Sei sulla pagina 1di 50

S10 Pgina 1

ING. D.D.C.A.
Presupuesto

Presupuesto MEJORAMIENTO Y ENBELLECIMIENTO DEL PARQUE PRINCIPAL DEL CENTRO URBANO DE CHAGLLA

Subpresupuesto MEJORAMIENTO Y EMBELLECIMIENTO DEL PARQUE PRINCIPAL DEL CENTRO URBANO DE CHAGLLA - DISTRITO DE CHAGLLA - PACHITEA - HUANUCO
Cliente MUNICIPALIDAD DISTRITAL DE CHAGLLA Costo al 06/03/2011
Lugar HUANUCO - PACHITEA - CHAGLLA

Item Descripcin Und. Metrado Precio S/. Parcial S/.

01 PARQUE PRINCIPAL DE CHAGLLA 136,334.56


01.01 OBRAS PROVISIONALES 807.53
01.01.01 ALQUILER DE LOCAL PARA ALMACEN mes 3.00 80.00 240.00
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 8.40 m u 1.00 567.53 567.53
01.02 OBRAS PRELIMINARES 18,083.53
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 510.67 0.48 245.12
01.02.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 510.67 0.67 342.15
01.02.03 TRAZO DURANTE LA EJECUCION DE LA OBRA m2 510.67 2.93 1,496.26
01.02.04 DEMOLICION DE CONSTRUCCION EXISTENTE glb 1.00 3,500.00 3,500.00
01.02.05 TRANSPORTE DE MATERIALES A LA OBRA glb 1.00 8,000.00 8,000.00
01.02.06 TRANSPORTE DE PIEDRA TIPO LAJA DE CANTERA - OBRA glb 1.00 2,500.00 2,500.00
01.02.07 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA glb 1.00 2,000.00 2,000.00
01.03 MOVIMIENTO DE TIERRAS 2,880.79
01.03.01 EXCAVACION DE ZANJAS EN TERRENO CON BOLONERIA m3 110.69 7.21 798.07
01.03.02 CORTE Y NIVELACION DE TERRENO MANUAL m3 510.67 0.96 490.24
01.03.03 RELLENO CON MATERIAL PROPIO m3 42.05 9.11 383.08
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3 + CARGADOR FRONTAL D=8KM m3 217.91 5.55 1,209.40
01.04 OBRAS DE CONCRETO SIMPLE 11,803.80
01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 50.26 164.48 8,266.76
01.04.02 SARDINELES DE MAMPOSTERIA DE PIEDRA DE f'c=140 kg/cm2 + 40%PM m3 6.34 199.21 1,262.99
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES m2 42.26 27.01 1,141.44
01.04.04 DADO DE CONCRETO DE F'C=140 KG/CM2 m3 2.11 248.07 523.43
01.04.05 ENCOFRADO Y DESENCOFRADO BASE DE MASTIL m2 5.76 22.26 128.22
01.04.06 RAMPA DE CONCRETO PARA DISCAPACITADOS m2 14.40 33.40 480.96
01.05 OBRAS DE CONCRETO ARMADO 46,787.67
01.05.01 MURO DE CONTENCION 21,662.75
01.05.01.01 CONCRETO EN MURO DE CONTENCION f'c=175 kg/cm2 m3 56.08 278.18 15,600.33
01.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION m2 91.38 29.53 2,698.45
01.05.01.03 ACERO fy=4200 kg/cm2 GRADO 60 EN MURO DE CONTENCION kg 606.12 5.55 3,363.97
01.05.02 BANCAS 8,897.41
01.05.02.01 CONCRETO f'c=175 kg/cm2 - BANCAS m3 9.53 278.23 2,651.53
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL - BANCAS m2 115.51 24.86 2,871.58
01.05.02.03 ACERO fy=4200 kg/cm2 GRADO 60 - BANCAS kg 598.28 5.64 3,374.30
01.05.03 PILETA CENTRAL 8,180.14
01.05.03.01 CONCRETO f'c=175 kg/cm2 - PILETA m3 17.77 278.23 4,944.15
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL - PILETA m2 33.00 24.86 820.38
01.05.03.03 ACERO fy=4200 kg/cm2 GRADO 60 - PILETA kg 428.30 5.64 2,415.61
01.05.04 PILETA AUXILIAR 4,035.73
01.05.04.01 CONCRETO f'c=175 kg/cm2 - PILETA m3 10.64 278.23 2,960.37
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL - PILETA m2 8.28 24.86 205.84
01.05.04.03 ACERO fy=4200 kg/cm2 GRADO 60 - PILETA kg 154.17 5.64 869.52
01.05.05 GRADAS 1,434.81
01.05.05.01 CONCRETO f'c=175 kg/cm2 - GRADAS m3 3.04 278.23 845.82
01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL - GRADAS m2 12.56 24.86 312.24
01.05.05.03 ACERO fy=4200 kg/cm2 GRADO 60 - GRADAS kg 49.07 5.64 276.75
01.05.06 JARDINERAS 2,576.83
01.05.06.01 CONCRETO f'c=175 kg/cm2 - JARDINERIA m3 2.85 278.23 792.96
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL - JARDINERIA m2 28.15 24.86 699.81
01.05.06.03 ACERO fy=4200 kg/cm2 GRADO 60 - JARDINERIA kg 192.21 5.64 1,084.06
01.06 ESTRUCTURAS METALICAS 7,231.30
01.06.01 MASTIL DE FIERRO GALVANIZADO L= 10 M INC COLOCACION u 3.00 443.93 1,331.79
01.06.02 SUMINISTRO DE ADORNO DE BRONCE FORMA DE PAPA DE BASE glb 2.00 1,749.63 3,499.26
01.06.03 SUMINISTRO DE ADORNO DE BRONCE FORMA DE PAPA SUPERIOR glb 1.00 1,748.65 1,748.65
01.06.04 TACHO DE BASURA METALICO u 4.00 162.90 651.60
01.07 CARPINTERIA DE MADERA 501.23
01.07.01 ESPALDAR DE BANCAS C/MADERA TRATADA p2 107.33 4.67 501.23
01.08 TARRAJEO Y ENLUCIDOS 4,442.41
01.08.01 PILETA 2,303.01
01.08.01.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 m2 32.99 9.73 320.99
01.08.01.02 TARRAJEO CON IMPERMEABILIZANTES - PILETA m2 64.51 17.07 1,101.19
01.08.01.03 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA m2 32.99 26.70 880.83
01.08.02 BANCAS 1,834.39
01.08.02.01 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA m2 54.53 33.64 1,834.39
01.08.03 GRADAS 305.01
01.08.03.01 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA m2 13.36 22.83 305.01
01.09 PISOS Y PAVIMENTOS 23,138.51
01.09.01 AFIRMADO DE 4" PARA VEREDAS m2 331.89 9.67 3,209.38
01.09.02 VEREDA CON PIEDRA TIPO LAJA CON f'c= 140 kg/cm2 m2 331.89 54.00 17,922.06
01.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS m2 66.88 30.01 2,007.07
01.10 CUNETAS 4,128.53
01.10.01 CUNETAS CON PIEDRA TIPO LAJA CON f'c= 140 kg/cm2 m2 81.10 50.23 4,073.65
01.10.02 JUNTA DE CONSTRUCCION EN VEREDA e=1" RELLENO DE BREA + ARENA m 98.00 0.56 54.88
01.11 AREAS VERDES 1,041.32
01.11.01 TIERRA DE CHACRA P/RELLENO EN AREAS VERDES m3 30.51 27.68 844.52
01.11.02 BATIDO DE TIERRA DE CHACRA DE 20 CMS DE PROFUNDIDAD m2 152.56 0.48 73.23
01.11.03 EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA P/SEMBRIO DE GRASS m2 152.56 0.36 54.92
01.11.04 SEMBRADO DE GRASS m2 152.56 0.45 68.65
01.12 INSTALACIONES SANITARIAS 2,826.29
01.12.01 DESAGUE EVACUACION DE AGUA/SERVIDA 944.59
01.12.01.01 SALIDA DE DESAGUE EN PVC pto 5.00 48.27 241.35
01.12.01.02 SUMINISTRO E INSTALACION TUBERIAS PVC DAL 4" m 35.00 11.92 417.20
01.12.01.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 143.02 286.04
01.12.02 SISTEMA DE AGUA FRIA 1,881.70
01.12.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4" pto 12.00 79.10 949.20
01.12.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" C-7.5 m 60.00 6.37 382.20
01.12.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 3/4" C-7.5 m 20.00 14.10 282.00
01.12.02.04 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE 1/2" u 5.00 53.66 268.30
01.13 INSTALACIONES ELECTRICAS 12,661.65
01.13.01 SALIDA PARA ELECTRICIDAD 12,661.65
01.13.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1" C-7.5 m 70.00 4.33 303.10
01.13.01.02 CABLE DE LUZ POR TIERRA 3-1 X 10 MM2 NYY m 120.00 4.55 546.00
01.13.01.03 TABLERO GENERAL DE DISTRIBUCION FG LIVIANO pza 1.00 294.52 294.52
01.13.01.04 POSTE DE C.A. 8/200/120/240 INSTALACION A PULSO u 4.00 434.85 1,739.40
01.13.01.05 PASTORAL SUCRE CONCRETO SIMPLE + LUMINARIA u 8.00 426.28 3,410.24
01.13.01.06 POZO CONEXION A TIERRA u 1.00 2,670.91 2,670.91
01.14. MANEJO DE AREA VERDE
01.14.01 PLANTAS ARBUSTIVAS
01.14.01.01 TRAZO Y REPLANTEO Y LIMPIEZA DE TERRENO DE IA M2
01.14.01.02 ADQUISICION Y TRANSPORTE DE PLANTONES FORESTALES U
01.14.01.03 SIEMBRA DE PLANTONES U
01.14.02 FLORES
01.14.02.01 TRAZO Y REPLANTEO Y LIMPIEZA DE TERRENO DE IA M2
01.14.02.02 ADQUISICION Y TRANSPORTE DE PLANTONES DE FLORES U
01.14.02.03 PLANTAS DE FLORES U
01.14.03 SEALIZACION
01.14.03.01 CINTA DE SEGURIDAD U
01.13.01.07 EQUIPO DE RECIRCULACION DE AGUA u 2.00 1,848.74 3,697.48

