online (Figura 9) do
edifcio e para alm disso contm uma gesto de manuteno programada dos equipamentos do
edifcio [24].

Figura 9: Modelo online do YouBIM [24].

596
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

4. Aplicao Prtica

Para a aplicao da metodologia BIM-FM foi escolhido um projeto multiuso de reabilitao


composto por escritrios, superfcie comercial e espaos exteriores de arranjo urbano. As
principais etapas do processo so a definio dos requisitos, a recolha dos dados, a modelao
e a integrao com uma ferramenta BIM-FM.

4.1 Definio dos requisitos


Esta fase tem um papel muito importante j que ela que define tudo que vai ser essencial para
o modelo. Para isso de extrema importncia definir o objetivo do modelo de maneira a poder
modelar e recolher apenas o que necessrio, de modo a evitar que este processo seja
desnecessariamente demorado e pesado [25]. De uma forma geral, para o modelo ter uma boa
informao opta-se por considerar os seguintes objetivos: gesto dos contratos, manuteno,
gesto do stock e criao de indicadores de desempenho (KPIs) para Benchmarking.

O facto deste trabalho abranger vrias reas, tanto no desenvolvimento do modelo, como na
reunio e remoo de informao deste mesmo modelo, suporta a necessidade de alerta devido
a vrios aspetos no desenvolvimento do trabalho. Contudo neste projeto as reas trabalhadas
so a gesto e planeamento de espao, gesto de ativos, operaes de construo e gesto de
servios.

4.2 Recolha de dados


Nesta fase considera-se a recolha dos dados fsicos do modelo como plantas, equipamentos e a
informao essencial para a gesto da mesma.

Neste projeto, inicialmente, a recolha de dados comeou por toda a informao que se encontra
no formato digital, contudo, nem todas as informaes esto nesse formato. Na informao
recolhida importante ter bem definido quais os dados essenciais, para que a modelao dos
equipamentos seja o mais leve possvel para no sobrecarregar o modelo.
4.3 Modelao
No que toca modelao, necessrio ter em conta alguns aspetos, tais como: saber se se trata
de uma construo nova ou de uma j existente e se j se encontra modelado ou se ainda se
encontra em planta, sendo que a variao destes fatores define a trajetria do processo. Se o
projeto for novo, toda a informao diretamente direcionada para o modelo que ser realizado,
caso contrrio, se o caso de estudo for um projeto existente, necessrio saber se j existe ou
no uma modelao. Caso no exista, a modelao criada de raiz; caso exista, necessrio
saber se preciso realizar alteraes no modelo. Ainda nesta fase, necessrio introduzir toda
a informao recolhida relativamente ao edifcio e equipamentos.

Neste caso a modelao j existia e foi criada com recurso ao software Autodesk Revit (Figura
10). A modelao Revit consiste em trs especializaes: Arquitetura, Estrutura e MEP, estas
podem estar ou no separadas. Optou-se por, inicialmente, usar a especialidade de arquitetura
de modo a simplificar o processo e o tamanho do modelo, no entanto tambm essencial fazer
uma adaptao ao contexto e s necessidades deste trabalho.

597
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 10: Imagem do modelo retirada diretamente do Revit.

4.4 Integrao com uma ferramenta BIM-FM.


Nesta fase, necessrio que as etapas anteriores estejam concludas, de forma que o modelo
BIM seja sincronizado com as ferramentas BIM-FM.

No presente caso prtico, a ferramenta BIM-FM utilizada foi o ArchiBUS, que possibilita fazer
a gesto e planeamento de espao, a gesto de ativos, as operaes de construo e os servios
do local de trabalho. Para isso, primeiramente, necessrio que os dados recolhidos relativos
ao edifcio e aos equipamentos se encontrem no modelo Revit para que este esteja preparado
para a integrao do ArchiBUS.

Aps o processo anteriormente descrito, necessrio instalar a expanso ArchiBUS no Revit


(Figura 11), de forma que toda a informao seja sincronizada com o ArchiBUS. A partir deste
ponto o utilizador pode consultar e gerir esta informao, bem como os seus objetivos de
trabalho, atravs do software ArchiBUS Smart client (Figura 12) onde possvel aceder ao
visualizador web.

Figura 11: Expanso do ArchiBUS no Revit.

Figura 12: ArchiBUS Smart cliente e visualizador web.

598
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

5. Concluses

A metodologia BIM-FM, devido ao facto de ainda estar em fase de desenvolvimento, pode ser
alvo de alguma resistncia, sendo importante difundir o seu interesse como ferramenta de apoio
manuteno das instalaes, mudando o modo como o trabalho desenvolvido e facilitando
certas tarefas. Para que este trabalho seja devidamente desenvolvido necessrio, no s uma
ao colaborativa de todos os intervenientes, mas tambm a existncia de documentao ou
uniformidade da documentao do caso em estudo. Em obras onde a metodologia BIM est
implementada, a conexo com o FM mais rpida e simples devido informao j existente
acerca destas. O contributo desta metodologia deveras importante na elaborao de um projeto
j que permite uma uniformizao no processo de trabalho, contrariamente ao que acontecia no
processo tradicional, onde a gesto das instalaes e a restante construo so duas fases
independentes. Com a introduo da metodologia BIM-FM, esta discriminao desaparece e o
mtodo de processo torna-se uniforme, o que traz maior funcionalidade e utilidade ao Dono de
Obra. Relativamente ao Software utilizado, ArchiBUS, torna-se fcil a implementao do BIM-
FM porque possvel retirar diretamente a informao do modelo Revit para o servidor e como
existe uma relao bidirecional possvel atualizar os dados em ambos os Software. Durante a
sua aplicao, possvel aferir que o uso deste tipo de plataformas web colaborativas muito
importante pois permite o acesso e controlo por todos os intervenientes, diretamente implicados
na gesto dos ativos.

