Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
References:
Definitions:
Process Data:
Ptemp 49 OC (Ref. 2)
m 0.095 cP (Ref. 2)
MW 52.52 (Ref. 2)
S.G 0.5052
Vp 19.5 bara
e 0.57
Equations:
= M/Q 1
Q = M/ 2
Q = Av 3
v = Q/A; A = pd2/4 4
v = 4Q/pd2 5
PD = P2 + hD + dLD 10
H = PD - PS 11
NPSHA = PS - Vp + V2/2g 12
bhp = (Q * p)/(1.714 * e) 15
Calculations
1. Pump Capacity
(i) Normal
M = 7.34 kg/s (Ref. 3)
r= 508 kg/m 3
(Ref. 3)
From eqn. 2
Q = 7.34kg/s / 508kg/m3
0.0145 m3/s
14.529 dm3/s
(ii) Rated
M = 8.54 kg/s (Ref. 2)
r = 505.2 kg/m 3
(Ref. 2)
From eqn. 2
Q = 8.54kg/s / 505.2kg/m3
0.0169 m3/s
16.904 dm3/s
267.937 gpm
(iii) Minimum
M = 3.34 kg/s (Ref. 1)
= 508 kg/m3 (Ref. 1)
From eqn. 2
Q = 3.34kg/s / 508kg/m3
0.0066 m3/s
6.575 dm3/s
2.Suction pressure
From eqn. 6,
Hs = 394.09 m
From Eqn. 9,
Hss 6.234 m
From equation 7;
P= 0.308 bara
The Total equivalent length shall be estimated from the isometric sketches taking into
account all the fittings associated with such lines.
23804 mm
23.804 m
Fittings:
From PPS,
hsL 0.546 m
From eqn. 8,
control point
Ps = 19.78 bara g 9.81 m/s2
399.78 m p 3.142
Constant-1 4
2v. Head of Vapour Pressure, HVp Constant-2 2
Constant-3 10.21
From Eqn. 6, Constant-4 1000
1 hr 3600 s
HVp = 19.5 * 10.21/0.5052 1000 dm3 1 m3
HVp = 394.09 m
3. NPSHA
The pipe internal diameter can be established based on the SCH, PC, NB and WT.
Using the PMC for a PC of 31177X, a SCH 40 is selected for a 6'' NB. (Ref. 6)
OD 6.625
WT 0.28 0.025 m 1 in
ID = OD - 2WT 0.00063 m2 1 in2
6.065 in 0.0230 m2 36.78 in2
36.784225 in2
0.0230 m2
V = 4 * 0.0169/(3.142 *0.0230)
0.936 m/s
V2 = 0.876 m/s
Let y = V2/2g
y = 0.045
4. Discharge Pressure
From Eqn. 6,
Hdv = 404.20 m
4ii. Static head in Discharge vessel above pump centre line, SHdv
SHdv 34 m (Ref. 9)
From equation 7;
P= 1.682 bara
4iiia. Line Loss (dL1) - Control valve (520-FICA-805) outlet to discharge vessel
The Total equivalent length shall be estimated from the isometric sketches taking into
account all the fittings associated with such lines.
Fittings:
The Total equivalent length shall be estimated from the isometric sketches taking into
account all the fittings associated with such line.
9408 mm 17326 mm
9.408 m 17.326 m
26.734 m
Fittings:
V-2013
C-2011 Psource
PV
SHdv Hss
dL1 dL2 PD
LCV dPsL
Ps
PD 23.53 bara
475.54 m
Pv 20 bara
404.20 m
dL1 0.564 bara 37.35
11.40 m
dL2 0.577 bara
11.66 m
SHdv 1.682 bara
34 m
LCV ?