Costo Directo 136,334.56

SON : CIENTO TRENTISEIS MIL TRESCIENTOS TRENTICUATRO Y 56/100 NUEVOS SOLES


Item Descripcin partida Unidad Metrado Rendimiento Tiempo unitario
Factor multiplicid.Duracin
(Ru) (Tu=Metrado/Ru) (f) (D=Tu/f)
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA C/PLANCHA METALICA DE 2.40 x 3.60 m. und 1.00 1.00 1.00 1.00 1 1
01.01.02 LIMPIEZA DE TERRENO MANUAL m2 277.00 120.00 2.31 1.00 3 2
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO - GLOBAL GLB 1.00 1.00 1.00 1.00 1 1
01.01.04 VIGILANCIA COMPLEMENTARIA DIA 210.00 8.00 26.25 1.00 27 26
01.01.05 ACORDONAMIENTO DE SEGURIDAD m 203.47 100.00 2.03 1.00 3 2
01.02 MOVIMIENTO DE TIERRAS
01.02.01 CORTE SUPERFICIAL LATERAL CON MAQUINARIA m3 441.31 200.00 2.21 1.00 3 2
01.02.02 RELLENO CON MATERIAL PROPIO EN CAPAS CON MAQUINA m3 367.76 80.00 4.60 1.00 5 5
01.02.03 PERFILADO, NIVELACION EN ZONA DE CORTE CON EQUIPO m2 1,471.03 200.00 7.36 1.00 8 7
01.02.04 EXCAVACION DE ZANJA PARA CIMENTACION (MANUAL) m3 123.73 4.00 30.93 1.00 31 31
01.02.05 EXCAVACION PARA ZAPATAS DE H= 3.10 M. DE PROFUNDIDAD m3 832.36 3.00 277.45 5.00 278 55
01.02.06 RELLENO Y COMPACTADO CON EQUIPO LIVIANO (CMP) m3 731.13 6.00 121.86 5.00 122 24
01.02.07 RELLENO CON MATERIAL DE PRESTAMO CON MAQUINARIA m3 200.01 8.00 25.00 5.00 26 5
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 K m3 123.14 336.00 0.37 1.00 1 0
01.02.09 NIV. INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4" C/EQUIPO m2 336.27 400.00 0.84 1.00 1 1
01.02.10 AFIRMADO DE 4" PARA VEREDAS C/EQUIPO m2 312.31 200.00 1.56 1.00 2 2
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 SOLADOS
01.03.01.01SOLADO E= 4" EN ZAPATAS MEZCLA 1:12 CEMENTO HORMIGON m2 249.50 120.00 2.08 1.00 3 2
01.03.02 CIMIENTOS CORRIDOS
01.03.02.01FALZA CIMENTACION MEZCLA 1:12 CEMENTO:HORMIGON + 30% P.G. m3 9.71 25.00 0.39 1.00 1 0
01.03.02.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G m3 54.87 25.00 2.19 1.00 3 2
01.03.03 SOBRECIMIENTOS
01.03.03.01CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON +25% P.M. m3 7.91 12.00 0.66 1.00 1 1
01.03.03.02ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO m2 75.43 16.00 4.71 1.00 5 5
01.03.04 FALSO PISO
01.03.04.01CONCRETO EN FALSO PISO DE 4" DE 1:8 CEMENTO:HORMIGON PARA m2 337.90 120.00 2.82 1.00 3 3
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 51.26 25.00 2.05 1.00 3 2
01.04.01.02ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60 kg 3,510.29 250.00 14.04 3.00 15 5
01.04.02 VIGAS DE CIMENTACION
01.04.02.01CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 51.51 22.00 2.34 1.00 3 2
01.04.02.02ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 215.32 12.00 17.94 3.00 18 6
01.04.02.03ACERO FY=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACIN kg 3,793.35 250.00 15.17 3.00 16 5
01.04.03 SOBRECIMIENTO ARMADO
01.04.03.01CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2 m3 9.69 20.00 0.48 1.00 1 0
01.04.03.02ACERO EN SOBRECIMIENTO ARMADO FY=4200 KG/CM2 GRADO 60 kg 1,612.42 250.00 6.45 3.00 7 2
01.04.04 COLUMNAS
01.04.04.01CONCRETO EN COLUMNETAS F'C=175 KGC/M2 m3 8.82 20.00 0.44 1.00 1 0
01.04.04.02CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 42.36 20.00 2.12 1.00 3 2
01.04.04.03ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 714.92 10.00 71.49 4.00 72 18
01.04.04.04ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS kg 12,078.84 250.00 48.32 4.00 49 12
01.04.05 PLACAS
01.04.05.01CONCRETO EN MUROS Y PLACAS F'C= 210 KG/CM2 m3 5.35 10.00 0.54 1.00 1 1
01.04.05.02ENCOFRADO Y DESENCOFRADO MUROS Y PLACAS m2 45.44 1.00 0
01.04.05.03ACERO GRADO 60 EN MUROS Y PLACAS kg 4,567.52 250.00 18.27 2.00 19 9
01.04.06 VIGAS
01.04.06.01CONCRETO EN VIGUETAS F`C=175 KG/CM2 m3 2.44 20.00 0.12 1.00 1 0
01.04.06.02CONCRETO EN VIGAS F'C=210 KG/CM2 m3 74.00 20.00 3.70 1.00 4 4
01.04.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 572.57 9.00 63.62 4.00 64 16
01.04.06.04ACERO FY=4200 KG/CM2 GRADO 60 EN VIGAS kg 9,157.53 250.00 36.63 4.00 37 9
01.04.07 LOSA ALIGERADA H=0.20 M.
01.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 61.02 25.00 2.44 1.00 3 2
01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 425.67 14.00 30.41 4.00 31 8
01.04.07.03ACERO FY=4200 KG/CM2 GRADO 60 EN LOSAS ALIGERADAS kg 3,310.90 250.00 13.24 4.00 14 3
01.04.07.04 LADRILLO HUECO/ARCILLA 15X30X30 P/TECHO ALIGERADO und 5,887.33 1,600.00 3.68 1.00 4 4
01.04.08 ESCALERAS
01.04.08.01CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 12.45 12.00 1.04 1.00 2 1
01.04.08.02ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 32.85 5.00 6.57 1.00 7 7
01.04.08.03ACERO FY=4200 KG/CM2 GRADO 60 EN ESCALERAS kg 193.87 250.00 0.78 1.00 1 1
01.04.09 GARGOLAS
01.04.09.01CONCRETO EN GARGOLAS F`C=210 KG/CM2 m3 0.08 25.00 0.00 1.00 1 0
01.04.09.02ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLA m2 0.52 9.00 0.06 1.00 1 0
01.04.09.03ACERO EN GARGOLA FY=4200 KG/CM2 - GRADO 60 kg 4.95 250.00 0.02 1.00 1 0
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA
02.01.01 MURO DE CABEZA LADRILLO KING-KONG 18 HUECOS DE ARCILLA m2 234.46 10.00 23.45 3.00 24 8
02.01.02 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS DE ARCILLA m2 360.19 10.90 33.04 3.00 34 11
02.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN INTERIORES ACABADO CON C:A - 1:4 m2 601.49 18.00 33.42 3.00 34 11
02.02.02 TARRAJEO EN EXTERIORES ACABADO CON C:A, 1:4 m2 237.36 12.00 19.78 3.00 20 7
02.02.03 TARRAJEO DE SUPERFICIES DE COLUMNAS CON CEMENTO ARENA 1 m2 378.61 15.00 25.24 3.00 26 8
02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO ARENA 1:4 m2 539.98 12.00 45.00 3.00 45 15
02.02.05 TARRAJEO PULIDO BOLEADO GRIS EN PARAPETO m2 70.27 15.00 4.68 1.00 5 5
02.02.06 VESTIDURA DE DERRAMES ANCHO=0.15M. m 172.04 18.00 9.56 2.00 10 5
02.02.07 BRUAS E= 1 CM. m 824.35 50.00 16.49 2.00 17 8
02.02.08 CUBIERTA LADR.PASTELERO ASEN.DE BARRO 3CM.+FRAGUA C/MOR. m2 467.58 13.70 34.13 3.00 35 11
02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA CEMENTO ARENA 1:4 m2 620.11 6.00 103.35 5.00 104 21
02.04 PISOS Y VEREDAS
02.04.01 PISOS DE CONCRETO
02.04.01.01PISO DE CONCRETO E=4", F'C=140 kg/cm2X 2 cm. PULIDO m2 530.13 80.00 6.63 1.00 7 7
02.04.02 VEREDAS
02.04.02.01VEREDA DE CONCRETO BRUADO DE 4" m2 362.87 100.00 3.63 1.00 4 4
02.04.02.02CONCRETO EN UAS DE VEREDA C:H - 1:8 m3 11.07 12.00 0.92 1.00 1 1
02.04.02.03JUNTAS DE CONSTRUCCION EN VEREDA E=1" m 56.25 95.00 0.59 1.00 1 1
02.05 CONTRAZOCALOS
02.05.01 CONTR. CEMENTO S/COLOREAR H=20 CM EN EXTERIORES m 195.55 20.00 9.78 2.00 10 5
02.05.02 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM EN INTERIORES m 296.34 20.00 14.82 2.00 15 7
02.06 REVESTIMIENTO DE GRADAS Y ESCALERA
02.06.01 FORJADO Y REVESTIM. DE GRADAS Y ESCALERAS DE CEM. COLOR m 72.60 5.00 14.52 3.00 15 5
02.06.02 FORJADO Y REVESTIM. DE DESCANZO DE ESCALERA DE CEMENTO m2 6.18 20.00 0.31 1.00 1 0
02.06.03 REVESTIMIENTO FONDO DE ESCALERA m2 24.66 8.00 3.08 1.00 4 3
02.06.04 REVESTIMIENTO PLACA DE ESCALERA C:A, 1:4 m2 51.91 12.00 4.33 1.00 5 4
02.06.05 CANTONERAS DE ALUMINIO 2" m 36.30 10.00 3.63 1.00 4 4
02.07 CARPINTERIA DE MADERA
02.07.01 PUERTAS
02.07.01.01PUERTA DE MADERA CEDRO TABLERO REBAJADO m2 44.17 1.00 44.17 4.00 45 11
02.07.01.02COLOCACION DE PUERTAS und 24.00 4.00 6.00 1.00 6 6
02.07.01.03TRABAZON DE PUERTA MADERA CON BARROTES DE FIERRO LISO DE m2 9.45 1.00 0
02.08 CARPINTERIA METALICA Y CERRAJERIA
02.08.01 VENTANAS
02.08.01.01VENTANAS METALICAS CON SEGURIDAD SEGUN DISEO m2 79.20 25.00 3.17 1.00 4 3
02.08.01.02COLOCACION DE VENTANAS und 18.00 6.00 3.00 1.00 3 3
02.08.02 BARANDAS - PASAMANOS
02.08.02.01BARANDA DE TUBERIA GALVANIZADO D=2 1/2 " m 110.67 8.00 13.83 2.00 14 7
02.08.02.02COLOCACION DE BARANDAS und 18.45 10.00 1.85 1.00 2 2
02.08.02.03BARANDA DE TUBERIA FG D=2 1/2 " EN PARAPETOS m 84.36 8.00 10.55 1.00 11 11
02.08.03 CERRAJERIA
02.08.03.01CERRADURA DE 02 GOLPES pza 24.00 8.00 3.00 1.00 3 3
02.08.03.02BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 72.00 12.00 6.00 1.00 6 6
02.08.03.03MANIJA DE BRONCE DE 4" PARA PUERTAS pza 24.00 55.00 0.44 1.00 1 0
02.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIOS SEMIDOBLES NACIONALES p2 860.90 100.00 8.61 1.00 9 9
02.10 PINTURA
02.10.01 PINTURA EN INTERIORES
02.10.01.01PINTURA LATEX EN MUROS INTERIORES m2 607.11 35.00 17.35 3.00 18 6
02.10.01.02PINTURA LATEX EN INTERIORES COLUMNA Y VIGA m2 598.47 28.00 21.37 3.00 22 7
02.10.01.03PINTURA EN CONTRAZOCALO CON ESMALTE H=0.10 m 296.34 80.00 3.70 1.00 4 4
02.10.02 PINTURA EN EXTERIORES
02.10.02.01PINTURA LATEX EN MUROS EXTERIORES m2 237.36 30.00 7.91 2.00 8 4
02.10.02.02PINTURA LATEX EN EXT. VIGAS Y COLUMNAS m2 613.40 28.00 21.91 3.00 22 7
02.10.02.03PINTURA LATEX EN EXTERIORES EN GARGOLA m2 0.57 28.00 0.02 1.00 1 0
02.10.02.04PINTURA EN ZOCALOS CON ESMALTE H=0.20 m 195.55 60.00 3.26 1.00 4 3
02.10.03 PINTURA EN CIELORRASOS
02.10.03.01PINTURA EN CIELORRASO SOBRE C:A m2 620.11 25.00 24.80 3.00 25 8
02.10.04 PINTURA EN ESTRUCTURA METALICA
02.10.04.01PINTURA ESMALTE ANTICORROSIVO EN TAPAJUNTAS METALICAS m 12.80 50.00 0.26 1.00 1 0
02.10.04.02PINTURA EN VENTANAS METALICAS CON ESMALTE ANTICORROSIV m2 79.20 30.00 2.64 1.00 3 3
02.10.04.03PINTURA ESMALTE ANTICORROSIVO EN PASAMANOS PARAPETO DE 2 m 110.67 50.00 2.21 1.00 3 2
02.11 OTROS
02.11.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2 26.55 34.00 0.78 1.00 1 1
02.11.02 LIMPIEZA FINAL DE OBRA GLB 1.00 1.00 1.00 1.00 1 1
02.11.03 TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEO m 12.80 20.00 0.64 1.00 1 1
02.11.04 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 40.00 24.00 1.67 1.00 2 2
02.11.05 PLACA RECORDATORIA und 1.00 1.00 1.00 1.00 1 1
03 INSTALACIONES SANITARIAS
03.01 APARATOS SANITARIOS Y ACCESORIOS
03.01.01 INODORO TANQUE BAJO BLANCO CON ACCESORIOS pza 12.00 3.00 4.00 1.00 4 4
03.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 12.00 4.00 3.00 1.00 3 3
03.01.03 URINARIOS DE LOZA DE PICO BLANCO pza 3.00 1.00 0
03.01.04 PAPELERA DE LOSA Y BARRA PLASTICA pza 12.00 1.00 12.00 5.00 12 2
03.01.05 COLOCACION DE APARATOS SANITARIOS und 12.00 4.00 3.00 1.00 3 3
03.01.06 COLOCACION DE ACCESORIOS SANITARIOS und 12.00 8.00 1.50 1.00 2 2
03.01.07 COLOCACION DE URINARIOS und 3.00 4.00 0.75 1.00 1 1
03.02 SALIDA DE DESAGUE
03.02.01 SALIDA DE DESAGUE EN PVC 6" pto 3.00 3.50 0.86 1.00 1 1
03.02.02 SALIDA DE DESAGUE EN PVC 2" pto 19.00 3.50 5.43 1.00 6 5
03.02.03 SALIDA DE DESAGUE CON PVC 4" pto 12.00 4.00 3.00 1.00 3 3
03.02.04 SALIDA DE VENTILACION 2" pto 2.00 4.00 0.50 1.00 1 1
03.03 RED DE DISTRIBUCION
03.03.01 RED DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL DE 6" m 137.90 40.00 3.45 1.00 4 3
03.03.02 RED DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL DE 4" m 20.94 40.00 0.52 1.00 1 1
03.03.03 RED DE DISTRIBUCION TUBERIA DE DESAGUE PVC SAL DE 2" m 37.93 40.00 0.95 1.00 1 1
03.04 ACCESORIOS DE REDES
03.04.01 CODO PVC SAL P/DESAGUE 2" X 90 - PESADO pza 28.00 8.00 3.50 1.00 4 4
