Sei sulla pagina 1di 1

EVENT ANALYSIS REPORT

UNIT NO: 03 TPS: PARAS THERMAL POWER STATION Unit Capacity: 250 MW
No. of days from last sync.-
1.HO Code: Station Code: T006 Time- 20:41 Hrs. Date- 12/12/2015
9 days 19 hrs 51 Min.
2. Operating conditions at the time of event:-
Load MW Coal Cycles in service Oil Support
210 AB, EF NIL
3. Nature of Event:
Boiler hand tripped due to main steam equalizing lines drain MS-109 was having heavy leakage.

4. Name of Protection Operated (First Up) and any other main protections Operated:
I) Gen. reverse power protection trip & Low forward protection alarm.
II) 32G1x/32G2x & 37G1x/37G2x.
III) STG2 TR REL 186 B operated & STG2 TR REL 286 B operated. Tripping sequence logic is ok.

5. Observations: -
Main Steam equalizing lines drain MS-109 was having heavy leakage.

6. Remedial Action / Work done:


Main Steam equalizing lines drain MS-109 was found leakage at its stub joint. Welding at stub joint of equalizing drain line is
done. Boiler purged out and lighted up at 12:30 Hrs on dated 13/12/2015 and TA set was synchronized at 16:58 Hrs on
dated 13/12/2015.

7. Root Cause Analysis :-


Main Steam equalizing lines drain MS-109 was found heavy leakage due to erection welding joint defect.

8. Preventive action suggested (Short Term):- NIL

9. Preventive action suggested ( Long Term) :-


High pressure drain lines welding joints inspection will be carried out in forthcoming AOH.

10. Boiler Lighted up Time- 12:30 Hrs Date: 13/12/2015


11. T-A set Synchronised Time- 16:58 Hrs Date: 13/12/2015
12. Remark :-

Chief Engineer

14. Recommendations of Work Section:


1. Procurement/ Replacement Plan:
2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the unit:
5. Training of Staff:
6. Whether remedial action is completed satisfactory & point is closed :