Sei sulla pagina 1di 27

Cost Estimate Page 1

Description Qty Price UM Draw Me Total


1 IMPORTANT: BE SURE TO INCLUDE
2 SALES TAX AND DELIVERY CHARGES
3
4 LAND
5 Lot Price 0.00 0.00 0.00
6 Closing Costs on Lot 0.00 0.00
7 Interest On Lot 0.00 0.00
8 0.00 0.00
9 TOTAL LAND (LINES 5-8) 0.00 0.00 0.00
10 LAND
11 DESIGN
12 * Architecture 0.00 0.00
13 Engineering 0.00 0.00
14 Blueprints 0.00 0.00
15 0.00 0.00
16 TOTAL DESIGN (LINES 12-15) 0.00 0.00 0.00
17
18 CONSTRUCTION LOAN
19 Appraisal 0.00 0.00
20 Point(s) 0.00 0.00
21 Closing Costs 0.00 0.00
22 Interest 0.00 0.00
23 Builder's Risk Insurance 0.00 0.00
24 Initial Survey 0.00 0.00
25 0.00 0.00
26 TOTAL LOAN (LINES 19-24) 0.00 0.00 0.00
27
28 PERMITS
29 Septic Tank 0.00 0.00
30 Building 0.00 0.00
31 Electrical (usually included in electrician's quote) 0.00 0.00
32 Mechanical (HVAC) (usually included in heating quote) 0.00 0.00
33 Plumbing (usually included in plumber's quote) 0.00 0.00
34 Tree Removal 0.00 0.00
35 Curb Cut 0.00 0.00
36 0.00 0.00
37 TOTAL PERMITS (LINES 29-37) 0.00 0.00 0.00
38
39 UTILITIES
40 Underground Electric Service 0.00 0.00
41 Water Tap and Meter 0.00 0.00
42 Sewer Tap and Connect Fee 0.00 0.00
43 Temporary Electric Power 0.00 0.00
44 0.00 0.00
45 TOTAL UTILITIES (LINES 40-44) 0.00 0.00 0.00
46
47
48
49 PAGE TOTALS (LINES 9, 16, 26, 37, 45) 0.00 0.00 0.00
50
UM = Unit
Note: Measure
For each (ea,
item onsqyour
ft, etc.) 1990-2012
estimate enter a quantity (Qty), Home
a unit price Building
(Price), andAnswers
the
amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw).
For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump
Sum quote in the Price Column. Excel will do all of the other calculations including what will
be paid for each item from your construction loan draw, the total for each item, Section
Totals, Page Totals, and Summary Page Totals.
B C D E F G H I J
2 Cost Estimate Page 2
3 Description Qty Price UM Draw Me Total
4 51 SITE PREPARATION
5 52 Rough Stake 0.00 0.00
6 53 Clearing, Grading, Hauling 0.00 0.00
7 54 Fill Dirt 0.00 0.00
8 55 Locate Corners 0.00 0.00
9 56 0.00 0.00
10 57 TOTAL SITE PREP (LINES 52-55) 0.00 0.00 0.00
11 58
12 59 FOOTINGS
13 60 Layout, Dig, and Pour 0.00 0.00
14 61 Steel 0.00 0.00
15 62 Concrete 0.00 0.00
16 63 Drains 0.00 0.00
17 64 TOTAL FOOTINGS (LINES 60-63) 0.00 0.00 0.00
18 65
19 66 FOUNDATIONS
20 67 Concrete 0.00 0.00
21 68 Brick 0.00 0.00
22 69 Block 0.00 0.00
23 70 Mortar 0.00 0.00
24 71 Sand 0.00 0.00
25 72 Steel 0.00 0.00
26 73 Vents 0.00 0.00
27 74 Damp Proofing 0.00 0.00
28 75 Backfill 0.00 0.00
29 76 Labor 0.00 0.00
30 77 Foundation Survey 0.00 0.00
31 78 0.00 0.00
32 79 TOTAL FOUNDATIONS (LINES 67-77) 0.00 0.00 0.00
33 80
34 81
35 82
36 83
37 84
38 85 PAGE TOTALS (LINES 57, 64, 79) 0.00 0.00 0.00
39 86
40 87
41 88
42 89
43 90
44 91
45 92
46 93
47 94
48 95
49 96
50 97
51 98
52 99
53 100
54 UM
Note:= Unit Measure
For each (ea,
item onsqyour estimate enter a quantity (Qty),a 1990-2012
ft, etc.) Home Building
unit price (Price), Answers
and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
55 Price Column. Excel will do all of the other calculations including what will be paid for each item
from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.
Cost Estimate Page 3
Description Qty Price UM Draw Me Total
101 SLAB (IF APPLICABLE)
102 Fill Dirt 0.00 0.00
103 Sand 0.00 0.00
104 Backfill Labor 0.00 0.00
105 Polyethelene 0.00 0.00
106 Wire Mesh 0.00 0.00
107 Styrofoam (Perimeter Insulation) 0.00 0.00
108 Steel 0.00 0.00
109 Grade Stakes 0.00 0.00
110 Form Materials 0.00 0.00
111 Concrete 0.00 0.00
112 Set Up and Finishing 0.00 0.00
113 0.00 0.00
114 TOTAL SLAB (LINES 102-112) 0.00 0.00 0.00
115
116 SOIL TREATMENT FOR TERMITES 0.00 0.00
117
118 FRAMING - FLOORS
119 Sills 0.00 0.00
120 Steel Posts 0.00 0.00
121 Steel Beams 0.00 0.00
122 Microlams 0.00 0.00
123 Joists 0.00 0.00
124 Hangers 0.00 0.00
125 Cross Bracing 0.00 0.00
126 Floor Decking 0.00 0.00
127 Glue 0.00 0.00
128 0.00 0.00
129 FRAMING - WALLS
130 Base Plates 0.00 0.00
131 Studs 0.00 0.00
132 Top Plates 0.00 0.00
133 Header Materials 0.00 0.00
134 Corner Bracing 0.00 0.00
135 Sills, Jacks, and Cripples 0.00 0.00
136 Back Out Materials 0.00 0.00
137 Insulated Sheathing 0.00 0.00
138 Chimney Framing Materials 0.00 0.00
139 Bracing Materials 0.00 0.00
140 0.00 0.00
141 0.00 0.00
142 0.00 0.00
143 TOTAL FLOOR AND WALL FRAMING (LINES 119-139) 0.00 0.00 0.00
144
145
146 PAGE TOTAL (LINES 114, 116, 143) 0.00 0.00 0.00
147
148
149
150
UM = Unit
Note: For Measure (ea,on
each item sqyour estimate enter a quantity (Qty),
ft, etc.) 1990-2012
a unit Homeand
price (Price), Building Answers
the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
Price Column. Excel will do all of the other calculations including what will be paid for each item
from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.