03.04.02 CODO PVC SAL P/DESAGUE 4" X 90 - PESADO pza 12.00 10.00 1.20 1.00 2 1
03.04.03 TEE PVC SAL DE 2" X 2" PESADO pza 15.00 12.00 1.25 1.00 2 1
03.04.04 YEE PVC SAL SANITARIA 4" A 2" PESADO pza 8.00 8.00 1.00 1.00 1 1
03.04.05 YEE DE P.V.C. SAL DE 2" und 15.00 1.00 15.00 5.00 15 3
03.04.06 YEE PVC SAL 4" X 4" pza 2.00 8.00 0.25 1.00 1 0
03.04.07 REDUCCION PVC SAL DE 4" A 2" pza 2.00 10.00 0.20 1.00 1 0
03.05 ADITAMENTOS VARIOS
03.05.01 SUMIDEROS CROMADOS DE 2" EN PISO pza 4.00 4.00 1.00 1.00 1 1
03.05.02 SUMIDEROS CROMADOS DE 2" EN LAVADERO pza 12.00 4.00 3.00 1.00 3 3
03.05.03 SUMIDERO CROMADO DE 2" EN URINARIO pza 3.00 4.00 0.75 1.00 1 1
03.05.04 SOMBRERO VENTILACION PVC DE 2" pza 2.00 25.00 0.08 1.00 1 0
03.05.05 REGISTROS DE BRONCE DE 4" pza 2.00 4.00 0.50 1.00 1 1
03.06 CAMARA DE INSPECCION
03.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 3.00 0.67 1.00 1 1
03.07 SISTEMA DE AGUA FRIA
03.07.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP 1/2" pto 31.00 4.00 7.75 1.00 8 8
03.08 RED DE DISTRIBUCION
03.08.01 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 63.70 30.00 2.12 1.00 3 2
03.09 ACCESORIOS DE REDES
03.09.01 CODO PVC SAP DE 1/2" AGUA FRIA und 34.00 30.00 1.13 1.00 2 1
03.09.02 TEE PVC SAP DE 3/4" PARA AGUA pza 3.00 30.00 0.10 1.00 1 0
03.09.03 TEE PVC SAP DE 1/2" PARA AGUA pza 31.00 30.00 1.03 1.00 2 1
03.09.04 REDUCCION PVC SAP DE 3/4" A 1/2" PARA AGUA pza 2.00 30.00 0.07 1.00 1 0
03.10 LLAVES Y VALVULAS
03.10.01 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" und 2.00 1.00 2.00 1.00 2 2
03.10.02 VALVULAS DE INTERRUPCION GENERAL pza 1.00 8.00 0.13 1.00 1 0
03.11 PIEZAS VARIAS
03.11.01 CAJA METALICA PARA VALVULAS DE 12" X 12" pza 1.00 5.00 0.20 1.00 1 0
03.11.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 3.00 0.67 1.00 1 1
03.11.03 TUBO DE FIERRO GALVANIZADO DE 3/4" SEGUN DISEO EN URINAR m 3.00 15.00 0.20 1.00 1 0
04 INSTALACIONES ELECTRICAS
04.01 SALIDAS ELECTRICAS
04.01.01 SALIDA PARA CENTROS DE LUZ pto 55.00 8.00 6.88 1.00 7 7
04.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 46.00 10.00 4.60 1.00 5 5
04.01.03 SALIDA EN LA PARED PARA INTERRUPTOR pto 14.00 10.00 1.40 1.00 2 1
04.02 CANALIZACION Y / O TUBERIAS
04.02.01 TUBERIA PVC SAP P/INST. ELECTRICAS 20mm m 221.87 30.00 7.40 1.00 8 7
04.02.02 TUBERIA PVC SAP P/INST. ELECTRICAS 20mm (Toma Corrientes) m 147.39 30.00 4.91 1.00 5 5
04.02.03 TUBERIA PVC SAP P/INST. ELECTRICAS 40mm (Sub-Terraneo) m 2.89 20.00 0.14 1.00 1 0
04.02.04 TUBERIA PVC SAP P/INST. ELECTRICAS 25mm (Sub-Terraneo) m 95.52 20.00 4.78 1.00 5 5
04.03 CONDUCTORES Y/O CABLES
04.03.01 CONDUCTOR DE Cu TW DE 4 mm2 m 442.17 300.00 1.47 1.00 2 1
04.03.02 CONDUCTOR DE Cu TW DE 2.5 mm2 m 665.61 400.00 1.66 1.00 2 2
04.03.03 CABLE 10mm2 DE Cu NYY m 254.16 75.00 3.39 1.00 4 3
04.03.04 CABLE 6mm2 DE Cu NYY m 91.50 60.00 1.53 1.00 2 2
04.04 ACCESORIOS
04.04.01 TOMACORRIENTE DE BAQUELITA DOBLE pto 46.00 8.00 5.75 1.00 6 6
04.04.02 TUBERIA PVC SAP P/INST. ELECTRICAS 50mm m 10.00 20.00 0.50 1.00 1 1
04.04.03 INTERRUPTOR DE BAQUELITA SIMPLE pto 8.00 20.00 0.40 1.00 1 0
04.04.04 INTERRUPTOR DE BAQUELITA DOBLE pto 7.00 20.00 0.35 1.00 1 0
04.04.05 INTERRUPTOR DE BAQUELITA TRIPLE pto 1.00 20.00 0.05 1.00 1 0
04.04.06 INTERRUPTOR BAQUELITA DE CONMUTACION pto 2.00 24.00 0.08 1.00 1 0
04.04.07 SALIDA PARA CAJA DE PASE 100 X 100 mm pto 5.00 15.00 0.33 1.00 1 0
04.04.08 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15A pza 1.00 16.00 0.06 1.00 1 0
04.04.09 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 1.00 12.00 0.08 1.00 1 0
04.04.10 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 50A pza 1.00 12.00 0.08 1.00 1 0
04.04.11 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X150 A pza 1.00 20.00 0.05 1.00 1 0
04.05 TABLERO Y SUB TABLEROS
04.05.01 TABLERO DE DISTRIBUCION (TD) und 3.00 3.00 1.00 1.00 1 1
04.05.02 CONEXION A RED EXTERNA Y MEDIDORES und 2.00 6.00 0.33 1.00 1 0
04.06 ARTEFACTOS Y EQUIPOS DE ILUMINACION
04.06.01 FOCO AHORRADOR + ACCESORIOS und 1.00 1.00 1.00 1.00 1 1
04.06.02 LUMINARIA DE 36 W X 3 UNIDADES + ACCESORIOS pto 12.00 15.00 0.80 1.00 1 1
04.06.03 LUMINARIA DE 36 W X 2 UNIDADES + ACCESORIOS pto 33.00 15.00 2.20 1.00 3 2
04.06.04 LUMINARIA DE 18 W X 2 UNIDADES MAS ACCESORIOS pto 5.00 15.00 0.33 1.00 1 0
04.06.05 REFLECTORES DE ILUMINACION EN EXTERIORES 400 W und 8.00 3.00 2.67 1.00 3 3
04.07 OTROS
04.07.01 POSTE DE SOPORTE DE CONCRETO CENTRIFUGADO und 8.00 4.00 2.00 1.00 2 2
04.07.02 FAROLA ESFERICA + ACCESORIOS und 8.00 4.00 2.00 1.00 2 2
04.07.03 POZO DE TIERRA INCLUIDO INSTALACION GLB 3.00 4.00 0.75 1.00 1 1
04.07.04 BUZON DE REGISTRO DE C. A. DE 400x 400mm und 2.00 3.00 0.67 1.00 1 1
05 LOSA MULTIDEPORTIVA
05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 420.00 500.00 0.84 1.00 1 1
05.01.02 DEMOLICION DE LOSA DEPORTIVA E=4" m3 208.05 100.00 2.08 1.00 3 2
05.02 MOVIMIENTO DE TIERRAS
05.02.01 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 105.00 7.02 14.96 1.00 15 15
05.02.02 PERFILADO Y COMPACTACION A NIVEL DE RASANTE m2 420.00 200.00 2.10 1.00 3 2
05.02.03 COLOCACION DE RELLENO ESTRUCTURAL E=10CM m2 420.00 80.00 5.25 1.00 6 5
05.02.04 EXCAVACION DE ZANJAS PARA SARDINELES (UAS) m3 3.44 3.00 1.15 1.00 2 1
05.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.= m3 260.06 336.00 0.77 1.00 1 1
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 ENCOFRADO Y DESENCOFRADO PARA LOSA m2 44.10 14.00 3.15 1.00 4 3
05.03.02 CONCRETO F'C=140 KG/CM2 LOSA MULTIDEPORTIVA m2 428.00 60.00 7.13 1.00 8 7
05.03.03 CONCRETO F'C= 140 KG/CM2 m3 4.73 12.00 0.39 1.00 1 0
05.04 VARIOS
05.04.01 JUNTAS DE DILATACION EN LOSA DEPORTIVA E=1", H=0.10 M. m 58.00 25.00 2.32 1.00 3 2
05.04.02 JUNTAS DE CONTRACCION EN LOSA DEPORTIVA E=3/4", H=0.05 M. m 101.00 40.00 2.53 1.00 3 3
05.04.03 EQUIPAMIENTO DEPORTIVO GLB 6.00 10.00 0.60 1.00 1 1
05.04.04 CURADO DE LOSA m2 840.00 200.00 4.20 1.00 5 4
05.04.05 DEMARCACION DE LOSA DEPORTIVA m 301.50 150.00 2.01 1.00 3 2
06 TRIBUNAS Y COBERTURA
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 124.46 500.00 0.25 1.00 1 0
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MASIVA MANUAL m3 34.73 3.00 11.58 1.00 12 12
06.02.02 RELLENO COMPACTADO C/MATERIAL PROPIO m3 7.71 6.00 1.29 1.00 2 1
06.02.03 PERFILADO Y COMPACTACION A NIVEL DE RASANTE m2 110.00 200.00 0.55 1.00 1 1
06.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.= m3 33.78 336.00 0.10 1.00 1 0
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PM. EN GRADERIA m3 80.17 20.00 4.01 1.00 5 4
06.03.02 ENCOFRADO Y DESENCOFRADO EN TRIBUNAS m2 64.29 14.00 4.59 1.00 5 5
06.04 SOPORTE DE TIJERALES
06.04.01 TUBERIA DE SOPORTE DE COBERTURA 4" FG und 11.00 5.00 2.20 1.00 3 2
06.04.02 ANCLAJE DE TUBERIAS und 11.00 5.00 2.20 1.00 3 2
06.05 TIJERAL
06.05.01 TIJERAL PRINCIPAL T-3 und 22.00 2.00 11.00 1.00 11 11
06.05.02 MONTAJE DE TIJERALES und 12.66 10.00 1.27 1.00 2 1
06.05.03 ARRIOSTRE TIJERAL m 117.40 40.00 2.94 1.00 3 3
06.06 CORREAS
06.06.01 CORREAS m 200.00 15.00 13.33 1.00 14 13
06.06.02 MONTAJE DE CORREAS und 80.00 20.00 4.00 1.00 4 4
06.07 COBERTURAS
06.07.01 COBERTURA CON FIBRAFORTE m2 138.78 30.00 4.63 1.00 5 5
06.07.02 CUMBRERA CON CALAMINA GALVANIZADA N 30 m 25.70 160.00 0.16 1.00 1 0
07 CERCO PERIMETRICO
07.01 OBRAS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 243.31 100.00 2.43 1.00 3 2
07.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISL m2 243.31 500.00 0.49 1.00 1 0
07.02 MOVIMIENTO DE TIERRAS
07.02.01 DEMOLICION SOBRECIMIENTO EXISTENTE m3 6.17 2.00 3.09 1.00 4 3
07.02.02 DESMONTAJE DE CERCO PERIMETRICO METALICO m2 231.55 60.00 3.86 1.00 4 4
07.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMA m3 162.20 4.00 40.55 2.00 41 20
07.02.04 REFINE, PERFILADO Y NIVELACION DE ZANJA m2 486.61 40.00 12.17 1.00 13 12
07.02.05 ELIMINACION MATERIAL EXCEDENTE m3 202.76 25.00 8.11 1.00 9 8
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 162.20 24.00 6.76 1.00 7 7
07.03.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 100.96 12.50 8.08 1.00 9 8
07.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT m2 504.82 14.50 34.82 1.00 35 35
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 COLUMNAS
07.04.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 20.15 10.00 2.02 1.00 3 2
07.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 245.02 10.00 24.50 1.00 25 25
07.04.01.03 ACERO EN COLUMNAS FY = 4200 Kg/cm2 kg 2,538.90 250.00 10.16 1.00 11 10
07.04.02 VIGAS
07.04.02.01 CONCRETO EN VIGA COLLARIN F`C=175kG/CM2 m3 20.28 7.50 2.70 1.00 3 3
07.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGA COLLARIN m2 210.87 9.00 23.43 1.00 24 23
07.04.02.03 ACERO FY=4200 Kg/cm2 EN VIGA COLLARIN kg 2,654.28 250.00 10.62 1.00 11 11
07.05 MUROS Y TABIQUES
07.05.01 MUROS CARAVISTA DE LADRILLO KK DE ARCILLA DE SOGA C/M 1 m2 807.18 5.26 153.46 2.00 154 77
07.06 REVOQUES ENLUCIDOS Y MOLDURAS
07.06.01 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 245.02 8.00 30.63 2.00 31 15
07.06.02 TARRAJEO DE SUPERFICIE DE VIGA COLLARIN m2 210.87 6.50 32.44 2.00 33 16
07.07 CARPINTERIA METALICA
07.07.01 PUERTA METAL LAC 1/16" C/MARCO TUBO 2.5" Y REFUERZOS PL m2 5.24 0.50 10.48 1.00 11 10
07.08 CERRAJERIA
07.08.01 CANDADO DE 2", INC ALDABAS und 1.00 1.00 1.00 1.00 1 1
07.09 PINTURA
07.09.01 PINTURA ESMALTE EN PUERTAS m2 5.24 15.00 0.35 1.00 1 0
07.09.02 PINTURA AL BARNIZ EN MURO CARAVISTA m2 1,614.36 33.00 48.92 4.00 49 12
07.10 VARIOS, LIMPIEZA
07.10.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2 11.05 34.00 0.33 1.00 1 0
07.10.02 LIMPIEZA FINAL DE OBRA GLB 243.31 1.00 243.31 2.00 244 122
08 CANAL PLUVIAL DE CONCRETO
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 132.54 500.00 0.27 1.00 1 0
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN MATERIAL SUELTO MANUAL m3 79.52 3.00 26.51 1.00 27 27
08.02.02 RELLENO CON MATERIAL PROPIO m3 13.25 8.00 1.66 1.00 2 2
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.= m3 82.84 336.00 0.25 1.00 1 0
08.03 OBRAS DE CONCRETO ARMADO
08.03.01 CONCRETO F'C=175 KGC/M2 CANAL PLUVIAL m3 28.68 7.50 3.82 1.00 4 4
08.03.02 ENCOFRADO Y DESENCOFRADO CANALES m2 573.58 15.00 38.24 1.00 39 38
08.03.03 ACERO FY=4200 KG/CM2 GRADO 60 EN CANAL PLUVIAL kg 497.58 350.00 1.42 1.00 2 1
08.04 VARIOS
08.04.01 JUNTA ASFALTICA E=1" EN CANAL PLUVIAL m 28.50 20.00 1.43 1.00 2 1
08.04.02 REJILLA SUMIDERO-PLAT 1 1/4"X1/4"@1/2" Y MARCO "L" 1 1/4" m2 73.19 16.00 4.57 1.00 5 5
08.05 TUBERIA DE EVACUACION PLUVIAL Y MONTANTES
08.05.01 TUBERIA DE BAJADA PVC SAL DIAMETRO 4" m 23.10 60.00 0.39 1.00 1 0
08.05.02 CONCRETO F'C=175 KG/CM2. PARA MONTANTES m3 0.81 10.00 0.08 1.00 1 0
08.05.03 ENCOFRADO Y DESENCOFRADO m2 8.10 15.00 0.54 1.00 1 1
08.05.04 ACERO FY=4200 KG/CM2 GRADO 60 EN MONTANTES kg 34.23 350.00 0.10 1.00 1 0
09 MOBILIARIO EDUCATIVO
09.01 MOBILIARIOS EDUCATIVO GLB 180.00 1.00 180.00 1.00 180 180
10 EQUIPAMIENTO DE SALA DE COMPUTO
10.01 EQUIPAMIENTO DE SALA DE COMPUTO GLB 30.00 1.00 30.00 1.00 30 30
S10 Pgina :
ING.RODV Fecha :

