ACTIVITIES TYPES OF WORKS

Site Clearing Peon


Site Layout

Mobilization
Installation of Construction Plants Carpenter
Peon
Excavation for Footings and Wall Footings Peon
Fabrication of Forms for Columns Carpenter
Peon
Fabrication of Rebar for Column Footing and Wall Footings Steelman
Peon
Installation of forms for Columns Carpenter
Peon
Rebar Installation for Footing-Columns and Wall Footings Steelman
Peon
Concrete Pouring for Footings and Wall Footings Mason
Peon
Concrete pouring for Columns Mason
Peon
Erection of CHB Peon

Scafoldings Steelman
Peon
Fabrication of Doors and Windows Carpenter

Installation of Doors and Windows Carpenter


Peon
Fabrication of Forms for Beams Carpenter
Peon
Fabrication of Rebar for Beams Steelman
Peon
Installation of forms for Beams (1st Floor) Carpenter
Peon
Rebar Installation for Beams(1st Floor) Steelman
Peon
Concrete Pouring for Beams(1st Floor) Mason
Peon
Fabrication of Forms for stairs Carpenter
Peon
Fabrication of Rebar for stairs Steelman
Peon
Installation of forms for stair (1st Floor) Carpenter
Peon
Rebar Installation for stairs(1st Floor) Steelman
Peon
Pouring of concrete for Stairs Mason
Peon
Plumbing Rough Installation wew Plumber
Peon
Electric Rough Installation Electrician
Peon
Back Filling of soil for floor slab Peon

Soil poisoning and Compacting Peon

Fabrication of Reinforcing Bars for Floor Slabs(1st Floor) Steelman


Peon
Installation of Reinforcing Bars for Floor Slabs (1st floor) Steelman
Peon
Concrete Pouring for Floor Slabs (1st Floor) Mason
Peon
Installation of forms for Columns(2nd floor) Carpenter
Peon
Rebar Installation for Column (2d floor) Steelman
Peon
Concrete pouring for Columns(2nd floor) Mason
Peon
Erection of CHB(2nd floor) Peon

Fabrication of Doors and Windows Carpenter

Installation of Doors and Windows Carpenter


Peon
Fabrication of Forms for Beams Carpenter
Peon
Fabrication of Rebar for Beams Steelman
Peon
Installation of forms for Beams (2nd Floor) Carpenter
Peon
Rebar Installation for Beams(2nd Floor) Steelman
Peon
Concrete Pouring for Beams(2nd Floor) Mason
Peon
Fabrication of Forms for stairs Carpenter
Peon
Fabrication of Rebar for stairs Steelman
Peon
Installation of forms for stair (2nd Floor) Carpenter
Peon
Rebar Installation for stairs(2nd Floor) Steelman
Peon
Pouring of concrete for Stairs Mason
Peon
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor) Steelman
Peon
Installation of Reinforcing Bars for Floor Slabs (2nd floor) Steelman
Peon
Concrete Pouring for Floor Slabs (2nd Floor) Mason
Peon
Installation of forms for Columns(3rd floor) Steelman
Peon
Rebar Installation for Column (3rd floor) Mason
Peon
Concrete pouring for Columns(3rd floor) Peon

Erection of CHB(3rd floor) Carpenter

Fabrication of Doors and Windows(3rd floor) Carpenter


Peon
Installation of Doors and Windows (3rd loor) Carpenter
Peon
Fabrication of Rebar for Beams Steelman
Peon
Installation of forms for Beams (2nd Floor) Carpenter
Peon
Rebar Installation for Beams(2nd Floor) Steelman
Peon
Concrete Pouring for Beams(2nd Floor) Mason
Peon
Fabrication of Forms for stairs Carpenter
Peon
Fabrication of Rebar for stairs Steelman
Peon
Installation of forms for stair (2nd Floor) Carpenter
Peon
Rebar Installation for stairs(2nd Floor) Steelman
Peon
Pouring of concrete for Stairs Mason
Peon
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor) Steelman
Peon
Installation of Reinforcing Bars for Floor Slabs (3rd floor) Steelman
Peon
Concrete Pouring for Floor Slabs (3rd Floor) Mason
Peon
Fabrication of Reinforcing Bars for Floor Slabs(top Floor) Steelman
Peon
Installation of Reinforcing Bars for Floor Slabs (top floor) Steelman
Peon
Concrete Pouring for Floor Slabs (top Floor) Mason
Peon
Installation of Floor Tiles Mason
Peon
Removing of Forms for Columns/ Beams Peon

