1 Congresso portugus de
Building Information Modelling
Editores:
Miguel Azenha
Joo Poas Martins
Jos Granja
Coorganizado por:
3
Texto 2016 Editores
Design Jos Granja
ISBN: 978-989-8793-04-1
DOI: https://doi.org/10.5281/zenodo.166758
Departamento de Engenharia Civil, Escola de Engenharia, Universidade do Minho
Campus de Azurm, 4800-058, Guimares, Portugal
http://www.civil.uminho.pt/
Universidade do Minho. 2016
Autores. 2016
Editores. 2016
4
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
COMISSO CIENTFICA
Joo Poas Martins Universidade do Porto (FEUP) (Presidente)
Alfredo Soeiro Universidade do Porto (FEUP)
Antnio Aguiar Costa Universidade de Lisboa (IST)
Bruno Figueiredo Universidade do Minho (EAUM)
Diogo Ribeiro Instituto Superior de Engenharia do Porto (ISEP)
Fernanda Rodrigues Universidade de Aveiro (UA)
Fernando Pinho Universidade Nova de Lisboa (UNL)
Francisco Teixeira Bastos Universidade de Lisboa (IST)
Hugo Rodrigues Instituto Politcnico de Leiria (IPL)
Joo Pedro Couto Universidade do Minho (EEUM)
Jos Carlos Lino Newton-C - Consultores de Engenharia
Jos Pedro Sousa Universidade do Porto (FAUP)
Jos Pinto Duarte Penn State University (PSU)
Levi da Costa Universidade Lusada (UL)
Lus Costa Neves Universidade de Coimbra (FCTUC)
Miguel Azenha Universidade do Minho (EEUM)
Nuno Lacerda Universidade do Porto (FAUP)
Paula Couto laboratrio Nacional de Engenharia Civil (LNEC)
Sara Eloy Inst. Universidade de Lisboa (ISCTE)
Zita Sampaio Universidade de Lisboa (IST)
COMISSO DE HONRA
Paulo Loureno Universidade do Minho (EEUM)
Hiplito Sousa Universidade do Porto (FEUP)
Fernando Branco Universidade de Lisboa (IST)
Carlos Guimares Universidade do Porto (FAUP)
Teresa Heitor Universidade de Lisboa (IST)
5
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
PATROCINADORES
6
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
7
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
8
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
PREFCIO
Esta primeira edio do PTBIM, com lugar no Campus de Azurm da Universidade do Minho
(24 e 25 de novembro de 2016) contou com 52 artigos reportados neste livro de atas, e cerca de
200 inscritos, em correspondncia com o limite mximo preconizado pela organizao. Os
artigos contemplam autores de diversas instituies de ensino/investigao nacionais, bem
como profissionais da Indstria da Arquitetura, Engenharia e Construo.
Os Editores:
Miguel Azenha
Joo Poas Martins
Jos Granja
9
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
10
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
NDICE
Prefcio ...................................................................................................................................... 9
ndice ....................................................................................................................................... 11
11
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
12
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Da linha ao varo: caso de estudo do projeto de estabilidade, tendo o conceito BIM como
base
Gabriel Lopes .................................................................................................................... 297
Energy analysis using cooperation between BIM tools (Revit and Green Building Studio)
and Energy Plus
Kamar Aljundi, Armando Pinto, Fernanda Rodrigues ...................................................... 309
13
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
14
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Contributo do BIM como suporte das fases de manuteno e operao dos edifcios
Wilson Dias, Jos Carlos Lino, Joo Pedro Couto ............................................................ 589
15
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
16
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Parte I
Implementao, interoperabilidade e colaborao
17
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
18
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Existem vrios exemplos de implementao de tecnologias BIM na produo de projetos, no
entanto o xtase do primeiro projeto bem-sucedido rapidamente d lugar a uma inquietao
perante um problema de grande importncia Como controlar os custos de produo de
projetos em BIM?
Todo este processo obrigou a uma profunda reformulao na forma como abordamos os
projetos, desde a alterao dos campos de ao dos intervenientes, passando pela aquisio de
meios, pela formao e qualificao dos recursos e at o desenvolvimento de software. No
artigo sero descritas as alteraes ao modus operandi dos departamentos e a forma como o
BIM permitiu difundir e controlar a informao de forma simples, inequvoca e eficaz.
A interligao dos vrios softwares que utilizam os modelos BIM em interao revelou-se uma
vantagem importante. Os softwares de modelao Revit e Tekla Sutructures permitiram
transmitir informao com ferramentas de clculo e simulao como o Robot (Estruturas) e
Design Builder (AVAC), assim como vrios softwares desenvolvidos internamente otimizando
os tempos de desenvolvimento de projeto de uma forma significativa.
19
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
A gnese e fora motriz do processo BIM no seio da A400 ambicionou a melhoria do processo
produtivo, segundo uma tica de aumento da rentabilidade. Esse objetivo conseguiu-se atravs
da identificao e resoluo de problemas, incompatibilidades e incongruncias em fases a
montante do processo construtivo.
2. O Problema/Oportunidade BIM
Recentemente, apesar da tecnologia BIM ser encarada pelos diversos atores como uma
inevitabilidade para a indstria AEC (Architecture, Engineering, Construction), os avanos
neste processo tm decorrido de forma lenta. A crise do sector em Portugal restringe os
investimentos e consequentemente os processos de implementao nas empresas possuem
recursos escassos e atrasos significativos.
20
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Processo de Implementao
Edifcios cada vez mais complexos e exigentes a nvel tcnico agravam a ineficincia deste
modelo de produo. A metodologia BIM surge como ferramenta de melhoria dos processos
produtivos aumentando a facilidade com que a informao flui entre os vrios intervenientes.
21
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O percurso foi, sem dvida sinuoso, repleto de dificuldades e de decises complexas, mas foram
os resultados que transmitiram o incentivo para o desenvolvimento metodolgico e de melhoria
contnua, particularmente na motivao e envolvimento dos recursos humanos, os quais, de
forma natural sentiram o abalo associado significativa alterao de paradigma vigente.
22
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Largura
Comprimento
Dimensions Family Parameter Espaamento Alhetas Common Lenght Dimensions
Extrao, Insuflao, Exteriores,
Altura
Lineares, Intumescentes,
Outras necessrias
Desenfumagem
Mechanical Flow Shared Parameter Caudal de Ar HVAC Air Flow Mechanical - Flow
5. Recursos humanos
23
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
processo na sua globalidade, dedicava demasiada ateno aos seus projetos em curso,
penalizando o tempo despendido com o processo de implementao;
A equipa que melhor efeito surtiu foi composta por engenheiros estagirios, com 0 a 1
ano de experincia: A juventude desta equipa, aliada a uma maior frescura mental,
estabeleceu caminho motivao para um universo novo, exibindo perseverana nas
dificuldades e abertura para discutir e aplicar as diretrizes.
6. Formao
7. Software e Hardware
24
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
BIM, nomeadamente o Tekla Structures, h cerca de 10 anos, com elevado grau de sucesso e
enraizamento.
Os custos anuais de licenciamento para Revit Completo, Revit LT e Tekla Structures rondam
os 30 000 . Dadas as alteraes do licenciamento Autodesk estima-se que uma licena de Revit
em regime de aluguer poder atingir cerca de 15% do custo direto de um posto de trabalho,
representando assim um encargo elevado.
A infraestrutura de rede suportada por dois cluster cada um deles composto por 2 nodos de
computao redundantes, com armazenamento de dados redundante multi-camada interligados
por switches instalados em cascata com um backbone a 40Gbps.
25
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O processo produtivo da A400 assenta na criao distinta de modelos por especialidade que se
interligam com os restantes segundo o esquema da figura abaixo. ainda gerado um modelo
de coordenao com o intuito de detetar incompatibilidades e exportar elementos coordenados
a enviar para entidades externas (clientes, arquitetos, outros projetistas de especialidades).
Outro dado com relevncia ser o facto do trabalho segundo a metodologia BIM obrigar a uma
reformulao interna de organizao da informao na infraestrutura (Fileserver). Esse trabalho
desenvolveu-se baseado numa metodologia que permita trabalho colaborativo.
26
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para evitar este tipo de problemtica criou-se um procedimento de criao de famlias, apoiado
por um aplicativo derivado do Repository (Knowledge Base), que permite gerir e atualizar
qualquer elemento. Cada um dos objetos acompanhado por um manual que relata o seu
propsito e descreve o seu processo de criao e parametrizao. Este aplicativo permite a
introduo direta no modelo em curso a partir da sua interface.
27
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A opo pela divulgao dos modelos em base editvel pretende mobilizar os parceiros da A400
a aderir a esta tecnologia, sendo que na preparao de modelo em Revit procura-se fomentar a
utilizao dos objetos criados pela A400 e ao mesmo tempo familiarizar os parceiros com os
processos de modelao internos.
Contudo, grande parte dos elementos processados por parceiros e clientes so ainda os ficheiros
DWG. Com a implementao da tecnologia BIM procurou-se manter em larga medida os
elementos produzidos anteriormente, sendo estes exportados diretamente do modelo Revit. Para
o efeito criou-se um aplicativo que permite a exportao para Autocad a partir do Revit.
Embora este esforo pela garantia da compatibilidade entre processos produtivos seja til
apenas no futuro prximo, considerou-se que o incremento de investimento desta opo seria
justificado pela durao do processo de massificao das tecnologias BIM. Dado que com os
recursos designados no era possvel implementar o processo em todos os departamentos em
simultneo, seria em todo o caso necessrio haver procedimentos e ferramentas que
permitissem ambos os processos produtivos coexistir.
28
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Algumas das licenas de Revit foram adquiridas anteriormente, no entanto a sua utilizao em
pleno iniciou-se com este processo. As licenas de Tekla Structures tambm foram adquiridas
anteriormente e j eram utilizadas antes do processo de implementao do BIM.
As projees de retorno para este investimento basearam-se na reduo dos rcios de horas em
projetos. As seguintes notas mostram as projees por especialidade:
No departamento de Coordenao os custos de projeto ascendiam a 10-20% do valor
total. Com a introduo da tecnologia BIM estimou-se uma reduo de 30% neste valor,
concretamente ao nvel dos tcnicos de desenho dado o elevado nmero de horas
necessrio para efetuar sobreposies dos desenhos.
No departamento de Estruturas otimizaram-se tempos de produo dos modelos de
clculo e de preparao de plantas estruturais, utilizando o modelo BIM para ambas as
funes. Na prtica a opo permitiu dispensar as horas de desenhador em fases iniciais
e reduzir o tempo de preparao de modelos. Estimou-se uma reduo de 30% do tempo
necessrio para estas tarefas, o que representa uma reduo de 9% no custo total de
estruturas.
29
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Apesar de serem esperados retornos a longo prazo, foi evidente que os primeiros projetos
produzidos atravs de tecnologia e metodologia BIM tiveram um sobrecusto. Os resultados
mostraram um aumento superior a 50%. Dado o lote de projetos ser reduzido em nmero, no
possvel retirar significado dos resultados. Destaque-se que o desempenho dos departamentos
nestes projetos iniciais foi heterogneo, dada a variabilidade dos perfis dos recursos humanos.
9. Desenvolvimentos Futuros
Apesar do custo necessrio para produzir estas aplicaes ser substancial, os retornos esperados
garantem a viabilidade deste investimento em perodos relativamente curtos (3-5 anos).
30
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
10. Concluses
data deste artigo a empresa comea a retirar dividendos dos investimentos realizados, no
sendo, no entanto, possvel afirmar de forma perentria quais as redues de alocao
atualmente. Mantendo o nvel de encomendas mdio dos ltimos 3 anos a empresa prev
amortizar o investimento no prximo trinio. Esta expectativa exclui os investimentos futuros
descritos no captulo anterior.
Ser inegvel que existem outras vantagens e benefcios de todo este processo, no entanto desde
o incio manteve-se o foco no retorno do investimento atravs do aumento da eficincia do
processo produtivo. Convm, ainda assim, listar outros benefcios diretos ou indiretos que se
obtiveram com esta implementao:
Melhorias do processo produtivo, que de outra forma seriam infundados;
A qualidade dos projetos aumentou substancialmente com a reduo de erros por
incompatibilidades. Este ganho traduz-se num aumento generalizado de encomendas;
Preparao com a devida adequao tecnolgica para uma mudana de paradigma no
setor que se antev inevitvel;
A modelao BIM agilizou a interao com aplicativos que facilitam os processos de
dimensionamento e simulao que fazem parte de qualquer projeto de engenharia;
A utilizao de modelos BIM permitiu um novo patamar de interoperabilidade entre os
softwares de clculo e simulao j adquiridos. Deu-se uma reduo dos erros
associados a estas modelaes dada a facilidade atingida no processamento de dados.
O processo e as perspetivas futuras mostram ainda algumas desvantagens que penalizam o
desempenho da abordagem seguida pela empresa:
Grande parte do investimento deve-se falta de formao dos tcnicos envolvidos. Com
a difuso destas tecnologias as empresas que prologarem o processo no precisaro de
investimentos to avultados nesta rbrica;
O mercado ainda no produz contedos BIM de uma forma generalizada, para assim
permitirem s empresas dispensar a produo prpria de objetos. Grande parte da base
de dados da A400 foi produzida internamente, com custos de investimento assinalveis.
Este problema tender a desaparecer com a massificao da utilizao da tecnologia
BIM, particularmente por parte dos fabricantes;
Alguns dos aplicativos desenvolvidos foram elaborados por falta de solues comerciais
com as mesmas capacidades. Com a evoluo dos softwares julga-se que estes
programas cairo em desuso face a produtos mais generalizados e com maiores
potencialidades.
Em suma as orientaes e objetivos definidos inicialmente permitiram que hoje seja possvel
identificar os indcios de sucesso perspetivados. Sem dvida que a via da rentabilidade do
investimento o melhor caminho para justificar os custos de implementao. Dada a crise que
se faz sentir no sector no expectvel que o mercado reconhea os benefcios desta
metodologia de forma imediata. Note-se ainda que as iniciativas governamentais nesta rea tm
sido diminutas e no se antev uma mudana de poltica capaz de prosperar uma mudana mais
radical. Caber aos profissionais do setor, e mais particularmente s empresas de projeto,
encontrar uma forma de rentabilizar o investimento orientando-se principalmente no seu
mercado sem esperar contrapartidas de clientes ou de outros intervenientes no processo.
31
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
32
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O BIM aparece, hoje, como necessidade e obrigatoriedade, levando as pessoas e organizaes
a adaptarem-se cada vez mais rapidamente a esta nova realidade e mudana que a mesma
implica.
Tal como muitas outras inovaes tecnolgicas, somos amide surpreendidos por uma mirade
de casos, de aplicao local, isolados, mas que denotam que a disseminao e difuso do BIM,
entre outros, veiculadas pelas comunicaes web, tm sido muito eficazes. De qualquer modo,
a muitos surge, porm, a necessidade de descodificar um novo lxico, de se apreenderem novas
ferramentas e de se implementarem novos procedimentos. Enfim, de se aplicarem novas
solues aos velhos problemas da indstria da construo, suportada pelos profissionais de
arquitetura e engenharia.
Procurando responder a essa necessidade, a BIMMS constituiu-se assim como uma associao
de profissionais, multifacetados em aplicaes especficas nas vrias reas de Arquitetura e
Engenharia com o intuito de apoiar organizaes e indivduos na transio dos seus projetos e
processos para BIM. Com esse esprito de servio ao BIM aplicado, neste artigo, procuram-se
ilustrar vrias solues que surgiram como respostas aos desafios colocados, pela natureza e
localizao dos diversos projetos, desde a coordenao e modelao, implementao e
gesto, todos representando oportunidades concretas de inovao e evoluo.
33
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
A consultoria em BIM uma atividade ainda muito recente, carente de ser mais estudada do
ponto de vista cientfico, pelo que ainda difcil encontrar estudos especficos sobre este tema.
Baseia-se, essencialmente, no conhecimento e experincia dos consultores, que perante uma
nova abordagem aos tradicionais mtodos de projetar, construir e operar, optam pelas solues
e implementaes que lhes parecem mais eficientes e adequadas. Apesar de j muita teoria se
poder encontrar sobre BIM e sobre os seus usos e aplicaes, j no to fcil encontrar a sua
aplicao prtica, pelo que neste artigo, procurou-se partilhar a experincia adquirida nesta rea.
Para tal, recolheram-se junto dos diversos consultores da BIMMS, os diversos usos e aplicaes
adotadas em vrios casos prticos internacionais, apresentando alguns resultados e concluses
desta sua experincia.
Atualmente, a indstria AECO encontra-se perante novos desafios de grande relevncia, tais
como, a crescente complexidade dos projetos a executar, a necessidade de praticar opes
sustentveis, as preocupaes energticas globais, a reduo dos custos e a melhoria da
produtividade, entre outros. Como forma de resposta necessidade de melhoria dos processos
atuais de trabalho em projeto, surgiu o conceito BIM, que essencialmente assenta numa
metodologia de construo virtual que, entre muitas outras capacidades, permite a partilha de
informao entre todos os intervenientes e fases do projeto. Num modelo BIM a informao
encontra-se interligada por relaes paramtricas o que significa que as alteraes so
processadas em tempo real em todo o modelo, evitando a propagao de erros e dinamizando
os processos de atualizao [1].
Com vista implementao total do processo BIM, baseada em mapas de processos claramente
identificados, detalhados e compreensivos a definir o fluxo de informao, a tecnologia permite
vrios melhoramentos em cada fase do ciclo de vida de uma construo [2]. O BIM
proporciona, cada vez mais cedo, visualizaes mais realistas, colaborao efetiva das mltiplas
34
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O BIM foi avaliado como benfico para a construo, fabrico e ps-construo [3],
principalmente devido ao uso do modelo de projeto como base para o Fabrico de Componentes
[4], Sincronizao de projeto e Planeamento da construo [5] e integrao com Sistemas de
Operao e Gesto de instalaes. O BIM, entre muitos outros benefcios deu aos consultores
MEP e construtores a oportunidade de levarem a cabo a requerida coordenao com um maior
grau de preciso e colaborao [6, 7]. A implementao prtica desta metodologia comea a ser
evidente, tendo ainda que lidar com dificuldades, nomeadamente, as inerentes ao investimento
e curva de aprendizagem. Comea a sentir-se a necessidade de adquirir competncias a nvel
profissional, quer nos cursos de arquitetura, engenharia civil e cursos especiais bem como no
ambiente empresarial [8].
Esta transio para o BIM trouxe diversas alteraes ao modo de fazer e de pensar as diversas
disciplinas. A Arquitetura tem ao seu dispor auxiliares conceo, produo e comunicao
da sua proposta que antes no existiam. A Engenharia comea a integrar-se com processos de
fabrico e automatizao para otimizar as suas solues. A construo adapta-se a novos
modelos de negcio e de contratao, ao trabalho colaborativo e integrao de diversos
sistemas de gesto. A operao e manuteno integram o conhecimento das fases anteriores
visando um ciclo de vida mais sustentvel.
Da recolha dos vrios casos prticos em que a BIMMS tem participado desde o seu incio de
atividade, identificaram-se usos principais que integram este ciclo de vida, optando-se por os
agrupar em Modelao, Coordenao, Implementao, Formao e Inovao, conforme se
apresentam nos captulos seguintes.
3. Modelao e Coordenao
A modelao trata-se do elemento base a partir do qual se pode iniciar a interao e integrao
da informao. Esse processo de Modelao, tal como a Construo, tem sido desenvolvido
como um agrupamento de Peas, Materiais e Equipamentos, que concentra a ateno do
Projetista na soluo e no no desenho ou representao. Nos trabalhos analisados, a
preocupao que os elementos modelados tenham propriedades geomtricas e no
geomtricas, constituindo estas propriedades no seu conjunto uma Base de Dados automtica
de informao inerente ao Projeto que possa ser usada por qualquer interveniente durante o
ciclo de vida do Edifcio/Instalao em qualquer fase desde o Projeto Operao e Manuteno.
Os principais modelos requeridos so os de arquitetura, de estruturas, de hidrulicas
(abastecimento, drenagem, pluviais, rede de incndio), de mecnicas e de eltricas (ver Figuras
1 e 2).
35
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A criao e uso de objetos paramtricos tem sido uma condicionante quase permanente em
todas as modelaes efetuadas. Se j vo existindo algumas bibliotecas a disponibilizar estes
componentes, principalmente quando se trata das principais marcas, muito est ainda por
desenvolver, sendo necessrio programar esses blocos de classes e famlias (ver Figura 3).
Igualmente muito recorrente, encontra-se a solicitao de modelos que sejam desenvolvidos a
partir do levantamento do existente, seja a partir de peas desenhadas, seja a partir de
levantamentos topogrficos ou por aquisio de nuvens de pontos. Nestes modelos de registo,
admite-se normalmente um nvel de informao menor, correspondente ao desconhecimento
das caractersticas dos materiais e processos construtivos usados inicialmente.
36
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste processo de simulao, um dos usos mais importantes e mais requeridos a extrao de
peas desenhadas diretamente do modelo. A necessidade de criar peas desenhadas com uma
linguagem visual percetvel e compatvel com a normalizao das empresas, obriga a um
esforo de configurao e ajuste nos diversos softwares e plataformas, que no dever ser
negligenciado.
O conceito BIM comea, realmente, a fazer sentido quando se inclui a componente colaborativa
entre os diversos intervenientes, logo entre os diversos modelos, acarretando uma cuidada
coordenao dos mesmos.
Esta coordenao tem diferentes nveis e graus de interveno, no entanto, em casos mais
avanados, comea logo por uma gesto de informao. O domnio dos dados, com a
organizao da criao, anlise e controlo de documentos, essencial para que a estrutura de
informao seja gervel.
Em todos os casos analisados, sempre que existe mais que um modelo, a deteo de conflitos
e verificao de incompatibilidades foi um uso requerido (ver Figuras 5 e 6). Aparentemente
sendo algo simples, a sua aplicao prtica, dados os milhares de conflitos que por vezes
existem, bem como a necessidade de encontrar solues concretas para cada um desses
problemas, faz desta uma atividade de elevado grau de especializao e exigindo experincia.
37
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 5: Modelo BIM das especialidades MEP. Figura 6: Anlise de Conflitos entre
especialidade com recurso a Software.
Outro aspeto muito comum em quase todos os casos analisados, em que a coordenao se torna
mais eficaz, passa pela adoo de um ambiente comum colaborativo. A possibilidade de usar
plataformas de partilha de ficheiros na cloud ou servidores locais em tempo real torna possvel
que durante a modelao, todas as especialidades estejam visveis, detetando antecipadamente
os possveis problemas de organizao, espao ou conflitos.
4. Implementao e Formao
38
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Uma das principais mais valias que a BIMMS tem proporcionado aos seus parceiros, tem sido
um apoio tcnico in situ, seja numa obra ou num gabinete. Desde logo na preparao da obra
e verificao/adaptao do projeto s condicionantes prprias da empreitada, mtodos de
trabalho e planeamento. Durante este o modelo BIM serve de base de trabalho para a
Construo permitindo a extrao de Peas Desenhadas, elementos que tero de ser pr-
fabricados, assim como preparao de cofragens e simulao da construo (ver Figuras 7 e 8).
Todos os intervenientes trabalham sobre a mesma referncia permitindo a facilidade no
entendimento da soluo preconizada e possveis alternativas. A Construo Virtual potencia
novos processos de trabalho como por exemplo a preparao dos trabalhos em visualizaes
3D, a validao dos autos de medio pelo modelo ou mesmo as reunies de trabalho/obra em
que o Modelo visualizado evitando assim deslocaes e movimentos de pessoas ao local. A
georreferenciao de todos os elementos permite uma monitorizao constante do processo de
construo podendo ser usadas ferramentas de laser scanning para o acompanhamento da fase
de construo ou mesmo validao da construo a nvel geomtrico.
Os pedidos de esclarecimento apoiados nos modelos e plataformas BIM, so um dos usos mais
requeridos quando a BIMMS presta apoio tcnico in situ. A facilidade com que estas dvidas
so complementadas com ilustraes extradas do modelo, vem trazer uma nova abordagem ao
modo como as fiscalizaes estavam habituadas a dar resposta a essas solicitaes por parte
dos construtores.
39
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A gesto da obra, implica uma grande conivncia com o BIM Manager, com vista a poder
efetivamente controlar quer os tempos quer os custos inerentes mesma.
40
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 10: Modelo BIM das Estruturas de um Figura 11: Modelo BIM - Auto Estrada.
tabuleiro de uma Ponte.
O modelo BIM 4D pode ser tambm usado para planear efetivamente as fases de construo,
controlar os trabalhos executados diariamente monitorizando-os relativamente ao planeamento
inicial, assim como gerir os espaos ocupados, caminhos de acesso e apoiando tambm
implementao de planos de monitorizao e preveno de segurana e ambiente em obra. O
usos de ferramentas de Gesto e Planeamento apoiadas em modelos BIM est a tonar-se um
procedimento essencial nas empresas de Construo pois o seu uso potencia uma diminuio
41
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
de risco na empreitada assim como de uma forma fcil permite criar cenrios de simulao do
Planeamento da Construo.
A anlise do Custo (BIM 5D) ou controlo oramental pode ser usada desde a fase inicial at
concluso da empreitada, servido como elemento de gesto apoiada em quantidades retiradas
diretamente do modelo. Associando custos ao planeamento consegue-se sem grande dificuldade
retirar os cronogramas financeiros, grficos de cash-flow, autos de medio e outros, elementos
esses fundamentais para qualquer empresa de Construo.
Dos diversos tipos de formaes que a BIMMS tem sido solicitada a coordenar, a formao
genrica para quadros-topo de alinhamento e envolvimento na causa BIM, surge como a
inicial e normalmente condicionante de todo o seguimento. Seguem-se formaes e sesses
gerais e departamentais de alinhamento de organizao em BIM. Muitas vezes so requeridas
sesses tcnicas de aquisio de competncias em softwares e ferramentas BIM bsicas e
avanadas. As formaes prticas de verificao so normalmente in situ e servem de controlo
e acompanhamento dos processes BIM. A BIMMS, face da sua experincia, tem sido tambm
convidada a apresentar casos em cursos para organizaes profissionais, e escolas do ensino
superior.
5. Inovao
Por ltimo, mas com forte repercusso na sua sustentabilidade, surge a inovao, em que
qualquer consultor deve investir fortemente. Da passagem do seu conhecimento aos seus
parceiros, dever resultar o reconhecimento por parte destes de um constante processo de
inovao e valorizao do conhecimento dos seus especialistas. A BIMMS no s possui
quadros especializados nas diversas reas da indstria da Arquitetura, Indstria, Construo e
Operao (AECO) como tambm na rea da informtica e programao. Com grande
experincia no apoio ao Projeto, Construo e j muito desenvolvimento na rea de Operao
e Manuteno e com o sempre presente objetivo da inovao a empresa tem apostado em reas
especificas de desenvolvimento inovador, como a realidade aumentada a programao de Plug-
ins para Softwares existentes de reas especficas que colmatam as necessidades dos
utilizadores, apoio a teses de mestrado e doutoramento assim como a participao em formaes
BIM a nvel Nacional e Internacional e tambm com a participao em grupos de trabalho
nacionais e europeus de normalizao BIM.
A aposta na inovao representa uma forte parcela dos custos operacionais da empresa
traduzindo-se isso em confiana uma vais valia nos servios oferecidos que so diferenciadores
relativamente oferta normal de mercado.
42
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
6. Concluses
Da apresentao deste quadro de usos e aplicaes prticas em que a BIMMS tem participado,
percebe-se o seu carter holstico e integrador. A individualizao tem sido preterida ao
coletivo, e os clientes tendem a alterar os usos e a amplitude dos requisitos, de trabalho para
trabalho.
O BIM global. O conceito e a sua aplicao esto distribudos, o que permite a uma consultora
deslocalizada em relao aos habituais centros de deciso, tambm competir e integrar esses
modos novos de realizar projeto, porventura at com maior eficincia.
A carncia pelo conhecimento prtico desta metodologia, com vista sua aplicao
profissional, leva os Arquitetos e Engenheiros a procurarem ofertas formativas e educacionais,
quer nas instituies acadmicas, nos organismos profissionais, nas empresas especializadas e
mesmo junto das software houses.
Referncias
[1] Eastman, C., et al., BIM Handbook, in A Guide to Building Information Modeling for
Owners, Managers, Designers, Engineers, and Contractors 2011.
[2] Beauregard, M., S. Alsafouri, and S.K. Ayer, Development of a peer review-based
activity to improve students BIM process mapping understanding. 2016: Orlando.
[3] Azhar, S., M. Khalfan, and T. Maqsood, Building information modeling (BIM): now and
beyond. Australasian Journal of Construction Economics and Building 2012.
[4] Cao, D., et al., Identifying and contextualising the motivations for BIM implementation
in construction projects: An empirical study in China 2016.
[5] Chen Ke, et al., Bridging BIM and building: From a literature review to an integrated
conceptual framework. Int. J. Proj. Manag., 2015.
[6] Quigley, D.E., Achieving Spatial Coordination Through BIM. 2013, MCAA, NECA,
and SMACNA.
[7] Neil, J., How has Building Information Modelling changed the MEP Coordination
process? . 2014: University of Salford, Manchester.
[8] Lino , J.C., M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, in Encontro Nacional BETO ESTRUTURAL - BE2012 FEUP. 2012.
43
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
44
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Os programas comerciais associados tecnologia BIM (Building Information Modeling),
apesar da sua constante atualizao, so por vezes rivalizados por outro tipo de solues
informticas tecnologicamente menos evoludas e com mais anos de mercado. O know-how e
o processo de familiarizao com o software BIM, o custo da atualizao do equipamento das
empresas e da formao ao nvel do pessoal so dos principais obstculos no percurso pela
implementao desta tecnologia. O desenvolvimento de novos processos de interao entre
Realidade Virtual (RV) e software BIM poder desempenhar um papel relevante na relao
entre mquina e utilizador.
Foi desenvolvida uma soluo original que permite uma troca de dados bidirecional entre o
software de modelao e a interface virtual. A soluo explorada recorreu a equipamento de
RV como o Oculus Rift DK2 (Development Kit 2) e o sensor de deteo de comandos gestuais
Leap Motion.
1. Introduo
45
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
As solues BIM requerem maior detalhe e quantidade de informao pelo que, necessitam de
maior dispndio de tempo para o desenvolvimento das vrias fases do projeto. Neste ponto as
solues como o CAD podem ser preferveis para utilizadores que ainda no fizeram a transio
para o BIM, sendo que, muitas das vezes implicam menor detalhe ou mais tempo gasto na
realizao de tarefas que, de outra forma, seriam automticas no caso de um modelo BIM. [1]
Neste trabalho prope-se a avaliao do uso da realidade virtual (RV) como complemento
interao com software comercial BIM. Deste modo, ser avaliada a sua viabilidade em
operaes como visualizao, edio de modelos 3D, diminuio do tempo de familiarizao
do utilizador com a mecnica do trabalho, o potencial do seu uso como ferramenta facilitadora
do dilogo entre os diferentes intervenientes num projeto, entre outros.
O desenvolvimento de uma interface capaz de mobilizar sinergias entre BIM e RV pretende dar
resposta aos seguintes desafios:
Falta de experincia e incentivo por parte do pessoal ativo nas empresas relativamente
transio para a implementao da metodologia BIM e sua operabilidade;
Diminuio do tempo de adaptao e familiarizao com uma nova ferramenta
informtica;
Acessibilidade da tecnologia a novos pblicos, desde utilizadores de nvel profissional
com vasta experincia em modelao, a estudantes, docentes, utilizadores de um BIM
mais terico, a trabalhadores da indstria da construo sem qualquer contato anterior
com este tipo de tecnologia, etc.;
Alternativa s restries associadas visualizao limitada pelo confinamento de ecrs
2D;
Explorar novos mtodos de trabalho entre mquina e o utilizador.
46
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
equipamentos atuais suficiente para afirmar que a RV se poderia aplicar a todo o tipo de
objetivos. Quer isto dizer que a RV no se encontra prescrita para determinado uso numa nica
rea do conhecimento. De modo evidente, a razoabilidade dessa mesma aplicao ter que ser
sempre avaliada. No entanto, recai sobre a imaginao o potencial que a RV poder exercer
sobre novas metodologias e renovao de processos de trabalho.
Exemplos com alguma complexidade visual e apresentao contida numa s imagem so raros
e difceis de concretizar. Na generalidade dos casos so precisos conjuntos de plantas, cortes e
pormenores construtivos para possibilitar a plena compreenso de alguns elementos
construtivos. Uma visualizao mais interativa e representativa dos elementos, da sua
configurao no real, poder auxiliar o processo de compreenso da escala e caractersticas dos
mesmos.
47
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O modelo virtual poder ser til no s em lies presenciais, mas tambm para aprendizagem
distncia. Deste modo, a RV proporciona novas alternativas para um ensino tcnico, de uma
forma impraticvel recorrendo a metodologias tradicionais [4].
A introduo de RV nas instituies de ensino possibilita aos estudantes considerar este tipo de
tecnologia na sua vida profissional.
No desenvolvimento da interface foi utilizado o motor de jogo Unity (verso 5.3.4f1). Este
motor de jogo surge como intermedirio para que os modelos BIM, importados para este em
formato prprio, possam ser manuseados em ambiente virtual.
Dada a forma expedita com que o Unity interage com equipamentos de RV possvel, atravs
de pequenos passos, conectar o modo de visualizao da cena a um HMD.
Para alm do HMD Oculus Rift DK2 foi ainda utilizado um sensor de leitura de movimentos
gestuais. O Leap Motion deteta os movimentos das mos do utilizador atravs de duas cmaras
e trs LEDs de infravermelhos at uma distncia de 80 cm, afastamento limitado pela
propagao da luz LED no espao. O aparelho recebe a informao captada pelos sensores
sendo esta enviada via USB para o Leap Motion tracking software.
48
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para alcanar uma interao distinta daquela que tradicionalmente feita atravs de um
computador, a relao obtida entre estas duas peas de hardware, Oculus Rift e Leap Motion,
foi testada e consecutivamente sujeita a ajustes. O objetivo seria criar, ou reutilizar comandos
para que, de forma natural, permitissem manusear a geometria de objetos de um projeto.
Como representado na Figura 1, basta ao utilizador erguer as mos at que estas estejam no seu
campo de viso para que possam surgir no cenrio virtual e interagir com o projeto a decorrer.
A interao poder ser feita adicionalmente recorrendo a um joystick, nomeadamente para
operaes de movimento do observador e rotao, cpia e translao de objetos.
49
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
objetos criados no ambiente virtual foi necessrio desenvolver um expediente para garantir a
sua correta identificao no software de modelao. Assim, ao reproduzir o comando cpia no
ambiente virtual, um objeto com ID original igual a [4000] registado como [-4000] no ficheiro
de texto. De imediato o Revit ir criar uma cpia deste objeto, sendo reconhecido (plugin) que
o ID [-4000] ser interpretado pelo Revit como um novo ID de valor igual a [-1]. Desta forma,
o resultado visvel no Revit uma cpia de um objeto j existente cujo ID corresponde a [-1].
Foi programado um contador para que caso se fizesse uma nova cpia, o ID da mesma seria [-
2] e assim sucessivamente de forma cumulativa por cada nova cpia de um objeto j existente.
Recorreu-se ainda funo Idling da API do Revit que permite que o cdigo do plugin seja
executado praticamente de forma contnua, desde que nenhum outro comando do Revit esteja
a ser invocado [5]. Desta forma, caso sejam escritas novas linhas no ficheiro de texto, ou seja,
operaes de cpia, translao ou rotao no Unity, ir ocorrer uma resposta no Revit. Da
perspetiva do utilizador o projeto ser atualizado, comunicando entre os dois programas, Unity
e Revit, de um modo prximo a uma comunicao em tempo real, embora ambos processem
modelos separados.
5. Caso de estudo
5.1 Descrio
Com o objetivo de obter uma resposta do utilizador final realizou-se uma prova de conceito
transposta no formato de caso de estudo. Assim, e embora se reconhea que a dimenso da
amostra no permita obter resultados estatisticamente significativos para a populao alvo,
depreenderam-se cuidadosamente algumas concluses acerca da recetividade dos inquiridos
face interao proporcionada pelos comandos desenvolvidos.
A importao do modelo integral seria incompatvel com o intuito deste estudo pelo que, a cada
participante no caso de estudo apresentou-se um modelo BIM do edifcio O, cafetaria da FEUP
(Faculdade de Engenharia da Universidade do Porto). Por forma a realar a componente
sequencial do teste o modelo encontrou-se dividido em dois espaos (Figura 2). Nestes
decorreram os testes para avaliao do grau de interao/adequabilidade dos comandos
programados.
O modelo foi importado para o motor de jogo Unity a partir do Autodesk Revit 2016, via FBX.
A fase prtica do teste inicia-se na zona 1 (Figura 2, esquerda) cuja inteno consiste na
familiarizao do utilizador com o ambiente em RV. Nesta zona decorram testes em dois
momentos. Primeiramente o domnio de dois comandos bsicos de interao: comando de
movimento e comando de seleo, ambos com auxlio do joystick. O domnio do movimento
pela cena e a capacidade de selecionar individualmente um objeto, representam duas funes
fundamentais para a primeira experincia com a interface. O comando de movimento ativado
atravs do deslocamento do boto analgico esquerdo (Figura 3). O utilizador movimenta-se
pelo cenrio mudando de direo mediante a orientao da cabea. O comando de seleo
ativado ao premir o boto A, e desativado caso o boto B seja pressionado (Figura 3). Um objeto
50
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
ao ser selecionado no ambiente virtual ter a sua cor original modificada para amarelo
(decretada por cdigo RGB) auxiliando o utilizador na identificao.
Num segundo momento decorreu o teste dos comandos de translao, rotao e cpia dos perfis
H indicados na Figura 2 esquerda. A translao destes objetos pode ser executada por dois
processos. O primeiro consiste em selecionar um objeto e atravs do boto analgico esquerdo
(Figura 3) arrast-lo at posio desejada. Como alternativa possvel selecionar um objeto
pretendido e executar um pinch. O Leap Motion, caso se coloque uma das mos em frente do
sensor, unindo o polegar ao indicador, deteta a execuo do comando gestual pinch. De seguida,
basta mobilizar a mo numa direo e o objeto selecionado acompanhar o movimento de
translao.
O comando de rotao, semelhante ao de movimento, poder ser ativado por dois meios. Ambos
requerem que um objeto seja selecionado atravs do boto do joystick que executa o comando
de seleo. Aps a escolha do objeto a manusear, o utilizador poder optar por uma das teclas
destinadas ao comando de rotao atravs do joystick (Figura 3) gerando uma rotao do objeto
selecionado segundo o seu prprio eixo vertical.
Um segundo processo para ativar o comando de rotao executado atravs do sensor Leap
Motion. Estabelecendo gestualmente dois pinchs, o Unity deteta o ponto mdio entre a posio
das duas mos. Em rigor, esta posio calculada como o ponto mdio entre a unio de um
polegar com um indicador de uma mo (pinch da mo esquerda, por exemplo) e o seu
correspondente na mo direita (pinch detetado com a mo direita). O objeto selecionado ir
rodar, para esquerda ou direita, atendendo ao deslocamento de uma mo em relao outra.
Para copiar um elemento previamente selecionado, ser necessrio recorrer ao comando cpia.
Esta funcionalidade permite que o utilizador crie um nmero ilimitado de cpias de um objeto.
O comando ativado atravs do boto X do joystick, ou seja, um objeto selecionado e poder
produzir-se uma cpia do mesmo pressionando o boto X.
A zona 2 (Figura 2 direita) foi concebida tendo como finalidade um teste integral da interface
e das suas funcionalidades. O utilizador tendo sua disposio todos os comandos programados
teria que executar cada um dos tpicos indicados:
1. Criar uma cpia do lavatrio existente;
51
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Alterar a posio da cpia, colocando-a sobre uma nova parede, para alm da que
suporta o lavatrio original.
Rotao de Rotao de um
um objeto objeto selecionado
selecionado no sentido horrio.
no sentido
anti-horrio.
Desativa o
comando de
seleo de um
objeto.
Ativa o comando
de seleo de um
Ativa o comando Ativa o comando
objeto.
de movimento. de cpia.
Figura 3: Comandos associados a cada boto do joystick. [6]
No trabalho desenvolvido optou-se por explorar o software Revit 2016 da Autodesk. Representa
um dos programas BIM mais utilizados a nvel mundial e disponibiliza uma licena de estudante
gratuita. O Revit tambm a ferramenta BIM mais utilizada para a produo de desenhos
segundo o National BIM Report de 2016 no setor da construo do Reino Unido, seguindo o
ArchiCAD e o Vectorworks [7].
52
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Como nota final, pode salientar-se o fato de a grande maioria das classificaes se ter feito
atravs das opes Requer pouco treino e Natural, no necessita de treino. A globalidade
dos comandos do caso de estudo foi classificada com 126 (60%) de um total de 210 votos (30
participantes, 7 comandos), com a classificao mxima dos 4 graus da escala (Figura 6).
53
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
30
28
26
24
22
20
Nmero de respostas
18
16
14
12
10
8
6
4
2
0
Movimento Seleo Rotao Rotao Criao de Translao Translao
(joystick) (joystick) (joystick) (Leap cpia (joystick) (Leap
Motion) (joystick) Motion)
Pouco intuitivo Requer muito pouco treino Natural, no necessita de treino
140
126
120
Nmero de respostas
100
77
80
60
40
20
7
0
0
Nada intuitivo Pouco intuitivo Requer muito Natural, no
pouco treino necessita de treino
54
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
6. Concluso
Atravs do recurso a hardware de realidade virtual (Oculus Rift e sensor Leap Motion) foi
possvel observar que utilizadores de diferentes ramos do conhecimento e de diferentes idades
conseguiram operar com software BIM sem conscincia de que o estavam a realizar. Dado as
alteraes no modelo em Unity reproduzirem-se automaticamente no projeto em Revit,
possvel sem conhecimento prvio de trabalho com esta ferramenta BIM, executar
modificaes simples em projetos. A interface no detm o rigor geomtrico da ferramenta
Autodesk Revit, nem faria sentido dentro dos objetivos do presente trabalho. O rigor do projeto
conferido atravs de software dedicado como o Revit, ArchiCAD, AECOsim, Vectorworks,
entre outros. Um dos principais objetivos alcanados passou pela evidncia de uma modificao
no projeto exercida atravs de RV e visualizada paralelamente num programa BIM.
Importa referir que durante o caso de estudo apresentado detetou-se entre os 30 participantes
um caso de nusea e enjoo provocado pelo chamado motion sickness. Pausas regulares, a
habituao tecnologia e a qualidade do computador onde a interface de RV est a ser utilizada
exercem influncia sobre esta reao.
Referncias
[1] Ireland, B. "Growing Pains Despite an increase in the softwares adoption, the electrical
industry is still experiencing barriers with BIM". EC&M Electrical Construction &
Maintenance. http://www.ecmweb.com/design/growing-pains. (Maro 2016).
[2] Clemente, J., Cachadinha N., "Building Information Modeling como ferramenta de
visualizao de realidade aumentada em obras de reabilitao Um Caso de Estudo"
(2012), Congresso Construo 2012, 4 Congresso Nacional, Coimbra 2012.
[3] Hampton, V., Rubenstone, J., Sawyer, T. "How Video Games Became Design and
Construction Tools A new generation is hacking into its childhood toysand driving
better project decisions". ENR Engineering News-Record
http://www.enr.com/articles/38932-how-video-games-became-design-and-
construction-tools. (Maro 2016).
[4] Sampaio, Alcnia Z., Ferreira, Miguel M., Rosrio, Daniel P., Martins, Octvio P, "3D
and VR models in Civil Engineering education: Construction, rehabilitation and
maintenance", Automation in Construction, vol. 19, pp. 819 - 828, Novembro 2010. doi.:
10.1016/j.autcon.2010.05.006.
[5] Tammik, J. "Idling Event". The Building Coder Blogging about the Revit API.
http://thebuildingcoder.typepad.com/blog/2010/04/idling-event.html. (Junho 2016).
[6] http://ecx.images-amazon.com/images/I/91RsGVBf1IL._SL1500_.jpg (Junho 2016).
[7] National BIM Library. " The National BIM Report is the most comprehensive analysis
of the state of BIM within the UK construction sector", National BIM Report 2016.
https://www.thenbs.com/knowledge/national-bim-report-2016. (Junho 2016).
55
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
56
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Pedro Serra (1), Carlos Canelhas (1), Antnio Raposo (1), Jos Cidades (1)
Resumo
O grupo COBA, pelos vrios campos de atividade e o elevado nmero de valncias que agrega,
apresenta um interesse particular relativamente s metodologias BIM, sobretudo no que respeita
gesto centralizada da informao do projeto. O presente artigo pretende apresentar os
trabalhos prticos de implementao BIM desenvolvidos at ao momento.
Inicialmente foi recolhida e analisada informao sobre BIM, de forma a identificar as mais-
valias desta metodologia, definindo-se de seguida um conjunto de objetivos a alcanar atravs
de uma estratgia de implementao gradual na empresa.
No primeiro projeto piloto foi desenvolvido o modelo estrutural de uma ETA, o que permitiu
formar uma equipa na utilizao do software e estabelecer processos de extrao da informao
do modelo. De seguida foram desenvolvidas a arquitetura e as estruturas de um edifcio, tendo
sido criados vrios objetos paramtricos e explorada a interoperabilidade entre os formatos
DGN e DWG. No ltimo projeto piloto foi modelada uma central hidroeltrica, recorrendo a
modeladores em localizao remota, na qual foram includas especialidades adicionais. Este
projeto serviu para aproximar os projetistas do modelo BIM, o qual foi j utilizado na
visualizao e no apoio tomada de deciso.
1. Introduo
57
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
rea em que o Reino Unido se encontra claramente destacado, com um roadmap BIM imposto
pelo governo e com um plano de longo prazo que impe a utilizao BIM na indstria da
construo. convico da COBA que, em breve, esta imposio legal ir ser alargada a outros
pases e que as exigncias dos donos de obra iro evoluir no sentido de aumentar o rigor nos
processos de partilha de informao digital e de gesto do ciclo de vida dos empreendimentos.
Foi esta espectativa que levou introduo do conceito BIM na COBA, tendo sido identificada
a necessidade de criar conhecimentos sobre o tema que contribussem para incrementar a
competitividade da empresa.
Apesar dos fatores identificados, necessrio ter em conta que, nos mercados onde a empresa
atua, o BIM no se apresenta como uma necessidade imediata. No entanto, o contacto com a
tecnologia BIM permitiu reconhecer algumas vantagens que esta metodologia pode trazer,
nomeadamente: o aumento do nvel de conformidade entre documentos que tm como origem
o modelo BIM, a deteo de problemas e incompatibilidades mais cedo durante o projeto, a
coordenao entre especialidades atravs do modelo 3D e a comunicao com o cliente.
2. Implementao
58
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Identificados os usos a dar ao modelo foi realizada uma anlise aos recursos humanos
disponveis e verificou-se existir um conjunto de colaboradores com alguns conhecimentos de
modelao 3D em Microstation e com capacidade para, de forma autnoma, desenvolverem
modelos BIM na plataforma escolhida o AECOsim Building Designer. Estes recursos estavam
afetos na sua maioria ao Ncleo de Recursos Naturais da empresa, departamento com uma das
componentes de produo mais importantes da COBA. Procurou-se ento criar as condies
para o desenvolvimento mais ou menos autnomo de modelos BIM por parte da equipa, numa
abordagem de experimentao com apoio de recursos on-line e guias de modelao da Bentley.
Esperava-se com esta abordagem reduzir os custos de implementao atravs de um
investimento reduzido na formao, mas garantindo uma transio gradual e orgnica, em
primeiro lugar dentro do prprio ncleo, e mais tarde transversal a toda a empresa.
Com base nesta estratgia deu-se incio ao desenvolvimento de um conjunto de projetos piloto,
mais representativos do trabalho realizado habitualmente pela empresa.
3. Projetos Piloto
Devido elevada componente de trabalho autnomo a que a estratgia idealizada obriga, estes
projetos iniciais serviram sobretudo para desenvolver os conhecimentos sobre os programas
utilizados, e compreender exatamente o alcance dos objetivos definidos para a implementao
BIM na empresa.
59
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
60
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esperava-se nesta etapa melhorar os processos de trabalho explorados no projeto anterior e criar
uma base de trabalho alargada para a especialidade de arquitetura. Durante este projeto a equipa
adquiriu os conhecimentos necessrios para a criao de objetos paramtricos nativos do
AECOsim recorrendo ao Parametric Cell Studio, o que representou um avano importante para
a criao e manuteno de uma biblioteca paramtrica prpria.
Este projeto serviu ainda para estabelecer um processo de trabalho para a obteno de imagens
renderizadas (Figuras 5 e 6). Tal como ficou estabelecido para os desenhos tcnicos, procurou-
se encontrar uma soluo que minimizasse qualquer quebra de produtividade relativamente aos
mecanismos j implementados na empresa. Por este motivo foram testadas as opes de
exportao do modelo BIM para DWG, para posterior importao em 3dStudio Max. Apesar
de mais uma vez esta soluo quebrar a interatividade entre os modelos, ela permite aumentar
o grau de detalhe dos objetos para o nvel necessrio renderizao (mas irrelevante para a
produo de desenhos e extrao de quantidades) sem sobrecarregar o modelo BIM.
61
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Modelo
BIM
Modelo
Render
Figura 5 Em cima: modelo BIM original do edifcio em DGN. Em baixo: modelo para
renderizao em DWG.
Figura 6: Esquema simplificada do fluxo de informao nos usos a dar ao modelo BIM [2].
O projeto piloto seguinte permitiu aumentar as rotinas de trabalho 3D, melhorar os processos e
aproximar o modelo das equipas de projeto. Iniciaram-se ento os trabalhos de modelao da
Central Hidroeltrica apresentada na Figura 7.
62
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este trabalho foi substancialmente diferente dos restantes, uma vez que o modelo foi realizado
em 3D por vrios modeladores, um dos quais localizado externamente COBA. Os modelos
BIM foram criados em paralelo, utilizados para coordenao entre especialidades (Figura 8) e
como veculo de comunicao entre modeladores internos e externos.
Esta necessidade de partilha de informao colocou uma srie de novos desafios. A necessidade
de transmitir alteraes em diferentes modelos, e o facto de no existir uma regra clara sobre o
processo e os momentos de partilha de informao, provocaram problemas na interpretao dos
modelos por parte de cada um dos envolvidos. Surgiu assim a necessidade de definir um
documento orientador dos processos e regras na partilha de informao digital um Project
BIM Execution Plan (BEP).
63
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os projetos apresentados permitiram criar uma base de trabalho slida (biblioteca paramtrica
e conhecimentos de modelao) para os prximos desenvolvimentos, onde se espera aplicar as
vrias ferramentas utilizadas em projetos reais.
4. Desenvolvimentos futuros
importante referir uma vez mais que o trabalho apresentado foi desenvolvido com uma
componente autnoma que no pode ser ignorada, o que limitou a possibilidade de quantificar
os reais ganhos em termos de produtividade na utilizao de metodologias de trabalho BIM.
Mesmo sem uma quantificao exata, ficou j claro que a utilizao de ferramentas BIM
representa enormes ganhos nos tempos de produo, nomeadamente nas alteraes necessrias
numa fase de projeto base. Estes ganhos so obtidos nas fases de produo de desenhos e de
quantificao de trabalhos. Esta situao ser seguramente apurada quando forem definidos os
objetivos para os projetos a desenvolver de seguida. A estratgia de implementao BIM na
empresa tem alis de ser constantemente revista, em conformidade com as dificuldades e as
oportunidades que vo sendo identificados em cada projeto.
Para alm da necessidade de definir o BEP, importante extender o processo BIM ao projeto,
e aumentar a capacidade de modelao na empresa. Foi ento elaborado um plano de formao,
que se divide em trs mdulos distintos: produo, projeto e manuteno da biblioteca BIM.
(Figura 9).
64
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para alm da reviso dos objetivos definidos inicialmente, os projetos desenvolvidos revelaram
um conjunto de oportunidades de melhoria nos processos de trabalho internos, que merecem
ser exploradas. Todos os processos expostos esto sujeitos a serem revistos, melhorados ou at
descartados na eventualidade de se encontrarem alternativas mais produtivas ou que permitam
enfrentar novos desafios sem comprometer a integridade dos resultados j estabelecidos.
Das vrias etapas documentadas relativamente extrao de informao dos modelos (Figura
10), ser interessante eliminar por completo a necessidade de exportar os desenhos para
Autocad. Utilizando o modelo BIM como origem da informao 2D, a criao e manuteno
de um desenho base parece desnecessria, sendo possvel fazer a transio diretamente dos
cortes dinmicos para os layouts, sempre em ambiente AECOsim. Este processo resulta num
menor nmero de ficheiros a gerir, permite manter a interatividade total entre modelos e layouts,
e possibilita a utilizao da meta-informao existente no modelo para anotao dos desenhos
(pelo menos de forma mais eficaz). Esta alterao permite ainda utilizar processos de gesto de
documentao com recurso s ferramentas existentes no software.
Figura 10: Esquema simplificada do fluxo de informao nos usos a dar ao modelo BIM [3].
Sendo o BIM uma metodologia de trabalho que tem por base a partilha de informao digital
iremos continuar a desenvolver o BEP, pondo em prtica algumas das regras que foram
identificadas como fundamentais no ltimo projeto piloto. Esta etapa pode at ser estendida a
outros programas como o Revit, utilizando o IFC ou o i-model como formatos de transferncia
65
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com uma base de trabalho slida para as estruturas e a arquitetura, necessrio desenvolver os
objetos e as tcnicas de modelao para os equipamentos mecnicos, hidrulicos e eltricos.
Este trabalho j foi iniciado, estando a ser abordadas as questes do nvel de detalhe geomtrico
dos elementos e a sua incluso nos processos apresentados. Contribui tambm para este desafio
as definies criadas no plano de formao.
Cada especialidade tem as suas especificidades no que diz respeito modelao paramtrica.
A modelao de estradas, acessos e topografia, exige ferramentas de modelao especficas,
encontradas em softwares como o InRoads ou o Civil 3D, programas que j so utilizados na
empresa. Ser importante incorporar estes programas nos fluxos de informao alcanados.
Com a incluso de mais especialidades nos vrios modelos e com o aumento da complexidade
dos projetos, ser importante utilizar, de maneira formal, as ferramentas de Clash-Detection, e
encontrar rotinas e metodologias de trabalho que facilitem a coordenao do projeto.
necessrio aproximar as equipas de projeto do modelo BIM, usando-o como ferramenta, tanto
para coordenar as vrias especialidades, como para projetar. Para o efeito necessrio
identificar uma ferramenta que d acesso informao digital (o AECOsim, um i-model
acessvel atravs do Microstation ou do Navigator, ou pdfs 3D). ainda necessrio munir os
projetistas das ferramentas para realizarem parte do seu trabalho em BIM, atravs da aplicao
do plano de formao e da modelao de nveis de detalhe baixos, utilizando objetos
paramtricos mais evoludos construdos, por exemplo, com o Generative Components (Figura
11).
66
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
que permitem avanar na produo de modelos BIM. No entanto, esta apenas uma das
vantagens da utilizao deste tipo de tecnologias, sendo necessrio evoluir a aplicao do BIM
ao projeto. necessrio aproximar as equipas de trabalho ao modelo para coordenao, utilizar
a modelao como ferramenta para projetar, e construir um processo de gesto da informao
de uma forma mais eficaz.
Referncias
67
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
68
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O Departamento Tcnico da CASAIS deu incio ao processo de implementao da metodologia
BIM de modo a capacitar os seus tcnicos com a necessria formao e conhecimentos
especializados permitindo introduzir nos projetos de conceo interna a abordagem de acordo
com o conceito BIM. Em conjunto com a bimTEC, empresa consultora especialista na
integrao de metodologias e processos BIM, foi desenvolvido um plano de ao para
introduo da nova metodologia de trabalho, contemplando uma estratgia faseada, com
objetivos definidos para curto, mdio e longo prazo.
Os principais objetivos da primeira fase da implementao BIM foram criar o ncleo CASAIS
BIM, desenvolver e integrar "workflows", e desenvolver e potenciar os servios BIM no mbito
dos trabalhos do Grupo CASAIS. O objetivo final a atingir o incremento do ROI e
concomitantemente providenciar um melhor servio aos clientes, interna e externamente, de
modo a exceder as suas expectativas.
69
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
2.1 Introduo
Qualquer alterao de metodologias, em especial numa indstria como da Arquitetura,
Engenharia e Construo (AEC), caracterizada pela rigidez dos seus processos, em
concomitncia com a elevada maturidade da CASAIS (cerca de 6 dcadas de atividade),
implicam mudanas profundas, resultando em processos delicados.
70
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
71
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Analise SWOT
Como forma prtica de sistematizar as diversas perspetivas e variveis foi realizada uma anlise
SWOT (Figura 1) enquanto metodologia apropriada na cenarizao para apoio deciso.
4. Implementao
72
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Projeto-piloto
5.1 Introduo
A CASAIS Gibraltar, motivada pelo impulso anglo-saxnico atualmente presente na adoo e
obrigatoriedade de projetar de acordo com metodologia BIM [3], apadrinhou enquanto
patrocinador a iniciativa de implementao. A escolha do projeto-piloto recaiu pelo edifcio
West One cuja conceo construo foi totalmente desenvolvida pelos tcnicos da CASAIS
e que o Dep. Tcnico coordenou. um edifcio de 12 andares destinado a habitao com os
dois pisos iniciais aptos para comrcio e a presena de uma penthouse no ltimo piso.
73
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
74
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
uma inspeo visual da geometria e da informao associados aos elementos. Testar a utilizao
das funcionalidades descritas anteriormente eram aspetos valorizadores do projeto-piloto, numa
tica de antecipar o tipo de utilizao que se pretende dar aos modelos a curto prazo.
Os resultados do projeto-piloto foram particularmente encorajadores para as Estruturas,
especialidade cujo modelo foi criado mais rapidamente, inclusivamente, com uma demora
inferior ao esperado. A falta dos objetos especficos para o modelo de instalaes foi um fator
condicionante, no entanto, foi possvel desenvolver o modelo recorrendo a objetos semelhantes
da biblioteca do software. A abordagem ao desenvolvimento do modelo de arquitetura foi
ambiciosa, tendo-se optado pela modelao a um nvel de detalhe elevado, o que por sua vez
tambm resultou no aumento do tempo necessrio para concluir o modelo.
6. Projetos Adicionais
Figura 6: Exemplo de modelos adicionais. Da esquerda para a direita, Ocean Spa Plaza,
Consulado de Angola, Edifcio Estrela 24.
7. Concluso
75
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
76
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O Departamento de Estudos e Projetos da CENOR deu incio implementao da metodologia
BIM nos seus processos de trabalho, tendo como principais objetivos, por um lado, integrar
novos processos que permitam aumentar o nvel de automao e sistematizao, e por outro,
dar resposta a solicitaes especficas do mercado nacional e internacional. Para tal, foi
desenvolvido em conjunto com a bimTEC, empresa consultora especialista na integrao de
metodologias e processos BIM, um plano de ao para introduo da nova metodologia de
trabalho de forma faseada, definindo objetivos a curto, mdio e longo prazo.
O presente artigo descreve com algum detalhe o processo de implementao BIM na CENOR,
dando especial nfase evoluo processual observada nos projetos BIM, entretanto
desenvolvidos na CENOR, salientando-se os principais resultados operacionais alcanados,
dificuldades e benefcios encontrados, assim como a aferio e anlise dos indicadores chave
de desempenho estabelecidos para este processo.
1. Introduo
77
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a metodologia BIM nos seus processos de trabalho, fruto no s das solicitaes de clientes
como do prprio reconhecimento do potencial da metodologia nos processos internos.
O processo de implementao BIM no obedece a uma frmula rigorosa e inflexvel, no
entanto, existem aspetos que podem ser generalizados. Simplificadamente, um processo de
implementao exige, no mnimo, a criao de uma equipa e a disponibilizao de uma
infraestrutura que lhe permita desenvolver projetos BIM de forma expedita e consistente [4]. A
nfase na equipa decisiva na medida em que ser a equipa a pr em prtica a metodologia
BIM. Por outro lado, e assumindo que a primeira equipa BIM se resume a um pequeno ncleo,
ser esta a responsvel por suportar a disseminao da metodologia BIM dentro da empresa em
fases futuras.
A transio de uma abordagem CAD para uma abordagem BIM implica alteraes estruturantes
da forma de trabalhar, pelo que sero sempre esperados desafios em qualquer processo de
implementao BIM [5].
No sentido de acompanhar uma tendncia cada vez mais presente e de dar resposta a
solicitaes concretas como o caso da ETAR, foi contratado um colaborador com vrios anos
78
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com o desenvolvimento do primeiro projeto BIM, ficou claro que uma implementao
estruturada e transversal a vrios departamentos da CENOR s seria possvel mediante um
esforo organizativo alicerado num conhecimento profundo da metodologia BIM. Para tal
seria necessrio mobilizar colaboradores cuja dispensa dos projetos aos quais se encontravam
alocados no era possvel. Assim, a CENOR decidiu recorrer a uma empresa consultora
especializada para desenvolver e pr em prtica uma estratgia de implementao da
metodologia BIM. A bimTEC foi a empresa escolhida para o efeito.
bimTEC
Plano
Entrevistas Define requisitos para desenvolver Formao Suporte
Estratgico
Administrao
Administrao Entregue a Diretores de Equipa BIM Equipa BIM
Servio
Mdulo 1 Projeto 1
Perfil da Objetivos da
empresa implementao
Mdulo 2 Projeto 2
Recursos Planeamento das
informticos atividades Mdulo n Projeto n
Organizao Armazm de
Objetivos e Processos do bimSPOT contedos
expectativas colaborativos
Perfil do
Plano de formao Estrutura da
colaborador
equipa BIM
Organizao da
Equipa Tcnica equipa BIM
Plano de
Recursos
investimento
informticos
Nvel de
Define
Maturidade BIM
Legenda
CENOR Atividades Tpicos Documentos Desenvolvimento
79
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A discusso do relatrio estratgico foi uma das etapas mais importantes do incio da
implementao na medida em que foi quando o plano de ao foi formalizado com base na
calendarizao das atividades e nos recursos disponveis. Alguns aspetos como a constituio
da equipa BIM ou os objetivos traados para a implementao foram ligeiramente alterados em
virtude dos recursos mobilizveis internamente. Manter os nveis de produo num patamar
aceitvel um dos principais requisitos da implementao de processos transformativos na
maioria das empresas. A CENOR no foi exceo pelo que, a flexibilizao da estratgia foi
um aspeto essencial na abordagem implementao do BIM.
3.2 Formao
A segunda etapa do processo de implementao passa pela formao dos membros da equipa
BIM.
A formao foi desenvolvida de forma modular, por especialidade e por nvel de complexidade.
As primeiras aes de formao tiveram como objetivo o desenvolvimento de competncias
bsicas de modelao em colaboradores sem contacto prvio com aplicaes BIM. A
consolidao das competncias foi concretizada, numa primeira fase, com o desenvolvimento
do projeto-piloto e, posteriormente, com uma segunda vaga de aes de formao focadas em
cada uma das especialidades de projeto existentes na CENOR, incluindo ainda formao de
carcter geral, focada na definio de processos e de metodologias aplicveis ao
desenvolvimento de projeto BIM.
3.3 Projeto-piloto
A escolha do projeto-piloto recaiu sobre o projeto de uma estao de metro. A generalidade das
aplicaes de modelao BIM encontra-se otimizada para a modelao de edifcios regulares e
no de edifcios de infraestruturas enterradas como uma estao de metro, pelo que uma
estrutura mais regular no implicaria desafios da mesma ordem. A opo por um projeto desta
80
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
81
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Uma das mais importantes ferramentas da infraestrutura a plataforma para consulta e partilha
de conhecimento que agrega os vrios documentos e workflows que compem a metodologia
BIM, tendo uma plataforma tipo Wiki sido escolhida para o efeito.
4. Anlise de resultados
4.2 Desafios
Apesar de expectveis, os desafios sentidos ao longo do processo de implementao e em
particular do desenvolvimento do projeto-piloto acabaram por se revelar incontornveis, sendo
os seguintes os mais relevantes:
Conciliar a formao (participao nas aes de formao e no desenvolvimento do
projeto-piloto) com a necessidade de dar resposta aos projetos em curso; a produo no
pode ser completamente interrompida, o que obriga a um compromisso entre as duas
atividades;
82
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4.3 Ps projeto-piloto
Imediatamente aps o desenvolvimento do projeto-piloto a CENOR deu incio a dois outros
projetos BIM, designadamente: o projeto de uma estao elevatria de gua e de uma segunda
estao de metro. Relativamente ao primeiro, o objetivo principal passava pela produo de
desenhos para fabrico apoiados em isometrias com elevado nvel de detalhe (geomtrico e
informativo). Neste projeto foi possvel integrar duas vertentes menos exploradas no projeto-
piloto, nomeadamente, a componente do desenvolvimento de modelos de redes (MEP) e a
componente de trabalho em simultneo no mesmo modelo (Worksharing). O projeto da
segunda estao permitiu a aplicao dos princpios do projeto-piloto, mas de forma mais linear
e consistente, bem como o desenvolvimento de novas metodologias e workflows.
Aps a implementao, foi possvel constatar, a nvel de recursos dedicados ao BIM, uma
consolidao da equipa BIM e um fluxo constante de novos projetos BIM. O nvel de
complexidade e de pormenorizao dos projetos tem tambm vindo a aumentar como
consequncia da maior destreza adquirida por parte dos modeladores e da diminuio de receios
sobre a metodologia BIM, em virtude das provas dadas.
Alm dos workflows bsicos formalizados, existem j novos processos avanados de trabalho
em desenvolvimento pela equipa BIM, pelo que a estrutura atual j permite a formalizao e
integrao de novos workflows avanados.
83
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5.2 Formao
Abordar a formao de forma intensiva e contnua tem a vantagem de permitir expor as equipas
a uma gama alargada de funcionalidades e tcnicas de modelao desde o incio do processo de
aprendizagem, o que tende a estimular o interesse e o entusiasmo pelos novos mtodos de
trabalho, no entanto, a consolidao dos princpios bsicos muito importante para garantir
destreza na utilizao das funcionalidades mais avanadas das ferramentas; este tipo de
conhecimento habitualmente obtido por via da utilizao repetida, isto , com a experincia e
utilizao diria. Por norma, o fator decisivo para intercalar ou no os mdulos de formao
reside na articulao com o restante calendrio de atividades relacionadas com a implementao
e com a produo.
5.3 Projeto-piloto
O grande objetivo do projeto-piloto passa pela aquisio de competncias de modelao,
especialmente em equipas cujos colaboradores se encontrem a dar os primeiros passos na
modelao BIM. Dominar a capacidade de modelar significa ganhar um nvel de destreza e
autonomia que permita abordar qualquer tipo de projeto. S com as competncias de modelao
consolidadas se poder passar para a aplicao de workflows mais avanados.
84
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
cada vez mais complexos. Os workflows que surgem no mbito de determinado projeto devem
sempre ser formalizados de modo a poderem ser reutilizados ou evoludos em projetos futuros.
6. Concluses
Referncias
85
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
86
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Ana Silva (1), Daniela Silva (1), Flvio Silva (1), Rui Dias (1)
Resumo
A NOZ um estdio de arquitetura sediado em Lisboa desenvolvendo projetos para Portugal e
Reino Unido.
Para a conferncia PT BIM, a NOZ prope-se a partilhar a sua experincia, utilizando como
exemplo o desenvolvimento dos projetos Dylon Site Redevelopment, para 250 apartamentos,
em Londres, e a obra de reconverso do The Courtyard Theatre, em Stratford-upon-Avon.
Ambos os projetos foram inteiramente desenvolvidos em ambiente BIM, desde a sua fase inicial
com a elaborao de diversos estudos de massas e reas at fase final de execuo e
construo, sempre tirando partido dos diversos recursos que as ferramentas proporcionam no
desenvolvimento do processo criativo, nomeadamente ao nvel de 'scheduling', 'design options',
faseamento, 'report', 'clash detection' e visualizao.
87
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
"Deus quer, O Homem sonha, a Obra nasce." Em Mensagem Mar Portugus de Fernando
Pessoa.
Durante este tempo, a forma de produo de projeto foi tambm sofrendo alteraes, fruto da
evoluo tecnolgica e da introduo dos computadores, com enormes ganhos de
produtividade.
2.1 Modelling
A introduo do computador, e no caso o desenho assistido por computador (CAD), no se
traduziu numa efetiva mudana de paradigma. O desenhador deixou de desenhar num estirador,
passando a desenhar num monitor. Evidentemente que os ganhos de produtividade foram
vrios, abrindo-se novas oportunidades, criando-se e explorando novas ferramentas. Tornou-se
banal ilustrar um edifcio por meio de representaes tridimensionais, e efeitos foto-realistas.
No obstante, e apesar da evoluo, o paradigma manteve-se, e a sua origem continua a ser
traada ao estirador. Uma linha mantm-se uma linha. Mesmo tratando-se de uma representao
tridimensional, mesmo sendo possvel a parametrizao das linhas e das superfcies geradas
pelo conjunto de linhas, a informao contida num determinado desenho ou modelo baseia-se
ainda na linha.
O conceito BIM altera este paradigma de uma forma que a introduo do CAD no permitia.
Deixmos de tratar de representaes geomtricas, e passmos a lidar com bases de dados. Uma
linha no mais apenas uma linha. um objeto especfico, com caractersticas fsicas precisas.
Uma linha, passa a ser, por exemplo, uma parede, com uma determinada espessura, altura,
material, cor. E porque uma 'linha' agora um objeto que reside num espao e tem uma relao
tridimensional, e no apenas bidimensional, a ao base de projeto consiste na modelao.
88
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Habilidade que aprendemos com o CAD, e que ser provavelmente uma das ltimas evolues
desse paradigma.
Num ambiente BIM, um desenho, apenas uma das formas de inquirir a base de dados em que
o projeto agora se transforma.
Figura 1: Fases de modelao de uma pea de mobilirio para PUMP FITNESS SPIRIT.
NOZ Arquitetura.
89
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
90
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.2 Information
No entanto, e porque se trata de uma base de dados, relativamente aberta, com uma capacidade
de compilao e agregao de informao virtualmente infinita, uma linha, alm de ter um
registo tridimensional, pode agregar ainda mais informao. A linha anteriormente traada num
estirador, e mais tarde traada num ecr, tem agora determinadas caractersticas espaciais e
tambm, caractersticas fsicas. Se for uma parede, uma linha ser composta por vrias
camadas, com indicao de materiais com caractersticas fsicas especficas como de resistncia
trmica, transparncia, refletncia, acstica, entre outros. Similarmente, a informao contida
em determinada linha, ser distinta se for um cabo de telecomunicaes ou uma conduta de
ventilao, ou seja, as linhas traadas no ecr podem agora corresponder de forma muito
especfica e completa a elementos e componentes de construo que existem na realidade, que
esto modelados espacialmente, e contextualizados num determinado espao ou modelo. Se um
objeto est modelado e informado que s pode ser colocado numa parede, apenas ser
permitida a sua colocao numa parede, ficando na dependncia desta. Se a parede mover, o
objeto mover com a parede. Se porventura a parede desaparecer, o objeto tambm desaparece.
O nvel de antecipao e capacidade de coordenao e eliminao de erro de manuseamento de
um projeto aumentou significativamente. A consequncia que alguns erros de manuseamento
tm a possibilidade de propagao catastrfica num modelo se no estiverem devidamente
implementados mecanismos de controlo.
91
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Porque se trata de uma base de dados, possvel complementar e adicionar aos elementos do
modelo informaes como custo, funo, acabamento, designao, entre outros, enriquecendo
o modelo de uma forma que permite um cruzamento de dados cada vez mais completo e
complexo.
Por outros lado, a colocao num espao tridimensional gera uma relao espacial entre estes,
permitindo a extrao de um conjunto de informaes adicionais. Extrair quantidades, reas,
filtrando por funo, cor, ocupao ou qualquer outro parmetro que tenha sido introduzido no
modelo, estabelecendo relaes e rcios, por exemplo, a relao de reas teis por reas brutas,
a relao entre ocupantes e nmero de lugares de estacionamento necessrios, o pr-
dimensionamento de percursos de fuga baseado em nveis de ocupao, etc., passam a ser
ferramentas importantes de deciso e comunicao do projeto com as vrias partes interessadas,
em particular com os clientes.
A inquirio do modelo a base de dados - permite agora a extrao de informao cada vez
mais completa e complexa, muito para alm da extrao de desenhos necessrios sua
construo.
As figuras 6 e 7 mostram um corte de fachada com indicao dos vrios elementos constituintes
de uma parede ou de uma laje. A legendagem do desenho obtida automaticamente com a
introduo prvia da informao no modelo. Desta forma garante-se um elevado nvel de
consistncia entre as vrias peas do projeto.
92
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
contribuindo para que os objetivos iniciais so cumpridos com menores margens de tolerncia
e consequentemente com menores custos.
Figura 9: Extrato da figura 8, referente aos requisitos para o dimensionamento da rea para
armazenamento de lixo. Zig-Zag House em Londres. Ian Ritchie Architects Ltd.
Ian Ritchie Architects Ltd.
Figura 10: Mapa Unidades tipo, com tabela de reas interiores brutas, ocupao e desvio ao
padro de reas mnimas estipuladas no London Housing Design Guide. Zig-Zag House em
Londres. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.
93
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 11: Extrato da figura 10 referente tabela de reas interiores brutas, ocupao e desvio
ao padro de reas mnimas estipuladas no London Housing Design Guide. Zig-Zag House
em Londres. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.
2.3 Building
Uma maior densidade de modelao, e a introduo de cada vez maiores quantidades de
informao, permitem a inquirio sobre muitos aspetos do edifcio, e sobre aspetos muito
especficos. A integrao de modelos de diferentes especialidades permite uma coordenao
cada vez mais fina, minimizando riscos e erros.