Tiempos para programacin

Obra 0804004 TROCHA CARROZABLE IZMO - LA FLORIDA (CONST.)


Frmula 01 TROCHA CARROZABLE IZMO - LA FLORIDA (CONST.)

Item Descripcin partida Unidad

01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA C/PLANCHA METALICA DE 2.40 x 3.60 m. GLB
01.01.02 LIMPIEZA DE TERRENO MANUAL m2
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO - GLOBAL GLB
01.01.04 VIGILANCIA COMPLEMENTARIA DIA
01.01.05 ACORDONAMIENTO DE SEGURIDAD m
01.02 MOVIMIENTO DE TIERRAS
01.02.01 CORTE SUPERFICIAL LATERAL CON MAQUINARIA m3
01.02.02 RELLENO CON MATERIAL PROPIO EN CAPAS CON MAQUINA m3
01.02.03 PERFILADO, NIVELACION EN ZONA DE CORTE CON EQUIPO m2
01.02.04 EXCAVACION DE ZANJA PARA CIMENTACION (MANUAL) m3
01.02.05 EXCAVACION PARA ZAPATAS DE H= 3.10 M. DE PROFUNDIDAD m3
01.02.06 RELLENO Y COMPACTADO CON EQUIPO LIVIANO (CMP) m3
01.02.07 RELLENO CON MATERIAL DE PRESTAMO CON MAQUINARIA m3
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM m3
01.02.09 NIV. INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4" C/EQUIPO m2
01.02.10 AFIRMADO DE 4" PARA VEREDAS C/EQUIPO m2
01.03 OBRAS DE CONCRETO SIMPLE M3
01.03.01 SOLADOS
01.03.01.01 SOLADO E= 4" EN ZAPATAS MEZCLA 1:12 CEMENTO HORMIGON m2
01.03.02 CIMIENTOS CORRIDOS
01.03.02.01 FALZA CIMENTACION MEZCLA 1:12 CEMENTO:HORMIGON + 30% P.G. m3
01.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G m3
01.03.03 SOBRECIMIENTOS
01.03.03.01 CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON +25% P.M. m3
01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO m2
01.03.04 FALSO PISO
01.03.04.01 CONCRETO EN FALSO PISO DE 4" DE 1:8 CEMENTO:HORMIGON PARA m2
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3
01.04.01.02 ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60 kg
01.04.02 VIGAS DE CIMENTACION
01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3
01.04.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2
01.04.02.03 ACERO FY=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACIN kg
01.04.03 SOBRECIMIENTO ARMADO
01.04.03.01 CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2 m3
01.04.03.02 ACERO EN SOBRECIMIENTO ARMADO FY=4200 KG/CM2 GRADO 60 kg
01.04.04 COLUMNAS
01.04.04.01 CONCRETO EN COLUMNETAS F'C=175 KGC/M2 m3
01.04.04.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3
01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
01.04.04.04 ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS kg
01.04.05 PLACAS
01.04.05.01 CONCRETO EN MUROS Y PLACAS F'C= 210 KG/CM2 m3
01.04.05.02 ENCOFRADO Y DESENCOFRADO MUROS Y PLACAS m2
01.04.05.03 ACERO GRADO 60 EN MUROS Y PLACAS kg
01.04.06 VIGAS
01.04.06.01 CONCRETO EN VIGUETAS F`C=175 KG/CM2 m3
01.04.06.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3
01.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2
01.04.06.04 ACERO FY=4200 KG/CM2 GRADO 60 EN VIGAS kg
01.04.07 LOSA ALIGERADA H=0.20 M.
01.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3
01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2
01.04.07.03 ACERO FY=4200 KG/CM2 GRADO 60 EN LOSAS ALIGERADAS kg
01.04.07.04 LADRILLO HUECO/ARCILLA 15X30X30 P/TECHO ALIGERADO und
01.04.08 ESCALERAS
01.04.08.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3
01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2
01.04.08.03 ACERO FY=4200 KG/CM2 GRADO 60 EN ESCALERAS kg
01.04.09 GARGOLAS
01.04.09.01 CONCRETO EN GARGOLAS F`C=210 KG/CM2 m3
01.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLA m2
01.04.09.03 ACERO EN GARGOLA FY=4200 KG/CM2 - GRADO 60 kg
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA
02.01.01 MURO DE CABEZA LADRILLO KING-KONG 18 HUECOS DE ARCILLA m2
02.01.02 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS DE ARCILLA m2
02.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN INTERIORES ACABADO CON C:A - 1:4 m2
02.02.02 TARRAJEO EN EXTERIORES ACABADO CON C:A, 1:4 m2
02.02.03 TARRAJEO DE SUPERFICIES DE COLUMNAS CON CEMENTO ARENA 1 m2
02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO ARENA 1:4 m2
02.02.05 TARRAJEO PULIDO BOLEADO GRIS EN PARAPETO m2
02.02.06 VESTIDURA DE DERRAMES ANCHO=0.15M. m
02.02.07 BRUAS E= 1 CM. m
02.02.08 CUBIERTA LADR.PASTELERO ASEN.DE BARRO 3CM.+FRAGUA C/MOR. m2
02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA CEMENTO ARENA 1:4 m2
02.04 PISOS Y VEREDAS
02.04.01 PISOS DE CONCRETO
02.04.01.01 PISO DE CONCRETO E=4", F'C=140 kg/cm2X 2 cm. PULIDO m2
02.04.02 VEREDAS
02.04.02.01 VEREDA DE CONCRETO BRUADO DE 4" m2
02.04.02.02 CONCRETO EN UAS DE VEREDA C:H - 1:8 m3
02.04.02.03 JUNTAS DE CONSTRUCCION EN VEREDA E=1" m
02.05 CONTRAZOCALOS
02.05.01 CONTR. CEMENTO S/COLOREAR H=20 CM EN EXTERIORES m
02.05.02 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM EN INTERIORES m
02.06 REVESTIMIENTO DE GRADAS Y ESCALERA
02.06.01 FORJADO Y REVESTIM. DE GRADAS Y ESCALERAS DE CEM. COLOR m
02.06.02 FORJADO Y REVESTIM. DE DESCANZO DE ESCALERA DE CEMENTO m2
02.06.03 REVESTIMIENTO FONDO DE ESCALERA m2
02.06.04 REVESTIMIENTO PLACA DE ESCALERA C:A, 1:4 m2
02.06.05 CANTONERAS DE ALUMINIO 2" m
02.07 CARPINTERIA DE MADERA
02.07.01 PUERTAS
02.07.01.01 PUERTA DE MADERA CEDRO TABLERO REBAJADO m2
02.07.01.02 COLOCACION DE PUERTAS und
02.07.01.03 TRABAZON DE PUERTA MADERA CON BARROTES DE FIERRO LISO DE m2
02.08 CARPINTERIA METALICA Y CERRAJERIA
02.08.01 VENTANAS
02.08.01.01 VENTANAS METALICAS CON SEGURIDAD SEGUN DISEO m2
02.08.01.02 COLOCACION DE VENTANAS und
02.08.02 BARANDAS - PASAMANOS
02.08.02.01 BARANDA DE TUBERIA GALVANIZADO D=2 1/2 " m
02.08.02.02 COLOCACION DE BARANDAS und
02.08.02.03 BARANDA DE TUBERIA FG D=2 1/2 " EN PARAPETOS m
02.08.03 CERRAJERIA
02.08.03.01 CERRADURA DE 02 GOLPES pza
02.08.03.02 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza
02.08.03.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza
02.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIOS SEMIDOBLES NACIONALES p2
02.10 PINTURA
02.10.01 PINTURA EN INTERIORES
02.10.01.01 PINTURA LATEX EN MUROS INTERIORES m2
02.10.01.02 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA m2
02.10.01.03 PINTURA EN CONTRAZOCALO CON ESMALTE H=0.10 m
02.10.02 PINTURA EN EXTERIORES
02.10.02.01 PINTURA LATEX EN MUROS EXTERIORES m2
02.10.02.02 PINTURA LATEX EN EXT. VIGAS Y COLUMNAS m2
02.10.02.03 PINTURA LATEX EN EXTERIORES EN GARGOLA m2
02.10.02.04 PINTURA EN ZOCALOS CON ESMALTE H=0.20 m
02.10.03 PINTURA EN CIELORRASOS
02.10.03.01 PINTURA EN CIELORRASO SOBRE C:A m2
02.10.04 PINTURA EN ESTRUCTURA METALICA
02.10.04.01 PINTURA ESMALTE ANTICORROSIVO EN TAPAJUNTAS METALICAS m
02.10.04.02 PINTURA EN VENTANAS METALICAS CON ESMALTE ANTICORROSIV m2
02.10.04.03 PINTURA ESMALTE ANTICORROSIVO EN PASAMANOS PARAPETO DE 2 m
02.11 OTROS
02.11.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2
02.11.02 LIMPIEZA FINAL DE OBRA GLB
02.11.03 TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEO m
02.11.04 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
02.11.05 PLACA RECORDATORIA und
03 INSTALACIONES SANITARIAS
03.01 APARATOS SANITARIOS Y ACCESORIOS
03.01.01 INODORO TANQUE BAJO BLANCO CON ACCESORIOS pza
03.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza
03.01.03 URINARIOS DE LOZA DE PICO BLANCO pza
03.01.04 PAPELERA DE LOSA Y BARRA PLASTICA pza
03.01.05 COLOCACION DE APARATOS SANITARIOS und
03.01.06 COLOCACION DE ACCESORIOS SANITARIOS und
03.01.07 COLOCACION DE URINARIOS und
03.02 SALIDA DE DESAGUE
03.02.01 SALIDA DE DESAGUE EN PVC 6" pto
03.02.02 SALIDA DE DESAGUE EN PVC 2" pto
03.02.03 SALIDA DE DESAGUE CON PVC 4" pto
03.02.04 SALIDA DE VENTILACION 2" pto
03.03 RED DE DISTRIBUCION
03.03.01 RED DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL DE 6" m
03.03.02 RED DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL DE 4" m
03.03.03 RED DE DISTRIBUCION TUBERIA DE DESAGUE PVC SAL DE 2" m
03.04 ACCESORIOS DE REDES
03.04.01 CODO PVC SAL P/DESAGUE 2" X 90 - PESADO pza
03.04.02 CODO PVC SAL P/DESAGUE 4" X 90 - PESADO pza
03.04.03 TEE PVC SAL DE 2" X 2" PESADO pza
03.04.04 YEE PVC SAL SANITARIA 4" A 2" PESADO pza
03.04.05 YEE DE P.V.C. SAL DE 2" und
03.04.06 YEE PVC SAL 4" X 4" pza
03.04.07 REDUCCION PVC SAL DE 4" A 2" pza
03.05 ADITAMENTOS VARIOS
03.05.01 SUMIDEROS CROMADOS DE 2" EN PISO pza
03.05.02 SUMIDEROS CROMADOS DE 2" EN LAVADERO pza
03.05.03 SUMIDERO CROMADO DE 2" EN URINARIO pza
03.05.04 SOMBRERO VENTILACION PVC DE 2" pza
03.05.05 REGISTROS DE BRONCE DE 4" pza
03.06 CAMARA DE INSPECCION
03.06.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza
03.07 SISTEMA DE AGUA FRIA
03.07.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP 1/2" pto
03.08 RED DE DISTRIBUCION
03.08.01 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m
03.09 ACCESORIOS DE REDES
03.09.01 CODO PVC SAP DE 1/2" AGUA FRIA und
03.09.02 TEE PVC SAP DE 3/4" PARA AGUA pza
03.09.03 TEE PVC SAP DE 1/2" PARA AGUA pza
03.09.04 REDUCCION PVC SAP DE 3/4" A 1/2" PARA AGUA pza
03.10 LLAVES Y VALVULAS
03.10.01 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" und
03.10.02 VALVULAS DE INTERRUPCION GENERAL pza
03.11 PIEZAS VARIAS
03.11.01 CAJA METALICA PARA VALVULAS DE 12" X 12" pza
03.11.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza
03.11.03 TUBO DE FIERRO GALVANIZADO DE 3/4" SEGUN DISEO EN URINAR m
04 INSTALACIONES ELECTRICAS
04.01 SALIDAS ELECTRICAS
04.01.01 SALIDA PARA CENTROS DE LUZ pto
04.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto
04.01.03 SALIDA EN LA PARED PARA INTERRUPTOR pto
04.02 CANALIZACION Y / O TUBERIAS
04.02.01 TUBERIA PVC SAP P/INST. ELECTRICAS 20mm m
04.02.02 TUBERIA PVC SAP P/INST. ELECTRICAS 20mm (Toma Corrientes) m
04.02.03 TUBERIA PVC SAP P/INST. ELECTRICAS 40mm (Sub-Terraneo) m
04.02.04 TUBERIA PVC SAP P/INST. ELECTRICAS 25mm (Sub-Terraneo) m
04.03 CONDUCTORES Y/O CABLES
04.03.01 CONDUCTOR DE Cu TW DE 4 mm2 m
04.03.02 CONDUCTOR DE Cu TW DE 2.5 mm2 m
04.03.03 CABLE 10mm2 DE Cu NYY m
04.03.04 CABLE 6mm2 DE Cu NYY m
04.04 ACCESORIOS
04.04.01 TOMACORRIENTE DE BAQUELITA DOBLE pto
04.04.02 TUBERIA PVC SAP P/INST. ELECTRICAS 50mm m
04.04.03 INTERRUPTOR DE BAQUELITA SIMPLE pto
04.04.04 INTERRUPTOR DE BAQUELITA DOBLE pto
04.04.05 INTERRUPTOR DE BAQUELITA TRIPLE pto
04.04.06 INTERRUPTOR BAQUELITA DE CONMUTACION pto
04.04.07 SALIDA PARA CAJA DE PASE 100 X 100 mm pto
04.04.08 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15A pza
04.04.09 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza
04.04.10 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 50A pza
04.04.11 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X150 A pza
04.05 TABLERO Y SUB TABLEROS
04.05.01 TABLERO DE DISTRIBUCION (TD) und
04.05.02 CONEXION A RED EXTERNA Y MEDIDORES und
04.06 ARTEFACTOS Y EQUIPOS DE ILUMINACION
04.06.01 FOCO AHORRADOR + ACCESORIOS und
04.06.02 LUMINARIA DE 36 W X 3 UNIDADES + ACCESORIOS pto
04.06.03 LUMINARIA DE 36 W X 2 UNIDADES + ACCESORIOS pto
04.06.04 LUMINARIA DE 18 W X 2 UNIDADES MAS ACCESORIOS pto
04.06.05 REFLECTORES DE ILUMINACION EN EXTERIORES 400 W und
04.07 OTROS
04.07.01 POSTE DE SOPORTE DE CONCRETO CENTRIFUGADO und
04.07.02 FAROLA ESFERICA + ACCESORIOS und
04.07.03 POZO DE TIERRA INCLUIDO INSTALACION GLB
04.07.04 BUZON DE REGISTRO DE C. A. DE 400x 400mm und
05 LOSA MULTIDEPORTIVA
05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2
05.01.02 DEMOLICION DE LOSA DEPORTIVA E=4" m3
05.02 MOVIMIENTO DE TIERRAS
05.02.01 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3
05.02.02 PERFILADO Y COMPACTACION A NIVEL DE RASANTE m2
05.02.03 COLOCACION DE RELLENO ESTRUCTURAL E=10CM m2
05.02.04 EXCAVACION DE ZANJAS PARA SARDINELES (UAS) m3
05.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM m3
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 ENCOFRADO Y DESENCOFRADO PARA LOSA m2
05.03.02 CONCRETO F'C=140 KG/CM2 LOSA MULTIDEPORTIVA m2
05.03.03 CONCRETO F'C= 140 KG/CM2 m3
05.04 VARIOS
05.04.01 JUNTAS DE DILATACION EN LOSA DEPORTIVA E=1", H=0.10 M. m
05.04.02 JUNTAS DE CONTRACCION EN LOSA DEPORTIVA E=3/4", H=0.05 M. m
05.04.03 EQUIPAMIENTO DEPORTIVO GLB
05.04.04 CURADO DE LOSA m2
05.04.05 DEMARCACION DE LOSA DEPORTIVA m
06 TRIBUNAS Y COBERTURA
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MASIVA MANUAL m3
06.02.02 RELLENO COMPACTADO C/MATERIAL PROPIO m3
06.02.03 PERFILADO Y COMPACTACION A NIVEL DE RASANTE m2
06.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM m3
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PM. EN GRADERIA m3
06.03.02 ENCOFRADO Y DESENCOFRADO EN TRIBUNAS m2
06.04 SOPORTE DE TIJERALES
06.04.01 TUBERIA DE SOPORTE DE COBERTURA 4" FG und
06.04.02 ANCLAJE DE TUBERIAS und
06.05 TIJERAL
06.05.01 TIJERAL PRINCIPAL T-3 und
06.05.02 MONTAJE DE TIJERALES und
06.05.03 ARRIOSTRE TIJERAL m
06.06 CORREAS
06.06.01 CORREAS m
06.06.02 MONTAJE DE CORREAS und
06.07 COBERTURAS
06.07.01 COBERTURA CON FIBRAFORTE m2
06.07.02 CUMBRERA CON CALAMINA GALVANIZADA N 30 m
07 CERCO PERIMETRICO
07.01 OBRAS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL m2
07.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADA m2
07.02 MOVIMIENTO DE TIERRAS
07.02.01 DEMOLICION SOBRECIMIENTO EXISTENTE m3
07.02.02 DESMONTAJE DE CERCO PERIMETRICO METALICO m2
07.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3
07.02.04 REFINE, PERFILADO Y NIVELACION DE ZANJA m2
07.02.05 ELIMINACION MATERIAL EXCEDENTE m3
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3
07.03.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3
07.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT m2
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 COLUMNAS
07.04.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3
07.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
07.04.01.03 ACERO EN COLUMNAS FY = 4200 Kg/cm2 kg
07.04.02 VIGAS
07.04.02.01 CONCRETO EN VIGA COLLARIN F`C=175kG/CM2 m3
07.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGA COLLARIN m2
07.04.02.03 ACERO FY=4200 Kg/cm2 EN VIGA COLLARIN kg
07.05 MUROS Y TABIQUES
07.05.01 MUROS CARAVISTA DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X m2
07.06 REVOQUES ENLUCIDOS Y MOLDURAS
07.06.01 TARRAJEO DE SUPERFICIE DE COLUMNAS m2
07.06.02 TARRAJEO DE SUPERFICIE DE VIGA COLLARIN m2
07.07 CARPINTERIA METALICA
07.07.01 PUERTA METAL LAC 1/16" C/MARCO TUBO 2.5" Y REFUERZOS PLATI m2
07.08 CERRAJERIA
07.08.01 CANDADO DE 2", INC ALDABAS und
07.09 PINTURA
07.09.01 PINTURA ESMALTE EN PUERTAS m2
07.09.02 PINTURA AL BARNIZ EN MURO CARAVISTA m2
07.10 VARIOS, LIMPIEZA
07.10.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2
07.10.02 LIMPIEZA FINAL DE OBRA GLB
08 CANAL PLUVIAL DE CONCRETO
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN MATERIAL SUELTO MANUAL m3
08.02.02 RELLENO CON MATERIAL PROPIO m3
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM m3
08.03 OBRAS DE CONCRETO ARMADO
08.03.01 CONCRETO F'C=175 KGC/M2 CANAL PLUVIAL m3
08.03.02 ENCOFRADO Y DESENCOFRADO CANALES m2
08.03.03 ACERO FY=4200 KG/CM2 GRADO 60 EN CANAL PLUVIAL kg
08.04 VARIOS
08.04.01 JUNTA ASFALTICA E=1" EN CANAL PLUVIAL m
08.04.02 REJILLA SUMIDERO-PLAT 1 1/4"X1/4"@1/2" Y MARCO "L" 1 1/4" INC/ m2
08.05 TUBERIA DE EVACUACION PLUVIAL Y MONTANTES
08.05.01 TUBERIA DE BAJADA PVC SAL DIAMETRO 4" m
08.05.02 CONCRETO F'C=175 KG/CM2. PARA MONTANTES m3
08.05.03 ENCOFRADO Y DESENCOFRADO m2
08.05.04 ACERO FY=4200 KG/CM2 GRADO 60 EN MONTANTES kg
09 MOBILIARIO EDUCATIVO
09.01 MOBILIARIOS EDUCATIVO GLB
10 EQUIPAMIENTO DE SALA DE COMPUTO
10.01 EQUIPAMIENTO DE SALA DE COMPUTO GLB
1

Metrado Rendimiento Tiempo unitario ctor multiplicid. Duracin


(Ru) Tu=Metrado/Ru) (f) (D=Tu/f)

1.00 1.00
277.00 120.00 2.31 1.00 7
1.00 1.00 1.00 1.00 3
210.00 8.00 26.25 1.00 1
203.47 100.00 2.03 1.00 27
3
441.31 200.00 2.21 1.00 3
367.76 80.00 4.60 1.00 5
1,471.03 200.00 7.36 1.00 8
123.73 4.00 30.93 1.00 31
832.36 3.00 277.45 1.00 278
731.13 6.00 121.86 1.00 122
200.01 8.00 25.00 1.00 26
123.14 336.00 0.37 1.00 1
336.27 400.00 0.84 1.00 1
312.31 200.00 1.56 1.00 2
3.60 3.50 1.03 1.00 2

249.50 120.00 2.08 1.00 3

9.71 25.00 0.39 1.00 1


54.87 25.00 2.19 1.00 3

7.91 12.00 0.66 1.00 1


75.43 16.00 4.71 1.00 5

337.90 120.00 2.82 1.00 3

51.26 25.00 2.05 1.00 3


3,510.29 250.00 14.04 1.00 15

51.51 22.00 2.34 1.00 3


215.32 12.00 17.94 1.00 18
3,793.35 250.00 15.17 1.00 16

9.69 20.00 0.48 1.00 1


1,612.42 250.00 6.45 1.00 7

8.82 20.00 0.44 1.00 1


42.36 20.00 2.12 1.00 3
714.92 10.00 71.49 1.00 72
12,078.84 250.00 48.32 1.00 49

5.35 10.00 0.54 1.00 1


45.44 1.00
4,567.52 250.00 18.27 1.00 19

2.44 20.00 0.12 1.00 1


74.00 20.00 3.70 1.00 4
572.57 9.00 63.62 1.00 64
9,157.53 250.00 36.63 1.00 37

61.02 25.00 2.44 1.00 3


425.67 14.00 30.41 1.00 31
3,310.90 250.00 13.24 1.00 14
5,887.33 1,600.00 3.68 1.00 4

12.45 12.00 1.04 1.00 2


32.85 5.00 6.57 1.00 7
193.87 250.00 0.78 1.00 1

0.08 25.00 0.00 1.00 1


0.52 9.00 0.06 1.00 1
4.95 250.00 0.02 1.00 1

1
234.46 10.00 23.45 1.00 24
360.19 10.90 33.04 1.00 34

601.49 18.00 33.42 1.00 34


237.36 12.00 19.78 1.00 20
378.61 15.00 25.24 1.00 26
539.98 12.00 45.00 1.00 45
70.27 15.00 4.68 1.00 5
172.04 18.00 9.56 1.00 10
824.35 50.00 16.49 1.00 17
467.58 13.70 34.13 1.00 35

620.11 6.00 103.35 1.00 104

530.13 80.00 6.63 1.00 7


362.87 100.00 3.63 1.00 4
11.07 12.00 0.92 1.00 1
56.25 95.00 0.59 1.00 1

195.55 20.00 9.78 1.00 10


296.34 20.00 14.82 1.00 15

72.60 5.00 14.52 1.00 15


6.18 20.00 0.31 1.00 1
24.66 8.00 3.08 1.00 4
51.91 12.00 4.33 1.00 5
36.30 10.00 3.63 1.00 4

44.17 1.00 44.17 1.00 45


24.00 4.00 6.00 1.00 6
9.45 1.00

79.20 25.00 3.17 1.00 4


18.00 6.00 3.00 1.00 3

110.67 8.00 13.83 1.00 14


18.45 10.00 1.85 1.00 2
84.36 8.00 10.55 1.00 11

24.00 8.00 3.00 1.00 3


72.00 12.00 6.00 1.00 6
24.00 55.00 0.44 1.00 1

860.90 100.00 8.61 1.00 9

607.11 35.00 17.35 1.00 18


598.47 28.00 21.37 1.00 22
296.34 80.00 3.70 1.00 4

237.36 30.00 7.91 1.00 8


613.40 28.00 21.91 1.00 22
0.57 28.00 0.02 1.00 1
195.55 60.00 3.26 1.00 4

620.11 25.00 24.80 1.00 25

12.80 50.00 0.26 1.00 1


79.20 30.00 2.64 1.00 3
110.67 50.00 2.21 1.00 3
26.55 34.00 0.78 1.00 1
1.00 1.00 1.00 1.00 1
12.80 20.00 0.64 1.00 1
40.00 24.00 1.67 1.00 2
1.00 1.00 1.00 1.00 1