Click "Page 4" below


Cost Estimate Page 4
Description Qty Price UM Draw Me Total
151 FRAMING - CEILINGS
152 Beams 0.00
153 Ceiling Joists 0.00 0.00
154 Headers and Trimmers 0.00 0.00
155 0.00 0.00
156 FRAMING - ROOF
157 Truss Package 0.00 0.00
158 Bracing Materials 0.00
159 Ridge Board 0.00 0.00
160 Ridge Rafter 0.00 0.00
161 Valley Rafter 0.00 0.00
162 Rafters 0.00 0.00
163 Lookout Material 0.00 0.00
164 Barge Rafter 0.00 0.00
165 Dormer Materials 0.00 0.00
166 Cricket Materials 0.00 0.00
167 Roof Decking 0.00 0.00
168 Roof Clips 0.00 0.00
169 15# Felt 0.00 0.00
170 Gable Vents 0.00 0.00
171 Strong Ties 0.00 0.00
172 Framing Labor 0.00 0.00
173 0.00 0.00
174 CEILING AND ROOF FRAMING (152-172) 0.00 0.00 0.00
175
176 TOTAL FRAMING (LINES 143, 174) 0.00 0.00 0.00
177
178 MASONRY WALLS
179 Block 0.00 0.00
180 Sills 0.00 0.00
181 Lintels 0.00 0.00
182 Block Ties 0.00 0.00
183 Sand 0.00 0.00
184 Mortar 0.00 0.00
185 Steel 0.00 0.00
186 Concrete 0.00 0.00
187 Masonry Labor 0.00 0.00
188 0.00 0.00
189 TOTAL MASONRY WALLS (LINES 179-187) 0.00 0.00 0.00
190
191
192
193 PAGE TOTAL (LINES 174, 189) 0.00 0.00 0.00
194
195
196
197
Note:
198
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
199
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
200 Column. Excel will do all of the other calculations including what will be paid for each item
Price
UM
from= your
Unit Measure (ea, sqloan
construction ft, etc.) Totals,
draw, the total for each item, Section 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 5" below


