ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

REVIEW COMMENTS ON:-


DOCUMENT TITLE: UTILITY FLOW SCHEME FUEL AND INSTRUMENT GAS SYSTEM

DOCUMENT NO: NTC-OB3-LOTA-X-DW-013 (A 04)

S. SHEE
N T FRAZIMEX RESPONSE IMPaC COMMENTS FRAZIMEX RESPONSE
COMMENTS
O NUM
. BER
1. 1 of 1 1- Kindly write 1. Implemented 1. Implemented
flow rate instead
2. Auto blow down
of design flow 2. Not implemented 2. Implemented
valve already
rate in data
provided upstream of
panels.
the preheater. High
2- Kindly provide
pressure can NEVER
auto blow down
be trapped in the
valve at outlet of
preheater because
pre-heater or
there is nothing to
relocate / shift the
3. Implemented
trap the gas.
auto-blow down
valve (10-BDV-
802) from
3. Implemented 10-
instrument gas
SDV-813 added
scrubber to outlet

FILE: 360736057.docx Dated: 26-Jun-2015 SHEET 1 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

of pre-heater 4. Not implemented 4. Implemented


because high
4. This drawing
pressure gas will
representing the
trap in the section
instrument gas
of pre-heater.
dryers system are
Kindly review it.
3- Shut down valve only indicative and
after 10-LCV-831 should be accepted
shall be provided as such. Fuel Gas
in order to avoid Dryers are
5. Implemented
gas-blow by in proprietary, therefore
6. Implemented
case of stuck- each vendor has
open of LCV or specific drawing
low level of their fuel gas dryer 5. Not implemented
liquid in system. Please not
6. Not Implemented
instrument gas that fuel gas are not
scrubber. dried with dry gas
4- Both adsorption
but with desiccants
and regeneration 7. Implemented
both the adsorption
lines after dryers
and regeneration
are routing
processes.
towards
instrument gas

FILE: 360736057.docx Dated: 26-Jun-2015 SHEET 2 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

receiver. 5. Vendor to advise


6. Please can you
Regeneration
provide the reasons
cycle will be
for the requesting
done with dry gas
NRV before the
and regenerated
instrument gas
gas will be wet
receiver.
gas and it cannot
7. It is a statutory
be routed to
requirement for a
instrument gas
vessel operating at
receiver and
more than 3bar. For
therefore
inventory evacuation
regenerated gas
in case of
should be
emergency.
recycled. Please
provide the
process
description of
dryer package.
Also provide the
flow rate for
regeneration
cycle in data
panel of dryers.

FILE: 360736057.docx Dated: 26-Jun-2015 SHEET 3 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

5- Column for Cycle


time with VTS
should be
provided in data
panel of
instrument gas
dryers.
6- NRV should be
provided before
instrument gas
receiver.
7- Review the
requirement of
auto-blow down
valve (10-BDV-
902) at
instrument gas
receiver.

FILE: 360736057.docx Dated: 26-Jun-2015 SHEET 4 OF 4