As figuras 12 e 13 mostram modelos de trabalho do teatro The Other Place, com definio das
vrias camadas constituintes dos diferentes elementos construtivos e integrao dos modelos
de estruturas e instalaes mecnicas. A execuo integrada dos modelos de arquitetura e
especialidades permite, com os procedimentos de controlo adequados, prever possveis
situaes de conflito, com uma margem de erro reduzida. A execuo do modelo de servios
sobre o modelo de arquitetura, com informao de funo e ocupao dos diversos
compartimentos, ou a existncia de equipamentos especiais, como portas assistidas (figura 14),
permite informar, no modelo, as premissas e requisitos base para o desenvolvimento dos
projetos de especialidades.
94
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 12: Visualizao seccionada do teatro The Other Place, com integrao do modelo de
estruturas. Em Stratford-upon-Avon, Reino Unido. Ian Ritchie Architects Ltd. Ian Ritchie
Architects Ltd.
Figura 14: Extrato do mapa de portas do teatro The Other Place, em Stratford-upon-Avon,
Reino Unido. Ian Ritchie Architects Ltd. Ian Ritchie Architects Ltd.
95
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 15: Foto do auditrio do teatro The Other Place, em Stratford-upon-Avon, Reino
Unido. Ian Ritchie Architects Ltd. Rui Dias.
A existncia do modelo como o reflexo de uma base de dados, que agora o nosso projeto de
edifcio, abre a possibilidade de cruzamento ou exportao para outras bases de dados,
especficas gesto de instalaes na sua vertente tcnica e econmica.
Aps a concluso, a existncia de um 'modelo final' as built por analogia s telas finais,
permitir navegar num determinado espao construdo, sobrepondo sobre este todos os servios
e infraestruturas que se encontram ocultos, facilitando a despistagem de incidentes e o
planeamento de alteraes.
96
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esta uma realidade que comea a dar os primeiros passos, de que se prev um enorme
crescimento. O prprio acrnimo tender a evoluir de BIM, para BIMM. Building Information
Modelling and Management.
Referncias
97
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
98
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O presente artigo aborda um caso de estudo de uma obra ferroviria existente. A obra em causa
uma passagem superior de pees. Elementos de diferentes especialidades foram modelados
no Revit para posteriormente se proceder anlise da sua implementao.
Foi modelada parte da obra, aps o que se procedeu a uma anlise comparativa entre os
elementos de projeto, no ProNIC e no Revit para averiguar a qualidade dos objetos nativos do
Revit. Foi feita uma anlise ao nvel do detalhe grfico entre elementos desenhados do projeto
e do modelo, e uma anlise ao nvel da informao de cada famlia de objetos abordada.
Concluiu-se que apesar dos softwares como o Revit apresentarem vantagens imediatas s
empresas que os adotem, tambm apresentam desvantagens. Ao nvel grfico verificou-se que
h de facto vantagens imediatas quando comparado com softwares CAD. Ao nvel da
informao, no entanto, ainda h um longo caminho a percorrer visto que ser necessrio que a
quase totalidade das empresas envolvidas na indstria da construo tomem parte no processo.
O grande obstculo prende-se com a falta de objetos para utilizar em modelos. Verificou-se
ainda que economicamente invivel em muitos dos casos s empresas criarem os seus prprios
objetos.
1. Introduo
Um dos grandes desafios da indstria da construo nos dias de hoje procurar novos mtodos
e formas de dar resposta ineficincia que est muitas vezes, e de um modo negativo, associada
construo civil. Felizmente, o desenvolvimento e progresso tecnolgico acompanham e
influenciam o mundo empresarial diretamente. O BIM, e todas as teorias associadas, aparece na
vanguarda tecnolgica atual e promete revolucionar todo o mercado da construo. De acordo
com a NBS (National Building Specification UK), BIM um acrnimo para Building
99
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Information Modelling em que so descritos os meios atravs dos quais todas as entidades
conseguem compreender um edifcio atravs do uso de um modelo digital [1]. Apesar de j ser
utilizado em alguns pases, sendo que noutros j mesmo obrigatrio o seu uso [2], ainda
existem muitos problemas por resolver. Os desafios da indstria ao nvel do BIM passam no
s pela sua implementao, mas tambm por problemas que transcendem o uso de softwares
[3].
100
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Partindo desta realidade, foi selecionada uma passagem superior de pees j existente num troo
ferrovirio em funcionamento em Portugal como objeto de estudo. A obra em causa denomina-
se: PSP ao KM 6+600 guas Santas / Palmilheira, e tal como o nome indica, trata-se de uma
passagem no apeadeiro de guas Santas / Palmilheira pertencente linha ferroviria do Minho.
O motivo para esta escolha deve-se ao facto de estas passagens se tratarem de objetos de
moderada complexidade e de se tratarem de construes que vo ser executadas dezenas de
vezes no mbito do plano estratgico nacional. Alm disso, estas construes fogem norma
daquilo que podem ser consideradas construes correntes (estruturas porticadas de beto
armado), visto tratarem-se de estruturas metlicas. Estes fatores foram decisivos para dar
resposta aos objetivos propostos; Figura 1.
Dos dois principais objetivos propostos o primeiro consiste em tentar compreender em que
pontos que os softwares de modelao por objetos (mais precisamente o Revit) so
superiores a softwares CAD na realizao das mesmas tarefas. Espera-se que atravs da
modelao parcial da infraestrutura em Revit, se consiga comprovar as vantagens entre os
dois tipos de software. O segundo objetivo o de tentar compreender se as famlias de objetos
nativas do Revit esto aptas para dar resposta s especificaes tcnicas exigidas pelo Protocolo
para a Normalizao da Tcnica na Construo (ProNIC). Este protocolo uma iniciativa do
Estado Portugus aprovado em dezembro de 2005, no mbito do Programa Operacional
Sociedade do Conhecimento (POSC) que permite a criao de documentao tcnica
normalizada, nomeadamente mapas de quantidades e trabalhos [5]. Atravs de uma anlise
101
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Metodologia
Foi modelada e analisada parte desta estrutura com dois objetivos em mente. O primeiro era
compreender se havia de facto vantagens em usar softwares de modelao por objetos que
seguem a metodologia BIM, nomeadamente o Revit. A existncia, ou no, destas vantagens
passou por analisar e comparar o projeto original ao projeto em Revit. Posteriormente
verificou-se se estas metodologias foram mais eficientes do que as prticas atuais.
O segundo grande objetivo era o de analisar o nvel de informao dos objetos no Revit e
compar-los com o mapa de quantidades e trabalhos do projeto original. Ainda dentro deste
objetivo, pretendeu-se fazer outra comparao entre os elementos descritos anteriormente e um
mapa de quantidades e trabalhos normalizado realizado em ProNIC. Atravs destes passos,
compreendeu-se at que ponto a informao presente em softwares de modelao por objetos
correspondem s exigncias nacionais feitas para descrever elementos em obra.
102
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
nomeadamente em softwares de modelao grfica por objetos como o caso do Revit, que
se evitaro erros de projeto comuns.
103
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Anlise e discusso
Atravs do uso do Revit e da explorao do ProNIC foi possvel dar uma resposta bastante
concreta aos dois objetivos inicialmente propostos.
104
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
incompatibilidades entre cada um destes elementos. Esta concluso assenta essencialmente nos
objetos da estrutura metlica, visto que estes representam o grosso da infraestrutura.
Exemplifica-se na figura 4 a modelao da caixa de elevadores em Revit existente na
passagem superior de pees. Com as famlias de objetos nativas do Revit de estruturas
metlicas foi possvel criar um modelo 3D com a preciso necessria para execuo em obra.
Como se pode verificar, possvel criar virtualmente qualquer tipo de corte e alado
representativo, permitindo assim uma poupana considervel de tempo como foi anteriormente
descrito.
105
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Ao comparar a informao que consta na figura 5 com a figura 6 conclui-se que apesar de
alguns dos parmetros essenciais estarem presentes na luminria do Revit, como o caso da
voltagem ou do tipo de materiais presentes, outros como os graus de proteo e tipos de classe
106
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
no se encontram presentes. Esta comparao, ainda que genrica, mostra que de acordo com
as especificaes tcnicas em Portugal, h ainda algum dfice no grau de informao de
famlias de objetos nativas de softwares como o Revit. Isto pode criar dificuldades iniciais a
gabinetes de projeto que adotem metodologias BIM, pois sero forados a criar os seus prprios
objetos.
107
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Concluso
Deste modo importante compreender at que ponto possvel criar uma biblioteca limitada
de objetos em softwares como o Revit. O objetivo, neste caso, entender se possvel
parametrizar esses objetos de acordo com o ProNIC, garantindo assim a existncia de uma
biblioteca pronta a utilizar de modo a criar uma normalizao idntica j existente noutros
pases que utilizam o Omniclass e o Uniclass. No menos importante compreender de que
modo que todas estas questes se podem enquadrar no COBie, assim como fazer uma anlise
aos IFC e questo imperativa da interoperabilidade.
Referncias
108
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Na elaborao de um modelo BIM de arquitetura, um dos seus principais fundamentos a
criao e gesto de informao. Neste sentido, o trabalho apresentado tem por base a
necessidade de extrair a informao de um modelo BIM, de acordo com as exigncias legais
para o licenciamento de um projeto de arquitetura, consistindo no preenchimento automatizado
do quadro sinptico.
No enquadramento descrito, apresenta-se um fluxo de trabalho entre Revit - Dynamo - Excel.
Este assenta sobre regras taxonmicas definidas previamente, de modo a facilitar a
interoperabilidade entre plataformas, que podero estar descritas em sede de protocolo BIM.
Deste modo, utiliza-se o Dynamo que, enquanto ferramenta de programao visual, permite a
recolha de dados criados no Revit, transpondo-os para Excel onde so calculados, compilados
e tornados acessveis a todos os intervenientes, sem necessidade de recorrer ao modelo nativo.
Porm, uma vez que parte dessa informao gerada em Revit de forma isolada, a restante no
Excel calculada, havendo a necessidade de devolver essa informao ao Revit, mais uma vez
recorrendo ao Dynamo.
Desta forma, cria-se um fluxo de trabalho automtico, explcito e baseado num modelo BIM,
mitigando riscos no que se refere qualidade da informao e acelerando todo o processo.
1. Introduo
109
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
quadro sinptico numa folha de clculo em Excel, a partir de um modelo BIM elaborado em
Revit. A escolha do Revit, recaiu no s pela experincia do autor com esta plataforma de
modelao, mas sobretudo pela grande adeso nos ltimos anos por parte de tcnicos no
contexto portugus, no que escolha de plataformas de modelao paramtrica diz respeito,
alargando o nmero de possveis interessados neste trabalho. J a escolha da plataforma Excel,
incide essencialmente pela sua utilizao generalizada no contexto digital atual. Para
automatizao do processo, utilizou-se a plataforma de programao visual Dynamo para trocas
de informao entre o Revit e o Excel. A utilizao do Dynamo neste fluxo, surge como veculo
de troca de dados entre plataformas de forma automatizada, instantnea, simples e direta. Neste
contexto, uma vez que o Revit produz apenas informao isolada e h necessidade de efetuar
clculos utilizando a informao recolhida, optou-se por efetu-los atravs de rotinas
elaboradas em Dynamo bem como entre clulas de uma folha de clculo em Excel.
No que respeita a trabalhos j realizados que tentem resolver situaes similares ao trabalho
apresentado, da pesquisa prvia efetuada para elaborao do mesmo, no foi encontrado algo
que se assemelhe. Trabalhos desenvolvidos at ento, que compreendam a utilizao de
programao visual, centram-se essencialmente no seu potencial enquanto software [7]. Por
outro lado, exemplos prticos, ainda que muito focado na modelao de estruturas complexas,
encontram-se acessveis apenas em fruns online ou stios da internet da especialidade, tais
como, por exemplo, em www.dynamobim.org ou em http://.au.autodesk.com.
A recolha da informao foi efetuada com recurso a trs plataformas digitais, sendo elas:
Autodesk Revit 2017: para criao do modelo BIM de arquitetura;
Microsoft Office Excel 2016: para armazenamento e clculo de dados;
Dynamo 0.9.2: para clculo de dados e trocas de informao entre Revit e Excel.
110
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
De forma a entender que objetos foram necessrios criar no Revit, elaborou-se uma tabela que
os relaciona com os dados necessrios ao quadro sinptico - Tabela 2.
111
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Cada objeto gerado de forma diferente, pelo que necessrio ter em conta as caractersticas
de cada um, nomeadamente a sua categoria bem como os seus parmetros associados, que
armazenam a informao pretendida para cada dado.
O objeto Property Line, definido por um polgono fechado. A informao quanto sua rea,
relativa ao dado D01, armazenada no seu parmetro "area".
Os objetos Area, so tambm definidos por um polgono fechado. Para fornecer a informao
relativa aos dados D02, D04, D05, D06, D07 e D14, cada objeto designado pelo nome do
dado a gerar, de modo a se poder calcular o resultado da soma das reas dos objetos com
nomenclatura igual.
Os objetos Room, so delimitados por objetos com caractersticas de definio de reas (e.g.:
paredes, lajes de piso, tetos falsos, etc.). Para clculo dos dados D08 (rea til) e D09 (rea
habitvel), houve a necessidade de criar dois parmetros do tipo booleano (Yes/No) especfico
para a categoria Rooms, com o nome "rea habitvel" e "rea til", visto que o Revit no os
possui por defeito. Desta maneira, adiciona-se essa informao a cada espao, i.e., a cada objeto
Room. Uma vez que a rea correspondente a cada objeto armazenada no seu parmetro de
tipo "area", os parmetros rea til e rea habitvel funcionam como filtro para o clculo
total das respetivas reas.
No sentido do acima descrito, aps modelao integral do modelo de arquitetura, foram criados
todos os elementos necessrios correta leitura da informao no modelo. Foi criado o objeto
Property Line no modelo BIM de Revit, a fim de gerar a rea da propriedade (D01) a intervir.
Foram tambm criados todos os objetos Area, correspondentes aos vrios tipos de reas brutas
de construo (D04; D05; D06; D07), bem como as reas de implantao e impermeabilizao
(D02; D14). Os objetos Room foram igualmente criados, correspondendo exclusivamente a
reas interiores do edifcio e com os parmetros "rea til" (D08) e "rea habitvel" (D09)
adicionados sua categoria de objetos.
112
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Foi assim criada uma folha de clculo em formato XLS, especificamente formatada para receber
a informao contida no modelo BIM, conforme apresentado a Figura 1. Alguns dos dados,
aps a sua recolha, foram calculados automaticamente dentro da folha de clculo,
nomeadamente os dados D03, D10, D15, D17, D18 e D19. As suas frmulas, dentro da folha
de clculo, encontram-se descritas na Tabela 3.
No que respeita aos ndices D17, D18 e D19, estes encontram-se em conformidade com as
frmulas descritas no Decreto-Regulamentar 9/2009 [3] e apresentadas de seguida:
D17: IO = 100 (1)
D18: Iimp = 100 (2)
D19: Iu = (3)
113
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.4 Troca automatizada de informao - do Modelo BIM para a Folha de clculo - Dynamo
As trocas de informao entre o modelo BIM e a folha de clculo, foram realizadas por meio
da plataforma de programao visual Dynamo. Para que tal seja possvel, foi necessrio
programar rotinas em Dynamo capazes de recolher no modelo BIM a informao desejada e
transmiti-la folha de clculo em Excel previamente formatada.
A plataforma Dynamo, trata-se de uma aplicao de cdigo aberto que utiliza programao
visual, i.e., pequenas linhas de cdigo de programao condensadas em "caixas" designadas de
"ns", que ligados a outros ns criam uma linha completa de cdigo. A linha de cdigo
completa, guardada num ficheiro externo na extenso DYN e comumente designada de rotina
(ou script em ingls). A grande vantagem na utilizao de programao visual, prende-se com
o facto de no ser necessrio possuir aprofundados conhecimentos de programao para poder
programar (embora seja uma vantagem em rotinas mais complexas). Atravs do Dynamo,
possvel aceder interface de programao do Revit (API - Application Programming
Interface), que de outra forma, na sua estrutura base, no seria possvel.
No trabalho elaborado, foi criado um conjunto de rotinas, que recolhessem toda a informao
existente no modelo de arquitetura elaborado em Revit. Para tal, foi preciso ter em conta a
categoria de cada objeto e respetivo parmetro de onde se pretende extrair informao.
Para a recolha do dado D01 no modelo BIM, foi utilizada a rotina para Dynamo conforme
apresentado na Figura 2. A rotina procura o objeto Property Line no modelo, do qual filtrado
o parmetro com o nome "Area" que contm o valor relativo rea da propriedade.
Figura 2: rotina em Dynamo para extrao da rea de objetos da categoria "Property Lines".
Para recolha dos valores baseados em objetos da categoria "Areas", aos quais correspondem os
dados D02, D03, D04, D05, D06, D07 e D14, foi utilizada uma rotina para Dynamo, conforme
apresentado na Figura 3. Utilizou-se um n do pacote de ns "LunchBox" para recolha de
objetos "Area" no modelo BIM em Revit. No n aplicado um filtro na caixa de cdigo (code
block) onde ser colocado o cdigo do dado a obter. A rotina procura todos os elementos com
esse nome e efetua a sua soma, revelando o seu valor total.
114
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 3: rotina em Dynamo para obteno da rea total de objetos da categoria "Areas" com
o mesmo cdigo de dado.
Para clculo da rea til e habitvel do edifcio, correspondentes aos dados D08 e D09, a rotina,
tal como apresentada na Figura 4, procura todos os objetos Room aos quais aplicado um
filtro por parmetro com o nome "rea til" ou "rea Habitvel", de acordo com os nomes
dos parmetros criados anteriormente no modelo em Revit. Isolados os objetos pelo parmetro
com valor YES em Revit (a que corresponde True na rotina em Dynamo), feito o somatrio
das suas reas, obtendo-se o valor total de reas teis ou de reas habitveis.
Figura 4: rotina em Dynamo para clculo de rea teis ou habitveis de objetos "Room".
Outros dados, dos quais no existem objetos no modelo BIM que possuam esses valores, podem
ser obtidos atravs de rotinas em Dynamo, com o intuito de estas calcularem esses valores em
falta. Enquadram-se nesta lgica, o nmero total de pisos acessveis (D11), a altura mxima do
edifcio (D12), a cota de soleira (D13) e a volumetria do edifcio (D16).
Para clculo do dado D11, relativo ao nmero total de pisos, conforme apresentado na Figura
5, solicita-se ao Dynamo que procure todos os nveis existentes no modelo em Revit em que o
parmetro Name contm o texto "Piso". Uma vez que este dado se refere ao nmero de pisos
acessveis, arbitrou-se durante a modelao que somente estes podem conter no seu nome a
palavra Piso, excluindo-se desta lgica nveis relativos a coberturas e outros que no sejam
acessveis. O Dynamo gera de seguida uma lista com todos os pisos que correspondem
procura, qual se solicita que a plataforma faa a contagem dos mesmos.
115
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No que diz respeito altura mxima do edifcio, relativo ao dado D12, a rotina apresentada na
Figura 6, parte de uma lista com todos os nveis existentes no modelo em Revit, de onde se isola
o primeiro e o ltimo nvel. Aps isolados, efetuada a diferena entre os valores armazenados
no parmetro Elevation de cada um deles, obtendo-se o valor correspondente altura do
edifcio.
Para clculo da cota de soleira, referente ao dado D13, conforme apresentado na Figura 7, na
rotina em Dynamo isolado do modelo Revit o objeto da categoria Level com o nome "Piso 0",
arbitrado como o correspondente ao nvel de entrada no edifcio. Deste nvel extrado a sua
cota altimtrica atravs do parmetro Elevation. necessrio que os elementos da categoria
Level se encontrem associados ao zero geodsico do projeto (Survey Point) e no associados ao
ponto base do modelo (Base Point).
Para clculo do volume do edifcio relativo ao dado D16, conforme apresentado na Figura 8,
na rotina efetuado a diviso entre o nmero total de pisos acessveis e a crcea mxima, a fim
de obter o valor mdio entre nveis acessveis, que ser multiplicado pela rea total de
construo, dando um valor aproximado da volumetria total do edifcio.
116
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 9: Parte da rotina em Dynamo que transportar os valores dos dados recolhidos no
modelo em Revit para a folha de clculo em Excel.
Toda as rotinas apresentadas para recolha dos dados necessrios a partir do modelo BIM em
Revit, foram criadas num nico ficheiro em formato DYN, pelo que com uma s ordem, toda a
tabela em Excel foi preenchida automaticamente. Estas seguem ainda uma lgica que foi ao
encontro das necessidades do trabalho apresentado, sendo que podero ser desenvolvidas outras
rotinas para obter a mesma informao.
3.5 Troca automatizada de informao - da Folha de clculo para o Modelo BIM - Dynamo
No que diz respeito informao contida na folha de Excel, parte dela foi gerada atravs do
clculo entre clulas. Como tal, essa informao no consta no modelo BIM. Assim, sendo que
toda a informao, relativa ao quadro sinptico, dever constar numa das peas desenhadas do
projeto de arquitetura, automatizou-se a transposio de toda a informao presente na folha de
clculo em Excel para o Modelo em Revit, com recurso a uma rotina em Dynamo, de modo a
preservar a integridade da informao j gerada. Essa informao transposta enquanto
parmetro da categoria Project Information. Uma vez no ser possvel no Revit criar uma tabela
com informao relativa a esta categoria, optou-se por utilizar uma famlia da categoria
117
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
TitleBlock, onde constam todos os parmetros adicionados famlia e ao projeto como Shared
Parameters, relativos a cada dado gerado e que sero preenchidos automaticamente aps
corrida a rotina. O Dynamo encarrega-se de recolher a informao existente em cada clula da
folha de clculo e pass-la aos parmetros associados, tal como apresentado na Figura 10.
Figura 10: Rotina em Dynamo para transposio de uma clula em Excel para Revit.
O fluxo foi concludo neste ponto, encontrando-se a tabela em Excel preenchida, bem como o
modelo BIM com toda a informao gerada.
4. Concluso
Todo o trabalho desenvolvido, poder ser aplicado em qualquer projeto de arquitetura seja qual
for a sua escala ou tipologia, para fins de licenciamento junto de cmaras municipais. A
metodologia por trs do mesmo, poder ser adaptada a outros contextos inerentes prtica da
arquitetura ou de outras disciplinas que necessitem de uma anlise e avaliao de condies
espaciais de um edifcio.
118
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
119
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
120
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
As malhas estruturais de madeira so um tipo especial de estruturas que estabelecem um novo
marco para a construo leve. Partindo de uma estrutura simples e ligeira, possvel criar uma
grande variedade de formas e geometrias garantindo assim uma enorme liberdade arquitetnica.
Contudo, tendo em conta a variedade de formas e a complexidade que estas podem apresentar,
necessria a criao de modelos atravs dos quais se possam desenvolver tcnicas de form-
finding, de otimizao e de simplificao dos processos de construo.
Neste trabalho ser apresentado um caso de estudo, construdo, com 46m2 (6mx6m), no qual
foram usadas ferramentas digitais para a sua idealizao, softwares de clculos e plug-ins
(Rhinoceros 5, Grasshopper, GeometryGym, Kangaroo Live Physics, Karamba, Autodesk
Robot Structura Analysis) que possibilitaram o processo de form-finding e a interoperabilidade
entre os diferentes softwares. Pretende-se apresentar o processo de desenho, anlise e a
construo da malha, a partir da utilizao destas ferramentas. Por fim, comparam-se os
modelos com as diferentes etapas da construo da malha de madeira.
1. Introduo
O caso de estudo que ser apresentado consiste numa malha estrutural elstica de madeira. Este
sistema estrutural tem por base a deformao de uma grelha de madeira plana a partir da qual
possvel obter formas tridimensionais simples ou mais complexas, garantindo uma excelente
relao geometria-eficincia. Estas malhas so tambm caracterizadas pela rapidez do processo
de construo e a otimizao dos recursos materiais. Com tudo isto, seria de esperar que as
malhas elsticas de madeira fossem mais comuns hoje em dia, no entanto, apenas um punhado
de exemplos foram construdos at agora. Por outro lado, a sua liberdade formal, que faz delas
estruturas interessantes para qualquer projetista, um grande desafio j que a definio da sua
121
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para dar resposta a estes desafios so necessrias novas ferramentas, j que os convencionais
processos/mtodos de idealizao no so capazes de o fazer. Para este tipo de soluo
estrutural necessrio recorrer a ferramentas que permitam controlar a modelao
tridimensional paramtrica, e a implementao de metodologias BIM certamente a resposta.
2. As malhas estruturais
Estas malhas estruturais podem ser construdas com diversos tipos de materiais, metal (ao ou
alumnio), madeira, carto ou fibra de vidro, e so diversos os exemplos j construdos que
podemos encontrar, como pode ser visto na Tabela 1 [1].
Tabela 1: Exemplos de malhas estruturais construdas com diversos tipos de material [1].
Exemplo Material Local
Mannheim Multihalle Madeira Mannheim, Alemanha
Japan Pavilion Carto Hannover, Alemanha
British Museum Great Court Ao Londres, Reino Unido
Roof
Experimental pavilion Fibra de vidro Institute Navier, ENPC,
Frana
Pods Sports Complex Madeira Scunthorpe, Reino Unido
A malha depende muito do material que a compe, e a madeira oferece a este tipo de estrutura
inmeras vantagens. Uma das caractersticas das malhas estruturais a sua leveza, que no caso
da madeira, pode ainda ser potenciada, dada a baixa densidade deste material. Por outro lado,
o baixo mdulo de elasticidade da madeira favorece a sua deformao, permitindo a construo
de malhas estruturais elsticas. Este tipo de malhas caracteriza-se principalmente pelo seu
processo construtivo, em que a partir de uma malha montada num plano bidimensional so
aplicadas foras deformando a malha at forma desejada [2]. Apesar de todas as suas
qualidades, somente em 1975 foi concluda, na Alemanha, a primeira malha estrutural de
122
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
madeira [3]. O edifcio denominado de Manheim Multihalle (Figura 1a), e o projeto foi
conduzido pelo arquiteto Frei Otto, vencedor do prmio Pritzker em 2015. J no sculo XXI,
possvel registar o aparecimento de novos exemplos (Figura 1b), sempre projetados caso a caso
devido falta de conhecimento que permitisse criar uma base de informao consolidada no
que diz respeito idealizao e construo destas estruturas.
Figura 1: Mannheim Multihalle (a), Alida Woodome (b) e Ostuni Pergola (c) [4].
3. Modelao
Focando agora no trabalho desenvolvido, e tal como j foi referido, o que se propunha era a
projeo e a construo de uma malha estrutural elstica de madeira, quadrada, de
aproximadamente 9m de lado e com os cantos cortados, como possvel visualizar na
Figura 2a. Aps a construo da malha plana, seria ps-tensionada at obter a geometria final
de cerca de 6m de lado (Figura 2b).
Sendo esta uma malha elstica, o processo de deformao foi a preocupao principal de todo
o processo de construo, e naturalmente, condicionou os processos de conceo e de
modelao. Assim sendo, foi necessrio encontrar um processo que permitisse simular a
transformao da malha no processo construtivo e que apresentasse a sua forma ps-tensionada.
Este processo, denominado form-finding [2], podia ser abordado de diversas formas: com base
123
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
em modelos fsicos (Figura 3a), com base em modelos computacionais (Figura 3b) e
combinaes entre modelos fsicos e computacionais.
Iniciou-se com a definio de uma geometria base (malha plana), qual foram associados
elementos com as propriedades do material a ser utilizado. Em seguida foram impostas as
condies fronteira e definidas as foras de deformao da malha. Foi ento realizada uma
simulao at a malha atingir o equilbrio, obtendo assim a nova geometria (Figura 5). O
processo descrito foi repetido, alterando as foras aplicadas, at se ter atingido a geometria
desejada, com base em requisitos previamente impostos: determinadas dimenses, mxima
encurvadura dos elementos, etc.
124
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 5: Sequncia de obteno da forma; A: Forma plana inicial com representao das
foras de deformao; B: Forma intermdia; C: Forma final [2].
Apesar do modelo obtido apresentar bons resultados, decidiu-se criar um novo modelo
recorrendo a outra ferramenta, com vista a mais tarde comparar os modelos e selecionar o mais
favorvel. Este segundo modelo foi concebido com o Grasshopper mas desta vez
complementado com o plug-in Karamba. Esta ferramenta mostrou-se bastante mais completa
do que o Kangaroo, pois oferecia a possibilidade de analisar a estrutura, obter valores de
reaes, deformaes e outros valores relativos ao comportamento estrutural da malha. Apesar
de tudo isto, o Karamba foi utilizado apenas no processo de obteno da forma, tal como o
Kangaroo. Este mtodo de conceo do modelo apenas apresentou pequenas diferenas
relativamente ao descrito anteriormente. No processo da definio da forma da malha no
Karamba foram aplicados deslocamentos nos apoios da estrutura, enquanto no Kangaroo a
deformao foi imposta atravs de foras aplicadas na malha.
Apesar de tudo, o modelo concebido atravs do Kangaroo apresentou um problema, pois devido
forma como a malha foi criada, os pontos de interseco entre os elementos de madeira no
eram fixos, o que lhes oferecia liberdade total, e tal no correspondia realidade. Para alm de
no ser realista, esta liberdade total permitia ainda que, aps a deformao, os quadrados da
malha variassem de dimenso. Embora na estrutura real isso fosse acontecer, devido liberdade
limitada das ligaes, essa variao nunca ultrapassaria os 25mm (Figura 6), j no modelo
atingiu em certos pontos variaes de 120mm.
No caso do modelo criado atravs do Karamba, foi possvel utilizar uma ferramenta do
Grasshopper denominada Galapagos. O Galapagos um comando que permite a
implementao de um algoritmo evolutivo de uma forma simplificada. Nesta situao o
125
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com esta comparao entre os modelos facilmente se concluiu que o modelo desenvolvido com
o Karamba, que possibilitou a utilizao do Galapagos, era vantajoso relativamente ao
desenvolvido com o Kangaroo, que apresentava o problema das ligaes.
4. Interoperabilidade
Para a anlise estrutural do caso de estudo foi utilizado o software Autodesk Robot Structural
Analysis [9]. Tal como a maioria dos softwares comerciais de clculo estrutural, o Robot
demonstrou limitaes na definio de geometria complexas. Assim sendo, foi necessrio
utilizar um modelo tridimensional concebido noutro programa. Surgiu com isto um tema muito
presente no universo BIM, a interoperabilidade entre softwares. O objetivo foi utilizar o modelo
concebido anteriormente (Rhinoceros 5 + Grasshopper + Karamba) no Robot. Apesar do
Rhinoceros 5 potenciar uma exportao direta para mais de 30 tipos de ficheiros diferentes, o
ficheiro RSA (.rtd) no era uma das opes, com isto, excluindo a exportao direta, foi
necessrio procurar outras alternativas. Uma destas alternativas foi a utilizao de um plug-in
do Grasshopper denominado GeometryGym [10]. Este plug-in mostrou-se bastante completo,
oferecendo diversos comandos utilizveis no Grasshopper que permitiam a aplicao de cargas,
a criao de seces de elementos estruturais, a atribuio de propriedades a estas seces e at
criar malhas de elementos finitos, entre outras funes. Para alm das funes associadas
anlise estrutural, o GeometryGym providenciava tambm outros conjuntos de componentes
dedicados ao Autodesk Revit [11] e aos ficheiros IFC [12]. Apesar de tudo, a utilizao deste
plug-in neste trabalho no apresentou bons resultados, pois para alm da sua complexidade no
processo de exportao, em que existiram algumas dificuldades, o resultado obtido no RSA
nunca foi o desejado, apresentando sempre falta de elementos.
Posto isto partiu-se para uma segunda alternativa, que consistia na exportao do modelo do
Rhinoceros para um ficheiro AutoCAD [13] (.dwg), e consequentemente a importao deste
novo ficheiro para o Robot (Figura 8). Com a exportao para ficheiro AutoCAD (.dwg) todos
os elementos da malha foram transformados em linhas, e aps a importao para o Robot estas
linhas apresentaram-se como barras unidas por ns, s quais foi possvel associar as
propriedades da madeira.
126
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Modelos numricos
Quando importado para o Robot, o modelo simplificado apresentou apenas um layer constitudo
por barras distribudas em 2 direes (perpendiculares) ligadas por ns. No caso do modelo
mais complexo, apareceram os 2 layers representados a diferentes cotas, constitudos por barras
em 2 direes (perpendiculares), tambm estas ligadas por ns, mas nas quais os ns das duas
camadas se interligavam por elementos de barra que representavam os ligadores reais
(parafusos de ao) (Figura 10).
Figura 10: Modelo simplificado com apenas um layer (a) e modelo com dois layers (b).
127
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Observando os dois modelos, apesar das suas diferenas, apresentaram resultados muito
prximos entre si, sendo apenas marcados por duas diferenas: o peso prprio da estrutura,
devido ao acrscimo dos ligadores, e a quantidade de elementos (barras, ns e apoios)
necessrios sua modelao (Tabela 2).
6. Construo
A primeira fase da construo consistiu em montar uma grelha plana, constituda por 2 layers
de elementos de madeira interligados por parafusos de ao, de igual geometria e propriedades
modelada no Grasshopper (Figura 11).
Devido sua leveza (206kg), a malha foi facilmente transportada para a sua localizao final
sem o auxlio de qualquer equipamento mecnico (Figura 12).
128
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 13: Aplicao de cargas com o sistema de cabos e alavancas (a) e aplicao de blocos
de beto como apoios da estrutura (b).
O comportamento da malha durante a sua fase de construo e como produto final foi
extremamente satisfatrio, e tal como a estrutura, foram tambm satisfatrios os modelos
computacionais desenvolvidos (Figura 14). Todas as dimenses da estrutura so idnticas s
dimenses dos modelos digitais, tendo variaes mximas de apenas 100mm na zona central
da malha. O seu comportamento ps construo foi o esperado, deformando-se ligeiramente no
topo devido ao do peso prprio, tal com previsto no modelo numrico.
7. Concluso
129
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No que toca interoperabilidade entre softwares, apesar dos bons resultados, a utilizao do
GeometryGym tende a ser vantajosa relativamente ao mtodo utilizado. O GeometryGym
possui um vasto leque de componentes que podem tornar mais completa a transio de modelos,
no s para o Robot, mas para outros softwares que podero vir a ser teis na concepo de
malhas estruturais de madeira.
Para concluir, a conceo e anlise da malha estrutural foram conseguidas com sucesso, e
atravs delas foi possvel construir a primeira malha estrutural de madeira de que h registo em
Portugal. Este sucesso s se tornou possvel graas utilizao de ferramentas digitais, e
possibilidade de transio de informao entre elas. Neste sentido, a utilizao de metodologias
BIM ser o futuro das malhas estruturais de madeira, com a implementao das ideias de
processo colaborativo atravs de um modelo central.
Referncias
[1] D. Naicu, Geometry and Performance of Timber Gridshells, Tese de Mestrado, The
University of Bath, Bath, Reino Unido, 2012.
[2] D. Naicu, R. Harris, and C. Williams, Timber Gridshells:Design methods and their
application to a temporary pavilion, in World Conference on Timber Engineering
(2014), Quebec City, Canada, 2014.
[3] C. Paoli, Past and Future of Grid Shell Structures, Tese de Mestrado, Massachusetts
Institute of Technology, Massachusetts, EUA, 2007.
[4] Gridshell.it, Gridshell.It, 2016. [Online]. Available: http://www.gridshell.it/.
[5] R. McNeel and Associates, Rhinoceros, 2016. [Online]. Available:
https://www.rhino3d.com/.
[6] S. Davidson, Grasshopper, 2016. [Online]. Available:
http://www.grasshopper3d.com/.
[7] D. Piker, Kangaroo. [Online]. Available: http://kangaroo3d.com/.
[8] D. Silva, B. Jacob, and M. Rodrigues, Implicit and Explicit Implementation of the
Dynamic Relaxation Method for the Definition of Initial Equilibrium Configurations of
Flexible, in 25th International Conference on Offshore Mechanics and Arctic
Engineering, at Hamburg, Germany, 2006.
[9] Autodesk Inc., Autodesk Robot Structural Analysis, 2016. [Online]. Available:
http://www.autodesk.com/products/robot-structural-analysis/overview.
[10] J. Mirtschin, GeometryGym. [Online]. Available:
https://geometrygym.wordpress.com/.
[11] Autodesk Inc., Autodesk Revit, 2016. [Online]. Available:
http://www.autodesk.pt/products/revit-family/overview.
[12] BuildingSMART International Ltd, BuildingSMART IFC, 2016. [Online]. Available:
http://www.buildingsmart-tech.org/.
[13] Autodesk Inc., Autodesk AutoCAD, 2016. [Online]. Available:
http://www.autodesk.com/products/autocad/overview.
130
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Nos ltimos anos tem-se verificado um crescimento de jogos srios e de simulao. Este tipo
de jogos tem como principais objetivos apoiar o treino de pessoas ou equipas, estudar os
comportamentos dos jogadores perante determinadas situaes ou simulao de vrios cenrios
de forma a prever resultados finais de solues adotadas.
Este trabalho resulta de dissertao de mestrado [1] na qual foi explorada a integrao do
conceito BIM e jogos de simulao, no sentido de aproveitar as potencialidades do BIM para a
criao de cenrios de jogos de simulao, e ao mesmo tempo, melhorar a navegao e interao
dos modelos BIM atravs dos motores de jogos. Assim o resultado deste trabalho uma
131
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Em 1970, Clark C. Abt [2] introduz o conceito jogos Srios com uma simples definio que
ainda e utilizada nos dias de hoje e que resume os jogos srios como sendo os jogos cujo
principal objetivo no o entretenimento (em oposio aos tradicionais videojogos). Jogos
srios tem como principal objetivo o treino e formao. No entanto, apesar da diferena do
objetivo fundamental do jogo, os videojogos normalmente contm tambm uma componente
de aprendizagem, pelo menos numa fase inicial do jogo. Assim o jogador executa um
determinado conjunto de aes, as quais devem concluir com sucesso, semelhana do mtodo
de ensino tradicional [3].
132
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O presente artigo estar focado numa proposta de fluxo de trabalho para garantia de adequada
interoperabilidade entre plataformas BIM e motores de jogo, garantindo a possibilidade do uso
de representaes fidedignas dos edifcios no processo de conceo de jogos srios.
A figura 1 ilustra a viso geral da soluo idealizada neste trabalho. Como se pode verificar
existem trs partes fundamentais. Uma parte definida por um conjunto de servios de
armazenamento de dados BIM, Data Providers, e que podero ser utilizados pelos pacotes de
software BIM, BIM Providers e pelos designados Consumers. Os BIM Providers representam
o conjunto de pacotes de software BIM que permitem a manipulao de informao nos objetos,
materiais e modelos dos edifcios. Os Consumers representam o conjunto pacotes de software
que utilizam a informao BIM na sua aplicao, mas que no tem capacidade de manipular
essa informao. Neste conjunto fazem parte pacotes de software como motores de jogo,
simuladores, ou plataformas para simulao social utilizando inteligncia artificial distribuda
a partir de entidades autnomas, conhecidas como agentes, que permitem desenvolver
aplicaes com o objetivo de enriquecer os modelos BIM atravs da sua anlise.
A camada de Cliente caracterizada pelo bloco Consumers. Este bloco representa as aplicaes
clientes que pretendem utilizar os servios disponibilizados pelos servidores.
A camada Servidor, por sua vez apresenta um conjunto de subcamadas mais complexo que
integra o BIM. Nesta camada, o processo de implementao foi dividido em duas fases.
133
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
134
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A informao relativa textura usada num material um exemplo de informao que se perde
quando um modelo exportado para o formato IFC. Um cenrio de jogo onde os objetos
apresentam formas e aparncias prximas da realidade ter um maior impacto na imerso do
jogador, pelo que as informaes relacionadas com a aparncia dos materiais e elementos so
muito importantes para a criao de um cenrio de jogo.
O formato adotado foi o formato proprietrio FBX (.fbx), desenvolvido pela Kaydara e detido
pela Autodesk. O utilizador precisa apenas de exportar o modelo para este formato. Ao exportar
o modelo a partir do Revit, possvel selecionar a opo de exportar o modelo considerando o
nvel de detalhe geomtrico. O modelo pode assim ser importado no motor de jogo com
facilidade e ser adicionado cena de jogo como um objeto de jogo. Por sua vez, o objeto de
jogo contem os vrios elementos do modelo. Cada elemento do modelo contm no seu nome o
nmero de ID usado como referncia na plataforma BIM. Assim a informao geomtrica do
modelo transferida para o motor de jogo recorrendo ao formato FBX e a informao adicional
passada atravs de uma arquitetura cliente-servidor, onde o motor de jogo (cliente) efetua
pedidos ao software BIM (servidor) para recolher a informao pretendida.
Autodesk Revit
A Autodesk disponibiliza uma API (Application Programming Interface) para que os seus
utilizadores possam desenvolver add-ins para implementar e automatizar algumas das suas
rotinas de modelao. Apesar da API suportar a framework .NET 4.5 existem muitas
funcionalidades que no esto exploradas. O uso de tarefas assncronas um desses casos.
A complexidade da estrutura de dados do proprietrio utilizada no Revit revelou ser uma das
maiores dificuldades deste trabalho. A quantidade de entidades e o facto de no haver uma
documentao clara sobre a estrutura e relacionamento dessas entidades, tornou-se num
obstculo difcil de contornar.
Unity 3D
No sentido de ultrapassar estas dificuldades na conexo dos dois sistemas via web-services a
soluo foi implementada de acordo com o protocolo TCP (Transmission Control Protocol).
Assim, esta soluo permite desenvolver aplicaes de servidor e cliente de forma independente
do protocolo de comunicao. Desta forma evita-se a necessidade de alterar os servios j
implementados caso novos protocolos de comunicao sejam implementados.
135
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para alm das dificuldades relacionadas com os materiais j mencionadas, a aplicao dos
materiais no modelo importado apresentou tambm algumas falhas. O modelo pode ser
exportado utilizando o nvel de detalhe grfico dos elementos. Um elemento composto por mais
do que um componente, por exemplo uma porta, ao ser exportado sem ser considerado o seu
nvel de detalhe grfico, transforma as meshs de cada componente numa nica mesh. Desta
forma, quando o elemento importado para o cenrio de jogo ter uma nica mesh. Se o mesmo
elemento for exportado considerando o nvel de detalhe grfico, as meshs de cada elemento
ficam agrupadas no mesmo elemento, mas de forma independente.
Para contornar este problema foi implementado o servio "GetMaterials" para adquirir os
materiais de um dado elemento. Assim o Unity efetua um pedido ao Revit para saber quais so
os materiais aplicados num dado elemento. Posteriormente o Unity cria os materiais no seu
editor de forma a replicar a biblioteca de materiais do Revit no Unity.
Servidor
A primeira etapa do processo de integrao definida pela exportao do modelo do edifcio
para o formato FBX, tendo o cuidado de exportar o modelo com o nvel de detalhe grfico
selecionado. Uma vez exportado o modelo necessrio iniciar o servidor para que o cliente
possa aceder informao dos elementos do modelo.
Cliente
A figura 4 apresenta a sequncia de atividades a seguir para criao do cenrio de jogo no lado
do cliente. As atividades foram agrupadas em quatro fases distintas. Assim temos as trs
primeiras fases para preparao do cenrio e a ltima fase para o desenvolvimento do jogo.
136
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A segunda fase, "BIM Model Info", consiste na atualizao da informao BIM dos objetos do
cenrio. Nesta fase esperado que o cliente complete a informao dos objetos de jogo
includos do cenrio. Assim, atravs da atividade "Gather Elements Info", o cliente solicita a
informao de cada objeto includo no cenrio e atualiza os dados do objeto com a informao
BIM recebida. Aps os objetos de jogo estarem atualizados, so atualizados os materiais
aplicados nos objetos. Para tal so executadas as atividades "Gather Materials" e "Update
Materials Library and Game Object Materials". A primeira consiste no pedido dos materiais (e
suas propriedades) de um determinado elemento. A segunda consiste no processamento e
tratamento da resposta do servidor. Assim se algum dos materiais recebidos ainda no estiver
replicado na biblioteca de materiais do cliente, este criado. Se o material existir, cabe ao
utilizador decidir se atualiza ou no a informao do material. Desta forma possvel manter
no motor de jogo uma biblioteca de materiais que o reflexo da biblioteca do software BIM.
Uma vez atualizados os elementos e os materiais do modelo, a conexo ao servidor pode ser
terminada, uma vez que no esto implementados outros servios.
Por fim, vem a fase de desenvolvimento do jogo em si, "Game Development". Nesta fase o
utilizador deve implementar os scripts com as interaes pretendidas de acordo com o objetivo
do jogo. Na figura 4 foram destacados os scritps associados abertura e fecho de portas, ao
acender e apagar luzes, ao jogador e lgica de jogo, uma vez que so as interaes que
permitem esta soluo destacar-se das solues existentes no mercado.
137
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Casos de Estudo
No sentido de avaliar a soluo desenvolvida neste trabalho foram realizados quatro casos de
estudo. Os casos de estudo consistem em executar um conjunto de aes para alcanar um fim
comum, que neste caso ser um ambiente virtual de um edifcio onde o utilizador possa navegar
livremente pelo edifcio segundo uma vista de primeira pessoa. Cada caso de estudo usar um
conjunto de ferramentas diferentes e ser avaliado num conjunto de parmetros. Posteriormente
feita uma comparao entre os resultados obtidos em cada caso de estudo no sentido de obter
uma avaliao relativa entre os vrios conjuntos.
Cada caso de estudo foi avaliado de acordo com um conjunto de mtricas de forma a avaliar a
soluo individualmente e posteriormente comparar com as restantes solues. As mtricas
definidas para avaliao das solues so: (i) nvel de esforo necessrio; (ii) necessidade de
tarefas manuais; (iii) quantidade de ferramentas necessrias; (iv) dependncia de software; (v)
experincia do utilizador; (vi) nvel de realismo do cenrio (renderizao); (vii) interaes do
utilizador com o modelo; (viii) expanso e integrao com outros sistemas.
Nos casos de estudo deste trabalho utilizaram-se ferramentas utilizadas atualmente na AEC para
a explorao do modelo e por fim a soluo desenvolvida. Assim, o primeiro consiste em
utilizar a ferramenta de visualizao avanada disponvel com o Autodesk Revit. No segundo
138
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
caso utilizado o software BIMx, da empresa Graphisoft. O caso trs consiste em utilizar o
motor de jogo Stingray, da Autodesk. O Stingray foi aquirido pela Autodesk para promover a
explorao em tempo real, animao e interao do modelo do edifcio. Assim este caso o
caso de estudo que mais se aproxima da soluo desenvolvida neste trabalho. Por fim, o ltimo
caso consiste em avaliar a soluo desenvolvida usando os pacotes de software Autodesk
Revit e Unity3D.
Nos casos de estudo um, trs e quatro foi utilizado o modelo avanado Revit disponibilizado
pela Autodesk no seu stio Web. A escolha deste modelo resultou da necessidade de utilizar um
modelo com complexidade geomtrica elevada de forma abranger o maior nmero de situaes
possveis. Ao mesmo tempo era necessrio que os elementos tivessem um nvel de
desenvolvimento tal que permitisse extrair informaes sobre a composio dos elementos e
materiais aplicados. No caso de estudo 2, dada a dependncia do formato da ferramenta, foi
utilizado outro edifcio.
4. Anlise de Resultado
No ponto anterior cada caso de estudo foi analisado individualmente. Os resultados obtidos
para cada critrio analisado, em cada uma das solues, encontram-se resumidos na Tabela 1.
A soluo do Revit torna-se uma soluo vlida quando se pretende realizar simples
visualizaes e exploraes do modelo. Nestas situaes o utilizador procura realizar aes
rpidas de visualizao sem precisar de realizar interaes com o modelo. Como se pretende
que estas aes sejam rpidas, o facto de o utilizador ter de utilizar mais do que um software
para obter um ambiente virtual torna-se uma desvantagem. Contudo, a navegao do utilizador
disponvel nesta soluo pouco prtica para o utilizador, pelo que neste aspeto as restantes
solues so uma melhor opo. Se o utilizador pretender navegar pelo modelo com um nvel
de renderizao aceitvel as restantes solues conseguem melhores resultados, uma vez que
para obter nvel de renderizao elevados a navegao pelo modelo fica impraticvel.
J o BIMx consegue um nvel de renderizao aceitvel ao mesmo tempo que permite uma
navegao na perspetiva de primeira pessoa bastante fluida. No entanto tem o inconveniente de
obrigar a que o modelo seja exportado a partir do ArchiCAD, limitando a escolha dos pacotes
de software de modelao da equipa projetista do modelo. As interaes do utilizador com o
modelo so tambm limitadas. O utilizador pode atravessar portas sem que haja colises e
impedimentos entre a porta e o utilizador o que torne o ambiente menos realista do desejvel.
A soluo do Stingray por sua vez apresenta um bom resultado na renderizao do ambiente e
permite a implementao de diversas interaes entre o modelo e o utilizador. No entanto a
necessidade de o modelo passar por quatro ferramentas (ver [1]) para gerar o ambiente virtual
navegvel por qualquer utilizador torna a soluo dissuasora dos utilizadores menos
experientes.
139
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Por sua vez, a soluo proposta neste trabalho e que foi implementada no caso de estudo do
Unity 3D, permite que a equipa projetista do modelo escolha as suas prprias ferramentas de
modelao BIM, desde que estas implementem a soluo proposta. O software de edio do
ambiente virtual fica tambm ao critrio dos utilizadores. Desta forma a soluo promove a
interoperabilidade entre pacotes de software. O resultado da renderizao do ambiente no
to bom como a renderizao da soluo do Stingray mas aceitvel. Contudo, o esforo
necessrio para gerar o ambiente virtual bastante inferior ao esforo requerido pela soluo
do Stingray, pelo que torna a soluo mais apelativa para os utilizadores. J a nvel de
expansibilidade a soluo proporciona a possibilidade de integrar com sistemas simuladores e
multiagentes semelhana do Stingray. As figuras 5.a) e 5.b) apresentam o ambiente virtual
resultante do processo definido na soluo. Conforme possvel verificar o resultado obtido
um ambiente virtual bastante aceitvel mesmo sem despender grandes esforos no Unity a
configurar as propriedades de iluminao, fator que tem grande influncia no realismo do
cenrio.
140
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A soluo resultante deste trabalho comprova que a integrao do BIM nos jogos de simulao
contribui para um desenvolvimento de ambientes virtuais realistas. Os criadores vem reduzido
o esforo de criao de ambientes virtuais realistas, que por sua vez incluem significativas
quantidades de informao sobre materiais e outras propriedades. Como resultado possvel
definir comportamentos tambm mais realistas. Por sua vez, a integrao de jogos de simulao
no BIM contribui para uma melhor a navegao e explorao do edifcio, ao mesmo tempo que
se tira proveito do potencial dos jogos de simulao para apoiar as tomadas de deciso da equipa
projetista do edifcio e dos restantes intervenientes, atravs de simulaes e anlises efetuadas
nos jogos de simulao. Confirmou-se, portanto, que existe benefcio mtuo na integrao do
BIM nos jogos de simulao e os jogos de simulao no BIM.
Com este trabalho foi possvel identificar diversas dificuldades que, embora tenham sido
ultrapassadas, merecem ainda um aprofundamento no sentido de melhorar os resultados
obtidos. Assim, rene-se os trabalhos futuros em trs grupos: Interoperabilidade, Plataforma
Open Data e Jogos BIM. A na implementao da arquitetura Cliente-Servidor SOAP atravs de
Web Services da WCF reflete-se numa maior adoo da soluo por parte da industria. O
desenvolvimento e implementao de uma plataforma Open Data dever ser capaz de dissociar
o modelo do edifcio dos pacotes de software BIM, integrando numa base de dados relacional
o modelo de dados IFC. Neste sentido a plataforma funcionaria como repositrio de elementos
BIM ao mesmo tempo que poderia ser utilizada como uma plataforma colaborativa durante a
conceo do projeto do edifcio. Por sua vez, a plataforma serviria tambm de biblioteca de
materiais com as suas propriedades fsicas e aparncia. Outra rea que pode servir de base para
futuros trabalho consiste no desenvolvimento de jogos de simulao que se adequem s diversas
fases de conceo do projeto, incluindo as fases operacionais do edifcio.
Referncias
[1] V. Mineiro, Exploracao dos benefic ios mutuos entre BIM e jogos de simulacao .
Dissertao de Mestrado. Porto, Faculdade de Engenharia da Universidade do Porto,
Portugal, 2016.
[2] C. A. Clark, Serious Game, 1970.
[3] D. R. Michael e S. L. Chen, Serious games: Games that educate, train, and inform,
2005.
[4] J. Ribeiro, J. E. Almeida, R. J. F. Rossetti, A. Coelho e A. L. Coelho, Using serious
games to train evacuation behaviour, em 7th Iberian Conference on Information
Systems and Technologies (CISTI), 2012.
[5] E. Cordeiro, A. L. Coelho, R. J. F. Rossetti e J. E. Almeida, Human behavior under fire
situationsportuguese population, em Fire and Evacuation Modeling Technical
Conference, 2011.
[6] U. Rppel e K. M. Stuebbe, BIM-based indoor-emergency-navigation-system for
complex buildings, Tsinghua Science & Technology, vol. 13, p. 362367, October
2008.
[7] S. Freitas, Using games and simulations for supporting learning, em Learning, media
141
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
142
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O setor de atividades de Arquitetura, Engenharia, Construo e Operao (AECO) portugus
evidencia a crise socioeconmica que tem afetado o pas nos ltimos anos. Considerando que
este setor uma das bases da economia do pas, necessrio estabelecer metas para o seu
desenvolvimento e modernizao. O desenvolvimento e divulgao do uso de tecnologias da
informao, aliados implementao de processos Building Information Modelling (BIM) e
adoo de sistemas de classificao para a construo, em harmonia com os sistemas e normas
internacionalmente aceites, apresentam-se como objetivos relevantes na evoluo do setor.
A crescente difuso dos processos BIM tem sensibilizado os diferentes intervenientes da AECO
para a importncia das Tecnologias de Informao e Comunicao (TIC) e da sua
uniformizao. Reconhecendo a relevncia desta questo, a International Organization for
Standardization (ISO), atravs do Comit Tcnico 59 (TC59) desenvolve normas com o intuito
de uniformizar a forma de classificao da informao, com publicaes orientadas para o
desenvolvimento de Sistemas de Classificao de Informao para a Construo (CICS).
143
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Nos ltimos anos tem-se observado o aparecimento de ferramentas informticas cada vez mais
eficientes, capazes de modelar e representar de modo mais realista variados projetos de
engenharia civil, com diferentes graus de complexidade. A utilizao destas ferramentas, aliada
necessidade e procura de agrupar e reunir informao sobre todo o ciclo de vida de
determinado empreendimento, est no mote do desenvolvimento do processo Building
Information Modelling (BIM). Atualmente existem diversos softwares e variadas abordagens
ao modo como se insere, se guarda e se apresenta a informao disponibilizada, pelo que, torna-
se fundamental que todos os intervenientes recorram mesma linguagem para partilhar
informao e tambm que esta esteja organizada e classificada de acordo com os mesmos
princpios [3].
No contexto nacional, foi criado o Comit Tcnico 197 (CT197) com o objetivo acompanhar
os desenvolvimentos do Comit Tcnico Europeu para a normalizao BIM (CEN/TC 442) e
contribuir no desenvolvimento de normalizao no mbito dos sistemas de classificao,
modelao da informao e processos ao longo do ciclo de vida dos empreendimentos [9].
144
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Importncia de classificar
Classifica-se quando se realiza uma distribuio de objetos em classes, sendo que, uma classe
composta por um conjunto de objetos com determinadas particularidades em comum, relao
lgica ou afinidade, que possibilita a sua distino de outros objetos [11]. As classes podem ser
decompostas em subclasses, e assim sucessivamente, aumentando a particularidade do conjunto
de caractersticas da classe anterior. Apresenta-se na Figura 1 a ilustrao da hierarquia
caracterstica de um sistema de classificao de informao.
De acordo com o nvel de detalhe de cada classe, estas so designadas de modo distinto. Classes
do mesmo nvel de subdiviso so denominadas Coordenadas (Classes A1, A2 e A3), classes
mais abrangentes, e portanto, com nvel de detalhe inferior, so designadas por Subordinantes
(Classe A). De modo idntico, classes com nvel de detalhe superior so designadas por
Subordinadas, j que existe uma classe superior a esta, associada a um conjunto de
caractersticas menos particulares (A11 e A12 so classes subordinadas de A1) [10].
Um sistema de classificao pode ser definido de forma simplista como sendo um conjunto de
termos ou classes organizado [11] e tal definio pode ser aplicada de diferentes formas a um
infindvel conjunto de objetos, oriundos de diferentes reas ou temas (Biologia, Engenharia,
Literatura, etc.). Apresentam-se na Figura 2 os principais tipos de classificao que se
consideram como da maior relevncia no estudo e anlise de sistemas de classificao de
informao para a construo [10].
145
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Gerais
Especializadas Analticas
Tipos de
Classificao
Enumerativas Documentais
Por Facetas
Uma classificao que tenha por objetivo um assunto particular, bem delimitado, denominada
por Especializada, uma vez que a sua abrangncia est bem definida, inversamente, se o seu
objetivo for abranger todo um universo de informao, denomina-se Geral.
Quando uma classificao pretende sistematizar informao, com o intuito de facilitar a sua
explicao e compreenso, ento constitui uma classificao Analtica (tambm conhecida por
classificao Cientfica ou Taxonomia). Por oposio, uma classificao designada como
Documental pressupe a classificao de documentos ou de diferentes tipos de informao com
o intuito de facilitar a sua organizao, armazenagem e localizao [10].
A inexistncia de um CICS completo faz com que se torne necessrio analisar sistemas de
classificao nacionais que abranjam o setor AECO mas cujo foco no seja exclusivo neste
setor. A principal vantagem de analisar estes sistemas prende-se com a terminologia e conceitos
146
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
147
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
148
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Sendo o UniClass 2015 a principal referncia, tal implicar que o sistema a conceber esteja em
conformidade com as normas internacionalmente aceites, e portanto seja um sistema
padronizado. Assim, o CICS nacional dever contemplar os seguintes princpios gerais: i) Estar
em conformidade com a norma ISO12006-2:2015; ii) Incluir uma classificao composta por
tabelas hierarquicamente organizadas; iii) Abranger a complexidade e dimenso dos trabalhos
do setor AECO nacional; iv) Ser dotado de uma codificao simples, intuitiva e flexvel para
acomodar novas entradas; v) Permitir a aplicao isolada das tabelas ou de tabelas relacionadas
entre si; vi) Integrar uma base de dados de terminologias, conceitos e descries;
O CICS nacional dever ser composto por diferentes tabelas classificativas. Estas tabelas
permitem organizar a informao em diferentes classes e a sua estrutura dever seguir o
149
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Sugere-se que sejam adotados outros princpios: i) a etapa do ciclo de vida, onde decorrem os
processos de construo, caracteriza o processo construtivo, por sua vez, os processos
construtivos devero estar agrupados em quatro tipologias: processos anteriores conceo, de
conceo, de produo e de manuteno; ii) as entidades de construo so responsveis pelas
atividades e funcionalidades disponveis para o utilizador, estas entidades so compostas por
elementos construtivos que podem por sua vez ser compostos por diferentes partes, com
diferentes nveis de complexidade; iii) um espao pode ter relaes espaciais (estar contido
em, ao lado de, etc.) e pode ser interpretado como um espao onde se realizam atividades,
um espao construdo (caracterizado pelos resultados da construo) ou um espao onde se
constri; iv) os recursos de construo compreendem produtos de construo, agentes de
construo, ajudas de construo e informao da construo. A diferena entre um recurso de
construo e um resultado da construo depende da relao com o procedimento construtivo,
isto , o recurso da construo pode ser utilizado na gesto de determinado procedimento ou
pode ser o resultado de determinado procedimento; v) os objetos de construo contm
propriedades construtivas que por sua vez so representadas como atributos na informao da
construo [4].
Relativamente forma como a informao classificada, esta dever ser estruturada de modo
hierrquico e, dependendo do tipo de informao que se pretende classificar, o tipo de
classificao a utilizar deve ser analisado e adotado para cada tabela, em funo do seu
propsito (recorrer a uma classificao enumerativa, para classificar produtos de construo,
por oposio a uma geral, aparenta ser uma escolha mais correta). Reala-se que o tipo de
classificao a adotar no deve ter carcter exclusivo, sendo possvel que a informao possa,
por exemplo, ser organizada por meio de facetas e ser enumerativa.
A anlise dos diferentes CICS, permitiu concluir que ao agregar diferentes tipos de classificao
(geralmente, por facetas complementada por outro tipo) consegue-se obter um maior nvel de
abrangncia e complexidade. Assim, considera-se aconselhvel seguir o mesmo procedimento
na anlise e organizao de informao com base no tipo de classificao por facetas.
Sugere-se que se adote o seguinte procedimento: i) identificao das classes principais; ii)
criao das facetas (caracterstica particular que possibilita a distino entre objetos) para cada
classe principal iii) estabelecer a ordem entre objetos dentro de cada faceta; iv) estabelecer a
ordem de citao para facetas compostas (duas ou mais facetas so utilizadas para distinguir
objetos); v) estabelecer a ordenao das facetas; vi) acrescentar a notao.
150
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com base na proposta apresentada e tendo como base de referncia o sistema UniClass 2015,
encontra-se em desenvolvimento a tabela de Elementos / Funes, tendo sido realizada a sua
traduo e adaptao ao contexto nacional, com o auxlio dos complementos de termos e
definies patentes nos sistemas nacionais de classificao. Apresenta-se na Tabela 4 um
excerto dessa tabela.
Atualmente a tabela contem cerca de 70 itens, compreendidos entre os primeiros dois nveis de
detalhe (grupo e subgrupo). Prev-se complementar a tabela com termos e definies, bem
como com a criao de um porteflio grfico, que permita a associao de modelos
tridimensionais digitais respetiva classificao.
5. Concluses
Referncias
151
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
152
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
No presente artigo, o conceito BIM (Building Information Modeling) e os sistemas de
classificao da informao foram combinados no sentido de entender de que forma os sistemas
de gesto da informao contribuem para a otimizao dos processos de gesto da construo.
1. Introduo
Desde o sculo XIX, o setor da Arquitetura, Engenharia e Construo (AEC) tem perdido o seu
posicionamento, relativamente ao desenvolvimento tecnolgico, para outras indstrias,
revelando-se um setor com baixa produtividade [1]. A falta de capacidade de aceitar e
implementar estas tecnologias da informao ou a sua adoo demasiado lenta um dos fatores
que elucida as diferenas entre o sector AEC e as outras indstrias. [2], [3].
153
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O BIM apresentado como uma soluo, para ajudar na resoluo dos problemas inerentes ao
setor AEC, pela sua metodologia que apresenta uma nova abordagem gesto da informao,
sistematizando um conjunto de polticas, processos e tecnologias interrelacionadas, e
proporciona uma metodologia para gerir um projeto e toda a sua informao atravs de um
formato digital, ao longo do ciclo de vida do edifcio [5][7]. Dada a grande quantidade de
informao que o sector AEC pode gerar, necessrio que esta informao esteja organizada e
padronizada de modo a alcanar a sua gesto eficaz. Deste modo, surgem os sistemas de
classificao, que so metodologias de uniformizao, organizao e partilha da informao
[8].
Ainda que, as metodologias BIM apresentem ainda apresenta algumas fragilidades na aplicao
direta dos sistemas de classificao. No entanto, relevante destacar que ainda que existam
muitos sistemas de classificao internacionais, estes sistemas ainda se encontram numa fase
de desenvolvimento incapaz de satisfazer algumas das necessidades existentes.
Perante estas consideraes o tema deste artigo centra-se no estudo e aplicao de metodologias
de organizao e classificao da informao, gerada pelos modelos BIM, com o intuito de
facilitar a preparao e gesto da construo. Neste sentido os domnios explorados foram os
sistemas de classificao existentes, metodologia BIM nas diversas dimenses com especial
enfase para 4D e 5D e os processos utilizados em organizaes sistemistas.
O setor AEC, envolve um conjunto vasto de informao, pelo que importante que toda esta
esteja organizada padronizada [9]. No sentido de suprimir algumas debilidades presentes neste
setor relativa organizao da informao que se iam acentuando em determinados processos,
muitas industrias do setor, no inicio do sculo XX comearam a desenvolver os sistemas de
classificao [10], [11].
Desde ento ao longo dos anos tm sido desenvolvidos vrios sistemas variando consoante a
sua aplicao. Neste sentido com o intuito de apoiar a cooperao dentro e entre os diferentes
pases, foram desenvolvidas normas internacionais. Relativamente classificao da
informao do setor da construo a International Organization for Standardization (ISO)
desenvolveu a norma ISO 12006-2, que define uma estrutura e um conjunto de ttulos de tabelas
recomendadas, mas no o seu contedo detalhado dessas tabelas, pois as tabelas de classificao
podem variar em detalhes para atender s necessidades locais [12], [13].
Existem inmeros sistemas de classificao usados em todo o mundo. Neste artigo sero
apresentados quatro sistemas de classificao considerados como dos mais importantes e
utilizados no setor da construo e que apoiam a metodologia BIM, nomeadamente Omniclass,
MasterFormat, Uniformat e Uniclass.
154
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Masterformat foi desenvolvido pelo CSI e CSC e amplamente adotado e usado na indstria
da construo no Norte da Amrica. Este sistema consiste numa lista de nmeros e ttulos
classificados por atividades de construo e utilizados na organizao das especificaes, dados
do produto, base de dados de custos da construo, notaes de desenho, dados de gesto de
instalaes e outras informaes da construo. Embora fornea uma lista detalhada e ordenada
de possveis ttulos, MasterFormat projetado para maximizar a flexibilidade para usurios
individuais, permitindo o usurio atribuir de novos cdigos e ttulos nos locais apropriados[16]
[14], [17]. Este sistema segue uma organizao enumerativa.
Uniclass foi desenvolvido no Reino Unido. Este sistema baseou-se nos princpios da ISO
12006-2 e teve como principal objetivo ser utilizado no planeamento e gesto da construo.
Inicialmente este sistema foi fundado com 15 tabelas, cada uma com subttulos e cdigos que,
segundo seus autores, cobrem os interesses de toda a indstria construo. No entanto, em 2013
o sistema foi atualizado e renomeado para Uniclass2. Esta atualizao deveu-se a problemas de
alcance, cdigo, profundidade, colocao dos objetos e granulao. Como resposta ao feedback
da indstria relativamente s tabelas publicadas pelo Construction Project Information
Committee (CPIC) em 2013, surge o Uniclass2015 [12], [20] [21] [22].
155
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
156
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Assim como o Omniclass, o Uniclass 2015 tem aplicao ao longo do ciclo de vida dos
empreendimentos e cada tabela deste sistema tanto podem ser utilizadas de forma independente
como podem ser combinadas.
Apesar de ambos estarem ambos em consonncia com os pressupostos definidos pela ISO, cada
um tem diferentes interpretaes para estrutura de classificao e tambm tem diferentes
estratgias para a sua organizao. Uniclass ao contrario do Omniclass apresenta uma relao
direta com as tabelas propostas pela ISO 12006-2 mais recente e apresentam-se
hierarquicamente definidas, promovendo a maturao progressiva da informao. Alm disso
o Uniclass 2015 apresenta maior proximidade aos costumes correntes da empresa e do pas. O
conjunto de tabelas permite que as informaes de um projeto sejam definidas a partir de uma
viso mais ampla para o mais detalhado e de acordo com as necessidades dos utilizadores, como
podemos verificar na Figura 2. O BIM requer uma abordagem unificada para que a classificao
da informao funcione de forma eficiente. Por forma a atender este requisito da metodologia
BIM o Uniclass 2015 apresenta as suas tabelas de forma mapeada ao contrario do Omniclass,
que no apresenta alinhamento entre suas tabelas.
Ainda de o Uniclass 2015 tenha sido um dos primeiros sistemas alinhados com as novas
definies da ISO, este sistema ao contrario do estabelecido na ISO 12006-2:2015 removeu a
tabela Resultados de Trabalho, substituindo por duas tabelas Sistemas e Produtos.
157
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No que diz respeito aos desenvolvimentos nacionais no mbito dos sistemas de classificao,
prev-se o desenvolvimento de um sistema de classificao da informao, tendo como base o
sistema Portugus ProNIC (Protocolo para a Normalizao da Informao Tcnicas na
Construo). Estes desenvolvimentos decorrero no mbito da Subcomisso 2 Trocas e
Requisitos de Informao da Comisso Tcnica de Normalizao de BIM (CT197).
Embora devam existir normas internacionais para melhorar a colaborao entre pases,
necessrio um sistema nacional bem definido para atender s necessidades locais. Uma vez que
no existe um sistema de classificao nacional alinhado com a metodologia BIM, viu-se a
necessidade de estudar uma estrutura de organizao e classificao da informao de sistemas
baseado na adaptao das prticas correntes nas organizaes sistemistas ao sistema de
classificao Uniclass 2015, para o uso em projetos destas organizaes de modo a classificar
a informao associada aos modelos BIM e retirar vantagens competitivas para a utilizao
desta no mbito da gesto (4D e 5D).
Requisitos e propsito
No mbito deste artigo o sistema em estudo tem como principais objetivos a organizao da
informao tcnica disponvel nos objetos tridimensionais, para apoio criao de Mapas de
quantidades, Custo e Planeamento, de modo a qua haja uma reduo do tempo despendido,
erros e incertezas na extrao de quantidades. Alm disso, este sistema dever promover uma
linguagem transversal entre os diferentes intervenientes e melhorar a performance na gesto
dos projetos.
Para alm dos principais objetivos so apresentados os princpios gerais deste sistema:
Aproveitamento dos sistemas de classificao internacionais existentes e baseado nas
normas estabelecidas na ISO12006-2 e ISO 12006-3;
158
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para este sistema proposto uma hierarquia para onde os elementos de Construo Civil o
principal ponto de partida seguido de Complexos so as Entidades ou Espaos. Quando se trata
de Sistemas o principal ponto de partida seguido de Complexo sero os Sistemas, pois para as
unidades sistemistas a primeira necessidade identificar que um conjunto de tubos, vlvulas ou
bombas pertence a determinado sistema ao invs de local/espao. A classificao e associao
dos objetos aos sistemas no que diz respeito organizao e estruturao da informao
fundamental, j que se um sistema partilhado por diferentes edifcios/espaos torna-se difcil
identificar a utilizao, funo e localizao dos elementos. Ainda que a necessidade primria
seja a identificao do sistema, esta informao poder ser complementada pela identificao
espacial, ainda que no seja essencial organizao. Na Figura 3 encontra-se um exemplo
esquematizado um circuito de uma Estao de Tratamento de Lamas, de forma muito
simplificada, partilhado por diferentes locais/espaos.
159
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esta estrutura poder ser base para extrao de quantidades e custos, onde nveis mais elevados
da hierarquia podem representar toda a informao agregada por exemplo de custos. Como se
encontra identificado na Figura 3, existem nveis que so inerentes ao projeto e no ao produto,
o significa que um produto pode ser classificado quando criado, pois, a sua classificao no
sofrer alteraes, o mesmo no acontece quando a classificao depende do tipo de
obra/espao/sistema. Outras estruturas podero ser formadas dependendo do objetivo de
aplicao. Este exemplo de estrutura entende-se a mais adequada para organizar os elementos
para extrao de quantidade e estimativas de custo.
160
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
modelo consistia num conjunto de elementos desorganizados, pelo que no seria til para as
fases de Planeamento e Custos.
Toda a informao que o modelo 3D incorpora e que organizada e estruturada, integrada com
sistemas de gesto para alm de economizarem tempo e esforo em atividades de planeamento
e custo permitir tomar decises fundamentadas em fase de projeto.
6. Consideraes Finais
O exemplo de sistema apresentado no mbito deste artigo, ainda numa fase preliminar, pretende
para alm de colmatar uma necessidade existente dos sistemistas, estabelecer uma relao com
a classificao dos trabalhos tendo ateno legislao nacional (nomeadamente ProNIC) e ao
aproveitamento das oportunidades que as tecnologias da informao atualmente oferecem na
otimizao dos processos e desenvolvimento de aplicaes que apoiem os conceitos abordados.
Referncias
161
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
162
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Pretendeu-se com este trabalho avaliar os principais desafios implementao do BIM na fase
de projeto de obras hidroeltricas. Para isso, foram elaborados modelos BIM deste tipo de
empreendimentos, com aplicao a vrias componentes estruturais no contexto do reforo de
potncia Venda Nova III. Um dos mais importantes desafios prendeu-se com a complexidade
geomtrica das peas a modelar, tendo-se recorrido sinergia entre a linguagem de
programao visual Dynamo e a plataforma BIM Revit. Os modelos criados foram explorados
para diversos usos BIM, como obteno de desenhos de execuo e extrao de quantidades.
Adicionalmente descrio da elaborao e explorao de modelos, este artigo detalha tambm
um plano de implementao BIM especfico com a finalidade de impulsionar e facilitar a
implementao de metodologias BIM no departamento de Fundaes e Estruturas da Direo
de Engenharia de Barragens da EDP Produo.
1. Introduo
163
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
164
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Aps passagem pela turbina a gua segue para a restituio, atravs do tnel da restituio. Na
Figura 1 possvel observar um corte longitudinal adaptado do reforo de potncia do
Aproveitamento Hidroeltrico de Picote - Picote II - estando identificadas as principais
componentes do circuito hidrulico (tomada de gua, tnel de aduo, tnel de restituio e
restituio) e a central.
3. Modelao
Com o objetivo de obter uma melhor perceo acerca dos desafios tcnicos implementao
BIM no contexto da Direo de Engenharia de Barragens da EDP, optou-se pela modelao de
trs constituintes de um aproveitamento hidroeltrico em casos particulares que foram objeto
de projeto recente na EDP: uma central (Venda Nova III), uma tomada de gua (Venda Nova
III) e uma restituio (Frido). No presente artigo ser apresentada a modelao da central e da
tomada de gua, sendo que a restituio seguiu uma estratgia anloga adotada no caso da
tomada de gua.