Finishing of Walls and Columns Mason


Painter
Removal of scafolds Peon

Septic tank Construction Mason


Peon
Final Cleaning Peon

Turn Over

Engineer
Foreman
NO. OF WORKERS DURATION (DAYS) COST/DAY(PHP)
4 2 200
1

1
1 1 250
2 1 200
4 4 200
2 4 250
4 4 200
2 4 300
2 4 200
2 4 250
2 4 200
2 4 300
2 4 200
4 1 300
4 1 200
4 1 300
4 1 200
4 12 200

1 1 300
4 1 200
4 1 250

1 1 250
1 1 200
2 2 250
2 2 200
2 4 300
4 4 200
2 4 250
2 4 200
2 3 300
2 3 200
4 1 300
4 1 200
1 1 250
1 1 200
2 1 300
1 1 200
1 1 250
1 1 200
1 1 300
1 1 200
1 1 300
1 1 200
2 7 300
1 7 200
1 7 300
3 7 200
4 1 200

4 1 200

3 7 300
3 7 200
4 15 300
4 15 200
2 3 300
2 3 200
2 4 250
2 4 200
2 4 300
2 4 200
4 4 300
4 4 200
4 12 200

4 1 250

1 1 250
1 1 200
2 2 250
2 2 250
2 4 300
4 4 200
2 4 250
2 4 200
2 3 300
2 3 200
4 3 300
4 3 200
1 1 250
1 1 200
2 1 300
1 1 200
1 1 250
1 1 200
1 1 300
1 1 200
1 1 300
1 1 200
3 7 300
3 7 200
4 12 300
4 12 200
2 3 300
2 3 200
2 4 300
2 4 200
4 4 300
4 4 200
4 1 200

4 12 250

1 1 250
1 1 200
2 1 250
2 1 200
2 2 300
4 2 200
2 4 250
2 4 200
2 4 300
2 4 200
4 3 300
4 3 200
1 1 250
1 1 200
2 1 300
1 1 200
1 1 250
1 1 200
1 1 300
1 1 200
1 1 300
1 1 200
3 7 300
3 7 200
4 15 300
4 15 200
2 3 300
2 3 200
3 7 300
3 7 200
4 15 300
4 15 200
2 3 300
2 3 200
3 15 300
3 15 200
4 1 200

3 15 300
6 15 500
4 1 200

2 2 300
2 2 200
3 5 200

1
1 233 500
TOTAL AMOUNT
1600

GRAND TOTAL

250 TOTAL DAYS OF WORK= 233DAYS


400
3200
2000
3200
2400
1600
2000
1600
2400
1600
1200
800
1200
800
9600

300
800
1000

250
200
1000
800
2400
3200
2000
1600
1800
1200
1200
800
250
200
600
200
250
200
300
200
300
200
4200
1400
2100
4200
800

800

6300
4200
18000
12000
1800
1200
2000
1600
2400
1600
4800
3200
9600

1000

250
200
1000
1000
2400
3200
2000
1600
1800
1200
3600
2400
250
200
600
200
250
200
300
200
300
200
6300
4200
14400
9600
1800
1200
2400
1600
4800
3200
800

12000

250
200
500
400
1200
1600
2000
1600
2400
1600
3600
2400
250
200
600
200
250
200
300
200
300
200
6300
4200
18000
12000
1800
1200
6300
4200
18000
12000
1800
1200
13500
9000
800