Cost Estimate Page 5
Description Qty Price UM Draw Me Total
201 ROOF
202 Roofing Shingles 0.00 0.00
203 Eave Drip 0.00 0.00
204 Flashing 0.00 0.00
205 Ridge Vents 0.00 0.00
206 Roof Ventilators 0.00 0.00
207 Nails 0.00 0.00
208 Roofing Labor 0.00 0.00
209 0.00 0.00
210 TOTAL ROOFING (LINES 202-208) 0.00 0.00 0.00
211
212
213 WINDOWS 0.00 0.00
214
215 EXTERIOR DOORS
216 Exterior Doors 0.00 0.00
217 Garage Door 0.00 0.00
218 0.00 0.00
219 TOTAL EXTERIOR DOORS (LINES 216, 217) 0.00 0.00 0.00
220
221 CORNICE, VENEER, & EXTERIOR TRIM
222 Siding 0.00 0.00
223 Masonry Veneer 0.00 0.00
224 Brick 0.00 0.00
225 Stone 0.00 0.00
226 Sand 0.00 0.00
227 Mortar 0.00 0.00
228 Ties 0.00 0.00
229 Lintel 0.00 0.00
230 Masonry Labor 0.00 0.00
231 Stucco (Including Materials) 0.00 0.00
232 Cornice Materials 0.00 0.00
233 Sub Fascia 0.00 0.00
234 Fascia 0.00 0.00
235 Soffit 0.00 0.00
236 Soffit Vents 0.00 0.00
237 Frieze Board 0.00 0.00
238 Shingle Mould 0.00 0.00
239 Dental Mould 0.00 0.00
240 Crown Moulding 0.00 0.00
241 Corner Trim 0.00 0.00
242 Window Trim/Mould 0.00 0.00
243 Door Trim and Mould 0.00 0.00
244 Flashing 0.00 0.00
245 0.00
246 CORNICE, VENEER, EXTERIOR TRIM CONTINUED ON NEXT PAGE
247
Note:
248
For each item onPAGE
your estimate
TOTAL* enter
(LINESa quantity
210, 213,(Qty),
219, a unit
220)price (Price),
0.00 and0.00
the amount
0.00
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
249
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
250 "Page
Price Total"
Column. on this
Excel page
will do all excludes lines222-245.
of the other calculationsTotals for these
including whatlines arepaid
will be included on line
for each item264
UM = your
from Unit Measure (ea, sqloan
construction ft, etc.) Totals,
draw, the total for each item, Section 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 6" below


Cost Estimate Page 6
Description Qty Price UM Draw Me Total
251 CORNICE, VENEER, EXT. TRIM CONTINUED
252 Shutters 0.00 0.00
253 Porch Columns 0.00 0.00
254 Pediment and Pilasters 0.00 0.00
255 Porch Materials 0.00 0.00
256 Flooring 0.00 0.00
257 Ceiling 0.00 0.00
258 Columns/Posts 0.00 0.00
259 Handrail 0.00 0.00
260 Trim 0.00 0.00
261 Nails 0.00 0.00
262 Siding and Trim Labor 0.00 0.00
263 0.00 0.00
264 TOTAL CORNICE, VENEER, EXTERIOR TRIM (222-262) 0.00 0.00 0.00
265
266 FIREPLACE
267 Face Brick 0.00 0.00
268 Fire Brick 0.00 0.00
269 Flue Liner 0.00 0.00
270 Mortar 0.00 0.00
271 Sand 0.00 0.00
272 Lintel 0.00 0.00
273 Damper 0.00 0.00
274 Ash Dump 0.00 0.00
275 Gas Lighter (Including Gas Line) 0.00 0.00
276 Masonry Labor 0.00 0.00
277 Prefab Fireplace 0.00 0.00
278 Chase Top 0.00 0.00
279 Hearth and Profile (Materials and Labor) 0.00 0.00
280 0.00 0.00
281 TOTAL FIREPLACE (LINES 267-279) 0.00 0.00 0.00
282
283 ELECTRICAL
284 Subcontract - Includes: Labor, Wire, Outlets, 0.00 0.00
285 Switches, Boxes, Connectors, Meter, 0.00 0.00
286 Service Entrance, Panel and Breakers, 0.00 0.00
287 Lighting Fixture (Allowance) Includes: Door Bell, 0.00 0.00
288 and Smoke Detectors 0.00 0.00
289 Ceiling Fan 0.00 0.00
290 Whole House Fan 0.00 0.00
291 0.00 0.00
292 TOTAL ELECTRICAL (LINES 284-290) 0.00 0.00 0.00
293
294
295
296 PAGE TOTAL (LINES 264, 281, 292) 0.00 0.00 0.00
297
Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
298
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
299
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
300 Column. Excel will do all of the other calculations including what will be paid for each item
Price
UM
from= your
Unit Measure (ea, sqloan
construction ft, etc.) Totals,
draw, the total for each item, Section 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 7" below