165
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
166
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esta modelao foi realizada com recurso ao Dynamo, tendo-se criado um algoritmo de
programao grfica em que os parmetros manipulveis pelo utilizador correspondem aos
parmetros identificados pelo fornecedor de equipamentos de forma a que, numa obra futura,
seja apenas necessrio adaptar o algoritmo ao invs da criao de raiz do objeto. Na Figura 4
so apresentadas ilustraes de objetos gerados pela ferramenta desenvolvida.
Para a restante estrutura foram utilizadas famlias nativas do Revit (p.ex. pilar, viga), sendo que
a modelao partiu de desenhos de execuo a duas dimenses. Nesta componente foram
aplicadas metodologias de modelao que visam uma extrao correta de quantidades a partir
do modelo. O modelo final apresenta um nvel de desenvolvimento (LOD) de 300 [5] para os
diferentes elementos, sendo apresentado na Figura 5.
167
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Foi, ento, realizada uma anlise dos elementos a modelar em Dynamo, estudando-se diferentes
estratgias de modelao, e entendeu-se que a mais intuitiva corresponde obteno do
elemento por subtrao sequencial de volumes modelados parametricamente, que
correspondem a vazios. Assim, para estes elementos, partiu-se de um prisma retangular de
geometria simples e, por operaes de subtrao de volumes cujos parmetros so controlados
pelo utilizador, obtm-se a geometria pretendida. Este processo demonstrado na Figura 7,
para o caso do bocal.
O modelo final da tomada de gua apresentado na Figura 8, estando apto para obteno de
desenhos de execuo.
Uma vez obtido o modelo da tomada de gua, optou-se por explorar tambm outros fatores,
nomeadamente a modelao de armaduras para elementos desta complexidade. Assim, e tendo
em conta a existncia no mercado de softwares que agilizam este processo e a inteno de testar
a interoperabilidade neste mbito, optou-se por explorar o Tekla Structures. O modelo foi
transmitido entre softwares atravs do formato de ficheiros IFC.
168
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Usos BIM
Uma vez criado o modelo BIM, e tendo em conta que se trata de um modelo rico em informao
geomtrica e no geomtrica, este pode ser explorado para diferentes usos, de forma a ir ao
encontro das exigncias de um projeto. Assim, na presente seco, so explorados/discutidos
dois usos dos modelos BIM de especial interesse no contexto deste trabalho: gerao de peas
desenhadas e extrao de quantidades.
169
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 10: Desenho de execuo tradicional (esquerda) e desenho obtido a partir do modelo
BIM (direita).
Tabela 1: Parte de tabela com volumes de beto de paredes da Central de Venda Nova III
compreendidas entre as cotas 217 m e 221 m.
Paredes 217m 221m
Tipo Material Espessura Comprimento Volume
Parede 1,15m Beto 1,15m 18,44m 238,57 m3
Parede 1,15m Beto 1,15m 14,20m 183,71 m3
Parede 1,15m Beto 1,15m 5,80m 74,98 m3
Parede 1,15m Beto 1,15m 8,30m 107,38 m3
Parede 0,30m Beto 0,30m 2,14m 4,11 m3
Parede 0,30m Beto 0,30m 5,07m 9,52 m3
De forma a promover uma implementao bem sucedida de metodologias BIM, essencial que
a equipa de projeto realize um planeamento detalhado e exaustivo [7]. Como resposta a este
170
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
fator, importante que a equipa de projeto desenvolva um plano de execuo BIM, doravante
designado BEP (BIM Execution Plan). O desenvolvimento deste documento deve permitir ao
dono de obra e aos membros de projeto [8]:
Entender claramente os objetivos estratgicos para a implementao BIM no projeto;
Perceber as suas funes e responsabilidades a nvel de criao de modelos, manuteno
e colaborao nas diferentes fases de projeto;
Desenvolver um processo apropriado para participarem na implementao;
Delinear eventuais recursos ou servios adicionais que possam ser necessrios;
Providenciar uma base de referncia para medir o progresso ao longo do projeto.
O BEP foi ainda complementado com outros documentos que se entendem catalisadores na
implementao BIM, nomeadamente um procedimento para controlo de qualidade de modelos,
um documento de especificaes LOD e ainda um auxiliar de modelao, que visa apoiar os
colaboradores menos familiarizados com modelao BIM. A consulta do plano pode ser
efetuada na referncia [9].
6. Concluses
Com o trabalho desenvolvido foi possvel obter uma perceo dos reais desafios
implementao BIM na fase de projeto de obras hidroeltricas. No caso das componentes de
complexidade inferior como, por exemplo, o posto de observao e controlo e at a central,
inequvoca a possibilidade de aplicao da metodologia BIM e explorao de todas as suas
dimenses. No entanto, no caso das componentes mais complexas, como a tomada de gua, a
modelao exigiu o recurso a programao grfica, com maior investimento inicial, mas com
elevado potencial de retorno a longo prazo dada a possibilidade de reutilizao do cdigo.
A explorao dos modelos revelou ser possvel a obteno de relevantes benefcios para o
departamento de Fundaes e Estruturas da Direo de Engenharia de Barragens da EDP
171
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Produo. De facto, os modelos permitem uma melhoria de qualidade do projeto e podem ser
determinantes em processos especficos (a ttulo exemplificativo, a possibilidade de se poder
complementar desenhos 2D tradicionais com cortes tridimensionais promove uma melhor
compreenso da obra por parte dos diferentes intervenientes e pode prevenir erros construtivos).
Referncias
[1] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors, 2nd
ed. New Jersey: Wiley, 2011.
[2] Infrastructure, Model-based Design Powers China Dam Construction. Consultado em 11
de maio de 2016, https://informedinfrastructure.com/4362/model-based-design-powers-
china-dam-construction/.
[3] EDP, Picote II - Informao tcnica. Consultado em 13 de setembro de 2015,
http://www.a-nossa-
energia.edp.pt/centros_produtores/empreendimento.php?item_id=85&cp_type=he.
[4] J.C. Lino, M. Azenha, M. and P. Loureno, "Integrao da metodologia BIM na
Engenharia de Estruturas" in Encontro Nacional BETO ESTRUTURAL (2012),
Faculdade de Engenharia da Universidade do Porto, Porto, 2012.
[5] BIM Forum, Level of Development Specification, 2013, http://bimforum.org/wp-
content/uploads/2013/08/2013-LOD-Specification.pdf.
[6] A. Ferreira, C. Sarmento and C. Lima, "Tomada de gua do Reforo de Potncia de
Venda Nova III" in Encontro Nacional BETO ESTRUTURAL (2012), Faculdade de
Engenharia da Universidade do Porto, Porto, 2012.
[7] The Computer Integrated Construction Research Program, BIM Project Execution
Planning Guide version 2.1. The Pennsylvania State Unversity, 2011.
[8] Building and Construction Authority, BIM Essential Guide for BIM Execution Plan.
Singapore, 2013.
[9] A. Marques, "Implementao de metodologias BIM na Direo de Engenharia de
Barragens da EDP: Casos de estudo de projeto de estruturas em obras hidroeltricas"
Tese de Mestrado, Universidade do Minho, 2015.
172
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O presente artigo retrata os primeiros progressos efetuados na Direo de Engenharia de
Barragens (DEB) da EDP Produo no sentido da implementao da metodologia BIM em
estruturas de obras hidroeltricas. Aborda-se o desenvolvimento de um Add-In, com recurso
API (Application Programming Interface) da plataforma BIM Revit, com o objetivo de
automatizar o processo de modelao paramtrica de geometrias complexas e transversais a
aproveitamentos hidroeltricos. A elaborao do processo de concurso do Aproveitamento
Hidroeltrico de Frido constitui um projeto piloto para a implementao BIM na DEB e, neste
contexto, so apresentados os diferentes modelos desenvolvidos para este empreendimento. D-
se particular nfase ao complexo da central e circuito hidrulico, registando-se os principais
desafios em termos de modelao, bem como ao software de programao grfica Dynamo
como importante complemento ao Revit na modelao de elementos de maior complexidade.
Discute-se ainda a explorao dos modelos elaborados na obteno de peas desenhadas e os
benefcios obtidos em termos de processo de trabalho. So tambm apresentadas reflexes
acerca do trabalho desenvolvido at escrita do presente artigo, bem como so apontados
diferentes fatores que se consideram ser importantes a considerar no futuro.
1. Introduo
173
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
174
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com base no guia de desenvolvedores de API do Revit [5], foi possvel transformar este
processo em linguagem de cdigo executando os comandos utilizados por meio de
programao. Este processo foi depois parametrizado, de forma a permitir ao utilizador o
mximo de controlo sobre o elemento a modelar. A ttulo exemplificativo, descrevem-se as
funcionalidades deste Add-In para o caso de modelao da geometria do beto envolvente a um
tubo de aspirao. Esta ferramenta tem de ser executada num template de criao de famlias
do Autodesk Revit onde o utilizador, aps selecionar a opo Tubo de Aspirao no menu
principal, insere o nmero de seces de cada tipo de entre os trs tipos programados para este
Add-In. Em funo do nmero de seces existentes o utilizador procede posteriormente ao
preenchimento dos parmetros correspondentes e dependentes do tipo de seco em causa. Uma
vez preenchidos os parmetros relativos a todas as seces que definem a geometria do tubo o
objeto automaticamente modelado podendo ser guardado e utilizado em qualquer projeto. De
realar que a parametrizao da posio relativa das seces apenas tem lugar no momento da
criao do objeto. Na Figura 2 apresentado o fluxograma da modelao da envolvente do tubo
de aspirao com recurso Ferramenta de modelao.
3. Modelos Desenvolvidos
175
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a) b)
Figura 3: Edifcio de Frido: a) vista exterior b) vista interior.
176
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
modelao desta zona de transio da escavao com recurso ao Add-In de programao grfica
Dynamo [6].
A soluo encontrada passou ento por, numa fase inicial, modelar a central sem esta transio,
ou seja, contendo apenas as extremidades desta (ver Figura 5). Posteriormente, foi criado um
algoritmo Dynamo em que, selecionando estas extremidades, gera superfcies entre elas e define
um slido a partir destas. Este slido depois exportado para o Revit e guardado como uma
famlia (ver Figura 6). Um corte tridimensional pelo eixo to tubo de aspirao do modelo do
poo da central apresentado na Figura 7.
177
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a) b)
178
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a) b)
Figura 10: Fluxograma da primeira soluo testada: a) eixo definido no espao; b) integrao
do troo modelado com o troo a montante (evidenciada a vermelho a incompatibilidade entre
troos).
Alm desta soluo, testou-se ainda o comando Swept Blend que, dado um eixo e as seces
inicial e final, cria um slido por varrimento do eixo, com as seces a servirem de auxiliares
na definio do objeto. Esta hiptese tambm no se revelou vivel pois pressupe que as
seces transversais definidas sejam perpendiculares ao eixo de varrimento, constituindo uma
limitao, por exemplo, no caso de se pretender modelar um troo que antecede uma transio
de inclinao do eixo do circuito hidrulico, em que a seco transversal final do troo no
perpendicular ao eixo. Tendo em conta o exposto anteriormente, recorreu-se, ento, ao Dynamo
para definio deste troo. Foi criado um algoritmo de programao grfica que parte da
premissa que executado quando, no Revit, esto modelados os troos a montante e jusante do
troo a modelar (com desenvolvimento circular) e o eixo projetado na horizontal (curva num
plano e no no espao). O utilizador tem, ento, de definir 4 inputs: i) selecionar os extremos
do troo a montante (isto , a seco inicial); ii) selecionar os extremos do troo a jusante
(seco final); iii) selecionar o eixo projetado na horizontal; iv) definir a inclinao desse
179
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
mesmo eixo (input numrico). Uma vez definidos estes inputs o algoritmo pode ser executado,
sendo o objeto automaticamente modelado em ambiente Revit, e o resultado ser guardado como
uma famlia e complementado com parmetros no geomtricos, conforme esquematizado na
Figura 11. Para o modelo do tnel de aduo h ainda a realar o facto de o modelo ser
discretizado pelas diferentes componentes que o podem constituir, como o beto de
revestimento e beto projetado. A modelao exigiu elevada ateno e rigor geomtrico na
definio do tnel, de forma a garantir a correta integrao deste modelo com os restantes
desenvolvidos.
3.5 Restituio
A modelao da restituio seguiu uma estratgia semelhante aplicada no caso da tomada de
gua. A restituio apresenta, tambm, uma geometria complexa que visa minimizar perdas
hidrulicas, sendo alguns dos elementos definidos a partir de uma sequncia lgica complexa.
Devido reduzida extenso do tnel da restituio, comparativamente com o tnel de aduo,
optou-se por incorporar esta componente no modelo da restituio. De facto, o tnel da
restituio constituiu o maior desafio em termos de modelao deste elemento de obra devido
ao facto de se caracterizar por uma seco de escavao atpica, no complementada ainda na
Ferramenta de modelao, descrita no ponto 2. Assim, optou-se pela criao de uma famlia
correspondente ao tnel da restituio, o que se revelou um processo moroso mas que revela
elevado potencial no caso de alterao de projeto, havendo a possibilidade de realizar a
atualizao em curtos intervalos de tempo. Nesta famlia foi includa uma outra famlia, a do
negativo do tubo de aspirao, que se prolonga desde a central at ao tnel da restituio. Tal
como no caso do tnel de aduo, a modelao do tnel da restituio exigiu um elevado rigor
geomtrico com o objetivo de promover uma correta integrao dos diferentes modelos
desenvolvidos. Na Figura 12 apresentado um corte tridimensional do modelo da restituio.
180
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
181
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
182
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
[1] Lino, J.C., Azenha, M. and Loureno, P., "Integrao da metodologia BIM na
Engenharia de Estruturas" in Encontro Nacional BETO ESTRUTURAL (2012),
Faculdade de Engenharia da Universidade do Porto, Porto.
[2] Informed Infrastructure, Model-based Design Powers China Dam Construction.
Consultado em 11 de Maio de 2016, https://informedinfrastructure.com/4362/model-
based-design-powers-china-dam-construction/.
[3] A. Marques, "Implementao de metodologias BIM na Direo de Engenharia de
Barragens da EDP: Casos de estudo de projeto de estruturas em obras hidroeltricas"
Tese de Mestrado, Universidade do Minho, 2015.
[4] Autodesk, My first Revit Plug-In. Consultado em 10 de Maio de 2016,
http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=16777469.
[5] Autodesk, Revit API Developers Guide. Consultado em 13 de Maio de 2016,
http://help.autodesk.com/view/RVT/2016/ENU/?guid=GUID-F0A122E0-E556-4D0D-
9D0F-7E72A9315A42.
[6] Dynamo, Open Source Graphical Programming for Design. Consultado em 13 de Maio
de 2016, http://dynamobim.org/.
183
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
184
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Claudio Gomes (1), Jos Carlos Lino (2), Ricardo Pereira Santos (3)
Resumo
A adoo da metodologia Building Information Modeling (BIM) vista como um processo
transformador que engloba as empresas, os Projetos e, no global, toda a Indstria da Construo
Civil. Contudo, a sua implementao tem impactos sociais, tcnicos e metodolgicos, pelo que
h alguns anos tem sido alvo de inmeras pesquisas com o objetivo primordial de difundir as
prticas associadas ao BIM nas empresas, nos Projetos e na Indstria. Por todo o mundo, vrias
iniciativas de entidades pblicas e privadas, governamentais e no-governamentais, tm
produzido guias, normas, manuais ou outros documentos que funcionam como um motor
propulsor da implementao BIM. Torna-se pertinente o desenvolvimento de documentos
similares orientados para a indstria da Arquitetura, Engenharia, Construo e Operao
(AECO) nacional.
185
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Implementar o BIM deve por isso seguir um procedimento estruturado numa sequncia de aes
de planeamento e aes de execuo, e como algo que tem um elevado impacto na
186
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Organizao deve ser planeado a um nvel estratgico pela gesto de topo e posteriormente
desenvolvido a um nvel ttico-operacional. O guia prope um procedimento constitudo por
dois tipos de planeamento, o Planeamento Estratgico e o Planeamento Detalhado e de
Execuo, que resultam em dois documentos, o Plano Estratgico e o Plano Detalhado e de
Execuo, respetivamente. Neles ficam registados todas os aspetos abordados ao longo do
planeamento da implementao. Com o Planeamento Estratgico proporcionada
Organizao a possibilidade de planear a sua estratgia global tendo em conta o BIM atravs
da determinao de metas e objetivos da sua implementao e a demarcao de uma estratgia
para os atingir. Possibilita ainda analisar a atual cultura organizacional e a sua posio no
ambiente que a rodeia e perspetivar o seu estado futuro bem como decidir at que ponto se
pretende implementar o BIM, ou seja, o nvel de integrao do BIM na Organizao.
Relativamente ao Planeamento Detalhado e de Execuo, o seu objetivo viabilizar de forma
detalhada as diretivas do Planeamento Estratgico determinando em concreto os recursos
necessrios e a eventual reestruturao da Organizao para implementar o BIM.
A implementao BIM no um ato isolado no tempo pelo que, tal como a figura anterior
demonstra, deve ser vista como um ciclo em que todo o planeamento envolvido revisto,
avaliado, controlado e melhorado, como parte integrante da Organizao.
187
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
188
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
189
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O planeamento da implementao BIM num Projeto deve ser registado num documento
denominado Plano de Execuo de Projeto em BIM, internacionalmente conhecido por BIM
Project Execution Plan (PxP) ou BIM Execution Plan (BEP) ou ainda BIM Management Plan
(BMP), variando de pas para pas. um documento formal com o objetivo de definir de que
forma o projeto ser executado, controlado e coordenado recorrendo metodologia BIM. Como
consequncia do facto de que o Plano de Execuo BIM elaborado pelas diversas entidades
intervenientes no Projeto, aquele diretamente influenciado pelo modelo de contratao
estipulado para o Projeto, j que os intervenientes se associam ao Projeto em diferentes fases
do seu ciclo de vida.
190
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O guia de implementao prope que deve ser desenvolvido apenas um Plano de Execuo de
Projeto em BIM que transportado ao longo de todas as fases do Projeto e deve ser visto como
um documento vivo em constante desenvolvimento e evoluo. Um Plano de Execuo de
Projeto em BIM traz mais-valias, no s para o Projeto em si mas tambm para os
intervenientes, na medida em que: i) todos os intervenientes so capazes de entender atravs
dele os objetivos estratgicos de implementar o BIM no Projeto; ii) entender qual o papel que
cada interveniente desempenha no Projeto e qual a sua responsabilidade que detm em criar,
manter e partilhar os modelos BIM e a informao, em cada fase do Projeto; iii) conceber ou
adaptar os seus mtodos e procedimentos tpicos (no seu mbito organizacional)
implementao BIM no Projeto; iv) prever recursos e servios adicionais eventualmente
necessrios; v) estabelecer um planeamento base a partir do qual possvel medir o progresso
da implementao no Projeto.
191
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Em Projeto podem ser enumerados fatores crticos de sucesso que passam pelo envolvimento
ativo de todos os intervenientes (incluindo o cliente) no planeamento da execuo do Projeto
em BIM e na compilao do Plano de Execuo do Projeto em BIM, despender o tempo
necessrio para este planeamento, consultar e atualizar o plano medida que o projeto evolu,
ter algum que detenha capacidades adequadas para defender a implementao BIM no Projeto
[9].
Todo o processo de estudo e compilao dos documentos BIM atualmente existentes e que
serviram de base ao Guia de Implementao BIM em Organizaes e Projetos permitiu
192
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este guia pretende ser uma base ao desenvolvimento de novas pesquisas e estudos. Assim,
como desenvolvimentos futuros proceder-se- sua aplicao prtica em casos reais com o
objetivo de criar casos de estudo que sustentem o seu contedo, para numa fase posterior
public-lo. Ambiciona-se tambm que sejam criados documentos similares que abordem
aspetos especficos da implementao BIM, nomeadamente especificaes que contenham
regras e metodologias de modelao gerais e especificas a cada disciplina. Por fim, a criao
de uma plataforma informtica que sirva de apoio gesto da implementao BIM no mbito
organizacional e no mbito de Projeto.
Referncias
193
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
194
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O artigo pretende comunicar a estratgia de implementao de BIM nos vrios projetos de
ensino do Departamento de Engenharia Civil da Universidade do Minho, particularmente no
Mestrado Integrado em Engenharia Civil, no Mestrado em Construo e Reabilitao
Sustentveis e no International Master in Sustainable Built Environment.
Mais do que fazer um estado da arte sobre a implementao BIM em contexto acadmico,
pretende dar-se um testemunho de um processo que est em desenvolvimento j desde o ano
letivo 2012/2013 e que tem vindo paulatinamente a ser consolidado. Ser possvel ilustrar a
evoluo da qualidade e profundidade que os alunos tm atingido em anos consecutivos, que
se deve ao progresso da equipa docente, ao apoio de alunos de anos anteriores e tambm a
melhorias ao nvel das prprias aplicaes informticas.
1. Introduo
Tendo em conta o cariz deste congresso, bem como o conhecimento sobre a temtica BIM por
parte dos leitores, considera-se desnecessrio efetuar um enquadramento das razes bem
conhecidas pelas quais fundamental que as temticas BIM venham a ser versadas nos projetos
de ensino das Universidades. Esse enquadramento convenientemente feito nos trabalhos de
Barison e Santos [1-3] que tm encetado investigao especfica na anlise de iniciativas a nvel
internacional, bem como nas competncias BIM que devem ser transmitidas no contexto da
formao de Engenheiros.
195
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Desde o incio do contacto dos autores deste trabalho com as metodologias BIM, foi
percecionado que seria importante tirar partido destas metodologias e mesmo ensin-las nos
projetos de ensino do DEC/UM. J desde o ano letivo 2010/2011 foram includos alguns
modelos BIM no ensino da Unidade Curricular de Estruturas de Beto I, como por exemplo
uma viga contnua de beto armado que objeto de anlise e dimensionamento, tornada
disponvel aos alunos em formato BIM (TeklaBIMSight) para apoio compreenso da
distribuio e dispensa de armaduras ver Figura 1 [4].
Figura 1: Modelo de viga de beto armado para apoio ao ensino em Estruturas de Beto I
Apesar de pequenas iniciativas avulsas no mbito das Unidades Curriculares em que os autores
deste artigo se encontravam envolvidos, o impacto do BIM nos processos de ensino era ainda
muito reduzido. Constatou-se desde bem cedo que seria estratgica a criao de Unidades
196
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Curriculares (UC) exclusivamente dedicadas a BIM nos projetos de ensino do DEC/UM, pois
permitira sensibilizar alunos e colegas de forma muito mais rpida para a premncia, relevncia
e complexidade desta temtica. Por essa razo, foram encetados esforos junto das direes dos
vrios projetos de ensino do DEC/UM para criao de nova UC. No entanto, este processo foi
difcil, por se tratarem de projetos de ensino j estabilizados, e sem espaos vazios para
preencher com um contedo que, invariavelmente, se substituiria a um outro contedo
anteriormente contemplado e j consolidado na estrutura desses projetos de ensino. No entanto,
a insistncia continuada na proposta de novas unidades curriculares BIM acabou por surtir
efeito a partir do ano letivo 2012/2013, seguindo o percurso cronolgico indicado nas 4 seces
seguintes. A descrio de contedos programticos ser feita no captulo 4 deste artigo,
relativamente edio mais recente de Unidade Curricular BIM no mbito do Mestrado
Integrado em Engenharia Civil da UMinho.
Foi tambm durante o ano letivo 2013/2014 que se iniciou o CursoBIM na Ordem dos
Engenheiros. O Curso baseou-se na experincia de ensino BIM tida no ano letivo anterior,
efetuando-se num esforo de equipa envolvendo formadores de vrias instituies acadmicas
e empresas, com coordenao da Universidade do Minho. Este curso tinha durao de 80 horas,
e realizou-se de forma praticamente simultnea no Porto e em Lisboa (uma semana de
desfasamento), nas respetivas sedes regionais da Ordem dos Engenheiros. Apesar deste Curso
no se enquadrar nos projetos de ensino do DEC/UM, entendeu-se ser relevante a sua referncia
neste artigo dada a inter-relao que teve com a crescente experincia docente da equipa UM
no contexto BIM.
197
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
198
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste ano letivo foi tambm realizada a 3 edio do Curso BIM (Porto e Lisboa com total de
50 formandos). Nesta edio, que decorreu entre setembro e dezembro de 2015, foram
introduzidas vrias alteraes relevantes das quais se destacam: (i) realizao de perodos
expositivos especficos para demonstrao da aplicao de conceitos BIM com software
comercial; (ii) registo de vdeos formativos de contedos veiculados nas formaes
(particularmente sobre software), permitindo acompanhamento e repetio por parte dos
formandos fora dos perodos de contacto. Estas duas alteraes principais decorreram de
sugestes efetuadas nos inquritos de satisfao realizados nas edies anteriores do
CursoBIM, que apontaram de forma consistente nesse sentido.
O processo de ensino BIM no DEC-UM foi evoluindo ao longo dos 4 anos letivos reportados
neste artigo. Naturalmente foram sendo introduzidos melhoramentos e contedos que
conduziram forma atual de ensinar. Pode considerar-se que a UC-BIM do MIEC ministrada
em 2015/2016 repercute a quase totalidade das evolues mencionadas, pelo que se optou pela
criao de uma seco independente neste artigo para a sua descrio detalhada.
Dada a inexistncia de sala especfica no DEC-UM com computadores para formao BIM,
optou-se por solicitar aos alunos que usassem os respetivos computadores pessoais para
realizao dos trabalhos durante as aulas (e fora delas). As aulas decorreram numa sala de aulas
normal, equipada com projetor multimdia, quadro branco e lugares sentados para ~35 pessoas.
Adicionalmente ao material disponvel na sala, foi feito um esforo por parte de docentes e
alunos em garantir a existncia de extenses eltricas para permitir que todos os computadores
pessoais pudessem estar ligados corrente eltrica durante as aulas. Com efeito, as aplicaes
BIM podem ser extremamente exigentes sobre os computadores, reduzindo drasticamente a
autonomia a perodos inferiores s 2h de aula prtica. O arranjo da sala sofria evolues durante
o dia de aulas: enquanto que de manh se mantinha a localizao de mesas e cadeiras tpica de
uma sala de aulas, com orientao para o docente, durante a tarde era efetuado um rearranjo de
mesas/cadeiras para criar clulas individuais correspondentes aos grupos de trabalho.
199
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A avaliao dos alunos foi feita exclusivamente com base nos trabalhos prticos, com os alunos
separados em grupos de 5 e envolvendo duas entregas: (a) entrega 1 durante a primeira semana
de abril, subordinada elaborao de Plano de Execuo BIM; (b) entrega 2 no final do
semestre, respeitante ao relatrio final do projeto BIM realizado. Ambas as entregas
compreenderam um relatrio escrito e uma apresentao oral. Foi dada uma ponderao de 35%
entrega 1 e de 65% entrega 2. Foi tambm tida em conta a assiduidade e o desempenho
especfico de cada aluno no seio do seu grupo para efeitos de avaliao final da Unidade
Curricular.
A comunicao entre docentes, alunos e monitores foi garantida de forma facilitada pela
plataforma GLIP.COM, que gratuita e permite troca de mensagens e ficheiros de forma
instantnea em grupos pr-definidos. tambm possvel a instalao de app nos telemveis,
garantindo ainda mais disponibilidade de leitura/resposta. Para alm do grupo global que
envolvia todos os docentes/alunos/monitores, foi dada a sugesto dos alunos criarem grupos
independentes relativos aos grupos de trabalho ou at interesses especficos (como linguagens
de programao). A experincia de interao foi bastante positiva e ir ser mantida no ano letivo
2016/2017.
A partilha de ficheiros com os alunos foi feita atravs da plataforma DROPBOX, dada a grande
dimenso e nmero de ficheiros. Para os docentes o processo foi extremamente simples e
transparente, no tendo sido identificado nenhum problema por parte dos alunos relativamente
a esta modalidade de partilha.
200
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Pretendeu-se com o trabalho prtico permitir aos alunos ter experincia direta na produo de
modelos BIM e, principalmente, na extrao de informao relevante dos mesmos.
Naturalmente, uma das importantes componentes do trabalho relacionou-se com a
aprendizagem do software, bem como a resposta aos desafios de interoperabilidade intrnsecos
aos processos BIM.
Os alunos foram desafiados a fazer o estudo completo em BIM de uma construo sorteada
aquando do arranque do trabalho. Este trabalho deveria envolver, potencialmente, as valncias
de Arquitetura, Estruturas, AVAC, Redes de guas, Oramentao e Faseamento Construtivo,
entre outras. Como material de base foram dados os processos completos de peas escritas
(PDF) e desenhadas (DWG) de 6 casos de estudo: 4 edifcios habitacionais em Guimares; um
Hotel em Lisboa; o novo edifcio do Instituto de Cincia e Inovao para a Bio-sustentabilidade
(IB-S) localizado no Campus de Azurm da UMinho, em Guimares.
Foram criados grupos de cinco alunos, encorajados desde o incio a definir claramente o papel
que cada um iria assumir no processo BIM, com a seguinte recomendao de papis:
coordenao BIM; arquitetura; engenharia de estruturas; engenharia de redes hidrulicas;
gesto da construo. Foi estabelecido um conjunto de objetivos recomendveis no contexto de
cada componente do modelo BIM e explanado no enunciado do trabalho. Alm disso, foram
estabelecidos os seguintes critrios de avaliao partida: (i) integrao e trabalho colaborativo;
(ii) abrangncia (integrao de vrias especialidades); (iii) utilizao de objetos e modelao
201
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
paramtrica na criao dos modelos; (iv) interoperabilidade (p.ex. IFC); (v) explorao de
visualizao avanada dos modelos; (vi) qualidade do relatrio; (vii) apresentao final
(incluindo respeito pelas regras/tempos).
Ainda relativamente ao software, indica-se que no ano letivo 2015/2016 se efetuou uma nova
experincia: tornar o uso de determinados softwares obrigatrio para determinadas
especialidades. Para o efeito, imediatamente aps o sorteio dos trabalhos a realizar, os alunos
foram informados de que teriam que usar um software especfico para cada especialidade. Esta
iniciativa foi tomada devido tendncia observada em formaes anteriores de os alunos
tendencialmente usarem apenas solues da Autodesk (lder de mercado em grande parte dos
segmentos BIM), em detrimento de se aventurarem em processos de aprendizagem de
plataformas alternativas, bem como de arriscar interoperabilidade entre plataformas distintas.
Esta prtica revelou-se interessante, mas dever ser aplicada com adaptaes no futuro, em face
das curvas de aprendizagem especialmente lentas de alguns softwares que disponibilizam
menos recursos de aprendizagem.
Apesar da entrega do trabalho estar marcada para o incio de junho, quer no ano letivo
2014/2015, quer no ano letivo 2015/2016, os alunos solicitaram adiamento da entrega do
trabalho e respetiva apresentao para o ms de julho, permitindo-lhes realizar trabalho
adicional durante a poca de exames e mesmo aps a mesma.
202
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 2: Algumas imagens exemplificativas do resultado final dos trabalhos dos alunos da
UC-BIM no ano letivo 2015/2016.
4.1 Seminrios
Desde o primeiro seminrio realizado em 12/12/2012, ilustrado na Figura 3a, tentou-se realizar
sempre um seminrio por ano, at presente data: em 2013, 2014, 2015 e 2016. exceo da
primeira iniciativa de 2012, que foi claramente dirigida ao conjunto da comunidade acadmica
e comunidade profissional da regio, os seminrios dos anos subsequentes foram
essencialmente direcionados para a comunidade acadmica, particularmente aos alunos do
curso de Mestrado Integrado em Engenharia Civil. Nestas atividades de disseminao tentou-
se sempre manter uma componente formativa de demonstrao de aplicao prtica de BIM em
exemplos concretos, mas tambm com convidados externos para apresentao de testemunhos
de aplicao BIM em contexto profissional. Tem-se tambm utilizado estes seminrios para
disseminao do progresso de trabalhos de dissertao de Mestrado em curso, com
oportunidade de discusso entre colegas, e funcionando como agente motivador para futuros
alunos da UC-BIM e de realizao de dissertaes de mestrado neste contexto.
203
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Numa comprovao cabal das suas caratersticas muito centradas na comunidade dos alunos
(servindo os docentes apenas como tutores e polos de ligao instituio universitria, por
uma questo mais de mera logstica de sites e espaos a utilizar do que propriamente de
envolvimento pedaggico/acadmico) e numa verdadeira estratgia de implementao
bottom-up, foi com grata satisfao que os autores se aperceberam da proliferao desta
iniciativa de um modo totalmente autnomo, para outras comunidades estudantis,
inclusivamente para Espanha (http://www.bimclub.es/).
5. Concluses
A experincia de ensino BIM no decurso dos ltimos 4 anos letivos tem-se revelado bastante
produtiva, tendo-se confirmado a viabilidade de recurso aprendizagem baseada em projeto
(project based learning) com que se tem realizado o ensino/avaliao no mbito da unidade
curricular do 4 ano do MIEC. Esta unidade curricular, pioneira a nvel nacional no contexto
dos cursos de Mestrado Integrado em Engenharia Civil, tem tido um acolhimento bastante
positivo por parte dos alunos, e encontra-se em constante atualizao face evoluo das
regulamentaes potencialmente aplicveis, bem como pela evoluo do software de suporte.
Acredita-se que o caminho trilhado conduziu os autores a uma perceo melhorada das formas
de ensinar BIM e que este testemunho se poder revelar til para garantir que outros projetos
de ensino de outras Escolas/Faculdades de Engenharia Civil e Arquitectura possam
implementar de forma facilitada o ensino do BIM.
204
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Agradecimentos
O trabalho aqui apresentado resultou em muitos aspetos de trabalho de equipa bastante alargado
com alunos, ex-alunos e colegas de outras instituies e/ou empresas. Apesar de ser difcil
sermos justos para todos os envolvidos, destaca-se a colaborao dos ex-alunos Bruno Caires,
Carlos Gomes, Alexandre Marques, Lus Bidarra e Bruno Ribeiro. tambm de assinalar a
uma palavra de agradecimento aos formadores que apoiam a UC BIM do MIEC, com referncia
especial aos que participaram nos ltimos 2 anos letivos: Joo Poas Martins, Antnio Aguiar
Costa, Carlos Nuno Lacerda, Francisco Reis, Vanessa Tavares e Jos Antnio Ribeiro.
Referncias
[1] MB Barison e ET Santos, "A tool for assisting teachers in planning BIM courses".
Computing in Civil and Building Engineering - Proceedings of the 2014 International
Conference on Computing in Civil and Building Engineering. pp. 2159-2166, 2014.
[2] MB Barison e ET Santos, " The competencies of BIM specialists: A comparative analysis
of the literature review and job Ad descriptions ". Congress on Computing in Civil
Engineering, Proceedings pp. 594-602, 2011.
[3] MB Barison e ET Santos, "BIM teaching strategies: an overview of the current
approaches" in Proc. of the International Conference on Computing in Civil and Building
Engineering, Nottingham, 2010.
[4] H Fontes, M Azenha e R Sanches, "Potencialidades de aplicao de ferramentas
Building Information Modelling, Encontro Nacional Beto Estrutural 2010 Lisboa,
2010.
[5] JC Lino, M Azenha e PB Loureno, "Integrao da metodologia BIM na Engenharia de
Estruturas, Encontro Nacional Beto Estrutural 2012 Porto, 2012.
[6] F Bastos, A Aguiar Costa, "Building Information Modeling. O Ensino do BIM em
Portugal, Construo Magazine, n69, 2015.
205
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
206
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Parte II
BIM em projeto de arquitetura e engenharia
207
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
208
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
No presente artigo expe-se de que forma as metodologias e processos BIM podem contribuir
para a comunicao do faseamento executivo no projeto de grandes escavaes, nomeadamente
de escavaes a cu aberto com recurso a cortinas flexveis. De seguida apresentado um caso
prtico de aplicao do processo BIM a uma estao de metro com cerca de 6700 m2 de rea de
implantao e 28 m de profundidade. Esta estao foi desenvolvida recorrendo a ambas as
metodologias, CAD e BIM, permitindo, por isso, comparar resultados. Indicam-se ainda as
principais dificuldades encontradas na abordagem BIM, explicando como foram ultrapassadas
e dando exemplos concretos de procedimentos que se desenvolveram para dar resposta,
designadamente, modelao da escavao. Por fim, apresenta-se uma outra estao de metro,
desenvolvida apenas em BIM, o que suscitou medidas adicionais de organizao, e onde se
introduziu o modelo geolgico.
1. Introduo
O presente artigo refere-se aplicao do processo Building Information Modelling (BIM) [1]
a grandes escavaes, explorando as vantagens gerais e particulares do mesmo neste tipo de
obras.
209
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Contributo do BIM
210
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Projeto-piloto
A rea de implantao da estao, incluindo os acessos, cerca de 6700 m2. A escavao tem
130 m de comprimento, 22,6 m de largura mdia e 28 m de profundidade. Est ainda definido
um poo de bombagem no extremo sudoeste da estao onde a escavao 7 m mais profunda
(Figura 1). No que diz respeito estrutura de conteno, foram projetadas paredes moldadas.
Definiu-se o encastramento das paredes de 16 m para garantir a impermeabilizao do fundo
da escavao. A viga de coroamento do corpo principal da estao situa-se a uma profundidade
mdia de 3,5 m, o que implica uma escavao geral, com tratamento dos taludes de escavao
at ao terreno natural (Figura 2).
211
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esto definidos 5 nveis de escoramento, dos quais quatro so metlicos e o restante uma laje
intermdia da estao com 0,70 m de espessura (Figura 3). Cada apoio da estao a materializar
pelos perfis metlicos ser formado por duas seces em caixo com um comportamento viga-
coluna independente (Figura 4). Tendo em conta os esforos atuantes em cada nvel, foi
necessrio definir contraventamento na direo de menor inrcia dos perfis nos trs nveis de
escoramento abaixo da laje intermdia (Figura 5). A localizao de cada nvel foi definida tendo
em conta as cotas de escavao e as juntas de betonagem da parede de forro.
A arquitetura da estao obrigou definio de trs nichos na parede sul para instalao de
poos de ventilao at superfcie, tendo-se definido o escoramento de forma a no ocupar o
espao corrente do interior da estao nessas zonas, para permitir a movimentao de materiais
e equipamentos entre o interior e o exterior da escavao (Figura 6). Foram ainda definidos
rolhes em jet-grout nas extremidades da estao.
212
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O projeto-piloto tinha trs propsitos fundamentais: formar uma equipa capaz de modelar em
BIM (usando REVIT); testar, na CENOR, a capacidade de desenvolvimento de projetos de
grandes escavaes em BIM; obter medies das principais quantidades de materiais do projeto.
Uma forma de validar o segundo objetivo foi a replicao de alguns dos desenhos produzidos
em CAD, selecionando-se desenhos considerados representativos de cada tipo, nomeadamente,
plantas, cortes, alados e detalhes.
Em adio aos elementos produzidos de acordo com a representao tradicional, foi definido
um quarto objetivo mais ambicioso que os restantes, a animao do faseamento executivo
atravs da combinao do modelo com o planeamento das atividades de construo.
213
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
estao, mas tambm porque foram definidos os seus acessos, que no foram modelados em
BIM. Por outro lado, o tempo despendido em BIM reflete, em parte, o tempo necessrio para
adaptao a um novo software, o desenvolvimento de metodologias de modelao, a criao de
vrios objetos personalizados e o teste dos modelos, em virtude de este ser o primeiro projeto
do gnero realizado na empresa, o que justifica no existirem ainda as bases necessrias para
agilizar o processo.
O primeiro est relacionado com a modelao da escavao (Figura 9). O primeiro passo foi a
importao do CAD com as curvas de nvel e os pontos que definiam o terreno natural,
convertendo-se de seguida essa informao numa topografia REVIT. Definida a fase zero
(existente), a topografia das fases seguintes foi, inicialmente, definida custa de uma
ferramenta especfica da aplicao para fasear alteraes topogrficas. Contudo, as ferramentas
de modelao de superfcies topogrficas, com as quais se definiriam as alteraes ao terreno
em relao sua forma original, limitam-se edio dos pontos que definem a topografia
(Figura 7). Esta operao, realizada com a referida ferramenta do REVIT, mostrou-se muito
214
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O procedimento adotado passou pela criao das superfcies de cada fase em Civil 3D, atravs
das quais se geraram slidos entre cada duas superfcies, representando os volumes a
movimentar em cada fase. Os slidos gerados automaticamente pelo Civil 3D foram importados
para o modelo REVIT como elementos genricos (Figura 8). Neste caso, optou-se por perder a
classificao do elemento como pertencendo categoria de topografia em prol da velocidade e
do rigor com que foi possvel definir a geometria.
O segundo exemplo est relacionado com a escolha da ferramenta para modelao das paredes
moldadas. Atendendo ao prprio nome faria sentido que fossem modeladas com a ferramenta
215
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Desenvolvimentos ps projeto-piloto
O arranque deste projeto foi marcado pela elaborao do BIM Execution Plan (BEP), onde se
define toda a informao relevante relacionada com o projeto: equipas; especialidades
envolvidas; responsveis; entregveis; datas de entrega; configuraes dos modelos; processos
de modelao. Este documento foi validado pelos responsveis das diferentes especialidades.
Foi tambm desenvolvido um sistema de gesto documental com o objetivo de evitar que se
perdesse o rasto da verso mais recente, ou que outras especialidades utilizassem modelos que
no estivessem validados.
216
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os diferentes limites geolgicos acabaram por ser modelados em Rhinoceros, uma vez que este
programa dispe de um conjunto de ferramentas de modelao muito mais alargado, que
permitiu expressar melhor a conceo que a equipa de Geologia fez do local (Figura 10).
A ligao ao Revit foi feita atravs do formato SAT (Standard ACIS text). Cada limite foi
exportado para um ficheiro SAT, que por sua vez foi ligado a uma In-Place Mass. Foi
necessrio colocar os links em famlias para que pudessem ser controladas visualmente, serem
seccionadas em corte, aparecendo apenas as linhas de corte das superfcies, e fossem passveis
de ligao a anotaes automticas (Figura 11). Os textos com a identificao do tipo de
material so tags que leem o nome do tipo de cada famlia de massa.
217
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No que diz respeito a avanos futuros, estes passaro decerto pela ligao dos modelos das
obras geotcnicas a programas de clculo geotcnico, nomeadamente de estabilidade, de
percolao, de anlise dinmica ou de tenso-deformao. Estando o faseamento construtivo e
as propriedades mecnicas das diferentes formaes geolgicas definidos no modelo, poderia
ser possvel importar tambm essa informao para o programa de clculo.
Agradecimentos
Os autores agradecem Arq. Sofia Henriques e ao Eng. Lus Rodrigues a sua colaborao na
elaborao deste artigo.
Referncias
218
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Apresenta-se, neste artigo, o caso de estudo de modelao BIM da componente hidrulica
(tubagens, acessrios e equipamento) de uma estao elevatria de gua bruta.
O projeto foi desenvolvido pela CENOR em 2016 para um cliente internacional. A CENOR
desenvolveu o modelo BIM para produo das peas desenhadas e extrao de quantidades a
nvel de projeto de execuo.
A modelao realizada permitiu cumprir os objetivos a que se props e revelou vantagens, face
metodologia CAD, de cada vez que surgiram alteraes.
219
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
A modelao BIM da Estao Elevatria serviu ento de teste s capacidades da empresa para
a elaborao de projetos de obras hidrulicas em BIM.
A Estao Elevatria faz parte do complexo de instalaes que fornece gua a uma refinaria.
Este complexo est implantado junto captao de gua da albufeira e a cerca de 20 km da
refinaria.
A Estao Elevatria apresenta trs linhas de bombagem com capacidade mxima de 2000 m3/h
prevendo a ampliao futura para quatro linhas de bombagem. A aspirao realizada a partir
de um reservatrio metlico de planta circular com cerca de 4000 m3 de capacidade.
3. Caso de Estudo
220
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O modelo foi utilizado para o desenvolvimento dos desenhos do projeto de execuo e para a
extrao de quantidades.
Apesar das bibliotecas BIM internacionais disponveis na internet estarem a crescer, so ainda
muito vocacionadas para projetos de arquitetura e de edifcios, sendo difcil encontrar
disponveis objetos para projetos de engenharia hidrulica mais especficos e de maiores
dimenses, como o caso de uma Estao Elevatria.
Os elementos utilizados neste tipo de projeto devem seguir a normalizao em vigor, que
estabelece o dimensionamento geral da sua geometria em funo do material, do dimetro do
sistema, e da presso a que podem estar sujeitos.
No incio da modelao, os elementos criados foram parametrizados com base nas normas
europeias, com vista a poderem ser utilizados por toda a empresa. Mais tarde, com o
desenvolvimento do trabalho, houve necessidade de adaptar estes elementos s normas
americanas.
Este trabalho de parametrizao dos elementos um trabalho complexo dada a relao existente
entre os diferentes elementos de MEP. Veja-se o caso dos acessrios das tubagens, que devem
221
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
ter o mesmo dimetro dos tubos a que esto ligadas. A alterao do dimetro do tubo tem
implicaes imediatas na geometria dos acessrios a eles associados. A parametrizao
implicou por isso a transferncia dos dados das normas europeias e americanas para lookup
tables que depois foram incorporadas nos elementos.
a) Modelo do
circuito hidrulico
com terreno e
estruturas
b) Modelo do
circuito hidrulico
isolado
c) Desenho
esquemtico
d) Folha com
desenho esquemtico
e tabelas de
quantidades.
222
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A modelao dos elementos teve tambm de ter em conta as diferentes formas de representao,
conforme as diversas vistas. Para este projeto era necessrio que os elementos tivessem uma
representao reconhecvel, e no simblica, nas plantas, cortes, alados e vistas 3D de
definio dos circuitos. Mas para os desenhos de fabricao/construo vistas axonomtricas
as vrias linhas de tubagem, acessrios e equipamentos tinham que ter uma representao
simblica (Figura 2). Para este efeito utilizaram-se as vrias opes de visualizao (nveis de
detalhe) disponveis no programa (Revit) de forma a controlar a representao dos elementos
nos diferentes tipos de vista.
Foram ainda adicionados aos elementos os parmetros necessrios para a sua identificao e
legendagem em quadros inseridos posteriormente nos desenhos.
223
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Um dos desafios deste projeto foi a criao das axonometrias esquemticas das vrias linhas de
tubagem para construo. Neste tipo de vistas necessrio recorrer a planos auxiliares de
trabalho para realizar a cotagem dos elementos nas vrias direes e a utilizao quase exclusiva
de anotaes paramtricas (labels).
A extrao das quantidades para o Mapa de Quantidades foi conseguida atravs da exportao
expedita de 5 tabelas, a partir do Revit, que depois foram trabalhadas em Excel.
Mas os desenhos com a representao axonomtrica esquemtica das vrias linhas tinham
tambm de conter a descrio de todos os elementos e as suas quantidades, indo ao encontro do
que se iria fazer para outras partes do projeto que estavam a ser desenvolvidas em CAD.
224
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.4 Visualizao 3D
Uma das vantagens do desenvolvimento do projeto em BIM foi a utilizao de imagens 3D do
modelo para mais facilmente comunicar ou explicar o projeto ao cliente, outros consultores ou
intervenientes. Foram criadas vrias vistas 3D que foram exportadas para o formato JPEG e
que se revelaram de grande utilidade na transmisso da evoluo das solues adotadas para o
projeto no decorrer do trabalho (Figura 4 e 5).
a) b)
Figura 4: Vista 3D soluo inicial (a) e soluo final (b)
225
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste caso, o projeto sofreu algumas alteraes durante o processo de validao da soluo e
reviso de desenhos.
4. Concluso
A adoo dos processos e metodologias BIM no projeto da Estao Elevatria revelou-se muito
eficaz na coordenao de representao entre todas as peas desenhadas e na extrao de
quantidades. A utilizao de vistas do modelo 3D foi tambm muito til para a transmisso
mais eficiente das solues de projeto.
A criao de elementos especficos para este tipo de projeto obras hidrulicas de maior
dimenso levou a um aumento do tempo gasto na fase inicial da modelao. No entanto, estes
elementos fazem agora parte da biblioteca BIM da CENOR e podero ser utilizados noutros
projetos.
226
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Abstract
There was always a need for an accurate virtual representation of buildings containing actual
geometry and related data, required to support the design, execution and supply. Building
Information Modeling (BIM) technology has appeared to fulfill that demand. Offering a model
with regularly actualized and synchronized information, the BIM concept is able to reshape any
AECO project. This paper presents an overview of BIM with focus on its applications in the
project life cycle and benefits for project stakeholders through two case studies, out of five
carried out during the master degree internship in the engineering consultancy company -
NEWTON. In the first case study, attention was focused on the goals achieved through BIM
based design in comparison with traditional design, particularly by structural engineer, due to
the implementation of the mentioned technology on a complex project of residential building
in Porto and its architectural integration. On the second case study, the spatial coordination of
Mechanical, Electrical and Plumbing (MEP) systems on a large-scale hotel project has been
analyzed and accomplished, highlighting merits of BIM at this project stage. Through the
reduction of space used for facilities and infrastructures and the ability to identify conflicts and
to nullify the related costs, its advantage on a complex building was proved.
1. Introduction
As a fundamentally new way of creating, sharing, and using project life-cycle data, BIM has
reached different levels of development worldwide: in countries such as Ukraine the term BIM
technology has just shown up on the horizon of Ukrainian architecture, engineering,
construction, and operations (AECO) industry [1], active discussion and efforts to optimize and
disseminate the implementation of BIM have been repeatedly observed in Portugal in recent
years [2], while USA, United Kingdom, Singapore, Norway, South Korea, Denmark and
Finland already have introduced requirements of BIM for the public projects been
institutionally advocated due to its great potential to streamline all project processes [3].
227
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
BIM consists of a set of interacting policies, processes and technologies that generate a work
methodology that is able to manage the building design and project data, in a digital format,
throughout the buildings lifecycle [4]. With BIM technology, an accurate virtual model of a
building is digitally constructed. When completed, the building information model contains
precise geometry and relevant data needed to support the design, procurement, fabrication, and
construction activities required to realize the building [5, 6]. The use of BIM goes beyond the
planning and design phase of the project, being extended throughout the life-cycle of buildings
and structures, from houses to malls, stadiums and bridges, and to a wide range of
infrastructures (water, wastewater, electricity, gas, waste etc.).
Within the framework of the internship in NEWTON Engineering Consultants company, five
projects from different engineering sectors were performed, two of which are presented in this
paper. For the development of these projects using BIM technology, a comprehensive literature
review of fundamental concepts was initially performed and the application of BIM process in
structural engineering and its impact on MEP coordination was reached. The main objective to
be established by these practical means was to figure out useful benefits and advantages of BIM
for engineering projects over traditional design approach, then highlighted in this article. In
addition, model inspection procedures for identification, inspection and report of interferences
in a 3D project model were investigated to justify BIM methodology application for the
coordination process and with all facilitations that follow.
Along with the rest, use of the Building Information Modeling (BIM) can be a beneficial
platform for structural engineers to stay competitive and match with needs of modern AECO
industry.
While using a building information model, both the physical, which contains the data used in
the analysis applications, and analytical information, which is the model applicable for the
structural analysis, are interconnected in the same place [7].
The project can be described as reinforced concrete building for habitation purposes with floor
area about 530 m. It consists of two parts (front and back), connected with elevated walkway
performed as steel structure and has complex multilevel floor marks. It was decided to carry
out modeling in phasing methodology of Revit. The main idea was that BIM development
process is needed to support the different uses of the model in different project phases.
According to official BIM regulations, such as [8], purposes of usage of BIM data were agreed
and confirmed for each phase of concrete project. Thus, the division into phases and
requirements to each model were as in Table 2.1:
228
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Table 2.1: Division the project into phases and Goal setting.
Phase
Figure 2.1: Data of topographic survey of Figure 2.2: 3D model of existing terrain and
worksite. structures remains.
229
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Modeling this phase was time-consuming (approximately 35 hours), but could be achieved
faster in more appropriate for terrain modeling software.
To create the base of the building it was used Building Pad Revit tool, which generates flat
horizontal surfaces according to reference plans uploaded to the project as links. The excavation
volumes by soil type were extracted from Revit through its function to compare and trace the
changes in different phases of one model. It should be noted that the cut and fill volumes
calculated by Revit are approximate, generally providing results with +/- 1% to 2% accuracy
[10]. The excavation volumes were extracted from Revit taking in account terrain change from
rocky soil on the back part of the worksite to earth soil on the front (Figure 2.4).
Figure 2.3: The longitudinal section of the building. Figure 2.4: Excavation
volumes of rocky soil and
earth soil extracted from
Revit.
230
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Architects models are not included in the scope of structural BIM [11], but, as for the presented
case study, when architectural BIM model isnt preliminarily developed, it is a structural model
that clarified some principal aspects and conceptual solutions of architectural project. This
follows from the fact that the information produced by the architect, engineer and all the various
contractors cannot always be represented in a drawing format [11].
As soon as the model had been accomplished (Figure 2.5) in Autodesk Revit and calculation of
structural elements were carried out in Robot Structural Analysis (Figure 2.6), a list of decisions
optimizing the project were taken. This was impracticable via traditional 2D drawings. Namely,
level marks of certain areas were changed, the position of beams (shallow, inverted or normal)
and columns location and elevation was chosen for the best architectural performance and,
simultaneously, without losses in bearing capacity.
Figure 2.5: 3D BIM structural model in Figure 2.6: Analytical model for
Revit. calculations in Robot Structural Analysis.
The main modeling concerns were associated with understanding of architectural drawings, and
their revision after some alterations were introduced. The received documentation contained
plans in quantity one plan per floor, while the building had 23 marks of finished ground level
for 6 floors, as it comes out of Figure 2.7.
231
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figure 2.7: Elevation view of building in Revit. Figure 2.8: Modeling of irregular
column (Source: (Standard
Approach of
Modelling(SAM),2014) [13], p.9).
Irregular shape elements, which also raised complexity of modeling, were modeled as elements
to be included into the building structure analytical model, by the principal demonstrated on
Figure 2.8. Structural model with schedules verification took more or less 40 hours to be created
following the structural modelling regulations.
Structural engineers can take advantage of BIM in different ways, as the model can be
constantly updated with any changes in the design or general specifications, keeping all the data
as accurate as possible [14]. BIM model allowed design team to assess impact of changes on
structure, design and quantities. Various projects carried out with BIM technology in past times
in NEWTON - Engineering Consultancy Company [15] and presented case study practically
proved BIMs merit of extracting quantities (volumes and lengths) of RC and steel elements
from model as schedules has been appreciated to the full extent, working on The bill of
quantities and processes.
3. Spatial MEP coordination in BIM environment: Case study 2 - BIM of large scale Hotel
in Asia
One of the most powerful tools and merits of BIM is its application for disciplines coordination
and clash detection. The task of spatial coordination has become a major challenge due to the
complexities of the various systems involved [16]. The coordination process involves locating
equipment and routing connecting elements for each system to avoid physical interferences
[17]. Unlike 2D method, no research was found that suggested the onset of BIM had anything
other than a positive effect on MEP spatial coordination [16].
232
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
For successful adoption of BIM and 3D modeling for spatial coordination of Mechanical,
Electrical, Plumbing, and Fire Protection Systems (MEP) well-defined, organized, consistent,
and repeatable framework has to be developed [18]. The introduced algorithm (Figure 3.1) was
worked out taking in account specific characteristic of the project large scale hotel building
with complex design to be constructed in Asia. As implies from the functional application,
building will accommodate, besides more than 700 rooms, numerous conference rooms,
restaurants, swimming pools and offices over approximate floor area 15.000 m. In this case
study the BIM effort was integrated into the project after design using 2D tools had already
been accomplished but was considered as insufficient for such great complexity of the project.
Figure 3.1: The MEP coordination process workflow developed for Case Study 2.
Figure 3.2: The fragment of 3D model Figure 3.3: Rendering of the model of the
displaying an exit of core of the building proposed building: complex configuration of
with complex configuration of MEP MEP equipment over steel trusses.
equipment.
233
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figure 3.4, 3.5 and 3.6 shows how the clashes between elements of different disciplines could
be identified easily in the 3D model, the proper zone is then corrected and redesigned by the
appropriate project team member. Figure 3.4 depicts utilization of the same service zone by
ventilation and firefighting system (clash 1) and near miss of wall opening (clash 2).
This case study covers the coordination process towards the minor part of the project - six floors
of the building, but even so, over 5000 clashes of 3 types were detected and resolved.
Coordination including clash detection is a continuous process which is carried out along with
modeling floor by floor, and in this case study was equal to 8 weeks. During this time the
strategy was developed and improved with practical experience, as well as ways of
communication between process members. The time dedicated to Intersections and errors
which were identified and managed before tendering and construction could be estimated by
avoided the direct and the indirect cost.
Analysis of return on investment (ROI) [21] has proved that the scale and size of a project
should be weight heavily by owners in ordered to invest in BIM, since on larger more
complicated projects benefit of BIM fees is the much higher. On an average, BIM results in the
potential savings in construction costs ranging from 15 40% [22]. BIM coordinations
efficiency effects on the clients budget, and invariably coordination issues affect the
programmed duration of the project [16].
Figure 3.4: The fragment of 3D model with clashes (left -Navisworks) sorted as 3rd type and
resolution after coordination process (right - Revit).
On Figure 3.6 architecture has suffered a change due to the presence of structural beam and
conducts passage downwards.
234
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figure 3.5: The fragment of Figure 3.6: The fragment of 3D model (Revit) with clash
3D model (Navisworks) with of the 1st type.
clash of the 2nd type.
The major advantages of BIM application in this case study, as well as in case studies presented
by other authors [5, 6, 23-25], were the reduction of MEP coordination time, reduction of RFIs
and avoid additional costs .
4. Conclusions
With BIM, engineers are empowered to achieve more efficient and intelligent design which
makes evident for the entire AECO industry, the benefits of using the technology. Especially
when analyzing the way how this methodology enhances the structural design workflow, it
turns out that optimal design solutions are more apparent and accessible, and procedure of
structural design data transfer to an architect and other stakeholders is facilitated in times.
Furthermore, productivity is rising without losses of quality due to high automation of
execution of construction documentation. Even though BIM is a relatively recent technology,
it has already provoked an idea, occasionally appeared in scientific literature, to abandon 2D
drawings, mostly due to reduction of the need in extensive checks and errors elimination even
before generate the documentation.
Regarding MEP coordination, the presence of BIM environment contributes to all steps to
dispose of the intersection: clash detection, finding solutions and final decisions realization.
Its important to note that resolving all physical interference during the MEP coordination
process does not necessary ensure that a facility has been well coordinated, since proper
methodologys application needs significant knowledge base and qualified specialists.
Moreover, before proceed to BIM process a bunch of properties of a project should be evaluated
to conclude that BIM usage is justified. Its definitely beneficial if BIM is implemented for the
entire life-cycle of the project, and return of investment has always positive value [21],
otherwise if model is developed for specific uses of different phases of the design and
construction process, the aspects as time available for design and deadlines of project execution,
need in future usage of model, skills of employees, architectural changes during the project,
complexity of the project, budget etc. should be considered.
235
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Acknowledgements
This work was possible due to the continuous support of all colleagues in NEWTON -
Engineering Consultancy Company and BIMMS-Building Information Modeling &
Management, who guided me through each of the presented case studies and accelerated my
learning curve. The paper was prepared during Master Degree Programme in Polytechnic
Institute of Leiria funded by INFINITY project in the framework of the EU Erasmus Mundus
Action 2.
References
236
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
[17] Korman, T.M., L. Simonian, and E. Speidel, How building information modeling has
changed the MEP coordination process. 2010: California Polytechnic State University,
San Luis Obispo, CA, USA.
[18] AGC BIMForum, MEP Spatial Coordination Requirements for Building Information
Modeling 2009.
[19] Navisworks, A., Navisworks Manage Brochure:Coordinated, Complete Control. 2010.
[20] Hughes Nigel, et al., Impact & control of RFIs on construction projects, in Construction
Forum. 2013.
[21] Giel, B. and R.R.A. Issa, Return on Investment Analysis of Building Information
Modeling in Construction. ASCE Journal of Computing in Civil Engineering special
issue, 2011.
[22] Holness, G., Building Information Modeling. ASHRAE Journal, 48(8), 38-46, 2006.
[23] Kullven, F. and K. Nyberg, Possibilities with BIM in relation to cost estimation and
scheduling.A case study of a Swedish civil engineering project. 2014, CHALMERS
UNIVERSITY OF TECHNOLOGY: Gteborg, Sweden.
[24] Gerbov, A., Process improvement and BIM in infrastructure design projects findings
from 4 case studies in Finland. 2014: Aalto University.
[25] Hergunsel, M.F., Benefits of building information modeling for construction managers
and BIM based scheduling. 2011, Worcester Polytechnic Institute.
237
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
238
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Ins Caetano (1), Antnio Leito (1) e Francisco Teixeira Bastos (2)
Resumo
Ultimamente, as tecnologias BIM tm vindo a substituir as ferramentas CAD tradicionais, por
permitirem aos seus utilizadores associar informao de natureza construtiva e de
comportamento dos materiais aos elementos constituintes dos seus modelos 3D. Por outro lado,
o Design Generativo, uma abordagem algortima ao design, tem permitido a mecanizao de
tarefas de design e a produo de geometrias de crescente complexidade. Dadas as
potencialidades destas duas abordagens, tm sido desenvolvidas formas de combinar BIM com
Design Generativo.
O trabalho desenvolvido neste artigo est inserido num projeto de arquitetura da autoria do
Atelier dos Remdios e dos FOR-A. O desafio proposto foi a criao de um conjunto de
fachadas perfuradas para um edifcio de habitao na rea de Lisboa. A explorao destes
elementos arquitetnicos foi feita usando Design Generativo para BIM.
O desenvolvimento deste trabalho foi feito utilizando o Rosetta, um IDE para Design
Generativo que suporta scripts usando diversas linguagens de programao e permite a
visualizao e a edio dos seus resultados em diversas aplicaes CAD e BIM. Resultou um
modelo de informao que incluiu trs fachadas de composio geomtrica parametrizvel,
com capacidade de extrapolao de quantidades de material utilizado e de ensaios de
desempenho da construo.
1. Introduo
239
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
complexidade dos modelos aumenta, estas ferramentas apresentam algumas limitaes devido
ao facto de no serem suficientemente flexveis. Para ultrapassarem estas limitaes, muitas
destas ferramentas foram estendidas de modo a j permitirem a utilizao do Design Generativo
(Generative Design-GD) [1].
Por outro lado, o Building Information Modeling (BIM) veio alterar o paradigma no processo
de projecto e construo, introduzindo novas funcionalidades na prtica de projecto digital. Isto
porque, para alm de lidarem com a geometria tipicamente suportada pelas ferramentas CAD,
as tecnologias BIM relacionam os elementos do edifcio de uma forma paramtrica e
associativa, atribuindo simultaneamente semntica aos mesmos [2]. Em termos prticos, esta
metodologia representa uma base de dados de informao a ser partilhada por todos os
intervenientes durante o ciclo de vida de um edifcio, entre eles a arquitetura, as especialidades
e a construo [3]. Esta informao pode ser tambm utilizada em processos de anlise com
vrios critrios de desempenho (i.e., arquitetural, estrutural, energtico, acstico, etc) [4].
Consequentemente, isto permite aos arquitetos, em especial, ganhar controlo sobre a
informao e a conceo do edifcio, em todas as fases do projeto [2].
Tal como aconteceu com as ferramentas CAD, o BIM foi tambm combinado com o GD numa
recente abordagem de projeto, ao qual podemos chamar de BIM Algortmico [5] [6]. O exemplo
desenvolvido neste artigo j utiliza esta nova abordagem no desenvolvimento de um conjunto
de fachadas algortmicas para um edifcio de habitao na rea de Lisboa.
2. Processos Algortmicos
Contudo, as tecnologias mais recentes j permitem que a explorao arquitetnica v para alm
das possibilidades tradicionais, promovendo o desenvolvimento e a proliferao de formas
complexas, novos padres e mtodos de fabricao avanados [8].
O Design Generativo (GD) uma abordagem de desenho que gera formas atravs de algoritmos
[9]. Esta abordagem permite gerar uma gama variada de solues num curto espao de tempo,
ao mesmo tempo evitando as tarefas repetitivas e bastante morosas necessrias na modelao
usando as ferramentas CAD e BIM. De modo a usar esta abordagem, em vez do arquiteto ir
diretamente da ideia para a forma, ele tem que desenvolver uma etapa intermdia onde produz
uma definio algortmica do design a produzir [10], na qual esto declarados os parmetros do
mesmo e as dependncias entre estes (ver o exemplo na Figura 1).
240
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. BIM Algortmico
Tal como as tecnologias CAD, algumas ferramentas BIM tambm j beneficiam de processos
algortmicos. Algorithm-Aided BIM [6] ou Algorithmic-Based BIM [5] so alguns dos nomes
pelo qual este novo paradigma conhecido. O Dynamo, o GenerativeComponents, o Lyrebird,
e o RosettaBIM so alguns exemplos de extenses que permitem aos seus utilizadores
explorarem abordagens algortmicas em aplicaes BIM.
O Dynamo [11] uma extenso do Revit que utiliza uma linguagem de programao visual,
cuja dinmica de trabalho se baseia na associao de ns atravs de fios que transportam
informao entre estes. As ligaes entre ns associam duas portas de ns distintos, uma de
sada e a outra de entrada, que suportem o mesmo tipo de informao.
Lyrebird [12] uma extenso que foi desenvolvida para o Grasshopper [13], uma linguagem
de programao visual para o Rhinoceros 3D (ver Figura 1) com uma dinmica de trabalho
muito semelhante do Dynamo, permitindo a utilizao do Grasshopper em ferramentas BIM
como o Revit.
Finalmente, o RosettaBIM [16] [5] [17] uma ferramenta de GD que suporta diversas
linguagens de programao textuais, como por exemplo o Python, AutoLISP e o Racket, e que
permite a portabilidade entre diversas ferramentas CAD, incluindo o AutoCAD, o Rhinoceros
3D e o SketchUP e BIM, incluindo o Revit e o ArchiCAD.
241
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Caso de Estudo
O trabalho desenvolvido est inserido num projeto de arquitetura da autoria do Atelier dos
Remdios em parceria com os FOR-A. O desafio proposto foi criar uma fachada perfurada que
assegurasse diferentes permeabilidades, para um edifcio de habitao na rea de Lisboa. Como
j foi referido em seces anteriores, optou-se pela explorao deste elemento arquitetnico
usando uma abordagem algortmica para BIM.
O projeto proposto era composto por cinco pisos, um piso de estacionamento e quatro de
habitao com quatro tipologias diferentes. Contudo, ao nvel da rua apenas estariam visveis
trs dos pisos, sendo que os dois primeiros ficariam a uma cota inferior, i.e. um estaria
totalmente enterrado (o estacionamento) e o outro semienterrado.
O edifcio em forma de U criava um ptio interior central localizado ao nvel do primeiro piso
de habitao, ou seja, com uma cota inferior do nvel da rua, facto que garantia que todos os
apartamentos estivessem virados para esse ptio. Como o lote em causa est localizado entre
dois lotes edificados, esta soluo conseguia assim fornecer iluminao natural a todos os
apartamentos (Figura 2.C).
242
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O desafio apresentado foi desenvolver um conjunto de trs fachadas para este edifcio de
habitao:
A fachada exterior norte, com frente para a rua da Junqueira;
A fachada exterior oeste, para o lote vizinho e futura rua a criar;
Uma fachada interior virada para o ptio central.
Figura 3: Kolumba Museum em Colnia, pelo arquiteto Peter Zumthor referncia de jogo de
tijolos para a fachada do edifcio (http://thetomorrow.net/events/venues/kolumba/).
243
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
projeto. De seguida, foram adicionados a esse programa base conjuntos de novos parmetros
de modo a gerar diferentes padres para as fachadas. A Figura 4 sumariza alguns dos modelos
que foram desenvolvidos.
Como nesta etapa ainda no havia a definio do material a aplicar na fachada, os resultados
propostos tiram proveito de diversas tcnicas e caractersticas de mais do que um material,
como por exemplo o tijolo (Figura 4.A), o azulejo (Figura 4.B), o metal (Figura 4.C) ou o beto
(Figura 4.D).
244
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com o mesmo objetivo, foi proposto utilizarem-se apenas tijolos retangulares de dois tamanhos
diferentes, em que o maior tivesse o dobro das dimenses do mais pequeno (tijolos 60x20cm
ou 30x10cm), sendo a escolha entre colocar um tijolo grande ou quatro pequenos controlada
por um parmetro aleatrio.
Por fim, os arquitetos sugeriram apenas existirem vazios quando criados pela ausncia de tijolos
mais pequenos, controladas de forma aleatria.
Figura 5: Padro escolhido para aplicar nas fachadas utilizao de tijolos empilhados com
dois tamanhos diferentes, 60x20 cm ou 30x10 cm. Criao de vazios aleatrios atravs da
ausncia pontual dos tijolos mais pequenos.
245
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Devido ao facto de termos usado uma abordagem algortmica na explorao destas fachadas, a
aplicao de pequenas alteraes e variaes aos modelos foi feita de forma quase imediata, o
que permitiu aperfeioar os modelos gradualmente at ficarem totalmente de acordo com o
gosto e a inteno inicial dos arquitetos.
Na Figura 7 esto representadas algumas das variaes que foram sendo aplicadas ao modelo
da fachada interior do edifcio, i.e. virada para o ptio interior. As variaes que so testadas
so (1) a percentagem de tijolos que ficam salientes, e (2) o grau de perfurao/transparncia
de certas zonas da fachada.
Por fim, conjugaram-se os modelos das fachadas e do modelo final do edifcio, por importao
e implantao nos locais corretos, dos primeiros no ltimo ficando assim o modelo da proposta
completo. A Figura 8 mostra duas imagens finais da proposta j com as fachadas. Na imagem
da direita so visveis duas das fachadas, a norte e a oeste. Na imagem da esquerda visvel a
fachada interior que est virada para o ptio central.
246
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 7: Variaes sobre o padro final da fachada interior variao do nmero de tijolos
salientes e da percentagem de ausncia de tijolos.
5. Concluses
Embora o objetivo inicial fosse desenvolver o conjunto de variaes dos diversos modelos
diretamente no Revit, por ser a ferramenta utilizada por ambos os ateliers, durante o projeto
constatmos que a gerao das solues neste software BIM era demasiado lenta, no permitido
assim o feedback imediato e a dinmica de design necessrios. Em situaes como esta, o
RosettaBIM bastante til pois permite a portabilidade necessria entre ferramentas, tirando
assim o melhor proveito de cada uma delas. Assim, numa fase mais inicial, como a gama de
variao das propostas era bastante ampla, os modelos produzidos foram visualizados em
AutoCAD, pois este permitiu uma performance superior. Numa fase mais avanada do
processo, em que a modelao geomtrica das fachadas j estava praticamente definida, o
programa desenvolvido que estava a gerar os resultados no AutoCAD, passou agora a produzir
modelos idnticos no Revit apenas sendo necessrio acrescentar a informao das famlias BIM
a utilizar.
247
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 8: Imagens finais do projeto proposto. Direita: Fachada virada para a rua da
Junqueira (Norte). Esquerda: Fachada virada para o ptio interior.
O facto de utilizarmos uma abordagem algortmica potenciou o poder criativo dos arquitetos
envolvidos no projeto, em particular:
1. Permitiu explorar de forma controlada uma vasta gama de solues num curto espao
de tempo, o que seria difcil e moroso utilizando o processo manual;
2. Facilitou a integrao de alteraes nas solues sucessivamente desenvolvidas,
permitindo assim uma interatividade quase imediata entre os arquitetos e os modelos.
3. Possibilitou a gerao e visualizao de solues para alm das idealizadas pelos
arquitetos, tornando-se por isso uma ferramenta de apoio conceo.
4. Abriu a possibilidade de se elaborarem ensaios de desempenho da construo.
Por outro lado, como o programa foi desenvolvido no RosettaBIM, este permitiu tirar proveito
da velocidade e flexibilidade do AutoCAD numa fase inicial, cruzando-a com a informao
construtiva necessria para o modelo BIM em Revit numa fase de finalizao. Deste modo,
atravs da combinao das aplicaes CAD e BIM conseguiu-se beneficiar duma abordagem
algortmica e, simultaneamente, aplicar a mesma no paradigma BIM.
Referncias
[1] R. Hudson, Strategies for parametric design in architecture (PhD Thesis), University
of Bath, Department of Architecture and Civil Engineering, 2010.
[2] P. Russel e D. Elger, The Meaning of BIM, Antwerpen (Belgium) , 2008.
[3] J. C. Lino, M. Azenha e P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, em Encontro Nacional BETO ESTRUTURAL - BE2012 , FEUP, Porto,
2012.
[4] M. R. Asl, M. Bergin, A. Menter e W. Yan, BIM-based Parametric Building Energy
248
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
249
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
250
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O Design Generativo (DG) uma abordagem algortmica para a criao de modelos
arquitetnicos, permitindo mecanizar tarefas, produzir geometrias complexas, e otimizar o
modelo criado. Uma vez que as aplicaes de Computer-Aided Design (CAD) so muito
utilizadas em Arquitetura e Engenharia, foram j criadas diversas ferramentas que combinam o
DG com as aplicaes CAD. Um exemplo a ter em conta o Rosetta, um ambiente de
programao para DG, desenvolvido para arquitetos e engenheiros, que permite aos utilizadores
escolher, no s em que linguagem querem programar, mas tambm em que ferramenta CAD
querem produzir os seus modelos. Mais recentemente, o paradigma CAD tem vindo a ser
substitudo pelo paradigma BIM, o que reduz a utilidade das ferramentas de DG que apenas
lidam com o paradigma CAD. Como as vantagens do DG se estendem naturalmente ao
paradigma BIM, propomos uma soluo que expande o Rosetta, permitindo a criao de
programas de DG que tiram proveito das capacidades do paradigma BIM. A nossa soluo
permite no s elevada portabilidade entre ferramentas BIM, mas ainda alguma portabilidade
entre os paradigmas CAD e BIM. De forma a avaliar a nossa soluo, apresentamos um
conjunto de casos de estudo onde mostramos o uso do Rosetta em combinao com o Revit.
