TAKING OFF FOR THE PROPOSED 0.

45 Excavate oversite to remove


TWO BEDROOM BUNGALOW 0.45 vegetable top soil average depth
FOR MRS UNONGO SARAH 0.20 150mm
BY UNONGO JOHN-MARK
NORTH BANK MAKURDI
26th JUNE 2017 0.45 Deposit excavated materials
0.45 in temporal spoil heap average
0.15 distance not exceeding 20mm
ELEMENT NO 1 0.03 from the excavation
SUBSTUCTURE
(All Provisional)
Trench Excavation
External Girth
Preamble H V
The site is relatively flat and the 0 0
ground water level is below the 0 0
depth of excavation 0 0
0
0
PLANT Ddt corners 4/225 900
Item Allow for bringing and removing -900
Item from site all plants required for
this element of the work
Internal Girth
3025 2000
Item Allow for maintaining on site all 1200 2000
Item plants required for this element of 1200 10325
the work 6750 3675
10000 3675
3025 5225
SITE PREPARTION
Cut down trees with the following
girth

5/ 1 Tree Girth 500 - 500mm 25200 26900


5 25200
Total Internal Girth
52100

7/ 1 Tree Girth 1500 - 3000mm


7 Total Girth
External Girth -900
Internal Girth 52100
4/ 1 Tree Girth 3000 - 4500mm 51200
4

15.00 Clear site of all vegetable growth Depth of Foundation 1000


60.00 including cutting down small trees Ddt Excavated Topsoil 150
900.00 and grubbing up roots
Depth of Trench 850

EXCAVATION
Top Soil Excavation Width of Trench 3/225 675
L W
0 0

Add
fnd sprd 450 450 51.20 Excavate trench for foundation
450 450 0.68 starting from stripped level max
0.85 depth not exceeding 2m
29.38