13500
45000
800

1200
800
3000

116500
total 537500 php
DESCRIPTION UNIT QUANTITY

A. MANSONRY AND CONCRETE WORKS

1.FOOTING (Class A) cu.m 8.208

Portland Cement (40kgs) bags 74


Sand cu.m 4.104
Gravel cu.m 8.208
G-2Filing cu.m 2.736

2. Column (Class A) cu.m 17.325

Portland Cement (40kgs) bags 156


Sand cu.m 8.663
Gravel cu.m 17.325

3. Tie Beam (Class A) cu.m 7.611

Portland Cement (40kgs) bags 69


Sand cu.m 3.806
Gravel cu.m 7.611

4. Wall Footing (Class B) cu.m 12.694

Portland Cement (40kgs) bags 95


Sand cu.m 6.347
Gravel cu.m 12.694
G-2Filing cu.m 12.694

5. Wall(Class B) cu.m 113.953

CHB pcs 9497


Portland Cement (40kgs) bags 855
Sand cu.m 56.977

6. Floor Slab cu.m 70.435


Portland Cement (40kgs) bags 634
Sand cu.m 35.218
Gravel cu.m 70.435
G-2Filing cu.m 7.043

7. Beam(Class A) cu.m 20.26

Portland Cement (40kgs) bags 183


Sand cu.m 10.13
Gravel cu.m 20.26

8. Stairway (Class B) cu.m 5.6

Portland Cement (40kgs) bags 39


Sand cu.m 0.385
Gravel cu.m 0.77

9. Plastering (Class C) cu.m 23.085

Portland Cement (40kgs) bags 139


Sand cu.m 11.543

B. REBARS

1. Footing

12mmx 6m bars pcs 63


#16 G.I wire kgs 7

2. Column

20mmx6m bars pcs 140


20mmx7,5m bars pcs 128
10mmx7.5m bars pcs 145
10mmx6m pcs 29
#16 G.I wire kgs 48
3. CHB

12mmx6mbars pcs 573


#16 G.I wire kgs 22

4. Two-way slab

10mmx6mbars pcs 2052


#16 G.I wire kgs 279

5. Wall-Footing

12mmx7.5m bars pcs 30


10mmx6m bars pcs 12
#16 G.I wire kgs 3.5

6. Beam

20mmx6m bars pcs 324


#16 G.I wire kgs 70

7. Tie Beam

16mmx6m bars pcs 72


#16 G.I wire kgs 16

C. EQUIPMENT
Bar Cutter (45days)
Bulldozer(20days)
Concrete Mixer(82days)
Dump Truck(20 days)
Pay Loader(20days)
Water Tank and etc(82days)
D. FORMS AND SCAFFOLDING
Forms: Steel
Scaffolding: Steel
Plywood

E. DOORS AND WINDOWS


Fire Exit Steel Ladder
Glass Door
Sliding Door
Wooden Door
CR Door
Glass Windows etc

F. ELECTRICAL AND PLUMBING FIXTURES

Plumbing installation and Fixtures


Electrical installation and Fixtures

G. PAINTING sq.m 759.7

Acrylic Gloss Latex Paint (G07) gallons 26


Acrylic Concrete Sealer gallons 22
Acrylic Gloss Latex Paint (D05) gallons 3

H. TILE WORKS
Walls for Comfort Rooms, and Flooring

Portland Cement (40 kg) bags 41


White Cement Joint Filler kg 235
8in. x 8in. Ceramic Tile pcs 888
12in. x 12in. Ceramic Tile pcs 4822

I. LANDSCAPE

Concrete
Rebars
Painting
Grass
Plants
Guard house and tec
lights
pavement

TOTAL

TOTAL DIRECT COST 6723449.05 PHP


OVER HEAD COST(Engineer's Salary 8%) 470641.4335 PHP
VAT(12%) 893081.886 PHP
Contengency fund (5%) 336172.4525 PHP
GRAND TOTAL 8423344.822 PHP
UNIT COST AMOUNT

RKS

235 17390
800 3283.2
800 6566.4
750 2052

235 36660
800 6930.4
800 13860

235 16215
800 3044.8
800 6088.8

235 22325
800 5077.6
800 10155.2
750 9520.5

11 104467
235 200925
800 45581.6
235 148990
800 28174.4
800 56348
750 5282.25

235 43005
800 8104
800 16208

235 9165
800 308
800 616

235 32665
800 9234.4
TOTAL 868242.55 PHP

193 12159
75 525

350 49000
438 56064
220 31900
178 5162
75 3600
193 110589
75 1650

178 365256
75 20925

193 5790
178 2136
75 262.5

350 113400
75 5250

193 13896
75 1200

798764.5 PHP

1500000
60000

700000

URES

275000
150000

580 15080
690 15180
510 1530

235 9635
25 5875
49 43512
30 144660
203682
1600000

cost of materials + labor cost


ACTIVITIES TYPES OF WORKS NO. OF WORKERS DURATION (DAYS)