1. Introduo
O Design Generativo (DG) uma abordagem que resolve estes problemas [1]. DG pode ser
descrito como a criao de formas atravs de algoritmos [2]. Estes algoritmos, implementados
251
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
sob a forma de programas, permitem a fcil gerao de variaes do mesmo modelo [3]. Estes
programas podem tambm gerar geometria que seria difcil de criar por meios manuais.
Uma dessas ferramentas o Rosetta. Esta ferramenta possui um ambiente de programao para
DG que permite aos utilizadores desenvolverem programas numa das diversas linguagens
disponveis. Estes programas so usados para gerar modelos em diversas ferramentas CAD [4].
Atualmente, as ferramentas CAD esto a ser substitudas por ferramentas de Building
Information Modeling (BIM), inviabilizando as ferramentas de DG como o Rosetta, que foram
desenvolvidas com as aplicaes CAD em mente. Isto acontece devido ao facto das ferramentas
CAD lidarem principalmente com geometria, enquanto que as ferramentas BIM lidam com
objetos BIM paramtricos. Estes so definidos por um conjunto de regras paramtricas, assim
como um conjunto de propriedades como material, preo, e fabricante, entre outras [5].
Estas propriedades permitem s ferramentas BIM detetar problemas nos modelos, como sejam
tubagens que atravessam vigas estruturais. Para alm disto, as regras paramtricas adaptam os
objetos sua utilizao no projeto, permitindo, por exemplo, que uma porta inserida numa
parede assuma as medidas corretas. Finalmente, toda a informao necessria durante o ciclo
de vida do edifcio armazenada no modelo, podendo ser utilizada para gerar um vasto conjunto
de documentos, desde oramentos a documentos de fabricao [5].
Estas capacidades implicam, no s, mudar a forma de trabalho dos utilizadores, mas tambm
a forma de trabalho das ferramentas de DG, de modo a possurem funcionalidades que permitam
tirar proveito do paradigma BIM, algo para o qual no estavam preparadas.
Desenvolver programas de DG para ferramentas BIM um problema atual, sendo que a maioria
das solues existentes envolvem a utilizao de Application Programing Interfaces (APIs)
disponibilizadas pelas ferramentas. No entanto, estas APIs requerem conhecimentos avanados
de programao e encontram-se escritas em linguagens de programao complexas como C# e
C++. Estas caractersticas tornam-nas inadequadas a utilizadores com reduzida experincia de
programao. Para resolver este problema, propomos uma soluo que permite a estes
utilizadores criar programas de DG no paradigma BIM. Na prxima seco descrevemos o
trabalho relacionado analisado para o desenvolvimento da soluo.
2. Trabalho Relacionado
252
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Uma vez que o Grasshopper uma linguagem visual, esta fcil de aprender e utilizar,
tornando-a popular entre arquitetos. No entanto, o seu aspeto grfico tambm uma
desvantagem, pois medida que os programas crescem, estes tornam-se difceis de
compreender e manipular. A Figura 1 ilustra um programa que torna evidente estes problemas.
O Grasshopper apenas funciona com a ferramenta CAD Rhinoceros, mas a sua funcionalidade
tem vindo a ser estendida com plug-ins, como o Lyrebird, que tornam possvel a utilizao da
linguagem com outras aplicaes, nomeadamente aplicaes BIM.
O Lyrebird um plug-in, desenvolvido pelos LMN Architects, para funcionar como ferramenta
de interoperabilidade entre o Grasshopper 3D e o Revit. O Lyrebird tem como foco principal
transferir informao entre aplicaes, em vez de traduzir geometria entre elas [7]. Este plug-
in permite a utilizao do Grasshopper para estruturar a informao necessria para produzir
objetos no Revit. Esta informao utilizada para identificar e criar instncias das famlias
corretas com os parmetros desejados. Por exemplo, para criar uma viga, criada uma linha no
lado do Grasshopper, que passada para o Revit de forma a, em conjunto com a famlia de
objetos a utilizar, instanciar a viga. Um exemplo de utilizao pode ser visto na figura 2.
253
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.2 Dynamo
Dynamo um plug-in para o Revit fortemente influenciado por linguagens de programao
visuais como o Grasshopper. Tal como no Grasshopper, os utilizadores criam um grafo de fluxo
de dados, utilizando ns que se encontram ligados entre si com cabos, associados a portos que
cada n contm. Os ns podem representar diversos elementos do Revit, como linhas, funes
matemticas e objetos BIM. Os utilizadores podem tambm definir ns personalizados, de
forma a estender a funcionalidade base do Dynamo [8].
O Dynamo tambm suporta ns de cdigo, que so elementos que podem conter pequenos
programas escritos numa linguagem de programao como o Python.
2.3 GenerativeComponents
GenerativeComponents um sistema paramtrico e associativo para a ferramenta BIM
Microstation da Bentley.
O GenerativeComponents demonstra que uma linguagem visual pode ser mais fcil de aprender
mas que medida que o utilizador evolui e quer produzir programas mais complexos, este tende
a transitar para uma linguagem mais textual.
254
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.4 RevitPythonShell
O RevitPythonShell um plug-in desenvolvido para o Revit que permite aceder API do
mesmo na linguagem Python, simplificando assim a sua utilizao [10].
O plug-in utiliza o IronPython como linguagem e um editor de cdigo fornecido pela Python
Tools. Com este editor, os utilizadores tm acesso a um Read-Eval-Print-Loop (REPL) que lhes
permite experimentar mais facilmente as funcionalidades da API. Com a REPL, basta apenas
escrever uma expresso, avali-la, ver os resultados e passar prxima expresso [10].
2.5 Comparao
A tabela 1 apresenta uma comparao entre as ferramentas analisadas.
Como possvel verificar, muitas destas ferramentas: (1) tiram proveito de linguagens de
programao visuais, dada a sua simplicidade e facilidade de aprendizagem; (2) oferecem
algum suporte a linguagens de programao textual, apesar de se restringirem a pequenos
programas; e (3) oferecem suporte a operaes BIM, demonstrando a necessidade de explorar
as ferramentas BIM com DG.
Em relao s ferramentas que oferecem suporte a linguagens textuais, muitas destas tiram
proveito de linguagens profissionais, como C#, que so difceis de serem utilizadas por
principiantes. Para alm disto, algumas das ferramentas requerem conceitos avanados de
programao, o que dificulta a aprendizagem das mesmas.
Por fim, todas estas ferramentas esto ligadas a apenas uma ferramenta BIM/CAD e utilizam
linguagens de programao muito especficas. Caso o utilizador queira mudar de linguagem ou
ferramenta de modelao, ter de reescrever o seu programa.
255
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
De forma a permitir que os utilizadores desenvolvam programas que escalam bem com a
complexidade, desenvolvemos uma soluo baseada em linguagens de programao textuais.
No entanto, como estas linguagens so mais difceis de aprender, decidimos utilizar linguagens
que tm qualidades pedaggicas, como Python e Racket. Alm disto, queremos disponibilizar
operaes BIM fceis de compreender e utilizar, assim como oferecer portabilidade entre
aplicaes BIM.
Por estas razes, a nossa soluo constituda por trs elementos: (1) um Integrated
Development Environment (IDE) onde o utilizador escreve os seus programas; (2) uma Camada
de Abstrao que fornece as operaes necessrias; e (3) um plug-in que permite comunicar e
produzir os resultados nas ferramentas BIM [12]. A arquitetura da soluo pode ser vista na
figura 3.
256
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Por exemplo, se um utilizador quiser produzir uma parede com uma porta, este necessita de
funes capazes de produzir ambos os elementos. A funo capaz de criar paredes dever
receber informao acerca da altura, comprimento, posio e tipo de parede, de forma a criar o
objeto BIM correto. Aps criar a parede, a funo que cria a porta ser utilizada, recebendo no
s a posio e tipo da porta, mas tambm a parede onde a porta ser colocada, criando uma
dependncia entre os objetos.
Todas estas funes tm de ser disponibilizadas numa Camada de Abstrao, uma biblioteca de
funes que simplifica e traduz as necessidades do utilizador para cdigo, de forma a que
possam ser utilizadas nas diversas aplicaes BIM. De forma a implementar esta camada,
decidimos expandir o Rosetta, tirando proveito das funes e abstraes j criadas para as
ferramentas CAD, como sistemas de coordenadas e entidades geomtricas e crimos novas
funcionalidades, agora adaptadas ao paradigma BIM.
3.3 Plug-In
Finalmente, de forma a permitir que os utilizadores executem os seus programas e produzam
os modelos na aplicao BIM desejada, foi criado um componente que permite ao Rosetta
comunicar com uma aplicao BIM.
Uma vez que as ferramentas BIM disponibilizam uma API que expe as suas funcionalidades,
este componente pode ser implementado como um plug-in, escrito com a API mencionada.
4. Avaliao
De forma a avaliar a nossa soluo, desenvolvemos um conjunto de casos de estudo que nos
permitiram demonstrar as diversas capacidades que pretendamos alcanar. Nas prximas
257
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
seces iremos descrever alguns modelos desenvolvidos que ilustram as funcionalidades BIM
da soluo, a portabilidade desta e a sua aplicao.
Ao examinarmos o modelo, pudemos verificar que todos os elementos eram objetos BIM
criados corretamente. Verificmos tambm que os elementos estavam devidamente associados,
estando cada laje associada a um nvel e cada parede associada a um nvel de base e topo, o que
condicionava a altura das mesmas. Para alm disto, foi tambm possvel criar as paredes com
as propriedades esperadas de um elemento deste tipo, apesar da sua forma irregular.
4.2 Portabilidade
Uma das principais funcionalidades oferecidas pelo Rosetta a portabilidade dos programas de
DG entre ferramentas CAD. Desta forma, quisemos manter esta funcionalidade para BIM.
Para demonstrar que seria possvel obter resultados semelhantes com o mesmo programa em
duas ferramentas BIM, desenvolvemos um programa que produzia um modelo das Absolute
Towers, criadas pelos MAD Architects. Dado que introduzimos funcionalidades a pensar em
conceitos gerais BIM, utilizamos o programa para produzir o modelo em Revit e em ArchiCAD,
a segunda ferramenta BIM que est atualmente a ser introduzida no Rosetta. Com algum
trabalho de uniformizao, facilitado pela Camada de Abstrao, foi possvel disponibilizar as
mesmas funes para ambas as ferramentas, o que permitiu utilizar o mesmo programa para
produzir os modelos visveis na figura 5.
258
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Como visvel na figura, o modelo obtido em ambas as ferramentas BIM era idntico,
possuindo o mesmo tipo de relaes entre os objetos, assim como os mesmos tipos de objetos.
Conseguimos assim obter portabilidade entre ferramentas BIM, tal como acontecia com as
ferramentas CAD. E uma vez que a portabilidade obtida atravs do programa, sendo o modelo
gerado nativamente na ferramenta alvo, no existem perdas de informao, um problema que
identificmos quando passvamos o modelo de uma ferramenta para a outra usando IFC.
Para alm da portabilidade entre ferramentas BIM, em modelos simples conseguimos tambm
alcanar portabilidade entre ferramentas CAD e BIM. Ao introduzir funes simples que
representam conceitos BIM para as ferramentas CAD, possvel ter algumas funcionalidades
BIM disponveis em todas as ferramentas. Utilizando estas funes foi possvel produzir um
modelo simples com lajes e uma fachada sinusoidal composta por vigas. Este modelo foi
produzido por um nico programa de DG, gerando o mesmo modelo em todas as ferramentas
de visualizao suportadas pelo Rosetta. O resultado visvel na figura 6.
259
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A portabilidade uma funcionalidade de extrema utilidade em DG, pois permite tirar proveito
dos pontos fortes de cada ferramenta, como seja a performance de ferramentas como o OpenGL,
para visualizar variaes simples e iniciais com rapidez, passando numa fase mais avanada
para ferramentas BIM com mais detalhe e informao.
5. Concluso
DG foi introduzido em Arquitetura como uma forma de utilizar algoritmos para explorar formas
complexas, difceis de obter por meios tradicionais. DG foi inicialmente combinado com
ferramentas CAD mas, com os avanos na rea da Arquitetura, passou a existir a necessidade
de combinar DG com ferramentas BIM. Assim, diversas ferramentas tm sido desenvolvidas
com o intuito de permitir ao utilizador produzir modelos BIM com programao. No entanto, a
maioria destas ferramentas condiciona os utilizadores a linguagens de programao
inadequadas ou limitam-no a uma s ferramenta BIM ou CAD.
Para resolver estes problemas propomos uma soluo que expande o Rosetta, um ambiente de
programao para DG adequado para principiantes. Atravs da nossa soluo, o utilizador pode
criar programas de DG para ferramentas BIM, tirando proveito das diversas funcionalidades
que o paradigma oferece. Para alm disto, o utilizador tem a liberdade de escolher em que
linguagem de programao quer programar, produzindo programas que podem ser facilmente
portados entre ferramentas BIM e, no caso de programas simples, tambm ferramentas CAD.
Atravs dos casos de estudo, mostramos a capacidade de produzir modelos BIM corretos com
programas DG desenvolvidos com a nossa soluo. tambm possvel verificar a utilidade da
portabilidade, permitindo alternar entre as ferramentas mais adequadas a cada fase do projeto,
utilizando ferramentas com melhor performance para variaes, e outras capazes de mais
detalhe em fases finais.
Referncias
[1] J. McCormack, A. Dorian, and T. Innocent, "Generative design: a paradigm for design
research," in Proceedings of Futureground (2004), Design Research Society, Melbourne,
Australia, 2004.
[2] R. Garber, BIM Design, Realising the Creative Potential of Building Information
Modelling. Hoboken, N.J.: Wiley 2014.
[3] R. Fernandes, "Generative Design: a new stage in the design process," Tese de Mestrado,
Instituto Superior Tcnico, Lisboa, Portugal, 2013.
[4] J. Lopes, and A.Leito, "Portable generative design for CAD applications," in
Proceedings of the 31st annual conference of the Association for Computer Aided
Design in Architecture (2011), Calgary/Banff, Canada, 2011, pp. 196-203.
260
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
[5] C. M. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM handbook : a guide to building
information modeling for owners, managers, designers, engineers, and contractors.
Hoboken, N.J.: Wiley, 2008.
[6] A.Payne, and R. Issa, Grasshopper Primer, Zen Edition. Robert McNeel & Associates,
2009.
[7] T. Logan, "Superb Lyrebird", February, 2014. Acedido em Abril de 2015. Disponvel
em: http://lmnts.lmnarchitects.com/bim/superb-lyrebird/
[8] Dynamo. Acedido em Dezembro de 2014. Disponvel em: http://dynamobim.com/learn/
[9] R. Aish, and R. Woodbury, "Multi-level interaction in parametric design," in Smart
Graphics (2005), Springer, Berlin, Germany, 2005.
[10] D. Thomas, "Introducing RevitPythonShell", December, 2009. Acedido em Abril de
2015. Disponvel em: http://darenatwork.blogspot.pt/2009/12/introducing-
revitpythonshell.html
[11] A. Leito, and L. Santos, "Programming languages for generative design," in Respecting
fragile places - Proceedings of the 29th Conference on Education in Computed Aided
Architectural Design in Europe (2011), Ljubljana, Slovenia, 2011, pp. 549-557.
[12] B. Ferreira, and A. Leito, "Generative design for building information modeling," in
Real Time - Proceedings of the 33rd International Conference on Education and
Research in Computed Aided Architectural Design in Europe (2015), Vienna, Austria,
2015, pp. 635- 644.
[13] R. B. Findler, C. Flanagan, M. Flatt, S. Krishnamurthi, and M.Felleisen, "DrScheme: A
pedagogic environment for Scheme," in Programming Languages: Implementations,
Logics, and Programs, Springer, 1997, pp. 369-388.
261
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
262
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Entre as fundaes e cobertura, os edifcios compem-se de elementos definveis pela forma ou
funo. Sendo que, por um lado, os Arquitetos fundamentam o seu trabalho na idealizao de
planos, e, por outro, BIM est numa fase crescente dentro da indstria da construo por
melhorar a interdisciplinaridade entre profissionais ao sintetizar processos, verifica-se uma
oportunidade, para os primeiros, atravs do desenho por computador, de melhorarem o seu
Arquivo, compondo-o com DIM, e continuarem a apresentar-se como criadores.
1. Introduo
263
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os objetos, referidos pelos autores, correspondem aos utilizados nessas metodologias. Estes,
tm forma e funo especfica que variam de forma inteligente, aos quais associada
informao, e que, conjugados, possibilitam que se estude um edifcio pelas partes que o
compem. Um possvel caso, destes objetos, so os elementos de vos de abertura portas e
janelas , analisados, aqui, pela sua indispensabilidade ao projeto de Arquitetura, dada a funo
que desempenham na relao entre espaos.
Como j existem processos implementados, para este princpio, um caminho possvel pode ser
a adaptao de metodologias anteriores s novas ferramentas, que incluem possibilidades mais
completas de que se pode tirar partido para os processos aplicados execuo arquitetnica, a
utilizar dentro de BIM, para a interdisciplinaridade entre profissionais.
2. De interdisciplinaridade e objetos
264
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Posto isto, difcil dizer o que um objeto porque pode ser visto tanto como uma pea com
uma forma num material qualquer, como um conjunto de peas que permitem que se cumpra
uma funo. Sem haver um limite que enquadre a sua definio, pensa-se que pode ser definido
pela fase em que se encontra, porque a ideia do que varia em funo dos objetivos que se
pretendem dele. Ou seja, por exemplo, uma porta um conjunto de objetos aro, folha,
moldura, entre outros na sua fase de construo e um objeto nico no desempenho da sua
funo, um todo constitudo pelas partes.
Mas no s de objetos visveis se faz um projeto. Um espao livre entre paredes e pisos
desenhado para definir o conforto, tem a caraterstica de ser uma massa fixa com forma e limites
definidos quando fechados, e massa mvel com formas variveis e moldveis quando aberto.
Nesta perspetiva, tal como os elementos visveis, pode pensar-se no espao livre como um
objeto criado para formalizar a definio do habitvel, do conforto.
Por tudo isto, o resultado final beneficiar com a definio dos objetos de composio para a
edificao, com relaes controladas de forma sequencial em hierarquia, por fases, que
cumpram ou faam cumprir funes clssicas ou modernas, de forma a ajudar o atual contexto
de maior complexidade construtiva verificado [Figura 1].
265
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
o Arquiteto teste o ambiente e o espao de uma realidade, numa simulao virtual, com
entidades, que Kennedy define como elemento grfico discreto e definvel [3].
Partindo desta definio, entidade no abrange todas as pretenses para BIM e, neste sentido,
Eastman et al identificam BEM Building Element Model [1] , o que, nesta sequncia, pode
levar a que se pense, neste, como uma evoluo natural do anterior.
Este, apresenta recursos direcionados para o entendimento do objeto real, por ser paramtrico,
autnomo, incluir mais informao geomtrica e escrita, referenciar a aplicabilidade
georreferenciao e apresentar potencialidades na qualificao da representao grfica para
visualizao 3D. da relao entre tipos de objetos de BEM, seja por associao a outro que
funcione como um hospedeiro, seja por funcionar autonomamente, seja por contar com luz
prpria, entre mais particularidades, que resulta a imagem geomtrica do modelo integrado
onde toda a informao desenvolvida corresponde escala 1:1 da construo. Estes, incluindo-
se dentro de BIM para dar resposta a procedimentos atuais, estabelecem direes processuais
complementares, tendo em conta especificaes de caractersticas, atravs do levantamento e
transferncia de informao para extrao de dados, de divulgao e partilha entre pessoas. O
seu formato aberto permite que possam ser alterados, reformulados ou transformados em
qualquer altura, criando, por um lado, mais alternativas para casos excecionais, mas, por outro,
fazendo com que seja necessrio confirmar os dados da modelao de forma regular.
Para alm do desenvolvimento de cada exemplar para um novo BEM, pode ser necessrio
proceder replicao de uns, derivados de outros, alterando ou transformando o primeiro,
verificando-se uma oportunidade de hereditariedade entre objetos, ou pelas suas caractersticas
de contacto com outros elementos variarem, ainda, ou por se comporem de elementos que
funcionam de maneira diferente, apesar de manterem, na gnese, a mesma imagem [Figura 2].
266
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tirando partido da potencialidade das interligaes do digital, BIM pode funcionar como um
ponto de partida para aproximar o trabalho dos intervenientes, fazendo parte de uma nova forma
de projetar que evolui a partir do grau zero o projeto de Arquiteto , de onde se parte para
outros nveis de desenvolvimento, compreendendo as fases de projeto, construo ou gesto, e
para onde tudo converge, num processo ritmado e ondulante, at ao projeto de Arquitetura
sntese do trabalho interdisciplinar que inclui todas as especialidades .
Estas bibliotecas de objetos referidas por Duddy et al compem-se por objetos digitais,
definidos pela sua forma e funo, para projeto. Estes, aproximam-se do que pode ser um acervo
a fazer parte de um Arquivo de Projeto de Arquitetura. Por a definio de biblioteca de objetos
ser mais abrangente e no se associar diretamente a BIM, no sendo conhecida outra definio,
prope-se DIM Database Information Modelling numa perspetiva de definir o acervo de
projeto que se compe de elementos para uma metodologia dentro da corrente BIM, como
BEM, templates e exemplos de espaos desenvolvidos para modelos integrados.
A informao selecionada, aps o levantamento, pode apresentar indicaes de como pode ser
pensada a estrutura de composio para DIM, sendo possvel pensar-se numa organizao que
parte das classes de famlias e famlias de objetos onde se organizam os ficheiros de BEM, de
maneira a que os grupos fiquem cada vez mais restritivos [Figura 3].
267
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O seu desenvolvimento deve partir de um ponto de origem que oriente a navegao dentro do
espao digital, de forma a servir como referncia para a sua prpria rotao ou cpia, que pode
ser o seu centro geomtrico, um vrtice, ou outro.
A partir deste ponto, necessrio ter controlo sobre as massas e, neste sentido, pode-se tomar
medidas que funcionem de forma auxiliar para regularizao da composio. Para isso, podem
ser utilizados eixos orientadores das geometrias, funcionando como o elemento que aproxima
o funcionamento entre as instncias que compem os tipos de objetos. Estes, so elementos de
visibilidade opcional, a utilizar para auxiliar o processo de modelao, ao qual so associadas
as faces das massas que esto em contacto entre si ou no mesmo plano.
Com estes eixos, torna-se mais fcil utilizar parmetros que funcionam como o veculo para
controlar as vrias formas de cada tipo de objeto. Nestes, indicada uma pretenso, que
despoletar uma ao, atravs de cotas parametrizadas que, segundo estes casos de estudos, se
organizam em trs tipos: ora por paralelismo distncia entre si, refletindo-se na altura, largura,
profundidade; ora por ngulo a partir de um ponto de convergncia ou repetio nmero
de instncias pretendidas em linha . Em situaes mais avanadas, pode-se verificar uma
indicao de um parmetro que controla a definio de outros parmetros que recebem a
informao indicada neste. A conjugao de parmetros dentro de um BEM deve ser controlada
de forma a manter a lgica coletiva, tendo cuidado com desacordos.
268
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para o processo de modelao, deve-se ter em conta o desenho da abertura do vo para a forma
como podem ser trabalhadas as posies de acordo com o funcionamento, pelo que se deve
criar um sistema que possibilite a colocao em qualquer uma das posies desejadas. No caso
de aberturas do interior, espectvel esperar tanto as duas posies esquerda ou direita
como as duas direes de abertura de entrada ou sada de espaos . No caso de aberturas do
exterior, verifica-se, como no anterior, as duas posies de abertura esquerda ou direita ,
sendo que, para a direo, apenas para um dos lados ou interior ou exterior .
Tanto para paredes exteriores como interiores, deve-se considerar a colocao da porta de
acordo com a face da parede, criando um sistema que possibilite alinhamentos ou afastamentos
de forma a que a sua colocao seja mais rpida e precisa.
269
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
que a dimenso de BEM pode sobrecarregar o modelo integrado, tornando o modelo pouco
operativo. Assim, de forma a no sobrecarregar o BEM, pode-se evitar modelar elementos de
menor dimenso parafusos, entre outros que possam no ter expresso para as escalas usadas
na representao grfica dentro do modelo integrado.
Para alm da composio visvel, pode verificar-se a necessidade de modelar os elementos com
funo tcnica invisvel ex.: pr-aro para utilizar na fase de pormenorizao, a acrescentar
a BEM, que deixam essa alternativa em aberto. Para os exemplos que no tm que ter
representao tridimensional, como informaes de funo ou a direo da abertura, por
exemplo, podem ter representao grfica bidimensional, para que sirva a compreenso da
utilizao do objeto em causa sem sobrecarregar o ficheiro.
Estes testes, como se colocam numa fase intermdia entre o incio da modelao e a sua
concluso, so importantes para revelar as fragilidades prprias de cada BEM, a serem tidas em
conta nas fases seguintes, e para que sejam criadas solues que, quando este for usado de forma
definitiva, no se verifiquem.
Da realizao para estes casos de estudo, so apresentados alguns dos desacordos mais
verificadas ao longo deste processo. Assim:
nas peas de contacto com a parede necessrio ter ateno se mantm a sua prpria
espessura, se a profundidade pretendida acompanha a espessura da parede e se os seus
recortes para encaixe e faces de contacto com a parede mantm a posio pretendida;
nas peas internas necessrio verificar se mantm a sua prpria espessura e se as suas
faces mantm a posio de relao pretendida com outras peas.
270
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
no caso de ter mais que uma folha, seja a manter o nmero de folhas com ou sem
variao do tamanho, seja a aumentar ou diminuir o seu nmero com ou sem variao
do mesmo, independentemente da forma de funcionamento, deve-se ter ateno se
mantm a proporcionalidade entre medidas individuais e de conjunto, os contactos entre
folhas, bem como se a definio de contacto com a parede a pretendida.
nos parmetros que controlam os eixos necessrio ter ateno se h mais que um com
a mesma funo ou se o controlo que executam entra em conflito com outros.
Para todos os objetos necessrio ter ateno se o desenho da abertura corresponde pretenso
exigida e se o puxador mantm a sua altura a partir do piso e a sua proximidade a partir do lado
de abertura [Figura 6].
Assim, este DIM de vos de abertura est pronto a ser utilizado e atualizado em ambiente prtico
de processo de modelao de projeto e, ainda, de ser reutilizado ou transformado, para outros
projetos.
Estas iniciativas revelam a importncia de se investigar este tema que contribui para
operacionalizar a realizao, de uma forma mais organizada e dinmica, para novos
procedimentos ao servio do utilizador, de forma a serem implementadas e difundidas.
271
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste sentido, para os casos, pode-se verificar a necessidade de ser desenvolvido mais que um
BEM para alguns casos, devido a variaes de elementos de composio, bem como mudanas
no contacto com a parede e na associao camada respetiva, sendo necessrio tomar
iniciativas para que a informao integrada seja compreendida nas tabelas de quantidades, ora
com novas interligaes, ora com desunio, das informaes automaticamente validadas.
Tambm, nestes, deve-se realizar testes do seu desempenho dentro de um modelo integrado,
dadas as particularidades de cada objeto, e, ainda, a quantidade e tipo de informao, que pode
incluir, devem ser trabalhados de acordo com as necessidades pretendidas, pois, esta, quando
for transferida para o modelo integrado, ser repetida quantas vezes forem necessrias, o que
pode aumentar a tamanho do ficheiro e, por consequncia, reduzir a sua operabilidade e
diminuir as suas potencialidades.
Assim, destes casos, verificou-se que h uma sntese de processos por intermdio de modelos
integrados de Arquitetura recorrendo a BEM de vos de abertura.
Depois desta investigao, para futuro, a linha manter-se- em processos de projeto associados
a metodologias de interdisciplinaridade, seguindo para anlise de procedimentos associados a
outros objetos reconhecveis em projeto de Arquitetura. Ser analisada a relao entre o
template utilizado para o desenvolvimento de projeto e os BEM, de maneira a perceber a
importncia da sua definio na sua utilizao para o projeto. E, ainda, sero iniciadas anlises
de implementao em empresas, bem como outras dinmicas, para relacionar a investigao
individual com a aplicabilidade e utilizao em prtica coletiva.
272
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
273
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
274
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
As reas urbanas consolidadas apresentam geralmente um desafio para o arquiteto
relativamente s decises de desenho sustentvel a implementar. O local, a orientao e a
envolvente construda constituem um compromisso para os sistemas passivos e ativos,
reduzindo as possveis medidas de otimizao, deixando o arquiteto com incertezas quanto
eficincia do edifcio. O uso de tecnologias de BIM permite a medio e monitorizao dessas
decises de desenho, no entanto, a sua otimizao consiste num processo de tentativa e erro,
tornando-o lento e conduzindo a uma limitao significativa. Este artigo discute as
potencialidades do uso de algoritmos evolutivos para gerar solues otimizadas para a
orientao solar da fachada. A inter-conectividade em tempo real do sistema BIM e de
programas de modelao algortmica representa uma vantagem para a diversidade e rapidez nas
decises de desenho e projeto sustentveis.
275
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Entre as vrias estratgias para melhorar a eficincia energtica na Europa, os edifcios devem
ser considerados como um dos principais objetivos, uma vez que so responsveis por cerca de
40% do consumo de energia na Europa. As atuais diretivas de eficincia energtica nos edifcios
da UE (Diretivas 2002/91 / CE, 2010/31 / UE, Nearly Zero Energy Building) impem novas
exigncias na construo e renovao de edifcios com o objetivo de criar um parque edificado
NZEB. Nessa premissa a abordagem ao ato de projetar ter que recorrer a estratgias
informadas e fundamentadas em dados concretos e realistas. A adoo de estratgias
inteligentes ser essencial para otimizar envolventes edificadas podendo comear desde o fator
forma com a finalidade de minimizar o consumo de energia garantindo em simultneo o
conforto dos seus ocupantes. No contexto da gerao prpria de energia a partir de fontes
renovveis, no sentido de atingir o ponto mais prximo do balano energtico nulo ou 0, gera-
se um problema antagnico de maximizao de ganhos solares (a fonte de energia mais
abundante) nos locais de implementao dos sistemas geradores, em paralelo com a
minimizao de ganhos nos perodos mais quentes do ano.
Se esta situao complexa num contexto isolado do edifcio, o contexto urbano, a partir do
ambiente construdo envolvente representa um desafio maior. Se considerarmos que metade da
populao mundial vive em cidades que consomem coletivamente trs quartos dos recursos
globais, com previses do seu aumento para trs quartos at 2050 [1], imperativo a
compreenso e criao de estratgias para minimizar o consumo de energia neste ambiente
concreto. A abordagem de maximizar a utilizao de energia solar ambiente - seja para a
converso ativa usando coletores trmicos e / ou fotovoltaicos solares ou por estratgias
passivas bioclimticas, permitem reduzir a necessidade de energia para aquecimento e
iluminao. Para trabalhar com este objetivo, a modelao computacional direcionada
disponibilidade de radiao solar pode ser uma ferramenta de apoio s decises de desenho para
arquitetura e urbanismo. No entanto a probabilidade de encontrar uma soluo ideal para a
forma geomtrica do edifcio pelo mtodo manual de tentativa e erro extremamente pequena.
possvel fazer clculos para a determinao da envolvente solar em papel utilizando os dados
do azimute solar e de elevao a par das alturas chave do ano. No entanto, o clculo no papel
um processo longo e pouco preciso para ambientes urbanos. No entanto, hoje em dia muitos
programas de desenho assistido por computador e paramtricos integram ferramentas de
simulao ambiental que incluem a possibilidade de avaliar envolventes solares de forma
automtica. um procedimento simples que requer pouca informao externa, onde se
encontram por exemplo a localizao, volumes envolventes, planos que definam a rea a avaliar
e perodos de anlise. No entanto este sistema permite apenas avaliar o potencial da envolvente
276
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Metodologia
O mtodo descrito aplicado a um edifcio situado num contexto urbano consolidado da cidade
do Porto. A envolvente direta representa dois edifcios residenciais com 4 pisos voltados para
a rua de acesso e 6 pisos voltados para o logradouro. Ambos apresentam coberturas inclinadas
de duas guas. A orientao das parcelas sobre o eixo nordeste sudoeste, representado uma
orientao pouco favorvel do ponto de vista dos ganhos e controlo solar, dada a predominncia
de sol com um angulo baixo correspondente a nascente e poente. O nmero de horas de
exposio na fachada voltada para a rua escasso por dois fatores: orientao e envolvente
direta. A fachada posterior a que apresenta maior potencial a par da cobertura inclinada. A
rea da implantao de aproximadamente 175 m2 sendo que o alinhamento com as empenas
respetivas permite alguma liberdade formal dado o desfasamento de limites no logradouro e
nas coberturas.
Numa primeira fase foi realizado um estudo do potencial solar do local no perodo de um ano.
O desenho evidente ou tradicional de concordncias de alinhamentos e geometria gerou um
volume que foi tambm submetido a anlise para referencia, base e comparao de resultados.
277
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
278
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Muitas vezes a busca pela forma passa por tentativas de representao onde se afina a partir do
desenho e da maqueta a busca pelo resultado fruto da inspirao. Com isto pretende-se apontar
a eficincia como elemento gerador de solues formais interessantes e funcionais.
Os algoritmos evolutivos baseiam-se nesta seleo natural criando grupos de genes que so
testados e posteriormente cruzados entre os mais adaptados gerando solues otimizadas. Um
processo tpico do algoritmo evolutivo inclui a seleo, cruzamento e mutao. Em primeiro
lugar, so gerados aleatoriamente uma srie de pontos como populao inicial. Uma avaliao
ento conduzida para avaliar a aptido de cada indivduo. Os indivduos mais adequados
soluo ideal so escolhidos como pais da prxima srie ou gerao por cruzamento e mutao.
As geraes seguintes passam pelo mesmo processo repetidamente at ao trmino do processo
ou algoritmo. Em comparao com a metodologia de pesquisa direta, o algoritmo evolutivo tem
uma velocidade de clculo mais elevada, maior preciso e uma adaptabilidade mais forte. Com
base nos seus diferentes detalhes de implementao, os algoritmos evolutivos foram
classificados como genticos, neuro-evolutivos, de otimizao por enxame de partculas e
outros tipos.
279
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
CMA-ES/HDE em conjunto com o programa Radiance para explorar a forma edificada tima
e a minimizao do consumo anual de ar condicionado. A partir de um mtodo de explorao
de vrias formas e sistemas concluram a eficcia desta abordagem e da incorporao destes
algoritmos e princpios. As solues formais foram obtidas depois de 10.000 a 20.000
avaliaes com um nmero de variveis entre 18 e 26, tendo concludo que a parametrizao
Taylor conduz s melhores solues. [5] No que respeita a otimizao da radiao solar em
edifcios e formas geomtricas urbanas, quer para solues ativas como passivas Kampf et al.
atingiu um incremento de 20% a partir de simulaes com recurso ao programa Radiance em
conjunto com o algoritmo evolutivo hibrido CMA-ES/HDE, concluindo que o algoritmo
conduziu a boas solues de forma consistente e que os resultados formais so muitas vezes
pouco intuitivos revelando inovao formal. [6] Huang et al. concluram que os algoritmos
generativos so os mais populares pela sua versatilidade, velocidade e preciso, principalmente
quando envolvem problemas complexos. Os algoritmos de objetivo nico so os dominantes
[7].
280
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
al. realizou uma otimizao de projeto baseado em AE com incidncia na forma, orientao e
materiais da envolvente do edifcio. Selecionou a minimizao do consumo de energia como
objetivo e fez uma validao detalhada com a ferramenta de simulao TRSYS. Descobriu que
o clima teve um efeito na preciso da otimizao. Se a situao de carga isolada para o espao
era complexa, com uma combinao amplamente varivel de condies de aquecimento, de
arrefecimento e de humidade, o grau de erro seria maior [15]. De Luca recorreu a um algoritmo
evolutivo dentro do sistema do Grasshopper com recurso ao plugin de anlise Ladybug e aos
algoritmos evolutivos do plugin Octopus para otimizar a envolvente edificada possvel dentro
dos constrangimentos legais locais de ensombramento entre volumes edificados. O processo
atingiu valores de otimizao de 60% com volumes possveis de construo superiores [16].
Jonathan A. Wright et al. recorreu ao algoritmo evolutivo multi-objectivo NSGA-II para
otimizar a percentagem de rea envidraada na fachada de um edifcio para minimizar os gastos
energticos necessrios a iluminao e climatizao. O sucesso da investigao foi uma reduo
significativa no consumo de energia com solues pouco convencionais do ponto de vista do
desenho [17]. Mais recentemente, Figueiredo et al. conduziu uma investigao de otimizao
energtica com aplicao de algoritmos evolutivos em Portugal onde geraram um grande leque
de solues otimizadas dentro do contexto construtivo local para vrias regies do pas [18].
4. Resultados
A soluo base apresenta uma radiao total anual de 498482 kw/h distribudos por 164472
kw/h nos trs meses de vero e os restantes 334010 kw/h pelos restantes meses do ano. Apesar
destes resultados absolutos pode-se verificar pela geometria do volume a presena de algumas
reas em sombra, o que cria pouca uniformidade na distribuio da energia solar.
A soluo proposta pelo resultado dos clculos do algoritmo apresenta uma radiao total anual
superior, o que poder partida conduzir a uma concluso negativa do processo. No entanto
dos 508609 kw/h anuais, a sua distribuio de 153190 kw/h nos meses quentes e os restantes
355419 kw/h nos meses frios. Assim temos menos incidncia solar no vero e maior ao longo
do ano. O potencial energtico mais elevado e distribudo de acordo com as necessidades do
edifcio.
O fator forma do edifcio foi alterado provocando uma distoro na cobertura e na fachada
permitindo o aumento de insolao nos planos inclinados do telhado a par de um
ensombramento natural na fachada dada a inclinao subtil gerada pela manipulao dos pontos
geradores.
281
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A nova envolvente edificada apresentou uma configurao mais favorvel sem comprometer a
rea de implantao ou o volume total de construo.
5. Concluses
282
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
permitindo tambm o trabalho com formas mais adaptadas sem comprometer outros fatores e
condicionantes.
Referncias
[1] United Nations, World Urbanization Prospects: The 2014 Revision, 2004.
[2] Sadeghipour, M. and Smith, A., Ladybug: a parametric environmental plugin for
Grasshopper to help designers create an environmentally-conscious design, Proceedings
of BS2013: 13th Conference of International Building Performance Simulation
Association, 2013, p. 3128-3135.
[3] Yi, Y. K. and Hyoungsub, K., Agent-based geometry optimization with Genetic
Algorithm (GA) for tall apartments solar right, Solar Energy, vol.113, 2015, p. 236-250.
[4] G. Zemella, A. Faraguna, Evolutionary optimization of faade design, a new approach
for the design of building envelopes. Springer, 2014.
[5] Caruso G., Kampf J.H., Building shape optimisation to reduce air-conditioning needs
using constrained evolutionary algorithms, Solar Energy vol. 118, 2015, p. 186196
[6] Kampf J.H, Robinson D., Optimisation of building form for solar energy utilisation using
constrained evolutionary algorithms, Energy and Buildings vol. 42, 2010, p. 807814
[7] Huang Y., Niu J., Optimal building envelope design based on simulated performance:
History, current status and new potentials, Energy and Buildings vol. 117, 2016, p. 387
398
[8] D.A. Coley, S. Schukat, Low-energy design: combining computer-based optimisation
and human judgement, Build. Environ. Vol. 37, 2002, p. 12411247.
[9] W. Wang, H. Rivard, R.G. Zmeureanu, Optimizing building design with respect to life-
cycle environmental impacts, in: Proceedings of the building simulation, Eindhoven,
Netherlands, 2003.
[10] W. Wang, R. Zmeureanu, H. Rivard, Applying multi-objective geneti calgorithms in
green building design optimization, Build. Environ. vol. 40, 2005, p.15121525.
[11] W. Wang, H. Rivard, R. Zmeureanu, An object-oriented framework for simulation-based
green building design optimization with genetic algorithms, Adv. Eng. Inform. Vol. 19,
2005, p. 523.
[12] W. Wang, H. Rivard, R. Zmeureanu, Floor shape optimization for green building design,
Adv. Eng. Inform. Vol. 20, 2006, p. 367378.
[13] J. Wright, M. Mourshed, Geometric optimization of fenestration, in: Proceedings of the
building simulation, Glasgow, Scotland, 2009.
[14] D. Tuhus-Dubrow, M. Krarti, Genetic-algorithm based approach to optimize building
envelope design for residential buildings, Build. Environ. vol. 45, 2010, p.15741581.
[15] M. Sahu, B. Bhattacharjee, S.C. Kaushik, Thermal design of air-conditioned building for
tropical climate using admittance method and genetic algorithm, Energy Build. Vol. 53,
2012, p. 16.
[16] De Luca F., Solar Envelope Optimization Method for Complex Urban Environments,
DOI: 10.3311/CAADence.1657
[17] Wright J. A., Brownlee A., Mourshed M, Wang M., Multi-objective optimization of
cellular fenestration by an evolutionary algorithm, 2014, Journal of Building
Performance Simulation, 7:1, 33-51, DOI: 10.1080/19401493.2012.762808
283
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
[18] Figueiredo A., Kmpf J., Vicentea R., Passive house optimization for Portugal:
Overheating evaluation and energy performance, Energy and Buildings vol. 118, 2016,
p. 181196
284
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O Projeto Algortmico (PA) uma abordagem de design baseada em programao em que, ao
invs de ser criado o modelo 3D do design pretendido, criado um programa que gera o modelo
3D do design pretendido. Esta abordagem permite trazer grandes vantagens a todo o processo
de design e de construo, incluindo, por exemplo, a produo de geometrias complexas e a
automatizao de tarefas e processos repetitivos que seriam muito morosos na modelao
manual. Graas sua natureza parametrizvel, esta abordagem permite tambm a fcil e rpida
explorao de alternativas ao modelo inicial.
Apesar destas vantagens, o PA tem sido pouco explorado em combinao com a metodologia
Building Information Modelling (BIM). Ao combinar processos algortmicos com a
metodologia BIM surge uma nova abordagem de design baseada no desenvolvimento de
programas que geram modelos BIM do design pretendido. A esta abordagem designamos
Algorithmic-based Building Information Modelling (A-BIM).
Neste paper, definimos, exploramos e avaliamos o A-BIM num contexto arquitetnico. A partir
de um caso de estudo, comparamos o A-BIM a uma abordagem BIM manual, e demonstramos
que o A-BIM pode oferecer grandes vantagens prtica arquitetnica.
1. Introduo
Apesar das ferramentas de Computer-Aided Design (CAD), i.e., Desenho Assistido por
Computadores, trazerem vrias melhorias ao processo de design e de construo de edifcios,
estas tm algumas limitaes na mecanizao de tarefas e na criao e manipulao de
geometrias complexas. Estas limitaes podem ser ultrapassadas atravs da introduo, na
arquitectura, da programao e de processos algortmicos.
285
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Projeto Algortmico (PA) uma abordagem de design baseada em programao que permite
a gerao de modelos 3D atravs de algoritmos. Usando esta abordagem, ao invs de ser criado
o modelo 3D do design pretendido, criado um programa que gera o modelo 3D do design
pretendido. O PA promove a explorao em arquitetura, permitindo aos arquitetos abordar
formas geomtricas complexas difceis de produzir usando meios manuais [1]. Para alm disso,
sendo o modelo gerado com PA tipicamente paramtrico, ao variar os parmetros que controlam
o modelo torna-se possvel produzir rapidamente vrias alternativas ao design. Finalmente, o
PA permite a automatizao de tarefas e processos repetitivos que consumiriam demasiado
tempo e esforo se tivessem de ser executados manualmente.
Para tirar partido do PA, vrios ambientes de programao tm vindo a ser introduzidos em
ferramentas de design geralmente usadas por arquitetos, e.g., AutoCAD e Rhinoceros 3D,
permitindo-lhes desenvolver programas que geram modelos nessas ferramentas. O Grasshopper
[2] um dos exemplos mais populares.
Apesar das vantagens do PA, esta abordagem tem sido pouco utilizada em combinao com o
Building Information Modelling (BIM), uma metodologia de trabalho que traz vrias vantagens
ao processo de design e de construo de edifcios [3]. Esta combinao de processos
algortmicos com a metodologia BIM cria uma nova abordagem de design baseada no
desenvolvimento de programas que geram modelos BIM, uma abordagem que denominamos
Algorithmic-based Building Information Modelling (A-BIM).
O A-BIM uma abordagem algortmica para BIM que permite gerar modelos BIM atravs de
algoritmos. Tal como no PA, o A-BIM oferece uma nova abordagem de projecto: ao invs de
ser desenvolvido o modelo do design pretendido diretamente na ferramenta BIM,
desenvolvido o programa que vai gerar esse modelo na ferramenta BIM.
Semelhante a uma abordagem BIM manual, o modelo gerado atravs da abordagem A-BIM
contm informao relevante para o projeto, sendo a inteno final simular digitalmente todo o
processo de design e de construo do edifcio. No entanto, ao contrrio da abordagem manual,
a origem desta informao o programa que gera o modelo. Este programa, tal como um
modelo BIM, pode ser partilhado e desenvolvido em paralelo entre os diversos intervenientes
do projeto assegurando assim a colaborao e coordenao destes durante todo o
desenvolvimento do projeto. Naturalmente, este processo pressupe que todos estes
intervenientes saibam programar, um requisito que, no sculo XXI, comea a ser to importante
como saber ler e escrever.
286
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para utilizar uma abordagem algortmica como o A-BIM necessrio a formalizao das
intenes e ideias do projecto de forma a construir um algoritmo que produza a soluo de
design pretendida. Este algoritmo depois transformado num programa, i.e., numa srie de
instrues especficas e rigorosas escritas numa linguagem de programao que o computador
consiga compreender e executar.
Antes de percebermos como que o A-BIM se aplica em arquitetura e quais as vantagens que
podemos obter desta abordagem, necessrio primeiro perceber exactamente o que que
significa programar para BIM. Para isso, relevante perceber como que as ferramentas BIM
funcionam e quais as diferenas entre estas e as suas precedentes: as ferramentas CAD. Dadas
as diferenas entre estas ferramentas, as suas metodologias de programao vo tambm diferir.
Na seco seguinte, definimos uma metodologia de programao para BIM baseada nestas
diferenas.
Outra diferena entre CAD e BIM resulta do facto dos objetos BIM terem regras paramtricas
e associativas que controlam o seu comportamento no modelo e conferem aos objetos um
sentido arquitetnico. Por exemplo, em BIM, uma porta s pode existir numa parede. Isto quer
dizer que, para criar uma porta, necessrio primeiro criar uma parede. Estas regras refletem-
se na programao onde, de facto, uma parede um dos parmetros necessrios para criar uma
porta. Diferentemente, em CAD, os objetos podem ser criados separadamente e a ordem de
criao dos elementos irrelevante para o resultado final.
Finalmente, uma outra diferena entre as ferramentas CAD e BIM est nas bibliotecas de
objetos paramtricos pr-modelados. Por exemplo, enquanto que numa ferramenta BIM uma
porta pode ser selecionada de uma biblioteca, numa ferramenta CAD todos os subcomponentes
da mesma porta podero ter de ser criados de raiz. Quando esta modelao feita atravs da
programao, isto traduz-se num programa longo e complexo, que pode demorar demasiado
tempo a desenvolver. Embora as ferramentas CAD tambm permitam a importao de blocos
externos de geometria pr-modelada, tipicamente estes objetos no so paramtricos, o que
dificulta a manipulao da sua geometria. Em muitos casos, esta geometria tem de ser
manualmente alterada para se adequar s especificaes do projeto, sendo muitas vezes mais
simples reconstrui-la de raiz.
287
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Enquanto que a abordagem BIM manual foi modelada diretamente em Revit, a abordagem A-
BIM foi implementada usando o Rosetta. Esta ferramenta de programao foi escolhida devido
sua caracterstica portvel [4] que, ao contrrio de outras ferramentas recentemente
desenvolvidas tal como o Dynamo e o Rhino-Grasshopper-ArchiCAD, permite a gerao do
mesmo modelo em mais do que apenas uma ferramenta BIM. Usando o Rosetta, o modelo das
TAWs podem ser igualmente geradas tanto no Revit como no ArchiCAD.
O processo de modelao foi dividido nos vrios objetos arquitetnicos que compem o edifcio
uma vez que o mesmo objeto pode ser modelado de duas maneiras completamente distintas
dependendo da abordagem usada. Os objetos considerados foram: os nveis (embora no
exatamente um objeto arquitetnico, so um elemento BIM importante), as lajes, as aberturas
nas lajes, as paredes, a laje da cobertura, as escadas, as portas e as guardas.
Como exemplo, vamos considerar a modelao das paredes das TAWs. Ambas as torres
possuem uma grelha de paredes estruturais que se repete em todos os pisos, garantindo assim a
continuidade estrutural da torre. No entanto, devido rotao da torre, o comprimento destas
paredes aumenta e encolhe de piso para piso de forma a adaptar as paredes forma do edifcio,
tal como illustrado na Figura 2.
288
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Nas seces seguintes, o processo de modelao das paredes explicado para as duas
abordagens consideradas, sendo estas de seguida comparadas para descobrir as vantagens e
desvantagens entre elas.
Ao colocar as paredes entre nveis, torna-se mais fcil controlar a sua altura j que esta passa a
ser calculada como a distncia entre o nvel inferior e superior. Neste caso, cada nvel
corresponde a um piso das TAWs. Deste modo, se for aplicada alguma mudana s alturas dos
pisos da torre, as paredes e as suas respetivas alturas iro ajustar-se automaticamente.
Devido rotao da torre, o comprimento das paredes varia consoante o piso, pelo que as
restantes paredes tiveram de ser criadas individualmente (ou copiadas do piso anterior) e os
seus comprimentos ajustados manualmente a cada piso, para todos os pisos das TAWs, um
processo moroso e entediante.
3.2 A-BIM
Usando o Rosetta, podemos tirar partido dos objetos paramtricos pr-modelados fornecidos
pelas ferramentas BIM e manipul-los consoante os requisitos do projeto. Estes objetos so
disponibilizados pelo Rosetta sob a forma de operaes pr-definidas que permitem a criao
dos respetivos objetos nas ferramentas BIM.
Para criar paredes, a correspondente operao requer como parmetros uma lista de pontos que
representa os eixos das paredes e o nvel inferior e superior dessas paredes que determinam o
289
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
seu posicionamento e altura. Esta operao pode tambm receber como parmetros adicionais
as propriedades desejadas das paredes, sendo utilizados valores genricos pr-definidos caso
estes parmetros no sejam fornecidos.
Usando esta operao, crimos uma grelha de paredes de acordo com a configurao em planta
das TAWs, a qual distribumos para todos os pisos. Para representar os pisos, foi criada uma
lista de nveis correspondente ao conjunto das alturas de todos os pisos das TAWs. Usando esta
lista, podemos facilmente controlar o nmero de pisos e, consequentemente, o nmero de
grelhas de paredes distribudas pela torre.
Finalmente, para generalizar a forma do edifcio e oferecer uma maior flexibilidade de solues,
a grelha de paredes que distribuda pelos pisos e a forma da laje auxiliar correspondente ao
espao interior do edifcio so dados com parmetros independentes que podem ser facilmente
modificados pelo utilizador.
Figura 3: Para cada piso, o comprimento das paredes ajustado em relao ao permetro de
uma laje auxiliar correspondente ao espao interior do edifcio nesse piso.
3.3 Comparao
Enquanto que para a abordagem manual as paredes tiveram de ser criadas e adaptadas
manualmente a cada piso devido rotao da torre, ao usarmos uma abordagem algortmica
podemos tirar partido da lgica construtiva das paredes ser a mesma para todos os pisos,
permitindo assim que a criao e a adaptao destas rotao da torre seja automatizada.
290
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Embora til, esta capacidade de propagao de alteraes proporcionada pelas ferramentas BIM
no to abrangente nem flexvel como a de uma abordagem algortmica. Por exemplo, esta
propagao no tem em considerao o ajuste necessrio no comprimento das paredes das
TAWs, que ter de ser executado manualmente em todos os pisos para as adaptar forma e
rotao de cada piso. Este processo repetitivo e moroso pode efetivamente desencorajar
alteraes futuras, sendo portanto um obstculo explorao.
Para alm disto, uma vez que no modelo das TAWs, tanto a grelha de paredes como a forma
interior do edifcio so parmetros independentes, podemos vari-los de forma ortogonal:
podemos experimentar diferentes grelhas de paredes que sero automaticamente adaptadas
forma do edifcio, tal como podemos experimentar diferentes formas para o interior do edifcio,
que ajustar automaticamente o comprimento das paredes.
4. Avaliao
O A-BIM tem uma vasta aplicabilidade em arquitetura: pode ser usado para desenvolver
modelos paramtricos de partes de edifcios (e.g., uma fachada), de edifcios inteiros, ou at de
cidades inteiras. No entanto, esta abordagem poder nem sempre ser a mais apropriada para um
dado projeto, pois necessita de um investimento inicial de esforo e tempo que poder no ser
inteiramente recuperado no final. Como tal, antes de escolher a abordagem que se pretende usar
num projeto, essencial que os arquitetos primeiro estabeleam as prioridades do projeto em
questo e avaliem se o desenvolvimento deste poder beneficiar da abordagem A-BIM. Nas
seces seguintes, discutimos alguns aspetos importantes a ter em considerao nesta avaliao.
291
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
importante para que se possa extrair informao (e.g., quantidades de materiais) correcta para
a construo do edifcio.
4.4 Otimizao
As variaes ao design inicial discutidas na seco anterior podem tambm ser analisadas e
comparadas em relao, por exemplo, sua performance trmica ou s suas caractersticas
aerodinmicas. No caso das TAWs, poderiamos rapidamente testar diferentes formas para a laje
e diferentes ngulos de rotao de modo a perceber qual a forma e ngulo que oferecem
melhores condies aerodinmicas para as torres.
O prximo passo neste cenrio seria automatizar esse processo de anlise e comparao de
alternativas de forma a deixar o computador encontrar as que melhor satisfazem certos critrios,
o que conduzir a um processo de otimizao do design. Isto permite priorizar aspectos da
performance de um edifcio sobre a sua forma, o que constitui uma diferena significativa em
relao aos mtodos tradicionais onde as anlises de performance (e.g., estruturais, trmicas e
aerodinmicas) so tipicamente feitas no final do processo de design, j depois da forma estar
estabelecida, sendo raramente uma prioridade [6].
292
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para avaliar este investimento inicial, foi simulado um processo de design onde so exploradas
uma srie de alternativas ao design inicial das TAWs de forma a medir o impacto que esta
explorao tem no projeto, i.e., o tempo e esforo necessrios, tanto na abordagem A-BIM
como na abordagem BIM manual. A simulao para a abordagem A-BIM foi implementada
por ns usando o Rosetta, enquanto que a abordagem manual foi implementada em Revit por
um utilizador experiente.
Como exemplo, vamos considerar o modelo da segunda TAW tal como ela na realidade, i.e.,
com 50 pisos e rotao constante de 4 por piso (ver primeiro modelo na Figura 4). Os tempos
de modelao desta torre em ambas as abordagens podem ser observados na Tabela 1.
Tabela 1: Tempo necessrio para produzir o modelo da segunda TAW na abordagem A-BIM e
na abordagem BIM Manual.
Tempo de Modelao
(aprox.)
A-BIM 14h
BIM Manual 2h
Ao comparar os tempos, podemos observar que a abordagem A-BIM requer mais tempo para a
produo do modelo inicial, consequncia do maior esforo intelectual necessrio para formular
o algoritmo e tornar o programa parametrizvel. Neste caso, se o modelo inicial no sofresse
mais alteraes, a abordagem A-BIM seria muito menos eficiente do que a modelao manual.
No entanto, se tivermos em considerao alteraes futuras e a possibilidade de explorar
alternativas ao modelo inicial, esta situao pode mudar consideravelmente.
Considerando um outro exemplo, vamos supor que se pretende mudar o ngulo de rotao da
torre de 4 para 6. Esta alterao implica actualizar todas as lajes (incluindo a da cobertura) e
guardas para o novo ngulo de rotao, bem como ajustar todas as paredes nova forma do
edifcio.
Para aplicar esta alterao na abordagem A-BIM, temos simplesmente de mudar o parmetro
correspondente ao ngulo de rotao da torre e as dependncias no modelo tratam de propagar
esta alterao para o modelo inteiro. Por outro lado, numa abordagem manual, a maioria destas
alteraes tm de ser aplicadas manualmente, o que resulta em tempos significativamente
diferentes para executar estas alteraes em ambas as abordagens, tal como ilustrado na Tabela
2:
293
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tabela 2: Tempo necessrio para alterar o ngulo de rotao da torre na abordagem A-BIM e
na abordagem BIM Manual.
Tempo de Modelao
(aprox.)
A-BIM 1min
BIM Manual 1h 40min
Numa situao inversa da verificada para a produo do modelo inicial, a abordagem manual
requer bastante mais tempo para aplicar alteraes ao modelo. Isto acontece pois, apesar das
capacidades paramtricas das ferramentas BIM, muitas das mudanas continuam a ter de ser
executadas manualmente.
Finalmente, vamos supor que se pretende explorar uma variao ao design inicial da torre,
fazendo diminuir consistentemente as dimenses das lajes ao longo do edifcio. Mais uma vez,
esta alterao implica atualizar todas as lajes, paredes e guardas.
Para a abordagem A-BIM, podemos simplesmente aplicar um factor decrescente tanto forma
da laje como forma que define o interior do edifcio e esta alterao ir-se- propagar para os
restantes elementos. Por outro lado, para a abordagem manual, temos de refazer manualmente
todas as lajes e adaptar todas as paredes s novas dimenses do edifcio. Temos tambm de
redesenhar todas as guardas em todos os pisos. Os tempos resultantes desta alterao so os
seguintes:
Mais uma vez, a abordagem manual requer mais tempo para a execuo das alteraes ao
modelo, sendo mesmo necessrio quase tanto tempo para aplicar as alteraes como para
refazer o modelo de raiz. Este tempo torna-se um obstculo quando se pretende explorar
rapidamente alternativas ao design inicial.
A tendncia observada com estes exemplos para que, medida que o projeto evolui e as
alteraes so cada vez mais frequentes, o processo de actualizao manual do modelo torna-
se moroso e dispendioso. Ao mesmo tempo, a explorao de alternativas s vivel e produtiva
se esta puder ser executada facilmente e rapidamente. Nestes casos, o investimento inicial pode
ser recuperado medida que o projecto evolui.
294
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluso
Apesar destas caractersticas, o modelo gerado com a abordagem A-BIM continua a ser um
modelo BIM idntico a um modelo criado manualmente, i.e., carregado de informao de
construo, permitindo assim a integrao desta abordagem nos processos tradicionais baseados
em BIM. A partir desta informao, o modelo pode ser trabalhado para alm da sua forma,
usando por exemplo processos de otimizao para combinar e gerir os requisitos do projeto e
priorizar aspetos da performance durante o desenvolvimento do mesmo.
Embora a abordagem A-BIM tenha uma grande aplicabilidade em arquitetura, nem sempre a
abordagem mais vantajosa para um determinado projeto, pois necessrio um investimento
inicial para formular o algoritmo que gera o modelo. Neste artigo, demonstramos que esse
investimento pode ser rapidamente recuperado em projectos em que ocorrem mudanas
frequentes.
Referncias
295
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
296
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
At muito recentemente, na rea de projeto de engenharia civil, nomeadamente de estruturas, a
tecnologia pouco inovou, tendo vindo apenas a automatizar os processos tradicionais j
existentes. A grande viragem deu-se quando surgiu a possibilidade do utilizador interagir com
os objetos de forma inteligente e paramtrica.
1. Introduo
297
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
potencialidades que surgem na utilizao de uma modelao deste tipo, seja ao nvel da
interoperabilidade, da coordenao ou da interao com processos de trabalho a jusante do
projeto. Por ltimo, mencionar-se-o algumas curiosidades do projeto, como tambm alguns
dos seus elementos finais.
2. Enquadramento
Convm tambm mencionar que o gestor de projeto era da equipa de arquitetura (Cliente) e que
no foi do conhecimento do consultor do projeto de estabilidade a forma de gesto e
coordenao dos restantes projetos de especialidade. A prestao dos servios cingiu-se apenas
consultoria e projeto de estabilidade.
3. Abordagem
Previamente ao incio de um projeto BIM (ou logo nas fases iniciais) deve ser acordado, entre
as partes, o plano de execuo BIM BEP que visa estabelecer, entre os diversos
intervenientes, um conjunto de fatores representativos das intenes e responsabilidades
associadas incorporao do BIM. Como j foi referido, no presente caso de estudo no foi
formalmente estabelecido um BEP. No entanto, o desenvolvimento do trabalho teve em conta,
mesmo que de forma implcita e abstrada de formalismos, vrios aspetos inerentes a um PEB,
mais concretamente, os usos e objetivos BIM, o nvel de desenvolvimento do projeto, o nvel
de informao e a forma de interao com as restantes partes interessadas (neste caso, apenas a
equipa de arquitetura).
298
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste caso, em concreto, apesar de no ter sido estabelecido um BEP com a indicao dos
LODs a observar durante o desenvolvimento do projeto, nem ter sido acordado formalmente
299
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No existe uma delimitao clara entre o LOD a usar para cada fase, mas, tratando-se sobretudo
de um projeto de estruturas praticamente s com elementos de beto armado, o LOD acabou
por estar, de certa forma, relacionado com a fase de projeto desenvolvida Figura 1. O grau do
LOD da especificao utilizada varia entre LOD 100 informao genrica e o LOD 500
informao da realidade (outras especificaes podem usar uma classificao diferente, mas a
categorizao , em geral, semelhante).
3.5 Metodologia
A metodologia utilizada foi estabelecida com base na experincia de projetos anteriores. O
processo de trabalho centrou-se na utilizao de um modelo BIM principal, correspondente
especialidade em estudo que, neste caso, foi a estrutura. Neste projeto em particular, devido a
restries de ordem tcnica, particularmente na instabilidade e morosidade da transferncia
eletrnica de dados, no foi possvel proceder a uma forma de trabalho colaborativa genuna a
partir de um modelo central partilhado (single shared project model) com a equipa de
arquitetura. A interao realizou-se, apenas, com a troca peridica (no incio do projeto e,
geralmente, uma vez no fim de cada fase) de modelos BIM para posterior importao por cada
uma das partes, tornando esta ligao esttica (a informao atualizada do modelo por uma das
partes s conseguida atravs de nova partilha do modelo da outra parte).
Uma vez que a equipa de arquitetura estava a utilizar a mesma aplicao de modelao BIM
(Autodesk Revit 2015), o formato de intercmbio foi o nativo da aplicao (.rvt).
300
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
de modelao BIM utilizada ter algumas capacidades para anlises estruturais, estas so
bastante reduzidas. A aplicao utilizada para a anlise estrutural foi o Autodesk Robot
Structural Analysis Professional 2015. possvel a interoperabilidade entre estas aplicaes de
modelao BIM e de anlise estrutural, mas com limitaes.
O processo evolutivo do projeto fez-se por iteraes entre a interao da arquitetura com a
estabilidade at que o dimensionamento estrutural satisfizesse totalmente os requisitos
arquitetnicos. Esta evoluo do modelo, associada ao desenvolvimento do projeto e articulada
com a incrementao do LOD, terminou quando todos os aspetos dimensionais e caractersticos
de todos os elementos da estrutura estavam definidos no modelo da estrutura.
4. Caso de estudo
Para o modelo da estrutura estar coerente com a implantao pretendida no terreno e para se
poder verificar com rigor as zonas de conteno a realizar, foi modelada a topografia existente
a partir do levantamento topogrfico. Para se conseguir uma maior exatido, o terreno foi
modelado numa outra aplicao mais adequada (o Autodesk Civil 3D 2014) a partir da qual se
extraram um conjunto de pontos (via .csv) que, posteriormente, foram importados para o Revit
para a construo da superfcie. possvel verificar, atravs da Figura 2, que este processo
proporcionou uma superfcie com uma malha triangular bastante homognea e coerente.
Figura 2: Modelo BIM com o terreno existente (esquerda) e o edifcio colorido por partes,
com o terreno e implantao finais (direita).
301
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O posicionamento dos elementos estruturais foi baseado numa grelha planimtrica ortogonal e
num conjunto de nveis. Todos estes elementos, que auxiliam o posicionamento dos elementos
estruturais, foram georreferenciados. Desta forma, qualquer elemento estava na sua posio
verdadeiramente real (tanto planimtrica como altimetricamente), permitindo uma implantao
rigorosa durante a execuo da obra.
302
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Apesar das grandes melhorias a que se tem vindo a assistir ao longo dos anos neste processo,
ainda existem algumas restries, faltando ainda um melhor e mais eficaz controlo por parte do
utilizador. Por exemplo, com as aplicaes utilizadas, surgem problemas de interoperabilidade
quando o modelo analtico [do modelo Revit] tem rigid links ou quando so adicionados
alguns tipos de objetos no modelo analtico do clculo [modelo do Robot]. Assim sendo, optou-
se por fazer a anlise e dimensionamento estrutural num modelo prprio independente [no
Robot] e o processo de ajuste das seces dos elementos estruturais no modelo geomtrico foi
realizado de forma manual a partir da informao obtida na anlise da estrutura, bem como as
seces de armaduras para os diferentes tipos de elementos de beto armado.
Figura 5: Vista das tabelas de medio de armaduras por dimetro, para a Parte C e para a
totalidade do projeto, obtidas no modelo BIM.
Para a modelao das armaduras foram parametrizadas famlias individuais por cada uma das
formas de dobragem. Essa parametrizao teve em considerao alguns fatores como, a forma
de dobragem (para estar em concordncia com a ISO 3766 [7]), os dimetros dos vares
disponveis e respetivos dimetros de dobragem e os ganchos de amarrao tpicos.
303
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Uma vez feita a modelao, possvel obter informaes de vrios tipos, sejam elas grficas
ou no. A ttulo de exemplo, na Figura 6 apresenta-se um desenho de uma das lajes com as
respetivas armaduras superiores. Para cada uma destas armaduras existe um conjunto de
informaes que podem ser apresentadas (por exemplo, na planta esto indicados os dimetros,
o nmero de vares e o afastamento entre eles por cada grupo, assim como um cdigo de
identificao que faz a associao com a tabela do fabrico) ou tratadas (no mesmo conjunto de
figuras apresentado um excerto da tabela de armaduras com os parmetros necessrios ao
fabrico, em concordncia com o desenho apresentado) de forma dinmica. O parmetro de
identificao unvoca das armaduras permite fazer a ligao dos desenhos com as tabelas de
fabrico. Assim, durante a construo, cada um dos lotes fabricados so colocados na localizao
correta.
A informao sobre o fabrico, particularmente das armaduras, foi incorporada nas peas
desenhadas e exportadas para posterior utilizao pelo construtor Figura 6 (inferior direita).
304
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 6: Armaduras superiores de uma laje (superior), excerto da tabela da taxa de armadura
nos pilares (esquerda) e da listagem de armaduras elementares para fabrico (direita).
305
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Consideraes finais
A utilizao de uma aplicao BIM obriga a encarar o processo de maneira diferente da forma
tradicional, no apenas pelo modo de interagir com as ferramentas de trabalho, mas tambm
porque, para se tirar partido das mais valias que este tipo de aplicaes oferece, necessrio
pensar e estruturar a forma de trabalho em concordncia com as potencialidades das aplicaes
utilizadas. No ter o cuidado de fazer essa adaptao ir na direo errada. Pois tal se ir
traduzir num maior volume de esforo para obter o mesmo resultado final. Outro aspeto que
importante ter em mente que o BIM um processo concretizado atravs de ferramentas que
tm limitaes de vrios tipos. Por exemplo, especificamente na aplicao utilizada, o modo de
representao simplificado de armaduras em vista menos flexvel do que no CAD. Acaba por
sem mais fcil fazer um corte normal para mostrar determinados pormenores na forma da
armadura (e.g. ganchos) do que incluir manualmente essa representao simblica na vista.
306
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
estrutura tinha mais do dobro dos objetos, aproximadamente 3000, e ocupava cerca de 30 Mb,
ou seja, tinha mais do dobro dos objetos e menos de um dcimo do tamanho em memria.
Sem qualquer margem para dvida, este tipo de tecnologia ir consolidar-se e a tendncia ser
a utilizao cada vez mais acentuada de modelos tridimensionais inteligentes como forma de
troca de informao no setor da construo. Muito provavelmente, os tpicos desenhos 2D de
projeto, como base de partilha de informao, estaro, brevemente, associados ao passado.
Referncias
[1] Computer Integrated Construction Research Program. BIM Project Execution Planning
Guide Version 2.1. University Park, PA, USA: The Pennsylvania State University,
2011.
[2] Guide a l'intention des mai tres d'ouvrage publics pour la negociation des remunerations
de mai trise d'uvre: loi MOP, Paris: Direction des journaux officiels, France. 2008.
[3] Dcomposition des tches de matrise duvre, Syntec-Ingenierie, CICF, UNAPOC,
UNTEC, 2004.
[4] BIMForum, Level of Development Specification 2015, Version 2015.
[5] Bowen, Brian, Robert P. Charette, and Harold E. Marshall. 1992. Uniformat II: a
recommended classification for building elements and related sitework. Gaithersburg,
MD: U.S. Dept. of Commerence, National Institute of Standards and Technology
[6] Construction Specifications Institute, and Construction Specifications Canada. 2010.
MasterFormat, 2010 update: master list of numbers and titles for the construction
industry. Alexandria, VA: Construction Specifications Institute.
[7] ISO 3766:2003, Construction drawings Simplified representation of concrete
reinforcement.
307
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
308
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Summary
Building design starts with the inception phase and follow to the digitally representation of the
design program in order to obtain a real approach of the final construction product. Building
Information Modelling (BIM) tools provide digital models very similar to the reality. During
this digital process, the information can be managed during the whole lifecycle of the project
by a collaborative environment that BIM methodologies and tools provide. This paper depicts
the results about the reliability and flexibility of energy analysis using BIM-based simulations
(with Revit software and Green Building Studio Autodesk), as well as the benefits and
challenges of these BIM tools when compared with Energy Plus results and measurements.
These tools were used to study the thermal and energy performance of a well-insulated test cell
and to study the impact of a change of thermal mass and insulation thickness to figure out the
advantages and disadvantages of each tool. It was concluded that these BIM tools enabled the
designers to easily experiment different design alternatives for the entire life cycle of the
project, before they start implementing the final design solutions, saving time and money, while
contributing for the achievement of more energy efficient buildings.
1. Introduction
Nowadays the growing concern about climatic changes and the high exigency of buildings
design regulations have powerful impact on their energy performance. So, special attention to
architecture, structure, constructive elements and installations should be developed and given
[1]. This requires a straight collaborative approach among all the specialist and decision makers
involved, and the Building Information Modeling (BIM) methodology is pointed out as a
reliable process to achieve those goals [2]. BIM consists on a process of generation and
management of all the information corresponding to the building in the design and execution
phase and during all its life cycle. This methodology use 3D models containing all the
309
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
information about geometry, spatial relations, constructive processes, quantities and materials
properties [3]. BIM tools allow easy simulation and consequent selection of different and more
efficient solutions of the envelope and thermal mass, taking into account the building lifecycle.
The main objective of this study is to analyze the potentialities of thermal simulation with
software tools included in a BIM software to study the impact of envelope thermal insulation
and thermal mass on the thermal comfort of a test cell. It will focus on the Energy analysis
using BIM tools (Autodesk Revit and Green Building Studio Autodesk (GBS)), the input
difficulties and limitations and the outputs accuracy that were found during the design process,
when comparing with a recognized validate software (EnergyPlus).
2. Methodology
Since the experimental mock-up described in section 3.1 did not cover all the configuration
required to assess the impact of thermal insulation and thermal mass change, it was necessary
to test and use a validated software (EnergyPlus) to obtain a set of results of those particular
aspect of sustainable building design. Energy Plus (E+) has been tested and validated since
1993 and it is presently considered a reference tool for sub-dynamic thermal simulation [5, 6]).
With this software, it was possible to produce accurate results that were crucial to check the
results obtained by Revit 2016 and GBS. The stages of this study have been summarised in
Table 1.
310
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
GBS is a flexible cloud-based service that allows the designer to run building performance
simulations and optimize energy efficiency earlier in the design process, helping to extend the
ability to design high performance buildings consuming less time and at lower costs when
compared with conventional methods [8]. As mentioned in the previous section the test cell was
also simulated with E+ to obtain reliable results to compare with the results obtained with the
other tools. To simulate the test cell model with E+, a SketchUp model constructed with the
OpenStudio plugin was first developed. SketchUp is a graphical interface used to reproduce
the geometry of the model and the thermal zoning division (in this case only a thermal zone).
The annual thermal behaviour of the building was simulated and calculated with the E+ engine,
adopting the conduction transfer function (CTF) method to solve the heat conduction and
envelope surface energy balance.
In this study, because of their simplicity and use to study annual heating and cooling demand,
it was also used a seasonal stationary method to assess the annual heating and cooling load of
the test cell [9].
311
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Case study
Figure 2 shows a photography of the test cell placed in LNEC, Lisbon (Figure 2a), the Revit
3D model (Figure 2b), its plan (Figure 2c) and cross section (Figure 2d).
