Sei sulla pagina 1di 159

BILL OF QUANTITY

FOR THE CONSTRUCTION OF PROPOSED HOUSE


for
Mrs. J.A.D.S.Champika

at
No. 73/1, Kirimatiyagara, Kadawatha.
BILL OF QUANTITIES FOR THE PROPOSED RESIDENCE FOR
Mrs. J.A.D.S.Champika
No. 73/1, Kirimatiyagara, Kadawatha.

BILL OF QUANTITIES - SUMMARY

DESCRIPTION AMOUNT / (Rs.)

A - PRELIMINARIES 15,000.00
B - EXCAVATION & EARTH WORK 99,220.00
C - CONCRETE WORK 27,500.00
D - MASONRY WORK 1,268,500.00
E - CARPENTRY & JOINERY 380,500.00
F - WATER PROOFING WORK 10,980.00
G - FLOOR, WALL & CEILING FINISHES 1,064,200.00
H - ROOF AND CEILING 807,175.00
I - PAINTING WORK 289,180.00
J - INTERNAL PLUMBING AND SANITARY INSTALLATION 110,000.00
K - ELECTRICAL INSTALLATION 175,000.00

TOTAL SUM 4,247,255.00

Prepared and Certified by:


K.R.T.I.Perera
Engineer
BSc. Eng, AMIE(SL)

1
15,000.00
114,220.00
141,720.00
1,410,220.00
1,790,720.00
1,801,700.00
2,865,900.00
2,865,900.00
3,155,080.00
3,265,080.00
3,440,080.00

2
BILL OF QUANTITIES FOR THE PROPOSED RESIDENCE FOR
Mrs. J.A.D.S.Champika
No. 73/1, Kirimatiyagara, Kadawatha.

NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

A PRELIMINARIES
A1 Allow for mobilization works LS Item Allow 15,000.00

B EXCAVATION & EARTH WORK


Unless otherwise measured separately rates Note
for excavation shall includes
a. Part return fill in, well rammed and
consolidated

b. Disposal of surplus earth away from the site


c. Compact bottom of excavations
d. Dewatering of ground and other water
e. Dewatering of rain water and collecting
water
f. Stacking of excavated earth for removal
g. Handling and rehandling of earth
All filling should be 100% compacted tested as Note
per the requirement.

Preparation of Site

Allow for clearing site from all debris and


B1 removal of all bushes and other vagetation Sqr 15.00 300.00 4,500.00
away from the site.

Allow for removal of top soil up to a thickness


B2 of 6" on existing ground level and removal of Sqr 15.00 1,200.00 18,000.00
all debris away from the site.

Excavation

Excavation not exceeding 5'0" deep from


existing ground level except rock requiring
blasting part return fill in if necessary and
compact bottom of excavation, rammed,
disposal of excavated material as derected
including necessary earth work supports and
dewatering in the following.

B3 Wall foundations Cube 12.80 2,800.00 35,840.00

Filling under floors

2
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Well compacted earth filling under floors and


B4 Cube 11.68 3,500.00 40,880.00
compaction (Earth available at the site)

TOTAL FOR EXCAVATION AND EARTH WORK 99,220.00


CARRIED TO BOQ SUMMARY
C CONCRETE WORK

All concrete shall be so cast as to receive fair


face finish on it's exposed faces suitable Note
receive paint/sealer directly. Any poor quality
finish on removal of form work to be

All concrete works shall comply to the


specifications, filled in to formwork and well Note
packed around reinforcement.

All concrete works shall be Grade 25 ready


mixed unless otherwise specified and as per Note
drawings.

Rate for concreting columns, walls shall Note


include for providing kickers.

Rates for lean concrete shall include for


preparation of bottom of excavation prior to Note
pouring of lean concrete.

Rates for formwork shall include for control


joints, isolation joints wherever specified and Note
required according to the drawings and
specifications.

Rate for concrete shall include forming joints


in concrete as per drawings unless otherwise Note
measured separately.

Lintel
Work in ground floor

Lintel 9"x6" high reinforced concrete lintels


including 4 nos 3/8" dia tor steel rods at top
C1 and bottom and mild steel rods 1/4" dia L.f 55.00 500.00 27,500.00
stirrups at 8" centers and necessary formwork
in the Ground floor.

TOTAL FOR CONCRETE WORK CARRIED TO 27,500.00


BOQ SUMMARY

D MASONRY WORK

3
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Rates shall include for lifing, handling,


wetting, all rough and fair cutting plumbing
angles, forming rebated reveals, rough arches,
raking out joints for pointing, plastering etc., Note
cutting and pinning forming or cutting chases,
making good and sundry items of a like
nature.

Rates shall include for scaffolding or


equivalent supports whether specified Note
seperately or not.

All bicks shall be well burnt standard size brick Note


with specified strength.

All cement used for Masonry work shall be Note


"Sanstha" or equivalent and with river sand.

Rubble work
Random rubble masonry foundation in Cube 16.00 25,000.00 400,000.00
cement and sand 1:5 in wall foundation
D1 Wall foundation

D.P.C
Damp proof course in cement and sand 1:2.
3/4" thick finished with two coats of D.P.C. hot
tar blinded with sand in the following.

D2 Wall foundation Sqr 3.60 10,000.00 36,000.00

Brick work
Work in ground floor
brick wall app. 9" thick in cement and sand 1:5
D3 Sqr 33.30 25,000.00 832,500.00
in wall

TOTAL FOR MASONRY WORK CARRIED TO 1,268,500.00


BOQ SUMMARY

E CARPENTRY & JOINERY

4
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

All timber for door window frames and sashes


shall be well seasoned Best quality "jack" Note
timber or equivalent.

All timber shall be selected, well seasoned,


treated for insect attacks to the following
unless otherwise specified.

All timber sizes given here is finished sizes Note


without any allowance for planning.

Minimum thickness of glass shall be 5mm


thick clear glass and shall be "Pilkingon", Note
"Saint Gobian" or equivalent reputed make.

All timber solid doors, plywood doors and


windows shall be finished with sanding
sealer/polishing to all timber surfaces Note
including preparation of surface with sand
papering and filling all uneven surface with a
suitable filling materials.

Doors
Door type D, size 4'0" x 8'6" high over all, jack
wood door with door locks, handles, closers
E1 Nos 1.00 35,000.00 35,000.00
etc., fix and complete as per the client's
requirement.

Door type D1, size 3'0" x 7'3" high over all,


jack wood door with door locks, handles,
E2 Nos 2.00 23,000.00 46,000.00
closers etc., fix and complete as per the
client's requirement.

Door type D2, size 3'0" x 8'6" high over all, Ply
wood door with door locks, handles, closers
E3 Nos 1.00 23,000.00 23,000.00
etc., fix and complete as per the client's
requirement.

Door type D3, size 2'6" x 7'0" high overall, Ply


wood door with door locks, handles, closers
E4 Nos 1.00 18,000.00 18,000.00
etc., fix and complete as per the client's
requirement.

Windows

5
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Window type W, size 8'0" x 7'6" high over all,


glazed four sash Timber wondow with Jack or
equivalent timber frame comprising 1'6" x
E5 Nos 1.00 96,000.00 96,000.00
7'6" sized timber louvers on one top, fixed
complete with all necessary ironmongaries as
per the client's requirement.

Window type W2, size 4'0" x 7'6" high over all,


glazed Triple sash Timber wondow with Jack
or equivalent timber frame comprising 1'6" x
E6 Nos 1.00 48,000.00 48,000.00
7'6" sized timber louvers on one top, fixed
complete with all necessary ironmongaries as
per the client's requirement.

Window type W2, size 6'0" x 5'6" high over all,


glazed doble sash Timber wondow with Jack
or equivalent timber frame comprising 1'6" x
E7 Nos 1.00 35,500.00 35,500.00
5'6" sized timber louvers on one top, fixed
complete with all necessary ironmongaries as
per the client's requirement.

Window type W3, size 4'0" x 5'9" high over all,


glazed doble sash Timber wondow with Jack
or equivalent timber frame comprising 1'6" x
E8 Nos 2.00 36,000.00 72,000.00
4'0" sized timber louvers on one top, fixed
complete with all necessary ironmongaries as
per the client's requirement.

Finlight type F1, size 2'0" x 3'0" high over all,


glazed top hung timber fanlight with jack or
E7 Nos 1.00 7,000.00 7,000.00
equivalent timber frame, fix and complete
with all necessary ironmongaries

TOTAL FOR CARPENTRY & JOINARY CARRIED 380,500.00


TO BOQ SUMMARY

F WATER PROOFING WORK

6
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Rates shall include for temporary screed,


grounds, rules, internal angles, fillet, arises, Note
external angles and exposed circular edges
chases for trucking in etc.,

The finish of the concrete slab shall be


acceptable to the client prior to carrying out Note
the water proofing system.

Rates shall include cutting top line, notching Note


bending and extra materials for lapping.

Rates shall also include working in to recesses


duct covers, shaped inserts, outlet pipes and Note
the like. Rates shall also include for work to
falls and cross falls.

Application of waterproofing treatment


"Barralastic" or equivalent to the walls of
bathroom shower area up to 7'-0" height and
other area up to 1'-0" strictly as per
F1 Sq.f 232.00 40.00 9,280.00
manufacturer's instructions including
preparation of surfaces to receive the same to
the Bathroom wall area in ground floor and
First Floor

Application of water proofing treatment


"Barralastic" or equivalent strictly as per
manufacturer's instructions to the floor in
F2 Sq.f 42.50 40.00 1,700.00
bathrrom including preparation of surfaces to
receive in the Bathroom floor area in ground
floor and First Floor

TOTAL FOR WATER PROOFING WORK 10,980.00


CARRIED TO BOQ SUMMARY

G FLOOR, WALL AND CEILING FINISHES

Rates shall include for all temporary rules,


screeds, grounds, etc. for raking out joints of
new brick work or hacking new concrete for Note
key, internal and coved angles, joints between
different surfaces and between new and old
plastering, arises, quirks, intersection.

7
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Rates for plastering shall include for providing


expanded metal laths or like areas of different Note
modes of construction.

All cement shall be "Sanstha Pedareru" and Note


the contractor shall use in fine sand.

Rates for tiling shall include for fixing all tile Note
specials.

All masonary mortar to be in river sand. Note

Floor Finishes

Ceramic floor tile, in approved manufacturer,


size, colour and design laid on and including
3/4" thick cement and sand 1:3 bedding and
pointing with suitable colour grout laid to
pattern as per the clients' requirements, to
the followings (Tile supplied by Client)

In Ground Floor
G1 In ground floor except for Veranda Sqr 10.50 43,000.00 451,500.00

G2 Veranda Sqr 1.60 43,000.00 68,800.00

imported non slip floor tiles in approved


manufacture, size, colour and design laid on
and including 3/4" thick cement and sand 1:3
G3 Sqr 0.60 43,000.00 25,800.00
bedding and pointing with tile grout to match
the colour of tiles laid to pattern as per the
client requirement to the bathrooms floors3

Skirting

Ceramic tile 3/4" thick skirting 4" height in


approved size, colour and design laid on and
including 3/4" thick cement and sand 1:3
G4 L.f 684.00 60.00 41,040.00
bedding with necessary cutting and laying to
pattern as per the client's requirements. (Tile
supplied by Client)

8
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)
Wall tiles

Imported glazed wall tiles in approved


manufacture, size, colour and design laid on
and including 3/4" thick cement and sand 1:3
G5 bedding and pointing with tile grout to matck Sqr 1.90 44,000.00 83,600.00
the colour of tiles laid to pattern of tiles op to
7'-0" height at bathroom in Ground (Tile
supplied by Client)

Internal wall plaster

Internal plaster in cement, lime and sand 1:1:5


to a thickness not less than 5/8" finished
G6 smooth with lime putty including forming Sqr 33.30 6,200.00 206,460.00
door and window reveals to the Ground Floor
level.

External wall plaster


External plaster in cement, lime and 1:1:5 to a
thickness not less than 5/8" thick finished
G7 Sqr 34.00 5,500.00 187,000.00
semi rough with wood float to walls in the
Ground Floor level.

TOTAL FLOOR, WALL & CEILING FINISHES 1,064,200.00


CARRIED TO BOQ SUMMARY

H ROOF AND CEILING

Rate of roof work shall be inclusive of sanding,


staining and applying two coats of PU varnish
to exposed timber rafers, wall plates, hip and
valley rafers, ridge plates.

Painting of asbestos sloping ceiling is also


include.

Timber shall be Kempas.

9
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Corrugated asbestos sheet roof with exposed


rafer asbestos ceiling on 50x100mm imported
treated timber rafers at 600mm centers and
50x50mm imported treated timber bearer
and 50x25mm reapers for the joints of ceiling
sheets with necessary coach screws and
limpet washers, and 25x6mm beading
H1 including prepare and apply one coat of wood Sqr 14.40 45,000.00 648,000.00
preservative (clear) and varnish to structural
timber work and application of one coat of
Alkali resistant primer and two coats of
emulsion paint to ceiling sheets including
touching up cut end etc. afer fixing (Timber
used other than those mentioned above
measured separately)

H2 Furnishing & laying 3 mm thick double side Sqr 14.40 2,000.00 28,800.00
Aluminium Insulation foil

H3 Ridging, Calicut pattern bedded in cement and


sand lime mortar 1:1:4 . Colour to match roof L.f 49.00 250.00 12,250.00
sheets

H4
Supply and fix Aluminium valley gutter,
900mm girth bent with end laps not less than
225mm width including 20mm tongued and L.f 0.00 1,100.00 -
grooved planks laid to slope and profile on
timber members
H5 Supply and fix square gutters with brackets in L.f 48.00 650.00 31,200.00
Zincaluminium

H6 Supply and fix down pipes with brackets in L.f 88.00 600.00 52,800.00
Zincaluminium

H7
Barge board and Valance board 20mm thick
225mm high, GINISAPU local timber fixed
complete with necessary screws, preparing L.f 97.50 350.00 34,125.00
and painting with one coat of primer and two
coats of enamel paint

TOTAL ROOF AND CEILING CARRIED TO 807,175.00


SUMMARY

I PAINTING WORK

10
NO DESCRIPTION UNIT QTY RATE (Rs.) AMOUNT (Rs.)

Rates shall include for preparation of surfaces


to receive paint and to provide protection for Note
all fixed fittings and equipments inlcuding
removing and prefixing if necessary.

Emulsion and weather shield paint shall be Note


C.I.C. or equivalent.

In Ground Floor

Extranal Wall Painting

External weather shield paint C.I.C or


equivalent quality application of two coats
I1 and a primer undercoat as per manufacture's Sqr 34.00 4,000.00 136,000.00
instruction including preparation of surfaces
to receive paint to external plastered walls.

Internal Wall Painting

Internal paint emulsion in an approved


manufacture C.I.C or equivalent finish with
two coats paint acrylic filler and suitable
I2 Sqr 33.30 4,600.00 153,180.00
under coat including preparation of surfaces
of internal plasterd walls in the Ground Floor
level.

TOTAL FOR PAINTING WORK CARRIED TO 289,180.00


BOQ SUMMARY

Allow for internal plumbing and sanitary


J LS Item Allow 110,000.00
installation

K Allow for Electrical installation LS Item Allow 175,000.00

11
Bill of Quantities for Construction of Bridge No. FS 183 Across Kirindegama Wan Ela (Mahakirindegama
Bridge - Span 18 m)

MEASUREMENT SHEET

T T T L W D = QTY

1.0 Preparation of Site


1.1 Allow for clearing site from all debris and removal of all bushes and
other vagetation away from the site.

1,200.0 / 100.00 = 12.00


Total = 12.00
Say = 12.00 Sqr

1.2 Allow for removal of top soil up to a thickness of 6" on existing ground
level and removal of all debris away from the site.

1,200.0 / 100.00 = 12.00


Total = 12.00
Say = 12.00 Sqr

2.0 Excavation
2.1 Wall foundations

Total Wall foundation 270.00 1.25 2.000 = 675.00


Deduction for Columns -17 3.00 1.25 2.000 = -127.50
Total in Cu.f = 547.50
Total in Cube 5.48
Say = 5.50 Cube

3.2 Err:509

17 3.00 3.00 3.0 = 459.00


Total in Cu.f = 459.00
Total in Cube 4.59
Say = 4.60 Cube

3.3 0

1 3.00 3.00 2.500 = 22.50


Total in Cu.f = 22.50
Total in Cube 0.23
Say = 0.30 Cube

3.0 Filling under floors


3.1 Well compacted earth filling under floors and compaction (Earth
available at the site)

For Column Bases 17 1.00 8.44 2.500 = 358.70


Under wall fon. 1 219.00 1.0 1.000 = 219.00
Under the Floor 1 1,200.00 1.00 0.500 = 600.00
Total in Cu.f = 1,177.70
Total in Cube 11.78
Say = 12.00 Cube

Err:509
C1 Err:509

17 3.00 3.00 = 153.00


1 270.00 4.00 = 1,080.00
2.50 3.00 = 7.50
Total in Sq.f = 1,240.50
Total in Sqr = 12.41
Say = 12.50 Sqr

C2 Err:509

1,200.00 1.0 = 1,200.00


Total in Sq.f = 1,200.00
Total in Sqr = 12.00
Say = 12.00 Sqr

Err:509
C3 Err:509

17 3.00 3.00 0.500 = 76.50


Total in Cu.f = 76.50
Total in Cube = 0.77
Say = 0.77 Cube

C4 Err:509

17 0.75 0.75 3.50 = 33.47


Total in Cu.f = 33.47
Total in Cube = 0.33
Say = 0.34 Cube

C5 Err:509

270.00 0.75 0.75 = 151.88


Total in Cu.f = 151.88
Total in Cube = 1.52
Say = 1.52 Cube

C6 Err:509

1 3.00 2.50 0.50 = 3.75


1 3.00 0.50 2.500 = 3.75
Total in Cu.f = 7.50
Total in Cube = 0.08
Say = 0.08 Cube

Err:509
Err:509
C7 Err:509

17 0.75 0.75 12.00 = 114.75


Total in Cu.f = 114.75
Total in Cube = 1.15
Say = 1.15 Cube

C8 Err:509

1 340.00 0.75 1.16667 = 297.50


Total in Cu.f = 297.50
Total in Cube = 2.98
Say = 2.98 Cube

C9 Err:509

40.0 40.0 0.417 = 666.67


Total in Cu.f = 666.67
Total in Cube = 6.67
Say = 6.67 Cube

C10 Err:509

Landing 3.0 3.0 0.417 = 3.75


Steps 16 0.5 3.00 0.83 0.417 = 8.33
Steps 1 23.00 3.00 0.417 = 28.75
Total in Cu.f = 40.83
Total in Cube = 0.41
Say = 0.41 Cube

Err:509
Err:509
C11 Err:509

17 0.75 0.75 11.00 = 105.19


Total in Cu.f = 105.19
Total in Cube = 1.05
Say = 1.06 Cube

beam

1 340.00 0.75 0.75 = 191.25


Total in Cu.f = 191.25
Total in Cube = 1.91
Say = 1.92 Cube

Err:509
Err:509
C12 Err:509

17 2 6.000 0.850 0.617 = 106.99


9 4.000 1.275 0.888 = 40.76
9 5.000 0.825 0.222 = 8.24
Total = 155.99
Say = 156.00 kg

C14 Err:509

T 10 1 7 0.850 0.617 = 3.67


T 10 1 6 1.000 0.617 = 3.70
T 10 2 8 0.800 0.617 = 7.90
T 10 2 4 1.000 0.617 = 4.94
Total = 20.21
Say = 21.00 kg

Err:509
C15 Err:509

17 4.000 3.600 0.888 = 217.38


17 18.000 0.825 0.222 = 56.04
Total = 273.43
Say = 274.00 kg

C16 Err:509
F1B-01 T 12 1.2 2.000 102.000 0.888 = 217.38
F1B-01 T 12 1.2 2.000 102.000 1.580 = 386.78
T 06 680 0.825 0.222 = 124.54
Total = 728.71
Say = 729.00 kg

C17 Err:509
lintle lintle
d1 4 8 1 0 6 0 32 0
d2 3 7 4 2 20 10 84 42
d3 2.5 7 1 1 4.5 4.5 17.5 17.5
w1 6 7 1 0 8 0 42 0
w2 4 7 1 0 6 0 28 0
w3 6 5 2 1 16 8 60 30
w4 6 4 1 0 8 0 24 0
f1 2 3 1 1 4 4 6 6
dw 6 7 0 2 0 16 0 84
72.5 42.5 293.5 179.5
2126.5 1668.5
21.3 16.7
32

42 0
28 0
60 30
24 0
6 6
0 84
192 120
Building Rates- 2012- NCP

RATES FOR
BUILDING
CONSTRUCTION
S - 2012

PROVINCIAL ENGINEERING

DEPARTMENT NORTH CENTRAL

PROVINCE

Page 18
Building Rates- 2012- NCP

PROVINCIAL ENGINEERING DEPARTMENT

NORTH CENTRAL PROVINCE

Head Office :

Maithreepala Senanayake Mawatha, Anuradhapura.


Tel. : 025-2220910, 025-2226157, 025-2225285 Fax : 025-2220910
e-mail : ncpengineering@yahoo.com

Divisional Engineer's Offices :

Anuradhapura : Tel. : 025 - 2236386


e-mail : ncpenganu@yahoo.com
Kekirawa : Tel. : 025 - 2264286
e-mail : ncpengkek@yahoo.com
Mahailluppallama : Tel. : 025 - 2249136
e-mail : ncpengmah@yahoo.com
Medawachchiya : Tel. : 025 - 2245930
e-mail : ncpengmed@yahoo.com
Polonnaruwa : Tel. : 027 - 2222406
e-mail : ncpengpol@yahoo.com

Quality Control laboratory :


Maradankadawala Road, Kekirawa
Tel. : 025-2263285
e-mail : ncpengqckek@yahoo.com

Page 19
Building Rates- 2012- NCP

Vision :
Being the forerunner in performing
Engineering activities in the North Central
Province qualitatively.

Mission :

Our mission is to raise the living


standards of the people with the participation
of the community, while utilizing resources in
an environment-friendly manner and
preserving the identity and the grandeur of
Rajarata, and to ensure optimum
management for sustainability of the
Engineering activities by using modern
technology with an institutional and
professional responsibility.