Site Clearing Peon 4 2


Site Layout 1

Mobilization 1
Installation of Construction Plants Carpenter 1 1
Peon 2
Excavation for Footings and Wall Footings Peon 4 4
Fabrication of Forms for Columns Carpenter 2 4
Peon 4
Fabrication of Rebar for Column Footing and Wall Footings
Steelman 2 4
Peon 2
Installation of forms for Columns Carpenter 2 4
Peon 2
Rebar Installation for Footing-Columns and Wall Footings
Steelman 2 4
Peon 2
Concrete Pouring for Footings and Wall Footings Mason 4 1
Peon 4
Concrete pouring for Columns Mason 4 1
Peon 4
Erection of CHB Peon 4 12

Scafoldings Steelman 1 1
Peon 4
Fabrication of Doors and Windows Carpenter 4 1

Installation of Doors and Windows Carpenter 1 1


Peon 1
Fabrication of Forms for Beams Carpenter 2 2
Peon 2
Fabrication of Rebar for Beams Steelman 2 4
Peon 4
Installation of forms for Beams (1st Floor) Carpenter 2 4
Peon 2
Rebar Installation for Beams(1st Floor) Steelman 2 3
Peon 2
Concrete Pouring for Beams(1st
Mason 4 1
Floor)
Peon 4
Fabrication of Forms for stairs Carpenter 1 1
Peon 1
Fabrication of Rebar for stairs Steelman 2 1
Peon 1
Installation of forms for stair (1st Floor) Carpenter 1 1
Peon 1
Rebar Installation for stairs(1st Floor) Steelman 1 1
Peon 1
Pouring of concrete for Stairs Mason 1 1
Peon 1
Plumbing Rough Installation wew Plumber 2 7
Peon 1
Electric Rough Installation Electrician 1 7
Peon 1
Back Filling of soil for floor slab Peon 4 1

Soil poisoning and Compacting Peon 4 1

Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)


Steelman 3 7
Peon 3
Installation of Reinforcing Bars for Floor Slabs (1st floor)
Steelman 4 15
Peon 4
Concrete Pouring for Floor Slabs (1st Floor) Mason 2 3
Peon 2
Installation of forms for Columns(2nd floor) Carpenter 2 4
Peon 2
Rebar Installation for Column (2d floor) Steelman 2 4
Peon 2
Concrete pouring for Columns(2nd floor) Mason 4 4
Peon 4
Erection of CHB(2nd floor) Peon 4 12

Fabrication of Doors and Windows Carpenter 4 1

Installation of Doors and Windows Carpenter 1 1


Peon 1
Fabrication of Forms for Beams Carpenter 2 2
Peon 2
Fabrication of Rebar for Beams Steelman 2 4
Peon 4
Installation of forms for Beams (2nd Floor) Carpenter 2 4
Peon 2
Rebar Installation for Beams(2nd Floor) Steelman 2 3
Peon 2
Concrete Pouring for Beams(2nd Floor) Mason 4 3
Peon 4
Fabrication of Forms for stairs Carpenter 1 1
Peon 1
Fabrication of Rebar for stairs Steelman 2 1
Peon 1
Installation of forms for stair (2nd Floor) Carpenter 1 1
Peon 1
Rebar Installation for stairs(2nd Floor) Steelman 1 1
Peon 1
Pouring of concrete for Stairs Mason 1 1
Peon 1
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)
Steelman 3 7
Peon 3
Installation of Reinforcing Bars for Floor Slabs (2nd floor)
Steelman 4 15
Peon 4
Concrete Pouring for Floor Slabs (2nd Floor) Mason 2 3
Peon 2
Installation of forms for Columns(3rd floor) Steelman 2 4
Peon 2
Rebar Installation for Column (3rd floor) Mason 4 4
Peon 4
Concrete pouring for Columns(3rd floor) Peon 4 1