Test cell photography Test cell 3D model - Revit Model plan view - Revit Model cross section -
Revit
In Figure 1 has been presented the measurement results of indoor and outdoor temperatures in
two similar test cells and the global horizontal solar radiation. The measurement was carried
out in February, 2005, with outside average air temperature of 10C and sunny days. Due to
solar heat gains, thermal insulation and low thermal mass, the inside temperature has daily
variation of almost 15C.
3.2 Thermal Models development throughout BIM tools and Energy Plus
Using Revit as a BIM tool the design process of the test cell model was facilitated. Each element
was designed by inserting each layer with its physical and thermal properties, compatible with
the real materials' characteristics of the test cell mass [7]. While the different situations are
tested, Revit has worked efficiently with improved performance during redraw process, by
navigating models more smoothly and continuously without having to wait for the software to
312
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
finish drawing elements at each step [7]. The model with its 3D views and sections was updated
automatically. Once the energy analysis button is clicked, the results run in both programs,
Revit and GBS, due to their collaborative capabilities. This 100% interoperability between
these two tools save time to designer team and help them to obtain an easy cooperation and
wisely decisions during the design process [7]. The Revit 3D model of the test cell has a more
realist aspect than using the Open Studio plugin model. However, as the interoperability
between Revit and E+ was not obtained it was necessary to develop a model with Open Studio
to be used by E+. The development of this model was more complex without the data base
management of construction materials, but the major limitation is the lack of interaction with
other design areas and updates, as it is possible with Revit.
The Revit and GBS presented limitations in the input of weather data from other sources than
the ones available in the software (Figure 3b). This is a limitation for the analysis of thermal
performance of the test cell. Thus, in Revit Lisbon was chosen as the test cell location (Figure
3b), consequently the weather data was selected and it is not allowed to update it or to upload
another weather data file as it is possible in E+ (upload a weather data file with epw extension,
Figure 3a).
Figure 4 and 5 depict the weather data from E+ and Revit files. The weather data from Revit
has slight differences compared with energy plus weather data in the temperature and solar
radiation.
313
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
GBS and Revit were not able to calculate the internal temperature, only the heating and cooling
loads. This constitutes a major drawback of those tools to study thermal comfort, green
buildings and nearly zero energy buildings. Energy Plus as a detailed building energy
simulation tool has the ability to calculate internal environmental conditions. Figure 6 depicts
the measurements values of outdoor and indoor air temperature and the calculated values with
Energy Plus. Analysing the results of measurements and calculation with E+, it was concluded
that the thermal models gather the thermal performance of test cell and the measurements and
simulation has an average air temperature of 15.5C, the calculation has an average error (MBE,
equation 1) of -1% (0.2 C) and a root mean square error (RMSE, equation 2) of 6% (0.9 C).
314
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Another limitation of Revit and GBS is the fact that this software always considers by default
heat gains for occupancy, lighting and equipment. In the present case study, it was considered
8 W/m2, despite the test cell has no internal heat gains.
4. Parametric study: impact of thermal insulation and thermal mass with BIM tools,
EnergyPlus and seasonal method
The test cell is insulated with 60 mm of EPS and has low thermal mass due to the existing
internal insulation layer. To assess the impact of thermal insulation, the thermal performance
of the test cell was simulated with the validated model and with several insulation thicknesses
as given in Table 2. In the case named low thermal mass, the insulation is applied in the
interior face of the construction elements; and in the solution named high the insulation is
applied in the outside face of the roof, the floor and in the air gap of the walls. For the low
solutions the thermal inertia of the test cell is low, while in high the thermal inertia is high
[10]. The heat transfer coefficient of the different solutions is given in Table 2. In all cases the
window thermal transmittance (Uw) was 5,9 W/(m2.C). The results will be presented in the
next section.
The nine parametric solutions described in Table 2 have been tested to experiment the flexibility
and the reliability of Revit/GBS to study the impact of changes in thermal insulation of opaque
building envelop and the effect of thermal mass changes between low and high, against the
results obtained with Energy Plus. The annual heating and cooling loads calculated with Energy
Plus, Revit/GBS and seasonal method are shown in Figure 7. With those tools, as it is expected,
heating loads using high thermal mass and thermal insulation were smaller than using low
315
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
thermal mass and lower thermal insulation. Its interesting to note that the seasonal method
gives better agreement with energy plus, for heating and cooling demand, than the Revit/GBS.
5. Results discussion
In figures 8 and 9, the monthly heating loads for the test cell are shown with 60 mm of insulation
layer (EPS) low thermal mass calculated using Revit/GBS and Energy Plus. In this figures both
tool predict heating and cooling demand of the test cell in February, agreeing with the
temperature measurements in the test cell (Figure 1), that were higher than 25C during the day
and lower than 20 C in the night.
It is also highlighted that both Revit and GBS presented more interesting graphs, showing
details about building heat transfer, contrasting with E+ which presents a bar with only the total
for heating/cooling demand, do not allowing the designer to identify weak points that could be
improved.
316
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figure 8: Results provided by Revit 2016 - 60 mm thermal insulation low thermal mass.
In Figures 10 are given the monthly heating and cooling loads for the test cell with 60 mm
thermal insulation and high thermal mass calculated with energy plus. Comparing those results
with the previous ones for the low thermal mass test cell (Figure 8 and 9) it is interesting to note
that the thermal model with high thermal mass in winter the cooling demand is almost zero, due
to the energy storage in the thermal mass, which is also responsible for the decrease in the
heating demand of the test cell.
317
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
6. Conclusion
To conclude, BIM tools have provided an integrated solution about testing the building during
the design phase and exporting the model softly from one tool to another inside BIM platform
of the same software house (with 100% of interoperability). The model can be analysed
automatically and allow a simple study of alternative solutions to be discussed directly through
this BIM collaborative environment. The use of BIM to study this simple test cell presents
several limitations, because we were not able to study the passive behaviour of test cell and
were compiled to use HVAC system to assess the heating and cooling load. In this calculation
Revit present big differences compared with the more detailed and validated software (Energy
Plus) and also presented to be a tool that has bigger errors than the seasonal annual method,
usually used in the thermal regulation. This research will continue to identify the sources of this
errors in Revit/GBS tool. For this, a deep analysis for the calculation method used by Revit is
in progress.
References
318
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
319
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
320
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O recurso da arquitetura s reas artsticas, humanas, cientficas e tecnolgicas evidencia a
multiplicidade de informao sintetizada no objeto arquitetnico, tornando a sua comunicao
algo difcil. Por outro lado, por se tratar de matria construda, pelas funes que lhe esto
associadas e pelo caracter privado de muitos dos seus exemplares, a sua visita muitas vezes
impossibilitada. Assim, o contacto com a arquitetura relevante por isso maioritariamente feito
por via de meios de comunicao e no atravs dos seus originais. Torna-se por isso essencial
investir em modos de divulgao de arquitetura que aproximem o objeto comunicante do objeto
comunicado. Para tal procurou-se, explorar a forma como os objetos de arquitetura so dados a
conhecer, abordando para tal as capacidades e limitaes de cada um dos meios tradicionais de
comunicao da mesma o desenho, o texto, a maquete, a fotografia e o vdeo para expor,
representar e documentar arquitetura. Procurou-se tambm analisar o BIM, considerando para
tal, no s as competncias do software, mas tambm as competncias atribudas pelos meios
e comunicao, passiveis de lhe serem associados. Por ltimo, procurou-se testar algumas das
qualidades de uma ferramenta BIM para esta rea de conhecimento, atravs do exerccio prtico
de modelao da Casa Albarraque em Revit. Concluiu-se que o BIM uma ferramenta relevante
para expor, representar e documentar arquitetura, no s devido capacidade de suportar outros
meios de comunicao, tirando partido das qualidades dos mesmos, como tambm pelas
prprias qualidades desta tecnologia, que se apresenta uma alternativa nica para experienciar
arquitetura.
1. Introduo
321
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
inacessvel. Neste sentido, reporta-se como necessrio garantir que a arquitetura seja descrita e
apresentada aos seus observadores da forma mais aproximada relativamente ao seu original.
Para tal, importa avaliar a qualidade da aproximao, entre o objeto original e os diferentes
suportes comunicativos, partindo de critrios prprios para o tratamento museolgico da
arquitetura. Assim, com base no International Council of Museums [1] [2] e na Direo Geral
de Patrimnio-Cultural [3], foi descortinada uma trilogia de anlise para avaliar os meios
utilizados para comunicar arquitetura (meios tradicionais e tecnologia BIM) conforme ilustrado
na Figura 1.
Trilogia de Anlise
Para estimar a qualidade de qualquer suporte comunicativo seja para expor, representar ou
documentar arquitetura tornou-se importante definir previamente o que so qualidades prprias
da arquitetura. Assim, a partir do pensamento de Bruno Zevi [4] foram consideradas trs
grandes qualidades da arquitetura que devem ser comunicadas: as suas qualidades sensitivas,
fsicas e identitrias (Figura 2).
Foi ento, a partir destas trs categorias, que se procurou avaliar a capacidade dos diferentes
meios para expor, representar e documentar as qualidades da arquitetura.
Desta forma, para a exposio de arquitetura, um dos aspetos mais relevantes a considerar
prende-se com a descrio das qualidades sensitivas de um espao. Assim, quando se trata a
dimenso sensitiva da arquitetura, procura-se apresentar as suas qualidades sensoriais e
emocionais, revelando to-somente os elementos estruturantes da atmosfera e dos ambientes
que o espao apresenta [4].
322
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
contextos sociais, culturais, econmicos e polticos [4]. Estes conceitos encontram-se ilustrados
no esquema da Figura 3.
Trilogia de Anlise
O trabalho aqui apresentado, de ndole terico-prtica, procura destacar algumas das mais-
valias que o BIM trs para o tratamento museolgico da arquitetura, focando-se nos seus
suportes comunicativos.
Numa ltima fase, com base em toda a informaes consultada, tornou-se possvel calcular
alguns dos benefcios da tecnologia BIM comunicar arquitetura. Considerando para tal, no s
a capacidade de agregar as competncias apresentadas pelos mtodos tradicionais de
comunicao, mas tambm de se constituir uma alternativa com valncias nicas de
experienciar arquitetura.
2. Contextualizao do tema
323
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Aps anlise sistemtica dos diferentes meios de comunicao pode concluir-se que a
exposio, representao e documentao de arquitetura tanto mais rica quanto mais
diversificados forem os meios utilizados para a comunicar.
Uma vez que cada um dos meios referidos se encontra intimamente relacionado com a produo
do projeto ou pelo contributo nico que os carateriza, considera-se ento que so todos eles
relevantes para comunicar as qualidades arquitetnicas.
Por essa razo para comunicar arquitetura com rigor necessrio recorrer a suportes
heterogneos que permitam complementar o discurso descritivo, colmatando assim as
limitaes inerentes de cada um dos suportes comunicativos, representando assim de forma
mais completa as diferentes qualidades sensitivas, fsicas e identitrias de um projeto.
Sendo o BIM uma tecnologia orientada para a conceo e gesto do ciclo de vida de edifcios
novos neste sentido que tm vindo a ser promovidas investigaes e consequentemente a
evoluo da sua tecnologia. No entanto, j alguns trabalhos tm vindo a ser desenvolvidos no
campo da aplicao da tecnologia BIM a edifcios pr-existentes, especialmente sobre edifcios
de relevncia histrica ou patrimonial [19].
Nas ltimas duas dcadas assistiu-se a um crescente processo de digitalizao, gesto e criao
de plataformas virtuais com o objetivo de disponibilizar e permitir o acesso a informaes
relativas a patrimnio histrico. O processo de digitalizao apostou inicialmente na modelao
virtual 3D para a documentao rigorosa da geometria e das propriedades visuais dos objetos
arquitetnicos, recorrendo para isso fotogrametria e ao laser scanning. Contudo a descrio
das superfcies de um objeto arquitetnico no tem qualquer tipo de informao para alm da
descrio do invlucro que contem a matria descrita [20].
324
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O HBIM foi utilizado num projeto de restauro em 2014 que, aps a sua destruio causada por
um terramoto, recorreu a esta tecnologia para simular e analisar o comportamento estrutural do
edifcio assim como para oramentar e desenvolver o projeto de restauro [23, p. 1].
Ramtin Attar et al. desenvolveram o modelo BIM do escritrio da Autodesk. O objetivo foi o
de construir um modelo que funcionasse como base de dados de toda a informao sobre o
edifcio. Assim o modelo do edifcio de relevncia histrica, regista as diferentes intervenes
que sofreu ao longo do tempo e opera como um repositrio de informao capaz de descrever
a geometria e a semntica associadas ao objeto arquitetnico. O autor acrescenta ainda que uma
das motivaes para a adoo do BIM foi a possibilidade de centralizar a informao referente
ao edifcio e permitir a produo de uma grande variedade de anlises a partir do modelo [24,
p. 3].
Em 2011, Stephen Fai et al. alerta que, apesar da proliferao da adoo do BIM para projetar
e gerir o ciclo de vida de edifcios novos, muito reduzido o nmero de investigaes
desenvolvidas com o intuito de explorar as capacidades do BIM para a gesto de informao
relativa a edifcios construdos de relevncia cultural [19, p. 1].
Apesar dos desenvolvimentos at data, Logothetis et al. reforam esta ideia em 2015 na
reviso do estado da arte sobre a aplicao da tecnologia BIM ao patrimnio cultural [25, p.
177].
Stephen Fai et al. estudaram a construo de modelos BIM que incorporassem dados
quantitativos, como o caso de objetos inteligentes e a informao do seu desempenho
estrutural, e informao qualitativa, tal como a incluso de fotografias e elementos textuais. Os
autores identificaram tambm a capacidade do BIM permitir organizar informao numa linha
de tempo navegvel, possibilitando assim o registo das alteraes tangveis e inatingveis que
foram ocorrendo ao longo do ciclo de vida do edifcio e eventuais projees futuras [19, p. 1].
325
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Todas estas capacidades podem ser exploradas como matria de base para a exposio,
representao ou documentao extensiva de um projeto de arquitetura relevante, enquanto
matria realizada ou enquanto processo.
Uma vez que os edifcios pr-existentes de relevncia histrica apresentam muitas vezes
elementos de geometria irregular, a modelao dos mesmos revela-se muitas vezes difcil [25,
p. 179]. Por outro lado, os materiais tambm sofrem alteraes sua morfologia e propriedades
originais, apresentando o desgaste prprio do uso e do tempo. Por isso, para documentar a
heterogeneidade da morfologia do edifcio ou o desgaste do mesmo, necessrio recorrer a
mecanismos de anlise tais como o laser scanner ou a fotogrametria [25, p. 179].
Para a construo de um modelo desta natureza a modelao em BIM tem de ser produzida
manualmente, uma vez que ainda no existe a capacidade de reconhecer os planos atravs da
nuvem de pontos ou dos levantamentos fotogramtricos, o que torna este mtodo pouco eficaz.
Neste campo, apenas possvel ultrapassar as dificuldades apresentadas pela falta de primitivas
da linguagem das bibliotecas BIM atravs do recurso ao HBIM referido anteriormente [25, p.
179].
326
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
327
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Num segundo ponto, identifica-se a mais-valia de apresentar a casa de uma forma mais intuitiva
a um pblico no especializado, uma vez que o modelo 3D prescinde de uma viso
tridimensional treinada para imaginar os espaos modelados.
As imagens e vdeos renders produzidos a partir do modelo permitem expor o projeto da casa
sem o vestgio das marcas do tempo, as imperfeies prprias do objeto original e sem o
mobilirio e as naturais apropriaes do espao. Estes meios, distintos da fotografia e do vdeo,
permitem focar a ateno do visitante apenas na arquitetura apresentando-se como uma visita
virtual distinta da visita real. Permite tambm apresentar perspetivas do projeto sobre o qual
pode no existir informao nos restantes suportes, como por exemplo em perspetivas areas.
Outro ponto a destacar, no mbito do caso de estudo do modelo da Casa Albarraque, recai sobre
a possibilidade do mesmo ser facilmente consultado e partilhado atravs da internet. Assim, e
ao contrrio da maquete, o modelo partilha deste importante veculo de divulgao de
informao. Tal como referido anteriormente, a compatibilidade do suporte comunicativo com
o ciberespao atualmente condio sine qua non para a exposio de arquitetura numa
sociedade que se quer cada vez mais informada, com acesso a informao inteligente, em rede
e mais conservadora na utilizao de recursos naturais.
Por outro lado, o modelo da Casa Albarraque rene informao heterognea como a visual
(renders e vdeos), a espacial (modelo 3D), a tcnica (desenhos tcnicos, materiais, as diferentes
listas) e a histrica (importao de documentos e texto). A reunio dessa informao torna o
modelo um meio expositivo apelativo a um pblico alargado com nveis de interesse distintos
entre si. A interoperabilidade do modelo garante tambm a possibilidade aos utilizadores de
consultarem o modelo no suporte que melhor servir os seus interesses pessoais e selecionar o
contedo no qual estejam mais interessados.
328
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O modelo da Casa representa tambm a materialidade dos diferentes elementos do projeto assim
como as qualidades visuais associadas a cada material. Para a representao da dimenso fsica
do projeto, o modelo tem associado a cada material as suas propriedades, tais como: o
comportamento trmico, mecnico e a resistncia do material.
Uma vez que o modelo pode ser navegvel, algumas das sensaes que o espao suscita no
observador podem ser experimentadas atravs da explorao do modelo em realidade virtual.
Este tipo de experincia pode ser apenas comparado com a consulta de modelos de maquete
que dificilmente alcanaria o nvel de detalhe e realismo a que se conseguiu chegar com este
modelo.
O modelo da Casa desenvolvido constitui-se uma ferramenta de representao que pode ser
utilizado para continuar a representar alteraes futuras ao edifcio e servir de suporte para a
produo de anlises e para a gesto e manuteno do mesmo ao longo do seu ciclo de vida.
Permite tambm informar e ensaiar diferentes propostas de alterao ao projeto original no
mbito de projetos de reconstruo, reabilitao ou recuperao do edifcio de forma informada
e rigorosa.
329
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
6. Concluses
No entanto, o BIM apresenta-se como uma ferramenta relevante para exibir, representar e
documentar a arquitetura, na medida em que se apresenta como uma soluo aglutinadora de
diferentes suportes comunicativos, assimilado consequentemente as valncias dos mesmos para
a comunicao de arquitetura.
Concluiu-se que o BIM tem a capacidade de expor arquitetura, propondo uma forma interativa
de interao e manipulao de projetos arquitetnicos, distinta dos meios tradicionais
abordados. Tambm, atravs da experincia imersiva de visita aos modelos BIM, possvel
aproximar o utilizador da experincia da visita real do objeto arquitetnico. Proporcionando
desta forma ao visitante uma experincia sensorial mais rica, informativa e interativa com a
arquitetura.
Finalmente, permite documentar com mais rigor do que os meios tradicionais de comunicao,
projetos de arquitetura relevante, uma vez que permite a incluso de um conjunto alargado de
elementos de diferentes formatos insinuando-se at mesmo como capaz de funcionar como um
modelo inventrio de projetos de arquitetura relevante com informao multidisciplinar, multi-
funcional, inteligente em organizada num suporte interopervel. De facto, por se tratar de uma
ferramenta digital, possvel organizar uma grande quantidade de informao disponibilizar o
modelo produzido na internet.
Referncias
[1] ICOM, ICOM Code of Ethics for Museums, I. C. o. Museums, Ed., Paris, 2013.
[2] ICOM, Museum Definition, 2007. [Online]. Available: http://icom.museum/the-
vision/museum-definition/. [Acedido em Fevereiro 2016].
[3] DGPC, Direco-Geral do Patrimnio Cultural: Patrimnio Arquitetnico, [Online].
Available: http://www.patrimoniocultural.pt/pt/patrimonio/patrimonio-
imovel/patrimonio-arquitetonico/. [Acedido em Maro 2016].
330
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
331
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
332
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A construo de barragens e o seu faseamento construtivo so atividades extremamente
complexas, que acarretam custos muito elevados e que assim requerem otimizao. Nesse
sentido impe-se cada vez mais uma tentativa de aproximao s abordagens de Integrated
Project Delivery (IPD) preconizadas pelas filosofias BIM, nomeadamente atravs da
integrao entre vrias valncias de uma forma automtica.
Assim sendo, este trabalho visa essencialmente estabelecer uma metodologia integrada que
permita a ligao entre a modelao, o clculo trmico e a definio do faseamento construtivo
de barragens (4D). No artigo so apresentadas trs principais ferramentas desenvolvidas
referentes modelao da barragem, ao clculo trmico e ao faseamento construtivo.
A barragem foi modelada atravs de programao visual com recurso ao Dynamo, sendo este
interopervel com as restantes ferramentas desenvolvidas. O clculo trmico faseado efetuado
pelo mtodo das diferenas finitas 2D atravs da linguagem MATLAB. A ferramenta
desenvolvida para gerao automtica do faseamento construtivo, igualmente implementada no
MATLAB, baseada num algoritmo de automao celular.
1. Introduo
333
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No caso particular do estudo do faseamento construtivo de barragens, uma das mais importantes
variveis a ter em conta a definio da espessura das camadas de betonagem, que por sua vez
est diretamente relacionada com o risco de fissurao decorrente das variaes trmicas
associadas ao calor gerado pela hidratao do cimento. Com efeito, caso sejam adotadas
espessuras de camadas de betonagem excessivamente grandes, as variaes de temperatura so
tambm bastante elevadas (sendo atingidas temperaturas de pico da ordem dos 60-70C) e
proporcionam expanses/contraes que so normalmente parcialmente impedidas, gerando,
portanto, nveis de tenses conducentes ao aparecimento de fissurao precoce de origem
trmica que altamente indesejvel. As fissuras trmicas so normalmente alvo de reparaes
com custos elevados, quer do ponto de vista da prpria reparao em si, quer tendo em conta
os atrasos induzidos concluso da obra. Por outro lado, se so adotadas espessuras de camada
muito pequenas para evitar risco de fissurao trmica, poder-se- incorrer em tempos de
construo demasiadamente longos e desnecessrios, com enormes sobrecustos associados ao
prolongamento do tempo de execuo da obra. relativamente frequente aceitar o aumento de
espessura das camadas de betonagem para acelerar o faseamento construtivo, acompanhado de
medidas de mitigao do risco de fissurao trmica, como por exemplo o abaixamento da
temperatura inicial do beto ou o recurso a tubagens de arrefecimento embebidas na prpria
barragem.
Tendo em conta os aspetos que acabam de ser explanados acerca do estudo do faseamento
construtivo de barragens, e caso se pretenda suportar filosofias de trabalho IPD com suporte em
modelos BIM, torna-se necessrio agilizar um conjunto de tarefas que partida no esto
garantidas nas aplicaes BIM disponveis no mercado: (i) estabelecer a modelao paramtrica
do corpo da barragem de forma facilitada, incluindo a definio das vrias fases de betonagem
que lhe so inerentes; (ii) estabelecer um fluxo de interoperabilidade que permita a anlise
trmica de cenrios de construo; (iii) estabelecer metodologia de definio automtica da
calendarizao das betonagens, tendo em conta a complexidade de definio manual em obras
com centenas de fases de betonagem.
334
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Aps a descrio das trs ferramentas descritas, ser explanada a sua aplicao integrada
barragem em estudo, ilustrando-se a concretizao do processo IPD mencionado.
O corpo de uma barragem em arco tem dupla curvatura ao longo do seu desenvolvimento
vertical e em planta [3], assim devido a sua complexidade geomtrica, este apresenta-se como
um grande desafio de modelao.
A barragem escolhida como caso de estudo uma barragem em arco, tem 98 metros de altura,
300 metros de comprimento e est representada em planta, em corte e em alado na Figura 1,
onde os eixos de referncia x, y e z esto representados (origem localizada no folheto mdio do
coroamento da barragem).
335
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O modelo da barragem foi efetuado com recurso ao plugin Dynamo do REVIT (Autodesk) que
permite a utilizao de programao visual para assistir o processo de criao de objetos BIM.
Assim, o procedimento implementado para a criao do modelo paramtrico da barragem em
estudo apresentado na Figura 2. Em primeiro lugar efetuou-se a modelao do folheto mdio
da barragem e da sua espessura com recurso s equaes acima indicadas, avaliadas para o
intervalo de valores de z compreendidos entre 0 e 98m. De seguida foi modelada a interseo
da barragem com o terreno considerado atravs de ferramentas padro disponveis na
plataforma BIM utilizada. As galerias foram modeladas por subtrao ao slido global da
barragem das suas seces transversais extrudidas ao longo das diretrizes correspondentes.
Finalmente, a barragem resultante foi sub-dividida segundo 19 planos verticais espaados
aproximadamente de 17,5 metros e por 49 planos horizontais espaados de aproximadamente
2 metros. Resultou um modelo da barragem compreendido por 841 elementos slidos
independentes, que compreendiam a respetiva informao no geomtrica relativa a volumes,
classe de beto e propriedades termo-fsicas, entre outras.
336
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Atribuio da Modelao
espessuar ao das galerias
plano mdio da barragem
Modelao da
Modelao do interseo Diviso da barragem
folheto mdio solo-barragem por juntas
betonagem vercais e
horizontais
Por forma a verificar adequada interoperabilidade entre a plataforma BIM utilizada (REVIT) e
as outras plataformas BIM, o modelo foi exportado para o formato IFC. Na Figura 3
apresentado o modelo IFC no Solibri Model Checker, onde podem ser verificados os parmetros
de identificao de uma camada, assim como as suas propriedades geomtricas.
3. Clculo trmico
337
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A ferramenta informtica tem como parmetros de entrada a altura das camadas de betonagem,
a espessura mxima do perfil vertical em estudo e o nmero de camadas de betonagem
diretamente provenientes de processo de interoperabilidade com o modelo descrito na seco
2, assim como os tempos de espera entre betonagens e todas as caractersticas trmicas
introduzidos diretamente pelo utilizador. Refira-se que foi tambm considerada a possibilidade
de transferncia de calor para a camada de fundao, bem como o cariz evolutivo das vrias
fronteiras envolvidas, sendo tambm simulada a colocao e retirada das cofragens. Com base
nas temperaturas calculadas, possvel tirar ilaes sobre o risco de fissurao relativo entre
cenrios em anlise, tendo em conta os gradientes espaciais (TS) e temporais (TT) de
temperaturas calculados.
a) b)
Figura 4: a) Mapas de temperaturas; b) Gradientes temporais de temperaturas.
Tendo em conta a disponibilidade do modelo BIM definido na seco 2, bem como o estudo
trmico possibilitado pela ferramenta de clculo trmico descrita na seco 3, possvel a
tomada de deciso relativa espessura das camadas de betonagem a adotar. No entanto, aps
essa definio torna-se necessria a definio da sequncia de betonagem da barragem em si, o
que na barragem em estudo inclui mais de 800 fases. Tratar-se-ia de um processo extremamente
tedioso e sujeito a erros, pelo que se decidiu realizar uma ferramenta que automatizasse os
processos. No entanto, para esse processo poder ser automatizado, foi necessrio um
levantamento cuidado dos critrios a aplicar (ver seco 4.1), passando posteriormente sua
338
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Sero, portanto, aqui explanados alguns critrios normalmente adotados na construo de obras
de beto em massa. O tempo mnimo de espera entre camadas de betonagem consecutivas est
normalmente fixado em 7 dias. Por outro lado, normalmente fixado o tempo mximo de espera
entre betonagens sucessivas, a fim de evitar a fendilhao na camada superior devido ao
avanado estado de endurecimento da camada inferior. O tempo mximo em questo
normalmente fixado em 2 semanas.
Outro fator importante, segundo as regras tradicionais encontradas na literatura [8] para a
definio do faseamento construtivo da barragem a mxima diferena de alturas entre
camadas adjacentes. Este limite permite tambm manter a temperatura da barragem
relativamente uniforme entre os blocos adjacentes. Normalmente a diferena de alturas entre
camadas adjacentes inferior a 4 camadas de betonagem.
Outros critrios como a construo da barragem do centro para as margens e como a diferena
de alturas entre as camadas mais baixa e mais alta devem tambm ser tidos em conta na
elaborao do faseamento construtivo da barragem.
Os algoritmos de automao celular so algoritmos de inteligncia artificial que com base num
simples conjunto de regras permitem a resoluo de problemas complexos de tomada de
deciso. Para mais detalhes acerca dos algoritmos de automao celular, bem com da sua
implementao na ferramenta computacional, consultar [5].
As estratgias tpicas de construo acima foram implementadas como regras para a colocao
de camadas de betonagem por parte da ferramenta computacional. Estas regras foram
hierarquizadas em funo da sua importncia na elaborao do faseamento construtivo de
barragens encontrado na literatura. Assim a hierarquia de prioridades de implementao das
regras por parte da ferramenta computacional a seguinte:
1. Tempo de espera mximo entre as camadas de betonagem sucessivas;
2. Mnimo tempo de espera entre betonagens sucessivas;
3. Diferena de alturas entre camadas de betonagem vizinhas.
339
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os resultados da aplicao deste algoritmo podem ser vistos nas Figuras 5 e 6, onde so
apresentadas a datas de betonagem das vrias camadas (Figura 5) e a evoluo trimestral da
construo (Figura 6).
340
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluses
No que diz respeito modelao paramtrica de barragens com recurso a programao visual,
foi atingido o objetivo inicial traado que permite a definio rpida de variantes geometria
da barragem, quer do ponto de vista de estudo de cenrios alternativos, quer do ponto de vista
de utilizao em projetos subsequentes. Trata-se de facto de uma ferramenta que permite criar
objetos BIM com toda a informao no-geomtrica relevante de forma rpida e conveniente,
viabilizando a utilizao de plataformas BIM neste contexto.
No que concerne ferramenta desenvolvida baseada para o clculo trmico, baseada no mtodo
das diferenas finitas, foi possvel verificar o seu adequado desempenho no clculo relativo a
estruturas de beto em massa construdas por fases. De facto, em sinergia com a ferramenta de
modelao paramtrica anteriormente descrita, permite o estudo de vrios cenrios de
construo distintos, em termos de temperatura ambiente, temperatura de colocao,
composio do beto e faseamento construtivo (entre outros), permitindo melhor apoiar
341
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
decises a tomar em funo de todas estas variveis para agilizar a rpida tomada de deciso
em fases iniciais de projeto.
A metodologia integradora exposta, aqui explanada segundo as suas trs vertentes principais,
permite tornar mais adequado e eficiente todo o processo de tomada de decises nas fases
iniciais do projeto, j em colaborao com a equipa de construo, permitindo uma rpida
integrao de valncias e anlise de cenrios de uma forma que no normalmente acessvel
desta forma facilitada nas fases preliminares do projeto de barragens. Esta tomada de decises
nas fases preliminares do projeto permitir ganhos de tempos de construo e
consequentemente de custos substanciais na construo de barragens e estruturas com desafios
de faseamento construtivo anlogos, como o caso de obras com beto em massa.
Referncias
[1] Aia, Integrated Project Delivery: A Guide, Am. Inst. Archit., pp. 162, 2007.
[2] M. Azenha, J. C. Lino, and B. Caires, Curso BIM: Building Information Modeling., in
Ordem dos Engenheiros, 2015.
[3] USDI, (United States Department Of The Interior). Design of arch dams. Design Manual
For Concrete Arch Dams. Denver: United States Government Printing Office, 1977.
[4] U.S. Army Corps of Engineers, Engineering and Design: Arch dam design.,
Department of the Army, Washingtom DC, 1994.
[5] L. P. Bidarra, An integrated model for simulation of construction phasing of arch
concrete dams,, MSC dissertation,University of Minho, 2015.
[6] Azenha, Numerical simulation of the structural behaviour of concrete since its early
ages, University of Porto, 2009.
[7] L. Bidarra and M. Azenha, Ferramenta baseada no mtodo das diferenas finitas 2D
para clculos trmicos expeditos de faseamento construtivo de estruturas de beto em
massa, Encontro Nacional Beto Estrutural, Coimbra, 2016.
[8] Spanish Commitee on Large Dams, Conventional Methods in Dam Construction,
CIGB ICOLD, 1990.
342
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A evoluo da tecnologia de modelao na rea especfica da pormenorizao de estruturas de
beto armado e das capacidades de interoperabilidade entre aplicaes, associadas ao conceito
BIM, j permite obter resultados satisfatrios. A integrao de novas capacidades para
avaliao de viabilidade em modelos tridimensionais, produo de desenhos tcnicos,
estimativa de custos e medio de quantidades tm vindo a facilitar o uso destas aplicaes.
No entanto, existe ainda uma certa resistncia, por parte dos projetistas, modelao das
armaduras, em modelos tridimensionais BIM, preferindo a alternativa do CAD como apoio
produo da documentao tcnica.
Este artigo tem como objetivo apresentar algumas das funcionalidades de modelao desses
elementos, em software BIM, e enunciar as principais vantagens dessa modelao, as principais
dificuldades e algumas estratgias na resoluo de problemas de interoperabilidade.
O tema abordado foi desenvolvido em ambiente de estgio curricular, numa parceria entre o
ISEP e a NEWTON Consultores de Engenharia no mbito da dissertao de Mestrado em
Engenharia Civil Produo automtica de modelos BIM de armaduras de beto armado:
Pormenorizao e Medio, da qual foi parte integrante.
343
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Quer isto dizer que no ato da modelao, seja ela numa fase ps-dimensionamento ou numa
fase de conceo estrutural, possvel antecipar possveis problemas de compatibilidade, ou
criar documentos de apoio execuo e montagem de armaduras em obra de peas simples ou
peas de execuo complexa, agilizando o processo de construo.
Relativamente ao formato CAD, no que respeita criao de desenhos, a modelao pode ser,
em termos de tempo despendido na criao de documentos para obra, muito semelhante
alternativa 2D na criao de representaes de armaduras, uma vez que para alcanar os
resultados finais necessrio, com as ferramentas atuais, realizar alteraes pontuais s
solues. Neste ponto, a alternativa CAD j no possui a vantagem de outrora, uma vez que, a
possibilidade de utilizar blocos CAD com pormenores tipo de distribuio de armaduras, que
tornavam a criao de desenhos muito mais rpida, j no exclusiva deste formato. verdade
que numa modelao 3D de uma estrutura estamos obrigados criao de armaduras e
pormenores novos adaptados ao modelo, mas tambm existe a possibilidade de preparar
templates com pormenores tipo para uma criao rpida de desenhos tcnicos. Existe ainda a
possibilidade de transio facilitada para formato CAD e a criao automtica de vistas nos
344
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
programas de modelao, como por exemplo os Assemblies em Revit, que ajudam a reduzir os
atrasos na preparao de desenhos.
Sempre com o objetivo do modelador e do grau de detalhe que o mesmo pretende alcanar em
mente, pode-se dizer que a opo de recorrer aos dois formatos e s suas principais vantagens
e funcionalidades ser a melhor abordagem no panorama atual de projeto.
2. Software
O software estudado abrange vrias reas da engenharia civil, comeando com o Robot
Structural Analysis e as suas ferramentas de anlise estrutural e dimensionamento, o Revit e o
Tekla Structures, com as suas capacidades de modelao e organizao de informao, e o
Advance Concrete, que surge como uma espcie hibrida cruzando a modelao BIM com a
plataforma CAD (base de funcionamento do programa), na criao de desenhos de pormenor
em estruturas de beto armado.
Convm referir que isto uma pequena amostra dos programas, com capacidade para criar uma
representao tridimensional detalhada de elementos de beto armado. O mercado do software
de modelao e mesmo o mercado dos aplicativos para dimensionamento e anlise estrutural j
contam com dezenas de opes e na altura de eleger quais as ferramentas a utilizar so diversos
os fatores que vo influenciar essa escolha, seja ela por motivos de ordem financeira ou pelas
capacidades e/ou funcionalidades dos programas. Por essa razo, e tendo consciente o prprio
fundamento da interoperabilidade defendida pela metodologia BIM, por vezes mais vantajoso
recorrer a diversos programas que se complementem ao invs de procurar um que faa tudo.
Este software tem como principal objetivo a modelao estrutural para propsitos de anlise,
sendo os mdulos de dimensionamento, elementos mais secundrios, pelo menos no que
respeita a dimensionamento de peas de beto armado. Variveis como a largura do apoio, a
posio dos vares na seco, os comprimentos de amarrao, so pormenores essenciais ao
dimensionamento e que ainda no esto bem assumidos. Todos estes condicionamentos
345
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
conduziram a ferramenta a evoluir para a situao atual, que apesar de no ser perfeita j permite
ter uma noo de uma soluo final de armadura.
Definidos os parmetros, o programa tem a possibilidade de definir por si s uma soluo. Esta
pode ser simples ou, dependendo da pea, ser algo mais complexo e menos compreensvel para
aplicar num caso real. O programa capaz de fornecer desenhos das seces longitudinais,
cortes e quadros representativos das quantidades. No relatrio de clculo fornecida uma lista
de quantidades com o volume de beto, rea de cofragem, nmero de vares e os respetivos
comprimentos.
O programa est limitado criao de modelos pea a pea, excetuando alguns casos onde o
programa assume o agrupamento de elementos, como pilares com caratersticas iguais, ou uma
viga com vrios vos.
Para retirar alguma da dependncia das decises do mdulo, existe uma ferramenta com o nome
de Typical Reinforcement que permite personalizar uma soluo e analisar a viabilidade da
mesma. A desvantagem que s pode ser aplicada a alguns tipos de seco mais simples.
Em relao interoperabilidade, esta pode ser feita atravs de integrao direta com o Revit,
que suporta a passagem de geometrias e de armaduras, ou ainda existe a possibilidade de criar
um fluxo de trabalho com o Tekla Structures. A interoperabilidade com o Revit possui alguns
problemas dependendo do sentido em que a informao flui. Se considerarmos um fluxo
iniciado a partir do software de clculo, o primeiro problema ocorre com as texturas dos
elementos que podem no ser as desejadas. As geometrias, se no forem muito complexas,
passam sem problemas, mas paredes com inclinaes para fora do plano podem no ser
transferidas e aberturas tambm no passam, mas se o fluxo for feito no sentido inverso alguns
destes problemas podem ser eliminados.
346
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A passagem de armaduras est dependente da forma como o prprio Robot passa a informao.
Por exemplo, em pilares, o Robot reconhece a altura do vo como a distncia entre dois ns da
estrutura, mas cria a armadura com um comprimento adicional igual a metade da altura da viga
de maior seco ligada ao n superior, isto faz com que as armaduras transferidas para Revit
possuam esse excedente. Em vigas o problema ocorre quando considerado um encadeamento
de vos. O Revit informado que uma dada viga com dois ou mais vos possui uma
determinada soluo, mas o problema est na forma como ele reconhece a soluo. Em vez de
reconhecer que a soluo aplicada j tem as informaes relativas aos restantes vos, ele vai
duplicar a soluo total para cada vo. Este ltimo erro ocorre quando utilizada a opo a
partir do Typical Reinforcement para personalizao de armaduras em Robot.
Comeando logo com o aspeto visual dos modelos, onde o software da Trimble se destaca pela
modelao mais colorida, mais conceitual, e o Revit pela tentativa de aproximao ao real na
sua palete de cores e texturas. No entanto, a principal diferena ocorre na especificidade que o
Tekla tem ao dar maior foco modelao estrutural, servindo-se atualmente do Sketchup como
principal suporte modelao de arquitetura e do BIMsight para controlo e gesto de
obra/projeto. O Revit procura uma aposta na diversidade e na modelao multifacetada,
contando tambm com o suporte de aplicativos como o Navisworks para atividades de apoio
gesto de projeto/obra. O Tekla tambm tem algumas ferramentas que permitem a modelao
de elementos externos conceo de superestruturas, mas no aprofunda ao nvel do Revit em
reas como a Arquitetura ou Infraestruturas.
Isso no implica que um seja melhor que o outro, at porque a disperso do foco que acontece
no Revit acaba por criar solues para algumas necessidades especficas, mas est mais sujeito
a falhas. Fica a ttulo de exemplo a criao em simultneo de um modelo de clculo estrutural
com o modelo de arquitetura da superestrutura. A compatibilizao dos dois modelos ainda
347
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
se encontra exposta a erros de ligao entre elementos e a sua sobreposio por vezes no atinge
os resultados desejados, o que obriga a realizar correes, ou criao em separado de um
modelo de clculo. Um exemplo ser a criao de lajes em Revit, que dependendo da dimenso
dos pilares, as ligaes nos ns do modelo de clculo podero ficar desfasadas, o que obriga a
entrar no modo analtico do Revit e a proceder a ajustes do modelo de clculo. Nos testes
efetuados, chegou-se concluso que a modelao de lajes utilizando as faces exteriores de
pilares, com cerca de 40/50 cm de dimenso numa das faces, como fronteira para definio do
bordo da laje podero gerar incoerncias nas ligaes do modelo de clculo.
Outro modo de criao de armaduras atravs de plug-ins integrados nos programas e que
permitem agilizar o processo de modelao, simplificando a introduo de dados e criando a
totalidade das armaduras para as diferentes peas. Esta criao feita elemento a elemento e as
opes que existem ainda no tm uma base de criao para toda e qualquer situao que possa
348
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
ocorrer em projeto. Ainda assim, o software Tekla, possui uma panplia de plug-ins mais vasta,
como a introduo de cordes de pr-esforo e com mais opes que o Revit, que se v limitado
automatizao para elementos mais simples, como, por exemplo, vigas retangulares. Isto no
implica que o Revit fique atrs do seu concorrente, uma vez que os modos de criao e interface
so mais simples de aplicar e compreender numa primeira aproximao. As ferramentas
disponveis em Tekla nem sempre possuem instrues claras e necessrio perder mais tempo
em formao para ter uma clara compreenso das funcionalidades dos diversos plug-ins.
Na produo de desenhos o Tekla mais rpido, pois aps a definio dos diversos parmetros
e a criao de um template adaptado s necessidades do projeto, a produo de desenhos feita
em segundos e com uma excelente qualidade. Em Revit o processo mais demorado porque
obriga montagem manual dos diversos planos e vistas, previamente definidas de forma manual
ou a partir de Assemblies. Estas vistas tm de ser integradas numa folha especifica, baseada
num template, editvel ou previamente criado, num processo de conceo que quase se
assemelha criao de Layouts em software CAD, mas sempre com garantias de que os
resultados alcanados possuem uma excelente qualidade.
349
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
dimetros de mandril que os diversos vares podem ter, enquanto o Revit tem uma abordagem
mais genrica dando ao utilizador a possibilidade de definir esses pormenores.
Em termos de interoperabilidade, se tivermos como principal foco o formato IFC, vemos que o
Tekla se encontra mais preparado para criar e receber este tipo de ficheiro, principalmente
porque o software permite a converso de elementos em formato IFC para o formato nativo do
Tekla Structures, seja esta uma converso global do modelo ou de elementos especficos.
certo que ainda no uma converso isenta de falhas, mas uma funcionalidade diferenciadora
e com bastante interesse. O Revit, de ano para ano, tem vindo a melhorar as suas capacidades
de reconhecimento e traduo de informao em formato RVT para IFC e muito em breve a
diferena entre os dois programas poder ser nula.
J foi referido que a possibilidade de recorrer a blocos com representaes tipo de pormenores
esquemticos de armaduras em elementos de beto armado ser uma opo mais vantajosa na
produo rpida de desenhos tcnicos, mas se o objetivo for a produo de desenhos mais
detalhados, o Advance Concrete uma opo com sentido. Isto porque o programa apesar de
possuir ferramentas de criao dinmica a partir de pontos de referncia e de ser possvel definir
templates para definio de desenhos e tags, o processo de edio manual de armaduras pode
ser algo moroso e que obriga definio de elementos num mnimo de dois planos, um
longitudinal para definio do perfil ao longo do elemento de beto e um transversal para definir
o posicionamento face ao eixo transversal da seco da pea a ser armada. Tambm existem
ferramentas para atribuio automtica de armaduras aos diferentes constituintes da
superestrutura, mas estas ferramentas ainda pecam por falhas na compatibilizao de elementos
entrecruzados. O que acontece que o ao tentarmos atribuir armadura em simultneo a duas
vigas que partilhem um n de ligao, a soluo final das armaduras de pelo menos uma das
vigas vai-se encontrar deslocada em relao ao n para que no ocorra uma sobreposio dos
elementos. No que toca a opes de modelao, existem algumas opes que no existem em
Revit, mas tambm existem opes muito teis do Revit que no existem neste aplicativo.
350
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O ponto forte deste software ser a extrao de quantidades, mais especificamente a extrao
de volumes de beto da superestrutura e as respetivas reas de cofragem dos diversos elementos.
O documento gerado organiza toda a informao relativa aos diversos elementos e ainda
apresenta uma previso oramental. A nvel de extrao de quantidades de armadura, a
informao extrada , em tudo, semelhante ao que os restantes programas anteriormente
analisados fornecem. uma funcionalidade que pode ser encarada como algo com pouco peso
numa fase de aprovao quanto imprescindibilidade do programa, mas no deixa de ser
interessante.
351
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Outra limitao est na comunicao com o Revit, principal objeto de ligao com o programa
em anlise. Em suma o Advance Concrete obriga converso do ficheiro para um formato
especfico ou para formato IFC que no o padro. O uso do ficheiro IFC regular tambm
possvel, mas encontra-se muito mais sujeito perda de informao. O uso dos outros dois
formatos de ligao leva ao reconhecimento das geometrias, mas podem estar sujeitos ao
deslocamento de elementos sobre os seus prprios eixos e, graas a essa pequena
particularidade, a erros que se mantm no retorno da informao ao modelo base. Outra
particularidade que o modelo importado para o Advance Concrete deixa de ser global e a
informao dos diversos nveis passa a estar repartida por diferentes parties, muito
semelhante ao que acontece na hora de gerar um novo desenho. Mesmo o modelo de armaduras
criado fica separado do modelo geral da estrutura e por essa razo no existe uma passagem
direta dessa informao, tendo o modelo DWG de ser integrado separadamente e com as
limitaes j mencionadas.
2.4 Dynamo
O Dynamo possui uma linguagem mais simples de programao visual. Esta permite ao
utilizador de programas como o Revit criar as suas prprias ferramentas de modelao e deixa
ao nosso dispor ferramentas que permitem criar modelos paramtricos de grande simplicidade
ou atingir nveis de modelao de grande complexidade com poucos elementos de
programao. Dizer que esta uma linguagem mais simples, no implica dizer que mais fcil,
pois para atingir resultados mais complexos tambm necessrio recorrer a elementos mais
avanados ou at a programas de suporte. O programa permite desenvolver comandos atravs
da linguagem Python, ou recorrer a folhas de clculo, como as que so programadas em MS-
Excel, para receber informao especfica ou realizar comandos que possam no estar
configurados. Outra forma de obter novas funcionalidades recorrer a pacotes de ns
elementos de programao visual disponibilizados pelo prprio software e que provm de
uma rede internacional de partilha. O Tekla Structures pode contar com o apoio deste tipo de
programao, mas tem de recorrer ao Grasshopper e a uma ligao com o Rhinoceros.
352
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este tipo de programao tem por base a seleo de um elemento para a base de aplicao dos
comandos e todos os elementos de armadura so introduzidos com base em ns prprios para
criao de armaduras e a um conjunto de informaes que so tratadas previamente, como por
exemplo, a criao de uma linha base representativa do percurso das armaduras longitudinais,
o nmero de vares e a posio ou espaamento entre vares. A modelao recorrendo a este
tipo de script garante que todos os elementos de ao gerados so reconhecidos pelo Revit como
o um elemento original Revit e todas informaes anexas inerentes ao objetos so mantidas,
sendo possvel tratar a informao para a a recolha de dados para oramentao ou medio de
quantidade de ao.
Esta folha de clculo foi criada com o intuito de importar todos os dados referentes
composio da estrutura e todos os esforos do modelo de clculo criado em Robot Structural
Analysis e deixar s mos do modelador/projetista toda a informao e um conjunto de
funcionalidades que permitem realizar o dimensionamento dos elementos de beto armado. A
informao gerada permite alm de gerar elementos paramtricos representativos das
353
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Toda esta informao importada permite um fluxo de trabalho de sentido nico que envolve a
passagem e o tratamento da informao desde o Robot, passando pelo MS-Excel, seguindo pelo
Dynamo e terminando no Revit. O processo pode parecer longo, mas aps a finalizao da
programao e do ajustamento de todos os elementos, a velocidade de execuo bastante mais
clere do que se fosse necessria a modelao de uma nova estrutura em Revit. Se no
quisermos a representao de armadura possvel ter uma estrutura modelada em Revit de
forma relativamente rpida aps a modelao em Robot estar completa. claro que o modelo
de clculo pode conter simplificaes face ao modelo Revit, mas ser prefervel introduzir
alguns pormenores ou elementos adicionais alternativa de realizar esta tarefa na totalidade. E
o utilizador pode sempre optar pela via inversa, um fluxo Revit-Robot, para obter um resultado
semelhante, apesar dos cuidados acrescidos que so necessrios para ter o modelo de clculo
criado em Revit definido de forma correta.
354
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este foco pode no ser o ideal, mas alm de serem controlados com maior preciso todos os
resultados, evitando problemas relativos a espaamentos e demais detalhes construtivos,
tambm dada uma noo oramental numa fase prvia de modelao de elementos, a
possibilidade de visualizao de elementos de armadura e a antecipao de possveis
incompatibilidades de execuo das solues.
O facto de no ser possvel realizar clash tests com garantias de verificar de forma precisa
eventuais conflitos entre elementos de armaduras com os modelos criados no grave uma vez
que muitos dos problemas que surgem nessas sobreposies podem ser facilmente resolvidos
em obra sem necessitar de grandes ajustes soluo desenvolvida em projeto, os principais
problemas a detetar consistem na deteo de zonas de ns no cruzamento de armaduras
longitudinais de pilares com armaduras longitudinais de vigas, onde muitas vezes os
espaamentos existentes podem no ter dimenso suficiente para acondicionar a passagem dos
diversos elementos.
355
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Concluses
O Advance Concrete apresenta-se como um software com valor muito especifico, mas que
dadas as falhas de interoperabilidade e algumas limitaes encontradas, no se mostra como
um aplicativo capaz de adicionar mais valor a um projeto. uma ideia que pode ser til se a
integrao com o programa de modelao, Revit, for melhorada.
Hoje em dia, ficarmos inteiramente dependentes de um nico software pode no ser o cenrio
mais desejado e cabe ao modelador, engenheiro, ou arquiteto procurar a soluo s limitaes
impostas. A qualidade das solues e de alternativas presentes na rea de modelao de
356
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
armaduras garantem qualidade aos elementos modelados, mas podemos estar sujeitos a
limitaes impostas por ns prprios para atingir determinados resultados.
Referncias
357
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
358
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O desenvolvimento de projeto em engenharia civil tem estado assente em processos clssicos
que dificilmente tiram partido das potencialidades das ferramentas existentes (e.g. Civil 3D).
359
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
2. Objetivos
Antes de dar incio ao desenvolvimento dos estudos do presente projeto, foram estabelecidos
alguns objetivos com o propsito ltimo de conseguir desenvolver as tarefas de forma rpida e
eficiente, mantendo um padro de qualidade elevado.
Dos objetivos principais definidos destacaram-se os seguintes:
Cumprir com os requisitos do Caderno de Encargos definidos pelo Dono de Obra;
Aplicar os parmetros de dimensionamento definidos pelo Dono de Obra e pela
regulamentao;
Utilizar ferramentas e metodologias para tornar o fluxo de trabalho mais rpido e
eficiente;
Evitar tarefas repetitivas e com grande propenso ocorrncia e introduo de erros que
impliquem um grande volume de trabalho na sua correo;
Realizar um trabalho com um elevado padro de qualidade.
3. Abordagem
Para dar resposta aos objetivos propostos, foi equacionada a metodologia tipicamente utilizada
neste tipo de estudo e foi pensada a sua reformulao, de forma mais integrada e com o desejo
de tirar partido das vrias ferramentas disponveis, para ultrapassar as condicionantes que o
prprio projeto impunha.
Na realizao destes estudos, associados observncia dos objetivos delineados, foi denotado
um conjunto de condicionantes que tiveram de ser contornadas durante a realizao das tarefas,
tais como: a falta de dados cadastrais fiveis, a inexistncia de levantamentos (topogrficos e
demogrficos) e os custos associados sua realizao, a obrigao da utilizao de
determinadas aplicaes de dimensionamento impostas pelo Dono de Obra (o caso do EPANET
para o dimensionamento da rede), a dificuldade em visitar o local da obra e os prazos para a
realizao dos estudos.
360
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No que se refere ao Desenho do Layout da Rede, este normalmente pensado sobre o papel
com uma base cartogrfica ou levantamento cadastral existente. Aps o estudo de um potencial
layout, necessrio determinar manualmente a altimetria de cada um dos elementos da rede
(ns, tubos, rgos, etc.) sobre a base altimtrica utilizada. Posteriormente, necessrio estudar
os consumos existentes e previstos para se determinarem os caudais de clculo dos diferentes
cenrios a simular e a sua distribuio ao longo da rede (no caso do EPANET os consumos s
podem ser aplicados nos ns da rede). Despois necessrio fazer a modelao da rede na
aplicao de dimensionamento/clculo. No caso do EPANET, uma forma de realizar isso
poderia ser atravs da introduo manual dos ns (Junctions no EPANET), especificando os
seus parmetros planimtricos, altimtrico e de consumo, ligando-os, manualmente, por tubos
(Pipes) com as caractersticas dimensionais e materiais (incluindo o comprimento que deve
ser corrigido para o comprimento real). Todo este processo seria manual, fosse feito diretamente
no EPANET ou indiretamente atravs de um ficheiro de CAD que seria posteriormente
processado, importado e corrigido. fundamental que a base de trabalho sobre a qual feita a
modelao tenha rigor suficiente e escada adequada para o tipo de projeto em estudo, seja um
ortofotomapa ou um levantamento topogrfico. O estudo de um cenrio de consumo diferente
361
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
implicaria a alterao manual de todos os consumos nos ns e para o estudo de layout da rede
diferente seria imprescindvel refazer manualmente todo (ou quase todo) o processo descrito
aplicado nova configurao.
Dadas as restries ao nvel da modelao e o dispndio de tempo que este tipo de atividades
repetitivas e sem valor acrescentado normalmente consome no desenvolvimento de um projeto
desta natureza, foi fundamental pensar numa abordagem que permitisse reduzir
substancialmente o tempo aplicado na realizao de tarefas tpicas de uma abordagem
tradicional.
Analisando a Figura 2 notrio que todo o fluxo de trabalho foi centralizado num modelo BIM
(Building Information Modeling). Este modelo central constitudo por um conjunto de objetos
que dependem de informao de entrada e que, muitas vezes, no est disponvel ou, os custos
e morosidade associados sua obteno so muito elevados como, por exemplo, o levantamento
topogrfico e fotogramtrico.
362
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Caso de estudo
363
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Aps a definio do layout a estudar, modelou-se a rede numa plataforma suportada no conceito
BIM, que teve um papel fundamental a partir do qual se tirou o verdadeiro usufruto das
vantagens dessa modelao. A modelao da rede foi feita no Autodesk Civil 3D com objetos
Pressure Pipes no mesmo modelo onde j se encontrava a superfcie do terreno resultante do
levantamento topogrfico (Tin Surface). Previamente modelao, as caractersticas dos
tubos foram parametrizadas e includas no catlogo para posterior escolha durante a modelao
(similar ao conceito de famlia) Figura 4.
Como ponto de partida para a modelao e aps a avaliao do resultado de alguns testes
realizados anteriormente, a forma mais eficiente encontrada para modelar toda a rede foi a de
utilizar apenas um tipo de tubo (aquele que partida se estimava como sendo o que teria mais
extenso na rede, que no caso foi o de dimetro DN63), e sempre ao mesmo nvel, neste caso
foi cota zero. de salientar que durante a modelao, tratando-se da utilizao de Polietileno
de Alta Densidade (PEAD) como material da tubagem, foi possvel fazer troos com diferentes
curvaturas e limit-las ao raio de flexo mximo definido na parametrizao da tubagem.
364
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Durante a modelao foi tido o cuidado de separar toda a setorizao em sub-redes. Outra nota
a reter que tanto o comprimento dos arcos como a extenso dos tubos no deveriam ser
demasiado extensos, sobretudo se o perfil real da tubagem for bastante acidentado entre o ponto
inicial e final do tubo, dadas as limitaes da aplicao de dimensionamento (no EPANET todos
os troos de tubagem so retos, tanto em planta com em perfil, sendo a configurao em perfil
feita atravs de ns intermdios introduzidos manualmente). Esta limitao condicionou
bastante a modelao no modelo BIM, no por limitaes da aplicao BIM mas porque
necessrio ter o cuidado de fazer uma discretizao adequada da tubagem (modelar com ns
intermdios), pois o EPANET apenas considera as coordenadas das extremidades da tubagem.
possvel observar pela Figura 5 as consequncias que o tipo de discretizao pode ter,
principalmente no resultado final, ao nvel das presses na tubagem.
365
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Nesta fase do processo a rede encontra-se modelada e divida de acordo com a setorizao
todas as tubagens tm o mesmo dimetro e o eixo da tubagem segue a superfcie do terreno a
um metro de profundidade Figura 7.
Figura 7: Modelo BIM com a setorizao da rede (esquerda) e layout inicial da rede com os
consumos principais (direita).
Por imposio do Dono de Obra, o clculo/dimensionamento da rede foi feito com recurso ao
software EPANET. Este software gratuito, desenvolvido e distribudo pela United States
Environmental Protection Agency, tem (apesar da boa capacidade de clculo) elevadas
limitaes no que respeita introduo de dados e interoperabilidade com outras aplicaes.
A aplicao desenvolvida teve como dados de entrada a informao da modelao da rede da
aplicao BIM, os dados relativos aos parmetros de dimensionamento hidrulico (capitaes,
tipos de consumos, anos horizontes de projeto, fatores de ponta, forma de distribuio do
caudal) e a informao do levantamento demogrfico e os parmetros relativos evoluo da
populao. As rotinas desenvolvidas determinaram a disposio dos ns e a sua localizao, a
sua associao com as tubagens, assim como com os consumos determinados nos ns. Os
consumos foram determinados para os cenrios de simulao especficos e a distribuio foi
feita ao longo da rede em funo do tipo de distribuio no setor. O consumo nos setores
periurbanos da rede de distribuio foi concentrado em apenas alguns ns pr-definidos e no
distribudo ao longo de toda a rede do setor (setores da malha urbana consolidada ou prevista).
Por ltimo os dados foram processados e exportados para um formato prprio de importao
no EPANET.
366
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
(presses nos
ns; velocidades
nas tubagens)
Com a importao para o EPANET, os modelos para os diferentes cenrios foram calculados e
os dimetros ajustados iterativamente (este processo foi complementado com o plug-in para
EPANET WaterNetGen 1.0.0.210 [3]). O processo de ajuste dos dimetros terminou quando o
valor das velocidades e das presses ao longo da rede se encontraram dentro dos limites
estipulados no Caderno de Encargos Figura 8.
O modelo de clculo para as simulaes hidrulicas finais contou com 557 ns e 564 tubos.
367
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Consideraes Finais
Como foi possvel verificar, existem enormes vantagens na utilizao de modelo BIM pela
abertura que permite na explorao da informao associada aos objetos.
Estas passam, sem dvida, pela possibilidade de incorporar informao de diferentes tipos de
objetos e a possibilidade de manter uma ligao dinmica entre eles. De uma forma prtica e
com a devida interoperabilidade, possvel automatizar um conjunto de tarefas que tipicamente
so feitas manual e repetitivamente sem adicionarem valor ao resultado final e muito suscetveis
introduo de erros. No caso apresentado essas vantagens foram notrias em vrias fases,
mas, principalmente, na modelao inicial da rede e na obteno da informao final do projeto
(peas desenhadas, tabelas e medies). Outro benefcio da ligao dinmica a de possibilitar
que o processo de trabalho se processe em paralelo entre a equipa de desenho e a equipa de
368
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
engenharia. Como a informao do desenho (e.g. anotaes, cotagem, etc.) est associada
dinamicamente aos objetos, quaisquer alteraes posteriores deste so refletidas
automaticamente nos desenhos, no sendo necessrio editar manualmente.
Com a automatizao de quase todo o processo, o tempo necessrio para obter o um resultado
final substancialmente encurtado comparativamente com o processo tradicional. Esse tempo
pode ser aproveitado tanto para otimizar e experimentar diferentes solues como tambm para
dar resposta aos prazos de realizao dos projetos, que so cada vez mais apertados. Associada
reduo do tempo est igualmente a poupana nos recursos utilizados que podem ser
aproveitados na procura e desenvolvimento de tcnicas mais eficientes, como tambm na
realizao de estudos complementares para uma maior economia em obra.
Nas aplicaes utilizadas existiram algumas limitaes que no permitiram uma maior
automatizao do fluxo de trabalho, sobretudo pelas dificuldades na importao de informao
para o modelo BIM a partir de aplicaes externas e da impossibilidade em adicionar
parmetros personalizados aos objetos (e.g. valor das presses, velocidades, etc.).
A evoluo das aplicaes BIM deve ser no sentido da integrao de aplicaes com diversas
funcionalidades, mas deve tambm ser no sentido de permitir uma maior flexibilidade de
importao e exportao da informao do modelo e dos seus objetos. Este tipo de
interoperabilidade muito importante para os utilizadores, uma vez que permite a manipulao
da informao com aplicaes independentes de forma fcil e rpida.
Referncias
[1] ESA/P/WP.228, World Population Prospects The 2012 Revision, Highlights and
Advance Tables, UN, Department of Economic and Social Affairs, Population Division,
2013
[2] Rossman, L. A., EPANET 2 Users Manual, US Environmental Protection Agency, 2000
[3] Muranho, J., Ferreira, A., Sousa, J, Gomes, A., & S Marques, A. WaterNetGen - an
EPANET extension for automatic water distribution networks models generation and
pipe sizing. Water Science and Technology: Water Supply (2012), 12(1), pp. 117-123.
369
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
370
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A aplicao de Building Information Modelling (BIM) tem crescido como forma de
metodologia de trabalho entre as vrias especialidades de projeto.
1. Introduo
371
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
encontrou um nicho de mercado prprio apresentando deste modo uma maior aplicabilidade
em relao a uma especialidade especfica e encontrando-se limitado em relao s outras. O
software ArchiCAD apresenta uma orientao mais focada no projeto de arquitetura,
apresentando fraquezas fora desta especialidade de projeto. O mesmo poder ser dito do
software Tekla Structures uma vez que fora da rea das estruturas tem pouca aplicabilidade [1].
A orientao especfica a nvel de ferramentas e procedimentos que cada software apresenta faz
com que existam diferentes ferramentas que podem ser utilizadas por cada uma das
especialidades. Desta forma existe um grande foco de ateno em questes ligadas a formas de
estabelecer colaborao entre os diferentes intervenientes num dado projeto. A
interoperabilidade BIM essencial dado que influencia toda a comunicao existente entre as
diferentes ferramentas usadas num projeto BIM.
2. Caso de estudo
O presente caso de estudo simula um ambiente real de colaborao BIM em que duas
especialidades distintas fazem uso da lgica BIM para desenvolver o seu projeto de
especialidade: arquitetura e instalaes, cada uma utilizando software distinto. O caso de estudo
utiliza uma habitao unifamiliar como objeto de estudo para elaborao do conjunto das
instalaes hidrulicas e de aspirao central. Este pode ser dividido em 3 partes distintas: 1) a
explorao da interoperabilidade entre a equipa de arquitetura e engenharia, 2) a implementao
do projeto de instalaes hidrulicas e de aspirao central e, finalmente, 3) a concluso de
vantagens e desvantagens encontradas com a utilizao do BIM. O projeto de arquitetura
representado na Figura 1, j tinha sido previamente concebido de raiz pela equipa de arquitetura,
usando uma logica BIM com o recurso ao ArchiCAD. Relativamente arquitetura, o software
ArchiCAD foi usado como raiz para modelao de todos os objetos paramtricos relativos
especialidade bem como instrumento de colaborao entre os arquitetos envolvidos no projeto.
Contudo, a elaborao do projeto de instalaes foi realizada em Revit a partir de um projeto
previamente desenhado em AutoCAD e do respetivo mapa de trabalhos e quantidades.
Procurou-se deste modo analisar as vantagens e dificuldades de implementao da metodologia
BIM, quando comparada utilizao de uma lgica de projeto tradicional em CAD.
372
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
373
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a erros graves de interpretao do mesmo em Revit e como tal suscitar a produo de vrios
erros na realizao do projeto de instalaes. Embora o somatrio dos erros de exportao e
importao de qualquer uma das opes utilizadas, apresentada nas tabelas 1 e 2 parea ser algo
elevado, este somatrio de nmero de erros no se revelou significativo. Uma anlise cuidadosa
ao projeto de arquitetura aps a importao deste em Revit e tendo como elemento de
comparao o mesmo projeto em ArchiCAD mostrou que os erros apresentados por ambas as
ferramentas no eram de grande importncia, e como tal no colocavam em risco a correta
leitura do projeto de arquitetura quando importado para Revit. Tambm foi observado que
propriedades base dos objetos tais como as categorias-tipo foram mantidas, contudo estas no
tiveram uma relevncia acentuada para o desenvolvimento o projeto de instalaes.
374
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O procedimento utilizado para implementao das guas e abastecimento que se revelou mais
eficiente foi o seguinte:
Implantao de todos os equipamentos relativos s instalaes.
Desenho de todas as tubagens.
Implantao de todos os acessrios.
O procedimento adotado para elaborao das guas residuais e pluviais foi o seguinte:
Desenho de todos os tubos de queda;
Implantao de todo o equipamento.
Implantao das restantes tubagens.
375
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Mostra-se na figura 2 uma casa de banho com a completa implantao das instalaes
hidrulicas.
Na realizao da aspirao central foi considerado o tipo de juntas possveis de serem utilizadas
a partir do sistema de condutas escolhido recorrendo assim modelao destas.
Todos os restantes objetos com a excluso das tubagens foram modelados em Revit atravz de
component families. A modelao por component families foi escolhida uma vez que os
376
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Apenas as tubagens foram modeladas como system families uma vez que neste caso s se
procedeu simples adaptao dos parmetros existentes na tubagem standard Revit.
377
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com a execuo em Revit do projeto das instalaes hidrulicas e de aspirao central foram
verificadas algumas dificuldades ao realizar os procedimentos estudados, das quais se destacam
as principais:
Difcil obteno de objetos paramtricos em bibliotecas.
Dificuldades na modelao e parametrizao dos vrios objetos.
Lentido de implementao associada a restries e incompatibilidades verificadas pelo
software.
378
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com o desenvolvimento Revit do projeto de instalaes verificou-se que aps, um certo esforo
inicial de explorao da forma de trabalho em Revit, o trabalho de modelao paramtrica e
implantao dos vrios objetos torna-se substancialmente mais simples e rpido. O
desenvolvimento do projeto em Revit trouxe inmeras vantagens quando comparadas com o
projeto em formato CAD, uma vez que todos os objetos desenhados em Revit tm um
significado fsico virtual correspondente ao real. Estes objetos, que no seu todo formam o
projeto de instalaes, partilham entre si um conjunto de relaes e regras que permitem a
obteno das vantagens supramencionadas.
Referncias
379
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
380
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Este artigo centra-se no desenvolvimento de uma ferramenta BIM para o dimensionamento
expedito de fundaes semi-profundas, do tipo poos de fundao, com base no mtodo do
Bloco Rgido. Para o efeito, foi desenvolvido um programa de clculo, utilizando a Interface
de Programao de Aplicaes (API) da plataforma BIM, Autodesk Revit. A interao entre o
programa de clculo e o modelo BIM feita em ambiente Revit, a partir de uma interface grfica
intuitiva por intermdio de modeless forms, permitindo a manipulao do modelo enquanto
efetuada a introduo de parmetros de clculo. O detalhamento do poo em peas desenhadas
feito automaticamente pelo programa Revit por intermdio da criao de um objeto autnomo
que inclui diversas propriedades avanadas. Com base no caso de um pavilho metlico
demonstrada a implementao desta ferramenta automtica na procura da soluo tima para
os poos de fundao, e que possibilita uma reduo do tempo de anlise e dos erros no seu
detalhamento comparativamente s ferramentas tradicionais.
1. Introduo
381
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
atrasos, o aumento dos custos em projeto e em obra e eventuais atritos entre intervenientes [1].
Neste contexto surge a tecnologia BIM, que tem sido disseminada na indstria AEC e que em
muito tem contribudo para uma considervel diminuio destes problemas. O BIM pressupe
no s a representao geomtrica das construes em modelos virtuais, facilmente adaptveis
a alteraes nos projetos e a deteo de incompatibilidades, mas tambm a organizao no
modelo de toda a informao relevante para o ciclo de vida de uma construo e uma alterao
profunda no uso e comunicao da informao [2].
Na maioria dos projetos requerido um controlo de custos e prazos bastante rigoroso, exigindo
da parte dos projetistas o mximo compromisso entre a segurana, a economia e a rapidez em
dar respostas. Isto implica que a equipa de projeto crie e analise diferentes cenrios estruturais
e controle em tempo til a estimativa de custos de cada um deles, permitindo o atempado
planeamento e oramentao das obras. Os programas de clculo correntes encontram-se
preparados, para com algum automatismo, auxiliar o engenheiro de estruturas a chegar a uma
soluo otimizada no que diz respeito definio de formas das solues mais tradicionais em
beto armado e ao. No entanto, no que se refere a fundaes especiais, como o caso dos
poos de fundao, existem lacunas, sobretudo na perspetiva da obteno da soluo mais
econmica e da sua integrao eficiente no fluxo de projeto.
Os mtodos analticos so geralmente mais eficientes, quer na rapidez da aplicao, quer pelo
facto de permitirem muito boas aproximaes ao comportamento real da estrutura, uma vez que
na maioria das situaes so validados experimentalmente. Por outro lado, uma vez que o
dimensionamento deste tipo de fundao geralmente baseado num processo iterativo, em que
so sucessivamente alteradas as dimenses do poo, os mtodos analticos tornam-se mais
apelativos e eficientes.
382
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A verificao da segurana do poo de fundao proposta por Delesques [5] envolve as tenses
actantes e resistentes do terreno, sendo realizada separadamente na base e nas faces laterais do
macio para cada uma das direes ortogonais. Para a verificao da segurana por rotura do
terreno necessrio satisfazer a seguinte condio:
ref,i (1)
em que ref,i a tenso de referncia instalada na face i do poo (i = 1 a 3), ou seja, na base ou
nas faces laterais, e calculada a partir da seguinte expresso:
3 max + min
ref,i = (2)
4
onde max a tenso mxima instalada na face i do bloco e min a tenso mnima instalada
nessa face, e adm a tenso admissvel do solo de fundao.
383
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tabela 1: Cenrios de clculo dos poos de fundao atravs do Mtodo do Bloco Rgido.
Resultante das foras Resultante das foras no
no interior do ncleo central exterior do ncleo central
Diagrama de
corpo livre
Dimenso da base a
a 3 ( -e )
compresso (z) 2 x
( ) N h1 3
M0 1 M0 = 2
+ N ex
Excentricidade (ex) a
N h 3 54 ( - ex )
2
1 + ( a1 ) (resoluo de equao 3 grau em
[ ]
ordem a ex)
N 6 M0 a
Valor + 2N
mximo ab
b ( h13 + a 3 )
bz
Tenso na base
(pF) N 6 M0 a
Valor -
mnimo ab
b ( h13 + a 3 )
0
T 6 ( ) M0 h 1
( ) N h 1
Valor T
+ + 2
mximo b h1
b ( h13 + a 3 ) b h1 bz
Tenso nas
faces laterais
Valor
(pL)
T 6 ( ) M0 h 1 T ( ) N h 1
mnimo
- - 2
b h1
b ( h13 + a 3 ) b h1 bz
M0 2N
ngulo de
rotao () b a3 b h1 3 a 2
kv ( + ( )
12 12 ) 9 ( 2 - ex ) b kv
Deslocamento
tan () h1
horizontal ()
384
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para o desenvolvimento do Add-In recorreu-se ao programa Microsoft Visual Studio 2013 [6],
o qual foi configurado para compilar, executar e testar o cdigo produzido em ambiente Revit
[7]. O recurso a esta soluo, alternativamente s macros disponibilizadas pelo programa Revit,
facilita a criao de interfaces grficas, oferecendo a possibilidade de usufruir das
funcionalidades de ajuda escrita de cdigo disponibilizadas pelo Visual Studio e agiliza a
distribuio da ferramenta de clculo entre diferentes utilizadores.
Em conjunto com o Add-In foi tambm desenvolvida uma famlia em Revit parametrizada e
representativa do poo de fundao e que possibilita o armazenamento das informaes
geomtricas e no geomtricas, incluindo os dados de entrada e os parmetros provenientes do
clculo.
As caractersticas desta famlia so alteradas pelo prprio Add-In de forma automtica sendo
classificada com o cdigo A1010 do sistema Uniformat, correspondente ao item Standard
Foundations includo na seco Foundations/Substructures [8]. As propriedades da famlia
atrs especificadas permitem atribuir-lhe o nvel de desenvolvimento LOD 300.
O formulrio includo na interface est dividido em 3 seces: uma seco de dados gerais para
introduo de informao geomtrica do poo (Figura 2a), uma seco de parmetros de anlise
para introduo de dados respeitantes s caractersticas mecnicas do solo e das cargas atuantes
na sapata (Figura 2b), e uma seco para visualizar os resultados do clculo (Figura 3), em
particular, os valores das aes e tenses atuantes no terreno, os valores dos deslocamentos e
rotaes do poo, as verificaes de segurana e ao fator de eficincia do dimensionamento do
385
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a) b)
Figura 2: Interface grfica: a) dados gerais; b) parmetros da anlise.
a) b) c)
d) e)
Figura 3: Interface grfica de resultados: a) valores de clculo das aes; b) valores das
tenses na base e faces laterais; c) deslocamentos e rotaes; d) verificaes de segurana e
coeficientes de segurana; e) fatores de eficincia.