Cost Estimate Page 7
Description Qty Price UM Draw Me Total
301 APPLIANCES AND SPECIAL EQUIPMENT
302 Range 0.00 0.00
303 Range Hood 0.00 0.00
304 Cook Top 0.00 0.00
305 Oven 0.00 0.00
306 Microwave 0.00 0.00
307 Trash Compactor 0.00 0.00
308 Disposal 0.00 0.00
309 Refrigerator 0.00 0.00
310 Dishwasher 0.00 0.00
311 Electronic Air Filter 0.00 0.00
312 Intercom System 0.00 0.00
313 Built-In Vacuum System 0.00 0.00
314 Security System 0.00 0.00
315 Garage Door Opener 0.00 0.00
316 0.00 0.00
317 TOTAL APPLIANCES (LINES 302-315) 0.00 0.00 0.00
318
319 HVAC SYSTEM
320 Subcontract - Includes: Labor; Heating/Air 0.00 0.00
321 Conditioning System; Humidifier and 0.00 0.00
322 Dehumidifier; Ducts, Dampers, and Vents 0.00 0.00
323 For Range Hood, Fireplace, Bath Fans, 0.00 0.00
324 and Dryer. 0.00 0.00
325 0.00 0.00
326 TOTAL HVAC (LINE 320) 0.00 0.00 0.00
327
328 PLUMBING
329 Subcontract - Includes: Labor; Supply, 0.00 0.00
330 Waste, and Vent Pipes, and Fittings; 0.00 0.00
331 Bathtubs, Prefab Showers and Shower Pans, 0.00 0.00
332 Sinks, Vanity Bowls, and Toilets; Shower 0.00 0.00
333 Heads, Faucets, Sill Cocks; Water Heater; 0.00 0.00
334 Gas Lines 0.00 0.00
335 0.00 0.00
336 TOTAL PLUMBING (LINE 329) 0.00 0.00 0.00
337
338 WELL 0.00 0.00
339
340 SEPTIC TANK 0.00 0.00
341
342 SOLAR SYSTEM (LABOR AND MTLS) 0.00 0.00
343
344
345 PAGE TOTAL (LINES 317, 326, 336, 338, 340, 342) 0.00 0.00 0.00
346
347
Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
348
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
349
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
350 Column. Excel will do all of the other calculations including what will be paid for each item
Price
UM
from= your
Unit Measure (ea, sqloan
construction ft, etc.) Totals,
draw, the total for each item, Section 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 8" below


Cost Estimate
Description Qty Price UM Draw
351 INSULATION - Materials and Subcontract 0.00
352
353 DRYWALL - Materials and Subcontract 0.00
354
355 INTERIOR DOORS AND TRIM
356 Doors 0.00
357 Base Moulding 0.00
358 Base Cap 0.00
359 Casing 0.00
360 Crown Moulding 0.00
361 Chair Rail 0.00
362 Shoe Mould 0.00
363 Shelving 0.00
364 Closet Rods 0.00
365 Rod Cups 0.00
366 Shelf and Rod Brackets 0.00
367 Shelf Cleating 0.00
368 Stairs 0.00
369 Stringers 0.00
370 Treads 0.00
371 Risers 0.00
372 Handrail & Fittings 0.00
373 Newells 0.00
374 Balusters 0.00
375 Skirt Board 0.00
376 Pre-Fab Unit 0.00
377 Panelling 0.00
378 Plywood 0.00
379 Picture Mould 0.00
380 Panel Mould 0.00
381 1x Materials 0.00
382 Window Trim 0.00
383 Stool 0.00
384 Mull 0.00
385 Stop 0.00
386 Apron 0.00
387 Drop Ceiling Mtls. 0.00
388 Disappearing Stairs 0.00
389 Nails 0.00
390 Glue 0.00
391 Trim Labor Incl Shoe Mould and Undercut Doors 0.00
392 0.00
393 TOTAL INTERIOR DOORS AND TRIM (LINES 356 -391) 0.00
394
395
396 PAGE TOTALS (LINES 351, 353, 393) 0.00
397
Note:
398
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
399
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
400 Column. Excel will do all of the other calculations including what will be paid for each item
Price
from
UM = your construction
Unit Measure (ea, sqloan Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 9" below