Erection of CHB(3rd floor) Carpenter 4 12

Fabrication of Doors and Windows(3rd floor) Carpenter 1 1


Peon 1
Installation of Doors and Windows (3rd loor) Carpenter 2 1
Peon 2
Fabrication of Rebar for Beams Steelman 2 2
Peon 4
Installation of forms for Beams (2nd Floor) Carpenter 2 4
Peon 2
Rebar Installation for Beams(2nd Floor) Steelman 2 4
Peon 2
Concrete Pouring for Beams(2nd Floor) Mason 4 3
Peon 4
Fabrication of Forms for stairs Carpenter 1 1
Peon 1
Fabrication of Rebar for stairs Steelman 2 1
Peon 1
Installation of forms for stair (2nd Floor) Carpenter 1 1
Peon 1
Rebar Installation for stairs(2nd Floor) Steelman 1 1
Peon 1
Pouring of concrete for Stairs Mason 1 1
Peon 1
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)
Steelman 3 7
Peon 3
Installation of Reinforcing Bars for Floor Slabs (3rd floor)
Steelman 4 15
Peon 4
Concrete Pouring for Floor Slabs (3rd Floor) Mason 2 3
Peon 2
Fabrication of Reinforcing Bars for Floor Slabs(top Floor)
Steelman 3 7
Peon 3
Installation of Reinforcing Bars for Floor Slabs (top floor)
Steelman 4 15
Peon 4
Concrete Pouring for Floor Slabs (top Floor) Mason 2 3
Peon 2
Installation of Floor Tiles Mason 3 15
Peon 3
Removing of Forms for Columns/ Beams Peon 4 1

Finishing of Walls and Columns Mason 3 24


Peon 3
Removal of scafolds Peon 4 1

Septic tank Construction Mason 2 2


Peon 2
Final Cleaning Peon 3 5

Turn Over 1
COST/DAY(PHP)
TOTAL AMOUNT

200 1600

250 250
200 400
200 3200
250 2000
200 3200
300 2400
200 1600
250 2000
200 1600
300 2400
200 1600
300 1200
200 800
300 1200
200 800
200 9600

300 300
200 800
250 1000

250 250
200 200
250 1000
200 800
300 2400
200 3200
250 2000
200 1600
300 1800
200 1200
300 1200
200 800
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
500 7000
200 1400
500 3500
200 1400
200 800

200 800

300 6300
200 4200
300 18000
200 12000
300 1800
200 12000
250 2000
200 1600
300 2400
200 1600
300 4800
200 3200
200 9600

250 1000

250 250
200 200
250 1000
200 800
300 2400
200 3200
250 2000
200 1600
300 1800
200 1200
300 3600
200 2400
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
300 2400
200 1600
300 4800
200 3200
200 800

250 12000

250 250
200 200
250 500
200 400
300 1200
200 1600
250 2000
200 1600
300 2400
200 1600
300 3600
200 2400
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
300 13500
200 9000
200 800