Referncias

[1] S. Raposo, A gesto da manuteno de edifcios - Uma introduo ao tema, Faro, 2012.
[2] D. Sapp, Facilities Operations & Maintenance. 2013 [Online] Available at:
http://www.wbdg.org/om/om.php [Accessed: March 15, 2015].
[3] Azenha, M., Lino, J.C. & Caires, B., Introduo ao BIM - BIM na Engenharia Civil:
Projeto e Construo. In U. do Minho, ed. Unidade curricular: BIM na Engenharia Civil
- Projeto e Construo. Guimares, 2015.
[4] A. D. Weise, C. A. Schultz, and R. A. da Rocha, Facility Management: contextualizao
e desenvolvimento, in 11a Conferncia Internacional da LARES, 2011.
[5] J.Moreira, Manuteno Preventiva de Edificios - Proposta de um Modelo Empresarial,
Dissertao de Mestrado, Faculdade de engenharia da Universidade do Porto, 2010.
[6] J. Ramos, Gesto de Instalaes, Dissertao de Mestrado, Instituto Superior de
Engenharia de Lisboa, 2012.
[7] A. Nour, Manuteno de Edifcios - Diretrizes para elaborao de um sistema de
manuteno de edifcios comerciais e residenciais, Escola Politcnica da Universidade
de So Paulo, So Paulo, 2003.
[8] BS EN 15221-3:2011 Facility Management. Guidance on quality in Facility
Management, 2012.
[9] TCMS, Facilities Management, 2016. [Online]. Available:
http://www.tcmsltd.com/services/facilities-management/. [Accessed: 20-Sep-2016].
[10] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, Encontro Nac. Beto Estrutural -BE2012, 2012.
[11] B. Haines, Ensured Success with a distributed BIM Lifecycle process, 2015. [Online].
Available: https://fmsystems.com/blog/distributed-bim/. [Accessed: 16-Sep-2016].

599
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

[12] I. Rodas, Aplicao da metodologia BIM na gesto de edifcios, Dissertao de


Mestrado, Faculdade de engenharia da Universidade do Porto, 2015.
[13] J. Soares, A metodologia BIM-FM aplicada a um caso prtico, Dissertao de
Mestrado, Instituto Superior de Engenharia do Porto, 2013.
[14] F. Sousa, A evoluo de um modelo BIM de construo para gesto de
empreendimentos, Dissertao de Mestrado, Instituto Superior de Engenharia do Porto,
2013.
[15] J. Jauhianen, COBie enables owners to get serious about asset management, [Online]
Available:http://www.solibri.com/journal/cobie-enables-owners-get-serious-asset-
management/ [Accessed: 18-Out-2016].
[16] Archibus, Facilities and Real Estate Management Applications For Every Challenge,
[Online]. Available: http://www.archibus.com/Applications/. [Accessed: 17-Sep-2016].
[17] ARCHIBUS, ARCHIBUS: Your Integrated Solution for Real Estate, Infrastructure &
Facilities Management, Boston, 2016.
[18] ArchiFM, Wide-ranging functionality in facility management [Online].
http://www.archifm.net/. [Accessed: 17-Sep-2016].
[19] EcoDomus, ECODOMUS FM, 2016. [Online]. Available:
http://ecodomus.com/products/. [Accessed: 18-Sep-2016].
[20] EcoDomus, ECODOMUS FM, 2016. [Online]. Available:
http://ecodomus.com/products/masonry?style/. [Accessed: 18-Sep-2016].
[21] Take your CAD/BIM data to the next level: FM+BIM Integration, 2014. [Online].
Available:http://advancedspatialtechnologies.blogspot.pt/2014/02/fmbim?integration.ht
ml. [Accessed: 19-Sep-2016].
[22] IBM, Gesto abrangente de activos empresariais para gesto de manuteno e ciclo de
vida de activos, 2016. [Online]. Available: http://www-
03.ibm.com/software/products/pt/maximoassetmanagement. [Accessed: 20-Sep-2016].
[23] STARBOARD CONSULTING, IBM MAXIMO APPLICATION, [Online].
Available: http://starboard-consulting.com/ibm-maximo-software/. [Accessed: 20-Sep-
2016].
[24] YouBIM, BIM for Facility Management Cloud-Based Solution, 2016. [Online].
Available: http://www.youbim.com/features.html. [Accessed: 22-Sep-2016].
[25] ndBIM Virtual Building, O PROXIMO PASSO EM BIM: GESTAO DE
EMPREENDIMENTOS, 2015. [Online]. Available:
http://ndbim.com/index.php/pt/component/k2/item/5-o-proximo-passo-em-bim-gestao-
de-empreendimentos. [Accessed: 22-Sep-2016].