386
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.3 Rotinas
A ferramenta Add-In foi desenvolvida recorrendo linguagem de programao C# que uma
linguagem orientada a objetos. Deste modo as rotinas de clculo foram naturalmente agrupadas
por diferentes classes representativas das propriedades da fundao (geomtricas e no
geomtricas), as metodologias de clculo de poos de fundao e a interao da interface grfica
com o programa Revit enquanto evento externo.
A forma de organizao do cdigo foi concebida para flexibilizar ao mximo a interao entre
as vrias rotinas. Assim, na prtica, aps o utilizador selecionar um determinado elemento os
dados de entrada do formulrio aparecem previamente preenchidos com a informao j
existente no elemento, alm de aps o clculo o Add-In avaliar se j existe, ou no, um tipo de
famlia com as caractersticas indicadas no formulrio. Caso exista, o tipo de famlia do
elemento selecionado modificado, caso no exista, criada uma nova famlia com as
caractersticas pretendidas que so atribudas ao elemento. Outro modo de o utilizador interagir
com o Add-In modificar os parmetros ou o tipo de famlia de um determinado elemento e
ordenar o seu clculo. Todos os dados do formulrio so atualizados a partir dos valores dos
parmetros do elemento e feito o clculo.
387
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No caso da terceira classe principal, saliente-se que, como o Add-In constitudo por uma form
representada por uma classe fora do contexto do API Revit, as eventuais alteraes nos
contedos do documento Revit so negados. Deste modo a classe ExtEventInteractionHandler
chamada a intervir com a funo especifica de integrao do cdigo no API Revit, uma vez
que deriva da classe ExternalEvents.
O encadeamento do cdigo que o Add-In segue iniciado quando o utilizador clica no boto
Element Selection e seleciona um elemento (Figura 2a). Os parmetros do elemento so lidos
pela rotina ReadElementParameters da classe ExtEventInteractionHandler e expostos no
formulrio. Em seguida o utilizador procede s modificaes que entender e aps o clique no
boto Calculate (Figura 2a) o Add-In assume a informao contida no formulrio e a transponha
rotina CalcRigidBlockMethods da classe CalculationMethods para proceder ao clculo
segundo o mtodo do Bloco Rgido. Esta rotina serve-se de 4 outras rotinas, a CalcEccentricity
para clculo da excentricidade, a CalcDesignForces para a determinao dos esforos de
clculo, a CalcDisplacements para o clculo dos deslocamentos e finalmente da
CalcVerificationsAndEfficiency para a verificao da segurana e eficincia. A rotina
PolyThirdSquare faz parte tambm da classe CalculationMethods e serve para resolver um
polinmio de terceiro grau no caso da resultante das foras estar fora do ncleo central.
Aplicado o mtodo do Bloco Rgido a classe ExtEventInteractionHandler chamada
novamente a intervir, e atravs da rotina SelectOrCreateFamilySymbol, decide se atribui um
tipo de famlia j existente ou cria um novo com base nas dimenses introduzidas. A classe
Foundation existe com o intuito de referenciar todos os valores envolvidos e que dizem respeito
sapata e serve como veculo sua transmisso entre as rotinas das outras classes.
388
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4.1 Descrio
O pavilho metlico composto por uma estrutura porticada constituda por perfis metlicos
comerciais, laminados a quente. O edifcio encontra-se localizado na periferia de Vila Real a
1000 m de altitude, possuindo uma rea de implantao de 16 36 m2 e uma altura de 9 m.
A estrutura da nave industrial constituda por 7 prticos afastados entre si de 6 m, cujos pilares
so perfis metlicos HEB 550 e vigas asna IPE 360. A ligao entre os prticos nas faces laterais
e na cumeeira da cobertura realizada por intermdio de vigas de travamento HEB 220. O
contraventamento dos prticos realizado atravs de cantoneiras do tipo L120 120 10
dispostas em cruz de Santo Andr. A estrutura que acolhe as cargas rolantes constituda por
vigas de caminho de rolamento IPE 600 apoiadas em consolas curtas IPE 240 escoradas com
perfis do mesmo tipo. A cobertura inclinada com duas guas constituda por madres
materializadas em perfis metlicos UNP 160 que apoiam as chapas do tipo sandwich como
revestimento.
O solo de fundao dotado das seguintes caractersticas: peso especifico 19 kN/m3, tenso
admissvel igual a 300 kPa, ngulo de atrito interno igual a 30, e um comportamento elstico
caracterizado por um coeficiente de Winkler vertical e horizontal igual a 100000 kN/m3.
A Figura 5 apresenta uma planta, um alado lateral e um corte da estrutura analisada.
a)
b) c)
Figura 5: Pavilho metlico: a) planta da cobertura; b) alado lateral; c) corte transversal.
389
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4.2 Resultados
Os resultados obtidos da anlise estrutural conduziram seleo das reaes apresentadas na
Tabela 2, correspondentes s combinaes de aes C1 a C8, como as mais condicionantes para
o dimensionamento dos poos de fundao.
Tabela 2: Valores dos esforos na base dos pilares para 8 combinaes de aes em estados
limites ltimos.
FX (kN) FY (kN) FZ (kN) MX (kN.m) MY (kN.m) MZ (kN.m)
C1 -25.02 -13.73 -54.73 12.25 -6.2 0.67
C2 10.43 -57.57 348.94 122.6 -23.37 3.16
C3 6.73 78.91 227.85 -310.15 0.97 -0.15
C4 2.88 -78.7 155.5 293.91 -3.07 0.47
C5 -28.52 -52.61 250.42 95.06 -29.48 3.23
C6 36.26 6.96 -1.37 -2.01 27.14 -0.18
O Add-In foi aplicado ao caso prtico com base na introduo manual dos esforos associados
a cada combinao de aes em estado limite ltimo, por meio de um processo iterativo baseado
no ajuste das dimenses da sapata e do poo de fundao (ver Figura 7).
390
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Factor de Segurana - Direco X Factor de Segurana - Direco Y Eficincia - Direco X Eficincia - Direco Y
A B H h1
Base Lateral Base Lateral Base Lateral Base Lateral
1.20 1.20 2.00 0.80 3.47 5.27 3.73 7.88 29% 19% 27% 13%
1.50 1.50 2.00 0.80 3.08 7.52 3.26 11.30 32% 13% 31% 9%
C1 1.20 1.50 2.00 0.80 3.33 6.58 3.38 9.04 30% 15% 30% 11%
1.20 1.60 2.00 0.80 3.29 3.30 7.02 9.53 30% 14% 30% 10%
1.20 1.50 3.00 0.80 2.65 10.69 2.65 13.87 38% 9% 38% 7%
1.20 1.50 2.00 0.80 1.00 80.40 0.78 1.61 100% 1% 128% 62%
2.00 2.00 2.00 0.80 1.56 110.15 1.25 3.64 64% 1% 80% 28%
C2 2.00 2.00 3.00 0.80 1.33 120.56 1.21 4.84 75% 1% 83% 21%
1.50 2.00 3.00 0.80 1.18 115.27 1.05 3.63 85% 1% 95% 28%
2.00 1.50 3.00 0.80 1.18 90.42 1.09 4.27 85% 1% 91% 23%
1.50 2.00 3.00 0.80 1.40 57.20 1.10 2.00 72% 2% 91% 50%
C3
2.00 2.00 3.00 0.80 1.53 64.34 1.25 2.67 65% 2% 80% 37%
1.50 2.00 3.00 0.80 1.58 204.11 1.21 2.06 63% 0% 83% 48%
C4
2.00 2.00 3.00 0.80 1.70 226.74 1.36 2.75 59% 0% 73% 36%
1.50 2.00 3.00 0.80 1.32 13.64 1.21 4.22 76% 7% 83% 24%
C5
2.00 2.00 3.00 0.80 1.45 15.34 1.36 5.63 59% 7% 73% 18%
1.50 2.00 3.00 0.80 2.05 9.06 2.16 44.86 49% 11% 46% 2%
C6
2.00 2.00 3.00 0.80 2.03 10.22 2.16 59.81 49% 10% 46% 2%
Figura 7: Resumo dos principais resultados do processo iterativo de clculo baseado no ajuste
das dimenses da sapata e do poo de fundao.
O processo iterativo teve inicio com uma sapata de dimenses 1.201.200.8 m e com um poo
de fundao de profundidade 2 m. Para a combinao de aes C1 chegou-se s dimenses de
uma sapata de 1.201.500.8 m e o poo de fundao com uma profundidade de 2 m. Esta foi
a soluo que apresenta valores dos fatores de eficincia mais prximos em ambas as direes,
na base e nas faces laterais do poo (ver Figura 7). Com base nesta soluo partiu-se para o
clculo para a combinao de aes C2 e constatou-se que a mesma no cumpria as verificaes
de segurana exigidas, como atesta um dos correspondentes valores do fator de eficincia
superior a 100%. Assim, por meio de iteraes sucessivas, chegou-se soluo tima de uma
sapata de 1.502.000.8 m e um poo de fundao com 3 m de profundidade, como atestam os
fatores de eficincia (ver Figura 7). Esta soluo foi depois testada com sucesso para as restantes
combinaes de aes (C3 a C6), pese embora se tenham tentado sapatas de dimenses
diferentes com o intuito de atingir uma soluo mais otimizada, no entanto, tal no foi
verificado com se demonstra nas diversas tentativas ilustradas na Figura 7.
391
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O presente artigo realiza a descrio de uma ferramenta BIM para o dimensionamento de poos
de fundao assente uma metodologia analtica de dimensionamento baseada no mtodo do
Bloco Rgido. Para o efeito foi desenvolvido um Add-In no programa Revit, programado com
base na linguagem por objetos C# e assente numa interface grfica interativa e de simples
utilizao.
A aplicao desta ferramenta ao caso das fundaes de um pavilho metlico permitiu
comprovar a sua eficincia e robustez tendo em vista a obteno de solues mais econmicas
e cumprindo os requisitos regulamentares estabelecidos pelos Eurocdigos. Acresce que o
recurso ferramenta BIM desenvolvida possibilita aos projetistas tomarem decises mais
sustentadas e menos baseadas na experincia, permitindo a criao de mltiplos cenrios com
brevidade e viabilizando a soluo mais adequada.
392
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
[1] Eastman, C.; Teicholz, P.; Sacks, R.; Liston, K. BIM Handbook: A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers, and Contractors.
Hoboken, New Jersey, John Wiley & Sons, Inc, 2011.
[2] Azhar, S. Building Information Modeling (BIM): Trends, Benefits, Risks, and
Challenges for the AEC Industry. Leadership Manage, 15/06/2011, 241252.
[3] Freitas, M. (2005) Apontamentos de Fundaes Encastradas no Terreno Poos de
Fundao. Unidade curricular de Fundaes e Estruturas de Suporte do Mestrado
Integrado em Engenharia Civil. FEUP, Porto.
[4] Salas, J. (1980) Geotcnia y cimientos III. Cimentaciones, excavaciones y aplicaciones
de la geotcnia. Volume 1. Editorial: Rueda. Espanha.
[5] Delesques, R. (1983) - Calcul des Fondations, Rubrique du Praticien. Construction
Mtallique, n 3. France.
[6] Microsoft Visual Studio (2015) - Visual Studio Homepage, specifications and features.
URL: https://www.visualstudio.com/vs/ (consultado em outubro de 2016).
[7] Autodesk Revit (2015) - Autodesk Web Page, My First Plugin Training.
http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=20132893 (consultado
em outubro de 2016).
[8] BIM Forum (2016) Level Of Development Specification, For Building Information
Models, Version 2016 August 25.
[9] Microsoft Developer Network (2016) Visual Basic Concepts, Modal and Modeless
Dialog Boxes. https://msdn.microsoft.com/en-us/library/aa263470(v=vs.60).aspx
(consultado em outubro de 2016).
[10] RSA (2015) - Manual do Robot Structural Analysis Professional 2015. URL:
http://help.autodesk.com/view/RSAPRO/2015/ENU/ (consultado em outubro de 2016).
[11] EN 1990 (2009) - Eurocdigo: Bases para o projeto de estruturas. Comit Europeu de
Normalizao (CEN). Bruxelas, Blgica.
393
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
394
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Com a crescente consciencializao em torno do tpico sustentabilidade ao longo dos ltimos
anos, este conceito comeou a ser aplicado maioria dos sectores econmicos da nossa
sociedade, com a Indstria da Construo em particular a ter um impacto considervel nas
denominadas aces sustentveis. No entanto, embora tenham sido realizados esforos para
quantificar a sustentabilidade de um edifcio, a complexidade do termo e o seu mtodo de
avaliao pouco expedito, desafiam a sua fcil avaliao.
No entanto, visto a sustentabilidade ser um tema muito amplo, neste artigo a certificao
Leadership in Energy and Environmental Design (LEED), mais especificamente os crditos
relacionados com a gesto do escoamento superficial de guas pluviais, serviram de exemplo,
possibilitando a retirada de concluses que possam ser adaptadas certificao no geral.
395
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
baseado em software de desenho assistido por computador (CAD) num sector dependente de
uma correta gerao, gesto, e transferncia de informaes entre os seus intervenientes.
No final do milnio, a sustentabilidade tornou-se num dos temas mais debatidos no Mundo mas,
discutivelmente, um dos menos compreendidos. Com a crescente consciencializao em torno
deste tpico, o conceito de sustentabilidade comeou a ser aplicado maioria dos sectores
econmicos, com a indstria da construo em particular a ter um impacto considervel nas
aes sustentveis da nossa sociedade [1]. Isto levou criao de normas de construo,
certificaes e sistemas de avaliao destinados a mitigar o impacto dos edifcios no meio
ambiente atravs do design sustentvel [2]. Desta forma os edifcios apresentariam um melhor
impacto ambiental e social na comunidade envolvente e, em simultneo, adquiriam novas
vantagens econmicas para o proprietrio, nomeadamente sobre a forma de marketing.
396
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
edifcio, mas tambm com o seu impacto social e econmico. Entre estes crditos um dos temas
recorrentes o escoamento superficial de um edifcio, que serviu de exemplo neste artigo.
O escoamento superficial tem, nas ltimas dcadas, manifestando-se como uma das principais
causas de problemas no meio urbano, em grande parte devido ao incremento percentual de
populao mundial residente em cidades [9]. Como tal, as reas urbanas so continuamente
expandidas no s em termos de espao, mas tambm de densidade provocando o aumento das
superfcies impermeveis que, por sua vez, tem inmeras consequncias para as infraestruturas
da cidade bem como para o ambiente natural envolvente [10]. Consequentemente, a infiltrao
diminui e a presso sobre as infraestruturas de guas pluviais aumenta, criando problemas em
reas urbanas tais como [11]: poluio dos recetores naturais de gua; inundaes; deficit de
reposio de gua subterrnea; reduo do fluxo base da gua; entre outros. A proliferao de
superfcies impermeveis permite que a gua chegue aos rgos de armazenamento naturais
mais rapidamente elevando os picos de escoamento superficial, o que resulta em profundas
alteraes no curso de gua e na degradao de habitats naturais. Alm disso, dependendo do
uso do solo dentro da bacia, nutrientes, substncias txicas, materiais em suspenso, entre
outros poluentes, podem ser transportados por terra para cursos de gua naturais, tornando o
escoamento superficial numa potencial fonte de poluio [12]. Com a inteno de remover e
aproveitar o escoamento superficial, as Low-Impact Development (LID) Best Managing
Practices (BMP) devem ser implementadas.
De facto, atualmente o escoamento superficial reconhecido como um recurso que deve ser
usado para benefcios sociais, ambientais e econmicos. Assim, as LID-BMP tipicamente tm
como objetivo armazenar esta gua por longos perodos de tempo, filtrando-a e reutilizando-a
ou, simplesmente, eliminando-a por evaporao e infiltrao com o volume restante sendo
lentamente libertado para um recipiente natural. Com este propsito as LID-BMP devem ser
implementadas o mais cedo possvel num projeto, por forma a integrar estas medidas o mais
facilmente possvel com a paisagem natural e o plano de construo local [13].
3. StormWater Runoff
397
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Para funcionar correctamente este software foi equipado com as exigncias encontradas nos
crditos LEED e o Mtodo Racional. Desta forma, o utilizador encontra no programa um
objectivo adequado e conciso a atingir, ao mesmo tempo que dispe dos meios para o alcanar.
Na criao deste software foram utilizadas vrias ferramentas BIM, nomeadamente o Revit, o
Dynamo (linguagem visual de programao) e o Dyno (software que serve de interface a
aplicaes criadas usando Dynamo).
Como j mencionado, para o software funcionar necessria muito pouca informao. De facto,
os inputs esto limitados a algumas variveis relacionadas com a precipitao local, utilizao
do edfcio e preferncias do utilizador que indicam as prioridades no clculo das LID-BMP.
As restantes informaes so obtidas a partir do modelo Revit. No entanto, como j indicado,
para eficazmente alcanar um edifcio sustentvel necessrio considerar e incorporar as
questes da sustentabilidade numa fase preliminar do projecto. Assim, o modelo do edifcio
pode ainda estar pouco desenvolvido o que torna o Level of Development (LOD) do modelo um
conceito fulcral na conceo deste software [15]. Desta forma, conseguiu-se alcanar os
objectivos iniciais do programa utilizando apenas as reas horizontais do edifcio em estudo.
No entanto, para um correcto desempenho do programa, estas reas tm que se encontrar
devidamente categorizadas, com cada elemento a corresponder a uma das seguintes categorias
398
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
do Revit: Roofs, Floors e Topography. Isto resulta numa especificao mnima de LOD 200 ou,
se possvel, LOD 300 para alcanar uma maior preciso nos resultados indicados pelo software.
399
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Caso de Estudo
No mbito deste artigo, fulcral o desenvolvimento de um caso de estudo que permita uma
melhor compreenso das capacidades e restries do software criado. Este captulo foca a
criao e descrio do modelo paramtrico usado juntamente com o programa, o executar deste
software e, por fim, a anlise dos resultados obtidos. Assim, este captulo visa contextualizar a
utilidade do programa StormWater Runoff na indstria da AEC, validando a capacidade de
produzir valores rigorosos de escoamento superficial e de gerar automaticamente solues
ambientalmente favorveis para o corrigir.
400
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Como tal, o primeiro passo identificar a utilizao associada a cada categoria do modelo Revit,
por forma a obter o respectivo coeficiente de escoamento (CE) superficial armazenado na base
de dados [16]. Posteriormente, a zona pluviomtrica do edifcio (obtida pelas curvas IDF) deve
ser identificada juntamente com o perodo de retorno e a durao da chuvada. Aps a execuo
da primeira parte do software, os resultados obtidos so introduzidos na segunda parte como
inputs. Estes incluem o escoamento superficial inicial, as reas de cada categoria, os respectivos
CE, e ainda a intensidade e durao da tempestade. De seguida, selecionado o crdito LEED
a obter e as prioridades a contabilizar na escolha da melhor soluo de LID-BMP.
401
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
acordo com a bibliografia LEED e o regulamento Portugus que, no Artigo n. 128, indica um
intervalo entre 5 e 15 minutos, dependendo da inclinao da superfcie. Sendo o local bastante
nivelado, foi selecionado o valor mdio. Por ltimo, consultando as zonas pluviomtricas
Portuguesas, foi selecionada a zona A. Todos estes inputs podem ser vistos na Figura 3.
Destes valores, alguns podem ser rapidamente determinados como correctos atravs de uma
simples comparao entre os resultados obtidos e a informao armazenada no modelo Revit e
na base de dados. Por exemplo, por anlise da Figura 2, facilmente se conclui que os elementos
das categorias Roofs e Topography contribuem em toda a sua extenso para o volume de
escoamento. Como tal, comparando as reas do Revit presentes na seco 4.2 com as obtidas
na Figura 3, possvel deduzir que estas reas se encontram correctas. Alm disso, tambm
compreensvel que a rea apresentada pelo software referente aos Floors seja inferior exibida
na seco 4.2, visto grande parte da categoria no ser atingida pela chuva. Finalmente,
comparando os CE apresentados na Figure 4.3 (indicados como "RC"), com o coeficiente que
foi overrided e os que esto presentes na base de dados [16], evidencia-se que esto corretos.
402
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Q = ACI = (1882.6250.80+2338.7190.75+2115.0080.2)0.082
= 3683.1410.082 = 302.018 m3 /h = 302017L/h 50336 L (2)
50406 L
De salientar que a diferena entre o escoamento obtido manualmente e o valor exibido pelo
software devido ao software trabalhar com nmeros de quinze dgitos (resultando em nove
casas dcimais) enquanto que os clculos manuais utilizaram apenas trs casas decimais.
403
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com o objectivo de esclarecer este clculo, deve ser mencionado que a subtrao apresentada
acima se traduz na subtrao entre o CE da categoria Floor pelo CE do Permeable Pavement.
5. Concluses
Os dois temas principais deste artigo, Sustentabilidade e BIM, foram combinados para
automatizar crditos LEED. Embora o software criado concentre-se nos crditos relacionados
com o escoamento de guas pluviais, procurou-se generalizar esta metodologia a outros crditos
que podero ser facilmente automatizados. Com efeito, considera-se que os crditos
mencionados neste artigo so dos mais difceis de automatizar visto existirem crditos
relacionados com a orientao do edifcio, a proximidade a servios, entre outros, podem ser
determinados utilizando apenas a informao armazenada no modelo Revit.
A relevncia do software foi tambm comprovada na exibio das suas capacidades no caso de
estudo, e atravs dos factos referentes importncia das certificaes de sustentabilidade e
sua respectiva complexidade e custos. Este programa responde ainda falta de software tcnico
destinado ao pblico geral, selecionando cuidadosamente a linguagem aplicada e inputs
necessrios. Alm disso, graas utilizao de bases de dados flexveis e simples de modificar,
o software encontra-se tambm equipado para responder a consideraes mais tcnicas da
indstria da AEC podendo, eventualmente, ser utilizado como ferramenta de design no apoio
tomada de decises nas fases preliminares do projeto.
Referncias
[1] T. Ebert, N. Essig, and G. Hauser, Green Building Certification Systems: Assessing
Sustainability-International System Comparison-Economic Impact of Certifications:
Walter de Gruyter, 2011.
[2] S. Vierra, "Green Building Standards and Certification Systems," Green Building
404
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
405
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
406
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Parte III
BIM na construo
407
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
408
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A adoo do BIM nos procedimentos e metodologias de trabalho tem vindo a abranger
transversalmente todos os intervenientes na indstria da Arquitetura, Engenharia, Construo e
Operao (AECO).
O BIM 5D acrescenta ao BIM 4D a varivel custo, permitindo aos profissionais obter uma
estimativa do custo total do projeto e tambm estudar virtualmente as vrias solues possveis
de forma a baixar o custo global do projeto.
1. Introduo
409
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
uma mudana no processo de execuo dos projetos das diferentes especialidades. No atual
contexto nacional, j se podem encontrar casos prticos de aplicao desta metodologia em
gabinetes de projeto, no entanto, alguns entraves tm contribudo para uma lenta adoo destes
novos procedimentos de modo mais generalizado [1].
O BIM representa um novo paradigma dentro da AEC, que encoraja a integrao de todas as
partes interessadas no projeto. Tem o potencial de promover uma grande eficincia e harmonia
entre os intervenientes, algo que no passado era uma adversidade [2].
Em Portugal, j se podem encontrar algumas equipas projetistas que adotam o BIM nas diversas
fases e com diferentes nveis de detalhe e trabalho colaborativo. Os construtores, apesar de
estarem atentos sua adoo globalizada e conscientes da sua generalizao a prazo, ainda o
tm testado em aplicaes pontuais e em casos de estudo localizados.
Alm das bvias vantagens da modelao 3D, a aplicao do BIM gesto de obra, em
particular nas fases de oramentao e de controlo da obra propriamente dito, assume cada vez
mais relevncia.
410
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A descrio inicitica do que o BIM j no parece ter cabimento hoje em dia, de qualquer
modo, de forma a integrar os conceitos que apoiaro o trabalho aqui realizado, apresentam-se
de seguida as subreas do BIM que mais interessam gesto, em particular ao controlo do
tempo (4D) e do custo (5D).
2.1 BIM 4D
Um dos vetores de desenvolvimento nas ferramentas BIM tem sido a introduo da dimenso
tempo nos seus modelos. Em termos da produo na construo, esta dimenso, pode ser vista
na perspetiva de um planeamento de atividades. Atravs da integrao deste tipo de
funcionalidade num modelo tridimensional BIM, surge o conceito BIM 4D [8].
411
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os objetos no modelo devem ser agrupados de acordo com as fases de construo e ligados s
respetivas atividades no calendrio do projeto. Por exemplo, se uma plataforma de beto ir ser
colocada em trs fases de betonagem, ento a plataforma deve ser detalhada em trs seces,
para que a sua sequncia possa ser detalhada e ilustrada [9].
2.2 BIM 5D
O BIM 5D significa o BIM 4D estendido com outra varivel extra que o custo quer da mo-
de-obra quer dos outros componentes at entrega de cada item. Com a ajuda do BIM 5D
facilmente se compara o tempo de execuo e o custo total de vrias alternativas em termos de
materiais a utilizar e tecnologia aplicada, o que pode promover a otimizao do custo total do
projeto [11].
Este custo pode ser estimado com base nos materiais, mo-de-obra, transportes, etc. Quanto
maior for a informao incorporada em cada objeto mais fcil ser o clculo oramental, mesmo
que a meio do processo o arquiteto ou designer altere algum material [9].
A extrao de quantidades uma das tarefas chave no processo construtivo, sendo a base para
decises importantes, j que ao medir os elementos do edifcio, essas quantidades, so usadas
para estimar o seu custo [12].
412
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
do custo total do projeto quando ocorrem alteraes no mesmo [14]; Maior controlo dos custos
evitando as derrapagens de oramento [15].
3. Caso de Estudo
O uso de ferramentas BIM pretende clarificar as alteraes a fazer na nave, introduzindo uma
perpectiva 3D combinada com a potencialidade de efetuar a extrao de quantidades de forma
quase instantnea e tambm integrar um diagrama Gantt, interligando cada elemento do mesmo
com cada elemento do modelo, visando uma melhor compreenso do processo construtivo.
3.2 Modelao
A modelao implicou 3 fases: modelao da parte existente, demolio e modelao da
ampliao a efetuar.
O processo de modelao iniciou-se pela parte estrutural. No processo inicial da modelao foi
importante a importao de algumas plantas CAD, nomeadamente as que continham a grelha
estrutural com a posio dos elementos. Toda a modelao estrutural foi efetuada com as
plantas CAD como fundo, contribuindo para uma melhor interpretao do projeto e reduzindo
os erros de modelao.
413
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
414
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
415
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
416
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A maioria das colises deram-se devido a erros de modelao. No tratamento e anlise de cada
coliso, o utilizador tem a capacidade de a aprovar ou rejeitar. Por fim poder ser emitido um
relatrio final, em formato .XML, que enviado para os responsveis das especialidades, de
forma a alterarem o modelo, eliminando o erro existente.
4. Concluso
Nesta fase possvel concluir que o uso de ferramentas BIM oferece uma enorme vantagem
aos profissionais da rea da construo.
Em fase de projeto, possvel detetar antecipadamente conflitos, que no decorrer da obra iriam
surgir. Este poder de os antever, traz ao construtor um acrscimo de segurana e eficcia,
comparado aos que fazem dos mtodos tradicionais a sua principal valncia. Os profissionais
que usam os mtodos BIM como primeira escolha partem com avano pelo facto de deterem
esse conhecimento. Para efeitos de oramentao, o uso destas ferramentas deve ser cuidadoso,
pois erros de modelao podem conduzir a derrapagens oramentais no decorrer da obra.
Contudo, a extrao de quantidades aliada a um modelo poder ser uma mais-valia para um
empreiteiro. Aliado a isso, temos o facto de poder percecionar tridimensionalmente o edifcio,
que por si s, j uma enorme vantagem para ultrapassar obstculos e ambiguidades relativas
obra.
417
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Um modelo visualmente bonito, no sinnimo de que seja til. No comeo de cada modelo
deve-se definir qual a finalidade do mesmo. Desta forma, o uso de ferramentas BIM requer
ento profissionais capacitados, suportados por boas equipas de coordenao de projeto, sendo
que esta far a diferena entre um bom e um mau modelo.
Referncias
418
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A segurana na construo necessita de meios que permitam uma eficcia maior na preveno
de acidentes. As ferramentas empregues de modo corrente nas fases de concepo, projecto,
contratao, construo e operao no tm sido suficientes para evitar acidentes. Numa
sociedade desenvolvida inaceitvel que algum tenha um acidente a trabalhar e muito menos
que a consequncia do acidente seja a morte. O BIM tem vindo a desenvolver-se rapidamente
em termos de capacidades tecnolgicas e de campo de aplicaes. Como consequncia tem
havido investigao e aplicao explorando a adoo de ferramentas BIM para elevar o nvel
de preveno de acidentes na construo. De facto a concentrao e a gesto da informao
usando as ferramentas BIM possibilitam outros nveis de apreciao das medidas de preveno
a seguir de modo a evitar acidentes na construo e de modo a avaliar os riscos existentes na
construo ou na reabilitao. Este artigo prope abordar os avanos constatados num mbito
internacional relativos utilizao de BIM envolvendo os aspectos seguintes:
a) preveno na fase de projeto (PTD, Prevention Through Design);
b) simulao de fases da construo para anlise de riscos;
c) elaborao de contratos com garantias de nveis de preveno;
d) utilizao de dispositivos mveis durante a execuo da obra;
e) uso de localizadores para controlo de operaes;
f) anlise de medidas de preveno durante as fases de operao e de manuteno.
1. Descrio Breve
419
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Casos de Estudo
Cerca de 43% das empresas que usam BIM realam o benefcio na preveno de acidentes e na
promoo dos nveis de segurana de operrios e de equipamentos. Nalguns casos o uso de
BIM permitiu lidar com obras complexas e tornarem-se mais competitivas elevando os nveis
de segurana. Estes benefcios resultaram da identificao de riscos antes do incio da obra.
Nestes riscos incluem-se sobretudo a identificao de situaes com conflitos de atividades e
com regulamentao existente como as provenientes da OSHA (Ocupational Safety and Health
Administration). A deteco de aberturas sem proteo ou de escadas sem guardas durante a
construo foi fcil de identificar na anlise 4D, combinando estrutura com o planeamento da
obra. Outros exemplos de benefcios so os da simulao de escavaes e de aterros com a
identificao de cenrios propcios a acidentes.
Uma das vantagens apresentadas no relatrio tem sido a utilizao de ambientes de realidade
virtual com apoio nos modelos BIM para formao dos trabalhadores e dos tcnicos. Esta
capacidade de simulao, alm de permitir identificar riscos, fornece ambientes realsticos de
obra para visualizar riscos e medidas preventivas mas sem ter necessidade de expor os
intervenientes a perigos reais. Uma das particularidades foi apresentada pela Skanska que
conseguiu introduzir nos modelos BIM o efeito da gravidade. Esta possibilidade permitiu
identificar situaes que apresentavam efeitos inesperados e condies que motivaram
avaliaes diferentes dos riscos. Estas anlises permitiram verificar efeitos que tinham passado
420
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste caso, o objetivo construir num ambiente sem riscos: Zero Harm (Danos Zero). A ideia
a mudar a cultura na empresa, criando condies para que a segurana da construo seja
considerada quando se fazem escavaes ou movimento de terras. Desenvolvendo modelos
virtuais de escavaes para a construo de modo a aplicar as normas em sesses de formao
para tcnicos e operrios da empresa e para sub-empreiteiros pode ser um modelo eficaz na
preveno de acidentes e na implementao de processos de construo mais seguros.
Esta capacidade de modelar o que se espera em cada local, requerido pelo plano de segurana
e pelas medidas de preveno, permite tambm a formao do pessoal e das equipas envolvidas.
Esta formao e a sensibilizao pode reduzir riscos de modo integrado com a produo. A
421
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
verificao dos equipamentos de segurana a utilizar em cada tarefa pode ser feita atravs do
recurso de gesto do mapa de produo das medidas e dos equipamentos de segurana.
A aplicao permite que os operrios, encarregados e outros operrios consultem atravs dos
dispositivos mveis as fichas de segurana associadas a cada tarefa ou funo. As fichas de
segurana so instrumentos valiosos para identificar riscos habituais em cada tarefa, para
escolher as medidas preventivas relacionadas com cada um dos riscos e a empregar os
equipamentos de proteo individual ou colectiva prprios para esses riscos. Ao contrrio da
utilizao dos equipamentos mveis para verificao do plano de segurana verifica-se que o
uso dos mesmos para anlise das fichas de segurana tem uma componente mais genrica e
fcil de utilizar por ser mais modular.
2.4 Hourigan
Neste caso de estudo a empresa de cosntruo decidiu utilizar BIM para melhorar a segurana
com trs tipos de medidas [7]. A primeira medida tem a ver com a representao virtual do
estaleiro e da obra para fazer participar os envolvidos na obra. O envolvimento passava pela
contribuio dos operrios e dos tcnicos na identificao de riscos, na proposta de medidas de
preveno e da anlise proposta para controlo da eficcia das medidas. Tambm servia para
formar os construtores sobre as medidas de preveno e sobre os processos de contruo e
equipamentos.
A segunda medida adoptada pela empresa foi baseada numa visualizao 4D que permitia
identificar riscos resultantes da montagem de estruturas provisrias, como andaimes ou gruas,
e de perigos resultantes da movimentao de cargas e de equipamentos. Esta anlise sequencial
das tarefas permitiu ensaios das medidas preventivas com indicao de custos e de eficcia.
A terceira medida permitiu uma anlise detalhada de tarefas selecionadas para anlise em
termos de preveno de riscos. A anlise de alternativas de execuo para cada tarefa em termos
de processos e de equipamentos possibilitou a considerao da hiptese que combinava nvel
de risco com custo e com preos. Estas simulaes revelaram-se teis para atingir os objectivos
de nvel de preveno adequados.
Tendo em ateno a combinao dos motores automticos de deciso com as ferramentas BIM
foi criada uma plataforma que prope aos projectistas e aos contrutores medidas preventivas
para minimizar os riscos. A aplicao da plataforma foi feita para os riscos de queda que
representam a causa para o maior nmero de acidentes mortais na construo.
O processo de deciso para proposta de medidas preventivas das quedas potenciais usando BIM
tem quatro fases. A primeira consiste na parametrizao das regras de escolha das medidas
422
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.6 Modelo MMPtD (Management Model for Prevention through Design) e BIM
O modelo MMPtD foi elaborado a partir duma tese de doutoramento que analisou as causas de
cerca de 2000 acidentes mortais ou graves [10]. A anlise permitiu identificar para cada uma
das ocorrncias quais as medidas que poderiam ter sido tomadas para eliminar ou aligeirar os
riscos de acidentes. As concluses mostraram que cerca de 60% dos acidentes poderiam ter sido
evitados ou atenuados na fase antes do incio da obra. Foram feitos guias de procedimentos para
os intervenientes nas fases anteriores abertura do estaleiro.
A interao com o modelo BIM da obra com as medidas preventivas elaboradas no modelo
MMPtD foi feita atravs da associao com as diferentes tarefas que poderiam estar envolvidas
em acidentes. Esta associao permite na fase de projecto e na fase de planeamento alertar os
decisores para as medidas preventivas adequadas. A deciso de as empregar depende do
julgamento dos projectistas ou dos directores de obra.
Esta possibilidade de relacionar o local de trabalho na obra com os riscos da tarefa a executar
usando o modelo BIM que integra as recomendaes do modelo MMPtD pode ser uma
ferrramenta poderosa na eliminao dos acidentes. Os trabalhadores so os maiores
interessados em nveis adequados de segurana e so tambm os melhores defensores de nveis
de preveno aceitveis. Por isso a possibilidade de poderem ser informados em tempo real
atravs duma plataforma BIM, que incorpora o modelo MMPtD, dos riscos a evitar e das
medidas preventivas respectivas poder ser a estratgia ganhadora.
423
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esta associao da informao especifca sobre riscos e acidentes com a tarefa a executar pode
beneficiar da visualizao da obra em modelo digital pelos executantes. Este benefcio pode
ainda se acrescido pela utilizao de localizadores geoespaciais por cada operrio. Esta
geolocalizao poder ajudar os gestores de segurana a determinar se h necessidade de
intervirem na execuo da tarefa ao detectarem tarefas a serem executadas sem a existncia de
medidas preventivas adequadas. A interveno dos responsveis de segurana depois de
alertados pelos geolocalizadores poder ser substituda por programas de deciso que lidaro
com os dados do modelo MMPtD, com as informaes do BIM e com os registos das posies
dos trabalhadores envolvidos.
A considerao destes casos de estudo leva a concluir que a utlizao do modelo BIM para
diminuir, ou eliminar, a sinistralidade nas obras pode ser uma ferramenta eficaz. Esta utilizao
pode variar entre a utilizao na fase de preparao e de projecto at s operaes de reparao
e de manuteno.
O facto de haver estudos que mostram que cerca de 60% dos acidentes podem ser evitados antes
das obras comearem leva a concluir que nesta fase pr-obra que se deve concentrar o uso de
ferramentas BIM para garantir medidas preventivas eficazes.
O projecto e a preparao da obra so propcios ao uso dos modelos BIM 3D, 4D ou 5D para
evitar acidentes na obra. Durante a execuo da obra tambm se apresentaram exemplos de
como melhorar a preveno de acidentes atravs da integrao do modelo BIM com
dispositivos mveis ou com geolocalizadores.
Um dos desenvolvimentos futuros poder ser a utlizao de drones que podero constatar o
desenvolvimento de cada tarefa e comunicar a um controlador, virtual ou real, os dados em
tempo real. O modelo BIM poder ser utilizado para comparar o modelo virtual desejvel com
o obra e verificar se h medidas preventivas que faltem, Poder tambm servir para actualizar
o modelo BIM virtual caso existam alteraes ocorridas na obra devidas a intempries,
incidentes ou a m execuo.
Outro desenvolvimento futuro na melhoria do uso de modelos BIM para melhorar a preveno
poder ser a integrao com dispositivos mveis que permitam um fluxo de informao em
tempo real. Esta informao sobre os trabalhadores e sobre as tarefas poder contribuir para
uma avaliao integral da obra com possibilidade de interveno atempada de modo a evitar
acidentes.
424
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
425
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
426
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A deficiente organizao dos estaleiros uma das causas dos acidentes de trabalho relativos
construo. A realizao deste estudo foca-se na importncia que um estaleiro gerido de uma
forma otimizada, utilizando as tecnologias BIM, representa para um maior controlo da
segurana no decorrer das tarefas de uma obra. Neste caso, relativo ao estaleiro da construo
do tnel do Maro. Os objetivos principais consistiram em modelar o estaleiro da construo
para assim obter uma visualizao tridimensional do mesmo. Com esta visualizao possvel
manipular o estaleiro conforme as necessidades no decorrer da obra, ajudando a otimizar a
ocupao do espao, a gerir a circulao de viaturas e trabalhadores e gerir o armazenamento
de materiais e equipamentos. Deste modo, possvel prever e prevenir eventuais
comportamentos de risco que possam surgir, garantindo uma maior segurana aos
intervenientes da empreitada. importante referir que a modelao foi realizada aps
montagem dos estaleiros. Sendo assim, como resultado apresenta-se uma anlise critica
relativamente introduo do BIM na gesto dos estaleiros de construo, descrevendo a sua
influncia nos mesmos. Para o desenvolvimento deste trabalho recorreu-se anlise
bibliogrfica e ao estudo de caso.
1. Introduo
Building Information Modelling (BIM) uma metodologia que est a ser implementada em
Portugal. Apresenta-se como uma metodologia que obriga as pessoas a mudarem os hbitos, ou
seja, abandonar mtodos tradicionais para adotar mtodos atuais e em desenvolvimento. Esta
uma das razes para os quais esta metodologia recebe resistncia por parte dos trabalhadores,
levando muitos profissionais a debater-se com a nova realidade e a deixar-se ultrapassar por
quem j a conquistou.
427
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A prtica do BIM na gesto de estaleiros em Portugal uma rea em estudo que vem enaltecer
a importncia da sua introduo no quotidiano da gesto dos estaleiros de construo.
construo de um tnel esto associados elevados riscos, muitos deles por atropelamento,
que podem resultar em acidentes de trabalho graves, por isso, com este estudo pretende-se
mostrar uma alternativa de gesto da segurana com vista a melhoria nesta rea.
Para comprovar que utilizando o BIM se pode, efetivamente, otimizar os espaos dos estaleiros,
Srinath S. Kumar e Jack C. P. Cheng [4] elaboraram um estudo em que criaram um modelo de
estaleiro dinmico. A partir daqui estudaram vrias variveis sendo uma delas o clculo de
quantas e quais as instalaes que foram necessrias para colocar no estaleiro, assim como, o
espao que foi ocupado. Outra varivel estudada foi a quantificao do espao interior do
edifcio a construir para armazenamento de materiais respeitando certas regras de segurana.
Para alm disso, tambm foi otimizada a distncia a percorrer entre instalaes tendo em conta
os obstculos temporrios e os equipamentos presentes no estaleiro. Com este estudo
428
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
concluram que com o uso das ferramentas BIM possvel poupar tempo e recursos uma vez
que todo o processo foi feito devido a clculo automtico.
Tao Cheng e Jochen Teizer [1] realizaram um estudo com o objetivo de relacionar a tecnologia
de visualizao e recolha de dados em tempo real para uma construo segura. Para tal,
realizaram vrias experincias para testar a aplicao de recolha de dados e tecnologia de
visualizao em tempo real em operaes de construo. As experincias concentraram-se nas
relaes de proximidade entre trabalhadores e equipamentos como a simulao de violaes na
segurana. Centraram-se, tambm, em situaes que podem ocorrer em ambientes de trabalho
fechados e ao ar livre. Por exemplo, um trabalhador enfrenta o perigo de andar debaixo de uma
carga elevada (Figura 1). Os resultados do estudo mostram que a informao relacionada tanto
com a segurana como com as atividades de construo em estaleiros podem ser
automaticamente monitorizadas e visualizadas em tempo real, concluindo que podem oferecer
benefcios como a sensibilizao para os perigos de cada situao, que podem ser visualizados
e monitorizados quer no estaleiro de construo, quer noutra localizao fora do mesmo.
429
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Salman Azhar e Alex Behringer [6] desenvolveram um estudo com o objetivo de investigar a
eficcia das tecnologias BIM no desenvolvimento e implementao de um plano de segurana
num estaleiro de construo. Para tal, recorreu-se a um caso de estudo onde foram realizadas
simulaes de planeamento 4D e desenhos em 3D para a identificao de perigos. Com este
estudo obtiveram-se vrios resultados, sendo que um deles concluiu que as ferramentas 4D e
3D so mais eficientes no planeamento e na gesto da segurana, em comparao com os
desenhos 2D, por permitir simular as condies reais de trabalho (Figura 2). Para melhorar os
mtodos atuais concluiu-se que as tecnologias BIM podem ser utilizadas como novas
ferramentas de planeamento de segurana colaborativa, devido ao facto de, atravs dos modelos
BIM, projetistas, engenheiros e construtores poderem tomar medidas de proteo eficazes na
fase de planeamento do projeto para eliminar ou minimizar os perigos nos estaleiros de
construo durante a fase de obra. Concluiu-se que o BIM pode tambm ser usado durante uma
investigao de acidente, por ser possvel recriar a sequncia de acontecimentos que o
antecederam. Outra concluso obtida diz respeito ao comportamento humano, em que este no
pode ser mudado rapidamente. Pode concluir-se que as tecnologias BIM no devem ser
consideradas como um mtodo de resoluo de todos os problemas de segurana e sade nos
estaleiros de construo, apenas vo ajudar a melhorar a situao de segurana, no entanto, a
melhoria global poder ser visvel em vrias dcadas.
M. Natrop, Mahdavi A. e Martens B. [3] realizaram um estudo acerca do BIM nos estaleiros de
construo, referindo-se informao presente nos desenhos. O propsito do estudo relativo
informao que aparece nos desenhos ou modelos e que no necessria para desempenhar
uma determinada tarefa, ou ento, a informao que deveria estar presente e se encontra oculta.
O objetivo do estudo foi gerar desenhos com informao que apenas necessria para
desempenhar uma determinada tarefa com recurso a um caso prtico. Concluram que fornecer
desenhos com informao estritamente necessria para o desenvolvimento de uma tarefa
especfica a um trabalhador evita distraes com outros dados, aumenta a qualidade dos
trabalhos e reduz a probabilidade de erros. Por ltimo, concluram que essencial uma boa
comunicao entre projetistas e trabalhadores presentes nos estaleiros.
430
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Metodologia de estudo
A metodologia adotada centrou-se numa pesquisa relativa ao BIM nos estaleiros de construo
e num estudo de caso referente construo do tnel do Maro, de onde resultou a modelao
dos estaleiros da obra de forma a perceber melhor o seu funcionamento e que, utilizando a
visualizao 3D, se pode prevenir riscos associados s tarefas da construo.
Para iniciar o modelo do estaleiro comeou por se importar o ficheiro do formato dwg para o
Autodesk Revit para se obter o terreno topogrfico em 3D. De seguida, com base nos desenhos
2D disponibilizados, modelaram-se todas as instalaes presentes no estaleiro. Recorrendo s
famlias de objetos, carregaram-se mquinas, veculos e pessoas para conseguir obter uma
perceo do espao e mostrar que a circulao deles influencia o funcionamento do estaleiro.
Os estaleiros no eram de grandes dimenses, pelo contrrio, pela obra em si, as dimenses
eram bastante reduzidas. Com isto surgiram dificuldades na gesto do estaleiro, nomeadamente
na gesto do espao, por este ser exguo para caminhos pedonais e para a circulao de veculos
e pessoas, sendo necessrio ter em considerao a conjugao de todos os fatores. Ainda em
relao ao espao, este tambm era pequeno para a montagem da oficina mecnica, de
eletricidade, para as instalaes do refeitrio e vestirios e limitado para o estacionamento.
Outras dificuldades encontradas so relativas acumulao de lamas, que dificultaram o
trnsito, e o levantamento de poeiras, que afetaram todos os utentes do estaleiro. Para alm
disso, outra considerao a ter foi o armazenamento de combustveis em local protegido que
poderia provocar danos para o ambiente.
Todos estes entraves provocaram situaes de risco. Com a utilizao do BIM na gesto da
segurana nos estaleiros possvel um maior controlo dos mesmos, uma vez que com a
visualizao 3D e em tempo real possvel manipular o estaleiro e ver a melhor forma de
conjugar todas as situaes acima descritas evitando comportamentos de risco. Com o uso deste
mtodo possvel prever e prevenir atempadamente os perigos, conduzindo a uma gesto
otimizada da segurana e sade nos estaleiros.
431
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Como se pode constar, foram vrios os fatores considerados para gerir a segurana do estaleiro
da construo do tnel, tarefa esta bem-sucedida pois no houve ocorrncia de acidentes graves.
4. Modelo do estaleiro
Embora esta modelao tenha ocorrido aps a montagem do estaleiro, no deixa de ser
vantajoso elaborar uma simulao 3D para diferenciar o mtodo de gesto do estaleiro utilizado
relativamente ao estudado neste trabalho. A figura 4 apresenta uma perspetiva geral do estaleiro
nascente no local onde estava inserido.
Uma das vantagens desta metodologia ser possvel o reconhecimento mais eficaz do espao
antes de se colocarem os equipamentos, maquinarias e instalaes necessrias para o decorrer
dos trabalhos. Para uma melhor perceo da rea do estaleiro em estudo apresentam-se as
figuras 5 e 6, relativas ao modelo, de maneira a ser possvel idealizar a distribuio das
instalaes e equipamentos. Para simplificao apenas esto apresentadas imagens do modelo
do estaleiro nascente.
432
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Os caminhos no estaleiro eram bastante estreitos, por isso, seria importante poder antever como
se cruzariam os veculos de modo a no perturbar os trabalhos nem criar perigos. Neste modelo,
foi criada uma simulao referente a esta situao, onde tambm, se encontram trabalhadores
nas mediaes (figura 7 e 8). Com a realizao de simulaes como esta, possvel visualizar
433
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
atempadamente como seria o cruzamento de veculos entre si e tambm entre veculos e pessoas
nos estaleiros. Para cada situao, tornar-se-ia possvel o estudo prvio de medidas e solues
a tomar para estes casos e a elaborao prvia de medidas de segurana, evitando decises
precipitadas no local. A gesto deste tipo de situaes vem minimizar os perigos a todos os
intervenientes, aumentando a segurana dos mesmos. Posto isto, verifica-se a necessidade de
uma gesto cuidada e otimizada relativamente a este assunto.
Outros resultados que se podem retirar deste estudo so relativos aos equipamentos presentes
nos estaleiros. Com um alinhamento correto das tarefas de determinada obra e com um modelo
434
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
tridimensional possvel colocar em estaleiro apenas os recursos de que essa tarefa carea,
podendo visualizar-se a disposio dos mesmos oportunamente. Assim, evita-se o
congestionamento nos estaleiros e previne-se eventuais situaes de risco, aumentando,
naturalmente, a segurana. Daqui pode, tambm, inferir-se que os custos podem ser mais
controlados evitando derrapagens nos oramentos.
Para que tal no acontea, a informao pode ser partilhada entre todos os intervenientes na
obra, nomeadamente, dono de obra, coordenadores de segurana em obra e em projeto,
projetistas e mesmo os prprios operrios. A visualizao simples e informatizada, evitando
os desenhos de grandes dimenses. Com esta partilha de informao possvel alertar todos os
trabalhadores para a sua exposio aos riscos das obras. Para alm disso, apresenta a vantagem
de se poderem esclarecer dvidas de execuo e planeamento in situ evitando perdas de tempo
que em obra podem ser valiosas.
legtimo afirmar que com um ambiente de trabalho seguro os trabalhadores sentem-se mais
confiantes para desempenhar as suas tarefas. Esta metodologia vem contribuir para oferecer
essa confiana, uma vez que tudo planeado e revisto atempadamente e atualizado
automaticamente face s circunstncias e condicionalismos concretos da obra, minimizando
qualquer comportamento arriscado que possa surgir.
5. Concluses
O bom planeamento de qualquer projeto crucial para o desenvolvimento do mesmo, por isso,
conclui-se com este estudo, que para obras de elevada envergadura e complexidade como foi a
do tnel do Maro, o BIM apresenta-se como essencial na gesto dos estaleiros.
435
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Facilmente se pode inferir - e os resultados de vrios estudos fundamentam isso mesmo - que
as metodologias BIM so ideais para a otimizao e controlo de tarefas das obras, possibilitando
consequentemente uma melhor gesto e um maior controlo da obra e do estaleiro, especialmente
se estes, em consequncia do reduzido espao disponvel, primarem por uma densidade de
constituintes significativa e potencializadora de conflitos e impactos na produtividade.
De uma forma geral, a conjugao de todas as reas que foram estudadas neste trabalho
contribui para uma gesto da segurana mais eficiente, uma vez que fornece a possibilidade de
um maior controlo das movimentaes do estaleiro, e atravs da escolha das melhores solues
de preveno, evita comportamentos de risco.
Concluiu-se ainda que o ideal na gesto da segurana a mesma ter incio na fase de projeto,
contando com a participao ativa de todos os intervenientes, situao que a utilizao do BIM
poder ajudar a potenciar.
Pode assim concluir-se que o BIM importante para que se prossiga a imposio de uma cultura
de segurana transversal e integrada em todos os projetos de construo.
Referncias
[1] Cheng, T., & Teizer, J. (2013). "Real-time resource location data collection and
visualization technology for construction safety and activity monitoring applications," in
Automation in Construction, vol. 34, pp. 315, November 2012.
http://doi.org/10.1016/j.autcon.2012.10.017
[2] Shah, R., & Edwards, J. (2016). "Investigation of health and s afety impact from the
Site BIM tools in the live construction sites", Vol. 6, No.2, June 2016.
http://dx.doi.org/10.6106/JCEPM.2016.6.2.001
[3] Lon A.H.M., & Natrop, M. (2015). "BIM on the construction site: providing
information on task specific drawings," Netherlands organization for applied scientific
research TNO & Solidu, 20 (November 2014), 97106.
[4] Kumar, S. S., & Cheng, J. C. P. (2015). "A BIM-based automated site layout planning
framework for congested construction sites," in Automation in Construction, vol. 59, pp.
2437, August 2015. http://doi.org/10.1016/j.autcon.2015.07.008
[5] Sulankivi, K., Zhang, S., Teizer, J., Charles, M., Kiviniemi, M., Romo, I., & Granholm,
L. (n.d.). "Utilization of BIM-based Automated Safety Checking in Construction
Planning," Technical Research Center of Finland, School of Civil and Environment
Engineering, Georgia Institute of Techocology, Georgia Institute of Technology,
Skanska Finland & Tekla Finland, 2013.
[6] Azhar, S., Ph, D., & Behringer, A.,B.S (2013). A BIM-based Approach for
Communicating and Implementing a Construction Site Safety Plan, Auburn University
Auburn, Alabama & The Whiting-Turner Contracting Company Orlando, Florida, 2013.
436
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O estudo apresentado enquadra-se na dissertao de Mestrado Integrado em Engenharia Civil
realizada em parceria com a empresa CONSTRUES GABRIEL A.S. COUTO, S.A,
possibilitando ao autor estar envolvido no Projeto Jpiter da SAKTHI Portugal SP21.
O desenvolvimento deste artigo passa pela demonstrao das vantagens da implementao das
metodologias BIM no setor da construo. Contudo, ter maior incidncia no BIM 4D e 5D, os
quais permitem evitar atrasos no cumprimento de prazos e precaver possveis derrapagens
oramentais. Primeiramente, proceder-se- avaliao da qualidade dos modelos recebidos,
avaliando as incompatibilidades existentes entre os modelos. Posteriormente proceder-se-
realizao do 4D sendo necessrio efetuar-se a monitorizao da obra atravs do levantamento
do que vai sendo executado ao longo de todo o perodo de construo. Contudo, dadas as
caractersticas do software utilizado, proceder-se- primeiramente elaborao do BIM 5D e
s depois o BIM 4D, sendo que nesta fase necessrio associar a todas as tarefas do mapa de
trabalhos fornecido pela empresa, os recursos necessrios realizao das mesmas. J numa
fase final ser possvel obter-se um conjunto de documentos, nomeadamente, o oramento e o
plano de trabalhos, os quais sero comparados com os mesmos documentos elaborados pela
empresa atravs da metodologia tradicional.
1. Introduo
Durante muitos anos, o setor da construo foi um dos setores responsveis pela evoluo
tecnolgica. Contudo, esse estatuto foi-se perdendo com o passar dos anos, por consequncia
da crise econmica que afetou este setor. Tratando-se da indstria mais afetado pela crise, foi
importante encontrar e estudar novos mtodos de trabalho por forma a reverter toda esta
situao. Desta forma, tm estudados tcnicas e formas de aumentar a competitividade,
437
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Building Information Modelling (BIM) uma das tendncias que tm vindo a ser introduzida
no setor da construo sendo que passa, primeiramente, pela construo virtual do edifcio num
modelo digital, conhecido como BIM 3D. Esse modelo deve ser acompanhado com o maior
nmero de informao possvel, nomeadamente, geometria, relaes espaciais, informao
geogrfica, quantidades e caratersticas dos elementos de construo, estimativa de custos,
stock de materiais e cronograma de projeto [4]. Torna-se importante referir que esta
metodologia apenas tira verdadeiros benefcios quando aplicado totalidade do projeto, ou seja,
no deve ficar-se apenas pela representao 3D do mesmo, mas tambm deve ser estendida ao
planeamento (BIM 4D) e controlo de custos (BIM 5D) [1].
438
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
por exemplo, deve-se procurar que o 4D da metodologia BIM seja sempre que possvel
acompanhado pelo 5D, pois quando existem alteraes ao nvel das quantidades ou dos recursos
necessrios (4D), estas so refletidas automaticamente no oramento, caso contrario isso no
acontece. Adicionalmente, ser feita uma avaliao dos documentos obtidos nas duas
metodologias por forma a ser possvel efetuar-se uma comparao.
2.1 Definio
O BIM pode ser definido como sendo uma tecnologia de modelao e um conjunto de processos
associados, com a finalidade de produzir, comunicar e analisar modelos de uma construo.
Trata-se de uma metodologia de partilha de informao entre todos os intervenientes do projeto
(arquitetos, engenheiros, empresa(s) de construo, dono de obra) passando por todas as fases
do ciclo de vida do edifcio (projeto, construo, manuteno, desconstruo). Porm, necessita
de um modelo digital em trs dimenses, o qual pode conter diversas informaes relacionadas
com o projeto, nomeadamente, caractersticas geomtricas, propriedades (fsicas e mecnicas),
atributos, prazos, custo de construo, entre outras. Alm disso, tem a capacidade para guardar
informaes paramtricas com relao entre os diversos elementos e ainda permite o apoio nos
fluxos de trabalho entre as diferentes atividades relacionadas com o processo construtivo [3].
Esta metodologia permite efetuar uma simulao do projeto num ambiente virtual e como
resultado possvel extrair-se com facilidade quantidades e propriedades dos materiais. Alm
disso, trata-se de um processo que engloba todas as especialidades num nico modelo virtual
permitindo uma colaborao mais precisa e eficiente quando comparada com o mtodo
tradicional. [4].
439
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
440
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
do projeto atravs das quantidades takeoffs obtidas na dimenso anterior. Torna-se importante
referir que todas as alteraes efetuadas ao longo do projeto so refletidas nos valores obtidos
inicialmente. Nesta fase necessrio avaliar todos os recursos necessrios para realizao de
uma determinada tarefa sendo que o custo dessa mesma tarefa influenciado pelo valor
associado a cada recurso.
Na dimenso 6D, normalmente conhecida como Facilities Management (FM), possvel gerir
o ciclo de vida do projeto visto que at chegar a esta fase os projetistas criaram e atualizaram
todos os modelos durante toda a fase de construo, podendo-se considerar que o modelo
construdo corresponde ao real, sendo atribudo a cada elemento todas as informaes de
operaes e manutenes efetuadas. Desta forma, o modelo dever ser capaz de dizer quando
que determinado elemento ir necessitar de manuteno [8].
441
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Assim sendo, pode-se admitir que a construo desta empreitada encontra-se dividida em 4
fases:
Execuo das fundaes e pilares de beto armado, incluindo aplicao de
chumbadouros.
Montagem dos prticos principais, pilares, vigas e travamentos.
Montagem de cavaletes e calhas sobre a estrutura metlica para apoio da chapa
estrutural.
Montagem da chapa estrutural entre prticos principais, com um comprimento de 20
metros cada.
442
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Recolhida toda a informao procedeu-se anlise dos modelos recebidos de forma a avaliar a
forma de modelao usada por cada equipa de projeto. Posteriormente, com o auxlio de um
software de coordenao (Solibri Model Checker), avaliou-se a qualidade dos modelos atravs
da anlise das incompatibilidades entre os diferentes modelos e alm disso verificou-se at que
ponto os modelos se encontravam parametrizados, isto , avaliou-se se os modelos
apresentavam informaes referentes geometria e propriedades dos elementos e tambm se
estes se encontravam classificados. Posto isto, deu-se inicio implementao do BIM 4D e 5D
para o projeto em estudo.
Antes de iniciar qualquer trabalho no software Vico foi necessrio elaborar alguns trabalhos
prvios, nomeadamente, atualizao do mapa de trabalhos e quantidades (MTQ) fornecido pela
empresa, documento que serviu de base ao processo de concurso. No MTQ foi necessrio
acrescentar algumas colunas e linhas de trabalho para adicionar dados que so necessrios
fornecer ao software, nomeadamente, linhas para definir todos os recursos necessrios para
cada tarefa, desde de mo-de-obra, materiais e equipamentos e colunas para adicionar a esses
recursos os respetivos rendimentos e preos unitrios. Nesta fase foi necessrio a utilizao do
software disponibilizado na plataforma online denominado por Gerador de Preos da CYPE,
que permite retirar os recursos associados a cada recurso, bem como os respetivos rendimentos
e preos unitrios [12]. Porm, foi necessrio proceder a alguns ajustes dos valores
correspondentes aos rendimentos e preos unitrios de cada recurso porque como foram
retirados diretamente do CYPE no correspondem na integra aos valores reais que serviram de
base ao clculo do valor total de cada tarefa. No entanto, se se fosse a trabalhar da forma mais
correto ter-se-ia de utilizar os valores reais dos rendimentos calculados pela empresa. Aps
colocados todos os recursos e respetivos rendimentos e preos unitrios, falta s proceder
classificao das tarefas e respetivos recursos, como manda o software. O Vico prev a
classificao em 6 nveis, desde do Code 1 ao Code 6, sendo que as classificaes utilizadas
em cada um desses nveis ligeiramente diferente. Do nvel 1 ao 4, inclusive, utiliza-se a
classificao Uniformat II, sendo que os Codes 1, 2, 3 e 4 correspondem aos Levels 1, 2, 3 e 4
dessa classificao, respetivamente. O Code 5 diz respeito tabela 22 do sistema de
classificao Omniclasse e por fim, o Code 6 consiste num sistema de classificao
desenvolvido pelo aluno, em que a primeira letra do cdigo diz respeito ao tipo de recurso em
questo, sendo que foi definido que a letra L correspondia mo de obra (Labor), o E
corresponde aos equipamentos e o M aos materiais.
443
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste caso, a escolha passou pela utilizao de programas que apresentam uma maior utilizao
ao nvel mundial, evidenciem maiores potencialidades e aqueles que o aluno j apresenta algum
conhecimento. Assim sendo, optou-se pela utilizao do Revit 2015 e 2016 para a modelao
em 3D, o Vico Office 5.1 para trabalhar a dimenso 4D e 5D do BIM, o Solibri Model Checker
v9.6 para a avaliao da qualidade de modelos funcionando como software de coordenao e
por fim, o Tekla BIM Sight como visualizador.
4. Resultados Obtidos
Dentro das responsabilidades assumidas, foi possvel tirar diversos resultados atravs do uso da
metodologia BIM no caso de estudo em anlise. Apesar deste trabalho se encontrar mais
centrado no BIM 4D e 5D foram realizados outros trabalhos associados ao BIM 3D, tendo estes
sido executados numa fase inicial do trabalho. Posto isto, com a realizao deste trabalho
procedeu-se inicialmente deteo das incompatibilidades entre os vrios modelos existentes
em obra (estrutura, arquitetura e AVAC), antecipando a deteo de alguns erros de projeto.
Procedeu-se ento importao em ifc dos modelos para o software Solibri Model Checker de
modo a efetuar-se a anlise das incompatibilidades. Isto s conseguido porque este software
permite a compatibilizao de todas as especialidades num nico modelo e a partir das regras
associadas a esse programa possvel verificar as incompatibilidades existentes sendo que
algumas colises merecem maior ateno comparativamente a outras. No que diz respeito
avaliao da qualidade dos modelos, o aspeto que mereceu mais ateno foi o facto que a
modelao das condutas enterradas do sistema de AVAC encontravam-se modeladas tendo em
conta o dimetro interior. Em consequncia, fez com que numa anlise preliminar se conclusse
que no existiam incompatibilidades entre o modelo de Estruturas e o de AVAC, sendo que tal
no estava certo. Desta forma, foi necessrio proceder a uma segunda anlise em que se teve
444
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
em considerao o dimetro real da tubagem. Neste caso, alm de ser necessrio ter em conta
o dimetro exterior, tambm preciso ter em ateno o dimetro da tubagem na zona da
campnula. Alm das incompatibilidades associadas aos elementos estruturais e as tubagens de
ventilao, tambm foram verificadas colises entre elementos constituintes do modelo de
AVAC e de Arquitetura, nomeadamente, conflitos entre difusores e portas/portes (Figura 4).
445
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 7: Executado Estrutura Metlica (esq.) e Beto Armado (dir.) a 19/09/2016 (Revit).
Aquando a importao e ativao dos modelos no Vico possvel verificar todas as quantidades
existentes, podendo estas ser organizadas de forma diferente. No entanto, o objetivo passa
sempre pela agregao do maior nmero de informao num nico parmetro, isto , pretende-
se por exemplo agrupar todas as sapatas num nico cone, sendo que, tambm se pretende que
a poltica adotada na organizao das quantidades se adapte o mais prximo possvel ao
articulado da obra, para assim ser mais fcil organizar toda a informao para o oramento que
ser elaborado na 5 dimenso do BIM (Figura 8). No entanto, a organizao da informao foi
diferente de modelo para modelo. No caso da especialidade de estruturas, procurou-se agrupar
elementos iguais na mesma categoria, isto , juntar todas as sapatas da obra num nico tpico.
Isto s foi possvel porque o Revit tem a capacidade de criar novos parmetros, o que permitiu
a criao de um parmetro Vico 01, igual ao que aparecia quando se escolhia de que forma se
pretende organizar a informao no Vico. Quando ao modelo de arquitetura e de AVAC, a
informao foi organizada tendo em conta o nome e tipo de famlia.
446
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
447
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluses
O BIM surge como sendo um novo paradigma dentro do setor das AEC, o qual incentiva uma
interao entre todas as especialidades existentes num projeto de construo, permitindo um
aumento da eficincia de todas as partes interessadas.
448
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
pode verificar que a aplicao desta metodologia trs diversas vantagens na deteo de
incompatibilidade, pois possvel detet-las de uma forma rpida e numa fase antecedente ao
inicio da empreitada, o que permite uma resoluo prvia dos problemas. Alm disso, permite
a produo automtica de informao. Apesar disso, esta metodologia apresentou algumas
limitaes e/ou problemas relativamente a este caso de estudo, os quais so relacionados com
a organizao das quantidades e com a importao do modelo de AVAC para o software. Este
ltimo problema est relacionado com a incompatibilidade entre o Revit 2016 e o software Vico
instalado. Desta forma, foi necessrio exportar o modelo em formato ifc e da importar para o
Vico, o que tambm trouxe algumas limitaes na organizao da informao.
Referncias
449
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
450
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A necessidade de evoluo dos mtodos e processos, conduz a uma procura constante por
tecnologias mais eficientes, com vista maximizao da qualidade. O setor da Arquitetura,
Engenharia, Construo e Operao (AECO) deve acompanhar o desenvolvimento tecnolgico.
Por mais heterogneo que o setor seja, j no so aceitveis desvios de prazos e custos.
Este artigo tem por finalidade estruturar um mtodo que permita a interoperabilidade, sem
contemplar a parte informtica da ligao, entre BIM e ProNIC, e que englobe todo o processo
construtivo no setor AECO, e ainda aplic-lo ao caso de estudo da reabilitao de um edifcio.
1. Introduo
451
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Estima-se que para cada posto de trabalho direto criado pela atividade, cerca de outros 3 novos
empregos sejam gerados [1]. O que torna o setor merecedor de primordial importncia junto do
Estado, uma vez que grande parte das obras realizadas advm de contrataes pblicas,
principalmente frente a um cenrio de crise econmica e escassez de investimentos.
Trata-se de uma atividade diferenciada das pertencentes a outros ramos da economia, devido
grande diversidade de mo-de-obra, produtos, clientes (setor pblico e privado), mtodos,
processos e tecnologias associadas, as ferramentas de trocas e uniformizao de informao
tm impacto direto na qualidade final do empreendimento.
Este artigo baseia-se na tese de mestrado do mesmo ttulo que tem vindo a ser desenvolvida ao
abrigo do protocolo existente entre o LNEC e a ULHT e que tem como objeto de estudo a
reabilitao de um edifcio pblico localizado na zona metropolitana de Lisboa.
2.1 BIM
Do ponto de vista conceptual, o BIM um mtodo de produo, integrao e gesto da
informao entre todos os intervenientes de um projeto e transversal a todas as fases do ciclo
de vida de uma construo. Tem por base um modelo digital manipulvel que permite simular
virtualmente, atravs de um software adequado s necessidades, o ambiente real [3].
Produto: o modelo final da edificao. Depois de passar pelo processo de criao que
teve por base as ferramentas de informao e os processos abertos do projeto o resultado
um modelo da edificao;
452
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Alguns autores divergem a respeito de quais informaes poderiam ocupar os nveis 6D e 7D,
outros consideram a existncia de um nvel 8D representado pelas componentes de segurana
e preveno de acidentes [7]. Neste sentido, verifica-se a inexistncia de uma opinio
consensual no que se refere a este assunto. A Figura 1 ilustra as caractersticas mais
frequentemente aceites.
Os modelos BIM podem ser classificados ainda quanto ao seu Level of Development (LOD),
ou em portugus, Nvel de Desenvolvimento, que diz respeito quantidade, ao tipo e
qualidade da informao armazenada no modelo. Os LODs so divididos pela American
Institute of Architects (AIA) em 5 categorias e vo do LOD100 ao LOD500 [8]. Quanto maior
for o LOD, maior o nmero de detalhes e maior a fiabilidade das informaes. Deve-se,
entretanto, estar atento s reais necessidades de detalhes que cada fase do projeto requer, uma
vez que medida que o LOD aumenta, cresce significativamente o investimento empregado
em tempos, recursos e esforos para introduo de informaes no modelo.
453
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.2 ProNIC
O ProNIC funciona como uma grande biblioteca de dados de conhecimento de trabalhos de
construo, que inclui a informao tcnica necessria ao projeto e abrange dois dos maiores
tipos de construo do setor, nomeadamente, Edifcios (tanto na construo nova como na
reabilitao) e Estradas. Neste sentido, atua como uma eficiente ferramenta de gesto e
articulao dos contedos tcnicos, por estar associado a aplicaes informticas que permitem,
aos diferentes agentes que participam do processo construtivo, cumprir as exigncias
regulatrias e legais impostas, de forma mais facilitada e precisa, com destaque para as
Medies Detalhadas, Estimativas Oramentais, Mapas de Quantidade de Trabalhos e ainda os
Cadernos de Encargos (CE) [9].
O ProNIC conta com um primeiro nvel de desagregao da WBS para Edifcios, que engloba
trabalhos de construo em geral e tcnicas de reabilitao, e que compreende 26 captulos. E
uma segunda WBS para obras de infraestruturas rodovirias dividida em 10 captulos. Esta
desagregao da obra por captulos usada pelas diferentes especialidades e tem por base as
regras de medio do LNEC [12]. Os nveis hierrquicos subsequentes decompem estes
captulos e, para cada nvel, associam um cdigo numrico:
O modelo adotado para trabalhos de construo nova de Edifcios segue a diviso por captulos,
consoante as diferentes especialidades, enquanto que as obras de reabilitao se encontram
estruturadas segundo as diferentes tcnicas de interveno. Neste caso so definidas segundo
um artigo de reabilitao ou combinao de vrios artigos de trabalhos de Edifcios at que os
trabalhos fiquem completamente definidos [13].
No que diz respeito aos contedos tcnicos, o ProNIC capaz de gerar automaticamente Fichas
de Execuo de Trabalhos e Fichas de Materiais, organizadas e estruturadas uniformemente.
Trazem, associadas a si, referncias s boas prticas de execuo, normas e especificaes
aplicveis a cada caso (trabalhos e materiais) e ainda indicam medidas relacionadas com a
segurana, manuteno e utilizao. So as fichas que posteriormente daro origem as clusulas
tcnicas gerais do CE. O resultado um documento com toda a informao organizada por
454
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
captulos, consoante o tipo de obra e disposta segundo uma estrutura padronizada de descrio
de trabalhos e de materiais [14].
3. Interoperabilidade
A estrutura IFC dividida em camadas que funcionam de acordo com uma hierarquia de
referncia em rvore, dos mdulos mais genricos aos mais especficos [15]. Assim, tanto o
utilizador poderia introduzir dados em ProNIC e ter a equivalncia representada por meio de
IFC no BIM, como introduzir diretamente o cdigo IFC no BIM e dele extrair a informao do
ProNIC.
Com efeito, prope-se que seja adotado o seguinte mtodo de associao ao estabelecer-se a
ligao entre o BIM e ProNIC [16]:
455
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
trabalhos de construo que funciona como uma legenda associativa, isto , certo cdigo
diz respeito sempre a certo trabalho de construo;
Na parametrizao de objetos BIM, a cada elemento presente no modelo estariam
associados vrios artigos do ProNIC, tantos quanto se fizessem necessrios de forma a
caracteriza-lo perfeitamente;
No diz respeito s especialidades de projeto, as duas ferramentas, BIM e ProNIC j
esto de acordo e compreendem a legislao.
A medida que o modelo BIM vai sendo construdo e que os LODs forem aumentando, os
objetos integrantes do modelo vo ganhando as informaes requeridas pelo software BIM
utilizado [8], bem como, e de forma automtica, as informaes tcnicas geradas pelo ProNIC,
para que desta maneira se possa elaborar o CE, as medies detalhadas, os mapas de
quantidades de trabalho e as estimativas oramentais precisas com relativa facilidade. O
ProNIC faz ainda meno s boas prticas de trabalho, normas de segurana a serem seguidas
e toda a informao tcnica dos materiais de construo utilizados, todas de acordo com a
legislao vigente [13], desta forma, quando associados ao modelo construdo em BIM o
utilizador pode contar com informaes fiveis, completas e em qualquer fase do projeto de um
empreendimento.
4. Caso de estudo
Com este propsito, o edifcio construdo em 1966 ser o alvo de uma interveno que
compreende a reabilitao e adaptao das salas e laboratrios existentes, as novas instalaes
do Laboratrio Nacional de Referncia de Sade Animal, bem como adaptar redes de energia,
rede estruturada (voz e dados) e segurana contra incndio do edifcio.
456
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
457
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O captulo 3 do ProNIC trata dos trabalhos de demolio. O utilizador tem diante de si, ao nvel
do artigo, opes de preenchimento representadas em cada campo editvel por $ e
apresentadas na Tabela 1, que posteriormente conduzem descrio completa do trabalho,
458
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
conforme segue: Demolio parcial ($8) de paredes simples de tijolo ($1) cermico furado ou
perfurado ($2) e a dos seus eventuais revestimentos, considerando triagem na prpria obra
($3) e reciclagem de todos os materiais, de acordo com as peas escritas e desenhadas do projeto
e a legislao em vigor. Inclui carga, transporte e descarga ($5), todas as tarefas necessrias
para a realizao dos trabalhos, assim como para a limpeza do local. Considera-se includa a
implementao das medidas de segurana consideradas necessrias para a realizao dos
trabalhos.