300 21600
200 14400
200 800

300 1200
200 800
200 3000

416500 php GRAND TOTAL


Task Name Duration Predecessors

1 Site Clearing 2 days none


2 Site Layout 1 day 1
3 Mobilization 1 day 1
4 Installation of Construction Plants 1 day 3
5 Excavation for Footings and Wall Footings 4 days 2
6 Fabrication of Forms for Columns 4 days 4
7 Fabrication of Rebar for Column Footing and Wall Footings 4 days 4
8 Installation of forms for Columns 4 days 5,6
9 Rebar Installation for Footing-Columns and Wall Footings 4 days 5,6
10 Concrete Pouring for Footings and Wall Footings 1 day 8,9
11 Concrete pouring for Columns 1 day 9
12 Erection of CHB 12 days 11,10,9
13 Scafoldings 1 day 5,12
14 Fabrication of Doors and Windows 1 day 10,13
15 Installation of Doors and Windows 1 day 14
16 Fabrication of Forms for Beams 2 days 8,9
17 Fabrication of Rebar for Beams 4 days 8,9
18 Installation of forms for Beams (1st Floor) 4 days 12,17
19 Rebar Installation for Beams(1st Floor) 3 days 18,17
20 Concrete Pouring for Beams(1st Floor) 1 day 19
21 Fabrication of Forms for stairs 1 day 11,20
22 Fabrication of Rebar for stairs 1 day 11,21
23 Installation of forms for stair (1st Floor) 1 day 21,22
24 Rebar Installation for stairs(1st Floor) 1 day 22,23
25 Pouring of concrete for Stairs 1 day 12,24
26 Plumbing Rough Installation 7 days 9,19,25
27 Electric Rough Installation 7 days 9,19,25,26
28 Back Filling of soil for floor slab 1 day 10,27
29 Soil poisoning and Compacting 1 day 10,27
30 Fabrication of Reinforcing Bars for Floor Slabs(1st Floor) 7 days 12,29
31 Installation of Reinforcing Bars for Floor Slabs (1st floor) 12 days 30
32 Concrete Pouring for Floor Slabs (1st Floor) 3 days 31
33 Installation of forms for Columns(2nd floor) 4 days 25,32
34 Rebar Installation for Column (2d floor) 4 days 25,32
35 Concrete pouring for Columns(2nd floor) 4 days 34
36 Erection of CHB(2nd floor) 12 days 34
37 Fabrication of Doors and Windows 1 day 34
38 Installation of Doors and Windows 1 day 36,37
39 Fabrication of Forms for Beams 2 days 36,38
40 Fabrication of Rebar for Beams 4 days 36,39
41 Installation of forms for Beams (2nd Floor) 4 days 40,39
42 Rebar Installation for Beams(2nd Floor) 3 days 40,41
43 Concrete Pouring for Beams(2nd Floor) 3 days 42
44 Fabrication of Forms for stairs 1 day 42,40
45 Fabrication of Rebar for stairs 1 day 42,41,44
46 Installation of forms for stair (2nd Floor) 1 day 43
47 Rebar Installation for stairs(2nd Floor) 1 day 43
48 Pouring of concrete for Stairs 1 day 47
49 Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor) 7 days 34,46,48
50 Installation of Reinforcing Bars for Floor Slabs (2nd floor) 12 days 36
51 Concrete Pouring for Floor Slabs (2nd Floor) 3 days 50
52 Installation of forms for Columns(3rd floor) 4 days 34
53 Rebar Installation for Column (3rd floor) 4 days 52
54 Concrete pouring for Columns(3rd floor) 1 day 53
55 Erection of CHB(3rd floor) 12 days 52
56 Fabrication of Doors and Windows(3rd floor) 1 day 55
57 Installation of Doors and Windows (3rd loor) 1 day 55
58 Fabrication of Rebar for Beams 2 days 52
59 Installation of forms for Beams (2nd Floor) 4 days 52
60 Rebar Installation for Beams(2nd Floor) 4 days 59
61 Concrete Pouring for Beams(2nd Floor) 3 days 60
62 Fabrication of Forms for stairs 1 day 60
63 Fabrication of Rebar for stairs 1 day 60
64 Installation of forms for stair (2nd Floor) 1 day 63
65 Rebar Installation for stairs(2nd Floor) 1 day 63
66 Pouring of concrete for Stairs 1 day 65
67 Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor) 5 days 53
68 Installation of Reinforcing Bars for Floor Slabs (3rd floor) 12 days 67
69 Concrete Pouring for Floor Slabs (3rd Floor) 3 days 68
70 Fabrication of Reinforcing Bars for Floor Slabs(top Floor) 7 days 69
71 Installation of Reinforcing Bars for Floor Slabs (top floor) 12 days 70
72 Concrete Pouring for Floor Slabs (top Floor) 3 days 71
73 Installation of Floor Tiles 12 days 72
74 Removing of Forms for Columns/ Beams 1 day 72
75 Finishing of Walls and Columns 15 days 72
76 Removal of scafolds 1 day 75
77 Septic tank Construction 2 days 75
78 Final Cleaning 2 days 77
79 Turn Over 1 day 78,74,75,76
Predecessors
78,74,75,76