600
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O BIM NA CERTIFICAO ENERGTICA DE EDIFCIOS DE


SERVIOS
Raul Lana Miguel (1), Daniel Marcelo Ferreira (2)

(1) Universidade do Algarve, Faro


(2) Enerfos, Faro

Resumo
O consumo de energia primria no setor dos edifcios de habitao e de servios tem vindo a
despertar um crescente interesse global, principalmente devido ao grande potencial de
poupana disponvel atravs de medidas de melhoria de eficincia energtica e da utilizao de
fontes de energias renovveis.

Existem vrios planos de ao para a progresso gradual para edifcios com necessidades quase
nulas de energia (nZEB nearly Zero Energy Buildings) a ser implementados em simultneo
nos diversos estados membro da Unio Europeia. Estas aes decorrem das transposies da
Diretiva 2010/31/EU Reformulada (EPBD - Recast: Energy Performance of Buildings
Directive) tendo em conta o contexto nacional de cada estado membro.

O presente artigo aborda o processo de determinao do desempenho energtico de edifcios


em Portugal, no contexto regulamentar atual, comparando uma abordagem tradicional com uma
abordagem BIM.

So analisados dois processos de certificao energtica de edifcios de servios, comparando


os indicadores que determinam a classe energtica dos edifcios em estudo e os workflows de
processo segundo duas metodologias distintas.

Ambas as metodologias recorrem a uma simulao dinmica multizona com recurso a uma
aplicao acreditada pela norma ASHRAE 140. Na abordagem tradicional os inputs necessrios
so obtidos a partir de peas desenhadas em 2D e da informao retirada das memrias
descritivas dos respetivos projetos de arquitetura e especialidades. Na abordagem alternativa os
inputs necessrios so retirados de um nico modelo criado numa plataforma BIM.

601
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

1. Introduo

O Sistema Nacional de Certificao Energtica e da Qualidade do Ar Interior nos Edifcios


(SCE) entrou em vigor a 04 de abril de 2006 [1]. Este sistema marcou a nova fase da legislao
de desempenho energtico de edifcios em Portugal e resulta da implementao da Diretiva
2002/91/CE (EPBD) [2]. O sistema tem sido objeto de alteraes, sendo que a mais importante
resultou da transposio da diretiva 2010/31/EU (EPBD recast) [3].

Apesar da evoluo que o SCE tem sofrido ao longo dos ltimos dez anos dois aspetos
permanecem inalterados: i) a necessidade de verificar o cumprimento regulamentar e de
quantificar o desempenho energtico numa fase de projeto e ii) a necessidade de verificar a
concordncia entre a obra concluda e o projeto aprovado e previamente certificado no mbito
do SCE.

Os indicadores necessrios quantificao do desempenho energtico nestes dois momentos


so obtidos atravs de mtodos de anlise energtica dos edifcios (AEE) que so habitualmente
executados por especialistas ou peritos qualificados (PQ) registados no SCE.

Os tcnicos responsveis por este tipo de anlise tm duas tarefas principais: i) reunir toda a
informao relevante para a criao de um modelo energtico do edifcio e ii) fornecer
resultados que apoiem o processo de deciso ao longo das diversas fases do projeto e garantam
o cumprimento regulamentar. Este processo envolve habitualmente a utilizao de complexas
ferramentas de modelao energtica, requerendo elevadas cargas de trabalho para a recolha e
correta introduo da mirade de dados necessria simulao do desempenho energtico do
edifcio [4]. A modelao/simulao energtica, numa fase prematura do projeto, constitui uma
forma eficaz de prever e reduzir consumos energticos em edifcios de qualquer tipologia.
Contudo, ainda habitual encontrar situaes em que a AEE realizada numa fase avanada
de projeto, onde decises cruciais j foram tomadas e o papel do especialista em energia
apenas o de fornecer os resultados da simulao para efeitos de verificao de cumprimento
regulamentar e emisso de pr-certificado energtico (PCE).

A possibilidade de simular diferentes cenrios de forma a encontrar a melhor alternativa numa


fase inicial do projeto no aproveitada, em virtude da dificuldade e custos envolvidos na
modelao energtica do edifcio. Atualmente a metodologia BIM permite ultrapassar estas
barreiras, fornecendo aos utilizadores uma forma de avaliar diversas medidas de melhoria de
eficincia energtica sem necessitar do processo penoso de reintroduo de toda a geometria e
propriedades da envolvente trmica do edifcio, espaos, zonas e caractersticas dos sistemas
de ventilao e climatizao necessrios para uma anlise energtica completa [5].

Os planos de ao para alcanar os edifcios nZEB pressupem a realizao de anlises de


sensibilidade e avaliaes de custo timo [3]. A possibilidade de realizar uma grande
quantidade de simulaes de desempenho energtico do edifcio fundamental para uma
avaliao rpida e economicamente vivel das solues possveis.