Page 20
Building Rates- 2012- NCP

KEY PERSONS
* Eng. C.K.B. Seneviratne : Deputy Chief Secretary
C.Eng., MIE(SL), P.G.Dip.(L&W), M-2432 (Engineering), Tel.025-2220910

* Eng. (Ms.) K.C.D. Fernando : Director (Buildings),


B.Sc. Eng., P.G.Dip.(IWM), C.Eng., MIE(SL), Tel. 025-2226157
M-5068
* Eng. (Ms.) D.L.B.P. Wijesekara, : Director Designs, (Consultancy &
B.Sc. Eng., M.Sc.(IWRM), C.Eng., MIE(SL), Quality Control),
M-4492 Tel. 025-2222423
* Eng. S.J.K. Alas : Divisional Engineer -
B.Sc. Eng., AMIE(SL), AM-5978 Medawachchiya,
Tel. 025-2245930
* Eng.(Ms.) I.K.M.C.K. Illangasinghe : Divisional Engineer - Kekirawa,
B.Sc. Eng., AMIE(SL), AM-4630 Tel. 025-
2264286
* Eng. D.M.U.S.B. Dissanayake : Engineer - School works,
B.Sc. Eng., C.Eng., MIE(SL), M-5187 Tel. 025-2222194
* Eng. H.M.J. Herath : Divisional Engineer -
B.Sc. Eng., C.Eng., MIE(SL), M-5822 Mahailluppallama,
Tel. 025-2249136
* Eng. (Ms.) M.P.P. Dilhani : Divisional Engineer
B.Sc. Eng., C.Eng., MIE(SL), M-5698 -Anuradhapura, Tel. 025-2236386
* Eng. W. Jayasundara : Engineer in charge (Special
E.C.(UK), AM-7728 projects), Tel. 025-2225285
* Eng. W.G.S.S. Bandara : Divisional Engineer -
Polonnaruwa, Tel. 027-2222406
B.Sc. Eng., AMIE(SL), AM-10614
* W.N.P.M.S. Wijithaweera : Architect, Tel. 025-2225285
B.Sc. (B.E.)
* Eng. S.D.N. Ariyawansha : Engineer in charge (Health
B.Sc. Eng., AMIE(SL), AM-10626 department projects),
Tel. 025-2225285
* Eng. A.A.D.C.R. Aluthgama : Quality Control Engineer,
B.Sc. Eng., AMIE(SL), AM-10760 Tel. 025-2263285
* Eng. W.G.S.S. Bandara : Divisional Engineer -
B.Sc. Eng., AMIE(SL), AM-10614 Polonnaruwa, Tel. 027-2222406
* Eng. H.M.R.M. Aberathna : Irrigation Engineer,
B.Sc. Eng., AMIE(SL), AM-10023 Tel. 025-3779070
* Eng. W.H. Hapuarachchi : Mechanical Engineer ,
B.Sc. Eng., AMIE(SL), AM-11257 Tel. 025-2225285

Page 21
Building Rates- 2012- NCP
GUIDELINES FOR USERS

* All rates in this book have been prepared by using Anuradhapura district buying committee
rates and market prices of materials in North Central Province.

General Specifications :-

1. Specifications for Building Works - Volume I - ICTAD Publication No. SCA/4/I - Revised
Edition - July 2004

2. Specifications for Building Works - Volume II - Sanitary Installations - ICTAD Publication


No. SCA/4/II - Revised Edition - October 2001

3. Specifications for Water Supply, Sewerage & Storm Water Drainage Works - ICTAD
Publication No. SCA/3/2- Revised Edition - April 2002

4. Specifications for Electrical & Mechanical works Associated with Building & Civil
Engineering - ICTAD Publication No. SCA/8 - Revised Edition - August 2000

* The Particular Specification shall be read in conjunction with the General Specification
where applicable. In the event the Particular Specification is in conflict with the General
Specification, the Particular Specification shall be prevail.

* Particular Specifications for each category are mentioned above. Full description and
relevant notes mentioned above for each category in the rate book should be given for each
item when preparing estimates.

* In the specifications, if any materials/fittings are described by using a trade name, it is only
for the purpose of indicating the minimum level of quality and standard required. It may be
used any other material/ fitting, which are considered as equivalent in quality and standard
to those specified therein subject to the approval of the Engineer.

* Rates can be used as guidance and adjustment could be made to suit the specific site
conditions subjected to approval.

* Overhead and profit applied is 20%.

* Transport, loading, unloading and material wastage are included in the rates.

* Prices used are exclusive of VAT.

Page 22
Building Rates- 2012- NCP
LEDGEND

No. ITEM Page

RATES FOR BUILDING CONSTRUCTIONS

A. DEMOLISHER 7-9

B. EXCAVATION & EARTHWORK 10

C. MASON 11

D. CONCRETOR 12 - 14

E. FORMWORK 15

F. REINFORCEMENT 16

G. BRICKLAYER 17

H. PLASTERER 18 - 19

I. PAVIOR 20 - 23

J. ROOFER 24 - 31

K. CARPENTER & JOINER 32 - 35

L. IRONWORK 36 - 38

M. PAINTER & DECORATOR 39 - 40

N. PLUMBER 41 - 46

O. DRAINLAYER 46 - 48

P. ELECTRICAL INSTALLATION 49 - 52

Q. MISCELLANEOUS 53

R. ALUMINIUM WORK 54 - 56

UNITS PRICES OF MATERIAL, LABOUR AND 56 - 58


PLANT FOR 2012

RATES FOR IRRIGATION CONSTRUCTIONS 60-72

RATES FOR QUALITY CONTROL TESTS 73-75

Page 23
Building Rates- 2012- NCP
A - DEMOLISHER
Rates for Demolisher shall include for:
(a) Scaffolding, shoring and shores required.
(b) Protection of site personal, plant and equipment by taking precautions against uncontrolled
collapse, electrical hazards and fire or explosion risks.

(c) Materials arising from the demolition works shall be removed as directed by the Engineer.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
A-1 Brickwork in lime demolished, brick stacked cube 1,483.00 cum 524.00
and debris cleared within the site.
A-2 Brickwork in cement mortar demolished, cube 1,978.00 cum 699.00
brick stacked and debris cleared within the
site.
A-3 Ceiling existing removed, materials stacked sqr. 648.00 sqm 70.00
and debris cleared within the site
A-4 Cement concrete demolished and debris cube 8,640.00 cum 3,053.00
cleared within the site.
A-5 Reinforced concrete demolished, cube 18,909.00 cum 6,682.00
reinforcement removed and debris cleared
within the site.
A-6 Corrugated sheets (Iron, asbestos or sqr. 742.00 sqm 80.00
aluminium) removed from roof or walls and
stacked - single storied building

A-7 Corrugated sheets (Iron, asbestos or sqr. 803.00 sqm 86.00


aluminium) removed from roofs or walls and
stacked - 2 storied building.

A-8 Corrugated sheets (Iron, asbestos or sqr. 865.00 sqm 93.00


aluminium) removed from roofs or walls and
stacked - 3 storied buildings.

A-9 Door or window with frame size up to 40 sqft. no. 960.00 no. 960.00
removed from existing walls and stacked.
A-10 Door or window with frame size over 40 sqft. no. 1,440.00 no. 1,440.00
removed from existing walls and stacked.
A-11 Door or window sash only, up to 40 sqft. no. 149.00 no. 149.00
removed from existing walls and stacked.
A-12 Door or window sash only, over 40 sqft. no. 223.00 no. 223.00
removed from existing walls and stacked.
A-13 Down pipes, old or decayed, removed from lft. 10.00 lm 33.00
existing building and stacked.
A-14 Drains demolished and debris cleared within lft. 19.00 lm 62.00
the site.

Page 24
Building Rates- 2012- NCP
A-15 Fence uprooted, barbed wire rolled up and all lft. 40.00 lm 131.00
materials stacked (Length of fencing to be
measured)

Page 25
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
A-16 Floors brick paved, demolished and debris sqr. 720.00 sqm 78.00
cleared away within the site.

A-17 Gate sash removed and stacked after no 960.00 no. 960.00
demolishing cement concrete blocks or
removing posts and separating pintos
(demolishing brickwork where necessary paid
for separately)

A-18 Glass panes in doors and windows and sqft. 45.00 sqm 484.00
fanlights removed and stacked.

A-19 Gutter, eaves removed and stacked from roof lft. 6.00 lm 20.00
of single storied building.

A-20 Gutter, eaves removed and stacked from roof lft. 9.00 lm 30.00
of 2 storied building

A-21 Gutter, eaves removed and stacked from roof lft. 12.00 lm 39.00
of 3 storied building.

A-22 Partitions removed and stacked at site, sqft. 28.00 sqm 301.00
including making good to walls and floors.

A-23 Cement, lime plastering chipped and debris sqr. 510.00 sqm 55.00
cleared away within the site.

A-24 Rendering, cement chipped and debris cleared sqr. 1,080.00 sqm 116.00
away from brick walls and floors within the
site.

A-25 Rendering, cement chipped and debris cleared sqr. 1,622.00 sqm 175.00
away from cement concrete floors and walls
within the site.

A-26 Removing of existing roof (tiles, asbestos sqr. 1,440.00 sqm 155.00
sheets or GI sheets) with timber frame,
stacking usable material and clearing debris in
single storied building.

A-27 Removing of existing roof (tiles, asbestos sqr. 1,854.00 sqm 200.00
sheets or GI sheets) with timber frame,
stacking usable material and clearing debris in
2 storied building.

A-28 Removing of existing roof (tiles, asbestos sqr. 2,348.00 sqm 253.00
sheets or GI sheets) with timber frame
stacking usable material and clearing debris
in 3 storied and above

A-29 Rubble masonry in cement demolished, cube 3,090.00 cum 1,092.00


rubble stacked and debris cleared within the
site.

Page 26
Building Rates- 2012- NCP
A-30 Tiles, glazed demolished and debris cleared sqr. 1,920.00 sqm 207.00
within the site.

Page 27
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
A-31 Tiles Calicut or half round, removed from sqr. 494.00 sqm 53.00
roof of single storied buildings and stacked at
site.
A-32 Tiles Calicut or half round removed from roof sqr. 742.00 sqm 80.00
of 2 storied building and stacked at site.

A-33 Tiles Calicut or half round, removed from sqr. 989.00 sqm 106.00
roofs of 3 storied and above buildings and
stacked at site.
A-34 Waterproof Treatment of hot bitumen taken sqr. 1,920.00 sqm 207.00
off from flat roof and debris cleared away.

A-35 Ceiling asbestos removed including timber sqr. 2,472.00 sqm 266.00
framework stacking usable materials and
debris cleared away in single storied building.

A-36 Ceiling asbestos removed including timber sqr. 2,966.00 sqm 319.00
frame work, stacking usable materials and
debris cleared away in 2 storied building.

A-37 Valance/Barge boarding removed, materials lft. 6.00 lm 20.00


stacked and debris cleared away in single
storied building.

A-38 Valance/Barge board removed, materials lft. 9.00 lm 30.00


stacked and debris cleared away in 2 storied
building.

A-39 Cement plastering in soffit chipped and debris sqr. 1,384.00 sqm 149.00
cleared away.

A-40 Roof trusses span up to 30' 0" removed from no. 2,966.00 no. 2,966.00
roof and stacked.

A-41 Transport of debris to a place where 1-5 km cube 2,040.00 cum 721.00
away from the site as directed by the Engineer
including loading.

A-42 Transport of debris to a place where 5-10 km cube 2,340.00 cum 827.00
away from the site as directed by the Engineer
including loading.

A-43 Basin, sink, or urinals including all fittings no. 1,200.00 no. 1,200.00
removed and wall made good

A-44 Water Closet or Squatting pan, removed, no. 1,907.00 no. 1,907.00
sewer connection plugged and floor made
good

Page 28
Building Rates- 2012- NCP
B - EXCAVATION & EARTHWORK
Rates for Excavation and Earthwork shall include for:
(a) Trimming sides, keeping clean, leveling, grading and consolidating bottom of bases and
trenches etc.
(b) Leveling and consolidating where required under slabs or sub-floor layers.
(c) Back filling and well ramming around foundation.
(d) Keeping all excavations free from storm or percolating water to keep excavation dry at all
stages of construction.
(e) Any necessary additional excavation for working spaces, planking and strutting etc.
(f) Providing shoring work where necessary.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
B-1 Removing top soil to a depth of 150mm and sqr. 816.00 sqm 88.00
depositing as directed within the site
B-2 Excavation for foundation in any material cube 1,483.00 cum 524.00
except rock requiring blasting, part return fill
in and ram, and surplus dispose within the
site as directed.

B-3 Excavation in any material except rock cube 1,183.00 cum 418.00
requiring blasting including transporting up
to 400m, depositing and leveling.

B-4 Excavation in trenches for walls and column cube 2,016.00 cum 712.00
pits in soft disintegrated rock (not requiring
blasting) up to a depth of 1.5m and depositing
excavated materials to distance not exceeding
10m.

B-5 Excavation in trenches for walls and column cube 5,808.00 cum 2,052.00
pits in hard rock requiring blasting up to a
depth of 1.5m and depositing excavated
materials to distance not exceeding 10m.

B-6 Filling under floors with gravel or other cube 1,939.00 cum 685.00
approved quality of filling, spread, watered
and well rammed in 150mm layers (material
available at site)

B-7 Filling under floors with gravel or other cube 4,398.00 cum 1,554.00
approved quality of filling, spread, watered
and well rammed in 150mm layers (material
not available at site)

B-8 Anti termite treatment on excavated sqr. 3,575.00 sqm 385.00


foundation and compacted soil under floors
(Treatment should be done according to the
instructions given by the Engineer) -
Warranty period 10 years

Page 29
Building Rates- 2012- NCP
B-9 Drains, earth in any soil except rock requiring cube 1,291.00 cum 456.00
blasting cut to gradient and shaped as
directed, soil deposited within site.

Page 30
Building Rates- 2012- NCP
C - MASON

Rates for Masonry work shall include for:


(a) All joggles, clamps, dowels, ties, and templates.
(b) Rough and fair cutting forming splays.
(c) Angles, reveals and returns.
Instructions :

(a) Cement used should be SLS Certified Products for Masonry work
(b) Average crushing strength of 10 blocks shall be not less than 2.8 N/mm2
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
Rubble Masonry

C-1 150-225mm Random Rubble Masonry in cube 29,166.00 cum 10,306.00


cement mortar 1:5 above 1 cube

C-2 150-225mm Random Rubble Masonry in cube 31,762.00 cum 11,223.00


cement mortar 1:5 up to 1 cube

Block Masonry

C-3 150mm thick Hollow block work in cement sqr. 14,189.00 sqm 1,527.00
and sand mortar 1:5 with 400x200x150mm
blocks (Cavities unfilled)

C-4 100mm thick Hollow block work in cement sqr. 9,830.00 sqm 1,058.00
and sand mortar 1:5 with 400x200x100mm
blocks (Cavities unfilled)

C-5 150mm thick solid block work in cement and sqr. 14,472.00 sqm 1,558.00
sand mortar 1:5 with 400x200x150mm blocks

C-6 100mm thick solid block work in cement and sqr. 10,677.00 sqm 1,149.00
sand mortar 1:5 with 400x200x100mm blocks

Page 31
Building Rates- 2012- NCP
D - CONCRETOR

Grade of concrete used in the construction and recommended mixes as follows.


(a) Grade 25 Recommended Mix 1 : 1 : 3 (20mm)
(b) Grade 20 Recommended Mix 1 : 2 : 4 (20mm)
(c) Grade 15 Recommended Mix 1 : 2 1/2 : 5 (25mm)
(d) Grade 10 Recommended Mix 1 : 3: 6 (40mm)
Rate shall include,
(a) Mixing, hoisting, placing and compacting on the surfaces of any material or on formwork.
(b) Forming any construction joint.
(c) Vibrating, curing and protecting concrete surfaces from harmful weather conditions.
(d) Forming sloping on upper surfaces where required.
(e) Grouting the earlier concreted edges.
(f) Making good after removal of formwork.
Instructions
(a) Prior approval for any concrete work should be taken from the Engineer.

(b) Approval for constituent materials and test reports for properties of concrete should be
taken from Quality Control Engineer, Quality Control lab, Kekirawa with contractor's
expense.
(c) Cement used should be SLS certified products approved for concrete.
(d) Reinforcement and formwork paid separately where not mentioned.

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
D-1 Cement concrete grade 10 above one cube. cube 35,690.00 cum 12,611.00

D-2 Cement concrete grade 10 up to 1 cube. cube 37,970.00 cum 13,417.00


D-3 75mm thick cement concrete grade 15 in sqr. 10,691.00 sqm 1,151.00
floors using concrete mixer and vibrator
including laying of gauge 1000 polythene
sheet
D-4 Cement concrete grade 20 in column cube 46,299.00 cum 16,360.00
foundation, column shaft and plinth beams
using mixer and vibrator - up to first floor
level
D-5 Cement concrete grade 20 in column shaft cube 48,493.00 cum 17,135.00
using mixer and vibrator - up to second floor
level

D-6 Cement concrete grade 20 in column shaft cube 51,459.00 cum 18,183.00
using mixer and vibrator - up to third floor
level

Page 32
Building Rates- 2012- NCP
D-7 Cement concrete grade 20 in slab, beams and cube 47,676.00 cum 16,847.00
stair case using mixer and vibrator - up to first
floor level

Page 33
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
D-8 Cement concrete grade 20 in slab, beams and cube 48,665.00 cum 17,196.00
stair case using mixer and vibrator - up to
second floor level

D-9 Cement concrete grade 20 in slab, beams and cube 50,148.00 cum 17,720.00
stair case using mixer and vibrator - up to
third floor level

D-10 Cement concrete grade 25 in column cube 49,760.00 cum 17,583.00


foundation, column shaft and plinth beams
using mixer and vibrator - up to first floor
level
D-11 Cement concrete grade 25 in column shaft cube 51,954.00 cum 18,358.00
using mixer and vibrator - up to second floor
level

D-12 Cement concrete grade 25 in column shaft cube 54,920.00 cum 19,406.00
using mixer and vibrator - up to third floor
level

D-13 Cement concrete grade 25 in slab, beams cube 52,291.00 cum 18,477.00
and stair case using mixer and vibrator - up to
first floor level

D-14 Cement concrete grade 25 in slab, beams and cube 53,280.00 cum 18,827.00
stair case using mixer and vibrator - up to
second floor level

D-15 Cement concrete grade 25 in slab, beams and cube 54,763.00 cum 19,351.00
stair case using mixer and vibrator - up to
third floor level

D-16 Cement concrete grade 20 in lintels cube 41,997.00 cum 14,840.00


(reinforcement and shuttering paid separately)
using mixer and vibrator - up to first floor
level

D-17 Cement concrete grade 20 in lintels cube 43,974.00 cum 15,539.00


(reinforcement and shuttering paid
separately) using mixer and vibrator - up to
second floor level

D-18 Cement concrete grade 20 in lintels cube 46,941.00 cum 16,587.00


(reinforcement and shuttering paid
separately) using mixer and vibrator - up to
third floor level

D-19 Lintel, cement concrete grade 20, Lft. 345.00 Lm 1,132.00


112x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to first floor level

Page 34
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
D-20 Lintel, cement concrete grade 20, lft. 356.00 lm 1,168.00
112x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to second floor level

D-21 Lintel, cement concrete grade 20, lft. 364.00 lm 1,194.00


112x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to third floor level

D-22 Lintel, cement concrete grade 20, lft. 411.00 lm 1,348.00


225x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to first floor level

D-23 Lintel, cement concrete grade 20, lft. 422.00 lm 1,384.00


225x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to second floor level

D-24 Lintel, cement concrete grade 20, lft. 429.00 lm 1,407.00


225x150mm with 2 nos. 12 mm dia. tor steel
bars and form work - up to third floor level

D-25 Coble stone in grade 20 cement concrete no. 3,116.00 no. 3,116.00
reinforced with 4 n. of 10mm dia. Tor steel,
up to 1 cuft. in volume

D-26 75mm thick worktop in grade 20 cement sqft. 350.00 sqm 3,766.00
concrete with 10mm tor steel at 150mm c/c
both ways including formwork and soffit
plastering

D-27 100mm thick copping in grade 20 concrete lft. 689.00 lm 2,260.00


on 225mm thick walls including 2nos. of
8mm tor steel bars and stirrups with 6mm dia.
mild steel including formwork finished
smooth with 50mm rendering and red cement
floating with throat.

D-28 100mm thick copping in grade 20 concrete lft. 496.00 lm 1,627.00


on 112mm thick walls including 2nos. of
8mm tor steel bars and stirrups with 6mm dia.
mild steel including formwork finished
smooth with 50mm rendering and red cement
floating with throat.

Page 35
Building Rates- 2012- NCP
E - FORMWORK

Rates for formwork shall include for:


(a) All framing, propping, bracing, cutting angles, bolting, wedging, cleaning, wetting and
treating before pouring concrete.
(b) Erecting, Striking off and cleaning of formwork.
(c) Rubbing down, filling and making good the surface of concrete after removal of formwork.
Instructions
(a) All the formwork for slabs should be done in such a way that it is good enough to apply a
layer of skim coat or suitable pillar and painting, without soffit plastering.