PD = 23.53 bara
From Eqn. 6,
HD = 475.54 m
5. Differential head
From equation11;
H = 3.75 bar
75.76 m
54.35 psi
Service: LIQUID
Option 1: 6''
Formular:
p = ((Lv2)/(2 di)) 1
2
Let Lv2 = A
Let 2 di = B 3
Let A/B = C 4
p = C 5
Re = rvdi/m 6
Q = Av 7
M/ = Av
M/ = (pdi2/4)*v
v = 4M/(pdi2) 8
Let pdi2 = k 9
v = 4M/k 10
di = OD -2Wt 11
DEFINITIONS:
Document : NE-CSU-PRO-F-6052
NLNG SIX PROJECT file:///conversion/tmp/scratch/359801852.xls Revisiov : A
Date :
NIGERIA LNG LTD
PAGE 11 of 14
NLNG SIX PROJECT
REFERENCES :
1. T-2.968.011-AD: PFS - Condensate Stabilization Unit case 9 AAGACW, NLNG Expansion project.
2. T-12.411.409: PEFS - HC Condensate Stabilizer, Stabilizer Gas Compressor
3. DEP 31.38.01.12-GEN - Piping Class Specs
4. Piping equipment - TROUVAY CAUVIN 2001
5. DEP 31.38.01.11-Gen. Piping - General Requirement, Appendix 3, Fig. 3.1-3.3
INPUT DATA :
Control point:
= 0.0135 (Ref 5)
3.142
L= 30 m 2
0.03 km 4
= 505.2 kg/m3 0.0254 m 1 in
0.307086 m 12.09 in
NB = 6 in
1 cp 0.001 kg/m.s
OD = 6.625 in 0.095 cp 0.000095 kg/m.s
Wt = 0.28 in
p 3.142
M= 8.54 kg/s
= 0.095 cP
0.000095 kg/m.s
CALCULATIONS:
The pipe internal diameter can be established based on the SCH, PC, NB and WT.
Using the PMC for a PC of 31177X, a SCH 40 is selected for a 6'' NB. (Ref. 3)
di =6.625 - (2 * 0.28)
di = 6.065 in
0.154051 m
2di = m
di2 = 0.023731711 m2
B. Determination of velocity,v
From Equation 9,
k 37.67025553 kg/m
Document : NE-CSU-PRO-F-6052
NLNG SIX PROJECT file:///conversion/tmp/scratch/359801852.xls Revisiov : A
Date :
NIGERIA LNG LTD
PAGE 12 of 14
NLNG SIX PROJECT
v = (4*8.54)/9.63935
v= 0.906816254 m/s
v2 0.822315718 (m/s)2
C. Determination of Re:
Re =505.2*3.54381*0.0779272/0.000095
Re = 742888.361
From eqn 2,
A= 12463.01702 kg/s2
Control point
From eqn. 3 1.01E+05 kg/ms2 1 bar
B= 0.308102 m
546.087756 kg/ms2 5.39E-03 bar
From eqn. 4 1000 m 1km
C= 40450.94489 kg/ms2
p = 546.087756 kg/ms2
5.39E-03 bar
1.80E-01 bar/km
Document : NE-CSU-PRO-F-6052
NLNG SIX PROJECT file:///conversion/tmp/scratch/359801852.xls Revisiov : A
Date :
LINE ELEVATION CALCULATIONS
Purpose:
The Purpose of this document is to establish the actual pressure drop across the line 10'' 5P-20125-31172X
References:
1. T-12.411.407 : PEFS - HC Condensate Stabilization Condensate stabilizer
2. T-12.411.408 : PEFS - HC Condensate Stabilization Condensate stabilizer overheads
3. 3"-5P-20120-31177X : Piping Isometric Drawing
4. 3"-5P-20122-31177X : Piping Isometric Drawing
5. Fluid flow through pipes and fittings - Crane
Scheme:
C-2011 N2
PD
Ps
P-2012A/B
hD
hS
Pin dP Pout
520-FICA-805
Formulae:
Calculations:
The Total equivalent length shall be estimated from the isometric sketches taking into
account all the fittings associated with such lines.
22978 mm 0 mm
22.978 m 0m
22.978 m
Fittings: