Sei sulla pagina 1di 6

Sr.

No Activities Planned Start


1 Proper tagging of material 1/19/2017
Alignment and inspectin of already erected Columns as
3 1/20/2017
per drawing.
Alignment and Inspectin of already erected Rafters as
4 1/20/2017
per drawing.
Alignment and Inspection of already erected purlins as
5 1/22/2017
per drawing

6 Erection of Cross Brassing of already erected Columns 1/24/2017

Column 7-8
Shifting of material to the location of remaining
6 1/19/2017
frames( columns, rafters and purlins )
7 Preparation of Erection of Columns 1/20/2017
8 Erection of Columns 1/21/2017
9 Erection of Rafter across the columns 1/21/2017
10 Erection of Rafter between the columns 1/22/2017
11 Installation of Purlings 1/23/2017
12 Alignment checking 1/24/2017
13 Installation of braced bay 1/25/2017
14 Installation of X-Bracing & Cable Bracing 1/26/2017
Column 9-10
Shifting of material to the location of remaining
16 1/19/2017
frames( columns, rafters and purlins )
17 Preparation of Erection of Columns 1/27/2017
18 Erection of Columns 1/28/2017
19 Erection of Rafter across the columns 1/29/2017
20 Erection of Rafter between the columns 1/30/2017
21 Installation of Purlings 1/31/2017
22 Alignment checking 2/1/2017
23 Erection of Brassed bays 2/2/2017
Column 11-12
Shifting of material to the location of remaining
23 2/3/2017
frames( columns, rafters and purlins )
24 Preparation of Erection of Columns 2/4/2017
25 Erection of Columns 2/5/2017
26 Erection of Rafter across the columns 2/5/2017
27 Erection of Rafter between the columns 2/6/2017
28 Installation of Purlings 2/7/2017
29 Alignment checking 2/8/2017
30 Erection of Brassed bays 2/9/2017
31 Installation of X-Bracing & Cable Bracing 2/10/2017
Column 13-14
Shifting of material to the location of remaining
32 2/3/2017
frames( columns, rafters and purlins )
33 Preparation of Erection of Columns 2/11/2017
34 Erection of Columns 2/12/2017
35 Erection of opposite two columns 2/13/2017
36 Erection of Rafter across the columns 2/13/2017
37 Erection of Rafter between the columns 2/14/2017
38 Installation of Purlings 2/15/2017
39 Alignment checking 2/16/2017
40 Erection of Brassed bays 2/17/2017
41 Installation of X-Bracing & Cable Bracing 2/18/2017
Column 15-16
Shifting of material to the location of remaining
42 2/3/2017
frames( columns, rafters and purlins )
43 Preparation of Erection of Columns 2/19/2017
44 Erection of Columns 2/20/2017
45 Erection of opposite two columns 2/21/2017
46 Erection of Rafter across the columns 2/21/2017
47 Erection of Rafter between the columns 2/22/2017
48 Installation of Purlings 2/23/2017
49 Alignment checking 2/24/2017
50 Erection of Brassed bays 2/25/2017
Column 17-18
Shifting of material to the location of remaining
51 2/26/2017
frames( columns, rafters and purlins )
52 Preparation of Erection of Columns 2/27/2017
53 Erection of Columns 2/28/2017
54 Erection of opposite two columns 3/1/2017
55 Erection of Rafter across the columns 3/1/2017
56 Erection of Rafter between the columns 3/2/2017
57 Installation of Purlings 3/3/2017
58 Alignment checking 3/4/2017
59 Erection of Brassed bays X Brassing 3/5/2017
Column 19-20
Shifting of material to the location of remaining
60 2/26/2017
frames( columns, rafters and purlins )
61 Preparation of Erection of Columns 3/6/2017
62 Erection of Columns 3/7/2017
63 Erection of opposite two columns 2/8/2017
64 Erection of Rafter across the columns 3/9/2017
65 Erection of Rafter between the columns 3/10/2017
66 Installation of Purlings 3/11/2017
67 Alignment checking 3/12/2017
68 Erection of Brassed bays & X brassing 3/13/2017
Column 21-22
Shifting of material to the location of remaining
69 2/26/2017
frames( columns, rafters and purlins )
70 Preparation of Erection of Columns 3/14/2017
71 Erection of Columns 3/14/2017
72 Erection of opposite two columns 3/15/2017
73 Erection of Rafter across the columns 3/15/2017
74 Erection of Rafter between the columns 3/16/2017
75 Installation of Purlings 3/17/2017
76 Alignment checking 3/18/2017
77 Erection of Brassed bays and X brassing 3/19/2017
Sheeting and Roofing
78 Sheeting and Roofing 1/19/2017
Planned Finished
1/20/2017

1/23/2017

1/22/2017

1/24/2017

1/25/2017

1/20/2017

1/21/2017
1/22/2017
1/22/2017
1/23/2017
1/24/2017
1/25/2017
1/26/2017
1/27/2017

1/20/2017

1/28/2017
1/29/2017
1/30/2017
1/31/2017
2/1/2017
2/2/2017
2/3/2017 Time Duration= 20 jan to 20 march

2/4/2017

2/5/2017
2/6/2017
2/6/2017
2/7/2017
2/8/2017
2/9/2017
2/10/2017
2/11/2017

2/4/2017

2/12/2017
2/13/2017
2/14/2017
2/14/2017
2/15/2017
2/16/2017
2/17/2017
2/18/2017
2/19/2017

2/4/2017

2/20/2017
2/21/2017
2/22/2017
2/22/2017
2/23/2017
2/24/2017
2/25/2017
2/26/2017

2/27/2017

2/28/2017
3/1/2017
3/2/2017
3/2/2017
3/3/2017
3/4/2017
3/5/2017
3/6/2017

2/27/2017

3/7/2017
2/8/2017
3/9/2017
3/10/2017
3/11/2017
3/12/2017
3/13/2017
3/14/2017

2/27/2017

3/15/2017
2/15/2017
3/16/2017
3/16/2017
3/17/2017
3/18/2017
3/19/2017
3/20/2017

3/20/2017

Potrebbero piacerti anche