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
E-1 12mm Plywood shuttering for slab, beams sqr. 11,747.00 sqm 1,264.00
and staircase including dismantling - up to
first floor level

E-2 12mm Plywood shuttering for slab, beams sqr. 12,395.00 sqm 1,334.00
and staircase including dismantling - up to
second floor level

E-3 12mm Plywood shuttering for slab, beams sqr. 12,467.00 sqm 1,342.00
and staircase including dismantling - up to
third floor level

E-4 12mm Plywood shuttering for column shaft sqr. 13,238.00 sqm 1,425.00
including dismantling - up to first floor level

E-5 12mm Plywood shuttering for column shaft sqr. 13,658.00 sqm 1,470.00
including dismantling - up to second floor
level
E-6 12mm Plywood shuttering for column shaft sqr. 13,938.00 sqm 1,500.00
including dismantling - up to third floor level

E-7 Shuttering for plinth beams and lintels sqr. 8,752.00 sqm 942.00
including dismantling - up to first floor level

E-8 Shuttering for lintels including dismantling - sqr. 10,132.00 sqm 1,091.00
up to second floor level

E-9 Shuttering for lintels including dismantling - sqr. 10,252.00 sqm 1,104.00
up to third floor level

E-10 Class III timber shuttering for small works sqr. 5,533.00 sqm 596.00
including dismantling

Page 36
Building Rates- 2012- NCP
F- REINFORCEMENT

Rates for Reinforcement shall include for:


(a) Rolling margin and waste.
(b) Bending, cutting, fabricating, hoisting, and placing in position.
(c) Holding and supporting including temporary fixing supports, hangers.
(d) Cleaning and wire brushing.
(e) All spacing, laps etc. in reinforced steel other than design laps.
(f) Tensile strength of Tor Steel should be not less than 460 N/mm2 and Mild Steel should be
not less than 250 N/mm2
Instructions
(a) Inevitable laps should be measured.
(b) Unless otherwise specified laps to be 50 times the diameter of the bar.
(c) Preparation, supplying & binding of cover blocks such that specified cover is maintained at
outer-most rod.
(d) Reinforcements should be CN, GTB or LANWA. Tensile strength of reinforcements should
be tested if requested, from the institution where specified by the Engineer with
contractor's expense.
(e) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
F-1 Tor steel rods reinforcing in Column cwt. 10,131.00 M.Ton 202,614.00
foundation and plinth beams up to DPC,
bent to shape laid in position and tied with
G.I. Wire as directed

F-2 Tor steel rods reinforcing in columns, beams, cwt. 10,491.00 M.Ton 209,814.00
slabs and lintels up to first floor level bent
to shape laid in position and tied with G.I.
Wire as directed

F-3 Tor steel rods reinforcing in columns, cwt. 10,815.00 M.Ton 216,294.00
beams, slabs and lintels up to second floor
level bent to shape laid in position and tied
with G.I. Wire as directed

F-4 Tor steel rods reinforcing in columns, beams, cwt. 11,031.00 M.Ton 220,614.00
slabs and lintels up to third floor level bent
to shape laid in position and tied with G.I.
Wire as directed

F-5 Mild steel rods, shape into stirrups and laid in cwt. 10,443.00 M.Ton 208,854.00
position and tied with GI wires as directed -
up to first floor level
F-6 Mild steel rods, shape into stirrups and laid in cwt. 10,767.00 M.Ton 215,334.00
position and tied with GI wires as directed -
up to second floor level

Page 37
Building Rates- 2012- NCP
F-7 Mild steel rod, shape into stirrups and laid in cwt. 10,983.00 M.Ton 219,654.00
position and tied with GI wires as directed -
up to third floor level

Page 38
Building Rates- 2012- NCP
G - BRICK LAYER

Rates for Brickwork shall include for:


(a) Wetting well all the surfaces of the bricks before using.
(b) Plumbing angles.
(c) Normal straight cuttings.
(d) Ranking of joints for plastering.
(e) All the necessary scaffolding.
(f) Ranking of joints for plastering.
Instructions :
(a) Cement used should be SLS Certified Products for Masonry work
(b) Average crushing strength of 10 bricks shall be not less than 7.0 N/mm2
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
G-1 Arch, segmental, brick in cement sand 1:3, cube 43,857.00 cum 15,497.00
including plumbing angles, normal straight
cutting, forming rebated reveals and raking of
joints for plastering

G-2 225mm thick brick work in cement - sand cube 33,741.00 cum 11,923.00
mortar 1:8 (up to first floor level)

G-3 225mm thick brick work in cement - sand cube 35,224.00 cum 12,447.00
mortar 1:8 (up to second floor level)

G-4 225mm thick brick work in cement - sand cube 38,190.00 cum 13,495.00
mortar mortar 1:8 (up to third floor level)

G-5 Brick 112mm thick in cement - sand mortar sqr. 13,379.00 sqm 1,440.00
1:5 (up to first floor level)

G-6 Brick 112mm thick in cement - sand mortar sqr. 14,862.00 sqm 1,600.00
1:5 (up to second floor level)

G-7 Brick 112mm thick in cement - sand mortar sqr. 17,828.00 sqm 1,919.00
1:5 (up to third floor level)

G-8 Coping, brick in cement - sand mortar 1:5, lft. 274.00 lm 899.00
weathered and throated on 112mm walls,
cement rendered with 12mm thick 1:3 mix
complete

G-9 Coping, brick in cement - sand mortar 1:5, lft. 378.00 lm 1,240.00
weathered and throated on 225mm walls,
cement rendered with 12mm thick 1:3 mix
complete

G-10 Widening R.C.C Column by placing one lft. 202.00 lm 663.00


brick on both side of column to size
450x225mm

Page 39
Building Rates- 2012- NCP

H- PLASTERER
Rates for wall finishing shall include for:
(a) Temporary rules, screeds, ground etc.
(b) Ranking out joints of brickwork and backing concrete surface for forming key.
(c) Joints between different surfaces.
(d) Forming arises and stopping against joinery work, metal work etc.
(e) Making good around pipes, sanitary fittings and fixtures.
(f) Straight cutting and raking cutting holes, notching and other sundries Labour of a like
nature.
(g) Preparing sample panel of different finishes described below for the approval of the
Engineer. Each panel not less than 0.5 m2 in area.
(h) Cement used should be SLS Certified Products for masonry work.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
H-1 D.P.C., 20mm thick, in cement-sand mortar sqr. 7,307.00 sqm 787.00
1:2 finished with two coats of hot tar applied
at the rate of 0.25 liters per sqm. for each coat

H-2 20mm thick plinth plaster in 1:3 cement - sqr. 5,921.00 sqm 637.00
sand mortar finished smooth with neat cement
floating.

H-3 20mm thick plinth plaster in 1:3cement - sqr. 6,247.00 sqm 672.00
sand mortar finished smooth with red cement
floating.

H-4 Cement plastering with 1:5 mix, 15mm thick sqr. 3,835.00 sqm 413.00
finished semi rough in external walls - up to
first floor level

H-5 Cement plastering with 1:5 mix, 15mm thick sqr. 4,188.00 sqm 451.00
finished semi rough in external walls - up to
second floor level

H-6 Cement plastering with 1:5 mix, 15mm thick sqr. 4,423.00 sqm 476.00
finished semi rough in external walls - up to
third floor level

H-7 Cement plaster with 1:5 mix, 15mm thick sqr. 5,411.00 sqm 582.00
finished smooth with skim coat in internal
walls - up to first floor level

H-8 Cement plaster with 1:5 mix, 15mm thick sqr. 5,965.00 sqm 642.00
finished smooth with skim coat in internal
walls - up to second floor level

H-9 Cement plaster with 1:5 mix, 15mm thick sqr. 6,274.00 sqm 675.00
finished smooth with skim coat in internal
walls - up to third floor level

Page 40
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
H-10 Cement lime plaster with 1:1:5 mix, 15mm sqr. 5,184.00 sqm 558.00
thick finished smooth with lime putty in
internal walls - up to first floor level
H-11 Cement lime plaster with 1:1:5 mix, 15mm sqr. 5,685.00 sqm 612.00
thick finished smooth with lime putty in
internal walls - up to second floor level

H-12 Cement lime plaster with 1:1:5 mix, 15mm sqr. 6,019.00 sqm 648.00
thick finished smooth with lime putty in
internal walls - up to third floor level

H-13 Reveals or plaster band 150mm wide in walls lft. 69.00 lm 226.00
with cement lime and sand 1:1:5 mix finished
to match existing
H-14 Finish smooth soffit of slab by applying skim sqr. 2,623.00 sqm 282.00
coat - up to first floor level
H-15 Finish smooth soffit of slab by applying skim sqr. 2,772.00 sqm 298.00
coat - up to second level
H-16 Finish smooth soffit of slab by applying skim sqr. 2,870.00 sqm 309.00
coat - up to third floor level
H-17 15mm thick plaster to R.C.C. columns, beams sqr. 5,911.00 sqm 636.00
and soffit of slab in cement - sand 1:3 mix
including floating with lime putty - up to first
floor level
H-18 15mm thick plaster to R.C.C. columns, beams sqr. 6,579.00 sqm 708.00
and soffit of slab in cement - sand 1:3 mix
including floating with lime putty - up to
second floor level
H-19 15mm thick plaster to R.C.C. columns, beams sqr. 7,024.00 sqm 756.00
and soffit of slab in cement - sand 1:3 mix
including floating with lime putty - up to third
floor level
H-20 15mm thick semi rough finished plaster to sqr. 5,767.00 sqm 621.00
R.C.C. columns, beams and soffit of slab in
cement - sand 1:3 mix - up to first floor level

H-21 15mm thick semi rough finished plaster to sqr. 6,435.00 sqm 693.00
R.C.C. columns, beams and soffit of slab in
cement - sand 1:3 mix - up to second floor
level
H-22 15mm thick semi rough finished plaster to sqr. 6,880.00 sqm 741.00
R.C.C. columns, beams and soffit of slab in
cement - sand 1:3 mix - up to third floor level

H-23 15mm thick plastering to wall in cement- sand sqr. 4,064.00 sqm 437.00
1:3 mix including cement floating

Page 41
Building Rates- 2012- NCP
H-24 Cracks in walls plastered in cement - sand 1:3 lft. 26.00 lm 85.00
mix after chipping to 50-100mm wide

Page 42
Building Rates- 2012- NCP
I - PAVIOR
Rates for paving and tiling shall include for:
(a) Preparing surfaces of concrete / brick to receive rendering plaster bedding etc.
(b) Joints between different surfaces.
(c) Finishing to slopes and cross falls.
(d) Straight cutting and waste of tiles and other types of floor finishes.
(e) Protecting finished surfaces.
(f) For temporary rules, screeds, ground etc.
(g) All normal cutting arises, rounded edges, bedding and pointing.
(h) Slope should be maintained to a suitable direction to flow the water towards out side.
(i) Expansion joints so that no cracks propagated.
(j) Tiles should be approved by the Architect

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
I -1 Floors, cement concrete 1:2 1/2: 5 (25mm), sqr. 14,586.00 sqm. 1,570.00
75mm thick, cement rendered 12mm thick,
1:5 with expansion joints filled with cement
and sand (including laying gauge 1000
polythene sheet)

I -2 Rendering cement 12mm, in 1:5 cement and sqr. 4,007.00 sqm 431.00
sand on existing concrete, finished smooth

I -3 Rendering cement 12mm, in 1:5 cement and sqr. 5,437.00 sqm 585.00
sand on existing concrete, floating coat using
red cement finished smooth

I -4 Rendering cement 12mm, in 1:5 cement and sqr. 3,568.00 sqm 384.00
sand on existing concrete, finished rough

I -5 Tile glazed 200x200mm, Sri Lankan made of sqr. 29,987.00 sqm 3,228.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2,
with tile beadings on top and edges - Ground
floor

I -6 Tile glazed 200x200mm, Sri Lankan made of sqr. 30,275.00 sqm 3,259.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2,
with tile beadings on top and edges - First
floor

Page 43
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
I -7 Tile glazed 200x200mm, Sri Lankan made of sqr. 30,467.00 sqm 3,280.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2,
with tile beadings on top and edges - Second
floor

I -8 Tile glazed, 300x200mm, Sri Lankan made sqr. 27,932.00 sqm 3,007.00
of approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - Ground floor

I -9 Tile glazed, 300x200mm, Sri Lankan made sqr. 28,220.00 sqm 3,038.00
of approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - First floor

I -10 Tile glazed, 300x200mm, Sri Lankan made sqr. 28,412.00 sqm 3,058.00
of approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - Second floor

I -11 Floor tile, 300x300mm, Sri Lankan made, sqr. 25,610.00 sqm 2,757.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Ground floor

I -12 Floor tile, 300x300mm, Sri Lankan made, sqr. 25,898.00 sqm 2,788.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
First floor

I -13 Floor tile, 300x300mm, Sri Lankan made, sqr. 26,090.00 sqm 2,808.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Second floor

I -14 Floor tile, 200x200mm, Sri Lankan made, sqr. 30,230.00 sqm 3,254.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Ground floor

Page 44
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
I -15 Floor tile, 200x200mm, Sri Lankan made, sqr. 30,518.00 sqm 3,285.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
First floor

I -16 Floor tile, 200x200mm, Sri Lankan made, sqr. 30,710.00 sqm 3,306.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Second floor

I -17 Homogeneous Floor tile, 300x300mm, Sri sqr. 30,677.00 sqm 3,302.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Ground floor

I -18 Homogeneous Floor tile, 300x300mm, Sri sqr. 30,965.00 sqm 3,333.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - First floor

I -19 Homogeneous Floor tile, 300x300mm, Sri sqr. 31,157.00 sqm 3,354.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Second floor

I -20 Homogeneous Floor tile, 400x400mm, Sri sqr. 31,028.00 sqm 3,340.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Ground floor

I -21 Homogeneous Floor tile, 400x400mm, Sri sqr. 31,316.00 sqm 3,371.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - First floor

I -22 Homogeneous Floor tile, 400x400mm, Sri sqr. 31,508.00 sqm 3,392.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Second floor

Page 45
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
I -23 Floor tiles Tera cota of approved type laid on sqr. 23,976.00 sqm 2,581.00
existing concrete floor including plaster bed
in 1:2 cement and sand

I -24 Skirting 25x150mm in 1:5, projected or flush lft. 84.00 lm 276.00


with walls and including forming groove

I -25 Skirting 25x150mm in 1:5, projected or flush lft. 121.00 lm 397.00


with walls and including forming groove
finished with red cement

I -26 Skirting 25x100mm in 1:5, projected or flush lft. 54.00 lm 177.00


with walls and including forming groove

I -27 Skirting 25x100 in 1:5, projected or flush lft. 78.00 lm 256.00


with walls and including forming groove
finished with red cement

I -28 Floor ramp 75mm thick, 750mm width lft. 561.00 lm 1,840.00
cement concrete 1:21/2:5(25mm) on gauge
1000 polythene layer and cement rendered,
expansion joints filled with 1:2 bitumen sand
including filling and compacting gravel on the
base and providing 150x225mm curb at the
edge finished smooth with red cement floating

I -29 225mm width surface drain joined to the lft. 428.00 lm 1,404.00
existing ramp with 75mm thick 1:2
1/2:5(25mm) concrete base, side wall of
112mm brick work in 1:5 cement sand
rendering in 1:5 match to existing floor/ramp
complete with expansion joints and necessary
excavation

I -30 Laying of inter locking paving blocks of sqr. 27,780.00 sqm 2,990.00
compressive strenght of 25 N/mm2 (28 day)
on 75mm thick sand bed including site
preparation, trimming, leveling and
compacting with plate compactor as per
instructions

Page 46
Building Rates- 2012- NCP
J - ROOFER

Rates for Roof work shall include for:


(a) Hoisting and placing roofing materials in position.
(b) Laps, straight cutting and waste.
(c) Galvanized iron J bolts, nuts, limpets and bituminous felt washers, nails screw clips,
rivets straps and the like.
(d) Rafter hooks fixing rafters to the wall.
Rates for joinery work shall include for:
(a) Framing together all works in accordance with the best practices.
(b) Nails Screws, Glue, plugs etc.
(c) Priming backs before fixing.
(d) Rawl plugs, brass screws etc.
(e) Drilling and making goods.
Instructions
(a) Approval for all sizes of timber should be taken from the Engineer before using.
(b) All the timber used to be treated with wood preservative to the specifications.
(c) Ceiling sheets to be painted with one coat of acetic filler and two coats of emulsion paints.
(d) All the beading to be painted with one coat of wood primer and two coats of enamel paints.
(e) For exposed rafter roofs, timber should be well planed and varnished. Timber sizes
indicated in the description are the sizes before planning.

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
Roof including Timber frame
J-1 Corrugated asbestos sheet roof (sloping to sqr. 23,005.00 sqm 2,476.00
two directions) including 50x100mm
imported treated timber rafters at 900 c/c and
50x50mm imported treated timber bearers
with necessary coach screws and limpet
washers or hook bolts, prepare and apply one
coat of wood preservative (black) to structural
timber work, including touching up cut end
etc. after fixing (Timber used other than those
mentioned above measured separately)

Page 47
Building Rates- 2012- NCP
J-2 Calicut tile roof (sloping to four directions) sqr. 34,154.00 sqm 3,676.00
on imported treated timber framework
including 100x100mm struts, 50x175mm
ridge, 50x150mm hip and valley rafters,
100x75mm wall plate, 75x125mm purling,
50x100mm rafters, 50x25mm reapers
including nuts and bolts and, prepare and
apply one coat of wood preservative (black)
to structural timber work (Timber beams
measured and paid separately)

Page 48
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
J-3 Zink Alum sheet -colour- (gauge 0.47 mm, sqr. 15,441.00 sqm. 1,662.00
strength 550Mpa) roof on existing
framework including necessary fasteners as
per Manufacturer's Specifications

J-4 Zink Alum Non-Colour Roofing on existing sqr. 13,557.00 sqm 1,459.00
framework including necessary fasteners as
per Manufacturer's Specifications

J-5 Asbestos corrugated sheet fixed on existing sqr. 11,275.00 sqm 1,214.00
frame with necessary bolt and nuts (single
storied building)

J-6 Asbestos corrugated sheet fixed on existing sqr. 11,522.00 sqm 1,240.00
roof with necessary bolt and nuts (2 storied
building)

J-7 Corrugated G.I . Roofing sheet 20 BWG on sqr. 17,611.00 sqm 1,896.00
class 1 timber frame work, including
50x100mm rafters at 900mm c/c and
50x50mm bearers at 900mm c/c complete
with G.I. ridging, washers, hook bolts or
clips including treating timber with wood
preservative (sheets to have 150mm end laps
and 1 1/2 corrugation side laps)

Ceiling including Timber frame


J-8 Asbestos ceiling -to existing rafters
Asbestos ceiling fixed to existing rafters, sqr. 20,650.00 sqm 2,223.00
with 50x50mm imported treated timber
framework, interior beading 38x12mm and
outer molding 38x38mm including prepare
and apply one coat of wood preservative to
structural timber work and application of one
coat of Alkali resistant primer and two coats
of Emulsion paint to ceiling sheets including
necessary nails and screws.

Page 49
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
J-9 Asbestos ceiling -with rafters
Asbestos ceiling with 50x100mm imported sqr. 27,254.00 sqm 2,934.00
timber framework at 1.2m c/c and 50x50mm
imported treated timber bearer at 600mm c/c,
interior beading 37x12mm and outer molding
37x37mm including prepare and apply one
coat of wood preservative to structural timber
work and application of one coat of Alkali
resistant primer and two coats of emulsion
paint to ceiling sheets including necessary
nails and screws.

J-10 Plywood ceiling - with rafters


9mm plywood flat ceiling with 50x100mm sqr. 30,369.00 sqm 3,269.00
imported timber framework at 1200mm c/c
and 50x50mm imported treated timber bearer
at 600mm c/c, prepare and apply one coat of
wood preservative to structural timber work
and painting plywood sheets with two coats
of varnish including necessary nails and
screws.

J-11 Lunumidella ceiling - to existing rafters


Lunumidella slope ceiling under existing sqr. 19,016.00 sqm 2,047.00
rafters with outer molding to the accepted
design (All the beading and Lunumidella
planks should be painted with one coat of
wood sealer mixing with approved colour die
and two coats of varnish)

J-12 Lunumidella ceiling -With rafters


Lunumidella flat ceiling on 50x100mm sqr. 31,207.00 sqm 3,359.00
imported timber framework at 600mm
centers, with outer molding to the accepted
design (All the beading and Lunumidella
planks should be painted with one coat of
wood sealer mixing with approved colour die
and two coats of varnish)

Page 50
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
Exposed rafter roof with ceiling
J-13 Corrugated asbestos sheet roof with sqr. 44,668.00 sqm 4,808.00
exposed rafter asbestos ceiling on
50x100mm imported treated timber rafters at
600mm centers and 50x50mm imported
treated timber bearer and 50x25mm reapers
for the joints of ceiling sheets with necessary
coach screws and limpet washers, and
25x6mm beading including prepare and
apply one coat of wood preservative (clear)
and varnish to structural timber work and
application of one coat of Alkali resistant
primer and two coats of emulsion paint to
ceiling sheets including touching up cut end
etc. after fixing (Timber used other than
those mentioned above measured separately)

J-14 Corrugated asbestos sheet roof with sqr. 46,419.00 sqm 4,997.00
exposed rafter Lunumidella ceiling on
50x100mm imported treated timber rafters at
300mm c/c and 50x50mm imported treated
timber bearer, with necessary coach screws
and limpet washers, including prepare and
apply one coat of wood preservative and
varnish to structural timber work, including
touching up cut end etc. after fixing -
Lunumidella planks should be painted with
one coat of wood sealer mixing with approved
colour die and two coats of varnish (Timber
used other than those mentioned above
measured separately)

J-15 Corrugated asbestos sheet roof with sqr. 45,710.00 sqm 4,920.00
exposed rafter plywood (9mm) ceiling on
2"x4" imported treated timber rafters at 2' c/c
and 2"x2" imported treated timber bearer at 2'
c/c with necessary coach screws and limpet
washers, and 25x6mm beading prepare and
apply one coat of wood preservative (clear) to
structural timber work and painting plywood
sheets with two coats of varnish including
touching up cut end etc. after fixing (Timber
used other than those mentioned above
measured separately)

Page 51
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
J-16 Calicut tile roofing (sloping to four sqr. 48,172.00 sqm 5,185.00
directions) on imported treated timber
framework with exposed rafter asbestos
ceiling including 100x100mm struts,
50x175mm ridge, 50x150mm hip and valley
rafters, 100x75mm wall plate, 75x125mm
purlins, 50x100mm rafters, 50x25mm reapers
including nuts and bolts and 25x6mm beading
including prepare and apply one coat of wood
preservative prepare and apply one coat of
wood preservative(clear) and varnish to
structural timber work and application of one
coat of Alkali resistant primer and two coats
of emulsion paint to ceiling sheets (Timber
beams measured and paid separately)

Ridging
J-17 Ridging, Calicut pattern bedded in cement lft. 163.00 lm 535.00
and sand lime mortar 1:1:4 . Colour to match
tiles
J-18 Riding G.I. 24 BWG 450mm wide overall lft. 267.00 lm 876.00
fixed complete
J-19 Ridging with asbestos bedded in cement and lft. 293.00 lm 961.00
sand mortar 1:4
J-20 Supply and fix Zink Alum ridging (colour) - lft. 419.00 lm 1,374.00
0.47 mm thick with necessary bolts and nuts

J-21 Supply and fix Zink Alum ridging (non- lft. 388.00 lm 1,273.00
colour) - 0.47 mm thick with necessary bolts
and nuts
Gutters & Downpipes
J-22 Eaves gutter 150mm, rectangular, PVC fixed lft. 197.00 lm 646.00
with PVC brackets with all necessary specials

J-23 Down pipes, PVC fixed with wooden plug to lft. 166.00 lm 544.00
wall including all necessary specials
J-24 Supply and fix Zink Alum eave gutter lft. 412.00 lm 1,351.00
(colour) - size 130x145mm, 0.47 mm thick
with necessary bolts and nuts
J-25 Supply and fix Zink Alum eave gutter (non- lft. 357.00 lm 1,171.00
colour) - size 130x145mm, 0.47 mm thick
with necessary bolts and nuts