602
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

O presente artigo procura dar resposta s seguintes questes:


possvel realizar simulaes de desempenho energtico de edifcios (SDEE) vlidas
baseadas em modelos BIM?
Essas simulaes fornecem os resultados necessrios e suficientes para a certificao
energtica dos edifcios de acordo com a legislao em vigor?
mais vantajoso criar um modelo BIM para realizar uma SDEE ou utilizar o processo
tradicional (introduo manual de dados na ferramenta de anlise/simulao)?

2. A certificao energtica de edifcios em Portugal: Conceitos fundamentais

A transposio da diretiva europeia 2010/31/EU (EPBD recast), j referida, criou um nico


regulamento para a avaliao do desempenho energtico dos edifcios, o Decreto-Lei 118/2013
[14], com o conjunto de despachos e portarias aplicveis. Apesar da nova legislao constituir
uma aparente unificao entre edifcios de habitao (Regulamento de Desempenho Energtico
dos Edifcios de Habitao REH) e edifcios de comrcio e servios (Regulamento de
Desempenho Energtico dos Edifcios de Comrcio e Servios RECS), os princpios
subjacentes s metodologias de avaliao dos consumos previstos para cada caso so
substancialmente distintos.

No REH a avaliao contempla essencialmente a envolvente trmica, o clima local, a


ventilao, a exposio solar e baseia-se num balano de energia calculado numa base mdia
sazonal. Os consumos previstos para o edifcio real so depois comparados com os consumos
previstos para o edifcio nocional ou de referncia e do seu rcio resulta a classificao
energtica cuja escala vai de A+ (mais eficiente) a F (menos eficiente). interessante verificar
a predominncia de certificados emitidos com classificao D (Figura 1), de acordo com os
requisitos regulamentares de 2016 [6], o que denota dois aspetos relevantes: i) os valores de
referncia so cada vez mais exigentes (progresso gradual para edifcios com necessidades de
energia quase nulas nZEB) e ii) a situao de pobreza energtica (fuel poverty) em que se
encontra grande parte dos agregados que habitam em edifcios com classificaes baixas e sem
sistemas de climatizao (a metodologia de clculo assume que o interior das habitaes
mantido em condies de conforto o que nem sempre corresponde realidade [7]).

Figura 1: Distribuio de classes energticas relativas aos certificados emitidos no perodo


compreendido entre dez-2013 a ago-2016 e respeitantes aos edifcios de habitao (Fonte e
elaborao: ADENE).

603
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Por outro lado, nos edifcios de servios, objeto do presente estudo, a regulamentao atual do
SCE introduz modificaes importantes na metodologia de clculo dos consumos previstos e
da classificao energtica. Esta ltima deixa de ser baseada em condies nominais de
funcionamento, numa lgica de benchmarking, e passa a ser efetuada em condies reais,
considerando a envolvente trmica, o clima local, a ventilao, a exposio solar do edifcio em
estudo, comparando os consumos deste com aqueles do edifcio nocional ou de referncia
(Figura 2).

Figura 2: Classificao energtica de um edifcio de servios com base nos IEE (Fonte e
elaborao: ADENE).

As principais diferenas em relao ao REH so:


As mdias sazonais so substitudas por valores horrios para um ano tpico;
Os consumos ligados iluminao artificial so calculados e considerados para efeitos
de classificao energtica do edifcio;
Os ganhos internos passam a depender da utilizao e afetam a classificao energtica
do edifcio;
Nem sempre um aumento de isolamento da envolvente trmica corresponde a uma
reduo do consumo global de energia primria, e.g. edifcio com elevados ganhos
internos em que a diminuio da possibilidade de dissipar calor pela envolvente conduz
a maiores consumos de arrefecimento;
Todos os consumos so avaliados e convertidos em energia primria por rea de
pavimento formando o Indicador de Eficincia Energtica (IEE) expresso em
kWhEP/(m2.ano);
Nem todos os consumos afetam diretamente a classificao energtica do edifcio,
porm so todos indicados no Certificado Energtico.

Existe a possibilidade de basear o clculo em consumos efetivos, mas essa metodologia sai for
do mbito do presente estudo. Este contempla apenas edifcios novos ou, quando enquadrados
como existentes no mbito do SCE, sem um histrico de consumos documentado i.e. sem
faturas de fornecedores de energia ou campanhas de monitorizao.

604
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

3. Anlise do desempenho energtico de edifcios de servios baseada em BIM

Atualmente existem mais de 40 ferramentas de simulao do desempenho energtico de


edifcios (SDEE) [8] com capacidade para simulao multizona e em conformidade com a
norma ASHRAE 140 [9]. A maioria das ferramentas de simulao so compostas por duas
partes: i) uma interface grfica de utilizador (IGU) e ii) um algoritmo de simulao para o
clculo dos consumos energticos.

A realizao de uma simulao vlida requer a introduo direta dos dados que caracterizam o
edifcio em estudo tais como a envolvente trmica (geometria e solues construtivas), dados
meteorolgicos locais em formato normalizado, caractersticas dos sistemas de aquecimento,
ventilao e ar condicionado (AVAC), perfis de operao para as diversas tipologias de
utilizao do edifcio, cargas e ganhos internos por espao (ocupao, iluminao e
equipamentos) e tarifas dos comercializadores de energia. Esta informao encontra-se
normalmente dispersa por peas escritas e desenhadas dos projetos de arquitetura e
especialidades do edifcio, especificaes tcnicas de fabricantes, levantamentos fotogrficos,
relatrios de peritagem, etc. (Figura 3-a). Os ficheiros de dados de entrada que contm a
informao relevante so lidos pelo algoritmo de simulao de forma a calcular as cargas
trmicas do edifcio e os consumos de energia final e primria associados ao edifcio em estudo.

