WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
CONTENTS :
1. SCOPE
1.1. General Rules and Information
1.2. Work Coverage
1.3. Override
1.4. Recognition
2. MATERIALS
2.1. Resources and Specifications
2.2. Procurement, Handling and Storage
2.3. Check and Inspection
7. DRAWING
8. FORMS
8.1 Inspection Control Sheet FM/OPR E016, E020, E022
8.2 Material Delivery Receiving Inspection Report FM/OPR E026
8.3 Request for Inspection FM/OPR E027
Page 2 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Project
Industrial Plant (Mining, Oil & Gas, etc) Building : (Low Rise/High Rise)
Project Category
Power Plant Others :
Location
Owner
Designer/Engineer
Contractor
Sub-Contractor
Number of Storey
Building Height
Page 3 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
1. SCOPE
1.3. Override
For any instance that there are some change of works occur that are not mentioned in
this Method of Statement shall be properly discussed immediately and the outcome of
discussion shall be absolutely followed and the agreed procedures may override.
1.4. Recognition
To avoid any inherent mistakes during execution of this particular work, the contents of
this Method of Statements shall be thoroughly verified. A copy shall be distributed and
recognized by all concerns prior to the commencement of works.
2. MATERIALS
Table 1
Item Description Submittal Reference Approval Date
Page 4 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Table 2
Page 5 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Preparation :
Material Approval SM / PM/ENG SM : Site Manager
Shop Drawing PM : Project Manager
Method Statement ENG : Engineer
No Customer
2. Approved ?
Yes
3. Material ;
Vendor Selection Purchasing
Procurement
4. Material On site
Inspection material
Warehouse control /Stock S M / Staff SM : Site Manager
Card
5. Installation Staff
7. Repair
Not Good
* 6. * Item 6 Inspection :
Inspection ?
Internal Inspection by PT.
Good Kinden Indonesia
External Inspection by
Owner / Main Con
If found deviation, should
8. Completion
repaired by Project Team
Page 6 of 13 Photograph for Report
At Inspection event
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Page 7 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Page 8 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Page 9 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Page 10 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
Page 11 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
7. DRAWING
Page 12 of 13
WI/OPR - E020
METHOD OF STATEMENT FOR SUB- Rev 0
STATION SYSTEM WORKS
Date -
8. FORMS
8.1. Inspection Control Sheet FM/OPR E016, E020, E022
8.2. Material Delivery Receiving Inspection Report FM/OPR E026
8.3. Request for Inspection FM/OPR E027
Page 13 of 13