Page 52
Building Rates- 2012- NCP
J-26 Supply and fix Zink Alum down pipes lft. 358.00 lm 1,174.00
(colour) - size 100x100mm, 0.47 mm thick to
wall with necessary bracket clips

Page 53
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
J-27 Supply and fix Zink Alum down pipes (non- lft. 321.00 lm 1,053.00
colour) - size 100x100mm, 0.47 mm thick to
wall with necessary bracket clips

J-28 Supply and fix standard Zink Alum gutter box no. 948.00 no. 948.00
- colour - (0.47mm thick)

J-29 Supply and fix standard Zink Alum gutter box no. 858.00 no. 858.00
- non-colour - (0.47mm thick)

Valley gutter
J-30 Supply and fix Aluminium valley gutter, lft. 1,019.00 lm 3,342.00
900mm girth bent with end laps not less than
225mm width including 20mm tongued and
grooved planks laid to slope and profile on
timber members

J-31 Supply and fix Zn-Al valley gutter (Colour), lft. 391.00 lm 1,282.00
on existing steel members as per
Manufacturer's Specifications

J-32 Supply and fix Zn-Al valley gutter (non- lft. 362.00 lm 1,187.00
colour), on existing steel members as per
Manufacturer's Specifications

Flashing
J-33 Supplying and fixing gauge 24 GI wall lft. 424.00 lm 1,391.00
flashing all complete
J-34 Supplying and fixing Zn Alum wall flashing lft. 394.00 lm 1,292.00
(colour)
J-35 Supplying and fixing Zn Alum wall flashing lft. 360.00 lm 1,181.00
(non-colour)

Valance & Barge Board


J-36 lft. 259.00 lm 850.00

Insulation Foil
J-37 Furnishing and laying 3mm thick single side sqr. 1,127.00 sqm 121.00
Aluminium foil

J-38 Furnishing and laying 3mm thick Double side sqr. 1,591.00 sqm 171.00
Aluminium foil

J-39 Furnishing and laying gauge 17, 75x75mm sqr. 2,404.00 sqm 259.00
Galvanized roof mesh

Page 54
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
Roof Timber
J-40 Furnishing and fixing of 50x150mm Imported lft. 362.00 lm 1,187.00
treated timber and apply one coat of wood
preservative

J-41 Furnishing and fixing of 75x100mm Imported lft. 362.00 lm 1,187.00


treated timber and apply one coat of wood
preservative

J-42 Furnishing and fixing of 50x100mm Imported lft. 224.00 lm 735.00


treated timber and apply one coat of wood
preservative

J-43 Furnishing and fixing of 75x125mm Imported lft. 484.00 lm 1,588.00


treated timber and apply one coat of wood
preservative

J-44 Furnishing and fixing of 100x150mm lft. 944.00 lm 3,096.00


Imported treated timber and apply one coat of
wood preservative

J-45 Furnishing and fixing of 175x50mm Imported lft. 569.00 lm 1,866.00


treated timber and apply one coat of wood
preservative

J-46 Furnishing and fixing of 100x200mm lft. 1,284.00 lm 4,212.00


Imported treated timber and apply one coat of
wood preservative

J-47 Furnishing and fixing of 50x50mm Imported lft. 102.00 lm 335.00


treated timber and apply one coat of wood
preservative

J-48 Furnishing and fixing of 50x25mm Imported lft. 65.00 lm 213.00


treated timber and apply one coat of wood
preservative

J-49 Supplying and fixing of Coconut rafters lft. 69.00 lm 226.00


75x50mm

J-50 Supplying and fixing of Coconut rafters lft. 81.00 lm 266.00


100x50mm

J-51 Supplying and fixing 38x12mm beadings for lft. 40.00 lm 131.00
ceiling
J-52 Supplying and fixing 38x38mm molding for lft. 41.00 lm 134.00
ceiling

Page 55
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
Maintenance
J-53 Corrugated G.I. sheet 24 BWG, fixed to sqr. 8,592.00 sqm 925.00
roof, walls or fence with necessary cup
washers and hook bolts or screws (timber
framing paid for separately)

J-54 Leaks (up to 5 in numbers) in roofs of single no. 160.00 no. 160.00
storied building made good

J-55 Leaks (above 5 in numbers) in roof of single no. 40.00 no. 40.00
storied building made good
J-56 Leaks (up to 5 in numbers) in roofs of two or no. 200.00 no. 200.00
above storied building made good

J-57 Leaks (above 5 in numbers) in roof of two or no. 80.00 no. 80.00
above storied building made good
J-58 Leaks in corrugated sheet roof made good no. 258.00 no. 258.00
with bitumen washers and G.I. bolts and nuts

J-59 Ridging, Calicut pattern removed and re-laid lft. 147.00 lm 482.00
in cement mortar 1:1:4 and colour to match
tile
J-60 Tiles, Calicut pattern, flat supplied and laid up no. 55.00 no. 55.00
to 25 tiles in single storied building
J-61 Tiles, Calicut pattern, flat supplied and laid no. 43.00 no. 43.00
above 25 tiles and up to 100 in single storied
building
J-62 Tiles Calicut pattern supplied and laid on sqr. 4,853.00 sqm 522.00
roofs - single storied building

J-63 Tiles Calicut pattern supplied and laid on sqr. 5,333.00 sqm 574.00
roofs - two storied building
J-64 Roof covering with Calicut pattern tiles sqr. 1,200.00 sqm 129.00
available at site on existing timber frame.

J-65 Roof covering with corrugated asbestos sheets sqr. 933.00 sqm 100.00
available at site on existing timber frame with
necessary roofing screws and washers.

J-66 Furnishing and fixing of available timber lft. 28.00 lm 92.00


purlins or rafters for the roof including
necessary screws and nails and, application of
one coat of wood preservative.

Page 56
Building Rates- 2012- NCP
K - CAPENTER AND JOINER
Rates for carpentry work shall include for:
(a) All Labour in framing together all work in accordance with the best practices, complete
with all necessary nails, spikes, screws etc.
(b) Hoisting and fixing in position.
(c) Drilling and making good.
(d) Applying two coats of and approved wood preservative before fixing.
(e) Testing to establish properties to conformity to specification.
Rates for joinery work shall include for:
(a) Framing together all works in accordance with the best practices.
(b) Nails Screws, Glue, plugs etc.
(c) Priming backs before fixing.
(d) Drilling and making goods.
(e) Rawtering all squares.
Rates for Glazing shall include for:
(a) Straight cutting and grinding edges where required.
(b) External miters to polishing and leveled edges.
(c) Curving edges.

NO DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
K-1 Supply and fix Front door, 95x70mm frame in sqft. 1,033.00 sqm 11,115.00
MAHOGANI and 28mm thick and sash with
designs in TEAK timber (Fit panels) complete
with brass furniture, 2 nos. 150mm barrel
bolts and 3 nos. hinges including preparation
of surface and application of two coats of
Varnish

K-2 Supply and fix Front door, 95x70mm frame sqft. 1,014.00 sqm 10,911.00
and 28mm thick sash with designs in
MAHOGANI timber (Fit panels) complete
with brass furniture, 2 nos. 150mm barrel
bolts and 3 nos. hinges including preparation
of surface and application of two coats of
Varnish

K-3 Door or Window, ledge braced and battened sqft. 1,010.00 sqm 10,868.00
with grooved and tongued joints, 95x70mm
frame and 19mm to 22mm thick sashes in
class 1 timber complete with brass furniture 2
nos. 150mm barrel bolts and 3 nos. hinges
including preparation of surface and
application of two coats of Varnish

Page 57
Building Rates- 2012- NCP
NO DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
K-4 Door or window glazed and / or paneled sqft. 1,283.00 sqm 13,805.00
with 95x70mm frame and 28mm thick sash in
class 1 timber fixed complete with brass
furniture, 2 nos. 150mm barrel bolts and 6
nos. hinges including preparation of surface
and application of two coats of Varnish -
Double sash

K-5 Supply and fix Plywood door -GINTOTA or sqft. 845.00 sqm 9,092.00
equitant with 95x70mm frame and complete
with brass furniture, 2 nos. 150mm barrel
bolts and 3 nos. hinges including preparation
of surface and application of two coats of
Varnish

K-6 Supply and fix PVC door with frame sqft. 486.00 sqm 5,229.00
complete with 3 hinges and lock/barrel bolt

K-7 Door or window glassed with 95x70mm sqft. 820.00 sqm 8,823.00
frame comprising 2 no. of openable sashes
with100x28mm outer frame and non-openable
125x28mm timber strips area complete with
brass mongers including preparation of
surface and application of two coats of
varnish

K-8 Door or windows glazed and / or paneled, sqft. 856.00 sqm 9,211.00
sash only 28mm thick in class 1 timber with
brass furniture, 2 nos. 150mm barrel bolts and
3 nos. hinges including preparation of surface
and application of two coats of Varnish

K-9 Supplied and fixed plywood door sash 28mm sqft. 483.00 sqm 5,197.00
thick (GINTOTA or equitant) to the existing
frame complete with brass furniture 2 nos.
150mm barrel bolts and 3 nos. hinges
including preparation of surface and
application of two coats of Varnish

K-10 Supply and fix door sash 19 to 22mm thick, sqft. 690.00 sqm 7,424.00
ledge braced and battened with grooved and
tongued joints in class 1 timber complete with
brass furniture 2 nos. 6" barrel bolts and 3
nos. hinges including preparation of surface
and application of two coats of Varnish

K-11 Door frame 95x70mm class 1 timber sqft. 304.00 sqm 3,271.00
supplied and fixed in position

Page 58
Building Rates- 2012- NCP
K-12 Door or window sash, removing, easing and no. 471.00 no. 471.00
re-fixing

K-13 Door or window sash easing only no. 189.00 no. 189.00

Page 59
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
K-14 Door or window frames renewed in short lft. 582.00 lm 1,909.00
length with class 1 timber

K-15 Door or window, glazing bars renewed in lft. 242.00 lm 794.00


class 1 timber
K-16 Door sash, swing, removed and re-fixed in no. 630.00 no. 630.00
new position
K-17 Louver blade 9mm thick in class 1 timber lft. 139.00 lm 456.00
100mm wide
K-18 Louver blade 9mm thick in class 1 timber lft. 209.00 lm 686.00
150mm wide
K-19 Wicket gate at entrance 1050x900mm sqft. 934.00 sqm 10,050.00
double hinge fittings to include 2 pairs of
25x63mm butt hinges and 100mm iron barrel
bolts post and sash with 40x40x5mm angle
iron and 50mm SWG 10 welded mesh
complete with 2 coats of anticorrosive paint

K-20 Glass panes 3 mm thick supplied and fixed sqft. 252.00 sqm 2,712.00
with class 1 timber beading

K-21 Glass panes 5 mm thick supplied and fixed sqft. 337.00 sqm 3,626.00
with class 1 timber beading

K-22 Beading or filleting for glass panes fixed lft. 15.00 lm 49.00
complete with brass panel pins (with class 1
timber)

K-23 Door or window frame altered, existing, no. 3,442.00 no. 3,442.00
rebate fillets using class 1 timber with screws
and sash re-hung on opposite side

K-24 Supplying and fix mortise lock - Union 678- no. 5,640.00 no. 5,640.00
24-95CH or equivalent, with 5 years
guarantee. (guarantee certificate should be
submitted with bills)

K-25 Supplying and fix switch lock - Bird or no. 2,334.00 no. 2,334.00
equivalent
Iron furniture
K-26 Supply and fix barrel bolt 100mm - Iron with no. 244.00 no. 244.00
brass screws

K-27 Supply and fix barrel bolt 75mm - Iron with no. 235.00 no. 235.00
brass screws

K-28 Supply and fix Hasp and staples 100mm - no. 172.00 no. 172.00
Iron with brass screws

Page 60
Building Rates- 2012- NCP
K-29 Supply and fix Hasp and staples 150mm - no. 320.00 no. 320.00
Iron with brass screws

Page 61
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
K-30 Supply and fix Casement fasteners - Iron no. 211.00 no. 211.00
with brass screws

K-31 Supply and fix Casement stays, 250mm - Iron no. 286.00 no. 286.00
heavy quality with brass screws

K-32 Supply and fix door closer approved type with no. 4,892.00 no. 4,892.00
brass screws

K-33 Supply and fix Butt Hinge, 100mm - Iron no. 663.00 no. 663.00
with brass screws

K-34 Supply and fix Butt Hinge, 125mm - Iron no. 795.00 no. 795.00
with brass screws

Brass Furniture
K-35 Supply and fix Barrel bolts 150mm - brass, no. 597.00 no. 597.00
heavy quality with brass screws

K-36 Supply and fix Casement fasteners -brass no. 463.00 no. 463.00
with mortise plate, heavy quality with brass
screws
K-37 Supply and fix Casement stays, 250mm - no. 345.00 no. 345.00
brass heavy quality with brass screws
K-38 Supply and fix Butt Hinge, 100mm - brass no. 772.00 no. 772.00
heavy quality with brass screws

K-39 Bolts, casement fasteners or stays removed no. 95.00 no. 95.00
and refixed including making good to holes in
frames and sashes

Page 62
Building Rates- 2012- NCP

L - IRON WORK

Rates for Metal work shall include for:


(a) To make good ground at balusters on completion.
(b) Welding where necessary.
(c) Wire brush and clean metal surfaces prior to painting.
(d) All fabricating work handling, hosting, fitting and fixing in position.
(e) Preparing surfaces and painting as specified or directed.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
L-1 Supply and fix Iron grill with 20x6 mm flat sqft. 612.00 sqm 6,585.00
iron outer frame and horizontal bracings at
300 mm intervals complete with 12x6 mm flat
iron verticals at 75 mm c/c as per given
design including two coats of anticorrosive
paint and enamel paint

L-2 Iron grill with 6 mm mild steel rods welded sqft. 524.00 sqm 5,638.00
diagonally at 100 mm cts. both way and outer
frame with 20x6 mm flat iron fabricated and
fixed complete including two coats of
anticorrosive paint and enamel paint.

L-3 50x50mm G.I weld mesh fixed to existing sqft. 134.00 sqm 1,442.00
frame with staple including painting (Beading
paid separately)

L-4 50x50mm G.I weld mesh supplied and fixed sqft. 321.00 sqm 3,454.00
to window frame with 50x6mm class 1 timber
beadings and, painted weld mesh with 2 coats
of anticorrosive paint and beading with primer
coat and 2 coats of enamel paint including
making opening for bolts and casement stays

L-5 50x50mm G.I weld mesh fixed to sqft. 380.00 sqm 4,089.00
40x40x5mm angle iron frame fabricated and
fixed to wall with rawl plugs and screws
including painting with enamel paint and
anticorrosive paint

Page 63
Building Rates- 2012- NCP
L-6 Supply and fix gate with Zink Alum gate clad sqft. 709.00 sqm 7,629.00
sheet (colour) with 30mm heavy duty GI pipe
frame work, 20mm heavy duty squire tube
bitterns and vertical members at the top,
including application of two coats of
anticorrosive primer and finishing coat of
enamel paint complete with stap hinges, hasp
and staples as per given design

Page 64
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
L-7 Supply and place in position steel roof truss no 46,935.00 no. 46,935.00
(WEB) - span 4.5-6.0 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-8 Supply and place in position steel roof truss no. 55,831.00 no. 55,831.00
(WEB) - span 6.5-7.5 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-9 Supply and place in position steel roof truss no. 73,334.00 no. 73,334.00
(WEB) - span 8.0-9.0 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-10 Supply and place in position steel roof truss no 53,061.00 no. 53,061.00
(FLAT) - span 4.5-6.0 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-11 Supply and place in position steel roof truss no. 73,601.00 no. 73,601.00
(FLAT) - span 6.5-7.5 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

Page 65
Building Rates- 2012- NCP
L-12 Supply and place in position steel roof truss no. 81,321.00 no. 81,321.00
(FLAT) - span 8.0-9.0 lm - complete with
double member exterior and single member
interior, 6mm gusset plate, 16mm dia. rag
bolts, 6mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

Page 66
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
L-13 Supplying and fixing Angle iron purling lft. 223.00 lm 731.00
40x40x5mm to trusses with 10 mm dia. bolts
and nuts including application of
anticorrosive paint

L-14 Supplying and fixing Angle iron purling lft. 224.00 lm 735.00
50x50x5mm to trusses with 10mm dia. bolts
and nuts including application of
anticorrosive paint

L-15 Supplying and fixing Angle iron purling lft. 312.00 lm 1,023.00
65x65x5mm to trusses with 10mm dia. bolts
and nuts including application of
anticorrosive paint

L-16 Supplying and fixing End rafters, lft. 726.00 lm 2,381.00


50x50x5mm (double) angle iron on gable
ends with purling cleats including
application of anticorrosive paint

L-17 Furnishing and fixing 100x50mm (Thickness- lft. 312.00 lm 1,023.00


2mm) C-Purlins as per Manufacturer's
Specifications

L-18 Furnishing and fixing 150x65mm (Thickness lft. 451.00 lm 1,479.00


- 2mm) C-Purlins as per Manufacturer's
Specifications

L-19 Furnishing and fixing 75x38mm (Thickness - lft. 261.00 lm 856.00


2mm) C-Purlins as per Manufacturer's
Specifications

Page 67
Building Rates- 2012- NCP
M - PAINTER AND DECORATOR

Rates for painting shall include for:


(a) Preparation of surfaces, cleaning down.
(b) Smoothing, knotting, stopping etc.
(c) Protecting floors and fittings etc.
(d) Removing and replacing doors furniture and cleaning upon completion.
(e) Providing samples and specification of all paints to be used in the works.
(f) Providing painting to an approved colour scheme design.
(g) All the paints are to be done up to the manufacturers specification.
(h) Preparation sample panels of different finishes for the approval of the Engineer. Each panel
not less than 0.5 sqm in area.

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
M-1 Prepare and apply one coat of Alkali resistant sqr. 2,678.00 sqm 288.00
primer and two coats of emulsion paint to
walls - up to first floor level

M-2 Prepare and apply one coat of Alkali resistant sqr. 2,925.00 sqm 315.00
primer and two coats of emulsion paint to
walls - up to second floor level

M-3 Prepare and apply one coat of Alkali resistant sqr. 3,172.00 sqm 341.00
primer and two coats of emulsion paint to
walls - up to third floor level

M-4 Prepare and apply one coat of Alkali resistant sqr. 2,751.00 sqm 296.00
primer and two coats of emulsion paint soffit
of slabs - up to first floor level

M-5 Prepare and apply one coat of Alkali resistant sqr. 2,999.00 sqm 323.00
primer and two coats of emulsion paint to
soffit of slabs - up to second floor level

M-6 Prepare and apply one coat of Alkali resistant sqr. 3,212.00 sqm 346.00
primer and two coats of emulsion paint to
soffit of slabs - up to third floor level

M-7 Prepare and apply one coat of Acrylic wall sqr. 3,297.00 sqm 355.00
filler and two coats of weather proof white
and colour paint - up to first floor level

M-8 Prepare and apply one coat of Acrylic wall sqr. 3,545.00 sqm 382.00
filler and two coats of weather proof white
and colour paint - up to second floor level

Page 68
Building Rates- 2012- NCP
M-9 Prepare and apply one coat of Acrylic wall sqr. 3,792.00 sqm 408.00
filler and two coats of weather proof white
and colour paint - up to third floor level

Page 69
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
M-10 Prepare and apply one coat of Acrylic wall sqr. 3,296.00 sqm 355.00
filler and two coats of bathroom paint, white
and colour paint - up to first floor level

M-11 Prepare and apply one coat of Acrylic wall sqr. 3,543.00 sqm 381.00
filler and two coats of bathroom paint, white
and colour paint - up to second floor level

M-12 Prepare and apply one coat of Acrylic wall sqr. 3,790.00 sqm 408.00
filler and two coats of bathroom paint, white
and colour paint - up to third floor level

M-13 Prepare and apply two coats of floor paint, sqr. 2,611.00 sqm 281.00
red, gray or black

M-14 Prepare and apply one coat of wood sqr. 2,155.00 sqm 232.00
preservative to structural timber work,
including touching up cut end etc. after fixing

M-15 Varnishing two coats after sand papering of sqr. 2,943.00 sqm 317.00
the surface

M-16 Preparing and painting wood work with sqr. 3,410.00 sqm 367.00
primer and two coats of enamel paint

M-17 Painting aluminum paint 1 coat to metal sqr. 1,371.00 sqm 148.00
surfaces

M-18 Painting steel on new work with 2 coats of sqr. 2,195.00 sqm 236.00
anti-corrosive paint

M-19 Painting walls with Emulsion paint, 2 coats, sqr. 2,442.00 sqm 263.00
including preparation of surface

M-20 Painting Ceiling with 2 coats of Emulsion sqr. 2,561.00 sqm 276.00
paint to the ceiling sheets and 2 coats of
enamal paint to timber beadings including
preparation of surface

M-21 Painting walls with Weather shield paint, 2 sqr. 2,888.00 sqm 311.00
coats, including preparation of surface

M-22 Wall, scraped to original plaster, sand sqr. 2,092.00 sqm 225.00
papering and lime putting to cracks and
defects, applying plaster of Paris and
preparing surface for new or similar
application of emulsion, snowcem or similar
application
M-23 Preparing and painting wood work with 2 sqr. 2,761.00 sqm 297.00
coats of enamel paint.
Page 70
Building Rates- 2012- NCP
M-24 White or colour washing two coats to walls sqr. 678.00 sqm 73.00
with SAMARA
M-25 Water - Proofing of Bathrooms with approved sqr. 3,170.00 sqm 341.00
materials as per Instructions

Page 71
Building Rates- 2012- NCP
N - PLUMBER
Rates for Plumbing shall include for:
(a) Excavation of trenches for services, pipes or drain pipes shall include for deepening and
widening as necessary to enable the barrels of pipes, ducts etc. to rest on firm ground and
to facilitate jointing .

(b) Testing installations on completion.