12.00 3.00 4.00 1.00 4


12.00 4.00 3.00 1.00 3
3.00 1.00
12.00 1.00 12.00 1.00 12
12.00 4.00 3.00 1.00 3
12.00 8.00 1.50 1.00 2
3.00 4.00 0.75 1.00 1

3.00 3.50 0.86 1.00 1


19.00 3.50 5.43 1.00 6
12.00 4.00 3.00 1.00 3
2.00 4.00 0.50 1.00 1

137.90 40.00 3.45 1.00 4


20.94 40.00 0.52 1.00 1
37.93 40.00 0.95 1.00 1

28.00 8.00 3.50 1.00 4


12.00 10.00 1.20 1.00 2
15.00 12.00 1.25 1.00 2
8.00 8.00 1.00 1.00 1
15.00 1.00 15.00 1.00 15
2.00 8.00 0.25 1.00 1
2.00 10.00 0.20 1.00 1

4.00 4.00 1.00 1.00 1


12.00 4.00 3.00 1.00 3
3.00 4.00 0.75 1.00 1
2.00 25.00 0.08 1.00 1
2.00 4.00 0.50 1.00 1

2.00 3.00 0.67 1.00 1

31.00 4.00 7.75 1.00 8

63.70 30.00 2.12 1.00 3

34.00 30.00 1.13 1.00 2


3.00 30.00 0.10 1.00 1
31.00 30.00 1.03 1.00 2
2.00 30.00 0.07 1.00 1
2.00 1.00 2.00 1.00 2
1.00 8.00 0.13 1.00 1

1.00 5.00 0.20 1.00 1


2.00 3.00 0.67 1.00 1
3.00 15.00 0.20 1.00 1

55.00 8.00 6.88 1.00 7


46.00 10.00 4.60 1.00 5
14.00 10.00 1.40 1.00 2

221.87 30.00 7.40 1.00 8


147.39 30.00 4.91 1.00 5
2.89 20.00 0.14 1.00 1
95.52 20.00 4.78 1.00 5

442.17 300.00 1.47 1.00 2


665.61 400.00 1.66 1.00 2
254.16 75.00 3.39 1.00 4
91.50 60.00 1.53 1.00 2

46.00 8.00 5.75 1.00 6


10.00 20.00 0.50 1.00 1
8.00 20.00 0.40 1.00 1
7.00 20.00 0.35 1.00 1
1.00 20.00 0.05 1.00 1
2.00 24.00 0.08 1.00 1
5.00 15.00 0.33 1.00 1
1.00 16.00 0.06 1.00 1
1.00 12.00 0.08 1.00 1
1.00 12.00 0.08 1.00 1
1.00 20.00 0.05 1.00 1

3.00 3.00 1.00 1.00 1


2.00 6.00 0.33 1.00 1

1.00 1.00 1.00 1.00 1


12.00 15.00 0.80 1.00 1
33.00 15.00 2.20 1.00 3
5.00 15.00 0.33 1.00 1
8.00 3.00 2.67 1.00 3

8.00 4.00 2.00 1.00 2


8.00 4.00 2.00 1.00 2
3.00 4.00 0.75 1.00 1
2.00 3.00 0.67 1.00 1
420.00 500.00 0.84 1.00 1
208.05 100.00 2.08 1.00 3

105.00 7.02 14.96 1.00 15


420.00 200.00 2.10 1.00 3
420.00 80.00 5.25 1.00 6
3.44 3.00 1.15 1.00 2
260.06 336.00 0.77 1.00 1

44.10 14.00 3.15 1.00 4


428.00 60.00 7.13 1.00 8
4.73 12.00 0.39 1.00 1

58.00 25.00 2.32 1.00 3


101.00 40.00 2.53 1.00 3
6.00 10.00 0.60 1.00 1
840.00 200.00 4.20 1.00 5
301.50 150.00 2.01 1.00 3

124.46 500.00 0.25 1.00 1

34.73 3.00 11.58 1.00 12


7.71 6.00 1.29 1.00 2
110.00 200.00 0.55 1.00 1
33.78 336.00 0.10 1.00 1

80.17 20.00 4.01 1.00 5


64.29 14.00 4.59 1.00 5

11.00 5.00 2.20 1.00 3


11.00 5.00 2.20 1.00 3

22.00 2.00 11.00 1.00 11


12.66 10.00 1.27 1.00 2
117.40 40.00 2.94 1.00 3

200.00 15.00 13.33 1.00 14


80.00 20.00 4.00 1.00 4

138.78 30.00 4.63 1.00 5


25.70 160.00 0.16 1.00 1

243.31 100.00 2.43 1.00 3


243.31 500.00 0.49 1.00 1

6.17 2.00 3.09 1.00 4


231.55 60.00 3.86 1.00 4
162.20 4.00 40.55 1.00 41
486.61 40.00 12.17 1.00 13
202.76 25.00 8.11 1.00 9

162.20 24.00 6.76 1.00 7


100.96 12.50 8.08 1.00 9
504.82 14.50 34.82 1.00 35

20.15 10.00 2.02 1.00 3


245.02 10.00 24.50 1.00 25
2,538.90 250.00 10.16 1.00 11

20.28 7.50 2.70 1.00 3


210.87 9.00 23.43 1.00 24
2,654.28 250.00 10.62 1.00 11

807.18 5.26 153.46 1.00 154

245.02 8.00 30.63 1.00 31


210.87 6.50 32.44 1.00 33

5.24 0.50 10.48 1.00 11

1.00 1.00 1.00 1.00 1

5.24 15.00 0.35 1.00 1


1,614.36 33.00 48.92 1.00 49

11.05 34.00 0.33 1.00 1


243.31 1.00 243.31 1.00 244

132.54 500.00 0.27 1.00 1

79.52 3.00 26.51 1.00 27


13.25 8.00 1.66 1.00 2
82.84 336.00 0.25 1.00 1

28.68 7.50 3.82 1.00 4


573.58 15.00 38.24 1.00 39
497.58 350.00 1.42 1.00 2

28.50 20.00 1.43 1.00 2


73.19 16.00 4.57 1.00 5

23.10 60.00 0.39 1.00 1


0.81 10.00 0.08 1.00 1
8.10 15.00 0.54 1.00 1
34.23 350.00 0.10 1.00 1

180.00 1.00 180.00 1.00 180

30.00 1.00 30.00 1.00 30


S10
Pgina :

Tiempo para programacin (Mano de Obra)

Presupuesto 0309002 MEJORAMIENTO DEL PARQUE PRINCIPAL DE LA LOCALIDAD DE CH

Subpresupuesto 001 MEJORAMIENTO DEL PARQUE PRINCIPAL DE LA LOCALIDAD DE CH


Item Descripcin Partida Und. Metrado Rendimiento TiempoUnitario
FactorMultiplicidad Duracion

(Ru) (Tu=Metrado/Ru) (f) (D=Tu/f)

01 ARQUITECTURA

01.01 OBRAS PROVISIONALES


01.01.01 CARTEL DE OBRA DE 3.60 X 2.40 m (GIGANTOGRAFIA) u 1.00 1.00 1.00 1.00
01.01.02 LIMPIEZA DE TERRENO MANUAL m2 2,262.31 120.00 18.85 1.00
01.01.03 CERCO DE PROTECCION m 180.20 100.00 1.80 1.00
01.01.04 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA glb 1.00 1.00 1.00 1.00

01.02 OBRAS PRELIMINARES


01.02.01 DEMOLICION DE VEREDAS PERIMETRALES H=0.25 m2 404.44 200.00 2.02 1.00
01.02.02 DEMOLICION DE VEREDAS DE 0.15 m m2 286.52 300.00 0.96 1.00
01.02.03 DEMOLICION DE PERESTAL DE CONCRETO m3 9.12 5.00 1.82 1.00
01.02.04 DEMONTAJE DE BANCAS METALICAS u 24.00 10.00 2.40 1.00

01.03 MOVIMIENTO DE TIERRAS


01.03.01 TRAZO Y REPLANTEO m2 2,262.31 500.00 4.52 1.00
01.03.02 NIVELACION INTERIOR Y APISONADO FINAL DEL TERRENO PREVIO AL PISO m2 729.77 500.00 1.46 1.00
01.03.03 EXCAVACION DE ZANJAS PARA UAS DE VEREDAS m3 169.35 5.00 33.87 1.00
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3 + CARGADOR FRONTAL D=8KM m3 191.51 100.00 1.92 1.00

01.04 OBRAS DE CONCRETO SIMPLE


01.04.01 CONCRETO EN VEREDA f'c= 175 kg/cm2 m2 729.77 120.00 6.08 1.00
01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS m2 133.70 15.00 8.91 1.00
01.04.03 CONCRETO EN PEDESTAL DE ASTA DE BANDERA f'c= 175 kg/cm2 m2 24.43 120.00 0.20 1.00
01.04.04 ENCOFRADO Y DESENCOFRADO DE PEDESTAL DE ASTA DE BANDERA m2 5.23 15.00 0.35 1.00
01.04.05 RAMPA DE CONCRETO PARA DISCAPACITADOS m2 14.40 20.00 0.72 1.00

01.05 OBRAS DE CONCRETO ARMADO


01.05.01 CONCRETO EN BASE DE BUSTO CONMEMORATIVO f'c=210 kg/cm2 m3 0.24 10.00 0.02 1.00
01.05.02 ENCOFRADO Y DESENCOFRADO DE BASE DE BUSTO CONMEMORATIVO m2 4.50 15.00 0.30 1.00
01.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 EN BASE DE BUSTO CONMEMORATIVO kg 12.50 350.00 0.04 1.00

01.06 PISOS Y PAVIMENTOS


01.06.01 PISO DE LOSETA DE PIEDRA LABRADA m2 729.77 6.00 121.63 1.00
01.06.02 ACABADO Y PULIDO DE PISO DE PIEDRA LABRADA m2 729.77 60.00 12.16 1.00
01.06.03 JUNTAS METALICAS m 16.00 30.00 0.53 1.00

01.07 CARPINTERIA METALICA


01.07.01 REJA METALICA DE SEGURIDAD m 408.79 2.00 204.40 1.00
01.07.02 POSTE DE SOPORTE METALICO u 15.00 5.00 3.00 1.00
01.07.03 ASTA DE BANDERA (SEGUN DISEO) u 3.00 4.00 0.75 1.00
01.07.04 BANCAS ORNAMENTALES SEGUN DISEO u 24.00 6.00 4.00 1.00
01.07.05 TACHO DE BASURA METALICO u 4.00 4.00 1.00 1.00

01.08 CARPINTERIA DE MADERA


01.08.01 PERGOLAS DE MADERA (4" x 8") m 104.00 40.00 2.60 1.00
01.08.02 PERGOLAS DE MADERA (4" x 4") m 99.82 40.00 2.50 1.00

01.09 PINTURA
01.09.01 PINTURA EN POSTES DE SOPORTE METALICO m 56.25 28.00 2.01 1.00
01.09.02 PINTURA EN PERGOLAS DE MADERA CON BARNIZ 2 MANOS m2 102.33 18.00 5.69 1.00
01.09.03 PINTURA EN BANCAS DE MADERA CON BARNIZ 2 MANOS m2 14.40 18.00 0.80 1.00
01.09.04 PINTURA CON ESMALTE SINTETICO EN TACHOS DE BASURA u 4.00 20.00 0.20 1.00

01.10 JARDINERIA
01.10.01 SEMBRADO DE GRASS m2 1,492.88 80.00 18.66 1.00
01.10.02 SIEMBRA DE PLANTONES u 21.00 5.00 4.20 1.00

02 INSTALACIONES ELECTRICAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS PARA DADO DE SOPORTE DE FAROLAS m3 1.08 3.60 0.30 1.00
02.01.02 EXCAVACION DE ZANJAS PARA TUBERIA m3 5.28 4.00 1.32 1.00

02.02 OBRAS DE CONCRETO ARMADO


02.02.01 CONCRETO CICLOPEO EN DADO DE SOPORTE DE FAROLAS f'c=140 kg/cm2 + 70 % PM. m3 1.08 20.00 0.05 1.00

02.03 CABLES Y/O CONDUCTORES


02.03.01 TUBERIA PVC - SEL 3/4" m 218.12 20.00 10.91 1.00
02.03.02 CABLE ELECTRICO NYY 2 X 6 mm2 m 654.36 1.00 654.36 1.00

02.04 ACCESORIOS
02.04.01 POSTE PEDESTAL PARA SOPORTE DE FAROLAS ESFERICAS u 14.00 8.00 1.75 1.00
02.04.02 FAROLA u 28.00 1.00 28.00 1.00
02.04.03 INTERRUPTOR SIMPLE P/EMPOTRADO pza 14.00 4.20 3.33 1.00
02.04.04 REFLECTOR CIRCULAR X 200 W u 2.00 4.00 0.50 1.00

03 INSTALACIONES SANITARIAS
03.01 OBRAS DE CONCRETO ARMADO
03.01.01 CONCRETO EN PILETA f'c=210 kg/cm2 m3 8.71 10.00 0.87 1.00
03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PILETA m2 40.97 5.00 8.19 1.00
03.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA PILETA kg 236.07 350.00 0.67 1.00

03.02 TUBERIAS
03.02.01 TUBERIA PVC CLASE C-10 AGUA POTABLE DE 3/4" m 32.73 150.00 0.22 1.00
03.02.02 TUBERIA DE FG 1" m 25.91 20.00 1.30 1.00
03.02.03 TUBERIA DE FG 3/4" m 32.73 20.00 1.64 1.00

03.03 ACCESORIOS
03.03.01 ELECTRO BOMBA 1 H.P. u 1.00 1.00 1.00 1.00
03.03.02 LLAVES DE PASO 3/4" u 2.00 4.00 0.50 1.00
03.03.03 CODO DE FIERRO GALVANIZADO UNION ROSCADA DE 3/4" u 10.00 20.00 0.50 1.00
03.03.04 CODO DE FIERRO GALVANIZADO UNION ROSCADA DE 1" u 4.00 20.00 0.20 1.00
03.03.05 CODO DE PVC SAP 3/4" u 14.00 12.00 1.17 1.00

04 OTROS
04.01 PLACA RECORDATORIA DE OBRA (ACRILICA DE 0.55 X 0.45) u 1.00 1.00 1.00 1.00
04.02 LIMPIEZA FINAL DE OBRA m2 2,262.31 120.00 18.85 1.00
1

LOCALIDAD DE CHAULAN

LOCALIDAD DE CHAULAN

1
19
2
1

3
1
2
3

5
2
34
2

7
9
1
1
1

1
1
1

122
13
1

205
3
1
4
1

3
3

3
6
1
1

19
5

1
2

11
655

2
28
4
1

1
9
1

1
2
2

1
1
1
1
2

1
19
CRONOGRAMA DE EJECUCION DE OBRAS VALORIZA
PROYECTO :MEJORAMIENTO Y ENBELLECIMIENTO DEL PARQUE PRINCIPAL DEL CENTRO URBANO DE

LOCALIDAD : CHAGLLA PROVINCIA : PACHITEA

DISTRITO : CHAGLLA DEPARTAMENTO : HUANUCO


ITEM PARTIDAS UND % 1 MES 2 M
COSTO 1 2 3 4 1 2
01.00.00 PARQUE PRINCIPAL DE CHAGLLA 176,945.02
01.01.00 OBRAS PROVISIONALES % 100.00

1240.11
01.01.01 ALQUILER DE LOCAL PARA ALMACEN % 100.00 100.00
c
MES 240.00 240.00
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 8.40 m % 100.00 100.00
c
UND 1000.11 1,000.11
01.02.00 OBRAS PRELIMINARES % 100.00

19015.73
01.02.01 LIMPIEZA DE TERRENO MANUAL % 100.00 100.00
c
M2 796.65 796.65
01.02.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR % 100.00 100.00
c
M2 663.87 663.87
01.02.03 TRAZO DURANTE LA EJECUCION DE LA OBRA % 100.00 100.00
c
M2 1649.46 1,649.46
01.02.04 DEMOLICION DE CONSTRUCCION EXISTENTE % 100.00 50.00 50.00
c c
GLB 3500.00 1,750.00 1,750.00
01.02.05 TRANSPORTE DE MATERIALES A LA OBRA % 100.00 16.67 16.67 16.67
c c c
GLB 8000.00 1,333.33 1,333.33 1,333.33
01.02.06 TRANSPORTE DE PIEDRA TIPO LAJA DE CANTERA - OBRA % 100.00 16.67 16.67 16.67
c c c
GLB 2500.00 416.67 416.67 416.67
01.02.07 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA % 100.00 10.00 10.00 10.00 10.00
c c c c
GLB 1905.75 190.58 190.58 190.58 190.58
01.03.00 MOVIMIENTO DE TIERRAS % 100.00

7691.82
01.03.01 EXCAVACION DE ZANJAS EN TERRENO CON BOLONERIA % 100.00 50.00 50.00
c c
M3 2583.50 1,291.75 1,291.75
01.03.02 CORTE Y NIVELACION DE TERRENO MANUAL % 100.00 50.00 50.00
c c
M3 1588.18 794.09 794.09
01.03.03 RELLENO CON MATERIAL PROPIO % 100.00 50.00 50.00
c c
M3 1064.29 532.15 532.15
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6M3 + CARGADOR FRONTAL D=8 % 100.00 50.00 50.00
c c
M3 2455.85 1,227.93 1,227.93
01.04.00 OBRAS DE CONCRETO SIMPLE % 100.00

16439.16
01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA % 100.00 50.00
c
M3 11159.23 5,579.62
01.04.02 SARDINELES DE MAMPOSTERIA DE PIEDRA DE f'c=140 kg/cm2 + 40%PM % 100.00

M3 1767.85
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES % 100.00

M2 1971.85
01.04.04 DADO DE CONCRETO DE F'C=140 KG/CM2 % 100.00

M3 633.15
01.04.05 ENCOFRADO Y DESENCOFRADO BASE DE MASTIL % 100.00

M2 203.21
01.04.06 RAMPA DE CONCRETO PARA DISCAPACITADOS % 100.00

M2 703.87
01.05.00 OBRAS DE CONCRETO ARMADO % 100.00

57302.79
01.05.01 MURO DE CONTENCION % 100.00

27716.65
01.05.01.01 CONCRETO EN MURO DE CONTENCION f'c=175 kg/cm2 % 100.00 33.33 33.33
c c
M3 20775.40 6,925.13 6,925.13
01.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION % 100.00 50.00 50.00
c c
M2 4250.08 2,125.04 2,125.04
01.05.01.03 ACERO fy=4200 kg/cm2 GRADO 60 EN MURO DE CONTENCION % 100.00 50.00 50.00
c c
KG 2691.17 1,345.59 1,345.59
01.05.02 BANCAS % 100.00

10696.02
01.05.02.01 CONCRETO f'c=175 kg/cm2 - BANCAS % 100.00

M3 3287.28
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL - BANCAS % 100.00 50.00
c
ITEM PARTIDAS UND % 1 MES 2 M
COSTO 1 2 3 4 1 2
M2 4710.50 2,355.25
01.05.02.03 ACERO fy=4200 kg/cm2 GRADO 60 - BANCAS % 100.00 50.00
c
KG 2698.24 1,349.12
01.05.03 PILETA CENTRAL % 100.00

9406.95
01.05.03.01 CONCRETO f'c=175 kg/cm2 - PILETA % 100.00

M3 6129.58
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL - PILETA % 100.00

M2 1345.74
01.05.03.03 ACERO fy=4200 kg/cm2 GRADO 60 - PILETA % 100.00

KG 1931.63
01.05.04 PILETA AUXILIAR % 100.00

4703.13
01.05.04.01 CONCRETO f'c=175 kg/cm2 - PILETA % 100.00

M3 3670.16
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL - PILETA % 100.00

M2 337.66
01.05.04.03 ACERO fy=4200 kg/cm2 GRADO 60 - PILETA % 100.00

KG 695.31
01.05.05 GRADAS % 100.00

1782.13
01.05.05.01 CONCRETO f'c=175 kg/cm2 - GRADAS % 100.00

M3 1048.62
01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL - GRADAS % 100.00

M2 512.20
01.05.05.03 ACERO fy=4200 kg/cm2 GRADO 60 - GRADAS % 100.00

KG 221.31
01.05.06 JARDINERAS % 100.00

2997.91
01.05.06.01 CONCRETO f'c=175 kg/cm2 - JARDINERIA % 100.00

M3 983.08
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL - JARDINERIA % 100.00

M2 1147.96
01.05.06.03 ACERO fy=4200 kg/cm2 GRADO 60 - JARDINERIA % 100.00

KG 866.87
01.06.00 ESTRUCTURAS METALICAS % 100.00

8262.34
01.06.01 MASTIL DE FIERRO GALVANIZADO L= 10 M INC COLOCACION % 100.00

UND 1862.85
01.06.02 SUMINISTRO DE ADORNO DE BRONCE FORMA DE PAPA DE BASE % 100.00

GLB 3678.12
01.06.03 SUMINISTRO DE ADORNO DE BRONCE FORMA DE PAPA SUPERIOR % 100.00

GLB 1837.89
01.06.04 TACHO DE BASURA METALICO % 100.00

UND 883.48
01.07.00 CARPINTERIA DE MADERA % 100.00

719.11
01.07.01 ESPALDAR DE BANCAS C/MADERA TRATADA % 100.00

P2 719.11
01.08.00 TARRAJEO Y ENLUCIDOS % 100.00

8079.13
01.08.01 PILETA % 100.00

3986.70
01.08.01.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 % 100.00

M2 561.49
01.08.01.02 TARRAJEO CON IMPERMEABILIZANTES - PILETA % 100.00

M2 1786.93
01.08.01.03 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA % 100.00

M2 1638.28
01.08.02 BANCAS % 100.00

3542.27
01.08.02.01 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA % 100.00

M2 3542.27
01.08.03 GRADAS % 100.00

550.16
01.08.03.01 REVESTIMIENTO DE PILETA CON PIEDRA TIPO LAJA % 100.00

M2 550.16
01.09.00 PISOS Y PAVIMENTOS % 100.00

30251.61
01.09.01 AFIRMADO DE 4" PARA VEREDAS % 100.00 25.00 25.00
c c
ITEM PARTIDAS UND % 1 MES 2 M
COSTO 1 2 3 4 1 2
M2 4145.31 1,036.33 1,036.33
01.09.02 VEREDA CON PIEDRA TIPO LAJA CON f'c= 140 kg/cm2 % 100.00 25.00 25.00 25.00
c c c
M2 23122.78 5,780.70 5,780.70 5,780.70
01.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS % 100.00 25.00 25.00 25.00
c c c
M2 2983.52 745.88 745.88 745.88
01.10.00 CUNETAS % 100.00

5647.34
01.10.01 CUNETAS CON PIEDRA TIPO LAJA CON f'c= 140 kg/cm2 % 100.00 25.00 25.00
c c
M2 5551.30 1,387.83 1,387.83
01.10.02 JUNTA DE CONSTRUCCION EN VEREDA e=1" RELLENO DE BREA + ARENA % 100.00 25.00 25.00
c c
ML 96.04 24.01 24.01
01.11.00 AREAS VERDES % 100.00

3512.42
01.11.01 TIERRA DE CHACRA P/RELLENO EN AREAS VERDES % 100.00

M3 1855.62
01.11.02 BATIDO DE TIERRA DE CHACRA DE 20 CMS DE PROFUNDIDAD % 100.00

M2 234.94
01.11.03 EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA P/SEMBRIO DE GRASS % 100.00

M2 176.97
01.11.04 SEMBRADO DE GRASS % 100.00

M2 1244.89
01.12.00 INSTALACIONES SANITARIAS % 100.00

3758.33
01.12.01 DESAGUE EVACUACION DE AGUA/SERVIDA % 100.00

1395.67
01.12.01.01 SALIDA DE DESAGUE EN PVC % 100.00 33.33
c
PTO 397.20 132.40
01.12.01.02 SUMINISTRO E INSTALACION TUBERIAS PVC DAL 4" % 100.00 33.33
c
ML 582.75 194.25
01.12.01.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" % 100.00

PZA 415.72
01.12.02 SISTEMA DE AGUA FRIA % 100.00

2362.66
01.12.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4" % 100.00

PTO 1198.56
01.12.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" C-7.5 % 100.00

ML 442.20
01.12.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 3/4" C-7.5 % 100.00

ML 304.80
01.12.02.04 SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA DE 1/2" % 100.00

UND 417.10
01.13.00 INSTALACIONES ELECTRICAS % 100.00

10763.28
01.13.01 SALIDA PARA ELECTRICIDAD % 100.00

10763.28
01.13.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1" C-7.5 % 100.00 33.33
c
ML 377.30 125.77
01.13.01.02 CABLE DE LUZ POR TIERRA 3-1 X 10 MM2 NYY % 100.00

ML 644.40
01.13.01.03 TABLERO GENERAL DE DISTRIBUCION FG LIVIANO % 100.00

PZA 403.50
01.13.01.04 POSTE DE C.A. 8/200/120/240 INSTALACION A PULSO % 100.00

UND 2388.12
01.13.01.05 PASTORAL SUCRE CONCRETO SIMPLE + LUMINARIA % 100.00

UND 4132.88
01.13.01.06 POZO CONEXION A TIERRA % 100.00

UND 2817.08
01.14. MANEJO DE AREA VERDE % 100.00

4261.85
01.14.01 PLANTAS ARBUSTIVAS % 100.00

1187.48
01.14.01.01 TRAZO Y REPLANTEO Y LIMPIEZA DE TERRENO DE IA % 100.00

M2 4.28
01.14.01.02 ADQUISICION Y TRANSPORTE DE PLANTONES FORESTALES % 100.00

UND 577.50
01.14.01.03 SIEMBRA DE PLANTONES % 100.00

UND 605.70
01.14.02 FLORES % 100.00

2912.37
01.14.02.01 TRAZO Y REPLANTEO Y LIMPIEZA DE TERRENO DE IA % 100.00

M2 104.05
ITEM PARTIDAS UND % 1 MES 2 M
COSTO 1 2 3 4 1 2
01.14.02.02 ADQUISICION Y TRANSPORTE DE PLANTONES DE FLORES % 100.00

UND 446.25
01.14.02.03 PLANTAS DE FLORES % 100.00

UND 2362.07
01.14.03 SEALIZACION % 100.00

162.00
01.14.03.01 CINTA DE SEGURIDAD % 100.00

UND 162.00
COSTO DIRECTO DE LA OBRA 176,945.02 2,036.76 5,455.62 7,425.88 11,514.01 21,321.14 28,804.77
26,432.27
GASTOS GENERALES 14155.60 162.94 436.45 594.07 921.12 1705.69 2304.38
SUBTOTAL 191,100.62 2,199.70 5,892.07 8,019.95 12,435.13 23,026.83 31,109.15

PRESUPUESTO TOTAL DE LA OBRA 191,100.62 2,199.70 5,892.07 8,019.95 12,435.13 23,026.83 31,109.15

GASTOS DE SUPERVISION 9000.00


ELABORACION DEL EXPEDIENTE TECNICO 6417.00

TOTAL 15417.00

2,199.70 5,892.07 8,019.95 12,435.13 23,026.83 31,109.15

PRESUPUESTO TOTAL 206,517.62


E EJECUCION DE OBRAS VALORIZADO
IENTO DEL PARQUE PRINCIPAL DEL CENTRO URBANO DE CHAGLLA

2 MES 3 MES
3 4 1 2 3 4

16.67 16.67 16.67


c c c
1,333.33 1,333.33 1,333.33
16.67 16.67 16.67
c c c
416.67 416.67 416.67
10.00 10.00 10.00 10.00 10.00 10.00
c c c c c c
190.58 190.58 190.58 190.58 190.58 190.58

50.00
c
5,579.62
50.00 50.00
c c
883.93 883.93
50.00 50.00
c c
985.93 985.93
50.00 50.00
c c
316.58 316.58
33.33 33.33 33.33
c c c
67.74 67.74 67.74
50.00 50.00
c c
351.94 351.94

33.33
c
6,925.13

50.00 50.00
c c
1,643.64 1,643.64
50.00
c
2 MES 3 MES
3 4 1 2 3 4
2,355.25
50.00
c
1,349.12

50.00 50.00
c c
3,064.79 3,064.79
50.00 50.00
c c
672.87 672.87
50.00 50.00
c c
965.82 965.82

50.00 50.00
c c
1,835.08 1,835.08
50.00 50.00
c c
168.83 168.83
50.00 50.00
c c
347.66 347.66

50.00 50.00
c c
524.31 524.31
50.00 50.00
c c
256.10 256.10
50.00 50.00
c c
110.66 110.66

50.00 50.00
c c
491.54 491.54
50.00 50.00
c c
573.98 573.98
50.00 50.00
c c
433.44 433.44

100.00
c
1,862.85
100.00
c
3,678.12
100.00
c
1,837.89
100.00
c
883.48

100.00
c
719.11

100.00
c
561.49
100.00
c
1,786.93
100.00
c
1,638.28

100.00
c
3,542.27

100.00
c
550.16

25.00 25.00
c c
2 MES 3 MES
3 4 1 2 3 4
1,036.33 1,036.33
25.00
c
5,780.70
25.00
c
745.88

25.00 25.00
c c
1,387.83 1,387.83
25.00 25.00
c c
24.01 24.01

50.00 50.00
c c
927.81 927.81
50.00 50.00
c c
117.47 117.47
50.00 50.00
c c
88.49 88.49
50.00 50.00
c c
622.45 622.45

33.33 33.33
c c
132.40 132.40
33.33 33.33
c c
194.25 194.25
50.00 50.00
c c
207.86 207.86

50.00 50.00
c c
599.28 599.28
50.00 50.00
c c
221.10 221.10
50.00 50.00
c c
152.40 152.40
50.00 50.00
c c
208.55 208.55

33.33 33.33
c c
125.77 125.77
50.00 50.00
c c
322.20 322.20
50.00 50.00
c c
201.75 201.75
50.00 50.00
c c
1,194.06 1,194.06
50.00 50.00
c c
2,066.44 2,066.44
100.00
c
2,817.08

100.00
c
4.28
100.00
c
577.50
100.00
c
605.70

100.00
c
104.05
2 MES 3 MES
3 4 1 2 3 4
100.00
c
446.25
100.00
c
2,362.07

100.00
c
162.00
33,208.22 17,981.18 16,094.72 18,091.58 14,820.57 190.58
101,315.31 49,197.44
2656.66 1438.49 1287.58 1447.33 1185.65 15.25
35,864.87 19,419.68 17,382.29 19,538.91 16,006.22 205.82

