Introduction
EMAS-AMC has performed the
installation of pipelines in the
South China Sea using Lewek
Centurion, a deepwater S-lay
vessel, at water depths ranging
from 1100 to 1400m.
DP2 S-lay
Pipe Storage Capacity: 6500mT
Adjustable Double Section Stinger
(Radius 70m~300m)
3/14/2015 4
A-Frame & Hang-off Platform
3/14/2015 6
Crane Load Loss
Crane Wire Tension (Max)
220mT (static) 250mT(dynamic)
@Hs=1.5m; Tp=10s
Oops
Safety Concern
What if crane wire load is lost
accidentally?
Any excessive acceleration or
unexpected large ship motion?
Stability is sensitive as location of center
of gravity of the ship is relatively high
with pipe loads.
3/14/2015 8
Current Code Requirement
For crane vessels, accidental load drop should be
considered.
DNV, ABS, BV
e < 15deg from upright.
A2/A1>1.4 (DNV, BV) or 1.3 (ABS)
Static
In favorable weather condition
IMO
Static intact stability standards based on the properties of the righting lever (GZ)
curve have served the shipping industry well for decades, but it has been recognized
that incidents do occur to ships meeting the standards and that there may be
hydrodynamic related mechanisms that can lead to stability failure
2nd generation dynamic stability
Excessive acceleration
3/14/2015 9
Numerical Methodology
MOSES Orcaflex
Displacement Link property
COG & COF Simulation speed
Hydrostiffness Batch run
Load RAO
Added mass Time domain
Added
damping
Frequency domain
3/14/2015 10
Numerical Model
MOSES Orcafle
x
3/14/2015 11
Orcaflex Simulation
3/14/2015 12
Numerical Result and Animation
3/14/2015 13
Sensitivity Study
Hs=1.5m
T=10s
T refers to the time difference between the max wire tension and PLET
loss .
Heel after PLET loss: 3.4deg to Starboard.
Max angle acc. to IMO weather criterion:
22.9 + 9.1 = 32 < 48.7 (Down flooding angle)
3/14/2015 14
More to think
3/14/2015 16
Installation Video
Installation Video
3/14/2015 17
Thank You!
Disclaimer: This material includes forward-looking statements prepared by Ezra Holdings Limited (Company). The opinions, forecasts, projections or other statements other than statements of historical fact, including, without limitation, estimates of
proved reserves of oil and gas, reserves potential and plans and objectives of management of the Company for financing, are forward-looking statements. Although the Company believes that the expectations reflected in such forward-looking
statements are reasonable, it can give no assurance that such expectations will prove to have been correct. All forward looking-statements contained in this presentation are expressly qualified in their entirety by the cautionary statements contained or
referred to in this section. Readers should not place undue reliance on forward-looking statements. Each forward looking statement speaks only as of the date of this presentation. Neither the Company nor any of its subsidiaries and associates
undertake any obligation to publicly update or revise any forward-looking statement as a result of new information, future events or other information. In light of these risks, results could differ materially from those stated, implied or inferred from the
forward-looking statements contained in this presentation.