(c) Chasing in brickwork / block work / concrete floor / concrete columns and make good.
(d) Fixing pipes to brickwork / block work.
(e) Solder rivets, screws, nails, clips, brackets, straps etc.
(f) Testing installations on completion.
(g) Sterilization, of Drinking water pipes on completion.
FIXTURES, APPLIANCES AND EQUIPMENT
Rates for sanitary fixtures shall include for:
(a) Installation complete with plugs.
(b) Grated waste outlets.
(c) Brackets and all fixings including jointing to pipes.
Instructions
(a) Prior approval from the architect should be taken for all the sanitary fittings and
accessories.
(b) Guarantee certificates of fittings should be submitted to the Department with the bills. No
payment is done without bills.
(c) All the UPVC pipes to be SLS certified products.
(d) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
N-1 Supply and lay PVC Pipe 20mm - type 1000 lft. 27.00 lm 89.00
including all necessary fittings

N-2 Supply and lay PVC Pipe 25mm - type 1000 lft. 64.00 lm 210.00
including all necessary fittings

N-3 Supply and lay PVC Pipe 32mm - type 1000 lft. 86.00 lm 282.00
including all necessary fittings

N-4 Supply and lay PVC Pipe 40mm - type 600 lft. 98.00 lm 321.00
including all necessary fittings

N-5 Supply and lay PVC Pipe 50mm - type 600 lft. 121.00 lm 397.00
including all necessary fittings

N-6 Supply and lay PVC Pipe 63mm - type 400 lft. 191.00 lm 626.00
including all necessary fittings

N-7 Supply and fix Ball valve PEGLER or no. 1,049.00 no. 1,049.00
equivalent - for overhead tanks - 20mm - all
complete

Page 72
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
N-8 Supply and fix Ball valve PEGLER or no. 1,469.00 no. 1,469.00
equivalent - for overhead tanks - 25mm - all
complete

N-9 Supply and lay 110mm drainage pipe PVC - lft. 305.00 lm 1,000.00
special for drainage - with necessary fittings
complete

N-10 Wash basin, ceramic, with pedestal (Chinese no. 12,882.00 no. 12,882.00
made) with 15 years guarantee complete with
mono type, chromium plated basin tap -
(Momali, Huai or equivalent) - with 5 years
guarantee including all necessary fittings
(Guarantee certificates should be submitted
with the bill)

N-11 Supply and fix closet, closed couple, Chinese no. 17,368.00 no. 17,368.00
made with 15 years guarantee complete with
hard seat cover and all necessary fittings.
(Guarantee certificate should be submitted
with the bill)

N-12 Supply and fix 2 PC set, closed couple with no. 30,490.00 no. 30,490.00
hard seat cover, (Chinese made) with 15
years guarantee complete with mono type,
chromium plated basin tap - (Momali, Huai or
equivalent) - with 5 years guarantee with all
necessary fittings.(Guarantee certificate
should be submitted with the bill)

N-13 Supply and fix Closet Squatting type (Indian) no. 5,248.00 no. 5,248.00
with foot rest ceramic, medium, with trap

Page 73
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
N-14 Supply and fix stainless steel kitchen Sink, no. 7,170.00 no. 7,170.00
PRINCE or equivalent - with single bawl,
one side drain board including chromium
plated long neck type sink tap - Momali,
Huai or equivalent - with 5 years guarantee
complete with all necessary fittings - (overall
size 900x450mm) - (Guarantee certificate
should be submitted with the bill)

N-15 Supply and fix stainless steel kitchen Sink, no. 6,714.00 no. 6,714.00
PRINCE or equivalent with single bawl,
without drain board including chromium
plated long neck type sink tap - Momali,
Huai or equivalent - with 5 years guarantee
complete with all necessary fittings (overall
size 450x375mm) - (Guarantee certificate
should be submitted with the bill)

N-16 Supply and fix Ceramic Sink, 24"x15"x7" no. 9,024.00 no. 9,024.00
complete with mono type, chromium plated
long neck type sink tap - (Momali, Huai or
equivalent) - with 5 years guarantee
including all necessary fittings (Guarantee
certificates should be submitted with the bill)

N-17 Supply and fix corner wash basin complete no. 6,612.00 no. 6,612.00
with mono type, chromium plated basin tap -
(Momali, Huai or equivalent) - with 5 years
guarantee including all necessary fittings

N-18 Supply and fix bidet spray - (Momali, Huai or no. 2,202.00 no. 2,202.00
equivalent) - with 5 years guarantee with all
necessities. (Guarantee certificate should be
submitted with the bill)

N-19 Supply and fix Urinal bawl type no. 5,190.00 no. 5,190.00

N-20 Supply and fix bath room accessories set no. 10,920.00 no. 10,920.00
(chromium plated with 5 years guarantee) - 4
pcs. (mirror, mirror shelf, towel bar and soap
holder) all complete

N-21 Supply and fix bath room accessories set no. 14,460.00 no. 14,460.00
(chromium plated with 5 years guarantee) - 6
pcs. (mirror, mirror shelf, towel bar, soap
holder, tooth brush holder and toilet paper
holder) all complete

Page 74
Building Rates- 2012- NCP
N-22 Supply and fix Mirror, bathroom type, oval no. 2,520.00 no. 2,520.00
shape, 20" x 16" with plastic back and shelves

Page 75
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
N-23 Supply and fix Plastic Shower rose, with no. 207.00 no. 207.00
guarantee

N-24 Supply and fix head shower, chromium plated no. 3,432.00 no. 3,432.00
heavy with 5 years guarantee

N-25 Supply and fix Telephone shower with bar, no. 5,742.00 no. 5,742.00
chromium plated heavy with 5 years
guarantee including flexible cable

N-26 Supply and fix Soap tray, chromium plated no. 3,480.00 no. 3,480.00
(Chinese), (Momali, Huai or equivalent) with
5 year guarantee (Guarantee certificate
should be submitted with the bill)

N-27 Supply and fix towel bar, chromium plated - no. 3,300.00 no. 3,300.00
(Momali, Huai or equivalent) - with 5 year
guarantee (Guarantee certificate should be
submitted with the bill)

N-28 Supply and fix concealed stop cock - Mono no. 2,196.00 no. 2,196.00
type (Momali, Huai or equivalent) with 5
years guarantee (Guarantee certificate should
be submitted with the bill)

N-29 Supply and fix Angle valve (Momali, Huai or no. 1,530.00 no. 1,530.00
equivalent) with 5 years guarantee (Guarantee
certificate should be submitted with the bill)

N-30 Supply and fix Long neck type Sink tap, no. 2,574.00 no. 2,574.00
chromium plated - (Momali, Huai or
equivalent) - with 5 years guarantee
(Guarantee certificate should be submitted
with the bill)

N-31 Supply and fix bib tap 20mm dia. - (Momali, no. 1,710.00 no. 1,710.00
Huai or equivalent) - with 5 years guarantee
(Guarantee certificate should be submitted
with the bill)

N-32 Supply and fix 20mm dia. plastic Bib tap - no. 402.00 no. 402.00
Water Tec or equivalent - all complete
N-33 Supply and fix stop cock/gate valve PVC no. 366.00 no. 366.00
Water Tec or equitant with SLS standards -
20mm dia.

N-34 Supply and fix stop cock/gate valve PVC no. 412.00 no. 412.00
Water Tec or equitant with SLS standards -
25mm dia.

Page 76
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
N-35 Supply and fix stop cock/gate valve PVC no. 523.00 no. 523.00
Water Tec or equitant with SLS standards -
32mm dia.

N-36 Supply and fix stop cock/gate valve PVC no. 432.00 no. 432.00
Water Tec or equivalent with SLS standards
- 40mm dia.

N-37 Plastic shell water tank with 10 years no. 17,400.00 no. 17,400.00
guarantee of capacity 500 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-38 Plastic shell water tank with 10 years no. 26,681.00 no. 26,681.00
guarantee of capacity 1000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-39 Plastic shell water tank with 10 years no. 43,560.00 no. 43,560.00
guarantee of capacity 2000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-40 Plastic shell water tank with 10 years no. 83,160.00 no. 83,160.00
guarantee of capacity 5000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-41 Supply and fix Cover and seat for WC - no. 1,620.00 no. 1,620.00
plastic

N-42 Supply and fix Chromium plated flexible no. 1,140.00 no. 1,140.00
cable (Momali, Huai or equivalent)
N-43 Flushing cistern, plastic low level, with flush no. 4,740.00 no. 4,740.00
pipe and bracket supplied and fixed complete

N-44 Closet, pedestal type, available at site fixed no. 1,989.00 no. 1,989.00
with cement concrete after breaking concrete
floor and making good and making
connection
N-45 Supply and fix PVC specials with SLS no. 108.00 no. 108.00
standards - 20mm dia. (Elbow, Bend, Socket)

N-46 Supply and fix PVC specials with SLS no. 125.00 no. 125.00
standards - 25mm dia. (Elbow, Bend, Socket)

N-47 Supply and fix PVC specials with SLS no. 140.00 no. 140.00
standards - 32mm dia. (Elbow, Bend, Socket)

Page 77
Building Rates- 2012- NCP
N-48 Supply and fix PVC specials with SLS no. 176.00 no. 176.00
standards - 40mm dia. (Elbow, Bend, Socket)

Page 78
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
N-49 Supply and fix PVC specials with SLS no. 235.00 no. 235.00
standards - 50mm dia. (Elbow, Bend, Socket)

N-50 Supply and fix PVC specials with SLS no. 336.00 no. 336.00
standards - 63mm dia. (Elbow, Bend, Socket)

N-51 Supply and fix PVC specials with SLS no. 86.00 no. 86.00
standards - 20mm dia. Tees

N-52 Supply and fix PVC specials with SLS no. 120.00 no. 120.00
standards - 25mm dia. Tees

N-53 Supply and fix PVC specials with SLS no. 145.00 no. 145.00
standards - 32mm dia. Tees

N-54 Supply and fix PVC specials with SLS no. 197.00 no. 197.00
standards - 40mm dia. Tees

N-55 Supply and fix PVC specials with SLS no. 272.00 no. 272.00
standards - 50mm dia.Tees

N-56 Supply and fix PVC specials with SLS no. 380.00 no. 380.00
standards - 63mm dia. Tees

N-57 Supply and fix cistern accessories set no. 1,200.00 no. 1,200.00

N-58 Supply and fix plastic flexible cable no. 720.00 no. 720.00

O - DRAINLAYER

Rates for underground drainage shall include for:


(a) Short lengths, joints and cutting at Manholes.
(b) Cutting and fixing pipe work to fittings.
(c) Testing.
(d) Grading to slopes and falls.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
O-1 Connection to existing sewer or manhole Item 1,639.00 Item 1,639.00
O-2 Drainage pipe 110mmdia. (type 400) PVC lft. 568.00 lm 1,863.00
laid on cement concrete 150mm up to 600mm
depth of invert including excavation and
cement concrete hunching 1:3:6 (40mm)

O-3 Furnishing and fixing of Multi-floor trap no. 1,637.00 no. 1,637.00
including 150mm plastic grating

Page 79
Building Rates- 2012- NCP
O-4 Gulley pit with internal dimension no. 4,674.00 no. 4,674.00
300x300x300mm deep, 150mm thick
1:3:6(40mm) concrete foundation, 225mm
thick brick work in 1:5 ct. sand, 12mm thick
cement sand rendering in 1:2 with forming
canals and 75mm thick R.C.C. slab as per
Drawings

Page 80
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
O-5 Manhole with internal dimension no. 10,284.00 no. 10,284.00
450x450x600mm deep, 150mm thick
1:3:6(40mm) concrete foundation, 225mm
thick brick work in 1:5 ct. sand, 12mm thick
cement sand rendering in 1:2 with forming
cannels and 75mm thick R.C.C. slab as per
Drawings

O-6 Manhole with internal dimension no. 13,619.00 no. 13,619.00


600x600x600mm deep, 150mm thick
1:3:6(40mm) concrete foundation, 225mm
thick brick work in 1:5 ct. sand, 12mm thick
cement sand rendering in 1:2 with forming
canals and 75mm thick R.C.C. slab as per
Drawings

O-7 Manhole with internal dimension no. 18,548.00 no. 18,548.00


750x750x600mm deep, 150mm thick
1:3:6(40mm) concrete foundation, 225mm
thick brick work in 1:5 ct. sand, 12mm thick
cement sand rendering in 1:2 with forming
canals and steel grating with 16mm dia. MS
rod welded at 50mm centers to 25 x 25 x 5
mm angle iron frame including application of
anti-corrosive paint.

O-8 Septic tank with internal dimensions no. 87,624.00 no. 87,624.00
2325x900x2100mm, partition with same
wall, all complete including excavation,
100mm thick base slab with 1:3:6 (40mm),
225mm brick work, 20mm thick 1:3 cement
rendering including 75mm cover slab with
10mm bars at 225mm c/c both way and
63mm vent pipe. (Refer relevant Drawings) -
for 30 persons

O-9 Septic tank with internal dimensions no. 108,749.00 no. 108,749.00
3225x900x2100, partition with same wall, all
complete including excavation, 100mm thick
Base slab with 1:3:6 (40mm), 225mm brick
work, 20mm 1:3 cement rendering including
75mm cover slab with 10mm bars at 225mm
c/c both way and 63mm vent pipe. (Refer
relevant Drawings) - for 60 persons

Page 81
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
O-10 Septic tank with internal dimensions no. 136,067.00 no. 136,067.00
4125x1050x2100mm, partition with same
wall, all complete including excavation,
100mm thick Base slab with 1:3:6 (40mm),
225mm brick work, 20mm thick 1:3 cement
rendering including 75mm cover slab with
10mm bars at 225mm c/c both way and
63mm vent pipe. (Refer relevant Drawings) -
for 100 persons

O-11 Soakage pit with internal dia. 1200mm and no. 83,048.00 no. 83,048.00
depth 1500mm, all complete including
excavation, ring beam with 4 Nos. 10 mm
bars & 6 mm dia. stirrups at 225mm spacing
at bottom of wall, 225mm brick work and
75mm thick cover slab with 12mm bars in
150mm c/c both way (as per detail drawing)

O-12 Soakage pit with internal dia. 1200mm and no. 141,144.00 no. 141,144.00
depth 3000mm, all complete including
excavation, ring beam with 4 Nos. 10 mm
bars & 6 mm dia. stirrups at 225mm spacing
at bottom of wall, 225mm brick work and
75mm thick cover slab with 12mm bars in
150mm c/c both way (as per detail drawing)

O-13 Supply and fix 900x2400mm ready made no. 38,488.00 no. 38,488.00
RCC septic tank

Page 82
Building Rates- 2012- NCP
P - ELECTRICAL INSTALLATION
Rates for Electrical Installations shall include for:
(a) All necessary conduits, cables, fittings, screws, nails clips, brackets straps, and the like.
(b) Giving notices, obtaining permits, paying fees etc.
(c) Provision of drawings or circuit diagrams etc.
(d) Labeling switch and switches or other fittings.
(e) Providing samples of switches or other fittings.
(f) Earthening and testing installation as required.
Instructions
(a) Before conduit pipes are laid on concrete floor slabs, a conduit layout drawing shall be
prepared by the contractor for the approval of consultant.
(b) All electrical installation shall be for 400 volts / 230 volts 50 Hz.
(c) 5 Amp final sub-circuits shall be carried out by the looping-in method.
(d) No joints are permitted in the runs of cables.
(e) Fixing heights from finished floor level, unless directed otherwise shall be as follows,
Main switches (switch fuses) - 1.5 m Distribution boards - 1.7 m
Lamp fittings - 2.4 m Ceiling fans - 2.5 m
Switches and fan regulators - 1.4 m Socket outlets - 0.2 m
(f) Current operated ELCBs.
(g) Earth resistance shall be less than 5 Ohms, tested on a dry day.
(h) All fan regulators to be earthen.
(i) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
P-1 Supply and install Earth electrode copprer no. 854.00 no. 854.00
rod, 1800mm long fixed on ground with
connection

P-2 Supply and install 65x65x6 mm angle iron, no. 3,836.00 no. 3,836.00
service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed
to wall or roof frame - Single Phase

P-3 Supply and install 65x65x6 mm angle iron, no. 5,252.00 no. 5,252.00
service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed
to wall or roof frame - Three Phase

P-4 Supply and fix 7/1.35 mm main wire - lft. 337.00 lm 1,105.00
(Double)

Page 83
Building Rates- 2012- NCP
P-5 Supply install MCB 6 way, 40A, 2 pole no. 9,106.00 no. 9,106.00
Isolator, 40A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

Page 84
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
P-6 Supply install MCB 8 way, 40A, 2 pole no. 10,510.00 no. 10,510.00
Isolator, 40A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

P-7 Supply install MCB 10 way, 40A, 2 pole no. 11,974.00 no. 11,974.00
Isolator, 40A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

P-8 Supply install MCB 6 way, 63A, 4 pole no. 26,778.00 no. 26,778.00
Isolator, 63A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-9 Supply install MCB 8 way, 63A, 4 pole no. 30,990.00 no. 30,990.00
Isolator, 63A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-10 Supply install MCB 10 way, 63A. 4 pole no. 35,202.00 no. 35,202.00
Isolator, 63A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-11 Supply and install Electric bell and bell push no. 3,274.00 no. 3,274.00
complete with necessary wiring

P-12 Supply and install Ceiling fan 56",(230V, no. 12,846.00 no. 12,846.00
80W) KDK or equivalent with SLS
certificate complete with regulator and other
fittings
P-13 Supply and install Wall fan 16" all complete no. 8,220.00 no. 8,220.00

P-14 Supply and install Exhaust fan all complete no. 6,660.00 no. 6,660.00

P-15 Supply and install Florescent lamp 20W, no. 3,539.00 no. 3,539.00
600mm single, with plastic cover including
switch and necessary wiring

P-16 Supply and install Florescent lamp 40W, no. 3,689.00 no. 3,689.00
1200mm single, with plastic cover including
switch and necessary wiring

P-17 Supply and install Florescent lamp 40W, no. 4,709.00 no. 4,709.00
1200mm, double, with plastic cover including
switch and necessary wiring

P-18 Supply and install Ceiling lamp barrel type, no. 4,289.00 no. 4,289.00
dia. 150mm - including switch and necessary
wiring

Page 85
Building Rates- 2012- NCP
P-19 Supply and install Batten lamp including no. 1,992.00 no. 1,992.00
switch and necessary wiring

P-20 Supply and install Batten lamp including no. 2,502.00 no. 2,502.00
CFL Bulb-20W (( spiral or globe) - with
guarantee) ,switch and necessary wiring

Page 86
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
P-21 Supply and install Pendent lamp including no. 2,219.00 no. 2,219.00
switch and necessary wiring
P-22 Supply and install CFL bulb - 20w ( spiral or no. 2,657.00 no. 2,657.00
globe) - with guarantee - including switch
and necessary wiring
P-23 Supply and install Wall lamp bracket type no. 2,582.00 no. 2,582.00
with single glass globe including switch and
necessary wiring
P-24 Supply and install 5A Switch Socket outlet no. 2,978.00 no. 2,978.00
including necessary wiring

P-25 Supply and install 13A Switch Socket outlet no. 3,839.00 no. 3,839.00
including necessary wiring
P-26 Supply and install 15A Switch Socket outlet no. 4,568.00 no. 4,568.00
including necessary wiring
P-27 Replacing lamp holders no. 117.00 no. 117.00
P-28 Replacing Florescent lamp 1200mm with no. 1,365.00 no. 1,365.00
shade
P-29 Replacing florescent lamp 600mm with no. 1,244.00 no. 1,244.00
plastic shade
P-30 Replacing 1/1.13 mm cables lft. 18.00 lm 59.00

P-31 Replacing 7/1.35 mm Cables lft. 105.00 lm 344.00


P-32 Conduit PVC - 3/4" laid in brick or con. lft. 80.00 lm 262.00
Walls
P-33 Replace One Gang one way switch as per no. 222.00 no. 222.00
instruction
P-34 Replacing Two Gang one way switch as per no. 306.00 no. 306.00
instruction
P-35 Replacing Three Gang one way switch as per no. 402.00 no. 402.00
instruction
P-36 Replacing Four Gang one way switch as per no. 510.00 no. 510.00
instruction
P-37 Replacing Five Gang one way switch as per no. 628.00 no. 628.00
instruction
P-38 Replacing 5 Amp switchet socket outlet as per no. 462.00 no. 462.00
instruction
P-39 Replacing 15 Amp switchet socket outlet as no. 546.00 no. 546.00
per instruction
P-40 Replacing 40A 2 Pole isolater as per no. 1,116.00 no. 1,116.00
instruction

Page 87
Building Rates- 2012- NCP
P-41 Replaceing 40A 2 Pole RCCB as per no. 2,490.00 no. 2,490.00
instruction

Page 88
Building Rates- 2012- NCP
AC MACHINES
P-42 Supply and install wall mounted AC machine no. 84,150.00 no. 84,150.00
split type - 9000 btu - LG or equivalent - with
one year guarantee to all and five year
guarantee for compressor including free
service

P-43 Supply and install wall mounted AC machine no. 95,150.00 no. 95,150.00
split type - 12000 btu - LG or equivalent -
with one year guarantee to all and five year
guarantee for compressor including free
service

P-44 Supply and install wall mounted AC machine no. 122,650.00 no. 122,650.00
split type - 18000 btu - LG or equivalent -
with one year guarantee to all and five year
guarantee for compressor including free
service

P-45 Supply and install wall mounted AC machine no. 150,150.00 no. 150,150.00
split type - 24000 btu - LG or equivalent -
with one year guarantee to all and five year
guarantee for compressor including free
service

Page 89
Building Rates- 2012- NCP

Q - MISCELLANEOUS

Instructions
(a) Prior approval for the type of barbed wire should be taken from the Engineer before using.
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
Q-1 Barbed wire fence on concrete posts - (height lft. 267.00 lm 876.00
1800mm) - reinforced with 4 nos. 6mm bars,
2 supports on corner posts, 2 supports for mid
of every 6 intervals and 7 nos. wire lines to
the accepted Engineering standard. (Posts
should be fixed on a concrete pad of
300x300x450mm) - Distance between two
posts 2400-3000mm

Q-2 Barbed wire fence on concrete posts - (height lft. 333.00 lm 1,092.00
2400mm) - reinforced with 4 nos. 6mm bars,
2 supports on corner posts, 2 supports for mid
of every 6 intervals and 9 nos. wire lines to
the accepted Engineering standard. (Posts
should be fixed on a concrete pad of
300x300x450mm) - Distance between two
posts 2400-3000mm

Q-3 Furnishing and fixing of fence post - (height no. 1,273.00 no. 1,273.00
1800 mm, on a concrete pad of
300x300x450mm, including necessary
excavation to the accepted Engineering
standard

Q-4 Furnishing and fixing of fence post - (height no. 1,573.00 no. 1,573.00
2400 mm), on a concrete pad of
300x300x450mm including necessary
excavation to the accepted Engineering
standard

Q-5 Fixing of barbed wire lines to the existing lft. 18.00 lm 59.00
posts with necessary hooks, bolts and nuts