Figura 3: Fluxos de informao necessrios ferramenta de anlise.

605
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

A certificao energtica exige ferramentas de anlise especficas. A diferena principal est


no nvel de detalhe exigido pelos regulamentos, principalmente na caracterizao dos
equipamentos. Por outro lado, a possibilidade de integrar algoritmos de clculo no ambiente
nativo de modelao geomtrica permite obter um rpido feedback sobre os indicadores de
desempenho energtico ao longo do processo de conceo. Estes aspetos encontram-se
definidos de uma forma clara por Negendahl [12], onde se defende que os utilizadores das
ferramentas/plataformas de modelao geomtrica (tipicamente arquitetos) tm necessidades
substancialmente diferentes dos utilizadores de ferramentas de simulao de desempenho
energtico (tipicamente engenheiros). A utilizao de ferramentas distintas conduz a uma
deficiente convergncia entre modelos geomtrico e analtico (Figura 4) com consequncias
difceis de acomodar em processos de desenvolvimento com alteraes frequentes.

Figura 4: Divergncias entre modelos geomtrico e analtico, resultantes da introduo


manual de dados (Fonte e elaborao: Negendahl [12]).

A soluo parece residir numa maior integrao entre as ferramentas de conceo e de


simulao, o que nem sempre fcil atendendo aos condicionalismos j expostos. Algumas das
ferramentas de simulao de desempenho energtico existentes (e.g. Green Building Studio,
DesignBuilder, Hevacomp, eQUEST, HAP e IES <VE>) j permitem um grau de
interoperabilidade aceitvel com as principais plataformas de modelao BIM (e.g. Revit,
Bentley e ArchiCAD). A interoperabilidade plataforma/ferramenta garantida atravs de
estruturas de dados normalizadas (schemas) do tipo Industry Foundation Classes (IFC) ou
Green Building XML (gbXML), tendo-se esta ltima tornado na estrutura normalizada de facto
da indstria, suportada pelas principais empresas de software tais como Autodesk, Graphisoft,
e Bentley [22]. A CYPE tem vindo a desenvolver ferramentas de SDEE baseadas no EnergyPlus
e apresentou recentemente um ambiente de desenvolvimento integrado baseado em BIM, com
incorporao de metodologias de clculo compatveis com a regulamentao em vigor [14].

Com o caso de estudo proposto, procura-se dar uma resposta s questes formuladas na
introduo e ao mesmo tempo dar alguns exemplos concretos que ajudem a entender de que
forma se pode melhorar a convergncia entre o modelo geomtrico e o modelo analtico, sempre
com o foco na certificao energtica de edifcios de servios.

Pretende-se calcular os consumos previstos e de referncia para um edifcio classificado como


grande edifcio de comrcio e servios (rea superior a 1000 m2) atravs da utilizao da
ferramenta de anlise Hourly Analysis Program (HAP), desenvolvida pela Carrier [13]. Esta
ferramenta amplamente utilizada principalmente pelas seguintes razes: i) cumpre os

606
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

requisitos da norma ASHRAE 140 [9], ii) o nvel de detalhe compatvel com as exigncias
regulamentares [14] e iii) fcil avaliar medidas de melhoria de desempenho energtico
baseadas na operao dos equipamentos (e.g. tcnicas de arrefecimento noturno com ar novo,
ajuste de set-points de climatizao e iluminao, etc.).

O edifcio em questo j tinha sido objeto de certificao energtica, com obteno dos
indicadores relevantes atravs do processo tradicional (esquematizado na figura 3-a). Foi
necessrio criar um modelo BIM do edifcio para poder chegar aos resultados necessrios a
uma nova certificao energtica atravs do processo esquematizado na figura 3-b. O modelo
BIM foi desenvolvido de raiz na plataforma Revit 2017, a partir das telas finais do projeto de
arquitetura, da informao relevante dos projetos de especialidades e de inspees pontuais no
edifcio construdo.

Uma das principais vantagens do processo de transferncia de informao atravs de


importao/exportao por ficheiro gbXML a verificao de coerncia entre o modelo BIM e
o modelo de simulao, que pode ser executada em qualquer altura atravs da comparao entre
tabelas obtidas na plataforma BIM e na ferramenta de anlise. Esta vantagem especialmente
valorizada em edifcios com geometrias complexas e em ferramentas de anlise que no
permitem uma visualizao tridimensional do modelo de simulao. As figuras 5 e 6 ilustram
este aspeto.

Figura 5: Solues construtivas da envolvente trmica.

607
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 6: Densidades e perfis por espao (Revit 2017 e HAP 4.8).