35,864.87 19,419.68 17,382.29 19,538.91 16,006.22 205.82

35,864.87 19,419.68 17,382.29 19,538.91 16,006.22 205.82


15,417.00
191,100.62
206,517.62
Item
0 01
0 01.01
0 01.02
0 02
0 02.01
0 02.02
0 02.03
0 03
0 03.01
03.02
0 03.03
0 03.04
0 03.05
0 04
0 04.01
0 04.02
0 05
0 05.01
0 05.01.01
0 05.01.02
0 05.01.03
0 05.02
0 05.02.01
0 05.02.01.01
0 05.02.02
0 05.02.02.01
0 05.02.02.02
0 05.02.02.03
0 05.02.03
0 05.02.03.01
0 05.02.03.02
0 05.02.04
0 05.02.04.01
0 05.02.04.02
0 05.02.04.03
0 05.02.05
0 05.02.05.01
0 05.03
0 05.03.01
0 05.03.01.01
0 05.03.02
0 05.03.02.01
0 05.03.02.02
0 05.03.02.03
0 05.03.03
0 05.03.03.01
0 05.03.03.02
0 05.03.04
0 05.03.04.01
0 05.03.04.02
0 05.03.04.03
0 05.03.05
0 05.03.05.01
0 05.04
0 05.04.01
0 05.04.01.01
0 05.04.01.02
0 05.04.02
05.04.02.01
0 05.04.02.02
05.04.02.03
05.04.03
05.04.03.01
0 05.04.03.02
0 05.04.04
0 05.04.04.01
0 05.05
0 05.05.01
05.05.01.01
0 05.05.01.02
0 05.05.01.03
0 05.05.02
0 05.05.02.01
0 05.05.02.02
0 05.05.02.03
0 05.05.02.04
0 05.05.03
0 05.05.03.01
0 05.05.03.01.01
0 05.05.03.02
0 05.05.03.02.01
0 05.05.03.02.02
0 05.05.03.03
0 05.05.03.03.01
0 05.05.03.03.02
0 05.05.03.04
0 05.05.03.04.01
0 05.05.03.04.02
0 05.05.04
0 05.05.04.01
0 05.05.04.01.01
0 05.05.04.01.01
0 05.05.04.01.01
05.05.04.01.01
05.05.04.01.02
05.05.04.01.02
05.05.04.01.02
05.05.04.01.02
05.05.05
05.05.05.01
05.05.05.02
05.05.05.03
05.05.05.04
05.05.05.05
05.05.06
05.05.06.01
05.05.06.02
05.05.06.03
05.05.06.04
05.05.06.05
05.05.06.06
05.05.06.07
06
06.01
06.02
06.03
07
07.01
07.02
07.03
08
08.01
Descripcin
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40 X 3.60 m
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DE EJE
LIMPIEZA Y DESBROCE
ELIMINACION DE MATERIAL ORGANICO R= 360 m3/da
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO R=570 m3/da
CORTE ROCA SUELTA (PERFORACION Y DISPARO) R=250 m3/da
CORTE ROCA FIJA (PERFORACION Y DISPARO) R=260 m3/da
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CORTE A BOTADEROS
PAVIMENTOS
PERFILADO Y COMPACTADO EN ZONA DE CORTE
AFIRMADO DE 0.15 m.
OBRAS DE ARTE Y DRENAJE
CUNETAS SIN REVESTIR
CONFORMACION DE CUNETAS EN TIERRA SUELTA
CONFORMACION DE CUNETAS EN ROCA SUELTA
CONFORMACION DE CUNETAS EN ROCA FIJA
ALCANTARILLA TIPO I
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE TIERRA NORMAL
RELLENO COMPACTADO MANUAL MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO ARMADO
CONCRETO f'c=210 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
MAMPOSTERIA DE PIEDRA
EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM
ALCANTARILLA TIPO II
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE TIERRA NORMAL
RELLENO COMPACTADO MANUAL MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO ARMADO
CONCRETO f'c=210 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
MAMPOSTERIA DE PIEDRA
EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM
BADEN
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
DESVIO PROVISIONAL DEL AGUA
MOVIMIENTO DE TIERRAS
EXCAVACION DE TIERRA NORMAL
RELLENO COMPACTADO MANUAL MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO Y DESENCOFRADO NORMAL
MAMPOSTERIA DE PIEDRA
EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM
PONTON
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
IMPLEMENT. DE PLAN DE DESVIOS Y MANTENIMIENTO
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO(EN SECO)
EXCAVACION EN ROCA CON PRE-CORTE R= 260 m3/da
RELLENO DE ESTRUCTURAS (MATERIAL PROPIO)
ELIMINACION DE MATERIAL EXCEDENTE CORTE A BOTADEROS
OBRAS DE CONCRETO SIMPLE
CONCRETO SIMPLE EN SOLADO DE ZAPATAS
CONCRETO SIMPLE Y SOLADO PARA ZAPATAS
CONCRETO EN ZAPATAS
CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE
ENCOFRADO DE ZAPATAS
CONCRETO EN MUROS
CONCRETO f'c=175 kg/cm2 -ESTRIBOS DEL PONTON
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
LOSA DE APROXIMACION
CONCRETO F'C= 175 KG/CM2 EN LOSA DE APROXIMACION
ENCOFRADO Y DESENCOFRADO DE LOSAS DE APROXIMACION
OBRAS DE CONCRETO ARMADO
TABLERO
VIGAS
CONCRETO F'C= 210 KG/CM2 EN VIGA
ENCOFRADO Y DESENCOFRADO VIGA
ACERO CORRUGADO F'Y=4200
LOSA Y VEREDAS
CONCRETO F'C= 210 KG/CM2 EN LOSA DE TABLERO
ENCOFRADO Y DESENCOFRADO DE LOSAS DE TABLERO
ACERO CORRUGADO F'Y=4200 Kg/cm2 PARA LOSAS DE TABLERO
FALSO PUENTE
DESMONTAJE DE PUENTE DE MADERA Y ESTRIBOS
EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETROEXCAVADORA DE 5Y3
ARRIOSTRE TRANSVERSAL DE 3"X4"X12'
PALO ROLLIZO DE D = 6", L = 5 M.
PALO ROLLIZO DE D = 4", L = 5 M.
VARIOS
TUBOS DE DRENAJE PVC D=3" 0.40 M
TUBO DE DRENAJE DE PANTALLA PVC SAP D = 2"
BARANDAS METALICAS
PINTURA EN BARANDAS METALICAS
APOYO NEOPRENO REFORZADO
APOYO DE NEOPRENO SIMPLE
JUNTAS DE DILATACION
MUROS DE SOSTENIMIENTO
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MAMPOSTERIA DE PIEDRA, F'C = 140 KG/CM2+30%PM
SEALIZACION Y SEGURIDAD
SEALES INFORMATIVA
SEALES PREVENTIVAS
POSTES KILOMETRICOS INCLUIDO COLOCACION
FLETE TOTAL
FLETE TERRESTRE
Und. Metrado Precio (S/.) Parcial (S/.)
12,566.011
glb 1.00 10,919.570 10,919.570
u 1.00 1,646.441 1,646.441
18,188.848
km 5.10 1,628.916 8,307.472
ha 7.70 450.828 3,471.376
m3 1,250.00 5.128 6,410.000
853,779.488
m3 34,241.52 3.276 112,175.220
m3 10,469.50 12.643 132,365.889
m3 25,066.47 18.796 471,149.370
m3 5,739.08 5.140 29,498.871
m3 80,676.18 1.346 108,590.138
182,498.624
m2 20,416.00 2.618 53,449.088
m2 20,416.00 6.321 129,049.536
235,602.036
27,938.320
m 2,000.00 2.187 4,374.000
m 1,600.00 6.545 10,472.000
m 1,504.00 8.705 13,092.320
29,533.595
196.372
m2 100.19 1.960 196.372
4,192.682
m3 108.88 31.239 3,401.302
m3 12.96 41.477 537.542
m3 16.20 15.669 253.838
11,169.835
m3 21.60 277.547 5,995.015
m2 108.00 47.915 5,174.820 *
11,295.933
m3 12.85 304.277 3,909.959
m2 31.68 47.915 1,517.947
kg 957.42 6.129 5,868.027
2,678.773
m2 55.46 48.301 2,678.773
15,021.997
102.175
m2 52.13 1.960 102.175
2,061.911
m3 57.56 31.239 1,798.117
m3 4.32 41.477 179.181
m3 5.40 15.669 84.613
7,320.001 *
m3 16.43 277.547 4,560.097
m2 57.60 47.915 2,759.904
3,764.297
m3 4.28 304.277 1,302.306
m2 10.56 47.915 505.982
kg 319.14 6.129 1,956.009
1,773.613
m2 36.72 48.301 1,773.613
28,622.650
506.941
m2 210.00 1.960 411.600
u 1.00 95.341 95.341
4,095.890
m3 78.27 31.239 2,445.077
m3 4.32 41.477 179.181
m3 93.92 15.669 1,471.632
20,155.739
m3 58.81 277.547 16,322.539
m2 80.00 47.915 3,833.200
3,864.080
m2 80.00 48.301 3,864.080
134,485.474
1,674.135
m2 264.92 1.960 519.243
m2 264.92 1.917 507.852
m2 48.00 13.480 647.040
3,755.806
m3 77.49 13.937 1,079.978
m3 93.86 22.050 2,069.613
m3 12.00 27.609 331.308
m3 204.24 1.346 274.907
69,335.970
1,577.461
m3 8.53 184.931 1,577.461
18,232.017
m3 10.86 281.325 3,055.190
m2 284.37 53.370 15,176.827
46,437.498
m3 88.76 281.325 24,970.407
m2 284.37 75.490 21,467.091
3,088.994
m3 8.40 267.998 2,251.183
m2 12.80 65.454 837.811
47,108.619
47,108.619
30,694.513
m3 19.67 321.218 6,318.358
m2 130.37 65.454 8,533.238
kg 3,480.43 4.552 15,842.917
16,414.106
m3 19.67 321.218 6,318.358
m2 100.84 41.614 4,196.356
kg 1,296.00 4.552 5,899.392
3,237.606
u 12.00 85.124 1,021.488
m3 69.96 10.840 758.366
p2 141.34 8.536 1,206.478
u 6.00 23.043 138.258
u 6.00 18.836 113.016
9,373.338
m 2.40 40.805 97.932
m 10.00 30.494 304.940
m 30.00 111.083 3,332.490
m 30.00 13.074 392.220
u 4.00 520.444 2,081.776
u 4.00 291.280 1,165.120
m 20.00 99.943 1,998.860
4,174.240
m2 80.00 1.960 156.800
m2 80.00 1.917 153.360
m2 80.00 48.301 3,864.080
12,782.580
u 4.00 807.408 3,229.632
u 12.00 753.704 9,044.448
glb 6.00 84.750 508.500
6,459.590
glb 1.00 6,459.590 6,459.590
CRONOGRAMA DE EJECUCION DE OBRAS VALORIZADO
PROYECTO :REABILITACION Y CONSTRUCCION DE LA CARRETERA LINDA LINDA-TINAJ PARQUENCHO, DISTRITO DE MOLINO-PROVINCIA DE PACHITEA DEPARTAMENTO HUANUCO

LOCALIDAD : LINDA LINDA-TINAJ PAQUENCHO PROVINCIA : HUANUCO

DISTRITO : MOLINO DEPARTAMENTO : HUANUCO


ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

01.00.00 OBRAS PROVISIONALES % 100.00

12,566.01
01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS % 100.00 100.00
c
GLB 10,919.57 10,919.57
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40 X 3.60 m % 100.00 100.00
c
UND 1,646.44 1,646.44
02.00.00 TRABAJOS PRELIMINARES % 100.00

18,188.85
02.01.00 TRAZO Y REPLANTEO DE EJE % 100.00 50.00 50.00
c c
KM 8,307.47 4,153.74 4,153.74
02.02.00 LIMPIEZA Y DESBROCE % 100.00 100.00
c
HA 3,471.38 3,471.38
02.03.00 ELIMINACION DE MATERIAL ORGANICO R= 360 m3/da % 100.00 100.00
c
M3 6,410.00 6,410.00
03.00.00 MOVIMIENTO DE TIERRAS % 100.00

853,779.49
03.01.00 CORTE DE MATERIAL SUELTO R=570 m3/da % 100.00 20.00 20.00 20.00 20.00 20.00
c c c c c
M3 112,175.22 22,435.04 22,435.04 22,435.04 22,435.04 22,435.04
03.02.00 CORTE ROCA SUELTA (PERFORACION Y DISPARO) R=250 m3/da % 100.00 33.33 33.33 33.33
c c c
M3 132,365.89 44,121.96 44,121.96 44,121.96
03.03.00 CORTE ROCA FIJA (PERFORACION Y DISPARO) R=260 m3/da % 100.00 14.29 14.29 14.29 14.29 14.29 14.29 14.29
c c c c c c c
M3 471,149.37 67,307.05 67,307.05 67,307.05 67,307.05 67,307.05 67,307.05 67,307.05
03.04.00 RELLENO CON MATERIAL PROPIO % 100.00 50.00 50.00
c c
M3 29,498.87 14,749.44 14,749.44
03.05.00 ELIMINACION DE MATERIAL EXCEDENTE CORTE A BOTADEROS % 100.00 16.67 16.67 16.67 16.67 16.67 16.67
c c c c c c
M3 108,590.14 18,098.36 18,098.36 18,098.36 18,098.36 18,098.36 18,098.36
04.00.00 PAVIMENTOS % 100.00

182,498.62
04.01.00 PERFILADO Y COMPACTADO EN ZONA DE CORTE % 100.00 50.00 50.00
c c
M2 53,449.09 26,724.54 26,724.54
04.02.00 AFIRMADO DE 0.15 m. % 100.00 50.00 50.00
c c
M2 129,049.54 64,524.77 64,524.77
05.00.00 OBRAS DE ARTE Y DRENAJE % 100.00

235,602.04
05.01.00 CUNETAS SIN REVESTIR % 100.00

27,938.32
05.01.01 CONFORMACION DE CUNETAS EN TIERRA SUELTA % 100.00 33.33 33.33 33.33
c c c
M 4,374.00 1,458.00 1,458.00 1,458.00
05.01.02 CONFORMACION DE CUNETAS EN ROCA SUELTA % 100.00 100.00
c
M 10,472.00 10,472.00
05.01.03 CONFORMACION DE CUNETAS EN ROCA FIJA % 100.00 50.00 50.00
c c
M 13,092.32 6,546.16 6,546.16
05.02.00 ALCANTARILLA TIPO I % 100.00

29,533.60
05.02.01 TRABAJOS PRELIMINARES % 100.00

196.37
05.02.01.01 TRAZO, NIVELACION Y REPLANTEO % 100.00 100.00
c
M2 196.37 196.37
05.02.02 MOVIMIENTO DE TIERRAS % 100.00

4,192.68
05.02.02.01 EXCAVACION DE TIERRA NORMAL % 100.00 20.00 20.00 20.00 20.00 20.00
c c c c c
M3 3,401.30 680.26 680.26 680.26 680.26 680.26
05.02.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO % 100.00 100.00
c
M3 537.54 537.54
05.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE % 100.00 100.00
c
M3 253.84 253.84
05.02.03 CONCRETO SIMPLE % 100.00

11,169.84
05.02.03.01 CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
c
M3 5,995.02 5,995.02
ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
05.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL % 100.00 33.33 33.33 33.33
c c c
M2 5,174.82 1,724.94 1,724.94 1,724.94
ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
05.02.04 CONCRETO ARMADO % 100.00

11,295.93
05.02.04.01 CONCRETO f'c=210 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
c
M3 3,909.96 3,909.96
05.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL % 100.00 100.00
c
M2 1,517.95 1,517.95
05.02.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 % 100.00 100.00
c
KG 5,868.03 5,868.03
05.02.05 MAMPOSTERIA DE PIEDRA % 100.00

2,678.77
05.02.03.01 EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM % 100.00 100.00
c
M2 2,678.77 2,678.77
05.03.00 ALCANTARILLA TIPO II % 100.00

15,022.00
05.03.01 TRABAJOS PRELIMINARES % 100.00

102.18
05.03.01.01 TRAZO, NIVELACION Y REPLANTEO % 100.00 100.00
c
M2 102.18 102.18
05.03.02 MOVIMIENTO DE TIERRAS % 100.00

2,061.91
05.03.02.01 EXCAVACION DE TIERRA NORMAL % 100.00 33.33 33.33 33.33
c c c
M3 1,798.12 599.37 599.37 599.37
05.03.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO % 100.00 100.00
c
M3 179.18 179.18
05.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE % 100.00 100.00
c
M3 84.61 84.61
05.03.03 CONCRETO SIMPLE % 100.00

7,320.00
05.03.03.01 CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
c
M3 4,560.10 4,560.10
05.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL % 100.00 50.00 50.00
M2 c c
2,759.90 1,379.95 1,379.95
05.03.04 CONCRETO ARMADO % 100.00

3,764.30
05.03.04.01 CONCRETO f'c=210 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
M3 c
1,302.31 1,302.31
05.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL % 100.00 100.00
M2 c
505.98 505.98
05.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 % 100.00 100.00
KG c
1,956.01 1,956.01
05.03.05 MAMPOSTERIA DE PIEDRA % 100.00

1,773.61
05.03.05.01 EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM % 100.00 100.00
M2 c
1,773.61 1,773.61
05.04.00 BADEN % 100.00

28,622.65
05.04.01 TRABAJOS PRELIMINARES % 100.00

506.94
05.04.01.01 TRAZO, NIVELACION Y REPLANTEO % 100.00 100.00
M2 c
411.60 411.60
05.04.01.02 DESVIO PROVISIONAL DEL AGUA % 100.00 100.00
c
UND 95.34 95.34
05.04.02 MOVIMIENTO DE TIERRAS % 100.00

4,095.89
05.04.02.01 EXCAVACION DE TIERRA NORMAL % 100.00 25.00 25.00 25.00 25.00
c c c c
M3 2,445.08 611.27 611.27 611.27 611.27
05.04.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO % 100.00 100.00
c
M3 179.18 179.18
05.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE % 100.00 33.33 33.33 33.33
M3 c c c
1,471.63 490.54 490.54 490.54
ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
05.04.03 CONCRETO SIMPLE % 100.00

20,155.74
05.04.03.01 CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
c
M3 16,322.54 16,322.54
05.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL % 100.00 50.00 50.00
c c
M2 3,833.20 1,916.60 1,916.60
05.04.04 MAMPOSTERIA DE PIEDRA % 100.00

3,864.08
05.04.04.01 EMBOQUILLADO DE PIEDRA, F'C = 140 KG/CM2+30%PM % 100.00 100.00
c
M2 3,864.08 3,864.08
05.05.00 PONTON % 100.00

134,485.47
05.05.01 TRABAJOS PRELIMINARES % 100.00

1,674.14
05.05.01.01 TRAZO, NIVELACION Y REPLANTEO % 100.00 100.00
M2 c
519.24 519.24
05.05.01.02 LIMPIEZA DE TERRENO MANUAL % 100.00 100.00
c
M2 507.85 507.85
05.05.01.03 IMPLEMENT. DE PLAN DE DESVIOS Y MANTENIMIENTO % 100.00 100.00
M2 c
647.04 647.04
05.05.02 MOVIMIENTO DE TIERRAS % 100.00