Page 8
Me Total
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
401 HARDWARE
402 Entry Lockset 0.00
403 Bedroom Locksets 0.00
404 Bathroom Locksets 0.00
405 Passage Doorsets 0.00
406 Dummy Locksets 0.00
407 Deadbolts 0.00
408 Window Locks And Sash Lifts 0.00
409 Door Stops (Base Board) 0.00
410 Door Stops (Hinge Type) 0.00
411 Bath Accessories 0.00
412 Towel Holders 0.00
413 Soap Dish 0.00
414 Toothbrush Holder 0.00
415 Tumbler Holder 0.00
416 Medicine Cabinet 0.00
417 Shower Curtain Rod 0.00
418 Glass Fireplace Door 0.00
419 Hardware Labor 0.00
420 0.00
421 TOTAL HARDWARE (LINES 402-419) 0.00
422
423 CABINETS AND VANITIES
424 Wall Cabinets, Base Cabinets, and Vanities 0.00
425 Including Installation 0.00
426 "Cultured" Marble Vanity Tops 0.00
427 0.00
428 TOTAL CABINETS AND VANITIES (PAGES 424-426) 0.00
429
430 PAINTING (Mtls and Labor) 0.00
431
432 WALLPAPER
433 Wallpaper 0.00
434 Labor Including Sizing And Paste 0.00
435 0.00
436 TOTAL WALLPAPER (LINES 433, 434) 0.00
437
438 WROUGHT IRON (Mtls and Labor) 0.00
439
440 GLASS
441 Mirror 0.00
442 Tub Enclosure 0.00
443 Shower Enclosure 0.00
444 Installation Of Glass Products 0.00
445 0.00
446 TOTAL GLASS (LINES 441-444) 0.00
447
Note:
448
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
449 PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446) 0.00
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
450
Price Column. Excel will do all of the other calculations including what will be paid for each item
from
UM = your construction
Unit Measure (ea, sqloan Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 10" below


Page 9
Me Total

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00

0.00

0.00
0.00
0.00
0.00 0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
0.00 0.00
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
451 CERAMIC TILE - Materials and Labor
452
453 FLOORS AND FLOOR COVERINGS
454 Carpet Including Pads and Installation 0.00
455 Vinyl Tile Including Installation 0.00
456 Wood Floors Including Installation 0.00
457 0.00
458 TOTAL FLOOR COVERING (LINES 454-456) 0.00
459
460 SCREEN PORCH
461 Framing And Ceiling Materials 0.00
462 Screening 0.00
463 Screen Mould 0.00
464 Screen Door 0.00
465 Screen Door Hardware 0.00
466 Labor 0.00
467 0.00
468 TOTAL SCREEN PORCH (LINES 461-466) 0.00
469
470 DECK
471 Concrete (Footings) 0.00
472 Framing Materials 0.00
473 Decking 0.00
474 Handrail Materials 0.00
475 Nails 0.00
476 Labor 0.00
477 0.00
478 TOTAL DECK (LINES 471-476) 0.00
479
480 WALKS, DRIVES, AND PATIOS
481 Form Materials and Stakes 0.00
482 Wire Mesh 0.00
483 Joint Materials 0.00
484 Concrete 0.00
485 Labor 0.00
486 River Rock Or Other Special Finishes - Materials 0.00
487 and Subcontract 0.00
488 0.00
489 TOTAL WALKS, DRIVES, PATIOS (LINES 481-487) 0.00
490
491
492
493
494 PAGE TOTAL (LINES 451, 458, 468, 478, 489) 0.00
495
496
497
Note:
498
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
499
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
500 Column. Excel will do all of the other calculations including what will be paid for each item
Price
from
UM = your construction
Unit Measure (ea, sqloan Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Page 11" below