3.1 Limitaes de interoperabilidade


Foram detetados alguns problemas de interoperabilidade entre a plataforma BIM (Revit 2017)
e a ferramenta de anlise (HAP 4.80). Estes podem ser descritos em dois tipos principais: i)
incongruncia entre superfcies analticas da envolvente trmica do edifcio e ii) perda de
parmetros analticos em elementos de algumas categorias.

No tipo i) constatou-se que as coberturas eram consideradas como elementos de sombreamento,


no pertencendo envolvente trmica do modelo analtico. A forma de contornar este problema
consistiu em aumentar o limite superior dos espaos definidos no Revit para que estes
inclussem as coberturas. O clculo de reas e volumes no foi afetado pois as coberturas tinham
o constrangimento de room bounding verificado.

No tipo ii) o problema principal envolveu a categoria das janelas e a perda das propriedades
analticas dos vos envidraados durante o processo de exportao para o ficheiro gbXML. A
forma prtica de resolver o problema foi a edio direta dos parmetros na interface do HAP.
Trata-se de um procedimento expedito uma vez que os vos envidraados so caracterizados
apenas por dois parmetros, o coeficiente de transmisso superficial de calor do vo U, expresso
em W/(m2.K) e o fator de sombreamento (shading coefficient SC), adimensional e que se
relaciona com o fator solar (solar heat gain coefficient SHGC) atravs da expresso
SHGC = 0,87 SC. Foi apenas necessrio introduzir estes dois parmetros para cada tipo de vo
envidraado no modelo analtico e todos os elementos foram atualizados. O inconveniente que
da resultou foi a criao de alguma divergncia entre o modelo BIM e o modelo analtico [12]
uma vez que a informao relevante para efeitos de desempenho energtico passou a residir
apenas no modelo analtico.

Um problema mais difcil de contornar consiste nas limitaes existentes nas propriedades de
alguns elementos. No presente caso de estudo salientam-se duas categorias de elementos
utilizados: vos envidraados e sistemas AVAC. Para ambas as categorias o Revit 2017 assume
um conjunto de solues construtivas ou tipologias pr definidas e assume que os

608
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

elementos/objetos utilizados devero pertencer a uma delas. Mais uma vez a necessidade de
contornar este problema atravs da edio manual de parmetros na interface da ferramenta de
anlise revela-se como a nica forma de chegar a resultados fiveis.

importante salientar que apesar da disponibilidade crescente de objetos modelados pelos


respetivos fabricantes, com nveis de desenvolvimento (LOD) elevados (e.g. bim object [19],
autodesk seek [20]), ainda se encontram omissos muitos dos parmetros necessrios anlise
de desempenho energtico, deixando ao utilizador a responsabilidade de definir os mesmos e
reunir as evidncias necessrias ao seu suporte.

3.2 Controlo de qualidade do modelo analtico


Como j foi referido, a forma expedita de verificar a convergncia da envolvente trmica entre
modelo de arquitetura e modelo analtico consiste na comparao de tabelas (schedules) obtidas
na plataforma de modelao e na ferramenta de anlise.

O Revit 2017 no permite a segregao de superfcies da envolvente trmica vertical (paredes,


janelas, portas) por orientao. Este facto limita de forma significativa quer a verificao de
convergncia quer a obteno de informao necessria ao processo de certificao. Foi
necessria a criao de um parmetro adicional para conter a informao relativa orientao
das referidas superfcies. O clculo automtico a partir das coordenadas do vetor normal a cada
superfcie e posterior clculo do seu azimute foi efetuado a partir de programao visual atravs
da aplicao Dynamo 1.1.0 (Figura 7).

Figura 7: Clculo do parmetro orientao atravs de programao visual.

Na figura 8 compara-se a tabela de reas totais de envolvente exterior do modelo de arquitetura,


com as orientaes agrupadas por azimute (valor expresso em graus) com uma tabela de reas
de envolvente exterior de um espao do edifcio, com as orientaes agrupadas por setores de
azimute com uma amplitude de 45 (N/NE/E/SE/S/SO/O/NO).

609
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 8: Tabelas de paredes agrupadas por orientao (Revit 2017 e HAP 4.8).

Uma forma de realizar um controlo de qualidade mais abrangente e eficaz consiste na utilizao
de visualizadores gbXML adequados. Desta forma possvel verificar a convergncia entre
modelo de arquitetura e modelo analtico em todas as vertentes relevantes. No caso em estudo
utilizou-se o FZK Viewer [21] (Figuras 9 e 10), permitindo uma rpida verificao da geometria
(envolvente e espaos), da coerncia entre solues construtivas e dos perfis associados a cada
espao (ocupao, iluminao e equipamentos).

Figura 9: Controlo de qualidade com visualizador gbXML (envolvente e espaos).

610
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Figura 10: Controlo de qualidade com visualizador gbXML (solues construtivas).

4. Resultados

A simulao dinmica multizona foi efetuada atravs da ferramenta HAP 4.80 [13]. Esta
simulao procura traduzir o consumo anual de energia do edifcio com base na localizao do
edifcio, nas caractersticas da envolvente, na eficincia dos sistemas tcnicos e nos perfis de
utilizao previstos para o edifcio.

No modelo de simulao foram consideradas diversas zonas trmicas tendo em conta os


seguintes critrios: sistemas de climatizao, exposio solar, cargas internas, perfis de
utilizao e controlo.