3,755.81
05.05.02.01 EXCAVACION EN MATERIAL SUELTO(EN SECO) % 100.00 100.00
M3 c
1,079.98 1,079.98
05.05.02.02 EXCAVACION EN ROCA CON PRE-CORTE R= 260 m3/da % 100.00 100.00
c
M3 2,069.61 2,069.61
05.05.02.03 RELLENO DE ESTRUCTURAS (MATERIAL PROPIO) % 100.00 100.00
M3 c
331.31 331.31
05.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE CORTE A BOTADEROS % 100.00 100.00
c
M3 274.91 274.91
05.05.03 OBRAS DE CONCRETO SIMPLE % 100.00

69,335.97
05.05.03.01 CONCRETO SIMPLE EN SOLADO DE ZAPATAS % 100.00

1,577.46
05.05.03.01.01 CONCRETO SIMPLE Y SOLADO PARA ZAPATAS % 100.00 100.00
M3 c
1,577.46 1,577.46
05.05.03.02 CONCRETO EN ZAPATAS % 100.00

18,232.02
05.05.03.02.01 CONCRETO f'c=175 kg/cm2 PARA OBRAS DE ARTE % 100.00 100.00
M3 c
3,055.19 3,055.19
05.05.03.02.02 ENCOFRADO DE ZAPATAS % 100.00 50.00 50.00
M2 c c
15,176.83 7,588.41 7,588.41
05.05.03.03 CONCRETO EN MUROS % 100.00

46,437.50
05.05.03.03.01 CONCRETO f'c=175 kg/cm2 -ESTRIBOS DEL PONTON % 100.00 100.00
M3 c
24,970.41 24,970.41
05.05.03.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS % 100.00 33.33 33.33 33.33
c c c
M2 21,467.09 7,155.70 7,155.70 7,155.70
05.05.03.04 LOSA DE APROXIMACION % 100.00

3,088.99
05.05.03.04.01 CONCRETO F'C= 175 KG/CM2 EN LOSA DE APROXIMACION % 100.00 100.00
c
M3 2,251.18 2,251.18
05.05.03.04.02 ENCOFRADO Y DESENCOFRADO DE LOSAS DE APROXIMACION % 100.00 100.00
M2 c
837.81 837.81
05.05.04 OBRAS DE CONCRETO ARMADO % 100.00

47,108.62
05.05.04.01 TABLERO % 100.00

47,108.62
05.05.04.01.01 VIGAS % 100.00

30,694.51
ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
05.05.04.01.01.01 CONCRETO F'C= 210 KG/CM2 EN VIGA % 100.00 100.00
c
M3 6,318.36 6,318.36
05.05.04.01.01.02 ENCOFRADO Y DESENCOFRADO VIGA % 100.00 50.00 50.00
M2 c c
8,533.24 4,266.62 4,266.62
05.05.04.01.01.03 ACERO CORRUGADO F'Y=4200 % 100.00 50.00 50.00
c c
KG 15,842.92 7,921.46 7,921.46
05.05.04.01.01 LOSA Y VEREDAS % 100.00

16,414.11
05.05.04.01.01.01 CONCRETO F'C= 210 KG/CM2 EN LOSA DE TABLERO % 100.00 100.00
M3 c
6,318.36 6,318.36
05.05.04.01.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS DE TABLERO % 100.00 100.00
M2 c
4,196.36 4,196.36
05.05.04.01.01.03 ACERO CORRUGADO F'Y=4200 Kg/cm2 PARA LOSAS DE TABLERO % 100.00 100.00
KG c
5,899.39 5,899.39
05.05.05 FALSO PUENTE % 100.00

3,237.61
05.05.05.01 DESMONTAJE DE PUENTE DE MADERA Y ESTRIBOS % 100.00 100.00
UND c
1,021.49 1,021.49
05.05.05.02 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETR % 100.00 100.00
M3 c
758.37 758.37
05.05.05.03 ARRIOSTRE TRANSVERSAL DE 3"X4"X12' % 100.00 50.00 50.00
P2 c c
1,206.48 603.24 603.24
05.05.05.04 PALO ROLLIZO DE D = 6", L = 5 M. % 100.00 100.00
c
UND 138.26 138.26
05.05.05.05 PALO ROLLIZO DE D = 4", L = 5 M. % 100.00 100.00
UND c
113.02 113.02
05.05.06 VARIOS % 100.00

9,373.34
05.05.06.01 TUBOS DE DRENAJE PVC D=3" 0.40 M % 100.00 100.00
M c
97.93 97.93
05.05.06.02 TUBO DE DRENAJE DE PANTALLA PVC SAP D = 2" % 100.00 100.00
c
M 304.94 304.94
05.05.06.03 BARANDAS METALICAS % 100.00 100.00
M c
3,332.49 3,332.49
05.05.06.04 PINTURA EN BARANDAS METALICAS % 100.00 100.00
M c
392.22 392.22
05.05.06.05 APOYO NEOPRENO REFORZADO % 100.00 100.00
UND c
2,081.78 2,081.78
05.05.06.06 APOYO DE NEOPRENO SIMPLE % 100.00 100.00
UND c
1,165.12 1,165.12
05.05.06.07 JUNTAS DE DILATACION % 100.00 100.00
c
M 1,998.86 1,998.86
06.00.00 MUROS DE SOSTENIMIENTO % 100.00

4,174.24
06.01.00 TRAZO, NIVELACION Y REPLANTEO % 100.00 100.00
c
M2 156.80 156.80
06.02.00 LIMPIEZA DE TERRENO MANUAL % 100.00 100.00
c
M2 153.36 153.36
06.03.00 MAMPOSTERIA DE PIEDRA, F'C = 140 KG/CM2+30%PM % 100.00 100.00
c
M2 3,864.08 3,864.08
07.00.00 SEALIZACION Y SEGURIDAD % 100.00

12,782.58
07.01.00 SEALES INFORMATIVA % 100.00 100.00
c
UND 3,229.63 3,229.63
07.02.00 SEALES PREVENTIVAS % 100.00 100.00
c
UND 9,044.45 9,044.45
07.03.00 POSTES KILOMETRICOS INCLUIDO COLOCACION % 100.00 100.00
c
GLB 508.50 508.50
08.00.00 FLETE TOTAL % 100.00

6,459.59
ITEM PARTIDAS UND % 1 MES 2 MES 3 MES 4 MES
COSTO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
08.01.00 FLETE TERRESTRE % 100.00 20.00 20.00 20.00 20.00 20.00
c c c c c
GLB 6,459.59 1,291.92 1,291.92 1,291.92 1,291.92 1,291.92
09.00.00 MITIGACION DE IMPACTO AMBIENTAL % 100.00

37,149.48
09.01.00 IMPACTO AMBIENTAL % 100.00 20.00 20.00 20.00 20.00 20.00
c c c c c
GLB 37,149.48 7,429.90 7,429.90 7,429.90 7,429.90 7,429.90
COSTO DIRECTO DE LA OBRA 1,363,200.90 24,759.20 17,993.63 45,213.80 42,382.44 45,501.19 44,630.94 150,893.17 184,309.42 161,100.87 97,778.71 94,618.79 120,940.82 112,600.40 34,009.89 105,296.19 81,171.43
130,349.08 425,334.72 474,439.18 333,077.91
GASTOS GENERALES (9.528144%) 129,887.75 2,359.09 1,714.46 4,308.04 4,038.26 4,335.42 4,252.50 14,377.32 17,561.27 15,349.92 9,316.50 9,015.41 11,523.42 10,728.73 3,240.51 10,032.77 7,734.13
UTILIDAD (10.00%) 136,320.09 2,475.92 1,799.36 4,521.38 4,238.24 4,550.12 4,463.09 15,089.32 18,430.94 16,110.09 9,777.87 9,461.88 12,094.08 11,260.04 3,400.99 10,529.62 8,117.14
SUBTOTAL 1,629,408.73 29,594.21 21,507.45 54,043.22 50,658.95 54,386.73 53,346.54 180,359.81 220,301.63 192,560.88 116,873.07 113,096.08 144,558.32 134,589.16 40,651.40 125,858.58 97,022.70
IGV (18%) 293,293.57 5,326.96 3,871.34 9,727.78 9,118.61 9,789.61 9,602.38 32,464.77 39,654.29 34,660.96 21,037.15 20,357.29 26,020.50 24,226.05 7,317.25 22,654.54 17,464.09

PRESUPUESTO TOTAL DE LA OBRA 1,922,702.31 34,921.17 25,378.80 63,771.00 59,777.56 64,176.34 62,948.91 212,824.58 259,955.92 227,221.84 137,910.23 133,453.37 170,578.82 158,815.21 47,968.65 148,513.13 114,486.79

GASTOS DE SUPERVISION (6.22567293%) 119,701.16 2,174.08 1,580.00 3,970.17 3,721.56 3,995.41 3,918.99 13,249.76 16,184.01 14,146.09 8,585.84 8,308.37 10,619.68 9,887.32 2,986.37 9,245.94 7,127.57
GASTOS DE MONITOREO DE SUPERVISIN Y OBRA 18,360.00 333.46 242.34 608.95 570.82 612.82 601.10 2,032.27 2,482.33 2,169.75 1,316.91 1,274.35 1,628.87 1,516.54 458.06 1,418.16 1,093.24
GASTOS DE COMISION DE ENTREGA DE TERRENO Y RECEPCION DE OBRA 1,500.00
GASTOS NOTARIALES Y ADMINISTRATIVOS 600.00
GASTOS DE PROCESO DE LICITACION DE SUPERVISOR OBRA 600.00
GASTOS DE PUBLICIDAD DE EJECUCION DE OBRA Y PROCESOS DIVERSOS 1,683.76
COSTO DE EXPEDIENTE TCNICO 20,606.25

TOTAL 163,051.17

PRESUPUESTO TOTAL 2,085,753.47 37,428.71 27,201.14 68,350.13 64,069.93 68,784.57 67,469.01 228,106.61 278,622.26 243,537.68 147,812.98 143,036.10 182,827.36 170,219.07 51,413.07 159,177.23 122,707.60
GASTOS DE COMISION DE ENTREGA DE TERRENO Y RECEPCION DE OBRA 1,500.00
GASTOS NOTARIALES Y ADMINISTRATIVOS 600.00
GASTOS DE PROCESO DE LICITACION DE SUPERVISOR OBRA 600.00
GASTOS DE PUBLICIDAD DE EJECUCION DE OBRA Y PROCESOS DIVERSOS 1,683.76
COSTO DE EXPEDIENTE TCNICO 20,606.25
TOTAL 2,085,753.47
CRONOGRAMA DE EJECUCION DE OBRAS VALORIZADO
PROYECTO : TROCHA CARROZABLE IZMO - LA FLORIDA (CONST.)
LOCALIDAD : LA FLORIDA
DISTRITO : HUACHN
COSTO DIRECTO TOTAL 214,185.43

ITEM PARTIDAS % 1 MES


COSTO 1 2 3 4
I LINEA DE CONDUCCION 00.00 LINEA DE CONDUCCION
01.00 CAPTACION MANANTIAL T-4 TIPO LADERA N 01,02 Y 03 (02 UND.) 100.00 33.33 33.33 33.33 100.00 01.00 CAPTACION MANANTIAL T-4 TIPO LADERA N 01
c c c
7077.00 2,359.00 2,359.00 2,359.00 7,077.00
02.00 CERCO PERIMETRICO CAPTACION T-4 N 01,02 Y 03 100.00 50.00 50.00 100.00 02.00 CERCO PERIMETRICO CAPTACION T-4 N 01,02
c c
4526.15 2,263.08 2,263.08 4,526.15
03.00 CAPTACION MANANTIAL TIPO LADERA T-1 N05 (01 UND.) 100.00 33.33 33.33 33.33 100.00 03.00 CAPTACION MANANTIAL TIPO LADERA T-1 N05
c c c
1737.45 579.15 579.15 579.15 1,737.45
04.00 CERCO PERIMETRICO CAPTACION T-1 N 5 100.00 50.00 50.00 50.00 04.00 CERCO PERIMETRICO CAPTACION T-1 N 5

390.94 195.47 195.47 195.47


05.00 CERCO PERIMETRICO CRP-CAPTACION N 4 100.00 50.00 50.00 100.00 05.00 CERCO PERIMETRICO CRP-CAPTACION N 4

395.26 197.63 197.63 395.26


06.00 CAJA DE REUNION DE CAUDALES (01 UND.) 100.00 100.00 06.00 CAJA DE REUNION DE CAUDALES (01 UND.)

930.34 930.34
07.00 LINEA DE CONDUCCION (3338.00 ML.) 100.00 11.11 11.11 11.11 33.33 44.44 22.22 07.00 LINEA DE CONDUCCION (3338.00 ML.)

69359.91 7,706.66 7,706.66 7,706.66 23,119.97 30,826.63 15,413.31


08.00 CAMARA ROMPE PRESION CRP-TIPO 6 (03 UND.) 100.00 75.00 25.00 08.00 CAMARA ROMPE PRESION CRP-TIPO 6 (03 UND

1843.13 1,382.35 460.78


09.00 CAJA SIFON 100.00 66.67 33.33 09.00 CAJA SIFON

3017.65 2,011.77 1,005.88


10.00 CERCO PERIMETRICO CAJA SIFON 100.00 100.00 10.00 CERCO PERIMETRICO CAJA SIFON

395.26 395.26
11.00 VALVULAS DE PURGA (01 UND.) 100.00 100.00 11.00 VALVULAS DE PURGA (01 UND.)

585.53 585.53
12.00 CRUCE DE RIO 67.00 ML. 100.00 100.00 12.00 CRUCE DE RIO 67.00 ML.

20760.42 20,760.42
13.00 CRUCE DE QUEBRADA (L=6.00 ml) 100.00 100.00 13.00 CRUCE DE QUEBRADA (L=6.00 ml)

448.55 448.55
CONDUCCION, ADUCCION Y DISTRIBUCION 14.00.00 CONDUCCION, ADUCCION Y DISTRIBUCION
13.00 CAPTACION T-1N 06 100.00 33.33 33.33 33.33 33.33 14.01.00 CAPTACION T-1N 06

1737.45 579.15 579.15 579.15 579.15


13.00 LINEA DE CONDUCCION 100.00 100.00 14.02.00 LINEA DE CONDUCCION

226.27 226.27
13.00 LINEA DE ADUCCION Y DISTRIBUCION 100.00 66.67 33.33 14.03.00 LINEA DE ADUCCION Y DISTRIBUCION

41570.97 27,713.98 13,856.99


13.00 VALVULAS DE COMPUERTAS O CONTROL 100.00 50.00 50.00 14.04.00 VALVULAS DE COMPUERTAS O CONTROL

2045.28 1,022.64 1,022.64


13.00 VALVULAS DE PURGA 100.00 50.00 50.00 14.05.00 VALVULAS DE PURGA

786.54 393.27 393.27


13.00 CONEXIONES DOMICILIARIAS 100.00 50.00 50.00 14.06.00 CONEXIONES DOMICILIARIAS

40626.84 20,313.42 20,313.42


13.00 DISEO DE MEZCLA 100.00 100.00 15.00 DISEO DE MEZCLA

500.00 500.00
13.00 FLETE 100.00 25.00 25.00 25.00 25.00 25.00 16.00 FLETE

13151.52 3,287.88 3,287.88 3,287.88 3,287.88 3,287.88


13.00 MODULO DE CAPACITACION EN AGUA POTABLE 100.00 100.00 17.00 MODULO DE CAPACITACION EN AGUA POTABLE

857.15 857.15
13.00 PLACA RECORDATORIA 100.00 100.00 18.00 PLACA RECORDATORIA

180.00 180.00
13.00 CARTEL DE OBRA MODELO FONCODES 100.00 100.00 100.00 19.00 CARTEL DE OBRA MODELO FONCODES

1035.82 1,035.82 1,035.82


214,185.43 7,261.85 10,644.81 13,105.51 10,941.98 41,954.15 60,785.80 71,534.13 39,911.35
41,954.15 214,185.43
40,319.68
O LADERA N 01,02 Y 03 (02 7,077.00

ON T-4 N 01,02 Y 03 4,526.15

DERA T-1 N05 (01 UND.) 1,737.45

ON T-1 N 5 390.94

TACION N 4 395.26

S (01 UND.) 930.34

69,359.91

TIPO 6 (03 UND.) 1,843.13

3,017.65

395.26

585.53

20,760.42

448.55

TRIBUCION
1,737.45

226.27

41,570.97

CONTROL 2,045.28
786.54

40,626.84

500.00

13,151.52

AGUA POTABLE 857.15

180.00

CODES 1,035.82