459
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tendo por base a informao apresentada, verifica-se que daqui que se retiram as informaes
que sero incorporadas nos objetos do modelo BIM, seja sobre os materiais de construo, seja
sobre os trabalhos a eles associados. medida que se avana nos LODs do modelo BIM,
avana-se em simultneo nos captulos do ProNIC, at o nvel dos $, que caracterizam
perfeitamente o trabalho a ser realizado.
5. Concluses
A principal dificuldade residiu no fato de no software utilizado para modelao em BIM ainda
no contemplar de forma especfica os materiais de construo e suas propriedades. Estas
informaes foram completas quando na utilizao do ProNIC, mas perde-se a chance de fazer-
se o cruzamento de dados. A integrao de informao no dimensional, existente no ProNIC,
em modelos BIM, enriquece os modelos, tornando-os mais eficientes em todo o ciclo de vida.
Identifica-se um trabalho extenso no ponto de vista informtico, ao nvel do desenvolvimento
dos IFCs, para que os diferentes softwares possam importar e exportar ficheiros sem qualquer
constrangimento ou limitao. Devem para isso, contar com uma regulamentao detalhada e
uma normalizao dos processos.
O sucesso dos projetos realizados nestes novos moldes est intimamente ligado com a
disseminao e conscientizao, por todos os agentes do setor construtivo, dos benefcios que
se podem alcanar com a sua utilizao.
Referncias
460
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Proceedings of the 26th Annual Conference, 6-8 September, 2010, pp. 281289.
[8] AIA G202TM-2013, "Guide and Instructions to AIA Digital Practice Documents" em
Project Building Information Modeling Protocol Form, AIA G202TM -2013.
[9] P. Couto, S. Raposo, A.F. Salvado, L. Gonalves, Projecto de Investigao ProNIC,
Trabalhos Realizados e Desenvolvimentos Futuros, em Cidades e Desenvolvimento:
Jornadas de Investigao e Inovao LNEC, Lisboa, Portugal, 2012.
[10] J.R.Chapman, Work Breakdown Structure. Disponvel em:
http://www.hyperthot.com/pm_wbs.htm. Consult. em 10/2015.
[11] S. Carvalho, Anlise e Alinhamento de Tecnologias de Construo. Dissertao de
Mestrado. Universidade do Minho, Guimares, Portugal, 2010.
[12] M.S. Fonseca, Curso sobre Regras de Medio na Construo, LNEC, Lisboa, 1997.
[13] Instituto de Engenharia de Sistemas e Computadores, Tecnologia e Cincias
(INESCTEC, 2008). Disponvel em: https://www.inesctec.pt/cese/noticias-eventos/nos-
na-imprensa/pronic-sistema-de-geracao-e-gestao-de-informacaotecnica-para-cadernos-
de-encargos/. Consult. em 08/2015.
[14] P.Mda,Integrated Construction Organization - Contributions to the Portuguese
Framework. Tese de Mestrado, Universidade Porto, Porto, Portugal, 2014.
[15] M. El-Desouki, and A.H. Hosny. A Framework Model for Workflow Automation in
Construction Industry em International Workshop on Innovations in Materials and
Design of Civil Infraestruture (2005), Cairo, Egito, 2005.
[16] M. J. Falco Silva, F. Salvado, P. Couto, A. Vale e Azevedo,Sistematizao da
informao tcnica e econmica da construo para incorporao em objetos BIM, em
COMPAT 2015, Lisboa, Portugal, 2015.
461
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
462
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Anne-Marie Mushamalirwa(1), Andr Reis Antunes (2), Antnio Aguiar Costa (2)
Resumo
A tecnologia BIM tem crescido consideravelmente nos ltimos anos, tendo-se tornado uma
ferramenta essencial na rea da gesto da construo. A fase de construo de um
empreendimento de construo tem sido sempre sensvel a inmeras restries e incertezas,
entre as quais as mais relevantes sero de ndole financeira e de prazos, e a implementao
eficiente do BIM pode reduzir significativamente os impactos potencialmente negativos
causados por estas situaes.
Este trabalho apresenta uma ferramenta que visa apoiar os gestores da construo durante esta
fase especfica, em particular combinando a tecnologia BIM e a tcnica de gesto Earned Value
Management, permitindo visualizar diretamente num modelo 3D BIM, atravs de um
computador ou um dispositivo mvel, o desempenho nas vertentes de custo e prazo.
Os gestores podero introduzir os dados necessrios numa folha de Excel e obter um modelo
BIM atualizado em tempo real, de acordo com um sistema pr-definido de cores, que permite
identificar rapidamente o ndice de desempenho de cada elemento do modelo. A ferramenta
permite no s identificar reas sensveis do projeto, como tambm categoriz-las em termos
do seu grau de importncia.
1. Introduo
463
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
em projetos de construo [2] e permitiu uma colaborao mais eficiente entre todas as partes
interessadas do projeto durante o ciclo de vida do empreendimento [1].
Uma das fases que pode realmente beneficiar de BIM a fase de construo. Esta fase uma
das mais desafiadoras e sempre enfrentou problemas in-situ, motivados pelas alteraes ou
erros de projeto, atrasos etc. Alm disso, o tempo de resposta dos gestores no local deve ser
capaz de dar resposta ao planeamento e oramento definidos. A implementao do BIM pode
reduzir em muito as restries mencionadas acima e ser uma ferramenta til para os gestores
da construo.
O objetivo deste trabalho apresentar uma ferramenta inovadora baseada em BIM para apoiar
os gestores durante esta fase delicada e complexa. Esta ferramenta baseia-se numa sinergia
entre BIM e o Earned Value Management (EVM) e utiliza duas ferramentas conhecidas,
Microsoft Excel e Autodesk Revit, para mostrar o desempenho de custo e de prazo de uma obra
em curso num ponto especfico do tempo e utilizando um modelo tridimensional BIM. Para
isso, o utilizador deve fornecer os dados de entrada necessrios com o uso de dispositivos
mveis, como um porttil ou Tablet.
Este artigo est dividido em quatro partes. A primeira parte apresenta uma reviso da literatura
que foi conduzida para compreender os conceitos e aplicao do BIM e do EVM. A segunda
parte explica a metodologia utilizada no estudo. A terceira parte descreve como a ferramenta
EVM / BIM foi desenvolvida e implementada, e, finalmente, a ltima parte apresenta os
resultados obtidos num caso-piloto de uma casa residencial. Pretende-se ainda que a ferramenta
seja expandida de forma a identificar variveis exteriores e assim identificar quais as reas que,
sendo sensveis em termos do seu ndice de desempenho, possam ser alvo de interveno
imediata pelo gestor da construo.
2. Reviso de literatura
464
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O BIM tambm est a mudar a abordagem a respeito da segurana na construo, o que constitui
uma questo da maior relevncia. Por exemplo, no Centro de Pesquisa Tcnica Estatal da
Finlndia foi desenvolvido um procedimento que recorre tecnologia BIM para visualizar o
nvel de segurana contra quedas de um varandim [8]. Zhang et al [9] tambm desenvolveu um
sistema de verificao automtica baseada em regras de segurana para proteo contra quedas
baseado em software BIM, com foco em possveis riscos de queda, como aberturas sejam elas
janelas desprotegidas, ou buracos nas lajes.
Com uma abordagem diferente, a combinao de 3D Laser Scanning e EVM pode tambm ser
potenciada como uma forma eficiente de avaliar o desempenho da construo de uma obra. O
Laser Scanning tem sido considerado como a melhor tecnologia disponvel na AEC/FM para
capturar informaes 3D com velocidade e preciso num projeto [17], apoiando, por exemplo,
a reconstruo de modelos 3D BIM com base em nuvens de pontos 3D de estruturas existentes
[18]. A comparao entre esses modelos e o estado planeado, com base no modelo BIM, permite
465
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
realizar uma anlise EVM e, assim, obter o desempenho do custo e prazo de obras de
construo. Este princpio foi utilizado j na mecnica, eletricidade e hidrulica [18], estruturas
de ao e estruturas de beto armado [19].
3. Mtodo de Investigao
O objetivo deste estudo foi a criao de uma ferramenta EVM / BIM capaz de apoiar os gestores
da construo durante a fase de execuo, mostrando o desempenho de custo e prazo num
modelo BIM. Para alcanar este objetivo, foi desenhado um modelo conceptual da ferramenta
para delinear o contexto da sua utilizao, os diferentes componentes, a tecnologia utilizada e
o modo de operar com a ferramenta. Em segundo lugar, foi criada uma tabela do Excel, onde
todos os dados de entrada necessrios para todas as tarefas do cronograma do projeto devem
ser inseridos manualmente. Esta folha permite executar o clculo dos diferentes indicadores
EVM de uma forma automtica, sendo estes apresentados por tarefa, em primeiro lugar, e, em
seguida, para todos os elementos que constituem o modelo de BIM, assumindo que todos estes
elementos so conhecidos. Em terceiro lugar, foi desenvolvido um algoritmo em Dynamo para
implementar a ligao automtica entre o ficheiro de Excel e o software BIM. O Dynamo um
suplemento de programao visual do Autodesk Revit que permite automatizar vrias
operaes baseadas no modelo BIM e foi, neste caso, utilizado para realizar uma troca de
informaes desde o Revit para o Excel, pela extrao de uma lista de todos os elementos e
suas propriedades a partir do modelo Revit para uma tabela, e do Excel para o Revit, pela
recolha de informaes de todos os elementos ao nvel do seu desempenho. Posteriormente,
com base nesses indicadores de desempenho, o Dynamo foi tambm usado para colorir os
elementos no modelo BIM de acordo com o seu indicador de desempenho. Para isso, foram
definidos 9 estados, que correspondem a 9 cores diferentes. Finalmente, vrios ensaios foram
realizados para testar o prottipo de ferramenta, com base num modelo Revit de uma casa
residencial.
466
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
= (1)
= (2)
467
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Neste estudo, necessria uma permuta de diversa informao entre o modelo BIM e o Excel.
Como j referido, o Dynamo foi a interface escolhida para realizar esta interoperabilidade
bidirecional, enquanto que o Excel foi usado para calcular o desempenho por elemento, depois
de receber informaes do Revit. Assim, o Dynamo foi utilizado para 4 funes essenciais, que
so apresentadas na Tabela 2.
468
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4.4 Desafios
O maior desafio do estudo foi a conexo entre a lista de atividades e a lista de elementos. At
ao presente, a ligao entre objetos e tarefas feita manualmente [1], visto no existir nenhum
processo automatizado para conectar objetos com as tarefas [7]. Nesta ferramenta, esta ligao
necessria porque, quando o desempenho por tarefa obtido, os elementos tm tambm de
ser creditados de um valor de desempenho. Normalmente, um planeamento apresenta o seguinte
formato ou, se no, fcil de se converter no seguinte formato:
1. Sapatas
1.1. Cofragem, etc.
Isto requer que a cada tarefa seja atribudo um nmero hierrquico como "1.1.2.". Portanto, a
soluo para isso criar no Revit um parmetro partilhado chamado "nmero da tarefa". O
nmero de tarefa de um elemento corresponde ao nmero da tarefa em que est envolvido. Esta
atribuio pode ser feita manualmente ou diretamente no Revit usando mais uma vez o
Dynamo, que mais expedito. O prximo passo envolve a transferncia da lista de elementos
469
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
com a respetiva identificao (ID) e o nmero da tarefa para a folha de Excel intitulada
"Desempenho por elemento".
5. Resultados
O prottipo foi testado num modelo Revit de uma casa residencial com uma tipologia T3, com
2 pisos e uma rea de 325 m2. Antes de se iniciarem as simulaes, foi elaborado um
cronograma de construo, com base no qual foram introduzidos os nmeros de tarefa
correspondentes a cada elemento no arquivo do Revit, desde a construo das fundaes at
instalao de mobilirio residencial. A introduo destes dados foi feita usando um cdigo de
Dynamo com o n "Element.SetParameterByName" que muda o valor de um parmetro para
um determinado valor de entrada.
De seguida, foram feitas simulaes correspondentes a dois cenrios distintos, um com as obras
a comear bem, mas a acabar de forma crtica e outro considerando a situao oposta. Estas
simulaes so apresentadas na Tabela 3.
470
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A Figura 3 ilustra os resultados obtidos em vista temporria, para as quatro simulaes que
representam o contorno da casa. No entanto, se o objetivo visualizar a parte no estrutural da
casa, tais como equipamento ou paredes divisrias, devem ser fornecidas outras vistas. Neste
caso, mais apropriado para fazer uma vista de corte da casa.
No entanto, a utilizao da ferramenta neste caso piloto possui vrias fragilidades. Em primeiro
lugar, a entrada manual de nmeros de tarefas no modelo Revit inconveniente, porque
bastante propenso a erros. Alm disso, a conexo no automatizada entre tarefas e elementos
requer que o cronograma, ou mais especificamente a ordem das tarefas, no mude. Caso
contrrio, a entrada de nmeros de tarefa tem de ser repetida e, para grandes projetos, pode ser
demorado. Em segundo lugar, uma vez que o Revit orientado a objetos, o nvel de detalhe do
calendrio no pode ser sempre transposto para o modelo. Por exemplo, a tarefa Acabamento
das paredes uma tarefa que no se considera de forma individual, porque o elemento "parede"
inclui todas as tarefas relacionadas com este elemento, inclusive as relacionadas com os
acabamentos. Alm disso, a conexo elemento / tarefa no necessariamente unvoca. Assim,
471
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
6. Concluses
A ferramenta EVM / BIM criada mostrou que o EVM uma tcnica de gesto poderosa que
permite ao utilizador visualizar facilmente o desempenho do custo e tempo de uma obra com a
ajuda de um sistema de cdigo de cores. O estudo piloto globalmente positivo. No entanto, as
simulaes apresentadas foram duas situaes extremas: uma otimista e outra pessimista.
Normalmente, a realidade mais complexa, por isso, a fim de verificar a sua verdadeira
eficcia, com um maior desenvolvimento, a ferramenta deve ser testada em condies reais.
Um caso de estudo concreto permitiria tambm ter algum feedback dos gestores da construo,
a fim de verificar se a ferramenta til para alert-los quando uma situao se torna crtica em
termos de prazo e/ou custo, e ajuda na tomada de decises mais eficientes. Finalmente, a
ferramenta tem um bom potencial para um uso mais automatizado.
Referncias
[1] C. Eastman, P. Teicholz, R. Sack and K. Liston, BIM Handbook, A Guide for Building
Information Modeling for Owners, Managers, Designers, Engineers and Contractors,
2nd ed., New Jersey: John Wiley & Sons, Inc., 2011.
[2] B. Hardin, BIM and Construction Management, Indianapolis: Wiley Publishing, 2009.
[3] R. Manning and J. Messner, Case studies in BIM implementation for programming of
healthcare facilities, ITcon, vol. 13, pp. 246-257, 2008.
[4] N. Chevallier and A. Russel, Automated schedule generation, Canadian Journal of
Civil Engineering, vol. 26, no. 6, pp. 1056-1077, 1998.
[5] E. Tauscher, E. Mikulakova, E. Beucke and M. Knig, Automated generation of
construction schedules based on the IFC object model, Computing in Civil Engineering
2009, pp. 666-675, 2009.
[6] M. Kataoka, Automated generation of construction plans from primitive geometries,
Journal of Construction Engineering and Management, vol. 134, no. 8, pp. 592-600,
2008.
[7] H. Kim, K. Anderson, L. SangHyun and J. Hildreth, Generating construction schedules
through automatic data extraction using open BIM (building information modeling)
technology, Automation in Construction, vol. 35, pp. 285-295, 2013.
[8] K. Sulankivi, K. Khknen, T. Mkel and M. Kiviniemi, 4D-BIM for Construction
Safety Planning, 2010. [Online]. Available:
http://www.vtt.fi/files/sites/bimsafety/bim_safety_cib2010_1167.pdf. [Accessed 11
November 2015].
[9] S. Zhang, J. Teizer, J.-K. Lee, C. M. Eastman and M. Venugopal, Building Information
Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and
Schedules, Automation in Construction, vol. 29, pp. 183-195, 2013.
[10] Q. Fleming and J. Koppelman, Earned value project management, 4th ed., Newtowns
Square: Project Management Institute, 2010.
472
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
473
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
474
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Joana Arajo (1), Jos Carlos Lino (2), Joo Pedro Couto (3)
Resumo
Ao contrrio de outras indstrias, onde se privilegia a produo em srie e em ambientes
controlados, a indstria da construo tem, em cada projeto, um produto nico, variando a
localizao, a forma e a diversidade dos materiais aplicados, o que dificulta a implementao
sistemtica de processos de gesto neste tipo de empreendimentos.
Este artigo tem como principal objetivo, apresentar um conjunto de ferramentas de gesto que
controlam melhor o tempo e o custo ao longo da construo, integrando-as com o BIM 4D e
5D.
1. Introduo
475
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
produtividade [1]. A competitividade no setor outra razo das mudanas que se vivem: a
necessidade de produzir mais, melhor e em menos tempo so um novo desafio para as empresas
do setor que queiram sobreviver no mercado [2].
Segundo vrios autores [3][5], a indstria da construo caracterizada por ser diversificada
em vrios domnios, comparativamente com outras atividades industriais.
Por outro lado, o ciclo-de-vida do projeto encontra muitas vezes situaes caticas na
contribuio de vrios agentes, que usam diferentes mtodos e formatos para organizar e
entregar a informao. De certa forma, estes fatores tendem a desencorajar os profissionais da
indstria AEC em colocar esforo na garantia da qualidade e especificao das tarefas do
projeto. Estando perante um desafio no desenvolvimento da sua produtividade, de uma forma
mais flexvel [3].
Numa obra existem fatores nos quais se associa um grau de incerteza, tais como acidentes de
trabalho, avarias ou condies atmosfricas inesperadas, entre outros. Contudo, a maioria dos
fatores de incerteza est ligada a fatores humanos resultantes de uma deficiente gesto do tempo
e dos recursos [6].
Um estudo feito por Paul Teicholz [7] sobre o declnio da produtividade na indstria da
construo, mede uma taxa geral de declnio com uma linha de tendncia de -0.32% por ano,
em contrapartida tendncia positiva de 3.06% por ano das indstrias no-agrcolas. Este
impacto ao longo de 48 anos bastante significativo (desde 1964 a 2012).
Building Information Modeling (BIM) uma das recentes tecnologias mais promissoras na
indstria da AEC [5], [8]. Segundo Eastman [5], num modelo BIM, um ou mais modelos
virtuais de um edifcio so produzidos digitalmente servindo de suporte ao projeto e aos seus
envolventes.
2. Enquadramento terico
476
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Assim, o EVM fornece um sistema de gesto que permite a monitorizao integrada, de custos
e prazos, fornecendo indicadores de desempenho sobre o estado do projeto e estimativas para a
sua concluso.
O Planned Value (PV) ou Budgeted Cost of Work Schedule (BCWS), em portugus Custo
oramentado acumulado para o planeamento ao longo do plano base, descreve a evoluo que
o projeto dever ter para qualquer ponto do planeamento.
O Earned Value (EV) ou Budgeted Cost of Work Performed (BCWP), o custo oramentado
dos trabalhos realizados para um determinado instante ou plano base.
Por fim, o Actual Cost (AC) ou Actual Cost of Work Performed (ACWP), o custo real dos
trabalhos realizados, ou seja, o que efetivamente foi gasto com os trabalhos realizados.
Estas trs mtricas podem ser representadas e interpretadas com base no grfico genrico da
Figura 1, sendo o PV, EV e o AC representados por trs curvas tipo-S, e medidos como referido
anteriormente a partir de uma data de estado (status date).
Com base nestas trs medidas e a introduo de uma quarta data, Budget at completion (BAC)
ou oramento total previsto na concluso do projeto, desenvolvem-se os restantes desvios/
variaes, ndices de medio e previses relativamente aos prazos e aos custos. O grfico da
Figura 1 permite representar estas relaes e dar informao das equaes de clculo, e a Tabela
1 em interligar medir os vrios ndices [9][11].
477
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tabela 1: Quadro de medio do projeto com base nos ndices de tempo e custo, [11].
2.2 BIM
Para alm de uma geometria paramtrica precisa, os modelos BIM contm datas e funes
necessrias no uso do ciclo de vida de um edifcio. Trazem mudanas na forma como a equipa
projetista se relaciona, pela integrao das fases de projeto e de construo numa plataforma
comum, resultando a otimizao da construo, reduzindo os custos e a durao dos projetos.
A Figura 2 mostra a evoluo trazida pelo BIM na interligao das vrias fases de trabalho a
iniciar no mesmo instante [13], [14].
2.2.1 BIM 4D
O BIM 4D consiste na adio do tempo ao modelo 3D paramtrico.
478
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2.2.2. BIM 5D
O BIM 5D consiste na adio do custo ao modelo BIM (4D) [8].
O 5D integra todo o tipo de informao das datas de custo, como quantidades, cronogramas e
oramentos [16].
Num estudo elaborado pela McGraw Hill Construction em 2012, [19], relata que a adio dos
custos (5D) ao BIM reconhecido ainda como um processo dificultado, mesmo que se
reconhea como um potencial valor do BIM no futuro, caso esta dificuldade seja ultrapassada.
Monteiro [20], reconhece ainda que a maioria das ferramentas BIM so capazes de realizar a
extrao de quantidades, mas no efetuam a estimativa de custo, que geralmente efetuada num
software diferente, sendo esta transferncia feita atravs de um ficheiro em formato IFC que
ainda no garante que a totalidade da informao transferida, existindo assim perda de
informao que pode levar, em ltima anlise a quantidades e estimativas incorretas.
Na primeira fase criaram-se modelos de vista que permitem o apoio s restantes fases.
Este esquema identifica os caminhos que foram percorridos para se fazer a gesto de obra e
explica tambm as relaes entre os vrios softwares usados e como se fez a passagem entre
eles.
479
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Por fim resultou uma anlise de gesto alicerada numa animao 4D e num modelo esttico
de cores identificativas do estado da construo.
A modelao 3D destas componentes foi feita de acordo com o faseamento construtivo, para
que houvesse uma melhor interao entre o modelo virtual e a realidade e facilitasse mais tarde
na ligao das tarefas do planeamento no modelo 4D. Como exemplo, os pilares estruturais
foram modelados por pisos, o que permite sequenciar o seu processo construtivo em alturas de
betonagem por nveis.
Para a modelao utilizou-se o software Revit 2016, e foram modeladas todas as especialidades,
em primeiro as estruturas, a arquitetura e por ltimo as instalaes MEP ( exceo das redes
eltricas), resultando no modelo federado da Figura 5.
480
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
481
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O software usado para determinao das incompatibilidades foi o Solibri Model Checker
(SMC), da Nemetschek group, por se tratar de um software bastante completo, no sendo s um
identificador das clashes mas um bom gestor dos projetos em ambiente BIM.
A interoperabilidade entre o Revit e o SMC fez-se atravs de trs ficheiros IFC 2x3 (Estruturas,
Arquitetura e MEP). A coordenao dos trs ficheiros automtica no solibri, atribuindo a cada
IFC um tipo de servio.
A deteo um processo iterativo entre os softwares Revit e SMC, sendo que as regras
encontram-se por defeito no Solibri atravs de um ficheiro (.cset).
Uma vez que se trata de um modelo completo envolvendo todas as especialidades da AEC,
necessrio verificar as compatibilidades entre todos os tipos.
Por fim apresenta-se na Figura 8 a coordenao entre o Solibri e o Revit lado a lado e respetiva
correo efetuada no Revit na Figura 9.
482
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.4 Simulao 4D
A simulao 4D da construo baseia-se na ligao das tarefas do cronograma/planeamento aos
objetos da modelao 3D, em funo do tempo e do espao, originando um vdeo 4D.
importante referir que quanto mais detalhado for o planeamento maior a qualidade da
simulao. Deve tambm haver uma coerncia entre o planeamento e a modelao 3D tal como
referido no subcaptulo da modelao.
A WBS presente na Figura 10 foi criada pelo Project estruturando as tarefas da construo para
este artigo.
Por fim, criou-se duas funes no Project, a week number e a week number finish que
registam em que semana (do ano) corresponde as datas de inicio e fim planeadas. Estas funes
iro guiar na construo das tabelas dinmicas no Excel e do informao ao utilizador (gestor
de obra).
483
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
a) b) c)
Figura 11: a) Planeamento por semanas; b) Custos e datas das tarefas; c) Ligao Excel.
Esta folha pode ser atualizada sempre que houverem alteraes feitas no software de simulao.
As colunas das tarefas Name (Figura 11-(a)), do registo das semanas de inicio e fim (colunas
X e AB da Figura 11-(b)) e as colunas de custo (ver colunas T, Z e AA da Figura
11-(b)) encontram-se conectadas as restantes folhas para a anlise EVM do Excel, de modo a
que a informao seja introduzida e editada de forma automtica.
Pela recolha dos dados dos custos e datas, referidos no subcaptulo 4.2, determinou-se
automaticamente os acumulados do PV (azul), EV (verde) e AC (vermelho) e criou-se o grfico
da Figura 12.
484
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Pela anlise do grfico verifica-se que ao longo das semanas 12 a 15 e 23 a 29, a curva EV est
por cima da curva PV, ou seja, que se realizou mais trabalho do que o planeado fazer nessas
semanas (em termos monetrios), e nas semanas 15 a 23 realizou-se menos trabalho do que o
planeado, em que no primeiro caso a curva AC est acima da EV e no segundo intervalo abaixo
da EV, sucessivamente no primeiro caso gastou-se mais do que o que se planeou, e no segundo
caso gastou-se menos do que planeado.
CV 0,00 0,00 0,00 2 556,06 0,00 0,00 0,00 -10 056,90 -7 781,73 -25 642,46 -35 003,18 -30 686,77
SV 1,00 1,00 1,00 0,00 0,00 0,26 0,14 -0,14 -0,17 -0,19 -0,20 -0,17
(%)
CV 1,00 1,00 1,00 1,00 0,00 0,00 0,00 -0,10 -0,06 -0,18 -0,21 -0,16
(%)
SPI 1 1 1 1,0 1,0 1,3 1,1 0,9 0,8 0,8 0,8 0,8
CPI 1,0 1,0 1,0 1,0 1,0 1,0 1,0 0,9 0,9 0,8 0,8 0,9
Pela consulta do quadro da Tabela 1 presente no captulo 2 percebe-se que o projeto na semana
19 de estudo est atrasado e abaixo do oramento.
485
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O modelo de cores (Override de cores) resulta pela seleo desses objetos e pela atribuio da
cor que se pretende (ver exemplo da Figura 13), em que os objetos da semana 19 se encontram
pintados a vermelho.
5. Concluses
O desenvolvimento de trabalhos em BIM permite acrescentar valor aos projetos, sem perda de
informao, com as vrias especialidades.
Assim, o objetivo deste artigo consistiu em agregar a vria informao do modelo, fornecendo
bases que poderiam antecipar os problemas a surgir em obra (compatibilizao da modelao),
e apresentar ferramentas para a gesto dos custos e do tempo ao longo da construo.
Com base nestes pressupostos concluiu-se que a criao de modelos de vista e de parmetros
para cada objeto da modelao, no software Revit 2016 contribuiu para uma eficiente
visualizao/ filtro da informao e facilitou nos processos envolvidos no restante software
486
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
(SMC e Navisworks Manage 2016), uma vez que o parmetro SUBDISCIPLINE passou
eficazmente atravs de um ficheiro IFC ou por exportao direta (no caso do Navisworks).
Referncias
487
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
488
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A metodologia Building Information Modelling (BIM) aplica-se a todo o ciclo de vida da
construo. Hoje, j possvel identificar mltiplos casos de estudo a nvel internacional, desde
as fases de planeamento e programao, passando pelos projetos, construo e fabrico, at
fase de operao e manuteno. O presente artigo foca-se na fase de preparao, fabrico e
montagem de estruturas.
489
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Para tal ser apresentado um caso de estudo de aplicao prtica, promovido pelas empresas
BIMMS-BIM Management Solutions e ImasD Consult, na modelao e preparao da
construo de uma estrutura complexa de apoio a um moinho de cru numa cimenteira na
Bolvia. A estrutura composta por fundaes em beto armado ps-esforado para apoio de
uma torre de um moinho Quadropol, da ThyssenKrupp [3] (ver figura 1), inserido numa
cimenteira em Oruro, na Bolvia, com a particularidade desta obra se localizar a 4500 metros
de altitude.
490
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Organizao e Planeamento
491
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Modelao BIM
492
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A modelao dos elementos de beto armado, pr-esforo e armaduras ativas e passivas foi
integrada num nico modelo, devido a questes de montagem e execuo. Desta forma,
conseguiu-se montar o modelo de acordo com um sistema de classificao definido para esta
obra. Este sistema contempla a zona da cimenteira, o equipamento, o elemento e a fase de
betonagem.
As armaduras foram organizadas e agrupadas de acordo com a nomenclatura definida no projeto
de estruturas. Como a modelao ocorreu, lado a lado, com o projeto de estruturas, o modelo
BIM tornou-se essencial no agrupamento de armaduras para fabrico, uma vez que, em casos
especficos, a apresentao bidimensional no permitiu obter uma perceo real da totalidade
das armaduras envolvidas. Assim, o modelo BIM possibilitou uma verificao contnua do
projeto com consequncias diretas na produo. Na figura 3 apresenta-se a imagem final deste
modelo, igualmente com quatro torres, que j permite uma noo da complexidade envolvida.
493
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Coordenao BIM
Como aludido anteriormente, a equipa de trabalho neste projeto foi bastante vasta. A
coordenao acabou por ser um processo complexo, mas que veio ser simplificado e otimizado
com a utilizao das seguintes plataformas distribudas para comunicao e colaborao:
Tekla BIMSight;
Trimble Connect;
ImasD VirtualOffice;
AtView.
O Tekla BIMSight um software gratuito com ferramentas de coordenao que permitiu efetuar
deteo de colises entre modelos e comunicar via modelo 3D.
AtView a plataforma de gesto de ficheiros utilizada pelo cliente final e disponibilizada para
partilha de documentao a todos os intervenientes no projeto.
494
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A plataforma de trabalho colaborativo ImasD Virtual Office consiste num sistema de mquinas
virtuais com processamento grfico real por hardware, utilizando sistema de acesso seguro por
NetScaller e optimizado por Citrix para rendimento grfico remoto superior.
Esta plataforma permite o acesso remoto a uma rede privada para trabalho colaborativo
utilizando neste caso o software de modelao Tekla Structures na sua funcionalidade de
MultiUser.
Na Figura 6 apresenta-se uma imagem utilizada numa reunio de coordenao para a discusso
do posicionamento das ancoragens do sistema de pr-esforo das torres. O processo para
preparao e agendamento das reunies de coordenao semanais foi organizado com base no
modelo BIM. O coordenador de projeto da equipa ImasD/BIMMS produzia um documento
formal onde constava os assuntos a discutir e apresentava como anexo um ficheiro Tekla
BIMSight com os mesmos assuntos, para uma prvia anlise por todos os intervenientes.
495
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluses
O presente trabalho permitiu acompanhar todas as fases de projeto e construo de uma obra
de elevada dimenso e complexidade atravs de ferramentas, aplicaes e plataformas BIM. A
documentao e detalhamento de todos os processos permitiu equipa uma constante
otimizao de recursos e produtividade graas clareza do sistema montado. Alm disso, este
projeto possibilitou identificar e aferir os requisitos tcnicos para equipas de trabalho idnticas,
no futuro.
Relativamente fase de projeto de execuo e montagem, apesar de este tipo de trabalho j ser
uma prtica corrente no mercado das estruturas metlicas, a aplicao do detalhe do beto
armado pr-esforado demonstrou-se essencial, quer na coordenao de projeto, quer na
construo.
Finalmente, importa tambm referir que a utilizao de ferramentas BIM neste projeto permitiu
facilitar a comunicao com o exterior, isto , com operadores da cimenteira, cliente e mesmo
com futuros clientes (ver figuras 8 e 9).
496
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
497
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
498
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Parte IV
BIM na gesto de operaes e manuteno
499
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
500
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
As instalaes das instituies de Ensino Superior, que no caso do ISCTE-IUL esto
concentradas num campus no centro de Lisboa, so usadas diariamente por vrios milhares de
utentes, acolhem inmeros eventos e o exerccio prprio da instituio e requerem
investimentos constantes de manuteno, renovao e adaptao. Ao contrrio de outros ativos
estratgicos a sua gesto frequentemente suportada por instrumentos informais: folhas de
clculo, documentao em papel e registos pessoais, tornando-se difcil controlar e planear
operaes e custos globais de manuteno por equipamento ou sistema. Por outro lado, os
desenhos tcnicos das instalaes esto dispersos e no so fiis realidade construda, o que
tambm dificulta as operaes de manuteno, modernizao e estudo de cenrios de melhoria.
Perante este cenrio, o ISCTE-IUL montou uma equipa multidisciplinar, tendo-se definido uma
metodologia para o desenvolvimento de uma soluo hbrida de gesto de edifcios e apoio ao
utilizador. A primeira etapa consiste na uniformizao e verificao no terreno dos desenhos
dos projetos incluindo equipamentos fixos e mveis e redes, numa Base Digital de Desenhos
em 2D CAD. A segunda etapa consiste na migrao desta informao para um modelo BIM,
mais completo e fcil de atualizar, principalmente no que diz respeito extrao de mtricas.
Simultaneamente com estas duas tarefas realizada a anlise, levantamento e especificao de
requisitos de uma aplicao web que, interligada com o modelo BIM, ir registar intervenes
de manuteno programada e reativa, oramentos, controlo de stocks de material de reparao
e restantes operaes.
501
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
As ferramentas bsicas para a gesto de instalaes variam desde a coleo de folhas de clculo,
desenhos e manuais de equipamentos em pastas e arquivos em papel ao know-how dos
funcionrios sobre as instalaes. Existem no mercado ferramentas informticas que vo desde
a gesto de equipamentos e operaes dirias (Computer Aided Facility Management - CAFM)
aos sistemas de gesto total de patrimnio incluindo arrendamentos, energia, hospitalidade ou
helpdesk (Integrated Workspace Management System - IWMS) [1], [3]. Estes sistemas agregam
informao atualizada, disponibilizam interfaces uniformes, perfis de utilizador com diferentes
nveis de acesso, conduzem os processos, disponibilizam ferramentas de reporting e ligam-se
aos departamentos financeiros, de compras, ou de patrimnio. Tal como acontece com qualquer
502
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Metodologia
2.1 A Equipa
Para responder necessidade de modernizao do funcionamento integrado das unidades do
ISCTE envolvidas na gesto do campus, montou-se uma equipa multidisciplinar composta por
tcnicos de vrias reas. O grupo Digital Living Spaces (DLS) do Centro de Investigao em
Cincias da Informao, Tecnologias e Arquitetura (ISTAR-IUL) um centro de investigao
nas reas de Desenho Assistido por Computador e ferramentas digitais interativas, Realidade
Virtual e Aumentada aplicadas Arquitetura e Construo ([4][7]). Ao Gabinete de
Desenvolvimento de Sistemas de Informao (GDSI) compete conceber e manter os sistemas
de informao bem como garantir a integrao dos mesmos promovendo o aumento contnuo
da qualidade do ensino e investigao no ISCTE-IUL. Finalmente, e com papel fulcral, a
Unidade de Edifcios e Recursos (UER) a unidade que faz a gesto dos edifcios e
infraestruturas do campus e tem procurado implementar sistemas que tornem esta gesto mais
eficiente.
503
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Apesar de estar ao corrente das solues existentes no mercado para gesto de infraestruturas,
o ISCTE-IUL no as adotou devido expectativa de difcil adequao aos sistemas em uso e
ainda aos custos de licenas e de atualizao.
A equipa interna da UER sentia h vrios anos a necessidade de basear a sua atividade em
melhor informao e num sistema de controlo de processos formal e baseado em ferramentas
que refletissem de forma atualizada o estado dos edifcios e sistemas associados. Nasceu assim
este projeto, em ligao com as restantes unidades da instituio como a Qualidade,
Comunicao, Servios Acadmicos e de Apoio Investigao.
504
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A BDD tem por base uma hierarquia de ficheiros CAD em quatro nveis e por edifcio,
permitindo o trabalho simultneo de diferentes utilizadores em matrias especficas. Para a
introduo de toda a informao de geometria e especialidades de forma codificada e uniforme
adotou-se a Norma EN ISO 13567 [9], facilitando tambm a filtragem de informao no s
enquanto se utiliza a base CAD, como tambm na relao com a aplicao web, e na
organizao e visualizao de desenhos produzidos para distribuio (formato PDF). medida
que este trabalho foi avanando, os tcnicos da UER foram solicitando no s desenhos, mas
tambm listas de quantidades, reas, etc. Por outro lado, verificou-se que a representao de
equipamentos como mesas, cadeiras ou sanitrios, atravs de blocos com atributos, era
insuficiente para listar a informao necessria e relacion-la com outras aplicaes. Tornou-
se evidente que se estava a aumentar a ferramenta CAD (Autocad 2016) para cumprir o papel
de um BIM, tendo-se ento tomado a opo de terminar o levantamento da geometria em 2D
em algumas das especialidades, mas arrancar com o modelo BIM, substituindo-se gradualmente
os processos de trabalho. No obstante, foi dada formao presencial e na plataforma interna
de e-learning e a BDD 2D j usada internamente e diminui a necessidade de verificaes no
terreno, facilita a comunicao e interao com fornecedores e disponibiliza alguns valores
fiveis que servem de base s avaliaes de desempenho de equipas de manuteno.
505
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Aps a concluso da BDD, a metodologia traada (figura 2) comea pela reviso dos projetos
de arquitetura e restantes especialidades lgica BIM, e extruso da geometria elaborada em
2D para 3D, conforme ilustra a figura 3.
Figura 3: Vista dos modelos dos edifcios do campus ISCTE-IUL em diferentes estgios do
processo de modelao. Cada edifcio modelado separadamente sendo referenciado no
modelo global e inserido no modelo da envolvente urbana (no visvel nesta figura).
506
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
necessrios para simular e projetar alteraes nos espaos, calcular capacidades de ocupao e
alocao de equipamentos, entre outros.
Os principais usos do modelo BIM, dividido numa hierarquia de ficheiros de acordo com
especialidades e com os diversos edifcios, sero:
Visualizao do campus para a comunicao institucional, sinaltica, desenhos 2D,
aplicaes de navegao, suporte aos projetos de intervenes no campus, sistemas de
realidade virtual e aumentada, entre outros;
Sincronizao com informao sobre os espaos contida em diversos sistemas tal como
ocupao (funcionrios, unidades de ensino e de investigao, espaos de estudo,
restaurao, etc.), caratersticas dos espaos (como tipo de iluminao, capacidade,
conforto, idade, ventilao);
Compilao, armazenamento e tratamento de informao referente aos equipamentos
mais relevantes, no s no que diz respeito informao geomtrica (caractersticas e
localizao) mas tambm caractersticas como fabrico, fornecedor, ligao a manuais
de instrues, garantias, datas de manuteno, etc.
Gerao de relatrios escritos e grficos sobre a informao contida no modelo,
satisfazendo os requisitos regulares de vrias unidades, mas tambm para apoiar a
tomada de deciso e o planeamento estratgico da instituio (figuras 4 e 5).
Uma das dificuldades prticas encontradas no processo de trabalho colaborativo em BIM, foi a
de permitir a vrios utilizadores aceder e contribuir para o mesmo modelo e de forma sncrona.
Os testes feitos com pastas de rede, atravs de servidor interno do ISCTE-IUL, no se
traduziram nos resultados expetveis, no sendo possvel sincronizar ficheiros, locais e centrais,
devido a permisses de escrita definidas ao nvel dos servidores, eventualmente devido
estrutura complexa da rede do ISCTE. A soluo atualmente em testes passa pela utilizao de
pastas de rede que acedem diretamente cloud da Microsoft (www.onedrive.com).
507
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 5: Planta de espaos de acordo com as suas afetaes: circulao, sala de aula,
gabinete, etc.
508
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Surge, portanto, a necessidade de fornecer uma aplicao que facilite a misso da UER
permitindo, por um lado, a correta gesto das equipas de interveno na resposta a anomalias
comunicadas por terceiros (figura 6) ou na realizao de tarefas inerentes ao plano preventivo
de manuteno e, por outro lado, que toda a informao associada (equipamentos, inventrio)
fique organizada de forma a ser facilmente consultvel e pesquisvel.
No mbito desta iniciativa est em curso a especificao funcional de uma aplicao de suporte
a atividade da UER enquanto ferramenta de acompanhamento e monitorizao de atividades de
interveno nos espaos e equipamentos do campus universitrio. Pretende-se assim constituir
uma base de informao facilmente acessvel e rastreavel, que permita realizar diferentes tipos
de anlise de dados e constituir indicadores de desempenho relacionados com a atividade da
UER.
A aplicao ser desenvolvida segundo uma metodologia Web responsiva para permitir o
acesso e a manipulao da informao atravs de todo o tipo de dispositivos fixos e mveis. A
construo da aplicao ir culminar no desenvolvimento de um conjunto de funcionalidades
que permita cumprir os seguintes objetivos:
Constituio de histrico de aes realizadas sobre espaos, equipamentos e sistemas,
incluindo os custos com materiais, mo-de-obra e outros meios associados;
Avaliao de desempenho dos prestadores de aes interventivas e monitorizao do
nvel de satisfao dos utentes do campus face s intervenes realizadas;
Interligao com informao grfica na BDD de modo a: promover a integrao de
novos projetos; realizar o acompanhamento das respetivas obras; constituir inventrio
de espaos, sistemas e equipamentos georreferenciados;
Realizao de anlises econmicas ao ciclo de vida dos equipamentos (relao de custos
de investimento, operao, conservao, abate e oportunidade) e estimativa de custos
de explorao por espao para imputao de custos em eventos ou atividades letivas
Integrao com sistemas de gesto tcnica centralizada para efeitos de monitorizao e
minorao de consumos e horas de funcionamento de equipamentos;
Interligao com o modelo BIM para permitir o acesso fixo e mvel, atravs de
realidade virtual, a espaos e equipamentos e a contabilizao rigorosa da durao das
aes realizadas sobre espaos, equipamentos e sistemas para reduzir o erro das
estimativas de custos com mo-de-obra associadas a essas aes.
509
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Trabalho Futuro
Para alm do plano de trabalho exposto atrs, pretende-se expandir o sistema integrado em
diversas direes:
Integrao com sensores existentes nos edifcios, nomeadamente leitores de cartes de
abertura de salas;
Ligao com sensores ambientais e de consumo de gua e eletricidade e com sistemas
de Gesto Tcnica de Edifcios;
Integrao com sistema de gesto acadmica para representao de informao, tal
como histrico de utilizao de espaos;
Disponibilizao online de informao comunidade interna e externa.
510
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Produo de modelos para navegao virtual pelo Campus com vista promoo externa do
ISCTE-IUL e incluso em quiosque digital para apoio aos utilizadores usuais e ocasionais com
informao sobre servios, sua localizao e navegao, horrio, contactos, status, filas espera.
Finalmente, pretende-se com este trabalho receber a opinio e os contributos da comunidade
tcnica e cientfica e, de futuro, transmitir o know-how ganho atravs de comunicaes tcnicas
e cientficas regulares, prestao de servios e produtos de ensino.
Referncias
[1] K. O. Roper and R. P. Payant, The Facility Management Handbook, 4th ed. American
Management Association, 2014.
[2] B. Becerik-Gerber, F. Jazizadeh, N. Li, and G. Calis, Application Areas and Data
Requirements for BIM-Enabled Facilities Management, J. Constr. Eng. Manag., no.
March, pp. 431442, 2012.
[3] E. Teicholz and IFMA Foundation, Technology for facility managers: the impact of
cutting-edge technology on facility management. Hoboken, New Jersey: John Wiley &
Sons, 2013.
[4] McGraw Hill Construction, The Business Value of BIM for Owners, 2014.
[5] GSA, BIM Guide for Facility Management, 2011.
[6] BIMForum, Level of Development Specification, 2015.
[7] R. G. Kreider and J. I. Messner, The Uses of BIM: Classifying and Selecting BIM Uses
(v 0.9), 2013.
[8] Brian Haines (FM:Systems), The Benefits of Lifecycle BIM for Facility Management |
FM Systems, 2016. [Online]. Available: https://fmsystems.com/blog/the-benefits-of-
lifecycle-bim-for-facility-management/. [Accessed: 02-Sep-2016].
[9] NP ISO 13567 - Documentao tcnica de produtos. Organizao e designao de
camadas (layers) em CAD. Parte 3: 2011.
[10] Chuck Eastman, Paul Teicholz, Rafael Sacks, and Kathleen Liston, BIM Handbook: a
guide to building information modeling for owners, managers, designers, engineers and
contractors, 2nd ed. John Wiley & Sons, 2011.
[11] Y. Wang, X. Wang, J. Wang, P. Yung, and G. Jun, Engagement of Facilities
Management in Design Stage through BIM: Framework and a Case Study, Adv. Civ.
Eng., vol. 2013, no. 189105, 2013.
511
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
512
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Esta investigao visa explorar as potencialidades da tecnologia BIM (Building Information
Modelling) aplicadas a procedimentos de gesto e manuteno de edifcios pr-existentes, mais
especificamente, de edifcios patrimoniais. A tecnologia BIM, centrada no conceito de Objeto
e vocacionada para a descrio tridimensional do ambiente construdo, baseia-se numa
metodologia de trabalho mais aproximada da realidade. Permite-nos a sua descrio e
representao de um modo holstico (ao descrever o objeto construdo atravs de escalas de
maior e de menor detalhe) e complexo (ao integrar um conjunto de dados geomtricos e no
geomtricos e a possibilidade de parametrizar objetos). A aplicao da tecnologia BIM a
edifcios patrimoniais permite fixar para memria futura a sua verdade construtiva, registar
intervenes e adaptaes, divulgar o patrimnio junto de um pblico mais vasto e/ou
longnquo, preservando simultaneamente a fragilidade da sua construo. No entanto, no
existem muitos exemplos disponveis que permitam aprofundar o conhecimento sobre estas
vantagens. A abordagem desenvolvida recorreu a um caso de estudo o Convento dos
Capuchos situado na Caparica, em Almada, patrimnio municipal e espao vocacionado para
eventos de msica erudita de carter intimista. A maquete virtual deste convento franciscano
foi desenvolvida considerando todos os dados disponveis sobre o edifcio e procurando
detalhar, sobretudo, os seus aspetos geomtricos e construtivos. Esta abordagem permitiu
descrever cenrios demonstrativos do modo como a base de dados criada pode ajudar na
manuteno e gesto correntes deste edifcio patrimonial.
1. Introduo
Tendo em conta os tempos acelerados que se vivem nos dias de hoje, torna-se cada vez mais
prtico e til possuir ferramentas, nos campos da engenharia, arquitetura e construo, que nos
facilitem a comunicao e eficincia no trabalho. Para tal encontramos mltiplos softwares
centrados no conceito de Objeto, assim vocacionados para a tridimensionalidade, justificando
a sua existncia por se basearem numa metodologia mais aproximada da realidade - a linha
abandonada em detrimento do slido. Estas ferramentas digitais permitem uma viso mais
513
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Consideradas algumas das vantagens do BIM, importa referir a sua aplicao somente em novos
projetos e construes, ou seja, em obras que se encontram na fase de conceo e execuo.
Faltando assim o enquadramento nas fases posteriores, de explorao, como o caso da fase de
utilizao e manuteno ou ainda a fase posterior a esta, de reabilitao ou demolio.
As potencialidades desta ferramenta so numerosas neste campo. Como por exemplo, o clculo
de alternativas e otimizaes; a mitigao de riscos ou o limitar de custos; uma gesto de
recursos mais eficiente; o planeamento de uma demolio de infraestruturas complexas; a
criao de agendas de demolio; o planeamento de remodelaes; a gesto na segurana no
trabalho; a aprimorada colaborao, documentao, gesto de dados e visualizaes; a
contabilizao da eficincia energtica e emisses acrescidas das demolies [2].
Se somarmos estes atributos vantajosos, que o BIM pode acrescentar aos edifcios pr-
existentes, aos benefcios decorrentes do seu uso em edifcios patrimoniais, encontramos uma
vasta gama de vantagens asseguradas por esta ferramenta. De facto, a introduo do BIM no
campo do patrimnio construdo capaz de suportar a gesto da informao colectada,
514
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A modelao BIM serve assim como um inteligente dossi electrnico de dados sobre um
artefacto, durante as actividades de investigao e conservao, integrando a representao
geomtrica e os dados no geomtricos.
515
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Convento dos Capuchos da Caparica localiza-se no topo de uma extensa escarpa em frente
ao Oceano Atlntico a arriba fssil da Costa da Caparica. Esta paisagem protegida prolonga-
se ao longo da faixa costeira por uma distncia de 13km, cobrindo 1599 hectares (Figura 1).
Antigamente, esta arriba fssil estava em contacto direto com o mar, porm, com a regresso
marinha, tal deixou de acontecer, apesar deste elemento, a gua, continuar a ser a referncia de
contemplao, e a dominar as vistas e perspetivas que se obtm daquele lugar.
Numa gramtica construtiva que, em larga medida, se mostraria transversal s vrias provncias
capuchas, os Estatutos arrbidos descriminavam cuidadosamente as caractersticas dos diversos
espaos conventuais (Figura 5), assumindo como grandes elementos definidores a igreja, de
planta retangular, e o claustro, quadrangular, em torno do qual se alinhavam a maioria das
restantes dependncias (Figura 2).
Este documento/livro dos Estatutos da Provncia de Santa Maria da Arrbida, escrito pelos
primeiros frades que se estabeleceram na Arrbida, funciona como uma espcie de RGEU
(Regulamento Geral de Edificaes Urbanas) para os conventos capuchos, i.e, aqui so
descritas as normas construtivas necessrias edificao de um convento pertencente Ordem
dos Frades Menores Capuchinhos.
Segundo os critrios de classificao nacionais, o edifcio escolhido para servir de estudo de
caso do presente artigo insere-se na categoria de Imvel de Interesse Municipal ou Patrimnio
516
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 2: Perceo volumtrica do Convento dos Capuchos da Caparica a partir de uma vista
area. Fonte: Bing Maps, 2016.
No sculo XIX, com a extino das ordens religiosas em Portugal, ocorrida no contexto da
consolidao do liberalismo no pas, ao final da guerra civil portuguesa (1828-1834), a casa dos
frades capuchinhos na Caparica acaba por conhecer o seu fim, apesar de temporrio (Figura 3).
bem conhecido que a animosidade se fora instalando e crescendo face s ordens religiosas,
desde finais do sculo XVII, quer por certa decadncia interna das prprias ordens e
congregaes, quer por toda a mentalidade iluminista do sculo XVIII que com dificuldade
entendia o papel da dimenso contemplativa da vida religiosa.
517
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Desta forma a imagem do convento passa a afirmar a sua vocao para o acolhimento de
mltiplas iniciativas (Figura 4), desde a realizao de espetculos a exposies e conferncias.
A msica, atravs de ciclos de concertos entre o repertrio medieval e moderno e as expresses
mais contemporneas, cruza-se com outras linguagens e discursos, presentes,
fundamentalmente nas diversas exposies, propondo percursos pela pintura ou pela escultura,
pela fotografia ou pela joalharia, pela arte sacra ou pelo patrimnio mvel [5].
Figura 4: Instalao artstica no trio (24 de Outubro de 2015). As colunas foram cobertas por
espelhos, permitindo um jogo de perspetivas e visualizaes aos seus utilizadores como forma
de explorar a sua luz, espao e tempo de diferentes maneiras. Fontes: Ana Tom, 2016.
518
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A exposio permanente do convento, sobre o prprio edifcio em si e sua histria, foi tambm
uma tima fonte de recolha de informao. Outro elemento importante de recolha de dados de
apoio investigao foram os, j referidos anteriormente, Estatutos da Provncia de Santa Maria
da Arrbida, como forma de perceber a origem do convento, as necessidades de quem o habitou
regularmente ao longo da histria, assim como, o trao definidor caracterstico dos cenbios da
Ordem dos Frades Menores Capuchinhos (Figura 5).
Figura 5: Primeira pgina dos Estatutos da Provncia de Santa Maria da Arrbida. Fonte:
Caeiro e Fontes, 2013.
519
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Outra grande fonte de informao foi o Diretor do Convento dos Capuchos cuja colaborao
mostrou-se essencial. Em conjunto houve uma reflexo sobre quais as caractersticas que o
modelo BIM deveria incorporar de modo a se tornar til e preencher as necessidades
particulares deste espao de ndole cultural.
De um modo sucinto, toda esta informao foi muito importante para obter o modelo final,
sendo que os dados geomtricos influenciaram diretamente a execuo do modelo e os dados
no geomtricos tiveram uma influncia indireta.
520
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Modelou-se primeiro os objetos mais simples ou regulares, como pavimentos, paredes, tetos,
coberturas, escadas e rampas. Para os objetos mais complexos e que fugiam a esta regularidade,
pelo seu detalhe ou forma especial, criaram-se famlias.
521
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 7: Vista area poente do modelo BIM do Convento dos Capuchos da Caparica.
As Famlias, foram utilizadas para criar os vos (janelas, portas e vos simples) e ornamentos
que o convento possu. O detalhe nestes objetos atingiu a medida mnima de 5mm.
Em larga medida foi este tipo de objetos que conferiu uma maior autenticidade ao modelo, uma
vez que foram modelados todos os pormenores de acordo com a realidade existente.
Figura 8: Render da Janela com caixilho 3x4 - exemplo de uma Famlia existente no
modelo BIM do Convento dos Capuchos da Caparica.
Figura 9: Renders do interior do claustro, atualmente (esquerda) e nos anos cinquenta (direita)
do modelo BIM do Convento dos Capuchos da Caparica. Pode observar-se a alterao do
pavimento e o desaparecimento dos espelhos de gua.
522
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Tendo todas as partes criadas envolvente, convento atual e convento antigo e estando os
modelos dos edifcios conventuais ligados ao modelo do territrio, poder-se-ia dar como
terminado o trabalho de modelao efetuado. Porm, como forma de dar a conhecer a
reconstituio digital desenvolvida a um pblico mais vasto, exportou-se o modelo do Revit
para um formato que atualmente se pode considerar universal, o Adobe Acrobat Reader, criando
um PDF 3D de todo o modelo.
Como demonstrado na seo anterior, foi possvel criar um modelo tridimensional do Convento
dos Capuchos da Caparica e rea de implantao onde o mesmo se insere, o qual, por ter sido
desenvolvido num software BIM, fornece partida uma panplia de informao sobre os
objetos modelados, como por exemplo, a materialidade ou dimensionamentos dos objetos
criados. Foram ainda realizados dois modelos concernes a duas pocas distintas, dando assim a
conhecer as duas principais intervenes ao qual o edifcio esteve sujeito. De notar que a
modelao no contemplou o estgio original por falta de informao e documentao sobre o
mesmo, visto que o convento foi fundado no sculo XVI. No entanto, e dado ser um modelo
BIM, esta informao pode ser incorporada posteriormente dada a pretenso do Municpio em
dar continuidade investigao histrica e arqueolgica sobre a fundao deste espao
conventual.
523
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Concludo o trabalho prtico e terico relativo ao caso de estudo, foi possvel sistematizar
algumas ilaes quanto aplicao da tecnologia BIM no patrimnio edificado. Sublinhe-se,
porm que, s com a experincia e prtica desta atividade relativa preservao do patrimnio
usando a metodologia BIM, que se poder aprofundar resultados, identificar benefcios mais
especficos e quantificar melhor a utilidade deste processo.
Quanto parte grfica constatou-se que a aplicao da tecnologia BIM na representao fornece
um ambiente de modelao capaz de melhorar a gesto da informao, alcanando uma clareza,
consistncia e coordenao de todo o conhecimento disponvel para o perfeito entendimento do
edifcio que, de outra maneira, no existiria. Desta forma, a gesto e manuteno dos edifcios
beneficia das propriedades visuais do BIM, j que estas mesmas propriedades elevam o grau da
visualizao da informao disponvel, fator este que se traduz numa perceo da realidade
mais coerente, acessvel e completa.
524
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
do mesmo ao pblico, numa webpage ou numa aplicao, possibilitando aos utilizadores uma
navegao ou visita virtual pelo convento nunca antes conseguida.
H, porm, uma falta de uso do BIM em patrimnio como forma de mostrar o quo til poder
ser a conjugao desta ferramenta a este tipo de estruturas. J se tem estudado e verificado os
benefcios desta utilizao das novas tecnologias ao servio da herana cultural edificada, como
foi referido anteriormente, todavia, a parte prtica continua a ser o ncleo ou a chave dos
acontecimentos futuros. Por essa razo torna-se relevante que alguma entidade comece ou inicie
este processo, para se terem resultados mais especficos, que justifiquem e sugestionem outras
entidades, por sua vez, a usarem tambm esta metodologia de preservao do patrimnio.
Referncias
[1] J. Garcia and J. Leito, BIM value, in Revit Course by Lusocuanza (2014), Lisbon,
Portugal, 2014, pp. 6.
[2] F. Schultmann, J. Stengel and R. Volk, Building Information Modelling (BIM) for
existing buildings Literature review and future needs, Automation in Construction,
vol. 38, pp. 109-127, December 2013. doi: 10.1016/j.autcon.2013.10.023.
[3] G. Carrara, S. Cursi, D. Simeone and I. Toldo, BIM and knowledge management for
building heritage, Acadia 2014, pp. 681-690, 2013.
[4] Dirio da Repblica n 209/01 - IA Srie, Portaria n 107/01 de 8 de setembro de 2001,
Lei Fundamental do Patrimnio Cultural Portugus, 2001.
[5] N. Caeiro and J. Fontes, O Convento dos Capuchos Vida, Memria e Identidade
Catlogo da Exposio. Cmara Municipal de Almada, 2013.
525
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
526
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A gesto de edifcios ao longo do seu ciclo de vida atualmente um problema que requer
otimizao, considerando o alto custo associado utilizao dos edifcios e aos seus custos de
operao e manuteno. O nmero de edifcios existentes que necessitam de aes de
reabilitao, justifica a necessidade de um modelo de interveno que otimize a sua vida til,
aps o processo de reabilitao. Assim, a reabilitao, manuteno e os custos de planeamento
devem ser estabelecidos e guiados pelo valor dos princpios monetrios. Para melhorar o
planeamento e para diminuir a perda de informao, pode ser usado o Building Information
Modeling (BIM), que tem vantagens para todas as fases do ciclo de vida de uma edificao,
devendo ser utilizado para apoiar a respetiva gesto. O BIM baseia-se num modelo 3D de
estruturao de informao, que associado a vrias dimenses, pode apoiar a determinao do
custo do ciclo de vida (CCV) e o Building Life Cycle Management (BLCM). Assim, este artigo
analisa a aplicao da metodologia BIM reabilitao de um edifcio e as suas vantagens para
a determinao do CCV quando se consideram diferentes cenrios de manuteno. Analisa
tambm diferentes solues de reabilitao em termos de durabilidade e custos.
1. Introduo
527
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Building life cycle management (BLCM) uma metodologia que inclui o planeamento,
construo, operao e manuteno do edifcio ao longo do seu ciclo de vida. Engloba todo o
ciclo da construo, usando o processo digital para criar, gerir e compartilhar informaes de
ativos, desenvolvendo um modelo colaborativo virtual: a metodologia BIM, que surge como
um suporte essencial ao BLCM, permitindo a gesto e partilha de informao durante todo o
ciclo de vida do edifcio [2].
O Building life cycle management um conceito holstico desenvolvido para gerir um edifcio
e o seu ciclo de vida, incluindo materiais, processos de construo, qualidade de construo,
qualidade de fabricao, anlise de resultados, especificaes de teste, informaes de
componentes ambientais, normas de qualidade, requisitos de engenharia, mudana de ordens,
processos de fabrico, fornecedores de componentes, etc [3].
Para realizar a gesto do ciclo de vida muito importante saber como criar e realizar a gesto
de dados e das informaes corretamente [2]. As capacidades do Building life cycle
management incluem Workflow, gesto de programas, processos que agilizam as operaes de
gesto e um backbone de colaborao, permitindo que as pessoas nas vrias empresas possam
trabalhar em conjunto associando tambm o ACV e o CCV [3].Torna possvel controlar toda a
vida til de um edifcio e as informaes relacionadas com o mesmo, ou seja, permite uma
gesto eficiente do ciclo de vida de um edifcio, possibilitando aos proprietrios comparar
solues diferentes, para encontrar a mais econmica e menos prejudicial ao longo do seu ciclo
de vida [3].
528
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Note-se que esta descrio das fases do ciclo de vida, baseia-se nos estudos de ACV. Cada ciclo
de vida, pode incluir ou no todas as atividades descritas dependendo do mbito do projeto [5].
De acordo com a ISO 15686:2008 e Dixon (2012), o Custo do ciclo de vida (CCV) o custo
de um ativo ou de uma parte ao longo do seu ciclo de vida, enquanto cumprem os requisitos de
desempenho. Estes custos podem ser calculados pela expresso (1) [9].
= + (1)
Na qual: CCV o custo do ciclo de vida, C o custo de construo no ano 0 (custos indiretos
e diretos), o valor atual liquido de todos os custos recorrentes (de utilizao,
manuteno, substituio, servios, etc)e o valor atual liquido do valor
residual do edifcio em estudo ( recomendado ser igual a 0).
O trabalho desenvolvido, para alm deste artigo, foca-se no custo, mas importante reconhecer
que a escolha dos materiais e produtos para cada projeto tm impactos diretos e indiretos no
ambiente, bem como nos custos operacionais. A aplicao do CCV e do ACV permite s
equipas de projeto demonstrar que consideraram os impactos ambientais e econmicos nas suas
529
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
decises e, desta forma, escolheram os melhores materiais e produtos para o trabalho a realizar
[7].
Quando bem adotado, o BIM facilita um processo de conceo e construo mais integrado que
resulta numa melhor qualidade dos edifcios, a custos mais baixos e com reduo da durao
do projeto. Esta metodologia tambm melhora novas capacidades tais como, a verificao e
deteo de conflitos num modelo multidisciplinar, antes da fase de construo, e a verificao
automtica do projeto quanto ao cumprimento de exigncias legais e regulamentares [10].
O BIM tem benefcios para a fase de construo, atravs das suas ferramentas de coordenao
e controlo do planeamento e para a deteo de conflitos, permitindo a deteo e consequente
resoluo de erros com antecedncia, permitindo assim solues mais econmicas e menos
pedidos de alteraes que tornam os projetos e as construes mais caras [11]. Alm disso, a
combinao de Industry Foundation Classes (IFC), BIM, BLCM e web services (soluo
utilizada na integrao de sistemas e na comunicao entre aplicaes diferentes), torna
possvel chegar a uma plataforma que apresenta uma forma prtica de perceber, criar, trocar,
partilhar e gerir informaes de todos os participantes da indstria da construo.
As diferentes informaes tais como tempo, custos, medidas de segurana e qualidade, podem
ser integradas nas bases de dados do BIM, e por isso os investigadores acreditam que o BIM
tem um grande potencial para melhorar a construo e para gerir e partilhar informao durante
todo o ciclo de vida do edifcio [2]. O BIM torna ainda, a coordenao e a gesto do trabalho
no estaleiro mais eficiente, devido fcil compreenso do modelo, sua capacidade de deteo
de erros e omisses antecipadamente, facilitando a sua atualizao e evitando problemas, custos
e horas de trabalho a mais, durante a fase de construo.
530
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No presente estudo, o BIM aplicado na gesto do ciclo de vida, com o objetivo de introduzir
as aes de manuteno preventiva associadas ao modelo do edifcio. Alguns projetistas
incorporam dados sobre custos de substituio esperados durante a vida do edificado,
contribuindo assim para facilitar a anlise de alternativas, nomeadamente permitindo ao
proprietrio analisar os benefcios de investir em materiais e sistemas que podem custar mais
inicialmente, mas que tm um melhor retorno ao longo do ciclo de vida do edifcio. Considera-
se desta forma, a tecnologia BIM vantajosa na gesto de informaes durante todo o ciclo de
vida do edifcio na arquitetura, engenharia e construo.
Neste caso de estudo, atravs do modelo BIM, pretende-se criar apoio ao desenvolvimento do
CCV na reabilitao e s futuras aes de manuteno de um edifcio. No entanto, a inovao
da tecnologia BIM tambm pode melhorar a previso, gesto e monitorizao dos impactos
ambientais dos projetos de construo [12]. Assim, possvel concluir que o BIM traz
vantagens tanto para a ACV como para o CCV.
3. Caso de estudo
Foi considerado um edifcio do sculo XX, sujeito a reabilitao, localizado em Vila Nova de
Gaia, em Portugal, tendo sido aplicada a seguinte metodologia:
1. Caracterizao do edifcio;
2. Determinao da vida til estimada dos materiais e componentes;
3. Definio de alternativas;
4. Planeamentos das aes de manuteno e reabilitaes;
5. Estimativa de custos;
6. Clculo do Custo do ciclo de vida;
7. Anlise dos resultados;
8. Modelao do edifcio em Revit, incluindo a integrao de custos unitrios e aes de
manuteno correspondentes aos objetos.
531
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
reboco com pintura ou gesso cartonado e os forros do teto so, sobretudo, de gesso cartonado,
havendo um de madeira. O acabamento das paredes exteriores em pintura. Relativamente aos
revestimentos de pavimento so de madeira e pedra natural.
3.2 Metodologia
Foi desenvolvido um modelo 3D no software Revit 2016. Atravs da criao de parmetros
compartilhados foi possvel associar cada ao de reabilitao ao modelo 3D, a cada objeto em
cada famlia como se pode observar na Figura 7 relativamente Cobertura EP.
532
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O mesmo foi feito para os custos unitrios das aes de manuteno consideradas. Atravs de
uma Schedule pode ser extrado o custo de manuteno total de uma ao especfica, bem como
a listas dos trabalhos de manuteno a serem realizados, incluindo a sua periodicidade. Assim,
atravs dos parmetros compartilhados, das aes de manuteno e periodicidades adicionadas
e dos custos includos possvel a elaborao do plano de manuteno.
Relativamente ao CCV, o custo do ciclo de vida deve ser usado para avaliar as alternativas em
termos de custo e tempo. Neste caso de estudo, o CCV compara as vantagens de 3 estratgias
de manuteno. Assim, foram criadas 3 alternativas (ciclo de vida sem manuteno, ciclo de
vida com manuteno reativa e ciclo de vida com manuteno preventiva) e os respetivos
cenrios de manuteno, nos quais os fatores e as estratgias de manuteno mudam.
Para o clculo do CCV foi necessrio identificar os elementos fonte de manuteno e as suas
vidas teis de referncia. Em seguida, foi determinada a vida til estimada dos materiais atravs
do mtodo fatorial definido em [14]. Para aplicar este mtodo, foi necessrio definir e
caracterizar um conjunto de condies e fatores que tm implicaes no desempenho ao longo
do ciclo de vida do elemento. ainda necessrio o planeamento das aes de manuteno, os
seus custos e a sua programao, que permitem o clculo do CCV atualizado ao longo de 50
anos, que o perodo considerado neste estudo.
533
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
ainda de notar que o BIM est a transformar o setor da arquitetura, engenharia e construo
fornecendo informaes precisas e relevantes ao longo do ciclo de vida dos edifcios. Embora
o uso da tecnologia BIM ainda esteja em desenvolvimento, claro o seu potencial para melhorar
a eficcia do BLCM [11].
Figura 10: Modelo 3D corte no alado Oeste. Figura 11: Modelo 3D corte a
meio do edifcio.
O BIM mais do que um software [16], pois alm da modelao em 3D, inclui a colaborao
de pessoas com diferentes funes, competncias e interesses, atividades e processos. Permite,
entre outras informaes, extrair tabelas com a codificao do material e a sua respetiva
medio, custos, descrio e tipo.
A Figura 12, mostra uma tabela extrada automaticamente do modelo 3D, que inclui as
quantidades dos materiais, o custo total de manuteno e a lista de trabalhos de manuteno
incluindo as respetivas periodicidades.
534
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 12: Exemplo de tabela extrada do modelo 3D, no Revit, relativamente aos
revestimentos de pavimento.
4. Concluso
O uso da metodologia BIM revelou-se importante, uma vez que alm de reduzir a perda de
informao, facilita a comunicao dos vrios intervenientes, o que acaba por tornar mais
eficiente a sua interao com o projeto. Assim, possvel detetar conflitos, minimizar o pedido
de alteraes, o que acaba para contribui para a reduo do custo de construo. Alm disso,
permite a insero de aes de manuteno no modelo, o que facilita a realizao dos planos de
manuteno e minimiza o respetivo custo. Conclui-se assim que esta metodologia vantajosa
quando aplicada manuteno do edifcio permitindo a anlise e otimizao do CCV.
535
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
536
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
Apresenta-se o caso de estudo da modelao BIM de uma ETAR para a qual foram previstas
obras de beneficiao e ampliao na obra de entrada e respetiva unidade de desodorizao.
A CENOR identificou a oportunidade de criar o modelo BIM da obra existente passando este
modelo a ser a base para o desenvolvimento do projeto por parte do Empreiteiro e com o intuito
de obter, no final da empreitada, o modelo as built dos rgos sujeitos a interveno.
1. Introduo
537
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Segundo S. Ballesty et al. [1] desta experincia na pera de Sidney foi possvel concluir que:
The FM Exemplar Project has established that building information modelling is an appropriate beneficial
technology enabling storage and retrieval of integrated building, maintenance and management data for Sydney Opera
House. Using this approach yielded several advantages such as consistency in the data, intelligence in the model,
multiple representations such as two- and threedimensional (2D and 3D) reports, an integrated source of information
for existing software applications, and integrated queries for data mining. The standardised building model acts as
main data structure which can be extended with other data sources as each element of the model such as a wall,
furniture, a room, or a grouping of elements has a unique identifier. This unique identifier can be used as a basis for
correlating different datasets, thereby opening up query capabilities across different datasets
2. Enquadramento
Para a ETAR em estudo foram previstas obras de beneficiao e ampliao na obra de entrada
e respetiva unidade de desodorizao, para alm de outras pequenas intervenes de
substituio de equipamento noutros rgos.
538
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O cliente aceitou o desafio proposto e deu-se incio primeira experincia BIM da CENOR que
consistiu na modelao dos rgos alvo de interveno.
Note-se que, nesta altura, a CENOR no havia ainda iniciado um processo formal de adoo de
metodologias BIM, pelo que a modelao teve tambm um carcter exploratrio.
Na prtica, foi necessrio recriar o construdo (as built) a partir da documentao existente
complementada com levantamentos locais para definio de alteraes ao projeto no
documentadas.
539
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este reconhecimento, por parte do cliente, foi facilitado pela perceo de que o modelo BIM
pode ser encarado como uma representao grfica e ponto de acesso a uma base de dados,
semelhana dos SIG (Sistemas de Informao Geogrfica) que so j uma ferramenta
plenamente adotada pelo cliente, e cujas vantagens so reconhecidas. Note-se, no entanto, que
os SIG so uma ferramenta poderosa mas vocacionada para obras com disperso geogrfica,
carecendo de capacidade para representar obras localizadas e com alto grau de complexidade
num espao relativamente concentrado e com o detalhe necessrio.
Assim, os objetivos do modelo BIM passaram a incluir, tambm, a sua futura integrao com o
sistema de Gesto, Operao e Manuteno do cliente.
Foi entanto, definido que, no final da Empreitada o modelo as built, atualizado pelo Empreiteiro
e incluindo a informao tcnica relativa Empreitada, ser entregue ao cliente e submetido a
um processo de validao para conferir a compatibilidade da informao com as Bases de
Dados existentes e a adequao da mesma s necessidades dos intervenientes dos processos de
Operao e Manuteno.
O modelo BIM foi desenvolvido, essencialmente, com base nos seguintes elementos (Figura
1):
desenhos existentes em Arquivo: Telas Finais do projeto inicial da ETAR de 1987 e
Telas Finais da Empreitada de Adaptao e Completamento da ETAR de 1998;
levantamento por Nuvem de Pontos do exterior de toda a ETAR, realizado para apoio
ao projeto de beneficiao.
540
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 1: Informao base (da esq. para a dir.): telas finais (1987),
desenhos da ampliao (1998), desenhos da renovao de equipamento (2005),
levantamento por nuvem de pontos (2014), fotografia e vdeo (2014-2015)
O conjunto de desenhos das telas finais do projeto original de 1987, que se encontrava
arquivado apenas em papel, foi encontrado incompleto e apresentava alguns desenhos de fraca
leitura, devido ao seu estado de degradao.
Foi essencial, por isso, a recolha de informao no local medies, verificao de cdigos de
identificao dos elementos, dimetros de tubagem apoiada por registo fotogrfico e vdeo.
Estes levantamentos revelaram a transposio incompleta das alteraes realizadas para o
arquivo de telas finais da obra.
3.3 Modelao
Refira-se que as peas de projeto encontradas em arquivo no referiam o sistema de
coordenadas e os vrios projetos divergiam do levantamento mais recente e entre si.
541
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Modelo BIM foi posicionado em relao ao ltimo levantamento realizado, por Nuvem de
Pontos em Maio de 2014, tendo sido posteriormente conferidos alguns pontos de
georreferenciao, de forma a clarificar as cotas de alguns pontos e esclarecer as diferenas
entre os projetos antigos. O mbito da Nuvem de Pontos cingiu-se ao levantamento externo da
infraestrutura, mas foi uma referncia importante para posicionar coberturas e outros elementos
inacessveis que foram ao longo dos anos acrescentados ou alterados e no registados nas telas
finais existentes.
O modelo 3D (Figura 2 a 4) resultante apresenta grau de coerncia muito superior aos diversos
projetos anteriores e foi includo como parte integrante do processo de concurso.
542
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Nesta fase foi identificada a necessidade de ligao s bases de dados de gesto, explorao e
manuteno FM, o que permitiria a utilizao do modelo BIM como representao grfica
para interface de acesso informao da base de dados.