Tabela 1: Consumos anuais de energia por utilizao (Referncia).


Simulao Simulao baseada em
tradicional BIM
(kWh) (kWh)
Aquecimento 21181 20374
Arrefecimento 21922 22989
Iluminao 75751 77528
Equipamentos 29035 29750

611
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Tabela 2: Consumos anuais de energia por utilizao (Previstos).


Simulao Simulao baseada em
tradicional BIM
(kWh) (kWh)
Aquecimento 15202 14873
Arrefecimento 12458 14324
Iluminao 24615 25228
Equipamentos 29035 29750

Tabela 3: Parmetros de clculo da classe energtica.


IEEpr,S IEEREN IEEref,S
(kWhEP/m2.ano) (kWhEP/m2.ano) (kWhEP/m2.ano)
Simulao tradicional 148,4 1,0 270,2
Simulao baseada em BIM 153,5 1,0 272,0

Tabela 4: Classe energtica.


Classe Intervalo de RIEE RIEE
Energtica
Simulao tradicional A 0,26 RIEE 0,50 0,46
Simulao baseada em BIM A 0,26 RIEE 0,50 0,47

5. Concluses

A possibilidade de quantificar o desempenho energtico de um edifcio de servios numa fase


inicial do projeto constitui uma das vantagens principais da utilizao de uma abordagem BIM.
Para que essa quantificao seja compatvel com as exigncias regulamentares do SCE
necessrio um nvel de detalhe que obriga utilizao de determinadas ferramentas SDEE em
detrimento de outras.

A realizao do presente estudo permitiu retirar as seguintes concluses:


Foi possvel realizar uma SDEE vlida para o caso em estudo com a informao
relevante retirada do modelo BIM especialmente criado para o efeito.
Os resultados da simulao foram suficientes para a emisso de um certificado
energtico de acordo com a legislao em vigor.

612
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Compararam-se os recursos necessrios em termos de tempo e esforo para a


certificao energtica do edifcio em estudo atravs dos dois mtodos (tradicional e
baseado em modelo BIM) e foi possvel constatar que para um utilizador com
conhecimentos de modelao BIM de nvel mdio os dois mtodos apresentam um
consumo de recursos equivalente. Conclui-se assim que prefervel a criao de um
modelo BIM do edifcio a simular e a certificar, nos casos em que este no exista.

As solues de integrao e de interoperabilidade entre plataformas de modelao BIM e


ferramentas de anlise de SDEE esto em constante evoluo e a possibilidade de criar modelos
dinmicos integrados entre elas, atravs de linguagens de programao visual [12] (e.g.
Dynamo [16], Grasshopper [17] e GenerativeComponents [18]) constitui uma rea de
investigao bastante vasta e interessante.

Referncias

[1] Decreto-Lei n 78/2006 Sistema Nacional de Certificao Energtica (SCE), D.R. I Srie
A n 67 (2004-03-19) p. 2411-2415.
[2] Diretiva 2002/91/CE do Parlamento Europeu e do Conselho de 16 de Dezembro de 2002
relativa ao desempenho energtico dos edifcios, Jornal Oficial das Comunidades
Europeias.
[3] Diretiva 2010/31/UE do Parlamento Europeu e do Conselho de 19 de Maio de 2010
relativa ao desempenho energtico dos edifcios (reformulao), Jornal Oficial da Unio
Europeia.
[4] H. Kim, Z. Shen, I. Kim, K. Kim, A. Stumpf, and J. Yu, "BIM IFC information mapping
to building energy analysis (BEA) model with manually extended material information,"
Automation in Construction, vol. 68, pp. 183-193, 8// 2016.
[5] A. Stumpf, H. Kim and E. Jenicek, Early design energy analysis using building
information modeling technology, Relatrio Tcnico, US Army Corps of Engineers,
ERDC/CERL TR-11-41, 2011.
[6] ADENE, Agncia para a Energia, Informao retirada de um certificado energtico
emitido em 22/09/2016.
[7] S. M. C. Magalhes and V. M. S. Leal, "Characterization of thermal performance and
nominal heating gap of the residential building stock using the EPBD-derived databases:
The case of Portugal mainland," Energy and Buildings, vol. 70, pp. 167-179, 2// 2014.
[8] J. B. Kim, W. Jeong, M. J. Clayton, J. S. Haberl, and W. Yan, "Developing a physical
BIM library for building thermal energy simulation," Automation in Construction, vol.
50, pp. 16-28, Feb 2015.
[9] ANSI/ASHRAE, "ASHRAE 140:2001 Standard method of test for the evaluation of
building energy analysis computer programs," American Society of Heating,
Refrigerating and Air-Conditioning Engineers (ASHRAE), 2001.
[10] Green Building Studio, v. 2016.180.35.7 (DOE-2.2-48r), http://gbs.autodesk.com,
acedido em 23/09/2016.
[11] Autodesk, Revit, http://www.autodesk.com/products/revit-family, acedido em
23/09/2016.
[12] K. Negendahl, "Building performance simulation in the early design stage: An

613
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

introduction to integrated dynamic models," Automation in Construction, vol. 54, pp.