Q-6 Furnishing, laying and fixing 300mm dia. lft. 1,244.00 lm 4,080.00
RCC Hume pipes with collars

Q-7 Furnishing, laying and fixing 450mm dia. lft. 1,737.00 lm 5,697.00
RCC Hume pipes with collars

Q-8 Furnishing, laying and fixing 600mm dia. lft. 2,169.00 lm 7,114.00
RCC Hume pipes with collars

Page 90
Building Rates- 2012- NCP
R - Aluminium Work

Specifications
(a) All the Aluminium members used for work should have following properties

1. Temper - T5
2. Tensile Strength - 155 Mpa
3. Elongation - 7% (Minimum)
(b) Surface Treatment to be done to get following thicknesses

1. Anodizing - Coating Thickness - 10-15 Microns


2. Powder Coating - Coating Thickness - 60-80 Microns

(c) Glass should be float with thickness 5 mm

NO. DESCRIPTION IMPERIAL METRIC


UNIT RATE UNIT RATE
Anodized
R-1 Supply and fix Aluminium Sliding window sqft. 963.00 sqm 10,362.00
with 5mm float glass, rubber beading stick
with silicon gum Brown/Silver Aluminium
members complete to the accepted
Engineering standards

R-2 Supply and fix Aluminium Casement sqft. 1,127.00 sqm 12,127.00
window with 5mm float glass, rubber beading
stick with silicon gum Brown/Silver
Aluminium members complete to the
accepted Engineering standards

R-3 Supply and fix Aluminium window Fixed sqft. 825.00 sqm 8,877.00
type, beading stick with silicon gum
Brown/Silver Aluminium members complete
to the accepted Engineering standards

R-4 Supply and fix Aluminium Louvered frame, sqft. 1,294.00 sqm 13,923.00
beading stick with silicon gum Brown/Silver
Aluminium members complete to the
accepted Engineering standards

R-5 Supply and fix Aluminium Door with 5mm sqft. 1,375.00 sqm 14,795.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading
stick with silicon gum Brown/Silver
Aluminium members including tie rod and
lock complete to the accepted Engineering
standards

Page 91
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
R-6 Supply and fix Aluminium Door with 5mm sqft. 1,705.00 sqm 18,346.00
float glass on top and 0.47 mm Zn-Al covered
plywood board at bottom, rubber beading
stick with silicon gum Brown/Silver
Aluminium members including tie rod and
lock complete to the accepted Engineering
standards

R-7 Supply and fix Aluminium Partition with sqft. 539.00 sqm 5,800.00
5mm float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading
stick with silicon gum Brown/Silver
Aluminium members complete to the
accepted Engineering standards

R-8 Supply and fix Aluminium Partition with sqft. 693.00 sqm 7,457.00
5mm float glass rubber beading stick with
silicon gum Brown/Silver Aluminium
members complete to the accepted
Engineering standards

R-9 Supply and fix Roller shutter door with sqft. 1,300.00 sqm 13,988.00
necessary fittings, beading stick with silicon
gum Brown/Silver Aluminium members
complete to the accepted Engineering
standards

Powder coated

R-10 Supply and fix Aluminium Sliding window sqft. 1,150.00 sqm 12,374.00
with 5mm float glass, rubber beading stick
with silicon gum Powder coated Aluminium
members complete to the accepted
Engineering standards

R-11 Supply and fix Aluminium Casement sqft. 1,501.00 sqm 16,151.00
window with 5mm float glass, rubber beading
stick with silicon gum Powder coated
Aluminium members complete to the
accepted Engineering standards

R-12 Supply and fix Alumimium window Fixed sqft. 869.00 sqm 9,350.00
type, beading stick with silicon gum Powder
coated Aluminium members complete to the
accepted Engineering standards

Page 92
Building Rates- 2012- NCP
NO. DESCRIPTION IMPERIAL METRIC
UNIT RATE UNIT RATE
R-13 Supply and fix Aluminium Louvered frame, sqft. 1,472.00 sqm 15,839.00
beading stick with silicon gum Powder coated
Aluminium members complete to the
accepted Engineering standards

R-14 Supply and fix Aluminium Door with 5mm sqft. 1,760.00 sqm 18,938.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading
stick with silicon gum Powder coated
Aluminium members including tie rod and
lock complete to the accepted Engineering
standards

R-15 Supply and fix Aluminium Door with 5mm sqft. 1,980.00 sqm 21,305.00
float glass on top and 0.47 mm Zn-Al covered
plywood board at bottom, rubber beading
stick with silicon gum Powder coated
Aluminium members including tie rod and
lock complete to the accepted Engineering
standards

R-16 Supply and fix Aluminium Partition with sqft. 728.00 sqm 7,833.00
5mm float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading
stick with silicon gum Powder coated
Aluminium members complete to the
accepted Engineering standards

R-17 Supply and fix Aluminium Partition with sqft. 866.00 sqm 9,318.00
5mm float glass rubber beading stick with
silicon gum Powder coated Aluminium
members complete to the accepted
Engineering standards

R-18 Supply and fix Roller shutter door with sqft. 1,906.00 sqm 20,509.00
necessary fittings, beading stick with silicon
gum Powder coated Aluminium members
complete to the accepted Engineering
standards

Aluminium ceiling
R-19 Aluminium ceiling with gypsum board of one sqft. 167.00 sqm 1,797.00
side decorative and the other side Aluminium
foil, fixed with 25x25x1mm angles and 25mm
concrete nails to the wall and, 25x25mm main
runners at 600mm c/c in one way and
25x25mm cross T in the other way hanged on
roof with binding wire as per the instructions

Page 93
Building Rates- 2012- NCP

UNITS PRICES OF MATERIAL, LABOUR AND PLANT FOR 2012


Labour
No. Item Unit Price (Rs.)
01 Special Skilled Labour Days 1,300.00
02 Skilled Labour Days 1,200.00
03 Semi Skilled Labour Days 950.00
04 Unskilled Labour Days 800.00

Plant
No. Item Unit Price (Rs.)
01 Concrete Mixer Day 4,264.00
02 Porker Vibrator Day 4,232.00

Construction Materials
No. Item Unit Size/Gauge Price (Rs.)
01 Cement - excluding transport 50 kg. 785.00
02 Rubble 6"-9" - excluding transport Cube 3,500.00
03 Metal - 1 1/2" - excluding transport Cube 5,250.00
04 Metal - 1 " - excluding transport Cube 6,000.00
05 Metal - 3/4 " - excluding transport Cube 7,000.00
06 Engineering Brick - including 15 km transport no. 9.90
07 Lime - slaked, standard - excluding transport 20 kg 300.00
08 River sand - including transport Cube 7,800.00
09 Earth - excluding transport Cube 600.00
10 Gravel - excluding transport Cube 900.00
11 Asbestos Corrugated Sheet no. 1.75 m 1,225.00
12 Asbestos Corrugated Sheet no. 2.5 m 1,875.00
13 Asbestos Corrugated Sheet no. 3.0 m 1,990.00
14 Asbestos Corrugated Sheet no. 3.5 m 2,400.00
15 Asbestos ceiling Sheet no. 1.2x1.2m 535.00
16 Asbestos Ridging - 3' no. 450.00
17 Cement sand hollow blocks, 16"x8"x4" no. 39.00
18 Cement sand hollow blocks, 16"x8"x8" no. 58.00
19 Cement sand solid blocks, 16"x8"x4" no. 45.00
20 Cement sand solid blocks, 16"x8"x8" no. 60.00
21 Calicut tiles - excluding transport no. 29.00
22 Ridge tiles - excluding transport no. 47.65
23 Skim coat 20 kg 700.00
24 Glass pan - 3 mm sqft. 110.00
25 Glass pan - 5 mm sqft. 175.00
26 Paint brush 6" no. 890.00

Page 94
Building Rates- 2012- NCP
27 Red cement kg 600.00

Page 95
Building Rates- 2012- NCP
No. Item Unit Size/Gauge Price (Rs.)
28 Enamel Paint ltr. 745.35
29 Emulsion Paint ltr. 611.60
30 Weather shield Paint ltr. 892.85
31 Anticorrosive Paint ltr. 560.00
32 Wall filler ltr. 294.64
33 Wood preservative - Black ltr. 237.50
34 Wood preservative - Clear ltr. 347.50
35 Floor paint ltr. 611.60
36 Aluminum paint ltr. 812.50
37 Reinforcement Steel -Tor Ton 130,000.00
38 Reinforcement Steel -Mild Ton 130,000.00
39 Barbed wire 25 kg 12.5 bwg 4,700.00
40 Binding wire 16 bwg lb 77.27
41 25x25x5 mm Angle Iron lft. 82.57
42 40X40X5 mm Angle iron lft. 121.95
43 50X50X5 mm Angle iron lft. 142.27
44 50X50X6 mm Angle iron lft. 154.97
45 65X65X6 mm Angle iron lft. 215.95
46 Zink alum colour sheet sqft. 119.90
47 Zink alum non-colour sheet sqft. 104.55
48 Zink alum ridging -colour lft. 168.90
49 Zink alum ridging - non colour lft. 145.73
50 Zink Alum gutter - colour lft. 175.30
51 Zink Alum gutter - non-colour lft. 134.14
52 Zink Alum down pipe -colour lft. 164.94
53 Zink Alum down pipe - non-colour lft. 140.55
54 Zink Alum gutter box - colour no 670.00
55 Zink Alum gutter box - non-colour no 595.00
56 Zink Alum wall flashing - colour lft. 176.82
57 Zink Alum wall flashing - non- colour lft. 151.21
58 Zink Alum roofing screws no. 15.00
59 Zink Alum valley gutter - colour lft. 168.90
60 Zink Alum valley gutter -non- colour lft. 145.73
61 AC Machine - split type - wall mounted - 9000btu no. 76,500.00

62 AC Machine - split type - wall mounted - no. 86,500.00


12000btu
63 AC Machine - split type - wall mounted - no. 111,500.00
18000btu

Page 96
Building Rates- 2012- NCP
64 AC Machine - split type - wall mounted - no. 136,500.00
24000btu

Page 97
Building Rates- 2012- NCP
No. Item Unit Size/Gauge Price (Rs.)

65 Plastishell water tanks - 10 years guarantee - 500l no. 8,200.00

66 Plastishell water tanks - 10 years guarantee - no. 15,934.00


1000l
67 Plastishell water tanks - 10 years guarantee - no. 30,000.00
2000l
68 Plastishell water tanks - 10 years guarantee - no. 63,000.00
5000l
69 Bathroom accessories set - Chromium plated no. 8,000.00
(4pcs.)
70 Bathroom accessories set - Chromium plated no. 10,500.00
(6pcs.)
71 Ball valve- Pegler - 20mm no. 750.00
72 Ball valve- Pegler - 25mm no. 1,100.00
73 Wash basin with pedestal - Chinese made no. 6,600.00
74 Water closet - Chinese made no. 12,000.00
75 2 PC set - Chinese made no. 19,850.00
76 Corner wash basin no. 2,250.00
77 Kitchen sink with drain board- stainless steel no. 2,750.00
78 Kitchen sink without drain board - stainless steel no. 2,350.00
79 Bidet shower - Chinese made no. 1,150.00
80 Urinal - bawl type no. 2,650.00
81 Chromium plated soap tray no. 2,650.00
82 Chromium plated towel bar no. 2,500.00
83 Chromium plated head shower no. 2,800.00
84 Chromium plated telephone shower no. 4,275.00
85 Squatting pan with foot rest no. 1,900.00
86 Bathroom mirror no. 1,650.00
87 Ceiling fan KDK with SLS no. 7,900.00
88 Fluorescent lamp 600mm - single no. 975.00
89 Fluorescent lamp 1200mm - single no. 1,100.00
90 Fluorescent lamp 1200mm - double no. 1,950.00
91 CFL bulb no. 490.00
92 Wall bracket no. 650.00
93 5A socket outlet no. 310.00
94 15A socket outlet no. 380.00
95 13A socket outlet no. 330.00
96 Door closer no. 3,500.00
97 Plywood door - 2025x900mm no. 4,150.00
98 Mortise lock - Union 678-24-95CH no. 3,650.00
99 Switch lock - Bird no. 895.00
100 Concrete posts - 1.8m no. 600.00

Page 98
Building Rates- 2012- NCP
101 Concrete posts - 2.4m no. 850.00
102 RCC septic tank- 900x2400mm no. 19,055.00

Page 99
Building Rates- 2012- NCP
Prepared and Checked by :-

Rates Preparing Committee

1 Eng. (Ms.) D.L.B.P. Wijesekara Director (Designs, Consultancy & QC)


2 Eng. S.J.K. Alas Divisional Engineer - Medawachchiya
3 Eng. H.M.J. Herath Divisional Engineer - Mahailuppallama
4 Eng. (Ms.) I.K.M.C.K. Illangasinghe Divisional Engineer - Kekirawa
5 Eng. D.M.U.S.B. Dissanayake Engineer- School works
6 Eng. (Ms.) M.P.P. Dilhani Divisional Engineer -Anuradhapura
7 Eng. W.G.S.S. Bandara Divisional Engineer - Polonnaruwa
8 Eng. Waruna Jayasundara Project Engineer
9 Archt. W.N.P.M.S. Wijithaweera Architect
10 Eng. S.D.N. Ariyawansa Engineer in charge (Health & Other dept)
11 Eng. A.A.D.C.R. Aluthgama Quality Control Engineer
12 Eng. W.H. Hapuarachchi Mechanical Engineer
13 Mr. Palitha Samaraweera Divisional Assistant - Anuradhapura
14 Mr. K.R. Kahandakumara Divisional Assistant -Polonnaruwa
15 Mr. I.L.B.Gamini Divisional Assistant -Kekirawa
16 Mr. W.J. Gunawardena Drawing Office Assistant
17 Mr. U.L.R.G. Weragoda Technical Officer
18 Mr K.A.Peiris Technical Officer
19 Mr. M.B.A.S. Ariyasinghe Technical Officer
20 Mr. R.M.M.R. Amarasena Technical Officer
21 Mrs. G.D.S. Shyamali Draughtsman
22 Mrs. D.G.R. Malani Draughtsman
23 Mrs. Namali Gunasinghe Management Assistant
24 Mr. P.A.D.S. Ponnamperuma Autocad Draughtsman

Recommended by :- Approved by :-

Eng. (Ms.) K.C.D. Fernando Eng. C.K.B. Seneviratne


Director (Buildings) Deputy Chief Secretary (Engineering)
Provincial Engineering Department Provincial Engineering Department

North Central Province North Central Province

Page 100
Building Rates- 2012- NCP
Anuradhapura. Anuradhapura.

Page 101
Building Rates- 2012- NCP

RATES FOR
IRRIGATION
CONSTRUCTION
S - 2012

PROVINCIAL IRRIGATION DEPARTMENT


NORTH CENTRAL PROVINCE

Page 102
Building Rates- 2012- NCP
PROVINCIAL IRRIGATION DEPARTMENT - NCP
RATES FOR IRRIGATION WORKS - 2011
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
JUNGLE CLEARING BY MACHINERY

RN 1 Clearing & grubbing Heavy jungle including acr. 23,331.00 hec. 57,650.00
removing out side of the reservation &
burning (by machinery).

RN 2 Clearing & grubbing Common jungle acr. 21,997.00 hec. 54,356.00


including removing out side of the reservation
& burning (by machinery).

RN 3 Clearing & grubbing Medium jungle acr. 16,606.00 hec. 41,035.00


including removing out side of the reservation
& burning (by machinery).

RN 4 Clearing & grubbing Light jungle including acr. 12,455.00 hec. 30,776.00
removing out side of the reservation &
burning (by machinery).

RN 5 Clearing & grubbing Shrub jungle including acr. 4,982.00 hec. 12,310.00
removing out side of the reservation &
burning (by machinery).

JUNGLE CLEARING BY MANUAL


LABOUR
RN 6 Clearing & grubbing Light jungle including acr. 76,800.00 hec. 189,772.00
removing out side of the reservation &
burning (by manual labour).

RN 7 Clearing & grubbing Secondary Growth acr. 18,181.00 hec. 44,926.00


jungle including removing out side of the
reservation & burning (by manual labour).

RN 8 Under bushing by manual labour. acr. 9,792.00 hec. 24,196.00


STRIPPING BY MACHINERY
RN 9 Stripping top soil to a depth of 3" to 6" to cube 127.00 m3 44.00
receive new earth & spoil to waste cut haul
200 ft. by machinery.

STRIPPING BY MANUAL LABOUR


RN 10 Stripping top soil to a depth of 3" to 6" to cube 1,920.00 m3 678.00
receive new earth & spoil to waste haul 100
ft. by manual labour.

EARTH WORK BY MACHINARY


(TANK BUND FORMATION)

Page 103
Building Rates- 2012- NCP
RN11 Earth excavation from borrow area cut & lift cube 641.00 m3 226.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 100 ft. (30m)

Page 104
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
RN 12 Earth excavation from borrow area cut & lift cube 938.00 m3
331.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 0.25 mile (0.4 km)

RN 13 Earth excavation from borrow area cut & lift cube 997.00 m3 352.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 0.5 mile (0.8 km)

RN 14 Earth excavation from borrow area cut & lift cube 1,062.00 m3 375.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 0.75 mile (1.2 km)

RN 15 Earth excavation from borrow area cut & lift cube 1,127.00 m3 398.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 1.0 mile (1.6 km)

RN 16 Earth excavation from borrow area cut & lift cube 1,192.00 m3 421.00
3 ft. placing & compaction earth in damp
including watering, compaction by machinery
haul 1.25 mile (2.0 km)

EARTH WORK BY MANUAL LABOUR


(TANK BUND FORMATION)
RN 17 Earth excavation from borrow area cut & lift cube 2,682.00 m3 947.00
5 ft. placing & compaction earth in damp
including watering, compaction by manually
haul 100 ft. (30m)

RN 18 Earth excavation from borrow area cut & lift cube 2,809.00 m3 992.00
3 ft. placing & compaction earth in damp
including watering, compaction by manually
haul 0.5 mile (0.8 km) by T.T

RN 19 Earth excavation from borrow area cut & lift cube 2,953.00 m3 1,043.00
3 ft. placing & compaction earth in damp
including watering, compaction by manually
haul 1.0 mile (1.6 km) by T.T

RN 20 Earth excavation from borrow area cut & lift cube 3,098.00 m3 1,094.00
3 ft. placing & compaction earth in damp
including watering, compaction by manually
haul 1.5 mile ( 2.4 km) by T.T

Page 105
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
COMMON EARTH EXCAVATION &
WASTE BY MACHINERY
RN 21 Common earth excavation & spoil to waste or cube 424.00 m3 149.00
fill material cut 3 ft. lift up to 3 ft. spread 100
ft. (30 m) by machinery (B-hoe)
RN 22 Common earth excavation & spoil to waste or cube 424.00 m3 149.00
fill material cut 3 -5 ft. lift up to 5 ft. spread
100 ft. (30 m) by machinery (B-hoe)
RN 23 Common earth excavation & spoil to waste or cube 432.00 m3 152.00
fill material cut 5 -10 ft. lift up to 10 ft. spread
100 ft. (30 m) by machinery (B-hoe)

RN 24 Common earth excavation & spoil to waste or cube 443.00 m3 156.00


fill material cut 10 -15 ft. lift up to 15 ft.
spread 100 ft. (30 m) by machinery (B-hoe)
RN 25 Common earth excavation & spoil to waste or cube 453.00 m3 160.00
fill material cut 15 -20 ft. lift up to 20 ft.
spread 100 ft. (30 m) by machinery (B-hoe)

COMMON EARTH EXCAVATION &


WASTE BY MANUAL LABOUR
RN 26 Common earth excavation & spoil to waste or cube 2,400.00 m3 847.00
fill material cut 3' lift up to 3 ft. spread 100 ft.
(30 m) by manual labour.
RN 27 Common earth excavation & spoil to waste or cube 2,823.00 m3 997.00
fill material cut 3'-5' lift up to 5 ft. spread 100
ft. (30 m) by manual labour.
RN 28 Common earth excavation & spoil to waste or cube 4,300.00 m3 1,519.00
fill material cut 5'-10' lift up to 10 ft. spread
100 ft. (30 m) by manual labour.

COMMON EARTH EXCAVATION IN


CANAL & WASTE BY MACHINERY
RN 29 Common earth excavation & spoil to waste cube 424.00 m3 149.00
cut 3' lift up to 3 ft. spread 100 ft. (30 m) by
machinery (B-hoe)
RN 30 Common earth excavation & spoil to waste cube 424.00 m3 149.00
cut 3'-5' lift up to 5 ft. spread 100 ft. (30 m)
by machinery (B-hoe)
RN 31 Common earth excavation & spoil to waste cube 432.00 m3 152.00
cut 5'-10' lift up to 10 ft. spread 100 ft. (30 m)
by machinery (B-hoe)
RN 32 Common earth excavation & spoil to waste cube 443.00 m3 156.00
cut 10'-15' lift up to 15 ft spread 100 ft(30 m)
by machinery (B - hoe)

Page 106
Building Rates- 2012- NCP
RN 33 Common earth excavation & spoil to waste cube 453.00 m3 160.00
cut 15'-20' lift up to 20 ft. spread 100 ft. (30
m) by machinery (B-hoe)

Page 107
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
EARTH EXCAVATION IN CANAL &
FORMING CANAL BUND BY
MACHINERY
RN 34 Earth excavation & forming canal bund cut 3 cube 589.00 m3 208.00
ft. lift up to 3 ft. spread 100 ft. (30 m) by
machinery (B-hoe) including watering &
compaction.

RN 35 Earth excavation & forming canal bund cut 3- cube 589.00 m3 208.00
5 ft. lift up to 5 ft. spread 100 ft. (30 m) by
machinery (B-hoe) including watering &
compaction.

RN 36 Earth excavation & forming canal bund cut 5 cube 597.00 m3 210.00
- 10 ft. lift up to 10 ft. spread 100 ft. (30 m)
by machinery (B-hoe) including watering &
compaction.
RN 37 Earth excavation & forming canal bund cut 10 cube 606.00 m3 214.00
- 15 ft. lift up to 15 ft. spread 100 ft. (30 m)
by machinery (B-hoe) including watering &
compaction.

RN 38 Earth excavation & forming canal bund cut 15 cube 615.00 m3 217.00
- 20 ft lift up to 20 ft. spread 100 ft. (30 m) by
machinery (B-hoe) including watering &
compaction.