Sendo a ETAR uma infraestrutura onde os equipamentos assumem grande importncia nos
processos de Operao e Manuteno, e sendo tambm os elementos que melhor esto
caracterizados nas bases de dados existentes, foi escolhido o modelo dos Circuitos Hidrulicos
como agregador da informao.
Uma das dificuldades sentidas na modelao da ETAR foi a definio do nvel de detalhe (LOD
- Level of Detail) da modelao em relao aos objetivos do modelo. O objetivo base era o
cadastro do existente para servir de base ao projeto da empreitada de ampliao da
infraestrutura, contudo o objetivo foi posteriormente alargado para incluir tambm a utilizao
como ferramenta auxiliar dos processos de FM.
Estes dois objetivos podem ter modos de modelao, principalmente a de cariz tridimensional,
muito distintos: o primeiro requer um nvel de modelao mais detalhado e elaborado; o
segundo poder ter uma modelao tridimensional mais simplificada, mas com informao
associada detalhada e desenvolvida.
Neste projeto optou-se ento por uma estratgia de compromisso. Os elementos tridimensionais
foram desenvolvidos com algum detalhe (Figura 5 e 6), de modo a servir de base para o projeto
da empreitada de ampliao da infraestrutura, mas de forma a no serem demasiado complexos
e a permitirem uma ligao facilitada do modelo BIM s bases de dados existentes.
543
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
informao carregada para o modelo teve origem em ficheiros Excel disponibilizados pelo
cliente. No decorrer deste processo foi possvel identificar e retificar situaes de incoerncia
nos dados, que foram posteriormente transmitidas ao cliente.
Por fim, para que o modelo estivesse preparado para a sua integrao na soluo de gesto de
ativos utilizada pelo cliente era necessrio que houvesse uma ligao inequvoca de cada
elemento do modelo a um item da base de dados. Contudo, esse trabalho no foi concludo,
porque certas zonas do modelo esto mais detalhadas do que a base de dados, no estando por
isso disponvel um cdigo de localizao para esses elementos.
4. Concluso
Conforme referido, este projeto foi a primeira experincia BIM da CENOR e foi desenvolvido
numa altura em que a CENOR no havia ainda iniciado um processo formal de adoo de
metodologias BIM, tendo um carcter exploratrio.
Por estes motivos se compreende que a contratao do servio de realizao do modelo BIM
revele insuficincias no que respeita definio de objetivos e de nveis de detalhe (LOD) a
atingir face aos mesmos. Assim verificou-se uma dificuldade na gesto de expectativas entre a
CENOR e o cliente. Naturalmente, o cliente pretendia uma modelao com elevado nvel de
detalhe grfico, pelo que o modelo foi desenvolvido com um nvel de detalhe que, em
retrospetiva, excessivo no que respeita a alguns equipamentos, para o cumprimento dos
objetivos do modelo, tanto de cadastro como de FM.
544
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No caso em apreo, o modelo BIM, alm de ser repositrio e agregador da informao existente
dispersa e em risco de se perder, cumprindo a funo de cadastro, poder tambm ser um ponto
de acesso s bases de dados de Gesto, Operao e Manuteno existentes. Note-se que a
entidade gestora, por j utilizar SIG e ter j obtido benefcios desse sistema, muito prontamente
entendeu as vantagens do BIM para cadastro de infraestruturas tridimensionalmente complexas
que os SIG no tm facilidade em representar.
Agradecimentos
Os autores agradecem ao Eng. Lus Ribeirinho a sua colaborao na elaborao deste artigo.
Referncias
[1] S. Ballesty et al., Adopting BIM for facilities management: Solutions for managing the
Sydney Opera House, Brisbane, Queensland, Austrlia, Cooperative Research Centre for
Construction Innovation, 2007.
545
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
546
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Andr Reis Antunes (1), Ruben Santos (1), Antnio Aguiar Costa (1)
Resumo
As aplicaes da tecnologia Building Information Modelling (BIM) tm sido amplamente
exploradas nas diversas fases do ciclo de vida dos empreendimentos. A possibilidade de
integrao de modelos BIM com tecnologia existente e as vantagens da visualizao em tempo
real potenciam a versatilidade destes modelos para a manuteno de edifcios complexos.
Neste artigo, proposta uma plataforma direcionada para infraestruturas urbanas complexas
(hospitais, centros comerciais, aeroportos, etc.) que funcionar como repositrio de informao
e assegurar a interoperabilidade de fluxos de dados entre entidades, sistemas e dispositivos.
Alm disso, pretende-se que esta ferramenta de gesto seja capaz de captar em tempo real um
grande volume de dados gerados no seu interior, por meio de elementos de monitorizao
(equipamentos, espaos, objetos, etc.) e pessoas (opinies, nveis de satisfao, incidentes ou
emergncias, etc.), sendo possvel visualizar os resultados diretamente no modelo BIM. O
volume de dados gerado carregado numa base de dados, permanentemente online, acedida em
tempo real por meio de instrues em Linguagem de Consulta Estruturada (SQL) enviadas do
modelo BIM atravs de um mdulo de comunicao em programao visual criado em
Dynamo.
1. Introduo
547
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Este artigo est dividido em quatro partes. A primeira parte apresenta uma reviso da literatura
de forma a compreender os conceitos e aplicao do BIM e GI. A segunda parte explica a
metodologia utilizada no estudo, enquanto a terceira parte descreve o desenvolvimento da
interface BIM e sua implementao. Por ltimo, a quarta parte apresenta os resultados obtidos
num dos modelos dos trs casos piloto do projeto 3i Buildings. Pretende-se ainda que esta
ferramenta seja expandida de forma a incluir outras variveis exteriores e conferir uma
capacidade preditiva interface.
2. Reviso de literatura
548
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O BIM, resumidamente, pode ser definido como um processo de criao e gesto da informao
do empreendimento de construo de uma forma interopervel que permite a integrao e
reutilizao da informao da obra e o domnio do conhecimento ao longo do ciclo de vida da
mesma por parte dos utilizadores [4]. Permite tambm que um edifcio seja representado por
componentes inteligentes, que contm informao detalhada, e possibilita a estruturao das
relaes semnticas entre os componentes do mesmo modelo [1]. Assim sendo, a mudana de
paradigma entre o desenho assistido por computador (CAD) e o BIM notria, fazendo com
que a comparao entre os mesmos seja totalmente irrealista [5].
Por exemplo, Liao e Barooah [6] desenvolveram um modelo estocstico com o objetivo de
determinar o nmero aproximado de ocupantes em diferentes locais de um edifcio, em
contraste com os mtodos utilizados atualmente, onde um espao poder estar apenas ocupado
ou desocupado, de forma binria. Para este efeito, utilizaram um modelo baseado em agentes1
(agent-based model) para simular o comportamento de um nmero arbitrrio de ocupantes
individuais (agentes) de um edifcio com um nmero arbitrrio de zonas, extraindo de seguida,
atravs de uma simulao de Monte-Carlo, os modelos grficos da ocupao por zonas. Liu et
al. [7] desenvolveram um sistema que determina com preciso a taxa de ocupao de uma
diviso, adquirindo dados atravs da utilizao de sensores de viso inteligente. Um grupo de
sensores instalado no interior da diviso para medir a ocupao interna e outro grupo
instalado na sua entrada, de forma a contar os ocupantes de passagem. O espao dividido em
diversas sub-regies e cada uma delas equipada com um sensor de viso colocado nos cantos
da diviso junto ao teto, para medir a ocupao no seu interior sem sobreposio das reas
cobertas e sem interferncia de objetos como secretrias ou cadeiras. Esta deteo feita atravs
de reconhecimento de imagem, com base no contorno das cabeas. A ocupao de toda a
diviso estimada atravs do somatrio das detees nas sub-regies, combinado com as
1 Agent-Based Models uma categoria de modelos computacionais que simula as aes e interaes de agentes autnomos, que tanto podem
ser entidades individuais como coletivas, como organizaes ou grupos, com vista a avaliar os seus efeitos no sistema como um todo. Combina
elementos de Teoria de Jogos, Sistemas Complexos e Emergncia, Sociologia Computacional, Sistemas Multiagentes e Programao
Evolutiva.
549
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
detees do sensor de movimento da entrada por intervalos de tempo. No seu trabalho no mbito
da domtica (home automation), Silva et al. [8] fizeram um levantamento do estado da arte
referente a edifcios inteligentes, enfatizando as aplicaes das tecnologias de vdeo, udio,
sensores e sistemas integrados de vdeo, udio e sensores (multimodais). Destacam-se as
aplicaes para segurana por intermdio da deteo de rudo e movimento, cuidados de sade,
cuidados a idosos e a crianas por intermdio de deteo de movimento, rudo e reconhecimento
de imagem (detetando, por exemplo, a queda de um idoso), eficincia energtica com base na
ocupao das divises e atravs de interruptores equipados com Wi-Fi, e a melhoria da
qualidade de vida.
550
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3. Mtodo de Investigao
O objetivo deste estudo foi o desenvolvimento de uma ferramenta BIM-GI com base num
conhecido software de modelao BIM, o RevitTM, para apoiar os gestores das instalaes ao
longo do ciclo de vida do empreendimento, permitindo recolher uma diversidade de dados e
estrutura-los de forma a serem acedidos por um modelo BIM. Para alcanar este objetivo, foi
desenhado um modelo conceptual da interface para mostrar o seu espectro de aplicao, os
diferentes componentes, a tecnologia utilizada e o modo de utilizao da interface. Em segundo
lugar, foi criada uma base de dados, onde todos os tipos de dados que se pretendem monitorizar
foram estruturados manualmente. Os dados so obtidos atravs de sensores e transferidos para
a base de dados alojada num servidor atualizado em tempo real. Estes dados so organizados
associados a um determinado espao, perfeitamente identificado no modelo BIM. Deste modo,
o modelo BIM capaz de captar essa informao e mostrar, de forma tridimensional, os seus
efeitos, atravs de uma ligao assegurada por um algoritmo desenvolvido em Dynamo. O
Dynamo um suplemento de programao visual do Autodesk Revit que permite automatizar
vrias operaes baseadas no modelo BIM. Neste caso foi utilizado para realizar uma troca de
diversa informao entre a base de dados estruturada e o modelo software BIM, extraindo a
informao de uma lista com todos os dados recolhidos pelos sensores, e tambm do Revit para
a base de dados, em situaes que seja necessria a atualizao da nomenclatura ou numerao
de espaos. Posteriormente, por meio da aplicao de filtros de visualizao e esquemas de
cores, o Dynamo usado para colorir os espaos no modelo BIM de acordo com o critrio
escolhido. Neste sentido, foram definidas 4 variveis: Ocupao, Temperatura, Nveis de CO2
e Humidade. Finalmente, vrios ensaios foram realizados para testar o prottipo da interface,
com base num modelo Revit de um edifcio de escritrios.
551
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
552
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4.4 Desafios
Diversos autores referem que ainda existem vrios problemas por resolver no domnio da
interoperabilidade, nomeadamente ao nvel da perda de informao [23-26]. Neste caso
particular, a utilizao de ferramentas de programao de fcil compreenso permite aumentar
as capacidades de interoperabilidade alargando o espectro de aplicaes do BIM. Esta
diversidade torna a troca de informaes entre modelos BIM e programas um enorme desafio.
553
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Um outro desafio foi o desenvolvimento de uma interface que fosse orgnica o suficiente de
forma a poder ser adaptada pelo prprio gestor do edifcio, permitindo a introduo de novas
variveis de anlise, modificao do sistema de cores, alterao da origem dos dados ou at
mesmo dos prprios elementos no modelo, no perdendo a respetiva associao entre o modelo
BIM e os dados recolhidos.
5. Resultados
A interface foi testada num modelo de um edifcio de escritrios com um nico piso e uma rea
de 675 m2. Este modelo foi o mesmo utilizado para a ferramenta do projeto conjunto com a
Siemens, 3i Buildings. Antes de iniciar as simulaes, foi preparada uma base de dados de
forma a simular dados recolhidos pelos sensores, a fim de introduzir posteriormente esses dados
no modelo BIM. A introduo destes dados no modelo BIM foi feita usando um cdigo de
Dynamo, atravs de instrues SQL, e atribudos aos espaos respetivos conforme indicado na
tabela 2. Em seguida, foram executadas as simulaes para diferentes grandezas analisadas.
A Figura 4 ilustra os resultados obtidos em vista temporria para as duas simulaes que
representam o os espaos do edifcio. No entanto, se o objetivo for a visualizao da parte
estrutural do edifcio, tais como paredes e pavimentos, devem ser alterados os filtros aplicados.
Neste caso, considerou-se mais apropriado apenas a visualizao dos espaos do edifcio.
As vistas apresentadas mostram que a transposio dos dados recolhidos para o Revit foi bem-
sucedida, uma vez que as cores refletem os valores gerados. Alm disso, devido ao cdigo de
cores adotado, facilmente se identifica quais as reas mais quentes e de maior ocupao do
edifcio. Por exemplo, as cores frias (azul e verde) indicam que no existem problemas,
enquanto as cores quentes (vermelho e amarelo) alertam para uma condio crtica. Alm disso,
554
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
possvel exportar os dados por cada simulao realizada sob a forma de relatrio numa folha
de Excel.
No entanto, importa referir o especial cuidado a ter caso sejam feitas alteraes manuais na base
de dados ou no modelo BIM, de forma a no corromper o emparelhamento dos dados a cada
um dos respetivos espaos.
6. Concluses
O caso piloto foi globalmente positivo, embora no tenha sido testado o seu desempenho em
situao real. As simulaes apresentadas foram as leituras de cada um dos parmetros num
dado instante. No entanto, a simulao em tempo real bastante mais complexa. Um caso de
estudo real permitiria ter feedback de gestores das instalaes, verificando, deste modo, se a
ferramenta efetivamente til para monitorizao e gesto do conforto interior e eficincia
energtica. Por ltimo, importa referir que a ferramenta tem potencial para se estender a outras
aplicaes, favorecendo a automatizao e otimizao de processos.
Agradecimentos
Referncias
[1] C. Eastman, P. Teicholz, R. Sack and K. Liston, BIM Handbook, A Guide for Building
Information Modeling for Owners, Managers, Designers, Engineers and Contractors,
2nd ed., New Jersey: John Wiley & Sons, Inc., 2011.
[2] Costa, A. A. et al. (2015). Creative Construction Conference 2015 (CCC2015): 3I
Buildings: Intelligent, Interactive and Immersive Buildings. Procedia Engineering
[3] CDI. (2008). Getting to the Starting Line with BIM and VDC. Adding Value to Model
Integration and Design Collaboration, 1-9. Retrieved from Complete Digital Integration
website: http://www.cdi-grp.net/uploads/Starting_Line_for_BIM_and_VDC.pdf
[4] Lee, G., Sacks, R., & Eastman, C. M. (2006). Specifying parametric building object
behavior (BOB) for a building information modeling system. Automation in
555
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
556
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
magazine.
[24] Hamil, S. (2012). Building Information Modelling and interoperability.
http://www.thenbs.com/topics/bim/articles/bimAndInteroperability.asp
[25] Steel, J., Drogemuller, R., & Toth, B. (2010). Model interoperability in building
information modelling. Faculty of Built Environment and Engineering; School of
Design.
[26] Weygant, R. S. (2011). BIM Content Development: Standards, Strategies, and Best
Practices: John Wiley & Sons.
557
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
558
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O Facility Management (FM) implementado na fase de operao e manuteno dos
empreendimentos baseando-se numa gesto integrada e pluridisciplinar. Apesar da necessidade
de verificao dos princpios bsicos duma metodologia de controlo, esta dever ser ajustada
s organizaes para que sejam alcanados os indicadores de desempenho mais eficientes.
Aps estudo bibliogrfico da rea BIM-FM e anlise de casos de estudo em que a metodologia
foi aplicada, dividiu-se o trabalho em trs fases. Inicia-se pela identificao das exigncias de
informao para a gesto e manuteno de edifcios. A PortoEstdio definiu as prioridades da
rea da manuteno das instalaes, para obter resposta s suas principais necessidades. Na
segunda fase, tendo em conta a informao recolhida, procedeu-se modelao da arquitetura,
seguindo-se as especialidades de mecnica e hidrulica com base no primeiro modelo.
Finalmente, todas as informaes inseridas foram exportadas para o software adequado
organizao da PortoEstdio.
559
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
2. Metodologia BIM-FM
Graas capacidade dos modelos BIM em inclurem metadados como a idade dos
equipamentos, as suas dimenses, a energia que consomem ou o tempo de manuteno, os
proprietrios e operadores renem informao suficiente para poderem antecipar os problemas
e planear os oramentos para explicar reparaes de equipamentos e substituies. O BIM pode
tambm ajudar a determinar onde um novo sistema de pode integrar no layout de uma
instalao.
Com este tipo de monitorizao dos equipamentos, o BIM torna-se especialmente til no
processo de aprovisionamento. Aquando a aquisio e instalao do equipamento, o contratante
pode enriquecer o modelo com todas as informaes pertinentes [1].
560
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com a utilizao desta prtica, possvel aceder a informaes como manuais, garantias, ordens
de trabalho e planos de manuteno, permitindo uma significativa reduo no tempo de resposta
de uma equipa, tornando ainda possvel a visualizao em realidade aumentada para uma
tomada de deciso mais fcil e eficiente.
Atualmente, j existem no mercado solues BIM-FM que facilitam esta interao, sendo que
para tal sempre necessria a utilizao de um software extra para modelao e o clculo dos
key performance indicator (KPI). Estes indicadores permitem a gesto e controlo mais eficiente
da qualidade de um servio, existindo vrios autores que j realizaram estudos para medir os
indicadores de desempenho. Estes estudos, mais direcionados para a manuteno, como o de
Shohet [3] em equipamentos hospitalares e os da norma EN 15341, fornecem uma anlise
global aos edifcios, sendo possvel a adaptao dos KPI ao tipo de utilizao de cada edifcio.
At ao momento no foram ainda publicados estudos relevantes com aplicao em piscinas.
O projeto inicial da Piscina de Campanh data de 1972 e foi realizado pelo arquiteto Leopoldo
Coutinho. A piscina foi inaugurada a 21 junho de 1984, tendo beneficiado de remodelaes em
2001, vindo a ser reinaugurada em fevereiro de 2001.
Em 2015 foi requalificada pelo Futebol Clube do Porto que ficou responsvel pelas instalaes
durante 25 anos, com a obrigao de manter horrios para usufruto da comunidade. A Piscina
de Campanh a nica piscina olmpica do Porto com pista de 50 metros e uma das poucas
cobertas do pas. Para alm de constituir um complexo para natao do clube, alberga tambm
as seces de boxe e desporto adaptado. Estas instalaes atraem mais jovens para a prtica do
desporto e possibilita a obteno de melhores resultados desportivos.
Este pormenorizado levantamento de dados tornou-se muito til para a modelao, onde foram
detetadas diferenas entre o projetado e o construdo, como o exemplo referenciado na figura
1.
561
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
562
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
563
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Uma vez que o modelo ser utilizado para facility management, foram atribudos valores a
campos relevantes manuteno de edifcios, no type properties da famlia, assim como a
associao do objeto aos catlogos online ou manuais de instalao. (figura 4)
3.3 FM Software
Inicialmente foram pesquisados vrios softwares com capacidade de utilizar os modelos BIM
juntamente com o FM, como o IBM Maximo, FM:Interact, EcoDomus, YouBIM, ArchiFM e
ArchiBus. Todos estes softwares BIM-FM oferecem funcionalidades semelhantes, como a
possibilidade de executar em navegador web. A soluo passa pela existncia de um modelo
BIM carregado com toda a informao inerente, facilitando a gesto dos edifcios. No que
respeita visualizao do modelo BIM, onde com um simples clique num equipamento
564
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Esta uma soluo que se adapta aos modernos requisitos de gesto de edifcios, automatizando
pedidos com workflows, proporcionando uma proximidade entre os requisitantes e os
prestadores de servio. Desta forma, h garantia de que o gestor recebe informaes acerca das
aes que necessitem de interveno ou deciso. Este software permite ainda simplificar a
gesto de Service Level Agreement (SLA) e o controlo de custos e operaes, assim como
incluir hard e soft services.
4. Concluses
O trabalho realizado tem como objetivo contribuir para a implementao da metodologia BIM
no facility management em Portugal, atravs do estudo efetuado a um complexo de piscinas.
Muitas vezes, este tipo de instalaes constitui uma fonte de prejuzo para os proprietrios, a
maioria das vezes municpios ou empresas municipais que, por vezes, no fazem uma correta
gesto de manuteno das mesmas.
A modelao um processo moroso e difcil quando as telas finais no esto de acordo com o
construdo, sendo assim bvia a importncia da realizao destes modelos desde a fase de
projeto, com realizao de alteraes sempre que necessrio. fulcral a existncia de um
modelo as-built de modo a que visualmente e intuitivamente se consiga navegar no modelo.
565
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Deste modo, o software de manuteno aliado ao modelo BIM, constitui uma mais-valia no que
respeita a informao disponibilizada e ao tempo poupado ao descobrir onde ser a avaria. O
relatrio de um simples ato de manuteno constitui tambm uma vantagem para a diminuio
de tempos de tarefas e custos.
A organizao responsvel pelo caso em estudo, uma vez que j utiliza software de gesto da
manuteno, teria todo o interesse em implementar a metodologia BIM nos seus processos de
manuteno, podendo assim obter benefcios significativos ao nvel de tempos e custos.
Referncias
[1] J. Marchese e C. Rudderow, (2013) The Power of 3D: Using BIM for facility
Management, [Online] disponvel em:
http://www.areadevelopment.com/AssetManagement/Q2-2013/building-information-
modeling-facility-management-0272892.shtml ,
[2] L. C.. Moreira eR. C. Ruschel (2015), Impacto da adoo de BIM em Facility
Management: Uma classificao, [online] disponvel em
http://dx.doi.org/10.20396/parc.v6i4.8634982.
[3] I. Shohet, "Key performance indicators for strategic healthcare facilities maintenance"
in ASCE Journal of Construction Management and Economics 2006, 132(4), pp. 345-
352
566
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
No processo de gesto de manuteno de um edifcio fundamental o uso e a boa gesto de um
vasto leque de informao, seja ela geogrfica, do edifcio, dos seus utilizadores, etc. A
metodologia BIM - Building Information Model surge, neste contexto, como uma ferramenta
integradora, que permite gerir de forma mais eficiente toda esta informao e, assim, apoiar a
manuteno otimizada das instalaes tcnicas (IT) e dos edifcios. Para o efeito, necessrio
garantir uma interligao entre o conceito BIM e a gesto da manuteno, com especial nfase
na adoo do 6D/7D BIM como aplicao ao Facility Management (FM).
O estudo de caso demonstra a forma como a metodologia BIM dever ser parte integrante das
solues de gesto de manuteno assistida por computador GMAC, evidenciando a
necessria interoperabilidade entre BIM e GMAC.
567
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Segundo [1] a Gesto de Edifcios uma rea de conhecimento que abrange as atividades
relacionadas com as operaes dirias do edifcio, a administrao de servios, o planeamento
estratgico, e a gesto de manuteno, ou facility management (FM). Embora a NP EN
13306:2001 defina o conceito de gesto de manuteno, segundo [2] o termo tem vindo a sofrer
alteraes ao longo do tempo, podendo ser considerado como o conjunto de processos
administrativos, tcnicos e de gesto (em torno de um edifcio), durante o seu ciclo de vida, e
que visam garantir as aes necessrias a manter ou repor o edifcio no estado para o qual foi
concebido. Os autores acrescentam que a gesto de manuteno um processo estratgico que
pode resumir-se a um termo a gesto de manuteno planeamento.
Outro aspeto relevante o custo de manuteno. Considerando que um edifcio novo tem um
valor aproximado de 80% do seu custo global (considerando uma vida til de 60 anos), o custo
anual de manuteno representa aproximadamente 1,3% dos custos de construo do edifcio
[1]. Por outro lado, de salientar que nas fases de conceo, projeto e fiscalizao (5%), que
podem ser introduzidas as melhores medidas de controlo de custos totais do edifcio, fase em
que a metodologia BIM pode contribuir de forma integrada, intervindo desde logo na fase
inicial de conceo. (ver figura 1).
568
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A escolha dos KPIs de manuteno dependem dos objetivos definidos por uma organizao, e
est altamente relacionada com o seu contexto especfico de atividade. Segundo [7], os gestores
de manuteno tem a tarefa de lidar com as complexas tarefas de encontrar indicadores de
desempenho que possam ajudar a alcanar as metas. Segundo o mesmo autor, a NP 4483 refere
que uma organizao deve planear e implementar a monitorizao, medio, anlise e melhoria
dos processos de manuteno para: (1) Demonstrar a conformidade dos requisitos do servio;
(2) Assegurar a conformidade do sistema de gesto da manuteno; (3) Melhorar continuamente
a eficcia do sistema de gesto da manuteno.
O autor [8] refere que o gestor da manuteno hoje uma figura a quem compete a
responsabilidade de desenvolver indicadores que permitam assegurar o alcance dos objetivos
do negcio. Segundo o mesmo autor, a FM uma atividade desenvolvida por este gestor, a
quem compete entre outros objetivos, gerir os conflitos decorrentes da atividade, monitorizar e
acompanhar a evoluo dos objetivos com referncia ao alcance das metas, e determinar de
forma clara, as estratgias a aplicar aos procedimentos [8].
569
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Segundo [11], existem alguns fatores a ter em conta no eventual processo de integrao do
processo BIM com GMAC:
A utilizao de informao em FM requere que a mesma seja exacta e atualizada;
570
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Segundo [12], um dos principais problemas dos atuais GMAC so os custos e tempo necessrio
para desenvolver e carregar os dados numa aplicao GMAC. Por este motivo, a indstria de
AECO procura na tecnologia BIM, novas formas de reunir e armazenar a informao,
explorando novas ferramentas de interligao ou troca de informao como COBie ou IFC [13].
4. estudo de caso
4.1 Metodologia
Atualmente o Instituto Politcnico de Leiria (IPL) tem um servio de manuteno e reparao
(SMR), onde efetuado o registo e gesto de pedidos de interveno. O SMR uma ferramenta
acessvel a todos os utilizadores: alunos, funcionrios docentes e no docentes do IPL (11000
utilizadores). O SMR alimentado por uma base de dados de espaos no espacial que
representa o cadastro de todos os espaos que compem os campi do IPL (Leiria, Caldas e
Peniche). Por consequncia, no h uma relao espacial entre os pedidos realizados, nem
possvel modelar a informao pelos seus atributos, quaisquer que sejam.
O estudo de caso apresentado foi desenvolvido num princpio de modelao as-managed, [14]
que significa que feita uma modelao do edifcio em funcionamento e no pleno perodo de
explorao. Por esse motivo, poder ser necessrio compatibilizar a informao existente em
projeto, com aquilo que efetivamente est executado.
Na figura 2 est representada a matriz de processo de uma interveno, desde o momento do
pedido at sua resoluo.
571
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 2: Matriz de Processo - Pedido de SMR (RTC Responsvel tcnico por campus;
RMAN Responsvel manuteno).
Para os autores [12], BIM dever estar no centro de interao entre os diversos intervenientes
da indstria de AEC. Os referidos autores referem que BIM representa um modelo grfico que
contm a informao paramtrica do edifcio. Por outro lado, um GMAC contem ferramentas
que permitem interagir com a informao do edifcio, desencadeando aes ordens de trabalho
(OT), a partir das quais se enviam para o campo as equipas necessrias interveno. As OT
contm uma breve descrio da interveno a efetuar, e permitem aos tcnicos de campo
descrever a resoluo, apontando ainda eventuais necessidades de melhoria, reposio de peas,
ou outras informaes que devero ficar associados reparao.
O processo de recolha e uniformizao desta informao poder ser oneroso quer seja para ser
utilizado num modelo BIM, quer seja para inserir num GMAC.
572
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A figura 4 representa a viso geral do edifcio modelado. Na figura 5 podemos ver alguns dos
pormenores construtivos, modelados de acordo com os objetos existente e efetivamente
construdos. Atravs da edio das propriedades dos componentes existentes nas bibliotecas,
possvel adequar as mesmas realidade.
573
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No caso de estudo, foi modelada uma rede de guas e esgotos (figura 6) contendo informao
especfica dos materiais e suas caractersticas (fabricante; manual instalao; tipo material;
dimenses; tipo de ligao, etc.). O objeto em causa foi importado a partir do stio da internet,
do prprio fabricante, disponibilizando informao especfica do componente.
Figura 6: Rede de gua e esgotos com a tabela dos parmetros do objeto - Sanita.
574
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
estabelecidas as relaes paramtricas existentes com outros objetos. Para isso, aos objetos -
lhes atribuda uma natureza famlias, onde so adicionados os parmetros que determinam a
forma de interao e comportamento dos objetos [15].
importante salientar que tanto o BIM, como o GMAC, contm o mesmo tipo de informao
e por isso, considerar eventual interligao, obrigar definio da melhor forma de recolha e
validao e armazenamento da informao. Se consideramos o BIM como um processo que se
inicia com a conceo na fase de arquitetura, ser legtimo considerar o fluxo de partilha e
exportao da informao de BIM para um GMAC na fase de operao. Quando abordamos a
metodologia BIM, e a forma como construdo o modelo do edifcio, a partir do princpio
colaborativo de partilha de dados correspondentes a cada especialidade desde a arquitetura,
estrutura e instalaes tcnicas at manuteno, torna-se percetvel que qualquer disciplina
complementar que esteja associada ao edifcio, dever fazer parte integrante da metodologia
BIM. Por esse motivo, toda e qualquer forma de partilha de informao entre BIM e outras
aplicaes de GMAC, dever garantir a integridade da informao.
Concluda a modelao, foi feita a exportao dos dados do modelo BIM, atravs de COBie,
com adio de um plug-in Autodesk para o Revit. COBie um formato para partilha dos
dados a partir de um modelo BIM para outras aplicaes tais como um GMAC. Contudo o
processo de exportao envolve um conjunto significativo de aes que tornam o processo
consideravelmente sensvel.
5. Concluso
O desafio deste estudo de caso passa por evidenciar os benefcios de interligao de BIM com
GMAC de forma a garantir um fluxo transversal de informao em processos de edio,
atualizao e alterao de informao para aes de manuteno. A utilizao da metodologia
BIM nas aes dirias de gesto de manuteno, obriga a uma interao constante entre os
sistemas de informao e as ferramentas j disponveis para realizao das operaes em
campo. A interao entre as equipas tcnicas a quem cabe o papel de planear, preparar e garantir
575
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Durante a realizao deste artigo, foi possvel verificar que a temtica BIM/GMAC ainda est
a dar os primeiros passos. Em Portugal, apesar da temtica ainda ser abordada de forma tmida,
ao consultar algumas empresas portuguesas de referncia que desenvolvem aplicaes de
GMAC, foi possvel constatar que apesar de j conhecerem a metodologia BIM, ainda no
desenvolveram processos que permitam avanar no sentido de eventual integrao.
A continuao desta pesquisa poder passar por explorar formas mais eficazes de
interoperabilidade ou interligao de BIM a GMAC, atravs de processos mais colaborativos,
em tudo semelhantes aos que hoje j operam na metodologia BIM, tais como Dynamo.
Bibliografia
576
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
577
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
578
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
As entidades gestoras de infraestruturas, aps os elevados investimentos efetuados para a sua
construo, tm atualmente preocupaes no mbito da gesto da sua explorao com o mximo
de rentabilizao e o mnimo de risco quer econmico quer de desempenho. Para se alcanar
este objetivo necessrio otimizar a explorao e manuteno dos seus ativos, ou seja, proceder
respetiva gesto. A gesto de ativos entre outras definies, consiste num processo integrado
de tomada de deciso, planeamento e controlo quanto aquisio, uso, proteo e eliminao
de ativos, visando maximizar o seu potencial de resposta em servio e benefcios e minimizar
os riscos e os custos que lhes esto associados ao longo do seu ciclo de vida. No entanto, para
se implementar eficazmente este processo de gesto as entidades gestoras enfrentam uma
dificuldade inerente falta de informao sistematizada dos seus ativos. Este trabalho pretende
demonstrar atravs de um caso de estudo, como que o BIM pode contribuir para a eficaz
gesto de ativos de infraestruturas de armazenamento e distribuio de guas, bem como para
a gesto dos riscos inerentes s mesmas. Para se atingir este objetivo procedeu-se elaborao
de modelos 3D de acordo com a metodologia BIM e desenvolveram-se os respetivos ficheiros
COBie, cuja integrao no sistema de gesto de ativos (Computerized Maintenance
Management System: CMMS) existente na empresa foi analisada. Concluiu-se que apesar da
empresa ter um software de gesto de ativos, este poder ser otimizado com a introduo da
metodologia BIM.
579
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
ativos, est a comear a tornar-se uma atividade chave e uma norma para se atingir uma
organizao de excelncia por parte dos gestores de operaes e manuteno [1].
Como referido anteriormente, os projetos de construo so cada vez mais complexos, sendo
necessrio um alto nvel de informao e detalhe para a sua gesto. Esta informao vital e
importante que se encontre disponvel de forma percetvel. Os grandes desafios do FM so
revelados quando os desafios de intercmbio de informaes durante a fase de
conceo/construo so multiplicados em todo o ciclo de vida de uma instalao [2].
A ISO 55000:2014 fornece uma viso geral sobre a gesto de ativos, os seus princpios e
terminologias e os benefcios que podem advir da adoo desta metodologia. Esta norma pode
ser aplicada a todos os tipos de ativos e por qualquer organizao. Deste modo, a norma prope
como principais benefcios para a aplicao desta metodologia (ISO 55000, 2014) [4]:
Melhorar o desempenho financeiro: permite melhorar o retorno dos investimentos e
pode ser alcanada uma reduo de custos, preservando o valor patrimonial, sem que
seja necessrio comprometer a curto ou a longo prazo a concretizao dos objetivos das
organizaes.
Informar sobre as decises tomadas: permite a cada organizao melhorar as tomadas
de decises e equilibrar eficazmente os custos, riscos, as oportunidades e um melhor
desempenho;
Melhorar a gesto dos riscos: permite uma reduo de perdas a nvel financeiro,
minimizando o impacto social, melhorando o nvel de reputao, podendo resultar numa
reduo de passivos.
580
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Permitir a sustentabilidade da organizao: faz com que exista uma gesto eficaz das
despesas e do desempenho a curto e a longo prazo, podendo melhorar a sustentabilidade
das operaes e da organizao.
Melhorar a eficincia e eficcia: permite rever e melhorar processos, procedimentos e
desempenhos dos ativos, fazendo com que tenham melhor eficincia, levando
realizao dos objetivos da organizao.
A integrao dos dados de todo o modelo em folhas de clculo especficas d-se na segunda
etapa. Depois de todos os parmetros se encontrarem corretamente atribudos a cada elemento
do modelo, o software pode, ou no, ter a capacidade de gerar os COBie que consistem em
spreadsheets onde toda a informao armazenada. Estes ficheiros sero detalhados
posteriormente.
581
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
2. Caso de estudo
2.1. Enquadramento
A instalao utilizada no presente caso de estudo, para a implementao da metodologia BIM
na gesto da manuteno, uma estao elevatria (ver Figura 2).
A instalao em estudo constituda por anis de beto armado e possu diferentes cmaras,
tais como a de entrada, visita e de inspeo. A estao dotada dos seguintes equipamentos: i)
Grupo eletrobomba submersvel; ii) Medidor de caudal eletromagntico; iii) Conversor de sinal
do medidor de caudal; iv) Clula de carga; v) Conversor de sinal da clula de carga; vi) Sondas
de nvel; vii) Escadas de acesso cmara; viii) Vlvula de seccionamento de cunha elstica; ix)
Vlvula de reteno esfrica; x) Transdutor de nvel ultrassnico.
Uma estao elevatria, por norma, encontra-se num nvel abaixo do da superfcie (encontra-
se enterrada). A Figura 2 pretende ilustrar a vista do local da estao em estudo, e
posteriormente sero apresentadas as plantas e cortes da instalao.
582
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Foi necessrio definir algumas fases para o desenvolvimento deste caso de estudo, de forma a
ordenar e simplificar o processo. Assim, o trabalho dividido em trs fases principais:
Recolha de toda a informao necessria, quer da instalao, quer dos equipamentos da
mesma.
Modelao da instalao e dos seus constituintes.
Partilha da informao originada pelo modelo e o software de gesto da manuteno.
importante referir que o objeto de estudo apenas uma das estaes do plano de interveno
anteriormente referido. O objetivo passa por perceber e aplicar o conceito do FM para uma
estao, sendo possvel depois generalizar para toda a rede, desenvolvendo assim um sistema
de gesto da manuteno eficiente graas a esta metodologia. A dimenso deste trabalho, tanto
a nvel de modelao como ao nvel da prpria informao que extrada do modelo, enfrentou
algumas dificuldades: o tempo de realizao limitado e a pouca experincia na utilizao do
software de modelao.
A informao relativa construo da instalao foi utilizada no seu todo para a construo do
modelo e dos seus vrios sistemas, e a informao sobre os equipamentos foi utilizada para
inserir diretamente nos elementos modelados, para posteriormente ser possvel a criao dos
ficheiros COBie.
Para a realizao do modelo, foram utilizados os desenhos referentes a cada uma das
especialidades, disponibilizadas em formato digital 2D, mais concretamente as suas plantas e
cortes.
Relativamente informao dos equipamentos, foi necessrio fazer um estudo prvio de qual
a informao a utilizar, bem como quais os equipamentos mais importantes para inserir mais
ou menos informao. Como a informao disponibilizada era bastante elevada, tornou-se
fundamental ordenar essa informao segundo as caractersticas pretendidas na criao da folha
de clculo para a prxima fase de trabalho. A informao recolhida foi ento ordenada segundo:
i) Marca/Modelo; ii) Caractersticas da garantia; iii) Tempo de vida til; iv) Dimenses; v)
Forma, tamanho e cor; vi) Acabamento; vii) Constituintes; viii) Manual de utilizao.
importante ter em conta que esta informao dos equipamentos foi obtida com a finalidade
de ser inserida posteriormente no ficheiro COBie, que no mais que a base de dados do
modelo.
583
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A modelao foi feita com recurso ao software de modelao Autodesk Revit 2016. A escolha
deste software teve por base a dimenso do projeto e as especialidades a serem modeladas, uma
vez que se trata de uma instalao de pequenas dimenses e o Revit contempla todas as
especialidades, no sendo necessrio recorrer ao mtodo de worksharing. Apenas foram
modeladas as especialidades mais importantes para a finalidade deste trabalho: arquitetura e
rede de guas residuais. Os elementos presentes na especialidade de estruturas so elementos
que no precisam de manuteno sistemtica frequente, pelo que devem ser monitorizados, no
necessitando, contudo de inspees feitas regularmente, principalmente pela instalao ser
bastante recente. A especialidade de eletricidade tambm foi excluda do mbito deste trabalho.
O LOD obtido no presente trabalho foi condicionado por alguns aspetos: o desconhecimento
inicial do software de modelao, bem como as poucas competncias do autor em modelao,
foram um fator limitante, conjugado com a no existncia de uma base de dados com objetos
BIM de cada fornecedor, tornou quase impraticvel a modelao de todos os equipamentos do
objeto de estudo; outro fator a ter em conta est relacionado com a informao fornecida, dado
que esta informao, principalmente dos equipamentos, foi facultada atravs de catlogos dos
fabricantes. No entanto, o pretendido obter a maior base de dados para que o ficheiro COBie
criado esteja conforme as normas, e o que acontece que essa informao no igual para
todos os equipamentos, o que dificulta essa criao. Deste modo, o LOD obtido no presente
trabalho foi o LOD 400, que corresponde a um nvel de desenvolvimento de uma maturidade
elevada. Devido s condies anteriormente descritas, no foi possvel obter o LOD 500, apesar
de ser o indicado como o ideal no processo do Facility Management.
3.1. Arquitetura
Como referido anteriormente, a modelao da arquitetura teve por base os elementos de projeto
fornecidos. Uma das principais dificuldades sentidas no processo de modelao foi encontrar
coerncia entre os desenhos fornecidos e o que foi construdo na realidade. Depois de vrias
visitas ao local da instalao e reunies com a empresa responsvel pela execuo da mesma,
foi possvel verificar que o projeto fornecido corresponde a um projeto-tipo de uma estao
elevatria, tendo sido adaptado a cada uma das treze estaes existentes no plano de
interveno. Na estao em estudo, constatou-se que existiam algumas alteraes ao projeto
inicial. As mais visveis, principalmente ao nvel do solo, so as tampas de saneamento, que no
projeto esto marcadas como tendo uma forma quadrada e com uma determinada medida, e na
realidade so redondas e com um dimetro diferente. Outra dificuldade sentida reside no facto
de a planta no indicar com grande rigor a localizao das diferentes cmaras (aspirao,
entrada e inspeo), apenas tendo sido possvel concluir sobre ela com visitas ao local da
instalao. Foi tambm feito um levantamento no local de todas as medidas necessrias para
modelar corretamente os diferentes elementos da envolvente, como o passeio, lancis e
distncias entre tampas (Figura 3). A Figura 4 representa um corte da estao elevatria.
584
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 4: Corte.
Concluda a modelao da parte fsica do modelo, foi tambm necessrio definir os espaos que
constituem cada zona, cuja identificao seguiu a estrutura organizacional dos COBie, pois s
segundo a definio correta dos espaos ser possvel saber a localizao dos vrios
componentes presentes nos vrios nveis. Assim, no presente trabalho, considerou-se a diviso
em quatro espaos principais, a cmara de aspirao, cmara de entrada, cmara de manobras
e cmara tcnica.
Nesta fase, a informao utilizada tem um papel fulcral no sucesso da metodologia. Para a
realizao deste modelo foi necessrio um maior nmero de informao, que teve por base o
maior nmero de especialidades, bem como um maior nmero de equipamentos que constitui
cada uma dessas especialidades. Por se tratar de equipamentos muito especficos, verifica-se
que o Revit no possui uma famlia que os represente, com os parmetros necessrios de acordo
com as especificaes do projeto. Por exemplo, para o grupo eletrobomba submersvel, apesar
585
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Deste modo, o prximo passo na criao do modelo MEP foi a modelao da especialidade das
instalaes hidrulicas, nomeadamente o sistema de saneamento de guas residuais. As
informaes fornecidas apenas indicavam as ligaes no interior da estao elevatria, no
tendo sido facultada qualquer informao da localizao e das cotas das tubagens na envolvente
da instalao. Estas informaes foram recolhidas junto da entidade responsvel pela
construo da instalao, o que permitiu ento concluir sobre a localizao das tubagens para a
criao do modelo (Figura 5).
586
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Comentrios Finais
A principal dificuldade sentida na parte da modelao foi a falta de congruncia entre as peas
de projeto fornecidas e o que efetivamente foi construdo. Isto condiciona quem modela, uma
587
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Outro problema que se verificou foi a falta de conhecimento por parte das empresas de
equipamentos sobre esta metodologia. No se encontrou, em grande parte dos casos, nenhum
equipamento modelado por parte da marca, e nos casos em que existia o equipamento, no era
possvel aceder informao que compe o ficheiro COBie. Isto faz com que se perca tempo
no processo de modelao dos equipamentos e na pesquisa da informao que necessrio
introduzir no modelo.
Referncias
[1] Saleh, A., Kamarulzaman, N., Hashim, H., Hashim S. (2011). An Approach to Facilities
Management (FM) Practices in Higher Learning Institutions to Attain a Sustainable
Campus (Case Study: University Technology Mara -UiTM). Procedia Engineering, 20,
269-278. doi:10.1016/j.proeng.2011.11.165.
[2] Lavy, S., Jawadekar, S. (2014). A Case Study of Using BIM and COBie for Facility
Management.
[3] GSA Guide (2012). 3D-4D Building Information Modeling.
[4] ISO 55000 (2014). Asset management Overview, priciples and terminology.
[5] Soares, J. (2013). A metodologia BIM-FM aplicada a um caso prtico. Relatrio de
Estgio para obteno do Grau de Mestre em Engenharia Civil, Instituto Superior de
Engenharia do Porto, Porto.
[6] Jordani, D. (2010). BIM and FM: The Portal to Lifecycle Facility Management. Journal
of Building Information Modeling, 10, 13-16. Lavy, S., Jawadekar, S. (2014). A Case
Study of Using BIM and COBie for Facility Management.
[7] Aubin, P. F. (2011). Autodesk Revit Families: A Step-by-Step Introduction. Autodesk
University 2011 (p. 35). Las Vegas: Autodesk.
[8] Pilgrim, L., Wood, D., Lacey, P. (2011). Maximo Extension for Building Information
Models (BIM).
[9] Alves, A. (2008). Sistemas Integrados de Manuteno: Processo SIM. Dissertao
apresentada para a obteno do grau de Mestre em Engenharia Civil, Faculdade de
Engenharia da Universidade do Porto, Porto.
588
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
A evoluo crescente das construes levou visualizao de edificaes mais complexas e
sofisticadas usando novas tecnologias. Com esta evoluo, os nveis de exigncia dos
utilizadores aumentaram, fazendo com que seja necessrio acrescentar mais informao aos
edifcios. Surgem novas preocupaes no s na fase de conceo mas tambm ao longo da sua
vida til, acrescentando assim mais valor e ateno por parte dos donos de obra fase de
manuteno e operao.
O Facilities Management (FM) diz respeito gesto de recursos onde se combinam os locais
fsicos, os intervenientes e a gesto de processos. J o Building Information Modeling (BIM)
permite armazenar toda a informao ao longo de todas as fases do ciclo de vida de uma
edificao. Assim sendo, compreende-se a necessidade atual da utilizao do BIM no FM,
criando assim a metodologia BIM for Facilities Management (BIM-FM) que consiste na gesto
das instalaes tendo como apoio os recursos BIM.
Este artigo tem como principal objetivo a demonstrao do contributo que o BIM pode oferecer
na otimizao da gesto da utilizao dos edifcios bem como para a sustentabilidade dos
respetivos edifcios.
1. Introduo
O presente artigo baseia-se na dissertao de mestrado integrado que o primeiro autor est a
desenvolver na Universidade do Minho em regime de colaborao com a empresa BIMMS.
Vrios estudos indicam que com uma correta manuteno se consegue aumentar a durao de
vida de um equipamento entre 30 a 40% em comparao com um equipamento que tenha uma
manuteno inadequada [1].
589
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
O Facilities Management (FM) diz respeito gesto de recursos onde se combinam locais
fsicos, os intervenientes e a gesto de processos, de maneira a criar uma gesto de servios
com maior organizao e eficincia na coordenao das operaes e manutenes [2]. Contudo,
o uso tradicional do FM contm algumas limitaes, nomeadamente, a sua tradicional falta de
capacidades grficas [3]. Para poder ultrapassar estas limitaes pode recorrer-se ao uso da
metodologia Building Information Modeling (BIM) que uma metodologia onde existe
comunicao entre todos os intervenientes do projeto e partilha da informao de todas as fases
do mesmo. Deste modo, compreende-se a incorporao do BIM na metodologia FM, tornando-
se assim a metodologia BIM for Facilities Management (BIM-FM) que apoia a gesto das
instalaes.
Considerando que o FM tem vindo a ser estudado e desenvolvido desde 1950 [4] e que o BIM
tambm se encontra em desenvolvimento e investigado por diversos especialistas, pretende-
se com este artigo contribuir para a divulgao do papel e contributo do BIM no FM, na
combinao BIM-FM.
2. Enquadramento
2.1 Manuteno
A manuteno um conjunto de diversas aes com o objetivo de garantir o bom
funcionamento de mquinas e instalaes, ou seja, com o propsito de reparar ou repor o que
se encontra estragado ou sem a funcionalidade desejada, de modo que consigam desempenhar
as funes primitivamente requeridas, evitando a perda de funo ou mesmo a reduo do
rendimento [5].
Para conseguir que este tipo de sistema seja eficaz, necessrio adotar polticas planeadas por
um gestor com um forte domnio na rea da manuteno. Este gestor fica encarregue de definir
uma poltica que se adeque ao tipo de manuteno que se deseja realizar de forma a manter o
desempenho funcional exigido inicialmente, atravs de aes preventivas, corretivas ou mesmo
preditivas, tendo em considerao tanto aspetos econmicos, como sociais, culturais e
histricos [5] [6]. O proprietrio do edifcio ou maquinaria pode exercer o papel de gestor, bem
como o administrador do condomnio, se for o caso. possvel tambm dar esse cargo a uma
entidade especializada na rea da manuteno. Existem vrios tipos de manuteno tais como
manuteno preventiva, corretiva e preditiva [5].
590
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A gesto e manuteno de edifcios uma rea que envolve um grande nmero de servios
(Figura 1) o que, consequentemente, torna o seu custo elevado, sendo de grande interesse para
qualquer entidade gestora a otimizao dos seus custos. Assim, compreensvel que o uso do
FM seja aplicado nesta rea, pois tem a finalidade de gerir da melhor forma os vrios processos
e servios existentes.
2.3 BIM
O BIM no se baseia apenas em modelos computacionais tridimensionais, mas sim, em toda a
informao associada aos componentes desses modelos e equipamentos neles existentes. Para
591
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
alm disto, toda esta informao pode ser gerida durante a vida til da edificao (Figura 2). A
utilizao do BIM uma mais-valia para a rea de gesto da manuteno, pois torna as
intervenes de manuteno mais rpidas, confiveis e corretas devido representao do
edifcio em 3D e ao facto de toda a informao do mesmo estar reunida numa nica base de
dados. Assim, qualquer responsvel pela operao do edifcio pode recorrer ao modelo
tridimensional, com o intuito de conseguir as informaes necessrias para operar, tendo
tambm a possibilidade de acrescentar informao nesse mesmo modelo, garantindo que
qualquer alterao que se efetue neste o torna automaticamente atualizado [10].
3. Software BIM
Ao realizar a modelao do edifcio virtual necessrio que o modelo virtual contenha toda a
informao, a sua representao grfica, a anlise construtiva, a quantificao de trabalhos e do
tempo de mo-de-obra. Para isto preciso utilizar software de modelao tal como o Revit,
Archicad, Allplan, VectorWorks, Cype, Tekla Structures, entre outros [12].
A metodologia BIM for Facilities Management (BIM-FM) consiste na gesto das instalaes
tendo como apoio os recursos obtidos, sejam estes modelos tridimensionais, base de dados ou
qualquer outro tipo de informao proporcionada pela metodologia BIM. O tempo que uma
equipa de gesto de instalaes demora a fazer uma avaliao, por vezes ultrapassa o desejvel.
Com todas as informaes disponibilizadas quando aplicada a metodologia BIM, possvel o
acesso quase instantneo a essas informaes, poupando assim bastante tempo em fazer anlises
morosas [13], como por exemplo os detalhes, a localizao e historial, o fabricante, as normas,
os custos de desempenho, entre outros.
592
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
incentiva a recolher e a introduzir a informao no modelo assim que ela obtida, mudando
assim a forma como a informao reunida [14].
3.1 Archibus
O Archibus tem o objetivo de reduzir a complexidade da gesto das empresas [16]. Este
software permite: gesto do portflio imobilirio, gesto do investimento, gesto e planeamento
de espao, gesto de movimentos, gesto de ativos, gesto ambiental e de risco, operaes de
construo, gesto de servios e extenses de tecnologia (Figura 4).
3.2 ArchiFM
O ArchiFM, desenvolvido pela vintoCON Ltd, uma ferramenta FM que funciona em conjunto
com o software ArchiCAD da Graphisoft (Figura 5). Esta soluo foi desenvolvida com o
intuito de proporcionar uma gesto das instalaes durante o ciclo de vida til do edifcio,
utilizando um modelo grfico criado no ArchiCAD.
Nesta parceria possvel aceder a um visualizador web onde o utilizador pode realizar a gesto
sem ter que possuir o software de modelao. Esta ferramenta possui trs reas, nomeadamente
593
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.4 EcoDomus
O EcoDomus fornece solues BIM-FM, que trabalham com vrios sistemas como modelos
BIM (Figura 6), sistemas FM, sistema GIS, sistema de automatizao predial (BAS Building
Automation Systems), o que permite gerir as instalaes com uma maior eficincia. O
EcoDomus fornece duas ferramentas, o EcoDomus PM e o EcoDomus FM. O primeiro
possibilita a integrao dos dados BIM em ferramentas FM e o segundo possibilita a integrao
em tempo real do BIM com Building Automation Systems. Pode servir como uma base de dados
das instalaes que pode ser sempre atualizada e que permite a filtragem de informao por
localizao e rea [13] [19].
594
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.5 FM:Interact
O FM:Interact foi criado pela FM:Systems e consiste numa ferramenta composta por um
conjunto de aplicaes que permitem organizar e analisar os dados relativos s instalaes.
Contm uma ligao bidirecional (Figura 7) com o Revit da Autodesk, atravs do qual tem
acesso a plantas e dados do modelo BIM, com o intuito de usar essa informao para a fase de
operao e gesto das instalaes [13]. As reas principais desta ferramenta so Space
Management (Gesto do espao), Strategic Planning (Planeamento estratgico) e Asset
Management (Gesto de ativos). O Space Management possibilita a criao de inventrios com
os detalhes dos espaos, da ocupao e benchmarking das instalaes de forma a melhorar as
taxas tanto da utilizao do espao como da ocupao. O Strategic Planning permite criar
planos de estratgia com base em anlises de requisitos do nmero de funcionrios e previso
de espao necessrio. O Asset Management possibilita a localizao de ativos fsicos como
equipamentos, computadores, mveis e sistemas, entre outros. O FM:Interact contm ainda
outros mdulos que so: Facility Maintenance, Move Management, Project Management, Real
Estate, Space Reservation, Sustainability. FM:Mobile.
595
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
3.6 Maximo
O IBM Maximo uma soluo destinada para a gesto de ativos fsicos. Esta ferramenta
permite que as organizaes consigam gerir todo o tipo de ativos (produo, infra-estrutura,
instalaes, transportes e comunicaes). Para fornecer servios de otimizao, o Maximo,
apresenta seis reas de gesto (Figura 8) nomeadamente gesto de ativos, gesto de trabalho,
gesto de servio, gesto de contratos, gesto de inventrios e gesto de Procurement [22].
3.7 YouBIM
O YouBIM proporciona uma base de dados integrada e com acesso instantneo informao
das instalaes. No que se trata de gesto das instalaes, o YouBIM permite aceder dados e
documentao do fabricante, aos objetos da base de dados do modelo online (Figura 9) do
edifcio e para alm disso contm uma gesto de manuteno programada dos equipamentos do
edifcio [24].
596
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Aplicao Prtica
O facto deste trabalho abranger vrias reas, tanto no desenvolvimento do modelo, como na
reunio e remoo de informao deste mesmo modelo, suporta a necessidade de alerta devido
a vrios aspetos no desenvolvimento do trabalho. Contudo neste projeto as reas trabalhadas
so a gesto e planeamento de espao, gesto de ativos, operaes de construo e gesto de
servios.
Neste projeto, inicialmente, a recolha de dados comeou por toda a informao que se encontra
no formato digital, contudo, nem todas as informaes esto nesse formato. Na informao
recolhida importante ter bem definido quais os dados essenciais, para que a modelao dos
equipamentos seja o mais leve possvel para no sobrecarregar o modelo.
4.3 Modelao
No que toca modelao, necessrio ter em conta alguns aspetos, tais como: saber se se trata
de uma construo nova ou de uma j existente e se j se encontra modelado ou se ainda se
encontra em planta, sendo que a variao destes fatores define a trajetria do processo. Se o
projeto for novo, toda a informao diretamente direcionada para o modelo que ser realizado,
caso contrrio, se o caso de estudo for um projeto existente, necessrio saber se j existe ou
no uma modelao. Caso no exista, a modelao criada de raiz; caso exista, necessrio
saber se preciso realizar alteraes no modelo. Ainda nesta fase, necessrio introduzir toda
a informao recolhida relativamente ao edifcio e equipamentos.
Neste caso a modelao j existia e foi criada com recurso ao software Autodesk Revit (Figura
10). A modelao Revit consiste em trs especializaes: Arquitetura, Estrutura e MEP, estas
podem estar ou no separadas. Optou-se por, inicialmente, usar a especialidade de arquitetura
de modo a simplificar o processo e o tamanho do modelo, no entanto tambm essencial fazer
uma adaptao ao contexto e s necessidades deste trabalho.
597
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No presente caso prtico, a ferramenta BIM-FM utilizada foi o ArchiBUS, que possibilita fazer
a gesto e planeamento de espao, a gesto de ativos, as operaes de construo e os servios
do local de trabalho. Para isso, primeiramente, necessrio que os dados recolhidos relativos
ao edifcio e aos equipamentos se encontrem no modelo Revit para que este esteja preparado
para a integrao do ArchiBUS.
598
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluses
A metodologia BIM-FM, devido ao facto de ainda estar em fase de desenvolvimento, pode ser
alvo de alguma resistncia, sendo importante difundir o seu interesse como ferramenta de apoio
manuteno das instalaes, mudando o modo como o trabalho desenvolvido e facilitando
certas tarefas. Para que este trabalho seja devidamente desenvolvido necessrio, no s uma
ao colaborativa de todos os intervenientes, mas tambm a existncia de documentao ou
uniformidade da documentao do caso em estudo. Em obras onde a metodologia BIM est
implementada, a conexo com o FM mais rpida e simples devido informao j existente
acerca destas. O contributo desta metodologia deveras importante na elaborao de um projeto
j que permite uma uniformizao no processo de trabalho, contrariamente ao que acontecia no
processo tradicional, onde a gesto das instalaes e a restante construo so duas fases
independentes. Com a introduo da metodologia BIM-FM, esta discriminao desaparece e o
mtodo de processo torna-se uniforme, o que traz maior funcionalidade e utilidade ao Dono de
Obra. Relativamente ao Software utilizado, ArchiBUS, torna-se fcil a implementao do BIM-
FM porque possvel retirar diretamente a informao do modelo Revit para o servidor e como
existe uma relao bidirecional possvel atualizar os dados em ambos os Software. Durante a
sua aplicao, possvel aferir que o uso deste tipo de plataformas web colaborativas muito
importante pois permite o acesso e controlo por todos os intervenientes, diretamente implicados
na gesto dos ativos.
Referncias
[1] S. Raposo, A gesto da manuteno de edifcios - Uma introduo ao tema, Faro, 2012.
[2] D. Sapp, Facilities Operations & Maintenance. 2013 [Online] Available at:
http://www.wbdg.org/om/om.php [Accessed: March 15, 2015].
[3] Azenha, M., Lino, J.C. & Caires, B., Introduo ao BIM - BIM na Engenharia Civil:
Projeto e Construo. In U. do Minho, ed. Unidade curricular: BIM na Engenharia Civil
- Projeto e Construo. Guimares, 2015.
[4] A. D. Weise, C. A. Schultz, and R. A. da Rocha, Facility Management: contextualizao
e desenvolvimento, in 11a Conferncia Internacional da LARES, 2011.
[5] J.Moreira, Manuteno Preventiva de Edificios - Proposta de um Modelo Empresarial,
Dissertao de Mestrado, Faculdade de engenharia da Universidade do Porto, 2010.
[6] J. Ramos, Gesto de Instalaes, Dissertao de Mestrado, Instituto Superior de
Engenharia de Lisboa, 2012.
[7] A. Nour, Manuteno de Edifcios - Diretrizes para elaborao de um sistema de
manuteno de edifcios comerciais e residenciais, Escola Politcnica da Universidade
de So Paulo, So Paulo, 2003.
[8] BS EN 15221-3:2011 Facility Management. Guidance on quality in Facility
Management, 2012.
[9] TCMS, Facilities Management, 2016. [Online]. Available:
http://www.tcmsltd.com/services/facilities-management/. [Accessed: 20-Sep-2016].
[10] J. C. Lino, M. Azenha, and P. Loureno, Integrao da Metodologia BIM na Engenharia
de Estruturas, Encontro Nac. Beto Estrutural -BE2012, 2012.
[11] B. Haines, Ensured Success with a distributed BIM Lifecycle process, 2015. [Online].
Available: https://fmsystems.com/blog/distributed-bim/. [Accessed: 16-Sep-2016].
599
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
600
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Resumo
O consumo de energia primria no setor dos edifcios de habitao e de servios tem vindo a
despertar um crescente interesse global, principalmente devido ao grande potencial de
poupana disponvel atravs de medidas de melhoria de eficincia energtica e da utilizao de
fontes de energias renovveis.
Existem vrios planos de ao para a progresso gradual para edifcios com necessidades quase
nulas de energia (nZEB nearly Zero Energy Buildings) a ser implementados em simultneo
nos diversos estados membro da Unio Europeia. Estas aes decorrem das transposies da
Diretiva 2010/31/EU Reformulada (EPBD - Recast: Energy Performance of Buildings
Directive) tendo em conta o contexto nacional de cada estado membro.
Ambas as metodologias recorrem a uma simulao dinmica multizona com recurso a uma
aplicao acreditada pela norma ASHRAE 140. Na abordagem tradicional os inputs necessrios
so obtidos a partir de peas desenhadas em 2D e da informao retirada das memrias
descritivas dos respetivos projetos de arquitetura e especialidades. Na abordagem alternativa os
inputs necessrios so retirados de um nico modelo criado numa plataforma BIM.
601
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
1. Introduo
Apesar da evoluo que o SCE tem sofrido ao longo dos ltimos dez anos dois aspetos
permanecem inalterados: i) a necessidade de verificar o cumprimento regulamentar e de
quantificar o desempenho energtico numa fase de projeto e ii) a necessidade de verificar a
concordncia entre a obra concluda e o projeto aprovado e previamente certificado no mbito
do SCE.
Os tcnicos responsveis por este tipo de anlise tm duas tarefas principais: i) reunir toda a
informao relevante para a criao de um modelo energtico do edifcio e ii) fornecer
resultados que apoiem o processo de deciso ao longo das diversas fases do projeto e garantam
o cumprimento regulamentar. Este processo envolve habitualmente a utilizao de complexas
ferramentas de modelao energtica, requerendo elevadas cargas de trabalho para a recolha e
correta introduo da mirade de dados necessria simulao do desempenho energtico do
edifcio [4]. A modelao/simulao energtica, numa fase prematura do projeto, constitui uma
forma eficaz de prever e reduzir consumos energticos em edifcios de qualquer tipologia.
Contudo, ainda habitual encontrar situaes em que a AEE realizada numa fase avanada
de projeto, onde decises cruciais j foram tomadas e o papel do especialista em energia
apenas o de fornecer os resultados da simulao para efeitos de verificao de cumprimento
regulamentar e emisso de pr-certificado energtico (PCE).
602
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
603
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Por outro lado, nos edifcios de servios, objeto do presente estudo, a regulamentao atual do
SCE introduz modificaes importantes na metodologia de clculo dos consumos previstos e
da classificao energtica. Esta ltima deixa de ser baseada em condies nominais de
funcionamento, numa lgica de benchmarking, e passa a ser efetuada em condies reais,
considerando a envolvente trmica, o clima local, a ventilao, a exposio solar do edifcio em
estudo, comparando os consumos deste com aqueles do edifcio nocional ou de referncia
(Figura 2).
Figura 2: Classificao energtica de um edifcio de servios com base nos IEE (Fonte e
elaborao: ADENE).
Existe a possibilidade de basear o clculo em consumos efetivos, mas essa metodologia sai for
do mbito do presente estudo. Este contempla apenas edifcios novos ou, quando enquadrados
como existentes no mbito do SCE, sem um histrico de consumos documentado i.e. sem
faturas de fornecedores de energia ou campanhas de monitorizao.
604
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
A realizao de uma simulao vlida requer a introduo direta dos dados que caracterizam o
edifcio em estudo tais como a envolvente trmica (geometria e solues construtivas), dados
meteorolgicos locais em formato normalizado, caractersticas dos sistemas de aquecimento,
ventilao e ar condicionado (AVAC), perfis de operao para as diversas tipologias de
utilizao do edifcio, cargas e ganhos internos por espao (ocupao, iluminao e
equipamentos) e tarifas dos comercializadores de energia. Esta informao encontra-se
normalmente dispersa por peas escritas e desenhadas dos projetos de arquitetura e
especialidades do edifcio, especificaes tcnicas de fabricantes, levantamentos fotogrficos,
relatrios de peritagem, etc. (Figura 3-a). Os ficheiros de dados de entrada que contm a
informao relevante so lidos pelo algoritmo de simulao de forma a calcular as cargas
trmicas do edifcio e os consumos de energia final e primria associados ao edifcio em estudo.
605
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Com o caso de estudo proposto, procura-se dar uma resposta s questes formuladas na
introduo e ao mesmo tempo dar alguns exemplos concretos que ajudem a entender de que
forma se pode melhorar a convergncia entre o modelo geomtrico e o modelo analtico, sempre
com o foco na certificao energtica de edifcios de servios.
606
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
requisitos da norma ASHRAE 140 [9], ii) o nvel de detalhe compatvel com as exigncias
regulamentares [14] e iii) fcil avaliar medidas de melhoria de desempenho energtico
baseadas na operao dos equipamentos (e.g. tcnicas de arrefecimento noturno com ar novo,
ajuste de set-points de climatizao e iluminao, etc.).
O edifcio em questo j tinha sido objeto de certificao energtica, com obteno dos
indicadores relevantes atravs do processo tradicional (esquematizado na figura 3-a). Foi
necessrio criar um modelo BIM do edifcio para poder chegar aos resultados necessrios a
uma nova certificao energtica atravs do processo esquematizado na figura 3-b. O modelo
BIM foi desenvolvido de raiz na plataforma Revit 2017, a partir das telas finais do projeto de
arquitetura, da informao relevante dos projetos de especialidades e de inspees pontuais no
edifcio construdo.
607
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
No tipo ii) o problema principal envolveu a categoria das janelas e a perda das propriedades
analticas dos vos envidraados durante o processo de exportao para o ficheiro gbXML. A
forma prtica de resolver o problema foi a edio direta dos parmetros na interface do HAP.
Trata-se de um procedimento expedito uma vez que os vos envidraados so caracterizados
apenas por dois parmetros, o coeficiente de transmisso superficial de calor do vo U, expresso
em W/(m2.K) e o fator de sombreamento (shading coefficient SC), adimensional e que se
relaciona com o fator solar (solar heat gain coefficient SHGC) atravs da expresso
SHGC = 0,87 SC. Foi apenas necessrio introduzir estes dois parmetros para cada tipo de vo
envidraado no modelo analtico e todos os elementos foram atualizados. O inconveniente que
da resultou foi a criao de alguma divergncia entre o modelo BIM e o modelo analtico [12]
uma vez que a informao relevante para efeitos de desempenho energtico passou a residir
apenas no modelo analtico.
Um problema mais difcil de contornar consiste nas limitaes existentes nas propriedades de
alguns elementos. No presente caso de estudo salientam-se duas categorias de elementos
utilizados: vos envidraados e sistemas AVAC. Para ambas as categorias o Revit 2017 assume
um conjunto de solues construtivas ou tipologias pr definidas e assume que os
608
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
elementos/objetos utilizados devero pertencer a uma delas. Mais uma vez a necessidade de
contornar este problema atravs da edio manual de parmetros na interface da ferramenta de
anlise revela-se como a nica forma de chegar a resultados fiveis.
609
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Figura 8: Tabelas de paredes agrupadas por orientao (Revit 2017 e HAP 4.8).
Uma forma de realizar um controlo de qualidade mais abrangente e eficaz consiste na utilizao
de visualizadores gbXML adequados. Desta forma possvel verificar a convergncia entre
modelo de arquitetura e modelo analtico em todas as vertentes relevantes. No caso em estudo
utilizou-se o FZK Viewer [21] (Figuras 9 e 10), permitindo uma rpida verificao da geometria
(envolvente e espaos), da coerncia entre solues construtivas e dos perfis associados a cada
espao (ocupao, iluminao e equipamentos).
610
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
4. Resultados
A simulao dinmica multizona foi efetuada atravs da ferramenta HAP 4.80 [13]. Esta
simulao procura traduzir o consumo anual de energia do edifcio com base na localizao do
edifcio, nas caractersticas da envolvente, na eficincia dos sistemas tcnicos e nos perfis de
utilizao previstos para o edifcio.
611
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
5. Concluses
612
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Referncias
[1] Decreto-Lei n 78/2006 Sistema Nacional de Certificao Energtica (SCE), D.R. I Srie
A n 67 (2004-03-19) p. 2411-2415.
[2] Diretiva 2002/91/CE do Parlamento Europeu e do Conselho de 16 de Dezembro de 2002
relativa ao desempenho energtico dos edifcios, Jornal Oficial das Comunidades
Europeias.
[3] Diretiva 2010/31/UE do Parlamento Europeu e do Conselho de 19 de Maio de 2010
relativa ao desempenho energtico dos edifcios (reformulao), Jornal Oficial da Unio
Europeia.
[4] H. Kim, Z. Shen, I. Kim, K. Kim, A. Stumpf, and J. Yu, "BIM IFC information mapping
to building energy analysis (BEA) model with manually extended material information,"
Automation in Construction, vol. 68, pp. 183-193, 8// 2016.
[5] A. Stumpf, H. Kim and E. Jenicek, Early design energy analysis using building
information modeling technology, Relatrio Tcnico, US Army Corps of Engineers,
ERDC/CERL TR-11-41, 2011.
[6] ADENE, Agncia para a Energia, Informao retirada de um certificado energtico
emitido em 22/09/2016.
[7] S. M. C. Magalhes and V. M. S. Leal, "Characterization of thermal performance and
nominal heating gap of the residential building stock using the EPBD-derived databases:
The case of Portugal mainland," Energy and Buildings, vol. 70, pp. 167-179, 2// 2014.
[8] J. B. Kim, W. Jeong, M. J. Clayton, J. S. Haberl, and W. Yan, "Developing a physical
BIM library for building thermal energy simulation," Automation in Construction, vol.
50, pp. 16-28, Feb 2015.
[9] ANSI/ASHRAE, "ASHRAE 140:2001 Standard method of test for the evaluation of
building energy analysis computer programs," American Society of Heating,
Refrigerating and Air-Conditioning Engineers (ASHRAE), 2001.
[10] Green Building Studio, v. 2016.180.35.7 (DOE-2.2-48r), http://gbs.autodesk.com,
acedido em 23/09/2016.
[11] Autodesk, Revit, http://www.autodesk.com/products/revit-family, acedido em
23/09/2016.
[12] K. Negendahl, "Building performance simulation in the early design stage: An
613
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
614
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
NDICE DE AUTORES
Alexandre Marques 163, 173 Diogo Coelho 437
Alfredo Soeiro 419 Diogo Drumond 19
Ana Alves 527 Diogo Ribeiro 381
Ana Quintela 153 Fbio Alexandre Matoseiro Dinis 45
Ana Silva 87 Fernanda Rodrigues 309, 527, 579
Ana Tom 513 Fernando F.S. Pinho 143
Andr Ferreira 163, 173 Flvio Silva 87
Andr Monteiro 69, 77, 209 Francisco Reis 33, 153
Andr Reis Antunes 463, 547 Francisco Teixeira Bastos 239, 321
Andr Santos 381 Gabriel Lopes 297, 359
Andr Silva 19 Henrique Nunes 143
AnneMarie Mushamalirwa 463 Hugo Pina 579
Antnio Aguiar Costa 463, 547, 567 Hugo Rodrigues 527, 579
Antnio Leito 239, 251, 285 Ins Caetano 239
Antnio Lopes 501 Joana Arajo 475
Antnio Raposo 57 Joo Fernandes 343
Armando Pinto 309 Joo Frescata Pereira 513
Bruno Caires 33 Joo Lima 77
Bruno Costa 381 Joo M. Barroso 121
Bruno Ferreira 251 Joo Morgado 437
Carlos Canelhas 57 Joo Oliveira 19
Celso Lima 173 Joo Pedro Couto 153, 195, 333, 409, 427,
Cludio Carvalho 567 437, 475, 589
Cludio Gomes 185, 381 Joo Poas Martins 45, 419, 395
Daniel Marcelo Ferreira 601 Joaquim Danado 109
Daniela Silva 87 Jorge de Mello Vieira 219, 537
Diana Bastos Silva 559 Jorge G. Fernandes 121
Dinis Leito 437 Jorge M. Branco 121
615
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Jos Carlos Lino 33, 185, 195, 227, 333, Rafael Vieira 263
343, 409, 475, 489, 559, 589 Raquel Matos 527
Jos Cidades 57 Raul Lana Miguel 601
Jos PintoFaria 559 Ricardo Resende 501
Juliana Fernandes 427 Ricardo Santos 185, 343
Kamar Aljundi 309 Rita Rebelo Pvoas 321
Lus Coroado 501 Rodrigo Giollo 451
Lus M. P. Rodrigues 77, 219, 537 Rodrigo Sacadura 501
Lus Pedro Bidarra 333 Rosaldo Rossetti 131
Lus Ribeirinho 77, 209 Ruben Santos 547
Lus Sanhudo 395 Rui Dias 87
Lusa M. S. Gonalves 227, 567 Rui Gavina 381
Manuel Tender 427 Sara Eloy 501
Maria Helena Teixeira 501 Sofia Feist 285
Maria Joo Falco Silva 143, 451 Sofia Henriques 77, 219, 537
Martim Bernardo Ribeiro 99, 371 Taisiia Mitina 227
Miguel Azenha 131, 163, 195, 333 Tiago Gouveia 409
Miguel Chichorro Gonalves 99, 371 Vtor Mineiro 131
Miguel Conceio 209 Wilson Dias 589
Miguel Pires 69
Miguel Sales Dias 501
Nuno Lacerda 33
Nuno Pires 489
Paula Couto 143, 451
Pedro Mda Magalhes 99
Pedro Mota da Silva 579
Pedro Rocha 371
Pedro Santiago 275
Pedro Serra 57
616
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
617
1 Congresso Portugus de Building Information Modelling
24 e 25 de novembro de 2016, Universidade do Minho, Guimares
Universidade do Minho
www.ptbim.org
ISBN: 978-989-8793-04-1
DOI:618
https://doi.org/10.5281/zenodo.166758