39-53, 6// 2015.
[13] Carrier Corporation, Hourly Analysis Program v. 4.80.0.30 International Edition.
[14] Decreto-Lei n 118/2013 Sistema Nacional de Certificao Energtica (SCE),
Regulamento de Desempenho Energtico dos Edifcios de Habitao (REH) e
Regulamento de Desempenho Energtico dos Edifcios de Comrcio e Servios (RECS),
D.R. I Srie n 159 (2013-08-20) p. 4988-5005.
[15] CLIMAS-SCE - Software para o Sistema Nacional de Certificao de Edifcios,
http://www.lneg.pt/servicos/328/2263/, acedido em 23/09/2016.
[16] Dynamo v. 1.1.0.2094, http://dynamobim.org, acedido em 23/09/2016.
[17] Grasshopper, http://grasshopper3d.com, acedido em 23/09/2016.
[18] Generative Components, https://www.bentley.com/en/products/product-line/modeling-
and-visualization-software/generativecomponents, acedido em 23/09/2016.
[19] Bimobject, http://bimobject.com/pt, acedido em 23/09/2016.
[20] Autodesk Seek, http://seek.autodesk.com, acedido em 23/09/2016.
[21] Karlsruhe Institute of Technology, Institute for Applied Science, FZKViewer v. 4.4,
05/05/2015 (Build 837)
[22] E. Guzmn Garcia and Z. Zhu, Interoperability from building design to building energy
modeling, J. Build. Eng., vol. 1, pp. 3341, 2015.

614
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

NDICE DE AUTORES
Alexandre Marques 163, 173 Diogo Coelho 437
Alfredo Soeiro 419 Diogo Drumond 19
Ana Alves 527 Diogo Ribeiro 381
Ana Quintela 153 Fbio Alexandre Matoseiro Dinis 45
Ana Silva 87 Fernanda Rodrigues 309, 527, 579
Ana Tom 513 Fernando F.S. Pinho 143
Andr Ferreira 163, 173 Flvio Silva 87
Andr Monteiro 69, 77, 209 Francisco Reis 33, 153
Andr Reis Antunes 463, 547 Francisco Teixeira Bastos 239, 321
Andr Santos 381 Gabriel Lopes 297, 359
Andr Silva 19 Henrique Nunes 143
AnneMarie Mushamalirwa 463 Hugo Pina 579
Antnio Aguiar Costa 463, 547, 567 Hugo Rodrigues 527, 579
Antnio Leito 239, 251, 285 Ins Caetano 239
Antnio Lopes 501 Joana Arajo 475
Antnio Raposo 57 Joo Fernandes 343
Armando Pinto 309 Joo Frescata Pereira 513
Bruno Caires 33 Joo Lima 77
Bruno Costa 381 Joo M. Barroso 121
Bruno Ferreira 251 Joo Morgado 437
Carlos Canelhas 57 Joo Oliveira 19
Celso Lima 173 Joo Pedro Couto 153, 195, 333, 409, 427,
Cludio Carvalho 567 437, 475, 589
Cludio Gomes 185, 381 Joo Poas Martins 45, 419, 395
Daniel Marcelo Ferreira 601 Joaquim Danado 109
Daniela Silva 87 Jorge de Mello Vieira 219, 537
Diana Bastos Silva 559 Jorge G. Fernandes 121
Dinis Leito 437 Jorge M. Branco 121

615
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Jos Carlos Lino 33, 185, 195, 227, 333, Rafael Vieira 263
343, 409, 475, 489, 559, 589 Raquel Matos 527
Jos Cidades 57 Raul Lana Miguel 601
Jos PintoFaria 559 Ricardo Resende 501
Juliana Fernandes 427 Ricardo Santos 185, 343
Kamar Aljundi 309 Rita Rebelo Pvoas 321
Lus Coroado 501 Rodrigo Giollo 451
Lus M. P. Rodrigues 77, 219, 537 Rodrigo Sacadura 501
Lus Pedro Bidarra 333 Rosaldo Rossetti 131
Lus Ribeirinho 77, 209 Ruben Santos 547
Lus Sanhudo 395 Rui Dias 87
Lusa M. S. Gonalves 227, 567 Rui Gavina 381
Manuel Tender 427 Sara Eloy 501
Maria Helena Teixeira 501 Sofia Feist 285
Maria Joo Falco Silva 143, 451 Sofia Henriques 77, 219, 537
Martim Bernardo Ribeiro 99, 371 Taisiia Mitina 227
Miguel Azenha 131, 163, 195, 333 Tiago Gouveia 409
Miguel Chichorro Gonalves 99, 371 Vtor Mineiro 131
Miguel Conceio 209 Wilson Dias 589
Miguel Pires 69
Miguel Sales Dias 501
Nuno Lacerda 33
Nuno Pires 489
Paula Couto 143, 451
Pedro Mda Magalhes 99
Pedro Mota da Silva 579
Pedro Rocha 371
Pedro Santiago 275
Pedro Serra 57

616
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

617
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares

Universidade do Minho
www.ptbim.org

ISBN: 978-989-8793-04-1
DOI:618
https://doi.org/10.5281/zenodo.166758

Potrebbero piacerti anche