EARTH EXCAVATION FROM BORROW


& FORMING CANAL BUND BY
MACHINERY
RN 39 Earth excavation from borrow & placing cube 589.00 m3 208.00
watering & compacting earth in canal bund
cut 3 ft. lift up to 3 ft. spread 100 ft. by
machinery.
RN 40 Earth excavation from borrow & placing cube 886.00 m3 313.00
watering & compacting earth canal bund cut 3
ft. lift up to 3 ft. haul 1/4 mile (0.4 km ) by
machinery

RN 41 Earth excavation from borrow & placing cube 945.00 m3 333.00


watering & compacting earth canal bund cut 3
ft. lift up to 3 ft. haul 1/2 mile (0.8 km) by
machinery

RN 42 Earth excavation from borrow & placing cube 1,010.00 m3 356.00


watering & compacting earth canal bund cut 3
ft. lift up to 3 ft haul 3/4 mile (1.2 km ) by
machinery

Page 108
Building Rates- 2012- NCP
RN 43 Earth excavation from borrow & placing cube 1,075.00 m3 379.00
watering & compacting earth canal bund cut 3
ft. lift up to 3 ft. haul 1.0 mile (1.6 km) by
machinery

Page 109
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
COMMON EARTH EXCAVATION IN
CANAL & FORMING CANAL BUND BY
MANUAL LABOUR
RN 44 Common earth excavation in canal & forming cube 3,065.00 m3 1,082.00
canal bund cut 0 - 3 ft. lift up to 5 ft. spread
100 ft. (30 m) by manual labour

RN 45 Common earth excavation in canal & forming cube 3,488.00 m3 1,232.00


canal bund cut 3 - 5 ft. lift up to 5 ft. spread
100 ft. (30 m) by manual labour

RN 46 Common earth excavation in canal & forming cube 3,965.00 m3 1,753.00


canal bund cut 5 - 10 ft. lift up to 10 ft. spread
100 ft. (30 m) by manual labour

EARTH EXCAVATION FROM BORROW


& FORMING CANAL BUND BY
MANUAL LABOUR

RN 47 Earth excavation from borrow & forming cube 2,265.00 m3 800.00


canal bund cut 3 ft. lift up to 3 ft. spread 100
ft. ( 15 m) & compacting by manual labour,
Haul 100 ft.

RN 48 Earth excavation from borrow & forming cube 2,561.00 m3 904.00


canal bund cut 3 ft. lift up to 3 ft. spread 50 ft.
(15 m) & compacting by manual labour,
transport by RD. Haul 1/4 mile (0.4 Km)

RN 49 Earth excavation from borrow & forming cube 2,620.00 m3 925.00


canal bund cut 3 ft lift up to 3 ft spread 50 ft.
(15 m) & compacting by manual labour,
transport by RD. Haul 1/2 mile (0.8 Km)

RN 50 Earth excavation from borrow & forming cube 2,685.00 m3 948.00


canal bund cut 3 ft lift up to 3 ft. spread 50 ft.
(15 m) & compacting by manual labour,
transport by RD. Haul 3/4 mile (1.2 Km)

RN 51 Earth excavation from borrow & forming cube 2,750.00 m3 971.00


canal bund cut 3 ft. lift up to 3 ft. spread 50 ft.
( 15 m) & compacting by manual labour,
transport by RD. Haul 1.0 mile (1.6 Km)

CUT OPENING THE TANK BUND BY


MACHINERY

Page 110
Building Rates- 2012- NCP
RN 52 Earth excavation for cut opening the tank cube 862.00 m3 304.00
bund & dump at the site with back filling 75%
excavated soil & 25% borrow earth including
placing, watering & compaction by
machinery, cut 5 - 10 ft. lift up to 10 ft. spread
100 ft.

Page 111
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
CUT OPENING THE TANK BUND BY
MANUALY
RN 53 Earth excavation for cut opening the tank cube 5,731.00 m3 2,026.00
bund & dump at the site with back filling 75%
excavated soil & 25% borrow earth including
placing, watering & compaction by manual
labour, cut 5 - 10 ft. lift up to 10 ft. spread 100
ft.

DESILTING IN CANAL BY MANUAL


LABOUR
RN 54 Desilting in canal Bed & spoil to waste cut & cube 1,920.00 m3 678.00
lift 0 - 5 ft. haul 100 ft. (30m) by manual
labour.
WEEDING BY MANUAL LABOUR
RN 55 Weeding
in Canals / Bunds by manual labour. acr. 16,727.00 hec. 5,908.00

DESILTING BY MACHINARY
RN 56 Desilting & spoil to waste cut & lift 0-5 ft. cube 278.00 m3 98.00
haul 100 ft. (30m) by Machinery.
RN 57 Desilting & spoil to waste cut & lift 0-10 ft. cube 282.00 m3 99.00
haul 100 ft. (30m) by Machinery.
RN 58 Desilting & spoil to waste cut & lift 0-5 ft. cube 575.00 m3 203.00
haul (0.4 km) (Transport by R.D.)
RN 59 Desilting & spoil to waste cut & lift 0-5 ft. cube 633.00 m3 223.00
haul (0.8 km) (Transport by R.D.)
RN 60 Desilting & spoil to waste cut & lift 0-5 ft. cube 698.00 m3 246.00
haul (1.2 km) (Transport by R.D.)
RN 61 Desilting & spoil to waste cut & lift 0-5 ft. cube 764.00 m3 269.00
haul (1.6 km) (Transport by R.D.)
RN 62 Desilting& spoil to waste cut & lift 0-5 ft. cube 829.00 m3 292.00
haul (2 km) (Transport by R.D.)
TURFING
RN 63 Furnishing, placing & watering turf till take sqr. 1,298.00 m2 139.00
roots transport 1/2 mile by manual labour.
RN 64 Furnishing, placing & watering turf till take sqr. 1,339.00 m2 144.00
roots transport 1 mile by manual labour.

GRAVELLING ON TANK BUND OR


AGRI ROAD BY MACHINERY
TANSPORT BY FARM TRACTOR

Page 112
Building Rates- 2012- NCP
RN 65 Gravel excavation & use as construction cube 1,536.00 m3 542.00
material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 0.5
mile (0.8 km) by machinery (Transport by
T.T.)

Page 113
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
RN 66 Gravel excavation & use as construction cube 1,680.00 m3 593.00
material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 1.0
mile (1.6 km) by machinery (Transport by
T.T.)

RN 67 Gravel excavation & use as construction cube 1,825.00 m3 644.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 1.5
mile (2.4 km) by machinery (Transport by
T.T.)

RN 68 Gravel excavation & use as construction cube 1,969.00 m3 695.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 2.0
mile (3.2 km) by machinery (Transport by
T.T.)

RN 69 Gravel excavation & use as construction cube 2,114.00 m3 746.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 2.5
mile (4.0 km) by machinery (Transport by
T.T.)

RN 70 Gravel excavation & use as construction cube 2,258.00 m3 797.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 3.0
mile (4.8 km) by machinery (Transport by
T.T.)

RN 71 Gravel excavation & use as construction cube 2,403.00 m3 848.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 3.5
mile (5.6 km) by machinery (Transport by
T.T.)

RN 72 Gravel excavation & use as construction cube 2,547.00 m3 899.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 4.0
mile (6.4 km) by machinery (Transport by
T.T.)

Page 114
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
RN 73 Gravel excavation & use as construction cube 2,692.00 m3
950.00
material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 4.5
mile (7.2 km) by machinery (Transport by
T.T.)

RN 74 Gravel excavation & use as construction cube 2,836.00 m3 1,001.00


material cut 0 -5 ft. lift up to 5 ft. spread 100
ft. including furnishing, placing, watering &
compaction transport by farm tractor haul 5.0
mile (8.0 km) by machinery (Transport by
T.T.)

EARTH EXCAVATION FOR


FOUNDATION BY MANUAL LABOUR
RN 75 Excavation for foundation in any material cube 1,920.00 m3 678.00
except rock requiring blasting, ram, and
surplus disposed of within site as directed.
Cut & fill 0 -5 ft. by manual labour.

RN 76 Excavation for foundation in any material cube 2,193.00 m3 774.00


except rock requiring blasting, 50% part
return fill in and ram , and surplus disposed of
within site as directed . Cut & fill 0-5 ft. by
manual labour.

CONCRETE WORK
RN 77 Cement concrete Grade 10 (1:3:6-40mm) cube 35,756.00 m3 12,630.00
mixing, hoisting placing in position, packing
temping including vibrating as directed,
curing as specified and stop pour construction
joint etc. in irrigation structures, without
form work by manual labour.

RN 78 Cement concrete Grade 10 (1:3:6-40mm) cube 40,342.00 m3 14,250.00


above one cube mixing, hoisting placing in
position, packing temping around
reinforcement including vibrating as directed,
curing as specified and stop pour construction
joint etc. making good after removal off form
work, in irrigation structures, with form
work by manual labour.

Page 115
Building Rates- 2012- NCP
RN 79 Cement concrete Grade 20 (1:2:4-20mm) cube 46,570.00 m3 16,450.00
mixing, hoisting placing in position, packing
temping around reinforcement including
vibrating as directed, curing as specified and
stop pour construction joint etc. making good
after removal off form work, in irrigation
structures, with form work by manual labour.

Page 116
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
REINFORCEMENT
RN 80 MILD steel rods to the SLS standards in cwt. 11,031.00 kg 220.00
reinforcing supplying, bending, cutting,
fabrication, hoisting, and placing in position
and tied with G.I wire as directed including
rolling margin, waste, all spacing, laps etc. in
reinforced steel other than design laps,
holding and supporting including temporary
fixing supports, hangers

RN 81 TOR steel rods to the SLS standards in cwt. 11,164.00 kg 223.00


reinforcing supplying, bending, cutting,
fabrication, hoisting, and placing in position
and tied with G.I wire as directed including
rolling margin, waste, all spacing, laps etc. in
reinforced steel other than design laps

FORM WORK
RN 82 Plywood shuttering for irrigation structures sqr. 7,643.00 m2 822.00
including dismantling
RUBBLE MASONARY
RN 83 Random rubble masonry in cement mortar 1:5 cube 23,317.00 m3 8,236.00
RN 84 9" thick pitching in 6" - 9" rubble in 1:5 cube 17,132.00 m3 6,051.00
cement mortar lift 0 - 5 ft. haul.
RCC SPUN PIPE AND COLLARS IN
STRUCTURES
RN 85 Supplying, laying, joining 4" dia. long Hume lft. 394.00 lm 1,293.00
pipe.
RN 86 Supplying, laying, joining 6" dia. long Hume lft. 452.00 lm 1,483.00
pipe.
RN 87 Supplying, laying, joining 9" dia. long Hume lft. 625.00 lm 2,052.00
pipe.
RN 88 Supplying, laying, joining 12" dia. long Hume lft. 856.00 lm 2,809.00
pipe.
RN 89 Supplying, laying, joining 15" dia. long Hume lft. 1,077.00 lm 3,534.00
pipe.
RN 90 Supplying, laying, joining 18" dia. long Hume lft. 1,320.00 lm 4,331.00
pipe.
RN 91 Supplying, laying, joining 24" dia. long Hume lft. 1,889.00 lm 6,199.00
pipe.
RN 92 Supplying, laying, joining 30" dia. long Hume lft. 2,499.00 lm 8,199.00
pipe.
RN 93 Supplying, laying, joining 36" dia. long Hume lft. 3,663.00 lm 12,018.00
pipe.

Page 117
Building Rates- 2012- NCP
RN 94 Supplying, laying, joining 48" dia. long Hume lft. 5,630.00 lm 18,468.00
pipe.

Page 118
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
LIGHT DUTY CAST IRON GATES FOR
SLUICES
RN 95 Furnishing and install in 6" dia. Cast iron no. 16,872.00 no. 16,872.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.

RN 96 Furnishing and install in 9" dia. Cast iron no. 26,568.00 no. 26,568.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.
RN 97 Furnishing and install in 12" dia. Cast iron no. 33,300.00 no. 33,300.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.
RN 98 Furnishing and install in 15" dia. Cast iron no. 39,900.00 no. 39,900.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.

RN 99 Furnishing and install in 18" dia. Cast iron no. 59,430.00 no. 59,430.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.
RN 100 Furnishingand install in 24" dia. Cast iron no. 84,120.00 no. 84,120.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.
RN 101 Furnishingand install in 30" dia. Cast iron no. 120,815.00 no. 120,815.00
gates & hoist complete with spindle etc.
P.No.C501-2-6D.
PLASTERING
RN 102 1/2" thick rough cement plastering in 1:3 sqr. 3,769.00 m2 405.00
cement mortar for rubble masonry faces for
all lifts by manual labour.

CONSTRUCTION OF PUDDLE CORE


WALL
RN 103 Earth work from borrow Puddle clay & cube 4,177.00 m3 1,475.00
construction of puddle clay wall including
watering & compaction by manual labour.
Transport by F.T haul 1.0 mile.

SOFT ROCK EXCAVATION BY


MACHINERY

RN 104 Soft rock excavation and spoil to waste, cut 0 cube 630.00 m3 222.00
-5 lift 5' spread 100' by machinery
RN 105 Soft rock excavation and spoil to waste, cut 5 cube 641.00 m3 226.00
-10 lift 10' spread 100' by machinery
RN 106 Soft rock excavation and spoil to waste, cut cube 652.00 m3 230.00
10 -15 lift 15' spread 100' by machinery

Page 119
Building Rates- 2012- NCP
RN 107 Softrock excavation and spoil to waste, cut cube 664.00 m3 234.00
15 -20 lift 20' spread 100' by machinery

Page 120
Building Rates- 2012- NCP
ISR DESCRIPTION IMPERIAL METRIC
NO. UNIT RATE UNIT RATE
SOFT ROCK EXCAVATION BY
MANUAL LABOUR
RN 108 Soft rock excavation and spoil to waste, cut 0 cube 3,505.00 m3 1,238.00
-5 lift 5' spread 100' by manual labour.
RN 109 Soft rock excavation and spoil to waste, cut 5 cube 4,692.00 m3 1,657.00
-10 lift 10' spread 100' by manual labour.
RN 110 Soft rock excavation and spoil to waste, cut cube 4,791.00 m3 1,692.00
10 -15 lift 15' spread 100' by manual labour.
RN 111 Soft rock excavation and spoil to waste, cut cube 4,907.00 m3 1,733.00
15 -20 lift 20' spread 100' by manual labour.
ROCK EXCAVATION BY MACHINERY
RN 112 Rock excavation and spoil to waste / Quarry cube 2,045.00 m3 722.00
products cut 5 ft. lift 5 ft. by machinery
RN 113 Rock excavation and spoil to waste / Quarry cube 2,204.00 m3 778.00
products cut 5 - 10 ft. lift 10 ft. by machinery
RN 114 Rock excavation and spoil to waste / Quarry cube 2,374.00 m3 838.00
products cut 10 -15 ft. lift 15 ft. by machinery
RN 115 Rock excavation and spoil to waste / Quarry cube 2,553.00 m3 901.00
products cut 15 - 20 ft. lift 20 ft. by machinery
ROCK EXCAVATION BY MANUALY
RN 116 Rock excavation and spoil to waste / Quarry cube 3,814.00 m3 1,347.00
products cut 5 ft. lift 5 ft. by manual labour.

RN 117 Rock excavation and spoil to waste / Quarry cube 5,001.00 m3 1,766.00
products cut 5 -10 ft. lift 10 ft. by manual
labour.
RN 118 Rock excavation and spoil to waste / Quarry cube 6,286.00 m3 2,220.00
products cut 10 -15 ft. lift 15 ft. by manual
labour.

RN 119 Rock excavation and spoil to waste / Quarry cube 7,688.00 m3 2,715.00
products cut 15 - 20 ft. lift 20 ft. by manual
labour.
LABOUR RATES
RN 120 Un skilled labour day 800.00 day 800.00
RN 121 Semi skilled labour day 900.00 day 900.00
RN 122 Skilled labour - grade 1 day 1,250.00 day 1,250.00
RN 123 Skilled labour - grade 2 day 1,100.00 day 1,100.00
MACHINE RATE
RN 124 Motor grader (120 - 140 HP ) Clearing road hrs. 3,841.00 hrs. 3,841.00
plat form, reducing high side or cutting side
drain of Agri - Road
RN 125 Hydraulic excavator cum back hoe 1.0 Cu.yd. hrs. 3,630.00 hrs. 3,630.00
Page 121
Building Rates- 2012- NCP
These rates were prepared according to the Irrigation Department rates in 2008.

Page 122
Building Rates- 2012- NCP

Prepared & Checked by :-

1 Eng. H.M.R.M.Abeyrathna Irrigation Engineer

2 Mr. W.L.G.S.Liyanage Irrigation Engineer

3 Mr. A. L. Ranjith Mendis Irrigation Engineer

4 Mr. P.M.R.L Jayarathna Draughtsman

5 Mr. R.M.M.S.Rathnayake Draughtsman

6 Mrs. H.M.C. Herath Technical Officer

7 Miss. H.T. Kuluge Technical Officer

8 Mr. H.M.U.P. Kumara Technical Officer

9 Mr. D.M.C.K. Dissanayake Technical Officer

10 Mr. H.P.A.P. Amarasinghe Technical Officer

Recommended by :- Approved by :-

J.K.J. Jayasooriya Eng. C.K.B. Senavirathna


Irrigation Engineer Director of Irrigation
Provincial Irrigation Department Provincial Irrigation Department
North Central Province North Central Province
Anuradhapura Anuradhapura

Page 123
Building Rates- 2012- NCP

RATES FOR
QUALITY
CONTROL TESTS
- 2012
QUALITY CONTROL LABORATORY
KEKIRAWA.

Page 124
Building Rates- 2012- NCP
QUALITY CONTROL UNIT- KEKIRAWA
RATES FOR QUALITY CONTROL TESTS CARRIED OUT BY QC
LABORATORY - KEKIRAWA
Name of the Test Rate per Test (Rs.)
1.0 Soil testing
1.1 Particle size distribution 1,210.00
1.2 Hydrometer analysis test 5,100.00
1.3 Consistency limits (LL,PL) 1,865.00
1.4 Specific gravity test 1,865.00
1.5 Moisture content test 410.00
1.6 Field density test 1,065.00
1.7 C.B.R. test 3,645.00
1.8 Standard procter compaction test 2,500.00
1.9 Modified procter compaction test 2,775.00
2.0 Mackintosh test- per one point
2.1 Up to 4m depth 3,175.00
2.2 Above 4m depth 6,150.00
3.0 Trial pits
3.1 1.01.01.5m 625.00
3.2 Additional 1m depth 760.00
4.0 Auger hole- per point
4.1 Up to 4m depth 430.00
4.2 Above 4m depth 865.00
5.0 Concrete testing
5.1 Schmidt hammer test (NDT) - per point 365.00
(readings 10-15)
5.2 Concrete cube test (for one sample) 365.00
5.3 PUNDITH test(per point) 550.00
5.4 Covermeter test(per m2) 1,650.00
6.0 Cement Block testing-per sample
6.1 Interlocking block test 365.00
6.2 Cement Block test-with capping 1,000.00
6.3 Cement Block test-without capping 365.00
6.0 Aggregate testing
6.1 Particle size distribution 1,210.00
6.2 Flakiness index (FI) 880.00
6.3 Elongation index 880.00
6.4 Specific gravity and water absorption 1,700.00
6.5 Aggregate impact value 1,700.00
6.6 Aggregate crushing value 2,300.00
Page 125
Building Rates- 2012- NCP
6.7 Los Angeles Abrasion value 2,775.00
7.0 Aluminium testing(per sample)
7.1 Powder coating thickness 272.00
7.2 Hardness 272.00
7.3 Sectional thickness 272.00

Page 126
Building Rates- 2012- NCP
8.0 Measurement of pipes & steel bars

8.1 Per sample 150.00


9.0 Transport cost
9.1 Per 1 km 23.00

Prepared and Checked by :-

1 Eng. A.A.D.C.R. Aluthgama Quality Control Engineer


2 Mr.K.B. Sirinama Technical Officer

Recommended by :- Approved by :-

Eng. (Ms.) D.L.B.P. Wijesekara Eng. C.K.B. Seneviratne


Director (Designs Consultancy & QC) Deputy Chief Secretary (Engineering)
Provincial Engineering Department Provincial Engineering Department
North Central Province North Central Province
Anuradhapura. Anuradhapura.

Page 127
Building Rates- 2012- NCP

Cover page designed by :

Archt. W.N.P.M.S. Wijithaweera

Page 128
Sanitary fittings
22" * 16" glazed fire clay wash basin with 1/2" dia chromium
plated waste chain and stay, including fixing wash basin on
brackets.(Water supply and waste water connection measured
seperately)

Per No.

Materials
1 - wash basin complete with brackets 0.00 0.00
1 - 1/2" tap 0.00 0.00
waste plug and chain 0.00 0.00
4 - wooden plugs 0.00 0.00
6 - 1 1/2" brass screws 0.00 0.00
2 lbs cement 10.00 20.00

Labour
1/2 day mason 1500.00 750.00
1 day U/SK labourer 1100.00 1100.00

Rate per No. 1870.00

Closet pedestal type with L/L flushing cistern, flush pipe


double plastic seat cover, 1/2" dia stop cock, trap supplied &
fixed complete to working order.

Per No.