Page 10
Me Total

0.00
0.00
0.00
0.00
0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
501 LANDSCAPING
502 Subcontract - Includes: Finish Grading, 0.00
503 Seeding, Sodding, Shrubs, Ground 0.00
504 Covers, and Trees. 0.00
505 Other Landscape Construction (Retaining Walls, 0.00
506 Steps, Etc.) Including Materials and Labor 0.00
507 0.00
508 TOTAL LANDSCAPING (502-506) 0.00
509
510 GUTTERS AND DOWNSPOUTS 0.00
511
512 CLEANING
513 Site Clean Up - Haul Trash 0.00
514 Clean Out House During Construction 0.00
515 Final House Cleaning Incl. Windows 0.00
516 Cleaning Brick and Concrete Surfaces 0.00
517 0.00
518 TOTAL CLEANING (LINES 513-516) 0.00
519
520 EQUIPMENT RENTAL 0.00
521
522 INSPECTIONS 0.00
523
524 SUPERINTENDING 0.00
525
526 CONTINGENCY 0.00
527
528
529 PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526) 0.00
530
531
532
533
534
535 GRAND TOTALS (FROM PAGE TOTALS) #REF!
536
537
538
539
540
541
542
543
544
545
546
547
Note:
548
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
549
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
550 Column. Excel will do all of the other calculations including what will be paid for each item
Price
from
UM = your construction
Unit Measure (ea, sqloan Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.

Click "Summary " below


Page 11
Me Total

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00

#REF! #REF!
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Draw Me
1 LAND Line 9 0.00 0.00
2 DESIGN Line 16 0.00 0.00
3 CONSTRUCTION LOAN Line 26 0.00 0.00
4 PERMITS Line 37 0.00 0.00
5 UTILITIES Line 45 0.00 0.00
6 SITE PREPARATION Line 57 0.00 0.00
7 FOOTINGS Line 64 0.00 0.00
8 FOUNDATIONS Line 79 0.00 0.00
9 SLAB Line 114 0.00 0.00
10 SOIL TREATMENT Line 116 0.00
11 FRAMING Line 176 0.00 0.00
12 MASONRY WALLS Line 189 0.00 0.00
13 ROOFING Line 210 0.00 0.00
14 WINDOWS Line 213 0.00
15 EXTERIOR DOORS Line 219 0.00 0.00
16 CORNICE, VENEER, & EXTERIOR TRIM Line 264 0.00 0.00
17 FIREPLACE Line 281 0.00 0.00
18 ELECTRICAL Line 292 0.00 0.00
19 APPLIANCES AND SPECIAL EQUIPMENT Line 317 0.00 0.00
20 HVAC SYSTEM Line 326 0.00 0.00
21 PLUMBING Line 336 0.00 0.00
22 WELL Line 338 0.00
23 SEPTIC TANK Line 340 0.00
24 SOLAR SYSTEM Line 342 0.00
25 INSULATION Line 351 0.00
26 DRYWALL Line 353 0.00
27 INTERIOR DOORS AND TRIM Line 393 0.00 0.00
28 HARDWARE Line 421 0.00 0.00
29 CABINETS AND VANITIES Line 428 0.00 0.00
30 PAINTING Line 430 0.00
31 WALLPAPER Line 436 0.00 0.00
32 WROUGHT IRON Line 438 0.00
33 GLASS Line 446 0.00 0.00
34 CERAMIC TILE Line 451
35 FLOORS AND FLOOR COVERINGS Line 458 0.00 0.00
36 SCREEN PORCH Line 468 0.00 0.00
37 DECK Line 478 0.00 0.00
38 WALKS, DRIVES, AND PATIOS Line 489 0.00 0.00
39 LANDSCAPING Line 508 0.00 0.00
40 GUTTERS AND DOWNSPOUTS Line 510 0.00
41 CLEANING Line 518 0.00 0.00
42 EQUIPMENT RENTAL Line 520 0.00
43 INSPECTIONS Line 522 0.00
44 SUPERINTEND Line 524 0.00
45 CONTINGENCY Line 526 0.00
46
47 GRAND TOTAL 0.00 0.00
48
49
50
UM = Unit Measure 1990-2012 Home Building Answers
Summary
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

012 Home Building Answers

Potrebbero piacerti anche