Materials
1 - low level suite complete 0.00 0.00
1 - 1/2" dia stop cock 0.00 0.00
2 - lbs cement 10.00 20.00
1/4 cu. ft sand 70.00 17.50
2 - 1 1/2" dia brass screws 0.00 0.00

Labour
1/4 day mason 1500.00 375.00
1 day plumber 1500.00 1500.00
1 day U/SK labourer 1100.00 1100.00

Rate per No. 3012.50


wall tiling and Terra tiles
Glazzed tiles fixed to walls including bedding in cement mortar
1:2 and raking in ground floor. (special measured seperately)

Per square

Materials
400 glazed tiles 6" * 6" 0.00 0.00
Add 10% for wastage on cutting 0.00 0.00
2 1/2 cwt cement (50 Kg bags) 1000.00 1250.00
0.11 cubes sand 7000.00 490.00
1 lb white cement 100.00 100.00

Labour
4 days mason 1500.00 6000.00
4 days U/SK labourer 1100.00 4400.00
1/4 days U/SK labourer for polishing 1100.00 275.00

Rate per square 12515.00


15018
340.00
469'-10" 469 10 18.49738
152'-5" 152 5 6.000656
171'-5.5 171 5.5 6.750328
144'-9.5 144 9.5 5.700459
171'-5.5 171 5.5 6.750328
171'-5.5 171 5.5 6.750328
323'-10" 323 10 12.74934
298'-5.5 298 5.5 11.75033
139'-8.5 139 8.5 5.500328
184'-2" 184 2 7.250656
323'-10" 323 10 12.74934
355'-7" 355 7 13.99934
323'-11" 323 11 12.75262
215'-10" 215 10 8.497375
254'-0" 254 0 10
336'-6" 336 6 13.24803
323'-10" 323 10 12.74934
298'-5.5 298 5.5 11.75033
254'-0" 254 0 10
241'-1" 241 1 9.49147
374'-8" 374 8 14.75066
154'-4" 154 4 6.076115
298'-5.5 298 5.5 11.75033
325'-0.5 325 0.5 12.79692
298'-5.5 298 5.5 11.75033
297'-9.5 297 9.5 11.72408
298'-5.5 298 5.5 11.75033
469'-10" 469 10 18.49738
172'-1.5 172 1.5 6.776575
323'-11" 323 11 12.75262
177'-9.5 177 9.5 6.999672
355'-7" 355 7 13.99934
317'-6" 317 6 12.5
501'-8" 501 8 19.75066
177'-9.5 177 9.5 6.999672
298'-5.5 298 5.5 11.75033
184'-2" 184 2 7.250656
69'-10" 69 10 2.749344
374'-8" 374 8 14.75066
323'-11" 323 11 12.75262
171'-5.5 171 5.5 6.750328
76'-2.5 76 2.5 3.000328
298'-5.5 298 5.5 11.75033
101'-7" 101 7 3.999344
297'-9.5 297 9.5 11.72408
336'-6" 336 6 13.24803
482
101'-7" 101 7 3.999344
152'-5" 152 5 6.000656
154'-4" 154 4 6.076115
184'-2" 184 2 7.250656
184'-2" 184 2 7.250656
184'-2" 184 2 7.250656
241'-1" 241 1 9.49147
254'-0" 254 0 10
254'-0" 254 0 10
317'-6" 317 6 12.5
336'-6" 336 6 13.24803
336'-6" 336 6 13.24803
355'-7" 355 7 13.99934
355'-7" 355 7 13.99934
374'-8" 374 8 14.75066
374'-8" 374 8 14.75066
501'-8" 501 8 19.75066
69'-10" 69 10 2.749344
215'-10" 215 10 8.497375
323'-10" 323 10 12.74934
323'-10" 323 10 12.74934
323'-10" 323 10 12.74934
323'-10" 323 10 12.74934
323'-11" 323 11 12.75262
323'-11" 323 11 12.75262
323'-11" 323 11 12.75262
469'-10" 469 10 18.49738
469'-10" 469 10 18.49738
139'-8 1/2 139 8 1/2 5.500328
139'-8 1/2 139 8 1/2 5.500328
171'-5 1/2 171 5 1/2 6.750328
171'-5 1/2 171 5 1/2 6.750328
171'-5 1/2 171 5 1/2 6.750328
172'-1 1/2 172 1 1/2 6.776575
177'-9 1/2 177 9 1/2 6.999672
177'-9 1/2 177 9 1/2 6.999672
177'-9 1/2 177 9 1/2 6.999672
177'-9 1/2 177 9 1/2 6.999672
297'-9 1/2 297 9 1/2 11.72408
297'-9 1/2 297 9 1/2 11.72408
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
298'-5 1/2 298 5 1/2 11.75033
325'-0 1/2 325 1/2 12.79692
76'-2 1/2" 76 2 1/2 3.000328
508.5876
510
First Floor Beams

MR MR
Beam ID Dedpth Lenght
Dia Nos Dia Sp Length Sp Length
F1B-01 12 13.25 12 4 6 6 7.95 10 5.3 25.395833 14.75
F1B-02 12 23.5 12 4 6 6 14.1 10 9.4 45.041667 25
12 3.5 10 2 6.7083333 4.25
12 7 12 2 13.416667 7.75
F1B-02A 12 11.75 10 4 6 6 7.05 10 4.7 22.520833 13.25
F1B-03 29 13.25 12 6 6 6 7.95 10 5.3 62.9375 17.58333
29 1.8333333 12 2 8.7083333 4
29 4 12 1 19 6.166667
29 13.25 10 2 62.9375 15.41667
12 6.75 12 4 6 6 4.05 10 2.7 12.9375 8.25
12 4.1666667 12 1 7.9861111 4.916667
F1B-05 14 31.5 12 4 6 6 18.9 10 12.6 70.875 33.33333
14 3.5 12 1 7.875 4.416667
14 7.5 20 2 16.875 8.416667
14 6 12 2 13.5 6.916667
14 2 12 2 4.5 2.916667
F1B-04 12 14.75 12 4 6 6 8.85 10 5.9 28.270833 16.25
12 1 12 2 1.9166667 1.75
12 4.333 12 1 8.3049167 5.083
12 3.5 12 2 6.7083333 4.25
F1B-06 12 14.75 12 4 6 6 8.85 10 5.9 28.270833 16.25
F1B-07 12 19 12 4 6 6 11.4 10 7.6 36.416667 20.5
12 5.6666667 12 1 10.861111 6.416667
12 3.5 16 2 6.7083333 4.25
12 8.25 10 2 15.8125 9
F1B-08 12 19.75 12 4 6 6 11.85 10 7.9 37.854167 21.25
12 6 12 1 11.5 6.75
F1B-09 12 14.75 12 4 6 6 8.85 10 5.9 28.270833 16.25
12 4.5 12 1 8.625 5.25
12 4.5 12 1 8.625 5.25
F1B-10 12 31.75 12 4 6 6 19.05 10 12.7 60.854167 33.25
12 7.5 12 1 14.375 8.25
F1B-11 12 19.75 12 4 6 6 11.85 10 7.9 37.854167 21.25
12 3.8333333 12 1 7.3472222 4.583333
12 9 12 1 17.25 9.75
12 2 12 2 3.8333333 2.75
F1B-12 12 19.5 12 4 6 6 11.7 10 7.8 37.375 21
12 6 12 1 11.5 6.75
F1B-12' 15 18.5 12 4 6 6 11.1 10 7.4 44.708333 20.5
15 5.5 16 2 13.291667 6.5
15 13 12 1 31.416667 14
15 5.5 16 2 13.291667 6.5
F1B-14 12 19.5 12 4 6 6 11.7 10 7.8 37.375 21
12 5.8333333 12 2 11.180556 6.583333
12 9 12 1 17.25 9.75
12 3.8333333 12 1 7.3472222 4.583333
F1B-13 16 40.75 12 4 6 6 24.45 10 16.3 105.27083 42.91667
16 5.5833333 12 2 14.423611 6.666667
16 13 12 2 33.583333 14.08333
16 8.5 12 1 21.958333 9.583333
16 8.5 16 2 21.958333 9.583333
16 6.6666667 16 2 17.222222 7.75
16 9 12 1 23.25 10.08333
F1B-15 12 10 12 4 6 6 6 10 4 19.166667 11.5
29 8.5 12 6 6 6 5.1 10 3.4 40.375 12.83333
29 8.5 10 2 40.375 10.66667
F1B-16 12 12.75 12 4 6 6 7.65 10 5.1 24.4375 14.25
F1B-17 12 26.5 12 4 6 6 15.9 10 10.6 50.791667 28
12 2 12 2 6 6 1.2 10 0.8 3.8333333 2.75
12 3.8333333 12 1 7.3472222 4.583333
F1B-19 15 39.25 12 4 6 6 23.55 10 15.7 94.854167 41.25
15 3.8333333 12 2 9.2638889 4.833333
15 22.75 12 1 54.979167 23.75
15 5.8333333 16 2 14.097222 6.833333
F1B-18 12 18.5 12 4 6 6 11.1 10 7.4 35.458333 20
12 13 10 1 24.916667 13.75
12 5.5833333 12 1 10.701389 6.333333
F1B-20 15 26.5 12 4 6 6 15.9 10 10.6 64.041667 28.5
1737.916
15.969 23 3.25 5.058004
27.066 41 3.25 9.016441
1.599 0 3.25 0
4.195 0 3.25 0
9.967 21 3.25 4.618177
28.555 23 6.083333 9.467545
2.165 0 6.083333 0
1.669 0 6.083333 0
5.799 0 6.083333 0
8.932 13 3.25 2.858872
1.331 0 3.25 0
36.088 54 3.583333 13.09329
1.195 0 3.583333 0
12.673 0 3.583333 0
3.744 0 3.583333 0
1.579 0 3.583333 0
17.593 26 3.25 5.717743
0.947 0 3.25 0
1.376 0 3.25 0
2.301 0 3.25 0
17.593 26 3.25 5.717743
22.194 33 3.25 7.257136
1.737 0 3.25 0
4.093 0 3.25 0
3.385 0 3.25 0
23.006 34 3.25 7.477049
1.827 0 3.25 0
17.593 26 3.25 5.717743
1.421 0 3.25 0
1.421 0 3.25 0
35.998 55 3.25 12.09523
2.233 0 3.25 0
23.006 34 3.25 7.477049
1.241 0 3.25 0
2.639 0 3.25 0
1.489 0 3.25 0
22.736 34 3.25 7.477049
1.827 0 3.25 0
22.194 32 3.75 8.119872
6.261 0 3.75 0
3.789 0 3.75 0
6.261 0 3.75 0
22.736 34 3.25 7.477049
3.564 0 3.25 0
2.639 0 3.25 0
1.241 0 3.25 0
46.464 69 3.916667 18.28663
3.609 0 3.916667 0
7.624 0 3.916667 0
2.594 0 3.916667 0
9.230 0 3.916667 0
7.465 0 3.916667 0
2.729 0 3.916667 0
12.450 17 3.25 3.738524
20.841 16 6.083333 6.586118
4.012 0 6.083333 0
15.428 23 3.25 5.058004
30.314 45 3.25 9.896094
1.489 4 3.25 0.879653
1.241 0 3.25 0
44.659 67 3.75 17.00098
2.616 0 3.75 0
6.428 0 3.75 0
6.582 0 3.75 0
21.653 32 3.25 7.037222
2.586 0 3.25 0
1.714 0 3.25 0
30.856 45 3.75 11.41857
721.449 198.5478
919.997
LEN
18.75 12
20 15
12 8.75
17.75 12.75
7.25 6.75
13 11.75
18.75 13.5
14.25 12.75
27 20

L sp L sp L sp L
18.75 3 6 3 6 12 4.75 6 3
20 3.5 6 3.5 10 15 8.25 6 3.25
12 4.75 6 8.75 4 6 3
17.75 4 10 12.75 4 6 4
7.25 4 10 6.75 4 10
13 3 6 3 6 11.75 4 10
18.75 3.5 8 3.5 8 13.5 4 10 4.75
14.25 4 6 4 6 12.75 3.5 10 3.5
27 3.5 6 2 10 20 10 6 4
DIA SP DIA SP
10 10 10 5 15 45 52.89233 101.5533
10 10 10 10 18 24 67.70218 67.70218
10 5 10 5 21 29 47.39152 47.72063
10 5 10 5 31 43 103.4809 103.1048
10 5 10 5 17 18 23.17859 22.84948
10 5 10 5 29 32 70.89922 70.71116
10 10 10 10 17 23 59.94464 58.39313
10 10 10 10 16 18 42.87804 43.16014
10 10 10 10 24 33 121.8639 124.1207
590.2313 639.3154

sp
6 38 38 24 24 77.8575
10 40 24 30 18 99.67265
8 24 18 14 42.87804
10 22 26 16 48.14377
9 9 13.54044
26 26 15 40.62131
6 29 29 17 27 75.08359
10 29 29 16 16 64.69319
6 54 33 40 40 153.2702
615.7607

1845.307
Length of Wall Foundation
No Length Feet Inch Length /(feet)
1 2'-9" 2 9 2.75
2 3'-0" 3 0 3.00
3 7'-0" 7 0 7.00
4 7'-0" 7 0 7.00
5 8'-6" 8 6 8.50
6 10'-0" 10 0 10.00
7 11'-9" 11 9 11.75
8 12'-9" 12 9 12.75
9 12'-9" 12 9 12.75
10 12'-9" 12 9 12.75
11 13'-3" 13 3 13.25
12 13'-3" 13 3 13.25
13 14'-9" 14 9 14.75
14 14'-9" 14 9 14.75
15 18'-6" 18 6 18.50
16 18'-6" 18 6 18.50
17 19'-0" 19 0 19.00
18 19'-0" 19 0 19.00
19 19'-6" 19 6 19.50
20 19'-6" 19 6 19.50
21 19'-6" 19 6 19.50
22 19'-9" 19 9 19.75
23 19'-9" 19 9 19.75
24 24'-6" 24 6 24.50
25 26'-6" 26 6 26.50
26 26'-6" 26 6 26.50
27 38'-0" 38 0 38.00
28 23'-5 3/4" 23 5.75 23.48
29 6'-9 3/8" 6 9.375 6.78
Total Length 463.01
Footing Details Column Details

Col ID MR DR Excavation Length / MR DR


Length / Width / Height / Width / Height /
Depth/
(Feet) (Feet) (Feet) Dia / (mm) Spacing / Dia / (mm) Spacing / (Feet) (Inch) (Inch) (Feet) Dia / (mm) Spacing / Dia / (mm) Spacing /
(Inch) (Inch) (Inch) (Inch)
C-01 3 3 9 10 8 10 8 4 9 9 16 4 6 6
C-02 3 3 9 10 8 10 8 4 9 9 16 4 6 6
C-03 3.5 3.5 9 10 8 10 8 4 9 9 16 6 6 6
C-04 4.6 4.6 12 10 6 10 6 4 9 9 16 8 6 6
C-05 4 4 9 10 6 10 6 4 9 9 12 4 6 5
C-06 4.6 4.6 12 10 6 10 6 4 9 9 16 6 6 6
C-07 4.6 4.6 12 10 6 10 6 4 9 9 16 6 6 6
C-08 3 3 9 10 6 10 6 4 9 9 16 6 6 6
C-09 4 4 9 10 6 10 6 4 9 9 16 6 6 6
C-10 5 5 12 12 7 12 7 4 9 9 20 8 6 10
C-11 3.25 3.25 9 10 8 10 8 4 9 9 12 4 6 5
C-12 5 5 15 12 7 12 7 4 9 9 20 6 6 10
C-13 3.5 3.5 9 10 7 10 7 4 9 9 20 6 6 10
C-14 3.5 3.5 9 10 7 10 7 4 9 9 12 6 6 5
C-15 4 4 12 10 7 10 7 4 9 9 12 6 6 5
C-16 4 4 12 10 7 10 7 4 9 9 12 6 6 5
C-17 4 4 12 10 7 10 7 4 9 9 12 4 6 5
C-18 4 4 12 10 7 10 7 4 9 9 12 4 6 5
C-19 3 3 9 10 7 10 7 4 9 9 12 4 6 5
C-20 3.25 3.25 9 10 7 10 7 4 9 9 16 6 6 6
C-21 3.5 3.5 9 10 7 10 7 4 9 9 12 6 6 5
C-22 4 4 12 10 7 10 7 4 9 9 12 6 6 5
C-23 3.5 3.5 9 10 7 10 7 4 9 9 12 4 6 5
C-24 3 3 9 10 7 10 7 4 9 9 16 4 6 6
C-25 3 3 9 10 7 10 7 4 9 9 16 6 6 6
C-26 5 5 14 12 7 12 7 4 9 9 20 6 6 10
D-01 3 3 9 10 8 10 8 4 9 9 12 4 6 5
D-02 3 3 9 10 8 10 8 4 9 9 12 4 6 5
D-03 3 3 9 10 8 10 8 4 9 9 12 4 6 5
C-27 12 4 6 5
Area of Column Footing 413.855 Sq.f
Volume of Column Footing 375.4279 Cu.f
Minimum shear links - 12 * Nominal dia of MR
Cover for 1.5 hour fire - 20 mm
Excavation /
(Cu.ft) Steel
21 44.25 2.666667 5 5.01333 6.083333 11.72867 10 1.87000 18.61200 27.811
21 44.25 2.666667 5 5.01333 6.083333 11.72867 10 1.87000 18.61200 27.811
22.5 60.23 3.166667 6 7.14400 6.083333 17.59300 10 1.87000 26.60700 39.379
30.4 109.33 4.266667 10 16.04267 6.333333 24.42133 11 2.05700 42.52100 50.947
24 78.67 3.666667 8 11.02933 6.083333 6.59433 12 2.24400 19.86767 18.618
30.4 109.33 4.266667 10 16.04267 6.333333 18.31600 11 2.05700 36.41567 39.379
30.4 109.33 4.266667 10 16.04267 6.333333 18.31600 11 2.05700 36.41567 39.379
21 44.25 2.666667 6 6.01600 6.083333 17.59300 10 1.87000 25.47900 39.379
24 78.67 3.666667 8 11.02933 6.083333 17.59300 10 1.87000 30.49233 39.379
32 129.17 4.666667 9 22.76400 6.333333 38.10133 7 1.30900 62.17433 74.997
21.75 51.93 2.916667 5 5.48333 6.083333 6.59433 12 2.24400 14.32167 18.618
37 135.42 4.666667 9 22.76400 6.583333 29.70400 7 1.30900 53.77700 56.949
22.5 60.23 3.166667 6 7.14400 6.083333 27.44800 7 1.30900 35.90100 56.949
22.5 60.23 3.166667 6 7.14400 6.083333 9.89150 12 2.24400 19.27950 25.122
28 82.67 3.666667 7 9.65067 6.333333 10.29800 13 2.43100 22.37967 25.122
28 82.67 3.666667 7 9.65067 6.333333 10.29800 13 2.43100 22.37967 25.122
28 82.67 3.666667 7 9.65067 6.333333 6.86533 13 2.43100 18.94700 18.618
28 82.67 3.666667 7 9.65067 6.333333 6.86533 13 2.43100 18.94700 18.618
21 44.25 2.666667 6 6.01600 6.083333 6.59433 12 2.24400 14.85433 18.618
21.75 51.93 2.916667 6 6.58000 6.083333 17.59300 10 1.87000 26.04300 39.379
22.5 60.23 3.166667 6 7.14400 6.083333 9.89150 12 2.24400 19.27950 25.122
28 82.67 3.666667 7 9.65067 6.333333 10.29800 13 2.43100 22.37967 25.122
22.5 60.23 3.166667 6 7.14400 6.083333 6.59433 12 2.24400 15.98233 18.618
21 44.25 2.666667 6 6.01600 6.083333 11.72867 10 1.87000 19.61467 27.811
21 44.25 2.666667 6 6.01600 6.083333 17.59300 10 1.87000 25.47900 39.379
35.33333 133.33 4.666667 9 22.76400 6.5 29.32800 7 1.30900 53.40100 56.949
21 44.25 2.666667 5 5.01333 6.083333 6.59433 12 2.24400 13.85167 18.618
21 44.25 2.666667 5 5.01333 6.083333 6.59433 12 2.24400 13.85167 18.618
21 44.25 2.666667 5 5.01333 6.083333 6.59433 12 2.24400 13.85167 18.618
0 0.00
728.5333 2099.82 761.72 949.049
Length of Wall Foundation
No Length Feet Inch Length /(feet)
1 2'-9" 2 9 2.75
2 3'-0" 3 0 3.00
3 5'-6" 5 6 5.50
4 5'-9" 5 9 5.75
5 6'-9" 6 9 6.75
6 8'-6" 8 6 8.50
7 10'-6" 10 6 10.50
8 11'-9" 11 9 11.75
9 11'-9" 11 9 11.75
10 11'-9" 11 9 11.75
11 12'-9" 12 9 12.75
12 12'-9" 12 9 12.75
13 12'-9" 12 9 12.75
14 14'-0" 14 0 14.00
15 14'-0" 14 0 14.00
16 14'-9" 14 9 14.75
17 14'-9" 14 9 14.75
18 18'-6" 18 6 18.50
19 19'-0" 19 0 19.00
20 19'-6" 19 6 19.50
21 19'-6" 19 6 19.50
22 19'-6" 19 6 19.50
23 20'-0" 20 0 20.00
24 23'-6" 23 6 23.50
25 26'-9" 26 9 26.75
Total Length 340.00
Ground Floor First Floor
Type Nos Width Hieght Type Nos Width Hieght
D1 2 3.5 8 D1 2 3.5 8
D2 3 3 7 D2 5 3 7
D3 1 2.25 7 D3 1 2.25 7
D4 0 0 0 D4 0 0 0
DW 0 0 0 DW 0 0 0
F 1 2 2.25 F 1 2 2.25
FG 1 3.5 11.5 FG 0 3.5 11.5
FG1 0 6 4 FG1 0 6 4
W1 3 8 8 W1 2 8 8
W2 3 6.5 5.25 W2 3 6.5 5.25
W3 1 5.25 4.5 W3 1 5.25 4.5
W4 W4

15
C 30 Length of Lintle in GF 56.75 f
C 31 Length of Lintle in FF 112.00 f
Area of Door Windoors in GF 497.50 Sq.f
Area of Door Windoors in FF 435.25 Sq.f

Ground Flor 1st Floor D2


DW FG1 5 D2
Dw DW D3
FG F D3
F W1 D4
F FG D4
w2 F DW
FG F Dw
W2 W2 DW
D2 FG1 3 F
W1 D2 F
DW FG1 2 FG
W3 W1 FG
D2 FG1 W1
D3 D1 w2
D4 D3 W2
D3 D4 W3
D4 D3
D3
D3
7 7
9 15
2.25 2.25
0 0
0 0
2 2
3.5 0
0 0
24 16
19.5 19.5
5.25

67.25 67

D1
D2
D3
D3
D3
D3
D4
D4
DW
F
F
F
FG
FG1 5
FG1 3
FG1 2
FG1
W1
W1
W2
Length = 2'-9 2 9 2.75
Length = 3'-0 3 0 3
Length = 3'-9 3 9 3.75
Length = 6'-9 6 9 6.75
Length = 6'-9 6 9 6.75
Length = 7'-0 7 0 7
Length = 7'-0 7 0 7
Length = 8'-6 8 6 8.5
Length = 11'-9 11 9 11.75
Length = 11'-9 11 9 11.75
Length = 11'-9 11 9 11.75
Length = 12'-9 12 9 12.75
Length = 12'-9 12 9 12.75
Length = 12'-9 12 9 12.75
Length = 14'-9 14 9 14.75
Length = 14'-9 14 9 14.75
Length = 14'-9 14 9 14.75
Length = 19'-6 19 6 19.5
Length = 20'-0 20 0 20
Length = 24'-6 24 6 24.5
Length = 31'-9 31 9 31.75
Length = 32'-3 32 3 32.25
Length = 34'-3 34 3 34.25
325.5

Potrebbero piacerti anche